Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
October 8, 2018
7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
  4. APPROVAL OF MINUTES September 10, 2018
  5. APPROVAL OF INVOICES Pennoni Invoice #823030 $ 220.75 Pennoni Invoice #823031 $ 4,618.50 Pennoni Invoice #823033 $ 1,333.75 Payment Application No. #2 Pennoni $ 21,614.20 Gawthrop Invoice #199945 $ 500.00
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS September Financial Report
  8. OLD BUSINESS
  9. GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de; Continue to implement the I&I Plan – 3-8-2018 completed; Submit articles for the newsletter – none

F:\Data\Shared Data\Agendas\Municipal Authority\2018\10-8-18 - .doc

  1. NEW BUSINESS Pump Replacement for Ashbridge Pump Station $23,686.00; Change order #3 Pennoni
  2. CAPACITY REQUESTS
  3. ANY OTHER MATTER
  4. CORRESPONDENCE AND REPORTS OF INTEREST
  5. PUBLIC COMMENT
  6. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2018\10-8-18 - .doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 3, 2018

To: Municipal Authority
From: Mark Miller
Re: September 2018 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 748,000 gallons per day. No problems to report.

Meters: The meters are being read on a daily basis. We have had a power problem with the Paoli Pike meter, however I believe we corrected the problem.

C.C. Collection: The month has been very busy, we had some problems with the Barkway Pump Station. The pumps were not pumping to capacity, we found Pump #1 was burned out and Pump #2 was very weak. We pulled both pumps out and sent them to Deckman for repair. Both pump cutters were jammed up with towels. I would recommend that we speed up the process of installing the Muffin Monster. The original plans called for us to install the Muffin Monster in the wet well however, the wet well is getting crowded. I would recommend that we do a separate manhole for the Muffin Monster.

We also had problems with the Ashbridge Pump Station. After checking the amperage, we found pump #2 pulling more amps than pump #1. We pulled the pump and sent it to Deckmens. I checked the records and found that the pumps at Ashbridge are the original pumps that were built in 1985 and installed in 1987. This will make them 33 years old. Being that the pump housings have been submerged in sewage for that long I would recommend that we order a new pump now at a cost of $23,686.00 with 8 to 12-week delivery time. Then in 2019, order a second pump. These pumps are very hard to get parts for, if you recall over the years we have always tried to keep spare internal parts on the shelves so they are readily available. We also televised several suspicious

areas where we thought we were getting INI. We did find that a manhole between Wyllpen Place and the station was taking n ground water.

R.C. Collection: the pumping station was visited on a daily basis with no problems to report. Mr. Brandolini called to report a problem with his lateral. We televised it and found that the lateral has pulled apart on the house side of the trap. Mr. Brandolini was told what was found and that when his plumber makes the repair he is to contact the Public Works Department to inspect the repairs. Pipe Date View has been contacted to come in and televise areas of concern in Quad #2 and Quad #4.

Ridley Creek: We installed the rebuilt blower. I have received pricing to install a Splitter Cooling System for the control room in the older building. 2019 budget.

Alarms: We responded to 23 alarms for the month of September.

PA One Calls: We received 97 PA One calls in September.

Rainfall: September rainfall total was 9.81

[Logo: Pennoni]

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

October 3, 2018

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – A summary and recommendations report has been prepared and will be issued prior to the October MA meeting.
  • SBR coatings – Following the September MA meeting, we prepared a revised budgetary cost estimate for a reduced scope to only coat the portions of walls that are not current coated. Removal and replacement of existing CIM coatings was deleted from the cost estimate as was coating installation on the tank floors. The revised estimate is attached with reduced quantities; unit prices were not changed. We also provided updates on the applicable cost projections for the 5-year Capital Improvement Plan.; Contact information for Chase Corporation (CIM manufacturer) was provided to the Township to conduct further discussions on detailed scope and to obtained updated pricing from the manufacturer.; We will conduct a visual inspection of the concrete and coating conditions in the next tank when it is taken offline, which we understand is tentatively scheduled for November.; It is our understanding that the warranty expires in October 2019.

RCSTP and Pump Stations’ O&M Manual

  • We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for one full year.

Supplee Valley Pipe Lining

  • We processed a final payment application and reviewed contract closeout documents from SWERP, and we submitted a final payment recommendation letter.

Barkway Pump Station Grinder

  • We have revisited the approach to installation of the Muffin Monster inside the wet well with Mark Miller and the equipment vendor due to recent accessibility issues within the wet well experienced by the Public Works Department during emergency pump replacements. Installation of an upstream Muffin Monster within a prefabricated manhole is being explored again in more detail as a result. An updated equipment quote of $58,000 was obtained from the vendor for the manhole system. For reference, the wet well mounted system material cost is $33,450, so the outside unit is approximately $25,000 more. However, the Township has received a $32,309 grant for the project from the PA DCED Small Water and Sewer Grant program, which would help to offset this additional cost.
  • Our design was 95% complete for the internal Muffin Monster. If the manhole system is to be pursued, we would need to revise the design and plans, coordinate with the vendor, perform a limited field

EGMAU18001
October 3, 2018
Page 2
East Goshen Municipal Authority
Engineer’s Report

survey to determine existing sewer elevations for design of the manhole location and depth as well as topography, obtain PA One Call utility information, prepare a limited existing site plan, and provide notification of the proposed system to DEP. We propose this additional effort for a lump sum of $7,000.00.

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Lane, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • The contractor provided all required insurance and bonding documents, and the contract has been executed. A pre-construction meeting was held on October 2. The contractor is planning to start the work in mid-November, and he anticipates 2 weeks to complete the project. The contract allows for 20 consecutive calendar days.

I&I Support and Reporting

  • We intended to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. However, there have been issues with obtaining instantaneous meter data from the permanent collection system meters. If instantaneous data is not available, we will perform a limited analysis of all permanent meters based on daily flow data, and we will prepare a semi-annual I&I report accordingly. We propose to make a summary Powerpoint presentation at a MA meeting once the next report is submitted.

New Connections

  • No activity since last report.

West Goshen Sewer System Consultation

  • No activity since last report.

Capital Improvement Planning

  • We provided updated cost information for the SBR Coatings as discussed above.

P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-10-03.docx

[Logo: Pennoni]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

RCSTP SBR Tanks Coatings
Opinion of Probable Costs

9/12/2018

PRE-DESIGN BUDGETARY OPINION

This estimate is based upon maintaining the existing coatings as-is and only coating the currently uncoated portions of the walls.

Description Quantity Unit Unit Price Cost
Tank 1
86' x 16' Wall Coating Removal 0 SF $ 5 $ -
1 - 86' x 8' Walls Coating 688 SF $ 20 $ 13,760
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 0 SF $ 20 $ -
Subtotal $ 32,960
Tank 2
2 - 86' x 16' Wall Coating Removal 0 SF $ 5 $ -
2 - 86' x 8' Walls Coating 1,376 SF $ 20 $ 27,520
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 0 SF $ 20 $ -
Subtotal $ 46,720
Tank 3
2 - 86' x 16' Wall Coating Removal 0 SF $ 5 $ -
2 - 86' x 8' Walls Coating 1,376 SF $ 20 $ 27,520
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 0 SF $ 20 $ -
Subtotal $ 46,720
Tank 4
86' x 16' Wall Coating Removal 0 SF $ 5 $ -
1 - 86' x 8' Walls Coating 688 SF $ 20 $ 13,760
2 - 20' x 24' Walls Coating 960 SF $ 20 $ 19,200
20' x 86' Floor Slab Coating 0 SF $ 20 $ -
Subtotal $ 32,960
Subtotal $ 159,360
Construction Contingency Percent 20% $ 31,872
Construction Total $ 191,232
Engineering & Inspections Percent 15% $ 28,685
GRAND TOTAL (rounded) $ 220,000

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

C:\Users\convert\AppData\Local\Temp\1\task-669661597\8352b85f20832db6a7d4c9aeb8098c8d; Tank Coating Tab 1 of 1

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

Executive Summary

The Ridley Creek sewage treatment plant outfalls 001 and 002 achieved compliance with the permitted effluent discharge limitations for during the month of August 2018. Discharge to the Applebrook irrigation lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for the August 2018 DMR.

