Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
September 10, 2018
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES August 13, 2018
- APPROVAL OF INVOICES
Pennoni Approved and Paid Invoice from July
| Pennoni Invoice #815429 | $ 2,607.25 paid |
|---|---|
| Pennoni Invoice #815428 | $ 3,619.00 paid |
| Pennoni Invoice #818043 | $ 200.75 |
| Pennoni Invoice #818044 | $ 933.75 |
| Pennoni Invoice #818045 | $ 822.00 |
- LIAISON REPORTS
- FINANCIAL REPORTS August Financial Report
- OLD BUSINESS
- GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de; Continue to implement the I&I Plan – 3-8-2018 completed; Submit articles for the newsletter - none
F:\Data\Shared Data\Agendas\Municipal Authority\2018\9-10-18 .doc
- NEW BUSINESS Pump Replacement for SBR tank; Pennoni Budget Supplement
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2018\9-10-18 .doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
September 6, 2018
To: Municipal Authority
From: Mark Miller
Re: August 2018 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 787,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. The meters were calibrated two weeks ago with no problems. The Paoli Pike meter is out of service due to PECO problem, they have been notified and we are waiting on them for repairs.
C.C. Collection: The pump stations were visited on a daily basis. The emergency generators were serviced; no problems were found. The older generator at Ridley is going thru engine oil so much that we have started checking it on a weekly basis. This unit is scheduled to be replaced in 2019. As you know the Muffin Monster at Ashbridge is on its way out, I hope to have it replaced next week.
We were notified of a sewer lateral back up in Marydell, we plunged the lateral to clear the backup. We had a phone line problem at Ashbridge and Verizon was notified and the line has been repaired.
R.C. Collection: There were not problems to report for the month.
Ridley Creek: The pumps were picked up at Deckmens and returned to SBR2
Alarms: We responded to 15 alarms for the month of August.
PA One Calls: We received 61 PA One calls in August.
Rainfall: August rainfall total was 10.85
[Logo: Pennoni]
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
September 7, 2018
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – Upon receipt of Big Fish’s study analysis, a summary report will be issued.
- SBR coatings – We will submit a report summarizing our structural engineer’s visual inspection of the SBR #2 wall coatings and concrete conditions prior to the September MA meeting. Notably, there is corrosion occurring on certain iron piping and fittings for which blasting & coating and replacement is recommended.; A meeting was conducted at the site to determine the coating blistering repair approach in SBR #2 with Pennoni, Dutchland, Township staff, and Kevin Cummings. Dutchland subsequently made spot repairs to blisters on the walls.; We also sampled the pH of water behind the blisters in SBR #2. The pH of water in blisters on the floor was 14, and the pH of blisters on the wall was 10-11. However, there were difficulties sampling the wall blisters due to lack of water so those results may not be fully indicative of the actual condition.; It is our understanding that the warranty expires in October 2019.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for one full year.
Supplee Valley Pipe Lining
- We determined in coordination with SWERP and Mark Miller that the remaining two lateral saddle repairs will not be performed under this contract due to lack of access and risk of improper installation. The contract is therefore complete, and we are awaiting submission of closeout documents and a final payment application from SWERP.
Barkway Pump Station Grinder
- We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter. No update since our last report.
| EGMAU18001 | September 7, 2018 | Page 2 |
|---|---|---|
| East Goshen Municipal Authority | Engineer’s Report |
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Lane, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- We received the Form of Agreement, bonds, and insurance documentation from the awarded contractor. The Agreement and bonds are acceptable, but there have been several issues with their insurance coverages including a gap in their worker’s compensation (WC) coverage. They obtained new WC coverage this week. We are still awaiting a minor change to their auto policy coverage and confirmation that their umbrella covers all other policies. Once we receive those items, the Agreement can be signed by the MA.
- The contractor is planning to perform the work in early November, and he anticipates 2 weeks to complete the project. The contract allows for 20 consecutive calendar days.
I&I Support and Reporting
- We intended to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. However, there have been issues with obtaining instantaneous meter data from the permanent collection system meters, so we are evaluating if there is adequate data to prepare a I&I report or analysis at this time. We propose to make a summary Powerpoint presentation at a MA meeting once the next report is submitted.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
Capital Improvement Planning
- No activity since last report.
P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-09-07.docx
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
Executive Summary
The Ridley Creek sewage treatment plant outfalls 001 and 002 achieved compliance with the permitted effluent discharge limitations for during the month of July 2018. Discharge to the Applebrook irrigation lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for the July 2018 DMR.
Table 1
July 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | lbs/ | lbs/ | lbs/ | lbs/ | Geo | ||||||
| Average | mg/L | month | mg/L | month | mg/L | month | mg/L | month | Geo Mean | Mean | |
| Average | 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| July 3, 2018 | 0.182 | 2.0 | 3.0 | 2 | 3.0 | 0.155 | 0.24 | 0.10 | 0.15 | 1 | 0.0000 |
| July 6, 2018 | 0.171 | 3 | 4.3 | ||||||||
| July 10, 2018 | 0.152 | 3.6 | 4.6 | 3 | 3.8 | 0.547 | 0.69 | 0.25 | 0.32 | 1 | 0.0000 |
| July 17, 2018 | 0.127 | 2.7 | 2.9 | 5 | 5.3 | 0.717 | 0.76 | 0.25 | 0.26 | 1 | 0.0000 |
| July 20, 2018 | 0.160 | 2 | 2.7 | ||||||||
| July 24, 2018 | 0.373 | 2.0 | 6.2 | 5 | 15.6 | 0.737 | 2.29 | 0.22 | 0.68 | 1 | 0.0000 |
| July 31, 2018 | 0.184 | 3.7 | 5.7 | 3 | 4.6 | 0.100 | 0.15 | 0.10 | 0.15 | 1 | 0.0000 |
| Average | 0.193 | 3.0 | 4.8 | 4 | 6.4 | 0.525 | 0.97 | 0.21 | 0.35 | 1 | 0.0000 |
| Minimum | 0.127 | 2.0 | 2.9 | 2 | 2.7 | 0.100 | 0.15 | 0.10 | 0.15 | 1 | 0.0000 |
| Maximum | 0.373 | 3.7 | 6.2 | 5 | 15.6 | 0.737 | 2.29 | 0.25 | 0.68 | 1 | 0.0000 |
The total phosphorus monthly average was reported as 0.21 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.10 to 0.25 mg/L. The ammonia as nitrogen monthly concentration
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
was reported as 0.525 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.737 mg/L. The total suspended solids (TSS) monthly concentration was reported as 4 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 5 mg/L as compared to the permit discharge limitation of 15 mg/L.
Table 2 illustrates the final effluent composite sample data reported for the July 2018 DMR.
