Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

December 10, 2018
7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
  4. APPROVAL OF MINUTES November 19, 2018
  5. APPROVAL OF INVOICES
Pennoni Invoice #832260$113.75
Pennoni Invoice #832261$1,889.25
Pennoni Invoice #832262$332.25
Pennoni Invoice #832263$552.25
  1. LIAISON REPORTS
  2. FINANCIAL REPORTS November Financial Report
  3. OLD BUSINESS
  4. GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de; Continue to implement the I&I Plan – 3-8-2018 completed; Submit articles for the newsletter – The fall newsletter included an article about flushable wipes; the winter newsletter was submitted with an article about the improvements at WGSTP.

F:\Data\Shared Data\Agendas\Municipal Authority\2018\12-10-18 - .doc

10 NEW BUSINESS
a. 2019 Fee schedule and Annual Services from Pennoni
b. Request approval for the Roto mat Screen Segment
c. Maillie requested an audit of net position

11. CAPACITY REQUESTS

12. ANY OTHER MATTER

13. CORRESPONDENCE AND REPORTS OF INTEREST
a. FYI – Annual Planning Session January 12, 2019 8:00 am

14. PUBLIC COMMENT

15. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2018\12-10-18 - .doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

December 7, 2018

To: Municipal Authority

From: Mark Miller

Re: November 2018 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 833,000 gallons per day. No problems to report.

Meters: The meters were calibrated two weeks ago. The field meter at Ridley has been removed and sent back to HACH for repairs. The temporary flow meter that was at the Hershey Mill Pump Station has been removed. I’m waiting on John Laidly to forward me the data.

C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We cleaned and televised 3,850 linear feet of pipe in various developments. The sump connection that we located has been disconnected. When I met with the resident, I inspected the line and viewed that the pump has been removed from the system. The new pumps that we had to order to replace the pumps at the Barkway Pump Station have arrived and will be installed next week. The Public Works Department has been going out in the middle of the night and pulling manholes to locate high flows and then isolating them. We are trying to locate INI, so far we have located 5 sources of infiltration.

R.C. Collection: We televised and cleaned the following development: Lochwood Chase, Fairway Village and Bittersweet Development. We located 4 areas of infiltration all have been repaired. We located a large leak at the sewer lateral at the Blacksmith shop. On Thursday of last week we repaired a significant leak in Hershey Mill development. We also attacked the Ridley Creek system as well, we were looking for Infiltration.

Ridley Creek: We cleaned the grit chamber in the screen building and also cleaned the brush and bamboo from the fence line.

Tallmadge Drive sewer replacement has been interesting to say the least. The contractor has cored the manhole and installed some pipe, this is not going very fast. Matt and I are inspecting the site on a daily basis. We are currently waiting for some elevation work to get completed.

1603 East Boot Road has been connected to our sewer system.

Alarms: We responded to 23 alarms for the month of November.

PA One Calls: We received 64 PA One calls in November.

Rainfall: November rainfall total was 8.15 inches.

Pipe Separated Hershey Mill

Photograph of a sewer pipe trench with a worker wearing high-visibility protective clothing working on a green pipe.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

December 7, 2018

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • No activity since last report.

RCSTP and Pump Stations’ O&M Manual

  • We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for over one year.

Supplee Valley Pipe Lining

  • Prevailing wage discrepancies were resolved by the contractor, which was the final closeout item needed to make final payment. It is our understanding that final payment was made to the contractor thereafter.

Barkway Pump Station Grinder

  • We have continued redesign and vendor coordination for an external Muffin Monster in a prefabricated manhole.

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Lane, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • The contractor began work on November 26. Groundwater and wet/loose soil conditions have dramatically impacted the contractor’s progress and have caused him to fall behind his proposed schedule. The size of trench restoration and associated trenching, aggregate, and paving costs are increasing as a result.
  • The contractor has completed installation of the 125 LF downstream pipe run and the replacement manhole. However, the pipe run was installed too high due to a contractor survey error. The contractor will coordinate with a surveyor at his own expense to determine if the upstream run can be installed at an acceptable, shallower slope to compensate for the higher downstream piping.
  • Construction will likely run past the required December 14 contract cutoff completion date (20 consecutive calendar days). An exact completion date will not be known until the survey has occurred. The contractor will notify residents of updates to the construction schedule.
  • The Public Works Department will install temporary hot mix asphalt paving upon completion of the work.

EGMAU18001
East Goshen Municipal Authority
December 7, 2018
Page 2
Engineer’s Report

I&I Support and Reporting

  • It has been determined that instantaneous meter data is not available for the permanent meters, so we have initiated a limited analysis of all permanent meters based on daily flow data, and we are preparing a semi-annual I&I report accordingly. The Township is coordinating with the metering company to add instantaneous metering capabilities if possible. No update since our last report.

New Connections

  • No activity since last report.

West Goshen Sewer System Consultation

  • No activity since last report.

Hershey’s Mill Pump Station

  • We continued to evaluate electrical problems via discussions with the generator mechanic and evaluation of electrical test data provided by the mechanic. Our updated observations and recommendations will be provided separately.

P:\Projects\EGMA\Memos to Board\2018\Engineers Report 2018-12-07.docx

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

Executive Summary

The Ridley Creek sewage treatment plant outfalls 001 and 002 is anticipated to achieve compliance with the permit discharge limitations for the month of November 2018. Discharge to the Applebrook irrigation lagoon remained off line during November 2018. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

Table 1 illustrates the revised final effluent composite sample data reported for outfall 001 for the October 2018 DMR.

Table 1

October 2018 - Final Effluent - Out Fall 001
NPDES Permit
Discharge Limitations
Flow
MGD
Average
CBOD5 TSS NH4-N Phosphorus,Total
, mg/L
Fecal Coliform
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
Geo Mean Geo
Mean
0.75 20
40
125 10
42
131 2.5 44 0.5 3 200 1,000
Sample Date
October 2, 20180.3602.88.426.00.110.320.180.5410.0000
October 5, 20180.30537.6
October 9, 20180.4202.07.0310.50.1080.380.130.4610.0000
October 11, 20180.45930.0
October 16, 20180.4193.110.820.00.1000.350.1110.0000
October 23, 20180.3704.112.720.00.1380.430.180.5610.0000
October 26, 20180.31030.0
October 30, 20180.3893.411.026.50.1000.320.331.0710.0000
Average0.3793.110.033.80.1110.360.190.6610.0000
Minimum0.3052.07.020.00.1000.320.110.4610.0000
Maximum0.4594.112.7310.50.1380.430.331.0710.0000

The difference in the initial and revised report is the missing CBOD5 data for October 30th. The results were received on December 5th and updated for the DMR reporting. The difference in the initial and revised reports include the monthly average CBOD5

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

concentrations reported as 3.4 mg/L with a corresponding organic loading of 11.0 lbs/day. The remainder of the reported values remained unchanged. The facility remained within compliance with the NPDES DMR discharge permit limitations for October.

Table 2 illustrates the preliminary final effluent composite sample data for outfall 001 for the November 2018 DMR

Table 2

November 2018 - Final Effluent - Out Fall 001
NPDES Permit
Discharge Limitations
Flow
MGD
Average
CBOD5 TSS NH4-N Phosphorus,Total
, mg/L
Fecal Coliform
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
Geo Mean Geo
Mean
0.75 20
40
125 10
42
131 2.5 44 0.5 3 200 1,000
Sample Date
November 1, 20180.369412.3
November 6, 20180.5442.09.129.10.110.500.100.4510.0000
November 13, 20180.5942.713.429.90.1000.500.130.6410.0000
November 15, 20180.655421.9
November 20, 20180.5563.516.229.30.1290.6010.0000
November 23, 20180.524
November 27, 20180.5952.09.9
Average0.5782.612.2312.50.1130.530.120.5510.0000
Minimum0.5242.09.129.10.1000.500.100.4510.0000
Maximum0.6553.516.2421.90.1290.600.130.6410.0000

The treatment process performed well during November with no abnormalities. The process monitoring, and control data indicates the facility will remain within compliance of the NPDES permit.

There was no discharge to the Applebrook outfall 002 during November 2018.

The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. There were periodic BOD5 and TSS sample concentration atypically less than “normal” conditions. Although these samples are collected from the influent flow

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

meter located prior to the Screening Building which excludes the internal recycle flows, debris can accumulate around the sampler suction line impacting the pollutant concentrations measured.

Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during November 2018.

Table 3

November 2018 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus,Total,
mg/L
MGD
Average
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
November 6, 20180.66558.83266334921.211827.01504.726.1
November 13, 20180.6571226772815519.810919.01042.614.4
November 20, 20180.6573051,69214882127.2149
November 27, 20180.723138765
Average0.6761568658044222.712523.01273.720.2
Minimum0.657593262815519.810919.01042.614.4
Maximum0.7233051,69214882127.214927.01504.726.1

Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.

The foam on the SNR surface remained consistent at approximately 75% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The colder water temperatures within the SBRs historically contributes increasing the foam concentrations.

As of December 5, 2018, there is no analytical data available from the certified contract laboratory for samples collected during December. Having said that, the first samples in December were collected on December 4th. Standard turnaround

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

time from collection to final test results is 2 weeks. At the time of this report, there are no indications that the treatment process will not achieve compliance with the DMR.

