Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

October 9, 2017

7:00 PM – Regular meeting at Township Building

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report
  4. APPROVAL OF MINUTES September 11, 2017
  5. APPROVAL OF INVOICES Pennoni Invoice #768598      $ 75.75; Pennoni Invoice #768600      $1,146.00; Pennoni Invoice #768601      $ 109.75; Pennoni Invoice #768602      $1,416.00; Pennoni Invoice #768624      $15,000.00
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS September Financial Report
  8. OLD BUSINESS Supplee Valley Pipe Lining Bid Document
  9. GOALS Operate the Ridley Creek Sewer Treatment Plant in compliance with NPDES Permit requirements. January, May, June, July

F:\Data\Shared Data\Agendas\Municipal Authority\2017\10-09-17.doc

  1. Continue to implement the formal Inflow (surface water) & Infiltration (ground water), (collectively “I&I”) Plan to reduce the amount of I&I into the sewer system.
  2. Respond to capacity requests within 45 days.
  3. Develop an operation manual for Ridley Creek Sewer Treatment Plant and pump stations. Currently under review by staff. Completed on August 7, 2017
  4. Submit topical articles of interest for the East Goshen newsletter. May
  5. Attend West Goshen Municipal Authority meetings to keep informed of planned capital expenditures and operation compliance. January, February, March, April, May, June, July
  1. NEW BUSINESS Consider the Barkway Pump Station Grinder Unit Addition
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER Acknowledge the Mariner East Sunoco Pipeline Project Horizontal Directional Drilling Construction Notification and Private Water Supply/Well Sampling Offer.
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2017\10-09-17.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 4, 2017

To:Municipal Authority
From:Mark Miller
Re:October 2017 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 657,000 gallons per day.

Meters: Meters were read on a daily basis with no problems to report.

C.C. Collection: The pump stations were visited on a daily basis. Wet wells were washed down.

Pumps were pulled at all pump stations and sent to Deckmans for repairs. We repaired 6 lateral caps so far this month. We had Lenni Electric out to check all electrical motors and control panels at the pump station and the sewer plant. A full report was also provided.

The generators at all locations were serviced.

We had a problem at the Barkway Pump Station while pulling the pump. The way we have to work in the wet well needs to be changed. That being said, I have asked Mike Ellis to look into the possibility of installing a Muffin Monster. I have contacted a local Roofer to install a roof hatch which would allow us to remove the pumps safer.

R.C. Collection: Pump Stations were visited on a daily basis with no problems to report.

R.C. Plant: Routine maintenance was performed by the Public Works Department, no problems to report.

Lateral Insp.: Lateral’s were inspected at the Brandolini site on Strasburg Road and the Clock Farms addition on E. Boot Road.

INI: We have been replacing the manhole costings and lids with a water tight lid. (36) In the Wentworth Development.

Alarms: We responded to 28 alarms for September.

PA One Calls: We received 74 PA One calls in September.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

October 5, 2017

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – We previously calculated the estimated caustic soda feed rate to be 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We previously recommended a 7.7-gallon/hour pump be acquired for the study. We have obtained pricing for a larger ±19.9 gallon/hour pump as requested by the Municipal Authority in the event the recommended pump is found to be inadequate during the trial. Two 350-gallon totes should allow for a 2.5-3 week trial. We previously sent our recommendations to the plant operator for review and are awaiting a response. No update since our last report.; A pilot study sampling plan was previously requested from Big Fish, and we are awaiting a response. No update since our last report.; The pilot study can begin once the tap is installed and the operator provides a sampling plan and confirms the caustic soda feed rate. No update since our last report.; In order to progress this project, a meeting has been tentatively set up for October 13 at the RCSTP with the Public Works Department, Pennoni, Big Fish, and the controls consultant to resolve outstanding questions and concerns (i.e. chemical feed control during fill-decant phase) and establish a definitive schedule to begin the trial.
  • SBR tanks CIM coatings – Our structural engineers and leakage consultant performed a visual and non-destructive evaluation of the SBR #1 concrete walls on August 23. Two concrete cores were taken from the SBR #1 walls the same day. The cores have been tested and analyzed. We will provide a report with lab analyses, findings, and recommendations prior to the October MA meeting.

Reservoir Road Pump Station

  • We have received all permits. The bid document will be finalized to incorporate the recently issued Army Corps of Engineers permit, and a final set of plans and specifications will be provided to the Township for their files.
  • A listing of the permits, expiration dates, and renewal deadlines will also be provided.

RCSTP and Pump Stations’ O&M Manual

  • Completed. We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.

EGMA1701      October 5, 2017      Page 2
East Goshen Municipal Authority      Engineer’s Report

Supplee Valley Pipe Lining

  • We prepared the bid document and submitted it to the Township for review. The bid document includes ALL sewers that we had previously recommended for repair over a 3-year period since the contract will span over calendar years 2017 into 2018, and funding from both years will therefore be available. We recommend the following schedule: Advertisements = 10/10 and 10/13; Non-mandatory pre-bid meeting = 10/18 at 10:00 am at the Twp building; Bids Due = 11/6 at 10:00 am; Award = 11/13 MA meeting; Contract Execution ≈ early December; NTP ≈ mid-December; Construction (90 days duration) - mid-December to March

White Chimneys Manhole Lining

  • We completed a 1-year warranty visual observation of the manholes that were lined in 2016 in White Chimneys and along Cornwallis Drive. No deficiencies were observed with the liners. However, apparent sulfuric acid (from hydrogen sulfide) is present on the liners near the bottoms of some of the manholes. We have recommended that the Public Works Department clean those liners. No update since our last report.

Barkway Pump Station Grinder

  • We met with the Public Works Director at the pump station to perform an initial evaluation of alternatives to add a comminutor (such as a Muffin Monster) to address problems with the pumps being caused by rags, wipes, and other materials. We submitted a proposal for engineering services to add a comminutor.

New Connections

  • Knauer Property, 1680 East Boot Road – We reviewed another revised plan submission to add additional sewer piping on-site to convey wastewater from additional on-site facilities through the previously approved laterals. Comments were provided to the Township.
  • Brakman Property, 1420 East Strasburg Road – We reviewed a revised plan to change one of the two gravity service laterals to a force main with grinder pump due to shallow rock. Comments were provided to the Township and developer.

West Goshen Sewer System Consultation

  • No activity since last report.

P:\Projects\EGMA\Memos to Board\2017\Engineers Report 2017-10-05.docx

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of August 2017. Discharge to Applebrook was initiated August 20th. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

The total phosphorus monthly average was reported as 0.44 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.20 to 0.67 mg/L. The ammonia as nitrogen monthly concentration was reported as 0.16 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.33 mg/L. The total suspended solids (TSS) monthly concentration was reported as 4 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 5 mg/L as compared to the permit discharge limitation of 15 mg/L.

Table 1 illustrates the final effluent composite sample data reported for the August 2017 DMR. Discharge to Applebrook, Outfall 002 was 1.266 million gallons during August.

The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during August 2017.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Table 1

August 2017 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
August 1, 2017 0.261 2.0 4.4 5 10.9 0.160 0.35 0.51 1.11 4 0.6021
August 8, 2017 0.276 4.0 9.2 3 6.9 0.330 0.76 0.67 1.54 1 0.0000
August 15, 2017 0.314 2.0 5.2 3.000 7.9 0.108 0.28 0.52 1.36 1.000 0.0000
August 22, 2017 0.223 2.0 3.7 5 9.3 0.100 0.19 68 1.8325
August 25, 2017 0.138 0.58 0.67
August 26, 2017 0.178 0.54 0.80
August 27, 2017 0.201 0.41 0.69
August 28, 2017 0.147 0.290 0.36
August 29, 2017 0.181 2.0 3.0 3 4.5 0.100 0.15 0.26 0.39 1 0.0000
August 31, 2017 0.20 0.00
Average 0.213 2.4 5.1 4 7.9 0.160 0.35 0.44 0.86 3 0.4869
Minimum 0.138 2.0 3.0 3 4.5 0.100 0.15 0.20 0.36 1 0.0000
Maximum 0.314 4.0 9.2 5 10.9 0.330 0.76 0.67 1.54 68 1.8325

Table 3 presents the data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 remained within compliance with the NPDES permit.

Table 4 presents the available Outfall 001 final effluent data for the month as of September 12, 2017. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters. The alum feed to the SBRs was frequently increased to improve the total phosphorus removal.

The facility is anticipated to achieve compliance with the discharge permit limitations during the month of September.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Table 2

August 2017 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
August 1, 2017 0.319 264 702 246 654 33.3 88.6 56.5 150 8.6 22.9
August 8, 2017 0.307 100 266 280 745 23.3 59.7 34.5 88 7.2 19.2
August 15, 2017 0.385 131 349 112 298 36.3 116.6 44.8 144 6.5 17.3
August 22, 2017 0.323 104 277 60 160 34.0 91.6 40.6 109 5.3 14.1
August 29, 2017 0.376 104 277 46 122 34.0 106.6 40.6 127 4.2 11.2
Average 0.342 141 374 149 396 32.2 92.6 43.4 124 6.4 16.9
Minimum 0.307 100 266 46 122 23.3 59.7 34.5 88 4.2 11.2
Maximum 0.385 264 702 280 745 36.3 116.6 56.5 150 8.6 22.9

During September, the presence of foam conditions on the surface of the SBRs began to decrease with foam concentrations ranging from 50% to 70% of the area. Reduction of filled decants and adjustments to the SBR dissolved oxygen control set points to ensure adequate aeration for nitrification assisted to sustain the final effluent water quality.