Table 2
July 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | lbs/ | lbs/ | lbs/ | lbs/ | Geo | ||||||
| Average | mg/L | month | mg/L | month | mg/L | month | mg/L | month | Geo Mean | Mean | |
| Average | 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| July 3, 2018 | 0.1499 | 2.0 | 2.5 | 2 | 2.5 | 0.155 | 0.194 | 0.10 | 0.13 | 1 | 0.0000 |
| July 6, 2018 | 0.1576 | 3 | 3.9 | ||||||||
| July 10, 2018 | 0.1497 | 3.6 | 4.5 | 3 | 3.7 | 0.547 | 0.683 | 0.25 | 0.31 | 1 | 0.0000 |
| July 17, 2018 | 0.0970 | 2.7 | 2.2 | 5 | 4.0 | 0.717 | 0.580 | 0.25 | 0.20 | 1 | 0.0000 |
| July 20, 2018 | 0.1585 | 2 | 2.6 | ||||||||
| July 24, 2018 | 0.1518 | 2.0 | 2.5 | 5 | 6.3 | 0.737 | 0.933 | 0.22 | 0.28 | 1 | 0.0000 |
| July 31, 2018 | 0.1524 | 3.7 | 4.7 | 3 | 3.8 | 0.100 | 0.127 | 0.10 | 0.13 | 1 | 0.0000 |
| Average | 0.1453 | 2.8 | 3.3 | 3 | 3.9 | 0.451 | 0.503 | 0.18 | 0.21 | 1 | 0.0000 |
| Minimum | 0.0970 | 2.0 | 2.2 | 2 | 2.5 | 0.100 | 0.127 | 0.10 | 0.13 | 1 | 0.0000 |
| Maximum | 0.1585 | 3.7 | 4.7 | 5 | 6.3 | 0.737 | 0.933 | 0.25 | 0.31 | 1 | 0.0000 |
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during July 2018.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
Table 3
July 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| July 3, 2018 | 0.423 | 131 | 462 | 90 | 317 | 37.2 | 131 | 34.6 | 122 | 4.2 | 14.8 |
| July 10, 2018 | 0.449 | 231 | 815 | 218 | 769 | 33.6 | 126 | 29.6 | 111 | 5.6 | 19.8 |
| July 17, 2018 | 0.301 | 250 | 882 | 224 | 790 | 30.0 | 75 | 37.3 | 94 | 0.28 | 1.0 |
| July 24, 2018 | 0.688 | 0 | 0 | 0 | 0 | 0.0 | |||||
| July 31, 2018 | 0.442 | 0 | 0 | 0 | 0 | 0.0 | |||||
| Average | 0.460 | 204 | 432 | 177 | 375 | 33.6 | 66 | 33.8 | 65 | 3.4 | 7.1 |
| Minimum | 0.301 | 131 | 0 | 90 | 0 | 30.0 | 0 | 29.6 | 0 | 0.3 | 0.0 |
| Maximum | 0.688 | 250 | 882 | 224 | 790 | 37.2 | 131 | 37.3 | 122 | 5.6 | 19.8 |
Table 4 presents the available Outfall 001 final effluent data for the month of August 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.
Table 4
August 2018 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | lbs/ | lbs/ | lbs/ | lbs/ | Geo | ||||||
| Average | mg/L | month | mg/L | month | mg/L | month | mg/L | month | Geo Mean | Mean | |
| Average | 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| August 7, 2018 | 0.185 | 3.1 | 4.8 | 1 | 1.5 | 0.139 | 0.21 | 0.10 | 0.15 | 1 | 0.0000 |
| August 14, 2018 | 0.325 | 3.5 | 9.5 | 6 | 16.3 | 0.338 | 0.92 | 0.25 | 0.68 | 68 | 1.8325 |
| August 21, 2018 | 0.321 | 0.19 | 0.51 | ||||||||
| August 28, 2018 | 0.202 | 0.35 | 0.59 | ||||||||
| Average | 0.258 | 3.5 | 9.5 | 6 | 16.3 | 0.338 | 0.92 | 0.26 | 0.59 | 68 | 1.8325 |
| Minimum | 0.185 | 3.1 | 4.8 | 1 | 1.5 | 0.139 | 0.21 | 0.10 | 0.15 | 1 | 0.0000 |
| Maximum | 0.325 | 3.5 | 9.5 | 6 | 16.3 | 0.338 | 0.92 | 0.35 | 0.68 | 68 | 1.8325 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
The facility is anticipated to achieve compliance with the discharge permit limitations during the month of August 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
During August, the presence of foam conditions on the surface of the SBRs remained consistent at approximately 75% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures within the SBRs, coupled with raising the food to mass ratios, the foam concentrations have decreased.
Table 5 presents the available August data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit. Discharge to Applebrook, Outfall 002 was 4,585,072 gallons during August.
Table 5
August 2018 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | lbs/ | lbs/ | lbs/ | lbs/ | Geo | ||||||
| Average | mg/L | month | mg/L | month | mg/L | month | mg/L | month | Geo Mean | Mean | |
| Average | 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| August 7, 2018 | 0.1532 | 3.1 | 4.0 | 1 | 1.3 | 0.139 | 0.178 | 0.10 | 0.13 | 1 | 0.0000 |
| August 14, 2018 | 0.1527 | 3.5 | 4.5 | 6 | 7.6 | 0.338 | 0.430 | 0.25 | 0.32 | 68 | 1.8325 |
| August 21, 2018 | 0.1511 | 0.19 | 0.24 | ||||||||
| August 28, 2018 | 0.1472 | 0.35 | 0.43 | ||||||||
| Average | 0.1511 | 3.3 | 4.2 | 4 | 4.5 | 0.239 | 0.304 | 0.22 | 0.28 | 35 | 0.9163 |
| Minimum | 0.1472 | 3.1 | 4.0 | 1 | 1.3 | 0.139 | 0.178 | 0.10 | 0.13 | 1 | 0.0000 |
| Maximum | 0.1532 | 3.5 | 4.5 | 6 | 7.6 | 0.338 | 0.430 | 0.35 | 0.43 | 68 | 1.8325 |
Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during August 2018.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
Table 6
August 2018 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| August 7, 2018 | 0.452 | 297 | 1,119 | 488 | 1,838 | 34.9 | 131 | 34.5 | 130 | 3.0 | 11.3 |
| August 14, 2018 | 0.558 | 96 | 362 | 96 | 362 | 12.5 | 58 | 12.1 | 56 | 7.0 | 26.4 |
| August 21, 2018 | 0.603 | ||||||||||
| August 28, 2018 | 0.466 | ||||||||||
| Average | 0.520 | 197 | 740 | 292 | 1100 | 23.7 | 95 | 23.3 | 93 | 5.0 | 18.8 |
| Minimum | 0.452 | 96 | 362 | 96 | 362 | 12.5 | 58 | 12.1 | 56 | 3.0 | 11.3 |
| Maximum | 0.603 | 297 | 1,119 | 488 | 1838 | 34.9 | 131 | 34.5 | 130 | 7.0 | 26.4 |
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during July and August. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Significant Rainfall
During August, there were seventeen (17) days when rainfall occurred. Seven (7) storm events resulting in a daily precipitation amount equal to or greater than 0.49 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 9.61 inches of rainfall measured during the month. These events occurred on:
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
| August 1st | 0.06 inches |
|---|---|
| August 2nd | 0.01 inches |
| August 3rd | 0.09 inches |
| August 4th | 0.86 inches |
| August 5th | 0.16 inches |
Five (5) consecutive days of rainfall for a total of 1.180 inches
| August 11th | 1.37 inches |
|---|---|
| August 12th | 0.49 inches |
| August 13th | 0.62 inches |
| August 14th | 1.71 inches |
Four (4) consecutive days of rainfall for a total of 4.19 inches
| August 17th | 0.31 inches |
|---|---|
| August 18th | 0.16 inches |
| August 19th | 1.59 inches |
| August 20th | 0.83 inches |
Four (4) consecutive days of rainfall for a total of 2.89 inches
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reading aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
PA DEP
No activity
Solids Dewatering and Disposal:
| August 2018 | |
|---|---|
| Gallons of sludge dewatered | 257,885 |
| Number of dumpsters | 4 |
*Sixteen (16) days of centrifuge operation
Chemical Usage:
| Chemical | August 2018 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 234 lbs | 7,250 lbs |
| Aluminum Sulfate solution | 59.4 gallons | 1,782 gallons |
| Polymer (centrifuge) | 0.85 | 14.45 gallons |
*Sixteen (16) days of centrifuge of operation
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
Flow data:
| Flow Meter Location | August 2018 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building* | 19.502 | 629,091 | 1,151,260 |
| Influent Wastewater to SBRs | 15.198 | 490,265 | 842,624 |
| Internal Recycle | NA | NA | NA |
| Treated Effluent to Disc Filters | 15.373 | 495,917 | 816,384 |
| Final Effluent Discharge | 7.717 | 248,935 | 556,000 |
| Applebrook Golf Course | 4.585 | 152,716 | 191,808 |
The field flow meter recorded elevated flows as compared to the flow meter measuring flow to the SBRs. A zero calibration is planned. Conversation with John Laidley, (M&S) suggested that the meter be removed and returned to the factory for repair.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned piping within SBR building
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Major Preventative Maintenance Activities
Centrifuge
The tool was delivered at no cost to the Township.
