Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
May 13, 2019
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report.
- APPROVAL OF MINUTES April 8, 2019
- APPROVAL OF INVOICES Pennoni Invoice #855973 $ 519.52 Pennoni Invoice #855974 $ 1,647.75 Pennoni Invoice #855975 $ 31.75 Pennoni Invoice #855976 $ 2,496.25 Pennoni Invoice #855977 $ 1,592.25 Pennoni Invoice #855978 $ 1,507.50 Gawthrop Invoice #207417 $ 400.00 Delaware River Basin Comm. Invoice#7224 $ 626.00
- LIAISON REPORTS
- FINANCIAL REPORTS April Financial Report
- OLD BUSINESS
- GOALS Continue to monitor the upgrades at West Goshen Sewer Plant. Members have been attending meetings.; Continue to implement the I&I Plan – on-going
F:\Data\Shared Data\Agendas\Municipal Authority\2019\5-13-19.doc
- Continue to run the plant to DEP permit requirements
- NEW BUSINESS Penn Dot Agreement for Incorporated Work – Signature Required
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2019\5-13-19.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 10, 2019
To: Municipal Authority
From: Mark Miller
Re: April 2019 Monthly Report
Monthly Flows: We have not received the West Goshen flows for April.
Meters: The meters were read on a daily basis. The meters were calibrated on May 6th, they did not require any adjustments. The probes and transducers were cleaned. The portable meters have been pulled in Bowtree, we will determine the next step after reviewing the last quarter flows.
C.C. Collection: The pump stations have been visited on a daily basis, routine maintenance was performed at each station. The wet wells were pumped down and the walls were scraped and the grit was vacuumed out. The generators were serviced as part of our preventive maintenance program, each was run under load and all electrical components were checked during the test. The two new pumps for Ashbridge pump station have arrived. They will be installed in the next rotation.
R.C. Collection: The pumping stations were visited on a daily basis. The wet wells were thoroughly leaned and the grit was vacuumed out. The generators were serviced and run under load. The Hershey Mill generator is starting to burn oil. The pump wires were separated and installed in the new conduit that we installed.
R.C. Plant: The was run on a daily basis by Big Fish, personal labs were drawn and routine maintenance was performed. I received an e-mail from Ms. Hill who resides behind the plant reporting an odor from plant. I rode down to the plant at 9:30 pm and detected an odor as well. I thought it may have been caused by sludge tank #1 since we were draining it to change a valve. The next morning, I met the operator at the plant, he also detected an odor however, he was confident that it was coming from SBR #2 since it was full of rain water and leaves. The operator dumped soda
ash in the tank and added air to the tank, by the afternoon the odor was gone. We brought McGovern Inc. in to vacuum out the remaining sludge in tank #1 so we could change out the valve. The valve was changed out by Public Works and placed back on line. I contacted the operator and advised him we completed the valve replacement and he should plan on draining tank #2. Once tank #2 is empty we will excavate the valve and replace it. I contacted Ms. Hill via e-mail and explained that we had found the source of the odor and if she had any concerns to please contact me.
The Public Works Department has milled and paved Tallmadge Drive. The work has been completed.
Alarms: We responded to 17 alarms for April.
PA One Calls: We received 74 PA One Calls for the month of April.
Monthly Rainfall: 3.45 inches for April.
[Photograph of a cracked PVC pipe tee fitting with arrows pointing to the crack, labeled "Cracked Tee"]
[Photograph of an excavated pipe repair at Bow Tree Drive with workers, labeled "Bow tree Dr broken Tee."]
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
May 10, 2019
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- No activity since last report.
Barkway Pump Station Grinder
- The Muffin Monster vendor, Watermark, was authorized to proceed. We have reviewed submittals, and it is our understanding that they have released the equipment for production. We anticipate equipment delivery will occur in mid-July.
Tallmadge Drive Sewer Main Replacement
- The 2-year maintenance bond period is until March 21, 2021. We notified the contractor accordingly in writing.
I&I Support and Reporting
- We continued to analyze meter data on a weekly basis for the three portable meters in Bow Tree and provide weekly updates to the PW Director. Data has now been analyzed from February 8 to April 23. As previously reported, there were very low overnight base flows at two of the metering locations (Double Pond and Eldridge Drive), indicating little to no continuous infiltration. There was ±10 gpm of continuous base flow at the Achcom Way meter, and that location also experienced a significant increase in flow on February 21, after a 1.84” rain event.
- Pipe Data View televised the sewers upstream of Achcom Way the week of April 8 and located a significant break in the sewer line, which was subsequently repaired. The average flow at Achcom was approximately 11,500 gpd over the following five days, which is an approximate 38,000-gpd reduction. Additionally, there no longer appears to be any baseflow upstream of the meter location. This significant reduction is considered to be primarily due to the repair but also coupled with reduced precipitation.
New Connections
- No activity since last report.
- We recommend the Sewer Ordinance be amended to incorporate a few Township policies (i.e. minimum 6” laterals for non-residential uses, grinder pumps conveying into gravity laterals at the ROW line, prohibiting internal manhole drop connections) that have been the source of comments in multiple recent plan submissions.
Hershey’s Mill Pump Station
- We provided generator information and photos to the Public Works Director (for coordination with the HOA) and are evaluating the fuel tank sizing and site location alternatives.
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2019
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of March 2019. Discharge to the Applebrook irrigation lagoon remained off line during March and April 2019. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the revised final effluent composite sample data reported for outfall 001 for the March 2019 DMR.
Table 1
March 2019- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| March 5, 2019 | 0.533 | 2.0 | 8.9 | 1 | 4.4 | 0.100 | 0.44 | 0.19 | 0.84 | 1 | 0.0000 |
| March 7, 2019 | 0.524 | 1 | 4.4 | ||||||||
| March 12, 2019 | 0.514 | 2.0 | 8.6 | 1 | 4.3 | 0.100 | 0.43 | 0.17 | 0.73 | 1 | 0.0000 |
| March 14, 2019 | 0.445 | 1 | 3.7 | ||||||||
| March 19, 2019 | 0.450 | 3.4 | 12.8 | 1 | 3.8 | 0.100 | 0.38 | 0.18 | 0.68 | 1 | 0.0000 |
| March 21, 2019 | 0.599 | 2 | 10.0 | ||||||||
| March 26, 2019 | 0.494 | 2.0 | 8.2 | 2 | 8.2 | 0.211 | 0.87 | 0.20 | 0.82 | 1 | 0.0000 |
| March 29, 2019 | 0.443 | 2 | 7.4 | ||||||||
| Average | 0.500 | 2.4 | 9.6 | 1 | 5.8 | 0.128 | 0.53 | 0.19 | 0.77 | 1 | 0.0000 |
| Minimum | 0.443 | 2.0 | 8.2 | 1 | 3.7 | 0.100 | 0.38 | 0.17 | 0.68 | 1 | 0.0000 |
| Maximum | 0.599 | 3.4 | 12.8 | 2 | 10.0 | 0.211 | 0.87 | 0.20 | 0.84 | 1 | 0.0000 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2019
The treatment process performed well during Mach with no abnormalities. The process monitoring, and control data indicates the facility will remain within compliance of the NPDES permit.
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. There were periodic BOD5 and TSS sample concentration atypically less than “normal” conditions. Although these samples are collected from the influent flow meter located prior to the Screening Building which excludes the internal recycle flows, debris can accumulate around the sampler suction line impacting the pollutant concentrations measured.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during March 2019.
