Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
August 13, 2018
7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report.; Pennoni Engineer's Report.; Big Fish Environmental Report.
  4. APPROVAL OF MINUTES July 9, 2018
  5. APPROVAL OF INVOICES Pennoni Invoice's - None Gawthrop Greenwood Invoice #197989                              $ 300.00
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS July Financial Report; Proposed Sewer Capital Improvement Program update 8-8-18
  8. OLD BUSINESS Memo on West Goshen Sewer Plant Work
  9. GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de; Continue to implement the I&I Plan – 3-8-2018 completed; Submit articles for the newsletter - none
  10. NEW BUSINESS Tallmadge Drive Award Recommendation

F:\Data\Shared Data\Agendas\Municipal Authority\2018\8-13-18 - .doc

  1. CAPACITY REQUESTS
  2. ANY OTHER MATTER
  3. CORRESPONDENCE AND REPORTS OF INTEREST
  4. PUBLIC COMMENT
  5. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2018\8-13-18 - .doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 9, 2018

To: Municipal Authority

From: Mark Miller

Re: July 2018 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 746,000 gallons per day. No problems to report.

Meters: The meters are being read on a daily basis, no problems to report.

C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We had no problems with the collection system. We had a sewer clog on 1616 Margo Lane, lateral clog and lateral repair.

R.C. Collection: The pumping station was visited on a daily basis with no problems to report. As part of our routine maintenance we televised and cleaned Tallmadge Drive this will keep up until the line is replaced. As part of our repaving program we replaced 14 castings and lids in the Hadleigh development off of Greenhill Road.

Ridley Creek: The channel was cleaned in the screen building. While we were there we washed the walls down and did general cleanup of the interior of the building. We pulled the pumps on the empty SBR tank and sent them to Deckman Electric to be checked over. Last month there was a discussion about the blower that went down. The blower was fine the problem was with the blowers rebuilt, we expended the plant but the motors were checked but did not require repairs in 2009. The blower building has two exhaust fans that run continually. We installed an air conditioner in the small motor control room last year which has helped to cool that equipment. I don’t see the need to do any other ventilation work in the main blower room.

Alarms: We responded to 15 alarms for June which were all various issues.

PA One Calls: We received 97 PA One calls in June.

Rainfall: July rainfall total was 7.80

[Photograph showing workers in high-visibility shirts cleaning a channel in the screen room using equipment and hoses.]

Cleaning Channel in Screen Room

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT

August 8, 2018

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – We are analyzing study data in coordination with Big Fish. Upon receipt of their analysis, a summary report will be issued, tentatively by the end of August.
  • SBR coatings – We performed a visual inspection of the SBR #2 wall coatings, and our structural engineer performed a visual observation of the condition of the concrete. A memo will be issued summarizing the structural evaluation. The coating is experiencing more blistering than prior tanks, including a number of coating locations that were repaired when this tank was last offline. A meeting is tentatively scheduled at the site on August 22 to determine the repair approach with Pennoni, Dutchland, Mark Miller, and Kevin Cummings. Under the expectation that repairs can be made within one month thereafter, it is our understanding that the next tank will be taken offline around November. It is our understanding that the warranty expires in October 2019.
  • Influent metering – We performed a very cursory evaluation of influent metering alternatives since the "field meter", which is located in a manhole in the wetlands and measures flow prior to recycle, had been reading 100,000-200,000 gpd too high for the prior approximately two months. Mark Miller advised us that the meter was inspected about one month ago, and a large spider nest was found on top of the meter. This would cause the meter to read an incorrectly high flow depth and calculate a resultant higher flow rate. We have not reviewed recent flow data, but it is our understanding that metered flows have decreased since the maintenance. We are not aware of any other significant issues with this meter over the past several years. We were also informed that the metering company had recommended this location because it was the closest existing manhole/vault to the plant with adequate slope, straight-through piping, and non-turbulent conditions. There are several alternatives that could be evaluated in more detail for the influent metering: Continue with the meter as-is, and ensure adequate maintenance is regularly performed.; Item #1 plus add cellular connectivity so that metered flow can be regularly monitored online for abnormalities by the Township, Pennoni, and/or Big Fish.; Installation of a manhole/vault with meter inside the fence line upstream of the screen building; however, there were apparent prior concerns about this location due to the flatness of the pipe and solids build-up that occurs.; Installation of a manhole with meter between the screen building and the influent pump station, but there may not be an adequate distance of straight pipe diameters in this area for a meter to function property.; Abandonment of the existing field meter and installation of a meter on the recycle piping. The recycle flow could then be subtracted from the influent pump station flow to determine non-recycle influent flow as required by PADEP. This is generally not recommended since PADEP has directed metering be on the influent piping.

EGMAU18001          August 8, 2018          Page 2
East Goshen Municipal Authority          Engineer's Report

RCSTP and Pump Stations' O&M Manual

  • We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.

Supplee Valley Pipe Lining

  • SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order.
  • They performed the injection grouting of leaks in two manholes on August 3. We are still awaiting a schedule for the remaining two lateral spot repairs that were previously approved via change order.

Barkway Pump Station Grinder

  • We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter. No update since our last report.

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Lane, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • Bids were received on August 7, and a bid tabulation was submitted to the Township. We are processing bids will provide an award recommendation letter prior to the August MA meeting.

I&I Support and Reporting

  • We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at a MA meeting immediately thereafter. No update since our last report.

New Connections

  • No activity since last report.

West Goshen Sewer System Consultation

  • No activity since last report.

Capital Improvement Planning

  • We reviewed the 5-year capital improvement plan budget and provided comments to the Township.

P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-08-08.docx

East Goshen Municipal Authority
Tabulation of Bids Received by 2:00 PM on August 7, 2018
Contract No. TD-2018-2: Tallmadge Drive Sewer Replacement

ITEM NUMBER DESCRIPTION ESTIMATED QUANTITY/UNIT Iron Eagle Excavating
35 Ann Street
Highspire, PA 17034
(717) 821-3863
Business Contracting Solutions, LCC
220 Park Avenue
Chambersburg, PA 17201
(717) 360-9427
Pipeline Excavating, Inc
8 West Garrison Road
Brookhaven, PA 19015
(610) 876-1119
Eagle Contracting Inc.
418 Fairmont Drive
Chester Springs, PA 19425
(610) 496-8254
Ron Smith Inc.
559 Trestle Place
Downingtown, PA 19335
(610) 873-3940
Total Site Development, Inc.
433 W. Market St., Suite 13
West Chester, PA 19382
(610) 429-5800
UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT
BASE BID
1 Sanitary Sewer Bypass Pumping and Flow Control 1 L.S. $4,500.00 $4,500.00 $5,000.00 $5,000.00 $10,500.00 $10,500.00 $3,900.00 $3,900.00 $5,500.00 $5,500.00 $30,530.00 $30,530.00
2 Furnish and Install Precast Concrete Manhole 1 EA. $6,500.00 $6,500.00 $7,500.00 $7,500.00 $6,500.00 $6,500.00 $7,500.00 $7,500.00 $8,757.20 $8,757.20 $14,425.00 $14,425.00
3 Furnish and Install 8" Dia. SDR26 PVC Gravity Sewer Pipe 527 L.F. $124.50 $65,611.50 $91.00 $47,957.00 $120.00 $63,240.00 $160.75 $84,715.25 $225.66 $118,922.82 $175.34 $92,404.18
4 Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral 40 L.F. $100.00 $4,000.00 $137.50 $5,500.00 $85.00 $3,400.00 $95.00 $3,800.00 $255.00 $10,200.00 $300.00 $12,000.00
5 Connection to Existing Sanitary Sewer Manholes 1 L.S. $3,000.00 $3,000.00 $6,500.00 $6,500.00 $2,500.00 $2,500.00 $3,500.00 $3,500.00 $5,500.00 $5,500.00 $14,000.00 $14,000.00
6 Demolition of Drop Connection Concrete Encasement 1 C.Y. $400.00 $400.00 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $7,500.00 $7,500.00 $6,600.00 $6,600.00 $15,500.00 $15,500.00
7 Miscellaneous Excavation and Backfill 20 C.Y. $10.00 $200.00 $380.00 $7,600.00 $35.00 $700.00 $35.00 $700.00 $89.75 $1,795.00 $975.00 $19,500.00
8 Rock Removal 75 C.Y. $10.00 $750.00 $126.50 $9,487.50 $150.00 $11,250.00 $85.00 $6,375.00 $70.00 $5,250.00 $150.00 $11,250.00
TOTAL BASE BID
(BASED ON ESTIMATED QUANTITIES)
$84,961.50 $93,544.50 $99,090.00 $117,990.25 $162,525.02 $209,609.18
BID SECURITY REVIEW 10% of Bid 10% of Bid 10% of Bid 10% of Bid 10% of Bid 10% of Bid

We Declare this to be a true Tabulation of Bids Received on August 7, 2018 by East Goshen Township for Contract No. TD-2018-2.

