Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
June 11, 2018
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES May 14, 2018
- APPROVAL OF INVOICES Pennoni Invoice #803811 $ 168.68 Pennoni Invoice #803812 $ 964.00 Pennoni Invoice #803813 $ 6,309.75 Pennoni Invoice #803814 $ 61.50
- LIAISON REPORTS
- FINANCIAL REPORTS May Financial Report
- OLD BUSINESS Consider revised insurance requirements for Tallmadge Drive
- GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de; Continue to implement the I&I Plan – 3-8-2018 completed; Submit articles for the newsletter - none
F:\Data\Shared Data\Agendas\Municipal Authority\2018\6-11-18.doc
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2018\6-11-18.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 8, 2018
To: Municipal Authority
From: Mark Miller
Re: May 2018 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 771,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis, no problems to report.
C.C. Collection: The pump stations were checked on a daily basis. Routine maintenance was performed at each station. Franc Environmental was utilized to clean and vacuum the wet wells. The floats were pulled up and cleaned at all the pump stations and the plant.
R.C. Collection: The station was visited on a daily basis. We continue to have a build-up of rags in the basket.
Ridley Creek: Equipment and parts were dropped off for Scott’s personnel to rebuild the centrifuge . The meter seems to be working correctly. The filter feed pump was rebuilt and reinstalled.
Alarms: We responded to 10 alarms for May which were all various issues.
PA One Calls: We received 68 PA One calls May.
Lateral Repairs: We replaced 8 caps and found that 2 required pushing the stacks back into the tee.
Note: Aqua PA has notified us that they will be replacing the water main in MaryDell. We will be cleaning and televising the lines and marking laterals as part of the PA One Call. This way they will have accurate locations. We will mark the depth and location of each lateral and main.
Photograph of a white Camel vacuum truck extending an overhead boom hose into the roof hatch of the Barkway Pump Station building.
Barkway Pump Station
Utilizing the new roof hatch to clean the wet well.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
June 8, 2018
Invoices
- Invoices with summaries are provided under separate cover.
Multi-Year Capital Planning
- We performed a field visit to the Hunt Country Pump Station and began to evaluate concepts and budgetary costs for adding a Muffin Monster and flow meter to the station. We also performed field visits to obtain information on the Hershey’s Mill Pump Station emergency generator and the RCSTP generators in order to evaluate concepts and budgetary costs for generator replacements. We will provide concepts and budgetary costs prior to the July MA meeting.
- The following list of future sewer system capital improvement projects (previously discussed at the November 2017 MA meeting) is updated to include the aforementioned projects (items 9-12 below), item #8, and some updates to other projects in italics: Supplee Valley Sewer System Pipe Lining – Nearly complete construction; Barkway Pump Station Muffin Monster – Submitted a grant application; planned to be constructed in 2018 if the grant is awarded, or budgeted for 2019 if it is not awarded.; Ashbridge Pump Station Force Main Rehabilitation; Tallmadge Drive Sewer Main Replacement – See project update hereafter; RCSTP SBR Tank Coatings – Tentatively planning to coat one tank per year from 2021-2024; RCSTP Caustic Soda Treatment Change – Tentatively planning to budget for 2020; Waterview Sewer System Rehabilitation; Ridley Creek Collection System 3 Permanent Gravity Sewer Meters – Tentatively budgeting for 2019; Hunt Country Pump Station Muffin Monster – Consider budgeting for 2019; Hunt Country Pump Station Flow Meter – Consider budgeting for 2019; RCSTP Generator Replacement – Consider budgeting for 2019; Hershey’s Mill Pump Station Generator Replacement – Consider budgeting for 2019
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – The trial began on February 28 and concluded on May 6. Analysis of sampling data is ongoing, and we are preparing a letter report of the results, potential permanent caustic soda feed concept and capital cost estimate, and a cost-benefit analysis of caustic soda vs. soda ash.
- Dutchland is scheduled to re-coat the core holes in SBR #1 on June 8, 2018 so that the tank can be put back into operation.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
EGMAU18001 June 8, 2018 Page 2
East Goshen Municipal Authority Engineer’s Report
Supplee Valley Pipe Lining
- SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order. One of the lateral locations cannot be lined or grouted due to the severe angle of connection between the lateral and the main; however, this location only had a very minor infiltration leak. We are continuing to coordinate with the PW Department and SWERP to evaluate the feasibility of installing saddles in the other two difficult-to-access laterals as well as the one spot repair lateral liner that was approved via change order. Lastly, the contractor still needs to perform injection grouting in two manholes. Once we resolve the accessibility, we will pursue a schedule from the contractor to complete the work.
Barkway Pump Station Grinder
- We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We notified bidders that all bids were rejected.
- We have updated the bid document for re-bid in the following ways and met with Mark Miller on June 5 to review the changes: Bid items clearly indicate the Township will purchase aggregate materials and have them delivered and clarify that the cost of those materials shall not be included in the contractor bid prices.; A unit price bid item for “rock removal” was added.; A flexible schedule is proposed allowing the contractor to perform the work anytime before December 15, 2018.; The contractor shall backfill with all 2A stone. The Township will perform all temporary and permanent paving.; The contractor’s insurance coverage requirements have been reduced.
- We have prepared an updated opinion of probable cost based on the bid document changes, original bid prices, and conversations with the contractors following the first bid.
- The following re-bid schedule is proposed: Advertise = July 9; Bids Due = August 7; Award = August 13; Contract Execution = late August; Construction = Anytime between late August and December 15 (must be completed within 20 consecutive days)
P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-06-08.docx
EGMAU18001 June 8, 2018 Page 3
East Goshen Municipal Authority Engineer’s Report
I&I Support and Reporting
- We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at a MA meeting immediately thereafter. No update since our last report.
New Connections
- We discussed our comments on the proposed residential grinder pump sewer connection plans at 1506 Meadowbrook Lane via grinder pump with the applicant’s design consultant, and we are awaiting a revised plan submission.
West Goshen Sewer System Consultation
- No activity since last report.
P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-06-08.docx
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations for during the month of April 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The caustic solution addition pilot study for pH control was completed on May 6th. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for the April 2018 DMR.
Table 1
April 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| April 3, 2018 | 0.254 | 4.4 | 9.3 | 5 | 10.6 | 0.109 | 0.23 | 0.14 | 0.30 | 3 | 0.4771 |
| April 6, 2018 | 0.235 | 7 | 13.7 | ||||||||
| April 10, 2018 | 0.226 | 5.9 | 11.1 | 7 | 13.2 | 0.342 | 0.64 | 0.25 | 0.47 | 1 | 0.0000 |
| April 13, 2018 | 0.185 | 6 | 9.3 | ||||||||
| April 17, 2018 | 0.297 | 3.1 | 7.7 | 6 | 14.9 | 0.187 | 0.46 | 0.2 | 0.50 | 2 | 0.3010 |
| April 20, 2018 | 0.243 | 6 | 12.2 | ||||||||
| April 24, 2018 | 0.233 | 2.8 | 5.4 | 7 | 13.6 | 0.314 | 0.61 | 0.21 | 0.41 | 2 | 0.3010 |
| April 26, 2018 | 0.230 | 5 | 9.6 | ||||||||
| Average | 0.238 | 3.9 | 8.1 | 6 | 12.3 | 0.281 | 0.57 | 0.22 | 0.46 | 2 | 0.2007 |
| Minimum | 0.185 | 2.8 | 5.4 | 5 | 9.3 | 0.109 | 0.23 | 0.14 | 0.30 | 1 | 0.0000 |
| Maximum | 0.297 | 5.9 | 11.1 | 7 | 14.9 | 0.342 | 0.64 | 0.25 | 0.50 | 3 | 0.4771 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
The total phosphorus monthly average was reported as 0.22 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.14 to 0.25 mg/L. The ammonia as nitrogen monthly concentration was reported as 0.281 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.342 mg/L. The total suspended solids (TSS) monthly concentration was reported as 6 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 7 mg/L as compared to the permit discharge limitation of 15 mg/L.
Table 2 illustrates the final effluent composite sample data reported for the April 2018 DMR. Discharge to Applebrook, Outfall 002 was 4,204,382 gallons during April.
Table 2
April 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| April 3, 2018 | 0.1393 | 4.4 | 5.1 | 5 | 5.8 | 0.109 | 0.13 | 0.14 | 0.16 | 3 | 0.4771 |
| April 6, 2018 | 0.1519 | 7 | 8.9 | ||||||||
| April 10, 2018 | 0.1390 | 5.9 | 6.8 | 7 | 8.1 | 0.342 | 0.40 | 0.25 | 0.29 | 1 | 0.0000 |
| April 13, 2018 | 0.1431 | 6 | 7.2 | ||||||||
| April 17, 2018 | 0.1374 | 3.1 | 3.6 | 6 | 6.9 | 0.187 | 0.21 | 0.20 | 0.23 | 2 | 0.3010 |
| April 20, 2018 | 0.1280 | 6 | 6.4 | ||||||||
| April 24, 2018 | 0.1387 | 2.8 | 3.2 | 7 | 8.1 | 0.314 | 0.36 | 0.21 | 0.24 | 2 | 0.3010 |
| April 26, 2018 | 0.1402 | 5 | 5.8 | ||||||||
| Average | 0.1397 | 4.1 | 4.7 | 6 | 7.1 | 0.238 | 0.28 | 0.20 | 0.23 | 2 | 0.2698 |
| Minimum | 0.1280 | 2.8 | 3.2 | 5 | 5.8 | 0.109 | 0.13 | 0.14 | 0.16 | 1 | 0.0000 |
| Maximum | 0.1519 | 5.9 | 6.8 | 7 | 8.9 | 0.342 | 0.40 | 0.25 | 0.29 | 3 | 0.4771 |
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during April 2018.