Table 1
August 2018 - Final Effluent - Out Fall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
August 7, 2018 0.185 3.1 4.8 1 1.5 0.139 0.21 0.10 0.15 1 0.0000
August 14, 2018 0.325 3.5 9.5 6 16.3 0.338 0.92 0.25 0.68 68 1.8325
August 21, 2018 0.321 2.6 7.0 3 8.0 0.195 0.52 0.19 0.51 1 0.0000
August 28, 2018 0.202 2.0 3.4 2 3.4 0.180 0.30 0.35 0.59 1 0.0000
Average 0.258 2.7 6.6 4 9.2 0.238 0.58 0.26 0.59 23 0.6108
Minimum 0.185 2.0 3.4 1 1.5 0.139 0.21 0.10 0.15 1 0.0000
Maximum 0.325 3.5 9.5 6 16.3 0.338 0.92 0.35 0.68 68 1.8325

The total phosphorus monthly average was reported as 0.26 mg/L as compared to the permitted limitation of 0.50 mg/L. Total phosphorus discharge concentrations ranged from 0.10 to 0.35 mg/L. The ammonia as nitrogen monthly concentration

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

was reported as 0.238 mg/L as compared to the permit discharge limitation of 2.5 mg/L. The ammonia as N weekly maximum was 0.338 mg/L. The total suspended solids (TSS) monthly concentration was reported as 4 mg/L as compared to the permit discharge limitation of 10 mg/L. The weekly maximum concentration was 6 mg/L as compared to the permit discharge limitation of 15 mg/L.

Table 2 illustrates the final effluent composite sample data reported for the August 2018 DMR.

Table 2
August 2018 - Applebrook - Out Fall 002

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
40 42
Sample Date
August 7, 2018 0.1532 3.1 4.0 1 1.3 0.139 0.178 0.10 0.13 1 0.0000
August 14, 2018 0.1527 3.5 4.5 6 7.6 0.338 0.430 0.25 0.32 68 1.8325
August 21, 2018 0.1511 2.6 3.3 3 3.8 0.195 0.246 0.19 0.24 1 0.0000
August 28, 2018 0.1472 2.0 2.5 2 2.5 0.180 0.221 0.35 0.43 1 0.0000
Average 0.1511 2.8 3.5 3 3.8 0.213 0.269 0.22 0.28 18 0.4581
Minimum 0.1472 2.0 2.5 1 1.3 0.139 0.178 0.10 0.13 1 0.0000
Maximum 0.1532 3.5 4.5 6 7.6 0.338 0.430 0.35 0.43 68 1.8325

The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during August 2018.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

Table 3
August 2018 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
August 7, 2018 0.452 297 1,119 488 1,838 34.9 131 34.5 130 3.0 11.3
August 14, 2018 0.558 96 362 96 362 12.5 58 12.1 56 7.0 26.4
August 21, 2018 0.603 132 497 168 633 24.3 122 31.3 157 3.4 12.8
August 28, 2018 0.466 247 930 344 1,296 26.2 102 42.0 163 5.9 22.2
Average 0.520 193 727 274 1032 24.5 103 30.0 127 4.8 18.2
Minimum 0.452 96 362 96 362 12.5 58 12.1 56 3.0 11.3
Maximum 0.603 297 1,119 488 1838 34.9 131 42.0 163 7.0 26.4

Table 4 presents the available Outfall 001 final effluent data for the month of September 2018. Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.

The facility is anticipated to achieve compliance with the discharge permit limitations during the month of August 2018. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

During August, the presence of foam conditions on the surface of the SBRs remained consistent at approximately 75% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures within the SBRs, coupled with raising the food to mass ratios, the foam concentrations have decreased.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

Table 4
September 2018 - Final Effluent - Out Fall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
September 4, 2018 0.225 2.0 3.8 3 5.6 3.21 6.02 0.19 0.36 1 0.0000
September 11, 2018 0.364 2.0 6.1 2 6.1 0.100 0.30 0.14 0.43 1 0.0000
September 18, 2018 0.447 3.6 13.4 2 7.5 0.123 0.46 0.14 0.52 2 0.3010
September 25, 2018 0.503 0.10 0.42
Average 0.385 2.5 7.7 2 6.4 1.144 2.26 0.14 0.43 1 0.1003
Minimum 0.225 2.0 3.8 2 5.6 0.100 0.30 0.10 0.36 1 0.0000
Maximum 0.503 3.6 13.4 3 7.5 3.210 6.02 0.19 0.52 2 0.3010

Table 5 presents the available September data for Outfall 002, Applebrook. The discharge limitations for Outfall 002 are anticipated to remain within compliance with the NPDES permit. Discharge to Applebrook, Outfall 002 was 4,410,592 gallons during September.

Table 5
September 2018 - Applebrook - Out Fall 002

NPDES Permit
Discharge Limitations
Flow CBOD5 TSS NH4-N Phosphorus,Total , mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
40 42
Sample Date
September 4, 2018 0.1497 2.0 2.5 3 3.7 3.210 4.008 0.19 0.24 1 0.0000
September 11, 2018 0.1461 2.0 2.4 2 2.4 0.100 0.122 0.14 0.17 1 0.0000
September 18, 2018 0.1510 3.6 4.5 2 2.5 0.123 0.155 0.14 0.18 2 0.3010
September 25, 2018 0.1515 0.10 0.13
Average 0.1496 2.5 3.2 2 2.9 1.144 1.428 0.14 0.18 1 0.1003
Minimum 0.1461 2.0 2.4 2 2.4 0.100 0.122 0.10 0.13 1 0.0000
Maximum 0.1515 3.6 4.5 3 3.7 3.210 4.008 0.19 0.24 2 0.3010

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

Table 6
September 2018 - Influent Wastewater

Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
September 4, 2018 0.457 192 731 208 792 23.1 88 34.6 132 6.2 23.6
September 11, 2018 0.594 160 609 188 716 16.1 80 24.1 119 2.9 11.0
September 18, 2018 0.724 108 411 224 853 18.8 113 19.6 118 3.8 14.5
September 25, 2018 0.731
Average 0.626 153 584 207 787 19.3 94 26.1 123 4.3 16.4
Minimum 0.457 108 411 188 716 16.1 80 19.6 118 2.9 11.0
Maximum 0.731 192 731 224 853 23.1 113 34.6 132 6.2 23.6

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during August and September. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

Significant Rainfall

During September, there were sixteen (16) days when rainfall occurred. Seven (7) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period as well as consecutive days of

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

precipitation exceeding 0.5 inches of rainfall. A total of 10.52 inches of rainfall measured during the month. These events occurred on:

September 1st 0.94 inches
September 7th 0.30 inches
September 8th 1.82 inches
September 9th 0.83 inches
September 10th 1.12 inches
September 11th 0.07 inches
September 12th 0.06 inches
September 13th 0.21 inches
September 14th 0.04 inches
Eight (8) consecutive days of rainfall for a total of 4.45 inches
September 18th 1.33 inches
September 23rd 0.04 inches
September 24th 0.64 inches
September 25th 0.45 inches
September 26th 1.00 inches
September 27th 0.32 inches
September 28th 1.35 inches
Six (6) consecutive days of rainfall for a total of 3.80 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfalls 001 and 002. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.

PA DEP

No activity

Solids Dewatering and Disposal:

September 2018
Gallons of sludge dewatered 278,729 gallons
Number of dumpsters 4

*Sixteen (16) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 10

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report:
September 2018

Chemical Usage:

Chemical September 2018
Daily Average Total Monthly
Soda Ash 257 7,700 gallons
Aluminum Sulfate solution 52.3 1,569 gallons
Polymer (centrifuge) 0.85 14.45 gallons

*Seventeen (17) days of centrifuge operation

Flow data:

Flow Meter Location September 2018 Daily Maximum Flow, gpd
Total Volume for Month, MG Average Daily Flow, gpd
Influent Wastewater to Screening Building* 24.646 821,528 1,394,410
Influent Wastewater to SBRs 17.720 590,682 903,808
Internal Recycle NA NA NA
Treated Effluent to Disc Filters 17.419 580,634 855,808
Final Effluent Discharge 9.944 331,467 557,000
Applebrook Golf Course 4.411 151,442 163,952

Conversation with John Laidley, (M&S) suggested that the meter be removed and returned to the factory for repair. The influent flow data to the SBR was used to prepare the influent flow supplemental form, which is also used for the PA DEP Chapter 94 report.

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned piping within SBR building
  • Cleaned final effluent weir trough daily
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 10

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2018

Major Preventative Maintenance Activities

Blower B1B

The blower was removed and sent out for evaluation by the Township.

SBR 2

Repairs were completed to the tank. The motive pump was rebuilt and reinstalled by the Township staff.

SBR 1 Motive Pump

Observed a seal failure. The pump is operational and under observation.

Aqua Aerobic Disc Filters

On September 11th, valve number 1 on disc filter number 2 was replaced. In addition, valve number 1 on disc filter number 1 was replaced. Eight (8) new valves were ordered by the Township. As a proactive measure, on September 18th, the remaining three (3) valves were replaced with new valves and on September 19th, the remaining three (3) valves on disc filter number 2 were replaced.

It is worthy to mention that during the year 2010, Aqua Aerobic replaced all eight (8) valves as a warranty claim during the initial phase of operation of the new treatment facility.