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 are in service during November and December. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

Significant Rainfall

During November, there were fourteen (14) days when rainfall occurred. Seven (7) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 8.96 inches of rainfall measured during the month. These events occurred on:

November 3rd      1.10 inches
November 4th      0.50 inches
November 5th      0.29 inches
November 6th      0.91 inches
November 7th      0.11 inches
Five (5) consecutive days of rainfall totaling 2.91 inches

November 9th      0.,87 inches
November 13th      1.01 inches

November 15th      0.20 inches
November 16th      1.16 inches
Two (2) consecutive days of rainfall totaling 1.36 inches

November 25th      2.13 inches
November 26th      0.34 inches
November 27th      0.29 inches
Three (3) consecutive days of rainfall totaling 2.76 inches

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.

Rainfall – Year to date total

Year : 2018
Month Precipitation,
inches
January2.53
February6.02
March3.56
April4.95
May6.06
June2.12
July7.41
August9.61
September10.52
October3.27
November8.96
December
Year to Date65.01

The average annual rainfall for West Chester, PA is typically 47.1 inches as compared to the national average of 39 inches. Rainfall measured at RCSTP for the 2018 calendar year is tracking 17.91 inches above the typical average, excluding the month of December. As a result, the groundwater table is elevated.

PA DEP

No activity.

Solids Dewatering and Disposal:

November 2018
Gallons of sludge dewatered306,733
Number of dumpsters5

*Eighteen (18) days of centrifuge operation

An increase of 24,873 gallons of sludge was dewatered during November as compared to October.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

Chemical Usage:

Chemical November 2018
Daily Average Total Monthly
Soda Ash3179,000
Aluminum Sulfate solution82.52,394
Polymer (centrifuge)0.8515.3 gallons

*Eighteen (18) days of centrifuge of operation

The alum feed increased by an average of 48.3 gallons per day during November. This is attributed to the lower water temperatures and reduced biological activity.

Flow data:

Flow Meter Location November 2018
Total Volume
for Month, MG
Average Daily
Flow, gpd
Daily Maximum
Flow, gpd
Influent Wastewater to Screening Building*Flow Meter removed for rebuild
Influent Wastewater to SBRs19.679655,966952,448
Internal RecycleNANANA
Treated Effluent to Disc Filters19.332644,416934,144
Final Effluent Discharge16.375545,833797,000
Applebrook Golf Course000

Influent wastewater flow measurements to the SBRs are bring used for DMR and Chapter 94 reporting. These flow measurements are typically 10 to 15% above the flow from the community when the internal recycle flow volumes are removed.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 13

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
December 2018

Major Preventative Maintenance Activities

UV System

Parts were identified to repair and replace the electrical connections at a considerable savings as compared to sending the UV banks to Siemens for rebuilding. Replacing one UV bank with plant staff is recommended and proposed to be evaluated for a period of two months.

Generator Number 2

On November 28th, generator number 2 at the plant failed to for its weekly exercise. Attempted start the generator manually with no success. It looks like 1 of the 2 batteries have failed. Batteries have a date of 1/2016. Recommend new batteries.

Influent Grit Chamber

Township staff cleaned the grit chamber on Friday, November 30th at 4:00 am.

Influent Flow Meter located in the “field”

Township staff removed the meter in the field and sent back to the factory for repair.

Screening Building

On Friday, November 30th, Rick Smith and Mark Miller visited RCSTP. During their visit, they reported that the Fine Screening building was not maintained to the Township/Municipal Authority’s expectations. This was brought to the attention of BFESI to immediately correct the situation. Corrections were implemented and presented below are below and after photos.
The remainder of the facility was in a condition which met the expectations of the Township/Municipal Authority.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 13

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 19, 2018

The East Goshen Township Municipal Authority held their regular public meeting on Monday, November 19, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Phil Mayer and Kevin Cummings. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Public Works Director), Michael Ellis (Pennoni), Carmen Battavio (Supervisor), Jessica K. Wiesak (Attorney), and Walter Wujcik (Conservancy Board).

COMMON ACRONYMS:

BFES – Big Fish Environmental ServicesMA- Municipal Authority
BOS – Board of SupervisorsNPDES – National Pollutant Discharge Elimination System
CB – Conservancy BoardPC – Planning Commission
DEP – Department of Environmental ProtectionPM – Prevention Maintenance
EPA – Environmental protection AgencyPR – Park & Recreation Board
HC – Historical CommissionRCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & InfiltrationSBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment PlantSSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Jack asked if anyone would be recording the meeting. There was no response.

Chairman’s Report
1. Jack was unable to attend the last West Goshen meeting.
2. Phil mentioned that Josh Fox of HRG, provided a spreadsheet of a summary of West Goshen costs as of March 2018. He wanted to use the costs in his article for the newsletter. Jon mentioned that he has a more current report.

Sewer Reports
1. Director of Public Works, Mark Miller’s report for October:
Monthly Flows: The average daily flow to West Goshen was 653,899 gallons per day. No problems to report.
Meters: The meters are being read on a daily basis. With all the rain the flows are up. We put a temporary meter on at the Hershey Mill Pump Station to check on the accuracy of the current meter. I will have the results for the next meeting. Mark will pull the meter at Ridley Creek and send it back to be recalibrated.
C.C. Collection: The pump stations were visited on a daily basis, wet wells were washed down and general housekeeping was completed. We had some minor power issues on the night of November 2nd at the Barkway Pump Station.
R.C. Collection: On the night of November 2nd, a severe storm came through causing problems with the power grid. The first of a series of alarms started coming in at 9:45 pm. The Hershey Mill Pump Station was the first alarm. This was for a pump failure followed by a High Lever alarm. When we arrived at the pump station, we found both pumps tripped out

MA 11-19-18 draft

1

and the generator was running. Unfortunately the generator had taken a surge and could not generate power. The VFD’s were both down. We called Lenni Electric and Paul Siddel our generator contractor. We called in pump trucks to pump and haul until we could get the pumps up and running again. At 2:00 am we were able to get the pumps running. However; at 3:30 am we lost the VFD for pump #2 but we were able to keep pump #1 running. We then sent the pump trucks home around 4:00 am. We located a portable generator in southern Delaware and sent two men down to pick it up. Once they got back we ran temporary wiring to the station. We cleared the station at 4:00 pm on Saturday. I will explain where we are today with regards to the pump station.
We televised Hershey Mill Estates and found 12 breaks and 4 laterals that are in need of repairs. The breaks are taking in a lot of water. Rather than digging them up, we will be doing point repairs. It will be done in-house (cost $5,000) rather than out sourcing ($20,000 cost).
Ridley Creek: Was on emergency power Saturday into Sunday afternoon. We also had an issue with the phone service, which only took a week to get resolved.
Alarms: We responded to 43 alarms for October.
PA One Calls: We received 66 PA One calls for October.
Rainfall: October rainfall total was 3.78 inches.

2. Pennoni Engineer’s Report for October
Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic soda pilot study – The final summary and recommendations report was issued on October 10, 2018.
  • SBR Coatings – We will conduct a visual inspection of the concrete and coating conditions in the next tank when it is taken offline, which we understand had been tentatively scheduled for November.; It is our understanding that the warranty expires in October 2019.

RCSTP and Pump Stations’ O&M Manual

  • We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for over one year.

Supplee Valley Pipe Lining

  • A final payment recommendation letter was submitted prior to the October MA meeting with a recommended condition that payment not be physically made until all contract closeout documents were submitted including prevailing wage rate certifications. As of this report, we

MA 11-19-18 draft

2

are coordinating with the contractor to resolve prevailing wage rate discrepancies. All other closeout documents have been submitted and are acceptable.

Barkway Pump Station Grinder

  • We have initiated redesign and vendor coordination for an external Muffin Monster in a prefabricated manhole.

Ashbridge Pump Station Force Main

  • Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.

Tallmadge Drive Sewer Main Replacement

  • The contractor plans to start work on November 26 and be complete by December 7. However, they may perform some limited mobilization and pavement sawcutting for one day the week of November 19. The contract allows for 20 consecutive calendar days to complete the work.
  • We have reviewed shop drawings and coordinated with the contractor on pre-construction matters such as schedule and detailed bypass pumping approach. We prepared a notice for property owners with detailed schedule information.

I&I Support and Reporting

  • It has been determined that instantaneous meter data is not available for the permanent meters, so, we have initiated a limited analysis of all permanent meters based on daily flow data, and we are preparing a semi-annual I&I report accordingly. The Township is coordinating with the metering company to add instantaneous metering capabilities if possible

New Connections

  • No activity since last report.

West Goshen Sewer System Consultation

  • No activity since last report.

Hershey’s Mill Pump Station

  • We performed a site investigation of recent electrical problems and we submitted a memo to the Township with observations and recommendations.

[illegible] and permitting to upgrade and re-rate the station will be required prior to new connections.

MA 11-19-18 draft

3

3. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 and 002 is anticipate to achieve compliance with the permitted effluent discharge limitations during the month of October 2018. Discharge to the Applebrook irrigation lagoon was discontinued beginning October 9th. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Approval of Minutes
The minutes of the October 8, 2018 meeting were approved.