Table 3
April 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| April 3, 2018 | 0.485 | 316 | 1,279 | 286 | 1,158 | 26.6 | 108 | 31.7 | 128 | 5.3 | 21.5 |
| April 10, 2018 | 0.454 | 233 | 943 | 301 | 1,219 | 29.3 | 111 | 29.0 | 110 | 5.4 | 21.9 |
| April 17, 2018 | 0.508 | 209 | 846 | 129 | 522 | 22.5 | 95 | 31.2 | 132 | 3.6 | 14.6 |
| April 24, 2018 | 0.463 | 152 | 615 | 112 | 453 | 26.6 | 103 | 25.8 | 100 | 4.2 | 17.0 |
| Average | 0.477 | 228 | 921 | 207 | 838 | 26.3 | 104 | 29.4 | 117 | 4.6 | 18.7 |
| Minimum | 0.454 | 152 | 615 | 112 | 453 | 22.5 | 95 | 25.8 | 100 | 3.6 | 14.6 |
| Maximum | 0.508 | 316 | 1,279 | 301 | 1219 | 29.3 | 111 | 31.7 | 132 | 5.4 | 21.9 |
Table 4 presents the available Outfall 001 final effluent data for the month of May 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters. The alum feed to the SBRs was frequently increased to improve the total phosphorus removal.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Table 4
May 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| May 1, 2018 | 0.210 | 4.3 | 7.5 | 3 | 5.3 | 0.251 | 0.44 | 0.31 | 0.54 | 1 | 0.0000 |
| May 4, 2018 | 0.210 | 6 | 10.5 | ||||||||
| May 8, 2018 | 0.209 | 2.0 | 3.5 | 2 | 3.5 | 0.100 | 0.17 | 0.17 | 0.30 | 2 | 0.3010 |
| May 15, 2018 | 0.241 | 5.0 | 10.0 | 5 | 10.0 | 0.100 | 0.20 | 0.23 | 0.46 | 2 | 0.3010 |
| May 18, 2018 | 0.243 | 6 | 12.2 | ||||||||
| May 22, 2018 | 0.278 | 4.2 | 9.7 | 4 | 9.3 | 0.176 | 0.41 | 0.20 | 0.46 | 1 | 0.0000 |
| May 29, 2018 | 0.207 | 5.6 | 9.7 | 3 | 5.2 | 0.19 | 0.33 | 1 | 0.0000 | ||
| Average | 0.228 | 4.2 | 8.2 | 4 | 8.4 | 0.125 | 0.26 | 0.20 | 0.39 | 2 | 0.1505 |
| Minimum | 0.207 | 2.0 | 3.5 | 2 | 3.5 | 0.100 | 0.17 | 0.17 | 0.30 | 1 | 0.0000 |
| Maximum | 0.278 | 5.6 | 10.0 | 6 | 12.2 | 0.251 | 0.44 | 0.31 | 0.54 | 2 | 0.3010 |
The facility is anticipated to achieve compliance with the discharge permit limitations during the month of May 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
During May, the presence of foam conditions on the surface of the SBRs remained at 90% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The lower water temperatures within the SBRs, coupled with lower food to mass ratios, the foam concentrations have increased because of increased filamentous growth. Management of the food to mass ratio assists to manage the foam concentrations balanced by maintaining nitrification is critical during the colder winter months.
Table 5 presents the available May data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Table 5
May 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| May 1, 2018 | 0.1426 | 4.3 | 5.1 | 3 | 3.6 | 0.251 | 0.299 | 0.31 | 0.37 | 1 | 0.0000 |
| May 4, 2018 | 0.1490 | 6 | 7.5 | ||||||||
| May 8, 2018 | 0.1423 | 2.0 | 2.4 | 2 | 2.4 | 0.100 | 0.119 | 0.17 | 0.20 | 2 | 0.3010 |
| May 15, 2018 | 0.1367 | 5.0 | 5.7 | 5 | 5.7 | 0.100 | 0.114 | 0.23 | 0.26 | 2 | 0.3010 |
| May 18, 2018 | 0.1131 | 6 | 5.7 | ||||||||
| May 22, 2018 | 0.1388 | 4.2 | 4.9 | 4 | 4.6 | 0.176 | 0.204 | 0.20 | 0.23 | 1 | 0.0000 |
| May 29, 2018 | 0.1353 | 5.6 | 6.3 | 3 | 3.4 | 0.19 | 0.21 | 1 | 0.0000 | ||
| Average | 0.1368 | 4.2 | 4.9 | 4 | 4.7 | 0.157 | 0.184 | 0.22 | 0.26 | 1 | 0.1204 |
| Minimum | 0.1131 | 2.0 | 2.4 | 2 | 2.4 | 0.100 | 0.114 | 0.17 | 0.20 | 1 | 0.0000 |
| Maximum | 0.1490 | 5.6 | 6.3 | 6 | 7.5 | 0.251 | 0.299 | 0.31 | 0.37 | 2 | 0.3010 |
Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during May 2018.
Table 6
May 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| May 1, 2018 | 0.560 | 175 | 818 | 262 | 1,224 | 32.1 | 150 | 33.5 | 157 | 5.6 | 26.2 |
| May 8, 2018 | 0.474 | 114 | 69 | 29.1 | 49.8 | 3.8 | |||||
| May 15, 2018 | 0.483 | 135 | 631 | 116 | 542 | 28.2 | 114 | 33.1 | 133 | 4.4 | 20.6 |
| May 22, 2018 | 0.536 | 209 | 977 | 264 | 1,234 | 30.0 | 134 | 25.8 | 115 | 5.9 | 27.6 |
| May 29, 2018 | 0.452 | 345 | 1,612 | 392 | 1,832 | 7.1 | 33.2 | ||||
| Average | 0.501 | 196 | 1,009 | 221 | 1208 | 29.9 | 133 | 35.6 | 135 | 5.4 | 26.9 |
| Minimum | 0.452 | 114 | 631 | 69 | 542 | 28.2 | 114 | 25.8 | 115 | 3.8 | 20.6 |
| Maximum | 0.560 | 345 | 1,612 | 392 | 1832 | 32.1 | 150 | 49.8 | 157 | 7.1 | 33.2 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during April and May. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Pilot Study – Addition of Caustic solution for supplemental pH and total alkalinity
The pilot study adding caustic solution for supplemental pH and total alkalinity continued ended May 6, 2018. A summary is provided through a separate technical memorandum.
Significant Rainfall
During May, there were twelve (12) days when rainfall occurred. Six (6) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 6.06 inches of rainfall measured during the month. These events occurred on:
| May 12th | 0.41inches |
|---|---|
| May 13th | 0.72 inches |
| May 14th | 0.90 inches |
| Three (3) consecutive days of rainfall for a total of 2.03 inches | |
| May 16th | 0.57 inches |
| May 17th | 1.37 inches |
| May 18th | 0.10 inches |
| May 19th | 0.37 inches |
| May 20th | 0.67 inches |
| May 21st | 0.05 inches |
| May 22nd | 0.53 inches |
| Seven (7) consecutive days of rainfall for a total of 3.66 inches | |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
PA DEP
The Applebrook Water Quality Management (WQM) permit number 1500410 A1 was issued on February 21, 2012 and expired on February 28, 2017. Confirmation with Paul White, P.G., Brickhouse Environmental, confirmed all quarterly sampling and reports have been submitted and are continuing to do so. Coordination to submit a WQM permit renewal application is required with Pravin Patel, PA DEP. A Pennsylvania registered professional geologist will be required to prepare and apply their P.G. seal for the groundwater monitoring well data and analysis.
Solids Dewatering and Disposal:
| May 2018 | |
|---|---|
| Gallons of sludge dewatered | 226,470 |
| Number of dumpsters | 4 |
*Sixteen (16) days of centrifuge operation
Chemical Usage:
| Chemical | May 2018 Daily Average |
Total Monthly |
|---|---|---|
| Soda Ash | 285 | 8,250 |
| Aluminum Sulfate solution | 49.4 | 1,530 |
| Polymer (centrifuge) | 0.85 | 13.60 |
*Sixteen (16) days of centrifuge operation
Flow data:
| Flow Meter Location | May 2018 Total Volume for Month, MG |
Average Daily Flow, gpd | Daily Maximum Flow, gpd |
|---|---|---|---|
| Influent Wastewater to Screening Building* | 15.806 | 509,669 | 607,140 |
| Influent Wastewater to SBRs | 15.058 | 485,748 | 629,760 |
| Internal Recycle | 0.091 | 11,359 | 27,960 |
| Treated Effluent to Disc Filters | 14.855 | 479,191 | 623,616 |
| Final Effluent Discharge | 7.311 | 235,839 | 360,000 |
| Applebrook Golf Course | 4.368 | 140,916 | 161,024 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
The field flow meter appears to periodically record elevated flows as compared to the flow meter measuring flow to the SBRs. Periodic inspection of the flow meter (without confined space entry) has been imitated during June to visually check for debris on the flow meter resulting in flow measurement errors.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned piping within SBR building
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Major Preventative Maintenance Activities
The solids dewatering centrifuge, Alfa Laval Model Aldec G2-40, was removed from service on May 31st through June 2nd and rebuilt. Replacement of bearings, bushing and seals was performed.
The centrifuge rebuild was initiated on May 31st. A few issues were encountered.