Fine Screen Unit

On September 12th, completed a pact repair on the auger basket to improve removal of rags. The unit has been in continual service for eight (8) years. A visit with the vendor to review and evaluate recommended fine screen maintenance and repairs is planned during October.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 8 of 10

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2018

UV System

The Ridley Creek WWTP has a Barrier Sunlight H-4XE-HO-5W-2B-1C, Vineland Project 550001 UV system. One of the UV module power connectors (Harting) has been burned up. The manual we have does not have any description, or part numbers for this plug/connector. Since operation commenced during 2010, this system has continually experienced ballast failures, both Siemens products and after market products. The Township has implemented corrected actions to improve the power supply to the UV system, however, it appears that the issue may be related to the original connectors provided by Siemens. Below are key discussion points with Siemens during the past couple of months working to identify a solution for a failed rack on UV bank number 2.

Siemens commented that the power connector is “indeed Horrible. The lead Service technician, Steve, and his team have gone around the country re-habbing this module. They often have plants send us or drive us the modules for repair. In your case, driving it here is better.”

They suggested that sometimes, the wrong parts or inferior aftermarket components will cause things to burn up. They have requested where the parts are coming so they can diagnose. They believe something does not look right.

About the photos sent of the UV Control panel, their electrical guys say there are way too many wires just sitting on the bottom of the enclosure. This causes cross talk and other issues as the ballasts and lamps are sensitive.

Siemens reports that there is nothing they can do onsite. They recommend bringing the modules 2.5 hours from West Chester to new Jersey for the to rebuild. Siemens reported that they don’t have time or equipment to fix it on site.

Siemens recommends delivering one (1) entire bank of UV modules, which is five (5) racks, for they to rebuild. They commented that don’t look to make a huge profit when doing rehabs. They cover our costs and then put in some profit.

I was wondering if you could provide me with part numbers, and pricing for this plug? I really can’t find any additional numbers, or information for the system.

Around the 2010 – 2011, one the UV racks caught fire and required replacing. The decision was to deliver on of the racks to new Jersey for rebuilding.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 9 of 10

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
September 2018

Recommendation:

Remove and deliver one (1) entire bank, five (5) racks, to Siemens in New Jersey for rebuilding. After the rebuilt racks are returned and installed, evaluate operation, note any failures or problems for a period of four (4) months. If problems continue, work with Siemens to resolve the issues. Should no problem exist, send the second UV bank during mid 2019 for rebuilding.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 10 of 10

DRAFT

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
September 10, 2018

The East Goshen Township Municipal Authority held their regular public meeting on Monday, September 10, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Dana Pizarro, Phil Mayer and Kevin Cummings. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Public Works Director), Michael Ellis (Pennoni), Scott Towler (Plant Operator), Jessica Wiesak (Attorney) and Walter Wujcik (Conservancy Board).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Jack asked if anyone would be recording the meeting. There was no response.
The Municipal Authority and their engineer had a tour of the West Goshen Plant before tonight’s meeting.

Chairman’s Report

Jack reported that he attended the West Goshen meeting. The agreement with West Whiteland is done. They don’t inspect for illegal connections. On September 20, 2018 the Board of Supervisors will hold their regular meeting and want the Sewer Authority to be there because of the rate increase. Also, there will be a tour for the public of the West Goshen Sewer Plant on September 26, 2018.

Sewer Reports

1. Director of Public Works, Mark Miller’s report for August:

Monthly Flows: The average daily flow to West Goshen was 787,000 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. The meters were calibrated two weeks ago with no problems. The Paoli Pike meter is out of service due to a PECO problem. They have been notified and we are waiting on them for repairs.
C.C. Collection: The pump stations were visited on a daily basis. The emergency generators were serviced; no problems were found. The older generator at Ridley is going through engine oil so much that we have started checking it on a weekly basis. This unit is scheduled to be replaced in 2019. As you know, the Muffin Monster at Ashbridge is on its way out. I hope to have it replaced next week.

MA 9-10-18 draft 1

We were notified of a sewer lateral back up in Marydell. We plunged the lateral to clear the backup. We had a phone line problem at Ashbridge and Verizon was notified and the line has been repaired.
R.C. Collection: There were no problems to report for the month.
R.C. Plant: The pumps were picked up at Deckmens and returned to SBR2.
Alarms: We responded to 15 alarms for August.
PA One Calls: We received 61 PA One calls for August.
Rainfall: August rainfall total was 10.85 inches.
Mark also reported that the school across the street from the Township Building had a sewer malfunction. A trap was broken. It was fixed today. The school was closed for 2 days. There was a lot of ground water.

2. Pennoni Engineer’s Report for July

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – Upon receipt of Big Fish’s study analysis , a summary report will be issued.
  • SBR Coatings – We will submit a report summarizing our structural engineer’s visual inspection of the SBR #2 wall coatings and concrete conditions prior to the September MA meeting. Notably, there is corrosion occurring on certain iron piping and fittings for which blasting & coating and replacement is recommended.; A meeting was conducted at the site to determine the coating blistering repair approach in SBR#2 with Pennoni, Dutchland, Township staff and Kevin Cummings. Dutchland subsequently made spot repairs to blisters on the walls.; We also sampled the pH of water behind the blisters in SBR#2. The pH of water in blisters on the floor was 14, and the pH of blisters on the wall was 10-11. However, there were difficulties sampling the wall blisters due to lack of water so those results may not be fully indicative of the actual condition.; It is our understanding that the warranty expires in October 2019.; Kevin explained what he observed. He went physically into SBR#2 and looked at the blistering. It was minor. He explained how the moisture runs through the channels in the concrete. The pH was high at 14, which means it is caustic. He didn’t see any structural damage. He recommends that they don’t remove the existing coatings at this point. He also recommended that, whenever the repair of the blisters is done, they use epoxy. Mark will continue with the current maintenance schedule and will get pricing for the coatings.

MA 9-10-18 draft 2

RCSTP and Pump Stations’ O&M Manual

  • We recommend the Manual be revisited in July-August 2018 to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for one full year..

Supplee Valley Pipe Lining

  • We determined in coordination with SWERP and Mark Miller, that the remaining two lateral saddle repairs will not be performed under this contract due to lack of access and risk of improper installation. The contract is therefore complete, and we are awaiting submission of closeout documents and a final payment application from SWERP.

Barkway Pump Station Grinder

  • We met with Mark Miller on June 5 to review our design plans. We are re-evaluating the feasibility of coring the wet well to run the hydraulic lines rather than entering through the top of the wet well steel hatch. However, a site investigation is required to accurately determine coring feasibility due to inconsistencies in how the foundation is shown on the original pump station design plans. The design plans will be finalized thereafter. No update sine our last report.

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • We received the Form of Agreement, bonds and insurance documentation from the awarded contractor. The Agreement and bonds are acceptable, but there have been several issues with their insurance coverage including a gap in their worker’s compensation (WC) coverage. They obtained new WC coverage this week. We are still awaiting a minor change to their auto policy coverage and confirmation that their umbrella covers all other policies. Once we receive those items, the Agreement can be signed by the MA.
  • The contractor is planning to perform the work in early November, and he anticipates 2 weeks to complete the project. The contract allows for 20 consecutive calendar days.

I&I Support and Reporting

  • We intended to analyze meter data and submit the next semi-annual I&I report following completion of the Supplee Valley pipe lining project so that the impact of that project can be assessed. However, there have been issues with obtaining instantaneous meter data from the permanent collection system meters, so we are evaluating if there is adequate data to prepare an I&I report or analysis at this time. We propose to make a summary Powerpoint presentation at a MA meeting once the next report is submitted.

New Connections

  • No activity since last report.

MA 9-10-18 draft 3

West Goshen Sewer System Consultation

  • No activity since last report.

Capital Improvement Planning

  • No activity since last report.

3. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with the permitted effluent discharge limitations during the month of July 2018. Discharge to the Applebrook irrigation lagoon continued during the month. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Scott mentioned the amount of rainfall in August and that September had 4 inches of rain in 4 days so far. As of yesterday, almost 1 million gallons went to the SBRs. Inventory will be done soon. Licensing is up to date. He discussed the meters.

Approval of Minutes

The minutes of the August 13, 2018 meeting were approved as corrected.

Approval of Invoices

1. Phil moved to approve payment of the following Pennoni invoices:

Pennoni invoice #818043 200.75
Pennoni invoice #818044 933.75
Pennoni invoice #818045 822.00

Discussion: Regarding #818043 there will be 1 more for Supplee Valley. For #818044 Talmadge – this is the last for the design phase.
Dana seconded the motion. The motion passed unanimously.
2. The following 2 Pennoni invoices that were discussed at the August meeting were paid:

Pennoni invoice #815429 2,607.25
Pennoni invoice #815428 3,619.00

Liaison Reports

Conservancy Board - Walter reported that at their meeting this week they will discuss their Fall planting. Jon gave updates on the Marydell pond. The pond committee will meet individually. Jon applied for the NPDES permit. Mark Miller explained what the rain has done and how they are preparing for the pending hurricane. Mark commented that they removed about 300 fish, and 100 turtles, all large. They put them in the Reservoir and the Pin Oaks pond.