Blower B1B
The blower was removed and sent out for evaluation by the Township.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 8
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report: August 2018 |
|---|
SBR 2
Dutchland is required to complete the necessary repairs prior to removing SBR 3 from service. The extent of repairs is under review by the Township Engineer.
Filter Feed Pump Number 3
The rebuilt pump was reinstalled.
SBR 1 Motive Pump
Observed a seal failure. The pump is operational and under observation.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 8 of 8
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 13, 2018
The East Goshen Township Municipal Authority held their regular public meeting on Monday, August 13, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Dana Pizarro, and Phil Mayer. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Public Works Director), Brian Miller (Pennoni), Scott Towler (Plant Operator) and Patrick McKenna (Attorney).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders, and Jim Yiaski, an accountant for Maillie, who passed away suddenly at the age of 54.
Jack asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
Phil reported that West Goshen may have a site visit some time in September. They had a settlement meeting with the EPA and there is a 30 day waiting period for comments to the proposed agreement. The West Whiteland agreement is going to the West Goshen Board of Supervisors for approval. They are deciding if the pump station at Westtown Way needs screening. It would cost $450,000. and East Goshen would be responsible for 50%. Mark Miller will contact West Goshen about this.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for July:
Monthly Flows: The average daily flow to West Goshen was 746,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. No problems to reports.
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We had no problems with the collection system. We had a sewer clog on 1616 Margo Lane, lateral clog and lateral repair.
R.C. Collection: The pumping station was visited on a daily basis with no problems to report. As part of our routine maintenance we televised and cleaned Tallmadge Drive. This will keep up until the line is replaced. As part of our repaving program we replaced 14 castings and lids in the Hadleigh development off of Greenhill Road.
MA 8-13-18 draft
1
R.C. Plant: The channel was cleaned in the screen building. While we were there we washed the walls down and did general cleanup of the interior of the building. We pulled the pumps on the empty SBR tank and sent them to Deckman Electric to be checked. Last month there was a discussion about the blower that went down. The blower was fine. The problem was with the blowers rebuild. We expanded the plant and the motors were checked but did not require repairs in 2009. The blower building has two exhaust fans that run continually. We installed an air conditioner in the small motor control room last year, which has helped to cool that equipment. I don’t see the need to do any other ventilation work in the main blower room.
Alarms: We responded to 15 alarms for July, which were all various issues.
PA One Calls: We received 97 PA One calls for July.
Rainfall: July rainfall total was 7.80 inches.
Mark also reported that the permit for additional spray irrigation at Applebrook was submitted.
2. Pennoni Engineer’s Report for July
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic soda pilot study – We are analyzing study data in coordination with Big Fish. We anticipate a summary report will be issued prior to the end of August.
- SBR Coatings – We performed a visual inspection of the SBR#2 wall coatings and our structural engineer performed a visual observation of the condition of the concrete. A memo will be issued summarizing the structural evaluation. The coating is experiencing more blistering than prior tanks, including a number of coating locations that were repaired when this tank was last offline. A meeting is tentatively scheduled at the site on August 22 to determine the repair approach with Pennoni, Dutchland, Mark Miller and Kevin Cummings. Under the expectation that repairs can be made within one month thereafter, it is our understanding that the next tank will be taken offline around November. It is our understanding that the warranty expires in October 2019.
- Influent metering – We performed a very cursory evaluation of influent metering alternatives since the “field meter”, which is located in a manhole in the wetlands and measures flow prior to recycle, had been reading 100,000 – 200,000 gpd too high for the prior approximately two months. Mark Miller advised us that the meter was inspected about one month ago and a large spider nest was found on top of the meter. This would cause the meter to read an incorrectly high flow depth and calculate a resultant higher flow rate. We have not reviewed recent flow data, but it is our understanding that metered flows have decreased since the maintenance. We are not aware of any other significant issues with this meter over the past several years. We were also informed that the metering company had recommended this location because it was the closest existing manhole/vault to the plant with adequate slope, straight-through piping, and non-turbulent conditions. There are several alternatives that could be evaluated in more detail for the influent metering: Continue with the meter as-is, and ensure adequate maintenance is regularly performed.
MA 8-13-18 draft
2
- Item #1 plus add cellular connectivity so that metered flow can be regularly monitored online for abnormalities by the Township, Pennoni and/or Big Fish.
- Installation of a manhole/vault with meter inside the fence line upstream of the screen building; however, there were apparent prior concerns about this location due to the flatness of the pipe and solids build-up that occurs.
- Installation of a manhole with meter between the screen building and the influent pump station, but there may not be an adequate distance of straight pipe diameters in this area for a meter to function properly.
- Abandonment of the existing field meter and installation of a meter on the recycle piping. The recycle flow could then be subtracted from the influent pump station flow to determine non-recycle influent flow as required by PADEP. This is generally not recommended since PADEP has directed metering be on the influent piping.
RCSTP and Pump Stations’ O&M Manual
- We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate.
Supplee Valley Pipe Lining
- SWERP completed lining of all contracted sewers on February 21. They subsequently installed supplemental lateral saddle liners in 3 of 6 locations in April that were approved via change order.
- They performed the injection grouting of leaks in two manholes on August 3. We are still awaiting a schedule for the remaining two lateral spot repairs that were previously approved via change order.
Barkway Pump Station Grinder
- We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter. No update sine our last report.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- Bids were received on August 7, and a bid tabulation was submitted to the Township. We are processing bids and will provide an award recommendation letter prior to the August MA meeting.
