Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
May 14, 2018
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES April 9, 2018
- APPROVAL OF INVOICES Pennoni Invoice #799471 $ 45.50 Pennoni Invoice #799466 $ 510.75 Pennoni Invoice #799477 $ 5,672.50 Pennoni Invoice #799467 $ 30.75 Pennoni Invoice #799468 $ 3,408.25 Gawthrop Invoice #194208 $ 480.00
- LIAISON REPORTS
- FINANCIAL REPORTS April Financial Report
- OLD BUSINESS
- GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.; Continue to implement the I&I Plan – 3-8-2018 completed
F:\Data\Shared Data\Agendas\Municipal Authority\2018\5-14-18 - .doc
- Submit articles for the newsletter - none
- NEW BUSINESS Tallmadge Drive Sewer Replacement Bid Review; Supplee Valley payment App. No. #1 – Sanitary Sewer Pipe Lining
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2018\5-14-18 - .doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 7, 2018
To: Municipal Authority
From: Mark Miller
Re: April 2018 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 764,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. Allied Control came out to calibrate all the meters on May 3rd.
C.C. Collection: The pump stations were checked on a daily basis. We had three emergency call outs at the Barkway Pump Station for the back-up float failure. We found that one of the back floats had failed. The float was replaced and the station was put back on line. The generators were all serviced at part of the routine maintenance. No problems were found at the pump station generators.
We televised approximately 2500 of main on Cornwallis Drive. We completed restoration work to the laterals that we repaired over the winter.
R.C. Collection: Hunt Country Pump Station was visited on a daily basis with no problems to report. We cleaned the sewer line on Talmadge Drive as part of an on-going maintenance until the line is replaced.
Ridley Creek: The plant was visited on a daily basis. The plant operator notified me that the flow meter was not operating. Allied Control was already on site when Scott called , so they pulled the probe and checked out the meter. The screen room trough is scheduled to be cleaned next week as part of our routine basis. The generators were serviced as part of our preventive maintenance, the tech has recommended that we consider replacing the older Spectrum unit. He noted that the unit went thru five gallons of oil over a 5 month period, the unit was installed in 1996.
Alarms: We responded to 12 alarms for April which were all various issues.
PA One Calls: We received 75 PA One calls April.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
May 10, 2018
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – The trial began on February 28 and concluded on May 6. We are currently analyzing the sampling data and will provide a verbal update at the May MA meeting. We intend to follow-up with a letter report of the results, potential permanent caustic soda feed concept and capital cost estimate, and a cost-benefit analysis of caustic soda vs. soda ash.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- We have continued to provided construction administration and inspection services.
- SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order. One of the lateral locations cannot be lined or grouted due to the severe angle of connection between the lateral and the main; however, this location only had a very minor infiltration leak. We are coordinating with the PW Department to evaluate the feasibility of installing saddles in the other two difficult-to-access laterals as well as the one spot repair lateral liner that was approved via change order. Lastly, the contractor still needs to perform injection grouting in two manholes. Once we resolve the accessibility, we will pursue a schedule from the contractor to complete the work.
- We processed the first pay application and forwarded our recommendation to the Township.
Barkway Pump Station Grinder
- We completed construction plans for the installation of the Muffin Monster and submitted them to the Township for review. The grinder is proposed inside the existing wet well, and the hydraulic power pack is proposed inside the generator/controls building. No update since our last report.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We prepared a bid document with plans to replace 545 linear feet of sanitary sewer pipe and one manhole. The project was bid on PennBID, and we responded to contractor questions and issued one addendum. Bids were received from four contractors on May 8. The bids were higher than anticipated so we have discussed with the bidders and a few contractors that opted not to bid, and we have
EGMAU18001 May 10, 2018 Page 2
East Goshen Municipal Authority Engineer’s Report
analyzed alternatives to re-bid the project to reduce the cost. Those considerations have been sent to the Township in a separate memo along with the official bid tabulation.
I&I Support and Reporting
- No activity since our last report. We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at a MA meeting immediately thereafter.
New Connections
- We reviewed a revised plan for a new residential sewer connection at 1506 Meadowbrook Lane via grinder pump. Updated comments were provided as part of the Land Development Plan review.
West Goshen Sewer System Consultation
- No activity since last report.
P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-05-10.docx
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations for during the month of March 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The caustic solution addition pilot study for pH control continued during the month. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for the March 2018 DMR.
Table 1
March 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| March 1, 2018 | 0.369 | 6 | 18.5 | ||||||||
| March 6, 2018 | 0.264 | 2.7 | 5.9 | 5 | 11.0 | 0.825 | 1.82 | 0.26 | 0.57 | 1 | 0.0000 |
| March 9, 2018 | 0.232 | 4 | 7.7 | ||||||||
| March 12, 2018 | 0.327 | 6 | 16.4 | ||||||||
| March 13, 2018 | 0.292 | 5.8 | 14.1 | 5 | 12.2 | 0.187 | 0.46 | 0.26 | 0.63 | 4 | 0.6021 |
| March 16, 2018 | 0.252 | 6 | 12.6 | ||||||||
| March 20, 2018 | 0.263 | 2.6 | 5.7 | 4 | 8.8 | 0.260 | 0.57 | 0.19 | 0.42 | 1 | 0.0000 |
| March 23, 2018 | 0.284 | 6 | 14.2 | 0.00 | 0.00 | ||||||
| March 27, 2018 | 0.254 | 2.0 | 4.2 | 8 | 16.9 | 0.794 | 1.68 | 0.32 | 0.68 | 148 | 2.1703 |
| Average | 0.282 | 3.3 | 7.5 | 6 | 12.5 | 0.517 | 0.90 | 0.26 | 0.46 | 39 | 0.6931 |
| Minimum | 0.232 | 2.0 | 4.2 | 4 | 7.7 | 0.187 | 0.00 | 0.19 | 0.00 | 1 | 0.0000 |
| Maximum | 0.369 | 5.8 | 14.1 | 8 | 18.5 | 0.825 | 1.82 | 0.32 | 0.68 | 148 | 2.1703 |
The total phosphorus monthly average was reported as 0.26 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.19 to 0.32 mg/L. The ammonia as nitrogen monthly concentration
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
was reported as 0.517 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.825 mg/L. The total suspended solids (TSS) monthly concentration was reported as 6 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 8 mg/L as compared to the permit discharge limitation of 15 mg/L.
Table 2 illustrates the final effluent composite sample data reported for the March 2018 DMR. Discharge to Applebrook, Outfall 002 was 4,204,400 gallons during March.
Table 2
March 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| March 1, 2018 | 0.1423 | 6 | 7.1 | ||||||||
| March 6, 2018 | 0.1296 | 2.7 | 2.9 | 5 | 5.4 | 0.825 | 0.89 | 0.26 | 0.28 | 1 | 0.0000 |
| March 9, 2018 | 0.1117 | 4 | 3.7 | ||||||||
| March 12, 2018 | 0.1473 | 6 | 7.4 | ||||||||
| March 13, 2018 | 0.1472 | 5.8 | 7.1 | 5 | 6.1 | 0.187 | 0.23 | 0.26 | 0.32 | 4 | 0.6021 |
| March 16, 2018 | 0.1515 | 6 | 7.6 | ||||||||
| March 20, 2018 | 0.1452 | 2.6 | 3.1 | 4 | 4.8 | 0.260 | 0.31 | 0.19 | 0.23 | 1 | 0.0000 |
| March 23, 2018 | 0.1436 | 6 | 7.2 | ||||||||
| March 27, 2018 | 0.1387 | 2.0 | 2.3 | 8 | 9.3 | 0.794 | 0.92 | 0.32 | 0.37 | 148 | 2.1703 |
| Average | 0.1397 | 3.3 | 3.9 | 6 | 6.5 | 0.517 | 0.59 | 0.26 | 0.30 | 39 | 0.6931 |
| Minimum | 0.1117 | 2.0 | 2.3 | 4 | 3.7 | 0.187 | 0.23 | 0.19 | 0.23 | 1 | 0.0000 |
| Maximum | 0.1515 | 5.8 | 7.1 | 8 | 9.3 | 0.825 | 0.92 | 0.32 | 0.37 | 148 | 2.1703 |
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during March 2018.