There are no anticipated exceedances of the permitted limitations for Outfall 001 for September 2017. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Table 3

August 2017 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
August 1, 2017 0.000
August 8, 2017 0.000
August 15, 2017 0.000
August 22, 2017 0.000
August 25, 2017 0.105 0.58 0.51
August 26, 2017 0.076 0.54 0.34
August 27, 2017 0.147 0.41 0.50
August 28, 2017 0.151 0.29 0.37
August 29, 2017 0.151 2.0 2.5 3.0 3.8 0.10 0.13 0.26 0.33 1.0 0.0000
August 31, 2017 0.110 0.20 0.18
Average 0.080 2.0 2.5 3.0 3.8 0.10 0.13 0.56 0.43 1 0.0000
Minimum 0.0000 2.0 2.5 3.0 3.8 0.10 0.13 0.29 0.34 0 0.0000
Maximum 0.1510 2.0 2.5 3.0 3.8 0.10 0.13 0.58 0.51 1 0.0000

Table 4

September 2017 - Final Effluent - Out Fall 001

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
September 5, 2017 0.198 2.0 3.3 1 1.7 0.122 0.20 0.24 0.40 1 0.0000
September 12, 2017 0.123 2.8 2.9 3 3.1 0.100 0.10 0.44 0.45 1 0.0000
September 19, 2017 0.163 0.31 0.42
September 26, 2017 0.162 0.36 0.49
Average 0.162 2.4 3.1 2 2.4 0.111 0.15 0.34 0.44 1 0.0000
Minimum 0.123 2.0 2.9 1 1.7 0.100 0.10 0.24 0.40 1 0.0000
Maximum 0.198 2.8 3.3 3 3.1 0.122 0.20 0.44 0.49 1 0.0000

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Table 5 presents the available September data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit.

Table 5

September 2016 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
September 5, 2017 0.0813 2.0 1.4 1.0 0.7 0.12 0.08 0.24 0.16 1.000 0.000
September 12, 2017 0.1702 2.8 4.0 3.0 4.3 0.10 0.14 0.44 0.62 1.000 0.000
September 19, 2017 0.1604
September 26, 2017 0.1866
Average 0.1735 2.4 2.7 2.0 2.5 0.11 0.11 0.34 0.39 1 0.0000
Minimum 0.0813 2.0 1.4 1.0 0.7 0.10 0.08 0.24 0.16 1 0.0000
Maximum 0.1866 2.8 4.0 3 4.3 0.12 0.14 0.44 0.62 1 0.0000

Table 4 presents the available Outfall 001 final effluent data for the month as of September 12, 2017.

Table 5 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during September 2017.

Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during August and September. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Table 6

September 2017 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
September 5, 2017 0.339 217 614 429 1,213 29.5 83.4 46.7 132 8.1 22.9
September 12, 2017 0.328 159 450 255 721 35.1 96.0 49.4 135 7 19.8
September 19, 2017 0.340
September 26, 2017 0.525
Average 0.383 188 532 342 967 32.3 89.7 48.1 134 7.6 21.3
Minimum 0.328 159 450 255 721 29.5 83.4 46.7 132 7.0 19.8
Maximum 0.525 217 614 429 1213 35.1 96.0 49.4 135 8.1 22.9

Significant Storm/Hydraulic Loading Events

During September, there was one (1) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period. A total of 1.95 inches of rainfall measured during the month. This event occurred on:

September 2nd      0.85 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. The facility experienced several filled decant cycles during the rain events.

PA DEP

No activity.

Minor Repairs and Preventative Maintenance

Flushed chemical feed lines to the SBRs.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7

Big Fish
Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2017

Cleaned piping within SBR building

Look Ahead Preventative Maintenance Activities

Overhaul centrifuge drive gear boxes and evaluation of bearings for replacement. Gathering information for parts.

Rebuild of filter feed pumps

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7

DRAFT

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES

September 11, 2017

The East Goshen Township Municipal Authority met at the Ridley Creek Sewer Treatment Plant at 6:00 p.m to check SBR tanks CIM coatings. Then they held their regular public meeting on Monday, September 11, 2017 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Ed McAssey, Jack Yahraes, Dana Pizarro, and Phil Mayer. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Mike Ellis (Pennoni), Patrick McKenna (Attorney) , and Walter Wujcik, (Conservancy Board).

COMMON ACRONYMS:

BFES – Big Fish Environmental ServicesMA- Municipal Authority
BOS – Board of SupervisorsNPDES – National Pollutant Discharge Elimination System
CB – Conservancy BoardPC – Planning Commission
DEP – Department of Environmental ProtectionPM – Prevention Maintenance
EPA – Environmental protection AgencyPR – Park & Recreation Board
HC – Historical CommissionRCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & InfiltrationSBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment PlantSSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Ed called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders and everyone effected by the hurricanes in Texas and Florida.
Ed asked if anyone would be recording the meeting. There was no response.

Chairman’s Report

Dana and Phil reported that they attended the West Goshen meeting. Finances were discussed. They will hire someone to coordinate all the systems for the emergency generator. HRG was asked if they could have someone on site fulltime. They changed the start time for their meetings to 7:00 p.m.

Sewer Reports

1. Director of Public Works, Mark Miller’s report for August:

Monthly Flows: The average daily flow to West Goshen was 670,000 gallons per day.
Meters: Meters were read on a daily basis with no problems.
C.C. Collection: The pump stations were visited on a daily basis. Lenni Electric is currently doing the PM at the plant and pump stations. We are scheduled to pull the pumps this month.
R.C. Collection: Pump stations were visited on a daily basis with no problems to report.
R.C. Plant: The plant was visited by Public Works. George and I were at the plant on Monday. We noticed the roto-mat was making noise. Upon further investigation we found the screen spray nozzles were blocked. We were able to get them cleaned.
Lateral Repairs: Four Lateral Repairs for the month of August.
Alarms: We responded to 27 alarms for August, most of them were for power outages.
PA One Calls: We received 68 PA One calls for August.

MA 9-11-17 draft      1

2. Pennoni Engineer’s Report for August

Mike Ellis provided the following report.

Plant (RCSTP)

  • Caustic soda pilot study – We previously calculated the estimated caustic soda feed rate to be 5-6 gallons/hour when the pilot study SBR tank is in a Fill cycle. We previously recommended a 7.7-gallon/hour pump be acquired for the study. We have obtained pricing for a larger ±19.9 gallon/hour pump as requested by the Municipal Authority in the event the recommended pump is found to be inadequate during the trial. Two 350-gallon totes should allow for a 2.5-3 week trial. We previously sent our recommendations to the plant operator for review and are awaiting a response.; A pilot study sampling plan was previously requested from Big Fish, and we are awaiting a response.; The pilot study can begin once the tap is installed and the operator provides a sampling plan and confirms the caustic soda feed rate.; In order to progress this project, we propose to set up a meeting within the next week at the RCSTP with the Public Works Department, Pennoni, the operator, and the controls consultant to resolve outstanding questions and concerns (i.e. chemical feed control during fill-decant phase) and establish a definitive schedule to begin the trial.
  • SBR tanks CIM coatings – Our structural engineers and leakage consultant performed a visual and non-destructive evaluation of the SBR #1 concrete walls on August 23. Two concrete cores were taken from the SBR #1 walls the same day. The cores have been tested, and we expect to receive a laboratory report with results on September 11. A verbal update will be provided at the Municipal Authority meeting on September 11. Upon receipt of the lab report, we will evaluate the results in conjunction with our field visit and background research, and we expect to submit a report to the Township by the end of September.

Reservoir Road Pump Station

  • We received the Army Corps of Engineers (USACE) special conditions permit for the proposed force main creek crossings on August 17. WE NOW HAVE ALL PERMITS IN HAND!!!!!
  • The bid document will be finalized to incorporate the remaining USACE permit, and a final set of plans and specifications will be provided to the Township within the next two weeks.
  • A listing of the permits, expiration dates, and renewal deadlines will also be provided.

RCSTP and Pump Stations’ O&M Manual

MA 9-11-17 draft      2

  • Completed. No further action.

Supplee Valley Pipe Lining

  • We received the missing videos of the sewer mains and completed our review, prioritization, scoping, and cost estimating. A recommendation letter was sent to the Township.

White Chimneys Manhole Lining

  • We completed a 1-year warranty visual observation of the manholes that were lined in 2016 in White Chimneys and along Cornwallis Drive. No deficiencies were observed with the liners. However, apparent sulfuric acid (from hydrogen sulfide) is present on the liners near the bottoms of some of the manholes. We have recommended that the Public Works Department clean those liners.

New Connections

  • Knauer Property, 1680 East Boot Road – No activity since our last report. We previously reviewed a revised plan submission for a proposed sewer connection to be installed with fewer lateral pipes at less-than-minimum slopes, and we provided comments to the Township and developer.
  • Brakman Property, 1420 East Strasburg Road – We continued to perform construction observation of the new gravity sewer main across East Strasburg Road and the new manhole on the subject property as well as providing shop drawings reviews and responses to questions from the contractor and developer.

West Goshen Sewer System Consultation

  • No activity since last report.

3. Big Fish Environmental Services

– Scott’s report for August showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of June 2017. Discharge to Applebrook remained off line. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Jack commented on the discharge to Applebrook. Mark said the pump is on now.

Approval of Minutes

The minutes of the August 7, 2017 meeting were approved.

