Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
August 7, 2017
6:00 PM - Meet at Ridley Creek Sewer Treatment Plant
~7:00 PM – Regular meeting at Township Building.
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting
- CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS a. Director of Public Works Report b. Pennoni Engineer's Report c. Big Fish Environmental Inc. Report
- APPROVAL OF MINUTES a. July 10, 2017
- APPROVAL OF INVOICES a. Pennoni Invoice #759081 $2,589.25 b. Pennoni Invoice #759083 $ 269.25 c. Pennoni Invoice #759084 $2,621.25 d. Gawthrop Invoice #182042 $ 940.00
- LIAISON REPORTS
- FINANCIAL REPORTS a. July Financial Report
- OLD BUSINESS a.
- GOALS a. Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, May, June,
F:\Data\Shared Data\Agendas\Municipal Authority\2017\8-07-17 .doc
b. Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively "I&I") Plan to reduce the amount of I&I into the sewer system.
c. Respond to capacity requests within 45 days.
d. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. Currently under review by staff.
e. Submit topical articles of interest for the East Goshen newsletter. May
f. Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, April, May, June, July
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER a. Discuss replacement of new probes and controller for the plant (Mark)
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2017\8-07-17 .doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 5, 2017
To: Municipal Authority
From: Mark Miller
Re: July 2017 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 719,000 gallons per day.
Meters: Meters were read on a daily basis with no problems to report
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We replaced the all the castings and lids along Reservoir Road and Meadow Drive and Hollyberry Lane.
R.C. Collection: Pump Stations were visited on a daily basis with no problems to report.
R.C. Plant: Pump Stations were visited on a daily basis with no problems to report.
Alarms: We responded to 20 alarms for July.
PA One Calls: We received 78 PA One calls in July.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
August 3, 2017
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study –
- We previously calculated the estimated caustic soda feed rate to be 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We previously recommended a 7.7-gallon/hour pump be acquired for the study. We are obtaining pricing for a larger ±19.9 gallon/hour pump as requested by the Municipal Authority in the event the recommended pump is found to be inadequate during the trial. Two 350-gallon totes should allow for a 2.5-3 week trial. We previously sent our recommendations to the plant operator for review and are awaiting a response.
- A pilot study sampling plan was previously requested from Big Fish, and we are awaiting a response.
- We provided recommendations to Public Works on the chemical feed tapping location to the influent SBR ductile iron piping including injection quill and ball valve.
- The pilot study can begin once the tap is installed and the operator provides a sampling plan and confirms the caustic soda feed rate.
- SBR tanks CIM coatings –
- We researched the history of the SBR tanks' structural design, construction, and CIM coating bubbling and peeling issues. A summary of findings and structural condition assessment testing alternatives will be provided at the August MA meeting.
Reservoir Road Pump Station
- We submitted revised plans to the Army Corps of Engineers (USACE) to address their last set of minor comments, and we are hopeful that this final permit will be issued by the end of August.
- The bid document will be finalized and submitted upon receipt of the remaining USACE permit.
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the USACE permit is issued.
RCSTP and Pump Stations' O&M Manual
- We received comments on the near-final O&M Manual submission from Mark Miller. The comments were addressed, and the Manual has been finalized. We reproduced 22 bound, hard copies for the Public Works staff and other Township staff. We recommend the Manual be revisited in one year to determine if further updates are needed.
EGMA1701
East Goshen Municipal Authority
August 3, 2017
Page 2
Engineer's Report
Supplee Valley Pipe Lining
- We reviewed several videos of the sewer mains and began prioritizing sewers for rehabilitation. Additional missing videos have been requested from the CCTV contractor so that we can complete the prioritization, scoping, and cost estimating.
New Connections
- Knauer Property, 1680 East Boot Road – We reviewed a revised plan submission for a proposed sewer connection to be installed with fewer lateral pipes at less-than-minimum slopes, and we provided comments to the Township and developer.
- Brakman Property, 1420 East Strasburg Road – We reviewed sanitary sewer shop drawings, attended a sewer pre-construction meeting, and performed construction observation of the horizontal directional drilling of the new gravity sewer main across East Strasburg Road.
West Goshen Sewer System Consultation
- We prepared and issued a Self-Liquidating Debt Certification for the portion of the upcoming bond issuance that will be used to pay East Goshen's portion of West Goshen's plant and sewer system upgrades.
P:\Projects\EGMA\Memos to Board\2017\Engineers Report 2017-08-03.docx
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2017
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of June 2017. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
The treatment process monitoring and adjustments resulted in compliance with the final effluent discharge limitations for outfall 001 during June 2017.
The total phosphorus monthly average was reported as 0.14 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.10 to 0.17 mg/L. The ammonia as nitrogen monthly concentration was reported as 0.395 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.707 mg/L. The total suspended solids (TSS) monthly concentration was reported as 2 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 3 mg/L as compared to the permit discharge limitation of 15 mg/L.
Table 1 illustrates the final effluent composite sample data reported for the June 2017 DMR. Discharge to Applebrook, Outfall 002, remained discontinued during and June and July 2017.
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2017.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 5
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2017
Table 1
June 2017 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total , mg/L mg/L | Phosphorus,Total , mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| June 6, 2017 | 0.370 | 2.0 | 6.2 | 3 | 9.3 | 0.220 | 0.68 | 0.13 | 0.40 | 1 | 0.0000 |
| June 9, 2017 | 0.277 | 3 | 6.9 | ||||||||
| June 15, 2017 | 0.286 | 2.5 | 6.0 | 3 | 7.2 | 0.171 | 0.41 | 0.40 | 0.95 | 1 | 0.0000 |
| June 20, 2017 | 0.314 | 2.0 | 5.2 | 2 | 5.2 | 0.483 | 1.26 | 0.13 | 0.34 | 1 | 0.0000 |
| June 22, 2017 | 0.291 | 0.15 | |||||||||
| June 23, 2017 | 0.343 | 0.14 | |||||||||
| June 24, 2017 | 0.366 | 0.15 | |||||||||
| June 25, 2017 | 0.279 | 0.17 | |||||||||
| June 26, 2017 | 0.300 | 0.14 | |||||||||
| June 27, 2017 | 0.301 | 2.2 | 5.5 | 1 | 2.5 | 0.707 | 1.77 | 0.10 | 0.25 | 1 | 0.0000 |
| Average | 0.313 | 2.2 | 5.7 | 2 | 6.2 | 0.395 | 1.03 | 0.17 | 0.49 | 1 | 0.0000 |
| Minimum | 0.277 | 2.0 | 5.2 | 1 | 2.5 | 0.171 | 0.41 | 0.10 | 0.25 | 1 | 0.0000 |
| Maximum | 0.370 | 2.5 | 6.2 | 3 | 9.3 | 0.707 | 1.77 | 0.40 | 0.95 | 1 | 0.0000 |
Table 2
June 2017 - Influent Wastewater
| Design Basis | Flow MGD Average | BOD5 mg/L | BOD5 lbs/day | TSS mg/L | TSS lbs/day | NH4-N mg/L | NH4-N lbs/day | TKN, mg/L mg/L | TKN, mg/L lbs/day | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/day |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| June 6, 2017 | 0.454 | 114 | 432 | 94 | 356 | 40.1 | 152 | 59.4 | 225 | 5.8 | 22.0 |
| June 15, 2017 | 0.374 | 91.9 | 348 | 246 | 932 | 51.2 | 194 | 58.3 | 182 | 7.6 | 28.8 |
| June 20, 2017 | 0.405 | 106 | 402 | 52 | 197 | 36.6 | 139 | 41.1 | 139 | 4.0 | 15.2 |
| June 27, 2017 | 0.375 | 583 | 2,209 | 1090 | 4,131 | 36.2 | 137 | 51 | 160 | 7.8 | 29.6 |
| Average | 0.402 | 224 | 848 | 371 | 1404 | 41.0 | 155 | 52.5 | 176 | 6.3 | 23.9 |
| Minimum | 0.374 | 92 | 348 | 52 | 197 | 36.2 | 137 | 41.1 | 139 | 4.0 | 15.2 |
| Maximum | 0.454 | 583 | 2209 | 1090 | 4131 | 51.2 | 194 | 59.4 | 225 | 7.8 | 29.6 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 5
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2017
Table 3 presents the available Outfall 001 final effluent data for the month as of July 25, 2017,. The facility is anticipated to achieve compliance with the discharge permit limitations during the month of July.
Table 3
July 2017 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total , mg/L mg/L | Phosphorus,Total , mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| July 6, 2017 | 0.320 | 2.0 | 5.3 | 1 | 2.7 | 0.119 | 0.32 | 0.19 | 0.51 | 1 | 0.0000 |
| July 11, 2017 | 0.263 | 2.7 | 5.9 | 4 | 8.8 | 0.135 | 0.30 | 0.21 | 0.46 | 1 | 0.0000 |
| July 18, 2017 | 0.282 | 2.0 | 4.7 | 1 | 2.4 | 0.243 | 0.57 | 0.14 | 0.33 | 1 | 0.0000 |
| July 25, 2017 | |||||||||||
| Average | 0.288 | 2.2 | 5.3 | 2 | 4.6 | 0.166 | 0.40 | 0.18 | 0.43 | 1 | 0.0000 |
| Minimum | 0.263 | 2.0 | 4.7 | 1 | 2.4 | 0.119 | 0.30 | 0.14 | 0.33 | 1 | 0.0000 |
| Maximum | 0.320 | 2.7 | 5.9 | 4 | 8.8 | 0.243 | 0.57 | 0.21 | 0.51 | 1 | 0.0000 |
During July, the presence of foam conditions on the surface of the SBRs began to decrease with foam concentrations ranging from 40% to 50% of the area. Reduction of filled decants and adjustments to the SBR dissolved oxygen control set points to ensure adequate aeration for nitrification assisted to sustain the final effluent water quality.
There are no anticipated exceedances of the permitted limitations for Outfall 001 for July 2017. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 5
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2017
Table 4
July 2017 - Influent Wastewater
| Design Basis | Flow MGD Average | BOD5 mg/L | BOD5 lbs/day | TSS mg/L | TSS lbs/day | NH4-N mg/L | NH4-N lbs/day | TKN, mg/L mg/L | TKN, mg/L lbs/day | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/day |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| July 5, 2017 | 0.392 | 243 | 794 | 222 | 726 | 35.8 | 4 | 51.4 | 168 | 6.9 | 22.6 |
| July 11, 2017 | 0.348 | 186 | 608 | 410 | 1,340 | 43.5 | 142 | 49.9 | 145 | 6.1 | 19.9 |
| July 18, 2017 | 0.357 | 111 | 363 | 56 | 183 | 42.3 | 138 | 44.7 | 133 | 5.1 | 16.7 |
| July 25, 2017 | |||||||||||
| Average | 0.366 | 180 | 588 | 229 | 750 | 40.5 | 95 | 48.7 | 149 | 6.0 | 19.7 |
| Minimum | 0.348 | 111 | 363 | 56 | 183 | 35.8 | 4 | 44.7 | 133 | 5.1 | 16.7 |
| Maximum | 0.392 | 243 | 794 | 410 | 1340 | 43.5 | 142 | 51.4 | 168 | 6.9 | 22.6 |
Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during June and July. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Significant Storm/Hydraulic Loading Events
As of July 25, 2017, there were three (3) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24 hour period. A total of 2.22 inches of rainfall measured during as of July 25th,. These events occurred on:
- July 2nd 0.50inches
- July 8th 0.51 inches
- July 14th & 15th 0.70 inches
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 5
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2017
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. The facility experienced several filled decant cycles during the rain events.
PA DEP
No activity.