Financial Reports

Jon Altshul provided the following written report:
In August, the Municipal Authority recorded -$14.83 in income (reflecting $15 for banking fees) and $6,226 in expenses (engineering), for a negative variance of -$6,241. The fund balance is $1,595.
Jon will have a proposed budget for the November meeting..

MA 9-10-18 draft 4

New Business

1. Pump replacement for SBR Tank – Mark reported that the SBR tank #2 is down for maintenance and as part of the maintenance procedure, we pulled the pumps and sent them out to be gone over. The motive pump was pulled apart and new seals were installed and a new impeller was required. A new impeller has been ordered. It takes 6 weeks to receive it. Now the pump in SBR#1 has a seal failure and keeps shutting down. We have bypassed some wiring to keep the pump running. If we did not switch the wiring and keep the pump running, the tank will go septic. We need to purchase a new pump so, when we have a pump failure, we can pull the pump and drop in a spare pump. The cost of the pump is $21,648.00 with a delivery time of 4 to 6 weeks.
Phil made a motion to approve purchase of a new pump for $21,648.00. Kevin seconded the motion. The motion passed unanimously.

2, Pennoni Budget Supplement – Mike gave a breakdown of the approved 2018 budget which was $18,000.00. The YTD total is $17,146.50. The General Engineering is on pace with expectations, but the required effort for Tallmadge Dr. Sewer, Caustic Soda Pilot Study, and SBR Coatings has been more than projected at the beginning of the year. They are requesting a supplement of $5,000.00 for the Pennoni Budget. Kevin seconded the motion. The motion passed unanimously.
Talmadge Construction – Dana moved to approve additional funds not to exceed $9,000.00 at their hourly rates. Phil seconded the motion. The motion passed unanimously.

Adjournment

There being no further business, Kevin moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:00 p.m. The next regular meeting will be held on Monday, October 8, 2018 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 9-10-18 draft 5

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 823030
Invoice Date : 09/27/2018
Project : EGMAU17007
Project Name : Supplee Valley CIPPL Construction

For Services Rendered through: 9/16/2018

Construction coordination with Township and contractor on project completion and contract closeout documentation.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 220.75
Expense : 0.00
Phase Total : 220.75
Fee : 15,000.00 Amount Due This Invoice $220.75
Prior Billings : 14,311.50
Current Billings : 220.75
Total Billings : 14,532.25

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 0.50 123.00 61.50
Associate Professional 1.75 91.00 159.25
Labor Total: 2.25 220.75
Total Phase : **** -- Professional Services Labor : $220.75
Expense : $0.00
Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction Labor : $220.75
Expense : $0.00

OK [Initials/Signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMAU17007 Invoice Summary

Invoice Date 9/27/2018

Project: EGMAU17007
Pennoni Job No.: Supplee Valley CIPPL Construction
Invoice No: 823030
Invoice Period: 8/30/2018 to 9/16/2018
Initial Authorization: $ 12,000.00 Date: 9/27/2018
Contract Amount: $ 15,000.00
Previously Invoiced: $ 14,311.50
Current Invoice: $ 220.75
Invoiced to Date ($): $ 14,532.25
Invoiced to Date (%): 97%
Remaining Budget ($): $ 467.75
Remaining Budget (%): 3%

Budget by Phase:

Phase Name: Supplee Valley CIPP
Phase Budget: $ 15,000.00
Previously Invoiced: $ 14,311.50
Current Invoice: $ 220.75
Invoiced to Date ($): $ 14,532.25
Invoiced to Date (%): 97%
Remaining Budget ($): $ 467.75
Remaining Budget (%): 3%

Comments: Construction coordination with Township and contractor on project completion and contract closeout documentation.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

Louis F. Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice # : 823031
Invoice Date : 09/27/2018
Project : EGMAU18001
Project Name : 2018 General Services

For Professional Services Rendered through:09/16/2018

General Consultation: Prepared for and attended August and September MA meetings; attended field visit of West Goshen STP's rehabilitation projects; and prepared September Engineer's Report.

SBR Coatings: Coordinated with Dutchland, Big Fish, and Township & MA personnel for SBR #2 coating repairs; attended pre-repair field meeting on 8/22/18; sampled pH of water from behind blisters; and corresponded with MA and Township about coatings and pH. Finalized and submitted report of structural visual assessment of SBR #2 concrete conditions. Follow-up to September MA meeting on revised SBR tanks' re-coating scope: revised and submitted re-coating budgetary cost estimate to be for new wall coatings only (no replacements or floor coating), updated proposed 5-year Capital Improvement Plan accordingly, and coordinated with Township to obtain updated pricing from CIM manufacturer.

Caustic Soda Study: Initiated analysis of Big Fish's sampling data in order to finalize study report and recommendations.

Phase Code Phase Name Fee Type Contract Amount Previously Billed Current Billing Total Billing Remaining % Complete
**** Professional Services NTE $ 23,000.00 $ 15,190.50 $ 4,618.50 $ 19,809.00 $ 3,191.00 86.13%
Subtotal: $ 15,190.50 $ 4,618.50 $ 19,809.00
Total: $ 15,190.50 $ 4,618.50 $ 19,809.00
Total Amount Due $ 4,618.50

[Signature/Initials: OK]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMAU18001 -- 2018 General Services

Invoice # : 823031

...Continued from previous page

Phase : **** -- Professional Services

Rate Schedule Labor

Class / Employee Name Hours Rate Amount
Authority Engineer 15.75 123.00 1,937.25
Engineering Technician 4.25 83.00 352.75
Graduate Professional 4.25 82.00 348.50
Senior Professional 13.50 117.00 1,579.50
Sr. Engineering Technician 4.50 89.00 400.50
Rate Schedule Labor 4,618.50
Total Phase : **** -- Professional Services 4,618.50
Total Project : EGMAU18001 -- 2018 General Services 4,618.50

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. Page: 2

East Goshen Municipal Authority

EGMAU18001 Invoice Summary

Invoice Date 09/27/2018

Project: EGMAU18001
Pennoni Job No.: 2018 General Services
Invoice No: 823031
Invoice Period: 8/30/2018 to 9/16/2018
Initial Authorization: $ 18,000.00 Date: 9/27/2018
Contract Amount: $ 23,000.00
Previously Invoiced: $ 15,190.50
Current Invoice: $ 4,618.50
Invoiced to Date ($): $ 19,809.00
Invoiced to Date (%): 86%
Remaining Budget ($): $ 3,191.00
Remaining Budget (%): 14%

Budget by Phase:

Phase Name: 2018 General Services
Phase Budget: $ 23,000.00
Previously Invoiced: $ 15,190.50
Current Invoice: $ 4,618.50
Invoiced to Date ($): $ 19,809.00
Invoiced to Date (%): 86%
Remaining Budget ($): $ 3,191.00
Remaining Budget (%): 14%

Comments: General Consultation: Prepared for and attended August and September MA meetings; attended field visit of West Goshen STP's rehabilitation projects; and prepared September Engineer's Report.

SBR Coatings: Coordinated with Dutchland, Big Fish, and Township & MA personnel for SBR #2 coating repairs; attended pre-repair field meeting on 8/22/18; sampled pH of water from behind blisters; and corresponded with MA and Township about coatings and pH. Finalized and submitted report of structural visual assessment of SBR #2 concrete conditions. Follow-up to September MA meeting on revised SBR tanks' re-coating scope: revised and submitted re-coating budgetary cost estimate to be for new wall coatings only (no replacements or floor coating), updated proposed 5-year Capital Improvement Plan accordingly, and coordinated with Township to obtain updated pricing from CIM manufacturer.

Caustic Soda Study: Initiated analysis of Big Fish's sampling data in order to finalize study report and recommendations.

