Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July 8, 2019
7:00 PM
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE
a. Ask if anyone will be taping the meeting
2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
3. SEWER REPORTS
- a. Director of Public Works Report.
- b. Pennoni Engineer's Report.
- c. Big Fish Environmental Report.
4. APPROVAL OF MINUTES
a. June 10, 2019
4. APPROVAL OF INVOICES
| Pennoni Invoice #865644 | $ 456.75 |
|---|---|
| Pennoni Invoice #865645 | $ 4,076.00 |
| Pennoni Invoice #865646 | $ 95.25 |
| Pennoni Invoice #865647 | $ 877.25 |
| Gawthrop, Greenwood #211867 | $ 460.00 |
6. LIAISON REPORTS
7. FINANCIAL REPORTS
a. June Financial Report
8. OLD BUSINESS
a.
9. GOALS
- a. Continue to monitor the upgrades at West Goshen Sewer Plant. Members have been attending meetings.
- b. Continue to implement the I&I Plan – on-going
- c. Continue to run the plant to DEP permit requirements
F:\Data\Shared Data\Agendas\Municipal Authority\2019\7-08-2019.doc
10 NEW BUSINESS
- a. Consider new ways to receive meeting packets.
- b. Maillie Audit for East Goshen Municipal Authority
11. CAPACITY REQUESTS
12. ANY OTHER MATTER
13. CORRESPONDENCE AND REPORTS OF INTEREST
a. West Goshen Sewer Authority
14. PUBLIC COMMENT
15. ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2019\7-08-2019.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
July 3, 2019
To: Municipal Authority
From: Mark Miller
Re: June 2019 Monthly Report
Monthly Flows: West Goshen flow average is 781.000 for the month of June.
Meters: The meters were read on a daily basis. We had some extreme storm events that brought torrential rain in a matter of hours. Pump stations due to the heavy rain sent two stations into alarm. The Ashbridge Pump Station and the Hershey Mill Station as well. The plant also saw significant flows. We are currently waiting on Allied Control to install the portable meters.
C.C. Collection: The pump stations have been visited on a daily basis the wet wells were washed down. Fuel and engine oil was checked on the generators; stations were swept out. We did replace three sewer caps along Reservoir Road. In the rain event on June 20th we received 4" of rain in 2.5 hours. The Ashbridge station went into high level mode. We were in a flash flood stage for most of the morning beginning at 2am. Later on that day we received an additional 1.5" of rain in 30 minutes putting us in a flash flood once again.
R.C. Collection: The pumping stations were visited on a daily basis. Routine maintenance was performed on the generators. The Hershey Mill Station had experienced a high level during the rain event on June 20th. The Hershey Mill Dam carried over and that contributed to the high flow. Once the dam stopped overflowing the plant returned to normal.
R.C. Plant: Flows were extremely high on June 20th due to the flash flood in the morning and then again later in the afternoon. The flows started to return to normal on the 21st of June. In order to keep up with the flow
the plant operators put the fourth tank on line until the flow returned to normal.
We had the two 8" air lines that supply air to the sludge holding tanks scraped and painted along with the man doors at the plant. Scotts people did a good job during the flash flood by balancing the flows during the day and evening hours.
Alarms: We responded to 30 alarms for June.
PA One Calls: We received 59 PA One Calls for the month of June.
Monthly Rainfall: 10.15 inches for June.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
July 3, 2019
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- We continued evaluating the existing Spectrum Detroit Diesel "Generator 1" for replacement. A proposal will be provided separately for design of a replacement generator.
Barkway Pump Station Grinder
- No activity since our last report. The Muffin Monster manhole and equipment was delivered to the Township in late May.
Tallmadge Drive Sewer Main Replacement
- The 2-year maintenance bond period ends March 21, 2021.
I&I Support and Reporting
- No activity since our last report.
New Connections
- No activity since our last report.
Hershey's Mill Pump Station
- We have determined the preferred sizing and location of the replacement generator and diesel fuel tank in coordination with Mark Miller. We will prepare a photo rendering of the pump station site with the new exterior generator as it would be viewed from Hershey's Mill community entrance drive, for use in coordination with the Condo Association. A proposal will be provided separately for survey, floodplain coordination, and generator design.