Table 2
March 2019 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| March 5, 2019 | 0.623 | 116 | 603 | 120 | 623 | 17.6 | 91 | 22.7 | 118 | 2.9 | 15.1 |
| March 12, 2019 | 0.622 | 199 | 1,034 | 120 | 623 | 13.3 | 69 | 22.4 | 116 | 2.3 | 12.0 |
| March 19, 2019 | 0.579 | 88.8 | 461 | 138 | 717 | 18.7 | 90 | 26.8 | 129 | 4.2 | 21.8 |
| March 26, 2019 | 0.629 | 108 | 561 | 167 | 868 | 17.0 | 89 | 27.0 | 142 | 3.1 | 16.1 |
| Average | 0.613 | 128 | 665 | 136 | 708 | 16.7 | 85 | 24.7 | 126 | 3.1 | 16.2 |
| Minimum | 0.579 | 89 | 461 | 120 | 623 | 13.3 | 69 | 22.4 | 116 | 2.3 | 12.0 |
| Maximum | 0.629 | 199 | 1,034 | 167 | 868 | 18.7 | 91 | 27.0 | 142 | 4.2 | 21.8 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 7
Big Fish
Environmental Services Inc.
RCSTP Monthly Operations Report:
May 2019
Table 3 1 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the April 2019 DMR.
Table 3
April 2019- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| April 2, 2019 | 0.436 | 2.0 | 7.3 | 2 | 7.3 | 0.358 | 1.30 | 0.21 | 0.76 | 1 | 0.0000 |
| April 4, 2019 | 0.384 | 1 | 3.2 | ||||||||
| April 9, 2019 | 0.380 | 3.0 | 9.5 | 2 | 6.3 | 0.100 | 0.32 | 3.10 | 9.82 | 1 | 0.0000 |
| April 11, 2019 | 0.381 | 3 | 9.5 | ||||||||
| April 16, 2019 | 0.396 | 2.2 | 7.3 | 2 | 6.6 | 0.100 | 0.33 | 0.00 | 1 | 0.0000 | |
| April 18, 2019 | 0.354 | 12 | 35.4 | ||||||||
| April 23, 2019 | 0.323 | 2.4 | 6.5 | 14 | 37.7 | 0.100 | 0.27 | 0.19 | 0.51 | 1 | 0.0000 |
| April 25, 2019 | 0.358 | 3 | 9.0 | ||||||||
| April 30, 2019 | 0.300 | 0.2 | 0.53 | ||||||||
| Average | 0.368 | 2.4 | 7.6 | 5 | 14.4 | 0.165 | 0.55 | 0.93 | 2.33 | 1 | 0.0000 |
| Minimum | 0.300 | 2.0 | 6.5 | 1 | 3.2 | 0.100 | 0.27 | 0.19 | 0.00 | 1 | 0.0000 |
| Maximum | 0.436 | 3.0 | 9.5 | 14 | 37.7 | 0.358 | 1.30 | 3.10 | 9.82 | 1 | 0.0000 |
During April, the final effluent outfall 001 monthly average flow to Ridley Creek was measured and recorded as 0.368 MGD. This represents approximately 49.1% of the facility’s average daily design hydraulic loading of 0.750 MGD. This is decrease as compared to the monthly average for March. During April, there were two (2) days the influent flow measured at the manhole in the field prior to the Screening building exceeded a daily flow of 0.75 MGD. The days were:
March 3rd 798,470 gallons
March 10th 801,060 gallons
The corresponding final effluent flows remained less than the 0.750 MGD average daily hydraulic design loading of 0.750 MGD. The final effluent flows were:
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2019
March 3rd 566,000 gallons
March 10th 640,000 gallons
Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.
The influent organic loadings remain below those of the influent design loadings. Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during April 2019
Table 4
| April 2019 - Influent Wastewater | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| Design Basis | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| April 2, 2019 | 0.548 | 110 | 502 | 52.2 | 238 | 20.7 | 95 | 52.2 | 238 | 3.7 | 16.9 |
| April 9, 2019 | 0.520 | 94 | 431 | 44 | 201 | 18.7 | 81 | 25.0 | 108 | 3.6 | 15.6 |
| April 16, 2019 | 0.537 | 84 | 383 | 204 | 931 | 16.6 | 74 | 36.2 | 162 | 4.1 | 18.4 |
| April 23, 2019 | 0.493 | 138.0 | 630 | 73 | 333 | 17.9 | 74 | 28.0 | 115 | 5.1 | 21.0 |
| April 30, 2019 | 0.453 | ||||||||||
| Average | 0.510 | 107 | 487 | 93 | 426 | 18.5 | 81 | 35.4 | 156 | 4.1 | 18.0 |
| Minimum | 0.453 | 84 | 383 | 44 | 201 | 16.6 | 74 | 25.0 | 108 | 3.6 | 15.6 |
| Maximum | 0.548 | 138 | 630 | 204 | 931 | 20.7 | 95 | 52.2 | 238 | 5.1 | 21.0 |
The foam on the SBR surface was observed to decrease slightly to approximately 90% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures combined with increasing the F:M ratios to 0.06 will assist to reduce the foam concentrations.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2019
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 are in service during February and March. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Significant Rainfall
During April, there were eight (8) days when rainfall occurred. Two (2) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period. A total of 3.24 inches of rainfall measured during the month. These events occurred on:
| April 19th | 1.02 inches |
|---|---|
| April 26th | 0.70 inches |
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
PA DEP
No activity
Solids Dewatering and Disposal:
| April 2019 | |
|---|---|
| Gallons of sludge dewatered | 264,252 |
| Number of dumpsters | 4 |
*Nineteen (19) days of centrifuge operation
An increase of gallons of 4,659 gallons of sludge was dewatered during April as compared to March.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2019
Chemical Usage:
| April 2019 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 9,450 | 315 |
| Aluminum Sulfate solution | 1,609 | 53.6 |
| Polymer (centrifuge) | 0.85 | 14.45 |
*Seventeen (17) days of centrifuge of operation
=
Flow data:
| April 2019 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | NA | NA | NA |
| Influent Wastewater to SBRs | 15.758 | 519,297 | 631,168 |
| Internal Recycle | NA | NA | NA |
| Treated Effluent to Disc Filters | 15.352 | 511,744 | 596,992 |
| Final Effluent Discharge | 11.356 | 378,532 | 438.000 |
| Applebrook Golf Course | 0 | 0 | 0 |
*The fie
Minor Preventative Maintenance
- Flushed chemical feed lines to the SBRs.
- Cleaned final effluent weir trough daily
- Skimmed surface of disc filters daily
- Drained and cleaned disc filters bi-weekly
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2019
Recommended Minor Maintenance Repairs
Influent Flow Meter located in the “field”
The meter recorder was removed for service on March 29, 2019.
Gate Valve on Centrifuge Sludge Feed Line
The gate valve on the centrifuge sludge feed line has been replaced on SHT
Unscheduled Maintenance Activities
On April 3rd
The Township removed the utility pump that was bad
Mark ordered the materials to remove filter on the wall by the bug zapper.
Mark approved the work order for the broken meter. He is looking into the bladder on the recycle water tank.
April 10th
’
The toilet and sink drains in the lab are clogged. We have plunged for several hours now, and have not been able to get the drain unclogged. The township staff Unclogged the drain.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 7
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 8, 2019
The East Goshen Township Municipal Authority held their regular public meeting on Monday, April 8, 2019 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Phil Mayer, Dana Pizarro and Walter Wojcik. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Director of Public Works), Michael Ellis (Pennoni), and Patrick McKenna (Attorney),
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops, veterans and first responders. Kevin asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
1. Phil attended the West Goshen meeting. Their flow was near the limit at 6.4 M gallons/day. They want to revamp the pumping stations and do more training. They formed a committee to plan future capital projects. The West Chester Borough sewer plant is for sale.