Approval of Invoices
1. Kevin moved to approve payment of the following Pennoni invoices:

Pennoni invoice #827473$1,069.82
Pennoni invoice #827474$341.25
Pennoni invoice #827475$2,304.75
Pennoni invoice #827476$4,073.75
Pennoni invoice #827477$1,380.75

Phil seconded the motion. The motion passed unanimously.
2. Phil moved to approve payment of Gawthrop Invoice #201997 in the amount of $795.94. Kevin seconded the motion. The motion passed unanimously.

Liaison Reports
Conservancy Board – Walter reported that they did a site walk on November 10 in Clymers Woods. On December 1st they will spread wood chips.
Board of Supervisors – Carmen reported that they are getting more information on the proposal to amend R2 section of the ordinance; Jon gave a Budget proposal for 2019; the proposed amendment to the ordinance regarding chickens will be reviewed at the next meeting; and they are considering making the Fire Marshall a staff member.

Financial Reports
Jon Altshul provided the following written report:
In October, the Municipal Authority recorded $1,985 in income (a tap-in fee for 1603 E. Boot, net of banking fees) and $6,173 in expenses, including $4,839 for general engineering and $1,334 for Tallmadge Drive engineering for a negative variance of $4,188. As of October 31, the fund balance was $16,554.
Jon mentioned that he presented the Township Budget to the BOS. He combined funds going to the MA and will pay out of MA accounts. He explained what items will be paid out of which MA account. There is no Misc. line item. The Sewer Operating Fund only had a 1.8% increase. He will get a proposal from the auditors for the next meeting.

New Business
1. Gawthrop Legal Fees – As per the letter from Gawthrop, they aren’t increasing their fee this year. It will remain at $200 per hour. Phil moved to accept the Gawthrop letter regarding 2019 fees. Jack seconded the motion. The motion passed unanimously.

MA 11-19-18 draft

4

Any Other Matter

  1. Charter Chase – Jon mentioned that at the public meeting about the ordinance amendment, there were 2 comments from the public regarding sewer install in Charter Chase. Jon mentioned that when a poll was done in 2000 about this, the response showed that there was no interest in this. Kevin suggested looking at current expected cost with inflation and send a letter to their association.
  2. Stormwater Management – Kevin pointed out that there was an article on this topic in the recent Authority Magazine. There was some discussion.

Adjournment

There being no further business, Phil moved to adjourn the meeting. Jack seconded the motion. The meeting was adjourned at 8:00 p.m. The next regular meeting will be held on Monday, December 10, 2018 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 11-19-18 draft 5

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 832260
Invoice Date : 11/20/2018
Project : EGMAU17007
Project Name : Supplee Valley CIPPL Construction

For Services Rendered through: 11/11/2018

"FINAL INVOICE" Reviewed remaining closeout documents and prevailing wage rate certifications from contractor; and coordinated with Township on making final payment.

Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 113.75
Expense : 0.00
Phase Total : 113.75

Amount Due This Invoice: $113.75

Fee : 15,000.00
Prior Billings : 14,873.50
Current Billings : 113.75
Total Billings : 14,987.25

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Associate Professional 1.25 91.00 113.75
Labor Total: 1.25 113.75

Total Phase : **** -- Professional Services
Labor : $113.75
Expense : $0.00

Total Project : EGMAU17007 -- Supplee Valley CIPPL Construction
Labor : $113.75
Expense : $0.00

OK [signature] 12/7/18

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU17007 Invoice Summary
Invoice Date 11/20/2018

Project: EGMAU17007
Pennoni Job No.: Supplee Valley CIPPL Construction
Invoice No: 832260
Invoice Period: 10/15/2018 to 11/11/2018
Date: 11/20/2018

Initial Authorization: $ 12,000.00
Contract Amount: $ 15,000.00
Previously Invoiced: $ 14,873.50
Current Invoice: $ 113.75
Invoiced to Date ($): $ 14,987.25
Invoiced to Date (%): 100%
Remaining Budget ($): $ 12.75
Remaining Budget (%): 0%

Budget by Phase:

Phase Name: Supplee Valley CIPP
Phase Budget: $ 15,000.00
Previously Invoiced: $ 14,873.50
Current Invoice: $ 113.75
Invoiced to Date ($): $ 14,987.25
Invoiced to Date (%): 100%
Remaining Budget ($): $ 12.75
Remaining Budget (%): 0%

Comments: FINAL INVOICE Reviewed remaining closeout documents and prevailing wage rate certifications from contractor; and coordinated with Township on making final payment.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

Louis F. Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice # : 832261
Invoice Date : 11/20/2018
Project : EGMAU18001
Project Name : 2018 General Services

For Professional Services Rendered through:11/11/2018

Hershey's Mill Pump Station electrical assessment: site visit by Authority Engineer and Electrical Engineer to assess VFD, surge, and other electrical issues; researched and reviewed project files and past electrical testing information; initial discussion with generator mechanic about generator issues; prepared memo with initial observations and recommendations; and conceptual scoping for generator replacement.

Phase Code Phase Name Fee Type Contract Amount Previously Billed Current Billing Total Billing Remaining % Complete
**** Professional Services NTE $ 28,000.00 $ 22,113.75 $ 1,889.25 $ 24,003.00 $ 3,997.00 85.73%
Subtotal: $ $ 22,113.75 $ 1,889.25 $ 24,003.00
Total: $ $ 22,113.75 $ 1,889.25 $ 24,003.00

Total Amount Due $ 1,889.25

[signature] 12/7/18

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMAU18001 -- 2018 General Services
Invoice # : 832261

...Continued from previous page

Phase : **** -- Professional Services
Rate Schedule Labor

Class / Employee Name Hours Rate Amount
Authority Engineer 7.75 123.00 953.25
Senior Professional 8.00 117.00 936.00
Rate Schedule Labor 1,889.25

Total Phase : **** -- Professional Services 1,889.25

Total Project : EGMAU18001 -- 2018 General Services 1,889.25

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2

East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 11/20/2018

Project: EGMAU18001
Pennoni Job No.: 2018 General Services
Invoice No: 832261
Invoice Period: 10/15/2018 to 11/11/2018
Date: 11/20/2018

Initial Authorization: $ 18,000.00
Contract Amount: $ 28,000.00
Previously Invoiced: $ 22,113.75
Current Invoice: $ 1,889.25
Invoiced to Date ($): $ 24,003.00
Invoiced to Date (%): 86%
Remaining Budget ($): $ 3,997.00
Remaining Budget (%): 14%

Budget by Phase:

Phase Name: 2018 General Services
Phase Budget: $ 28,000.00
Previously Invoiced: $ 22,113.75
Current Invoice: $ 1,889.25
Invoiced to Date ($): $ 24,003.00
Invoiced to Date (%): 86%
Remaining Budget ($): $ 3,997.00
Remaining Budget (%): 14%

Comments: Hershey's Mill Pump Station electrical assessment: site visit by Authority Engineer and Electrical Engineer to assess VFD, surge, and other electrical issues; researched and reviewed project files and past electrical testing information; initial discussion with generator mechanic about generator issues; prepared memo with initial observations and recommendations; and conceptual scoping for generator replacement.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 832262
Invoice Date : 11/20/2018
Project : EGMAU18002
Project Name : 2018 I&I Support and Reports

For Services Rendered through: 11/11/2018

Coordination with Township on meter data for semi-annual report; provided sample correspondence to PW Director for sump pump sewer disconnection letters to residents; and prepared scoping for Hershey's Mill Pump Station capacity analysis and obtained potential replacement pump material costs from vendor.

Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 332.25
Expense : 0.00
Phase Total : 332.25

Amount Due This Invoice: $332.25

Fee : 11,000.00
Prior Billings : 6,606.50
Current Billings : 332.25
Total Billings : 6,938.75

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Authority Engineer 1.75 123.00 215.25
Senior Professional 1.00 117.00 117.00
Labor Total: 2.75 332.25

Total Phase : **** -- Professional Services
Labor : $332.25
Expense : $0.00

Total Project : EGMAU18002 -- 2018 I&I Support and Reports
Labor : $332.25
Expense : $0.00

OK [signature] 12/7/18

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU18002 Invoice Summary
Invoice Date 11/20/2018

Project: EGMAU18002
Pennoni Job No.: 2018 I&I Support and Reports
Invoice No: 8332262
Invoice Period: 10/15/2015 to 11/11/2018
Date: 11/20/2018

Initial Authorization: $ 11,000.00
Contract Amount: $ 11,000.00
Previously Invoiced: $ 6,606.50
Current Invoice: $ 332.25
Invoiced to Date ($): $ 6,938.75
Invoiced to Date (%): 63%
Remaining Budget ($): $ 4,061.25
Remaining Budget (%): 37%

Budget by Phase:

Phase Name: 2018 I&I Support and Reports
Phase Budget: $ 11,000.00
Previously Invoiced: $ 6,606.50
Current Invoice: $ 332.25
Invoiced to Date ($): $ 6,938.75
Invoiced to Date (%): 63%
Remaining Budget ($): $ 4,061.25
Remaining Budget (%): 37%

Comments: Coordination with Township on meter data for semi-annual report; provided sample correspondence to PW Director for sump pump sewer disconnection letters to residents; and prepared scoping for Hershey's Mill Pump Station capacity analysis and obtained potential replacement pump material costs from vendor.