Table 3
March 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| March 6, 2018 | 0.454 | 140 | 530 | 254 | 962 | 24.7 | 94 | 27.8 | 105 | 5.1 | 19.3 |
| March 13, 2018 | 0.512 | 60.2 | 228 | 182 | 689 | 22.2 | 95 | 23.9 | 102 | 4.1 | 15.5 |
| March 20, 2018 | 0.456 | 248 | 939 | 218 | 826 | 34.1 | 130 | 32.8 | 125 | 6.6 | 25.0 |
| March 27, 2018 | 0.475 | 125 | 473 | 71 | 269 | 23.1 | 92 | 31.3 | 124 | 3.6 | 13.6 |
| Average | 0.474 | 143 | 543 | 181 | 686 | 26.0 | 102 | 29.0 | 114 | 4.9 | 18.4 |
| Minimum | 0.454 | 60 | 228 | 71 | 269 | 22.2 | 92 | 23.9 | 102 | 3.6 | 13.6 |
| Maximum | 0.512 | 248 | 939 | 254 | 962 | 34.1 | 130 | 32.8 | 125 | 6.6 | 25.0 |
Table 4 presents the available Outfall 001 final effluent data for the month of April 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters. The alum feed to the SBRs was frequently increased to improve the total phosphorus removal.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Table 4
April 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| April 3, 2018 | 0.254 | 4.4 | 9.3 | 5 | 10.6 | 0.109 | 0.23 | 0.14 | 0.30 | 3 | 0.4771 |
| April 6, 2018 | 0.235 | 7 | 13.7 | ||||||||
| April 10, 2018 | 0.226 | 5.9 | 11.1 | 7 | 13.2 | 0.342 | 0.64 | 0.25 | 0.47 | 1 | 0.0000 |
| April 13, 2018 | 0.185 | 6 | 9.3 | ||||||||
| April 17, 2018 | 0.297 | 3.1 | 7.7 | 6 | 14.9 | 0.187 | 0.46 | 0.2 | 0.50 | 2 | 0.3010 |
| April 20, 2018 | 0.243 | 6 | 12.2 | ||||||||
| April 24, 2018 | 0.233 | 0.21 | 0.41 | ||||||||
| April 26, 2018 | 0.230 | 5 | 9.6 | ||||||||
| Average | 0.238 | 4.5 | 9.4 | 6 | 12.1 | 0.265 | 0.55 | 0.22 | 0.46 | 2 | 0.1505 |
| Minimum | 0.185 | 3.1 | 7.7 | 5 | 9.3 | 0.109 | 0.23 | 0.14 | 0.30 | 1 | 0.0000 |
| Maximum | 0.297 | 5.9 | 11.1 | 7 | 14.9 | 0.342 | 0.64 | 0.25 | 0.50 | 3 | 0.4771 |
The facility is anticipated to achieve compliance with the discharge permit limitations during the month of April 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
During April, the presence of foam conditions on the surface of the SBRs remained at 90% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The lower water temperatures within the SBRs, coupled with lower food to mass ratios, the foam concentrations have increased because of increased filamentous growth. Management of the food to mass ratio assists to manage the foam concentrations balanced by maintaining nitrification is critical during the colder winter months.
Table 5 presents the available April data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Table 5
April 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| April 3, 2018 | 0.1393 | 4.4 | 5.1 | 5 | 5.8 | 0.109 | 0.13 | 0.14 | 0.16 | 3 | 0.4771 |
| April 6, 2018 | 0.1519 | 7 | 8.9 | ||||||||
| April 10, 2018 | 0.1390 | 5.9 | 6.8 | 7 | 8.1 | 0.342 | 0.40 | 0.25 | 0.29 | 1 | 0.0000 |
| April 13, 2018 | 0.1431 | 6 | 7.2 | ||||||||
| April 17, 2018 | 0.1374 | 3.1 | 3.6 | 6 | 6.9 | 0.187 | 0.21 | 0.20 | 0.23 | 2 | 0.3010 |
| April 20, 2018 | 0.1280 | 6 | 6.4 | ||||||||
| April 24, 2018 | 0.1387 | 0.21 | 0.24 | ||||||||
| April 26, 2018 | 0.1402 | 5 | 5.8 | ||||||||
| Average | 0.1397 | 4.5 | 5.2 | 6 | 7.0 | 0.213 | 0.25 | 0.20 | 0.23 | 2 | 0.2594 |
| Minimum | 0.1280 | 3.1 | 3.6 | 5 | 5.8 | 0.109 | 0.13 | 0.14 | 0.16 | 1 | 0.0000 |
| Maximum | 0.1519 | 5.9 | 6.8 | 7 | 8.9 | 0.342 | 0.40 | 0.25 | 0.29 | 3 | 0.4771 |
Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during April 2018.
Table 6
April 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| April 3, 2018 | 0.485 | 316 | 1,279 | 286 | 1,158 | 26.6 | 108 | 31.7 | 128 | 5.3 | 21.5 |
| April 10, 2018 | 0.454 | 233 | 943 | 301 | 1,219 | 29.3 | 111 | 29.0 | 110 | 5.4 | 21.9 |
| April 17, 2018 | 0.508 | 209 | 846 | 129 | 522 | 22.5 | 95 | 31.2 | 132 | 3.6 | 14.6 |
| April 24, 2018 | 0.463 | ||||||||||
| Average | 0.477 | 253 | 1,023 | 239 | 966 | 26.1 | 105 | 30.6 | 123 | 4.8 | 19.3 |
| Minimum | 0.454 | 209 | 846 | 129 | 522 | 22.5 | 95 | 29.0 | 110 | 3.6 | 14.6 |
| Maximum | 0.508 | 316 | 1,279 | 301 | 1219 | 29.3 | 111 | 31.7 | 132 | 5.4 | 21.9 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during March and April. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Pilot Study – Addition of Caustic solution for supplemental pH and total alkalinity
The pilot study adding caustic solution for supplemental pH and total alkalinity continued during April and ended May 6, 2018.
Significant Rainfall
During April, there were thirteen (13) days when rainfall occurred. Two (2) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 3.56 inches of rainfall measured during the month. These events occurred on:
| April 7th & 8th | 0.65 inches |
|---|---|
| April 16th | 2.75 inches |
| April 25th | 0.64 inches |
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
PA DEP
Investigating the status of the Applebrook Water Quality Management (WQM) permit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Solids Dewatering and Disposal:
| April 2018 | |
|---|---|
| Gallons of sludge dewatered | 267,137 |
| Number of dumpsters | 4 |
*Seventeen (17) days of centrifuge operation
Chemical Usage:
| April 2018 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 200 | 6,000 |
| Aluminum Sulfate solution | 57.2 | 1,657 |
| Polymer (centrifuge) | 0.85 | 14.45 |
*Seventeen (17) days of centrifuge operation
Flow data:
| April 2018 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 18.404 | 613,481 | 868,970 |
| Influent Wastewater to SBRs | 14.637 | 487,898 | 646,528 |
| Internal Recycle | 0.027 | 901 | 27,028 |
| Treated Effluent to Disc Filters | 14.391 | 479,693 | 606,976 |
| Final Effluent Discharge | 7.505 | 250,000 | 382,000 |
| Applebrook Golf Course | 4.204 | 140,146 | 151,880 |
On April 15th, the field flow meter appears to have begun recording increasingly elevated flows as compared to the flow meter measuring flow to the SBRs. The flow meter has been scheduled for additional troubleshooting. In consideration of the erroneous elevated flow readings, the flow measurements to the SBRs will be utilized for the influent supplemental form and Chapter 94 report.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned piping within SBR building
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 8
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
April 2018
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters weekly
Look Ahead Preventative Maintenance Activities
Installation of the LDO probes and controls for SBRs is planned when the weather becomes warmer.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 8 of 8
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 9, 2018
The East Goshen Township Municipal Authority held their regular public meeting on Monday, March 12, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes , Kevin Cummings, and Phil Mayer. Also in attendance were: Mark Miller (Director of Public Works), Jon Altshul (Assistant Township Manager), Carmen Battavio (Board of Supervisors), Patrick McKenna (attorney), Mike Ellis (Pennoni), Scott Towler (Big Fish Environmental) and Walter Wujcik (Conservancy Board).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Jack asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
Phil attended the March meeting of the West Goshen Sewer Authority and Jack attended the April meeting. Jack reported that West Goshen is discussing sewer rate increases of between 42% and 51% up to $98 per quarter. He added that West Goshen still does not have inter-municipal agreements signed with either Westtown or West Whiteland.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for January:
Monthly Flows: The average daily flow to West Goshen was 786,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis with no problems to report.