[Signature: Michael J. Ellis]
Michael J. Ellis, P.E., PA Reg. No. PE075139
PENNONI ASSOCIATES INC.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

August 10, 2018

EGMA1701

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Award Recommendation
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2

Dear Mr. Smith:

We have tabulated the bids received through PennBid on August 7, 2018 for the referenced contract. The bid tabulation is attached.

As reflected in the bid tabulation, the low bidder is Iron Eagle Excavating, located in Highspire, Pennsylvania, who submitted a Total Bid of $84,961.50

We found the low bidder's submitted proposal to be complete in all respects. We have confirmed their experience on similar projects by contacting references from prior projects they have completed. We have also spoken at length with Randall Weaver, the company owner and site superintendent. Mr. Weaver provided a detailed background of his company's history, construction experience, and financial capabilities and demonstrated a sound knowledge of construction practices. We discussed the construction scope and procedures in detail with Mr. Weaver. He provided a clear understanding and well-thought-out approach to the project. Therefore, we recommend Iron Eagle Excavating be awarded the contract.

Attached is a copy of Iron Eagle Excavating's Bid Bond. We will provide the original Form of Guaranty under separate cover.

Sincerely,

PENNONI ASSOCIATES INC.

[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Authority Engineer

Enclosures: As noted

/edj

cc: East Goshen Municipal Authority
Mark Miller, Public Works Director
Jon Altshul, Assistant Township Manager

W:\Projects\EGMA\EGMA1701-2017 General Services\Tallmadge Drive Sewer Replacement\Bid Services - REBID\02 Award Recommendation\Award Recommendation Ltr 2018.08.10.docx

THE AMERICAN INSTITUTE OF ARCHITECTS

AIA Document A310

Bid Bond

KNOW ALL MEN BY THESE PRESENTS, that we Iron Eagle Excavating
35 Ann Street, Highspire, PA 17034
(Here insert full name and address or legal title of Contractor)
as Principal, hereinafter called the Principal, and United States Fire Insurance Company
1209 Orange Street, Wilmington, DE 19801
(Here insert full name and address or legal title of Surety)
a corporation duly organized under the laws of the State of Delaware
as Surety, hereinafter called the Surety, are held and firmly bound unto East Goshen Municipal Authority
1580 Paoli Pike, West Chester, PA 19380
(Here insert full name and address or legal title of Owner)
as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of Amount Bid
Dollars ($ 10% ),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has submitted a bid for
(Here insert full name, address and description of project)
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2

NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.

Signed and sealed this 7th day of August 2018

[Signature: Courtney Dyson]
(Witness)
Iron Eagle Excavating (Principal) (Seal)
[Signature: Randall Weaver]
(Title)
[Signature: Kimberly Burton]
(Witness)
Kimberly Burton
United States Fire Insurance Company (Surety) (Seal)
[Signature: William L. Rushton]
(Title)
William L. Rushton, Attorney-in-Fact

AIA DOCUMENT A310 • BID BOND • AIA ® • FEBRUARY 1970 ED • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D. C. 20006
Printed on Recycled Paper          9/93          1

CONSENT OF SURETY

KNOW ALL MEN BY THESE PRESENTS, that for and in consideration of the sum of $1.00, lawful money of the United States of America, the receipt whereof is hereby acknowledged, paid the undersigned corporation, and for other valuable consideration, the

United States Fire Insurance Company

organized and existing under the laws of the State of Delaware and licensed to do business in the State of Pennsylvania certifies and agrees, that if contract for
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2

for East Goshen Municipal Authority

is awarded to Iron Eagle Excavating the undersigned Corporation will execute the bond or bonds as required of the contract documents and will become Surety in the full amount set forth in the contract documents for the faithful performance of all obligations of the Contractor.

Signed and Sealed this 7th day of August, 2018 .

United States Fire Insurance Company
[Signature: William L. Rushton]
William L. Rushton, Attorney-in-Fact

COMMONWEALTH OF PENNSYLVANIA
INSURANCE DEPARTMENT

CERTIFICATE OF AUTHORITY

Property                          Effective Date: April 1, 2018

UNITED STATES FIRE INSURANCE COMPANY

NAIC NO. 21113

HAS COMPLIED WITH THE REQUIREMENTS OF THE LAWS OF THE COMMONWEALTH OF PENNSYLVANIA RELATING TO ADMISSION IN SAID COMMONWEALTH FOR THE PURPOSE OF TRANSACTING INSURANCE BUSINESS IN PENNSYLVANIA AND THAT THE ABOVE NAMED COMPANY IS HEREBY AUTHORIZED TO TRANSACT THE BUSINESS OF:

Accident and Health 40 P.S. s 382(c)(2) Auto Liability 40 P.S. s 382(c)(11)
Boiler and Machinery 40 P.S. s 382(c)(5) Burglary and Theft 40 P.S. s 382(c)(6)
Credit 40 P.S. s 382(c)(7) Elevator 40 P.S. s 382(c)(9)
Fidelity and Surety 40 P.S. s 382(c)(1) Glass 40 P.S. s 382(c)(3)
Inland Marine and Physical Damage 40 P.S. s 382(b)(2) Livestock 40 P.S. s 382(c)(10)
Ocean Marine 40 P.S. s 382(b)(3) Other Liability 40 P.S. s 382(c)(4)
Property and Allied Lines 40 P.S. s 382(b)(1) Water Damage 40 P.S. s 382(c)(8)
Workers Compensation 40 P.S. s 382(c)(14)

FOR THE YEAR ENDING MARCH 31, 2019 IN ACCORDANCE WITH ITS CHARTER AND IN CONFORMITY WITH THE LAWS OF SAID COMMONWEALTH OF PENNSYLVANIA.

IN WITNESS WHEREOF, I HAVE HEREUNTO SET MY HAND AND AFFIXED MY OFFICIAL SEAL, THE DATE AND YEAR FIRST ABOVE WRITTEN.

[Seal: INSURANCE DEPARTMENT COMMONWEALTH OF PENNSYLVANIA]

[Signature: Jessica K. Altman]
Jessica K. Altman
INSURANCE COMMISSIONER

POWER OF ATTORNEY
UNITED STATES FIRE INSURANCE COMPANY
PRINCIPAL OFFICE - MORRISTOWN, NEW JERSEY

01300405318

KNOW ALL MEN BY THESE PRESENTS: That United States Fire Insurance Company, a corporation duly organized and existing under the laws of the state of Delaware, has made, constituted and appointed, and does hereby make, constitute and appoint:

William L. Rushton, John R. Waite Jr., Melissa Mattox, Kimberly Burton, Vincent Giorgio

each, its true and lawful Attorney(s)-In-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver: Any and all bonds and undertakings of surety and other documents that the ordinary course of surety business may require, and to bind United States Fire Insurance Company thereby as fully and to the same extent as if such bonds or undertakings had been duly executed and acknowledged by the regularly elected officers of United States Fire Insurance Company at its principal office, in amounts or penalties not exceeding: Seven Million, Five Hundred Thousand Dollars ($7,500,000).

This Power of Attorney limits the act of those named therein to the bonds and undertakings specifically named therein, and they have no authority to bind United States Fire Insurance Company except in the manner and to the extent therein stated.

This Power of Attorney revokes all previous Powers of Attorney issued on behalf of the Attorneys-In-Fact named above and expires on January 31, 2019.

