Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 12, 2018
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES January 22, 2018
- APPROVAL OF INVOICES Description Amount Pennoni Invoice #786299 $ 142.50 Pennoni Invoice #786300 $ 877.00 Pennoni Invoice #786301 $ 1,775.50 Pennoni Invoice #786302 $ 552.50 Pennoni Invoice #786304 $ 1,181.75 Pennoni Invoice #786305 $ 123.00 Pennoni Invoice #786306 $ 1,297.75 Pennoni Invoice #786307 $ 1,341.75 Gawthrop Invoice #190131 $ 680.00
- LIAISON REPORTS
- FINANCIAL REPORTS January Financial Report
- OLD BUSINESS
- GOALS
F:\Data\Shared Data\Agendas\Municipal Authority\2018\2-12-18.doc
- Continue to monitor the upgrades at West Goshen Sewer Plant.
- Continue to implement the I&I Plan.
- Submit articles for the newsletter.
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST Goals presented by the ABC’s at the planning session.; Dana Pizarro was appointed to a five-year term as PE to the Authority
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2018\2-12-18.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 9, 2018
To: Municipal Authority
From: Mark Miller
Re: January 2018 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 754,000 gallons per day. No problems to report.
Meters: All meters were calibrated on 2/8/18 by Allied Control. The meters are being read on a daily basis. We have been having power problems with a couple of the meters which has required the men to go out and re-set the breakers.
C.C. Collection: We have been busy working in Supplee Valley prior to the contractor lining. We have been televising and repairing laterals. We have repaired four laterals to date. With the water table being high we are finding INI in the lines that were dry a couple months ago. We also repaired several manholes that had several leaks. The lining contractor has completed a majority of the lining. We had the contractor do several point repairs due to the lateral depths and location. We replaced two manhole castings and lids on Reservoir Road. We televised the sewer line between Baldwin Drive and Reservoir Road. The line was in excellent condition.
We finished the roof hatch at Barkway Pump Station. All the pump stations were visited on a daily basis and wet wells were cleaned.
R.C. Collection: We found six lateral stacks raised due to frost, they were pushed down into place. The pump station was visited on a daily basis and the wet well was cleaned. Ace Disposal was utilized to vacuum the grease from the wet well. We did not have any emergencies on the Ridley Creek system.
R.C. Plant: The caustic soda system is up and running. To make sure everything was operational we ran the system on a trial basis for ten days using water with not problems to report. Scott Towler said he was having problems with the meter at the sewer plant. I asked Allied Control to check it out then they were here.
Alarms: We responded to 17 alarms for January ranging from power outages to high level alarms. The Ridley Creek, Reservoir Road meter has to be pulled for repairs; they could be down for ten days.
PA One Calls: We received 38 PA One calls January.
[Photograph of a worker inside a trench excavation installing white PVC sewer pipes and fittings, with trench shoring and an access ladder.]
226 Baldwin Dr
[Photograph from above of two workers in a shored trench excavation installing a pipe run along the trench floor, with cross-brace struts and an access ladder.]
226 Baldwin Dr.
[Photograph of two utility workers wearing safety helmets inside a trench box excavation with vertical white pipes, trench shielding, and support struts.]
226 Baldwin Dr.
[Photograph looking down into a shored trench excavation showing two utility workers, shoring jacks, and pipe installation on a concrete bed.]
This lateral required Lining
1357 Mark Dr
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
February 9, 2018
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – The chemical feed pump, piping, two chemical totes, electric, and controls are set up for the study. We have coordinated with the operator on the recommended starting chemical dosing rate (5 gallons/hour). The operator is running a pre-test on the system with water for a few days to ensure functionality of controls and equipment and no leaks before starting to feed caustic soda. We anticipate the caustic soda feed will begin the week of February 12.
Reservoir Road Pump Station
- We have received all permits. The bid document will be finalized to incorporate the recently issued Army Corps of Engineers permit, and a final set of plans and specifications will be provided to the Township for their files. No update since our last report.
- A listing of the permits, expiration dates, and renewal deadlines will also be provided. No update since our last report.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- A pre-construction meeting was conducted with the contractor, SWERP, on January 16. The Notice to Proceed was issued on January 22 with a contract duration of 60 days. The contract completion date is therefore March 23. Work began on January 24, and we anticipate they will complete work the week of February 26.
- As of February 9, SWERP has pipe lined 10 of the 18 sewer runs in the contract. They have also installed two spot repair liners on one sewer lateral and one spot repair liner on a sewer main to address significant infiltration that was identified during their pre-construction cleaning and televising. This was work beyond that in the contract so a change order will be needed for approximately $5,500.
- The PW Department has also replaced two residential cleanouts and a portion of the associated sewer laterals to address infiltration, one of which is the lateral that received two spot repair liners downstream of the excavated lateral repairs. The PW Department also sealed a leak in a manhole.
- Infiltration is now occurring at the joints between a few laterals and the mains following the pipe lining, as a result of the pipe lining sealing the entire length of the sewer main piping and groundwater finding a new way in. We are coordinating with SWERP on the approach to seal these leaks (likely a cured-in-place trenchless lateral saddle connection) and the associated additional costs.
EGMAU18001
February 9, 2018
Page 2
East Goshen Municipal Authority
Engineer’s Report
- In summary, there is a significant amount of infiltration that has been identified in this area of the sewer system during this project. Based on visual observations, we estimate that the project may be addressing nearly 100,000 gpd of infiltration sources, nearly half of which was in one lateral.
Barkway Pump Station Grinder
- The Township’s electrical inspector confirmed that the hydraulic power pack and controls can be installed inside the building. We are initiating work to finalize the design.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. We coordinated with Mark Miller on the scope of these test pits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We prepared an existing conditions plan of the roadway and sanitary sewer based on our field survey, and we reviewed the Township’s sewer videos. A portion of the sewer has a severe sag, and we have identified the approximate extent of repair required; however, additional televising may be needed to determine with certainty. At this time, we are tentatively recommending that only the sag be repaired/replaced. Two other alternatives would be to: (1) replace the full length of pipe from manhole-to-manhole to provide a consistently sloped pipe for the entire run, and (2) to replace that full length of pipe plus the next downstream sewer run and the intermediate manhole in order to improve the very flat slope of the subject pipe. We are evaluating the alternatives with Mark Miller. No update since our last report.
I&I Support and Reporting
- We issued a draft semi-annual I&I report to the Township and conducted a review meeting with Mark Miller thereafter. The report is being finalized based upon the meeting, and we expect to issue it on February 12.
Chapter 94 Reports
- We are in the process of obtaining and analyzing data and preparing the reports for the Westtown, West Goshen (Chester Creek), and RCSTP service areas.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
Other
- 1405 Wexford Circle – We have communicated with the Township Codes Department and reviewed correspondence from PADEP about the single-family residential wastewater treatment system with stream discharge that is proposed to replace a failing on-lot system.