- A bolt in the gearbox was unable to be removed. The gearbox was sent to the Township garage whereas the Township mechanic used a specialized tool for removal of the bolt.
- A new bolt was purchased to replace the seized one.
- An issue was experienced removing and installing the conveyor from the centrifuge bowl. The tool Alfa-Laval supplied during the original machine purchase was incorrect. A tool was borrowed from another facility. We will follow up with Alfa-Laval regarding the tool regarding whether they will it.
- We disassembled the pinion end of the gearbox to replace the leaking oil seal and realized Alfa Laval sent the incorrect seal. We checked this against the order list for confirmation. During the process, we found an additional part that will need to be replaced to repair the gearbox oil leak completely. We will coordinate with Alfa Laval to obtain the parts and finalize the repairs to the gear box.
As of June 2nd, the machine has been re-installed, tested and running well.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 8 of 9
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2018
Look Ahead Preventative Maintenance Activities
Installation of the LDO probes and controls for SBRs is planned when the weather becomes warmer.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 9 of 9
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 14, 2018
The East Goshen Township Municipal Authority held their regular public meeting on Monday, May 14, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Dana Pizarro, Kevin Cummings and Phil Mayer. Also in attendance were: Mark Miller (Director of Public Works), Jon Altshul (Asst. Township Manager), Stacey L. Fuller (attorney), Mike Ellis (Pennoni), Scott Fowler (Plant Operator), and Walter Wujcik (Conservancy Board).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Jack asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
Jack attended the West Goshen meeting and reported that they decided not to tape their meetings anymore. Jack mentioned that West Goshen doesn’t always have their meeting materials ahead of the meeting for East Goshen. He asked Jon to contact them. They had a tour of the plant under construction but could only take West Goshen members because of the rules of their insurance company. Ross Unruh spoke about meetings with other townships. They discussed raising their rates.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for April:
Monthly Flows: The average daily flow to West Goshen was 764,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. Allied Control came out to calibrate all the meters on May 3rd.
C.C. Collection: The pump stations were checked on a daily basis. We had three emergency call outs at the Barkway Pump Station for the back-up float failure. We found that one of the back floats had failed. The float was replaced and the station was put back on line. The generators were all serviced as part of the routine maintenance. No problems were found at the pump station generators
MA 5-14-18 draft 1
We televised approximately 2500 of main on Cornwallis Drive. We completed restoration work to the laterals that we repaired over the winter.
R.C. Collection: Hunt Country Pump Station was visited on a daily basis with no problems to report. We cleaned the sewer line on Talmadge Drive as part of an on-going maintenance until the line is replaced.
R.C. Plant: The plant was visited on a daily basis. The plant operator notified me that the flow meter was not operating. Allied Control was already on site when Scott called, so they pulled the probe and checked out the meter. The screen room trough is scheduled to be cleaned next week as part of our routine basis. The generators were serviced as art of our preventive maintenance. The tech has recommended that we consider replacing he older Spectrum unit. He noted that the unit went through five gallons of oil over a 5 month period and the unit was installed in 1996.
Alarms: We responded to 12 alarms for April which were all various issues.
PA One Calls: We received 75 PA One calls for April.
2. Pennoni Engineer’s Report for April
Mike Ellis provided the following report.
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – The trial began on February 28 and concluded on May 6. We are currently analyzing the sampling data and will provide a verbal update at the May MA meeting. We intend to follow up with a letter report of the results, potential permanent caustic soda feed concept and capital cost estimate, and a cost benefit analysis of caustic soda vs. soda ash.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- We have continued to provide construction administration and inspection services.
- SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order. One of the lateral locations cannot be lined or grouted due to the severe angle of connection between the lateral and the main; however, this location only had a very minor infiltration leak. We are coordinating with the PW Department to evaluate the feasibility of installing saddles in the other two difficult to access laterals as well as the one spot repair lateral liner that was approved via change order. Lastly, the contractor still needs to perform injection grouting in two manholes. Once we resolve the accessibility, we will pursue a schedule from the contractor to complete the work.
- We processed the first pay application and forwarded our recommendation to the Township.
MA 5-14-18 draft 2
Barkway Pump Station Grinder
- We completed construction plans for the installation of the Muffin Monster and submitted them to the Township for review. The grinder is proposed inside the existing wet well and the hydraulic power pack is proposed inside the generator/controls building. No update since our last report.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We prepared a bid document with plans to replace 545 linear feet of sanitary sewer pipe and one manhole. The project was bid on PennBID, and we responded to contractor questions and issued one addendum. Bids were received from four contractors on May 8. The bids were higher than anticipated so we have discussed with the bidders and a few contractors that opted not to bid, and we have analyzed alternatives to re-bid the project to reduce the cost. Those considerations have been sent to the township in a separate memo along with the official bid tabulation.
I&I Support and Reporting
- No activity since our last report. We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at the MA meeting immediately thereafter.
New Connections
- We reviewed a revised plan for a new residential sewer connection at 1506 Meadowbrook Lane via grinder pump. Updated comments were provided as part of the Land Development Plan review.
West Goshen Sewer System Consultation
- No activity since last report.
3. Big Fish Environmental Services –
Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations during the month of March 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. The caustic solution addition pilot study for pH control continued
MA 5-14-18 draft 3
during the month. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Scott mentioned that Gabby and Matt Jr will come back for the summer. He spoke about the monthly flows. He mentioned the permit for Applebrook Water Quality Management. Mark has the data and will submit it. Dana commented that we want credit for discharging nutrient to Applebrook.
Approval of Minutes
The minutes of the April 9, 2018 meeting were approved as corrected.
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
- Pennoni #799471 $ 45.50
- Pennoni #799466 $ 510.75
- Pennoni #799477 $5,672.50
- Pennoni #799467 $ 30.75
- Pennoni #799468 $ 3,408.25
Phil seconded the motion. The motion passed unanimously.
2. Phil moved to approve payment of the Gawthrop Invoice #194208 for $480.00. Dana seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board - Walter reported that Keep East Goshen Beautiful Day went very well. They had 45 volunteers that day who collected 80 bags of trash. For their Spring planting along E. Boot Road, they planted 9 trees. He explained that the Marydell pond will be the first pond to be improved. He reported that there is a committe of Marydell residents and explained what will be done.
Financial Reports
Jon Altshul provided the following written report:
In April, the Municipal Authority recorded $56.85 in income (interest net of bank fees for Positive Pay) and $75,104.38 in expenses (primarily an invoice for $72,288.00 for West Goshen) for a negative variance of $75,047.53. To clarify, the total West Goshen invoice was for $315,355.00, the balance of which ($243,067) was paid from the sewer fund portion of the Township’s 2017 GO Bonds.
As of April 30th, the fund balance was $22,527.00. Technically, there was a balance of $71.30 in the capital account from proceeds of the 2013 MA notes, which represents interest that accrued last month after the account had been drawn down to $0. We have now transferred that amount to the MA operating account, meaning that moving forward the MA’s finances will be greatly simplified!
Goals
Jack will rite an article for the next Township newsletter.
New Business
Tallmadge Drive Sewer Replacement Bid Review – The bid results were discussed. Mike commented about how costs are rising and everyone is busy. When he talked to the contractors he
MA 5-14-18 draft 4
found out that some are so busy they can’t cover the bonding and insurance requirements. He discussed options for a rebid including doing the project later in the year and maybe save 10-15%. Phil made a motion to reject the current bids for a re-bid in the fall with revised wording. Kevin seconded the motion. The motion passed unanimously. Mark suggested that a letter be sent to the residents explaining that the work will be done over the winter which will decrease the cost to the Township.
SWERP – The first invoice of $159,652.80 was for all of the pipelining. Phil made a motion to approved payment of this invoice. Kevin seconded the motion. The motion passed unanimously.
