Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
September 11, 2017

6:00 PM - Meet at Ridley Creek Sewer Treatment Plant

~7:00 PM – Regular meeting at Township Building.

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE — a. Ask if anyone will be taping the meeting
  2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS — a. Director of Public Works Report; b. Pennoni Engineer's Report; c. Big Fish Environmental Inc. Report
  4. APPROVAL OF MINUTES — a. August 7, 2017
  5. APPROVAL OF INVOICES — a. Pennoni Invoice #763591 $80.25; b. Pennoni Invoice #763593 $1,205.75; c. Pennoni Invoice #763595 $6,222.00; d. Pennoni Invoice #763596 $3,647.50; e. Gawthrop Invoice #184952 $440.00
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS — a. August Financial Report
  8. OLD BUSINESS — a. Reservoir Road Pump Station – On August 31, 2017 we received the final permit we need for the pump station.
  9. GOALS

F:\Data\Shared Data\Agendas\Municipal Authority\2017\9-11-17.doc

a. Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, May, June, July

b. Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively "I&I") Plan to reduce the amount of I&I into the sewer system.

c. Respond to capacity requests within 45 days.

d. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. Currently under review by staff. Completed on August 7, 2017

e. Submit topical articles of interest for the East Goshen newsletter. May

f. Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, April, May, June, July

  1. NEW BUSINESS
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER — a. Discuss replacement of new probes and controller for the plant (Mark); b. Discuss Supplee Valley Sewer System Analysis
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2017\9-11-17.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

September 8, 2017

To: Municipal Authority
From: Mark Miller
Re: August 2017 Monthly Report
Mark will not be at the meeting!

Monthly Flows: The average daily flow to West Goshen was 670,000 gallons per day.

Meters: Meters were read on a daily basis. We have not had any problems.

C.C. Collection: The pump stations were visited on a daily basis. Lenni Electric is currently doing the PM at the plant and pump stations. We are scheduled to pull the pumps this month.

R.C. Collection: Pump Stations were visited on a daily basis with no problems to report.

R.C. Plant: The plant was visited by Public Works. George and I were at the plant on Monday. We noticed the roto-mat was making noise . Upon further investigation we found the screen spray nozzles were blocked. We were able to get them cleaned.

Lateral Repairs: Four lateral repairs for the month of August.

Alarms: We responded to 27 alarms for August, most of them were for power outages.

PA One Calls: We received 68 PA One calls in August.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
September 8, 2017

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study –
  • We previously calculated the estimated caustic soda feed rate to be 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We previously recommended a 7.7-gallon/hour pump be acquired for the study. We have obtained pricing for a larger ±19.9 gallon/hour pump as requested by the Municipal Authority in the event the recommended pump is found to be inadequate during the trial. Two 350-gallon totes should allow for a 2.5-3 week trial. We previously sent our recommendations to the plant operator for review and are awaiting a response.
  • A pilot study sampling plan was previously requested from Big Fish, and we are awaiting a response.
  • The pilot study can begin once the tap is installed and the operator provides a sampling plan and confirms the caustic soda feed rate.
  • In order to progress this project, we propose to set up a meeting within the next week at the RCSTP with the Public Works Department, Pennoni, the operator, and the controls consultant to resolve outstanding questions and concerns (i.e. chemical feed control during fill-decant phase) and establish a definitive schedule to begin the trial.
  • SBR tanks CIM coatings –
  • Our structural engineers and leakage consultant performed a visual and non-destructive evaluation of the SBR #1 concrete walls on August 23. Two concrete cores were taken from the SBR #1 walls the same day. The cores have been tested, and we expect to receive a laboratory report with results on September 11. A verbal update will be provided at the Municipal Authority meeting on September 11. Upon receipt of the lab report, we will evaluate the results in conjunction with our field visit and background research, and we expect to submit a report to the Township by the end of September.

Reservoir Road Pump Station

  • We received the Army Corps of Engineers (USACE) special conditions permit for the proposed force main creek crossings on August 17. WE NOW HAVE ALL PERMITS IN HAND!!!!!
  • The bid document will be finalized to incorporate the remaining USACE permit, and a final set of plans and specifications will be provided to the Township within the next two weeks.
  • A listing of the permits, expiration dates, and renewal deadlines will also be provided.

RCSTP and Pump Stations' O&M Manual

  • Completed. No further action.

EGMA1701      September 8, 2017      Page 2
East Goshen Municipal Authority      Engineer's Report

Supplee Valley Pipe Lining

  • We received the missing videos of the sewer mains and completed our review, prioritization, scoping, and cost estimating. A recommendation letter was sent to the Township.

White Chimneys Manhole Lining

  • We completed a 1-year warranty visual observation of the manholes that were lined in 2016 in White Chimneys and along Cornwallis Drive. No deficiencies were observed with the liners. However, apparent sulfuric acid (from hydrogen sulfide) is present on the liners near the bottoms of some of the manholes. We have recommended that the Public Works Department clean those liners.

New Connections

  • Knauer Property, 1680 East Boot Road – No activity since our last report. We previously reviewed a revised plan submission for a proposed sewer connection to be installed with fewer lateral pipes at less-than-minimum slopes, and we provided comments to the Township and developer.
  • Brakman Property, 1420 East Strasburg Road – We continued to perform construction observation of the new gravity sewer main across East Strasburg Road and the new manhole on the subject property as well as providing shop drawings reviews and responses to questions from the contractor and developer.

West Goshen Sewer System Consultation

  • No activity since last report.

P:\Projects\EGMA\Memos to Board\2017\Engineers Report 2017-09-08.docx

Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report: August 2017

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of July 2017. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

The total phosphorus monthly average was reported as 0.25 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.14 to 0.47 mg/L. The ammonia as nitrogen monthly concentration was reported as 0.169 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.243 mg/L. The total suspended solids (TSS) monthly concentration was reported as 3 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 4 mg/L as compared to the permit discharge limitation of 15 mg/L.

Table 1 illustrates the final effluent composite sample data reported for the July 2017 DMR. Discharge to Applebrook, Outfall 002, remained discontinued during and July. The discharge to Applebrook was initiated during August.

The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during July 2017.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 5

Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report: August 2017

Table 1
July 2017 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
July 6, 2017 0.320 2.0 5.3 1 2.7 0.119 0.32 0.19 0.51 1 0.0000
July 11, 2017 0.263 2.7 5.9 4 8.8 0.135 0.30 0.21 0.46 1 0.0000
July 18, 2017 0.282 2.0 4.7 1 2.4 0.243 0.57 0.14 0.33 1 0.0000
July 25, 2017 0.338 3.6 10.1 4 11.3 0.178 0.50 0.47 1.32 5 0.6990
Average 0.301 2.6 6.5 3 6.3 0.169 0.42 0.25 0.66 1 0.1747
Minimum 0.263 2.0 4.7 1 2.4 0.119 0.30 0.14 0.33 1 0.0000
Maximum 0.338 3.6 10.1 4 11.3 0.243 0.57 0.47 1.32 5 0.6990

Table 2
July 2017 - Influent Wastewater

Design Basis / Sample Date Flow MGD Average BOD5 mg/L BOD5 lbs/day TSS mg/L TSS lbs/day NH4-N mg/L NH4-N lbs/day TKN, mg/L mg/L TKN, mg/L lbs/day Phosphorus, Total, mg/L mg/L Phosphorus, Total, mg/L lbs/day
Design Basis 335 2,098 320 2,001 32 200 48 301 9.1 57
July 5, 2017 0.392 243 794 222 726 35.8 4 51.4 168 6.9 22.6
July 11, 2017 0.348 186 608 410 1,340 43.5 142 49.9 145 6.1 19.9
July 18, 2017 0.357 111 363 56 183 42.3 138 44.7 133 5.1 16.7
July 25, 2017 0.33 280 915 374 1,223 38.8 127 37.5 103 4.5 14.7
Average 0.357 205 670 266 868 40.1 103 45.9 137 5.7 18.5
Minimum 0.330 111 363 56 183 35.8 4 37.5 103 4.5 14.7
Maximum 0.392 280 915 410 1340 43.5 142 51.4 168 6.9 22.6

Table 3 presents the available Outfall 001 final effluent data for the month as of August 8, 2017. The total phosphorus concentrations were elevated during the first

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 5

Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report: August 2017

three (3) weeks of the month. Maintenance and corrective actions included removal and cleaning of the static mixer injector, increased flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters. The alum feed to the SBRs was frequently increased to improve the total phosphorus removal. Lastly, additional samples were collected for analysis by the certified laboratory.