Pennoni

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 823033
Invoice Date : 09/27/2018
Project : EGMAU18004
Project Name : Tallmadge Dr Sewer Constr Phase

For Services Rendered through: 9/16/2018

Issued award letter to contractor; and reviewed contractor's insurance and bonding documents which involved repetitive communications with the contractor and his insurance carriers as well as review of numerous incorrect insurance document submissions in order to address non-compliant insurance coverages.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 1,333.75
Expense : 0.00
Phase Total : 1,333.75
Fee : 9,000.00 Amount Due This Invoice $1,333.75
Prior Billings : 0.00
Current Billings : 1,333.75
Total Billings : 1,333.75

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 4.00 123.00 492.00
Associate Professional 9.25 91.00 841.75
Labor Total: 13.25 1,333.75
Total Phase : **** -- Professional Services Labor : $1,333.75
Expense : $0.00
Total Project : EGMAU18004 -- Tallmadge Dr Sewer Constr Phase Labor : $1,333.75
Expense : $0.00

OK [Initials/Signature]
07426 - 3000

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMAU18004 Invoice Summary

Invoice Date 9/27/2018

Project: EGMAU18004
Pennoni Job No.: Tallmadge Drive Sewer Construction Phase
Invoice No: 823033
Invoice Period: NTP to 9/16/2018
Initial Authorization: $ 9,000.00 Date: 9/27/2018
Contract Amount: $ 9,000.00
Previously Invoiced: $ -
Current Invoice: $ 1,333.75
Invoiced to Date ($): $ 1,333.75
Invoiced to Date (%): 15%
Remaining Budget ($): $ 7,666.25
Remaining Budget (%): 85%

Budget by Phase:

Phase Name: Tallmadge Drive Sewer Construction Phase
Phase Budget: $ 9,000.00
Previously Invoiced: $ -
Current Invoice: $ 1,333.75
Invoiced to Date ($): $ 1,333.75
Invoiced to Date (%): 15%
Remaining Budget ($): $ 7,666.25
Remaining Budget (%): 85%

Comments: Issued award letter to contractor; and reviewed contractor's insurance and bonding documents which involved repetitive communications with the contractor and his insurance carriers as well as review of numerous incorrect insurance document submissions in order to address non-compliant insurance coverages.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

October 3, 2018

EGMAU17007

Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Payment Application No. 2 (Final) Recommendation Letter
Supplee Valley Sanitary Sewer Pipe Lining, Contract No. SSPL-2017

Dear Mr. Smith:

The Contractor, SWERP Incorporated, has submitted the final payment application for work completed on this project. This is the second and final payment for this project. Please note that the payment application submitted by the Contractor is titled payment application #3. This is because we did not recommend approval of the Contractor’s first payment application because the CIPP lining work was not complete at that time. However, we have observed the work-in-progress, and we confirm that the work has now been completed.

We have reviewed the attached Payment Application provided by the Contractor, and we recommend approval of the final payment in the amount of $21,614.20 conditioned upon the contractor providing the Statement of Surety and Prevailing Wage Rate Certifications to the satisfaction of Pennoni.

The original Contractor’s Release, which is a required closeout document, is attached. The Maintenance Bond was submitted at the beginning of the project.

If you have any questions, please contact me at your convenience.

Sincerely,
PENNONI ASSOCIATES INC.

[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Authority Engineer

/lef

Enclosures: Payment Application #3 (Pages 1-2)
Contractor’s Release

cc: Jon Altshul, Assistant Township Manager (via email)
Mark Miller, Public Works Director (via email)
East Goshen Municipal Authority (via email)

U:\Accounts\EGMAU\EGMAU17007 - Supplee Valley CIPPL Construction\CONSTRUCTION\PAY APPS8.10.02_Final Payment App Recommendation Ltr.docx

OWNER: Township of East Goshen

PROJECT: Supplee Valley Sanitary Sewer Pipe Lining

APPLICATION FOR PAYMENT

Current Application No. THREE Date: 08/27/2018
Period Beginning: 04/13/2018
Period Ending: 08/13/2018

ENGINEER:
Pennoni Associates, Inc.
121 Continental Drive, Suite 207
Newark, DE 19713

CONTRACTOR:
SWERP Incorporated
1237 Hayes Blvd.
Bristol, PA 19007

ITEM NO. Description Original Quantity Unit Cost Unit Quantiy or Percentage Complete Amount
Previous This Month To Date Previous This Month To Date
1 CIPP Lining of 8" Pipe Within Township Roads 2220 $31.00 LF 2,244.00 0.00 2,244.00 $69,564.00 $0.00 $69,564.00
2 Cleaning & Lining of 8" Pipe Within Easements 1009 $32.00 LF 1,021.00 0.00 1,021.00 $32,672.00 $0.00 $32,672.00
3 Lateral Reinstatements 33 $100.00 EA 30.00 0.00 30.00 $3,000.00 $0.00 $3,000.00
4 Manhole Pressure Grouting 2 $1,900.00 EA 0.00 2.00 2.00 $0.00 $3,800.00 $3,800.00
5 Grout 50 $50.00 GAL. 0.00 1.50 1.50 $0.00 $75.00 $75.00
6 CIPP Lining of 8" Pipe between MH C384 - MH C040 305 $42.00 LF 175.00 0.00 175.00 $7,350.00 $0.00 $7,350.00
7 CIPP Lining of 8" Pipe between MH C411 - MH C410 145 $40.00 LF 150.00 0.00 150.00 $6,000.00 $0.00 $6,000.00
8 CIPP Lining of 8" Pipe between MH C417 - MH C416 262 $34.00 LF 265.00 0.00 265.00 $9,010.00 $0.00 $9,010.00
9 CIPP Lining of 8" Pipe between MH C407 - MH C406 159 $34.00 LF 160.00 0.00 160.00 $5,440.00 $0.00 $5,440.00
10 CIPP Lining of 8" Pipe between MH C394 - MH C385 318 $32.00 LF 320.00 0.00 320.00 $10,240.00 $0.00 $10,240.00
11 CIPP Lining of 8" Pipe between MH C042I - MH C042H 278 $34.00 LF 285.00 0.00 285.00 $9,690.00 $0.00 $9,690.00
12 CIPP Lining of 8" Pipe between MH C042G - MH C042I 305 $32.00 LF 315.00 0.00 315.00 $10,080.00 $0.00 $10,080.00
13 Lateral Reinstatements 25 $100.00 EA 24.00 0.00 24.00 $2,400.00 $0.00 $2,400.00
c/o 1 Two Point Repair Installations 1 $5,427.00 LS 1.00 0.00 1.00 $5,427.00 $0.00 $5,427.00
c/o 2 Installation of 6 Saddle Liners and One Point Repair 1 $13,570.00 LS 0.48 0.00 0.48 $6,519.00 $0.00 $6,519.00
ORIGINAL CONTRACT ESTIMATE $175,520.00 GROSS AMOUNT DUE $181,267.00
+-CHANGE ORDER VALUES $5,747.00
CURRENT CONTRACT PLUS CHANGES $181,267.00 NET AMOUNT DUE TO DATE $181,267.00
VALUE OF WORK IN PLACE $181,267.00 LESS PREVIOUS PAYMENTS/ESTIMATES $159,652.80
ESTIMATED REMAINING WORK $0.00 AMOUNT PAYABLE THIS ESTIMATE $21,614.20

Township of East Goshen
Supplee Valley Sanitary Sewer Pipe Lining
SWERP Inc.
Pennoni Associates Inc.
Application for Payment No. Two

Manhole Grouting

Date Location
1 08/03/2018 Manhole C384
2 08/03/2018 Manhole C042FF

Supplee Valley Sanitary Sewer Pipe Lining
Contract No. SSPL-2017

(TO BE COMPLETED AFTER CONSTRUCTION)

CONTRACTOR'S RELEASE

KNOW ALL MEN BY THESE PRESENTS THAT:

SWERP Incorporated
(Contractor)

of Bristol County and State of Pennsylvania
does hereby acknowledge that he has received this 27th day of August and from the
East Goshen Municipal Authority
(Owner)
the sum of ONE DOLLAR ($1.00) and other valuable consideration in full satisfaction and payment of all
sums of money owing payable and belonging to
SWERP Incorporated
(Contractor)

by any means whatsoever, for on account of a certain agreement hereinafter called the CONTRACT,
between the said East Goshen Municipal Authority
(Owner)
and SWERP Incorporated
(Contractor)
dated 12/13/2017

NOW THEREFORE, the said SWERP Incorporated
(Contractor)

(for myself, my heirs, executors and administrators) (for itself, its successors and
assigns) do by these presents remise, release, quit-claim and forever discharge the
said East Goshen Municipal Authority
(Owner)
its successors and assigns, of and from all claims and demands arising from or in connection with the said
CONTRACT dated 12/13/2017 and of and from all, and all manner of action and actions,
cause and causes of action and actions, suits, debts, dues, duties, sum and sums of money, accounts,
reckonings, bonds, bills, specialties, covenants, contracts, agreements, promises, variances, damages,
judgments, extents executions, claims and demand, whatsoever, in law or equity, or otherwise which
against the said East Goshen Municipal Authority
(Owner)

H-4

Supplee Valley Sanitary Sewer Pipe Lining
Contract No. SSPL-2017

its successors and assigns, ever had, now have, or which (I, my heirs, executors, or administrators) (it, its successors and assigns) hereafter can, shall or may have, for upon or by reason of any matter, cause or thing whatsoever, from the beginning of the work to the date of these presents.

IN WITNESS WHEREOF SWERP Incorporated (Contractor) has caused these presents to be duly executed the 6th day of September, 2018.