Adjournment
There being no further business, Phil moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:15 p.m. The next regular meeting will be held on Monday, June 11, 2018 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 5-14-18 draft 5
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority |
Invoice # : 803811 |
|---|
For Services Rendered through: 5/20/2018
Coordination with Township on review of near-final DRAFT plan submission.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| **** -- Professional Services | $9,000.00 | $7,601.31 | 86.33% | $7,769.99 | $168.68 |
| Total : | $9,000.00 | $7,601.31 | $7,769.99 | $168.68 |
Amount Due This Invoice: $168.68
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17006 Invoice Summary
Invoice Date 5/24/2018
| Project: | EGMAU17006 | ||
|---|---|---|---|
| Pennoni Job No.: | Barkway PS Muffin Monster | ||
| Invoice No: | 803811 | ||
| Invoice Period: | 3/19/2018 | to | 5/20/2018 |
| Initial Authorization: | $ 9,000.00 | Date: | 5/24/2018 |
| Contract Amount: | $ 9,000.00 | ||
| Previously Invoiced: | $ 7,601.31 | ||
| Current Invoice: | $ 168.68 | ||
| Invoiced to Date ($): | $ 7,769.99 | ||
| Invoiced to Date (%): | 86% | ||
| Remaining Budget ($): | $ 1,230.01 | ||
| Remaining Budget (%): | 14% |
Budget by Phase:
| Phase Name: | Barkway PS Muffin Monster |
|---|---|
| Phase Budget: | $ 9,000.00 |
| Previously Invoiced: | $ 7,601.31 |
| Current Invoice: | $ 168.68 |
| Invoiced to Date ($): | $ 7,769.99 |
| Invoiced to Date (%): | 86% |
| Remaining Budget ($): | $ 1,230.01 |
| Remaining Budget (%): | 14% |
Comments: Coordination with Township on review of near-final DRAFT plan submission.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority |
Invoice # : 803812 |
|---|
For Services Rendered through: 5/20/2018
Construction administration: processed Pay Application #1, reviewed resubmittal for manhole injection grouting, and field meeting and coordination with PW Director and contractor regarding accessibility issues to make 4 remaining lateral repairs.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 964.00
Expense : 0.00
Phase Total : 964.00
Amount Due This Invoice: $964.00
| Fee : | 15,000.00 |
|---|---|
| Prior Billings : | 12,819.00 |
| Current Billings : | 964.00 |
| Total Billings : | 13,783.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.75 | 123.00 | 215.25 |
| Associate Professional | 7.25 | 91.00 | 659.75 |
| Sr. Engineering Technician | 1.00 | 89.00 | 89.00 |
| Labor Total: | 10.00 | 964.00 |
Total Phase : **** -- Professional Services
Labor : $964.00
Expense : $0.00
Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction
Labor : $964.00
Expense : $0.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17007 Invoice Summary
Invoice Date 5/24/2018
| Project: | EGMAU17007 | ||
|---|---|---|---|
| Pennoni Job No.: | Supplee Valley CIPPL Construction | ||
| Invoice No: | 803812 | ||
| Invoice Period: | 4/16/2018 | to | 5/20/2018 |
| Initial Authorization: | $ 12,000.00 | Date: | 5/24/2018 |
| Contract Amount: | $ 15,000.00 | ||
| Previously Invoiced: | $ 12,819.00 | ||
| Current Invoice: | $ 964.00 | ||
| Invoiced to Date ($): | $ 13,783.00 | ||
| Invoiced to Date (%): | 92% | ||
| Remaining Budget ($): | $ 1,217.00 | ||
| Remaining Budget (%): | 8% |
Budget by Phase:
| Phase Name: | Supplee Valley CIPP |
|---|---|
| Phase Budget: | $ 15,000.00 |
| Previously Invoiced: | $ 12,819.00 |
| Current Invoice: | $ 964.00 |
| Invoiced to Date ($): | $ 13,783.00 |
| Invoiced to Date (%): | 92% |
| Remaining Budget ($): | $ 1,217.00 |
| Remaining Budget (%): | 8% |
Comments: Construction administration: processed Pay Application #1, reviewed resubmittal for manhole injection grouting, and field meeting and coordination with PW Director and contractor regarding accessibility issues to make 4 remaining lateral repairs.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority |
Invoice # : 803813 |
|---|
For Services Rendered through: 5/20/2018
Phase **** Professional Services - Prepared May Engineer's Report, reviewed May RCSTP operator's report and MA agenda packet, and attended May MA meeting. Initiated analysis of RCSTP caustic soda trial sampling data following completion of study, discussed trial success and results with operator, and began preparation of trial summary letter.
Phase 01 Tallmadge Drive Sewer Replacement - Completed plans and bid document including updated PA One Call and field confirmation of depth and conditions of manholes to be connected to, finalized stone material acquisition approach with Township, administered construction solicitation on PennBID, responded to bidders' questions, prepared Addendum #1, conducted bid opening, prepared bid tabulation, evaluated bids being higher than expected including discussions with all bidders, analyzed alternatives to restructure and rebid contract, prepared rebid recommendation letter to Township & Authority; and followed-up to MA meeting by revising insurance requirements and initiating other bid doc revisions, and preparing a re-bid project schedule; issued proposed re-bid schedule and bid restructuring info to Township for review; and prepared bid rejection letters to contractors. Phase 01 Total Effort To-Date = $8,576.75.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 1,329.50
Expense : 0.00
Phase Total : 1,329.50
Phase : 01 -- Tallmadge Drive Sewer Replacement
Total Phase : 01 -- Tallmadge Drive Sewer Replacement
Labor : 4,980.25
Expense : 0.00
Phase Total : 4,980.25
Amount Due This Invoice: $6,309.75
| Fee : | 18,000.00 |
|---|---|
| Prior Billings : | 10,015.75 |
| Current Billings : | 6,309.75 |
| Total Billings : | 16,325.50 |
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18001 -- 2018 General Services
Invoice # : 803813
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 6.00 | 123.00 | 738.00 |
| Senior Professional | 3.50 | 117.00 | 409.50 |
| Associate Professional | 2.00 | 91.00 | 182.00 |
| Labor Total: | 11.50 | 1,329.50 |
Total Phase : **** -- Professional Services
Labor : $1,329.50
Expense : $0.00
Phase : 01 -- Tallmadge Drive Sewer Replacement
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 13.00 | 123.00 | 1,599.00 |
| Senior Professional | 20.75 | 117.00 | 2,427.75 |
| Associate Professional | 9.50 | 91.00 | 864.50 |
| Sr. Engineering Technician | 1.00 | 89.00 | 89.00 |
| Labor Total: | 44.25 | 4,980.25 |
Total Phase : 01 -- Tallmadge Drive Sewer Replacement
Labor : $4,980.25
Expense : $0.00
Total Project : EGMAU18001 -- 2018 General Services
Labor : $6,309.75
Expense : $0.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. Page: 2
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 5/24/2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | 803813 | ||
| Invoice Period: | 4/16/2018 | to | 5/20/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 5/24/2018 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ 10,015.75 | ||
| Current Invoice: | $ 6,309.75 | ||
| Invoiced to Date ($): | $ 16,325.50 | ||
| Invoiced to Date (%): | 91% | ||
| Remaining Budget ($): | $ 1,674.50 | ||
| Remaining Budget (%): | 9% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 18,000.00 |
| Previously Invoiced: | $ 10,015.75 |
| Current Invoice: | $ 6,309.75 |
| Invoiced to Date ($): | $ 16,325.50 |
| Invoiced to Date (%): | 91% |
| Remaining Budget ($): | $ 1,674.50 |
| Remaining Budget (%): | 9% |
Comments: Phase **** Professional Services - Prepared May Engineer's Report, reviewed May RCSTP operator's report and MA agenda packet, and attended May MA meeting. Initiated analysis of RCSTP caustic soda trial sampling data following completion of study, discussed trial success and results with operator, and began preparation of trial summary letter.
Phase 01 Tallmadge Drive Sewer Replacement - Completed plans and bid document including updated PA One Call and field confirmation of depth and conditions of manholes to be connected to, finalized stone material acquisition approach with Township, administered construction solicitation on PennBID, responded to bidders' questions, prepared Addendum #1, conducted bid opening, prepared bid tabulation, evaluated bids being higher than expected including discussions with all bidders, analyzed alternatives to restructure and rebid contract, prepared rebid recommendation letter to Township & Authority; and followed-up to MA meeting by revising insurance requirements and initiating other bid doc revisions, and preparing a re-bid project schedule; issued proposed re-bid schedule and bid restructuring info to Township for review; and prepared bid rejection letters to contractors. Phase 01 Total Effort To-Date = $8,576.75.
Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
|
East Goshen Municipal Authority |
Invoice # : 803814 |
|---|
For Services Rendered through: 5/20/2018
Coordination with Township for analysis of instantaneous permanent meter data.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 61.50
Expense : 0.00
Phase Total : 61.50
Amount Due This Invoice: $61.50
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 2,440.50 |
| Current Billings : | 61.50 |
| Total Billings : | 2,502.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 123.00 | 61.50 |
| Labor Total: | 0.50 | 61.50 |
Total Phase : **** -- Professional Services
Labor : $61.50
Expense : $0.00
Total Project : EGMAU18002 -- 2018 I&I Support and Reports
Labor : $61.50
Expense : $0.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18002 Invoice Summary
Invoice Date 5/24/2018
| Project: | EGMAU18002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 I&I Support and Reports | ||
| Invoice No: | 803814 | ||
| Invoice Period: | 4/16/208 | to | 5/20/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 5/24/2018 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 2,440.00 | ||
| Current Invoice: | $ 61.50 | ||
| Invoiced to Date ($): | $ 2,501.50 | ||
| Invoiced to Date (%): | 23% | ||
| Remaining Budget ($): | $ 8,498.50 | ||
| Remaining Budget (%): | 77% |
Budget by Phase:
| Phase Name: | 2018 I&I Support and Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 2,440.00 |
| Current Invoice: | $ 61.50 |
| Invoiced to Date ($): | $ 2,501.50 |
| Invoiced to Date (%): | 23% |
| Remaining Budget ($): | $ 8,498.50 |
| Remaining Budget (%): | 77% |
Comments: Coordination with Township for analysis of instantaneous permanent meter data.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA May Financial Report
Date: June 7, 2018
In May, the Municipal Authority recorded $57 in income (a $71 transfer from the now closed capital account, offset by the cost of Positive Pay) and $1,787 in expenses (primarily annual fees to the Delaware River Basin Commission), for a negative variance of $1,730. To clarify, due to my oversight the Pennoni invoices approved at the May MA meeting were not processed until June. Therefore this report understates May expenses by $10,148.
In addition, earlier this week, I discovered a rather large discrepancy in the Sewer Operating Fund budget, fortunately one that works in the Township/MA’s benefit. Due to an error in the underlying debt service amortization schedule, the Township over-budgeted the principal payment on the 2008 MA note (for the Ridley Creek upgrade) by $187,000. As a result, it is likely that the Sewer Operating Fund will finish the year with a substantial surplus.
As of May 31st, the MA fund balance was $20,797, all of which is in the operating account.