Minor Repairs and Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Organized supply
Cleaned piping within SBR building
Look Ahead Preventative Maintenance Activities
Overhaul centrifuge drive gear boxes and evaluation of bearings for replacement. Gathering information for parts.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 5
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 10, 2017
The East Goshen Township Municipal Authority held their regular public meeting on Monday, July 10, 2017 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Ed McAssey, Jack Yahraes, Dana Pizzaro, Kevin Cummings and Phil Mayer. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Mark Miller (Public Works Director), Mike Ellis (Pennoni), and Anthony Verwey (Attorney).
COMMON ACRONYMS:
- BFES – Big Fish Environmental Services
- BOS – Board of Supervisors
- CB – Conservancy Board
- DEP – Department of Environmental Protection
- EPA – Environmental protection Agency
- HC – Historical Commission
- I&I – Inflow & Infiltration
- LCSTP – Lockwood Chase Sewer Treatment Plant
- MA- Municipal Authority
- NPDES – National Pollutant Discharge Elimination System
- PC – Planning Commission
- PM – Prevention Maintenance
- PR – Park & Recreation Board
- RCSTP – Ridley Creek Sewer Treatment Plant
- SBR – Sequencing Batch Reactor
- SSO – Sanitary System Overflow
- WAS – Waste Activated Sludge
Call to Order & Pledge of Allegiance
Ed called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Ed asked if anyone would be recording the meeting. There was no response.
Chairman's Report
Phil reported that West Goshen reviewed the proposed East Goshen agreement. The bond issue is closed and they should receive the funds soon. Jack mentioned that West Goshen was adopting by-laws.
Sewer Reports
1. Director of Public Works, Mark Miller's report for May:
Monthly Flows: The average daily flow to West Goshen was 801,000 gallons per day.
Meters: Meters were read on a daily basis. The new meter has been installed at the Reservoir Road location. However, we are still waiting on the modem. The portable meters are still in operation.
C.C. Collection: The pump stations were visited on a daily basis. Routine maintenance was performed. We replaced the force main manhole on Marie Road. The job went very well; we also installed a charcoal filter in the manhole to eliminate any odors. We bypassed the station. That is why we removed the old manhole. We have been owing the sewer right of ways.
R.C. Collection: Pump stations were visited on a daily basis. Routine maintenance was performed. We completed the paving overlay of the pump station. The neighbor called to thank us for all the work that was done. We had a sewer clog on Beaumont Circle. The clog was caused by roots in the cleanout. Our guys were able to grab the root ball with mechanical spoons. We flushed the lateral to make sure the line was cleared.
MA 7-10-17 draft
1
R.C. Plant: The security system installation is underway. We had to fabricate a pole in order to get a view of the four SBRs. As I stated last month, the team that Scott has in place has been doing a good job.
Alarms: We responded to 21 alarms for June.
PA One Calls: We received 60 PA One calls for June.
2. Pennoni Engineer's Report for June
Mike Ellis provided the following report.
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study –
- There was a significant difference between the jar testing in May and the equivalent caustic soda quantity of soda ash currently being used. We revisited and calculated the estimated caustic soda demand for the pilot study. We are estimating that caustic soda should be fed at 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We recommend a 7.7-gallon/hour pump be acquired for the study. Two 350-gallon totes will allow for a 2.5-3 week trial. We have sent our recommendations to the plant operator for review.
- A pilot study sampling plan has been requested from Big Fish.
- Our intent is to begin the pilot study by the week of July 24th.
- SBR tanks CIM coatings –
- We provided a summary narrative of the SBR tanks' CIM coating bubbling and peeling issues to Supervisor Battavio as an update to the Board of Supervisors. The narrative described that which was discussed at the June Municipal Authority meeting.
Reservoir Road Pump Station
- PADEP issued the State Water Obstruction and Encroachment Permit for the pump station site and Chester Creek utility crossing in June 2016; however, they are requiring a separate federal authorization by the Army Corps of Engineers (ACOE). Due to lack of coordination between PADEP and ACOE, we have had to initiate an application process directly with the ACOE. The ACOE provided lengthy comments and questions on May 5, 2017, including items outside the scope of the Chester Creek encroachment permit application before them such as work at the Ridley Creek, that we are in the process of addressing.
We have continued to address those comments including attending a site walk with Mr. Dave Caplan of the ACOE, obtained confirmation from USFWS that the previous approval of the bog turtle habitat study and exclusionary measures remains valid, obtained a finding of "no impact" from PA Fish & Boat Commission in response to the new PNDI potential endangered species impact, revised plans, and submitted supplemental documentation to the ACOE. We expect to submit the revised plans to ACOE by July 14, 2017, and we are hopeful that this final permit will be issued 30-60 days thereafter.
MA 7-10-17 draft | 2
- The bid document will be finalized and submitted upon receipt of the remaining ACOE permit.
- We will complete a listing of the permits, expiration dates, and renewal deadlines once the ACOE permit is issued.
RCSTP and Pump Stations' O&M Manual
- We have briefly discussed the near-final O&M Manual submission with Mark Miller, and we performed a field visit to the Hunt Country Pump Station to document equipment. We request a budget supplement to conduct a review meeting with Mr. Miller, make edits, incorporate any available information into the Manual to fill in blanks, and produce hard copy sets for use by the PW Department staff.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last meeting
3. Big Fish Environmental Services
Scott's report for June showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of May 2017. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Jack asked about the discharge to Applebrook. Mark confirmed that it just started the end of June.
Approval of Minutes
The minutes of the June 12, 2017 meeting were approved.
Approval of Invoices
1. Phil moved to approve payment of the following Pennoni invoices:
- a. Pennoni #754474 $2,726.00
- b. Pennoni #754475 $ 89.25
- c. Pennoni #754476 $ 1,904.00
Jack seconded the motion. The motion passed unanimously.
2. Jack moved to approve payment of Pennoni invoice #754474 in the amount of $1,173.50 and approve Pennoni's request for a supplement of $3,000 to the original budget of $12,500 for the O&M Manual. Phil seconded the motion. The motion passed unanimously.
3. Kevin moved to approve payment of the following Delaware River Basin invoices:
- a. #2101 $610.00
- b. #2181 $610.00
Jack seconded the motion. The motion passed unanimously.
MA 7-10-17 draft | 3
Liaison Report
Board of Supervisors – At the public meeting on June 27, 2017 at Fugett Middle School, Emergency services had a simulated event to show where each level of EMS kicks in. Carmen pointed out that the BOS decided not to fight Sunoco. He will ask Sunoco to check the wells near Matlack Florist again.
Financial Reports
Jon Altshul provided the following written report:
In June 2017, the Municipal Authority recorded $843.89 in interest income and $18,341.50 in expenses for a negative variance of $17,497.61. Expenses included $2,805 for general engineering, $3,363 for legal services, $1,220 for Delaware River Basin Commission, $2,083 for engineering costs related to the Reservoir Road Pump Station and $1,146 for Pennoni in support of the West Goshen project.
As of June 30, the fund balance was $1,181,977 of which $1,144,516 is in the main construction account (most of which represents the 2013 note.)
The competitive bond sale is scheduled for Tuesday, July 11th at 11 am. I will provide information of the results shortly thereafter.
Goals
Goals for 2017 were reviewed.
New Business
Supplee Valley Slip Lining & Manhole Lining – Mark mentioned that $100,000 was budgeted for this year. Mark is requesting $7,000 to have Mike prepare the bid documents for this project. Mike explained what needs to be done. Jack moved to authorize funds not to exceed $7,000 to prepare bid documents for the Supplee Valley Slip Lining & Manhole Lining project. Dana seconded the motion. The motion passed unanimously.
Adjournment
The meeting was adjourned at 7:40 p.m. The Municipal Authority went into executive session. The next meeting will be held on Monday, August 14, 2017 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 7-10-17 draft | 4
Pennoni INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 759081
Invoice Date : 07/27/2017
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting
For Services Rendered through: 7/16/2017
Army Corps of Engineers (ACOE) permitting work in response to ACOE comments: attended field meeting with ACOE to pump station site and along force main alignment, obtained PA Fish & Boat Commission clearance re-confirmation, measured ordinary high water at Ridley Creek, submitted revised plans and comment response letter to ACOE, and responded to their follow-up questions.
Phase : 12 -- Permitting
| Total Phase : 12 -- Permitting | Amount |
|---|---|
| Labor : | 2,589.25 |
| Expense : | 0.00 |
| Phase Total : | 2,589.25 |
| Amount Due This Invoice | $2,589.25 |
Phase : 12 -- Permitting
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.25 | 119.00 | 505.75 |
| Sr. Environmental Scientist | 13.50 | 101.00 | 1,363.50 |
| Graduate Professional | 9.00 | 80.00 | 720.00 |
| Labor Total: | 26.75 | 2,589.25 |
| Summary | Type | Amount |
|---|---|---|
| Total Phase : 12 -- Permitting | Labor : | $2,589.25 |
| Total Phase : 12 -- Permitting | Expense : | $0.00 |
| Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting | Labor : | $2,589.25 |
| Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting | Expense : | $0.00 |
ok RS 8-4-17
[Signature]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 7/27/2017
| Field | Value |
|---|---|
| Project: | EGMA1504 |
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting |
| Invoice No: | 759081 |
| Invoice Period: | 6/19/2017 to 7/16/2017 |
| Date: | 7/27/2017 |
| Initial Authorization: | $ 167,120.00 |
| Contract Amount: | $ 193,200.00 |
| Previously Invoiced: | $ 189,762.00 |
| Current Invoice: | $ 2,589.25 |
| Invoiced to Date ($): | $ 192,351.25 |
| Invoiced to Date (%): | 99.56% |
| Remaining Budget ($): | $ 848.75 |
| Remaining Budget (%): | 0.44% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | Permitting (Phase 12) |
| Phase Budget: | $ 50,940.25 |
| Previously Invoiced: | $ 47,759.00 |
| Current Invoice: | $ 2,589.25 |
| Invoiced to Date ($): | $ 50,348.25 |
| Invoiced to Date (%): | 98.84% |
| Remaining Budget ($): | $ 592.00 |
| Remaining Budget (%): | 1.16% |
Comments: Army Corps of Engineers (ACOE) permitting work in response to ACOE comments: attended field meeting with ACOE to pump station site and along force main alignment, obtained PA Fish & Boat Commission clearance re-confirmation, measured ordinary high water at Ridley Creek, submitted revised plans and comment response letter to ACOE, and responded to their follow-up questions.
Reservoir Road Pump Station Design & Permitting
INVOICE SUMMARY
For Services Rendered through: 7/16/2017
| Task No. | Activity | Contract Amount* | Invoiced Effort thru 3/19/2017 | Remaining Budget ($) | Remaining Budget (%) | Completed? |
|---|---|---|---|---|---|---|
| 1 | Concept Design | $13,655.75 | $13,655.75 | - | - | Yes |
| 2 | DEP WQM Pre-App. Meeting | $1,300.00 | $1,300.00 | - | - | Yes |
| 3 | Existing Conditions Survey | $22,783.75 | $22,783.75 | - | - | Yes |
| 4 | Sewer Stakeout in Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 5 | 1636 Bow Tree Dr. Boundary Survey & Easement | $4,020.00 | $4,020.00 | - | - | Yes |
| 6 | Additional Boundary Surveys & Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 7 | Geotechnical Borings | $4,000.00 | $4,000.00 | - | - | Yes |
| 8 | Install Permanent Survey Benchmarks | $0.00 | $0.00 | - | - | Scope eliminated |
| 9 | Progress Design | $29,450.00 | $29,450.00 | - | - | Yes |
| 10 | Infiltration Testing | $1,800.00 | $1,800.00 | - | - | Yes |
| 11 | Final Design | $65,170.25 | $64,993.50 | $176.75 | 0.3% | No** |
| 12 | Permitting | $50,940.25 | $50,348.50 | $591.75 | 1% | No*** |
| TOTAL | $193,120.00 | $192,351.50 | $768.50 | 0.4% |
*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.
