Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
January 14, 2019
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting; Election of 2019 Officers
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES December 10, 2018
- APPROVAL OF INVOICES E-mail summary from Pennoni $ 582.21 Pennoni Invoice #839068 $ 2,677.00 Pennoni Invoice #839069 $ 301.50 Pennoni Invoice #839070 $ 2,187.00 Pennoni Invoice #839085 $ 9,082.00 Pennoni Invoice #839095 $ 384.06 – Pd Dec. Gawthrop Invoice #202493 $ 440.00 Gawthrop Invoice #203528 $ 11,830.72 JWC Environ. Invoice #95288
- LIAISON REPORTS
- FINANCIAL REPORTS December Financial Report
- OLD BUSINESS
- GOALS
F:\Data\Shared Data\Agendas\Municipal Authority\2019\1-14-19 - .doc
- Continue to monitor the upgrades at West Goshen Sewer Plant. Jack and Phil have been attending meetings.de
- Continue to implement the I&I Plan – 3-8-2018 completed
- Submit articles for the newsletter – The fall newsletter included an article about flushable wipes; the winter newsletter was submitted with an article about the improvements at WGSTP.
- NEW BUSINESS Notice of Deficiencies & Resolution Requirements – Tallmadge Dr.; E-mail summary from Pennoni for payment Application #1 & #2; Payment Application #1 – Tallmadge Drive – Approval of $42,431.40; Payment Application #2 – Tallmadge Drive – Approval of $21,326.40
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2019\1-14-19 - .doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 11, 2019
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | December 2018 Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 817,000 gallons per day. No problems to report.
Meters: We have been reading the meters on a daily basis, the flows are running high.
C.C. Collection: We have been inspecting the entire collection system. We have been pulling manholes in the middle of the night to try and locate the infiltration. So far we have repaired 24 sewer laterals and found 3 manholes that need attention due to significant inflow. On the Ashbridge system we have three laterals to excavate which are scheduled for next week. We are scheduled to install the portable flow meters on the Chester Creek system as well as the R.C. Collection system.
R.C. Collection: We have three point repairs to do in Hershey’s Mill Estates, we also have to dig two laterals that are broken and taking in significant inflow. We also have to replace several castings and lids that are in bad shape. As I stated in the Chester Creek report, we will be installing portable meters on this system as well. We have been working in the early morning hours trying to locate inflow. So far it has paid off. We have to pull the pumps at Hershey’s Mill pump station for preventive maintenance.
Ridley Creek: The new screen has arrived and should be installed in the next two weeks. The flow meter arrived yesterday and is scheduled to be installed next week weather permitting. As you can see the flows are up as well. We have been repairing laterals as we inspect them. Once we get the Ashbridge system and Hershey Mill Estates tightened up then we will being hitting the Ridley Creek system.
Alarms: We responded to 22 alarms for the month of December.
PA One Calls: We received 40 PA One calls in December.
Rainfall: December rainfall total was 6.00 inches.
Laterals: 5 lateral repairs reported for December
I was notified last week that Deckman Electric is closing at the end of February. I have already started looking for a new shop to do our pump work.
[Photograph looking down into an open sewer manhole showing active water infiltration streaming from the manhole wall, marked with red drawn arrows pointing toward the leaks.]
Photograph looking down inside a concrete manhole shaft, with four red arrows pointing to cracks and water infiltration along the lower interior concrete wall.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
January 10, 2019
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- No activity since last report.
RCSTP and Pump Stations' O&M Manual
- We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for over one year.
Barkway Pump Station Grinder
- We have continued redesign and vendor coordination for an external Muffin Monster in a prefabricated manhole. Project-specific manhole details are currently being prepared by the vendor. Upon receipt of the details, the plans can be finalized, and the Township can order equipment. The lead time for the equipment is about 4 months.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Lane, as recommended by the Municipal Authority, when weather permits. No update since our last report.
Tallmadge Drive Sewer Main Replacement
- The contractor completed work on December 19, 2018. However, major and minor deficiencies that require monitoring and/or repair were identified during manhole vacuum testing and post-construction pipe televising. We prepared an agreement regarding the deficiencies and required repairs that was signed by the contractor (enclosed with our Pay Application #1 recommendation letter).
- A repair pre-construction meeting was conducted between Pennoni, Mark Miller, and the contractor on January 10. The contractor will begin repair of major deficiencies on January 16 and is expected to take 3 days to complete. The contractor will repair approximately 30 LF of pipe with a severe sag, repair the newly installed manhole such that it passes a vacuum test, and repair the abandoned downstream drop connection pipe stub, which is leaking groundwater. The pipes will be re-televised immediately upon completion of the repair work.
- Minor deficiencies, including minor sags (10% or less), were also noted at two locations within the replaced pipes. The contractor will re-televise the pipes again in April to determine if the sags have increased, and if so, will perform repairs at that time.
- The contractor has submitted two invoices for consideration at the January MA meeting. The first invoice is for a 50% contract payment for work completed and the second invoice is for an additional 25% contract payment to be paid immediately following acceptance of the aforementioned major deficiency repairs.
EGMAU19001
East Goshen Municipal Authority
January 10, 2019
Page 2
Engineer's Report
I&I Support and Reporting
- We analyzed permanent meter data and expect to issue a semi-annual I&I report prior to the January MA meeting. We also provided assistance to the Township on contractors for manhole injection grouting to eliminate infiltration sources.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
Hershey's Mill Pump Station
- We continued to evaluate electrical problems via discussions with the generator mechanic and evaluation of electrical test data provided by the mechanic. We prepared a letter recommending the PECO transformer be replaced with a larger transformer.
- We initiated evaluation of sizing for a replacement generator, and we are preparing a conceptual site exhibit to determine if the generator can be sited externally (instead of inside the control building).
P:\Projects\EGMA\Memos to Board\2019\Engineers Report 2019-01-10.docx
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of December 2018. Discharge to the Applebrook irrigation lagoon remained off line during December 2018. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the revised final effluent composite sample data reported for outfall 001 for the November 2018 DMR.
Table 1
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 40 |
125 | 10 42 |
131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Sample Date | |||||||||||
| November 1, 2018 | 0.369 | 4 | 12.3 | ||||||||
| November 6, 2018 | 0.544 | 2.0 | 9.1 | 2 | 9.1 | 0.111 | 0.50 | 0.10 | 0.45 | 1 | 0.0000 |
| November 13, 2018 | 0.594 | 2.7 | 13.4 | 2 | 9.9 | 0.100 | 0.50 | 0.13 | 0.64 | 1 | 0.0000 |
| November 15, 2018 | 0.655 | 4 | 21.9 | ||||||||
| November 20, 2018 | 0.556 | 3.5 | 16.2 | 2 | 9.3 | 0.129 | 0.60 | 0.10 | 0.46 | 1 | 0.0000 |
| November 23, 2018 | 0.524 | 4 | 17.5 | 0.00 | |||||||
| November 27, 2018 | 0.595 | 2.0 | 9.9 | 2 | 9.9 | 0.184 | 0.91 | 0.15 | 0.74 | 2 | 0.3010 |
| November 29, 2018 | 0.565 | 1 | 4.7 | ||||||||
| Average | 0.578 | 2.6 | 12.2 | 3 | 12.9 | 0.131 | 0.50 | 0.12 | 0.58 | 1 | 0.0753 |
| Minimum | 0.524 | 2.0 | 9.1 | 2 | 9.1 | 0.100 | 0.00 | 0.10 | 0.45 | 1 | 0.0000 |
| Maximum | 0.655 | 3.5 | 16.2 | 4 | 21.9 | 0.184 | 0.91 | 0.15 | 0.74 | 2 | 0.3010 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
The treatment process performed well during December with no abnormalities. The process monitoring, and control data indicates the facility will remain within compliance of the NPDES permit.
There was no discharge to the Applebrook outfall 002 during November 2018.
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. There were periodic BOD5 and TSS sample concentration atypically less than “normal” conditions. Although these samples are collected from the influent flow meter located prior to the Screening Building which excludes the internal recycle flows, debris can accumulate around the sampler suction line impacting the pollutant concentrations measured.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during November 2018.
Table 2
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| November 6, 2018 | 0.665 | 58.8 | 326 | 63 | 349 | 21.2 | 118 | 27.0 | 150 | 4.7 | 26.1 |
| November 13, 2018 | 0.657 | 122 | 677 | 28 | 155 | 19.8 | 109 | 19.0 | 104 | 2.6 | 14.4 |
| November 20, 2018 | 0.657 | 305 | 1,692 | 148 | 821 | 27.2 | 149 | 27.2 | 149 | 4.5 | 25.0 |
| November 27, 2018 | 0.723 | 138 | 765 | 118 | 654 | 19.6 | 118 | 18.2 | 110 | 3.1 | 17.2 |
| Average | 0.676 | 156 | 865 | 89 | 495 | 22.0 | 123 | 22.9 | 128 | 3.7 | 20.7 |
| Minimum | 0.657 | 59 | 326 | 28 | 155 | 19.6 | 109 | 18.2 | 104 | 2.6 | 14.4 |
| Maximum | 0.723 | 305 | 1,692 | 148 | 821 | 27.2 | 149 | 27.2 | 150 | 4.7 | 26.1 |
Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
The foam on the SNR surface remained consistent at approximately 75% to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The colder water temperatures within the SBRs historically contributes increasing the foam concentrations.
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 are in service during November and December, as well as January. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Table 3 1 illustrates the available final effluent composite sample data reported for outfall 001 for the December 2018 DMR.