Pennoni
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 832263
Invoice Date : 11/20/2018
Project : EGMAU18004
Project Name : Tallmadge Dr Sewer Constr Phase

For Services Rendered through: 11/11/2018

Pre-construction services: reviewed construction submittals and shop drawings; coordinated with contractor and Township on schedule, bypass pumping approach, service lateral outages, work hours, and other matters; and prepared construction notice to residents.

Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 552.25
Expense : 0.00
Phase Total : 552.25

Amount Due This Invoice: $552.25

Fee : 9,000.00
Prior Billings : 2,714.50
Current Billings : 552.25
Total Billings : 3,266.75

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Authority Engineer 0.50 123.00 61.50
Senior Professional 0.50 117.00 58.50
Associate Professional 4.75 91.00 432.25
Labor Total: 5.75 552.25

Total Phase : **** -- Professional Services
Labor : $552.25
Expense : $0.00

Total Project : EGMAU18004 -- Tallmadge Dr Sewer Constr Phase
Labor : $552.25
Expense : $0.00

[signature] 12/7/18

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU18004 Invoice Summary
Invoice Date 11/20/2018

Project: EGMAU18004
Pennoni Job No.: Tallmadge Drive Sewer Construction Phase
Invoice No: 832263
Invoice Period: 10/15/2018 to 11/11/2018
Date: 11/20/2018

Initial Authorization: $ 9,000.00
Contract Amount: $ 9,000.00
Previously Invoiced: $ 2,714.50
Current Invoice: $ 552.25
Invoiced to Date ($): $ 3,266.75
Invoiced to Date (%): 36%
Remaining Budget ($): $ 5,733.25
Remaining Budget (%): 64%

Budget by Phase:

Phase Name: Tallmadge Drive Sewer Construction Phase
Phase Budget: $ 9,000.00
Previously Invoiced: $ 2,714.50
Current Invoice: $ 552.25
Invoiced to Date ($): $ 3,266.75
Invoiced to Date (%): 36%
Remaining Budget ($): $ 5,733.25
Remaining Budget (%): 64%

Comments: Pre-construction services: reviewed construction submittals and shop drawings; coordinated with contractor and Township on schedule, bypass pumping approach, service lateral outages, work hours, and other matters; and prepared construction notice to residents.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA November Financial Report & 2019 Proposed Budget
Date: December 6, 2018

In November, the Municipal Authority recorded -$14.65 in revenues (banking fees) and $9,966 in expenses, including $7,790 for general engineering, $1,381 for Tallmadge Drive engineering and $796 for legal expenses for a negative variance of $9,981. As of November 30th, the fund balance was $6,573.

I have reattached the 2019 proposed Municipal Authority budget. If this is agreeable to you, I would propose the following motion:

Mr. Chairman, I move that we approve the 2019 Municipal Authority budget dated December 4, 2018.

EAST GOSHEN TOWNSHIP

2019 Proposed Budget, December 4, 2018
For Adoption

MUNCIPAL AUTHORITY

Account Title Acct # 2015 Actual 2016 Actual 2017 Actual 2018 Adopted 2018 Y/E Projection 2019 Proposed $ Increase % Increase
BEGINNING FUND BALANCE 142,331 1,928
REVENUE
INTEREST EARNINGS 07341 1000 11 (28) 8 10 (100) - 100 -100.0%
INTEREST EARNED - CONSTRUCTION 07341 1020 1,494 2,573 10,353 50 614 - (614) -100.0%
DCED GRANT 07354 0400 37,162 - - - 32,307 32,307
C.C. TAPPING FEES 07364 1100 27,600 6,000 8,000 8,000 2,000 (2,000) -100.0%
R.C.TAPPING FEES 07364 1110 16,296 43,300 - 2,000 1,128 (1,128) -100.0%
CONNECTION FEES - SEWER 07364 1130 1,269 1,128 1,128 1,692 565 (565) -100.0%
MISCELLANEOUS REVENUE 07380 1000 423 564 564 - 71 (71) -100.0%
TRANSFER FROM GENERAL ACCT 07392 0100 -
TRANSFER FROM SEWER OPERATING 07392 0500 40,000 77,000 185,000 89,853 102,000 311,118 209,118 205.0%
TRANSFER FROM SEWER CAP RESV 07392 0501 357,000 357,000
TOTAL REVENUE 124,255 130,537 205,053 101,605 106,278 700,425 594,147 559.0%
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,303 30,166 30,896 32,411 32,410 32,000 (410) -1.3%
MISCELLANEOUS EXPENSE 07424 3000 1,468 1,742 3,189 2,500 2,200 2,262 62 2.8%
MUNIC.AUTH.-AUDITING 07424 3110 8,900 8,900 9,200 9,384 9,400 9,663 263 2.8%
ENGINEERING SERVICES 07424 3130 33,525 54,100 82,530 43,260 70,000 70,000 - 0.0%
LEGAL SERVICES 07424 3140 4,100 8,593 14,438 - 6,000 8,000 2,000 33.3%
TALLMADGE DRIVE 07426 3000 14,000 24,144 (24,144) -100.0%
RESERVOIR PUMP STATION - ENGINEER 07428 1000 144,451 44,571 16,461 - 188 (188) -100.0%
RELINING 07429 1500 130,000 130,000
BARKWAY PUMP STATION CAPITAL 07429 1501 67,000 67,000
ASHBRIDGE PUMP STATION CAPITAL 07429 1502
HERSHEY'S MILL PUMP STATION CAPITAL 07429 1503 125,000 125,000
HUNT CO PUMP STATION CAPITAL 07429 1504 87,000 87,000
RCSTP CAPITAL 07429 1501 169,500 169,500
WEST GOSHEN CAPITAL 07429 6100 - 1,265,670 59,736 102,339 (102,339) -100.0%
M.C.-DVRFA-DEBT SERVICE 07471 1000 23,240 24,921 54,040 - -
M.A.-R.C. DEBT SERVICE 07471 1010 - - 1,948 - -

EAST GOSHEN TOWNSHIP

2019 Proposed Budget, December 4, 2018
For Adoption

Account Title Acct # 2015 Actual 2016 Actual 2017 Actual 2018 Adopted 2018 Y/E Projection 2019 Proposed $ Increase % Increase
M.C.-DVRFA-INTEREST PAYMN 07472 1000 4,169 3,171 - - -
TRANSFER TO GENERAL FUND 07492 0100 -
TOTAL EXPENSES 252,156 176,163 1,478,372 161,291 246,681 700,425 453,744 183.9%
NET RESULT FROM OPERATIONS (127,900) (45,626) (1,273,319) (59,686) (140,403) -
ENDING FUND BALANCE 1,928 1,928

EAST GOSHEN TOWNSHIP

Other Funds

November 2018
Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
REVENUE
INTEREST EARNINGS 07341 1000 10 10 (130.32) (140.32) 1 (14.65) (15.65)
CAPITAL RESERVE-INTEREST 07341 1010
INTEREST EARNED - CONSTRUCTION 07341 1020 50 50 613.94 563.94
DCED GRANT 07354 0400
C.C. TAPPING FEES 07364 1100 8,000 4,000 (4,000.00)
R.C.TAPPING FEES 07364 1110 2,000 2,000 4,000.00 2,000.00
M.C. LOAN PAYMENTS 07364 1120
CONNECTION FEES - SEWER 07364 1130 1,692 846 1,127.52 281.52
MISCELLANEOUS REVENUE 07380 1000 564.51 564.51
TRANSFER FROM GENERAL ACCT 07392 0100 71.30 71.30
TRANSFER FROM SEWER OPERATING 07392 0500 89,853 69,531 90,000.00 20,469.00 6,321 (6,321.00)
TRANSFER-ANNUAL CAP.RESERVE 07392 0510
GRANT REVENUE 07392 0800
LOAN PROCEEDS - SEWER PROJECT 07392 0804
TRANSFER FROM SEWER CAP RESERVE 07392 0900
TOTAL REVENUE 101,605 76,437 96,246.95 19,809.95 6,322 (14.65) (6,336.65)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 32,411 24,308 24,703.02 (395.02)
R.C. LOAN ISSUANCE COSTS 07424 1500
MISCELLANEOUS EXPENSE 07424 3000 2,500 2,291 1,336.00 955.00 208 208.00
MUNIC.AUTH.-AUDITING 07424 3110 9,384 9,384 9,400.00 (16.00)
ENGINEERING SERVICES 07424 3130 43,260 39,655 71,071.71 (31,416.71) 3,605 7,789.57 (4,184.57)
LEGAL SERVICES 07424 3140 4,215.94 (4,215.94) 795.94 (795.94)
W.G. C.C.STP-UPGRADE 07424 7400
MANHOLE COVER REPLACEMENTS 07424 7405
C.C. CAPITAL - METERS 07424 7410
C.C. CAPITAL- COLLECTION 07424 7420
C.C. CAPITAL- INTERCEPTOR 07424 7430
CAPITAL PROJ.-ENGINEERING 07424 7431
R.C. CAPITAL-STP 07424 7440
R.C. CAPITAL - COLLECTION 07424 7450
R.C.-CAP. PROJ.-ENGINEER 07424 7451
CAP.REPLACEMENT R.C. 07424 7490
CAPITAL REPLACEMENT ASHBRIDGE 07424 7491
HERSHEY MILL STATION - ENGINEER 07426 1000
HERSHEY MILL STATION - CONSTRUCTION 07426 2000
TALLMADGE DRIVE 07426 3000 14,000 12,833 18,680.50 (5,847.50) 1,167 1,380.75 (214.08)
RESERVOIR PUMP STATION - ENGINEER 07428 1000 188.00 (188.00)