P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-02-09.docx
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 experienced one exceedance of the permitted effluent discharge limitations for during the month of December 2017. The nature of the issue was a reported weekly TSS maximum of 16 mg/L as compared to the permitted discharge limitation of 15 mg/L. The root cause was attributed to one (1) disc filter drive unit was out of service. The problem was corrected and normal plant operations resumed. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
The total phosphorus monthly average was reported as 0.24 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.13 to 0.42 mg/L. The ammonia as nitrogen monthly concentration was reported as 0.399 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.888 mg/L. The total suspended solids (TSS) monthly concentration was reported as 6 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 16 mg/L as compared to the permit discharge limitation of 15 mg/L.
Table 1 illustrates the final effluent composite sample data reported for the December 2017 DMR.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Table 1
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum |
40 | 42 | |||||||||
| Sample Date | |||||||||||
| December 2, 2017 | 0.188 | 4 | 6.3 | ||||||||
| December 5, 2017 | 0.173 | 4.2 | 6.1 | 4 | 5.8 | 0.128 | 0.18 | 0.13 | 0.19 | 3 | 0.4771 |
| December 8, 2017 | 0.182 | 3 | 4.6 | ||||||||
| December 12, 2017 | 0.188 | 16.9 | 26.5 | 5 | 7.8 | 0.394 | 0.62 | 0.22 | 0.34 | 1 | 0.0000 |
| December 15, 2017 | 0.190 | 4 | 6.3 | ||||||||
| December 19, 2017 | 0.168 | 2.0 | 2.8 | 4 | 5.6 | 0.888 | 1.24 | 0.17 | 0.24 | 1 | 0.0000 |
| December 28, 2017 | 0.213 | 6.5 | 11.5 | 16 | 28.4 | 0.187 | 0.33 | 0.42 | 0.75 | 1 | 0.0000 |
| Average | 0.186 | 7.4 | 11.7 | 6 | 9.8 | 0.399 | 0.59 | 0.24 | 0.38 | 1 | 0.1193 |
| Minimum | 0.168 | 2.0 | 2.8 | 3 | 4.6 | 0.128 | 0.18 | 0.13 | 0.19 | 1 | 0.0000 |
| Maximum | 0.213 | 16.9 | 26.5 | 16 | 28.4 | 0.888 | 1.24 | 0.42 | 0.75 | 3 | 0.4771 |
The elevated TSS sample concentration recorded on December 28th is the result of a disc filter drive being off line inhibiting the routine filter back wash cycle. The filter drive was reset and the drive was observed to function as intended.
Table 2 illustrates the final effluent composite sample data reported for the December 2017 DMR. Discharge to Applebrook, Outfall 002 was 4.8355 million gallons during December.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Table 2
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum |
40 | 42 | |||||||||
| December 2, 2017 | 0.1454 | 4.0 | 4.9 | ||||||||
| December 5, 2017 | 0.1645 | 4.2 | 5.8 | 4.0 | 5.5 | 0.128 | 0.18 | 0.13 | 0.18 | 3 | 0.000 |
| December 8, 2017 | 0.1467 | 0.0 | 3.0 | 3.7 | |||||||
| December 12, 2017 | 0.1451 | 16.9 | 20.5 | 5.0 | 6.1 | 0.394 | 0.48 | 0.22 | 0.27 | 1 | 0.000 |
| December 15, 2017 | 0.1391 | 0.0 | 4.0 | 4.6 | |||||||
| December 19, 2017 | 0.1501 | 2.0 | 2.5 | 4.0 | 5.0 | 0.888 | 1.11 | 0.17 | 0.21 | 1 | 0.000 |
| December 28, 2017 | 0.1285 | 6.5 | 7.0 | 16.0 | 17.1 | 0.187 | 0.20 | 0.42 | 0.45 | 1 | 0.119 |
| Average | 0.1285 | 7.4 | 5.9 | 5.7 | 6.7 | 0.40 | 0.49 | 0.24 | 0.28 | 2 | 0.0298 |
| Minimum | 0.1285 | 2.0 | 0.0 | 3.0 | 3.7 | 0.13 | 0.18 | 0.13 | 0.18 | 1 | 0.0000 |
| Maximum | 0.1645 | 16.9 | 20.5 | 16 | 17.1 | 0.89 | 1.11 | 0.42 | 0.45 | 3 | 0.1193 |
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2017.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Table 3
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| December 5, 2017 | 0.402 | 159 | 533 | 168 | 563 | 35.0 | 117 | 42.5 | 142 | 4.2 | 14.1 |
| December 12, 2017 | 0.344 | 168 | 563 | 130 | 435 | 31.6 | 91 | 42.4 | 122 | 5.3 | 17.8 |
| December 19, 2017 | 0.365 | 227 | 760 | 384 | 1,286 | 43.9 | 134 | 43.6 | 133 | 7.0 | 23.4 |
| December 28, 2017 | 0.425 | 401 | 504 | 43.9 | 45.8 | 162 | 7.1 | 23.8 | |||
| Average | 0.384 | 239 | 619 | 297 | 762 | 38.6 | 114 | 43.6 | 140 | 5.9 | 19.8 |
| Minimum | 0.344 | 159 | 533 | 130 | 435 | 31.6 | 91 | 42.4 | 122 | 4.2 | 14.1 |
| Maximum | 0.425 | 401 | 760 | 504 | 1286 | 43.9 | 134 | 45.8 | 162 | 7.1 | 23.8 |
Table 4 presents the available Outfall 001 final effluent data for the month of January 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters. The alum feed to the SBRs was frequently increased to improve the total phosphorus removal.
The facility is anticipated to achieve compliance with the discharge permit limitations during the month of January 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
During January, the presence of foam conditions on the surface of the SBRs increased to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The lower water temperatures within the SBRs, coupled with lower food to mass ratios, the foam concentrations have increased because of increased filamentous growth.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Management of the food to mass ratio assists to manage the foam concentrations balanced by maintaining nitrification is critical during the colder winter months.