Table 3
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean | Geo Mean |
|
| 0.75 | 20 40 |
125 | 10 42 |
131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Sample Date | |||||||||||
| December 4, 2018 | 0.523 | 2.0 | 8.7 | 2 | 8.7 | 0.189 | 0.82 | 0.10 | 0.44 | 1 | 0.0000 |
| December 6, 2018 | 0.516 | 1 | 4.3 | ||||||||
| December 11, 2018 | 0.451 | 2.8 | 10.5 | 2 | 7.5 | 0.236 | 0.89 | 0.10 | 0.38 | 1 | 0.0000 |
| December 13, 2018 | 0.424 | 2 | 7.1 | ||||||||
| December 18, 2018 | 0.491 | 2.0 | 8.2 | 2 | 8.2 | 0.363 | 1.49 | 0.23 | 0.94 | 1 | 0.0000 |
| December 27, 2019 | 0.610 | 1 | 5.1 | ||||||||
| December 27, 2018 | 0.545 | 2.0 | 9.1 | 1 | 4.5 | 1.410 | 6.41 | 0.00 | 1 | 0.0000 | |
| Average | 0.509 | 2.2 | 9.1 | 2 | 6.5 | 0.550 | 2.40 | 0.14 | 0.44 | 1 | 0.0000 |
| Minimum | 0.424 | 2.0 | 8.2 | 1 | 4.3 | 0.189 | 0.82 | 0.10 | 0.00 | 1 | 0.0000 |
| Maximum | 0.610 | 2.8 | 10.5 | 2 | 8.7 | 1.410 | 6.41 | 0.23 | 0.94 | 1 | 0.0000 |
There was no discharge to the Applebrook outfall 002 during December 2018.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2018
Table 4
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average |
mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| December 4, 2018 | 0.614 | 154 | 788 | 110 | 563 | 16.9 | 86 | 21.3 | 109 | 2.6 | 13.3 |
| December 11, 2018 | 0.534 | 132 | 675 | 92 | 471 | 22.2 | 99 | 25.0 | 111 | 2.8 | 14.3 |
| December 18, 2018 | 0.563 | 216 | 1,105 | 146 | 747 | 22.4 | 105 | 25.2 | 118 | 3.4 | 17.4 |
| December 27, 2019 | 0.759 | 132 | 675 | 136 | 696 | 30.2 | 191 | 31.0 | 196 | 3.6 | 18.4 |
| Average | 0.617 | 159 | 811 | 121 | 619 | 22.9 | 120 | 25.6 | 134 | 3.1 | 15.9 |
| Minimum | 0.534 | 132 | 675 | 92 | 471 | 16.9 | 86 | 21.3 | 109 | 2.6 | 13.3 |
| Maximum | 0.759 | 216 | 1,105 | 146 | 747 | 30.2 | 191 | 31.0 | 196 | 3.6 | 18.4 |
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Significant Rainfall
During December, there were ten (10) days when rainfall occurred. Four (4) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period as well as consecutive days of precipitation exceeding 0.5 inches of rainfall. A total of 8.96 inches of rainfall measured during the month. These events occurred on:
| December 2nd | 0.57 inches |
|---|---|
| December 16th | 1.18 inches |
| December 21st | 1.96 inches |
| December 28th | 1.02 inches |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
2018 Rainfall Measured at RCSTP
| Year : 2018 | |
|---|---|
| Month | Precipitation, inches |
| January | 2.53 |
| February | 6.02 |
| March | 3.56 |
| April | 4.95 |
| May | 6.06 |
| June | 2.12 |
| July | 7.41 |
| August | 9.61 |
| September | 10.52 |
| October | 3.27 |
| November | 8.96 |
| December | 5.64 |
| Year to Date | 70.65 |
The average annual rainfall for West Chester, PA is typically 47.1 inches as compared to the national average of 39 inches. Rainfall measured at RCSTP for the 2018 calendar year was 23.55 inches above the typical average. As a result, the soil is saturated and groundwater table is elevated.
PA DEP
No activity.
Solids Dewatering and Disposal:
| December 2018 | |
|---|---|
| Gallons of sludge dewatered | 279,182 |
| Number of dumpsters | 4 |
*Seventeen (17) days of centrifuge operation
A decrease of 27,551 gallons of sludge was dewatered during December as compared to November.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
Chemical Usage:
| December 2018 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 300 | 9,000 |
| Aluminum Sulfate solution | 48.1 | 1,442 |
| Polymer (centrifuge) | 0.85 | 14.5 gallons |
*Seventeen (17) days of centrifuge of operation
The alum feed increased by an average of 48.3 gallons per day during November. This is attributed to the lower water temperatures and reduced biological activity.
Flow data:
| December 2018 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG |
Average Daily Flow, gpd |
Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | Flow Meter removed for rebuild | ||
| Influent Wastewater to SBRs | 20.083 | 647,849 | 904,576 |
| Internal Recycle | NA | NA | NA |
| Treated Effluent to Disc Filters | 19.746 | 636,969 | 903,168 |
| Final Effluent Discharge | 16.620 | 536,129 | 756,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
Influent wastewater flow measurements to the SBRs are bring used for DMR and Chapter 94 reporting. These flow measurements are typically 10 to 15% above the flow from the community when the internal recycle flow volumes are removed. For example, the December influent flow measurements into the SBR averaged 0.648 MGD, which is 86.4% of the average daily hydraulic design for the SBRs of 0.750 MGD, with all four (4) SBRs in service. The plant utilized three (3) SBRs during December and achieved compliance with all effluent discharge limitations within the NPDES permit.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations
Report:
January 2019
Drained and cleaned disc filters bi-weekly
Major Preventative Maintenance Activities
UV System
Parts were identified to repair and replace the electrical connections at a considerable savings as compared to sending the UV banks to Siemens for rebuilding. Replacing one UV bank with plant staff is recommended and proposed to be evaluated for a period of two months.
Influent Flow Meter located in the “field”
The meter remains at the factory for repair.
Screening Building
The parts to replace the screening basket have been received. Replacement of the screening basket and brush are scheduled for January.
UV Alarm on December 21, 2018
Responded to find the UV alarm was for insufficient lamps on. Two (2) ballasts were replaced. The alarm settings were adjusted in the UV PLC. Parts were ordered to repair the B3 UV module.
The problem with blowing so many ballasts, and damaging the plugs is due to the frequent cycling of the lag UV banks (in this case Bank B). The ballasts should only be used if they are going to cycle on once per day. Currently, the lag UV bank cycles on 8-10 times per day. This is probably shortening the lives of the lag bank ballasts. Another plug on Bank B that is melting. In the meantime, both UV banks will remain on continuously.
A meeting with the vendor providing the UV system supplies was scheduled.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 7
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 10, 2018
The East Goshen Township Municipal Authority held their regular public meeting on Monday, December 10, 2018 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Phil Mayer, Kevin Cummings and Dana Pizarro. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Public Works Director), Michael Ellis (Pennoni), Scott Towler (Plant Operator), Carmen Battavio (Supervisor), Patrick McKenna (Attorney), and Walter Wujcik (Conservancy Board).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 6:50 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops and first responders.
Jack asked if anyone would be recording the meeting. There was no response.
Chairman's Report
1. Phil mentioned that at the West Goshen meeting last week construction is done. He feels East Goshen should get a credit. They didn't discuss storm water management but did mention that they have a new township water ordinance.
Jon distributed copies of the West Goshen Sewer Authority Project cost report dated September 25, 2018. He commented that East Goshen does not pay miscellaneous fees.
Sewer Reports
1. Director of Public Works, Mark Miller's report for November:
Monthly Flows: The average daily flow to West Goshen was 833,000 gallons per day. No problems to report.
Meters: The meters were calibrated two weeks ago. The field meter at Ridley was been removed and sent back to HACH for repairs. The temporary flow meter that was at the Hershey Mill Pump Station has been removed. I'm waiting on John Laidly to forward me the data.
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We cleaned and televised 3,850 linear feet of pipe in various developments. The sump connection that we located has been disconnected. When I met with the resident, I inspected the line and viewed that the pump has been removed from the system. The new pumps that we had to order to replace the pumps at the Barkway Pump Station have arrived and will be
MA 12-10-18 draft
1
installed next week. The Public Works Department has been going out in the middle of the night and pulling manholes to locate high flows and then isolating them. We are trying to locate INI, so far we have located 5 sources of infiltration.
R.C. Collection: We televised and cleaned the following developments: Lochwood Chase, Fairway Village and Bittersweet Development. We located 4 areas of infiltration all have been repaired. We located a large leak at the sewer lateral at the Blacksmith Shop. On Thursday of last week we repaired a significant leak in Hershey Mill Development. We also attacked the Ridley Creek system as well. We were looking for infiltration.
Ridley Creek: We cleaned the grit chamber in the screen building and also cleaned the brush and bamboo form the fence line.
Tallmadge Drive sewer replacement has been interesting to say the least. The contractor has cored the manhole and installed some pipe. This is not going very fast. Matt and I are inspecting the site on a daily basis. We are currently waiting for some elevation work to get completed. Mike explained in more detail what they are doing.
1603 East Boot Road has been connected to our sewer system.
Alarms: We responded to 23 alarms for November.
PA One Calls: We received 64 PA One calls for November.
Rainfall: November rainfall total was 8.15 inches.
2. Pennoni Engineer's Report for November
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- No activity since last report.
RCSTP and Pump Stations' O&M Manual
- We recommend the Manual be revisited to determine if updates are needed and/or if new information has become available to incorporate now that it has been in place for over one year.
Supplee Valley Pipe Lining
- Prevailing wage discrepancies were resolved by the contractor, which was the final closeout item needed to make final payment. It is our understanding that final payment was made to the contractor thereafter.
Barkway Pump Station Grinder
- We have initiated redesign and vendor coordination for an external Muffin Monster in a prefabricated manhole.
Ashbridge Pump Station Force Main
- Test pits will be performed to identify backfill conditions along Manley Road with one test pit on Edith Road, as recommended by the Municipal Authority, when weather permits. No update since our last report.
MA 12-10-18 draft
2
Tallmadge Drive Sewer Main Replacement
- The contractor began work on November 26. Groundwater and wet/loose soil conditions have dramatically impacted the contractor's progress and have caused him to fall behind his proposed schedule. The size of trench restoration and associated trenching, aggregate and paving costs are increasing as a result.
- The contractor has completed installation of the 125 LF downstream pipe run and the replacement manhole. However, the pipe run was installed too high due to a contractor survey error. The contractor will coordinate with a surveyor at his own expense to determine if the upstream run can be installed at an acceptable, shallower slope to compensate for the higher downstream piping.
- Construction will likely run past the required December 14 contract cutoff completion date (20 consecutive calendar days). An exact completion date will not be known until the survey has occurred. The contractor will notify residents of updates to the construction schedule.
- The Public Works Department will install temporary hot mix asphalt paving upon completion of the work.
I&I Support and Reporting
- It has been determined that instantaneous meter data is not available for the permanent meters, so, we have initiated a limited analysis of all permanent meters based on daily flow data, and we are preparing a semi-annual I&I report accordingly. The Township is coordinating with the metering company to add instantaneous metering capabilities if possible. No update since our last report.
New Connections
- No activity since last report.
West Goshen Sewer System Consultation
- No activity since last report.
Hershey's Mill Pump Station
- We continued to evaluate electrical problems via discussions with the generator mechanic and evaluation of electrical test data provided by the mechanic. Our updated observations and recommendations will be provided separately.
3. Big Fish Environmental Services –
Scott's report showed that the Ridley Creek sewage treatment plant outfalls 001 and 002 is anticipate to achieve compliance with the permitted effluent discharge limitations during the month of November 2018. Discharge to the Applebrook irrigation lagoon remained off line during November 2018. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Scott revised DMR to the state and refiled. Rainfall flows have been higher. Average flows were discussed but still in compliance. He provided before and after photos of the corrective action work. It looks good. He recommends replacement of just the roto mat screen. They have a brush in stock.
MA 12-10-18 draft
3
Approval of Minutes
The minutes of the November 19, 2018 meeting were approved as amended.
Approval of Invoices
1. There was discussion of invoice #832261 for $1,889.25. Mike explained that they had additional time associated with Hershey Mill. He feels they will need $5,000.00 more which will increase the total from $23,000.00 to $28,000.00. Kevin recommended that the bills be paid as they are received for the rest of the year. He pointed out that the above invoice is incorrect because it shows $28,000.00 as the contract amount and not $23,000.00. Kevin moved to approve payment of the following Pennoni invoices and adjust the contract amount as per future invoices:
| Pennoni invoice #832260 | $ 113.75 |
|---|---|
| Pennoni invoice #832261 | $ 1,889.25 |
| Pennoni invoice #832262 | $ 332,25 |
| Pennoni invoice #832263 | $ 552.25 |
Phil seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board – Walter reported that they did the work at Clymers Woods on December 5th. In January they will select a date for the Keep East Goshen Beautiful Day.