C.C. Collection: We have been busy inspecting the collection system and repairing the cleanouts and vent caps. We have replaced 100+ caps and vents to date. The spray-rocked manholes have been visually inspected and look good.
R.C. Collection: The pump station has been visited on a daily basis; the wet well was power washed and vacuumed. We are conducting lateral inspections in a number of neighborhoods.
R.C. Plant: The motorized control center blower at the plant has been tripping out, and Lenni was called in to correct the problem. The filter feed pump #2 was pulled for repairs and two more caustic soda totes were dropped off.
Alarms: We responded to 23 alarms in March.
MA 3-12-18 draft
1
PA One Calls: We received 35 PA One calls in March
2. Pennoni Engineer’s Report for April
Mike Ellis provided his monthly
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – The trial began on February 28 and will continue for another six week. Initial results are positive and the caustic feed rate is less than half of what was expected.
Reservoir Road Pump Station
- Mike provided Jon with the final engineering report and design documents.
- Mike will resend a listing of the permits, expiration dates, and renewal deadlines.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- SWERP completed lining of all contracted sewers on February 21. They performed post-construction TV videos of the lined sewers. We have reviewed the videos and have found the work acceptable. However, 7 laterals were observed to have active flow coming from up the lateral and there were 6 new infiltration sources at connection joints between laterals and the sewer main. The PW Department inspected 7 laterals via TV inspection and found one to have a new infiltration source and another house to have a leaky fixture inside. The other 5 laterals were dry. SWERP provided a quote of $13,570 to install 6 cured-in-place lateral connection “saddle” repairs and one lateral cured-in-place spot repair.
- There is a significant amount of infiltration that has been identified in this area of the sewer system during this project. Based on visual observations, we estimate that the project may be addressing nearly 100,000 gpd of infiltration sources. We will attempt to quantify the reduction via meter analysis following the completion of work.
- SWERP will be onsite this week to perform the change orders previously approved, at a cost of approximately $19,000.
Barkway Pump Station Grinder
- We completed construction plans for the installation of the Muffin Monster and submitted them to the Township for review. The grinder is proposed inside the existing wet well and the hydraulic power pack is proposed inside the generator/controls building.
MA 3-12-18 draft
2
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. We coordinated with Mark Miller on the scope of these test pits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We prepared an existing conditions plan of the roadway and sanitary sewer based on our field survey, and we reviewed the Township’s sewer videos. A portion of the sewer has a severe sag, and we have identified the approximate extent of repair required.
- The three options under consideration at this time are to: (1) replace only the most severe sag which is believed to be approximately 40 LF of pipe; (2) replace the full length of pipe from manhole to manhole to provide a consistently sloped pipe for the entire run to eliminate two other sags; or (3) replace the full length of sewer run plus the next downstream sewer run and the intermediate manhole in order to improve the very flat slope of the subject pipe.
- We provided an opinion of probable construction costs to the Township for Option #3, consisting of replacement of 545 linear feet of pipe and one manhole at a cost between $70,000 and $86,000.
I&I Support and Reporting
- We finalized and issued the semi-annual I&I report #17. The report showed high flows in the Chester Creek Interceptor between Paoli Pike and East Strasburg Rd and that the Supplee Valley sewer lining project addressed much of that I&I. Additionally, the report raised concerns about the reliability and maintenance cost of portable meters in measuring flows.
Chapter 94 Reports
- The reports for the Ridley Creek and West Goshen Service Areas are complete and were provided to the Township
New Connections
- We reviewed a plan for a new residential sewer connection with grinder pump at 1506 Meadowbrook Lane.
West Goshen Sewer System Consultation
- No activity since last report.
3. Big Fish Environmental Services –
Scott reported that the plant is running well. He noted that later this month new UV lighting will be installed and that the repaired centrifuge will be assembled. He added that he was contacted by DEP concerning the NPDES permit for Applebrook Golf Course, which may have expired. Scott will follow up with DEP and Jared Viarengo concerning the permit.
Approval of Minutes
MA 3-12-18 draft
3
Phil made a motion to approve the minutes of the March 12, 2018 meeting as submitted. Kevin seconded. The motion passed 3-0.
Approval of Invoices
1. Kevin made a motion to approve the following Pennoni invoices:
- Pennoni #794736 $ 416.00
- Pennoni #794738 $ 3,452.34
- Pennoni #794739 $ 3,822.00
- Pennoni #794740 $ 2,176.50
- Pennoni #794741 $ 3,184.00
Phil seconded the motion. The motion passed unanimously.
2. Phil moved to approve payment of the Gawthrop Invoice #192549 for $400.00. Kevin seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board - Walter reminded everyone that Keep East Goshen Beautiful Day will be held on Saturday April 21, at 8:00 am. He added that there will be a spring planting along East Boot Road.
Financial Reports
Jon reported that the Municipal Authority recorded $30,490 in income (a $30,000 transfer from the sewer fund, one connection fee, pine rock revenue and interest) and $23,609 in expenses (including the Q1 2018 administrative overhead charge in the amount of $8,160 and a $3,664 credit from West Goshen for overpayment of a capital invoice), for a positive variance of $6,881. As of March 31st, the fund balance was $97,575, of which $72,288 is in the main construction account (most of which represents the 2013 note) and the remaining $25,286 is in the operating account with M&T. He also provided a copy of the MA’s 2017 Concise Financial Statement.
New Business
Mark explained that due to the complexity of the sewer line repairs on Tallmadge Drive, as well as limited in-house resources, he would prefer if the project could be put out to bid. Jon explained that the $30,000 was budgeted for this purpose in 2018, but that by outsourcing the project, the Municipal Authority would save some money by not having to incur Public Works labor and vehicle use.
Phil made a motion to authorize Pennoni to bid out the sewer line repair project on Tallmadge Drive. Jack seconded the motion. The motion passed 3-0.
Jon noted that Township staff was proposing a 1%-2% increase in sewer rates at the April 10th BOS meeting. This would correspond with a $2.11/quarter increase for the average single family property.
Adjournment
There being no further business, Phil moved to adjourn the meeting. Kevin seconded the motion. The meeting was adjourned at 8:20 p.m. The next regular meeting will be held on Monday, May 14, 2018 at 7:00 pm.
MA 3-12-18 draft
4
Respectfully submitted,
Jon Altshul
Recording Secretary
MA 3-12-18 draft
5
Pennoni
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 799471 Invoice Date : 04/26/2018 Project : EGMA1504 Project Name : Reservoir Rd PS Design & Permitting |
|---|
For Services Rendered through: 4/15/2018
Finalized and submitted bid document to Township.
Phase : 11 -- Final Design
| Total Phase : 11 -- Final Design | Labor : | 45.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 45.50 | |
| Amount Due This Invoice | $45.50 |
Phase : 11 -- Final Design
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Associate Professional | 0.50 | 91.00 | 45.50 |
| Labor Total: | 0.50 | 45.50 |
| Total Phase : 11 -- Final Design | Labor : | $45.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1504 -- Reservoir Rd PS Design & Permitting | Labor : | $45.50 |
| Expense : | $0.00 |
[Signature: Jon Altshul, 4/27/18]
FINAL INVOICE
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 4/26/2018
| Project: | EGMA1504 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting | ||
| Invoice No: | 799471 | ||
| Invoice Period: | 3/19/2018 | to | 4/15/2018 |
| Initial Authorization: | $ 167,120.00 | Date: | 4/26/2018 |
| Contract Amount: | $ 193,120.00 | ||
| Previously Invoiced: | $ 193,065.75 | ||
| Current Invoice: | $ 45.50 | ||
| Invoiced to Date ($): | $ 193,111.25 | ||
| Invoiced to Date (%): | 100.00% | ||
| Remaining Budget ($): | $ 8.75 | ||
| Remaining Budget (%): | 0.00% |
Budget by Phase:
| Phase Name: | Final Design | Phase 11 |
|---|---|---|
| Phase Budget: | $ 65,463.75 | |
| Previously Invoiced: | $ 65,409.50 | |
| Current Invoice: | $ 45.50 | |
| Invoiced to Date ($): | $ 65,455.00 | |
| Invoiced to Date (%): | 99.99% | |
| Remaining Budget ($): | $ 8.75 | |
| Remaining Budget (%): | 0.01% |
Comments: Finalized and submitted bid document to Township.