Approval of Invoices

  1. Dana moved to approve payment of the following Pennoni invoices: Pennoni #763591      $ 80.25; Pennoni #763593      $1,205.75; Pennoni #763595      $6,222.00; Pennoni #763596      $3,647.50 Jack seconded the motion. The motion passed unanimously.

MA 9-11-17 draft      3

  1. Jack moved to approve payment of Gawthrop Invoice #184952 for $440.00. Phil seconded the motion. The motion passed unanimously.

Liaison Reports

Conservancy Board - Walter reported that the Conservancy Board is planning a fall planting. A member of the Reservoir Dam Committee came to the Conservancy Board meeting to discuss the plans for this area.

Board of Supervisors – Carmen reported that Sunoco extended the distance for private wells from the pipeline to be notified to 400 feet. The property owner can get Sunoco to test their well or get an independent company to do it.

Financial Reports

Jon Altshul provided the following written report:
In August 2017, the Municipal Authority recorded $2,981 in income (mostly from a $2,000 tap-in fee for 1418 Strasburg Rd.) and $6,940 in expenses, for a negative variance of $3,959. Expenses included $2,589 for Reservoir Road Pump Station engineering; $269 for West Goshen engineering (capital); $2,621 for general engineering and $1,460 for legal services.
As of August 31st, the fund balance was $1,178,108 of which $1,140,872 is in the main construction account (most of which represents the 2013 note).
On September 6, the Board of Supervisors approved fraud protection services for Township bank accounts. Specifically, for the Municipal Authority bank account, it is recommended that the Authority have a service called “ACH Monitor” to prevent unauthorized electronic withdrawals. The cost of this service is $15 per month. Jack moved to authorize the Township to establish fraud protection services on the Municipal Authority account. Dana seconded the motion. The motion passed unanimously.

Goals

Goals for 2017 were reviewed.

Any Other Matter

  1. John Coleman, 1167 N. Chester Road was present at the meeting. He is still on private well and sewer and asked if there were plans to extend these services to the residents still on private systems. Rick explained that a few years ago when Brookmont and Charter Chase were done it cost $30,000 to the property owner. Anything is very costly.
  2. Supplee Valley Sewer System Analysis – Mike reviewed their report from the sanitary sewer televised videos. On the maps, green lines indicate good condition, yellow lines indicate medium priority and red lines indicate high priority. There is 4,800 linear feet of pipe and 2 manholes with leaks. They outlined a 3-year plan and estimated costs. Mike explained the process to reline the pipes. He recommends a public bid. Dana moved to approve phase 1 and authorize it to be put out for public bid. Phil seconded the motion. The motion passed unanimously.

Adjournment

MA 9-11-17 draft      4

There being no further business, Phil moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:00 p.m. The next regular meeting will be held on Monday, October 9, 2017 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 9-11-17 draft      5

[Logo: Pennoni]

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :768598
Invoice Date :09/26/2017
Project :EGMA1504
Project Name :Reservoir Rd PS Design & Permitting

For Services Rendered through: 9/17/2017

Correspondence with Army Corps of Engineers in response to additional permitting questions. Army Corps of Engineers Special Conditions Permit was issued thereafter.

Phase : 12 -- Permitting

Total Phase : 12 -- PermittingLabor :75.75
Expense :0.00
Phase Total :75.75
Amount Due This Invoice$75.75

Phase : 12 -- Permitting

Labor

ClassHours/UnitsRateAmount
Sr. Environmental Scientist0.75101.0075.75
Labor Total:0.7575.75
Total Phase : 12 -- PermittingLabor :$75.75
Expense :$0.00
Total Project : EGMA1504 -- Reservoir Rd PS Design & PermittingLabor :$75.75
Expense :$0.00

[Handwritten note: ok MSH 10/5/17]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 9/26/2017

Project: EGMA1504
Pennoni Job No.: Reservoir Rd PS Design & Permitting
Invoice No: 768598
Invoice Period: 8/14/2017 to 9/17/2017 Date: 9/26/2017
Initial Authorization: $ 167,120.00
Contract Amount: $ 193,200.00
Previously Invoiced: $ 192,431.50
Current Invoice: $ 75.75
Invoiced to Date ($): $ 192,507.25
Invoiced to Date (%): 99.64%
Remaining Budget ($): $ 692.75
Remaining Budget (%): 0.36%

Budget by Phase:

Phase Name: Permitting Phase 12
Phase Budget: $ 50,940.25
Previously Invoiced: $ 50,428.50
Current Invoice: $ 75.75
Invoiced to Date ($): $ 50,504.25
Invoiced to Date (%): 99.14%
Remaining Budget ($): $ 436.00
Remaining Budget (%): 0.86%

Comments: Correspondence with Army Corps of Engineers in response to additional permitting questions. Army Corps of Engineers Special Conditions Permit was issued thereafter.

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY

For Services Rendered through: 9/17/2017

Task No. Activity Contract Amount* Invoiced Effort thru 9/17/2017 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $4,020.00 - - Yes
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $65,170.25 $64,993.50 $176.75 0.3% No**
12 Permitting $50,940.25 $50,504.50 $435.75 0.9% No***
TOTAL $193,120.00 $192,507.50 $612.50 0.3%

*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.
**Need to complete Bid Form and assemble full bid document package for Township.
*** All permits have been received. Need to prepare permit expiration and renewal date summary list.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 768600
Invoice Date: 09/26/2017
Project: EGMA1701
Project Name: 2017 General Services

For Services Rendered through: 9/17/2017

Prepared September Engineer's Report. Attended September MA meeting including field meeting at the RCSTP with the MA, M. Ellis, and M. McAloon to discuss the SBR tanks coating conditions and ongoing structural evaluation. Completed one-year warranty inspection of Spraywall liners in remainder of manholes in White Chimneys.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,146.00
Expense : 0.00
Phase Total : 1,146.00
Amount Due This Invoice $1,146.00
Fee : 21,700.00
Prior Billings : 18,738.00
Current Billings : 1,146.00
Total Billings : 19,884.00

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 5.50 119.00 654.50
Senior Engineering Technician 4.50 87.00 391.50
Graduate Professional 1.25 80.00 100.00
Labor Total: 11.25 1,146.00
Total Phase : **** -- Professional Services Labor : $1,146.00
Expense : $0.00
Total Project : EGMA1701 -- 2017 General Services Labor : $1,146.00
Expense : $0.00

[Handwritten: ok MSM 10/5/17]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1701 Invoice Summary
Invoice Date 9/26/2017

Project: EGMA1701
Pennoni Job No.: 2017 General Services
Invoice No: 768600
Invoice Period: 8/14/2017 to 9/17/2017 Date: 9/26/2017
Initial Authorization: $ 12,700.00
Contract Amount: $ 21,700.00
Previously Invoiced: $ 18,738.00
Current Invoice: $ 1,146.00
Invoiced to Date ($): $ 19,884.00
Invoiced to Date (%): 92%
Remaining Budget ($): $ 1,816.00
Remaining Budget (%): 8%

Budget by Phase:

Phase Name: 2017 General Services
Phase Budget: $ 21,700.00
Previously Invoiced: $ 18,738.00
Current Invoice: $ 1,146.00
Invoiced to Date ($): $ 19,884.00
Invoiced to Date (%): 92%
Remaining Budget ($): $ 1,816.00
Remaining Budget (%): 8%

Comments: Prepared September Engineer's Report. Attended September MA meeting including field meeting at the RCSTP with the MA, M. Ellis, and M. McAloon to discuss the SBR tanks coating conditions and ongoing structural evaluation. Completed one-year warranty inspection of Spraywall liners in remainder of manholes in White Chimneys.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 768601
Invoice Date: 09/26/2017
Project: EGMA1702
Project Name: 2017 Semi-Annual I&I Reports

For Services Rendered through: 9/17/2017

Coordination of portable metering locations with PW Director.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 109.75
Expense : 0.00
Phase Total : 109.75
Amount Due This Invoice $109.75
Fee : 11,500.00
Prior Billings : 7,021.75
Current Billings : 109.75
Total Billings : 7,131.50

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 0.25 119.00 29.75
Graduate Professional 1.00 80.00 80.00
Labor Total: 1.25 109.75
Total Phase : **** -- Professional Services Labor : $109.75
Expense : $0.00
Total Project : EGMA1702 -- 2017 Semi-Annual I&I Reports Labor : $109.75
Expense : $0.00

[Handwritten: ok MSM 10/5/17]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1702 Invoice Summary
Invoice Date 9/26/2017

Project: EGMA1702
Pennoni Job No.: 2017 Semi-Annual I&I Reports
Invoice No: 768601
Invoice Period: 4/17/2017 to 9/17/2017 Date: 9/26/2017
Initial Authorization: $ 11,500.00
Contract Amount: $ 11,500.00
Previously Invoiced: $ 7,021.75
Current Invoice: $ 109.75
Invoiced to Date ($): $ 7,131.50
Invoiced to Date (%): 62%
Remaining Budget ($): $ 4,368.50
Remaining Budget (%): 38%

Budget by Phase:

Phase Name: 2017 Semi-Annual I&I Reports
Phase Budget: $ 11,500.00
Previously Invoiced: $ 7,021.75
Current Invoice: $ 109.75
Invoiced to Date ($): $ 7,131.50
Invoiced to Date (%): 62%
Remaining Budget ($): $ 4,368.50
Remaining Budget (%): 38%

Comments: Coordination of portable metering locations with PW Director.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 768602
Invoice Date: 09/26/2017
Project: EGMA1704
Project Name: Supplee Valley Pipe Lining & MH Reh