**Need to complete Bid Form and assemble full bid document package for Township once remaining permits are issued.
*** All permit applications have been submitted, and we are awaiting issuance of one remaining permit: Army Corps of Engineers federal authorization on the Chester Creek Small Projects Joint Permit.
Pennoni INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 759083
Invoice Date : 07/27/2017
Project : EGMA1608
Project Name : West Goshen Sewer System Consultati
For Services Rendered through: 7/16/2017
Initiated financial analysis and preparation of self-liquidating debt certification report for portion of bond issuance for the Municipal Authority's 2017-2020 West Goshen Sewer System Upgrade costs.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Amount |
|---|---|
| Labor : | 269.25 |
| Expense : | 0.00 |
| Phase Total : | 269.25 |
| Amount Due This Invoice | $269.25 |
| Billing Summary | Amount |
|---|---|
| Fee : | 5,000.00 |
| Prior Billings : | 2,444.75 |
| Current Billings : | 269.25 |
| Total Billings : | 2,714.00 |
Phase : **** -- Professional Services
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 119.00 | 89.25 |
| Graduate Professional | 2.25 | 80.00 | 180.00 |
| Labor Total: | 3.00 | 269.25 |
| Summary | Type | Amount |
|---|---|---|
| Total Phase : **** -- Professional Services | Labor : | $269.25 |
| Total Phase : **** -- Professional Services | Expense : | $0.00 |
| Total Project : EGMA1608 -- West Goshen Sewer System Consultati | Labor : | $269.25 |
| Total Project : EGMA1608 -- West Goshen Sewer System Consultati | Expense : | $0.00 |
ok RS 8-4-17
[Signature]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1608 Invoice Summary
Invoice Date 7/27/2017
| Field | Value |
|---|---|
| Project: | EGMA1608 |
| Pennoni Job No.: | West Goshen Sewer System Consultation |
| Invoice No: | 759083 |
| Invoice Period: | 5/15/2017 to 7/16/2017 |
| Date: | 7/27/2017 |
| Initial Authorization: | $ 5,000.00 |
| Contract Amount: | $ 5,000.00 |
| Previously Invoiced: | $ 2,444.75 |
| Current Invoice: | $ 269.25 |
| Invoiced to Date ($): | $ 2,714.00 |
| Invoiced to Date (%): | 54% |
| Remaining Budget ($): | $ 2,286.00 |
| Remaining Budget (%): | 46% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | West Goshen Sewer System Consultation |
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ 2,444.75 |
| Current Invoice: | $ 269.25 |
| Invoiced to Date ($): | $ 2,714.00 |
| Invoiced to Date (%): | 54% |
| Remaining Budget ($): | $ 2,286.00 |
| Remaining Budget (%): | 46% |
Comments: Initiated financial analysis and preparation of self-liquidating debt certification report for portion of bond issuance for the Municipal Authority's 2017-2020 West Goshen Sewer System Upgrade costs.
Pennoni INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 759084
Invoice Date : 07/27/2017
Project : EGMA1701
Project Name : 2017 General Services
For Services Rendered through: 7/16/2017
Prepared July Engineer's Report, reviewed July RCSTP operator's report, and attended July MA meeting.
RCSTP SBR Tanks CIM Coatings - Reviewed documentation on history of coatings including installation rationale, correspondence, deficiencies, and warranty information provided by Township Manager; located additional documentation in Pennoni files; and initiated further research and preparation of concrete condition assessment recommendations by structural staff as requested at July MA meeting.
RCSTP Caustic Soda Pilot Study - Calculated expected caustic soda demand, feed rate, and trial quantity and recommended chemical feed rate and pump selection; emailed recommendations to plant operator for review; field visit to plant to identify if any spares pumps would work (determined they will not); and evaluated operator's questions about chemical feeding during fill-decant phase.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Amount |
|---|---|
| Labor : | 2,621.25 |
| Expense : | 0.00 |
| Phase Total : | 2,621.25 |
| Amount Due This Invoice | $2,621.25 |
| Billing Summary | Amount |
|---|---|
| Fee : | 12,700.00 |
| Prior Billings : | 9,894.75 |
| Current Billings : | 2,621.25 |
| Total Billings : | 12,516.00 |
ok RS 8-4-17
[Signature]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1701 -- 2017 General Services | Invoice # : 759084
...Continued from previous page
Phase : **** -- Professional Services
| Labor Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 10.25 | 119.00 | 1,219.75 |
| Senior Professional | 11.00 | 114.00 | 1,254.00 |
| Senior Engineering Technician | 1.50 | 87.00 | 130.50 |
| Technician I | 0.25 | 68.00 | 17.00 |
| Labor Total: | 23.00 | 2,621.25 |
| Summary | Type | Amount |
|---|---|---|
| Total Phase : **** -- Professional Services | Labor : | $2,621.25 |
| Total Phase : **** -- Professional Services | Expense : | $0.00 |
| Total Project : EGMA1701 -- 2017 General Services | Labor : | $2,621.25 |
| Total Project : EGMA1701 -- 2017 General Services | Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. | Page: 2
East Goshen Municipal Authority
EGMA1701 Invoice Summary
Invoice Date 7/27/2017
| Field | Value |
|---|---|
| Project: | EGMA1701 |
| Pennoni Job No.: | 2017 General Services |
| Invoice No: | 759084 |
| Invoice Period: | 6/19/2017 to 7/16/2017 |
| Date: | 7/27/2017 |
| Initial Authorization: | $ 12,700.00 |
| Contract Amount: | $ 12,700.00 |
| Previously Invoiced: | $ 9,894.75 |
| Current Invoice: | $ 2,621.25 |
| Invoiced to Date ($): | $ 12,516.00 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 184.00 |
| Remaining Budget (%): | 1% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | 2017 General Services |
| Phase Budget: | $ 12,700.00 |
| Previously Invoiced: | $ 9,894.75 |
| Current Invoice: | $ 2,621.25 |
| Invoiced to Date ($): | $ 12,516.00 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 184.00 |
| Remaining Budget (%): | 1% |
Comments: Prepared July Engineer's Report, reviewed June RCSTP operator's report, and attended July MA meeting.
RCSTP SBR Tanks CIM Coatings - Reviewed documentation on history of coatings including installation rationale, correspondence, deficiencies, and warranty information provided by Township Manager; located additional documentation in Pennoni files; and initiated further research and preparation of concrete condition assessment recommendations by structural staff as requested at July MA meeting.
RCSTP Caustic Soda Pilot Study - Calculated expected caustic soda demand, feed rate, and trial quantity and recommended chemical feed rate and pump selection; emailed recommendations to plant operator for review; field visit to plant to identify if any spares pumps would work (determined they will not); and evaluated operator's questions about chemical feeding during fill-decant phase.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
07/06/2017
Client No: 6604-001R
Invoice No. 182042
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 06/01/2017 | PMM | Email from R Smith regarding agreement with West Goshen. | 0.20 | |
| 06/07/2017 | PMM | Emails from R Unruh and R Smith regarding agreement with West Goshen. | 0.30 | |
| 06/08/2017 | PMM | Emails (5) from R Unruh and R Smith regarding agreement with West Goshen. | 0.60 | |
| 06/12/2017 | PMM | Review and analyze meeting packet in preparation for Authority meeting; Attend Authority meeting; Email to R Unruh regarding approval of agreement with West Goshen. | 2.40 | |
| 06/15/2017 | PMM | Letter to R Smith regarding recorded NPDES permit. | 0.20 | |
| 06/23/2017 | PMM | Emails from R Smith and R Unruh regarding approval of Sewer Agreement. | 0.20 | |
| 06/29/2017 | PMM | Emails to/from R Smith and M Ellis regarding Dutchland. | 0.40 | |
| 06/30/2017 | PMM | Emails from/to R Smith regarding Dutchland. | 0.40 | |
| For Current Services Rendered | 4.70 | 940.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 4.70 | $200.00 | $940.00 |
East Goshen Municipal Authority
Page: 2
07/06/2017
Client No: 6604-001R
Invoice No. 182042
General Authority Services
| Date | Description | Amount |
|---|---|---|
| Previous Balance | $1,640.00 | |
| Total Current Charges | 940.00 | |
| 06/23/2017 | Payment | -1,640.00 |
| Balance Due | $940.00 |
7-13-17
OK TO PAY
[Signature] Rick
To MA
THIS HAS BEEN PAID
[Signature] Rick
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA July Financial Report
Date: August 3, 2017
In July, the Municipal Authority recorded $5,982 in interest income (mostly from a $5,000 transfer from the sewer fund) and $5,893 in expenses, for a positive variance of $90. Expenses included $3,167 for general engineering and $2,726 for Reservoir Road Pump Station engineering.
As of June 30th, the fund balance was $1,182,067 of which $1,142,761 is in the main construction account (most of which represents the 2013 note).
The July 11th bond sale was very successful. Six investment banks made 59 bids on the bonds over the course of 30 minutes. The low bid came from Janney Montgomery Scott with a yield (effective interest rate) of 2.778%. The closing will occur on August 15th, at which point the funds will be wired to the bank. I have attached a copy of the bond sale document for your review.
The bonds sold at a slight "premium", meaning that we received more in proceeds than the face value of the bonds. As a result, there is $2,891,009 is available for West Goshen projects, plus the balance of the 2013 notes or about $4.29 million total ($212,486 was already paid to West Goshen for the project two months ago, meaning that after the closing there will be a little over $4 million in funds remaining).
Getting a bit into the weeds, unlike past DelVal notes, these bonds were issued by the Township rather than by the Municipal Authority. Therefore, the money will be accounted for separately from other MA assets. However, as part of the monthly reports moving forward, I will provide a drawdown schedule for the West Goshen project that includes both the 2013 notes and the 2017 bonds.
Also, note that we are in the process of moving the balance of the MA operating account from BB&T to M&T. This move is long overdue, as M&T has been the primary Township depository for six years. Consolidating as many accounts with M&T as possible will make doing transfers from the Sewer Fund to the MA much easier and will simplify our bank relationships, which until very recently were unwieldy.