The facility is anticipated to achieve compliance with the discharge permit limitations during the month of August.

Table 3
August 2017 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations / Sample Date Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus, Total, mg/L Phosphorus, Total lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
NPDES Permit Discharge Limitations 0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
August 1, 2017 0.261 2.0 4.4 5 10.9 0.160 0.35 0.51 1.11 4 0.6021
August 8, 2017 0.276 4.0 9.2 3 6.9 0.330 0.76 0.67 1.54 1 0.0000
August 15, 2017 0.314 0.52 1.36
August 22, 2017 0.223
August 29, 2017 0.181
Average 0.251 3.0 6.8 4 8.9 0.245 0.55 0.57 1.34 2 0.3010
Minimum 0.181 2.0 4.4 3 6.9 0.160 0.35 0.51 1.11 1 0.0000
Maximum 0.314 4.0 9.2 5 10.9 0.330 0.76 0.67 1.54 4 0.6021

During August, the presence of foam conditions on the surface of the SBRs began to decrease with foam concentrations ranging from 50% to 70% of the area. Reduction of filled decants and adjustments to the SBR dissolved oxygen control set points to ensure adequate aeration for nitrification assisted to sustain the final effluent water quality.

There are no anticipated exceedances of the permitted limitations for Outfall 001 for August 2017. There was no discharge from outfall 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 5

Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report: August 2017

Table 4
August 2017 - Influent Wastewater

Design Basis / Sample Date Flow MGD Average BOD5 mg/L BOD5 lbs/day TSS mg/L TSS lbs/day NH4-N mg/L NH4-N lbs/day TKN, mg/L mg/L TKN, mg/L lbs/day Phosphorus, Total, mg/L mg/L Phosphorus, Total, mg/L lbs/day
Design Basis 335 2,098 320 2,001 32 200 48 301 9.1 57
August 1, 2017 0.319 264 702 246 654 33.3 88.6 56.5 150 8.6 22.9
August 8, 2017 0.307 100 280 23.3 59.7 34.5 88 7.2 19.2
August 15, 2017 0.385
August 22, 2017 0.323
August 29, 2017 0.376
Average 0.342 182 702 263 654 28.3 74.1 45.5 119 7.9 21.0
Minimum 0.307 100 702 246 654 23.3 59.7 34.5 88 7.2 19.2
Maximum 0.385 264 702 280 654 33.3 88.6 56.5 150 8.6 22.9

Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during July and August. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

Significant Storm/Hydraulic Loading Events

During August there was one (1) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period. A total of 1.98 inches of rainfall measured during the month. This event occurred on:

August 5th      0.50inches

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 5

Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report: August 2017

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. The facility experienced several filled decant cycles during the rain events.

PA DEP

No activity.

Minor Repairs and Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Organized supply

Cleaned piping within SBR building

Look Ahead Preventative Maintenance Activities

Overhaul centrifuge drive gear boxes and evaluation of bearings for replacement. Gathering information for parts.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 5

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 7, 2017

The East Goshen Township Municipal Authority held their regular public meeting on Monday, August 7, 2017 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Ed McAssey, Jack Yahraes, Dana Pizarro, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Mark Miller (Public Works Director), Mike Ellis (Pennoni), Patrick McKenna (Attorney) ,Walter Wujcik, (Conservancy Board) and Scott Towler (BFES).

COMMON ACRONYMS:

Acronym Meaning
BFES Big Fish Environmental Services
BOS Board of Supervisors
CB Conservancy Board
DEP Department of Environmental Protection
EPA Environmental protection Agency
HC Historical Commission
I&I Inflow & Infiltration
LCSTP Lockwood Chase Sewer Treatment Plant
MA Municipal Authority
NPDES National Pollutant Discharge Elimination System
PC Planning Commission
PM Prevention Maintenance
PR Park & Recreation Board
RCSTP Ridley Creek Sewer Treatment Plant
SBR Sequencing Batch Reactor
SSO Sanitary System Overflow
WAS Waste Activated Sludge

Call to Order & Pledge of Allegiance

Ed called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Ed asked if anyone would be recording the meeting. There was no response.

Chairman's Report

Ed reported that he attended the West Goshen meeting. They made some changes to the proposed by-laws. Westtown and West Whiteland have not signed the agreement yet. Mike Moffa, Waste Water Manager, recommended getting a new digester.

Sewer Reports

1. Director of Public Works, Mark Miller's report for July:

Monthly Flows: The average daily flow to West Goshen was 719,000 gallons per day.
Meters: Meters were read on a daily basis with no problems.
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We replaced all of the castings and lids along Reservoir Road, Meadow Drive and Hollyberry Lane.
R.C. Collection: Pump stations were visited on a daily basis with no problems to report.
R.C. Plant: No problems to report.
Alarms: We responded to 20 alarms for July.
PA One Calls: We received 78 PA One calls for July.

MA 8-7-17 draft      1

2. Pennoni Engineer's Report for June

Mike Ellis provided the following report.

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study –
  • We previously calculated the estimated caustic soda feed rate to be 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We previously recommended a 7.7-gallon/hour pump be acquired for the study. We are obtaining pricing for a larger ±19.9 gallon/hour pump as requested by the Municipal Authority in the event the recommended pump is found to be inadequate during the trial. Two 350-gallon totes should allow for a 2.5-3 week trial. We previously sent our recommendations to the plant operator for review and are awaiting a response.
  • A pilot study sampling plan was previously requested from Big Fish, and we are awaiting a response.
  • We provided recommendations to Public Works on the chemical feed tapping location to the influent SBR ductile iron piping including injection quill and ball valve.
  • The pilot study can begin once the tap is installed and the operator provides a sampling plan and confirms the caustic soda feed rate.
  • SBR tanks CIM coatings –
  • We researched the history of the SBR tanks' structural design, construction, and CIM coating bubbling and peeling issues. A summary of findings and structural condition assessment testing alternatives will be provided at the August MA meeting.

Reservoir Road Pump Station

  • We submitted revised plans to the Army Corps of Engineers (USACE) to address their last set of minor comments, and we are hopeful that this final permit will be issued by the end of August.
  • The bid document will be finalized and submitted upon receipt of the remaining USACE permit.
  • We will complete a listing of the permits, expiration dates, and renewal deadlines once the USACE permit is issued.

RCSTP and Pump Stations' O&M Manual

  • We received comments on the near-final O&M Manual submission from Mark Miller. The comments were addressed, and the Manual has been finalized. We reproduced 22 bound, hard

MA 8-7-17 draft      2

copies for the Public Works staff and other Township staff. We recommend the Manual be revisited in one year to determine if further updates are needed.

Supplee Valley Pipe Lining

  • We reviewed several videos of the sewer mains and began prioritizing sewers for rehabilitation. Additional missing videos have been requested from the CCTV contractor so that we can complete the prioritization, scoping, and cost estimating.

New Connections

  • Knauer Property, 1680 East Boot Road – We reviewed a revised plan submission for a proposed sewer connection to be installed with fewer lateral pipes at less-than-minimum slopes, and we provided comments to the Township and developer.
  • Brakman Property, 1420 East Strasburg Road – We reviewed sanitary sewer shop drawings, attended a sewer pre-construction meeting, and performed construction observation of the horizontal directional drilling of the new gravity sewer main across East Strasburg Road.

West Goshen Sewer System Consultation

  • We prepared and issued a Self-Liquidating Debt Certification for the portion of the upcoming bond issuance that will be used to pay East Goshen's portion of West Goshen's plant and sewer system upgrades.