Table 4
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantane ous |
40 | 42 | |||||||||
| Sample Date | |||||||||||
| January 3, 2018 | 0.256 | 1 | 0.0000 | ||||||||
| January 5, 2018 | 0.206 | 2.5 | 4.3 | 10.5 | 18.0 | 1.46 | 2.51 | 0.18 | 0.31 | ||
| January 9, 2018 | 0.189 | 3.6 | 5.7 | 9 | 14.2 | 1.15 | 1.81 | 0.15 | 0.24 | 2 | 0.3010 |
| January 12, 2018 | 0.325 | 7 | 19.0 | ||||||||
| January 16, 2018 | 0.176 | 2 | 2.9 | 8 | 11.7 | 0.353 | 0.52 | 0.15 | 0.22 | 2 | 0.3010 |
| January 23, 2018 | 0.222 | 2.7 | 5.0 | 4 | 7.4 | 1 | 0.0000 | ||||
| January 30, 2018 | 0.381 | 6 | 19.1 | 1 | 0.0000 | ||||||
| Average | 0.302 | 2.7 | 4.5 | 7.4 | 14.9 | 0.99 | 1.6 | 0.16 | 0.3 | 1 | 0.1204 |
| Minimum | 0.222 | 2.7 | 5.0 | 4 | 7.4 | 0.000 | 0.00 | 0.00 | 0.00 | 1 | 0.0000 |
| Maximum | 0.381 | 2.7 | 5.0 | 6 | 19.1 | 0.000 | 0.00 | 0.00 | 0.00 | 1 | 0.0000 |
Table 5 presents the available January data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Table 5
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantane ous |
40 | 42 | |||||||||
| January 3, 2018 | 0.1673 | 1.0 | 0.0 | ||||||||
| January 5, 2018 | 0.1210 | 2.5 | 2.5 | 10.5 | 10.6 | 1.46 | 1.47 | 0.18 | 0.18 | ||
| January 9, 2018 | 0.1301 | 3.6 | 3.9 | 9.0 | 9.8 | 1.15 | 1.25 | 0.15 | 0.16 | 2.0 | 0.3 |
| January 12, 2018 | 0.1592 | 7.0 | 9.3 | ||||||||
| January 16, 2018 | 0.1476 | 2.0 | 2.5 | 8.0 | 9.8 | 0.353 | 0.43 | 0.15 | 0.18 | 2.0 | 0.3 |
| January 23, 2018 | 0.1620 | 2.7 | 3.6 | 4.0 | 5.4 | ||||||
| January 30, 2018 | 0.1524 | 6.0 | 7.6 | ||||||||
| Average | 0.1485 | 2.7 | 3.1 | 7.4 | 8.8 | 0.99 | 1.05 | 0.16 | 0.18 | 2 | 0.2007 |
| Minimum | 0.1210 | 2.0 | 2.5 | 4.0 | 5.4 | 0.35 | 0.43 | 0.15 | 0.16 | 1 | 0.0000 |
| Maximum | 0.1673 | 3.6 | 3.9 | 11 | 10.6 | 1.46 | 1.47 | 0.18 | 0.18 | 2 | 0.3010 |
Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during January 2018.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
Table 6
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Averag | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| January 3, 2018 | 0.468 | 132 | 515 | 74 | 289 | 43.3 | 169 | 48.6 | 190 | 4.7 | 18.4 |
| January 9, 2018 | 0.334 | 253 | 988 | 272 | 1,062 | 34.4 | 96 | 41.6 | 116 | 5.5 | 21.5 |
| January 16, 2018 | 0.380 | 81.4 | 318 | 72 | 281 | 37.7 | 119 | 43.4 | 137 | 4.1 | 16.0 |
| January 23, 2018 | 0.464 | 153 | 597 | 72 | 281 | 38.2 | 148 | 3.7 | 14.4 | ||
| January 30, 2018 | 0.422 | 156 | 609 | 194 | 758 | ||||||
| Average | 0.413 | 155 | 606 | 137 | 534 | 38.4 | 133 | 44.5 | 148 | 4.5 | 17.6 |
| Minimum | 0.334 | 81 | 318 | 72 | 281 | 34.4 | 96 | 41.6 | 116 | 3.7 | 14.4 |
| Maximum | 0.468 | 253 | 988 | 272 | 1062 | 43.3 | 169 | 48.6 | 190 | 5.5 | 21.5 |
Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during December and January. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Significant Storm/Hydraulic Loading Events
During January, there were two (2) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period. A total of 2.53 inches of rainfall measured during the month. These events occurred on:
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
January 12th 0.68 inches
January 23rd 0.59 inches
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
PA DEP
No activity.
Solids Dewatering and Disposal: January 2018
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 337,834 |
| Number of dumpsters | 4 |
*Eighteen (18) days of centrifuge operation
Chemical Usage:
| Chemical | January 2018 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 300 | 9,000 |
| Aluminum Sulfate solution | 56.5 | 1,694 |
| Polymer (centrifuge) | 0.85 | 15.3 |
*Eighteen (18) days of centrifuge operation
Flow data:
The field flow meter was removed from service. The flow meter volumes were erratic.
| Flow Meter Location | January 2018 | Daily Maximum Flow, gpd | |
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | ||
| Influent Wastewater to Screening Building* | NA | NA | NA |
| Influent Wastewater to SBRs | 13.300 | 429,027 | 599,616 |
| Internal Recycle | NA | NA | NA |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 8 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
January 2018
| Treated Effluent to Disc Filters | 13.242 | 427,148 | 595,584 |
|---|---|---|---|
| Final Effluent Discharge | 7.017 | 226,355 | 381,000 |
| Applebrook Golf Course | 4.656 | 150,178 | 196,552 |
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned piping within SBR building
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters weekly
Look Ahead Preventative Maintenance Activities
Rebuild will be scheduled for February
Installation of the LDO probes and controls for SBRs is planned for first quarter 2018 when the weather becomes warmer.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 9 of 9
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 22, 2018
The East Goshen Township Municipal Authority held their regular public meeting on Monday, January 22, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Ed McAssey, Jack Yahraes, Dana Pizarro, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Carmen Battavio and David Shuey (Township Supervisors), and Walter Wujcik, (Conservancy Board).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Ed called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Ed asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
No report. Jack will attend the February meeting of the West Goshen Sewer Authority.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for December:
Monthly Flows: The average daily flow to West Goshen was 721,000 gallons per day.
Meters: Meters were read on a daily basis with no problems to report.
C.C. Collection: We had a lateral backup on Wyllpen Drive. We plunged the lateral to clear the blockage. The pump stations were visited on a daily basis. The roof was replaced at Ashbridge Pump Station. We have also been clearing the Right of Ways. Lateral repair between both systems, we have done 11 repairs for the month. We had three lateral problems and we televised them. We did locate one on Sturbridge Lane that had been sheared off at the house. The property owner hired a plumbing contractor to make the repairs.
R.C. Collection: We finished the repairs to the Hershey Mill Pump Station. The controller needed to be replaced on the generator. We also had to pull a pump that was not performing.
R.C. Plant: We started to install plumbing for the caustic soda pilot test. The operator compiled a list of parts for the Centrifuge to rebuild the unit. This will be the second rebuild since the unit has been in service.
Alarms: We responded to 17 alarms for November.
PA One Calls: We received 27 PA One calls for November.
MA 1-22-18 draft
1
2. Pennoni Engineer’s Report for October
Mike Ellis provided the following report.
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – We coordinated with Mark Miller on tapping the SBR influent pipe, purchasing the chemical feed pump, and ordering two caustic soda totes. The pilot study can begin upon receipt of the pumps and totes.
Reservoir Road Pump Station
- We have received all permits. The bid document will be finalized to incorporate the recently issued Army Corps of Engineers permit, and a final set of plans and specifications will be provided to the Township for their files. No update since our last report.