EAST GOSHEN TOWNSHIP
Other Funds
May 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | 10 | 5 | (42.42) | (47.42) | 1 | (14.49) | (15.49) |
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 50 | 50 | 613.94 | 563.94 | 0.03 | 0.03 | |
| DCED GRANT | 07354 0400 | |||||||
| C.C. TAPPING FEES | 07364 1100 | 8,000 | ||||||
| R.C.TAPPING FEES | 07364 1110 | 2,000 | ||||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 1,692 | 1,127.52 | 1,127.52 | ||||
| MISCELLANEOUS REVENUE | 07380 1000 | 564.48 | 564.48 | |||||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | 71.30 | 71.30 | 71.30 | 71.30 | |||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 75,853 | 31,605 | 30,000.00 | (1,605.00) | 6,321 | (6,321.00) | |
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | |||||||
| TRANSFER FROM RCSTP BUDGET | 07392 0990 | |||||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | |||||||
| TOTAL REVENUE | 87,605 | 31,660 | 32,334.82 | 674.82 | 6,322 | 56.84 | (6,265.16) | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,411 | 8,102 | 8,160.33 | (58.33) | |||
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500 | 1,041 | 1,336.00 | (295.00) | 208 | 1,236.00 | (1,028.00) |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,384 | 9,384 | 9,400.00 | (16.00) | |||
| ENGINEERING SERVICES | 07424 3130 | 43,260 | 18,025 | 30,240.14 | (12,215.14) | 3,605 | 3,605.00 | |
| LEGAL SERVICES | 07424 3140 | 2,180.00 | (2,180.00) | 480.00 | (480.00) | |||
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | |||||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | |||||||
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | |||||||
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | |||||||
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | |||||||
Report Date 1805 06/07/18 1 : 08 PM
EAST GOSHEN TOWNSHIP
Other Funds
May 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | |||||||
| LOCHWOOD - CAPITAL -STP | 07424 7460 | |||||||
| LOCHWOOD-CAPITAL-COLLECT. | 07424 7470 | |||||||
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | |||||||
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | |||||||
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | |||||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | |||||||
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | |||||||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | |||||||
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | |||||||
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 142.50 | (142.50) | |||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | 59,736 | 59,736 | 102,339.08 | (42,603.08) | 59,736 | 59,736.00 | |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | 71.30 | (71.30) | 71.30 | (71.30) | |||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER SINKING FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 147,291 | 96,288 | 153,869.35 | (57,581.35) | 63,549 | 1,787.30 | 61,761.70 | |
| NET RESULT FROM OPERATIONS | (59,686) | (64,628) | (121,534.53) | (56,906.53) | (57,227) | (1,730.46) | 55,496.54 |
Report Date 1805 06/07/18 1 : 08 PM
May 2018 Municipal Authority Financial Report - YTD REVENUES & EXPENDITURES
January 1, 2018 Fund Balance 142,331.32
| Account # | Description | Per | Debits | Credits | Date | Description | Memo / Notes |
|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | ||||||
| 07341-1000 | INTEREST EARNINGS | 1801 | 0 | 0.31 | 2/2/2018 | INTEREST EARNED JANUARY 2018 | 07 FUND |
| 07341-1000 | INTEREST EARNINGS | 1802 | 0 | 0.2 | 2/14/2018 | INTEREST ADJ. FROM JAN.2018 | 7105.2 |
| 07341-1000 | INTEREST EARNINGS | 1802 | 0 | 0.54 | 3/5/2018 | INTEREST EARNED FEBRUARY 2018 | 07 FUND |
| 07341-1000 | INTEREST EARNINGS | 1803 | 15 | 0 | 3/6/2018 | REIMBURSE S/R FOR BANK FEES | INTEREST EARNINGS |
| 07341-1000 | INTEREST EARNINGS | 1803 | 0 | 0.47 | 4/2/2018 | INTEREST EARNED MARCH 2018 | 07 FUND |
| 07341-1000 | INTEREST EARNINGS | 1804 | 15 | 0 | 4/2/2018 | REIMB.S/R FOR 3/2018 BANK FEES | INTEREST EARNINGS |
| 07341-1000 | INTEREST EARNINGS | 1804 | 0 | 0.55 | 5/1/2018 | INTEREST EARNED APRIL 2018 | 07 FUND |
| 07341-1000 | INTEREST EARNINGS | 1805 | 15 | 0 | 5/1/2018 | REIMBURSMT- 4/2018 BANK FEES | INTEREST EARNINGS |
| 07341-1000 | INTEREST EARNINGS | 1805 | 15 | 0 | 6/1/2018 | BANK FEES - MAY 2018 | INTEREST EARNINGS |
| 07341-1000 | INTEREST EARNINGS | 1805 | 0 | 15 | 6/5/2018 | REVERSE TRX 63388 EXPENSE TO | BE ENTERED IN JUNE NOT MAY |
| 07341-1000 | INTEREST EARNINGS | 1805 | 0 | 0.51 | 6/1/2018 | INTEREST EARNED MAY 2018 | 07 FUND |
| 07341-1020 | BEGINNING BALANCE | ||||||
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 1801 | 0 | 391.64 | 2/2/2018 | INTEREST EARNED JANUARY 2018 | 07 FUND |
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 1802 | 0 | 69.31 | 3/5/2018 | INTEREST EARNED FEBRUARY 2018 | 07 FUND |
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 1803 | 0 | 81.66 | 4/2/2018 | INTEREST EARNED MARCH 2018 | 07 FUND |
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 1804 | 0 | 71.3 | 5/1/2018 | INTEREST EARNED APRIL 2018 | 07 FUND |
| 07341-1020 | INTEREST EARNED - CONSTRUCTION | 1805 | 0 | 0.03 | 6/1/2018 | INTEREST EARNED MAY 2018 | 07 FUND |
| 07364-1130 | BEGINNING BALANCE | ||||||
| 07364-1130 | CONNECTION FEES - SEWER | 1801 | 0 | 423 | 1/25/2018 | STOFFLET, MICHAEL | |
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | 0 | 423 | 2/13/2018 | JACOBS, ROBERT & CHERYL | |
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | 0 | 423 | 2/27/2018 | GEORGE SMITH & CHRISTINA CONLE | |
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | 282.24 | 0 | 2/13/2018 | ANNUAL PINE ROCK INSTALLMENT | JACOBS & STOFFLET INTEREST |
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | 141.12 | 0 | 2/27/2018 | ANNUAL PINE ROCK INSTALLMENT | |
| 07364-1130 | CONNECTION FEES - SEWER | 1803 | 0 | 423 | 3/23/2018 | PAPPANO, JOSEPH & PATRICIA | |
| 07364-1130 | CONNECTION FEES - SEWER | 1803 | 141.12 | 0 | 3/23/2018 | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO |
| 07380-1000 | BEGINNING BALANCE | ||||||
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | 0 | 282.24 | 2/13/2018 | ANNUAL PINE ROCK INSTALLMENT | JACOBS & STOFFLET INTEREST |
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | 0 | 141.12 | 2/27/2018 | ANNUAL PINE ROCK INSTALLMENT | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1803 | 0 | 141.12 | 3/23/2018 | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO |
| 07392-0100 | BEGINNING BALANCE | ||||||
| 07392-0100 | TRANSFER FROM GENERAL ACCT | 1805 | 0 | 71.3 | 6/7/2018 | XFER $ TO MA REGARDING DEPOSIT | ERROR 5/10/18 |
| 07392-0500 | BEGINNING BALANCE | ||||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 1803 | 0 | 30000 | 3/29/2018 | XFER $ FROM SEWER TO MUNICIPAL | TO COVER EXPENSES |
| 07424-1400 | BEGINNING BALANCE | ||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 1803 | 8160.33 | 0 | 3/26/2018 | EAST GOSHEN TOWNSHIP - GENERAL | 1ST QTR.2018 REIMBURSEMENT - MA |
| 07424-3000 | BEGINNING BALANCE | ||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1801 | 100 | 0 | 1/31/2018 | COMMONWEALTH FINANCING AUTHORITY | GRANT APPLIC. DCED - WATER & SEWER |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1805 | 1236 | 0 | 5/30/2018 | DELAWARE RIVER BASIN COMMISSION | ANNUAL FEE D-2000-030 CP WASTE |
| 07424-3110 | BEGINNING BALANCE | ||||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1803 | 6964 | 0 | 3/22/2018 | MAILLIE FALCONIERO & CO. | PROGRESS BILLING - M.AUTHORTY 2017 |
| Account # | Description | Per | Debits | Credits | Date | Description | Memo / Notes |
|---|---|---|---|---|---|---|---|
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1804 | 2436 | 0 | 4/17/2018 | MAILLIE FALCONIERO & CO. | EXAMINATION 2017 MA FINANCIAL STMTS |
| 07424-3130 | BEGINNING BALANCE | ||||||
| 07424-3130 | ENGINEERING SERVICES | 1801 | 12523.56 | 0 | 1/24/2018 | PENNONI ASSOCIATES INC. | SERV.THRU 12/10/17 2017 GENERAL |
| 07424-3130 | ENGINEERING SERVICES | 1802 | 5415 | 0 | 2/15/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 1/14/18 -2017 GENERAL |
| 07424-3130 | ENGINEERING SERVICES | 1802 | 552.5 | 0 | 2/22/2018 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/14/18 SUPPLEE VAL. |
| 07424-3130 | ENGINEERING SERVICES | 1803 | 11749.08 | 0 | 3/15/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 2/11/18 2018 GEN.SERV |
| 07424-3140 | BEGINNING BALANCE | ||||||
| 07424-3140 | LEGAL SERVICES | 1801 | 680 | 0 | 1/24/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICES DEC. 2017 GEN.AUTH. |
| 07424-3140 | LEGAL SERVICES | 1802 | 240 | 0 | 2/22/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - JAN.2018 GEN.AUTH. |
| 07424-3140 | LEGAL SERVICES | 1803 | 400 | 0 | 3/19/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - FEBRUARY 2018 |
| 07424-3140 | LEGAL SERVICES | 1804 | 380 | 0 | 4/17/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE 3/12/18 |
| 07424-3140 | LEGAL SERVICES | 1805 | 480 | 0 | 5/16/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - APRIL 2018 GEN.AUTH |
| 07428-1000 | BEGINNING BALANCE | ||||||
| 07428-1000 | RESERVOIR PUMP STATION - ENGINE | 1802 | 142.5 | 0 | 2/22/2018 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/14/18 RESERV.RD PS |
| 07429-6100 | BEGINNING BALANCE | ||||||
| 07429-6100 | WEST GOSHEN CAPITAL | 1801 | 30050.7 | 0 | 1/24/2018 | WEST GOSHEN SEWER AUTHORITY | 16.67% OF COST - ENHANCED CHEMICAL |
| 07429-6100 | WEST GOSHEN CAPITAL | 1802 | 3664.01 | 0 | 2/22/2018 | WEST GOSHEN SEWER AUTHORITY | 16.67% - ENHANCED CHEMICAL ADDITION |
| 07429-6100 | WEST GOSHEN CAPITAL | 1803 | -3664.01 | 0 | 3/15/2018 | WEST GOSHEN SEWER AUTHORITY | VOID CK. 2017 |
| 07429-6100 | WEST GOSHEN CAPITAL | 1804 | 72288.38 | 0 | 4/13/2018 | WEST GOSHEN SEWER AUTHORITY | 2017 SEWER SYSTEM REPAIR PROJECT |
| 07492-0100 | BEGINNING BALANCE | ||||||
| 07492-0100 | TRANSFER TO GENERAL FUND | 1805 | 71.3 | 0 | 5/10/2018 | EAST GOSHEN TOWNSHIP - GENERAL | XFER TO GENERAL TO CLOSE ACCOUNT |
May 31, 2018 Fund Balance 20,796.79
Jon Altshul
From: Michael Ellis <[illegible]>
Sent: Wednesday, June 06, 2018 11:14 PM
To: rsmith@eastgoshen.org; Mark Miller (mmiller@eastgoshen.org)
Cc: Jon Altshul; Eric Jenson
Subject: Tallmadge Drive Sewer - Insurance Spec Revisions
Attachments: EGMA Updated Contractor Insurance_TALLMADGE.pdf
Hi Rick and Mark,
We propose revised insurance requirements for the subject project’s re-bid package as discussed in concept at the May MA meeting and in detail with Mark on Tuesday. These revised requirements are slightly different than the version we sent a few weeks ago. Please review and advise if these are acceptable.