Mike mentioned that Costars has 8 companies that do relining. The estimated cost is $40-50/linear foot. He will contact some of them and should have a recommendation next month.
Pennoni is requesting additional funds for general services totaling $8,500. Jack moved to approve additional funds not to exceed $9,000. Dana seconded the motion. The motion passed unanimously.

3. Big Fish Environmental Services – Scott's report for July showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of June 2017. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Jack commented on the discharge to Applebrook. Mark said the pump is on now.

Approval of Minutes

The minutes of the July 10, 2017 meeting were approved as corrected.

Approval of Invoices

1. Jack moved to approve payment of the following Pennoni invoices:

  • a. Pennoni #759081 $2,589.25
  • b. Pennoni #759083 $ 269.25
  • c. Pennoni #759084 $2,621.25

Dana seconded the motion. The motion passed unanimously.

MA 8-7-17 draft      3

2. Jack moved to approve payment of Gawthrop Invoice #182042 for $940.00. Dana seconded the motion. The motion passed unanimously.

Liaison Report

Conservancy Board - Walter reported that the BOS approved a study of the ponds to be done by the Natural Lands Trust. The results of the study will determine what will be done with the trees in Marydell. Ed complemented the CB on the work they have done on Clymer's Woods.

Board of Supervisors – Carmen reported that, in addition to the bond sale and NLT study, they approved the engineering for the Paoli Pike Trail.

Financial Reports

Jon Altshul provided the following written report:
In July 2017, the Municipal Authority recorded $5,982 in interest income (mostly from the $5,000 transfer from the sewer fund) and $5,893 in expenses for a positive variance of $90. Expenses included $3,167 for general engineering and $2,726 for Reservoir Road Pump Station engineering. As of June 30, the fund balance was $1,182,067 of which $1,142,761 is in the main construction account (most of which represents the 2013 note).
The July 11th bond sale was very successful. Six investment banks made 59 bids on the bonds over the course of 30 minutes. The low bid came from Janney Montgomery Scott with a yield (effective interest rate) of 2.778%. The closing will occur on August 15th at which point the funds will be wired to the bank.

Goals

Goals for 2017 were reviewed.

Old Business

SBR tanks CIM coatings - Mike provided photos of SBR Tank #1 and #2 which were taken on July 18, 2017. SBR #1 was off line. He explained that the liner is on the interior walls only. The top peeling is a new issue. There is a 10 year warranty on the coating through Dutchland and they have been making the repairs. Kevin suggested taking samples. Scott commented that there are no problems with the exterior walls. He explained the structure composition. Mike mentioned that Pennoni has structural engineers who can take cores from the walls and test it. He estimates the cost to be $10,000-15,000. After further discussion about the testing process, Kevin moved to authorize Pennoni to take 2 cores and do the testing not to exceed $15,000. Jack seconded the motion. The motion passed unanimously.

New Business

New Probes and controller - Mark explained that there are 3 probes in the SBRs that are 8-10 years old. Cost to replace them and the controller for the plant will be $14,000 and it will come out of Capital Reserve. Jack moved to authorize Mark to purchase the 3 replacement probes and controller. Dana seconded the motion. The motion passed unanimously.

MA 8-7-17 draft      4

Any Other Matter

Mark commented to Scott that he appreciates the daily reports the staff sends to him. Scott explained the processing at the plant.

Adjournment

There being no further business, Dana moved to adjourn the meeting. Jack seconded the motion. The meeting was adjourned at 8:10 p.m. The next regular meeting will be held on Monday, September 11, 2017 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 8-7-17 draft      5

Pennoni
INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 763591
Invoice Date : 08/24/2017
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting

For Services Rendered through: 8/13/2017

Correspondence with Army Corps of Engineers in response to additional permitting questions.

Phase : 12 -- Permitting

Phase Category Amount
Total Phase : 12 -- Permitting Labor : 80.25
Expense : 0.00
Phase Total : 80.25
Amount Due This Invoice $80.25

Phase : 12 -- Permitting

Labor Class Hours/Units Rate Amount
Authority Engineer 0.25 119.00 29.75
Sr. Environmental Scientist 0.50 101.00 50.50
Labor Total: 0.75 80.25
Summary Category Amount
Total Phase : 12 -- Permitting Labor : $80.25
Expense : $0.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting Labor : $80.25
Expense : $0.00

ok [Signature: RS]
9-8-17

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 8/24/2017

Project:EGMA1504
Pennoni Job No.:Reservoir Rd PS Design & Permitting
Invoice No:763591
Invoice Period:7/17/2017to8/13/2017
Initial Authorization:$ 167,120.00Date:8/24/2017
Contract Amount:$ 193,200.00
Previously Invoiced:$ 192,351.25
Current Invoice:$ 80.25
Invoiced to Date ($):$ 192,431.50
Invoiced to Date (%):99.60%
Remaining Budget ($):$ 768.50
Remaining Budget (%):0.40%

Budget by Phase:

Phase Name:PermittingPhase 12
Phase Budget:$ 50,940.25
Previously Invoiced:$ 50,348.25
Current Invoice:$ 80.25
Invoiced to Date ($):$ 50,428.50
Invoiced to Date (%):99.00%
Remaining Budget ($):$ 511.75
Remaining Budget (%):1.00%

Comments: Correspondence with Army Corps of Engineers in response to additional permitting questions.

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY
For Services Rendered through: 8/13/2017

Task No. Activity Contract Amount* Invoiced Effort thru 3/19/2017 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $4,020.00 - - Yes
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $65,170.25 $64,993.50 $176.75 0.3% No**
12 Permitting $50,940.25 $50,428.25 $511.50 1% No***
TOTAL $193,120.00 $192,431.75 $688.25 0.4%

*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.

**Need to complete Bid Form and assemble full bid document package for Township once remaining permits are issued.

*** All permit applications have been submitted, and we are awaiting issuance of one remaining permit as of 8/13/2017: Army Corps of Engineers federal authorization on the Chester Creek Small Projects Joint Permit.

Pennoni
INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :763593
Invoice Date :08/24/2017
Project :EGMA1505
Project Name :RCSTP and Pump Station O&M Manual

For Services Rendered through: 8/13/2017

FINAL INVOICE

Final review of O&M Manual with PW Director; final updates to Manual; and reproduction and binding of 22 hard copies for Township staff.

Phase : **** -- Professional Services

Total Phase : **** -- Professional ServicesLabor :1,205.75
Expense :0.00
Phase Total :1,205.75
Amount Due This Invoice$1,205.75
Fee :15,500.00
Prior Billings :13,433.25
Current Billings :1,205.75
Total Billings :14,639.00

Phase : **** -- Professional Services

Labor Class Hours/ Units Rate Amount
Authority Engineer 1.75 119.00 208.25
Senior Professional 8.75 114.00 997.50
Labor Total: 10.50 1,205.75
Total Phase : **** -- Professional ServicesLabor :$1,205.75
Expense :$0.00
Total Project : EGMA1505 -- RCSTP and Pump Station O&M ManualLabor :$1,205.75
Expense :$0.00

ok RS 9-8-17

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1505 Invoice Summary
Invoice Date 8/24/2017

Project:EGMA1505
Pennoni Job No.:RCSTP & Pump Station O&M Manual
Invoice No:763593
Invoice Period:6/19/2017to8/13/2017
Initial Authorization:$ 12,500.00Date:8/24/2017
Contract Amount:$ 15,500.00
Previously Invoiced:$ 13,433.25
Current Invoice:$ 1,205.75
Invoiced to Date ($):$ 14,639.00
Invoiced to Date (%):94%
Remaining Budget ($):$ 861.00
Remaining Budget (%):6%

Budget by Phase:

Phase Name:RCSTP & Pump Station O&M Manual
Phase Budget:$ 15,500.00
Previously Invoiced:$ 13,433.25
Current Invoice:$ 1,205.75
Invoiced to Date ($):$ 14,639.00
Invoiced to Date (%):94%
Remaining Budget ($):$ 861.00
Remaining Budget (%):6%

Comments: FINAL INVOICE
Final review of O&M Manual with PW Director; final updates to Manual; and reproduction and binding of 22 hard copies for Township staff.