For Services Rendered through: 9/17/2017

Completed review and analysis of CCTV videos of sewers; prepared and submitted rehabilitation scope recommendation letter with cost estimates, exhibits, and multi-year construction programming approach; and began preparation of the bid document and specifications.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,416.00
Expense : 0.00
Phase Total : 1,416.00
Amount Due This Invoice $1,416.00
Fee : 7,000.00
Prior Billings : 3,647.50
Current Billings : 1,416.00
Total Billings : 5,063.50

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 4.00 119.00 476.00
Graduate Professional 11.75 80.00 940.00
Labor Total: 15.75 1,416.00
Total Phase : **** -- Professional Services Labor : $1,416.00
Expense : $0.00
Total Project : EGMA1704 -- Supplee Valley Pipe Lining & MH Reh Labor : $1,416.00
Expense : $0.00

[Handwritten: ok MSM 10/5/17]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1704 Invoice Summary
Invoice Date 9/26/2017

Project: EGMA1704
Pennoni Job No.: Supplee Valley Pipe Lining & MH Reh
Invoice No: 763596
Invoice Period: 8/14/2017 to 9/17/2017 Date: 9/26/20127
Initial Authorization: $ 7,000.00
Contract Amount: $ 7,000.00
Previously Invoiced: $ 3,647.50
Current Invoice: $ 1,416.00
Invoiced to Date ($): $ 5,063.50
Invoiced to Date (%): 72%
Remaining Budget ($): $ 1,936.50
Remaining Budget (%): 28%

Budget by Phase:

Phase Name: Supplee Valley Pipe Lining & MH Reh
Phase Budget: $ 7,000.00
Previously Invoiced: $ 3,647.50
Current Invoice: $ 1,416.00
Invoiced to Date ($): $ 5,063.50
Invoiced to Date (%): 72%
Remaining Budget ($): $ 1,936.50
Remaining Budget (%): 28%

Comments: Completed review and analysis of CCTV videos of sewers; prepared and submitted rehabilitation scope recommendation letter with cost estimates, exhibits, and multi-year construction programming approach; and began preparation of the bid document and specifications.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice #: 768624
Invoice Date: 09/27/2017
Project: EGMA1705
Project Name: SBR Tank Structural Evaluation

For Services Rendered through: 9/17/2017

Performed visual structural evaluation of the SBR tanks; obtained two concrete cores of the SBR Tanks #1 walls; performed laboratory testing of the cores; evaluated concrete conditions and potential causes of coating blistering; and initiated preparation of findings and recommendations report. Note: An additional $3,113.50 of effort was expended on the SBR tank coatings work in 2017 beyond the $15,000.00 lump sum allocated to this project.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
**** -- Professional Services $15,000.00 $0.00 100.00% $15,000.00 $15,000.00
Total : $15,000.00 $0.00 $15,000.00 $15,000.00

Amount Due This Invoice: $15,000.00

[Handwritten: ok MSM 10/5/17]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1705 Invoice Summary
Invoice Date 9/27/2017

Project: EGMA1705
Pennoni Job No.: SBR Tank Structural Evaluation
Invoice No: 768624
Invoice Period: NTP to 9/17/2017
Initial Authorization: $ 15,000.00 Date: 9/27/20127
Contract Amount: $ 15,000.00
Previously Invoiced: $ -
Current Invoice: $ 15,000.00
Invoiced to Date ($): $ 15,000.00
Invoiced to Date (%): 100%
Remaining Budget ($): $ -
Remaining Budget (%): 0%

Budget by Phase:

Phase Name: SBR Tank Structural Evaluation
Phase Budget: $ 15,000.00
Previously Invoiced: $ -
Current Invoice: $ 15,000.00
Invoiced to Date ($): $ 15,000.00
Invoiced to Date (%): 100%
Remaining Budget ($): $ -
Remaining Budget (%): 0%

Comments: Performed visual structural evaluation of the SBR tanks; obtained two concrete cores of the SBR Tanks #1 walls; performed laboratory testing of the cores; evaluated concrete conditions and potential causes of coating blistering; and initiated preparation of findings and recommendations report. Note: An additional $3,113.50 of effort was expended on the SBR tank coatings work in 2017 beyond the $15,000.00 lump sum allocated to this project.

[Faint stamp at top]

Reservoir Road Pump Station Design & Permitting

INVOICE SUMMARY

For Services Rendered through: 9/17/2017

Task No. Activity Contract Amount* Invoiced Effort thru 9/17/2017 Remaining Budget ($) Remaining Budget (%) Completed?
1 Concept Design $13,655.75 $13,655.75 - - Yes
2 DEP WQM Pre-App. Meeting $1,300.00 $1,300.00 - - Yes
3 Existing Conditions Survey $22,783.75 $22,783.75 - - Yes
4 Sewer Stakeout in Easements $0.00 $0.00 - - Scope eliminated
5 1636 Bow Tree Dr. Boundary Survey & Easement $4,020.00 $4,020.00 - - Yes
6 Additional Boundary Surveys & Easements $0.00 $0.00 - - Scope eliminated
7 Geotechnical Borings $4,000.00 $4,000.00 - - Yes
8 Install Permanent Survey Benchmarks $0.00 $0.00 - - Scope eliminated
9 Progress Design $29,450.00 $29,450.00 - - Yes
10 Infiltration Testing $1,800.00 $1,800.00 - - Yes
11 Final Design $65,170.25 $64,993.50 $176.75 0.3% No**
12 Permitting $50,940.25 $50,504.50 $435.75 0.9% No***
TOTAL $193,120.00 $192,507.50 $612.50 0.3%

*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.
**Need to complete Bid Form and assemble full bid document package for Township.
*** All permits have been received. Need to prepare permit expiration and renewal date summary list.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA September Financial Report
Date: October 6, 2017

In September, the Municipal Authority recorded $20,948 in income (mostly from a $20,000 transfer from the sewer operating fund) and $19,320 in expenses, for a positive variance of $1,629. Expenses included $7,724 for the Q3 administrative chargeback and $11,075 for general engineering.

As of September 30th, the fund balance was $1,179,737 of which $1,141,729 is in the main construction account (most of which represents the 2013 note).

I have attached a draft 2018 budget for the Municipal Authority. While you are not required to adopt a budget under the Pennsylvania Municipal Authorities Act, doing so is considered a best practice and allows the Township to better anticipate the cash flow requirements from the Sewer Operating Fund. Please let me know if you would like changes made to this draft budget so that it can be revised and formally adopted at your November or December meeting.

Of particular note, on the revenue side, we anticipate four Chester Creek connections in 2018 (Brandolini- Strasburg Rd and Rennard-N. Chester Rd) and one Ridley Creek connection (Moore-N. Chester Rd). This budget also anticipates that most of the 2013 MA note will be drawn down by the end of this year, based on East Goshen staff's recent conversation with West Goshen staff. Once that note is exhausted, we will use the sewer portion of the 2017 Township bonds to cover the remainder of our share of the West Goshen improvements.

Municipal Authority

Account Title Acct # 2014 Actual 2015 Actual 2016 Actual 2017 Adopted YTD Budget YTD Actual
(Through July)
2017 Year-End
Projection
2018 Proposed
Budget
$ Variance
YE Proj-Prop.
%
Variance
Beginning Fund Balance 1,415,651 1,415,651 131,385
REVENUE
INTEREST EARNINGS 07341 1000 17 11 (28) 10 10 7 10 10 - 0.0%
INTEREST EARNED - CONSTRUCTION 07341 1020 1,577 1,494 2,573 3,250 1,476 5,370 8,000 4,000 (4,000) -50.0%
DCED GRANT 07354 0400 - 37,162 - - - - - - -
C.C. TAPPING FEES 07364 1100 112,200 27,600 6,000 14,296 7,148 4,000 14,296 4,000 (10,296) -72.0%
R.C.TAPPING FEES 07364 1110 12,289 16,296 43,300 - - - - 2,000 2,000
CONNECTION FEES - SEWER 07364 1120 1,128 1,269 1,128 - - 1,692 1,692 1,692 - 0.0%
MISCELLANEOUS REVENUE 07380 1000 564 423 564 - - - - - -
TRANSFER FROM SEWER OPERATING 07392 0500 21,000 40,000 77,000 100,755 58,772 70,000 118,183 115,945 (2,238) -1.9%
TOTAL REVENUE 148,775 124,255 130,537 118,311 67,406 81,069 142,181 127,647 (14,534)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,172 32,303 30,166 31,620 15,810 15,448 31,620 32,411 791 2.5%
MISCELLANEOUS EXPENSE 07424 3000 1,450 1,468 1,742 2,500 1,500 2,208 2,500 2,500 - 0.0%
MUNIC.AUTH.-AUDITING 07424 3110 10,800 8,900 8,900 9,078 9,078 9,200 9,200 9,384 184 2.0%
ENGINEERING SERVICES 07424 3130 32,259 33,525 54,100 37,500 21,875 41,312 46,500 43,260 (3,240) -7.0%
LEGAL SERVICES 07424 3140 7,460 4,100 8,593 9,250 5,397 10,103 - - -
C.C. CAPITAL-COLLECTION 07424 7420 - - - 212,486 212,486 - - - -
RESERVE PUMP STATION - ENGINEER 07427 1000 1,884 - - - - - - - -
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 6,323 - - - - - - - -
RESERVOIR PUMP STATION - ENGINEER 07428 1000 38,286 144,451 44,571 - - 13,716 18,000 - (18,000) -100.0%
WEST GOSHEN CAPITAL 07429 6100 - - - - - 222,665 1,290,264 59,736 (1,230,528) -95.4%
M.C.-DVRFA-DEBT SERVICE 07471 1000 22,120 23,240 24,921 26,320 - - 26,320 27,720 1,400 5.3%
M.A.-R.C. DEBT SERVICE 07471 1010 - - - 2,043 - - - - -
M.C.-DVRFA-INTEREST PAYMN 07472 1000 5,115 4,169 3,171 - - - 2,043 670 (1,373) -67.2%
TOTAL EXPENSES 157,869 252,156 176,163 330,797 266,146 314,652 1,426,447 175,681 (1,250,766)
NET RESULT FROM OPERATIONS (9,094) (127,900) (45,626) (212,486) (198,740) (233,583) (1,284,266) (48,034) 1,236,232
Ending Fund Balance 1,203,165 131,385 83,351