East Goshen Township
BOND SALE DOCUMENT
General Obligation Bonds
Series of 2017
Results of Competitive Sale
$8,150,000
July 11, 2017
(Parameters Ordinance enacted on June 6, 2017)
Prepared by:
Chris Bamber, CFA
Senior Managing Consultant
pfm
PFM Financial Advisors LLC
2533 Yellow Springs Road
Malvern, PA 19355
717.232.2723 (P)
717.232.8610 (F)
www.pfm.com
EAST GOSHEN TOWNSHIP
(Chester County, Pennsylvania)
General Obligation Bonds, Series of 2017
July 11, 2017
| 1 Bidder | 2 True Interest Cost | 3 Bond Discount | 4 Interest Rate Range* | 5 Number of Bids |
|---|---|---|---|---|
| 1. Janney Montgomery Scott | 2.778404 | 6.00 | 1.000-4.000 | 9 |
| 2. FTN Financial | 2.783790 | Unavailable | 2.000-3.250 | 20 |
| 3. PNC Capital Markets | 2.911166 | 10.00 | 2.000-3.125 | 4 |
| 4. UBS Financial Services | 2.923795 | 10.25 | 2.000-5.000 | 20 |
| 5. Robert Baird | 2.989755 | 14.43 | 2.000-3.300 | 1 |
| 6. Raymond James | 2.997369 | Unavailable | 3.000-3.250 | 5 |
| TOTAL | 59 |
Based on Preliminary Issue Size of $8,240,000*
*2018 through 2037 (Series of 2017)
- Moody's: Aaa (Stable Outlook) Bid Alone
- Moody's: Aaa (Stable Outlook) Bid Alone
- Moody's: Aaa (Stable Outlook) Bid Alone
- Moody's: Aaa (Stable Outlook) Bid Alone
- Moody's: Aaa (Stable Outlook) Bid Alone
- Moody's: Aaa (Stable Outlook) Bid Alone
PAYING AGENT:
Manufacturers & Traders Trust Company
OPTIONAL REDEMPTION DATE:
10/1/22 @ PAR
7
EAST GOSHEN TOWNSHIP
Summary of Financing Structure
| 1 SOURCES |
2 GENERAL FUND |
3 SEWER FUND |
4 TOTAL |
|---|---|---|---|
| Series of 2017 Bonds | 5,310,000.00 | 2,840,000.00 | 8,150,000.00 |
| Net Original Issue Premium | 13,257.05 | 51,008.85 | 64,265.90 |
| Trail Grants [1] | 3,072,400.00 | 3,072,400.00 | |
| Park Grants [1] | 475,000.00 | 475,000.00 | |
| Dam Grants [1] | 500,000.00 | 500,000.00 | |
| Sewer Grants & Existing Proceeds [1] | 1,398,333.33 | 1,398,333.33 | |
| TOTAL SOURCES | 9,370,657.05 | 4,289,342.18 | 13,659,999.23 |
| 5 USES |
6 GENERAL FUND |
7 SEWER FUND |
8 TOTAL |
|---|---|---|---|
| Paoli Pike Trail [1] | 5,197,359.00 | 5,197,359.00 | |
| Park Master Plan [1] | 751,562.00 | 751,562.00 | |
| Milltown & Hershey Dams [1] | 3,341,760.00 | 3,341,760.00 | |
| West Goshen WTP Upgrades [1] | 4,244,376.60 | 4,244,376.60 | |
| Costs of Issuance | 77,061.50 | 41,588.50 | 118,650.00 |
| Misc. Expenses/Rounding | 2,914.55 | 3,377.09 | 6,291.63 |
| TOTAL USES | 9,370,657.05 | 4,289,342.18 | 13,659,999.23 |
[1] Estimated per Township
PFM Financial Advisors LLC
10
EAST GOSHEN TOWNSHIP — GENERAL FUND PORTION
Series of 2017 — General Fund Pro-Rata
Settle: 8/15/2017 | Dated: 8/15/2017
| 1 Date | 2 Principal | 3 Coupon | 4 Yield | 5 Interest | 6 Semi-Annual Debt Service | 7 Fiscal Year Debt Service | 8 Existing Non-Electoral Debt Service | 9 Total Non-Electoral Debt Service |
|---|---|---|---|---|---|---|---|---|
| 10/1/2017 | 18,182.78 | 18,182.78 | 18,182.78 | 557,532.73 | 575,715.50 | |||
| 4/1/2018 | 71,150.00 | 71,150.00 | ||||||
| 10/1/2018 | 5,000 | 1.000 | 1.000 | 71,150.00 | 76,150.00 | 147,300.00 | 560,339.79 | 707,639.79 |
| 4/1/2019 | 71,125.00 | 71,125.00 | ||||||
| 10/1/2019 | 5,000 | 3.000 | 1.100 | 71,125.00 | 76,125.00 | 147,250.00 | 559,161.73 | 706,411.73 |
| 4/1/2020 | 71,050.00 | 71,050.00 | ||||||
| 10/1/2020 | 5,000 | 4.000 | 1.190 | 71,050.00 | 76,050.00 | 147,100.00 | 556,137.91 | 703,237.91 |
| 4/1/2021 | 70,950.00 | 70,950.00 | ||||||
| 10/1/2021 | 5,000 | 4.000 | 1.270 | 70,950.00 | 75,950.00 | 146,900.00 | 557,224.68 | 704,124.68 |
| 4/1/2022 | 70,850.00 | 70,850.00 | ||||||
| * 10/1/2022 | 5,000 | 4.000 | 1.450 | 70,850.00 | 75,850.00 | 146,700.00 | 529,011.80 | 675,711.80 |
| 4/1/2023 | 70,750.00 | 70,750.00 | ||||||
| 10/1/2023 | 5,000 | 2.000 | 1.600 * * | 70,750.00 | 75,750.00 | 146,500.00 | 530,164.73 | 676,664.73 |
| 4/1/2024 | 70,700.00 | 70,700.00 | ||||||
| 10/1/2024 | 320,000 | 2.000 | 1.750 * * | 70,700.00 | 390,700.00 | 461,400.00 | 461,400.00 | |
| 4/1/2025 | 67,500.00 | 67,500.00 | ||||||
| 10/1/2025 | 330,000 | 2.000 | 1.900 * * | 67,500.00 | 397,500.00 | 465,000.00 | 465,000.00 | |
| 4/1/2026 | 64,200.00 | 64,200.00 | ||||||
| 10/1/2026 | 335,000 | 2.000 | 2.100 | 64,200.00 | 399,200.00 | 463,400.00 | 463,400.00 | |
| 4/1/2027 | 60,850.00 | 60,850.00 | ||||||
| 10/1/2027 | 340,000 | 2.125 | 2.200 | 60,850.00 | 400,850.00 | 461,700.00 | 461,700.00 | |
| 4/1/2028 | 57,237.50 | 57,237.50 | ||||||
| 10/1/2028 | 350,000 | 2.250 | 2.350 | 57,237.50 | 407,237.50 | 464,475.00 | 464,475.00 | |
| 4/1/2029 | 53,300.00 | 53,300.00 | ||||||
| 10/1/2029 | 355,000 | 2.500 | 2.500 | 53,300.00 | 408,300.00 | 461,600.00 | 461,600.00 | |
| 4/1/2030 | 48,862.50 | 48,862.50 | ||||||
| 10/1/2030 | 365,000 | 3.000 | 2.600 * * | 48,862.50 | 413,862.50 | 462,725.00 | 462,725.00 | |
| 4/1/2031 | 43,387.50 | 43,387.50 | ||||||
| 10/1/2031 | 375,000 | 3.000 | 2.750 * * | 43,387.50 | 418,387.50 | 461,775.00 | 461,775.00 | |
| 4/1/2032 | 37,762.50 | 37,762.50 | ||||||
| 10/1/2032 | 390,000 | 3.000 | 2.800 * * | 37,762.50 | 427,762.50 | 465,525.00 | 465,525.00 | |
| 4/1/2033 | 31,912.50 | 31,912.50 | ||||||
| 10/1/2033 | 400,000 | 3.000 | 2.850 * * | 31,912.50 | 431,912.50 | 463,825.00 | 463,825.00 | |
| 4/1/2034 | 25,912.50 | 25,912.50 | ||||||
| 10/1/2034 | 410,000 | 3.000 | 2.900 * * | 25,912.50 | 435,912.50 | 461,825.00 | 461,825.00 | |
| 4/1/2035 | 19,762.50 | 19,762.50 | ||||||
| 10/1/2035 | 425,000 | 3.000 | 2.950 * * | 19,762.50 | 444,762.50 | 464,525.00 | 464,525.00 | |
| 4/1/2036 | 13,387.50 | 13,387.50 | ||||||
| 10/1/2036 | 435,000 | 3.000 | 3.050 | 13,387.50 | 448,387.50 | 461,775.00 | 461,775.00 | |
| 4/1/2037 | 6,862.50 | 6,862.50 | ||||||
| 10/1/2037 | 450,000 | 3.050 | 3.100 | 6,862.50 | 456,862.50 | 463,725.00 | 463,725.00 | |
| TOTALS | 5,310,000 | 2,073,207.78 | 7,383,207.78 | 7,383,207.78 | 3,849,573.37 | 11,232,781.14 |
* Optional redemption date of October 1, 2022
* * Yield to optional redemption date
Public Financial Management, Inc. 7/11/2017 — Page 11
EAST GOSHEN TOWNSHIP — SEWER FUND PORTION
Series of 2017 — Sewer Fund Pro-Rata
Settle: 8/15/2017 | Dated: 8/15/2017
| 1 Date | 2 Principal | 3 Coupon | 4 Yield | 5 Interest | 6 Semi-Annual Debt Service | 7 Fiscal Year Debt Service |
|---|---|---|---|---|---|---|
| 10/1/2017 | 10,227.17 | 10,227.17 | 10,227.17 | |||
| 4/1/2018 | 40,019.38 | 40,019.38 | ||||
| 10/1/2018 | 20,000 | 1.000 | 1.000 | 40,019.38 | 60,019.38 | 100,038.75 |
| 4/1/2019 | 39,919.38 | 39,919.38 | ||||
| 10/1/2019 | 115,000 | 3.000 | 1.100 | 39,919.38 | 154,919.38 | 194,838.75 |
| 4/1/2020 | 38,194.38 | 38,194.38 | ||||
| 10/1/2020 | 120,000 | 4.000 | 1.190 | 38,194.38 | 158,194.38 | 196,388.75 |
| 4/1/2021 | 35,794.38 | 35,794.38 | ||||
| 10/1/2021 | 120,000 | 4.000 | 1.270 | 35,794.38 | 155,794.38 | 191,588.75 |
| 4/1/2022 | 33,394.38 | 33,394.38 | ||||
| * 10/1/2022 | 125,000 | 4.000 | 1.450 | 33,394.38 | 158,394.38 | 191,788.75 |
| 4/1/2023 | 30,894.38 | 30,894.38 | ||||
| 10/1/2023 | 130,000 | 2.000 | 1.600 * * | 30,894.38 | 160,894.38 | 191,788.75 |
| 4/1/2024 | 29,594.38 | 29,594.38 | ||||
| 10/1/2024 | 135,000 | 2.000 | 1.750 * * | 29,594.38 | 164,594.38 | 194,188.75 |
| 4/1/2025 | 28,244.38 | 28,244.38 | ||||
| 10/1/2025 | 135,000 | 2.000 | 1.900 * * | 28,244.38 | 163,244.38 | 191,488.75 |
| 4/1/2026 | 26,894.38 | 26,894.38 | ||||
| 10/1/2026 | 140,000 | 2.000 | 2.100 | 26,894.38 | 166,894.38 | 193,788.75 |
| 4/1/2027 | 25,494.38 | 25,494.38 | ||||
| 10/1/2027 | 145,000 | 2.125 | 2.200 | 25,494.38 | 170,494.38 | 195,988.75 |
| 4/1/2028 | 23,953.75 | 23,953.75 | ||||
| 10/1/2028 | 145,000 | 2.250 | 2.350 | 23,953.75 | 168,953.75 | 192,907.50 |
| 4/1/2029 | 22,322.50 | 22,322.50 | ||||
| 10/1/2029 | 150,000 | 2.500 | 2.500 | 22,322.50 | 172,322.50 | 194,645.00 |
| 4/1/2030 | 20,447.50 | 20,447.50 | ||||
| 10/1/2030 | 155,000 | 3.000 | 2.600 * * | 20,447.50 | 175,447.50 | 195,895.00 |
| 4/1/2031 | 18,122.50 | 18,122.50 | ||||
| 10/1/2031 | 160,000 | 3.000 | 2.750 * * | 18,122.50 | 178,122.50 | 196,245.00 |
| 4/1/2032 | 15,722.50 | 15,722.50 | ||||
| 10/1/2032 | 160,000 | 3.000 | 2.800 * * | 15,722.50 | 175,722.50 | 191,445.00 |
| 4/1/2033 | 13,322.50 | 13,322.50 | ||||
| 10/1/2033 | 165,000 | 3.000 | 2.850 * * | 13,322.50 | 178,322.50 | 191,645.00 |
| 4/1/2034 | 10,847.50 | 10,847.50 | ||||