Pennoni
INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :763595
Invoice Date :08/24/2017
Project :EGMA1701
Project Name :2017 General Services

For Services Rendered through: 8/13/2017

Prepared August Engineer's Report, reviewed August RCSTP operator's report, and attended August MA meeting. Prepared and submitted self-liquidating debt financial analysis and certification report for bond issuance. Performed one-year warranty inspection of Spraywall liners in 6 manholes in White Chimneys.

RCSTP SBR Tanks CIM Coatings - Field visit by Authority Engineer to observe SBR #1 coating; structural engineers initiated concrete condition assessment recommendations by reviewing documentation on history of coatings including installation rationale, correspondence, deficiencies, design plans, shop drawings, and warranty information and also prepared assessment recommendations memo.

RCSTP Caustic Soda Pilot Study - Further evaluation of caustic feed tap location; continued coordination with plant operator for sampling plan and review of chemical feed rate calculations; and obtained price quote for larger feed pump.

Phase : **** -- Professional Services

Total Phase : **** -- Professional ServicesLabor :6,222.00
Expense :0.00
Phase Total :6,222.00
Amount Due This Invoice$6,222.00
Fee :21,700.00
Prior Billings :12,516.00
Current Billings :6,222.00
Total Billings :18,738.00

ok RS 9-8-17

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1701 -- 2017 General Services      Invoice # : 763595

...Continued from previous page

Phase : **** -- Professional Services

Labor Class Hours/ Units Rate Amount
Authority Engineer 20.00 119.00 2,380.00
Senior Professional 30.25 114.00 3,448.50
Associate Professional 2.00 88.00 176.00
Senior Engineering Technician 2.50 87.00 217.50
Labor Total: 54.75 6,222.00
Total Phase : **** -- Professional ServicesLabor :$6,222.00
Expense :$0.00
Total Project : EGMA1701 -- 2017 General ServicesLabor :$6,222.00
Expense :$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.      Page: 2

East Goshen Municipal Authority
EGMA1701 Invoice Summary
Invoice Date 8/24/2017

Project:EGMA1701
Pennoni Job No.:2017 General Services
Invoice No:763595
Invoice Period:7/17/2017to8/13/2017
Initial Authorization:$ 12,700.00Date:8/24/2017
Contract Amount:$ 21,700.00
Previously Invoiced:$ 12,516.00
Current Invoice:$ 6,622.00
Invoiced to Date ($):$ 19,138.00
Invoiced to Date (%):88%
Remaining Budget ($):$ 2,562.00
Remaining Budget (%):12%

Budget by Phase:

Phase Name:2017 General Services
Phase Budget:$ 21,700.00
Previously Invoiced:$ 12,516.00
Current Invoice:$ 6,622.00
Invoiced to Date ($):$ 19,138.00
Invoiced to Date (%):88%
Remaining Budget ($):$ 2,562.00
Remaining Budget (%):12%

Comments: Prepared August Engineer's Report, reviewed August RCSTP operator's report, and attended August MA meeting. Prepared and submitted self-liquidating debt financial analysis and certification report for bond issuance. Performed one-year warranty inspection of Spraywall liners in 6 manholes in White Chimneys.
RCSTP SBR Tanks CIM Coatings - Field visit by Authority Engineer to observe SBR #1 coating; structural engineers initiated concrete condition assessment recommendations by reviewing documentation on history of coatings including installation rationale, correspondence, deficiencies, design plans, shop drawings, and warranty information and also prepared assessment recommendations memo.
RCSTP Caustic Soda Pilot Study - Further evaluation of caustic feed tap location; continued coordination with plant operator for sampling plan and review of chemical feed rate calculations; and obtained price quote for larger feed pump.

Pennoni
INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :763596
Invoice Date :08/24/2017
Project :EGMA1704
Project Name :Supplee Valley Pipe Lining & MH Reh

For Services Rendered through: 8/13/2017

Reviewed and analyzed CCTV videos of sewers; prepared rehabilitation scope recommendations, cost estimates, exhibits, and multi-year construction programming approach; and evaluated Costars vs. public bidding contracting alternatives.

Phase : **** -- Professional Services

Total Phase : **** -- Professional ServicesLabor :3,647.50
Expense :0.00
Phase Total :3,647.50
Amount Due This Invoice$3,647.50
Fee :7,000.00
Prior Billings :0.00
Current Billings :3,647.50
Total Billings :3,647.50

Phase : **** -- Professional Services

Labor Class Hours/ Units Rate Amount
Authority Engineer 5.00 119.00 595.00
Senior Professional 6.25 114.00 712.50
Graduate Professional 29.25 80.00 2,340.00
Labor Total: 40.50 3,647.50
Total Phase : **** -- Professional ServicesLabor :$3,647.50
Expense :$0.00
Total Project : EGMA1704 -- Supplee Valley Pipe Lining & MH RehLabor :$3,647.50
Expense :$0.00

ok RS 9-8-17

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1704 Invoice Summary
Invoice Date 8/24/2017

Project:EGMA1704
Pennoni Job No.:Supplee Valley Pipe Lining & MH Reh
Invoice No:763596
Invoice Period:NTPto8/13/2017
Initial Authorization:$ 7,000.00Date:8/24/2017
Contract Amount:$ 7,000.00
Previously Invoiced:$ -
Current Invoice:$ 3,647.50
Invoiced to Date ($):$ 3,647.50
Invoiced to Date (%):52%
Remaining Budget ($):$ 3,352.50
Remaining Budget (%):48%

Budget by Phase:

Phase Name:Supplee Valley Pipe Lining & MH Reh
Phase Budget:$ 7,000.00
Previously Invoiced:$ -
Current Invoice:$ 3,647.50
Invoiced to Date ($):$ 3,647.50
Invoiced to Date (%):52%
Remaining Budget ($):$ 3,352.50
Remaining Budget (%):48%

Comments: Reviewed and analyzed CCTV videos of sewers; prepared rehabilitation scope recommendations, cost estimates, exhibits, and multi-year construction programming approach; and evaluated Costars vs. public bidding contracting alternatives.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
09/06/2017
Client No:6604-001R
Invoice No.184952

General Authority Services

Fees

Date Initials Description Hours Amount
08/07/2017 PMM Emails from/to R Smith regarding cancellation of sewer plant tour; Review and analyze meeting packet in preparation for Board meeting. 0.60
PMM Attend Board meeting. 1.60
For Current Services Rendered 2.20 440.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna 2.20 $200.00 $440.00
Previous Balance$1,460.00
Total Current Charges440.00
08/14/2017Payment-940.00
08/14/2017Payment-520.00
Total Payments-1,460.00
Balance Due$440.00

ok RS 9-8-17

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA August Financial Report
Date: September 6, 2017

In August, the Municipal Authority recorded $2,981 in income (mostly from a $2,000 tap-in fee for 1418 Strasburg) and $6,940 in expenses, for a negative variance of $3,959. Expenses included $2,589 for Reservoir Road Pump Station engineering; $269 for West Goshen engineering (capital); $2,621 for general engineering and $1,460 for legal services.

As of August 31st, the fund balance was $1,178,108 of which $1,140,872 is in the main construction account (most of which represents the 2013 note).

On September 6, the Board of Supervisors approved fraud protection services for Township bank accounts. Specifically, for the Municipal Authority Bank account, it is recommended that the Authority have a service called "ACH Monitor" to prevent unauthorized electronic withdrawals. The cost of this service is $15 per month.

Recommended motion: I authorize the Township to establish fraud protection services on the Municipal Authority account.

Finally, it is my understanding that the MA increased its engineering budget by $9,000 at its last meeting. I went ahead and increased the line item in our financial system as well as the transfer from the sewer operating fund by $9,000 to offset this expense, so that the MA budget remains balanced. On the Township side, the Sewer Operating Side is doing very well this year. As a result, the BOS approved a motion on August 15th, to increase the transfer to the Municipal Authority by $9,000. This was offset by a reduction in the O&M line-item for West Goshen, which is coming in under budget.