Board of Supervisors – Carmen reported that the budget was adopted. They approved our contract with WEGO Police. There will be a public meeting in January for the open space amendment. They are conducting interviews for ABCs vacancies. Also they started a Pipeline Committee and a Sustainability Committee. Carmen thanked everyone for coming to the Holiday party and wished them all a Happy New Year.
Financial Reports
Jon Altshul provided the following written report:
In November, the Municipal Authority recorded -$14.65 in revenues (banking fees) and $9,966 in expenses, including $7,790 for general engineering, $1,381 for Tallmadge Drive engineering and $796 for legal expenses for a negative variance of $9,981. As of November 30th, the fund balance was $6,573.
Jon provided the 2019 proposed Municipal Authority budget and reviewed it. Phil moved that the MA approve the 2019 budget dated December 4, 2018. Dana seconded the motion. The motion passed unanimously.
New Business
1. Maillie Auditor fees - The fees for 2018 were $9,400.00. The fees for 2019 will increase by $250.00 to a total of $9,650. Kevin moved to continue to use Maillie as our auditor in the amount of $9,650.00 for 2019. Phil seconded the motion. The motion passed unanimously.
2. Pennoni 2019 Fees – Mike commented that they are requesting for continue as engineer with an increase of 3% which is consistent with the cost of living. Kevin moved to retain Pennoni as our Municipal Engineer at 2018 rates pending a 3% increase if approved by the BOS. Then the MA will accept the increase. Dana seconded the motion. The motion passed unanimously.
3. Roto Mat Screen - Dana moved to approve the repair of the roto mat screen segment in the amount of $11,208.00 and $1,000.00 for installation for a total of $12,208.00. Phil seconded the motion. The motion passed unanimously.
MA 12-10-18 draft
4
Adjournment
There being no further business, Phil moved to adjourn the meeting. Dana seconded the motion. The meeting was adjourned at 8:10 p.m. The next regular meeting will be held on Monday, January 14, 2019 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 12-10-18 draft
5
Sue Smith
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Thursday, January 10, 2019 3:34 PM
To: rsmith@eastgoshen.org; Jon Altshul; Mark Miller (mmiller@eastgoshen.org)
Cc: 'ssmith@eastgoshen.org'
Subject: Pennoni Invoices - Municipal Authority - December 2018
Attachments: EGMA Invoices (12-2018).pdf
Hi Rick, Jon, and Mark,
Our Municipal Authority invoices for December are attached. Please include this email with our invoices in the MA packet to describe two of the invoices:
- 2018 General Services, Project EGMAU18001 – The previously approved hourly rate budget was $23,000 as noted in the invoice. As discussed at the December MA meeting, the electrical evaluation of the Hershey's Mill PS issues extended our year-to-date general consultation effort beyond that budget. As reflected in this Final Invoice for this activity, the actual total effort for the year is $26,190. Please note this is less than the $28,000 that had been projected at the MA meeting. We propose the MA increase the budget to $26,190 consistent with this effort. *FYI, to decrease the potential for adjustments in 2019, the general consultation budget for 2019 was set at $27,000 to be consistent with the actual effort in 2017 and 2018.
- Tallmadge Dr Sewer, Project EGMAU18004 – The estimated hourly rate fee on this project was initially approved at $9,000 as noted in the invoice. However, the actual effort has exceeded that due to the extended construction schedule, extent of needed contractor oversight during construction, and to address numerous deficiencies in the completed work requiring repairs. The attached invoice is for a total effort as of 12/30/18 of $12,348.75. We anticipate the total effort will end up being around $16,000-$18,000 following the performance of 2-3 days of repair work next week, acceptance testing thereafter, final televising and any repairs in April, and processing final invoices and closeout documentation. We recommend the budget be increased accordingly to $18,000.
Please call me if you have any questions.
Thanks,
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com
[Pennoni Logo: PARTNERS FOR WHAT'S POSSIBLE]
1
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 839068 Invoice Date : 01/10/2019 Project : EGMAU17006 Project Name : Barkway PS Muffin Monster |
|---|
For Services Rendered through: 12/30/2018
Continued design and plan revisions for Muffin Monster prefabricated manhole system, and coordinated with vendor for equipment specifications and details.
| Phase Code / Name | Contract Amount |
Previously Billed |
% Complete |
Complete To Date |
Amount This Invoice |
|---|---|---|---|---|---|
| **** -- Professional Services | $16,000.00 | $9,421.29 | 62.52% | $10,003.50 | $582.21 |
| Total : | $16,000.00 | $9,421.29 | $10,003.50 | $582.21 |
| Amount Due This Invoice | $582.21 |
|---|
[Signature: OK Jon Altshul 1/11/19]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17006 Invoice Summary
Invoice Date 1/10/2019
| Project: | EGMAU17006 | ||
|---|---|---|---|
| Pennoni Job No.: | Barkway PS Muffin Monster | ||
| Invoice No: | 839068 | ||
| Invoice Period: | 10/15/2018 | to | 12/30/2018 |
| Initial Authorization: | $ 9,000.00 | Date: | 1/10/2019 |
| Contract Amount: | $ 16,000.00 | ||
| Previously Invoiced: | $ 9,421.29 | ||
| Current Invoice: | $ 582.21 | ||
| Invoiced to Date ($): | $ 10,003.50 | ||
| Invoiced to Date (%): | 63% | ||
| Remaining Budget ($): | $ 5,996.50 | ||
| Remaining Budget (%): | 37% |
Budget by Phase:
| Phase Name: | Barkway PS Muffin Monster |
|---|---|
| Phase Budget: | $ 16,000.00 |
| Previously Invoiced: | $ 9,421.29 |
| Current Invoice: | $ 582.21 |
| Invoiced to Date ($): | $ 10,003.50 |
| Invoiced to Date (%): | 63% |
| Remaining Budget ($): | $ 5,996.50 |
| Remaining Budget (%): | 37% |
Comments: Continued design and plan revisions for Muffin Monster prefabricated manhole system, and coordinated with vendor for equipment specifications and details.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 839069 Invoice Date : 01/10/2019 Project : EGMAU18002 Project Name : 2018 I&I Support and Reports |
|---|
For Services Rendered through: 12/30/2018
FINAL INVOICE
Analyzed collection and conveyance systems' flow meter data, initiated preparation of semi-annual I&I Report #18, and continued scoping for Hershey's Mill Pump Station capacity upgrade including discussion with a developer's contractor to respond to scope and feasibility questions.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 2,677.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,677.00 |
| Amount Due This Invoice | $2,677.00 |
|---|
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 6,938.75 |
| Current Billings : | 2,677.00 |
| Total Billings : | 9,615.75 |
[Signature: OK Jon Altshul 1/11/19]
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 123.00 | 246.00 |
| Senior Professional | 2.00 | 117.00 | 234.00 |
| Associate Professional | 15.25 | 91.00 | 1,387.75 |
| Engineering Technician | 9.75 | 83.00 | 809.25 |
| Labor Total: | 29.00 | 2,677.00 |
| Total Phase : **** -- Professional Services | Labor : | $2,677.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18002 -- 2018 I&I Support and Reports | Labor : | $2,677.00 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18002 Invoice Summary
Invoice Date 1/10/2019
| Project: | EGMAU18002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 I&I Support and Reports | ||
| Invoice No: | 839069 | ||
| Invoice Period: | 11/12/2018 | to | 12/30/2018 |
| Initial Authorization: | $ 11,000.00 | Date: | 1/10/2019 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 6,938.75 | ||
| Current Invoice: | $ 2,677.00 | ||
| Invoiced to Date ($): | $ 9,615.75 | ||
| Invoiced to Date (%): | 87% | ||
| Remaining Budget ($): | $ 1,384.25 | ||
| Remaining Budget (%): | 13% |
Budget by Phase:
| Phase Name: | 2018 I&I Support and Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 6,938.75 |
| Current Invoice: | $ 2,677.00 |
| Invoiced to Date ($): | $ 9,615.75 |
| Invoiced to Date (%): | 87% |
| Remaining Budget ($): | $ 1,384.25 |
| Remaining Budget (%): | 13% |
Comments: analyzed collection and conveyance systems' flow meter data, initiated preparation of semi-annual I&I Report #18, and continued scopeing for Hershey's Mill Pump Station capacity upgrade including discussion with developer's contractor to respond to scope and feasibility questions.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
| East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr. |
Invoice # : 839070 Invoice Date : 01/10/2019 Project : EGMAU18005 Project Name : Hershey's Mill Generator Replace |
|---|
For Services Rendered through: 12/30/2018
Initiated analysis of replacement generator sizing and preparation of conceptual site plan for external generator.
Phase : 01 -- Concept Design
| Total Phase : 01 -- Concept Design | Labor : | 301.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 301.50 |
| Amount Due This Invoice | $301.50 |
|---|
| Fee : | 5,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 301.50 |
| Total Billings : | 301.50 |
[Signature: OK Jon Altshul 1/11/19]
Phase : 01 -- Concept Design
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.50 | 123.00 | 184.50 |
| Senior Professional | 1.00 | 117.00 | 117.00 |
| Labor Total: | 2.50 | 301.50 |
| Total Phase : 01 -- Concept Design | Labor : | $301.50 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18005 -- Hershey's Mill Generator Replace | Labor : | $301.50 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18005 Invoice Summary
Invoice Date 1/10/2019
| Project: | EGMAU18005 | ||
|---|---|---|---|
| Pennoni Job No.: | Hershey's Mill Generator Replacement | ||
| Invoice No: | 839070 | ||
| Invoice Period: | NTP | to | 12/30/2018 |
| Initial Authorization: | $ 5,000.00 | Date: | 1/10/2019 |
| Contract Amount: | $ 5,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 301.50 | ||
| Invoiced to Date ($): | $ 301.50 | ||
| Invoiced to Date (%): | 6% | ||
| Remaining Budget ($): | $ 4,698.50 | ||
| Remaining Budget (%): | 94% |
Budget by Phase:
| Phase Name: | Hershey's Mill Generator Replacement |
|---|---|
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 301.50 |
| Invoiced to Date ($): | $ 301.50 |
| Invoiced to Date (%): | 6% |
| Remaining Budget ($): | $ 4,698.50 |
| Remaining Budget (%): | 94% |
Comments: Inititated analysis of replacement generator sizing and preparation of conceptual site plan for external generator.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
Louis F. Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
| Invoice # : | 839085 |
|---|---|
| Invoice Date : | 01/10/2019 |
| Project : | EGMAU18001 |
| Project Name : | 2018 General Services |
For Professional Services Rendered through:12/30/2018
OK
Jon Altshul
1/11/19
FINAL INVOICE
Prepared November and December Engineer's Reports, reviewed RCSTP operator's reports, prepared for and attended November and December MA meetings, and provided alternative WWTP sampling labs for consideration to Township.