- A listing of the permits, expiration dates, and renewal deadlines will also be provided. No update since our last report.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- The contractor, SWERP, was notified of award. They submitted bonds, insurance, and the contract agreement, which were reviewed and found acceptable. A pre-construction meeting is being scheduled, and we anticipate initial cleaning and televising work will begin in January.
Barkway Pump Station Grinder
- We attended a field scoping meeting at the pump station on November 9 with Mark Miller and the Muffin Monster vendor, Mark Wolff of Watermark Environmental Systems. The recommended solution is to install the Muffin Monster within the existing wet well (rather than in a new prefabricated upstream manhole as previously considered) with the hydraulic power pack (HPP) and controls inside of the building. The vendor confirmed that a hydraulically powered Muffin Monster will fit within the existing wet well, so this solution is recommended because it is less expensive and there will be no noise issues with the HPP located inside. However, due to the size of the existing building, the HPP is expected to create slight encroachments of a few equipment clearance distances as per current codes. We have submitted a sketch of the proposed HPP and Muffin Monster control panel layout for review by the Township’s electrical inspector. If deemed acceptable, the design will be finalized. No update since our last report.
MA 1-22-18 draft
2
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. We coordinated with Mark Miller on the scope of these test pits.
Tallmadge Drive Sewer Main Replacement
- We prepared an existing conditions plan of the roadway and sanitary sewer based on our field survey, and we reviewed the Township’s sewer videos. A portion of the sewer has a severe sag, and we have identified the approximate extent of repair required; however, additional televising may be needed to determine with certainty. At this time, we are tentatively recommending that only the sag be repaired/replaced. Two other alternatives would be to: (1) replace the full length of pipe from manhole-to-manhole to provide a consistently sloped pipe for the entire run, and (2) to replace that full length of pipe plus the next downstream sewer run and the intermediate manhole in order to improve the very flat slope of the subject pipe. We are evaluating the alternatives with Mark Miller.
I&I Support and Reporting
- We received and analyzed new meter data from the portable and permanent flow meters throughout the collection systems. A draft report will be issued the week of January 8 for review by the Township. We anticipate a review meeting with Mark Miller will follow and that a finalized report will be submitted by the end of January.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
3. Big Fish Environmental Services Report for December – Scott’s report for December showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted discharge limitations during the month of November 2017. Discharge to Applebrook continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Approval of Minutes
The minutes of the December 11, 2017 meeting were approved as corrected.
MA 1-22-18 draft
3
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
- Pennoni #782383 $ 8,764.25
- Pennoni #782384 $ 956.50
- Pennoni #782386 $ 2,802.81
Jack seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of Gawthrop Greenwood invoice #188890 for $600.00. Jack seconded the motion. The motion passed unanimously.
3. Jack moved to approve payment of an additional Gawthrop Greenwood invoice for $680.00. Kevin seconded the motion. The motion passed unanimously.
4. Kevin moved to approve payment of a West Goshen Sewer Authority invoice for $30,050.70. Dana seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board - Walter reported that Keep East Goshen Beautiful Day will be held on Saturday April 21, at 8:00 am. They are considering Clymers Woods or the Blacksmith Shop area for their Spring planting.
Board of Supervisors – Carmen reported that the BOS will hold a special meeting for the Malvern Institute. The Township received notice that two more pipeline companies are changing from oil to natural gases in their pipelines. Sunoco is currently shut down by the DEP.
Financial Reports
Jon Altshul provided the following written report:
In December, the Municipal Authority recorded $71,123 in income (interest and a $70,000 transfer from the sewer operating fund) and $1,117,878 in expenses for a negative variance of $1,046,755. The main expense was the $1,042,736 payment to West Goshen for EGMA’s share of the anaerobic digester. This expense was paid from the balance of the capital account, which primarily includes proceeds from the 2013 MA note.
Jack moved to approve $9,400 for Maley to do the annual audit. Dana seconded the motion. The motion passed unanimously.
Old Business
Kevin moved to elect the following officers for 2018:
Jack – Chairman
Kevin – Vice Chairman
Phil – Secretary
Dana – Treasurer
Ed – Assistant Secretary/Treasurer
Jack mentioned that Ed is moving to Lancaster. He thanked him for his service as Chairman.
MA 1-22-18 draft
4
New Business
Resolution NO#34-A - This resolution revises the grant amount requested for a Pennsylvania Small Water and Sewer Program Grant to $64,000.00 for the Barkway Pump Station improvements. All MA members have to sign it. Ed moved to adopt and sign the Resolution NO#34-A. Dana seconded the motion. The motion passed unanimously.
Correspondence and Reports of Interest
After Reviewing the anti-Authority amendments to SB 656 Jack asked Rick to send a letter of opposition to this bill to all of our state representatives.
Adjournment
There being no further business, Ed moved to adjourn the meeting. Kevin seconded the motion. The meeting was adjourned at 7:55 p.m. The next regular meeting will be held on Monday, February 12, 2018 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 1-22-18 draft
5
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786299
Invoice Date : 01/25/2018
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting
For Services Rendered through: 1/14/2018
Prepared list of obtained permits with expiration dates and renewal timeframes.
Phase : 12 -- Permitting
| Total Phase : 12 -- Permitting | Labor : | 142.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 142.50 | |
| Amount Due This Invoice | $142.50 | |
Phase : 12 -- Permitting
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Senior Professional | 1.25 | 114.00 | 142.50 |
| Labor Total: | 1.25 | 142.50 |
| Total Phase : 12 -- Permitting | Labor : | $142.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting | Labor : | $142.50 |
| Expense : | $0.00 |
[Handwritten in red: ok RS 2-9-18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 1/25/2018
| Project: | EGMA1504 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting | ||
| Invoice No: | 786299 | ||
| Invoice Period: | 9/18/2017 | to | 1/14/2018 |
| Initial Authorization: | $ 167,120.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 193,200.00 | ||
| Previously Invoiced: | $ 192,507.25 | ||
| Current Invoice: | $ 142.50 | ||
| Invoiced to Date ($): | $ 192,649.75 | ||
| Invoiced to Date (%): | 99.72% | ||
| Remaining Budget ($): | $ 550.25 | ||
| Remaining Budget (%): | 0.28% |
Budget by Phase:
| Phase Name: | Permitting | Phase 12 |
|---|---|---|
| Phase Budget: | $ 50,940.25 | |
| Previously Invoiced: | $ 50,428.50 | |
| Current Invoice: | $ 75.75 | |
| Invoiced to Date ($): | $ 50,504.25 | |
| Invoiced to Date (%): | 99.14% | |
| Remaining Budget ($): | $ 436.00 | |
| Remaining Budget (%): | 0.86% |
Comments: Prepared list of obtained permits with expiration dates and renewal timeframes
Reservoir Road Pump Station Design & Permitting
INVOICE SUMMARY
For Services Rendered through: 1/14/2018
| Task No. | Activity | Contract Amount* | Invoiced Effort thru 9/17/2017 | Remaining Budget ($) | Remaining Budget (%) | Completed? |
|---|---|---|---|---|---|---|
| 1 | Concept Design | $13,655.75 | $13,655.75 | - | - | Yes |
| 2 | DEP WQM Pre-App. Meeting | $1,300.00 | $1,300.00 | - | - | Yes |
| 3 | Existing Conditions Survey | $22,783.75 | $22,783.75 | - | - | Yes |
| 4 | Sewer Stakeout in Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 5 | 1636 Bow Tree Dr. Boundary Survey & Easement | $4,020.00 | $4,020.00 | - | - | Yes |
| 6 | Additional Boundary Surveys & Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 7 | Geotechnical Borings | $4,000.00 | $4,000.00 | - | - | Yes |
| 8 | Install Permanent Survey Benchmarks | $0.00 | $0.00 | - | - | Scope eliminated |
| 9 | Progress Design | $29,450.00 | $29,450.00 | - | - | Yes |
| 10 | Infiltration Testing | $1,800.00 | $1,800.00 | - | - | Yes |
| 11 | Final Design | $65,170.25 | $64,993.50 | $176.75 | 0.3% | No** |
| 12 | Permitting | $50,940.25 | $50,647.00 | $293.25 | 0.6% | No*** |
| TOTAL | $193,120.00 | $192,650.00 | $470.00 | 0.2% | ||
*After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.