Report Date 1811 12/06/18 10 : 13 AM

EAST GOSHEN TOWNSHIP

Other Funds

November 2018
Municipal Authority

Account Title Acct # Annual Budget Y-T-D Budget Y-T-D Actual Y-T-D Variance M-T-D Budget M-T-D Actual M-T-D Variance
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000
WEST GOSHEN CAPITAL 07429 6100 59,736 59,736 102,339.08 (42,603.08)
M.C.-DVRFA-DEBT SERVICE 07471 1000
M.A.-R.C. DEBT SERVICE 07471 1010
DVRFA PUMPING STATIONS - PRINCIPAL 07471 2000
M.C.-DVRFA-INTEREST PAYMN 07472 1000
M.A.-R.C. INTEREST 07472 1010
DVRFA PUMPING STATIONS - INTEREST 07472 2000
TRANSFER TO GENERAL FUND 07492 0100 71.30 (71.30)
TRANSFER TO SEW.OPERATING 07492 0500
TRF TO SEWER SINKING FUND 07492 0550
TRANSFER TO AUTHORITY CAP FUND 07492 0990
TOTAL EXPENSES 161,291 148,207 232,005.55 (83,798.55) 4,980 9,966.26 (4,986.59)
NET RESULT FROM OPERATIONS (59,686) (71,770) (135,758.60) (63,988.60) 1,342 (9,980.91) (11,323.24)

Report Date 1811 12/06/18 10 : 13 AM

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 1

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1801 JE 61740 0.31 02/02/18 INTEREST INTEREST EARNED JANUARY 2018 07 FUND
1801 0.00 0.31 -0.31
1802 61932 0.20 02/14/18 INTEREST INTEREST ADJ. FROM JAN.2018 7105.2000
62159 0.54 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018 07 FUND
1802 0.00 0.74 -1.05
1803 EX 62192 15.00 03/06/18 62192 1 REIMBURSE S/R FOR BANK FEES INTEREST EARNINGS
JE 62535 0.47 04/02/18 INTEREST INTEREST EARNED MARCH 2018 07 FUND
1803 15.00 0.47 13.48
1804 EX 62551 15.00 04/02/18 62551 1 REIMB.S/R FOR 3/2018 BANK FEES INTEREST EARNINGS
JE 62904 0.55 05/01/18 INTEREST INTEREST EARNED APRIL 2018 07 FUND
1804 15.00 0.55 27.93
1805 EX 62911 15.00 05/01/18 62911 1 REIMBURSMT- 4/2018 BANK FEES INTEREST EARNINGS
63388 15.00 06/01/18 63388 1 BANK FEES - MAY 2018 INTEREST EARNINGS
63449 15.00 06/05/18 REVERSE REVERSE TRX 63388 EXPENSE TO BE ENTERED IN JUNE NOT MAY
JE 63377 0.51 06/01/18 INTEREST INTEREST EARNED MAY 2018 07 FUND
1805 30.00 15.51 42.42
1806 EX 63459 15.00 06/05/18 63459 1 REIMBURSE S/R FOR MAY '18 FEES INTEREST EARNINGS
JE 63815 0.40 07/03/18 INTEREST INTEREST EARNED JUNE 2018 07100.1035
1806 15.00 0.40 57.02

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 2

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 1807 EX 63820 15.00 07/03/18 63820 5 REIMBURSE S/R - 6/2018 BK.FEES INTEREST EARNINGS
64317 15.00 07/30/18 64317 1 REVERSE EXP.TRX 63820 M&T BANK - GEN'L CHKG # 98526374
64322 15.00 07/30/18 64322 1 REIMBURSE S/R - 6/2018 BK.FEES INTEREST EARNINGS
JE 64264 0.40 08/02/18 INTEREST INTEREST EARNED JULY 2018 07100.1035
1807 30.00 15.40 71.62
1808 EX 64289 15.00 08/03/18 64289 1 REIMBURSE S/R - 7/2018 BK FEES INTEREST EARNINGS
JE 64731 0.14 09/04/18 INTEREST INTEREST EARNED AUGUST 2018 07100.1035
1808 15.00 0.14 86.48
1809 64751 15.00 09/05/18 BANK FEES REIMBURSE S/R FOR AUGUST 2018 BANK FEES
65132 0.41 10/01/18 INTEREST INTEREST EARNED SEPT.2018 07100.1035
1809 15.00 0.41 101.07
1810 65144 15.00 10/01/18 REIMBURSE REIMBURSE S/R FOR SEPT.2018 BANK FEES
65539 0.40 11/01/18 INTEREST INTEREST EARNED OCTOBER 2018 7100.1035
1810 15.00 0.40 115.67
1811 65565 15.00 11/01/18 BANK FEES REIMBURSE S/R FOR OCTOBER 2018 BANK FEES
65953 0.35 11/30/18 INTEREST INTEREST EARNED NOVEMBER 2018 07100.1035
1811 15.00 0.35 130.32
07341-1000 **** *** **** 165.00 34.68 130.32
07341-1020 INTEREST EARNED - CONSTRUCTION 0.00
1801 61740 391.64 02/02/18 INTEREST INTEREST EARNED JANUARY 2018 07 FUND

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 3

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1801 0.00 391.64 -391.64
1802 62159 69.31 03/05/18 INTEREST INTEREST EARNED FEBRUARY 2018 07 FUND
1802 0.00 69.31 -460.95
1803 62535 81.66 04/02/18 INTEREST INTEREST EARNED MARCH 2018 07 FUND
1803 0.00 81.66 -542.61
1804 62904 71.30 05/01/18 INTEREST INTEREST EARNED APRIL 2018 07 FUND
1804 0.00 71.30 -613.91
1805 63377 0.03 06/01/18 INTEREST INTEREST EARNED MAY 2018 07 FUND
1805 0.00 0.03 -613.94
07341-1020 **** *** **** 0.00 613.94 -613.94
07364-1110 R.C.TAPPING FEES 0.00
1807 RE 63982 2,000.00 07/13/18 ROBERTS TAP IN FEE FOR MARLIN DR R.C.TAPPING FEES
1807 0.00 2,000.00 -2,000.00
1810 65507 2,000.00 10/30/18 65507 1 TAP IN FEE - 1603 E BOOT RD R.C.TAPPING FEES
1810 0.00 2,000.00 -4,000.00
07364-1110 **** *** **** 0.00 4,000.00 -4,000.00
07364-1130 CONNECTION FEES - SEWER 0.00

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 4

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1801 CR 61617 423.00 01/25/18 2572 10606 1 STOFFLET, MICHAEL
1801 0.00 423.00 -423.00
1802 61894 423.00 02/13/18 494 10607 1 JACOBS, ROBERT & CHERYL
62079 423.00 02/27/18 148 10605 1 GEORGE SMITH & CHRISTINA CONLE
JE 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 423.36 846.00 -845.64
1803 CR 62407 423.00 03/23/18 0011373243 10608 1 PAPPANO, JOSEPH & PATRICIA
JE 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO
1803 141.12 423.00 -1,127.52
07364-1130 **** *** **** 564.48 1,692.00 -1,127.52
07380-1000 MISCELLANEOUS REVENUE 0.00
1802 61900 282.24 02/13/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT JACOBS & STOFFLET INTEREST
62080 141.12 02/27/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
1802 0.00 423.36 -423.36
1803 62411 141.12 03/23/18 PINE ROCK ANNUAL PINE ROCK INSTALLMENT RC214 PAPPANO
1803 0.00 141.12 -564.48
1808 64477 0.03 08/16/18 DEPOSIT DEPOSIT CK.7100.1035 TO CLOSE OUT FULTON 7105.2000
1808 0.00 0.03 -564.51
07380-1000 **** *** **** 0.00 564.51 -564.51
07392-0100 TRANSFER FROM GENERAL ACCT 0.00

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 5

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1805 JE 63470 71.30 06/07/18 XFER XFER $ TO MA REGARDING DEPOSIT ERROR 5/10/18
1805 0.00 71.30 -71.30
07392-0100 **** *** **** 0.00 71.30 -71.30
07392-0500 TRANSFER FROM SEWER OPERATING 0.00
1803 62490 30,000.00 03/29/18 XFER XFER $ FROM SEWER TO MUNICIPAL TO COVER EXPENSES
1803 0.00 30,000.00 -30,000.00
1806 63665 30,000.00 06/22/18 XFER XFER $ FROM SEWER TO MA
1806 0.00 30,000.00 -60,000.00
1809 64868 30,000.00 09/12/18 XFER XFER FROM SEWER TO M.A. 9/12/18
1809 0.00 30,000.00 -90,000.00
07392-0500 **** *** **** 0.00 90,000.00 -90,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1803 CD 62424 8,160.33 03/26/18 3121 425 EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2018 REIMBURSEMENT - MA
1803 8,160.33 0.00 8,160.33
1806 63636 8,160.33 06/21/18 3129 425 EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2018 REIMBURSEMENT - MA
1806 8,160.33 0.00 16,320.66
1809 65076 8,382.36 09/28/18 3135 425 EAST GOSHEN TOWNSHIP - GENERAL QTR.3 2018 REIMBURSEMENT - MUN.A
1809 8,382.36 0.00 24,703.02