New Business
1. John and Rose Mary Hill, 1745 Towne Drive were present at the meeting. Their property in Clocktower backs up to the berm along the Ridley Creek Plant property. Some of the screening trees have died. Mark Miller looked at the trees and found some others that need to be replaced. He feels about 25 trees will be needed. Walter does not recommend white pines because they don’t last as long as other types of pines. Mark explained that there is a sewer easement along the berm so they will plant the trees above that. Mark has the original sight lines from the houses to the plant, which he will look at. Since other properties will be involved he will send a letter to the homeowners.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for March:
Monthly Flows: The average daily flows to West Goshen have not been received.
Meters: All meters were read on a daily basis. The three portable meters in Bow Tree are being read on a daily basis. The meter that is monitoring the flows in the first phase of Bow Tree is reading high. We have started cleaning and televising on April 8th. The meters were
MA 4-8-19 draft
1
calibrated on March 28th. The channels were cleaned and routine adjustments were performed.
C.C. Collection: The pump stations have been visited on a daily basis with no problems to report. The wet wells are scheduled for cleaning next week. A tree came down at the Ashbridge Pump Station, which took out the privacy fence. The tree was removed and the fence will be replaced.
On March 21st we received a call from a resident who was walking his dog in the sewer right of way between Barker Drive and Reservoir Road and noticed sewage coming out of a manhole. We walked the right of way and found the blockage. Due to the location and distance off the road, we had to utilize Pipe Data View to clear the blockage. Once the blockage was clear we spread lime over the area 25’ x 50’. I contacted the DEP as required and spoke to inspector Wolfinger and explained what had happened. What we did to rectify the problem was ok with him. I filed a field report.
We continued INI work on Christine Lane and eliminated a significant inflow at a manhole that had been a problem for several months. We completed all the INI repairs that we had located when we televised and we have seen a reduction at the Ashbridge Pump Station. The two new pumps that were ordered for Ashbridge arrived last week.
R.C. Collection: The conduit work at Hershey Mill Pump Station was completed and Lenni Electric separated the wiring for each pump and the float wires. We continued INI work on the system and completed the problems that we found when we were televising. We will be televising the Bow Tree area next week.
Ridley Creek Plant: They cleaned the grit chamber last week. The operator reported that the number one recycling water pump was tripping out under load so we pulled the pump last Tuesday and took it down to Deckmen’s for repairs. The operator also had a problem with an O ring blowing out on the recycling screen filter. We ordered fittings to repair the problem. The plant has been operating very well with the high flows and the flows are starting to drop. The field meter was acting up so we had Allied Control look at the meter and determined that the totalizer was not recording, so the controller was pulled for repair.
Alarms: We responded to 27 alarms for March.
Rainfall: March rainfall total was 4.60 inches.
Other: The fountain at Hershey Mill is maintained by the Township. Hershey Mill takes care of the landscaping. The fountain needs repair. Mark will send a letter to Ed McFalls.
Talmadge Dr. is scheduled to mill and pave the end of April.
2. Pennoni Engineer’s Report for February
Tallmadge Drive Sewer Main Replacement – Mike explained the final televising was done by Pipe Data View and vacuum testing passed. The contractor, Iron Eagle, replaced and reset damaged and shifted manhole frames and cleaned up the site. They will have the curbing repaired by a separate contractor at Iron Eagle’s expense. All of the closeout documents were reviewed including Change Order #1 and Pay Application #3. The Township has a 2 year warranty and 2 year maintenance bond from Iron Eagle.
Barkway Pump Station – The design plans were finalized. The Muffin Monster vendor provided a quote for materials. Delivery is expected in early August. Public Works will do the installation.
INI Report – The three portable meters in Bow Tree are providing good data. Achom Way has a continuous base flow, which increased significantly after a 1.84” rain event. These meters will be moved to other locations in the township. They coordinated with pipe inspection contractors for
MA 4-8-19 draft
2
inspection of the Chester Creek Interceptor. The cost for laser and sonar inspection of approx. 7,000 LF of the 24” diameter portion of the interceptor was approx. $49,000. Pipe Data View (PDV) can perform the TV inspection for approx. $12,000. Including PW Department’s time, this is projected to be less costly than the laser and sonar inspection.
Chapter 94 reports: They submitted Chapter 94 reports to the DEP. The RCSTP’s average daily influent flow was 539,000 gpd in 2018, which is a significant increase from the preceding 4 years but remains well within the 750,000 gpd permitted average capacity of the plant. The increased flow is considered to be the result of extreme precipitation in 2018. The 5-year projected average flow to the RCSTP is 437,000 gpd.
A grinder pump has been recommended for 204 Line Rd. to tie into Thorncroft.
Jon feels that the cost of a sewer inspection needs to be reviewed.
3. Big Fish Environmental Services – Kevin had no concerns about Scott’s report which showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of March 2019.
Approval of Minutes
The minutes of the March 11, 2019 meeting were approved as amended.
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
| Pennoni invoice #852270 | $ 297.40 |
|---|---|
| Pennoni invoice #852271 | $ 141.25 |
| Pennoni invoice #852272 | $ 560.75 |
| Pennoni invoice #852273 | $ 910.75 |
| Pennoni invoice #852274 | $ 1,403.75 |
Walter seconded the motion. The motion passed unanimously.
2. Jack moved to approve payment of the Gawthrop invoice #205694 for $260.00, which was paid on 3/12/19. Phil seconded the motion. The motion passed unanimously.
3. Dana moved to approve payment of Payment App #3 for Tallmadge Dr. in the amount of $20,403.70, which includes a deduction of $300.00 as per Change Order #1. Walter seconded the motion. The motion passed unanimously.
4. Phil moved to approve Change Order #1 which deducts $300.00 from the total contract price for Tallmadge Dr. Walter seconded the motion. The motion passed unanimously.
5. Jon presented two additional invoices.
a. Jack moved to approve payment of the Maillie invoice #1000085693 in the amount of $7,007.00 for the 2018 audit. Phil seconded the motion. The motion passed unanimously.
b. Phil moved to approve payment of administrative costs for the 1st quarter of 2019 in the amount of $7,587.59. Dana seconded the motion. The motion passed unanimously.
Liaison Reports
Conservancy Board – Walter reminded everyone about Keep East Goshen Beautiful Day this Saturday April 13. Areas to cleanup were discussed. Mark mentioned that some groups have already done some areas. Blosenski does some regular street cleanup for the Township especially along Rte. 352.
MA 4-8-19 draft
3
Futurist Committee - Rogers Vaughn, Vice President of the Futurist Committee, introduced himself and gave a summary of his background, including military service in Germany, work for Dupont for 38 years, on the WCASD school board, and moved to Hersheys Mill in 2006. The Futurist Committee was formed to think out 5 – 10 years and look at current trends. They are seeing movement out to western Chester County. What gives East Goshen an edge over other townships? The park, the planned trail, a good school district, and make a town center on Paoli Pike where the shopping strip is now. The purpose of the committee members visiting the other township ABC’s is to let you know that a plan is being looked at to enhance the town center and make it a destination point.
Financial Reports
Jon Altshul provided the following written report:
In March, the Municipal Authority recorded $14,239 in revenues (from inter-fund transfers) and $27,975 in expenses (including engineering and legal, as well as $7,588 for administrative overhead and $7,007 for audit services), for a negative variance of $13,735. As of March 31st, the fund balance was $13,421.
Jon mentioned that the BOS will be reviewing the sewer rates. Residential consumption went down but commercial went up. The variable rate is falling because of all the capital projects the MA is doing to maintain the system. Dana asked about Storm Water Management. Jon answered that there are no SWM expenses yet. Some time in the future the Township may have to develop and ordinance and set up a committee to oversee it.
Goals
The following changes should be made to the MA Goals for 2019:
Goal b – After the date (3-8-2018) deleted “completed” and add “report submitted”
add d. Continue to run the plant to DEP permit requirements.