The revisions are based upon discussions with a local insurance broker for municipalities, including revisions to coverage amounts based on the specific project size and risks (fairly limited) as well as revised terminology to be consistent with updated industry standards.
The attachment is an updated version of the insurance requirements specifically proposed for this project. There are highlighting and comments to describe all the changes made from the original insurance requirements for ease of review. Two of the coverages for General Liability are proposed at $1M instead of the more common $2M in an effort to open the project to smaller contractors and to hopefully drive down bid prices. See below:
Commercial General Liability:
| Standard | Tallmadge | |
|---|---|---|
| General Aggregate | $2,000,000 | $1,000,000 |
| Products/Completed Operations Aggregate | $2,000,000 | $1,000,000 |
Additionally, it was mentioned at the MA meeting that we consider reducing the financial rating requirements of insurance companies (currently requiring A- and Class VII or higher) in order to reduce bid prices. We discussed this with the insurance broker, and he strongly advised that they not be reduced, as the increased risk from using a lower rated company can significantly outweigh any cost savings.
Please feel free to call or email with any comments or questions. We can then finalize the re-bid package.
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | [illegible]
1
- CONTRACTOR'S INSURANCE Prior to the commencement of any work under the Contract and until completion and final payment is made for the work, the CONTRACTOR shall, at its expense, maintain the following insurance on its behalf, with an insurance company or companies having an A.M. Best Rating of “A-: Class VII” or better and furnish to the OWNER Certificates of Insurance evidencing the same. The term CONTRACTOR as used in these Insurance requirements shall mean to include SUBCONTRACTORs, including Suppliers, Manufacturers, Vendors, etc. of every tier. The CONTRACTOR shall either: a) require each SUBCONTRACTOR to procure and maintain during the life of the Contract, insurance of the type and in the same amounts as specified; or b) Insure the activities of his SUBCONTRACTORs in his own policy. Three (3) original copies of all Certificates must be provided. Umbrella Policies shall spell out the primary coverage to which the excess coverage will apply. Only certificates of insurance from companies licensed to do business in the state where the Owner is located will be approved. Prior to the commencement of work, CONTRACTOR shall file Certificates of Insurance with the OWNER which shall be subject to the OWNER’s approval of adequacy of protection and character of the insurer. Certificate shall include project description and Contract number. All contractors/suppliers are required to procure and maintain the following insurance coverages. (a) Compensation Insurance The contractor/supplier must maintain during the life of the contract Workers' Compensation and Employer's Liability insurance in the State in which the Work is being performed. Workers’ Compensation: Coverage must be in accordance with statutory requirements. Employers Liability Limits not less than: Bodily Injury by Accident $100,000 Each Accident Bodily Injury by Disease $100,000 Each Employee Bodily Injury by Disease $500,000 Policy Limit Commented [EJ1]: Reduced from $500,000 to $100,000, per minimum federal statutory values. (b) Commercial General Liability The CONTRACTOR must maintain during the life of this Contract Commercial General Liability insurance: including Premises – Operations, Contractors, Products/Completed Operations, Broad Form Property Damage, Contractual Liability (including Liability for Employee Injury assumed under a Contract) and Explosion, Collapse and Underground Coverages. Occurrence form with the following minimum limits:
| General Aggregate | $1,000,000 |
|---|---|
| Products/Completed Operations Aggregate | $1,000,000 |
| Each Occurrence | $1,000,000 |
| Personal and Advertising Injury | $1,000,000 |
| Damage to Rented Premises | $100,000 |
| Medical Expense (any one person) | $5,000 |
Commented [EJ2]: Reduced from $2,000,000 to $1,000,000 for Tallmadge Drive. Retain the original $2,000,000 value for all other standard contracts.
Commented [EJ3]: Renamed from “Fire Damage” to use modern terminology for clarity.
Products/Completed Operations Coverage must remain in effect for a minimum of two (2) years after Final Payment.
The General Aggregate Limit must apply on a per project basis.
(c) Automobile Liability
The CONTRACTOR must maintain during the life of this contract Liability Insurance for all vehicles operating on Owners property including all owned, hired and Non-owned vehicles. Coverage shall include Contractual Liability including Liability for Employee Injury assumed under a Contract.
Per Accident Combined Single Limit $1,000,000
(d) Commercial Umbrella Liability
| Occurrence Limit | $1,000,000 |
|---|---|
| Aggregate Limit (where applicable) | $1,000,000 |
Commented [EJ4]: Reduced from $2,000,000 to $1,000,000.
Policy to apply excess of the Commercial General Liability (following form per Project Limit), Commercial Automobile Liability and Employers Liability Coverages.
(e) Deductibles of Self Insured Retentions
None of the policies of the insurance required of the CONTRACTOR by this CONTRACT shall contain deductibles or self-insurance retentions in excess of $5,000.
Commented [EJ5]: Increased to $5,000 from $0.
(f) Financial Rating of Insurance Companies
A.M. Best Rating: A- (Excellent) or Higher
A.M. Best Financial Size Category: Class VII or Higher
The OWNER, its officers, agents, and employees; the ENGINEER; and any other contractor that the OWNER may be obligated to defend and indemnify in the Contract shall be added as additional insureds on all liability policies. With respect to General Liability, additional insured status shall include coverage for both ongoing operations and completed operations using CG 20 26 11/85 or equivalent.
CONTRACTOR’s insurance shall be endorsed to reflect its primary and non-contributory for the OWNER and all other additional insureds named in the Contract.
CONTRACTOR’s insurance shall not be cancelled, materially changed or renewed without at least 30 days advance written notice to the OWNER by certified mail return receipt requested.
Waiver of Rights of Recovery and Waiver of Rights of Subrogation
The CONTRACTOR waives all rights of recovery against OWNER and all additional insureds for the
loss or damage covered by any of the insurance maintained by the CONTRACTOR pursuant to this Contract.
The CONTRACTOR and their insurance carriers hereby waive all rights of subrogation against OWNER and all additional insureds for loss or damage covered by any of the insurance maintained by the CONTRACTOR pursuant to this Contract.
If any policies of insurance under this Contract require an endorsement to provide for the waiver of subrogation set forth above, then named insureds of such policies will cause them to be so endorsed.
The amount of insurance provided in the aforementioned coverages shall not be construed as a limitation of the liability on the part of the CONTRACTOR.
Any type of insurance or any increase in limits of liability not described above which the CONTRACTOR requires for its own protection or on account of statute shall be its own responsibility and at its own expense.
The carrying of insurance shall in no way be interpreted as relieving the CONTRACTOR of any responsibility or liability under the Contract.