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
SEPTEMBER 2017

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - CAPITAL 1,174,311.09
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - 2013 NOTES (FULTON BANK) 1,140,871.79
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE DNB CAPITAL ACCOUNT 33,439.30
CAPITAL:
REVENUE
INTEREST EARNED - CONSTRUCTION 07341 1020 3,250 948.30 7,298.35
TOTAL REVENUE 3,250 948.30 7,298.35
EXPENSES
C.C. CAPITAL - COLLECTION 07424 7420 212,486 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0 80.25 16,385.00
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0 0.00 0.00
WEST GOSHEN CAPITAL 07429 6100 0 0.00 222,934.73
TOTAL EXPENSES 212,486 80.25 239,319.73
NET CAPITAL (209,236) 868.05 (232,021.38)
MUNICIPAL AUTHORITY ENDING FUND BALANCE - CAPITAL 1,175,179.14
MUNICIPAL AUTHORITY ENDING FUND BALANCE - 2013 NOTES (FULTON BANK) 1,141,729.21
MUNICIPAL AUTHORITY ENDING FUND BALANCE DNB CAPITAL ACCOUNT 33,449.93

U:\bmccool\2017\Municipal Authority\2017 - 09 - Municipal Authority Report.xlsx Page 1 of 2 10/05/2017

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
SEPTEMBER 2017

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING:
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - OPERATING (BB&T) 3,796.90
REVENUE
INTEREST EARNINGS 07341 1000 10 0.13 7.23
C.C. TAPPING FEES 07364 1100 14,296 0.00 6,000.00
CONNECTION FEES - SEWER 07364 1130 0 0.00 1,692.00
TRANSFER FROM SEWER OPERATING 07392 0500 109,755 20,000.00 90,000.00
TOTAL REVENUE 124,061 20,000.13 97,699.23
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 31,620 7,724.00 23,172.00
MISCELLANEOUS EXPENSE 07424 3000 2,500 0.00 2,207.52
MUNIC.AUTH.-AUDITING 07424 3110 9,078 0.00 9,200.00
ENGINEERING SERVICES 07424 3130 46,500 11,075.25 55,008.75
LEGAL SERVICES 07424 3140 9,250 440.00 12,003.16
M.C.-DVRFA-DEBT SERVICE 07471 1000 26,320 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 2,043 0.00 0.00
TOTAL EXPENSES 127,311 19,239.25 101,591.43
NET OPERATING (3,250) 760.88 (3,892.20)
MUNICIPAL AUTHORITY ENDING FUND BALANCE - OPERATING 4,557.78
MUNICIPAL AUTHORITY ENDING FUND BALANCE CAPITAL + OPERATING 1,179,736.92

U:\bmccool\2017\Municipal Authority\2017 - 09 - Municipal Authority Report.xlsx Page 2 of 2 10/05/2017

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1701 JE 56730 0.23 02/03/17 INTEREST INTEREST EARNED JANUARY 2017
07 FUND
1701 0.00 0.23 -0.23
1702 57134 0.06 03/06/17 INTEREST INTEREST EARNED FEBRUARY 2017
07 FUND
1702 0.00 0.06 -0.29
1703 57173 3.23 03/08/17 INTEREST ADD'L INTEREST ADDED FROM JAN.
2017
57549 0.61 04/05/17 INTEREST INTEREST EARNED MARCH 2017
07 FUND
1703 0.00 3.84 -4.13
1704 57927 1.06 05/03/17 INTEREST INTEREST EARNED APRIL 2017
07 FUND
1704 0.00 1.06 -5.19
1705 58423 0.96 06/02/17 INTEREST INTEREST EARNED MAY 2017
07 FUND
1705 0.00 0.96 -6.15
1706 58876 0.66 07/03/17 INTEREST INTEREST EARNED JUNE 2017
07 FUND
1706 0.00 0.66 -6.81
1707 59333 0.16 08/01/17 INTEREST INTEREST EARNED JULY 2017
07 FUND
1707 0.00 0.16 -6.97
1708 59780 0.13 09/01/17 INTEREST INTEREST EARNED AUGUST 2017
07100.1000
1708 0.00 0.13 -7.10

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 1709 JE 60193 0.13 10/02/17 INTEREST INTEREST EARNED SEPT. 2017
07 FUND
1709 0.00 0.13 -7.23
07341-1000 **** *** **** 0.00 7.23 -7.23
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1701 56730 594.59 02/03/17 INTEREST INTEREST EARNED JANUARY 2017
07 FUND
1701 0.00 594.59 -594.59
1702 57134 536.20 03/06/17 INTEREST INTEREST EARNED FEBRUARY 2017
07 FUND
1702 0.00 536.20 -1,130.79
1703 57549 743.58 04/05/17 INTEREST INTEREST EARNED MARCH 2017
07 FUND
1703 0.00 743.58 -1,874.37
1704 57927 854.28 05/03/17 INTEREST INTEREST EARNED APRIL 2017
07 FUND
1704 0.00 854.28 -2,728.65
1705 58423 815.38 06/02/17 INTEREST INTEREST EARNED MAY 2017
07 FUND
1705 0.00 815.38 -3,544.03
1706 58876 843.23 07/03/17 INTEREST INTEREST EARNED JUNE 2017
07 FUND
1706 0.00 843.23 -4,387.26
1707 59333 982.28 08/01/17 INTEREST INTEREST EARNED JULY 2017
07 FUND
1707 0.00 982.28 -5,369.54

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1020 1708 JE 59796 980.51 09/05/17 INTEREST INTEREST EARNED AUGUST 2017
07 FUND
1708 0.00 980.51 -6,350.05
1709 60193 948.30 10/02/17 INTEREST INTEREST EARNED SEPT. 2017
07 FUND
1709 0.00 948.30 -7,298.35
07341-1020 **** *** **** 0.00 7,298.35 -7,298.35
07364-1100 C.C. TAPPING FEES 0.00
1704 57798 2,000.00 04/25/17 RECLASS RECLASS TAP IN FEE
RE 57797 2,000.00 04/25/17 57797 1 SEWER TAP IN - 5 SCHOOL LN
C.C. TAPPING FEES
1704 0.00 4,000.00 -4,000.00
1708 59745 2,000.00 08/31/17 CK105 TAP IN FEE-1418 E. STRASBRG
C.C. TAPPING FEES
1708 0.00 2,000.00 -6,000.00
07364-1100 **** *** **** 0.00 6,000.00 -6,000.00
07364-1110 R.C.TAPPING FEES 0.00
1704 JE 57798 2,000.00 04/25/17 RECLASS RECLASS TAP IN FEE
RE 57795 2,000.00 04/25/17 57795 1 SEWER TAP IN - 3 SCHOOL LN
1704 2,000.00 2,000.00 0.00
07364-1110 **** *** **** 2,000.00 2,000.00 0.00
07364-1130 CONNECTION FEES - SEWER 0.00
1702 CR 56762 423.00 02/07/17 125 25 10162 1 JACOBS, ROBERT & CHERYL
56823 423.00 02/13/17 125 26 10160 1 GEORGE SMITH & CHRISTINA CONLE
423.00 02/13/17 125 27 10161 1 STOFFLET, MICHAEL
** 0.00 846.00 ***

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1702 0.00 1,269.00 -1,269.00
1703 57212 423.00 03/09/17 125 54 10163 1 PAPPANO, JOSEPH & PATRICIA
1703 0.00 423.00 -1,692.00
07364-1130 **** *** **** 0.00 1,692.00 -1,692.00
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
JE 57171 25,000.00 03/08/17 DEPOSIT DEPOSIT FR: SEWER TO MUNICIPAL
1703 0.00 25,000.00 -25,000.00
1704 57579 40,000.00 04/06/17 DEPOSIT DEPOSIT TO MA ACCT.7100.1000
1704 0.00 40,000.00 -65,000.00
1707 59229 5,000.00 07/26/17 XFER XFER $ FROM 05 TO 07 OPERATING
1707 0.00 5,000.00 -70,000.00
1709 60005 20,000.00 09/19/17 XFER XFER $ FROM SEWER TO MA
1709 0.00 20,000.00 -90,000.00
07392-0500 **** *** **** 0.00 90,000.00 -90,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1703 CD 57378 7,724.00 03/22/17 3048 425 EAST GOSHEN TOWNSHIP - GENERAL
QTR.1 2017 REIMBURSEMENT FROM MA
1703 7,724.00 0.00 7,724.00
1706 58848 7,724.00 06/30/17 3059 425 EAST GOSHEN TOWNSHIP - GENERAL
2017 QTR.2 REIMBURSEMENT FROM MA
1706 7,724.00 0.00 15,448.00