Reservoir Road Pump Station Design & Permitting
INVOICE SUMMARY
For Services Rendered through: 4/15/2018
| Task No. | Activity | Contract Amount* | Invoiced Effort thru 9/17/2017 | Remaining Budget ($) | Remaining Budget (%) | Completed? |
|---|---|---|---|---|---|---|
| 1 | Concept Design | $13,655.75 | $13,655.75 | - | - | Yes |
| 2 | DEP WQM Pre-App. Meeting | $1,300.00 | $1,300.00 | - | - | Yes |
| 3 | Existing Conditions Survey | $22,783.75 | $22,783.75 | - | - | Yes |
| 4 | Sewer Stakeout in Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 5 | 1636 Bow Tree Dr. Boundary Survey & Easement | $4,020.00 | $4,020.00 | - | - | Yes |
| 6 | Additional Boundary Surveys & Easements | $0.00 | $0.00 | - | - | Scope eliminated |
| 7 | Geotechnical Borings | $4,000.00 | $4,000.00 | - | - | Yes |
| 8 | Install Permanent Survey Benchmarks | $0.00 | $0.00 | - | - | Scope eliminated |
| 9 | Progress Design | $29,450.00 | $29,450.00 | - | - | Yes |
| 10 | Infiltration Testing | $1,800.00 | $1,800.00 | - | - | Yes |
| 11 | Final Design | $65,463.50 | $65,455.00 | $8.50 | ~0.0% | Yes |
| 12 | Permitting | $50,647.00 | $50,647.00 | - | - | Yes |
| TOTAL | $193,120.00 | $193,111.50 | $8.50 | ~0.0% |
* After 12/14/2015 approved re-allocation of task budgets, 5/9/2016 approval of $7,000 supplement, 7/11/16 approval of $4,000 supplement, 11/14/16 approval of $5,000 supplement, 4/10/17 approval of $4,000 supplement, and 6/12/17 approval of $6,000 supplement.
Pennoni
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 799466 Invoice Date : 04/26/2018 Project : EGMAU17007 Project Name : Supplee Valley CIPPL Construction |
|---|
For Services Rendered through: 4/15/2018
Construction phase office support and coordination for saddle connection installations. Part-time construction observation for saddle connections.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 510.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 510.75 | |
| Amount Due This Invoice | $510.75 |
| Fee : | 15,000.00 |
|---|---|
| Prior Billings : | 12,308.25 |
| Current Billings : | 510.75 |
| Total Billings : | 12,819.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.25 | 123.00 | 153.75 |
| Associate Professional | 0.50 | 91.00 | 45.50 |
| Sr. Engineering Technician | 3.50 | 89.00 | 311.50 |
| Labor Total: | 5.25 | 510.75 |
| Total Phase : **** -- Professional Services | Labor : | $510.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction | Labor : | $510.75 |
| Expense : | $0.00 |
[Signature: Jon Altshul, 4/27/18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17007 Invoice Summary
Invoice Date 4/26/2018
| Project: | EGMAU17007 | ||
|---|---|---|---|
| Pennoni Job No.: | Supplee Valley CIPPL Construction | ||
| Invoice No: | 799466 | ||
| Invoice Period: | 3/19/2018 | to | 4/15/2018 |
| Initial Authorization: | $ 12,000.00 | Date: | 4/26/2018 |
| Contract Amount: | $ 15,000.00 | ||
| Previously Invoiced: | $ 12,308.25 | ||
| Current Invoice: | $ 510.75 | ||
| Invoiced to Date ($): | $ 12,819.00 | ||
| Invoiced to Date (%): | 85% | ||
| Remaining Budget ($): | $ 2,181.00 | ||
| Remaining Budget (%): | 15% |
Budget by Phase:
| Phase Name: | Supplee Valley CIPP | |
|---|---|---|
| Phase Budget: | $ 15,000.00 | |
| Previously Invoiced: | $ 12,308.25 | |
| Current Invoice: | $ 510.75 | |
| Invoiced to Date ($): | $ 12,819.00 | |
| Invoiced to Date (%): | 85% | |
| Remaining Budget ($): | $ 2,181.00 | |
| Remaining Budget (%): | 15% |
Comments: Construction phase office support and coordination for saddle connection installations. Part-time construction observation for saddle connections.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 799477 Invoice Date : 04/26/2018 Project : EGMAU18001 Project Name : 2018 General Services |
|---|
For Services Rendered through: 4/15/2018
Phase **** Professional Services - Continued coordination of RCSTP caustic soda trial including additional chemical supply to extend trial, review of sampling results, reduction of chemical feed rate, and conceptual planning for future permanent transition to caustic treatment. Prepared April Engineer's Report, and prepared for and attended April MA meeting. Researched WQM permit for Applebrook following DEP notification of permit expiration. Analysis and charting of historical Chester Creek and Ridley Creek systems' flows for quantification of reductions from ongoing sewer system repairs; submitted Chester Creek chart of 8 years of flow history to PW Director.
Phase 01 Tallmadge Drive Sewer Replacement - Performed budgeting, programming, design and bidding services including cost estimates, review of sewer videos, scoping alternatives, material acquisition approach, scheduling, design, preparation of plans and bid document, and PennBID solicitation setup.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 2,076.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,076.00 |
Phase : 01 -- Tallmadge Drive Sewer Replacement
| Total Phase : 01 -- Tallmadge Drive Sewer Replacement | Labor : | 3,596.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,596.50 |
| Amount Due This Invoice | $5,672.50 |
|---|
| Fee : | 18,000.00 |
|---|---|
| Prior Billings : | 4,343.25 |
| Current Billings : | 5,672.50 |
| Total Billings : | 10,015.75 |
[Signature: Jon Altshul 4/25/18]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 4-26-2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | 799477 | ||
| Invoice Period: | 3/19/2018 | to | 4/15/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 4/26/2018 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ 4,343.25 | ||
| Current Invoice: | $ 5,672.50 | ||
| Invoiced to Date ($): | $ 10,015.75 | ||
| Invoiced to Date (%): | 56% | ||
| Remaining Budget ($): | $ 7,984.25 | ||
| Remaining Budget (%): | 44% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 18,000.00 |
| Previously Invoiced: | $ 4,343.25 |
| Current Invoice: | $ 5,672.50 |
| Invoiced to Date ($): | $ 10,015.75 |
| Invoiced to Date (%): | 56% |
| Remaining Budget ($): | $ 7,984.25 |
| Remaining Budget (%): | 44% |
Comments: Phase **** Professional Services - Continued coordination of RCSTP caustic soda trial including additional chemical supply to extend trial, review of sampling results, reduction of chemical feed rate, and conceptual planning for future permanent transition to caustic treatment. Prepared April Engineer's Report, and prepared for and attended April MA meeting. Researched WQM permit for Applebrook following DEP notification of permit expiration. Analysis and charting of historical Chester Creek and Ridley Creek systems' flows for quantification of reductions from ongoing sewer system repairs; submitted Chester Creek chart of 8 years of flow history to PW Director.
Phase 01 Tallmadge Drive Sewer Replacement - Performed budgeting, programming, design and bidding services including cost estimates, review of sewer videos, scoping alternatives, material acquisition approach, scheduling, design, preparation of plans and bid document, and PennBID solicitation setup.