**Need to assemble full bid document package for Township.
*** All permits have been received. Need to prepare permit expiration and renewal date summary list.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786300
Invoice Date : 01/25/2018
Project : EGMA1701
Project Name : 2017 General Services
For Services Rendered through: 1/14/2018
FINAL INVOICE
Phase **** General Engineering Professional Services: Reviewed November-December RCSTP operator's report; prepared for and attended December MA meeting.
Phase 02 Ashbridge PS Force Main Rehabilitation: Submitted email narrative and exhibits with rock depth and potential extents of rock as well as recommended test pit locations; and coordinated with PW Director for reduced scope of test pits focused along Manley Rd following December MA meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 743.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 743.75 |
Phase : 02 -- Ashbridge PS Force Main Rehab
| Total Phase : 02 -- Ashbridge PS Force Main Rehab | Labor : | 133.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 133.25 | |
| Amount Due This Invoice | $877.00 | |
| Fee : | 36,700.00 |
|---|---|
| Prior Billings : | 33,859.00 |
| Current Billings : | 877.00 |
| Total Billings : | 34,736.00 |
[Handwritten in red: ok RS 2-9-18]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1701 -- 2017 General Services
Invoice # : 786300
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 6.25 | 119.00 | 743.75 |
| Labor Total: | 6.25 | 743.75 |
| Total Phase : **** -- Professional Services | Labor : | $743.75 |
|---|---|---|
| Expense : | $0.00 |
Phase : 02 -- Ashbridge PS Force Main Rehab
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 119.00 | 89.25 |
| Associate Professional | 0.50 | 88.00 | 44.00 |
| Labor Total: | 1.25 | 133.25 |
| Total Phase : 02 -- Ashbridge PS Force Main Rehab | Labor : | $133.25 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1701 -- 2017 General Services | Labor : | $877.00 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMA1701 Invoice Summary
Invoice Date 1/25/2018
| Project: | EGMA1701 | ||
|---|---|---|---|
| Pennoni Job No.: | 2017 General Services | ||
| Invoice No: | 786300 | ||
| Invoice Period: | 12/21/2017 | to | 1/14/2018 |
| Initial Authorization: | $ 12,700.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 36,700.00 | ||
| Previously Invoiced: | $ 33,859.00 | ||
| Current Invoice: | $ 877.00 | ||
| Invoiced to Date ($): | $ 34,736.00 | ||
| Invoiced to Date (%): | 95% | ||
| Remaining Budget ($): | $ 1,964.00 | ||
| Remaining Budget (%): | 5% |
Budget by Phase:
| Phase Name: | 2017 General Services |
|---|---|
| Phase Budget: | $ 36,700.00 |
| Previously Invoiced: | $ 33,859.00 |
| Current Invoice: | $ 877.00 |
| Invoiced to Date ($): | $ 34,736.00 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 1,964.00 |
| Remaining Budget (%): | 5% |
Comments: FINAL INVOICE
Phase **** General Engineering Professional Services: Reviewed November-December RCSTP operator's report; prepared for and attended December MA meeting.
Phase 02 Ashbridge PS Force Main Rehabilitation: Submitted email narrative and exhibits with rock depth and potential extents of rock as well as recommended test pit locations; and coordinated with PW Director for reduced scope of test pits focused along Manley Rd following December MA meeting.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786301
Invoice Date : 01/25/2018
Project : EGMA1702
Project Name : 2017 Semi-Annual I&I Reports
For Services Rendered through: 1/14/2018
FINAL INVOICE
Analyzed portable and permanent flow meter data; and initiated preparation of I&I Report #17.
Invoice is for effort through December 31, 2017. Related effort thereafter is invoiced under EGMAU18002.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,775.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,775.50 | |
| Amount Due This Invoice | $1,775.50 | |
| Fee : | 11,500.00 |
|---|---|
| Prior Billings : | 7,131.50 |
| Current Billings : | 1,775.50 |
| Total Billings : | 8,907.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 119.00 | 59.50 |
| Associate Professional | 19.50 | 88.00 | 1,716.00 |
| Labor Total: | 20.00 | 1,775.50 |
| Total Phase : **** -- Professional Services | Labor : | $1,775.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1702 -- 2017 Semi-Annual I&I Reports | Labor : | $1,775.50 |
| Expense : | $0.00 |
[Handwritten in red: ok RS 2-9-18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1702 Invoice Summary
Invoice Date 1/25/2018
| Project: | EGMA1702 | ||
|---|---|---|---|
| Pennoni Job No.: | 2017 Semi-Annual I&I Reports | ||
| Invoice No: | 786301 | ||
| Invoice Period: | 9/18/2017 | to | 1/14/2018 |
| Initial Authorization: | $ 11,500.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 11,500.00 | ||
| Previously Invoiced: | $ 7,131.50 | ||
| Current Invoice: | $ 1,775.50 | ||
| Invoiced to Date ($): | $ 8,907.00 | ||
| Invoiced to Date (%): | 77% | ||
| Remaining Budget ($): | $ 2,593.00 | ||
| Remaining Budget (%): | 23% |
Budget by Phase:
| Phase Name: | 2017 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 11,500.00 |
| Previously Invoiced: | $ 7,131.50 |
| Current Invoice: | $ 1,775.50 |
| Invoiced to Date ($): | $ 8,907.00 |
| Invoiced to Date (%): | 77% |
| Remaining Budget ($): | $ 2,593.00 |
| Remaining Budget (%): | 23% |
Comments: FINAL INVOICE
Analyzed portable and permanent flow meter data; and initiated preparation of I&I Report #17.