Hershey's Mill Pump Station electrical assessment: Continued evaluation of VFD, generator, and other electrical issues including coordination with repair technicians on electric load testing, transformer sizing, and service line splicing concerns; submitted memo summarizing November electrical site visit and recommendations; initiated letter to Township recommending larger transformer.
| Phase Code | Phase Name | Fee Type | Contract Amount | Previously Billed | Current Billing | Total Billing |
|---|---|---|---|---|---|---|
| **** | Professional Services | NTE | $ 23,000.00 | $ 24,003.00 | $ 2,187.00 | $ 26,190.00 |
| Subtotal: | $ 24,003.00 | $ 2,187.00 | $ 26,190.00 | |||
| Total: | $ 24,003.00 | $ 2,187.00 | $ 26,190.00 | |||
| Total Amount Due | $ 2,187.00 |
|---|
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18001 -- 2018 General Services
Invoice # : 839085
...Continued from previous page
Phase : **** -- Professional Services
Rate Schedule Labor
| Class / Employee Name | Hours | Rate | Amount |
|---|---|---|---|
| Associate Professional | 0.25 | 91.00 | 22.75 |
| Authority Engineer | 13.50 | 123.00 | 1,660.50 |
| Engineering Technician | 3.25 | 83.00 | 269.75 |
| Senior Professional | 2.00 | 117.00 | 234.00 |
| Rate Schedule Labor | 2,187.00 | ||
| Total Phase : **** -- Professional Services | 2,187.00 | ||
| Total Project : EGMAU18001 -- 2018 General Services | 2,187.00 | ||
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU18001 Invoice Summary
Invoice Date 1/10/2019
| Project: | EGMAU18001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2018 General Services | ||
| Invoice No: | 839085 | ||
| Invoice Period: | 11/12/2018 | to | 12/30/2018 |
| Initial Authorization: | $ 18,000.00 | Date: | 1/10/2019 |
| Contract Amount: | $ 23,000.00 | ||
| Previously Invoiced: | $ 24,003.00 | ||
| Current Invoice: | $ 2,159.00 | ||
| Invoiced to Date ($): | $ 26,162.00 | ||
| Invoiced to Date (%): | 114% | ||
| Remaining Budget ($): | $ (3,162.00) | ||
| Remaining Budget (%): | -14% |
Budget by Phase:
| Phase Name: | 2018 General Services |
|---|---|
| Phase Budget: | $ 23,000.00 |
| Previously Invoiced: | $ 24,003.00 |
| Current Invoice: | $ 2,159.00 |
| Invoiced to Date ($): | $ 26,162.00 |
| Invoiced to Date (%): | 114% |
| Remaining Budget ($): | $ (3,162.00) |
| Remaining Budget (%): | -14% |
Comments: FINAL INVOICE
Prepared November and December Engineer's Reports, reviewed RCSTP operator's reports, prepared for and attended November and December MA meetings, and provided alternative WWTP sampling labs for consideration to Township.
Hershey's Mill Pump Station electrical assessment: Continued evaluation of VFD, generator, and other electrical issues including coordination with repair technicians on electric load testing, transformer sizing, and service line splicing concerns; submitted memo summarizing November electrical site visit and recommendations; initiated letter to Township recommending larger transformer.
[Pennoni logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 839095 |
|---|---|
| Invoice Date : | 01/10/2019 |
| Project : | EGMAU18004 |
| Project Name : | Tallmadge Dr Sewer Constr Phase |
For Services Rendered through: 12/30/2018
Pre-construction services consisting of shop drawing reviews, bypass pumping approach, schedule coordination, project contact list, and preparation of resident's notice. Construction services consisting of on-site observation of work and testing from 11/20/18 through 12/19/18 and engineering office support. Reviewed post-construction sewer videos, coordinated approach and schedule to resolve pipe and manhole deficiencies, prepared a Notice of Deficiencies letter to the contractor, and processed Pay Applications #1 and #2.
Phase : **** -- Professional Services
| Labor : | 9,082.00 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 9,082.00 |
| Amount Due This Invoice | $9,082.00 |
|---|
OK
Jon Altshul
1/11/19
| Fee : | 9,000.00 |
|---|---|
| Prior Billings : | 3,266.75 |
| Current Billings : | 9,082.00 |
| Total Billings : | 12,348.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 10.75 | 123.00 | 1,322.25 |
| Senior Professional | 0.25 | 117.00 | 29.25 |
| Associate Professional | 21.25 | 91.00 | 1,933.75 |
| Sr. Engineering Technician | 63.50 | 89.00 | 5,651.50 |
| Engineering Technician | 1.75 | 83.00 | 145.25 |
| Labor Total: | 97.50 | 9,082.00 |
| Total Phase : **** -- Professional Services | Labor : | $9,082.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU18004 -- Tallmadge Dr Sewer Constr Phase | Labor : | $9,082.00 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18004 Invoice Summary
Invoice Date 1/10/2019
| Project: | EGMAU18004 | ||
|---|---|---|---|
| Pennoni Job No.: | Tallmadge Drive Sewer Construction Phase | ||
| Invoice No: | 839095 | ||
| Invoice Period: | 11/12/2018 | to | 12/30/2018 |
| Initial Authorization: | $ 9,000.00 | Date: | 1/10/2019 |
| Contract Amount: | $ 9,000.00 | ||
| Previously Invoiced: | $ 3,266.75 | ||
| Current Invoice: | $ 9,082.00 | ||
| Invoiced to Date ($): | $ 12,348.75 | ||
| Invoiced to Date (%): | 137% | ||
| Remaining Budget ($): | $ (3,348.75) | ||
| Remaining Budget (%): | -37% |
Budget by Phase:
| Phase Name: | Tallmadge Drive Sewer Construction Phase |
|---|---|
| Phase Budget: | $ 9,000.00 |
| Previously Invoiced: | $ 3,266.75 |
| Current Invoice: | $ 9,082.00 |
| Invoiced to Date ($): | $ 12,348.75 |
| Invoiced to Date (%): | 137% |
| Remaining Budget ($): | $ (3,348.75) |
| Remaining Budget (%): | -37% |
Comments: Pre-construction services consisting of shop drawing reviews, bypass pumping approach, schedule coordination, project contact list, and preparation of resident's notice. Construction services consisting of on-site observation of work and testing from 11/20/18 through 12/19/18 and engineering office support. Reviewed post-construction sewer videos, coordinated approach and schedule to resolve pipe and manhole deficiencies, prepared a Notice of Deficiencies letter to the contractor, and processed Pay Applications #1 and #2.
[Gawthrop Greenwood, PC logo]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
| Page: | 1 |
|---|---|
| Date: | 01/08/2019 |
| Client No: | 6604-001M |
| Invoice No. | 203528 |
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Staff | Description | Hours | Amount |
|---|---|---|---|---|
| 12/07/2018 | PMM | Email from S Smith with meeting materials. | 0.20 | |
| 12/10/2018 | PMM | Review and analyze meeting packet in preparation for Authority meeting; Attend Board meeting. | 1.50 | |
| 12/21/2018 | SLF | Telephone call from M Ellis regarding performance bond question. | 0.30 | |
| 12/28/2018 | PMM | Email from J Altshul regarding Tallmadge Drive. | 0.20 | |
| For Current Services Rendered | 2.20 | 440.00 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Stacey L. Fuller | 0.30 | $200.00 | $60.00 |
| Patrick M. McKenna | 1.90 | 200.00 | 380.00 |
| Previous Balance | $384.06 |
|---|---|
| Total Current Charges | 440.00 |
| 12/26/2018 | Payment | -384.06 |
|---|
| Balance Due | $440.00 |
|---|
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Gawthrop Greenwood, PC logo]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
| Page: | 1 |
|---|---|
| Date: | 12/05/2018 |
| Client No: | 6604-001M |
| Invoice No. | 202493 |
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Staff | Description | Hours | Amount |
|---|---|---|---|---|
| 11/19/2018 | JKW | Prepare for meeting; Attend meeting. | 2.00 | |
| For Current Services Rendered | 2.00 | 400.00 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Jessica K. Wiesak | 2.00 | $200.00 | $400.00 |
Expenses
CREDIT MEMO: Ref: J Wiesak mileage on invoice no. 200550 dated 10/8/18. -15.94
Total Credits for Expenses -15.94
| Previous Balance | $795.94 |
|---|---|
| Total Current Charges | 384.06 |
| 11/29/2018 | Payment | -715.94 |
|---|---|---|
| 11/29/2018 | Payment | -80.00 |
| Total Payments | -795.94 | |
| Balance Due | $384.06 |
|---|
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Pd. Dec. mtg.
[JWC Environmental logo]
2850 S. Red Hill Ave., STE 125
Santa Ana, CA 92705
(949) 833-3888
| Invoice No: | 95288 |
|---|---|
| Date: | 12/26/2018 |
| Order No: | S031631 |
| Page No: | 1 |
| F.O.B: | Origin |
| Sold To | Ship To |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
TIN: 45-2771126
DUNNS# 61-059-2388
| CUSTOMER ID | CUSTOMER PO | PAYMENT TERMS | FREIGHT TERMS |
|---|---|---|---|
| 6005886 | 2018.86 | NET 30 DAYS | Freight: Billed |
| SALES REP ID | SHIPPING METHOD | SHIP DATE | INVOICE DUE DATE |
|---|---|---|---|
| 035 | Old Dominion Freight Line | 12/26/2018 | 1/25/2019 |
| LI# | QUANTITY | PART | DESCRIPTION | TX | UNIT PRICE | EXTENDED PRICE | ||
|---|---|---|---|---|---|---|---|---|
| ORD | SHP | BCK | ||||||
| 1 | 1 | 1 | 0 | AMC0109-3235-480-06-S | SCREEN, SEGMENT 6MM PRF 35DG XE SS | $11,208.90 | $11,208.90 | |
| 2 | 1 | 1 | 0 | TARIFF | Tariff Surcharge Recently, the US Government, has implemented the following trade restrictions: Section 232, June 1, 2018: Restrictions on steel mill (25%) and aluminum articles (10%). All countries of origin except Argentina, Australia, Brazil, and South Korea. Section 301, July 6, 2018 Restrictions on products from China, 25% The tariff surcharge represents the increased cost of manufacturing our products as a result of the government-imposed trade restrictions. |
$294.79 | $294.79 | |
screen replacement
APPROVED BY: MDM
DATE PAID:
CHECK #:
CHARGED TO: 05422-3700
09409-7400
09409-7400
07424-7440
| SUB TOTAL: | $11,503.69 |
|---|---|
| TARIFF TOTAL: | $294.79 |
| SALES TAX: | $0.00 |
| SHIPPING & HANDLING CHARGES: | $327.03 |
| TOTAL AMOUNT DUE: | $11,830.72 |
PLEASE REFERENCE THIS INVOICE NUMBER ON YOUR CHECK AND REMIT TO: JWC Environmental Inc.
P.O. Box 848853
Los Angeles, CA 90084-8853
IF PAYING BY ACH OR WIRE:
ACH/WIRE INSTRUCTIONS
BANK NAME: WELLS FARGO
ADDRESS: IRVINE, CA.