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
AUGUST 2017

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - CAPITAL 1,176,189.08
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - 2013 NOTES (FULTON BANK) 1,142,761.14
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE DNB CAPITAL ACCOUNT 33,427.94
CAPITAL:
REVENUE
INTEREST EARNED - CONSTRUCTION 07341 1020 3,250 980.51 6,350.05
TOTAL REVENUE 3,250 980.51 6,350.05
EXPENESES
C.C. CAPITAL - COLLECTION 07424 7420 212,486 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0 2,589.25 16,304.75
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0 0.00 0.00
WEST GOSHEN CAPITAL 07429 6100 0 269.25 269.25
TOTAL EXPENSES 212,486 2,858.50 16,574.00
NET CAPITAL (209,236) (1,877.99) (10,223.95)
MUNICIPAL AUTHORITY ENDING FUND BALANCE - CAPITAL 1,174,311.09
MUNICIPAL AUTHORITY ENDING FUND BALANCE - 2013 NOTES (FULTON BANK) 1,140,871.79
MUNICIPAL AUTHORITY ENDING FUND BALANCE DNB CAPITAL ACCOUNT 33,439.30

U:\bmccool\2017\Municipal Authority\2017 - 08 - Municipal Authority Report.xlsx      Page 1 of 2      09/06/2017

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
AUGUST 2017

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING:
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - OPERATING (BB&T) 5,878.02
REVENUE
INTEREST EARNINGS 07341 1000 10 0.13 7.10
C.C. TAPPING FEES 07364 1100 14,296 2,000.00 6,000.00
CONNECTION FEES - SEWER 07364 1130 0 0.00 1,692.00
TRANSFER FROM SEWER OPERATING 07392 0500 109,755 0.00 70,000.00
TOTAL REVENUE 124,061 2,000.13 77,699.10
EXPENESES
ADMINISTRATIVE WAGES 07424 1400 31,620 0.00 15,448.00
MISCELLANEOUS EXPENSE 07424 3000 2,500 0.00 2,207.52
MUNIC.AUTH.-AUDITING 07424 3110 9,078 0.00 9,200.00
ENGINEERING SERVICES 07424 3130 46,500 2,621.25 43,933.50
LEGAL SERVICES 07424 3140 9,250 1,460.00 11,563.16
M.C.-DVRFA-DEBT SERVICE 07471 1000 26,320 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 2,043 0.00 0.00
TOTAL EXPENSES 127,311 4,081.25 82,352.18
NET OPERATING (3,250) (2,081.12) (4,653.08)
MUNICIPAL AUTHORITY ENDING FUND BALANCE - OPERATING 3,796.90
MUNICIPAL AUTHORITY ENDING FUND BALANCE CAPITAL + OPERATING 1,178,107.99

U:\bmccool\2017\Municipal Authority\2017 - 08 - Municipal Authority Report.xlsx      Page 2 of 2      09/06/2017

East Goshen Township General Ledger

Report Date 09/06/17      GL Transaction Details      PAGE 1
MGRP18 run by BRIAN      12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1701 JE 56730 0.23 02/03/17 INTEREST INTEREST EARNED JANUARY 2017
07 FUND
1701 0.00 0.23 -0.23
1702 57134 0.06 03/06/17 INTEREST INTEREST EARNED FEBRUARY 2017
07 FUND
1702 0.00 0.06 -0.29
1703 57173 3.23 03/08/17 INTEREST ADD'L INTEREST ADDED FROM JAN. 2017
57549 0.61 04/05/17 INTEREST INTEREST EARNED MARCH 2017
07 FUND
1703 0.00 3.84 -4.13
1704 57927 1.06 05/03/17 INTEREST INTEREST EARNED APRIL 2017
07 FUND
1704 0.00 1.06 -5.19
1705 58423 0.96 06/02/17 INTEREST INTEREST EARNED MAY 2017
07 FUND
1705 0.00 0.96 -6.15
1706 58876 0.66 07/03/17 INTEREST INTEREST EARNED JUNE 2017
07 FUND
1706 0.00 0.66 -6.81
1707 59333 0.16 08/01/17 INTEREST INTEREST EARNED JULY 2017
07 FUND
1707 0.00 0.16 -6.97
1708 59780 0.13 09/01/17 INTEREST INTEREST EARNED AUGUST 2017
07100.1000
1708 0.00 0.13 -7.10

East Goshen Township General Ledger

Report Date 09/06/17      GL Transaction Details      PAGE 2
MGRP18 run by BRIAN      12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 **** *** **** 0.00 7.10 -7.10
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1701 56730 594.59 02/03/17 INTEREST INTEREST EARNED JANUARY 2017
07 FUND
1701 0.00 594.59 -594.59
1702 57134 536.20 03/06/17 INTEREST INTEREST EARNED FEBRUARY 2017
07 FUND
1702 0.00 536.20 -1,130.79
1703 57549 743.58 04/05/17 INTEREST INTEREST EARNED MARCH 2017
07 FUND
1703 0.00 743.58 -1,874.37
1704 57927 854.28 05/03/17 INTEREST INTEREST EARNED APRIL 2017
07 FUND
1704 0.00 854.28 -2,728.65
1705 58423 815.38 06/02/17 INTEREST INTEREST EARNED MAY 2017
07 FUND
1705 0.00 815.38 -3,544.03
1706 58876 843.23 07/03/17 INTEREST INTEREST EARNED JUNE 2017
07 FUND
1706 0.00 843.23 -4,387.26
1707 59333 982.28 08/01/17 INTEREST INTEREST EARNED JULY 2017
07 FUND
1707 0.00 982.28 -5,369.54
1708 59796 980.51 09/05/17 INTEREST INTEREST EARNED AUGUST 2017
07 FUND
1708 0.00 980.51 -6,350.05

East Goshen Township General Ledger

Report Date 09/06/17 — GL Transaction Details — PAGE 3

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1020 * * * * * * * * * * * 0.00 6,350.05 -6,350.05
07364-1100 C.C. TAPPING FEES 0.00
1704 57798 2,000.00 04/25/17 RECLASS RECLASS TAP IN FEE
RE 57797 2,000.00 04/25/17 57797 1 SEWER TAP IN - 5 SCHOOL LN C.C. TAPPING FEES
1704 0.00 4,000.00 -4,000.00
1708 59745 2,000.00 08/31/17 CK105 TAP IN FEE-1418 E. STRASBRG C.C. TAPPING FEES
1708 0.00 2,000.00 -6,000.00
07364-1100 * * * * * * * * * * * 0.00 6,000.00 -6,000.00
07364-1110 R.C.TAPPING FEES 0.00
1704 JE 57798 2,000.00 04/25/17 RECLASS RECLASS TAP IN FEE
RE 57795 2,000.00 04/25/17 57795 1 SEWER TAP IN - 3 SCHOOL LN
1704 2,000.00 2,000.00 0.00
07364-1110 * * * * * * * * * * * 2,000.00 2,000.00 0.00
07364-1130 CONNECTION FEES - SEWER 0.00
1702 CR 56762 423.00 02/07/17 125 25 10162 1 JACOBS, ROBERT & CHERYL
56823 423.00 02/13/17 125 26 10160 1 GEORGE SMITH & CHRISTINA CONLE
423.00 02/13/17 125 27 10161 1 STOFFLET, MICHAEL
* * 0.00 846.00 * * *
1702 0.00 1,269.00 -1,269.00
1703 57212 423.00 03/09/17 125 54 10163 1 PAPPANO, JOSEPH & PATRICIA
1703 0.00 423.00 -1,692.00
07364-1130 * * * * * * * * * * * 0.00 1,692.00 -1,692.00