| Project : EGMAU18001 -- 2018 General Services | Invoice # : 799477 |
|---|
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.75 | 123.00 | 584.25 |
| Senior Professional | 10.75 | 117.00 | 1,257.75 |
| Project Professional | 0.50 | 104.00 | 52.00 |
| Associate Professional | 2.00 | 91.00 | 182.00 |
| Labor Total: | 18.00 | 2,076.00 |
| Total Phase : **** -- Professional Services | Labor : | $2,076.00 |
|---|---|---|
| Expense : | $0.00 |
Phase : 01 -- Tallmadge Drive Sewer Replacement
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.75 | 123.00 | 707.25 |
| Senior Professional | 21.00 | 117.00 | 2,457.00 |
| Associate Professional | 4.75 | 91.00 | 432.25 |
| Labor Total: | 31.50 | 3,596.50 |
| Total Phase : 01 -- Tallmadge Drive Sewer Replacement | Labor : | $3,596.50 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18001 -- 2018 General Services | Labor : | $5,672.50 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
| Pennoni Associates Inc. | Page: 2 |
|---|
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 799467 Invoice Date : 04/26/2018 Project : EGMAU18002 Project Name : 2018 I&I Support and Reports |
|---|
For Services Rendered through: 4/15/2018
Submitted semi-annual sewer system I&I status report #17.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 30.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 30.75 |
| Amount Due This Invoice | $30.75 |
|---|
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 2,409.75 |
| Current Billings : | 30.75 |
| Total Billings : | 2,440.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 123.00 | 30.75 |
| Labor Total: | 0.25 | 30.75 |
| Total Phase : **** -- Professional Services | Labor : | $30.75 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18002 -- 2018 I&I Support and Reports | Labor : | $30.75 |
|---|---|---|
| Expense : | $0.00 |
[Signature: Jon Altshul 4/27/18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18002 Invoice Summary
Invoice Date 4-26-2018
| Project: | EGMAU18002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 I&I Support and Reports | ||
| Invoice No: | 799467 | ||
| Invoice Period: | 2/12/2018 | to | 4/15/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 4/26/2018 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 2,409.75 | ||
| Current Invoice: | $ 30.75 | ||
| Invoiced to Date ($): | $ 2,440.50 | ||
| Invoiced to Date (%): | 22% | ||
| Remaining Budget ($): | $ 8,559.50 | ||
| Remaining Budget (%): | 78% |
Budget by Phase:
| Phase Name: | 2018 I&I Support and Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 2,409.75 |
| Current Invoice: | $ 30.75 |
| Invoiced to Date ($): | $ 2,440.50 |
| Invoiced to Date (%): | 22% |
| Remaining Budget ($): | $ 8,559.50 |
| Remaining Budget (%): | 78% |
Comments: Submitted semi-annual sewer system I&I status report #17.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 799468 Invoice Date : 04/26/2018 Project : EGMAU18003 Project Name : 2017 Chapter 94 Reports |
|---|
For Services Rendered through: 4/15/2018
Continued data gathering, analysis and preparation of Chapter 94 Reports for West Goshen (Chester Creek) and Ridley Creek service areas. Finalized and submitted Chapter 94 reports for Westtown, West Goshen (Chester Creek) and Ridley Creek service areas.
This is the FINAL invoice unless DEP provides any comments or questions.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 3,408.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,408.25 |
| Amount Due This Invoice | $3,408.25 |
|---|
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 5,698.75 |
| Current Billings : | 3,408.25 |
| Total Billings : | 9,107.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 8.50 | 123.00 | 1,045.50 |
| Senior Professional | 9.50 | 117.00 | 1,111.50 |
| Associate Professional | 13.75 | 91.00 | 1,251.25 |
| Labor Total: | 31.75 | 3,408.25 |
| Total Phase : **** -- Professional Services | Labor : | $3,408.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18003 -- 2017 Chapter 94 Reports | Labor : | $3,408.25 |
|---|---|---|
| Expense : | $0.00 |
[Signature: Jon Altshul 4/27/18]
FINAL INVOICE, PROVIDED DEP HAS NO COMMENTS
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18003 Invoice Summary
Invoice Date 4/26/2018
| Project: | EGMAU18003 | ||
|---|---|---|---|
| Pennoni Job No.: | 2017 Chapter 94 Reports | ||
| Invoice No: | 799468 | ||
| Invoice Period: | 3/19/2018 | to | 4/15/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 4/26/2018 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 5,698.75 | ||
| Current Invoice: | $ 3,408.25 | ||
| Invoiced to Date ($): | $ 9,107.00 | ||
| Invoiced to Date (%): | 83% | ||
| Remaining Budget ($): | $ 1,893.00 | ||
| Remaining Budget (%): | 17% |
Budget by Phase:
| Phase Name: | 2017 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 5,698.75 |
| Current Invoice: | $ 3,408.25 |
| Invoiced to Date ($): | $ 9,107.00 |
| Invoiced to Date (%): | 83% |
| Remaining Budget ($): | $ 1,893.00 |
| Remaining Budget (%): | 17% |
Comments: Continued data gathering, analysis and preparation of Chapter 94 Reports for West Goshen (Chester Creek) and Ridley Creek service areas. Finalized and submitted Chapter 94 reports for Westtown, West Goshen (Chester Creek) and Ridley Creek service areas.
This is the FINAL invoice unless DEP provides any comments or questions.
[Gawthrop Greenwood, PC Attorneys at Law Logo]
| Gawthrop Greenwood, PC Attorneys at Law 17 East Gay Street, Suite 100 West Chester, PA 19381-0562 gglaw@gawthrop.com |
(p) 610-696-8225 (f) 610-344-0922 www.gawthrop.com |
|---|
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 05/07/2018 Client No: 6604-001R Invoice No. 194208 |
|---|
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 04/02/2018 PMM |
Email from M Ellis I&I report. | 0.20 | |
| 04/06/2018 PMM |
Email from S Smith regarding materials for meeting. | 0.20 | |
| 04/09/2018 PMM |
Review meeting materials in preparation for Authority meeting; Attend Authority meeting. |
2.00 | |
| For Current Services Rendered | 2.40 | 480.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 2.40 | $200.00 | $480.00 |
| Previous Balance | $380.00 |
|---|---|
| Total Current Charges | 480.00 |
| 04/20/2018 Payment | -380.00 |
| Balance Due | $480.00 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA April Financial Report |
| Date: | May 9, 2018 |
In April, the Municipal Authority recorded $56.85 in income (interest net of bank fees for Positive Pay) and $75,104.38 in expenses (primarily an invoice of $72,288 for West Goshen), for a negative variance of $75,047.53. To clarify, the total West Goshen invoice was for $315,355, the balance of which ($243,067) was paid from the sewer fund portion of the Township’s 2017 GO Bonds.
As of April 30th, the fund balance was $22,527. Technically, there was a balance of $71.30 in the capital account from proceeds of the 2013 MA notes, which represents interest that accrued last month after the account had been drawn down to $0. We have now transferred that amount to the MA operating account, meaning that moving forward the MA’s finances will be greatly simplified!
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
APRIL 2018
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - 2013 NOTES (FULTON BANK) | 72,288.38 | |||
| CAPITAL: | ||||
| REVENUE | ||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 50 | 71.30 | 613.91 |
| TOTAL REVENUE | 50 | 71.30 | 613.91 | |
| EXPENESES | ||||
| C.C. CAPITAL - COLLECTION | 07424 7420 | 0 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0 | 0.00 | 142.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0 | 0.00 | 0.00 |
| WEST GOSHEN CAPITAL | 07429 6100 | 59,736 | 72,288.38 | 102,339.08 |
| TOTAL EXPENSES | 59,736 | 72,288.38 | 102,481.58 | |
| NET CAPITAL | (59,686) | (72,217.08) | (101,867.67) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE DNB CAPITAL ACCOUNT [handwritten: FULTON CAPITAL] | 71.30 | |||
| U:\bmccool\2018\Municipal Authority\2018-04 - Municipal Authority Report.xlsx | Page 1 of 2 | 05/09/2018 |
|---|
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
APRIL 2018
OPERATING:
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE - OPERATING (BB&T) | 25,286.40 | |||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 10 | (14.45) | (27.93) |
| C.C. TAPPING FEES | 07364 1100 | 8,000 | 0.00 | 0.00 |
| R.C. TAPPING FEES | 07364 1110 | 2,000 | 0.00 | 0.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 1,692 | 0.00 | 1,127.52 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0 | 0.00 | 564.48 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 75,853 | 0.00 | 30,000.00 |
| TOTAL REVENUE | 87,555 | (14.45) | 31,664.07 | |
| EXPENESES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,411 | 0.00 | 8,160.33 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500 | 0.00 | 100.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,384 | 2,436.00 | 9,400.00 |
| ENGINEERING SERVICES | 07424 3130 | 43,260 | 0.00 | 30,240.14 |
| LEGAL SERVICES | 07424 3140 | 0 | 380.00 | 1,700.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 0 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0 | 0.00 | 0.00 |
| TOTAL EXPENSES | 87,555 | 2,816.00 | 49,600.47 | |
| NET OPERATING | 0 | (2,830.45) | (17,936.40) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE - OPERATING | 22,455.95 | |||
| MUNICIPAL AUTHORITY ENDING FUND BALANCE CAPITAL + OPERATING | 22,527.25 | |||
| U:\bmccool\2018\Municipal Authority\2018-04 - Municipal Authority Report.xlsx | Page 2 of 2 | 05/09/2018 |
|---|
East Goshen Township General Ledger
| Report Date 05/09/18 | GL Transaction Details | PAGE 1 |
|---|---|---|
| MGRP18 run by BRIAN | 10 : 27 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | INTEREST EARNINGS | 0.00 | ||||||||
| 1801 | JE | 61740 | 0.31 | 02/02/18 | INTEREST | INTEREST EARNED JANUARY 2018 07 FUND |
||||
| 1801 | 0.00 | 0.31 | -0.31 | |||||||
| 1802 | 61932 | 0.20 | 02/14/18 | INTEREST | INTEREST ADJ. FROM JAN.2018 7105.2000 |
|||||
| 62159 | 0.54 | 03/05/18 | INTEREST | INTEREST EARNED FEBRUARY 2018 07 FUND |
||||||
| 1802 | 0.00 | 0.74 | -1.05 | |||||||
| 1803 | EX | 62192 | 15.00 | 03/06/18 | 62192 | 1 | REIMBURSE S/R FOR BANK FEES INTEREST EARNINGS |
|||
| JE | 62535 | 0.47 | 04/02/18 | INTEREST | INTEREST EARNED MARCH 2018 07 FUND |
|||||
| 1803 | 15.00 | 0.47 | 13.48 | |||||||
| 1804 | EX | 62551 | 15.00 | 04/02/18 | 62551 | 1 | REIMB.S/R FOR 3/2018 BANK FEES INTEREST EARNINGS |
|||
| JE | 62904 | 0.55 | 05/01/18 | INTEREST | INTEREST EARNED APRIL 2018 07 FUND |
|||||
| 1804 | 15.00 | 0.55 | 27.93 | |||||||
| 07341-1000 | **** | *** | **** | 30.00 | 2.07 | 27.93 | ||||
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 0.00 | ||||||||
| 1801 | 61740 | 391.64 | 02/02/18 | INTEREST | INTEREST EARNED JANUARY 2018 07 FUND |
|||||
| 1801 | 0.00 | 391.64 | -391.64 | |||||||
| 1802 | 62159 | 69.31 | 03/05/18 | INTEREST | INTEREST EARNED FEBRUARY 2018 07 FUND |
|||||
| 1802 | 0.00 | 69.31 | -460.95 | |||||||
| 1803 | 62535 | 81.66 | 04/02/18 | INTEREST | INTEREST EARNED MARCH 2018 07 FUND |
|||||
East Goshen Township General Ledger
| Report Date 05/09/18 | GL Transaction Details | PAGE 2 |
|---|---|---|
| MGRP18 run by BRIAN | 10 : 27 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1803 | 0.00 | 81.66 | -542.61 | |||||||
| 1804 | 62904 | 71.30 | 05/01/18 | INTEREST | INTEREST EARNED APRIL 2018 07 FUND |
|||||
| 1804 | 0.00 | 71.30 | -613.91 | |||||||
| 07341-1020 | **** | *** | **** | 0.00 | 613.91 | -613.91 | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 0.00 | ||||||||
| 1801 | CR | 61617 | 423.00 | 01/25/18 | 2572 | 10606 | 1 STOFFLET, MICHAEL | |||
| 1801 | 0.00 | 423.00 | -423.00 | |||||||
| 1802 | 61894 | 423.00 | 02/13/18 | 494 | 10607 | 1 JACOBS, ROBERT & CHERYL | ||||
| 62079 | 423.00 | 02/27/18 | 148 | 10605 | 1 GEORGE SMITH & CHRISTINA CONLE | |||||
| JE | 61900 | 282.24 | 02/13/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST |
|||||
| 62080 | 141.12 | 02/27/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 1802 | 423.36 | 846.00 | -845.64 | |||||||
| 1803 | CR | 62407 | 423.00 | 03/23/18 | 0011373243 | 10608 | 1 PAPPANO, JOSEPH & PATRICIA | |||
| JE | 62411 | 141.12 | 03/23/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO |
|||||
| 1803 | 141.12 | 423.00 | -1,127.52 | |||||||
| 07364-1130 | **** | *** | **** | 564.48 | 1,692.00 | -1,127.52 | ||||
| 07380-1000 | MISCELLANEOUS REVENUE | 0.00 | ||||||||
| 1802 | 61900 | 282.24 | 02/13/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST |
|||||
| 62080 | 141.12 | 02/27/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 1802 | 0.00 | 423.36 | -423.36 | |||||||
| 1803 | 62411 | 141.12 | 03/23/18 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO |
|||||
East Goshen Township General Ledger
| Report Date 05/09/18 | GL Transaction Details | PAGE 3 |
|---|---|---|
| MGRP18 run by BRIAN | 10 : 27 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1803 | 0.00 | 141.12 | -564.48 | |||||||
| 07380-1000 | **** | *** | **** | 0.00 | 564.48 | -564.48 | ||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 0.00 | ||||||||
| 62490 | 30,000.00 | 03/29/18 | XFER | XFER $ FROM SEWER TO MUNICIPAL TO COVER EXPENSES |
||||||
| 1803 | 0.00 | 30,000.00 | -30,000.00 | |||||||
| 07392-0500 | **** | *** | **** | 0.00 | 30,000.00 | -30,000.00 | ||||
| 07424-1400 | ADMINISTRATIVE WAGES | 0.00 | ||||||||
| CD | 62424 | 8,160.33 | 03/26/18 | 3121 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2018 REIMBURSEMENT - MA |
||||
| 1803 | 8,160.33 | 0.00 | 8,160.33 | |||||||
| 07424-1400 | **** | *** | **** | 8,160.33 | 0.00 | 8,160.33 | ||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 0.00 | ||||||||
| 1801 | 61728 | 100.00 | 01/31/18 | 3114 | 3353 | COMMONWEALTH FINANCING AUTHORITY GRANT APPLIC. DCED - WATER & SEW PROGRAM FOR BARKWAY |
||||
| 1801 | 100.00 | 0.00 | 100.00 | |||||||
| 07424-3000 | **** | *** | **** | 100.00 | 0.00 | 100.00 | ||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 0.00 | ||||||||
| 1803 | 62396 | 6,964.00 | 03/22/18 | 3120 | 808 | MAILLIE FALCONIERO & CO. PROGRESS BILLING - M.AUTHORITY 2 FINANCIAL STATEMENTS |
||||
| 1803 | 6,964.00 | 0.00 | 6,964.00 | |||||||
East Goshen Township General Ledger
Report Date 05/09/18 | GL Transaction Details | PAGE 4
MGRP18 run by BRIAN | 10 : 27 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3110 | 1804 | CD | 62732 | 2,436.00 | 04/17/18 | 3123 | 808 | MAILLIE FALCONIERO & CO. EXAMINATION 2017 MA FINANCIAL ST | ||
| 1804 | 2,436.00 | 0.00 | 9,400.00 | |||||||
| 07424-3110 | 9,400.00 | 0.00 | 9,400.00 | |||||||
| 07424-3130 | ENGINEERING SERVICES | 0.00 | ||||||||
| 1801 | 61613 | 12,523.56 | 01/24/18 | 3113 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 12/10/17 2017 GENERAL SERVICES | ||||
| 1801 | 12,523.56 | 0.00 | 12,523.56 | |||||||
| 1802 | 61944 | 5,415.00 | 02/15/18 | 3115 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 1/14/18 -2017 GENE | ||||
| 62032 | 552.50 | 02/22/18 | 3117 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 1/14/18 SUPPLEE VA | |||||
| 1802 | 5,967.50 | 0.00 | 18,491.06 | |||||||
| 1803 | 62323 | 11,749.08 | 03/15/18 | 3118 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 2/11/18 2018 GEN.S | ||||
| 1803 | 11,749.08 | 0.00 | 30,240.14 | |||||||
| 07424-3130 | 30,240.14 | 0.00 | 30,240.14 | |||||||
| 07424-3140 | LEGAL SERVICES | 0.00 | ||||||||
| 1801 | 61613 | 680.00 | 01/24/18 | 3112 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES DEC. 2017 GEN.AUT | ||||
| 1801 | 680.00 | 0.00 | 680.00 | |||||||
| 1802 | 62032 | 240.00 | 02/22/18 | 3116 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN.2018 GEN.AUT | ||||
| 1802 | 240.00 | 0.00 | 920.00 | |||||||
| 1803 | 62352 | 400.00 | 03/19/18 | 3119 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEBRUARY 2018 |
East Goshen Township General Ledger
| Report Date 05/09/18 | GL Transaction Details | PAGE 5 |
|---|---|---|
| MGRP18 run by BRIAN | 10 : 27 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1803 | 400.00 | 0.00 | 1,320.00 | |||||||
| 1804 | 62732 | 380.00 | 04/17/18 | 3122 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 3/12/18 |
||||
| 1804 | 380.00 | 0.00 | 1,700.00 | |||||||
| 07424-3140 | **** | *** | **** | 1,700.00 | 0.00 | 1,700.00 | ||||