ABA#: 121000248
ACCOUNT #: 4123519118
ACCOUNT NAME: JWC Environmental Inc.
[JWC Environmental logo]
2850 S. Red Hill Ave., STE 125
Santa Ana, CA 92705
(949) 833-3888
| Invoice No: | 95288 |
|---|---|
| Date: | 12/26/2018 |
| Order No: | S031631 |
| Page No: | 1 |
| F.O.B: | Origin |
| Sold To | Ship To |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
TIN: 45-2771126
DUNNS# 61-059-2388
| CUSTOMER ID | CUSTOMER PO | PAYMENT TERMS | FREIGHT TERMS |
|---|---|---|---|
| 6005886 | 2018.86 | NET 30 DAYS | Freight: Billed |
| SALES REP ID | SHIPPING METHOD | SHIP DATE | INVOICE DUE DATE |
|---|---|---|---|
| 035 | Old Dominion Freight Line | 12/26/2018 | 1/25/2019 |
| LI# | QUANTITY | PART | DESCRIPTION | TX | UNIT PRICE | EXTENDED PRICE | ||
|---|---|---|---|---|---|---|---|---|
| ORD | SHP | BCK | ||||||
Subject: Tariff Surcharge
Dear Valued JWC Environmental Customer,
The U.S. government has imposed new steel tariffs on imported raw steel (section 232) and certain imported product (section 301). JWC is committed to continuously improving efficiency which includes managing costs, and when possible protecting our customers from the adverse impacts of rising input costs. Unfortunately, due to the rapid nature of these new tariffs JWC must take action to recover some of these cost increases.
Given the uncertain nature of these market dynamics, JWC will not be increasing our base prices. Instead, JWC has implemented a “Tariff Surcharge”. The surcharge will be a flat rate of 2.63% which will cover a portion of JWC’s increase costs due to the new tariffs and will remain separate and transparent from base prices.
Using this method, JWC can quickly adapt to any future actions. If the tariffs are expanded or reduced JWC will be able to adjust the surcharge accordingly.
[JWC Environmental logo]
2600 S. Garnsey Street
Santa Ana, CA 92707
PACKLIST
| Packlist ID: | 92657 |
|---|---|
| Date: | 12/26/2018 |
| Page: | 1 |
S031631
| Sold To Address | Ship To Address |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
| CUSTOMER ID | F.O.B. | |||
|---|---|---|---|---|
| 6005886 | Origin | |||
| SALES REP ID | OUR ORDER NUMBER | |||
| 035 | S031631 | |||
| QUANTITY | CUSTOMER PART NO. | OUR WORK ORDER NO. | ||
| ORD | SHP | BCK | ||
| 1.00 | 1.00 | 0.00 | ||
Screen Replacement
Capital Replacem--
Ship Weight: 0.00
| 1.00 | 1.00 | 0.00 |
|---|
Ship Weight: 0.00
Recently, the US Government, has implemented the following trade restrictions:
Section 232, June 1, 2018: Restrictions on steel mill (25%) and aluminum articles (10%). All countries of origin except Argentina, Australia, Brazil, and South Korea.
Section 301, July 6, 2018 Restrictions on products from China, 25%
The tariff surcharge represents the increased cost of manufacturing our products as a result of the government-imposed trade restrictions.
| 0.00 | 1.00 | 0.00 | SALESTAX | Avalara Sales Tax |
|---|
Ship Weight: 0.00
Shipped Unit of Measure:
APPROVED BY: MDM
DATE PAID:
CHECK #:
CHARGED TO: 05422-
Ridley Creek
RECEIVED BY: ___________________
[JWC Environmental logo]
2600 S. Garnsey Street
Santa Ana, CA 92707
PACKLIST
| Packlist ID: | 92657 |
|---|---|
| Date: | 12/26/2018 |
| Page: | 2 |
| Sold To Address | Ship To Address |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
East Goshen Township 1580 Paoli Pike West Chester , PA 19380 US |
| CUSTOMER ID | CUSTOMER PO | PAYMENT TERMS | F.O.B. |
|---|---|---|---|
| 6005886 | 2018.86 | NET 30 DAYS | Origin |
| SALES REP ID | SHIPPING METHOD | SHIP DATE | OUR ORDER NUMBER |
| 035 | Old Dominion Freight Line | 12/26/2018 | S031631 |
| QUANTITY | PART ID | DESCRIPTION | CUSTOMER PART NO. | OUR WORK ORDER NO. | ||
|---|---|---|---|---|---|---|
| ORD | SHP | BCK | ||||
ORDER SPECIFICATIONS
EM/MM
****************************************
AMA3200-480
SN: 105661-3-1
****************************************
RECEIVED BY: ___________________
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA December Financial Report |
| Date: | January 11, 2019 |
In December, the Municipal Authority recorded 19,985 in revenues (a $20,000 transfer from Sewer Operating minus banking fees) and $12,635 in expenses, including $8,382 for the Q4 overhead chargeback, for a positive variance of $7,350. As of December 31st, the fund balance was $13,923.
For tonight’s meeting, I seek your recommendation on whether the Tallmadge Drive and RCSTP screen replacement expenses should be paid by the MA (via reimbursement from the Township’s sewer funds) or via the Sewer Operating and Sewer Capital Reserve funds. These projects were not included in the MA’s 2019 budget—Tallmadge because it was budgeted by the Township for last year and the screen because it was an emergency repair. In addition, for the purposes of our financial statements both projects will be accrued back to 2018 for accounting purposes.
EAST GOSHEN TOWNSHIP
Other Funds
December 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | 10 | 10 | (144.97) | (154.97) | (14.65) | (14.65) | |
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | 50 | 50 | 613.94 | 563.94 | |||
| DCED GRANT | 07354 0400 | |||||||
| C.C. TAPPING FEES | 07364 1100 | 8,000 | 8,000 | (8,000.00) | 4,000 | (4,000.00) | ||
| R.C.TAPPING FEES | 07364 1110 | 2,000 | 2,000 | 4,000.00 | 2,000.00 | |||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 1,692 | 1,692 | 1,127.52 | (564.48) | 846 | (846.00) | |
| MISCELLANEOUS REVENUE | 07380 1000 | 564.51 | 564.51 | |||||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | 71.30 | 71.30 | |||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 89,853 | 75,853 | 110,000.00 | 34,147.00 | 6,322 | 20,000.00 | 13,678.00 |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | |||||||
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | |||||||
| TOTAL REVENUE | 101,605 | 87,605 | 116,232.30 | 28,627.30 | 11,168 | 19,985.35 | 8,817.35 | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,411 | 32,411 | 33,085.38 | (674.38) | 8,103 | 8,382.36 | (279.36) |
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,500 | 2,500 | 2,317.00 | 183.00 | 209 | 981.00 | (772.00) |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,384 | 9,384 | 9,400.00 | (16.00) | |||
| ENGINEERING SERVICES | 07424 3130 | 43,260 | 43,260 | 73,406.96 | (30,146.96) | 3,605 | 2,335.25 | 1,269.75 |
| LEGAL SERVICES | 07424 3140 | 4,600.00 | (4,600.00) | 384.06 | (384.06) | |||
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | |||||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | |||||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | |||||||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | 14,000 | 14,000 | 19,232.75 | (5,232.75) | 1,167 | 552.25 | 614.72 |
Report Date 1812 01/11/19 8 : 33 AM
EAST GOSHEN TOWNSHIP
Other Funds
December 2018
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 188.00 | (188.00) | |||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | 59,736 | 59,736 | 102,339.08 | (42,603.08) | |||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | 71.30 | (71.30) | |||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER SINKING FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 161,291 | 161,291 | 244,640.47 | (83,349.47) | 13,084 | 12,634.92 | 448.75 | |
| NET RESULT FROM OPERATIONS | (59,686) | (73,686) | (128,408.17) | (54,722.17) | (1,916) | 7,350.43 | 9,266.10 |
Report Date 1812 01/11/19 8 : 33 AM
2018 ALL MUNICIPAL AUTHORITY TRANSACTIONS
| Account # | Description | Per | Src | Debits | Credits | Balance | Date | Check# | Name | Description | Description 2 | Description 3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | - | ||||||||||
| 07341-1000 | INTEREST EARNINGS | 1801 | JE | - | 0.31 | 2/2/2018 | INTEREST | INTEREST EARNED JANUARY 2018 | 07 FUND | |||
| 07341-1000 | INTEREST EARNINGS | 1802 | JE | - | 0.20 | 2/14/2018 | INTEREST | INTEREST ADJ. FROM JAN.2018 | 7105.2 | |||
| 07341-1000 | INTEREST EARNINGS | 1802 | JE | - | 0.54 | 3/5/2018 | INTEREST | INTEREST EARNED FEBRUARY 2018 | 07 FUND | |||
| 07341-1000 | INTEREST EARNINGS | 1803 | EX | 15.00 | - | 3/5/2018 | 62192 1 | REIMBURSE S/R FOR BANK FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1803 | JE | - | 0.47 | 4/2/2018 | INTEREST | INTEREST EARNED MARCH 2018 | 07 FUND | |||
| 07341-1000 | INTEREST EARNINGS | 1804 | EX | 15.00 | - | 4/2/2018 | 62551 1 | REIMB.S/R FOR 3/2018 BANK FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1804 | JE | - | 0.55 | 5/1/2018 | INTEREST | INTEREST EARNED APRIL 2018 | 07 FUND | |||
| 07341-1000 | INTEREST EARNINGS | 1805 | EX | 15.00 | - | 5/1/2018 | 62911 1 | REIMBURSMT- 4/2018 BANK FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1805 | EX | 15.00 | - | 6/1/2018 | 63388 1 | BANK FEES - MAY 2018 | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1805 | EX | - | 15.00 | 6/5/2018 | REVERSE | REVERSE TRX 63388 EXPENSE TO | BE ENTERED IN JUNE NOT MAY | |||
| 07341-1000 | INTEREST EARNINGS | 1805 | JE | - | 0.51 | 6/1/2018 | INTEREST | INTEREST EARNED MAY 2018 | 07 FUND | |||
| 07341-1000 | INTEREST EARNINGS | 1806 | EX | 15.00 | - | 6/5/2018 | 63459 1 | REIMBURSE S/R FOR MAY '18 FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1806 | JE | - | 0.40 | 7/3/2018 | INTEREST | INTEREST EARNED JUNE 2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1807 | EX | 15.00 | - | 7/3/2018 | 63820 5 | REIMBURSE S/R - 5/2018 BK.FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1807 | EX | - | 15.00 | 7/30/2018 | 64317 1 | REVERSE EXP.TRX 63820 | M&T BANK - GEN'L CHKG # 9852637421 | |||