| 10/1/2034 | 170,000 | 3.000 | 2.900 * * | 10,847.50 | 180,847.50 | 191,695.00 |
| 4/1/2035 | 8,297.50 | 8,297.50 | ||||
| 10/1/2035 | 175,000 | 3.000 | 2.950 * * | 8,297.50 | 183,297.50 | 191,595.00 |
| 4/1/2036 | 5,672.50 | 5,672.50 | ||||
| 10/1/2036 | 185,000 | 3.000 | 3.050 | 5,672.50 | 190,672.50 | 196,345.00 |
| 4/1/2037 | 2,897.50 | 2,897.50 | ||||
| 10/1/2037 | 190,000 | 3.050 | 3.100 | 2,897.50 | 192,897.50 | 195,795.00 |
| TOTALS | 2,840,000 | 950,327.17 | 3,790,327.17 | 3,790,327.17 |
* Optional redemption date of October 1, 2022
* * Yield to optional redemption date
Public Financial Management, Inc. 7/11/2017 — Page 12
EAST GOSHEN TOWNSHIP — OVERALL AMORTIZATION
Series of 2017 — Overall Amortization
Settle: 8/15/2017 | Dated: 8/15/2017
| 1 Date | 2 Principal | 3 Coupon | 4 Yield | 5 Interest | 6 Semi-Annual Debt Service | 7 Fiscal Year Debt Service |
|---|---|---|---|---|---|---|
| 10/1/2017 | 28,409.95 | 28,409.95 | 28,409.95 | |||
| 4/1/2018 | 111,169.38 | 111,169.38 | ||||
| 10/1/2018 | 25,000 | 1.000 | 1.000 | 111,169.38 | 136,169.38 | 247,338.75 |
| 4/1/2019 | 111,044.38 | 111,044.38 | ||||
| 10/1/2019 | 120,000 | 3.000 | 1.100 | 111,044.38 | 231,044.38 | 342,088.75 |
| 4/1/2020 | 109,244.38 | 109,244.38 | ||||
| 10/1/2020 | 125,000 | 4.000 | 1.190 | 109,244.38 | 234,244.38 | 343,488.75 |
| 4/1/2021 | 106,744.38 | 106,744.38 | ||||
| 10/1/2021 | 125,000 | 4.000 | 1.270 | 106,744.38 | 231,744.38 | 338,488.75 |
| 4/1/2022 | 104,244.38 | 104,244.38 | ||||
| * 10/1/2022 | 130,000 | 4.000 | 1.450 | 104,244.38 | 234,244.38 | 338,488.75 |
| 4/1/2023 | 101,644.38 | 101,644.38 | ||||
| 10/1/2023 | 135,000 | 2.000 | 1.600 * * | 101,644.38 | 236,644.38 | 338,288.75 |
| 4/1/2024 | 100,294.38 | 100,294.38 | ||||
| 10/1/2024 | 455,000 | 2.000 | 1.750 * * | 100,294.38 | 555,294.38 | 655,588.75 |
| 4/1/2025 | 95,744.38 | 95,744.38 | ||||
| 10/1/2025 | 465,000 | 2.000 | 1.900 * * | 95,744.38 | 560,744.38 | 656,488.75 |
| 4/1/2026 | 91,094.38 | 91,094.38 | ||||
| 10/1/2026 | 475,000 | 2.000 | 2.100 | 91,094.38 | 566,094.38 | 657,188.75 |
| 4/1/2027 | 86,344.38 | 86,344.38 | ||||
| 10/1/2027 | 485,000 | 2.125 | 2.200 | 86,344.38 | 571,344.38 | 657,688.75 |
| 4/1/2028 | 81,191.25 | 81,191.25 | ||||
| 10/1/2028 | 495,000 | 2.250 | 2.350 | 81,191.25 | 576,191.25 | 657,382.50 |
| 4/1/2029 | 75,622.50 | 75,622.50 | ||||
| 10/1/2029 | 505,000 | 2.500 | 2.500 | 75,622.50 | 580,622.50 | 656,245.00 |
| 4/1/2030 | 69,310.00 | 69,310.00 | ||||
| 10/1/2030 | 520,000 | 3.000 | 2.600 * * | 69,310.00 | 589,310.00 | 658,620.00 |
| 4/1/2031 | 61,510.00 | 61,510.00 | ||||
| 10/1/2031 | 535,000 | 3.000 | 2.750 * * | 61,510.00 | 596,510.00 | 658,020.00 |
| 4/1/2032 | 53,485.00 | 53,485.00 | ||||
| 10/1/2032 | 550,000 | 3.000 | 2.800 * * | 53,485.00 | 603,485.00 | 656,970.00 |
| 4/1/2033 | 45,235.00 | 45,235.00 | ||||
| 10/1/2033 | 565,000 | 3.000 | 2.850 * * | 45,235.00 | 610,235.00 | 655,470.00 |
| 4/1/2034 | 36,760.00 | 36,760.00 | ||||
| 10/1/2034 | 580,000 | 3.000 | 2.900 * * | 36,760.00 | 616,760.00 | 653,520.00 |
| 4/1/2035 | 28,060.00 | 28,060.00 | ||||
| 10/1/2035 | 600,000 | 3.000 | 2.950 * * | 28,060.00 | 628,060.00 | 656,120.00 |
| 4/1/2036 | 19,060.00 | 19,060.00 | ||||
| 10/1/2036 | 620,000 | 3.000 | 3.050 | 19,060.00 | 639,060.00 | 658,120.00 |
| 4/1/2037 | 9,760.00 | 9,760.00 | ||||
| 10/1/2037 | 640,000 | 3.050 | 3.100 | 9,760.00 | 649,760.00 | 659,520.00 |
| TOTALS | 8,150,000 | 3,023,534.95 | 11,173,534.95 | 11,173,534.95 |
* Optional redemption date of October 1, 2022
* * Yield to optional redemption date
PFM Financial Advisors LLC 7/11/2017 — Page 13
EAST GOSHEN TOWNSHIP
Series of 2017
Sources & Uses of Funds
SOURCES:
| Source | Amount |
|---|---|
| Bond Proceeds | 8,150,000.00 |
| Net Original Issue Premium | 64,265.90 |
| Accrued Interest | 0.00 |
| Total | 8,214,265.90 |
USES:
| Use | Rate | Amount |
|---|---|---|
| Deposit to Construction Fund | 8,089,324.27 | |
| Underwriter's Discount (Janney) | $6.00 | 48,900.00 |
| Bond Insurance | 0.00 | |
| Total Legal Fees and Expenses | 20,000.00 | |
| Financial Advisor | 24,000.00 | |
| OS Printing & Word Processing | 8,500.00 | |
| Credit Rating (Moody's Aaa) | 14,000.00 | |
| Internet Auction Administrator | 2,750.00 | |
| Paying Agent (M&T Bank) | 500.00 | |
| Miscellaneous Expenses/Rounding | 6,291.63 | |
| Total | 8,214,265.90 |
Dated Date: 8/15/2017
Settlement Date: 8/15/2017
Yield of the Issue: 2.704621
OIP/(OID) Calculation
| Date | Price | OIP/(OID) |
|---|---|---|
| 10/1/2018 | 100.000% | 0.00 |
| 10/1/2019 | 103.984% | 4,780.80 |
| 10/1/2020 | 108.601% | 10,751.25 |
| 10/1/2021 | 110.943% | 13,678.75 |
| 10/1/2022 | 112.556% | 16,322.80 |
| 10/1/2023 | 101.960% | 2,646.00 |
| 10/1/2024 | 101.220% | 5,551.00 |
| 10/1/2025 | 100.485% | 2,255.25 |
| 10/1/2026 | 99.172% | (3,933.00) |
| 10/1/2027 | 99.321% | (3,293.15) |
| 10/1/2028 | 99.024% | (4,831.20) |
| 10/1/2029 | 100.000% | 0.00 |
| 10/1/2030 | 101.906% | 9,911.20 |
| 10/1/2031 | 101.186% | 6,345.10 |
| 10/1/2032 | 100.947% | 5,208.50 |
| 10/1/2033 | 100.708% | 4,000.20 |
| 10/1/2034 | 100.471% | 2,731.80 |
| 10/1/2035 | 100.234% | 1,404.00 |
| 10/1/2036 | 99.277% | (4,482.60) |
| 10/1/2037 | 99.253% | (4,780.80) |
| TOTAL | 64,265.90 |
PFM Financial Advisors LLC 7/11/2017
14
EAST GOSHEN TOWNSHIP
Pricing Comparison
| 1 East Goshen Township |
2 West Goshen Sewer Authority |
|
|---|---|---|
| Issuer: | East Goshen Township | West Goshen Sewer Authority |
| Pricing Date: | Tuesday, July 11, 2017 | Tuesday, May 23, 2017 |
| Total Principal: | $8,150,000 | $17,055,000 |
| Enhanced Rating: | ||
| Underlying Rating: | Aaa (Stable Outlook) | AA+ |
| Insurer: | None | None |
| Financial Advisor: | PFM Financial Advisors LLC | None |
| Underwriter: | Janney Montgomery Scott | RBC Capital Markets |
| Type of Sale: | Competitive | Negotiated |
| BQ Status: | BQ | Non-BQ |
| Security: | General Obligation | Guaranteed Sewer Revenue |
| Call Date: | 10/1/2022 | 5/1/2025 |
| 3 Year |
4 Principal |
5 Coupon |
6 Yield to Call |
7 Spread to MMD |
8 Principal |
9 Coupon |
10 Yield to Call |
11 Spread to MMD |
12 MMD Spread Difference |
|---|---|---|---|---|---|---|---|---|---|
| 0 2017 | |||||||||
| 1 2018 | 25,000 | 1.000% | 1.000% | 5 bps | 5,000 | 0.900% | 0.900% | 7 bps | (2 bps) |
| 2 2019 | 120,000 | 3.000% | 1.100% | 1 bps | 620,000 | 3.000% | 1.030% | 11 bps | (10 bps) |
| 3 2020 | 125,000 | 4.000% | 1.190% | 1 bps | 640,000 | 3.000% | 1.180% | 15 bps | (14 bps) |
| 4 2021 | 125,000 | 4.000% | 1.270% | 0 bps | 665,000 | 4.000% | 1.320% | 17 bps | (17 bps) |
| 5 2022 | 130,000 | 4.000% | 1.450% | 5 bps | 685,000 | 1.750% | 1.500% | 21 bps | (16 bps) |
| 6 2023 | 135,000 | 2.000% | 1.600% | 6 bps | 705,000 | 4.000% | 1.640% | 22 bps | (16 bps) |
| 7 2024 | 455,000 | 2.000% | 1.750% | 9 bps | 735,000 | 5.000% | 1.780% | 23 bps | (14 bps) |
| 8 2025 | 465,000 | 2.000% | 1.900% | 10 bps | 775,000 | 5.000% | 1.960% | 23 bps | (13 bps) |
| 9 2026 | 475,000 | 2.000% | 2.100% | 15 bps | 815,000 | 5.000% | 2.160% | 27 bps | (12 bps) |
| 10 2027 | 485,000 | 2.125% | 2.200% | 13 bps | 850,000 | 4.000% | 2.430% | 44 bps | (31 bps) |
| 11 2028 | 495,000 | 2.250% | 2.350% | 18 bps | 885,000 | 4.000% | 2.600% | 51 bps | (33 bps) |
| 12 2029 | 505,000 | 2.500% | 2.500% | 22 bps | 920,000 | 4.000% | 2.750% | 55 bps | (33 bps) |
| 13 2030 | 520,000 | 3.000% | 2.600% | 23 bps | 960,000 | 4.000% | 2.840% | 55 bps | (32 bps) |
| 14 2031 | 535,000 | 3.000% | 2.750% | 32 bps | 1,000,000 | 4.000% | 2.920% | 55 bps | (23 bps) |
| 15 2032 | 550,000 | 3.000% | 2.800% | 30 bps | 1,040,000 | 4.000% | 3.000% | 56 bps | (26 bps) |
| 16 2033 | 565,000 | 3.000% | 2.850% | 29 bps | |||||
| 17 2034 | 580,000 | 3.000% | 2.900% | 28 bps | |||||
| 18 2035 | 600,000 | 3.000% | 2.950% | 29 bps | |||||
| 19 2036 | 620,000 | 3.000% | 3.050% | 36 bps | |||||
| 20 2037 | 640,000 | 3.050% | 3.100% | 39 bps | 5,755,000 | 3.250% | 3.420% | 72 bps | (33 bps) |
| 21 2038 | |||||||||
| 22 2039 | |||||||||
| 23 2040 | |||||||||
| 24 2041 | |||||||||
| 25 2042 | |||||||||
| 26 2043 | |||||||||
| 27 2044 | |||||||||
| 28 2045 | |||||||||
| 29 2046 | |||||||||
| 30 2047 |
PFM Financial Advisors LLC
15
EAST GOSHEN TOWNSHIP
Pricing Comparison
| 1 East Goshen Township |
2 Lower Moreland Township |
|
|---|---|---|