MA 8-13-18 draft
3
I&I Support and Reporting
- We intend to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. That report will likely be issued in the July-August timeframe. We propose to make a summary Powerpoint presentation at the MA meeting immediately thereafter. No update since our last report.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
Capital Improvement Planning
- We reviewed the 5-year capital improvement plan budget and provided comments to the Township.
3. Big Fish Environmental Services –
Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permitted effluent discharge limitations during the month of June 2018. Discharge to the Applebrook storm water lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Scott mentioned that Bill Collins is the new DEP inspector and recently did an inspection. A report should be received soon.
Approval of Minutes
The minutes of the July 9, 2018 meeting were approved as corrected.
Approval of Invoices
1. Phil moved to approve payment of the Gawthrop Greenwood Invoice #197989 for $300.00. Dana seconded the motion. The motion passed unanimously.
2. Two Pennoni invoices were discussed but had not gone through the normal process so they will be approved at the September meeting.
Liaison Reports
Board of Supervisors - Jon reported that they approved a new Pipeline Taskforce consisting of 7 members. The Food Truck Festival is scheduled for Saturday August 25, 2018. The BOS is in police negotiations. Milltown Dam update – Public Works has removed what they can. Bid notices will go out in 2020. So far a grant for $500,000 has been received. Marydell pond dredging will start soon.
Financial Reports
Jon Altshul provided the following written report:
In July, the Municipal Authority recorded $1,985 in income (including $2,000 for the Three Tun Tavern tap-in fee and -$15.00 for banking fees) and $19,160 in expenses (primarily for engineering), for a negative variance of -$17,174.42. The fund balance is $7,836.
Note that the 2018 budget has been amended to reflect $14,000 for Tallmadge Drive engineering per the decision at the July meeting. Jon provided an updated proposed sewer CIP worksheet for review.
MA 8-13-18 draft
4
Talmadge Drive Bid Award
After review of the Bid Tabulations and Pennoni recommendation letter, Phil moved to approve the bid of $84,961.50 from Iron Eagle Excavating. Dana seconded the motion. The motion passed unanimously.
Any Other Matter
Mark Miller will try to set up a site visit at the Westtown Pump station before the September meeting at 5:30 pm with the regular meeting to start at 7:30 pm.
Adjournment
There being no further business, Dana moved to adjourn the meeting. Phil seconded the motion. The meeting was adjourned at 8:00 p.m. The next regular meeting will be held on Monday, September 10, 2018 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 8-13-18 draft
5
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 815429 Invoice Date : 08/10/2018 Project : EGMAU18001 Project Name : 2018 General Services |
|---|
For Services Rendered through: 8/5/2018
Finalized re-bid plans and bid doc, set up solicitation on PennBID, responded to questions from prospective bidders, attended pre-bid meeting, and issued Addendums #1 and #2.
Phase : 01 -- Tallmadge Drive Sewer Replacement
| Total Phase : 01 -- Tallmadge Drive Sewer Replacement | Labor : Expense : Phase Total : |
2,607.25 0.00 2,607.25 |
|---|
Amount Due This Invoice $2,607.25
| Fee : | 14,000.00 |
|---|---|
| Prior Billings : | 10,556.75 |
| Current Billings : | 2,607.25 |
| Total Billings : | 13,164.00 |
Phase : 01 -- Tallmadge Drive Sewer Replacement
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 8.25 | 123.00 | 1,014.75 |
| Associate Professional | 17.50 | 91.00 | 1,592.50 |
| Labor Total: | 25.75 | 2,607.25 |
| Total Phase : 01 -- Tallmadge Drive Sewer Replacement | Labor : | $2,607.25 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18001 -- 2018 General Services | Labor : | $2,607.25 |
| Expense : | $0.00 |
[Signature: Jon Altshul]
[Handwritten: Approved + Paid 8-13-18]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 8/10/2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | |||
| Invoice Period: | 6/18/2018 | to | 8/5/2018 |
| Date: | 8/10/2018 |
| Initial Authorization: | $ | 12,000.00 |
|---|---|---|
| Contract Amount: | $ | 14,000.00 |
| Previously Invoiced: | $ | 10,556.75 |
| Current Invoice: | $ | 2,607.25 |
| Invoiced to Date ($): | $ | 13,164.00 |
| Invoiced to Date (%): | 94% | |
| Remaining Budget ($): | $ | 836.00 |
| Remaining Budget (%): | 6% |
Budget by Phase:
| Phase Name: | Tallmadge Drive Sewer Replacement | |
|---|---|---|
| Phase Budget: | $ | 14,000.00 |
| Previously Invoiced: | $ | 10,556.75 |
| Current Invoice: | $ | 2,607.25 |
| Invoiced to Date ($): | $ | 13,164.00 |
| Invoiced to Date (%): | 94% | |
| Remaining Budget ($): | $ | 836.00 |
| Remaining Budget (%): | 6% | |
Comments:
Finalized re-bid plans and bid doc, set up solicitation on PennBID, responded to questions from prospective bidders, attended pre-bid meeting, and issued Addendums #1 and #2.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 815428
Invoice Date : 08/10/2018
Project : EGMAU18001
Project Name : 2018 General Services
For Services Rendered through: 8/5/2018
General Consultation - Prepared July Engineer's Report; reviewed July RCSTP operator's report; prepared for and attended July MA meeting; initiated follow-up evaluations to MA meeting regarding potential RCSTP influent metering relocation and blower problems & room temperature controls; cursory review of MA's draft 5-year capital improvement budget; and continued budgetary scoping and cost estimating of future generator replacements at the RCSTP and Hershey's Mill PS.
SBR Coatings: Sr. Engineering Technician and Graduate Structural Engineer performed visual inspection of SBR #2 coating and concrete conditions; and prepared summary memo.
Caustic Soda Trial: continued analysis of trial sampling data and preparation of summary report.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 3,619.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,619.00 | |
| Amount Due This Invoice | $3,619.00 |
| Fee : | 18,000.00 |
|---|---|
| Prior Billings : | 10,637.75 |
| Current Billings : | 3,619.00 |
| Total Billings : | 14,243.75 |
[Handwritten signatures]
Approved + Paid
8-13-18
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18001 -- 2018 General Services
Invoice # : 815428
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 10.00 | 123.00 | 1,230.00 |
| Senior Professional | 5.25 | 117.00 | 614.25 |
| Associate Professional | 1.25 | 91.00 | 113.75 |
| Sr. Engineering Technician | 3.00 | 89.00 | 267.00 |
| Graduate Professional | 17.00 | 82.00 | 1,394.00 |
| Labor Total: | 36.50 | 3,619.00 |
| Total Phase : **** -- Professional Services | Labor : | $3,619.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18001 -- 2018 General Services | Labor : | $3,619.00 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 8/10/2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | |||
| Invoice Period: | 6/18/2018 | to | 8/5/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 8/10/2018 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ 10,637.75 | ||
| Current Invoice: | $ 3,619.00 | ||
| Invoiced to Date ($): | $ 14,256.75 | ||
| Invoiced to Date (%): | 79% | ||
| Remaining Budget ($): | $ 3,743.25 | ||
| Remaining Budget (%): | 21% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 18,000.00 |
| Previously Invoiced: | $ 10,637.75 |
| Current Invoice: | $ 3,619.00 |
| Invoiced to Date ($): | $ 14,256.75 |
| Invoiced to Date (%): | 79% |
| Remaining Budget ($): | $ 3,743.25 |
| Remaining Budget (%): | 21% |
Comments: General Consultation - Prepared July Engineer's Report; reviewed July RCSTP operator's report; prepared for and attended July MA meeting; initiated follow-up evaluations to MA meeting regarding potential RCSTP influent metering relocation and blower problems & room temperature controls; cursory review of MA's draft 5-year capital improvement budget; and continued budgetary scoping and cost estimating of future generator replacements at the RCSTP and Hershey's Mill PS.