| 07428-1000 | RESERVOIR PUMP STATION - ENGINEER | 0.00 | ||||||||
| 1802 | 62035 | 142.50 | 02/22/18 | 22016 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 1/14/18 RESERV.RD |
||||
| 1802 | 142.50 | 0.00 | 142.50 | |||||||
| 07428-1000 | **** | *** | **** | 142.50 | 0.00 | 142.50 | ||||
| 07429-6100 | WEST GOSHEN CAPITAL | 0.00 | ||||||||
| 1801 | 61614 | 30,050.70 | 01/24/18 | 22015 | 3843 | WEST GOSHEN SEWER AUTHORITY 16.67% OF COST - ENHANCED CHEMIC ADDITION |
||||
| 1801 | 30,050.70 | 0.00 | 30,050.70 | |||||||
| 1802 | 62035 | 3,664.01 | 02/22/18 | 22017 | 3843 | WEST GOSHEN SEWER AUTHORITY 16.67% - ENHANCED CHEMICAL ADDIT & ANAEROBIC DIGESTER REPLACEMENT |
||||
| 1802 | 3,664.01 | 0.00 | 33,714.71 | |||||||
| 1803 | 62343 | -3,664.01 | 03/15/18 | 22017 | 3843 | WEST GOSHEN SEWER AUTHORITY VOID CK. 2017 |
||||
| 1803 | -3,664.01 | 0.00 | 30,050.70 | |||||||
| 1804 | 62689 | 72,288.38 | 04/13/18 | 22018 | 3843 | WEST GOSHEN SEWER AUTHORITY 2017 SEWER SYSTEM REPAIR PROJECT .16667 % EAST GOSHEN SHARE |
||||
| 1804 | 72,288.38 | 0.00 | 102,339.08 | |||||||
East Goshen Township General Ledger
| Report Date 05/09/18 | GL Transaction Details | PAGE 6 |
|---|---|---|
| MGRP18 run by BRIAN | 10 : 27 AM |
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07429-6100 | **** | *** | **** | 102,339.08 | 0.00 | 102,339.08 | ||||
| Grand Total | 152,676.53 | 32,872.46 | 119,804.07 |
| Source | Debits | Credits |
|---|---|---|
| JE | 564.48 | 31,180.46 |
| EX | 30.00 | 0.00 |
| CR | 0.00 | 1,692.00 |
| CD | 152,082.05 | 0.00 |
| 152,676.53 | 32,872.46 |
[Pennoni Logo]
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
MEMORANDUM
| TO: | Rick Smith, Mark Miller, Municipal Authority |
|---|---|
| CC: | John Altshul, Patrick McKenna |
| FROM: | Michael Ellis, PE |
| DATE: | 5/11/2018 |
| SUBJECT: | Tallmadge Drive Sewer Replacement Bid Review |
The bids received on 5/8/18 resulted in a low bid of $94,652.68 from Eagle Contracting, Inc. JMC Contracting and Trio Siteworks were next with bids of $100,900 and $110,155 respectively. The final bid received from DiRocco Bros., Inc. was $320,810. The bid tabulation is attached.
The low bidder was at the very high end of our estimated cost range, but the bid prices did not include stone material (which the Township will provide), whereas our estimate did include stone. The additional cost of stone beyond the bid prices may be $10,000 – $15,000. Our opinion of probable cost is also attached for reference.
Since the bids were much higher than expected, we have contacted the bidders as well as some planholders that did not bid to identify why the pricing is in this range. The primary driver is that contractors are backlogged right now so they have either inflated the price or opted not to bid. Further, the small size of the project will not attract the large firms, and very small firms cannot bid it due to the insurance and bonding requirements, so there is a limited interested bidders’ pool. There were also apparent misunderstandings about the Township purchasing the stone materials and having them delivered versus the contractor doing the hauling from the quarry. Others were concerned about the possibility of rock and extensive dewatering in the subgrade since the project was bid as “unclassified” excavation.
We thereby recommend re-bidding the project with several changes to the scope and bid form in an effort to reduce costs.
After our follow-up calls and review of the bids we offer the following options for consideration should the Authority wish to rebid the project. Based on our discussions with the contractors, some of these items may only have limited impact on the bid pricing.
- Expand the project timeline to allow the work to be completed in the upcoming winter. Alternatively, extend the project to at least September 30, 2018. We anticipate a more flexible schedule allowing winter work could reduce the prices at least 10%. Extending to September is not likely to have a significant impact.
- Classify excavation to cover potential additional work or delays due to required rock excavation by creating a separate bid item for rock removal, assuming any depth below the existing pipe is rock. Alternatively, the presence or absence of rock and depth of rock (if applicable) could be determined with more certainty by performing a couple of borings.
- Add a dewatering clause and bid item to cover potential additional work or delays related to dewatering.
- Perform a test pit to confirm the configuration of the existing drop connection being modified (may not be worth the effort given the low bid pricing for this item).
| EGMA1701 | May 11, 2016 | Page 2 |
|---|---|---|
| East Goshen Township | Tallmadge Dr Sewer Replacement |
- East Goshen could perform all pavement restoration work (8” BCBC followed by mill & overlay) to save the asphalt material mark-up and labor costs. Alternatively, the contractor could just be required to install 1.5-2” of hot mix as temporary paving, and the Township could return after 30-60 days to mill and install base course and permanent wearing course. Temporary paving by the contractor is not likely to provide a significant cost savings though since the contractor will still have to mobilize paving equipment.
- Bypass pumping performed by the Township.
- Reduce the insurance requirements to open the project up to smaller contractors.
We anticipate the primary cost savings would be in Item #1. The other items may provide a 10-15% savings combined.
Schedule
If the project is rebid, one potential schedule that would still allow for final paving before winter follows. If the project can be constructed in the winter, it could be bid out in the early fall instead.
- Re-advertise = May 18 and 21
- Bids Due = June 6
- Award = June 11 MA meeting
- Contract Execution = End of June
- Construction = anytime between July – September
- Final Paving by Township PW Department = October-November
W:\PROJECTS\VLTW\VLTW3845-2015 DRBC Water Audit\CORRESPONDENCE\SENT\2016 DRBC Water Audit Memo.docx
East Goshen Township
Solicitation: TD-2018 (Tallmadge Drive Sewer Replacement)
Tabulation of Bids Received by 2:00 PM Eastern on May 8, 2018
| ITEM NUMBER | DESCRIPTION | ESTIMATED QUANTITY/UNIT | Eagle Contracting, Inc. | JMC Contractors, Inc. | Trio Siteworks | DiRocco Bros., Inc. | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 418 Fairmont Drive Chester Springs, PA 19425 (610) 496-8254 |
38 Stephen Drive Glen Mills, PA 19342 (610) 361-1850 |
1167 W. Baltimore Pike, Suite 268 Media, PA 1906 (484) 443-6000 |
509 Maple Avenue West Chester, PA 19380 (610) 696-0571 |
|||||||||
| UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | |||||
| BASE BID | ||||||||||||
| 1 | Sanitary Sewer Bypass Pumping and Flow Control | 1 | LS | $5,235.68 | $5,235.68 | $5,800.00 | $5,800.00 | $7,500.00 | $7,500.00 | $8,500.00 | $8,500.00 | |
| 2 | Furnish and Install Precast Concrete Manhole | 1 | EA | $5,850.00 | $5,850.00 | $10,000.00 | $10,000.00 | $5,500.00 | $5,500.00 | $12,500.00 | $12,500.00 | |
| 3 | Furnish and Install 8" Dia. SDR26 PVC Gravity Sewer Pipe | 527 | LF | $146.00 | $76,942.00 | $150.00 | $79,050.00 | $165.00 | $86,955.00 | $530.00 | $279,310.00 | |
| 4 | Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral | 30 | LF | $65.00 | $1,950.00 | $100.00 | $3,000.00 | $65.00 | $1,950.00 | $350.00 | $10,500.00 | |
| 5 | Connection to Existing Sanitary Sewer Manholes | 1 | LS | $3,500.00 | $3,500.00 | $2,000.00 | $2,000.00 | $3,500.00 | $3,500.00 | $2,500.00 | $2,500.00 | |
| 6 | Demolition of Drop Connection Concrete Encasement | 1 | CY | $900.00 | $900.00 | $800.00 | $800.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,000.00 | |
| 7 | Miscellaneous Excavation and Backfill | 5 | CY | $55.00 | $275.00 | $50.00 | $250.00 | $50.00 | $250.00 | $500.00 | $2,500.00 | |
| TOTAL BASE BID (Based on Estimated Quantities) |
$94,652.68 | $100,900.00 | $110,155.00 | $320,810.00 | ||||||||
| Bid Security Review | 10% of Bid | 10% of Bid | 10% of Bid | 10% of Bid | ||||||||
We Declare this to be a true Tabulation of Bids Received on May 8, 2018 by East Goshen Township for Contract No. TD-2018.