East Goshen Township General Ledger

Report Date 10/05/17     GL Transaction Details     PAGE 5

MGRP18 run by BRIAN     9 : 13 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07424-14001709CD601607,724.0009/29/173103425EAST GOSHEN TOWNSHIP - GENERAL
2017 QTR.3 REIMBURSEMENT - MA
17097,724.000.0023,172.00
07424-1400***********23,172.000.0023,172.00
07424-3000MISCELLANEOUS EXPENSE0.00
170156280984.3001/04/1730402132PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC
2017 ACTIVE MEMBERSHIP DUES
564243.2201/13/173041425EAST GOSHEN TOWNSHIP - GENERAL
CORRECT BB&T DEPOSIT OF REMAININ
BALANCE OF CLOSED ACCT.1100.1010
07100.1000
1701987.520.00987.52
1706588141,220.0006/29/1730583871DELAWARE RIVER BASIN COMMISSION
D-1984-056 CP ANNUAL FEE - WATER
DISCHARGE
17061,220.000.002,207.52
07424-3000***********2,207.520.002,207.52
07424-3110MUNIC.AUTH.-AUDITING0.00
1703574704,600.0003/30/173049808MAILLIE FALCONIERO & CO.
PROGRESS BILLING 2016 MUN.AUTH.
17034,600.000.004,600.00
1704576554,600.0004/13/173052808MAILLIE FALCONIERO & CO.
2016 EXAM. FINAN. STMTS. MUN.AUT
17044,600.000.009,200.00
07424-3110***********9,200.000.009,200.00
07424-3130ENGINEERING SERVICES0.00

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 6

MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1701 CD 56425 4,399.50 01/13/17 3042 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 10/16/16 RCSTP & P STATION
1701 4,399.50 0.00 4,399.50
1702 56874 2,044.00 02/17/17 3045 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/15/17 2016 CHAP
1702 2,044.00 0.00 6,443.50
1703 57328 7,962.00 03/17/17 3047 1052 PENNONI ASSOCIATES INC.
SERV.THRU 2/12/17 2017 GEN.SERV
1703 7,962.00 0.00 14,405.50
1704 57510 5,416.50 04/03/17 3050 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/11/16 2016 GEN.SERV
57655 7,306.50 04/13/17 3053 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 3/19/17 RCSTP PERMI
1704 12,723.00 0.00 27,128.50
1705 58070 8,211.75 05/11/17 3054 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 4/16/17 RCSTP & PUM STATION
1705 8,211.75 0.00 35,340.25
1706 58614 2,805.25 06/14/17 3057 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/14/17 RCSTP PERM
1706 2,805.25 0.00 38,145.50
1707 58978 3,166.75 07/12/17 3060 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 6/18/17 WHITE CHIM
1707 3,166.75 0.00 41,312.25
1708 59496 2,621.25 08/11/17 3063 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 7/16/17-2017 GEN.S
1708 2,621.25 0.00 43,933.50

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 7

MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1709 CD 59939 9,869.50 09/13/17 3101 1052 PENNONI ASSOCIATES INC.
SERV. THRU 8/13/17 SUPPLEE VAL.P
60029 1,205.75 09/20/17 3102 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 8/13/17 RCSTP & PS
1709 11,075.25 0.00 55,008.75
07424-3130 **** *** **** 55,008.75 0.00 55,008.75
07424-3140 LEGAL SERVICES 0.00
1701 56550 940.00 01/25/17 3043 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - DEC. 2016 GEN.AU
1701 940.00 0.00 940.00
1702 56874 597.50 02/17/17 3044 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - JAN.2017 GEN.AUT
1702 597.50 0.00 1,537.50
1703 57328 655.00 03/17/17 3046 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. FEB.2017 GEN.AUTHORI
1703 655.00 0.00 2,192.50
1704 57655 2,140.00 04/13/17 3051 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - MARCH 2017 GEN.A
1704 2,140.00 0.00 4,332.50
1705 58187 2,407.41 05/19/17 3055 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 4/4-4/28/17 GEN.AU
1705 2,407.41 0.00 6,739.91
1706 58614 1,640.00 06/14/17 3056 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. - MAY 2017 GEN.AUTH.
1,723.25 06/14/17 3057 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/14/17 2017 GEN.S
** 3,363.25 0.00 ***
1706 3,363.25 0.00 10,103.16

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 8

MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3140 1708 CD 59496 1,460.00 08/11/17 3062 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE JUNE 2017 - GEN.AU
1708 1,460.00 0.00 11,563.16
1709 59939 440.00 09/13/17 3100 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - AUG. 2017 GEN.AU
1709 440.00 0.00 12,003.16
07424-3140 **** *** **** 12,003.16 0.00 12,003.16
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1701 56426 2,546.50 01/13/17 22002 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 10/16/16 RESERV.RD
56551 375.00 01/25/17 22003 263 CHESTER COUNTY CONSERVATION DISTRICT
RESERVOIR RD. NPDES PLAN REVIEW
1701 2,921.50 0.00 2,921.50
1702 56875 1,422.75 02/17/17 22004 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/15/17 RESERV.RD
1702 1,422.75 0.00 4,344.25
1704 57511 1,784.25 04/03/17 22005 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/11/17 RESERVOIR RD.
57656 1,516.50 04/13/17 22006 1052 PENNONI ASSOCIATES INC.
SERV.THRU 3/19/17 RESERV.RD PS
1704 3,300.75 0.00 7,645.00
1705 58071 1,261.50 05/11/17 22007 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/16/17 RESERV.RD
1705 1,261.50 0.00 8,906.50
1706 58616 2,083.00 06/14/17 22009 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 5/24/17 RESERV.RD P
1706 2,083.00 0.00 10,989.50

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 9

MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07428-1000 1707 CD 58979 2,726.00 07/12/17 22010 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/18/17 RESERV.RD P
1707 2,726.00 0.00 13,715.50
1708 59495 2,589.25 08/11/17 22011 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 7/16/17 RESERVOR RD
1708 2,589.25 0.00 16,304.75
1709 59942 80.25 09/13/17 22012 1052 PENNONI ASSOCIATES INC.
SERV. THRU 8/13/17 RESERV.RD PS
1709 80.25 0.00 16,385.00
07428-1000 **** *** **** 16,385.00 0.00 16,385.00
07429-6100 WEST GOSHEN CAPITAL 0.00
1705 58071 705.00 05/11/17 22007 1052 PENNONI ASSOCIATES INC.
SERV. THRU 4/16/17 W.GOSHEN SEWE
220,814.48 05/11/17 22008 3843 WEST GOSHEN SEWER AUTHORITY
PROJECT COSTS RE: CONSTRUCTION,
LABOR, PARTS, ENGINEERING, LEGAL
TESTING
** 221,519.48 0.00 ***
1705 221,519.48 0.00 221,519.48
1706 58616 1,146.00 06/14/17 22009 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 5/24/17 W.GOSHEN SE
1706 1,146.00 0.00 222,665.48
1708 59495 269.25 08/11/17 22011 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 7/16/17 W.GOSH SEWE
1708 269.25 0.00 222,934.73
07429-6100 **** *** **** 222,934.73 0.00 222,934.73

East Goshen Township General Ledger

Report Date 10/05/17 GL Transaction Details PAGE 10

MGRP18 run by BRIAN 9 : 13 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
Grand Total 342,911.16 106,997.58 235,913.58
Source Debits Credits
JE 2,000.00 99,305.58
RE 0.00 6,000.00
CR 0.00 1,692.00
CD 340,911.16 0.00
342,911.16 106,997.58

ADVERTISEMENT
INSTRUCTIONS TO BIDDERS
FORM OF BID
FORM OF GUARANTY
GENERAL CONDITIONS
SPECIAL CONDITIONS
CONSTRUCTION SPECIFICATIONS
FORM OF AGREEMENT
FORM OF BONDS
LIST OF CONTRACT DRAWINGS

EAST GOSHEN MUNICIPAL AUTHORITY
WEST CHESTER, PENNSYLVANIA

SUPPLEE VALLEY SANITARY SEWER PIPE LINING

CONTRACT NO. SSPL - 2017

All documents prepared by Pennoni Associates are instruments of service in respect of the project. They are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Pennoni Associates will be at Owner's sole risk and without liability or legal exposure to Pennoni Associates; and Owner shall indemnify, and hold harmless Pennoni Associates from all claims, damages, losses and expenses arising out of or resulting therefrom.

OCTOBER 2017

PENNONI ASSOCIATES INC.
CHRISTIANA EXECUTIVE CAMPUS
121 CONTINENTAL DRIVE, SUITE 207
NEWARK, DE 19713

PROJECT NO. EGMA1704

Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

October 5, 2017

PRO 17-05144

East Goshen Municipal Authority
Attn: Rick Smith, Township Manager
1580 Paoli Pike
West Chester, PA 19380

RE: Barkway Pump Station Grinder Unit Addition
East Goshen Municipal Authority

Dear Mr. Smith:

Pennoni is pleased to present this engineering services proposal for design assistance related to the installation of a sewage grinder unit at the Barkway Pump Station.

PROJECT DESCRIPTION

Barkway Pump Station, located at the corner of Barkway Lane and Morstein Road, was designed by Yerkes Associates, Inc. as part of the Mill Valley Sewer Project. The pump station is equipped with a bar screen style trash basket for the removal of large solids that may otherwise damage the pumps. The trash rack must be removed frequently and manually cleaned due to the amount of rags and other solids reaching the pump station. The Public Works Department would like to install a Muffin Monster grinder as manufactured by JWC Environmental to eliminate trash rack maintenance and ongoing pump problems. The Muffin Monster grinds wastewater solids to allow them to be safely pumped through the conveyance and treatment systems. We understand that the Township plans to purchase the Muffin Monster directly from the equipment manufacturer representative, Watermark, and will contract out the labor for installation of the equipment and/or perform installation using Public Works Department staff.