Signed, Sealed and Delivered in the presence of:

_____________________________________(SEAL)
(Individual)
_____________________________________(SEAL)
(Partnership Contractor)
By ____________________________________(SEAL)
(Partner)
Attest:
[Signature: Laura Maszczak]
(Secretary)
Laura Maszczak
(CORPORATE SEAL)
By [Signature: James T. Brooks]
(President or Vice-President)
James T. Brooks, V.P.

H-5

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
09/10/2018
Client No: 6604-001M
Invoice No. 199945

General Authority Services

Fees

Date Timekeeper Description Hours Amount
08/02/2018 SLF Telephone call from M Ellis, review of notes, email to M Ellis, telephone call from M Ellis. 0.80
08/09/2018 PMM Email from S Smith with meeting materials. 0.20
08/13/2018 PMM Review and analyze meeting materials in preparation for meeting; Attend Authority meeting. 1.50
For Current Services Rendered 2.50 500.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Stacey L. Fuller 0.80 $200.00 $160.00
Patrick M. McKenna 1.70 200.00 340.00

Total Current Charges: 500.00

Balance Due: $500.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA August Financial Report
Date: October 3, 2018

In September, the Municipal Authority recorded $29,985 in income (a $30,000 transfer from Sewer Operating, net of banking fees) and $10,839 in expenses, including $8,382 from the Q3 administrative overhead charge back, for a positive variance of $19,147. The fund balance is $20,741.

EAST GOSHEN TOWNSHIP

Other Funds

September 2018

Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
REVENUE
INTEREST EARNINGS 07341 1000 10 8 (101.07) (109.07) 1 (14.59) (15.59)
CAPITAL RESERVE-INTEREST 07341 1010
INTEREST EARNED - CONSTRUCTION 07341 1020 50 50 613.94 563.94
DCED GRANT 07354 0400
C.C. TAPPING FEES 07364 1100 8,000 4,000 (4,000.00)
R.C.TAPPING FEES 07364 1110 2,000 2,000 2,000.00
M.C. LOAN PAYMENTS 07364 1120
CONNECTION FEES - SEWER 07364 1130 1,692 846 1,127.52 281.52
MISCELLANEOUS REVENUE 07380 1000 564.51 564.51
TRANSFER FROM GENERAL ACCT 07392 0100 71.30 71.30
TRANSFER FROM SEWER OPERATING 07392 0500 89,853 56,889 90,000.00 33,111.00 6,321 30,000.00 23,679.00
TRANSFER-ANNUAL CAP.RESERVE 07392 0510
GRANT REVENUE 07392 0800
LOAN PROCEEDS - SEWER PROJECT 07392 0804
TRANSFER FROM SEWER CAP RESERVE 07392 0900
TRANSFER FROM RCSTP BUDGET 07392 0990
LOAN PROCEEDS-SEWER PROJECT 07393 1001
TOTAL REVENUE 101,605 63,793 94,276.20 30,483.20 6,322 29,985.41 23,663.41
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,411 24,308 24,703.02 (395.02) 8,103 8,382.36 (279.36)
R.C. LOAN ISSUANCE COSTS 07424 1500
MISCELLANEOUS EXPENSE 07424 3000 2,500 1,875 1,336.00 539.00 209 209.00
MUNIC.AUTH.-AUDITING 07424 3110 9,384 9,384 9,400.00 (16.00)
ENGINEERING SERVICES 07424 3130 43,260 32,445 58,442.89 (25,997.89) 3,605 1,134.50 2,470.50
LEGAL SERVICES 07424 3140 3,420.00 (3,420.00) 500.00 (500.00)
W.G. C.C.STP-UPGRADE 07424 7400
MANHOLE COVER REPLACEMENTS 07424 7405
C.C. CAPITAL - METERS 07424 7410
C.C. CAPITAL- COLLECTION 07424 7420
C.C. CAPITAL- INTERCEPTOR 07424 7430
CAPITAL PROJ.-ENGINEERING 07424 7431
R.C. CAPITAL-STP 07424 7440
R.C. CAPITAL - COLLECTION 07424 7450
R.C.-CAP. PROJ.-ENGINEER 07424 7451
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452
R.C. CAP EXPANSION - ELECTRICAL 07424 7453
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455

PAGE 10
Report Date 1809 10/03/18 1 : 09 PM

EAST GOSHEN TOWNSHIP

Other Funds

September 2018

Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456
LOCHWOOD - CAPITAL -STP 07424 7460
LOCHWOOD-CAPITAL-COLLECT. 07424 7470
LOCHWOOD ABANDONMENT ENGINEER 07424 7475
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476
LOCHWOOD ELIMINATION PHASE 2 07424 7477
CAP.REPLACEMENT R.C. 07424 7490
CAPITAL REPLACEMENT ASHBRIDGE 07424 7491
MARYDELL PUMP STATION - ENGINEER 07425 1000
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000
HERSHEY MILL STATION - ENGINEER 07426 1000
HERSHEY MILL STATION - CONSTRUCTION 07426 2000
TALLMADGE DRIVE 07426 3000 14,000 10,500 15,966.00 (5,466.00) 1,167 822.00 344.67
RESERVE PUMP STATION - ENGINEER 07427 1000
RESERVE PUMP STATION - CONSTRUCTION 07427 2000
RESERVOIR PUMP STATION - ENGINEER 07428 1000 188.00 (188.00)
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000
ASBESTOS CONCRETE ENGINEERING 07429 3130
DIVERSION PROJ.- LEGAL 07429 3166
WEST GOSHEN CAPITAL 07429 6100 59,736 59,736 102,339.08 (42,603.08)
M.C.-DVRFA-DEBT SERVICE 07471 1000
M.A.-R.C. DEBT SERVICE 07471 1010
DVRFA PUMPING STATIONS - PRINCIPAL 07471 2000
M.C.-DVRFA-INTEREST PAYMN 07472 1000
M.A.-R.C. INTEREST 07472 1010
DVRFA PUMPING STATIONS - INTEREST 07472 2000
TRANSFER TO GENERAL FUND 07492 0100 71.30 (71.30)
TRANSFER TO SEW.OPERATING 07492 0500
TRF TO SEWER SINKING FUND 07492 0550
TRANSFER TO AUTHORITY CAP FUND 07492 0990
TOTAL EXPENSES 161,291 138,248 215,866.29 (77,618.29) 13,084 10,838.86 2,244.81
NET RESULT FROM OPERATIONS (59,686) (74,455) (121,590.09) (47,135.09) (6,762) 19,146.55 25,908.22

PAGE 11
Report Date 1809 10/03/18 1 : 09 PM

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1801 JE 61740 0.31 02/02/18 INTEREST INTEREST EARNED JANUARY 2018 07 FUND
1801 0.00 0.31 -0.31
1802 61932 0.20 02/14/18 INTEREST INTEREST ADJ. FROM JAN.2018 7105.2000
62159 0.54 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018 07 FUND
1802 0.00 0.74 -1.05
1803 EX 62192 15.00 03/06/18 62192 1 REIMBURSE S/R FOR BANK FEES INTEREST EARNINGS
JE 62535 0.47 04/02/18 INTEREST INTEREST EARNED MARCH 2018 07 FUND
1803 15.00 0.47 13.48
1804 EX 62551 15.00 04/02/18 62551 1 REIMB.S/R FOR 3/2018 BANK FEES INTEREST EARNINGS
JE 62904 0.55 05/01/18 INTEREST INTEREST EARNED APRIL 2018 07 FUND
1804 15.00 0.55 27.93
1805 EX 62911 15.00 05/01/18 62911 1 REIMBURSMT- 4/2018 BANK FEES INTEREST EARNINGS
63388 15.00 06/01/18 63388 1 BANK FEES - MAY 2018 INTEREST EARNINGS
63449 15.00 06/05/18 REVERSE REVERSE TRX 63388 EXPENSE TO BE ENTERED IN JUNE NOT MAY
JE 63377 0.51 06/01/18 INTEREST INTEREST EARNED MAY 2018 07 FUND
1805 30.00 15.51 42.42
1806 EX 63459 15.00 06/05/18 63459 1 REIMBURSE S/R FOR MAY '18 FEES INTEREST EARNINGS
JE 63815 0.40 07/03/18 INTEREST INTEREST EARNED JUNE 2018 07100.1035
1806 15.00 0.40 57.02