Invoice is for effort through December 31, 2017. Related effort thereafter is invoiced under EGMAU18002.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786302
Invoice Date : 01/25/2018
Project : EGMA1704
Project Name : Supplee Valley Pipe Lining & MH Reh
For Services Rendered through: 1/14/2018
FINAL INVOICE
Wrote contract award letter to SWERP, coordinated with SWERP on bonding requirements, and prepared draft resident notification letters.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 552.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 552.50 | |
| Amount Due This Invoice | $552.50 | |
| Fee : | 10,000.00 |
|---|---|
| Prior Billings : | 9,428.00 |
| Current Billings : | 552.50 |
| Total Billings : | 9,980.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 119.00 | 178.50 |
| Associate Professional | 4.25 | 88.00 | 374.00 |
| Labor Total: | 5.75 | 552.50 |
| Total Phase : **** -- Professional Services | Labor : | $552.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1704 -- Supplee Valley Pipe Lining & MH Reh | Labor : | $552.50 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1704 Invoice Summary
Invoice Date 1/25/2018
| Project: | EGMA1704 | ||
|---|---|---|---|
| Pennoni Job No.: | Supplee Valley Pipe Lining & MH Reh | ||
| Invoice No: | 786302 | ||
| Invoice Period: | 12/11/2017 | to | 1/14/2018 |
| Initial Authorization: | $ 7,000.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 9,428.00 | ||
| Current Invoice: | $ 552.50 | ||
| Invoiced to Date ($): | $ 9,980.50 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 19.50 | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | Supplee Valley Pipe Lining & MH Reh |
|---|---|
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 9,428.00 |
| Current Invoice: | $ 552.50 |
| Invoiced to Date ($): | $ 9,980.50 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ 19.50 |
| Remaining Budget (%): | 0% |
Comments: FINAL INVOICE
Wrote contract award letter to SWERP, coordinated with SWERP on bonding requirements, and prepared draft resident notification letters.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786304
Invoice Date : 01/25/2018
Project : EGMAU17007
Project Name : Supplee Valley CIPPL Construction
For Services Rendered through: 1/14/2018
Construction phase office support consisting of reviewing SWERP's insurance, bonding, and contract agreement forms; updating resident notification letters; reviewing shop drawings and pipe liner design calculations; and preparing for pre-construction meeting.
Effort in 2017 is invoiced at approved 2017 hourly rates; effort in 2018 is invoiced at approved 2018 hourly rates.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,181.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,181.75 | |
| Amount Due This Invoice | $1,181.75 | |
| Fee : | 12,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,181.75 |
| Total Billings : | 1,181.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.00 | 123.00 | 123.00 |
| Authority Engineer | 1.25 | 119.00 | 148.75 |
| Senior Professional | 0.50 | 117.00 | 58.50 |
| Associate Professional | 6.25 | 91.00 | 568.75 |
| Associate Professional | 3.25 | 87.00 | 282.75 |
| Labor Total: | 12.25 | 1,181.75 |
| Total Phase : **** -- Professional Services | Labor : | $1,181.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction | Labor : | $1,181.75 |
| Expense : | $0.00 |
[Handwritten in red: ok RS 2-9-18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17007 Invoice Summary
Invoice Date 1-25-2018
| Project: | EGMAU17007 | ||
|---|---|---|---|
| Pennoni Job No.: | Supplee Valley CIPPL Construction | ||
| Invoice No: | 786304 | ||
| Invoice Period: | NTP | to | 1/14/2018 |
| Initial Authorization: | $ 12,000.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 12,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,181.75 | ||
| Invoiced to Date ($): | $ 1,181.75 | ||
| Invoiced to Date (%): | 10% | ||
| Remaining Budget ($): | $ 10,818.25 | ||
| Remaining Budget (%): | 90% |
Budget by Phase:
| Phase Name: | Supplee Valley CIPPL Construction |
|---|---|
| Phase Budget: | $ 12,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,181.75 |
| Invoiced to Date ($): | $ 1,181.75 |
| Invoiced to Date (%): | 10% |
| Remaining Budget ($): | $ 10,818.25 |
| Remaining Budget (%): | 90% |
Comments: Construction phase office support consisting of reviewing SWERP's insurance, bonding, and contract agreement forms; updating resident notification letters; reviewing shop drawings and pipe liner design calculations; and preparing for pre-construction meeting.
Effort in 2017 is invoiced at approved 2017 hourly rates; effort in 2018 is invoiced at approved 2018 hourly rates.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786305
Invoice Date : 01/25/2018
Project : EGMAU18001
Project Name : 2018 General Services
For Services Rendered through: 1/14/2018
Prepared January Engineer's Report. Initiated evaluation of feasibility to disconnect elementary school mechanical room floor drain from sanitary sewer.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 123.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 123.00 | |
| Amount Due This Invoice | $123.00 | |
| Fee : | 18,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 123.00 |
| Total Billings : | 123.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.00 | 123.00 | 123.00 |
| Labor Total: | 1.00 | 123.00 |
| Total Phase : **** -- Professional Services | Labor : | $123.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18001 -- 2018 General Services | Labor : | $123.00 |
| Expense : | $0.00 |
[Handwritten in red: ok RS 2-9-18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 1-25-2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | 786305 | ||
| Invoice Period: | NTP | to | 1/14/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 123.00 | ||
| Invoiced to Date ($): | $ 123.00 | ||
| Invoiced to Date (%): | 1% | ||
| Remaining Budget ($): | $ 17,877.00 | ||
| Remaining Budget (%): | 99% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 18,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 123.00 |
| Invoiced to Date ($): | $ 123.00 |
| Invoiced to Date (%): | 1% |
| Remaining Budget ($): | $ 17,877.00 |
| Remaining Budget (%): | 99% |
Comments: Prepared January Engineer's Report. Initiated evaluation of feasibility to disconnect elementary school mechanical room floor drain from sanitary sewer.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786306
Invoice Date : 01/25/2018
Project : EGMAU18002
Project Name : 2018 I&I Support and Reports
For Services Rendered through: 1/14/2018
Continued analysis of portable and permanent flow meter data and preparation of I&I Report #17.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,297.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,297.75 | |
| Amount Due This Invoice | $1,297.75 | |
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,297.75 |
| Total Billings : | 1,297.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.25 | 123.00 | 153.75 |
| Senior Professional | 2.00 | 117.00 | 234.00 |
| Associate Professional | 10.00 | 91.00 | 910.00 |
| Labor Total: | 13.25 | 1,297.75 |
| Total Phase : **** -- Professional Services | Labor : | $1,297.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18002 -- 2018 I&I Support and Reports | Labor : | $1,297.75 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18002 Invoice Summary
Invoice Date 1-25-2018
| Project: | EGMAU18002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 I&I Support and Reports | ||
| Invoice No: | 786306 | ||
| Invoice Period: | NTP | to | 1/14/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,297.75 | ||
| Invoiced to Date ($): | $ 1,297.75 | ||
| Invoiced to Date (%): | 12% | ||
| Remaining Budget ($): | $ 9,702.25 | ||
| Remaining Budget (%): | 88% |
Budget by Phase:
| Phase Name: | 2018 I&I Support and Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,297.75 |
| Invoiced to Date ($): | $ 1,297.75 |
| Invoiced to Date (%): | 12% |
| Remaining Budget ($): | $ 9,702.25 |
| Remaining Budget (%): | 88% |
Comments: Continued analysis of portable and permanent flow meter data and preparation of I&I Report #17.