The existing pump station is a duplex pump station with a 5-foot diameter wet well top slab with a double door access hatch for pump and trash rack removal. The wet well is located under the extended roof of the generator building which limits access for lifting pumps. The Muffin Monster size and mounting configuration would need to be evaluated to determine if the unit would fit into the existing wet well without impeding access to the pumps. However, the overhanging roof will make installation, removal and maintenance difficult for the 70-inch tall unit under the 96-inch high ceiling. JWC Environmental offers a 5 HP Muffin Monster unit with a hydraulic power pak. Muffin Monster units are typically mounted into wet wells or in manholes just upstream of the wetwell. The installation of a new prefabricated fiberglass manhole upstream of the wet well may be the best option for ease of access and installation. A control panel can be mounted on a strut system at the wet well on the wall of the building. New PVC conduit will be installed from the Generator Building underground to the wet well for the required power feed.

Based on our preliminary observation of the pump station electrical system, it appears that adequate capacity exists for the additional electric load that will be imparted by the Muffin Monster. However, it may be necessary to perform some minor modifications to the electrical system; the extent of any modifications will be determined during the design phase.

We anticipate the following work items will be required for the installation of the new Muffin Monster at the Barkway Pump Station:

PRO 17-05144
October 6, 2017
Page 2
Mr. Rick Smith
Barkway PS Grinder Unit Addition

  • Bypass pumping during the work in the wet well or for installation of the new manhole.
  • Demolition of the existing trash rack and mounting supports.
  • Installation of the Muffin Monster, mounting frame, and slide rails in the wet well or the new manhole.
  • Installation of a new PVC conduit from the Generator Building to the grinder unit for power feed and controls.
  • Installation of the Muffin Monster hydraulic power pak and control panel outside the Generator Building.
  • Some minor interior modifications may be required to the power panel.
  • Startup and testing of the Muffin Monster.

Based on the work items described above, and assuming the Township will purchase the Muffin Monster directly from the manufacturer, the preliminary construction cost is estimated at $66,700 - $97,750 with a 15% contingency as summarized in the table below.

Table 1 - Wet Well Mounting Option

Equipment Purchase:
Muffin Monster Grinder, Wet Well Mounting Frame, Slide Rails, Control Panel
$33,000
Estimated Installation Labor and Incidental Materials (anchors, conduit, brackets, etc.) $25,000
Materials and Installation Labor Subtotal $58,000
15% Contingency $8,700
Estimated Construction Cost $66,7000

Table 2 – New Manhole Option

Equipment Purchase:
Muffin Monster Grinder and Manhole package, Wet Well Mounting Frame, Slide Rails, Control Panel
$55,000
Estimated Installation Labor and Incidental Materials (excavation, pipe connections, anchors, conduit, brackets, etc.)* $15,000
Materials and Installation Labor Subtotal $70,000
15% Contingency $10,500
Estimated Construction Cost $80,500

*Based on PW Department performing most of the construction.

SCOPE OF SERVICES

Pennoni will prepare mechanical and electrical plans and sections suitable for use by the Township to construct the work. A bid document will not be prepared. We will also work with the local Muffin Monster equipment representative, Watermark Environmental Systems, to obtain a proposal suitable for use by the Township to purchase the equipment. We will complete the following tasks:

  • Site visit with our electrical engineer to verify the control panel location and power panel interconnection requirements and evaluate available space for the control panel.
  • Evaluation of the pump station for best installation option for ease of construction and future operation and maintenance.

PRO 17-05144
October 6, 2017
Page 3
Mr. Rick Smith
Barkway PS Grinder Unit Addition

  • Preparation of mechanical plan, section and installation details for the Muffin Monster. Any required material specifications will be included on the drawings.
  • Preparation of an electrical plan, single line diagram and electrical details. Any required material specifications will be included on the drawings.
  • Coordination with Watermark Environmental Systems for Township purchase of Muffin Monster.
  • We will meet with the Township one time during the design to review and discuss the plans.
  • Submission of design plans to PADEP as a notification that the work is proposed. PADEP has not required permitting for grinder additions in the past so we assume they will not require a permit application for this project.

We do not expect that any other agency permits will be required for this work, so no permit applications are included in this scope. No building and roof modifications are included in the scope either.

SCHEDULE

We anticipate completion of the construction drawings approximately four weeks from receipt of the Township’s approval of this proposal.

FEE

Our fixed Lump Sum fee for this project will be $9,000.00.

Construction assistance and/or inspection services can be provided for an additional fee on a time and materials basis at our approved hourly rates.

Extraordinary expenses, authorized in advance and identifiable to the specific project will be billed in addition to the above stated fees. These expenses include, but are not limited to: application fees, UPS and delivery charges, and the reproduction of plans and specifications by outside services. We do not bill for such items as relatively small amounts of in-house printing, mailing expenses, reasonable telephone calls, and travel expenses.

BILLING AND PAYMENT

An invoice for professional services completed will be presented for payment on a monthly basis. Invoices are due upon receipt. The Client acknowledges that the method of billing and payment has been discussed in detail, that the terms agreed upon can only be changed by a written addendum agreed to by both parties, and that work may be stopped until payment is made in accordance with the agreement.

TERMS AND CONDITIONS

The attached Pennoni Associates Inc. General Terms and Conditions (Form No. LE01, Rev. 12/2015) are considered as part of this proposal.

PRO 17-05144
October 6, 2017
Page 4
Mr. Rick Smith
Barkway PS Grinder Unit Addition

We appreciate the opportunity to submit this proposal. Should you have any questions or need additional information, please do not hesitate to call.

Sincerely,

PENNONI ASSOCIATES INC.

Michael J. Ellis, P.E.
Authority Engineer

Please indicate your acceptance of this proposal by signing and returning a copy as our authorization to proceed. In signing this proposal, the Client authorizes Pennoni to complete the professional services outlined in this proposal.

Accepted By:

__________________________________________________
(Authorized Representative of the Client)

__________________________________________________
(Print Name & Title)

___________________
(Date)

Pennoni

PENNONI ASSOCIATES INC.
GENERAL TERMS & CONDITIONS
PRO 17-05144

  1. Unless withdrawn sooner, proposals are valid for thirty (30) days.
  2. The technical and pricing information in proposals is the confidential and proprietary property of Pennoni Associates Inc. ("Pennoni") or any Pennoni subsidiary or affiliate. Client agrees not to use or to disclose to third parties any technical or pricing information without Pennoni's written consent.
  3. The agreement created by the Client's acceptance of a proposal and these Terms & Conditions is hereinafter referred to as the “Agreement.” If a proposal is submitted to Client and Client fails to return a signed copy of the proposal but knowingly allows Pennoni to proceed with the services, then Client shall be deemed to have accepted the terms of the proposal and these General Terms & Conditions. If there is a conflict or inconsistency between any express term or condition in the proposal and these General Terms & Conditions, then the proposal shall take precedence. The proposal and these General Terms & Conditions constitute the entire Agreement, and supersede any previous agreement or understanding.
  4. Payment is due upon receipt of invoices as submitted. If Client chooses to make any payment via major credit card, Client agrees to pay a 3% surcharge or 1.03 times the total amount invoiced. Client agrees to pay interest at the rate of 1½ percent per month on invoices that are more than 30 days past due. If an invoice is 30 or more days past due, then Pennoni may suspend services and refuse to release work on this Agreement or any other agreement between Client and Pennoni until Client has paid all amounts due. Unless Pennoni receives written notice of Client's dispute of an invoice within 30 days of the invoice date, the invoice will be presumed correct. If payment is not made in accordance with the Agreement, then Client agrees to pay reasonable costs and attorney's fees incurred by Pennoni to collect payment.
  5. All drawings, sketches, specifications and other documents ("Documents") in any form, including electronic, prepared by Pennoni are instruments of Pennoni's services, and as such are and shall remain Pennoni's property. Upon payment in accordance with the Agreement, Client shall have the right to use and reproduce the Documents solely for the purposes of constructing, remediating, using or maintaining the project contemplated by the Agreement ("Project"). The Documents are prepared for use on this Project only, and are not appropriate for use on other projects, any additions or alterations of the Project, or completion of the Project by others. Client shall not use the Documents in violation of this paragraph without Pennoni's express written consent; and such use is at the Client's sole risk. Client agrees to indemnify, defend and hold harmless Pennoni from any claims, damages, losses, liabilities and expenses arising from such prohibited use.
  6. The proposed fees and schedule constitute Pennoni's best estimate of the charges and time required to complete the Project. As the Project progresses, facts uncovered may dictate revisions in scope, schedule or fee. The hourly rate schedule for services provided on a time and material basis will be subject to increases annually.
  7. Fee and schedule commitments will be subject to change for delays caused by Client's failure to provide specified facilities or information, or for delays caused by third parties, unpredictable occurrences or force majeure.
  8. Where the method of payment is based on time and materials, Client agrees that the following will apply: The minimum time segment for charging work is one-quarter hour, except the minimum time segment for charging of field survey work is four (4) hours. Client reimbursable expenses include travel and living expenses of personnel when away from the home office on business connected with the Project; subcontractor and subconsultant costs; identifiable communications, mailing and reproduction costs; identifiable drafting and stenographic supplies; and expendable materials and supplies purchased specifically for the Project. A ten (10) percent administrative and handling charge will be added to client reimbursable expenses.
  9. Client's termination of this Agreement will not be effective unless Client gives Pennoni seven (7) days prior written notice with accompanying reasons and details, and affords Pennoni an opportunity to respond. Where the method of payment is "Lump Sum," Client agrees that the final invoice will be based on services performed to the effective date of cancellation, plus an equitable adjustment to provide for costs Pennoni incurred for commitments made prior to cancellation. Where the method of payment is time and materials, Client agrees that the final invoice will include all services and direct expenses up to the effective date of cancellation plus an equitable adjustment to provide for costs Pennoni incurred for commitments made prior to cancellation.
  10. Pennoni will maintain at its own expense Workman's Compensation insurance, Commercial General Liability insurance, and Professional Liability insurance.
  11. Neither the Client nor Pennoni shall assign this Agreement without the written consent of the other.