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, P.E., PA Reg. No. PE075139
FOR: PENNONI ASSOCIATES INC.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
4/4/2018
Tallmadge Drive Sanitary Sewer Replacement
East Goshen Municipal Authority
ENGINEERING OPINION OF PROBABLE CONSTRUCTION COST
(Bid Construction with Contractor provided materials; Pavement Restoration by Township)
April 4, 2018
| BID ITEM | DESCRIPTION | UNITS | QUANTITY | UNIT PRICE | TOTAL |
|---|---|---|---|---|---|
| 1 | 10" Full Depth Pavement Demolition | SY | 371 | $12.75 | $4,735.92 |
| 3 | Demolish & Remove Manhole R-34 (9 ft depth) | EA | 1 | $2,270.00 | $2,270.00 |
| 4 | Misc. Excavation and Backfill | CY | 5 | $70.00 | $350.00 |
| 5 | Furnish and Install 8" SDR26 PVC (8-10' deep) | LF | 537 | $108.00 | $57,996.00 |
| 6 | Furnish and Install 4" SDR26 PVC Pipe for Lateral Replacement (8-10' depth) (6 Laterals @ 5 LF EA) | LF | 30 | $101.00 | $3,030.00 |
| 7 | Furnish and Install 4' Dia. Sanitary Manhole | EA | 1 | $4,300.00 | $4,300.00 |
| 8 | Core Drill Existing Manhole | EA | 2 | $2,000.00 | $4,000.00 |
| 9 | Bypass Pumping | LS | 1 | $3,500.00 | $3,500.00 |
| Subtotal | $80,182 | ||||
| Bonds & Insurance | 2.0% | $1,604 | |||
| Mobilization / Demobilization | 5.0% | $4,009 | |||
| Subtotal | $5,613 | ||||
| TOTAL | $85,795 | ||||
| Total with Contingency of: | 10% | $94,374 | |||
| SAY | $95,000 | ||||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
May 11, 2018
EGMAU17007
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application No. 1 Recommendation Letter
Supplee Valley Sanitary Sewer Pipe Lining, Contract No. SSPL-2017
Dear Mr. Smith:
The Contractor, SWERP Incorporated, has submitted a payment application for work completed on this project. This is the first payment for this project. Please note that the payment application submitted by the Contractor is titled payment application #2. This is because we did not recommend approval of the Contractor's first payment application because the CIPP lining work was not complete. However, we have observed the work-in-progress, and we confirm that the described work has been completed.
We have reviewed the attached Payment Application provided by the Contractor, and we recommend approval in the amount of $159,652.80.
The remaining work is to perform manhole grouting and to install 3 saddle liners.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Authority Engineer
/lef
Enclosures: Payment Application #2 (Pages 1-2)
cc: Mark Miller, Public Works Director (via email)
U:\Accounts\EGMAU\EGMAU17007 - Supplee Valley CIPPL Construction\DOC PREP\PAYMENT APPLICATIONS\Payment App #1 Recommendation Ltr.docx
OWNER: Township of East Goshen
APPLICATION FOR PAYMENT
Date: 04/23/2018
Current Application No: TWO
Period Beginning: 03/01/2018
Period Ending: 04/12/2018
PROJECT: Supplee Valley Sanitary Sewer Pipe Lining
ENGINEER:
Pennoni Associates, Inc.
121 Continental Drive, Suite 207
Newark, DE 19713
CONTRACTOR:
SWERP Incorporated
1237 Hayes Blvd.
Bristol, PA 19007
| ITEM NO. | Description | Original Quantity | Unit Cost | Unit | Quantity or Percentage Complete | Amount | ||||
|---|---|---|---|---|---|---|---|---|---|---|
| Previous | This Month | To Date | Previous | This Month | To Date | |||||
| 1 | CIPP Lining of 8" Pipe Within Township Roads | 2220 | $31.00 | LF | 2,244.00 | 0.00 | 2,244.00 | $69,564.00 | $0.00 | $69,564.00 |
| 2 | Cleaning & Lining of 8" Pipe Within Easements | 1009 | $32.00 | LF | 1,021.00 | 0.00 | 1,021.00 | $32,672.00 | $0.00 | $32,672.00 |
| 3 | Lateral Reinstatements | 33 | $100.00 | EA | 30.00 | 0.00 | 30.00 | $3,000.00 | $0.00 | $3,000.00 |
| 4 | Manhole Pressure Grouting | 2 | $1,900.00 | EA | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 |
| 5 | Grout | 50 | $50.00 | GAL. | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CIPP Lining of 8" Pipe between MH C384 - MH C040 | 305 | $42.00 | LF | 175.00 | 0.00 | 175.00 | $7,350.00 | $0.00 | $7,350.00 |
| 7 | CIPP Lining of 8" Pipe between MH C411 - MH C410 | 145 | $40.00 | LF | 150.00 | 0.00 | 150.00 | $6,000.00 | $0.00 | $6,000.00 |
| 8 | CIPP Lining of 8" Pipe between MH C417 - MH C416 | 262 | $34.00 | LF | 265.00 | 0.00 | 265.00 | $9,010.00 | $0.00 | $9,010.00 |
| 9 | CIPP Lining of 8" Pipe between MH C407 - MH C406 | 159 | $34.00 | LF | 160.00 | 0.00 | 160.00 | $5,440.00 | $0.00 | $5,440.00 |
| 10 | CIPP Lining of 8" Pipe between MH C394 - MH C385 | 318 | $32.00 | LF | 320.00 | 0.00 | 320.00 | $10,240.00 | $0.00 | $10,240.00 |
| 11 | CIPP Lining of 8" Pipe between MH C042I - MH C042H | 278 | $34.00 | LF | 285.00 | 0.00 | 285.00 | $9,690.00 | $0.00 | $9,690.00 |
| 12 | CIPP Lining of 8" Pipe between MH C042G - MH C042 | 305 | $32.00 | LF | 315.00 | 0.00 | 315.00 | $10,080.00 | $0.00 | $10,080.00 |
| 13 | Lateral Reinstatements | 25 | $100.00 | EA | 24.00 | 0.00 | 24.00 | $2,400.00 | $0.00 | $2,400.00 |
| c/o 1 | Two Point Repair Installations | 1 | $5,427.00 | LS | 1.00 | 0.00 | 1.00 | $5,427.00 | $0.00 | $5,427.00 |
| c/o 2 | Installation of 6 Saddle Liners and One Point Repair | 1 | $13,570.00 | LS | 0.00 | 0.48 | 0.48 | $0.00 | $6,519.00 | $6,519.00 |
| ORIGINAL CONTRACT ESTIMATE | $175,520.00 | GROSS AMOUNT DUE | $177,392.00 |
|---|---|---|---|
| +-CHANGE ORDER VALUES | $11,946.00 | 10% RETAINAGE | $17,739.20 |
| CURRENT CONTRACT PLUS CHANGES | $187,466.00 | NET AMOUNT DUE TO DATE | $159,652.80 |
| VALUE OF WORK IN PLACE | $177,392.00 | LESS PREVIOUS PAYMENTS/ESTIMATES | $153,785.70 |
| ESTIMATED REMAINING WORK | $10,074.00 | AMOUNT PAYABLE THIS ESTIMATE | $5,867.10 |
Township of East Goshen
Supplee Valley Sanitary Sewer Pipe Lining
SWERP Inc.
Pennoni Associates Inc.
Application for Payment No. Two
Saddle Liner Installations
| Date | Location | |
|---|---|---|
| 1 | 04/10/2018 | 212 Margaret Lane |
| 2 | 04/11/2018 | 230 Baldwin Dr. |
| 3 | 04/11/2018 | 232 Baldwin Dr. |