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 1807 EX 63820 15.00 07/03/18 63820 5 REIMBURSE S/R - 6/2018 BK.FEES INTEREST EARNINGS
64317 15.00 07/30/18 64317 1 REVERSE EXP.TRX 63820 M&T BANK - GEN'L CHKG # 98526374
64322 15.00 07/30/18 64322 1 REIMBURSE S/R - 6/2018 BK.FEES INTEREST EARNINGS
JE 64264 0.40 08/02/18 INTEREST INTEREST EARNED JULY 2018 07100.1035
1807 30.00 15.40 71.62
1808 EX 64289 15.00 08/03/18 64289 1 REIMBURSE S/R - 7/2018 BK FEES INTEREST EARNINGS
JE 64731 0.14 09/04/18 INTEREST INTEREST EARNED AUGUST 2018 07100.1035
1808 15.00 0.14 86.48
1809 64751 15.00 09/05/18 BANK FEES REIMBURSE S/R FOR AUGUST 2018 BANK FEES
65132 0.41 10/01/18 INTEREST INTEREST EARNED SEPT.2018 07100.1035
1809 15.00 0.41 101.07
07341-1000 **** *** **** 135.00 33.93 101.07
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1801 61740 391.64 02/02/18 INTEREST INTEREST EARNED JANUARY 2018 07 FUND
1801 0.00 391.64 -391.64
1802 62159 69.31 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018 07 FUND
1802 0.00 69.31 -460.95
1803 62535 81.66 04/02/18 INTEREST INTEREST EARNED MARCH 2018 07 FUND
1803 0.00 81.66 -542.61

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 3

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1020 1804 JE 62904 71.30 05/01/18 INTEREST INTEREST EARNED APRIL 2018 07 FUND
1804 0.00 71.30 -613.91
1805 63377 0.03 06/01/18 INTEREST INTEREST EARNED MAY 2018 07 FUND
1805 0.00 0.03 -613.94
07341-1020 **** *** **** 0.00 613.94 -613.94
07364-1110 R.C.TAPPING FEES 0.00
1807 RE 63982 2,000.00 07/13/18 ROBERTS TAP IN FEE FOR MARLIN DR R.C.TAPPING FEES
1807 0.00 2,000.00 -2,000.00
07364-1110 **** *** **** 0.00 2,000.00 -2,000.00
07364-1130 CONNECTION FEES - SEWER 0.00
1801 CR 61617 423.00 01/25/18 2572 10606 1 STOFFLET, MICHAEL
1801 0.00 423.00 -423.00
1802 61894 423.00 02/13/18 494 10607 1 JACOBS, ROBERT & CHERYL
62079 423.00 02/27/18 148 10605 1 GEORGE SMITH & CHRISTINA CONLE
JE 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 423.36 846.00 -845.64
1803 CR 62407 423.00 03/23/18 0011373243 10608 1 PAPPANO, JOSEPH & PATRICIA
JE 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO
1803 141.12 423.00 -1,127.52
07364-1130 **** *** **** 564.48 1,692.00 -1,127.52

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 4

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07380-1000 MISCELLANEOUS REVENUE 0.00
1802 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 0.00 423.36 -423.36
1803 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO
1803 0.00 141.12 -564.48
1808 64477 0.03 08/16/18 DEPOSIT DEPOSIT CK.7100.1035 TO CLOSE OUT FULTON 7105.2000
1808 0.00 0.03 -564.51
07380-1000 **** *** **** 0.00 564.51 -564.51
07392-0100 TRANSFER FROM GENERAL ACCT 0.00
1805 63470 71.30 06/07/18 XFER XFER $ TO MA REGARDING DEPOSIT ERROR 5/10/18
1805 0.00 71.30 -71.30
07392-0100 **** *** **** 0.00 71.30 -71.30
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1803 62490 30,000.00 03/29/18 XFER XFER $ FROM SEWER TO MUNICIPAL TO COVER EXPENSES
1803 0.00 30,000.00 -30,000.00
1806 63665 30,000.00 06/22/18 XFER XFER $ FROM SEWER TO MA
1806 0.00 30,000.00 -60,000.00
1809 64868 30,000.00 09/12/18 XFER XFER FROM SEWER TO M.A. 9/12/18
1809 0.00 30,000.00 -90,000.00

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 5

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07392-0500 **** *** **** 0.00 90,000.00 -90,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1803 CD 62424 8,160.33 03/26/18 3121 425 EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2018 REIMBURSEMENT - MA
1803 8,160.33 0.00 8,160.33
1806 63636 8,160.33 06/21/18 3129 425 EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2018 REIMBURSEMENT - MA
1806 8,160.33 0.00 16,320.66
1809 65076 8,382.36 09/28/18 3135 425 EAST GOSHEN TOWNSHIP - GENERAL QTR.3 2018 REIMBURSEMENT - MUN.A
1809 8,382.36 0.00 24,703.02
07424-1400 **** *** **** 24,703.02 0.00 24,703.02
07424-3000 MISCELLANEOUS EXPENSE 0.00
1801 61728 100.00 01/31/18 3114 3353 COMMONWEALTH FINANCING AUTHORITY GRANT APPLIC. DCED - WATER & SEW PROGRAM FOR BARKWAY
1801 100.00 0.00 100.00
1805 63278 1,236.00 05/30/18 3125 3871 DELAWARE RIVER BASIN COMMISSION ANNUAL FEE D-2000-030 CP WASTE WATER DISCHARGE
1805 1,236.00 0.00 1,336.00
07424-3000 **** *** **** 1,336.00 0.00 1,336.00
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1803 62396 6,964.00 03/22/18 3120 808 MAILLIE FALCONIERO & CO. PROGRESS BILLING - M.AUTHORITY 2 FINANCIAL STATEMENTS

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 6

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1803 6,964.00 0.00 6,964.00
1804 62732 2,436.00 04/17/18 3123 808 MAILLIE FALCONIERO & CO. EXAMINATION 2017 MA FINANCIAL ST
1804 2,436.00 0.00 9,400.00
07424-3110 **** *** **** 9,400.00 0.00 9,400.00
07424-3130 ENGINEERING SERVICES 0.00
1801 61613 12,523.56 01/24/18 3113 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/10/17 2017 GENERAL SERVICES
1801 12,523.56 0.00 12,523.56
1802 61944 5,415.00 02/15/18 3115 1052 PENNONI ASSOCIATES INC. SERVICES THRU 1/14/18 -2017 GENE
62032 552.50 02/22/18 3117 1052 PENNONI ASSOCIATES INC. SERVICE THRU 1/14/18 SUPPLEE VA
1802 5,967.50 0.00 18,491.06
1803 62323 11,749.08 03/15/18 3118 1052 PENNONI ASSOCIATES INC. SERVICES THRU 2/11/18 2018 GEN.S
1803 11,749.08 0.00 30,240.14
1806 63480 9,622.25 06/07/18 3126 1052 PENNONI ASSOCIATES INC. SERVICES THRU 4/15/18 SUPPLEE VA
63544 7,503.93 06/12/18 3127 1052 PENNONI ASSOCIATES INC. SERVICES THRU 5/20/18 BARKWAY PS
1806 17,126.18 0.00 47,366.32
1807 63960 16,879.82 07/11/18 3130 1052 PENNONI ASSOCIATES INC. SERVICES THRU 6/17/18 BARKWAY
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 16,879.82 10,556.75 53,689.39

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 7

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1808 CD 64451 3,619.00 08/15/18 3132 1052 PENNONI ASSOCIATES INC. PROF.SERV. THRU 8/5/18 2018 GENE
1808 3,619.00 0.00 57,308.39
1809 64831 1,134.50 09/11/18 3133 1052 PENNONI ASSOCIATES INC. SERVICES THRU 8/12/18 SUPPLEE VA
1809 1,134.50 0.00 58,442.89
07424-3130 **** *** **** 68,999.64 10,556.75 58,442.89
07424-3140 LEGAL SERVICES 0.00
1801 61613 680.00 01/24/18 3112 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES DEC. 2017 GEN.AUT
1801 680.00 0.00 680.00
1802 62032 240.00 02/22/18 3116 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN.2018 GEN.AUT
1802 240.00 0.00 920.00
1803 62352 400.00 03/19/18 3119 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEBRUARY 2018
1803 400.00 0.00 1,320.00
1804 62732 380.00 04/17/18 3122 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 3/12/18
1804 380.00 0.00 1,700.00
1805 63133 480.00 05/16/18 3124 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - APRIL 2018 GEN.A
1805 480.00 0.00 2,180.00
1806 63589 440.00 06/18/18 3128 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERV.- MAY 2018 GEN.AUTHOR
1806 440.00 0.00 2,620.00