LE01 12/2015

  1. Pennoni does not represent or warrant that any permit or approval will be issued by any governmental or regulatory body. Pennoni will endeavor to prepare applications for such permit or approval in conformance with applicable requirements; but, in view of the complexity of and the frequent changes in applicable rules and regulations and interpretations by the authorities, Pennoni cannot guarantee that any such application will be considered complete or will conform to all applicable requirements.
  2. Pennoni will perform its work in accordance with generally accepted professional standards. THERE ARE NO OTHER WARRANTIES, EXPRESSED OR IMPLIED. This Agreement is solely for the benefit of the Client and its successors. There is no third-party beneficiary of this Agreement.
  3. CLIENT AND PENNONI HAVE CONSIDERED THE RISKS AND REWARDS ASSOCIATED WITH THIS PROJECT, AS WELL AS PENNONI'S TOTAL FEE FOR SERVICES. CLIENT AGREES THAT, TO THE FULLEST EXTENT PERMITTED BY LAW, PENNONI'S TOTAL AGGREGATE LIABILITY (INCLUDING THE LIABILITY OF ITS OFFICERS, DIRECTORS, EMPLOYEES, AGENTS, SUBCONTRACTORS AND CONSULTANTS) TO THE CLIENT (AND ANYONE CLAIMING BY, THROUGH OR UNDER THE CLIENT) FOR ANY AND ALL INJURIES, CLAIMS, LOSSES, EXPENSES OR DAMAGES ARISING OUT OF THIS AGREEMENT FROM ANY CAUSE OR CAUSES IS LIMITED TO THE TOTAL FEE RECEIVED BY PENNONI UNDER THIS AGREEMENT OR $50,000, WHICHEVER IS GREATER. SUCH CAUSES INCLUDE, BUT ARE NOT LIMITED TO, PENNONI'S NEGLIGENCE, ERRORS, OMISSIONS, STRICT LIABILITY, OR BREACH OF CONTRACT OR WARRANTY. IN THE EVENT THE CLIENT IS UNABLE TO ACCEPT THE ABOVE LIMITATION OF LIABILITY, PENNONI AGREES TO INCREASE THE LIMITATION TO $1,000,000 UPON ITS RECEIPT, PRIOR TO PERFORMING ANY SERVICES, OF CLIENT'S WRITTEN AGREEMENT TO PAY AN ADDITIONAL SUM OF NOT LESS THAN 10% OF THE TOTAL FEE UNDER THIS AGREEMENT OR $1,000, WHICHEVER IS GREATER.
  4. Client shall make no claim against Pennoni unless the Client first provides a written certification, executed by an independent design professional, specifying those acts or omissions which the independent design professional contends is a violation of generally accepted professional standards and upon which the claim will be premised. The independent design professional must be licensed to practice in the state where the Project is located and in the discipline related to the claim. Client agrees that the independent design professional's certification is a condition precedent to the Client's right to institute any judicial proceeding.
  5. If required under the scope of services, Pennoni shall visit the Project site to become generally familiar with the progress and quality of the work for which Pennoni prepared contract documents, and Pennoni shall not make exhaustive or continuous onsite inspections. Pennoni's services do not include supervision or direction of the contractor's work. Observation by Pennoni field representatives shall not excuse the contractor for defects or omissions in its work. Pennoni shall not control construction means, methods, techniques, sequences, or procedures, and the contractor is solely responsible for all work on the Project, including safety of all persons and property.
  6. If Client does not retain Pennoni to render construction phase services, then Client waives any claim it may have against Pennoni and agrees to indemnify, defend, and hold harmless Pennoni from any loss or liability, including attorneys fees and other defense costs, arising out of or related to the interpretation of Pennoni's plans and specifications, the review of shop drawings, the evaluation of contractor's request for change orders, or the failure to detect and correct obvious errors or omissions in Pennoni's plans and specifications.
  7. Unless and until a court determines that Pennoni's preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs, specifications and/or Pennoni's giving or failure to give instructions is the primary cause of any damage, claim, loss or expenses, Client shall indemnify, defend and hold harmless Pennoni and its officers, employees and consultants from and against all damages, claims, losses or expenses, including reasonable attorneys fees and other costs of defense, arising out of this Agreement. In the event the Client is required to defend Pennoni under this paragraph, Pennoni shall have the right to select its attorneys.
  8. Client agrees to pay reasonable expert witness fees if Pennoni or any of its employees is subpoenaed to testify as a fact or opinion witness in any court proceeding, arbitration, or mediation to which the Client is a party.
  9. Unless otherwise provided in this proposal, Pennoni shall have no responsibility for the discovery, presence, handling, removal, or disposal of hazardous materials or underground structures at the Project site.
  10. Client and Pennoni waive consequential damages arising out of this Agreement.
  11. This Agreement shall be governed by the laws of the Commonwealth of Pennsylvania.
  12. Both Pennoni and Client agree to waive the right to subrogation for covered losses and each shall obtain similar waivers from Owner, subcontractors, property and casualty insurers, and any other party involved in this Project.

LE01 12/2015

SUNOCO PIPELINE
An ENERGY TRANSFER Partnership

RECEIVED OCT 4 2017 BY ________

October 2, 2017

BY CERTIFIED AND FIRST CLASS MAIL
East Goshen Municipal Sewer Authority
1580 Paoli Pike
West Chester, PA 19380

Re: Mariner East 2 – Pennsylvania Pipeline Project
Horizontal Directional Drilling Construction Notification
and Private Water Supply/Well Sampling Offer

Dear East Goshen Municipal Sewer Authority:

Sunoco Pipeline L.P. (“SPLP”) is writing to inform you that a certain construction activity known as Horizontal Directional Drilling (“HDD”) for Mariner East 2, also known as the Pennsylvania Pipeline Project, is located within 450 feet of your property boundary.

SPLP sent you a letter before construction activity began on the first of two HDDs that will occur in the area. This letter is intended to inform you that the second HDD will begin as soon as ten (10) days of the date of this letter.

As part of this construction activity, SPLP is offering private water supply/well testing at SPLP’s expense if you have a private water supply/well located within 450 feet of the HDD alignment. SPLP will provide you copies of all test results from your private water supply/well. Please note that upon their request, we will provide the test results to the Pennsylvania Department of Environmental Protection as well.

  • If you have already contacted the Right-of-Way agent for your area and requested that your private water supply/well be tested, you do not need to take any further action in response to this letter.
  • If you have not previously contacted the Right-of-Way agent for your area, SPLP is requesting that you do so by calling Amy Johnson at (717) 208-7735 to provide SPLP with the following information: If you have a private water supply/well on your property;; The location of your private water supply/well on your property; and,; If you would like to have your private water supply/well tested.

If you have not previously contacted the Right-of-Way agent for your area, and you would like to have your private water supply/well tested, you must contact the Right-of-Way agent for your area within the next then (10) days by calling Amy Johnson at (717) 208-7735 Your private water supply/well will be tested at a mutually-convenient time within ten (10) days of SPLP’s receipt of your request for testing. If you do not contact the Right-of-Way agent, there will be no further contact from us regarding any private water supply/well testing.

If you have any questions or concerns, please do not hesitate to contact the Right-of-Way agent for your area by calling Amy Johnson at (717) 208-7735.

Thank you for your cooperation.

Mark McConnell
Land Project Manager
Representing Sunoco Pipeline L.P.
Office: (814) 204-0450

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

September 29, 2017

Dear Property Owner:

The purpose of this letter is to inform you that the owner of 1007 Taylor Avenue, West Chester, PA 19380, has submitted a subdivision application and plan for review and approval by the Township. The owner, Taylor Ave Partners, proposes a 2 lot subdivision of the property. The existing parcel has an area of approximately 1.08 acres, has two existing single family homes and a large garage.

The property was recently granted zoning variances to allow for the subdivision of this legal non-conforming lot with legal non-conforming structures. The owner proposes to subdivide the 1.079 acre parcel into two lots in such a way as to position each single family home on its own parcel.

The application and plan proposes to subdivide the existing lot creating one new .870 acre lot and one new .209 acre lot.

Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of subdivision application submissions.

The public meeting schedule for the review and possible approval of this application is:

  • October 4, 2017 - Planning Commission meeting (7:00 PM)
  • November 1, 2017 - Planning Commission meeting (7:00 PM)
  • November 21, 2017 - Board of Supervisors (7:00 PM)

All meetings are held at the Township Building and are open to the public and subject to change without further written notice. The application and plan is available for review at the Township building during normal business hours. Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Mark A. Gordon
Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-2\53-2-51 1007 Taylor Ave\2017 SD\1000 foot letter for SD PLAN 09292017.doc