This Power of Attorney is granted pursuant to Article IV of the By-Laws of United States Fire Insurance Company as now in full force and effect, and consistent with Article III thereof, which Articles provide, in pertinent part:

Article IV, Execution of Instruments - Except as the Board of Directors may authorize by resolution, the Chairman of the Board, President, any Vice-President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on behalf of the Corporation:

(a) to execute, affix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts, obligations, instruments and documents whatsoever in connection with its business including, without limiting the foregoing, any bonds, guarantees, undertakings, recognizances, powers of attorney or revocations of any powers of attorney, stipulations, policies of insurance, deeds, leases, mortgages, releases, satisfactions and agency agreements;

(b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the seal of the Corporation.

Article III, Officers, Section 3.11, Facsimile Signatures. The signature of any officer authorized by the Corporation to sign any bonds, guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney and policies of insurance issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, if and as authorized by the Board of Directors, dividend warrants or checks, or other numerous instruments similar to one another in form, may be signed by the facsimile signature or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be authorized to sign such instruments on behalf of the Corporation. The Corporation may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Corporation, notwithstanding the fact that he may have ceased to be such at the time when such instruments shall be issued.

IN WITNESS WHEREOF, United States Fire Insurance Company has caused these presents to be signed and attested by its appropriate officer and its corporate seal hereunto affixed this 10th day of March, 2016.

UNITED STATES FIRE INSURANCE COMPANY
[Signature: Anthony R. Slimowicz]
Anthony R. Slimowicz, Senior Vice President

State of New Jersey }
County of Morris }

On this 10th day of March 2016, before me, a Notary public of the State of New Jersey, came the above named officer of United States Fire Insurance Company, to me personally known to be the individual and officer described herein, and acknowledged that he executed the foregoing instrument and affixed the seal of United States Fire Insurance Company thereto by the authority of his office.

SONIA SCALA
NOTARY PUBLIC OF NEW JERSEY
MY COMMISSION EXPIRES 3/25/2019

Sonia Scala
[Signature: Sonia Scala]
(Notary Public)

I, the undersigned officer of United States Fire Insurance Company, a Delaware corporation, do hereby certify that the original Power of Attorney of which the foregoing is a full, true and correct copy is still in force and effect and has not been revoked.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal of United States Fire Insurance Company on the 7th day of August 2018.

UNITED STATES FIRE INSURANCE COMPANY
[Signature: Al Wright]
Al Wright, Senior Vice President

UNITED STATES FIRE INSURANCE COMPANY
1209 ORANGE STREET, WILMINGTON, DELAWARE 19801

STATEMENT OF ASSETS, LIABILITIES, SURPLUS AND OTHER FUNDS
AT DECEMBER 31, 2017

ASSETS
Bonds (Amortized Value) 852,724,517
Preferred Stocks (Market Value) 2,500,000
Common Stocks (Market Value) 1,278,534,869
Cash, Cash Equivalents, and Short Term Investments 1,110,717,497
Derivatives 11,462,474
Other Invested Assets 335,759,125
Investment Income Due and Accrued 8,013,891
Premiums and Considerations 237,021,943
Amounts Recoverable from Reinsurers 23,944,019
Funds Held by or Deposited with Reinsured Companies 4,521,882
Current Income Taxes Recoverable 324,900
Net Deferred Tax Asset 135,312,662
Electronic Data Processing Equipment 3,772,271
Receivables from Parent, Subsidiaries and Affiliates 26,323,495
Other Assets 63,413,033
TOTAL ASSETS 4,094,346,578
LIABILITIES, SURPLUS & OTHER FUNDS
Losses (Reported Losses Net of Reinsurance Ceded and Incurred But Not Reported Losses) 1,570,075,192
Reinsurance Payable on Paid Losses and Loss Adjustment Expenses 76,325,088
Loss Adjustment Expenses 394,866,509
Commissions Payable, Contingent Commissions and Other Similar Charges 6,115,178
Other Expenses (Excluding Taxes, Licenses and Fees) 53,552,681
Taxes, Licenses and Fees (Excluding Federal Income Taxes) 20,497,732
Unearned Premiums 504,835,046
Advance Premium 3,459,204
Ceded Reinsurance Premiums Payable 23,031,797
Funds Held by Company under Reinsurance Treaties 16,414,772
Amounts Withheld by Company for Account of Others 68,163,429
Provision for Reinsurance 900,479
Payable to Parent, Subsidiaries and Affiliates 21,048,714
Other Liabilities 32,798,898
TOTAL LIABILITIES $2,792,084,719
Common Capital Stock 12,210,000
Gross Paid In and Contributed Surplus 1,115,644,940
Unassigned Funds (Surplus) 174,406,919
Surplus as Regards Policyholders 1,302,261,859
TOTAL LIABILITIES, SURPLUS & OTHER FUNDS $4,094,346,578

I, Carmine Scaglione, Vice President and Controller of UNITED STATES FIRE INSURANCE COMPANY, certify that the foregoing is a fair statement of Assets, Liabilities, Surplus and Other Funds of this Company, at the close of business, December 31, 2017, as reflected by its books and records and as reported in its statement on file with the Insurance Department of the State of Delaware.

[Signature: Carmine Scaglione]

IN TESTIMONY WHEREOF, I have set my hand and affixed the seal of the Company, this 6th day of March, 2018.
UNITED STATES FIRE INSURANCE COMPANY
[Seal]

Sue Smith

From: Michael Ellis <MEllis@Pennoni.com>
Sent: Friday, May 5, 2017 2:04 PM
To: Mark Miller (mmiller@eastgoshen.org)
Cc: rsmith@eastgoshen.org
Subject: RCSTP Caustic Soda cost
Attachments: DRAFT RCSTP Alkalinity memo 2-10-17.pdf

Hi Mark,

As requested, an off-the-cuff budget-level cost opinion for the design and construction of a permanent caustic soda chemical treatment system is $150,000. Breakdown follows:

±3,000 gal Tank and Containment $40,000
Pumps, Piping, and Valves $40,000
Electrical and Controls $30,000
Engineering, Permitting, Construction Admin & Inspections $25,000
SUBTOTAL $135,000
Allowance for Lean-To Structure Over Exterior Tank $15,000
TOTAL $150,000

This opinion is based upon a double-walled tank being located outside in the paved area on the SE side of the building with a new containment curb. A lean-to type roof could be constructed over the tank, but it would not be required.

For reference, our prior budgetary cost opinion for the permanent caustic soda system feeding into the screen building was $110,000. See the last page of the attachment. The cost has increased because the currently proposed concept would require 4 chemical feeds and associated piping (1 to each SBR tank) instead of only 1 feed into the screen building.

Mike

1

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

RCSTP SBR Tanks Coating Replacement
Opinion of Probable Construction Costs

PRE-DESIGN BUDGETARY OPINION

EGMA1705
11/9/2017

Description Quantity Unit Unit Price Cost
Tank 1
86' x 16' Wall Coating Removal 1,376 SF $ 5 $ 6,880
2 - 86' x 24' Walls Coating 4,128 SF $ 20 $ 82,560
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 1,720 SF $ 20 $ 34,400
Subtotal $ 143,040
Tank 2
2 - 86' x 16' Wall Coating Removal 2,752 SF $ 5 $ 13,760
2 - 86' x 24' Walls Coating 4,128 SF $ 20 $ 82,560
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 1,720 SF $ 20 $ 34,400
Subtotal $ 149,920
Tank 3
2 - 86' x 16' Wall Coating Removal 2,752 SF $ 5 $ 13,760
2 - 86' x 24' Walls Coating 4,128 SF $ 20 $ 82,560
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 1,720 SF $ 20 $ 34,400
Subtotal $ 149,920
Tank 4
86' x 16' Wall Coating Removal 1,376 SF $ 5 $ 6,880
2 - 86' x 24' Walls Coating 4,128 SF $ 20 $ 82,560
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 1,720 SF $ 20 $ 34,400
Subtotal $ 143,040
Subtotal $ 585,920
Construction Contingency Percent 20% $ 117,184
TOTAL $ 703,104