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 6

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-1400 **** *** **** 24,703.02 0.00 24,703.02
07424-3000 MISCELLANEOUS EXPENSE 0.00
1801 61728 100.00 01/31/18 3114 3353 COMMONWEALTH FINANCING AUTHORITY
GRANT APPLIC. DCED - WATER & SEW
PROGRAM FOR BARKWAY
1801 100.00 0.00 100.00
1805 63278 1,236.00 05/30/18 3125 3871 DELAWARE RIVER BASIN COMMISSION
ANNUAL FEE D-2000-030 CP WASTE
WATER DISCHARGE
1805 1,236.00 0.00 1,336.00
07424-3000 **** *** **** 1,336.00 0.00 1,336.00
07424-3110 MUNIC.AUTH.-AUDITING 0.00
1803 62396 6,964.00 03/22/18 3120 808 MAILLIE FALCONIERO & CO.
PROGRESS BILLING - M.AUTHORTY 2
FINANCIAL STATEMENTS
1803 6,964.00 0.00 6,964.00
1804 62732 2,436.00 04/17/18 3123 808 MAILLIE FALCONIERO & CO.
EXAMINATION 2017 MA FINANCIAL ST
1804 2,436.00 0.00 9,400.00
07424-3110 **** *** **** 9,400.00 0.00 9,400.00
07424-3130 ENGINEERING SERVICES 0.00
1801 61613 12,523.56 01/24/18 3113 1052 PENNONI ASSOCIATES INC.
SERV.THRU 12/10/17 2017 GENERAL
SERVICES
1801 12,523.56 0.00 12,523.56
1802 61944 5,415.00 02/15/18 3115 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 1/14/18 -2017 GENE

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 7

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 1802 CD 62032 552.50 02/22/18 3117 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/14/18 SUPPLEE VA
1802 5,967.50 0.00 18,491.06
1803 62323 11,749.08 03/15/18 3118 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 2/11/18 2018 GEN.S
1803 11,749.08 0.00 30,240.14
1806 63480 9,622.25 06/07/18 3126 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/15/18 SUPPLEE VA
63544 7,503.93 06/12/18 3127 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 5/20/18 BARKWAY PS
1806 17,126.18 0.00 47,366.32
1807 63960 16,879.82 07/11/18 3130 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 6/17/18 BARKWAY
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 16,879.82 10,556.75 53,689.39
1808 CD 64451 3,619.00 08/15/18 3132 1052 PENNONI ASSOCIATES INC.
PROF.SERV. THRU 8/5/18 2018 GENE
1808 3,619.00 0.00 57,308.39
1809 64831 1,134.50 09/11/18 3133 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 8/12/18 SUPPLEE VA
1809 1,134.50 0.00 58,442.89
1810 65266 4,839.25 10/10/18 3136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 9/16/18 SUPPLEE VA
1810 4,839.25 0.00 63,282.14
1811 65826 7,789.57 11/26/18 3138 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 10/14/18 2018 I&I
1811 7,789.57 0.00 71,071.71

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 8

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3130 **** *** **** 81,628.46 10,556.75 71,071.71
07424-3140 LEGAL SERVICES 0.00
1801 61613 680.00 01/24/18 3112 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICES DEC. 2017 GEN.AUT
1801 680.00 0.00 680.00
1802 62032 240.00 02/22/18 3116 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - JAN.2018 GEN.AUT
1802 240.00 0.00 920.00
1803 62352 400.00 03/19/18 3119 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - FEBRUARY 2018
1803 400.00 0.00 1,320.00
1804 62732 380.00 04/17/18 3122 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 3/12/18
1804 380.00 0.00 1,700.00
1805 63133 480.00 05/16/18 3124 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE - APRIL 2018 GEN.A
1805 480.00 0.00 2,180.00
1806 63589 440.00 06/18/18 3128 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV.- MAY 2018 GEN.AUTHOR
1806 440.00 0.00 2,620.00
1807 64183 300.00 07/30/18 3131 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE JUNE 2018 GEN.AUTH
1807 300.00 0.00 2,920.00
1809 64898 500.00 09/14/18 3134 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERVICE 8/9-8/13/18 GEN.AU
1809 500.00 0.00 3,420.00

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 9

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-3140 1811 CD 65826 795.94 11/26/18 3137 528 GAWTHROP GREENWOOD & HALSTED
LEGAL SERV. 9/7-9/10/18 GEN. AUT
1811 795.94 0.00 4,215.94
07424-3140 **** *** **** 4,215.94 0.00 4,215.94
07426-3000 TALLMADGE DRIVE 0.00
1807 63960 1,980.00 07/11/18 3130 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 6/17/18 2018 TALLMA
JE 63926 10,556.75 07/10/18 RECLASS RECLASS TALLMADGE DR EXPENSES
1807 12,536.75 0.00 12,536.75
1808 CD 64451 2,607.25 08/15/18 3132 1052 PENNONI ASSOCIATES INC.
PROF.SERV. THRU 8/5/18 2018 TALL
1808 2,607.25 0.00 15,144.00
1809 64831 822.00 09/11/18 3133 1052 PENNONI ASSOCIATES INC.
SERV.THRU 8/12/18 TALLMADGE- GEN
SERVICE 2018
1809 822.00 0.00 15,966.00
1810 65266 1,333.75 10/10/18 3136 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 9/16/18 TALLMADGE
1810 1,333.75 0.00 17,299.75
1811 65826 1,380.75 11/26/18 3138 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 10/14/18 TALLMDGE
1811 1,380.75 0.00 18,680.50
07426-3000 **** *** **** 18,680.50 0.00 18,680.50
07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00
1802 62035 142.50 02/22/18 22016 1052 PENNONI ASSOCIATES INC.
SERVICE THRU 1/14/18 RESERV.RD

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 10

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1802 142.50 0.00 142.50
1806 63480 45.50 06/07/18 3126 1052 PENNONI ASSOCIATES INC.
SERVICES THRU 4/15/18 RESERVOIR
FINAL INVOICE
1806 45.50 0.00 188.00
07428-1000 **** *** **** 188.00 0.00 188.00
07429-6100 WEST GOSHEN CAPITAL 0.00
1801 61614 30,050.70 01/24/18 22015 3843 WEST GOSHEN SEWER AUTHORITY
16.67% OF COST - ENHANCED CHEMIC
ADDITION
1801 30,050.70 0.00 30,050.70
1802 62035 3,664.01 02/22/18 22017 3843 WEST GOSHEN SEWER AUTHORITY
16.67% - ENHANCED CHEMICAL ADDIT
& ANAEROBIC DIGESTER REPLACEMENT
1802 3,664.01 0.00 33,714.71
1803 62343 -3,664.01 03/15/18 22017 3843 WEST GOSHEN SEWER AUTHORITY
VOID CK. 2017
1803 -3,664.01 0.00 30,050.70
1804 62689 72,288.38 04/13/18 22018 3843 WEST GOSHEN SEWER AUTHORITY
2017 SEWER SYSTEM REPAIR PROJECT
.16667 % EAST GOSHEN SHARE
1804 72,288.38 0.00 102,339.08
07429-6100 **** *** **** 102,339.08 0.00 102,339.08
07492-0100 TRANSFER TO GENERAL FUND 0.00
1805 63072 71.30 05/10/18 22019 425 EAST GOSHEN TOWNSHIP - GENERAL
XFER TO GENERAL TO CLOSE ACCOUNT

East Goshen Township General Ledger

Report Date 12/06/18 GL Transaction Details PAGE 11

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1805 71.30 0.00 71.30
07492-0100 **** *** **** 71.30 0.00 71.30
07492-0500 TRANSFER TO SEW.OPERATING 0.00
1806 JE 63662 30,000.00 06/22/18 XFER XFER FROM SEWER TO MA
63664 30,000.00 06/22/18 REVERSE REVERSE TRX 63662
1806 30,000.00 30,000.00 0.00
07492-0500 **** *** **** 30,000.00 30,000.00 0.00
Grand Total 273,291.78 137,533.18 135,758.60
Source Debits Credits
JE 41,166.23 131,811.18
EX 120.00 30.00
RE 0.00 4,000.00
CR 0.00 1,692.00
CD 232,005.55 0.00
Total 273,291.78 137,533.18

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

December 6, 2018

East Goshen Municipal Authority
Attn: Rick Smith, Township Manager
1580 Paoli Pike
West Chester, PA 19380

RE: Fee Schedule for Year 2019 and Annual Services
East Goshen Municipal Authority

Dear Rick:

Pennoni is proud to serve East Goshen Municipal Authority, and we look forward to working with you again in 2019. We respectfully request reappointment as Authority Engineer for 2019.