| 07341-1000 | INTEREST EARNINGS | 1807 | EX | 15.00 | - | 7/30/2018 | 64322 1 | REIMBURSE S/R 6/2018 BK.FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1807 | JE | - | 0.40 | 8/2/2018 | INTEREST | INTEREST EARNED JULY 2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1808 | EX | 15.00 | - | 8/3/2018 | 64289 1 | REIMBURSE S/R - 7/2018 BK FEES | INTEREST EARNINGS | |||
| 07341-1000 | INTEREST EARNINGS | 1808 | JE | - | 0.14 | 9/4/2018 | INTEREST | INTEREST EARNED AUGUST 2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1809 | JE | 15.00 | - | 9/5/2018 | BANK FEES | REIMBURSE S/R FOR AUGUST 2018 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 1809 | JE | - | 0.41 | 10/1/2018 | INTEREST | INTEREST EARNED SEPT.2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1810 | JE | 15.00 | - | 10/1/2018 | REIMBURSE | REIMBURSE S/R FOR SEPT.2018 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 1810 | JE | - | 0.40 | 11/1/2018 | INTEREST | INTEREST EARNED OCTOBER 2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1811 | JE | 15.00 | - | 11/1/2018 | BANK FEES | REIMBURSE S/R FOR OCTOBER 2018 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 1811 | JE | - | 0.35 | 11/30/2018 | INTEREST | INTEREST EARNED NOVEMBER 2018 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 1812 | JE | 15.00 | - | 12/3/2018 | BANK FEES | REIMBURSE S/R FOR NOV.2018 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 1812 | JE | - | 0.35 | 12/31/2018 | INTEREST | INTEREST EARNED DECEMBER 2018 | 7100.1035 | |||
| 07341-1020 | BEGINNING BALANCE | - | ||||||||||
| 07341-1020 | INTEREST EARNED - CONSTRUCTI | 1801 | JE | - | 391.64 | 2/2/2018 | INTEREST | INTEREST EARNED JANUARY 2018 | 07 FUND | |||
| 07341-1020 | INTEREST EARNED - CONSTRUCTI | 1802 | JE | - | 69.31 | 3/5/2018 | INTEREST | INTEREST EARNED FEBRUARY 2018 | 07 FUND | |||
| 07341-1020 | INTEREST EARNED - CONSTRUCTI | 1803 | JE | - | 81.66 | 4/2/2018 | INTEREST | INTEREST EARNED MARCH 2018 | 07 FUND | |||
| 07341-1020 | INTEREST EARNED - CONSTRUCTI | 1804 | JE | - | 71.30 | 5/1/2018 | INTEREST | INTEREST EARNED APRIL 2018 | 07 FUND | |||
| 07341-1020 | INTEREST EARNED - CONSTRUCTI | 1805 | JE | - | 0.03 | 6/1/2018 | INTEREST | INTEREST EARNED MAY 2018 | 07 FUND | |||
| 07364-1110 | BEGINNING BALANCE | - | ||||||||||
| 07364-1110 | R.C.TAPPING FEES | 1807 | RE | - | 2,000.00 | 7/13/2018 | ROBERTS | TAP IN FEE FOR MARLIN DR | R.C.TAPPING FEES | |||
| 07364-1110 | R.C.TAPPING FEES | 1810 | RE | - | 2,000.00 | 10/30/2018 | 65507 1 | TAP IN FEE -1603 E BOOT RD | R.C.TAPPING FEES | |||
| 07364-1130 | BEGINNING BALANCE | - | ||||||||||
| 07364-1130 | CONNECTION FEES - SEWER | 1801 | CR | - | 423.00 | 1/25/2018 | 2572 | STOFFLET, MICHAEL | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | CR | - | 423.00 | 2/13/2018 | 494 | JACOBS, ROBERT & CHERYL | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | CR | - | 423.00 | 2/27/2018 | 148 | GEORGE SMITH & CHRISTINA CONLE | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | JE | 282.24 | - | 2/13/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | JACOBS & STOFFLET INTEREST | |||
| 07364-1130 | CONNECTION FEES - SEWER | 1802 | JE | 141.12 | - | 2/27/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 1803 | CR | - | 423.00 | 3/23/2018 | 11373243 | PAPPANO, JOSEPH & PATRICIA | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 1803 | JE | 141.12 | - | 3/23/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO | |||
| 07380-1000 | BEGINNING BALANCE | - | ||||||||||
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | JE | - | 282.24 | 2/13/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | JACOBS & STOFFLET INTEREST | |||
| 07380-1000 | MISCELLANEOUS REVENUE | 1802 | JE | - | 141.12 | 2/27/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07380-1000 | MISCELLANEOUS REVENUE | 1803 | JE | - | 141.12 | 3/23/2018 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC214 PAPPANO | |||
| 07380-1000 | MISCELLANEOUS REVENUE | 1808 | JE | - | 0.03 | 8/16/2018 | DEPOSIT | DEPOSIT CK.7100.1035 TO CLOSE | OUT FULTON 7105.2000 | |||
| 07392-0100 | BEGINNING BALANCE | - | ||||||||||
| 07392-0100 | TRANSFER FROM GENERAL ACCT | 1805 | JE | - | 71.30 | 6/7/2018 | XFER | XFER $ TO MA REGARDING DEPOSIT | ERROR 5/10/18 | |||
| 07392-0500 | BEGINNING BALANCE | - | ||||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 1803 | JE | - | 30,000.00 | 3/29/2018 | XFER | XFER $ FROM SEWER TO MUNICIPAL | TO COVER EXPENSES | |||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 1806 | JE | - | 30,000.00 | 6/22/2018 | XFER | XFER $ FROM SEWER TO MA | ||||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 1809 | JE | - | 30,000.00 | 9/12/2018 | XFER | XFER FROM SEWER TO M.A. | 9/12/2018 | |||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 1812 | JE | - | 20,000.00 | 12/28/2018 | XFER | XFER $ FROM SEWER TO MA | 12/28/2018 | |||
| 07424-1400 | BEGINNING BALANCE | - |
| Account # | Description | Per | Src | Debits | Credits | Balance | Date | Check# | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 07424-1400 | ADMINISTRATIVE WAGES | 1803 | CD | 8,160.33 | - | - | 3/26/2018 | 3121 | EAST GOSHEN TOWNSHIP - GENERA | 1ST QTR.2018 REIMBURSEMENT - MA | |
| 07424-1400 | ADMINISTRATIVE WAGES | 1806 | CD | 8,160.33 | - | - | 6/21/2018 | 3129 | EAST GOSHEN TOWNSHIP - GENERA | 2ND QTR.2018 REIMBURSEMENT - MA | |
| 07424-1400 | ADMINISTRATIVE WAGES | 1809 | CD | 8,382.36 | - | - | 9/28/2018 | 3135 | EAST GOSHEN TOWNSHIP - GENERA | QTR.3 2018 REIMBURSEMENT - MUN.AUTH | |
| 07424-1400 | ADMINISTRATIVE WAGES | 1812 | CD | 8,382.36 | - | - | 12/28/2018 | 3142 | EAST GOSHEN TOWNSHIP - GENERA | 4TH QTR.2018 REIMBURSEMENT - MA | |
| 07424-3000 | BEGINNING BALANCE | - | |||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1801 | CD | 100.00 | - | - | 1/31/2018 | 3114 | COMMONWEALTH FINANCING AUTH | GRANT APPLIC. DCED - WATER & SEWER | PROGRAM FOR BARKWAY |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1805 | CD | 1,236.00 | - | - | 5/30/2018 | 3125 | DELAWARE RIVER BASIN COMMISSI | ANNUAL FEE D-2000-030 CP WASTE | WATER DISCHARGE |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1812 | CD | 981.00 | - | - | 12/20/2018 | 3141 | PENNSYLVANIA MUNICIPAL AUTHOR | 2019 ACTIVE MEMBERSHIP DUES | |
| 07424-3110 | BEGINNING BALANCE | - | |||||||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1803 | CD | 6,964.00 | - | - | 3/22/2018 | 3120 | MAILLIE FALCONIERO & CO. | PROGRESS BILLING - M.AUTHORITY 2017 | FINANCIAL STATEMENTS |
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1804 | CD | 2,436.00 | - | - | 4/17/2018 | 3123 | MAILLIE FALCONIERO & CO. | EXAMINATION 2017 MA FINANCIAL STMTS | |
| 07424-3130 | BEGINNING BALANCE | - | |||||||||
| 07424-3130 | ENGINEERING SERVICES | 1801 | CD | 12,523.56 | - | - | 1/24/2018 | 3113 | PENNONI ASSOCIATES INC. | SERV.THRU 12/10/17 2017 GENERAL | SERVICES |
| 07424-3130 | ENGINEERING SERVICES | 1802 | CD | 5,415.00 | - | - | 2/15/2018 | 3115 | PENNONI ASSOCIATES INC. | SERVICES THRU 1/14/18 -2017 GENERAL | |
| 07424-3130 | ENGINEERING SERVICES | 1802 | CD | 552.50 | - | - | 2/22/2018 | 3117 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/14/18 SUPPLEE VAL. | |
| 07424-3130 | ENGINEERING SERVICES | 1803 | CD | 11,749.08 | - | - | 3/15/2018 | 3118 | PENNONI ASSOCIATES INC. | SERVICES THRU 2/11/18 2018 GEN.SERV | |
| 07424-3130 | ENGINEERING SERVICES | 1806 | CD | 9,622.25 | - | - | 6/7/2018 | 3126 | PENNONI ASSOCIATES INC. | SERVICES THRU 4/15/18 SUPPLEE VAL. | |
| 07424-3130 | ENGINEERING SERVICES | 1806 | CD | 7,503.93 | - | - | 6/12/2018 | 3127 | PENNONI ASSOCIATES INC. | SERVICES THRU 5/20/18 BARKWAY PS | |
| 07424-3130 | ENGINEERING SERVICES | 1807 | CD | 16,679.82 | - | - | 7/11/2018 | 3130 | PENNONI ASSOCIATES INC. | SERVICES THRU 6/17/18 BARKWAY | |
| 07424-3130 | ENGINEERING SERVICES | 1807 | JE | - | 10,556.75 | - | 7/10/2018 | RECLASS | RECLASS TALLMADGE DR EXPENSES | ||
| 07424-3130 | ENGINEERING SERVICES | 1808 | CD | 3,619.00 | - | - | 8/15/2018 | 3132 | PENNONI ASSOCIATES INC. | PROF.SERV. THRU 8/5/18 2018 GENERAL | |
| 07424-3130 | ENGINEERING SERVICES | 1809 | CD | 1,134.50 | - | - | 9/11/2018 | 3133 | PENNONI ASSOCIATES INC. | SERVICES THRU 8/12/18 SUPPLEE VAL. | |
| 07424-3130 | ENGINEERING SERVICES | 1810 | CD | 4,839.25 | - | - | 10/10/2018 | 3136 | PENNONI ASSOCIATES INC. | SERVICES THRU 9/16/18 SUPPLEE VALL. | |
| 07424-3130 | ENGINEERING SERVICES | 1811 | CD | 7,789.57 | - | - | 11/26/2018 | 3138 | PENNONI ASSOCIATES INC. | SERVICE THRU 10/14/18 2018 I&I | |
| 07424-3130 | ENGINEERING SERVICES | 1812 | CD | 2,335.25 | - | - | 12/11/2018 | 3139 | PENNONI ASSOCIATES INC. | SERVICES THRU 11/11/18 SUPPLEE VALL | |
| 07424-3140 | BEGINNING BALANCE | - | |||||||||
| 07424-3140 | LEGAL SERVICES | 1801 | CD | 680.00 | - | - | 1/24/2018 | 3112 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICES DEC. 2017 GEN.AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1802 | CD | 240.00 | - | - | 2/22/2018 | 3116 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE - JAN.2018 GEN.AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1803 | CD | 400.00 | - | - | 3/19/2018 | 3119 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE - FEBRUARY 2018 | |