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\Projects\EGMA\EGMA1705-SBR Tank Structural Evaluation\DOCUMENTS\Cost Estimate\Cost Estimate.xlsx; Tank Coating Tab          1 of 1

Proposed Sewer Capital Improvement Program, updated 8/8/18, PENNONI

Project 2018 Adopted 2018 Re-est 2019 2020 2021 2022 2023 2024
Barkway PS Muffin Monster $ 89,500 $ 9,000 $ 67,000
Ashbridge Force Main $ 50,000 $ 50,000
Tallmadge Dr. Pipe Repl. $ 30,000 $ 120,000
Hershey's Mill PS Generator Repl. $ 125,000
Hunt Country PS Mag Meter Repl. $ 15,000
Hunt Country PS Bypass Pump Connection $ 5,000
Hunt Country Muffin Monster $ 67,000
Ridley Creek Collection Meters $ 12,000 $ 12,000 $ 12,000
RCSTP Generator Repl. (older generator) $ 150,000
RCSTP SBR Tank Lining Rehab $ 221,000 $ 228,000 $ 235,000 $ 243,000
Sewer Rehab Pipe/Manhole Lining $ 100,000 $ 160,000 $ 130,000 $ 134,000 $ 139,000 $ 144,000 $ 149,000 $ 154,000
Flow Meter Modem Replacement $ 10,000
Project 2018 Adopted 2018 Re-est 2019 2020 2021 2022 2023 2024
RCSTP Caustic Soda System $ 160,000
Total $ 269,500 $ 361,000 $ 571,000 $ 306,000 $ 360,000 $ 372,000 $ 384,000 $ 397,000
Total Net of Projects Paid from Sewer Cap Reserve $ 219,500 $ 311,000 $ 296,000 $ 306,000 $ 360,000 $ 372,000 $ 384,000 $ 397,000

II COMMENTS

Notes

May have offsetting grant revenue

Sewer Cap Reserve (no impact on rates) / covers 200-250 LF replacement; $500,000-$1Million for full replacement

Based on re-bid amount with stone and professional/inspection services

Sewer Cap Reserve (no impact on rates)/consider increase to $125,000 to cover design and roof/wall replacement too

Consider moving to 2019 to coincide with other Bypass Pump Connection (can possibly use same vault for both); increase to $15,000 to allow for larger vault

Assume same scope as Barkway PS Muffin Monster

A 3rd meter is planned

Sewer Cap Reserve (no impact on rates)

based on 2017 est. ($143-150K each), 12% prof. services for design and inspections, 20% contingency, and 3% escalation/yr starting in 2019

started at $130K with 3% escalation/yr; covers 2500-3000 LF/yr and prof. services; possibly consider increasing to $150K to $175K/yr to rehab more pipe

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations for during the month of June 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for the June 2018 DMR.

Table 1

June 2018 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
June 5, 2018 0.277 4.0 9.2 4 9.2 0.150 0.35 0.26 0.60 1 0.0000
June 12, 2018 0.265 4.2 9.3 3 6.6 0.299 0.66 0.32 0.71 1 0.0000
June 19, 2018 0.235 3.5 6.9 4 7.8 0.605 1.19 0.28 0.55 1 0.0000
June 22, 2018 0.334 2 5.6
June 26, 2018 0.202 2.8 4.7 4 6.7 0.100 0.24 0.40 1 0.0000
June 29, 2018 0.361 3 9.0
Average 0.279 3.5 7.0 3 7.2 0.335 0.92 0.28 0.55 1 0.0000
Minimum 0.202 2.8 4.7 2 5.6 0.100 0.35 0.24 0.40 1 0.0000
Maximum 0.361 4.2 9.3 4 9.2 0.605 1.19 0.32 0.71 1 0.0000

The total phosphorus monthly average was reported as 0.28 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.24 to 0.32 mg/L. The ammonia as nitrogen monthly concentration

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 1 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

was reported as 0.335 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.605 mg/L. The total suspended solids (TSS) monthly concentration was reported as 3 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 4 mg/L as compared to the permit discharge limitation of 15 mg/L.

Table 2 illustrates the final effluent composite sample data reported for the June 2018 DMR.

Table 2

June 2018 - Applebrook - Out Fall 002
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
40 42
June 5, 2018 0.1362 4.0 4.5 4 4.5 0.150 0.170 0.26 0.30 1 0.0000
June 12, 2018 0.1462 4.2 5.1 3 3.7 0.299 0.365 0.32 0.39 1 0.0000
June 19, 2018 0.1476 3.5 4.3 4 4.9 0.605 0.745 0.28 0.34 1 0.0000
June 22, 2018 0.1374 2 2.3
June 26, 2018 0.1464 2.8 3.4 4 4.9 0.100 0.122 0.24 0.29 1 0.0000
June 29, 2018 0.1609 3 4.0
Average 0.1458 3.6 4.3 3 4.1 0.289 0.350 0.28 0.33 1 0.0000
Minimum 0.1362 2.8 3.4 2 2.3 0.100 0.122 0.24 0.29 1 0.0000
Maximum 0.1609 4.2 5.1 4 4.9 0.605 0.745 0.32 0.39 1 0.0000

The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2018.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 2 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

Table 3

June 2018 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
June 5, 2018 0.476 124 492 174 691 28.9 115 28.0 111 3.3 13.1
June 12, 2018 0.699 115 457 54 214 33.8 197 40.3 235 4.8 19.1
June 19, 2018 0.515 211 838 103 409 38.3 165 36.0 155 4.8 19.1
June 26, 2018 0.537 180 715 119 473 34.5 155 34.3 154 4.6 18.3
Average 0.557 158 625 113 447 33.9 158 34.7 164 4.4 17.4
Minimum 0.476 115 457 54 214 28.9 115 28.0 111 3.3 13.1
Maximum 0.699 211 838 174 691 38.3 197 40.3 235 4.8 19.1

Table 4 presents the available Outfall 001 final effluent data for the month of July 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.

Table 4

July 2018 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
July 3, 2018 0.182 2.0 3.0 2 3.0 0.155 0.24 0.10 0.15 1 0.0000
July 6, 2018 0.171 3 4.3
July 10, 2018 0.152 3.6 4.6 3 3.8 0.547 0.69 0.25 0.32 1 0.0000
July 17, 2018 0.127 5 5.3 0.25 0.26
July 20, 2018 0.160 2 2.7
July 24, 2018 0.373 0.22 0.68
July 31, 2018 0.184 0.10 0.15
Average 0.193 3.6 4.6 3 3.9 0.547 0.69 0.21 0.35 1 0.0000
Minimum 0.127 2.0 3.0 2 2.7 0.155 0.24 0.10 0.15 1 0.0000
Maximum 0.373 3.6 4.6 5 5.3 0.547 0.69 0.25 0.68 1 0.0000

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 3 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

The facility is anticipated to achieve compliance with the discharge permit limitations during the month of July 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

During July, the presence of foam conditions on the surface of the SBRs remained consistent at approximately 75% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures within the SBRs, coupled with raising the food to mass ratios, the foam concentrations have decreased.

Table 5 presents the available July data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit. Discharge to Applebrook, Outfall 002 was 4,343,728 gallons during June.