SBR Coatings: Sr. Engineering Technician and Graduate Structural Engineer performed visual inspection of SBR #2 coating and concrete conditions; and prepared summary memo.
Caustic Soda Trial: continued analysis of trial sampling data and preparation of summary report.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 818043
Invoice Date : 08/29/2018
Project : EGMAU17007
Project Name : Supplee Valley CIPPL Construction
For Services Rendered through: 8/12/2018
Engineering support and construction observation of manhole grouting construction.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 200.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 200.75 | |
| Amount Due This Invoice | $200.75 |
| Fee : | 15,000.00 |
|---|---|
| Prior Billings : | 14,110.75 |
| Current Billings : | 200.75 |
| Total Billings : | 14,311.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Associate Professional | 0.25 | 91.00 | 22.75 |
| Sr. Engineering Technician | 2.00 | 89.00 | 178.00 |
| Labor Total: | 2.25 | 200.75 |
| Total Phase : **** -- Professional Services | Labor : | $200.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction | Labor : | $200.75 |
| Expense : | $0.00 |
OK [signatures]
9/7/18
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17007 Invoice Summary
Invoice Date 8/29/2018
| Project: | EGMAU17007 | ||
|---|---|---|---|
| Pennoni Job No.: | Supplee Valley CIPPL Construction | ||
| Invoice No: | 818043 | ||
| Invoice Period: | 6/18/2018 | to | 8/12/2018 |
| Initial Authorization: | $ 12,000.00 | Date: | 8/29/2018 |
| Contract Amount: | $ 15,000.00 | ||
| Previously Invoiced: | $ 14,110.75 | ||
| Current Invoice: | $ 200.75 | ||
| Invoiced to Date ($): | $ 14,311.50 | ||
| Invoiced to Date (%): | 95% | ||
| Remaining Budget ($): | $ 688.50 | ||
| Remaining Budget (%): | 5% |
Budget by Phase:
| Phase Name: | Supplee Valley CIPP |
|---|---|
| Phase Budget: | $ 15,000.00 |
| Previously Invoiced: | $ 14,110.75 |
| Current Invoice: | $ 200.75 |
| Invoiced to Date ($): | $ 14,311.50 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 688.50 |
| Remaining Budget (%): | 5% |
Comments: Engineering support and construction observation of manhole grouting construction.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
Louis F. Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice # : 818044
Invoice Date : 08/29/2018
Project : EGMAU18001
Project Name : 2018 General Services
For Professional Services Rendered through: 08/12/2018
General Consultation: Prepared August Engineer's Report; prepared for August MA meeting; reviewed and commented on MA's draft 5-year capital improvement plan budgeting; and continued cursory evaluations of potential RCSTP influent metering relocation.
SBR Coatings: Coordination with Dutchland, Big Fish, and Township & MA personnel in preparation for SBR #2 coating repairs pre-construction field meeting.
| Phase Code | Phase Name | Fee Type | Contract Amount | Previously Billed | Current Billing | Total Billing | Remaining | % Complete |
|---|---|---|---|---|---|---|---|---|
| **** | Professional Services | NTE | $ 18,000.00 | $ 14,256.75 | $ 933.75 | $ 15,190.50 | $ 2,809.50 | 84.39% |
| Subtotal: | $ 14,256.75 | $ 933.75 | $ 15,190.50 | |||||
| Total: | $ 14,256.75 | $ 933.75 | $ 15,190.50 |
| Total Amount Due | $ 933.75 |
|---|
OK [signatures]
9/7/18
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18001 -- 2018 General Services
Invoice # : 818044
...Continued from previous page
Phase : **** -- Professional Services
Rate Schedule Labor
| Class / Employee Name | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.50 | 123.00 | 553.50 |
| Senior Professional | 3.25 | 117.00 | 380.25 |
| Rate Schedule Labor | 933.75 | ||
| Total Phase : **** -- Professional Services | 933.75 | ||
| Total Project : EGMAU18001 -- 2018 General Services | 933.75 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 08/29/2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | 818044 | ||
| Invoice Period: | 8/6/2018 | to | 8/12/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 8/29/2018 |
| Contract Amount: | $ 18,000.00 | ||
| Previously Invoiced: | $ 14,256.75 | ||
| Current Invoice: | $ 933.75 | ||
| Invoiced to Date ($): | $ 15,190.50 | ||
| Invoiced to Date (%): | 84% | ||
| Remaining Budget ($): | $ 2,809.50 | ||
| Remaining Budget (%): | 16% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 18,000.00 |
| Previously Invoiced: | $ 14,256.75 |
| Current Invoice: | $ 933.75 |
| Invoiced to Date ($): | $ 15,190.50 |
| Invoiced to Date (%): | 84% |
| Remaining Budget ($): | $ 2,809.50 |
| Remaining Budget (%): | 16% |
Comments: General Consultation: Prepared August Engineer's Report; prepared for August MA meeting; reviewed and commented on MA's draft 5-year capital improvement plan budgeting; and continued cursory evaluations of potential RCSTP influent metering relocation.
SBR Coatings: Coordination with Dutchland, Big Fish, and Township & MA personnel in preparation for SBR #2 coating repairs pre-construction field meeting.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
Louis F. Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice # : 818045
Invoice Date : 08/29/2018
Project : EGMAU18001
Project Name : 2018 General Services
For Professional Services Rendered through: 08/12/2018
Tallmadge Drive Sewer Replacement - Conducted re-bid contract bid opening, prepared bid tabulation, reviewed bids, updated PennBID, researched low bidder references and qualifications, discussed project understanding and approach with low bidder, and prepared award recommendation letter.