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 4

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
JE 57171 25,000.00 03/08/17 DEPOSIT DEPOSIT FR: SEWER TO MUNICIPAL
1703 0.00 25,000.00 -25,000.00
1704 57579 40,000.00 04/06/17 DEPOSIT DEPOSIT TO MA ACCT.7100.1000
1704 0.00 40,000.00 -65,000.00
1707 59229 5,000.00 07/26/17 XFER XFER $ FROM 05 TO 07 OPERATING
1707 0.00 5,000.00 -70,000.00
07392-0500 **** *** **** 0.00 70,000.00 -70,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1703 CD 57378 7,724.00 03/22/17 3048 425 EAST GOSHEN TOWNSHIP - GENERAL QTR.1 2017 REIMBURSEMENT FROM MA
1703 7,724.00 0.00 7,724.00
1706 58848 7,724.00 06/30/17 3059 425 EAST GOSHEN TOWNSHIP - GENERAL 2017 QTR.2 REIMBURSEMENT FROM MA
1706 7,724.00 0.00 15,448.00
07424-1400 **** *** **** 15,448.00 0.00 15,448.00
07424-3000 MISCELLANEOUS EXPENSE 0.00
1701 56280 984.30 01/04/17 3040 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2017 ACTIVE MEMBERSHIP DUES
56424 3.22 01/13/17 3041 425 EAST GOSHEN TOWNSHIP - GENERAL CORRECT BB&T DEPOSIT OF REMAININ BALANCE OF CLOSED ACCT.1100.1010 07100.1000
1701 987.52 0.00 987.52
1706 58814 1,220.00 06/29/17 3058 3871 DELAWARE RIVER BASIN COMMISSION D-1984-056 CP ANNUAL FEE - WATER DISCHARGE

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 5

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1706 1,220.00 0.00 2,207.52
07424-3000 **** *** **** 2,207.52 0.00 2,207.52
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1703 57470 4,600.00 03/30/17 3049 808 MAILLIE FALCONIERO & CO. PROGRESS BILLING 2016 MUN.AUTH.
1703 4,600.00 0.00 4,600.00
1704 57655 4,600.00 04/13/17 3052 808 MAILLIE FALCONIERO & CO. 2016 EXAM. FINAN. STMTS. MUN.AUT
1704 4,600.00 0.00 9,200.00
07424-3110 **** *** **** 9,200.00 0.00 9,200.00
07424-3130 ENGINEERING SERVICES 0.00
1701 56425 4,399.50 01/13/17 3042 1052 PENNONI ASSOCIATES INC. SERVICES THRU 10/16/16 RCSTP & P STATION
1701 4,399.50 0.00 4,399.50
1702 56874 2,044.00 02/17/17 3045 1052 PENNONI ASSOCIATES INC. SERVICES THRU 1/15/17 2016 CHAP
1702 2,044.00 0.00 6,443.50
1703 57328 7,962.00 03/17/17 3047 1052 PENNONI ASSOCIATES INC. SERV.THRU 2/12/17 2017 GEN.SERV
1703 7,962.00 0.00 14,405.50
1704 57510 5,416.50 04/03/17 3050 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/11/16 2016 GEN.SERV
57655 7,306.50 04/13/17 3053 1052 PENNONI ASSOCIATES INC. SERVICE THRU 3/19/17 RCSTP PERMI
1704 12,723.00 0.00 27,128.50

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 6

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1705 CD 58070 8,211.75 05/11/17 3054 1052 PENNONI ASSOCIATES INC. SERVICE THRU 4/16/17 RCSTP & PUM STATION
1705 8,211.75 0.00 35,340.25
1706 58614 2,805.25 06/14/17 3057 1052 PENNONI ASSOCIATES INC. SERVICES THRU 5/14/17 RCSTP PERM
1706 2,805.25 0.00 38,145.50
1707 58978 3,166.75 07/12/17 3060 1052 PENNONI ASSOCIATES INC. SERVICES THRU 6/18/17 WHITE CHIM
1707 3,166.75 0.00 41,312.25
1708 59496 2,621.25 08/11/17 3063 1052 PENNONI ASSOCIATES INC. SERVICES THRU 7/16/17-2017 GEN.S
1708 2,621.25 0.00 43,933.50
07424-3130 **** *** **** 43,933.50 0.00 43,933.50
07424-3140 LEGAL SERVICES 0.00
1701 56550 940.00 01/25/17 3043 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - DEC. 2016 GEN.AU
1701 940.00 0.00 940.00
1702 56874 597.50 02/17/17 3044 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN.2017 GEN.AUT
1702 597.50 0.00 1,537.50
1703 57328 655.00 03/17/17 3046 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERV. FEB.2017 GEN.AUTHORI
1703 655.00 0.00 2,192.50
1704 57655 2,140.00 04/13/17 3051 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2017 GEN.A

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 7

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1704 2,140.00 0.00 4,332.50
1705 58187 2,407.41 05/19/17 3055 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 4/4-4/28/17 GEN.AU
1705 2,407.41 0.00 6,739.91
1706 58614 1,640.00 06/14/17 3056 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERV. - MAY 2017 GEN.AUTH.
1,723.25 06/14/17 3057 1052 PENNONI ASSOCIATES INC. SERVICES THRU 5/14/17 2017 GEN.S
** 3,363.25 0.00 ***
1706 3,363.25 0.00 10,103.16
1708 59496 1,460.00 08/11/17 3062 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE JUNE 2017 - GEN.AU
1708 1,460.00 0.00 11,563.16
07424-3140 **** *** **** 11,563.16 0.00 11,563.16
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1701 56426 2,546.50 01/13/17 22002 1052 PENNONI ASSOCIATES INC. SERVICE THRU 10/16/16 RESERV.RD
56551 375.00 01/25/17 22003 263 CHESTER COUNTY CONSERVATION DISTRICT RESERVOIR RD. NPDES PLAN REVIEW
1701 2,921.50 0.00 2,921.50
1702 56875 1,422.75 02/17/17 22004 1052 PENNONI ASSOCIATES INC. SERVICES THRU 1/15/17 RESERV.RD
1702 1,422.75 0.00 4,344.25
1704 57511 1,784.25 04/03/17 22005 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/11/17 RESERVOIR RD.
57656 1,516.50 04/13/17 22006 1052 PENNONI ASSOCIATES INC. SERV.THRU 3/19/17 RESERV.RD PS
1704 3,300.75 0.00 7,645.00

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 8

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-1000 1705 CD 58071 1,261.50 05/11/17 22007 1052 PENNONI ASSOCIATES INC. SERVICES THRU 4/16/17 RESERV.RD
1705 1,261.50 0.00 8,906.50
1706 58616 2,083.00 06/14/17 22009 1052 PENNONI ASSOCIATES INC. SERVICE THRU 5/24/17 RESERV.RD P
1706 2,083.00 0.00 10,989.50
1707 58979 2,726.00 07/12/17 22010 1052 PENNONI ASSOCIATES INC. SERVICE THRU 6/18/17 RESERV.RD P
1707 2,726.00 0.00 13,715.50
1708 59495 2,589.25 08/11/17 22011 1052 PENNONI ASSOCIATES INC. SERVICE THRU 7/16/17 RESERVOR RD
1708 2,589.25 0.00 16,304.75
07428-1000 **** *** **** 16,304.75 0.00 16,304.75
07429-6100 WEST GOSHEN CAPITAL 0.00
1705 58071 705.00 05/11/17 22007 1052 PENNONI ASSOCIATES INC. SERV. THRU 4/16/17 W.GOSHEN SEWE
220,814.48 05/11/17 22008 3843 WEST GOSHEN SEWER AUTHORITY PROJECT COSTS RE: CONSTRUCTION, LABOR, PARTS, ENGINEERING, LEGAL TESTING
** 221,519.48 0.00 ***
1705 221,519.48 0.00 221,519.48
1706 58616 1,146.00 06/14/17 22009 1052 PENNONI ASSOCIATES INC. SERVICE THRU 5/24/17 W.GOSHEN SE
1706 1,146.00 0.00 222,665.48
1708 59495 269.25 08/11/17 22011 1052 PENNONI ASSOCIATES INC. SERVICE THRU 7/16/17 W.GOSH SEWE
1708 269.25 0.00 222,934.73