| 07424-3140 | LEGAL SERVICES | 1804 | CD | 380.00 | - | - | 4/17/2018 | 3122 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE 3/12/18 | |
| 07424-3140 | LEGAL SERVICES | 1805 | CD | 480.00 | - | - | 5/16/2018 | 3124 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE - APRIL 2018 GEN.AUTH | |
| 07424-3140 | LEGAL SERVICES | 1806 | CD | 440.00 | - | - | 6/18/2018 | 3128 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERV.- MAY 2018 GEN.AUTHORITY | |
| 07424-3140 | LEGAL SERVICES | 1807 | CD | 300.00 | - | - | 7/30/2018 | 3131 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE JUNE 2018 GEN.AUTHOR. | |
| 07424-3140 | LEGAL SERVICES | 1809 | CD | 500.00 | - | - | 9/14/2018 | 3134 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE 8/9-8/13/18 GEN.AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1811 | CD | 795.94 | - | - | 11/26/2018 | 3137 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERV. 9/7-9/10/18 GEN. AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1812 | CD | 384.06 | - | - | 12/20/2018 | 3140 | GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE - 11/19/18 GEN.AUTH. | |
| 07426-3000 | BEGINNING BALANCE | - | |||||||||
| 07426-3000 | TALLMADGE DRIVE | 1807 | CD | 1,980.00 | - | - | 7/11/2018 | 3130 | PENNONI ASSOCIATES INC. | SERVICE THRU 6/17/18 2018 TALLMADGE | |
| 07426-3000 | TALLMADGE DRIVE | 1807 | JE | 10,556.75 | - | - | 7/10/2018 | RECLASS | RECLASS TALLMADGE DR EXPENSES | ||
| 07426-3000 | TALLMADGE DRIVE | 1808 | CD | 2,607.25 | - | - | 8/15/2018 | 3132 | PENNONI ASSOCIATES INC. | PROF.SERV. THRU 8/5/18 2018 TALLMDG | |
| 07426-3000 | TALLMADGE DRIVE | 1809 | CD | 822.00 | - | - | 9/11/2018 | 3133 | PENNONI ASSOCIATES INC. | SERV.THRU 8/12/18 TALLMADGE- GEN. | SERVICE 2018 |
| 07426-3000 | TALLMADGE DRIVE | 1810 | CD | 1,333.75 | - | - | 10/10/2018 | 3136 | PENNONI ASSOCIATES INC. | SERVICES THRU 9/16/18 TALLMADGE | |
| 07426-3000 | TALLMADGE DRIVE | 1811 | CD | 1,280.75 | - | - | 11/26/2018 | 3138 | PENNONI ASSOCIATES INC. | SERVICE THRU 10/14/18 TALLMDGE | |
| 07426-3000 | TALLMADGE DRIVE | 1812 | CD | 552.25 | - | - | 12/11/2018 | 3139 | PENNONI ASSOCIATES INC. | SERV. THRU 11/11/18 TALLMADGE SEWER | |
| 07428-1000 | BEGINNING BALANCE | - | |||||||||
| 07428-1000 | RESERVOIR PUMP STATION - ENG | 1802 | CD | 142.50 | - | - | 2/22/2018 | 22016 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/14/18 RESERV.RD PS | |
| 07428-1000 | RESERVOIR PUMP STATION - ENG | 1806 | CD | 45.50 | - | - | 6/7/2018 | 3126 | PENNONI ASSOCIATES INC. | SERVICES THRU 4/15/18 RESERVOIR RD | FINAL INVOICE |
| 07429-6100 | BEGINNING BALANCE | - | |||||||||
| 07429-6100 | WEST GOSHEN CAPITAL | 1801 | CD | 30,050.70 | - | - | 1/24/2018 | 22015 | WEST GOSHEN SEWER AUTHORITY | 16.67% OF COST - ENHANCED CHEMICAL | ADDITION |
| 07429-6100 | WEST GOSHEN CAPITAL | 1802 | CD | 3,664.01 | - | - | 2/22/2018 | 22017 | WEST GOSHEN SEWER AUTHORITY | 16.67% - ENHANCED CHEMICAL ADDITION | & ANAEROBIC DIGESTER RE |
| 07429-6100 | WEST GOSHEN CAPITAL | 1803 | CD | (3,664.01) | - | - | 3/15/2018 | 22017 | WEST GOSHEN SEWER AUTHORITY | VOID CK. 2017 | |
| 07429-6100 | WEST GOSHEN CAPITAL | 1804 | CD | 72,288.38 | - | - | 4/13/2018 | 22018 | WEST GOSHEN SEWER AUTHORITY | 2017 SEWER SYSTEM REPAIR PROJECT | .16667 % EAST GOSHEN SH. |
| 07492-0100 | BEGINNING BALANCE | - | |||||||||
| 07492-0100 | TRANSFER TO GENERAL FUND | 1805 | CD | 71.30 | - | - | 5/10/2018 | 22019 | EAST GOSHEN TOWNSHIP - GENERA | XFER TO GENERAL TO CLOSE ACCOUNT | |
| 07492-0500 | BEGINNING BALANCE | - | |||||||||
| 07492-0500 | TRANSFER TO SEW.OPERATING | 1806 | JE | 30,000.00 | - | - | 6/22/2018 | XFER | XFER FROM SEWER TO MA | ||
| 07492-0500 | TRANSFER TO SEW.OPERATING | 1806 | JE | - | 30,000.00 | - | 6/22/2018 | REVERSE | REVERSE TRX 63662 |
[Pennoni logo]
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
January 3, 2019
EGMAU18004
Randall Weaver
Iron Eagle Excavating
35 Ann Street
Highspire, PA 17034
Re: Notice of Deficiencies & Resolution Requirements
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2
East Goshen Municipal Authority, Chester County, PA
Dear Mr. Weaver:
On behalf of the East Goshen Municipal Authority, you are hereby notified of the following deficiencies in the work performed for the subject contract, based on field testing, visual observation, and sewer video footage, and documented herein are the corrective actions that have been verbally discussed:
MH R-034 to MH R-033
- 0' to 26' – Severe sag (30-40%)
- 6' – Infiltration runner at solid coupling joint
- 235' to 260' – Minor sag (±10%)
- 340' to 353' – Minor sag (±10%)
- 380' to 400' (last 20' of run into MH R-033) – Water sitting in pipe; however, this may be backup from the bypass pump hose partially blocking the downstream manhole channel during the televising
- MR R-033 failed the vacuum test
MH R-033 to MH R-032
- 0' to 14' – Minor sag (±10%)
- MH R-032 – The abandoned pipe has an infiltration runner into the manhole
Items 1, 2, 6, and 8 must be repaired by January 25, 2019, including the replacement of any temporary pavement removed. Items 1 and 2 shall be corrected via excavated repair. Item 8 shall be repaired by the installation of a screw plug as well as brick and mortar. Vacuum testing and television of the repaired manhole and severely sagging pipe, respectively, shall be performed within three days following construction. A pre-construction meeting shall be conducted at the site at least seven days prior to work between the Township, Pennoni, and Iron Eagle Excavating.
Items 3, 4, and 7, which include minor sags totaling approximately 52 linear feet, may be repaired now or re-evaluated at the end of March 2019. If you choose to re-evaluate, the re-evaluation must occur by sewer televising performed by the same company that performed the original televising with the same equipment and under the exact same bypass pump conditions. If, at the end of March, the sags in these areas have not increased, these pipe sections can be found acceptable. However, if any additional sagging is observed, that section of pipe will need to be repaired.
It is unclear if item 5 is an actual issue. This area needs to be re-evaluated by televising when the January repairs are made and repaired if needed to eliminate sags and standing water.
EGMAU18004 January 3, 2019 Page 2
Randall Weaver Tallmadge Drive Sewer Replacement
Further, the entirety of the contract work shall be re-televised after all repairs are performed. Any minor sag repairs must be completed by the end of April 2019. No work will be considered to be accepted until all repairs are satisfactorily completed and final re-televising is performed and determined acceptable by the owner. Performance and payment bonds shall remain in place until that time.
If you have any questions or need additional information, please call.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis
Michael J. Ellis, PE
Authority Engineer
/edj
| cc: | Rick Smith, Township Manager Jon Altshul, Assistant Township Manager Mark Miller, Public Works Director Patrick McKenna, Gawthrop Greenwood East Goshen Municipal Authority |
|---|
U:\Accounts\EGMAU\EGMAU18004 - Tallmadge Dr Sewer Constr Phase\COMMUNICATIONS\SENT\Notice of Deficiencies 1.3.2019.docx
Please sign below with your acknowledgement to these repair conditions.
ACKNOWLEDGEMENT:
Randall Weaver, Iron Eagle Excavating
Randall Weaver
DATE: 1/4/2019
Sue Smith
| From: | Jon Altshul <jaltshul@eastgoshen.org> |
|---|---|
| Sent: | Friday, January 11, 2019 8:17 AM |
| To: | Sue Smith |
| Subject: | FW: Tallmadge Dr Sewer - Pay Recommendations #1 and #2 |
| Attachments: | Payment App #1 Recommendation Ltr 2019.01.09.pdf; Payment App #2 Recommendation Ltr 2019.01.09.pdf |
Jon Altshul
Director of Finance & Assistant Township Manager
East Goshen Twp
jaltshul@eastgoshen.org
610-692-7171
Get all the latest news on East Goshen. Sign up for Constant Contact™ today!
[Township of East Goshen Chester County, Pennsylvania Incorporated 1817 seal]
From: Michael Ellis [mailto:MEllis@Pennoni.com]
Sent: Wednesday, January 09, 2019 10:07 PM
To: rsmith@eastgoshen.org; Jon Altshul; Mark Miller (mmiller@eastgoshen.org)
Cc: Eric Jenson; Matthew McAloon
Subject: Tallmadge Dr Sewer - Pay Recommendations #1 and #2
Hi Rick, Jon, and Mark,
Please find attached our recommendation letters for Payment Applications #1 and #2 for consideration at the MA meeting. If approved by the MA, we recommend Application #1 be paid next week, and Application #2 be paid upon completion of the initial rehab work. That work is scheduled to be performed next week so that payment could occur the following week.
Please call if you have any questions or comments.
Thanks,
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com
1
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
January 9, 2019
EGMAU18004
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application No. 1 Recommendation Letter
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2
Dear Mr. Smith:
The Contractor, Iron Eagle Excavating, Inc., has submitted the first invoice for work completed on this project. The invoice is for $42,431.40, which is approximately equal to 50% of the contract value.