| Issuer: | East Goshen Township | Lower Moreland Township |
| Pricing Date: | Tuesday, July 11, 2017 | Wednesday, April 19, 2017 |
| Total Principal: | $8,150,000 | $6,190,000 |
| Enhanced Rating: | ||
| Underlying Rating: | Aaa (Stable Outlook) | AA+ |
| Insurer: | None | None |
| Financial Advisor: | PFM Financial Advisors LLC | None |
| Underwriter: | Janney Montgomery Scott | Boenning & Scattergood |
| Type of Sale: | Competitive | Negotiated |
| BQ Status: | BQ | BQ |
| Security: | General Obligation | General Obligation |
| Call Date: | 10/1/2022 | 8/1/2022 |
| 3 Year |
4 Principal |
5 Coupon |
6 Yield to Call |
7 Spread to MMD |
8 Principal |
9 Coupon |
10 Yield to Call |
11 Spread to MMD |
12 MMD Spread Difference |
|---|---|---|---|---|---|---|---|---|---|
| 0 2017 | 1,045,000 | 2.000% | 0.850% | ||||||
| 1 2018 | 25,000 | 1.000% | 1.000% | 5 bps | 1,080,000 | 2.000% | 1.050% | 16 bps | (11 bps) |
| 2 2019 | 120,000 | 3.000% | 1.100% | 1 bps | 1,095,000 | 3.000% | 1.200% | 21 bps | (20 bps) |
| 3 2020 | 125,000 | 4.000% | 1.190% | 1 bps | 1,140,000 | 3.000% | 1.350% | 22 bps | (21 bps) |
| 4 2021 | 125,000 | 4.000% | 1.270% | 0 bps | 965,000 | 2.000% | 1.550% | 28 bps | (28 bps) |
| 5 2022 | 130,000 | 4.000% | 1.450% | 5 bps | |||||
| 6 2023 | 135,000 | 2.000% | 1.600% | 6 bps | |||||
| 7 2024 | 455,000 | 2.000% | 1.750% | 9 bps | |||||
| 8 2025 | 465,000 | 2.000% | 1.900% | 10 bps | 180,000 | 2.200% | 2.350% | 51 bps | (41 bps) |
| 9 2026 | 475,000 | 2.000% | 2.100% | 15 bps | |||||
| 10 2027 | 485,000 | 2.125% | 2.200% | 13 bps | |||||
| 11 2028 | 495,000 | 2.250% | 2.350% | 18 bps | |||||
| 12 2029 | 505,000 | 2.500% | 2.500% | 22 bps | 205,000 | 2.750% | 2.850% | 62 bps | (40 bps) |
| 13 2030 | 520,000 | 3.000% | 2.600% | 23 bps | |||||
| 14 2031 | 535,000 | 3.000% | 2.750% | 32 bps | |||||
| 15 2032 | 550,000 | 3.000% | 2.800% | 30 bps | 165,000 | 3.000% | 3.200% | 72 bps | (42 bps) |
| 16 2033 | 565,000 | 3.000% | 2.850% | 29 bps | |||||
| 17 2034 | 580,000 | 3.000% | 2.900% | 28 bps | |||||
| 18 2035 | 600,000 | 3.000% | 2.950% | 29 bps | |||||
| 19 2036 | 620,000 | 3.000% | 3.050% | 36 bps | |||||
| 20 2037 | 640,000 | 3.050% | 3.100% | 39 bps | 315,000 | 3.300% | 3.450% | 73 bps | (34 bps) |
| 21 2038 | |||||||||
| 22 2039 | |||||||||
| 23 2040 | |||||||||
| 24 2041 | |||||||||
| 25 2042 | |||||||||
| 26 2043 | |||||||||
| 27 2044 | |||||||||
| 28 2045 | |||||||||
| 29 2046 | |||||||||
| 30 2047 |
PFM Financial Advisors LLC
16
EAST GOSHEN TOWNSHIP
Pricing Comparison
| 1 East Goshen Township |
2 State College Area School District |
|
|---|---|---|
| Issuer: | East Goshen Township | State College Area School District |
| Pricing Date: | Tuesday, July 11, 2017 | Tuesday, June 13, 2017 |
| Total Principal: | $8,150,000 | $43,840,000 |
| Enhanced Rating: | ||
| Underlying Rating: | Aaa (Stable Outlook) | Aa1 |
| Insurer: | None | None |
| Financial Advisor: | PFM Financial Advisors LLC | NW Financial Group |
| Underwriter: | Janney Montgomery Scott | Bank of America Merrill Lynch |
| Type of Sale: | Competitive | Negotiated |
| BQ Status: | BQ | Non-BQ |
| Security: | General Obligation | General Obligation |
| Call Date: | 10/1/2022 | 5/15/2027 |
| 3 Year |
4 Principal |
5 Coupon |
6 Yield to Call |
7 Spread to MMD |
8 Principal |
9 Coupon |
10 Yield to Call |
11 Spread to MMD |
12 MMD Spread Difference |
|---|---|---|---|---|---|---|---|---|---|
| 0 2017 | |||||||||
| 1 2018 | 25,000 | 1.000% | 1.000% | 5 bps | 1,105,000 | 3.000% | 0.820% | 1 bps | 4 bps |
| 2 2019 | 120,000 | 3.000% | 1.100% | 1 bps | 975,000 | 5.000% | 0.990% | 7 bps | (6 bps) |
| 3 2020 | 125,000 | 4.000% | 1.190% | 1 bps | 1,035,000 | 4.000% | 1.100% | 8 bps | (7 bps) |
| 4 2021 | 125,000 | 4.000% | 1.270% | 0 bps | 1,075,000 | 5.000% | 1.220% | 10 bps | (10 bps) |
| 5 2022 | 130,000 | 4.000% | 1.450% | 5 bps | 1,125,000 | 3.000% | 1.380% | 15 bps | (10 bps) |
| 6 2023 | 135,000 | 2.000% | 1.600% | 6 bps | 1,160,000 | 5.000% | 1.520% | 18 bps | (12 bps) |
| 7 2024 | 455,000 | 2.000% | 1.750% | 9 bps | 1,220,000 | 5.000% | 1.650% | 20 bps | (11 bps) |
| 8 2025 | 465,000 | 2.000% | 1.900% | 10 bps | 1,280,000 | 5.000% | 1.830% | 23 bps | (13 bps) |
| 9 2026 | 475,000 | 2.000% | 2.100% | 15 bps | 1,345,000 | 5.000% | 2.030% | 26 bps | (11 bps) |
| 10 2027 | 485,000 | 2.125% | 2.200% | 13 bps | 1,410,000 | 5.000% | 2.150% | 28 bps | (15 bps) |
| 11 2028 | 495,000 | 2.250% | 2.350% | 18 bps | 1,480,000 | 5.000% | 2.270% | 30 bps | (12 bps) |
| 12 2029 | 505,000 | 2.500% | 2.500% | 22 bps | 1,555,000 | 5.000% | 2.370% | 30 bps | (8 bps) |
| 13 2030 | 520,000 | 3.000% | 2.600% | 23 bps | 1,635,000 | 5.000% | 2.470% | 30 bps | (7 bps) |
| 14 2031 | 535,000 | 3.000% | 2.750% | 32 bps | 1,715,000 | 5.000% | 2.550% | 30 bps | 2 bps |
| 15 2032 | 550,000 | 3.000% | 2.800% | 30 bps | 1,800,000 | 3.000% | 3.120% | 80 bps | (50 bps) |
| 16 2033 | 565,000 | 3.000% | 2.850% | 29 bps | 1,855,000 | 3.000% | 3.170% | 78 bps | (49 bps) |
| 17 2034 | 580,000 | 3.000% | 2.900% | 28 bps | 1,910,000 | 3.000% | 3.220% | 77 bps | (49 bps) |
| 18 2035 | 600,000 | 3.000% | 2.950% | 29 bps | 1,970,000 | 3.125% | 3.300% | 80 bps | (51 bps) |
| 19 2036 | 620,000 | 3.000% | 3.050% | 36 bps | 2,030,000 | 3.125% | 3.340% | 80 bps | (44 bps) |
| 20 2037 | 640,000 | 3.050% | 3.100% | 39 bps | 2,095,000 | 3.250% | 3.380% | 80 bps | (41 bps) |
| 21 2038 | |||||||||
| 22 2039 | |||||||||
| 23 2040 | |||||||||
| 24 2041 | |||||||||
| 25 2042 | |||||||||
| 26 2043 | 14,065,000 | 3.250% | 3.500% | 82 bps | |||||
| 27 2044 | |||||||||
| 28 2045 | |||||||||
| 29 2046 | |||||||||
| 30 2047 |
PFM Financial Advisors LLC
17
EAST GOSHEN TOWNSHIP
SUMMARY OF OUTSTANDING INDEBTEDNESS
Debt Service Requirements
| 1 - Fiscal Year Ended | 2 - Electoral Debt: (Del Val) G.O. Note Series of 1999 [1] | 3 - Electoral Debt: Total Electoral Debt Service | 4 - Non-Electoral Debt: (Del Val) G.O. Note Series of 2000 | 5 - Non-Electoral Debt: (Del Val) G.O. Note Series of 2003 | 6 - Non-Electoral Debt: (Pro-Rata) G.O. Bonds Series of 2012 [2] | 7 - Non-Electoral Debt: G.O. Bonds Series of 2017 [3] | 8 - Non-Electoral Debt: Total Non-Electoral Debt Service | 9 - Guaranteed Debt: (Del Val) Sewer Rev Note Series of 1998 | 10 - Guaranteed Debt: (Del Val) Sewer Rev Note Series of 2008 | 11 - Guaranteed Debt: (Del Val) Sewer Rev Note Series of 2013 | 12 - Guaranteed Debt: Total Guaranteed Debt Service | 13 - Total Debt Service |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 12/31/2017 | 239,998 | 239,998 | 22,966 | 410,199 | 124,368 | 28,410 | 585,943 | 101,298 | 613,903 | 166,865 | 882,065 | 1,708,005 |
| 12/31/2018 | 242,235 | 242,235 | 23,148 | 408,925 | 128,268 | 247,339 | 807,679 | 101,393 | 613,458 | 166,793 | 881,644 | 1,931,557 |
| 12/31/2019 | 245,019 | 245,019 | 24,260 | 408,129 | 126,773 | 342,089 | 901,250 | 613,480 | 167,622 | 781,101 | 1,927,370 | |
| 12/31/2020 | 24,317 | 406,773 | 125,048 | 343,489 | 899,627 | 612,946 | 167,336 | 780,283 | 1,679,910 | |||
| 12/31/2021 | 24,333 | 404,857 | 128,035 | 338,489 | 895,713 | 612,839 | 167,952 | 780,791 | 1,676,504 | |||
| 12/31/2022 | 403,377 | 125,635 | 338,489 | 867,501 | 613,118 | 167,453 | 780,571 | 1,648,072 | ||||
| 12/31/2023 | 402,290 | 127,875 | 338,289 | 868,453 | 612,763 | 167,856 | 780,619 | 1,649,072 | ||||
| 12/31/2024 | 655,589 | 655,589 | 612,755 | 168,136 | 780,891 | 1,436,479 | ||||||
| 12/31/2025 | 656,489 | 656,489 | 612,073 | 168,294 | 780,367 | 1,436,856 | ||||||
| 12/31/2026 | 657,189 | 657,189 | 611,699 | 168,330 | 780,029 | 1,437,218 | ||||||
| 12/31/2027 | 657,689 | 657,689 | 611,592 | 168,245 | 779,837 | 1,437,525 | ||||||
| 12/31/2028 | 657,383 | 657,383 | 611,713 | 169,029 | 780,742 | 1,438,125 | ||||||
| 12/31/2029 | 656,245 | 656,245 | 612,022 | 168,669 | 780,691 | 1,436,936 | ||||||
| 12/31/2030 | 658,620 | 658,620 | 611,499 | 169,180 | 780,679 | 1,439,299 | ||||||
| 12/31/2031 | 658,020 | 658,020 | 611,125 | 169,538 | 780,663 | 1,438,683 | ||||||
| 12/31/2032 | 656,970 | 656,970 | 610,860 | 169,743 | 780,603 | 1,437,573 | ||||||
| 12/31/2033 | 655,470 | 655,470 | 169,796 | 169,796 | 825,266 | |||||||
| 12/31/2034 | 653,520 | 653,520 | 653,520 | |||||||||
| 12/31/2035 | 656,120 | 656,120 | 656,120 | |||||||||
| 12/31/2036 | 658,120 | 658,120 | 658,120 | |||||||||