- SPECIAL COVERAGE TERMS All Contractors employing mechanical digging devices or requiring blasting must procure and maintain underground and/or blasting liability insurance for the period of time work is in progress. Limits shall be the same as required under Public Liability and Property Damage herein before specified.; Owner Protective Coverages All policies other than Workers’ Compensation shall name Owner and Engineer, and their officers, agents, and employees as additional insureds on a primary and noncontributory basis, including for completed operations. All policies shall provide a waiver of subrogation in favor of the additional insured parties. Contractor shall provide an insurance certificate evidencing the required coverages, with copies of the Additional Insured endorsement(s), Waiver of Subrogation, and Notice of Cancellation (if applicable) endorsements attached.; Fire Insurance (DELETED); Railroad Insurance (DELETED); Contractors Pollution Liability Insurance The Contractor shall take out and maintain during the life of this Contract, Pollution Liability Insurance upon all work included in Contract against pollution, explosion, soil, groundwater, or surface water contamination and any other violation of the Laws of the Commonwealth. The Contractor shall further indemnify and hold harmless the Owner and Engineer. Contractors Pollution Liability insurance shall be at a minimum limit of $2,000,000. The policy shall have a deductible of no more than $5,000. If coverage is provided on a claims-made basis, an Extended Reporting Period, or tail coverage, shall be provided for two (2) years following completion of the project. The policy retroactive date shall be no later than the effective date of this Agreement. Commented [EJ6]: Decreased to $2,000,000 from $3,000,000.
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
FYI
June 6, 2018
Dear Resident or Property Owner:
As you may recall, the Township developed and adopted the Paoli Pike Corridor Mater Plan in 2017. One recommendation of that Plan was to develop a zoning overlay district for the corridor. This overlay district will establish ordinances and design standards needed to implement the goals of the Paoli Pike Corridor Master Plan. East Goshen Township would like to receive your input during the process of amending our zoning ordinances, development regulations, and design standards for future development and redevelopment along the Paoli Pike Corridor.
The Board of Supervisors has tasked the Township Planning Commission with developing the “Goshenville Overlay District”, which will include zoning ordinance amendments and design standards. Thomas Comitta Associates Inc., a local professional municipal planning firm, has been hired by the Township to guide and direct this planning effort. Thomas Comitta Associates Inc. (TCA) has been working with the Township for a number of years on various planning initiatives.
You have received this letter because your property is located within 1000’ of the proposed zoning overlay district where these regulations will apply. The Township Planning Commission will hold public meetings on the following dates to discuss this planning effort:
June 20, 2018 at 7 PM
July 18, 2018 at 7 PM
August 15, 2018 at 7 PM
September 19, 2018 at 7 PM (if needed)
All these meetings are open to the public and public participation is encouraged. If you have any questions please call or email me at mgordon@eastgoshen.org. The Paoli Pike Corridor Master Plan is available for review at the Township Building and posted on the Township website; (www.eastgoshen.org). If any person who wishes to attend the meetings has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate, he or she should contact the Township Building at (610) 692-7171, to discuss how those needs may be accommodated.
Sincerely,
Mark A. Gordon
Township Zoning Officer
Would you like more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org., and click the “E-notification & Emergency Alert” button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones informed and safe during emergencies. Visit www.readychesco.org to sign up today!
F:\Data\Shared Data\Admin Dept\Township Code\Paoli Pike Overlay TND Ord\PP TND Overlay Dist. 1000' ltr 06062018.doc
Brickhouse Environmental
FYI
ANNUAL GROUNDWATER MONITORING REPORT
APPLEBROOK GOLF COURSE SPRAY IRRIGATION SYSTEM
WATER QUALITY MANAGEMENT PERMIT NO. 1500410
PREPARED FOR:
MR. RICK SMITH, TOWNSHIP MANAGER
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PENNSYLVANIA 19380
FOR SUBMITTAL TO:
MR. PETER EVANS, P.G.
PLANNING SECTION
PA DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
WASTE MANAGEMENT PROGRAM
2 EAST MAIN STREET
NORRISTOWN, PENNSYLVANIA 19401-4915
BE PROJECT NO. 13-2998-0
APRIL 26, 2018
PREPARED BY:
BRICKHOUSE ENVIRONMENTAL
515 SOUTH FRANKLIN STREET
WEST CHESTER, PENNSYLVANIA 19382
610.692.5770
ANTHONY NICOLARDI
PROJECT SCIENTIST II
PAUL WHITE, P.G.
MANAGING PARTNER
Brickhouse Environmental
TABLE OF CONTENTS
| Section | Page |
|---|---|
| 1.0 Introduction | 1 |
| 1.1 Contact Information | 1 |
| 2.0 Site Information | 1 |
| 3.0 Monitoring Wells | 2 |
| 4.0 Site History | 2 |
| 5.0 Site Data | 4 |
| 5.1 Effluent Data | 4 |
| 5.2 Quarterly Groundwater Monitoring | 4 |
| 6.0 Conclusions | 5 |
Figure 1 Well Location Map
Table 1 Groundwater Elevation Summary
Table 2 Groundwater Analytical Results
Appendix A Laboratory Analytical Data
AJN/CLR/PW/cee
J:Z998.0\Reports8.03.Applebrook.Annual.Report.to.PADEP.docx
Brickhouse Environmental
MR. PETER EVANS, P.G.
PA DEPT. OF ENVIRONMENTAL PROTECTION
APPLEBROOK SPRAY IRRIGATION SYSTEM/ANNUAL REPORT
BE PROJECT NO. 13-2998-0
1.0 INTRODUCTION
This annual groundwater monitoring report has been prepared to document quarterly monitoring at the Applebrook Golf Course Spray Irrigation System (Site) in association with Water Quality Management Permit No. 1500410 Amendment 1, issued February 21, 2012. The permittee is the East Goshen Municipal Authority, and the Site is located at 100 Township Line Road in Malvern, Pennsylvania. The permit approves the diversion of as much as 135,000 gallons per day (GPD) of treated effluent from the Ridley Creek Sewage Treatment Plant, to a 5-million gallon capacity lagoon located in the center of the golf course. The effluent can be stored in this lagoon for subsequent use in the irrigation of the 60-acre golf course. Brickhouse Environmental has been contracted by the East Goshen Municipal Authority to conduct the quarterly groundwater sampling of the three monitoring wells located on the Site; MW-1, MW-2, and MW-3.
1.1 Contact Information
Permittee:
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
(Phone) 610-692-7171
(Fax) 610-692-8950
Contact: Mr. Mark Miller
Operator: Same as Permittee
Consultant:
Brickhouse Environmental
515 South Franklin Street
West Chester, PA 19382
(Phone) 610-692-5770
(Fax) 610-692-8650
Contact: Mr. Anthony Nicolardi/Mr. Paul White, P.G.
2.0 SITE INFORMATION
The bedrock beneath the Site is described as felsic gneiss, granulite facies (Geology, Hydrology, and Groundwater Quality of Chester County, Pennsylvania, Sloto, 1994). Groundwater is stored and moves in the intergranular openings within the saprolite and through the connected fractures and joints of the unweathered rock below. Groundwater typically flows from higher elevations to lower elevations, where it discharges as baseflow to streams and other perennial surface water bodies.
APRIL 26, 2018 PAGE 1
Brickhouse Environmental
MR. PETER EVANS, P.G.
PA DEPT. OF ENVIRONMENTAL PROTECTION
APPLEBROOK SPRAY IRRIGATION SYSTEM/ANNUAL REPORT
BE PROJECT NO. 13-2998-0
3.0 MONITORING WELLS
According to the 2010 Comprehensive Groundwater Report prepared by Pennoni Associates Inc., the three monitoring wells were installed on January 15, 2001. All three wells are on Township property to ensure accessibility. A map depicting the locations of the monitoring wells is attached as Figure 1. The wells were drilled into the saprolite to depths ranging from 12 to 15 feet below grade.
No well casing survey data relative to the well elevations were found in historical documents. Because of this, Brickhouse Environmental used the Chester County 2-foot interval digital topographic contour mapping and field measurements of the well casing stickups, to estimate top of casing elevations. These elevations and other characteristics of the wells can be found on Table 1. All wells are 4 inches in diameter, and total depths range from 12 to 15 feet below grade. The wells have 10 feet of PVC screen, followed by PVC riser. Shallow groundwater is intercepted by each well with static water levels ranging from approximately 4 to 7 feet from the top of the inner casing.
Groundwater on the Site is expected to flow from east to west, following existing grade, and eventually discharging to Ridley Creek as diffuse flow to surface water. Ridley Creek runs along the western border of the Site from north to south. Monitoring well MW-1 is located at the far northern corner of the Site, remote from the areas receiving the water from the lagoon. This well is considered background groundwater data in relation to the Site spray activities. Monitoring wells MW-2 and MW-3 are both located on the southwest portion of the Site. These wells are located downgradient of the spray area and lagoon, and are used to monitor water quality associated with water migrating from the spray fields.
Background water quality data collected prior to utilization of the spray field was collected in March, June, August, and December of 2003. This data is summarized in Table 2 as background ranges.
4.0 SITE HISTORY
- April 10, 2000: Engineers Design Report for WQ Part II Permit Application for Applebrook Site Pumping Station & Force Main
- August 10, 2000: Permit No. 15000410 issued for construction of diversion from Ridley Creek Sewage Treatment Plant
- September 28, 2000: Permit No. PA0050504 Amendment No. 1 issued with effluent limits for 135,000 GPD diversion
- April 14, 2002: Applebrook Golf Course Pump Station Amendment Application
APRIL 26, 2018 PAGE 2
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Brickhouse Environmental
Mr. Louis F. Smith, Jr.