Table 5

July 2018 - Applebrook - Out Fall 002
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
40 42
July 3, 2018 0.1499 2.0 2.5 2 2.5 0.155 0.194 0.10 0.13 1 0.0000
July 6, 2018 0.1576 3 3.9
July 10, 2018 0.1497 3.6 4.5 3 3.7 0.547 0.683 0.25 0.31 1 0.0000
July 17, 2018 0.0970 5 4.0 0.000 0.000 0.25 0.20
July 20, 2018 0.1585 2 2.6
July 24, 2018 0.1518 0.22 0.28
July 31, 2018 0.1524 0.10 0.13
Average 0.1453 2.8 3.5 3 3.4 0.234 0.292 0.18 0.21 1 0.0000
Minimum 0.0970 2.0 2.5 2 2.5 0.000 0.000 0.10 0.13 1 0.0000
Maximum 0.1585 3.6 4.5 5 4.0 0.547 0.683 0.25 0.31 1 0.0000

Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2018.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 4 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

Table 6

July 2018 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
July 3, 2018 0.423 131 462 90 317 37.2 131 34.6 122 4.2 14.8
July 10, 2018 0.449 231 815 218 769 33.6 126 29.6 111 5.6 19.8
July 17, 2018 0.301
July 24, 2018 0.688
July 31, 2018 0.442
Average 0.460 181 638 154 543 35.4 128 32.1 116 4.9 17.3
Minimum 0.301 131 462 90 317 33.6 126 29.6 111 4.2 14.8
Maximum 0.688 231 815 218 769 37.2 131 34.6 122 5.6 19.8

Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service during May and June. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

Significant Rainfall

During July, there were twelve (12) days when rainfall occurred. Seven (7) storm events resulting in a daily precipitation amount equal to or greater than 0.5 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 7.41 inches of rainfall measured during the month. These events occurred on:

July 4th 0.63 inches

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 5 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

July 15th 0.72 inches

July 18th 0.74 inches

July 22nd 2.11 inches

July 23rd 0.54 inches

July 24th 1.20 inches

July 25th 0.95 inches

Four (4) consecutive days of rainfall for a total of 4.80 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.

PA DEP

Bill Collins from PADEP conducted an unscheduled inspection of the facility on July 19th. The visit went well, and a report should be forthcoming.

Solids Dewatering and Disposal:

July 2018
Gallons of sludge dewatered 205,026
Number of dumpsters 4

*Seventeen (17) days of centrifuge operation

Chemical Usage:

July 2018
Chemical Daily Average Total Monthly
Soda Ash 276 lbs 8,250 lbs
Aluminum Sulfate solution 73.3 gallons 2,200 gallons
Polymer (centrifuge) 0.85 14.45 gallons

*Seventeen (17) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 6 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

Flow data:

July 2018
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building* 14.548 469,293 703,910
Influent Wastewater to SBRs 12.916 416,646 618,112
Internal Recycle 0.084 2,711 28,992
Treated Effluent to Disc Filters 13.032 420,393 637824
Final Effluent Discharge 6.326 204,058 867,786
Applebrook Golf Course 4.489 144,821 206,144

The field flow meter recorded elevated flows as compared to the flow meter measuring flow to the SBRs. A zero calibration is planned. Periodic inspection of the flow meter (without confined space entry) has been imitated during July to visually check for debris on the flow meter.

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned piping within SBR building
  • Cleaned final effluent weir trough daily
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly

Major Preventative Maintenance Activities

Centrifuge

Matt Mullin leveraged his father's name, Tom Mullin, who worked for Alfa Laval for 30 years was able to gain Alfa Laval's agreement to send the Township a new centrifuge have conveyor removal bolt for free. They wanted $780 for the new piece. The part is anticipated to arrive around August 20. Just wanted to give you the heads-up so you know what you're getting when it arrives.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 7 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: July 2018

Blower B1B

The blower was removed and sent out for evaluation by the Township.

SBR 2

Dutchland is required to complete the necessary repairs prior to removing SBR 3 from service.

Filter Feed Pump Number 3

The pump was removed on July 20th and sent out to Deckman' overhaul and rebuild. The pump was returned to the plant. Reinstallation is scheduled for August.

July 20, 2018

Matthew and I have removed the final Filter Feed Pump #3 to be rebuilt. It is lying on a skid, ready for pick-up. Also, we removed the malfunctioning blower motor. I don't know if you plan on rebuilding it, or getting a new motor, but it is also lying on a skid for pick-up.

July 22, 2018

The influent flow chart recorder was observed to flashing an "Electronics Failure" causing Circular chart to not work correctly. John Laidely will be scheduled to investigate the chart recorder.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 8 of 8

DRAFT

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 9, 2018

The East Goshen Township Municipal Authority held their regular public meeting on Monday, July 9, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Dana Pizarro, Kevin Cummings and Phil Mayer. Also in attendance were: Jon Altshul (Asst. Township Manager), Carmen Battavio (Township Supervisor), Mike Ellis (Pennoni), and Scott Towler (Plant Operator).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.

Jack asked if anyone would be recording the meeting. There was no response.

Chairman’s Report

Jack reported that West Goshen did not have a meeting last week 7/4. They are meeting this week on July 12th.

Sewer Reports

1. Director of Public Works, Mark Miller’s report for June:

Monthly Flows: The average daily flow to West Goshen was 782,000 gallons per day. No problems to report.

Meters: The meters are being read on a daily basis. We had to clean the meter pits as part of our maintenance.

C.C. Collection: The pump stations were checked on a daily basis. There were no problems at any of the pump stations for the month of June. We received a call for a clogged lateral at 612 Marydell Dr. We tried to plunge the line but that was unsuccessful so we tried to jet the lateral. After several attempts we cleared the lateral. Aqua Water will be replacing the water lines in Marydell so we cleaned and televised the lines and physically marked the laterals. We cleaned and televised 6500 lf of pipe

R.C. Collection: The station was visited on a daily basis. The wet well was cleaned twice this month due to excessive grease build up. We cleaned and televised the sewer lines in the Hadleigh Development in preparation of the road paving.

R.C. Plant: Blower B1B failed and has been removed and taken to Deckens for repair. Scott asked me to get the influent meter checked as it was reading high. John Laidly was notified

MA 7-9-18 draft

1

and came out. He removed the probe and placed it back in service. John recommended that we plug the influent line so he can calibrate the meter. I ordered a plug in the event he decides to plug the line.

Alarms: We responded to 25 alarms for June, which were all various issues.

PA One Calls: We received 74 PA One calls for June.

Lateral Repairs: We received 11 requests for sewer caps between both systems.

2. Pennoni Engineer’s Report for June

Mike Ellis provided the following report.

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – We are analyzing study data in coordination with Big Fish. We anticipate a summary report will be issued prior to the August MA meeting.

RCSTP and Pump Stations’ O&M Manual

  • We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.

Supplee Valley Pipe Lining

  • SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order. One of the lateral locations cannot be lined or grouted due to the severe angle of connection between the lateral and the main; however, this location only had a very minor infiltration leak. We are continuing to coordinate with the PW Department and SWERP to evaluate the feasibility of installing saddles in the other two difficult to access laterals as well as the one spot repair lateral liner that was approved via change order. Lastly, the contractor still needs to perform injection grouting in two manholes. Once we resolve the accessibility, we will pursue a schedule from the contractor to complete the work. No update since our last report. Accessibility has been resolved but SWERP has not provided a schedule to complete the work.

Barkway Pump Station Grinder

  • We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter. No update sine our last report.

MA 7-9-18 draft

2

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • We revised the bid document for re-bid including insurance changes a discussed at the June MA meeting. The fist advertisement will be issued on July 9, and the following re-bid schedule is proposed: Bids Due = August 7; Award = August 13; Contract Execution = late August; Construction = Anytime between late August and December 15 (must be completed within 20 consecutive days).

I&I Support and Reporting

  • We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at the MA meeting immediately thereafter. No update since our last report.

New Connections

  • We reviewed two revised plan submissions for a proposed residential grinder pump sewer Connection at 1506 Meadowbrook Lane.

West Goshen Sewer System Consultation

  • No activity since last report.

3. Big Fish Environmental Services –

Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations during the month of May 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Scott reported that SBR1 is back in service and SBR2 is cleaned and ready to go on line. On July 26 he wants to take SBR3 off line.

Mike mentioned that they need to check for blisters. The Dutchland agreement is coming to an end. Kevin wants a letter sent to them about the cement coating. Carmen mentioned that the attorney was supposed to write a letter a few months ago. Jon will check on this.

Scott spoke about the heat at the plant in the summer. He suggested additional fans to move the hot air around. He also discussed the need for 4 new capacitors. Actuators and flow meters were discussed.

MA 7-9-18 draft

3

Approval of Minutes

The minutes of the June 11, 2018 meeting were approved as corrected.

Approval of Invoices

1. Kevin moved to approve payment of the following Pennoni invoices:

a. Pennoni #808974 $ 581.48
b. Pennoni #808975 $ 327.75
c. Pennoni #808976 $4,869.00
d. Pennoni #808977 $ 30.75

Phil seconded the motion. The motion passed unanimously.