| 12/31/2037 | 659,520 | 659,520 | 659,520 | |||||||||
| 12/31/2038 | ||||||||||||
| 12/31/2039 | ||||||||||||
| 12/31/2040 | ||||||||||||
| Totals | 727,251 | 727,251 | 119,024 | 2,844,549 | 886,000 | 11,173,535 | 15,023,108 | 202,690 | 9,797,845 | 2,860,836 | 12,861,371 | 28,611,730 |
| Principal: [4] | 676,000 | 676,000 | 89,000 | 2,420,000 | 820,000 | 8,150,000 | 11,479,000 | 193,000 | 6,927,000 | 2,218,000 | 9,338,000 | 21,493,000 |
| Call Date: | Make-whole | Make-whole | Make-whole | 12/15/2017 | 10/1/2022 | Make-whole | Make-whole | Make-whole | ||||
| Purpose: | New Money | New Money | New Money | Pro-Rata 2004 Refunding | New Money | New Money | New Money | New Money |
Del Val Information
| Metric | 2 - (Del Val) G.O. Note Series of 1999 [1] | 3 - Total Electoral Debt Service | 4 - (Del Val) G.O. Note Series of 2000 | 5 - (Del Val) G.O. Note Series of 2003 | 6 - (Pro-Rata) G.O. Bonds Series of 2012 [2] | 7 - G.O. Bonds Series of 2017 [3] | 8 - Total Non-Electoral Debt Service | 9 - (Del Val) Sewer Rev Note Series of 1998 | 10 - (Del Val) Sewer Rev Note Series of 2008 | 11 - (Del Val) Sewer Rev Note Series of 2013 | 12 - Total Guaranteed Debt Service | 13 - Total Debt Service |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Fixed/Variable: | Fixed | Fixed | Fixed | Bonds | Bonds | Fixed | Fixed | Fixed | ||||
| Fixed Through: | Maturity | Maturity | Maturity | n/a | n/a | 10/25/2017 | Maturity | Maturity | ||||
| Fixed Rate: | 3.660% | 3.760% | 3.910% | n/a | n/a | 3.840% | 3.560% | 2.649% | ||||
| Del Val Spread [5]: | 0.400% | 0.400% | 0.400% | n/a | n/a | 0.400% | 0.400% | 0.400% | ||||
| All-in Rate: | 4.060% | 4.160% | 4.310% | n/a | n/a | 4.240% | 3.960% | 3.049% |
Notes
- [1] The Township has 0.13 mills in place dedicated to this issue.
- [2] Per Township, represents approximately 46% pro-rata share of Westtown Township Series of 2012 Bonds originally allocable to the Series of 2004 Bonds
- [3] Includes both General Fund portion and Sewer Fund portion
- [4] Outstanding as of July 11, 2017
- [5] Per Del Val, rates assume 0.40% spread for Del Val administrative expenses and interest rate swap agreements
PFM Financial Advisors LLC 7/11/2017
18
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
JULY 2017
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - CAPITAL | 1,177,932.80 | |||
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - 2013 NOTES (FULTON BANK) | 1,144,516.21 | |||
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE DNB CAPITAL ACCOUNT | 33,416.59 | |||
| CAPITAL: | ||||
| REVENUE | ||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 3,250.00 | 982.28 | 5,369.54 |
| TOTAL REVENUE | 3,250.00 | 982.28 | 5,369.54 | |
| EXPENESES | ||||
| C.C. CAPITAL - COLLECTION | 07424 7420 | 212,486.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0.00 | 2,726.00 | 13,715.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| WEST GOSHEN CAPITAL | 07429 6100 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 212,486.00 | 2,726.00 | 13,715.50 | |
| NET CAPITAL | (209,236.00) | (1,743.72) | (8,345.96) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE - CAPITAL | 1,176,189.08 | |||
| MUNICIPAL AUTHORITY ENDING FUND BALANCE - 2013 NOTES (FULTON BANK) | 1,144,516.21 | |||
| MUNICIPAL AUTHORITY ENDING FUND BALANCE DNB CAPITAL ACCOUNT | 33,416.59 |
U:\bmccool\2017\Municipal Authority\2017 - 07 - Municipal Authority Report.xlsx Page 1 of 2 07/05/2017
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
JULY 2017
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| OPERATING: | ||||
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - OPERATING (BB&T) | 4,044.61 | |||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 10.00 | 0.16 | 6.97 |
| C.C. TAPPING FEES | 07364 1100 | 14,296.00 | 0.00 | 4,000.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 1,692.00 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 100,755.00 | 5,000.00 | 70,000.00 |
| TOTAL REVENUE | 115,061.00 | 5,000.16 | 75,698.97 | |
| EXPENESES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 31,620.00 | 0.00 | 15,448.00 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500.00 | 0.00 | 2,207.52 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,078.00 | 0.00 | 9,200.00 |
| ENGINEERING SERVICES | 07424 3130 | 37,500.00 | 3,166.75 | 41,312.25 |
| LEGAL SERVICES | 07424 3140 | 9,250.00 | 0.00 | 10,103.16 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 26,320.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 2,043.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 118,311.00 | 3,166.75 | 78,270.93 | |
| NET OPERATING | (3,250.00) | 1,833.41 | (2,571.96) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE - OPERATING | 5,878.02 | |||
| MUNICIPAL AUTHORITY ENDING FUND BALANCE CAPITAL + OPERATING | 1,182,067.10 |
U:\bmccool\2017\Municipal Authority\2017 - 07 - Municipal Authority Report.xlsx Page 2 of 2 07/05/2017
East Goshen Township General Ledger
GL Transaction Details
Report Date 08/02/17 PAGE 1
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | INTEREST EARNINGS | 0.00 | ||||||||
| 1701 | JE | 56730 | 0.23 | 02/03/17 | INTEREST | INTEREST EARNED JANUARY 2017 07 FUND |
||||
| 1701 | 0.00 | 0.23 | -0.23 | |||||||
| 1702 | 57134 | 0.06 | 03/06/17 | INTEREST | INTEREST EARNED FEBRUARY 2017 07 FUND |
|||||
| 1702 | 0.00 | 0.06 | -0.29 | |||||||
| 1703 | 57173 | 3.23 | 03/08/17 | INTEREST | ADD'L INTEREST ADDED FROM JAN. 2017 | |||||
| 57549 | 0.61 | 04/05/17 | INTEREST | INTEREST EARNED MARCH 2017 07 FUND |
||||||
| 1703 | 0.00 | 3.84 | -4.13 | |||||||
| 1704 | 57927 | 1.06 | 05/03/17 | INTEREST | INTEREST EARNED APRIL 2017 07 FUND |
|||||
| 1704 | 0.00 | 1.06 | -5.19 | |||||||
| 1705 | 58423 | 0.96 | 06/02/17 | INTEREST | INTEREST EARNED MAY 2017 07 FUND |
|||||
| 1705 | 0.00 | 0.96 | -6.15 | |||||||
| 1706 | 58876 | 0.66 | 07/03/17 | INTEREST | INTEREST EARNED JUNE 2017 07 FUND |
|||||
| 1706 | 0.00 | 0.66 | -6.81 | |||||||
| 1707 | 59333 | 0.16 | 08/01/17 | INTEREST | INTEREST EARNED JULY 2017 07 FUND |
|||||
| 1707 | 0.00 | 0.16 | -6.97 | |||||||
| 07341-1000 | **** | *** | **** | 0.00 | 6.97 | -6.97 | ||||
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 0.00 |
East Goshen Township General Ledger
GL Transaction Details
Report Date 08/02/17 PAGE 2
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1701 | JE | 56730 | 594.59 | 02/03/17 | INTEREST | INTEREST EARNED JANUARY 2017 07 FUND |
||||
| 1701 | 0.00 | 594.59 | -594.59 | |||||||
| 1702 | 57134 | 536.20 | 03/06/17 | INTEREST | INTEREST EARNED FEBRUARY 2017 07 FUND |
|||||
| 1702 | 0.00 | 536.20 | -1,130.79 | |||||||
| 1703 | 57549 | 743.58 | 04/05/17 | INTEREST | INTEREST EARNED MARCH 2017 07 FUND |
|||||
| 1703 | 0.00 | 743.58 | -1,874.37 | |||||||
| 1704 | 57927 | 854.28 | 05/03/17 | INTEREST | INTEREST EARNED APRIL 2017 07 FUND |
|||||
| 1704 | 0.00 | 854.28 | -2,728.65 | |||||||
| 1705 | 58423 | 815.38 | 06/02/17 | INTEREST | INTEREST EARNED MAY 2017 07 FUND |
|||||
| 1705 | 0.00 | 815.38 | -3,544.03 | |||||||
| 1706 | 58876 | 843.23 | 07/03/17 | INTEREST | INTEREST EARNED JUNE 2017 07 FUND |
|||||
| 1706 | 0.00 | 843.23 | -4,387.26 | |||||||
| 1707 | 59333 | 982.28 | 08/01/17 | INTEREST | INTEREST EARNED JULY 2017 07 FUND |
|||||
| 1707 | 0.00 | 982.28 | -5,369.54 | |||||||
| 07341-1020 | **** | *** | **** | 0.00 | 5,369.54 | -5,369.54 | ||||
| 07364-1100 | C.C. TAPPING FEES | 0.00 | ||||||||
| 1704 | 57798 | 2,000.00 | 04/25/17 | RECLASS | RECLASS TAP IN FEE | |||||
| RE | 57797 | 2,000.00 | 04/25/17 | 57797 1 | SEWER TAP IN - 5 SCHOOL LN C.C. TAPPING FEES |
East Goshen Township General Ledger
GL Transaction Details
Report Date 08/02/17 PAGE 3
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1704 | 0.00 | 4,000.00 | -4,000.00 | |||||||
| 07364-1100 | **** | *** | **** | 0.00 | 4,000.00 | -4,000.00 | ||||
| 07364-1110 | R.C.TAPPING FEES | 0.00 | ||||||||
| JE | 57798 | 2,000.00 | 04/25/17 | RECLASS | RECLASS TAP IN FEE | |||||
| RE | 57795 | 2,000.00 | 04/25/17 | 57795 1 | SEWER TAP IN - 3 SCHOOL LN | |||||
| 1704 | 2,000.00 | 2,000.00 | 0.00 | |||||||
| 07364-1110 | **** | *** | **** | 2,000.00 | 2,000.00 | 0.00 | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 0.00 | ||||||||
| 1702 | CR | 56762 | 423.00 | 02/07/17 | 125 25 | 10162 | 1 JACOBS, ROBERT & CHERYL | |||