Our proposed rates for 2019 are listed below, reflecting an average increase of 3.0%:

  • Authority/Township Engineer..............................................................$127/hr
  • Senior Professional ............................................................................$121/hr
  • Project Professional ...........................................................................$107/hr
  • Staff Professional ...............................................................................$99/hr
  • Associate Professional ........................................................................$94/hr
  • Senior Engineering Technician............................................................$92/hr
  • Graduate Professional ........................................................................$85/hr
  • Engineering Technician .......................................................................$84/hr
  • Survey Crew (2-Person) .....................................................................$198/hr

While our company has many employee classifications, these are the classifications most frequently utilized in performing tasks for our municipal clients. We assign the most appropriate level staff competent to perform the work effort requested.

As part of our responsibilities to the Authority as the appointed Engineer, we will continue to provide the following professional services:

  • Participation in monthly meetings of the Authority Board
  • Preparation of semi-annual sewer system status reports
  • Continued support in I&I reduction with periodic sewer meter data analysis upon request
  • Preparation of the annual Chapter 94 Municipal Wasteload Management Reports
  • Visual structural inspections of the RCSTP SBR tanks and coatings as tanks are taken offline for service
  • Consultation on issues on behalf of the Authority

The estimated total fee for these typical annual services is $49,000, to be billed on an hourly basis at the above rates. We have allocated the budget as follows:

  • General Consultation and monthly meetings................................$27,000
  • I&I support and semi-annual reports.........................................$11,000
  • Chapter 94 reports....................................................................$11,000

December 6, 2018 Page 2
East Goshen Municipal Authority Year 2019 Annual Services

The estimated fees are based upon the actual level of effort for each activity over the past two years with a similar level of effort projected for 2019. Similar to previous years, we will establish separate accounts for each project listed above, and each project will be invoiced separately.

Other projects outside of general services, as requested, will be proposed separately, such as the following projects that are planned for 2019 in the 5-Year Sewer System Capital Improvement Plan:

  • Hershey's Mill Pump Station Generator Replacement
  • RCSTP Generator Replacement
  • Hunt Country Pump Station Metering, Muffin Monster, and Bypass System
  • Annual Sewer System Rehabilitation (location TBD; expected to be pipe lining and other repairs)

A new gravity flow meter in the Ridley Creek collection system and an air stripper at the RCSTP are also planned capital improvements for 2019, but we anticipate any engineering involvement on those projects will be limited and can be covered under our "General Consultation" activity.

If you have any questions, please do not hesitate to contact me.

Sincerely,

PENNONI ASSOCIATES INC.

Michael J. Ellis, PE
Authority Engineer

P:\Projects\EGMA\EGMA General Services for 2019\2019 EGMA Annual Services Proposal.docx

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

New Business,

Need the Authority's approval to repair the roto mat screen segment in the amount of $11,208.00 another $1000.00 for installation for a total of $12,208.00

The rep will be out on December 10th to inspect the unit. If any other work is required I will e-mail the Authority.

Mark

JWC Environmental

Customer Service Center
2600 S. Garnsey Street
Santa Ana, CA 92707 USA
Phone: 949 833-3888
Toll Free: 800 331-2277
Fax: 714 549-4007

Customer: 6005886
East Goshen Township
1580 Paoli Pike
West Chester , PA 19380
US

Quote Number: 47187
Quote Date: 12/03/2018
Terms: NET 30 DAYS
Pricing: Valid 60 Days
FOB: Origin
Lead Time: 5-6 Weeks ARO
Grinder Serial #: 105661-3-1

Project: Ridley Creek WWTP

All orders will be billed the applicable sales tax, based on the "ship to address", unless a valid tax exemption certificate is provided prior to shipment.

Part Number Description Qty Unit Price Extended Price
ROTOR, ASSY 3200-480 35DG 7250L MC AMA0740-0480-3235-7250-MC 1 $28,873.67 $28,873.67
AMC0109-3235-480-06-SS SCREEN, SEGMENT 6MM PRF 35DG XE SS 1 $11,208.90 $11,208.90
TARIFF Tariff Surcharge
Recently, the US Government, has implemented the following trade restrictions:
Section 232, June 1, 2018: Restrictions on steel mill (25%) and aluminum articles (10%). All countries of origin except Argentina, Australia, Brazil, and South Korea.
Section 301, July 6, 2018 Restrictions on products from China, 25%
The tariff surcharge represents the increased cost of manufacturing our products as a result of the government-imposed trade restrictions.
1 $1,054.17 $1,054.17

Please verify serial number is correct.

Sub Total $41,136.74
Tax
Total $41,136.74

Notes:
1. Please fax or mail a purchase order for the total amount and we can process your order.
Please include the following:
Billing Address, Ship to Address, and sales tax exemption certificate.
2. Please reference our quote number on your purchase order.
3. Availability of parts are subject to change at any time.
4. 20% restocking fee on all returns.
5. Sales tax is not included in price.
6. Please make note on your PO that Shipping and Handling will be added to the invoice.
7. Call or e-mail with any questions or concerns.

Thank-You for your Business!

Maillie
Expertise Beyond The Numbers ®

Maillie LLP | 600 Willowbrook Lane, Suite 624, West Chester, PA 19382
610.696.4353 | Fax: 610.430.8811 | maillie.com

Partners
Robert L. Caruso
Deborah L. Horn
Edward J. Furman
Craig S. Springer
Robert L. Boland
Danielle VanderWerf
Richard A. Flanagan IV
Donald J. Pierce
Robert C. Hershey, Jr.
Gregory J. Shank
Laurie E. Harvey
William Breslawski, Jr.
Edward Fronczkowski

CLIENTS COPY
MAILLIE LLP
CERTIFIED PUBLIC ACCOUNTANTS

November 27, 2018

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6107

The following represents our understanding of the services we will provide East Goshen Municipal Authority.

You have requested that we audit the statement of net position of the East Goshen Municipal Authority as of December 31, 2018, and the related statements of revenues, expenses and changes in net position and cash flows for the year then ended and the related notes to the financial statements, which collectively comprise the East Goshen Municipal Authority's basic financial statements. We are pleased to confirm our acceptance and our understanding of this audit engagement by means of this letter. Our audit will be conducted with the objective of our expressing an opinion on the financial statements.

Accounting principles generally accepted in the United States of America (U.S. GAAP) require that management's discussion and analysis and budgetary comparison information be presented to supplement the basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board, who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. As part of our engagement, we will apply certain limited procedures to the required supplementary information (RSI) in accordance with auditing standards generally accepted in the United States of America (U.S. GAAS). These limited procedures will consist primarily of inquiries of management regarding their methods of measurement and presentation, and comparing the information for consistency with management's responses to our inquiries. We will not express an opinion or provide any form of assurance on the RSI. The following RSI is required by U.S. GAAP. This RSI will be subjected to certain limited procedures but will not be audited:

  1. Management's Discussion and Analysis

Certified Public Accountants and Business Consultants

Maillie
Expertise Beyond The Numbers ®

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
- 2 -
November 27, 2018

AUDITOR RESPONSIBILITIES

The Objective of an Audit

The objective of our audit is the expression of an opinion as to whether your basic financial statements are fairly presented, in all material respects, in conformity with U.S. GAAP. Our audit will be conducted in accordance with U.S. GAAS and will include tests of the accounting records and other procedures we consider necessary to enable us to express such an opinion. We cannot provide assurance that an unmodified opinion will be expressed. Circumstances may arise in which it is necessary for us to modify our opinion or add emphasis-of-matter or other-matter paragraphs. If our opinion on the financial statements is other than unmodified, we will discuss the reasons with you in advance. If, for any reason, we are unable to complete the audit or are unable to form or have not formed an opinion, we may decline to express an opinion or to issue a report as a result of this engagement.

General Audit Procedures

We will conduct our audit in accordance with U. S. GAAS. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the basic financial statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to error, fraudulent financial reporting, misappropriation of assets, or violations of laws, governmental regulations, grant agreements, or contractual agreements. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

Internal Control Audit Procedures

Because of the inherent limitations of an audit, together with the inherent limitations of internal control, an unavoidable risk that some material misstatements may not be detected exists, even though the audit is properly planned and performed in accordance with U. S. GAAS.

In making our risk assessments, we consider internal control relevant to the entity's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. However, we will communicate to you in writing concerning any significant deficiencies or material weaknesses in internal control relevant to the audit of the financial statements that we have identified during the audit.

Compliance with Laws and Regulations

As part of obtaining reasonable assurance about whether the financial statements are free of material misstatement, we will perform tests of the East Goshen Municipal Authority's compliance with the provisions of applicable laws, regulations, contracts and agreements. However, the objective of our audit will not be to provide an opinion on overall compliance and we will not express such an opinion.

Certified Public Accountants and Business Consultants

Maillie
Expertise Beyond The Numbers ®

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
- 3 -
November 27, 2018

REPORTING

We will issue a written report upon completion of our audit of the East Goshen Municipal Authority's basic financial statements. Our report will be addressed to the governing body of the East Goshen Municipal Authority. We cannot provide assurance that an unmodified opinion will be expressed. Circumstances may arise in which it is necessary for us to modify our opinion, add an emphasis-of-matter or other-matter paragraph(s), or withdraw from the engagement.