2. Phil moved to approve payment of the Gawthrop Greenwood invoice #196673 for $440.00. Dana seconded the motion. The motion passed unanimously.

Liaison Reports

Board of Supervisors - Carmen reported that Community Day was a success.

Financial Reports

Lynn LeBlanc provided the following written report:
In June, the Municipal Authority recorded $13,167 in income (including $30,000 from a transfer from the Sewer Operating Fund) and $11,917 in expenses for a positive variance of $2,962.99
As of June 30th, the MA fund balance was $25,009.78.

Engineering Budget - Jon discussed engineering costs. He provided spreadsheets showing the project, amount budgeted, where funds were budgeted and actual costs YTD 2018. Phil moved to make a separate line item for Talmadge Drive in the amount of $14,000. Dana seconded the motion. The motion passed unanimously.

Sewer Capital Improvement Program - Jon discussed this proposed program showing proposed cost of projects through 2024. He explained that some items already have funds set aside. He explained how sewer rates are assessed every April based on the water use report from Suburban Water. Mark Miller’s 5 year project list was discussed. He is requesting replacement of modems on 5 meters costing $8,600.
Kevin moved to approve $8,600 to purchase 5 modems with a charge back to West Goshen for one. Dana seconded the motion. The motion passed unanimously.

Adjournment

There being no further business, Phil moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:10 p.m. The next regular meeting will be held on Monday, August 13, 2018 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 7-9-18 draft

4

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page:1
Date:07/12/2018
Client No:6604-001M
Invoice No.197989

General Authority Services

Fees

Date Description Hours Amount
06/11/2018
SLF
Preparation for and attendance at monthly meeting. 1.50
For Current Services Rendered 1.50 300.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Stacey L. Fuller 1.50 $200.00 $300.00
Previous Balance $440.00
Total Current Charges 300.00
06/21/2018 Payment -440.00
Balance Due $300.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA July Financial Report
Date: August 6, 2018

In July, the Municipal Authority recorded $1,985 in income (including $2,000 for the Three Tun Tavern tap-in fee and -$15 for banking fees) and $19,160 in expenses (primarily for engineering), for a negative variance of $17,174.42. The fund balance is $7,836.

Note that the 2018 budget has been amended to reflect $14,000 for Tallmadge Drive engineering, per the decision at the July meeting.

I have also included an updated proposed sewer CIP worksheet for your review.

Proposed Sewer Capital Improvement Program, updated 8/8/18, PENNONI COMMENTS

Project 2018 Adopted 2018 Re-est 2019 2020 2021 2022 2023 2024 Notes
Barkway PS Muffin Monster $ 89,500 $ 9,000 $ 67,000 May have offsetting grant revenue
Ashbridge Force Main $ 50,000 $ 50,000 Sewer Cap Reserve (no impact on rates) / covers 200-250 LF replacement; $500,000-$1Million for full replacement
Tallmadge Dr. Pipe Repl. $ 30,000 $ 120,000 Based on re-bid amount with stone and professional/inspection services
Hershey's Mill PS Generator Repl. $ 125,000 Sewer Cap Reserve (no impact on rates)/consider increase to $125,000 to cover design and roof/wall replacement too
Hunt Country PS Mag Meter Repl. $ 15,000 Consider moving to 2019 to coincide with other Bypass Pump Connection (can possibly use same vault for both); increase to $15,000 to allow for larger vault
Hunt Country PS Bypass Pump Connection $ 5,000
Hunt Country Muffin Monster $ 67,000 Assume same scope as Barkway PS Muffin Monster
Ridley Creek Collection Meters $ 12,000 $ 12,000 $ 12,000 A 3rd meter is planned
RCSTP Generator Repl. (older generator) $ 150,000 Sewer Cap Reserve (no impact on rates)
RCSTP SBR Tank Lining Rehab $ 221,000 $ 228,000 $ 235,000 $ 243,000 based on 2017 est. ($143-150K each), 12% prof. services for design and inspections, 20% contingency, and 3% escalation/yr starting in 2019
Sewer Rehab Pipe/Manhole Lining $ 100,000 $ 160,000 $ 130,000 $ 134,000 $ 139,000 $ 144,000 $ 149,000 $ 154,000 started at $130K with 3% escalation/yr; covers 2500-3000 LF/yr and prof. services; possibly consider increasing to $150K to $175K/yr to rehab more pipe
Flow Meter Modem Replacement $ 10,000
RCSTP Caustic Soda System $ 160,000 $150K budgetary estimate in 2018 with 3% escalation/yr
Total $ 269,500 $ 361,000 $ 571,000 $ 306,000 $ 360,000 $ 372,000 $ 384,000 $ 397,000 updated totals
Total Net of Projects Paid from Sewer Cap Reserve $ 219,500 $ 311,000 $ 296,000 $ 306,000 $ 360,000 $ 372,000 $ 384,000 $ 397,000

EAST GOSHEN TOWNSHIP

Other Funds
July 2018
Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
REVENUE
INTEREST EARNINGS 07341 1000 10 6 (71.62) (77.62) 1 (14.60) (15.60)
CAPITAL RESERVE-INTEREST 07341 1010
INTEREST EARNED - CONSTRUCTION 07341 1020 50 50 613.94 563.94
DCED GRANT 07354 0400
C.C. TAPPING FEES 07364 1100 8,000 4,000 (4,000.00)
R.C.TAPPING FEES 07364 1110 2,000 2,000 2,000.00 2,000.00 2,000.00
M.C. LOAN PAYMENTS 07364 1120
CONNECTION FEES - SEWER 07364 1130 1,692 846 1,127.52 281.52
MISCELLANEOUS REVENUE 07380 1000 564.48 564.48
TRANSFER FROM GENERAL ACCT 07392 0100 71.30 71.30
TRANSFER FROM SEWER OPERATING 07392 0500 89,853 44,247 60,000.00 15,753.00 6,321 (6,321.00)
TRANSFER-ANNUAL CAP.RESERVE 07392 0510
GRANT REVENUE 07392 0800
LOAN PROCEEDS - SEWER PROJECT 07392 0804
TRANSFER FROM SEWER CAP RESERVE 07392 0900
TRANSFER FROM RCSTP BUDGET 07392 0990
LOAN PROCEEDS-SEWER PROJECT 07393 1001
TOTAL REVENUE 101,605 51,149 64,305.62 13,156.62 6,322 1,985.40 (4,336.60)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,411 16,205 16,320.66 (115.66)
R.C. LOAN ISSUANCE COSTS 07424 1500
MISCELLANEOUS EXPENSE 07424 3000 2,500 1,458 1,336.00 122.00 208 208.00
MUNIC.AUTH.-AUDITING 07424 3110 9,384 9,384 9,400.00 (16.00)
ENGINEERING SERVICES 07424 3130 43,260 25,235 53,689.39 (28,454.39) 3,605 6,323.07 (2,718.07)
LEGAL SERVICES 07424 3140 2,920.00 (2,920.00) 300.00 (300.00)
W.G. C.C.STP-UPGRADE 07424 7400
MANHOLE COVER REPLACEMENTS 07424 7405
C.C. CAPITAL - METERS 07424 7410
C.C. CAPITAL- COLLECTION 07424 7420
C.C. CAPITAL- INTERCEPTOR 07424 7430
CAPITAL PROJ.-ENGINEERING 07424 7431
R.C. CAPITAL-STP 07424 7440
R.C. CAPITAL - COLLECTION 07424 7450
R.C.-CAP. PROJ.-ENGINEER 07424 7451
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452
R.C. CAP EXPANSION - ELECTRICAL 07424 7453
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455