New Business
1. Barkway Muffin Monster – Jack made a motion to approve purchase of a Muffin Monster for the Barkway Pump Station as per quote from JWC Environmental for equipment of $52,724.00 plus time and materials for PW Department installation of $15,000.00 for a total not to exceed $67,724.00. Dana seconded the motion. The motion passed unanimously.
Any Other Matter
1. Walter will go to the next West Goshen meeting.
Adjournment
There being no further business, Jack moved to adjourn the meeting. Walter seconded the motion. The meeting was adjourned at 8:30 p.m. The next regular meeting will be held on Monday, May 13, 2019 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 4-8-19 draft
4
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855973
Invoice Date : 04/25/2019
Project : EGMAU17006
Project Name : Barkway PS Muffin Monster
For Services Rendered through: 4/14/2019
FINAL INVOICE
Finalized and submitted construction plans.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| **** -- Professional Services | $16,000.00 | $15,480.48 | 100.00% | $16,000.00 | $519.52 |
| Total : | $16,000.00 | $15,480.48 | $16,000.00 | $519.52 |
Amount Due This Invoice: $519.52
[Signature: Jon Altshul 5/10/19]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU17006 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU17006 | ||
|---|---|---|---|
| Pennoni Job No.: | Barkway PS Muffin Monster | ||
| Invoice No: | 855973 | ||
| Invoice Period: | 3/18/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 9,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 16,000.00 | ||
| Previously Invoiced: | $ 15,480.48 | ||
| Current Invoice: | $ 519.52 | ||
| Invoiced to Date ($): | $ 16,000.00 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ - | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | Barkway PS Muffin Monster |
|---|---|
| Phase Budget: | $ 16,000.00 |
| Previously Invoiced: | $ 15,480.48 |
| Current Invoice: | $ 519.52 |
| Invoiced to Date ($): | $ 16,000.00 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ - |
| Remaining Budget (%): | 0% |
Comments: FINAL INVOICE
Finalized and submitted construction plans.
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855974
Invoice Date : 04/25/2019
Project : EGMAU18004
Project Name : Tallmadge Dr Sewer Constr Phase
For Services Rendered through: 4/14/2019
FINAL INVOICE
Phase **** - Processed pay application #3 (final) and Change Order #1, reviewed contract closeout documents, and provided payment recommendation letter and supporting documents
Phase 01 - Coordination with the contractor and Township for pipe re-televising schedule, bypass pumping procedure, and concrete curb replacement; construction observation during final pipe re-televising, sewer manhole vacuum testing, repairs to damaged manholes frames and lids, and site cleanup and restoration; and review of pipe videos.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 823.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 823.75 |
Phase : 01 -- Deficiency Assistance
| Total Phase : 01 -- Deficiency Assistance | Labor : | 824.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 824.00 |
Amount Due This Invoice: $1,647.75
| Fee : | 9,000.00 |
|---|---|
| Prior Billings : | 20,117.50 |
| Current Billings : | 1,647.75 |
| Total Billings : | 21,765.25 |
[Signature: Jon Altshul 5/10/19]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU18004 -- Tallmadge Dr Sewer Constr Phase
Invoice # : 855974
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 127.00 | 95.25 |
| Associate Professional | 7.75 | 94.00 | 728.50 |
| Labor Total: | 8.50 | 823.75 |
| Total Phase : **** -- Professional Services | Labor : | $823.75 |
|---|---|---|
| Expense : | $0.00 |
Phase : 01 -- Deficiency Assistance
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 127.00 | 63.50 |
| Associate Professional | 0.75 | 94.00 | 70.50 |
| Sr. Engineering Technician | 7.50 | 92.00 | 690.00 |
| Labor Total: | 8.75 | 824.00 |
| Total Phase : 01 -- Deficiency Assistance | Labor : | $824.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18004 -- Tallmadge Dr Sewer Constr Phase | Labor : | $1,647.75 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU18004 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU18004 | ||
|---|---|---|---|
| Pennoni Job No.: | Tallmadge Drive Sewer Construction Phase | ||
| Invoice No: | 855974 | ||
| Invoice Period: | 3/18/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 9,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 9,000.00 | ||
| Previously Invoiced: | $ 20,117.50 | ||
| Current Invoice: | $ 1,647.25 | ||
| Invoiced to Date ($): | $ 21,764.75 | ||
| Invoiced to Date (%): | 242% | ||
| Remaining Budget ($): | $ (12,764.75) | ||
| Remaining Budget (%): | -142% |
Budget by Phase:
| Phase Name: | Tallmadge Drive Sewer Construction Phase |
|---|---|
| Phase Budget: | $ 9,000.00 |
| Previously Invoiced: | $ 12,992.00 |
| Current Invoice: | $ 823.75 |
| Invoiced to Date ($): | $ 13,815.75 |
| Invoiced to Date (%): | 154% |
| Remaining Budget ($): | $ (4,815.75) |
| Remaining Budget (%): | -54% |
| Phase Name: | Deficiency Assistance |
| Phase Budget: | $ - |
| Previously Invoiced: | $ 6,984.25 |
| Current Invoice: | $ 824.00 |
| Invoiced to Date ($): | $ 7,808.25 |
| Invoiced to Date (%): | 0% |
| Remaining Budget ($): | $ (7,808.25) |
| Remaining Budget (%): | 0% |
Comments: FINAL INVOICE
Phase **** - Processed pay application #3 (final) and Change Order #1, reviewed contract closeout documents, and provided payment recommendation letter and supporting documents
Phase 01 - Coordination with the contractor and Township for pipe re-televising schedule, bypass pumping procedure, and concrete curb replacement; construction observation during final pipe re-televising, sewer manhole vacuum testing, repairs to damaged manholes frames and lids, and site cleanup and restoration; and review of pipe videos.
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855975
Invoice Date : 04/25/2019
Project : EGMAU18005
Project Name : Hershey's Mill Generator Replace
For Services Rendered through: 4/14/2019
Assembled photos of the anticipated generator for the Township to present to the Hershey's Mill HOA.
Phase : 01 -- Concept Design
| Total Phase : 01 -- Concept Design | Labor : | 31.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 31.75 |
Amount Due This Invoice: $31.75
| Fee : | 5,000.00 |
|---|---|
| Prior Billings : | 4,192.25 |
| Current Billings : | 31.75 |
| Total Billings : | 4,224.00 |
Phase : 01 -- Concept Design
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 127.00 | 31.75 |
| Labor Total: | 0.25 | 31.75 |
| Total Phase : 01 -- Concept Design | Labor : | $31.75 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU18005 -- Hershey's Mill Generator Replace | Labor : | $31.75 |
|---|---|---|
| Expense : | $0.00 |
[Signature: Jon Altshul 5/10/19]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18005 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU18005 | ||
|---|---|---|---|
| Pennoni Job No.: | Hershey's Mill Generator Replacement | ||
| Invoice No: | 855975 | ||
| Invoice Period: | 3/9/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 5,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 5,000.00 | ||
| Previously Invoiced: | $ 4,192.25 | ||
| Current Invoice: | $ 31.75 | ||
| Invoiced to Date ($): | $ 4,224.00 | ||
| Invoiced to Date (%): | 84% | ||
| Remaining Budget ($): | $ 776.00 | ||
| Remaining Budget (%): | 16% |
Budget by Phase:
| Phase Name: | Hershey's Mill Generator Replacement |
|---|---|
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ 4,192.25 |
| Current Invoice: | $ 31.75 |
| Invoiced to Date ($): | $ 4,224.00 |
| Invoiced to Date (%): | 84% |
| Remaining Budget ($): | $ 776.00 |
| Remaining Budget (%): | 16% |
Comments: Assembled photos of the anticipated generator for the Township to present to the Hershey's Mill HOA.