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 8

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3140 1807 CD 64183 300.00 07/30/18 3131 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE JUNE 2018 GEN.AUTH
1807 300.00 0.00 2,920.00
1809 64898 500.00 09/14/18 3134 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 8/9-8/13/18 GEN.AU
1809 500.00 0.00 3,420.00
07424-3140 **** *** **** 3,420.00 0.00 3,420.00
07426-3000 TALLMADGE DRIVE 0.00
1807 63960 1,980.00 07/11/18 3130 1052 PENNONI ASSOCIATES INC. SERVICE THRU 6/17/18 2018 TALLMA
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 12,536.75 0.00 12,536.75
1808 CD 64451 2,607.25 08/15/18 3132 1052 PENNONI ASSOCIATES INC. PROF.SERV. THRU 8/5/18 2018 TALL
1808 2,607.25 0.00 15,144.00
1809 64831 822.00 09/11/18 3133 1052 PENNONI ASSOCIATES INC. SERV.THRU 8/12/18 TALLMADGE- GEN SERVICE 2018
1809 822.00 0.00 15,966.00
07426-3000 **** *** **** 15,966.00 0.00 15,966.00
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1802 62035 142.50 02/22/18 22016 1052 PENNONI ASSOCIATES INC. SERVICE THRU 1/14/18 RESERV.RD
1802 142.50 0.00 142.50
1806 63480 45.50 06/07/18 3126 1052 PENNONI ASSOCIATES INC. SERVICES THRU 4/15/18 RESERVOIR FINAL INVOICE

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 9

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1806 45.50 0.00 188.00
07428-1000 **** *** **** 188.00 0.00 188.00
07429-6100 WEST GOSHEN CAPITAL 0.00
1801 61614 30,050.70 01/24/18 22015 3843 WEST GOSHEN SEWER AUTHORITY 16.67% OF COST - ENHANCED CHEMIC ADDITION
1801 30,050.70 0.00 30,050.70
1802 62035 3,664.01 02/22/18 22017 3843 WEST GOSHEN SEWER AUTHORITY 16.67% - ENHANCED CHEMICAL ADDIT & ANAEROBIC DIGESTER REPLACEMENT
1802 3,664.01 0.00 33,714.71
1803 62343 -3,664.01 03/15/18 22017 3843 WEST GOSHEN SEWER AUTHORITY VOID CK. 2017
1803 -3,664.01 0.00 30,050.70
1804 62689 72,288.38 04/13/18 22018 3843 WEST GOSHEN SEWER AUTHORITY 2017 SEWER SYSTEM REPAIR PROJECT .16667 % EAST GOSHEN SHARE
1804 72,288.38 0.00 102,339.08
07429-6100 **** *** **** 102,339.08 0.00 102,339.08
07492-0100 TRANSFER TO GENERAL FUND 0.00
1805 63072 71.30 05/10/18 22019 425 EAST GOSHEN TOWNSHIP - GENERAL XFER TO GENERAL TO CLOSE ACCOUNT
1805 71.30 0.00 71.30
07492-0100 **** *** **** 71.30 0.00 71.30

East Goshen Township General Ledger

Report Date 10/03/18 GL Transaction Details PAGE 10

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07492-0500 TRANSFER TO SEW.OPERATING 0.00
1806 JE 63662 30,000.00 06/22/18 XFER XFER FROM SEWER TO MA
63664 30,000.00 06/22/18 REVERSE REVERSE TRX 63662
1806 30,000.00 30,000.00 0.00
07492-0500 **** *** **** 30,000.00 30,000.00 0.00

Grand Total 257,122.52 135,532.43 121,590.09

Source Debits Credits
JE 41,136.23 131,810.43
EX 120.00 30.00
RE 0.00 2,000.00
CR 0.00 1,692.00
CD 215,866.29 0.00
Total 257,122.52 135,532.43

CONTRACT CHANGE ORDER

CONTRACT NO.: SSPL-2017
Supplee Valley Sanitary Sewer Pipe Lining
CHANGE ORDER NO.: 3
TO: (Contractor) SWERP Incorporated
DATE: 18-Sep-18
PROJECT NO.: EGMAU17007
LOCATION: East Goshen Township, Chester County, Pennsylvania

You are hereby requested to comply with the following changes from the contract plans and specifications.

ITEM NO. (1) DESCRIPTION OF CHANGES-QUANTITIES, UNITS, UNIT PRICES, CHANGES IN COMPLETION SCHEDULE, ETC. (2) DECREASE IN CONTRACT PRICE (3) INCREASE IN CONTRACT PRICE (4)
1 The following Bid Item estimated quantity is decreased:
5. Grout is decreased to 1.50 GAL.
3. Lateral Reinstatements is decreased to 30 EA.
6. CIPP Lining of 8" Pipe between MH C384 - MH C040 is decreased to 175 LF.
13. Lateral Reinstatements is decreased to 24 EA.
$2,425.00
$300.00
$5,460.00
$100.00
2 The following Change Order Item is decreased:
c/o 2 Installation of 6 Saddle Liners is decreased to 48% of the lump sum.
$7,051.00
3 The following Bid Items estimated quantities are increased:
1. CIPP Lining of 8" Pipe Within Township Roads is increased to 2,244 LF.
2. Cleaning and Lining of 8" Pipe Within Easements is increased to 1,021 LF
7. CIPP Lining of 8" Pipe between MH C411 - MH C410 is increased to 150 LF.
8. CIPP Lining of 8" Pipe between MH C417 - MH C416 is increased to 265 LF.
9. CIPP Lining of 8" Pipe between MH C407 - MH C406 is increased to 160 LF.
10. CIPP Lining of 8" Pipe between MH C394 - MH C385 is increased to 320 LF.
11. CIPP Lining of 8" Pipe between MH C042I - MH C042H is increased to 285 LF.
12. CIPP Lining of 8" Pipe between MH C042G - MH C042F is increased to 315 LF.
$744.00
$304.00
$200.00
$102.00
$34.00
$64.00
$238.00
$320.00
CHANGE IN CONTRACT PRICE DUE TO THIS CHANGE ORDER
TOTAL DECREASE
TOTAL INCREASE
NET (INCREASE/DECREASE) CONTRACT PRICE (DIFFERENCE BETWEEN COL. (3) AND (4))
$15,336.00 $2,086.00
($13,250.00)

The sum of ($13,250.00) is hereby added to the total contract price, and the total adjusted contract price to date is thereby $181,267.00.

This document shall become an amendment to the contract and all provisions of the contract will apply hereto.

Accepted by: Contractor [signature] Date 9/20/2018
Recommended by: Engineer [signature] Date 9/28/18
Approved by: Owner Date

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

[Stamp: FYI]

September 25, 2018

Dear Property Owner:

The purpose of this letter is to inform you that East Goshen Township has received a Conditional Use application for 1302 Wilson Dr., West Chester PA 19380. The equitable owner, ESKE Development, LLC, is seeking approval to develop the property as a Child Daycare Center. The property is situated in the I-1, Light Industrial Zoning District of East Goshen Township. Child Daycare Centers are permitted in the I-1 Zoning District as a Conditional Use.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when Conditional use applications are received. The meeting dates for this matter are listed below and subject to change without further written notice:

October 3, 2018 – Planning Commission (7:00 PM)
October 10, 2017 – Conservancy Board (7:00 PM)
November 7, 2018 – Planning Commission (7:00 PM)
November 13, 2018 – Board of Supervisors (7:00 PM – Conditional Use Hearing)

These meetings will be held at the Township Administration Building and will be open to the public. The Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.

Sincerely,

Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\CU Application Sept 2018\1000 foot letter CU 09212018.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

[Stamp: FYI]

September 27, 2018

Mike,

We had a complete pump failure at 2:15 Sept. 26, this morning Pump 2 failed with rags. Pump 1 ran but would only pump 12 gallons a minute. We were able to get West Whiteland to shut down their pump station until we could get the wet well pumped. We then pulled both pumps and put the spare pumps in and returned the station to normal. Each pump was pumping 36 gallons per minute.

We pulled one pump apart, it was jammed with plastics and towels which caused the pump to burn up. I would like to move forward with the muffin minster. I know we were talking about putting it in the wet well. However, what we had to do this morning to pull the pumps was very difficult. I recommend we install the unit that comes in its own closure. I will send you the photos, the roof hatch worked great!

Thanks,

Mark Miller

Dusty + Kevin hooking up the pumps

Photograph looking down into an open concrete pump station wet well where two workers wearing high-visibility yellow-green shirts and blue gloves are descending a metal access ladder to hook up pumps using a chain hoist and a large corrugated hose, with combination wrenches resting on the concrete edge.

[Photograph of a new pump suspended from a utility truck boom crane, with a 1301 address sign and trees in the background.]

New Pump.

Lowering Pump into wet well

Photograph showing a red crane truck (labeled "LIFTING THE COMMUNITY SINCE 1917" on the boom) extending its boom over a pump station building with a shingle roof and a green ladder, while workers in high-visibility yellow-green shirts guide a suspended pump into the wet well.

Photograph showing a red crane truck (labeled "LIFTING THE COMMUNITY SINCE 1917" on the boom) parked alongside a pump station building surrounded by trees, with the crane boom extended above the roof and workers in high-visibility yellow-green shirts standing on the covered deck guiding the hoist cable.