PAGE 10

Report Date 1807 08/06/18 10 : 21 AM

EAST GOSHEN TOWNSHIP

Other Funds
July 2018
Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456
LOCHWOOD - CAPITAL -STP 07424 7460
LOCHWOOD-CAPITAL-COLLECT. 07424 7470
LOCHWOOD ABANDONMENT ENGINEER 07424 7475
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476
LOCHWOOD ELIMINATION PHASE 2 07424 7477
CAP.REPLACEMENT R.C. 07424 7490
CAPITAL REPLACEMENT ASHBRIDGE 07424 7491
MARYDELL PUMP STATION - ENGINEER 07425 1000
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000
HERSHEY MILL STATION - ENGINEER 07426 1000
HERSHEY MILL STATION - CONSTRUCTION 07426 2000
TALLMADGE DRIVE 07426 3000 14,000 8,166 12,536.75 (4,370.75) 1,167 12,536.75 (11,370.08)
RESERVE PUMP STATION - ENGINEER 07427 1000
RESERVE PUMP STATION - CONSTRUCTION 07427 2000
RESERVOIR PUMP STATION - ENGINEER 07428 1000 188.00 (188.00)
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000
ASBESTOS CONCRETE ENGINEERING 07429 3130
DIVERSION PROJ.- LEGAL 07429 3166
WEST GOSHEN CAPITAL 07429 6100 59,736 59,736 102,339.08 (42,603.08)
M.C.-DVRFA-DEBT SERVICE 07471 1000
M.A.-R.C. DEBT SERVICE 07471 1010
DVRFA PUMPING STATIONS - PRINCIPAL 07471 2000
M.C.-DVRFA-INTEREST PAYMN 07472 1000
M.A.-R.C. INTEREST 07472 1010
DVRFA PUMPING STATIONS - INTEREST 07472 2000
TRANSFER TO GENERAL FUND 07492 0100 71.30 (71.30)
TRANSFER TO SEW.OPERATING 07492 0500
TRF TO SEWER SINKING FUND 07492 0550
TRANSFER TO AUTHORITY CAP FUND 07492 0990
TOTAL EXPENSES 161,291 120,184 198,801.18 (78,617.18) 4,980 19,159.82 (14,180.15)
NET RESULT FROM OPERATIONS (59,686) (69,035) (134,495.56) (65,460.56) 1,342 (17,174.42) (18,516.75)

PAGE 11

Report Date 1807 08/06/18 10 : 21 AM

East Goshen Township General Ledger

Report Date 08/06/18

GL Transaction Details

PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1801 JE 61740 0.31 02/02/18 INTEREST INTEREST EARNED JANUARY 2018
07 FUND
1801 0.00 0.31 -0.31
1802 61932 0.20 02/14/18 INTEREST INTEREST ADJ. FROM JAN.2018
7105.2000
62159 0.54 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018
07 FUND
1802 0.00 0.74 -1.05
1803 EX 62192 15.00 03/06/18 62192 1 REIMBURSE S/R FOR BANK FEES
INTEREST EARNINGS
JE 62535 0.47 04/02/18 INTEREST INTEREST EARNED MARCH 2018
07 FUND
1803 15.00 0.47 13.48
1804 EX 62551 15.00 04/02/18 62551 1 REIMB.S/R FOR 3/2018 BANK FEES
INTEREST EARNINGS
JE 62904 0.55 05/01/18 INTEREST INTEREST EARNED APRIL 2018
07 FUND
1804 15.00 0.55 27.93
1805 EX 62911 15.00 05/01/18 62911 1 REIMBURSMT- 4/2018 BANK FEES
INTEREST EARNINGS
63388 15.00 06/01/18 63388 1 BANK FEES - MAY 2018
INTEREST EARNINGS
63449 15.00 06/05/18 REVERSE REVERSE TRX 63388 EXPENSE TO
BE ENTERED IN JUNE NOT MAY
JE 63377 0.51 06/01/18 INTEREST INTEREST EARNED MAY 2018
07 FUND
1805 30.00 15.51 42.42
1806 EX 63459 15.00 06/05/18 63459 1 REIMBURSE S/R FOR MAY '18 FEES
INTEREST EARNINGS
JE 63815 0.40 07/03/18 INTEREST INTEREST EARNED JUNE 2018
07100.1035
1806 15.00 0.40 57.02

East Goshen Township General Ledger

Report Date 08/06/18

GL Transaction Details

PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 1807 EX 63820 15.00 07/03/18 63820 5 REIMBURSE S/R - 6/2018 BK.FEES
INTEREST EARNINGS
64317 15.00 07/30/18 64317 1 REVERSE EXP.TRX 63820
M&T BANK - GEN'L CHKG # 98526374
64322 15.00 07/30/18 64322 1 REIMBURSE S/R - 6/2018 BK.FEES
INTEREST EARNINGS
JE 64264 0.40 08/02/18 INTEREST INTEREST EARNED JULY 2018
07100.1035
1807 30.00 15.40 71.62
07341-1000 **** *** **** 105.00 33.38 71.62
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1801 61740 391.64 02/02/18 INTEREST INTEREST EARNED JANUARY 2018
07 FUND
1801 0.00 391.64 -391.64
1802 62159 69.31 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018
07 FUND
1802 0.00 69.31 -460.95
1803 62535 81.66 04/02/18 INTEREST INTEREST EARNED MARCH 2018
07 FUND
1803 0.00 81.66 -542.61
1804 62904 71.30 05/01/18 INTEREST INTEREST EARNED APRIL 2018
07 FUND
1804 0.00 71.30 -613.91
1805 63377 0.03 06/01/18 INTEREST INTEREST EARNED MAY 2018
07 FUND
1805 0.00 0.03 -613.94
07341-1020 **** *** **** 0.00 613.94 -613.94

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 3

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07364-1110 R.C.TAPPING FEES 0.00
1807 RE 63982 2,000.00 07/13/18 ROBERTS TAP IN FEE FOR MARLIN DR
R.C.TAPPING FEES
1807 0.00 2,000.00 -2,000.00
07364-1110 **** *** **** 0.00 2,000.00 -2,000.00
07364-1130 CONNECTION FEES - SEWER 0.00
1801 CR 61617 423.00 01/25/18 2572 10606 1 STOFFLET, MICHAEL
1801 0.00 423.00 -423.00
1802 61894 423.00 02/13/18 494 10607 1 JACOBS, ROBERT & CHERYL
62079 423.00 02/27/18 148 10605 1 GEORGE SMITH & CHRISTINA CONLE
JE 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 423.36 846.00 -845.64
1803 CR 62407 423.00 03/23/18 0011373243 10608 1 PAPPANO, JOSEPH & PATRICIA
JE 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
RC214 PAPPANO
1803 141.12 423.00 -1,127.52
07364-1130 **** *** **** 564.48 1,692.00 -1,127.52
07380-1000 MISCELLANEOUS REVENUE 0.00
1802 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 0.00 423.36 -423.36
1803 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
RC214 PAPPANO
1803 0.00 141.12 -564.48

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 4

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07380-1000 **** *** **** 0.00 564.48 -564.48
07392-0100 TRANSFER FROM GENERAL ACCT 0.00
1805 63470 71.30 06/07/18 XFER XFER $ TO MA REGARDING DEPOSIT
ERROR 5/10/18
1805 0.00 71.30 -71.30
07392-0100 **** *** **** 0.00 71.30 -71.30
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1803 62490 30,000.00 03/29/18 XFER XFER $ FROM SEWER TO MUNICIPAL
TO COVER EXPENSES
1803 0.00 30,000.00 -30,000.00
1806 63665 30,000.00 06/22/18 XFER XFER $ FROM SEWER TO MA
1806 0.00 30,000.00 -60,000.00
07392-0500 **** *** **** 0.00 60,000.00 -60,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1803 CD 62424 8,160.33 03/26/18 3121 425 EAST GOSHEN TOWNSHIP - GENERAL
1ST QTR.2018 REIMBURSEMENT - MA
1803 8,160.33 0.00 8,160.33
1806 63636 8,160.33 06/21/18 3129 425 EAST GOSHEN TOWNSHIP - GENERAL
2ND QTR.2018 REIMBURSEMENT - MA
1806 8,160.33 0.00 16,320.66
07424-1400 **** *** **** 16,320.66 0.00 16,320.66
07424-3000 MISCELLANEOUS EXPENSE 0.00
1801 61728 100.00 01/31/18 3114 3353 COMMONWEALTH FINANCING AUTHORITY
GRANT APPLIC. DCED - WATER & SEW
PROGRAM FOR BARKWAY