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855976
Invoice Date : 04/25/2019
Project : EGMAU19001
Project Name : 2019 General Services
For Services Rendered through: 4/14/2019
April Engineer's Report; prepared for and attended April Municipal Authority meeting; provided scoping and pricing recommendations for Chester Creek interceptor investigation including coordination with multiple contractors on scoping and pricing; reviewed proposed low-pressure sewer connection submission for 204 Line Road and prepared comments and requests for additional project plans & information; and evaluated planned RCSTP sludge valve replacement and tank dewatering approach.
Barkway Muffin Monster construction assistance: obtained formal equipment price quotation from vendor for Municipal Authority approval including multiple quote submissions to ensure all equipment was provided; and provided a list of other materials the Township will need to acquire separately. (Note that EGMAU17006 project was for design and did not include any limited construction phase services).
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 2,496.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 2,496.25 |
Amount Due This Invoice: $2,496.25
| Fee : | 27,000.00 |
|---|---|
| Prior Billings : | 2,088.00 |
| Current Billings : | 2,496.25 |
| Total Billings : | 4,584.25 |
[Signature: Jon Altshul 5/10/19]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU19001 -- 2019 General Services
Invoice # : 855976
...Continued from previous page
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 9.00 | 127.00 | 1,143.00 |
| Senior Professional | 2.25 | 121.00 | 272.25 |
| Associate Professional | 11.50 | 94.00 | 1,081.00 |
| Labor Total: | 22.75 | 2,496.25 |
| Total Phase : **** -- Professional Services | Labor : | $2,496.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU19001 -- 2019 General Services | Labor : | $2,496.25 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc.
Page: 2
East Goshen Municipal Authority
EGMAU19001 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU19001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2019 General Services | ||
| Invoice No: | 855976 | ||
| Invoice Period: | 3/18/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 27,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 27,000.00 | ||
| Previously Invoiced: | $ 2,088.00 | ||
| Current Invoice: | $ 2,496.25 | ||
| Invoiced to Date ($): | $ 4,584.25 | ||
| Invoiced to Date (%): | 17% | ||
| Remaining Budget ($): | $ 22,415.75 | ||
| Remaining Budget (%): | 83% |
Budget by Phase:
| Phase Name: | 2019 General Services |
|---|---|
| Phase Budget: | $ 27,000.00 |
| Previously Invoiced: | $ 2,088.00 |
| Current Invoice: | $ 2,496.25 |
| Invoiced to Date ($): | $ 4,584.25 |
| Invoiced to Date (%): | 17% |
| Remaining Budget ($): | $ 22,415.75 |
| Remaining Budget (%): | 83% |
Comments: April Engineer's Report; prepared for and attended April Municipal Authority meeting; provided scoping and pricing recommendations for Chester Creek interceptor investigation including coordination with multiple contractors on scoping and pricing; reviewed proposed low-pressure sewer connection submission for 204 Line Road and prepared comments and requests for additional project plans & information; and evaluated planned RCSTP sludge valve replacement and tank dewatering approach.
Barkway Muffin Monster construction assistance: obtained formal equipment price quotation from vendor for Municipal Authority approval including multiple quote submissions to ensure all equipment was provided; and provided a list of other materials the Township will need to acquire separately. (Note that EGMAU17006 project was for design and did not include any limited construction phase services).
[Logo: Pennoni]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855977
Invoice Date : 04/25/2019
Project : EGMAU19002
Project Name : 2019 I&I Support and Reports
For Services Rendered through: 4/14/2019
Continued weekly flow analysis of portable metering in Bow Tree and weekly analysis summary correspondence with PW Director.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,592.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,592.25 |
Amount Due This Invoice: $1,592.25
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 4,499.75 |
| Current Billings : | 1,592.25 |
| Total Billings : | 6,092.00 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.25 | 127.00 | 158.75 |
| Associate Professional | 15.25 | 94.00 | 1,433.50 |
| Labor Total: | 16.50 | 1,592.25 |
| Total Phase : **** -- Professional Services | Labor : | $1,592.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMAU19002 -- 2019 I&I Support and Reports | Labor : | $1,592.25 |
|---|---|---|
| Expense : | $0.00 |
[Signature: Jon Altshul 5/10/19]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19002 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU19002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2019 I&I Support and Reports | ||
| Invoice No: | 855977 | ||
| Invoice Period: | 3/18/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 11,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 4,499.75 | ||
| Current Invoice: | $ 1,592.25 | ||
| Invoiced to Date ($): | $ 6,092.00 | ||
| Invoiced to Date (%): | 55% | ||
| Remaining Budget ($): | $ 4,908.00 | ||
| Remaining Budget (%): | 45% |
Budget by Phase:
| Phase Name: | 2019 I&I Support and Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 4,499.75 |
| Current Invoice: | $ 1,592.25 |
| Invoiced to Date ($): | $ 6,092.00 |
| Invoiced to Date (%): | 55% |
| Remaining Budget ($): | $ 4,908.00 |
| Remaining Budget (%): | 45% |
Comments: Continued weekly flow analysis of portable metering in Bow Tree and weekly analysis summary correspondence with PW Director.
[Pennoni Logo]
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 855978
Invoice Date : 04/25/2019
Project : EGMAU19003
Project Name : 2018 Chapter 94 Reports
For Services Rendered through: 4/14/2019
FINAL INVOICE provided no comments are received from PADEP.
Finalized and submitted the Ridley Creek STP (RCSTP) Chapter 94 Report to PADEP and East Goshen Township; and prepared RCSTP report summary for the April Municipal Authority meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,507.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,507.50 | |
| Amount Due This Invoice | $1,507.50 | |
| Fee : | 11,000.00 |
|---|---|
| Prior Billings : | 7,512.50 |
| Current Billings : | 1,507.50 |
| Total Billings : | 9,020.00 |
[Signature: Jon Alt 5/10/19]
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.50 | 127.00 | 571.50 |
| Associate Professional | 7.50 | 94.00 | 705.00 |
| Engineering Technician | 2.75 | 84.00 | 231.00 |
| Labor Total: | 14.75 | 1,507.50 |
| Total Phase : **** -- Professional Services | Labor : | $1,507.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMAU19003 -- 2018 Chapter 94 Reports | Labor : | $1,507.50 |
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19003 Invoice Summary
Invoice Date 4/25/2019
| Project: | EGMAU19003 | ||
|---|---|---|---|
| Pennoni Job No.: | 2019 Chapter 94 Reports | ||
| Invoice No: | 855978 | ||
| Invoice Period: | 3/18/2019 | to | 4/14/2019 |
| Initial Authorization: | $ 11,000.00 | Date: | 4/25/2019 |
| Contract Amount: | $ 11,000.00 | ||
| Previously Invoiced: | $ 7,512.50 | ||
| Current Invoice: | $ 1,507.50 | ||
| Invoiced to Date ($): | $ 9,020.00 | ||
| Invoiced to Date (%): | 82% | ||
| Remaining Budget ($): | $ 1,980.00 | ||
| Remaining Budget (%): | 18% | ||
Budget by Phase:
| Phase Name: | 2019 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 7,512.50 |
| Current Invoice: | $ 1,507.50 |
| Invoiced to Date ($): | $ 9,020.00 |
| Invoiced to Date (%): | 82% |
| Remaining Budget ($): | $ 1,980.00 |
| Remaining Budget (%): | 18% |
Comments: FINAL INVOICE provided no comments are received from PADEP.
Finalized and submitted the Ridley Creek STP (RCSTP) Chapter 94 Report to PADEP and East Goshen Township; and prepared RCSTP report summary for the April Municipal Authority meeting.