East Goshen Township General Ledger

Report Date 09/06/17 | GL Transaction Details | PAGE 9

MGRP18 run by BRIAN 12 : 48 PM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07429-6100 **** *** **** 222,934.73 0.00 222,934.73
Grand Total 323,591.66 86,049.15 237,542.51
Source Debits Credits
JE 2,000.00 78,357.15
RE 0.00 6,000.00
CR 0.00 1,692.00
CD 321,591.66 0.00
323,591.66 86,049.15

CERTIFIED MAIL-RETURN RECEIPT REQUESTED

[Seal] DEPARTMENT OF DEFENSE UNITED STATES OF AMERICA

DEPARTMENT OF THE ARMY

PHILADELPHIA DISTRICT CORPS OF ENGINEERS
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390

AUG 17 2017

REPLY TO ATTENTION OF

Regulatory Branch
Application Section II

SUBJECT: CENAP-OP-R-2017-0205-46 (PASPGP-5)
Project Name: RESERVOIR ROAD FORCE MAIN
PADEP #: E15-877 (Chester Creek) and GPs-051515327 and 081515309 (Ridley Creek)
Start Decimal Latitude: 39.972528° Longitude: -75.548231°
End Decimal Latitude: 39.985215° Longitude: -75.528128°

[Stamp: RECEIVED AUG 31 2017 BY]

Mr. Louis Smith
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, Pennsylvania 19380

Dear Mr. Smith:

Reference is made to your request for Department of the Army approval for the Reservoir Road Force Main and Pump Station project as described in a letter from your consultant, Pennoni Associates, dated April 18, 2017. The approved work includes the following activities:

  • A) Chester Creek – 8” force main open-cut trenching - 25 feet of waterway impacting a total of 490 square feet of area below the ordinary high water mark for both force main placement (75 square feet of permanent impact) and temporary impacts from sandbag de-watering and a temporary rock covered culvert vehicle access; and
  • B) Ridley Creek – 8” force main open cut trenching - 32 feet of waterway impacting a total of 725 square feet of area below the ordinary high water mark for both force main placement (96 square feet of permanent impact) and temporary impacts from sandbag de-watering and a temporary rock covered culvert vehicle access; or
  • C) Ridley Creek – 8” force main directional drilling (non-regulated) – beneath 32 feet of waterway and including a total of 375 square feet of area below the ordinary high water mark for temporary impacts from a temporary rock covered culvert vehicle access (regulated).

All such work is part of the subject 1.7 mile long force main and pump station project starting at the northeastern corner of the intersection of Strasburg and Reservoir Roads and ending at a point approximately 1700 linear feet from intersection of Bow Tree Drive and Beaumont Circle, in East Goshen Township, Chester County, Pennsylvania.

We have determined that your proposed work, if accomplished in accordance with the enclosed terms and conditions, is authorized by the Pennsylvania State Programmatic General Permit-5 (PASPGP-5 – Enclosure 1). This PASPGP-5 verification provides federal authorization pursuant to Section 10 of the Rivers and Harbors Act and/or Section 404 of the Clean Water Act. This authorization may be subject to modification, suspension, or revocation if

-2-

any of the information contained in the application, including the plans, is later found to be in error. The following conditions must be followed for purposes of the PASPGP-5. A PASPGP-5 Permit Compliance, Self-Certification Form must be completed and returned to the appropriate U.S. Army Corps of Engineers office upon completion of construction (Enclosure 2).

You are hereby authorized by the U.S. Army Corps of Engineers to conduct the above referenced work under the authority of the enclosed PASPGP-5 (Enclosure 1). Please note that you must conduct the authorized work in accordance with the requirements and conditions of the PASPGP-5 and the special conditions on the following page.

Special Conditions:

  1. All work done in association with the above noted project shall be conducted in accordance with Sheets 1-4, 6, 11, 12, 17, and 19-23 of a 37-page project plan set prepared by Pennoni Associates, Incorporated and entitled “RESERVOIR ROAD PUMP STATION ANDS FORCE MAIN PERMIT PLANS, East Goshen Township, Chester County, Pennsylvania, September 2015, Last Revised: July 2017, Prepared For: East Goshen Municipal Authority, 1580 Paoli Pike, West Chester, PA 19380, (610) 692-7171,” Project EGMA 1504, last revised 07/24/2017.
  2. Construction activities shall not result in the temporary disturbance or alteration of greater than the following (including permanent impacts as identified): A) 490 square feet of waters of the United States below the ordinary high water mark of Chester Creek associated with the discharge of dredged and/or fill materials in the waterway for open-cut trenching of the force main (75 square feet of permanent impact) and temporary construction of sandbag diversion dam, and rock-covered culverted vehicle access; and B) 725 square feet of waters of the United States below the ordinary high water mark of Ridley Creek associated with the discharge of dredged and/or fill materials in the waterway for open-cut trenching of the force main (96 square feet of permanent impact) and temporary construction of sandbag diversion dam and rock-covered culverted vehicle access; or. C) 375 square feet of waters of the United States below the ordinary high water mark of Ridley Creek associated with the discharge of dredged and/or fill materials in the waterway for temporary construction a rock-covered culverted vehicle access for directional drilling of the force main beneath the creek.
  3. Any deviation in construction methodology or project design from that shown on the above noted drawings must be approved by this office, in writing, prior to performance of the work. This includes modifications deemed necessary by the contractor at the time of construction. All modifications to the above noted project plans shall be approved, in writing, by this office. No work shall be performed prior to written approval of this office.
  4. This office shall be notified within 10 days of the completion of the authorized work by completing and signing the enclosed "PASPGP-5 PERMIT COMPLIANCE, SELF CERTIFICATION FORM" (Enclosure 2). All notifications required by this condition shall be in writing and shall be transmitted to this office by registered or electronic mail. Oral notifications are not acceptable. Similar notification is required each time maintenance work is to be done under the terms of this Corps of Engineers permit.

-3-

  1. That this authorization for the Chester Creek crossing shall become invalid should the PADEP permit E15-877 expire. This authorization will become valid upon extension of said PADEP permit or issuance of a new permit for the subject work.
  2. That the permittee shall comply with all requirements of the letter from the U.S. Fish and Wildlife Service dated November 14, 2014 to insure that the project will not be likely to adversely affect bog turtles [ Glyptemys (Clemmys) muhlenbergii ]. If any individuals are noted during any project phase, you are required to stop all work at that portion of the project and immediately notify this office and the U.S. Fish and Wildlife Service in State College, Pennsylvania. No work at that location may commence until this office has determined, in coordination with the U.S. Fish and Wildlife Service, that the project shall continue to have no likely adverse effects to listed species within the Corps’ action area.
  3. That this approval does not include the discharge of dredged and/or fill materials in regulated waters or wetlands associated with the remediation of inadvertent returns of fluids associated with horizontal directional drilling without prior approval of this office.

If you should have any questions regarding this matter, please contact David Caplan of this office at (215) 656-6731 or write to the above address.

Sincerely,

[Signature] Edward E. Bonner
Chief, Regulatory Branch

Enclosures

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

September 8, 2017

EGMA1704

East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director

1580 Paoli Pike
West Chester, PA 19380

RE: Supplee Valley Sewer System Analysis
East Goshen Municipal Authority

Dear Mr. Miller:

We have analyzed sanitary sewer televised videos from Supplee Valley conducted by Pipe Data View in the spring of 2015, and we have prepared the following condition assessment, prioritizations, and rehabilitation recommendations. Our analysis is based upon the understanding that all heavy flows from laterals have already been addressed and that deficiencies in the sewer between manholes C042M and C042L have also been addressed. The attached “Exhibit #1 - Supplee Valley Condition Assessment” map shows the priority rankings of the sewer lines as either High Priority, Medium Priority, or Good Condition based on our analysis of the videos. We have used the term Good Condition to describe sewer lines that did not have any observed deficiencies. However, these asbestos cement pipes are likely to become subject to similar deficient conditions as the high and medium priority pipes over time, so they should be considered for rehabilitation after all High and Medium Priority lines have been addressed. A breakdown of the analysis is provided in the attached table, “Supplee Valley Sanitary Sewer Deficiency Prioritization”.