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 5

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1801 100.00 0.00 100.00
1805 63278 1,236.00 05/30/18 3125 3871 DELAWARE RIVER BASIN COMMISSION
ANNUAL FEE D-2000-030 CP WASTE
WATER DISCHARGE
1805 1,236.00 0.00 1,336.00
07424-3000 **** *** **** 1,336.00 0.00 1,336.00
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1803 62396 6,964.00 03/22/18 3120 808 MAILLIE FALCONIERO & CO.
PROGRESS BILLING - M.AUTHORTY 2
FINANCIAL STATEMENTS
1803 6,964.00 0.00 6,964.00
1804 62732 2,436.00 04/17/18 3123 808 MAILLIE FALCONIERO & CO.
EXAMINATION 2017 MA FINANCIAL ST
1804 2,436.00 0.00 9,400.00
07424-3110 **** *** **** 9,400.00 0.00 9,400.00
07424-3130 ENGINEERING SERVICES 0.00
1801 61613 12,523.56 01/24/18 3113 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/10/17 2017 GENERAL
SERVICES
1801 12,523.56 0.00 12,523.56
1802 61944 5,415.00 02/15/18 3115 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/14/18 -2017 GENE
62032 552.50 02/22/18 3117 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/14/18 SUPPLEE VA
1802 5,967.50 0.00 18,491.06
1803 62323 11,749.08 03/15/18 3118 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/11/18 2018 GEN.S

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 6

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1803 11,749.08 0.00 30,240.14
1806 63480 9,622.25 06/07/18 3126 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/15/18 SUPPLEE VA
63544 7,503.93 06/12/18 3127 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/20/18 BARKWAY PS
1806 17,126.18 0.00 47,366.32
1807 63960 16,879.82 07/11/18 3130 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 6/17/18 BARKWAY
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 16,879.82 10,556.75 53,689.39
07424-3130 **** *** **** 64,246.14 10,556.75 53,689.39
07424-3140 LEGAL SERVICES 0.00
1801 CD 61613 680.00 01/24/18 3112 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES DEC. 2017 GEN.AUT
1801 680.00 0.00 680.00
1802 62032 240.00 02/22/18 3116 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - JAN.2018 GEN.AUT
1802 240.00 0.00 920.00
1803 62352 400.00 03/19/18 3119 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - FEBRUARY 2018
1803 400.00 0.00 1,320.00
1804 62732 380.00 04/17/18 3122 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 3/12/18
1804 380.00 0.00 1,700.00
1805 63133 480.00 05/16/18 3124 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - APRIL 2018 GEN.A

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 7

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1805 480.00 0.00 2,180.00
1806 63589 440.00 06/18/18 3128 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV.- MAY 2018 GEN.AUTHOR
1806 440.00 0.00 2,620.00
1807 64183 300.00 07/30/18 3131 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE JUNE 2018 GEN.AUTH
1807 300.00 0.00 2,920.00
07424-3140 **** *** **** 2,920.00 0.00 2,920.00
07426-3000 TALLMADGE DRIVE 0.00
63960 1,980.00 07/11/18 3130 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/18 2018 TALLMA
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 12,536.75 0.00 12,536.75
07426-3000 **** *** **** 12,536.75 0.00 12,536.75
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1802 CD 62035 142.50 02/22/18 22016 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/14/18 RESERV.RD
1802 142.50 0.00 142.50
1806 63480 45.50 06/07/18 3126 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/15/18 RESERVOIR
FINAL INVOICE
1806 45.50 0.00 188.00
07428-1000 **** *** **** 188.00 0.00 188.00

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 8

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07429-6100 WEST GOSHEN CAPITAL 0.00
1801 61614 30,050.70 01/24/18 22015 3843 WEST GOSHEN SEWER AUTHORITY
16.67% OF COST - ENHANCED CHEMIC
ADDITION
1801 30,050.70 0.00 30,050.70
1802 62035 3,664.01 02/22/18 22017 3843 WEST GOSHEN SEWER AUTHORITY
16.67% - ENHANCED CHEMICAL ADDIT
& ANAEROBIC DIGESTER REPLACEMENT
1802 3,664.01 0.00 33,714.71
1803 62343 -3,664.01 03/15/18 22017 3843 WEST GOSHEN SEWER AUTHORITY
VOID CK. 2017
1803 -3,664.01 0.00 30,050.70
1804 62689 72,288.38 04/13/18 22018 3843 WEST GOSHEN SEWER AUTHORITY
2017 SEWER SYSTEM REPAIR PROJECT
.16667 % EAST GOSHEN SHARE
1804 72,288.38 0.00 102,339.08
07429-6100 **** *** **** 102,339.08 0.00 102,339.08
07492-0100 TRANSFER TO GENERAL FUND 0.00
1805 63072 71.30 05/10/18 22019 425 EAST GOSHEN TOWNSHIP - GENERAL
XFER TO GENERAL TO CLOSE ACCOUNT
1805 71.30 0.00 71.30
07492-0100 **** *** **** 71.30 0.00 71.30
07492-0500 TRANSFER TO SEW.OPERATING 0.00
1806 JE 63662 30,000.00 06/22/18 XFER XFER FROM SEWER TO MA
63664 30,000.00 06/22/18 REVERSE REVERSE TRX 63662
1806 30,000.00 30,000.00 0.00

East Goshen Township General Ledger

Report Date 08/06/18 GL Transaction Details PAGE 9

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07492-0500 **** *** **** 30,000.00 30,000.00 0.00
Grand Total 240,027.41 105,531.85 134,495.56
Source Debits Credits
JE 41,121.23 101,809.85
EX 105.00 30.00
RE 0.00 2,000.00
CR 0.00 1,692.00
CD 198,801.18 0.00
240,027.41 105,531.85

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 1, 2018

To: Municipal Authority

From: Mark Miller

Re: West Goshen Sewer Plant Work

I spoke with Dave Woodward regarding the work at the plant, he said work is progressing well. The head works is finally nearing completion. All the equipment is in place. They are expecting start up in a few weeks.

The Digester project is moving along; the first tank is in and has passed testing. The rook pieces are on site and are waiting on placement and welding. The new boiler was delivered and installed, should be on schedule to have the second tank on line by the fall.

The upgrades to the chemical building are almost complete and ready to go online.

The work on the collection system is 90% complete, Dirocco has to install 2 air release valves on Little Shiloh road.

West Goshen Sewer Plant New Equipment.

[Photograph of new machinery and industrial piping installed at the West Goshen Sewer Plant, featuring a large hopper/tank and overhead pipework.]

Grit Wash

[Photograph of a chemical feed pump skid system featuring Watson-Marlow metering pumps, gauges, valves, and manifold piping.]

WATSON MARLOW

Chemical feed

[Photograph of industrial chemical feed equipment and hopper system, with piping, electrical panels, and catwalk inside a treatment facility room.]

Chemical feed

[Photograph of a large industrial boiler unit with an attached control panel, valves, and piping installed on a concrete pad.]

Boiler

[Photograph of a large concrete digester tank under construction with curved wall panels supported by diagonal shoring braces and a boom lift in the interior.]

Digester

[Photograph of grit removal equipment including a large blue pump, piping, drive motor, and overhead chain hoist installed on diamond-plate flooring.]

Grit removal

610-692-7171
www.eastgoshen.org

FYI

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

July 24, 2018

Dear Property Owner:

The purpose of this letter is to inform you that East Goshen Township has received a Conditional Use application for 1339 E. Strasburg Rd. West Chester PA 19380. The property owner, Peter Lloyd, is seeking approval to operate a scuba supply business as a Home Occupation. The property contains a single family home and is situated in the R-2 Zoning District of East Goshen Township. Home Occupations are permitted in single family homes within the R-2 Zoning District as a conditional use.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when conditional use applications are received. The meeting dates for this matter are listed below and subject to change without further written notice:

August 1, 2018 – Planning Commission (7:00 PM)
September 4, 2018 – Board of Supervisors (7:00 PM – Conditional Use Hearing)

These meetings will be held at the Township Administration Building and will be open to the public. The Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.

Sincerely,

Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Property Management\53-6B\53-6B-64 (1339 E. Strasburg Rd.)\Conditional Use (Home Occupation)\1000 foot letter CU 07192018.doc