Deficiencies were observed in the work performed when the manhole vacuum testing and pipe televising were performed in December 2018. Following discussions with the Township and the Contractor, a Notice of Deficiencies (enclosed), dated January 3, 2019, was submitted to the Contractor which noted the observed issues and required resolutions. It was discussed that an initial payment of 50% of the contract value would be provided for the work completed, an additional 25% of the contract value would be provided immediately following the correction of major deficiencies by January 25, 2019, and the final 25% of the contract value would be considered following repair of minor deficiencies, or acceptance, if conditions have not changed in retesting in April 2019.
We therefore recommend an initial payment of $42,431.40.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Authority Engineer
/edj
Enclosures: Invoice #106
Payment Application 1 Tabulation
Notice of Deficiencies (Acknowledged by Contractor)
cc: Jon Altshul, Assistant Township Manager
Mark Miller, Public Works Director
East Goshen Municipal Authority
U:\Accounts\EGMAU\EGMAU18004 - Tallmadge Dr Sewer Constr Phase\CONSTRUCTION\PAY APPS\Payment App #1 Recommendation Ltr 2019.01.09.docx
Invoice
Iron Eagle Excavating
35 ann street
Highspire, PA 17034
| Date | Invoice # |
|---|---|
| 1/4/2019 | 106 |
Bill To
| Item | Date | Description | Job site | Rate | Hours | Amount |
|---|---|---|---|---|---|---|
| Excavating | 1/4/2019 | Sanitary Sewer Bypass Pumping and Flow Control | Tallmadge Drive | 2,250.00 | 1 | 2,250.00 |
| Excavating | 1/4/2019 | Furnish and install 8" Dia. SDR26 PVC Gravity Sewer Pipe | Tallmadge Drive | 38,346.00 | 1 | 38,346.00 |
| Excavating | 1/4/2019 | Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral | Tallmadge Drive | 4,000.00 | 1 | 4,000.00 |
| Excavating | 1/4/2019 | Connection to Existing Sanitary Sewer Manholes | Tallmadge Drive | 1,500.00 | 1 | 1,500.00 |
| Excavating | 1/4/2019 | Miscellaneous Excavation and Backfill | Tallmadge Drive | 1,050.00 | 1 | 1,050.00 |
| Excavating | 1/4/2019 | Retainage 10% | Tallmadge Drive | -4,714.60 | 1 | -4,714.60 |
| Total | $42,431.40 | |||||
Payment Application 1 Tabulation
Contract No. TD-2018-2: Tallmadge Drive Sewer Replacement
Iron Eagle Excavating
| NUMBER | DESCRIPTION | ESTIMATED QUANTITY/UNIT | UNIT COST | AMOUNT | QUANTITY REQUIRED | QUANTITY PAID | QUANTITY REMAINING | AMOUNT PAID | AMOUNT REMAINING | PERCENT REMAINING | COMMENT |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BASE BID | |||||||||||
| 1 | Sanitary Sewer Bypass Pumping and Flow Control | 1 L.S. | $4,500.00 | $4,500.00 | 1.00 | 0.50 | 0.50 | $2,250.00 | $2,250.00 | 50.00% | Bypass required to repair manhole and upstream runner |
| 2 | Furnish and Install Precast Concrete Manhole | 1 EA. | $6,500.00 | $6,500.00 | 1.00 | 0.00 | 1.00 | $0.00 | $6,500.00 | 100.00% | Manhole failed vacuum test |
| 3 | Furnish and Install 8" Dia. SDR26 PVC Gravity Sewer Pipe | 527 L.F. | $124.50 | $65,611.50 | 527 | 308 | 219 | $38,346.00 | $27,265.50 | 41.56% | Various unacceptable sags in pipes |
| 4 | Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral | 40 L.F. | $100.00 | $4,000.00 | 40 | 40 | 0 | $4,000.00 | $0.00 | 0.00% | Pay in full |
| 5 | Connection to Existing Sanitary Sewer Manholes | 1 L.S. | $3,000.00 | $3,000.00 | 1.00 | 0.50 | 0.50 | $1,500.00 | $1,500.00 | 50.00% | Downstream connection not sufficient due to leak |
| 6 | Demolition of Drop Connection Concrete Encasement | 1 C.Y. | $400.00 | $400.00 | 0 | 0 | 0 | $0.00 | $0.00 | 0.00% | No concrete encasement encountered |
| 7 | Miscellaneous Excavation and Backfill | 20 C.Y. | $10.00 | $200.00 | 105 | 105 | 0 | $1,050.00 | $0.00 | 0.00% | Pay in full + Additional Quantity |
| 8 | Rock Removal | 75 C.Y. | $10.00 | $750.00 | 0 | 0 | 0 | $0.00 | $0.00 | 0.00% | No rock encountered |
| TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES) | $84,961.50 | $47,146.00 | $37,515.50 | 44.16% | |||||||
$4,714.60 10% Retainage of Amount Completed (Paid)
$42,431.40 Final Amount Paid
$42,530.10 Amount Remaining Including Retainage
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
January 9, 2019
EGMAU18004
Rick Smith, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application No. 2 Recommendation Letter
Tallmadge Drive Sewer Replacement, Contract No. TD-2018-2
Dear Mr. Smith:
The Contractor, Iron Eagle Excavating, Inc., has submitted a second invoice for work on this project. The invoice is for $21,326.40, which is approximately equal to 25% of the contract value. This invoice is being submitted for payment immediately upon completion of the following repairs, which are required to be completed by January 25, 2019: repair of 26-linear foot severe sag immediately downstream of MH R-034, repair of infiltration runner immediately downstream of MH R-034, review of potential 20-linear foot sag immediately preceding replaced MH R-033 and repair if needed, repair of replaced MH R-033 manhole such that it passes a vacuum test, and repair of the abandoned MH R-032 pipe to stop the groundwater leak.
Deficiencies were observed in the work performed when the manhole vacuum testing and pipe televising were performed in December 2018. Following discussions with the Township and the Contractor, a Notice of Deficiencies, dated January 3, 2019, was submitted to the Contractor which noted the observed issues and required resolutions. It was discussed that an initial payment of 50% of the contract value would be provided for the work completed, an additional 25% of the contract value would be provided immediately following the correction of major deficiencies by January 25, 2019, and the final 25% of the contract value would be considered following repair of minor deficiencies, or acceptance, if conditions have not changed in retesting in April 2019.
We therefore recommend approval of payment in the amount of $21,326.40, conditioned that payment not be made until the required January repairs are completed and determined acceptable by the Township.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Authority Engineer
/edj
| EGMAU18004 | January 9, 2019 | Page 2 |
|---|---|---|
| East Goshen Township | Tallmadge Drive Sewer Replacement |
Enclosures: Invoice #107
Payment Application 2 Tabulation
cc: Jon Altshul, Assistant Township Manager
Mark Miller, Public Works Director
East Goshen Municipal Authority
U:\Accounts\EGMAU\EGMAU18004 - Tallmadge Dr Sewer Constr Phase\CONSTRUCTION\PAY APPS\Payment App #2 Recommendation Ltr 2019.01.09.docx
Invoice
Iron Eagle Excavating
35 ann street
Highspire, PA 17034
| Date | Invoice # |
|---|---|
| 1/4/2019 | 107 |
Bill To
East Goshen Township
| Item | Date | Description | Job site | Rate | Hours | Amount |
|---|---|---|---|---|---|---|
| Excavating | 1/4/2019 | Sanitary Sewer Bypass Pumping and Flow Control | Tallmadge Drive | 4,500.00 | 4,500.00 | |
| Excavating | 1/4/2019 | Furnish and Install Precast Manhole | Tallmadge Drive | 6,500.00 | 6,500.00 | |
| Excavating | 1/4/2019 | Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral | Tallmadge Drive | 4,000.00 | 4,000.00 | |
| Excavating | 1/4/2019 | Furnish and Install 8" Dia. SDR26 PVC Gravity Sewer Pipe | Tallmadge Drive | 51,792.00 | 51,792.00 | |
| Excavating | 1/4/2019 | Connection to Existing Manholes | Tallmadge Drive | 3,000.00 | 3,000.00 | |
| Excavating | 1/4/2019 | Miscellaneous Excavation and Backfill | Tallmadge Drive | 1,050.00 | 1,050.00 | |
| Excavating | 1/4/2019 | Retainage 10% | Tallmadge Drive | -7,084.20 | -7,084.20 | |
| Excavating | 1/4/2019 | Previously Paid | Tallmadge Drive | -42,431.40 | -42,431.40 | |
| Total | $21,326.40 | |||||
Payment Application 2 Tabulation
Contract No. TD-2018-2: Tallmadge Drive Sewer Replacement
Iron Eagle Excavating
| ITEM NUMBER | DESCRIPTION | ESTIMATED QUANTITY/UNIT | UNIT COST | AMOUNT | QUANTITY REQUIRED | QUANTITY PAID | QUANTITY REMAINING | AMOUNT PAID | AMOUNT REMAINING | PERCENT REMAINING | COMMENT |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BASE BID | |||||||||||
| 1 | Sanitary Sewer Bypass Pumping and Flow Control | 1 L.S. | $4,500.00 | $4,500.00 | 1.00 | 1.00 | 0.00 | $4,500.00 | $0.00 | 0.00% | Pay in full |
| 2 | Furnish and Install Precast Concrete Manhole | 1 EA. | $6,500.00 | $6,500.00 | 1.00 | 1.00 | 0.00 | $6,500.00 | $0.00 | 0.00% | Pay in full |
| 3 | Furnish and Install 8" Dia. SDR26 PVC Gravity Sewer Pipe | 527 L.F. | $124.50 | $65,611.50 | 527 | 416 | 111 | $51,792.00 | $13,819.50 | 21.06% | Repair 10% sags (if required) |
| 4 | Furnish and Install 4" Dia. SDR26 PVC Sewer Lateral | 40 L.F. | $100.00 | $4,000.00 | 40 | 40 | 0 | $4,000.00 | $0.00 | 0.00% | Pay in full |
| 5 | Connection to Existing Sanitary Sewer Manholes | 1 L.S. | $3,000.00 | $3,000.00 | 1.00 | 1.00 | 0.00 | $3,000.00 | $0.00 | 0.00% | Pay in full |
| 6 | Demolition of Drop Connection Concrete Encasement | 1 C.Y. | $400.00 | $400.00 | 0 | 0 | 0 | $0.00 | $0.00 | 0.00% | No concrete encasement encountered |
| 7 | Miscellaneous Excavation and Backfill | 20 C.Y. | $10.00 | $200.00 | 105 | 105 | 0 | $1,050.00 | $0.00 | 0.00% | Pay in full + Additional Quantity |
| 8 | Rock Removal | 75 C.Y. | $10.00 | $750.00 | 0 | 0 | 0 | $0.00 | $0.00 | 0.00% | No rock encountered |
| TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES) | $84,961.50 | $70,842.00 | $13,819.50 | 16.27% | |||||||
$7,084.20 10% Retainage of Amount Completed (Paid)
$63,757.80 75% Payout Value
$42,431.40 Previously Paid
$21,326.40 Payment this Application #2
$21,203.70 Amount Remaining Including Retainage