| 56823 | 423.00 | 02/13/17 | 125 26 | 10160 | 1 GEORGE SMITH & CHRISTINA CONLE | |||||
| 423.00 | 02/13/17 | 125 27 | 10161 | 1 STOFFLET, MICHAEL | ||||||
| ** | 0.00 | 846.00 | *** | |||||||
| 1702 | 0.00 | 1,269.00 | -1,269.00 | |||||||
| 1703 | 57212 | 423.00 | 03/09/17 | 125 54 | 10163 | 1 PAPPANO, JOSEPH & PATRICIA | ||||
| 1703 | 0.00 | 423.00 | -1,692.00 | |||||||
| 07364-1130 | **** | *** | **** | 0.00 | 1,692.00 | -1,692.00 | ||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 0.00 | ||||||||
| JE | 57171 | 25,000.00 | 03/08/17 | DEPOSIT | DEPOSIT FR: SEWER TO MUNICIPAL | |||||
| 1703 | 0.00 | 25,000.00 | -25,000.00 | |||||||
| 1704 | 57579 | 40,000.00 | 04/06/17 | DEPOSIT | DEPOSIT TO MA ACCT.7100.1000 | |||||
| 1704 | 0.00 | 40,000.00 | -65,000.00 | |||||||
| 1707 | 59229 | 5,000.00 | 07/26/17 | XFER | XFER $ FROM 05 TO 07 OPERATING |
East Goshen Township General Ledger
GL Transaction Details
Report Date 08/02/17 PAGE 4
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1707 | 0.00 | 5,000.00 | -70,000.00 | |||||||
| 07392-0500 | **** | *** | **** | 0.00 | 70,000.00 | -70,000.00 | ||||
| 07424-1400 | ADMINISTRATIVE WAGES | 0.00 | ||||||||
| 1703 | CD | 57378 | 7,724.00 | 03/22/17 | 3048 | 425 | EAST GOSHEN TOWNSHIP - GENERAL QTR.1 2017 REIMBURSEMENT FROM MA |
|||
| 1703 | 7,724.00 | 0.00 | 7,724.00 | |||||||
| 1706 | 58848 | 7,724.00 | 06/30/17 | 3059 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 2017 QTR.2 REIMBURSEMENT FROM MA |
||||
| 1706 | 7,724.00 | 0.00 | 15,448.00 | |||||||
| 07424-1400 | **** | *** | **** | 15,448.00 | 0.00 | 15,448.00 | ||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 0.00 | ||||||||
| 1701 | 56280 | 984.30 | 01/04/17 | 3040 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2017 ACTIVE MEMBERSHIP DUES |
||||
| 56424 | 3.22 | 01/13/17 | 3041 | 425 | EAST GOSHEN TOWNSHIP - GENERAL CORRECT BB&T DEPOSIT OF REMAININ BALANCE OF CLOSED ACCT.1100.1010 07100.1000 |
|||||
| 1701 | 987.52 | 0.00 | 987.52 | |||||||
| 1706 | 58814 | 1,220.00 | 06/29/17 | 3058 | 3871 | DELAWARE RIVER BASIN COMMISSION D-1984-056 CP ANNUAL FEE - WATER DISCHARGE |
||||
| 1706 | 1,220.00 | 0.00 | 2,207.52 | |||||||
| 07424-3000 | **** | *** | **** | 2,207.52 | 0.00 | 2,207.52 | ||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 0.00 | ||||||||
| 1703 | 57470 | 4,600.00 | 03/30/17 | 3049 | 808 | MAILLIE FALCONIERO & CO. PROGRESS BILLING 2016 MUN.AUTH. |
East Goshen Township General Ledger
GL Transaction Details
Report Date 08/02/17 PAGE 5
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1703 | 4,600.00 | 0.00 | 4,600.00 | |||||||
| 1704 | 57655 | 4,600.00 | 04/13/17 | 3052 | 808 | MAILLIE FALCONIERO & CO. 2016 EXAM. FINAN. STMTS. MUN.AUT |
||||
| 1704 | 4,600.00 | 0.00 | 9,200.00 | |||||||
| 07424-3110 | **** | *** | **** | 9,200.00 | 0.00 | 9,200.00 | ||||
| 07424-3130 | ENGINEERING SERVICES | 0.00 | ||||||||
| 1701 | 56425 | 4,399.50 | 01/13/17 | 3042 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 10/16/16 RCSTP & P STATION |
||||
| 1701 | 4,399.50 | 0.00 | 4,399.50 | |||||||
| 1702 | 56874 | 2,044.00 | 02/17/17 | 3045 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 1/15/17 2016 CHAP |
||||
| 1702 | 2,044.00 | 0.00 | 6,443.50 | |||||||
| 1703 | 57328 | 7,962.00 | 03/17/17 | 3047 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 2/12/17 2017 GEN.SERV |
||||
| 1703 | 7,962.00 | 0.00 | 14,405.50 | |||||||
| 1704 | 57510 | 5,416.50 | 04/03/17 | 3050 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 12/11/16 2016 GEN.SERV |
||||
| 57655 | 7,306.50 | 04/13/17 | 3053 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 3/19/17 RCSTP PERMI |
|||||
| 1704 | 12,723.00 | 0.00 | 27,128.50 | |||||||
| 1705 | 58070 | 8,211.75 | 05/11/17 | 3054 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 4/16/17 RCSTP & PUM STATION |
||||
| 1705 | 8,211.75 | 0.00 | 35,340.25 | |||||||
| 1706 | 58614 | 2,805.25 | 06/14/17 | 3057 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/14/17 RCSTP PERM |
East Goshen Township General Ledger
Report Date 08/02/17 | GL Transaction Details | PAGE 6
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1706 | 2,805.25 | 0.00 | 38,145.50 | |||||||
| 1707 | 58978 | 3,166.75 | 07/12/17 | 3060 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 6/18/17 WHITE CHIM | ||||
| 1707 | 3,166.75 | 0.00 | 41,312.25 | |||||||
| 07424-3130 | **** | *** | **** | 41,312.25 | 0.00 | 41,312.25 | ||||
| 07424-3140 | 0.00 | LEGAL SERVICES | ||||||||
| 1701 | 56550 | 940.00 | 01/25/17 | 3043 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - DEC. 2016 GEN.AU | ||||
| 1701 | 940.00 | 0.00 | 940.00 | |||||||
| 1702 | 56874 | 597.50 | 02/17/17 | 3044 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN.2017 GEN.AUT | ||||
| 1702 | 597.50 | 0.00 | 1,537.50 | |||||||
| 1703 | 57328 | 655.00 | 03/17/17 | 3046 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. FEB.2017 GEN.AUTHORI | ||||
| 1703 | 655.00 | 0.00 | 2,192.50 | |||||||
| 1704 | 57655 | 2,140.00 | 04/13/17 | 3051 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2017 GEN.A | ||||
| 1704 | 2,140.00 | 0.00 | 4,332.50 | |||||||
| 1705 | 58187 | 2,407.41 | 05/19/17 | 3055 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 4/4-4/28/17 GEN.AU | ||||
| 1705 | 2,407.41 | 0.00 | 6,739.91 | |||||||
| 1706 | 58614 | 1,640.00 | 06/14/17 | 3056 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. - MAY 2017 GEN.AUTH. | ||||
| 1,723.25 | 06/14/17 | 3057 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/14/17 2017 GEN.S | ||||||
| ** | 3,363.25 | 0.00 | *** |
East Goshen Township General Ledger
Report Date 08/02/17 | GL Transaction Details | PAGE 7
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1706 | 3,363.25 | 0.00 | 10,103.16 | |||||||
| 07424-3140 | **** | *** | **** | 10,103.16 | 0.00 | 10,103.16 | ||||
| 07428-1000 | 0.00 | RESERVOIR PUMP STATION - ENGINEER | ||||||||
| 1701 | 56426 | 2,546.50 | 01/13/17 | 22002 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 10/16/16 RESERV.RD | ||||
| 56551 | 375.00 | 01/25/17 | 22003 | 263 | CHESTER COUNTY CONSERVATION DISTRICT RESERVOIR RD. NPDES PLAN REVIEW | |||||
| 1701 | 2,921.50 | 0.00 | 2,921.50 | |||||||
| 1702 | 56875 | 1,422.75 | 02/17/17 | 22004 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 1/15/17 RESERV.RD | ||||
| 1702 | 1,422.75 | 0.00 | 4,344.25 | |||||||
| 1704 | 57511 | 1,784.25 | 04/03/17 | 22005 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 12/11/17 RESERVOIR RD. | ||||
| 57656 | 1,516.50 | 04/13/17 | 22006 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 3/19/17 RESERV.RD PS | |||||
| 1704 | 3,300.75 | 0.00 | 7,645.00 | |||||||
| 1705 | 58071 | 1,261.50 | 05/11/17 | 22007 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 4/16/17 RESERV.RD | ||||
| 1705 | 1,261.50 | 0.00 | 8,906.50 | |||||||
| 1706 | 58616 | 2,083.00 | 06/14/17 | 22009 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 5/24/17 RESERV.RD P | ||||
| 1706 | 2,083.00 | 0.00 | 10,989.50 | |||||||
| 1707 | 58979 | 2,726.00 | 07/12/17 | 22010 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 6/18/17 RESERV.RD P | ||||
| 1707 | 2,726.00 | 0.00 | 13,715.50 | |||||||
| 07428-1000 | **** | *** | **** | 13,715.50 | 0.00 | 13,715.50 |
East Goshen Township General Ledger
Report Date 08/02/17 | GL Transaction Details | PAGE 8
MGRP18 run by BRIAN 1 : 00 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07429-6100 | 0.00 | WEST GOSHEN CAPITAL | ||||||||
| 1705 | 58071 | 705.00 | 05/11/17 | 22007 | 1052 | PENNONI ASSOCIATES INC. SERV. THRU 4/16/17 W.GOSHEN SEWE | ||||
| 220,814.48 | 05/11/17 | 22008 | 3843 | WEST GOSHEN SEWER AUTHORITY PROJECT COSTS RE: CONSTRUCTION, LABOR, PARTS, ENGINEERING, LEGAL TESTING | ||||||
| ** | 221,519.48 | 0.00 | *** | |||||||
| 1705 | 221,519.48 | 0.00 | 221,519.48 | |||||||
| 1706 | 58616 | 1,146.00 | 06/14/17 | 22009 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 5/24/17 W.GOSHEN SE | ||||
| 1706 | 1,146.00 | 0.00 | 222,665.48 | |||||||
| 07429-6100 | **** | *** | **** | 222,665.48 | 0.00 | 222,665.48 | ||||
| Grand Total | 316,651.91 | 83,068.51 | 233,583.40 |
| Source | Debits | Credits |
|---|---|---|
| JE | 2,000.00 | 77,376.51 |
| RE | 0.00 | 4,000.00 |
| CR | 0.00 | 1,692.00 |
| CD | 314,651.91 | 0.00 |
| 316,651.91 | 83,068.51 |