[Gawthrop Greenwood, PC Logo]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
05/07/2019
Client No: 6604-001M
Invoice No. 207417
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| 04/05/2019 PMM |
Email from S Smith with meeting materials. | 0.20 | |
|---|---|---|---|
| 04/08/2019 PMM |
Review and analyze meeting materials in preparation for authority board meeting; Attend board meeting. | 1.80 | |
| For Current Services Rendered | 2.00 | 400.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 2.00 | $200.00 | $400.00 |
| Previous Balance | $260.00 |
|---|---|
| Total Current Charges | 400.00 |
| 04/22/2019 Payment | -260.00 |
| Balance Due | $400.00 |
[Signature: Jon Alt 5/10/19]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
PAGE 1 OF 1
[DRBC Logo: Delaware River Basin Commission, DELAWARE • NEW JERSEY • PENNSYLVANIA • NEW YORK • UNITED STATES OF AMERICA • WWW.DRBC.NET]
Delaware River Basin Commission
P.O. Box 7360
West Trenton, NJ 08628-0360
| Letter Date: | 03/19/2019 |
|---|---|
| Invoice ID: | 7224 |
| Customer ID: | 31 |
| Docket Number: | D-2000-030 CP |
| Amount Due: | $ 626.00 |
| Due Date: | 5/15/19 |
March 19, 2019
000651 L2Z21T6T
East Goshen Municipal Authority
C/O Business Administrator
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
For Additional Information:
Website: www.drbc.net/fees
Email: annualfee@drbc.nj.gov
Phone: 609-883-9500
[Signature: Jon Alt 5/10/19]
Dear Docket Holder:
In accordance with Delaware River Basin Commission (DRBC) Resolution No. 2016-09, codified in relevant part at 18 CFR 401.43, each withdrawal and/or discharge project for which a water allocation and/or wastewater discharge approval has been issued pursuant to the Delaware River Basin Compact and implementing regulations (“Approval”) is subject to DRBC’s annual monitoring and coordination fee (“annual fee”). The annual fee corresponds to the volume of the monthly allocation and/or daily discharge capacity - whether express or implicit - established by the Approval. The allocation/discharge volumes and corresponding fees are shown in the schedule on the reverse of this invoice.
If an entity has received an Approval (or Approvals) for both water allocation and wastewater discharge activities, separate invoices will be issued for these separate activities. This invoice includes the annual fee for the facility and activity identified below for calendar year 2019. The invoiced amount was calculated based on the monthly allocation (in MGM) or daily discharge capacity (in MGD) approved as of January 1, 2019.
This invoice pertains to the Daily Discharge Capacity approved by D-2000-030 CP and is based on an amount of 0.750 MGD.
Detach here and return coupon with payment
East Goshen Municipal Authority
Amount Enclosed: $
Please make check payable to:
Delaware River Basin Commission
| Letter Date: | 03/19/2019 |
|---|---|
| Invoice ID: | 7224 |
| Customer ID: | 31 |
| Docket Number: | D-2000-030 CP |
| Amount Due: | $ 626.00 |
| Due Date: | 5/15/19 |
Delaware River Basin Commission
PO BOX 788801
Philadelphia, PA 19178-8801
[ ] Check here to indicate address change and complete form on reverse.
000000003120000072249900000005152019000000000626003
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA April Financial Report
Date: May 9, 2019
In April, the Municipal Authority recorded $38,298 in revenues (from inter-fund transfers) and $23,978 in expenses (including $20,545 for Tallmadge Drive) for a positive variance of $14,320. As of April 30th, the fund balance was $27,741.
A complete list of YTD MA revenues and expenses is attached.
EAST GOSHEN TOWNSHIP
Other Funds
April 2019
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | (42.02) | (42.02) | (14.36) | (14.36) | |||
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | |||||||
| DCED GRANT | 07354 0400 | 32,307 | ||||||
| C.C. TAPPING FEES | 07364 1100 | |||||||
| R.C.TAPPING FEES | 07364 1110 | |||||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 845.64 | 845.64 | |||||
| MISCELLANEOUS REVENUE | 07380 1000 | 424.36 | 424.36 | |||||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | |||||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 311,118 | 100,000 | 142,808.28 | 42,808.28 | 38,312.19 | 38,312.19 | |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | 357,000 | ||||||
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 16,022.97 | 16,022.97 | |||||
| TOTAL REVENUE | 700,425 | 100,000 | 160,059.23 | 60,059.23 | 38,297.83 | 38,297.83 | ||
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,000 | 8,000 | 7,587.59 | 412.41 | |||
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,262 | 754 | 8.00 | 746.00 | 188 | 188.00 | |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,663 | 9,663 | 7,007.00 | 2,656.00 | 2,504 | 2,504.00 | |
| ENGINEERING SERVICES | 07424 3130 | 70,000 | 23,333 | 18,964.25 | 4,368.75 | 5,833 | 2,875.25 | 2,957.75 |
| LEGAL SERVICES | 07424 3140 | 8,000 | 2,670 | 1,580.00 | 1,090.00 | 670 | 260.00 | 410.00 |
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | 11,830.72 | (11,830.72) | |||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | |||||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 4,192.25 | (4,192.25) | |||||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | 101,012.25 | (101,012.25) | 20,544.95 | (20,544.95) | |||
Report Date 1904 05/09/19 3 : 42 PM
EAST GOSHEN TOWNSHIP
Other Funds
April 2019
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | |||||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| RELINING | 07429 1500 | 130,000 | 32,500 | 32,500.00 | ||||
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 67,000 | 16,750 | 6,059.19 | 10,690.81 | 297.40 | (297.40) | |
| HERSHEY MILL PUMP STATION CAPITAL | 07429 1503 | 125,000 | 31,250 | 31,250.00 | ||||
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 87,000 | 21,750 | 21,750.00 | ||||
| RCSTP CAPITAL | 07429 1505 | 169,500 | 42,375 | 42,375.00 | ||||
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | |||||||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | |||||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER SINKING FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 700,425 | 189,045 | 158,241.25 | 30,803.75 | 9,195 | 23,977.60 | (14,782.60) | |
| NET RESULT FROM OPERATIONS | (89,045) | 1,817.98 | 90,862.98 | (9,195) | 14,320.23 | 23,515.23 |
Report Date 1904 05/09/19 3 : 42 PM
2019 Municipal Authority Year-to-Date Revenues & Expenses, 4/30/19
| Account # | Description | Per | Src | Debits | Credits | Date | Check# | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | |||||||||
| 07341-1000 | INTEREST EARNINGS | 1901 | JE | $15.00 | $0.00 | 1/4/2019 | BANK FEES | REIMBURSE S/R FOR DEC.2018 | BANK FEES | |
| 07341-1000 | INTEREST EARNINGS | 1901 | JE | $0.00 | $1.06 | 2/4/2019 | INTEREST | INTEREST EARNED JANUARY 2019 | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1902 | JE | $15.00 | $0.00 | 2/4/2019 | REIMBURS | REIMBURSE S/R FOR JANUARY 2019 | BANK FEES | |