| Phase Code | Phase Name | Fee Type | Contract Amount | Previously Billed | Current Billing | Total Billing | Remaining | % Complete |
|---|---|---|---|---|---|---|---|---|
| 01 | Tallmadge Drive Sewer Replacement | NTE | $ 14,000.00 | $ 13,164.00 | $ 822.00 | $ 13,986.00 | $ 14.00 | 99.90% |
| Subtotal: | $ 13,164.00 | $ 822.00 | $ 13,986.00 | |||||
| Total: | $ 13,164.00 | $ 822.00 | $ 13,986.00 |
| Total Amount Due | $ 822.00 |
|---|
OK [signatures]
9/7/18
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18001 -- 2018 General Services
Invoice # : 818045
...Continued from previous page
Phase : 01 -- Tallmadge Drive Sewer Replacement
Rate Schedule Labor
| Class / Employee Name | Hours | Rate | Amount |
|---|---|---|---|
| Associate Professional | 6.75 | 91.00 | 614.25 |
| Authority Engineer | 0.50 | 123.00 | 61.50 |
| Senior Professional | 1.25 | 117.00 | 146.25 |
| Rate Schedule Labor | 822.00 | ||
| Total Phase : 01 -- Tallmadge Drive Sewer Replacement | 822.00 | ||
| Total Project : EGMAU18001 -- 2018 General Services | 822.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 8/29/2018
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services - Tallmadge Drive Sewer Replacement | ||
| Invoice No: | 818045 | ||
| Invoice Period: | 8/6/2018 | to | 8/12/2018 |
| Initial Authorization: | $ 12,000.00 | Date: | 8/29/2018 |
| Contract Amount: | $ 14,000.00 | ||
| Previously Invoiced: | $ 13,164.00 | ||
| Current Invoice: | $ 822.00 | ||
| Invoiced to Date ($): | $ 13,986.00 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 14.00 | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | 2018 General Services - Tallmadge Drive Sewer Replacement |
|---|---|
| Phase Budget: | $ 14,000.00 |
| Previously Invoiced: | $ 13,164.00 |
| Current Invoice: | $ 822.00 |
| Invoiced to Date ($): | $ 13,986.00 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ 14.00 |
| Remaining Budget (%): | 0% |
Comments: Tallmadge Drive Sewer Replacement - Conducted re-bid contract bid opening, prepared bid tabulation, reviewed bids, updated PennBID, researched low bidder references and qualifications, discussed project understanding and approach with low bidder, and prepared award recommendation letter.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA August Financial Report |
| Date: | September 7, 2018 |
In August, the Municipal Authority recorded -14.83 in income (reflecting $15 for banking fees) and $6,226 in expenses (engineering), for a negative variance of $6,241. The fund balance is $1,595.
EAST GOSHEN TOWNSHIP
Other Funds
August 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | 10 | 7 | (86.48) | (93.48) | 1 | (14.86) | (15.86) |
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 50 | 50 | 613.94 | 563.94 | |||
| DCED GRANT | 07354 0400 | |||||||
| C.C. TAPPING FEES | 07364 1100 | 8,000 | 4,000 | (4,000.00) | ||||
| R.C.TAPPING FEES | 07364 1110 | 2,000 | 2,000 | 2,000.00 | ||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 1,692 | 846 | 1,127.52 | 281.52 | |||
| MISCELLANEOUS REVENUE | 07380 1000 | 564.51 | 564.51 | 0.03 | 0.03 | |||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | 71.30 | 71.30 | |||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 89,853 | 50,568 | 60,000.00 | 9,432.00 | 6,321 | (6,321.00) | |
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | |||||||
| TRANSFER FROM RCSTP BUDGET | 07392 0990 | |||||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | |||||||
| TOTAL REVENUE | 101,605 | 57,471 | 64,290.79 | 6,819.79 | 6,322 | (14.83) | (6,336.83) | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,411 | 16,205 | 16,320.66 | (115.66) | |||
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500 | 1,666 | 1,336.00 | 330.00 | 208 | 208.00 | |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,384 | 9,384 | 9,400.00 | (16.00) | |||
| ENGINEERING SERVICES | 07424 3130 | 43,260 | 28,840 | 57,308.39 | (28,468.39) | 3,605 | 3,619.00 | (14.00) |
| LEGAL SERVICES | 07424 3140 | 2,920.00 | (2,920.00) | |||||
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | |||||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | |||||||
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | |||||||
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | |||||||
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | |||||||
Report Date 1808 09/07/18 8 : 40 AM
EAST GOSHEN TOWNSHIP
Other Funds
August 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | |||||||
| LOCHWOOD - CAPITAL -STP | 07424 7460 | |||||||
| LOCHWOOD-CAPITAL-COLLECT. | 07424 7470 | |||||||
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | |||||||
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | |||||||
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | |||||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | |||||||
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | |||||||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | 14,000 | 9,333 | 15,144.00 | (5,811.00) | 1,167 | 2,607.25 | (1,440.58) |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | |||||||
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | |||||||
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 188.00 | (188.00) | |||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | 59,736 | 59,736 | 102,339.08 | (42,603.08) | |||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | 71.30 | (71.30) | |||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER SINKING FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 161,291 | 125,164 | 205,027.43 | (79,863.43) | 4,980 | 6,226.25 | (1,246.58) | |
| NET RESULT FROM OPERATIONS | (59,686) | (67,693) | (140,736.64) | (73,043.64) | 1,342 | (6,241.08) | (7,583.41) |
Report Date 1808 09/07/18 8 : 40 AM
1/1/18 FUND BALANCE 142,331
2018 MA YTD TRANSACTIONS
| Account # | Description | Per | Trx# | Debits | Credits | Date | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | INTEREST EARNINGS | 1801 | 61740 | - | 0.31 | 2/2/2018 | INTEREST EARNED JANUARY 2018 | 07 FUND | |
| 07341-1000 | INTEREST EARNINGS | 1802 | 61932 | - | 0.20 | 2/14/2018 | INTEREST ADJ. FROM JAN. 2018 | 7105.2 | |
| 07341-1000 | INTEREST EARNINGS | 1802 | 62159 | - | 0.54 | 3/5/2018 | INTEREST EARNED FEBRUARY 2018 | 07 FUND | |