East Goshen Municipal Authority
Applebrook Golf Course Spray Irrigation System
WQM Permit No. 1500210
- December 18, 2002: Amend Permit No. 1500210-A1 issued establishing the conditions for spray irrigation application rate and monitoring, including special conditions under drought warning
- November 20, 2009: Letter from Pennsylvania Department of Environmental Protection (PADEP) notifying that future monitoring results are to be provided in "Annual Groundwater Reports" and that a "Comprehensive Groundwater Evaluation" is to be provided with a permit renewal application
- 2002 to 2009: Treated wastewater effluent sent to the golf course at or below the permitted rate of 135,000 GPD
- August 11, 2010: Letter to PADEP stating that "Comprehensive Groundwater Evaluation" will be prepared to maintain the active status of the permit
- December 2010: First Comprehensive Groundwater Evaluation report submitted to PADEP
- February 21, 2012: Permit No. 1500210 A-1 issued
- July 22, 2013: Letter to PADEP explaining reason for not conducting quarterly monitoring, and that the spray system has not been utilized since the permit was issued in February 2012
- September 11, 2013: Letter to PADEP documenting that quarterly monitoring was initiated on August 6, 2013
- October 29, 2013: PADEP letter acknowledging receipt of September 11, 2013 letter
- March 2014: Annual Groundwater Report prepared by Brickhouse Environmental
- April 22, 2014: PADEP letter acknowledging receipt and approval of Annual Report
- March 2015: Annual Groundwater Report prepared by Brickhouse Environmental
- May 5, 2015: PADEP letter acknowledging receipt of Annual Report
- May 2015 to October 2015: Treated wastewater effluent was sent from the Ridley Creek Sewage Treatment Plant to the Applebrook irrigation lagoon at an average rate of 113,804 GPD
- March 2016: Annual Groundwater Report prepared by Brickhouse Environmental
June 28, 2016 Page 2
Brickhouse Environmental
MR. PETER EVANS, P.G.
PA DEPT. OF ENVIRONMENTAL PROTECTION
APPLEBROOK SPRAY IRRIGATION SYSTEM/ANNUAL REPORT
BE PROJECT NO. 13-2998-0
- September 18, 2002: Amend Permit No. 15000410 issued establishing the conditions for spray irrigation application rates and monitoring, including special conditions under drought warning
- November 20, 2008: Letter from Pennsylvania Department of Environmental Protection (PADEP) notifying that future monitoring results are to be provided in “Annual Groundwater Reports” and that a “Comprehensive Groundwater Evaluation” is to be provided with a permit renewal application
- 2008 to 2009: Treated wastewater effluent was sent to Applebrook at or below the permitted rate of 135,000 GPD
- August 11, 2010: Letter to PADEP stating that “Comprehensive Groundwater Evaluation” will be prepared to maintain the active status of the permit
- December 2010: First Comprehensive Groundwater Evaluation report submitted to PADEP
- February 21, 2012: Permit No. 15000410 A1 issued
- July 22, 2013: Letter to PADEP explaining reason for not conducting quarterly monitoring, and that the spray system has not been utilized since the permit was issued in February 2012
- September 11, 2013: Letter to PADEP documenting that quarterly monitoring was initiated on August 6, 2013
- October 23, 2013: PADEP letter acknowledging receipt of September 11, 2013 letter
- March 2014: Annual Groundwater Report prepared by Brickhouse Environmental
- April 22, 2014: PADEP letter acknowledging receipt and approval of Annual Report
- March 2015: Annual Groundwater Report prepared by Brickhouse Environmental
- May 5, 2015: PADEP letter acknowledging receipt of Annual Report
- May 2015 to October 2015: Treated wastewater effluent was sent from the Ridley Creek Sewage Treatment Plant to the Applebrook irrigation lagoon at an average rate of 118,804 GPD
- March 2016: Annual Groundwater Report prepared by Brickhouse Environmental
APRIL 26, 2018 PAGE 3
Brickhouse Environmental
MR. PETER EVANS, P.G.
PA DEPT. OF ENVIRONMENTAL PROTECTION
APPLEBROOK SPRAY IRRIGATION SYSTEM/ANNUAL REPORT
BE PROJECT NO. 13-2998-0
- July 6, 2016: PADEP letter approving March 2016 Annual Groundwater Report
- April, 2017: Annual Groundwater Monitoring Report prepared by Brickhouse Environmental
- June 28, 2017: PADEP letter approving April 2017 Annual Groundwater Report
5.0 SITE DATA
5.1 Effluent Data
The Operator reports that 29,481,476 gallons of treated wastewater effluent was sent from the Ridley Creek Sewage Treatment Plant to Applebrook Golf Course lagoon during the period March 1, 2017 through February 28, 2018. The average daily volume pumped during the period was equal to 121,824 gallons. The maximum volume pumped to the course was recorded in December 2017, when an average of 155,984 gallons of effluent was pumped per day.
The effluent was mixed with existing groundwater and surface water sources, and used for golf course irrigation.
5.2 Quarterly Groundwater Monitoring
Brickhouse Environmental began quarterly groundwater sampling events on August 6, 2013. Prior to that, the last time the wells were sampled was June 1, 2009. During this report period, Brickhouse Environmental collected quarterly groundwater samples on May 30, 2017; August 8, 2017; November 21, 2017; and February 20, 2018.
Static water levels were measured in each well prior to aquifer manipulation (Table 1). All three wells were then purged using a variable speed submersible pump of at least three well volumes, or until field parameters stabilized. Samples were then collected from the upper 5 feet of the water column using disposable single use polyethylene bailers. All samples were immediately placed on ice to aid in sample preservation, and transported under chain of custody to a Pennsylvania Certified Analytical laboratory. All samples from this reporting period were analyzed by Suburban Testing Labs of Reading, Pennsylvania. One quality assurance/quality control (QA/QC) sample was collected in the form of a duplicate sample. This sample was labeled MW-4 and is a duplicate of MW-2. The complete laboratory analytical reports are included as Appendix A.
Analytical results were then compared to historical data, to look for possible trends in groundwater quality. All of the current sampling results are presented on Table 2, along with the background sampling ranges from 2003.
APRIL 26, 2018 PAGE 4
Brickhouse Environmental
MR. PETER EVANS, P.G.
PA DEPT. OF ENVIRONMENTAL PROTECTION
APPLEBROOK SPRAY IRRIGATION SYSTEM/ANNUAL REPORT
BE PROJECT NO. 13-2998-0
Field observations and laboratory analytical results collected during this period (May 30, 2017 through February 20, 2018) were generally similar to those obtained during recent sampling events. Static water levels remain within historic ranges. Alkalinity in the background well MW-1 remains higher than original background ranges, but no increasing trend has been observed since our monitoring began in 2013. Nitrite, Ammonia, and Phosphorous remain largely undetected in each of the three monitoring wells. Nitrate concentrations remain very low, with the highest concentration reported to date in well MW-2 at 3.2 mg/L in May 2014. Dissolved solids and Turbidity are variable through time, but generally remain within background ranges.
Overall groundwater quality is considered typical of shallow overburden groundwater quality in Chester County. No clear increasing or decreasing trends have been identified. None of the fluctuations in groundwater quality are believed to be associated with the spray irrigation system.
6.0 CONCLUSIONS
No evidence has been identified indicating that the spray irrigation system at Applebrook Golf Course is having any effects on groundwater quality. Brickhouse Environmental will continue quarterly sampling of the monitoring well network and provide the PADEP with an annual report, as outlined in Sewerage Permit No. 1500410, no later than April 30, 2019.
APRIL 26, 2018 PAGE 5
Brickhouse Environmental
FIGURE
AND
TABLES
Aerial topographic map showing monitoring well locations (MW-1, MW-2, MW-3), groundwater flow directions, topographic contours, and static water levels at Applebrook Golf Course Spray Fields and Ridley Creek STP.
WELL LOCATION MAP (WITH FEBRUARY 14, 2017 STATIC WATER LEVELS)
Title Block
- BRICKHOUSE ENVIRONMENTAL - PROFESSIONAL GEOLOGISTS, SCIENTISTS AND ENGINEERS, 515 S. FRANKLIN STREET, WEST CHESTER, PA 19382, PHONE: 610.692.5770, FAX: 610.692.8650, WWW.BRICKHOUSE-ENVIRONMENTAL.COM
- FIGURE 1
- RIDLEY CREEK STP / APPLEBROOK GC SPRAY FIELDS
- PROJECT: 13-2998-0
- FILE NO.: 132998.WL.02-17
- DATE: 3/21/17
- SCALE: 1"=400'
Map Labels and Monitoring Wells
- TOWNSHIP LINE ROAD
- APPLEBROOK GOLF COURSE
- TREATED WASTEWATER LAGOON
- RIDLEY CREEK
- PAOLI PIKE
- Contour elevations: 400, 450
- MW-1: 409.40 (02/14/2017)
- MW-2: 389.31 (02/14/2017)
- MW-3: 387.29 (02/14/2017)
Legend and Notes
- ASSUMED GROUNDWATER FLOW DIRECTION
- EXISTING MONITOR WELL WITH GROUNDWATER ELEVATION AND MEASUREMENT DATE
- RIDLEY CREEK
- TOPOGRAPHIC CONTOUR 5' INTERVAL
- TOPOGRAPHIC CONTOUR 1' INTERVAL
- DVRPC 2010 DIGITAL ORTHOIMAGERY
- PAMAP PROGRAM, 2010, PENNSYLVANIA DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES, BUREAU OF TOPOGRAPHIC AND GEOLOGIC SURVEY