MANAGEMENT RESPONSIBILITIES

Our audit will be conducted on the basis that management and those charged with governance acknowledge and understand that they have responsibility:

  1. For the preparation and fair presentation of the financial statements in accordance with accounting principles generally accepted in the United States of America;
  2. For the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to error, fraudulent financial reporting, misappropriation of assets, or violations of laws, governmental regulations, grant agreements, or contractual agreements;
  3. To provide us with: a. Access to all information of which management is aware that is relevant to the preparation and fair presentation of the financial statements, such as records, documentation and other matters; b. Additional information that we may request from management for the purpose of the audit; and c. Unrestricted access to persons within the entity with whom we determine it necessary to obtain audit evidence.
  4. For including the auditors' report in any document containing financial statements that indicates that such financial statements have been audited by the entity's auditor;
  5. For identifying and ensuring that the entity complies with the laws and regulations applicable to its activities; and
  6. For adjusting the financial statements to correct material misstatements and confirming to us in the management representation letter that the effects of any uncorrected misstatements aggregated by us during the current engagement and pertaining to the current year under audit are immaterial, both individually and in the aggregate, to the financial statements as a whole.

Certified Public Accountants and Business Consultants

Maillie
Expertise Beyond The Numbers ®

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
- 4 -
November 27, 2018

We will perform the following nonattest services:

  1. Preparation of financial statements based on your trial balances.
  2. Preparation of the Commonwealth of Pennsylvania Department of Community and Economic Development Annual Report of Municipal Authorities.

With respect to any nonattest services we perform, the East Goshen Municipal Authority's management is responsible for (a) making all management decisions and performing all management functions; (b) assigning a competent individual to oversee the services; (c) evaluating the adequacy of the services performed; (d) evaluating and accepting responsibility for the results of the services performed and (e) establishing and maintaining internal controls, including monitoring ongoing activities.

As part of our audit process, we will request from management and those charged with governance, written confirmation concerning representations made to us in connection with the audit.

OTHER

We understand that your employees will prepare all confirmations we request and will locate any documents or invoices selected by us for testing.

If you intend to publish or otherwise reproduce the financial statements and make reference to our firm, you agree to provide us with printers' proofs or masters for our review and approval before printing. You also agree to provide us with a copy of the final reproduced material for our approval before it is distributed.

During the course of the engagement, we may communicate with you or your personnel via fax or e-mail, and you should be aware that communication in those mediums contains a risk of misdirected or intercepted communications.

Edward Fronczkowski, CPA, is the engagement partner for the audit services specified in this letter. His responsibilities include supervising Maillie LLP's services performed as part of this engagement and signing or authorizing another qualified firm representative to sign the audit report.

Our fees are based on the amount of time required by the individuals assigned to the engagement, plus direct out-of-pocket expenses. Invoices will be rendered as work progresses and expenses are incurred and are payable upon presentation. We estimate that our fee for the audit will be $9,650. We will notify you immediately of any circumstances we encounter that could significantly affect this initial fee estimate.

In accordance with our firm policies, work may be suspended if your account becomes 30 days or more overdue and will not resume until your account is paid in full. If we elect to terminate our services for nonpayment, our engagement will be deemed complete upon written notification of termination, even if we have not completed our report. You will be obligated to compensate us for all time expended and to reimburse us for all out-of-pocket costs through the date of termination.

During the course of the audit, we may observe opportunities for economy in, or improved controls over, your operations. We will bring such matters to the attention of the appropriate level of management, either orally or in writing.

Certified Public Accountants and Business Consultants

Maillie
Expertise Beyond The Numbers ®

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
- 5 -
November 27, 2018

The audit documentation for this engagement is the property of Maillie LLP and constitutes confidential information. However, we may be requested to make certain audit documentation available to various regulators pursuant to authority given to them by law or regulation, or to peer reviewers. If requested, access to such audit documentation will be provided under the supervision of Maillie LLP's personnel. Furthermore, upon request, we may provide copies of selected audit documentation to various regulators. The various regulators may intend, or decide, to distribute the copies of information contained therein to others, including other governmental agencies.

It is our policy to keep records related to this engagement for seven years. However, Maillie LLP does not keep any original records, so we will return those to you at the completion of the services rendered under this engagement. When records are returned to you, it is your responsibility to retain and protect your records for future possible use, including potential examination by government or regulatory agencies. By your signature below, you acknowledge and agree that upon the expiration of the seven year period, Maillie LLP shall be free to destroy our records related to this engagement.

At the conclusion of our audit engagement, we will communicate to those charged with governance the following significant findings from the audit:

  • Our view about the qualitative aspects of the entity's significant accounting practices;
  • Significant difficulties, if any, encountered during the audit;
  • Uncorrected misstatements, other than those we believe are trivial, if any;
  • Disagreements with management, if any;
  • Other findings or issues, if any, arising from the audit that are, in our professional judgment, significant and relevant to those charged with governance regarding their oversight of the financial reporting process;
  • Material, corrected misstatements that were brought to the attention of management as a result of our audit procedures;
  • Representations we requested from management;
  • Management's consultations with other accountants, if any; and
  • Significant issues, if any, arising from the audit that were discussed, or the subject of correspondence, with management.

Certified Public Accountants and Business Consultants

Maillie
Expertise Beyond The Numbers ®

To the Members of the Board
c/o Mr. Jack E. Yahraes, Chairman
East Goshen Municipal Authority
- 6 -
November 27, 2018

Please sign and return the attached copy of this letter to indicate your acknowledgment of, and agreement with, the arrangements for our audit of the financial statements including our respective responsibilities.

We appreciate the opportunity to be your financial statement auditors and look forward to working with you and your staff.

Respectfully,

MAILLIE LLP

Edward Fronczkowski

RESPONSE:

This letter correctly sets forth our understanding.

Acknowledged and agreed on behalf of the East Goshen Municipal Authority by:

__________________________________________________

Title:_____________________________________________

Certified Public Accountants and Business Consultants

FYI

Memo

East Goshen Township

Date: November 26, 2018

To: Conservancy Board
Futurist Committee
Historical Commission
Municipal Authority
Park and Rec Commission
Pipeline Task Force
Planning Commission

From: Rick Smith, Township Manager

Re: Annual Planning Session

The Annual Planning Session will be held on Saturday, January 12, 2019 at 8:00 AM. At that meeting it would be appreciated if each ABC would provide a summary of their accomplishments in 2018 as well as their goals for 2019.

Outlined below are the goals provided from each ABC that attended the 2018 Planning Session on January 6, 2018.

Conservancy Board

  1. Continue invasive species control - Comp Plan Objective 11.6
  2. Continue maintenance of the blue bird houses in Applebrook
  3. Develop a maintenance plan for the Serpentine Barren – PR&OS Plan Action 2.2C
  4. Keep East Goshen Beautiful Day - Comp Plan Objective 11.4
  5. Maintain the riparian buffer along the creeks
  6. Maintain Clymer’s Woods.
  7. Review the pond study and make a recommendation to the Board of Supervisors.

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals Memo 112618.docx
1

Futurist Commission

  1. The creation of a much needed “town center” to house specialty shops, restaurants, micro businesses, and central gathering areas. Comp Plan Objective 7.1
  2. Develop clear signage and lighting to highlight the “town center”. Comp Plan Objective 6.1
  3. Support a referendum to allow for liquor sales.
  4. Establish a strategic long-range planning objective with steps outlining how to achieve the objective and the stated benefits to all residents.
  5. Rebranding the Town Center as “Goshenville”.

Municipal Authority

  1. Continue to monitor the upgrades at West Goshen Sewer Plant. Comp Plan Objective 10.1
  2. Continue to implement the Inflow (surface water) & Infiltration (groundwater) (collectively “I&I”) Plan. Comp Plan Objective 10.1
  3. Submit articles for the newsletter.

Park & Recreation Commission

  1. Increase pedestrian circulation along Paoli Pike, especially in the form of a “Paoli Pike Promenade” with sidewalks and crosswalks, as well as increasing pedestrian circulation and safety along Greenways, with trails, walkways and crosswalks. Comp Plan Objective 8.6
  2. Develop the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown and consider the potential for feeder trails from the various developments to the Paoli Pike Trail. Comp Plan Objective 8.6
  3. Complete the playground renovation. Comp Plan Objective 9.3
  4. Renovate the basketball court area Comp Plan Objective 9.3
  5. Improve the upper sports fields to include landscaping and a new access. Comp Plan Objective 9.3

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals Memo 112618.docx
2

  1. Install security cameras in the park. Comp Plan Objective 9.3
  2. Make the Veterans Pavilion more user friendly for seniors. Comp Plan Objective 9.3
  3. Improve the pathway from the Pavilion to the Pickle Ball Court. Comp Plan Objective 9.3
  4. Installed a picnic area to support the playground and the baseball fields. Comp Plan Objective 9.3

Planning Commission

  1. Review the PPMCP and look at the overlay district to determine what needs to be amended in the Zoning Ordinance. Comp Plan Objective 6.2 and 6.2
  2. Look at single family development for the remaining parcels in the township. Comp Plan Objective 5.2 and 5.5

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals Memo 112618.docx