| 07341-1000 | INTEREST EARNINGS | 1803 | 62192 | 15.00 | - | 3/6/2018 | REIMB.S/R FOR BANK FEES | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1803 | 62535 | - | 0.47 | 4/2/2018 | INTEREST EARNED MARCH 2018 | 07 FUND | |
| 07341-1000 | INTEREST EARNINGS | 1804 | 62551 | 15.00 | - | 4/2/2018 | REIMB.S/R FOR 3/2018 BANK FEES | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1804 | 62904 | - | 0.55 | 5/1/2018 | INTEREST EARNED APRIL 2018 | 07 FUND | |
| 07341-1000 | INTEREST EARNINGS | 1805 | 62911 | 15.00 | - | 5/1/2018 | REIMBURSMT- 4/2018 BANK FEES | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1805 | 63388 | 15.00 | - | 6/1/2018 | BANK FEES - MAY 2018 | BE ENTERED IN JUNE NOT MAY | |
| 07341-1000 | INTEREST EARNINGS | 1805 | 63449 | - | 15.00 | 6/5/2018 | REVERSE TRX 63388 EXPENSE TO | 07 FUND | |
| 07341-1000 | INTEREST EARNINGS | 1805 | 63377 | - | 0.51 | 6/1/2018 | INTEREST EARNED MAY 2018 | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1806 | 63459 | 15.00 | - | 6/5/2018 | REIMBURSE S/R FOR MAY '18 FEES | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1806 | 63815 | - | 0.40 | 7/3/2018 | INTEREST EARNED JUNE 2018 | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1807 | 63820 | 15.00 | - | 7/3/2018 | REIMBURSE S/R - 5/2018 BK.FEES | M&T BANK - GEN'L CHKG # 98526374 | |
| 07341-1000 | INTEREST EARNINGS | 1807 | 64317 | - | 15.00 | 7/30/2018 | REVERSE EXP.TRX 63820 | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1807 | 64322 | 15.00 | - | 7/30/2018 | REIMBURSE S/R - 6/2018 BK.FEES | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1807 | 64264 | - | 0.40 | 8/2/2018 | INTEREST EARNED JULY 2018 | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1808 | 64289 | 15.00 | - | 8/3/2018 | REIMBURSE S/R - 7/2018 BK FEES | INTEREST EARNINGS | |
| 07341-1000 | INTEREST EARNINGS | 1808 | 64731 | - | 0.14 | 9/4/2018 | INTEREST EARNED AUGUST 2018 | ||
| 07341-1020 | INTEREST EARNED - CONS | 1801 | 61740 | - | 391.64 | 2/2/2018 | INTEREST EARNED JANUARY 2018 | 07 FUND | |
| 07341-1020 | INTEREST EARNED - CONS | 1802 | 62159 | - | 69.31 | 3/5/2018 | INTEREST EARNED FEBRUARY 2018 | 07 FUND | |
| 07341-1020 | INTEREST EARNED - CONS | 1803 | 62535 | - | 81.66 | 4/2/2018 | INTEREST EARNED MARCH 2018 | 07 FUND | |
| 07341-1020 | INTEREST EARNED - CONS | 1804 | 62904 | - | 71.30 | 5/1/2018 | INTEREST EARNED APRIL 2018 | 07 FUND | |
| 07341-1020 | INTEREST EARNED - CONS | 1805 | 63377 | - | 0.03 | 6/1/2018 | INTEREST EARNED MAY 2018 | 07 FUND | |
| 07364-1110 | R.C.TAPPING FEES | 1807 | 63982 | - | 2,000.00 | 7/13/2018 | TAP IN FEE FOR MARLIN DR | R.C.TAPPING FEES | |
| 07364-1130 | CONNECTION FEES - SEWE | 1801 | 61617 | - | 423.00 | 1/25/2018 | STOFFLET, MICHAEL | ||
| 07364-1130 | CONNECTION FEES - SEWE | 1802 | 61894 | - | 423.00 | 2/13/2018 | JACOBS, ROBERT & CHERYL | JACOBS & STOFFLET INTEREST | |
| 07364-1130 | CONNECTION FEES - SEWE | 1802 | 62079 | - | 423.00 | 2/27/2018 | GEORGE SMITH & CHRISTINA CONLE | ||
| 07364-1130 | CONNECTION FEES - SEWE | 1802 | 61900 | 282.24 | - | 2/13/2018 | ANNUAL PINE ROCK INSTALLMENT | ||
| 07364-1130 | CONNECTION FEES - SEWE | 1802 | 62080 | 141.12 | - | 2/27/2018 | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO | |
| 07364-1130 | CONNECTION FEES - SEWE | 1803 | 62407 | - | 423.00 | 3/23/2018 | PAPPANO, JOSEPH & PATRICIA | ||
| 07364-1130 | CONNECTION FEES - SEWE | 1803 | 62411 | 141.12 | - | 3/23/2018 | ANNUAL PINE ROCK INSTALLMENT | ||
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | 61900 | - | 282.24 | 2/13/2018 | ANNUAL PINE ROCK INSTALLMENT | JACOBS & STOFFLET INTEREST | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | 62080 | - | 141.12 | 2/27/2018 | ANNUAL PINE ROCK INSTALLMENT | ||
| 07380-1000 | MISCELLANEOUS REVENUE | 1803 | 62411 | - | 141.12 | 3/23/2018 | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1808 | 64477 | - | 0.03 | 8/16/2018 | DEPOSIT CK.7100.1035 TO CLOSE | OUT FULTON 7105.2000 | |
| 07392-0100 | TRANSFER FROM GENERA | 1805 | 63470 | - | 71.30 | 6/7/2018 | XFER TO MA REGARDING DEPOSIT | ERROR 5/10/18 | |
| 07392-0500 | TRANSFER FROM SEWER C | 1803 | 62490 | - | 30,000.00 | 3/29/2018 | XFER $ FROM SEWER TO MUNICIPAL | TO COVER EXPENSES |
[Page is printed rotated sideways.]
| Account # | Description | Per | Trx# | Debits | Credits | Date | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|
| 07392-0500 | TRANSFER FROM SEWER C | 1806 | 63665 | - | 30,000.00 | 6/22/2018 | XFER $ FROM SEWER TO MA | ||
| TOTAL NET REVENUE | 64,290.79 | ||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 1803 | 62424 | 8,160.33 | - | 3/26/2018 | EAST GOSHEN TOWNSHIP - GENERAL | 1ST QTR.2018 REIMBURSEMENT - MA | |
| 07424-1400 | ADMINISTRATIVE WAGES | 1806 | 63636 | 8,160.33 | - | 6/21/2018 | EAST GOSHEN TOWNSHIP - GENERAL | 2ND QTR.2018 REIMBURSEMENT - M | |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1801 | 61728 | 100.00 | - | 1/31/2018 | COMMONWEALTH FINANCING AUTHORI | GRANT APPLIC. DCED - WATER & SEW | PROGRAM FOR BARKWAY |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1805 | 63278 | 1,236.00 | - | 5/30/2018 | DELAWARE RIVER BASIN COMMISSION | ANNUAL FEE D-2000-030 CP WASTE | WATER DISCHARGE |
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1803 | 62396 | 6,964.00 | - | 3/22/2018 | MAILLIE FALCONIERO & CO. | PROGRESS BILLING - M.AUTHORITY 2 | FINANCIAL STATEMENTS |
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1804 | 62732 | 2,436.00 | - | 4/17/2018 | MAILLIE FALCONIERO & CO. | EXAMINATION 2017 MA FINANCIAL S | |
| 07424-3130 | ENGINEERING SERVICES | 1801 | 61613 | 12,523.56 | - | 1/24/2018 | PENNONI ASSOCIATES INC. | SERV.THRU 12/10/17 2017 GENERAL | SERVICES |
| 07424-3130 | ENGINEERING SERVICES | 1802 | 61944 | 5,415.00 | - | 2/15/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 1/14/18-2017 GENEF | |
| 07424-3130 | ENGINEERING SERVICES | 1802 | 62032 | 552.50 | - | 2/22/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 1/14/18 SUPPLEE VAL | |
| 07424-3130 | ENGINEERING SERVICES | 1803 | 62323 | 11,749.08 | - | 3/15/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 2/11/18 2018 GEN.SE | |
| 07424-3130 | ENGINEERING SERVICES | 1806 | 63480 | 9,622.25 | - | 6/7/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 4/15/18 SUPPLEE VAI | |
| 07424-3130 | ENGINEERING SERVICES | 1806 | 63544 | 7,503.93 | - | 6/12/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 5/20/18 BARKWAY PS | |