| 07341-1000 | INTEREST EARNINGS | 1902 | JE | $0.00 | $0.66 | 3/4/2019 | INTEREST | INTEREST EARNED FEB.2019 | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1903 | JE | $0.00 | $0.62 | 3/31/2019 | INTEREST | INTEREST EARNED MARCH 2019 | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1903 | JE | $15.00 | $0.00 | 4/3/2019 | REIMBURS | REIMBURSE S/R FOR MARCH 2019 | BANK FEES | |
| 07341-1000 | INTEREST EARNINGS | 1904 | JE | $0.00 | $0.64 | 4/30/2019 | INTEREST | INTEREST EARNED APRIL 2019 | 7100.1035 | |
| 07341-1000 | INTEREST EARNINGS | 1905 | JE | $15.00 | $0.00 | 5/3/2019 | REIMBURS | REIMBURSE S/R FOR APRIL 2019 | BANK FEES | |
| 07341-1000 | INTEREST EARNINGS | 1905 | JE | $15.00 | $0.00 | 5/6/2019 | BANK FEES | REIMBURSE S/R FOR FEB.2019 | BANK FEES | |
| 07364-1130 | BEGINNING BALANCE | |||||||||
| 07364-1130 | CONNECTION FEES - SEWER | 1901 | CR | $0.00 | $423.00 | 1/30/2019 | 2629 | STOFFLET, MICHAEL | ||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | CR | $0.00 | $423.00 | 2/11/2019 | 570 | JACOBS, ROBERT & CHERYL | ||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | CR | $0.00 | $423.00 | 2/19/2019 | 138 23 | GEORGE SMITH & CHRISTINA CONLE | ||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | $141.12 | $0.00 | 2/1/2019 | PINE ROCK | ANNUAL PINE ROCK - INTEREST | PMT - STOFFLET | |
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | $141.12 | $0.00 | 2/11/2019 | PINE ROCK | 2019 ANNUAL PINE ROCK INTEREST PMT | JACOBS | |
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | $141.12 | $0.00 | 2/19/2019 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC210 | |
| 07380-1000 | BEGINNING BALANCE | |||||||||
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | $0.00 | $141.12 | 2/1/2019 | PINE ROCK | ANNUAL PINE ROCK - INTEREST | PMT - STOFFLET | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | $0.00 | $141.12 | 2/11/2019 | PINE ROCK | 2019 ANNUAL PINE ROCK INTEREST PMT | JACOBS | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | $0.00 | $141.12 | 2/19/2019 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC210 | |
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | RE | $0.00 | $1.00 | 2/19/2019 | 66923 1 | SALE OF GENERATOR TO BEALE TWP | MISCELLANEOUS REVENUE | |
| 07392-0500 | BEGINNING BALANCE | |||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 1901 | JE | $0.00 | $57,399.61 | 1/15/2019 | XFER | XFER FR: SEWER TO MA 1/15/19 | ||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 1902 | JE | $0.00 | $34,587.60 | 2/15/2019 | XFER | XFER FROM SEWER 05 TO MA 07 | ||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 1903 | JE | $0.00 | $12,508.88 | 3/14/2019 | XFER | XFER $ FROM 05 TO MA 07 TO | COVER EXPENSES | |
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 1904 | JE | $0.00 | $38,312.19 | 4/10/2019 | XFER | XFER TO 07 FROM 05 4/10/19 | ||
| 07392-0900 | BEGINNING BALANCE | |||||||||
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1901 | JE | $0.00 | $12,132.22 | 1/15/2019 | XFER | XFER FROM SEWER SINKING TO MA | 1/15/2019 | |
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1902 | JE | $0.00 | $2,161.00 | 2/15/2019 | XFER | XFER FROM SEWER CAPITAL 09 TO | MA 07 | |
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1903 | JE | $0.00 | $1,729.75 | 3/14/2019 | XFER | XFER $ FROM SEWER SINKING TO | MA 07 TO COVER EXPENSES | |
| 07424-1400 | BEGINNING BALANCE | |||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 1903 | CD | $7,587.59 | $0.00 | 3/25/2019 | 3154 | EAST GOSHEN TOWNSHIP - GENERAL | QTR.1-2019 REIMBURSEMENT - MA | |
| 07424-3000 | BEGINNING BALANCE | |||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1901 | CD | $8.00 | $0.00 | 1/15/2019 | 3147 | PMAA | PA MUNICIPAL AUTH.- PROUD HISTORY | - BRIGHT FUTURE |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1902 | CD | $8.00 | $0.00 | 2/14/2019 | 3148 | YAHRAES, JOHN E. | REIMBURSEMENT - PROUD HISTORY..." | PUBLICATION |
| 07424-3000 | MISCELLANEOUS EXPENSE | 1902 | CD | -$8.00 | $0.00 | 2/14/2019 | 3148 | YAHRAES, JOHN E. | VOID CK. 3148 | |
| 07424-3110 | BEGINNING BALANCE | |||||||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1903 | CD | $7,007.00 | $0.00 | 3/25/2019 | 3155 | MAILLIE FALCONIERO & CO. | 2018 FINANCIAL STMT. - MUNICIPAL | AUTHORITY |
| 07424-3130 | BEGINNING BALANCE | |||||||||
| 07424-3130 | ENGINEERING SERVICES | 1901 | CD | $4,864.00 | $0.00 | 1/15/2019 | 3146 | PENNONI ASSOCIATES INC. | SERV. THRU 12/30/18 2018 I&I SUPPT. | |
| 07424-3130 | ENGINEERING SERVICES | 1902 | CD | $5,170.00 | $0.00 | 2/15/2019 | 3150 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/27/19 CHAP.94 | |
| 07424-3130 | ENGINEERING SERVICES | 1903 | CD | $6,055.00 | $0.00 | 3/14/2019 | 3153 | PENNONI ASSOCIATES INC. | SERVICE THRU 2/24/19 2019 GEN.SERV | |
| 07424-3130 | ENGINEERING SERVICES | 1904 | CD | $2,875.25 | $0.00 | 4/10/2019 | 3157 | PENNONI ASSOCIATES INC. | SERVICES THRU 3/17/19 2019 GENERAL | |
| 07424-3140 | BEGINNING BALANCE | |||||||||
| 07424-3140 | LEGAL SERVICES | 1901 | CD | $440.00 | $0.00 | 1/15/2019 | 3143 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERV. 12/7-12/28/18 GEN.AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1902 | CD | $620.00 | $0.00 | 2/15/2019 | 3149 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE 1/2-1/14/19 GEN.AUTH | |
| 07424-3140 | LEGAL SERVICES | 1903 | CD | $260.00 | $0.00 | 3/14/2019 | 3152 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICES - FEB.2019 GEN.AUTH. | |
| 07424-3140 | LEGAL SERVICES | 1904 | CD | $260.00 | $0.00 | 4/18/2019 | 3158 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE MARCH 2019 - GEN.AUTH |
| Account # | Description | Per | Src | Debits | Credits | Date | Check# | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-7440 | BEGINNING BALANCE | |||||||||
| 07424-7440 | R.C. CAPITAL-STP | 1901 | CD | $11,830.72 | $0.00 | 1/15/2019 | 3145 | JWC ENVIRONMENTAL | SCREEN REPLACEMENT | |
| 07426-1000 | BEGINNING BALANCE | |||||||||
| 07426-1000 | HERSHEY MILL STATION - ENGINEER | 1901 | CD | $301.50 | $0.00 | 1/15/2019 | 3146 | PENNONI ASSOCIATES INC. | SERV. THRU 12/30/18 HERSHEY MILL | GENERATOR REPLAC |
| 07426-1000 | HERSHEY MILL STATION - ENGINEER | 1902 | CD | $2,161.00 | $0.00 | 2/15/2019 | 3150 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/27/19 H.M.GENERATOR | |
| 07426-1000 | HERSHEY MILL STATION - ENGINEER | 1903 | CD | $1,729.75 | $0.00 | 3/14/2019 | 3153 | PENNONI ASSOCIATES INC. | SERVICE THRU 2/24/19 HM GENERATOR | |
| 07426-3000 | BEGINNING BALANCE | |||||||||
| 07426-3000 | TALLMADGE DRIVE | 1901 | CD | $42,431.40 | $0.00 | 1/15/2019 | 3144 | IRON EAGLE EXCAVATING INC. | EXCAVATING - TALLMADGE DR. SEWER | REPLACEMENT |
| 07426-3000 | TALLMADGE DRIVE | 1901 | CD | $9,082.00 | $0.00 | 1/15/2019 | 3146 | PENNONI ASSOCIATES INC. | SERV.THRU 12/30/18 TALLMADGE DR. | |
| 07426-3000 | TALLMADGE DRIVE | 1902 | CD | $4,678.25 | $0.00 | 2/15/2019 | 3150 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/27/19 TALLMADGE | |
| 07426-3000 | TALLMADGE DRIVE | 1902 | CD | $21,326.40 | $0.00 | 2/15/2019 | 3151 | IRON EAGLE EXCAVATING INC. | SANITARY SEWER BYPASS PUMPING & FL | CONTROL, FURNISH ; |