We recommend that a total of 4,860 linear feet of sanitary sewer be rehabilitated with cured-in-place pipe lining, and manholes C042FF and C384 should be rehabilitated with pressure grouting to eliminate infiltration. Due to the large quantity of sanitary sewers to be lined and budget limitations, a 3-year rehabilitation program could be implemented as shown in the “Exhibit #2 - Supplee Valley Phasing” map and as further described in the table below. Each year’s rehabilitation program maximizes the number of high priority pipes, from the “Supplee Valley Sanitary Sewer Deficiency Prioritization” table, while including certain upstream or downstream Medium Priority pipes that may be able to be lined continuous with High Priority pipes directly through a manhole.

Street Name Upstream Manhole Downstream Manhole Pipe Length (feet) Pipe Dia. (inches) No. Laterals Estimated Cost
YEAR ONE
Mark Drive C042K C042J 251 8 4 $13,525
Mark Drive C042J C042F 257 8 3 $13,595
Easement C042FF C042D 281 8 2 $14,555
Baldwin Drive C042D C042C 396 8 5 $21,070
Baldwin Drive C042C C042B 256 8 4 $13,775
Baldwin Drive C042B C041A 285 8 3 $15,000
Baldwin Drive C041A C041 89 8 0 $4,470
Manhole C384 and C042FF Pressure Grouting $5,000
Total 1,815 - 21 $100,990

EGMA1704
Mr. Miller | September 8, 2017 | Page 2
Supplee Valley Sewer System Analysis

Street Name Upstream Manhole Downstream Manhole Pipe Length (feet) Pipe Dia. (inches) No. Laterals Estimated Cost
YEAR TWO
Easement C402 C401 395 8 4 $20,765
Easement C401 C400 357 8 3 $18,580
Margaret Lane C407 C406 159 8 4 $8,935
Easement C406 C405 291 8 5 $15,820
Easement C405 C404 371 8 0 $18,555
Easement C411 C410 145 8 2 $7,740
Easement C384 C040 163 8 0 $8,155
Total 1,881 - 18 $98,550
YEAR THREE
Reservoir Road C394 C385 318 8 4 $16,920
Baldwin Drive C417 C416 262 8 5 $14,365
Mark Drive C042I C042H 278 8 5 $15,170
Mark Drive C042G C042F 305 8 5 $16,485
Total 1,163 - 19 $62,940

If you should have any questions, please do not hesitate to contact me.

Sincerely,

PENNONI ASSOCIATES INC.

[Signature] Michael J. Ellis, PE
Authority Engineer

Attachments: Supplee Valley Sanitary Sewer Deficiency Prioritization
Exhibit #1 - Supplee Valley Condition Assessment
Exhibit #2 - Supplee Valley Phasing Exhibit

cc: Rick Smith, Township Manager

W:\Projects\EGMA\EGMA1704-Supplee Valley Pipe Lining MH Rehab\DOCUMENTS\Supplee Valley 2017 Analysis.docx

September 5, 2017

East Goshen Municipal Authority

Supplee Valley Sanitary Sewer Deficiency Prioritization

Priority Deficiency Ranking Street Name Upstream Manhole Downstream Manhole Estimated Length (feet) No. Laterals Pipe Dia. (inches) Pipe Material Notes
High Priority 1 (Worst) Mark Drive C042K C042J 251 4 8 Asbestos Cement (50.8') CC-1
(140.3') JSM-1
(143.3) FC-2
(158.5') HSV-5
(167.5') HSV-5
(176.3') FC-2
(176.3') HSV-5
(176.3) ID-3
(204.8) H-5
(218.5) H-3
(218.5) ID-3
High Priority 2 Baldwin Drive C042C C042B 256 4 8 Asbestos Cement (0.5') FC-2
(31.3') FC-2
(83.0') CC-1
(87.1') Possible pipe intrusion
(87.4') FC-2
High Priority 3 Mark Drive C042J C042F 257 3 8 Asbestos Cement (2.9') H-5
(2.9') IR-4
High Priority 4 Katherine Lane ROW C401 C400 357 3 8 Asbestos Cement (248.5' - 250.1') RTJ-4
(266.7') HSV-5
High Priority 5 Katherine Lane ROW C402 C401 395 4 8 Asbestos Cement (257.7') External patch expanded into pipe; RPPD-4
(351.6') H-3
(351.6') RFB-2
(368.3') H-5
(368.2) RFB-2
High Priority 6 Mark Dr. - Baldwin Dr. Easement C042FF C042D 281 2 8 Asbestos Cement (114.8') FC-2
(114.8') RTJ-2
(114.8') CC-1
(134.8') FC-2
(135.1') IR-4
(237.2') IR-4
High Priority 7 Reservoir Road ROW C384 C040 163 0 8 Asbestos Cement (0.0') ID-5
(0.1' - 3.2') RPRD-4
(157.8' - 163.1') RPRD-4
(160.9) Pipe turns; RPRD-4
High Priority 8 Mark Drive C411 C410 145 2 8 Asbestos Cement (74.5') External patch expanded into pipe; RPPD-4
(75.7') External patch expanded into pipe; RPPD-4
High Priority 9 Baldwin Drive C417 C416 262 5 8 Asbestos Cement (99.8') External patch expanded into pipe; RPPD-4
(116.6') External patch expanded into pipe; RPPD-4
(163.7') IS-0
High Priority 10 Baldwin Drive C042B C041A 285 3 8 Asbestos Cement (100' to 130.5') MWLS-4
Medium Priority 11 Margaret Lane C406 C405 291 5 8 Asbestos Cement (41.5') Liner Frayed; LFDE-3
(80.6') Liner Frayed; LFDE-3
(234' - 238.9') RPRD-4
Medium Priority 12 Baldwin Lane Easement C405 C404 371 0 8 Asbestos Cement (194.9' - 228.6') MWLS-2
(253.6' - 272.6') MWLS-5
Medium Priority 13 Margaret Lane C407 C406 159 4 8 Asbestos Cement (152.1') Liner Frayed; LFDE-3
(157.0') Liner Frayed; LFDE-3
Medium Priority 14 Reservoir Road C394 C385 318 4 8 Asbestos Cement (248.1) RMC-3
Medium Priority 15 Baldwin Drive C041A C041 89 0 8 Asbestos Cement (85.8') LFDE-3
Medium Priority 16 Mark Drive C042I C042H 278 5 8 Asbestos Cement (85.7') FC-2
(155.5') FC-2
Medium Priority 17 Baldwin Drive C042D C042C 396 5 8 Asbestos Cement (131.9') JSM-1
(393) JSM-1
Medium Priority 18 Mark Drive C042G C042F 305 5 8 Asbestos Cement (225.1) JSM-1
Total 4,860 58

Legend:

  • CC - Crack Circumferential
  • FC - Fractured Circumferential
  • H - Hole
  • HSV - Hole Soil Visible
  • ID - Infiltration Dripper
  • IR - Infiltration Runner
  • IS - Infiltration Stain
  • JSM - Joint Separation Medium
  • LFDE - Liner Defective at End
  • MWLS - Sag in Line Water Level > 50% of Pipe
  • RFB - Root Intrusion Fine in Pipe
  • RMC - Root Intrusion Medium at Lateral Connection
  • RPPD - Point Repair Patch Defective
  • RPRD - Point Repair Pipe Defective
  • RTJ - Root Intrusion at Joint

Note(s):

(1) The numbers after each designation are based on the PAPC Guideline rating system. The rating system goes from 1 to 5, were 5 is the worst condition.

Map of the Supplee Valley sanitary sewer system showing condition assessment rankings and manhole numbers (Televised: April 2015, Analyzed: August 2017).

Map of the Supplee Valley sanitary sewer system showing rehabilitation phasing and manhole numbers (Televised: April 2015, Analyzed: August 2017).