INVOICE
Pennoni
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 786307
Invoice Date : 01/25/2018
Project : EGMAU18003
Project Name : 2017 Chapter 94 Reports
For Services Rendered through: 1/14/2018
Initiated data gathering and analysis and preparation of Chapter 94 Reports for West Goshen (Chester Creek), Ridley Creek, and Westtown Service Areas.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,341.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,341.75 | |
| Amount Due This Invoice | $1,341.75 | |
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,341.75 |
| Total Billings : | 1,341.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.00 | 123.00 | 123.00 |
| Senior Professional | 0.50 | 117.00 | 58.50 |
| Associate Professional | 12.75 | 91.00 | 1,160.25 |
| Labor Total: | 14.25 | 1,341.75 |
| Total Phase : **** -- Professional Services | Labor : | $1,341.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18003 -- 2017 Chapter 94 Reports | Labor : | $1,341.75 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18003 Invoice Summary
Invoice Date 1-25-2018
| Project: | EGMAU18003 | ||
|---|---|---|---|
| Pennoni Job No.: | 2017 Chapter 94 Reports | ||
| Invoice No: | 786307 | ||
| Invoice Period: | NTP | to | 1/14/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 1/25/2018 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,341.75 | ||
| Invoiced to Date ($): | $ 1,341.75 | ||
| Invoiced to Date (%): | 12% | ||
| Remaining Budget ($): | $ 9,658.25 | ||
| Remaining Budget (%): | 88% |
Budget by Phase:
| Phase Name: | 2017 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,341.75 |
| Invoiced to Date ($): | $ 1,341.75 |
| Invoiced to Date (%): | 12% |
| Remaining Budget ($): | $ 9,658.25 |
| Remaining Budget (%): | 88% |
Comments: Initiated data gathering and analysis and preparation of Chapter 94 Reports for West Goshen (Chester Creek), Ridley Creek, and Westtown Service Areas.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
|
East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 01/09/2018 Client No: 6604-001R Invoice No. 190131 |
|---|
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 12/11/2017 | PMM | Review and analyze meeting packet in preparation for Authority meeting. | 0.40 | |
| PMM | Attend Authority Meeting. | 3.00 | ||
| For Current Services Rendered | 3.40 | 680.00 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 3.40 | $200.00 | $680.00 |
| Previous Balance | $600.00 |
|---|---|
| Total Current Charges | 680.00 |
| 01/02/2018 Payment | -600.00 |
| Balance Due | $680.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA January Financial Report |
| Date: | February 8, 2017 |
In January, the Municipal Authority recorded $815 in income (one connection fee and interest) and $43,354 in expenses (primarily $30,051 for West Goshen Capital and general engineering expenses), for a negative variance of $43,354.
As of January 31st, the fund balance was $99,792, of which $72,280 is in the main construction account (most of which represents the 2013 note) and the remaining $27,512 is in the operating account with M&T. Note that in January, we closed a small MA account with DNB First Bank, which is where we had been depositing tap in fees, and transferred the balance to M&T. Once the balance of the construction account is drawn down, the MA will only have the one checking account with M&T.
Two weeks ago, I submitted the Small Water & Sewer Program application to DCED for the Barkway Pump Station project. Hopefully, we will receive word on our application by early spring.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
JANUARY 2018
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - 2013 NOTES (FULTON BANK) | 101,938.77 | |||
| CAPITAL: | ||||
| REVENUE | ||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 50 | 391.64 | 391.64 |
| TOTAL REVENUE | 50 | 391.64 | 391.64 | |
| EXPENESES | ||||
| C.C. CAPITAL - COLLECTION | 07424 7420 | 0 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0 | 0.00 | 0.00 |
| WEST GOSHEN CAPITAL | 07429 6100 | 59,736 | 30,050.70 | 30,050.70 |
| TOTAL EXPENSES | 59,736 | 30,050.70 | 30,050.70 | |
| NET CAPITAL | (59,686) | (29,659.06) | (29,659.06) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE DNB CAPITAL ACCOUNT | 72,279.71 |
U:\bmccool\2018\Municipal Authority\2018-01 - Municipal Authority Report.xlsx
Page 1 of 2
02/08/2018
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
JANUARY 2018
OPERATING:
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - OPERATING (BB&T) | 40,392.55 | |||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 10 | 0.31 | 0.31 |
| C.C. TAPPING FEES | 07364 1100 | 8,000 | 0.00 | 0.00 |
| R.C. TAPPING FEES | 07364 1110 | 2,000 | 0.00 | 0.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 1,692 | 423.00 | 423.00 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0 | 0.00 | 0.00 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 75,853 | 0.00 | 0.00 |
| TOTAL REVENUE | 87,555 | 423.31 | 423.31 | |
| EXPENESES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,411 | 0.00 | 0.00 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500 | 100.00 | 100.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,384 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 43,260 | 12,523.56 | 12,523.56 |
| LEGAL SERVICES | 07424 3140 | 0 | 680.00 | 680.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 0 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0 | 0.00 | 0.00 |
| TOTAL EXPENSES | 87,555 | 13,303.56 | 13,303.56 | |
| NET OPERATING | 0 | (12,880.25) | (12,880.25) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE - OPERATING | 27,512.30 | |||
| MUNICIPAL AUTHORITY ENDING FUND BALANCE CAPITAL + OPERATING | 99,792.01 |
U:\bmccool\2018\Municipal Authority\2018-01 - Municipal Authority Report.xlsx
Page 2 of 2
02/08/2018
East Goshen Township General Ledger
| Report Date 02/08/18 | GL Transaction Details | PAGE 1 |
|---|---|---|
| MGRP18 run by BRIAN 8 : 55 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 INTEREST EARNINGS | 0.00 | |||||||||
| 1801 | JE | 61740 | 0.31 | 02/02/18 | INTEREST | INTEREST EARNED JANUARY 2018 07 FUND |
||||
| 07341-1000 **** *** **** | 0.00 | 0.31 | -0.31 | |||||||
| 07341-1020 INTEREST EARNED - CONSTRUCTION | 0.00 | |||||||||
| 391.64 | 02/02/18 | INTEREST | INTEREST EARNED JANUARY 2018 07 FUND |
|||||||
| 07341-1020 **** *** **** | 0.00 | 391.64 | -391.64 | |||||||
| 07364-1130 CONNECTION FEES - SEWER | 0.00 | |||||||||
| CR | 61617 | 423.00 | 01/25/18 | 2572 | 10606 1 | STOFFLET, MICHAEL | ||||
| 07364-1130 **** *** **** | 0.00 | 423.00 | -423.00 | |||||||
| 07424-3000 MISCELLANEOUS EXPENSE | 0.00 | |||||||||