| 07424-3130 | ENGINEERING SERVICES | 1807 | 63960 | 16,879.82 | - | 7/11/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 6/17/18 BARKWAY | |
| 07424-3130 | ENGINEERING SERVICES | 1807 | 63926 | - | 10,556.75 | 7/10/2018 | RECLASS TALLMADGE DR EXPENSES | ||
| 07424-3130 | ENGINEERING SERVICES | 1808 | 64451 | 3,619.00 | - | 8/15/2018 | PENNONI ASSOCIATES INC. | PROF.SERV. THRU 8/5/18 2018 GENE | |
| 07424-3140 | LEGAL SERVICES | 1801 | 61613 | 680.00 | - | 1/24/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICES DEC. 2017 GEN.AUT | |
| 07424-3140 | LEGAL SERVICES | 1802 | 62032 | 240.00 | - | 2/22/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - JAN.2018 GEN.AUTH | |
| 07424-3140 | LEGAL SERVICES | 1803 | 62352 | 400.00 | - | 3/19/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - FEBRUARY 2018 | |
| 07424-3140 | LEGAL SERVICES | 1804 | 62732 | 380.00 | - | 4/17/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE 3/12/18 | |
| 07424-3140 | LEGAL SERVICES | 1805 | 63133 | 480.00 | - | 5/16/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - APRIL 2018 GEN.AU1 | |
| 07424-3140 | LEGAL SERVICES | 1806 | 63589 | 440.00 | - | 6/18/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERV.- MAY 2018 GEN.AUTHOI | |
| 07424-3140 | LEGAL SERVICES | 1807 | 64183 | 300.00 | - | 7/30/2018 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE JUNE 2018 GEN.AUTH | |
| 07426-3000 | TALLMADGE DRIVE | 1807 | 63960 | 1,980.00 | - | 7/11/2018 | PENNONI ASSOCIATES INC. | SERVICE THRU 6/17/18 2018 TALLMA | |
| 07426-3000 | TALLMADGE DRIVE | 1807 | 63926 | 10,556.75 | - | 7/10/2018 | RECLASS TALLMADGE DR EXPENSES | ||
| 07426-3000 | TALLMADGE DRIVE | 1808 | 64451 | 2,607.25 | - | 8/15/2018 | PENNONI ASSOCIATES INC. | PROF.SERV. THRU 8/5/18 2018 TALLM | |
| 07428-1000 | RESERVOIR PUMP STATIOI | 1802 | 62035 | 142.50 | - | 2/22/2018 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/14/18 RESERV.RD P | |
| 07428-1000 | RESERVOIR PUMP STATIOI | 1806 | 63480 | 45.50 | - | 6/7/2018 | PENNONI ASSOCIATES INC. | SERVICES THRU 4/15/18 RESERVOIR F | FINAL INVOICE |
| 07429-6100 | WEST GOSHEN CAPITAL | 1801 | 61614 | 30,050.70 | - | 1/24/2018 | WEST GOSHEN SEWER AUTHORITY | 16.67% OF COST - ENHANCED CHEMI | ADDITION |
| 07429-6100 | WEST GOSHEN CAPITAL | 1802 | 62035 | 3,664.01 | - | 2/22/2018 | WEST GOSHEN SEWER AUTHORITY | 16.67% - ENHANCED CHEMICAL ADDI & | ANAEROBIC DIGESTER REPLACEMENT |
| 07429-6100 | WEST GOSHEN CAPITAL | 1803 | 62343 | (3,664.01) | - | 3/15/2018 | WEST GOSHEN SEWER AUTHORITY | VOID CK. 2017 | |
| 07429-6100 | WEST GOSHEN CAPITAL | 1804 | 62689 | 72,288.38 | - | 4/13/2018 | WEST GOSHEN SEWER AUTHORITY | 2017 SEWER SYSTEM REPAIR PROJEC | .16667 % EAST GOSHEN SHARE |
| 07492-0100 | TRANSFER TO GENERAL FL | 1805 | 63072 | 71.30 | - | 5/10/2018 | EAST GOSHEN TOWNSHIP - GENERAL | XFER TO GENERAL TO CLOSE ACCOUN | |
| 07492-0500 | BEGINNING BALANCE | ||||||||
| 07492-0500 | TRANSFER TO SEW.OPERA | 1806 | 63662 | 30,000.00 | - | 6/22/2018 | XFER FROM SEWER TO MA | ||
| 07492-0500 | TRANSFER TO SEW.OPERA | 1806 | 63664 | - | 30,000.00 | 6/22/2018 | REVERSE TRX 63662 | ||
| TOTAL NET EXPENSES | 205,027.43 |
FUND BALANCE 8/31/18 1,595
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
September 7, 2018
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | Pump Replacement |
As you know, we have SBR tank 2 down for maintenance as part of the maintenance procedure we pulled the pumps and sent them out to be gone over. The motive pump was pulled apart and new seals were installed and a new impeller was required. A new impeller has been ordered, it takes 6 weeks to receive it. Now the pump in SBR 1 has a seal failure and keeps shutting down. We have bypassed some wiring to keep the pump running. If we did not switch the wiring and keep the pump running the tank will go septic.
We need to purchase a new pump so when we have a pump failure we can pull the pump and drop in a spare pump. The cost of the pump is $21,648.00 with a delivery time of 4 to 6 weeks.
F:\Data\Shared Data\Public Works Dept\Monthly Reports\2018 Municipal\pump replacement letter September 7.docx
Jon Altshul
| From: | Michael Ellis <MEllis@Pennoni.com> |
|---|---|
| Sent: | Friday, September 07, 2018 12:14 AM |
| To: | rsmith@eastgoshen.org; Jon Altshul; Mark Miller (mmiller@eastgoshen.org) |
| Subject: | 2018 General Consultation Budget |
Hi Rick, Jon, and Mark,
We are approaching budget on our General Consultation work (Pennoni project EGMAU18001). The approved budget for General Consultation for calendar year 2018 was $18,000. As of 9/2/18, the effort for the year-to-date is $17,146.50. I anticipate the remaining budget will be expended by the end of September so I respectfully request the MA consider a supplement to cover October through December.
An approximate breakdown of effort for the YTD through 9/2/18 follows:
| Task | Amount |
|---|---|
| General Engineering* | $8,734.00 |
| Tallmadge Drive Sewer** | $1,218.75 |
| Caustic Soda Pilot Study | $3,180.25 |
| SBR Coatings Assistance & Repair Inspections | $4,013.50 |
| TOTAL | $17,146.50 |
*Includes monthly engineer's reports, review of monthly plant operator's reports, attendance at monthly MA meetings, elementary school floor drain assistance, Applebrook NPDES Permit expiration research, RCSTP & HMPS generator replacement research, 5-yr capital improvement planning, RCSTP operations assistance on filter pump & controls issues, and Wexford Circle small flow treatment system planning module review).
**Prior to creating a separate project for charges.
The General Engineering effort is on pace with expectations, but the required effort for Tallmadge Dr Sewer, Caustic Soda Pilot Study, and SBR Coatings has been more than that projected at the beginning of the year.
To complete the remainder of calendar year 2018, I anticipate another $5,000 may be needed for 3 months of meetings and engineer's reports, finalizing caustic soda study report, and another SBR tank coating inspection. We therefore respectfully request a supplement of $5,000 to allow for continued General Consultation work through the remainder of 2018.
Please call if you would like to discuss, or let me know if you may need any additional information.
Thanks,
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com
1