| 07426-3000 | TALLMADGE DRIVE | 1903 | CD | $2,949.25 | $0.00 | 3/14/2019 | 3153 | PENNONI ASSOCIATES INC. | SERVICE THRU 2/24/19 TALLMDG SEWER | |
| 07426-3000 | TALLMADGE DRIVE | 1904 | CD | $20,403.70 | $0.00 | 4/10/2019 | 3156 | IRON EAGLE EXCAVATING INC. | EXCAVATING - TALLMADGE DR. SEWER | REPLACEMENT |
| 07426-3000 | TALLMADGE DRIVE | 1904 | CD | $141.25 | $0.00 | 4/10/2019 | 3157 | PENNONI ASSOCIATES INC. | SERVICES THRU 3/17/19 TALLMADGE | SEWER |
| 07429-1501 | BEGINNING BALANCE | |||||||||
| 07429-1501 | BARKWAY PUMP STATION CAPITAL | 1901 | CD | $582.21 | $0.00 | 1/15/2019 | 3146 | PENNONI ASSOCIATES INC. | SERVICE THRU 12/30/18 BARKWAY PS MI | |
| 07429-1501 | BARKWAY PUMP STATION CAPITAL | 1902 | CD | $2,793.45 | $0.00 | 2/15/2019 | 3150 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/27/19 BARKWY MUF.M | |
| 07429-1501 | BARKWAY PUMP STATION CAPITAL | 1903 | CD | $2,386.13 | $0.00 | 3/14/2019 | 3153 | PENNONI ASSOCIATES INC. | SERVICE THRU 2/24/19 BARKWAY PS | |
| 07429-1501 | BARKWAY PUMP STATION CAPITAL | 1904 | CD | $297.40 | $0.00 | 4/10/2019 | 3157 | PENNONI ASSOCIATES INC. | SERVICES THRU 3/17/19 BARKWAY PS | MUFFIN MONSTER |
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 5/7/2018
To: MunicipalAuthority
From: Mark Gordon, Township Zoning Officer [Signature: MG]
Cc: Mark Miller, Public Works Director
Re: PennDOT Agreement for Incorporated Work
Dear Municipal Authority Members:
As you may know, the Paoli Pike Trail Project is completing the permitting process with PennDOT and we have a number of final housekeeping items to clean up for the project.
Along Segments F and G (Applebrook Park) of the trail, there are two (2) EGT sanitary sewer manholes that need to be adjusted to meet the new final grades. PennDOT requires that the Township and the Municipal Authority enter into an agreement to ensure that the Township is going to pay for and / or reimburse the East Goshen Municipal Authority for the cost of the required adjustment. This is another safeguard PennDOT has in place to ensure all public utilities are protected and reimbursed for the relocation of utility infrastructure.
Mark Miller is well aware of this project requirement and the PW Dept. will perform the work to make the elevation adjustment to these manholes.
Staff Recommendation:
Staff recommends that the Board authorize the Chairman to execute this Project Agreement for Incorporated Work and forward it to the Municipal Authority for their authorization.
Draft Motion:
I move that the Board authorize the Chairman to execute the Project Agreement for Incorporated Work with the East Goshen Municipal Authority for the work needed to adjust the two (2) manholes within the Paoli Pike Trail project area within Segments F and G of the Paoli Pike Trail Project.
F:\Data\Shared Data\Paoli Pike Trail\Memo to MA re. EGT BOS and MA Agreement 05072019.doc
[Stamp: COPY]
Agreement No. 00001
PROJECT AGREEMENT FOR INCORPORATED WORK
This Project Agreement, numbered 00001 is made and entered into this _________ day of ___________________, _______, between “East Goshen Township”, hereinafter “Township” and “East Goshen Township Municipal Authority”, hereinafter “Utility”.
WITNESSETH
Whereas, the Township is about to undertake a project on Paoli Pike (SR 2014) in Chester County, hereinafter “Project” which requires the adjustment of “Utility” castings; and,
Whereas, “Utility” has requested and “Township” has agreed to incorporate the adjustment of said castings into the Project agreement; and,
Whereas, “Utility” agrees to reimburse “Township” the cost of the adjustment of the castings in accordance with this Agreement.
NOWTHEREFORE
In consideration of the foregoing premises and the mutual promises hereinafter set forth, and with intent to be legally bound hereby, the Parties agree as follows:
- The estimated number of castings to be adjusted and the cost of each are shown on Exhibit 1 which is attached hereto and made a part hereof. Casting adjustment costs are estimated to be a total cost of $ $1,970.00 .
- In the event the actual number of castings to be adjusted changes from the number estimated in Exhibit 1, “ Utility ” agrees to reimburse “ Township ” for the actual number of adjusted castings based on the unit costs shown on Exhibit 1.
- Upon completion of the work to the satisfaction of “ Utility ”, “ Township ” shall invoice “ Utility ” for the adjustment of the castings. “ Utility ” agrees to pay “ Township ” within 60 days of receipt of an invoice from “ Township ”.
- All work performed pursuant to this Agreement must comply with the Buy America provisions in 23 U.S.C. §313 and 23 CFR §635.410 and the Steel Products Procurement Act, 73 P.S. §1881 et seq.
1
RE:
County: Chester
Utility: East Goshen Township Municipal Authority
Hereinafter set forth is the listing of anticipated castings which are being incorporated herein by this Agreement.
| Number of Castings | Bid Item | Unit Price | Total Cost |
|---|---|---|---|
| 9999-9950 | 388.00 | ||
| 9999-9951 | 365.00 | ||
| 9999-9952 | 473.00 | ||
| 9999-9953 | 477.00 | ||
| 9999-9954 | 591.00 | ||
| 9999-9955 | 567.00 | ||
| 9999-9956 | 690.00 | ||
| 9999-9957 | 713.00 | ||
| 9999-9958 | 908.00 | ||
| 2 | 9999-9959 | 735.00 | 1470.00 |
| 9999-9960 | 951.00 | ||
| 9999-9961 | 1,183.00 | ||
| 9999-9962 | 558.00 | ||
| 2 | 9999-9963 | 250.00 | 500.00 |
| 9999-9964 | 404.00 | ||
| 9999-9965 | 279.00 | ||
| 9999-9966 | 465.00 | ||
| 9999-9967 | 495.00 |
EXHIBIT 1
3
610-692-7171
www.eastgoshen.org
[Stamp: FYI]
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
April 18, 2019
Dear Property Owner:
The purpose of this letter is to inform you that the owner of 1422 Ardleigh Cir., West Chester, PA 19380, has submitted a Conditional Use Application to operate a Home Occupation from his home, for review and approval by the Township.
The property owner, Christopher Zumpano, has submitted a Conditional Use application seeking approval to operate his woodworking business as a Home Occupation from his home. The wood working business will be conducted within the new 24’x28’ 2 story accessory building on the property.
Conditional Uses applications are reviewed by the Planning Commission and the Board of Supervisors. Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Conditional Use applications.
The meeting dates and times scheduled for the review and discussion of this application are listed below:
May 1, 2019 - Planning Commission (7:00 PM)
June 5, 2019 - Planning Commission (7:00 PM)
June 18, 2019 - Board of Supervisors - Conditional Use Hearing (7:00 pm)
All meetings are held at the Township Building and are open to the public. The plan is available for review at the Township building during normal business hours. Please give me a call if you have any questions or need additional information.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-4\53-4-107 (1422 Ardleigh Cir)\CU Application 2019\1000 foot letter for Conditional Use 04182019.doc