| CD | 61728 | 100.00 | 01/31/18 | 3114 | 3353 | COMMONWEALTH FINANCING AUTHORITY GRANT APPLIC. DCED - WATER & SEW PROGRAM FOR BARKWAY |
||||
| 07424-3000 **** *** **** | 100.00 | 0.00 | 100.00 | |||||||
| 07424-3130 ENGINEERING SERVICES | 0.00 | |||||||||
| 61613 | 12,523.56 | 01/24/18 | 3113 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 12/10/17 2017 GENERAL SERVICES |
|||||
| 07424-3130 **** *** **** | 12,523.56 | 0.00 | 12,523.56 | |||||||
| 07424-3140 LEGAL SERVICES | 0.00 | |||||||||
| 680.00 | 01/24/18 | 3112 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES DEC. 2017 GEN.AUT |
||||||
| 07424-3140 **** *** **** | 680.00 | 0.00 | 680.00 | |||||||
| 07429-6100 WEST GOSHEN CAPITAL | 0.00 | |||||||||
| 61614 | 30,050.70 | 01/24/18 | 22015 | 3843 | WEST GOSHEN SEWER AUTHORITY 16.67% OF COST - ENHANCED CHEMIC ADDITION |
|||||
| 07429-6100 **** *** **** | 30,050.70 | 0.00 | 30,050.70 | |||||||
East Goshen Township General Ledger
| Report Date 02/08/18 | GL Transaction Details | PAGE 2 |
|---|---|---|
| MGRP18 run by BRIAN 8 : 55 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| Grand Total | 43,354.26 | 814.95 | 42,539.31 | |||||||
| Source | Debits | Credits |
|---|---|---|
| JE | 0.00 | 391.95 |
| CR | 0.00 | 423.00 |
| CD | 43,354.26 | 0.00 |
| 43,354.26 | 814.95 |
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 7, 2018
East Goshen Township ABC Members
1580 Paoli Pike
West Chester, PA 19380
Dear ABC Members:
The East Goshen Township ABC Annual Planning Session was held on Saturday, January 6, 2018. This was one of the best planning sessions that we have had to date, and it was due in no small part to the efforts of the ABC members in attendance.
Enclosed is a list of the goals that were presented by the ABCs at the planning session.
At their meeting on February 6, 2018 the Board of Supervisors approved these goals.
It would be appreciated begin working on these goals ASAP.
Also please provide me with a status report on your goals by August 29th. The Board will review them at its meeting on September 5, 2017.
Sincerely,
Louis F. Smith, Jr.
Township Manager
Enclosure
F:\Data\Shared Data\ABC'S\Goals\2018\Letter 020717.docx
Memo
East Goshen Township
| Date: | February 1 2018 |
|---|---|
| To: | Board of Supervisors |
| From: | Rick Smith, Township Manager |
| Re: | 2018 ABC Goals |
The Board needs to set the 2018 ABC Goals. The goals listed below are a summation of what was presented at the Planning Session. Where applicable I have noted the appropriate objective from the Comp Plan or action from the Park Rec and Open Space Plan. I have also identified three goals for the Board.
If the Board approves the goals I will send a cover letter with the goals to each ABC and ask them to submit a status report for the Board's review at their meeting on September 4.
Conservancy Board
- Continue invasive species control - Comp Plan Objective 11.6
- Continue maintenance of the blue bird houses in Applebrook
- Develop a maintenance plan for the Serpentine Barren – PR&OS Plan Action 2.2C
- Keep East Goshen Beautiful Day - Comp Plan Objective 11.4
- Maintain the riparian buffer along the creeks
- Maintain Clymer's Woods.
- Review the pond study and make a recommendation to the Board of Supervisors.
Futurist Commission
- The creation of a much needed “town center” to house specialty shops, restaurants, micro businesses, and central gathering areas. Comp Plan Objective 7.1
- Develop clear signage and lighting to highlight the “town center”. Comp Plan Objective 6.1
- Support a referendum to allow for liquor sales.
F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.docx
1
- Establish a strategic long-range planning objective with steps outlining how to achieve the objective and the stated benefits to all residents.
- Rebranding the Town Center as “Goshenville”.
Municipal Authority
- Continue to monitor the upgrades at West Goshen Sewer Plant. Comp Plan Objective 10.1
- Continue to implement the Inflow (surface water) & Infiltration (groundwater) (collectively “I&I”) Plan. Comp Plan Objective 10.1
- Submit articles for the newsletter.
Park & Recreation Commission
- Increase pedestrian circulation along Paoli Pike, especially in the form of a “Paoli Pike Promenade” with sidewalks and crosswalks, as well as increasing pedestrian circulation and safety along Greenways, with trails, walkways and crosswalks. Comp Plan Objective 8.6
- Develop the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown and consider the potential for feeder trails from the various developments to the Paoli Pike Trail. Comp Plan Objective 8.6
- Complete the playground renovation. Comp Plan Objective 9.3
- Renovate the basketball court area Comp Plan Objective 9.3
- Improve the upper sports fields to include landscaping and a new access. Comp Plan Objective 9.3
- Install security cameras in the park. Comp Plan Objective 9.3
- Make the Veterans Pavilion more user friendly for seniors. Comp Plan Objective 9.3
- Improve the pathway from the Pavilion to the Pickle Ball Court. Comp Plan Objective 9.3
- Installed a picnic area to support the playground and the baseball fields. Comp Plan Objective 9.3
F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.docx
2
Planning Commission
- Review the PPMCP and look at the overlay district to determine what needs to be amended in the Zoning Ordinance. Comp Plan Objective 6.2 and 6.2
- Look at single family development for the remaining parcels in the township. Comp Plan Objective 5.2 and 5.5
Board of Supervisors
Review and update as need the Comp Plan Implementation Matrix. Comp Plan Notes on page 16-1
Adopt a parkland standard of 28.20 acres per 1,000 residents PR&OS Plan Action 1.1A
Adopt a mandatory Dedication of Parkland Ordinance. PR&OS Plan Action 1.1B
Adopt the Pond Study and a schedule for implementing the recommendations. PR&OS Plan Action 2.2B
F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.docx
3
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 4, 2018
FYI
Dana Pizarro
1602 Ivy Lane
West Chester, PA 19380
RE: Municipal Authority Appointment
Dear Dana:
I am pleased to inform you that at their meeting on Tuesday, January 2, 2018, the Board of Supervisors appointed you to a five-year term as PE to the East Goshen Township Municipal Authority. Your term will expire at the end of the year 2022.
We thank you for your hard work in the past and look forward to working with you in the coming years. If we can ever be of any assistance, please do not hesitate to call.
Sincerely yours,
Louis F. Smith, Jr.
Township Manager
cc: Municipal Authority
F:\Data\Shared Data\ABC'S\general\Appointments\appointments 2018\Pizarro appointment 010418.doc