Permanent Flow Meter Manholes
- We continued investigation and research into permanent flow meter manholes and meter systems for installation for two locations in the collection system. The concept remains to install new manholes (to ensure straight pipe runs through the meter), run electricity to them, and provide remote monitoring and data recording functionality. We have continued vendor coordination to obtain scoping and pricing for a variety of different flow metering technologies, such as Parshall or Palmer-Bowlus type flumes, ultrasonic, and lasers. Upon completion of the evaluation, a summary memo will be provided.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of May 2019. Discharge to the Applebrook irrigation lagoon remained off line during May and June. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the revised final effluent composite sample data reported for outfall 001 for the May 2019 DMR.
Table 1
May 2019- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total , mg/L mg/L | Phosphorus,Total , mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| May 2, 2019 | 0.325 | 3 | 8.1 | ||||||||
| May 7, 2019 | 0.374 | 2.0 | 6.2 | 3 | 9.4 | 0.100 | 0.31 | 0.23 | 0.72 | 6 | 0.7782 |
| May 14, 2019 | 0.535 | 2.9 | 12.9 | 4 | 17.8 | 0.100 | 0.45 | 0.25 | 1.12 | 1 | 0.0000 |
| May 17, 2019 | 0.355 | 4 | 11.8 | ||||||||
| May 21, 2019 | 0.383 | 2.0 | 6.4 | 2 | 6.4 | 0.119 | 0.38 | 0.23 | 0.73 | 5 | 0.6990 |
| May 23, 2019 | 0.377 | 2 | 6.3 | ||||||||
| May 28, 2019 | 0.465 | 2.0 | 7.8 | 2 | 7.8 | 0.152 | 0.59 | 0.23 | 0.89 | 2 | 0.3010 |
| May 30, 2019 | 0.352 | 3 | 8.8 | ||||||||
| Average | 0.396 | 2.2 | 8.3 | 3 | 9.7 | 0.118 | 0.43 | 0.24 | 0.86 | 4 | 0.4445 |
| Minimum | 0.325 | 2.0 | 6.2 | 2 | 6.3 | 0.100 | 0.31 | 0.23 | 0.72 | 1 | 0.0000 |
| Maximum | 0.535 | 2.9 | 12.9 | 4 | 17.8 | 0.152 | 0.59 | 0.25 | 1.12 | 6 | 0.7782 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
The treatment process performed well during May with no abnormalities. The process monitoring, and control data indicates the facility will remain within compliance of the NPDES permit.
The monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations. There were periodic BOD5 and TSS sample concentration atypically less than "normal" conditions. Although these samples are collected from the influent flow meter located prior to the Screening Building which excludes the internal recycle flows, debris can accumulate around the sampler suction line impacting the pollutant concentrations measured.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during May 2019.
Table 2
May 2019 - Influent Wastewater
| Design Basis | Flow MGD Average | BOD5 mg/L | BOD5 lbs/day | TSS mg/L | TSS lbs/day | NH4-N mg/L | NH4-N lbs/day | TKN, mg/L mg/L | TKN, mg/L lbs/day | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/day |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| May 7, 2019 | 0.518 | 130 | 562 | 182 | 786 | 17.0 | 73 | 30.9 | 133 | 5.6 | 24.2 |
| May 14, 2019 | 0.594 | 105 | 454 | 154 | 665 | 12.8 | 63 | 23.9 | 118 | 5.6 | 27.7 |
| May 21, 2019 | 0.485 | 105 | 454 | 240 | 1,037 | 25.5 | 103 | 38.1 | 154 | 5.1 | 20.6 |
| May 28, 2019 | 0.607 | 209 | 903 | 288 | 1,244 | 28.1 | 142 | 39.7 | 201 | 6.8 | 34.4 |
| Average | 0.551 | 137 | 593 | 216 | 933 | 20.9 | 96 | 33.2 | 152 | 5.8 | 26.7 |
| Minimum | 0.485 | 105 | 454 | 154 | 665 | 12.8 | 63 | 23.9 | 118 | 5.1 | 20.6 |
| Maximum | 0.607 | 209 | 903 | 288 | 1244 | 28.1 | 142 | 39.7 | 201 | 6.8 | 34.4 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
Table 3 1 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the June 2019 DMR.
Table 3
June 2019- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total , mg/L mg/L | Phosphorus,Total , mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| June 4, 2019 | 0.315 | 2.0 | 5.3 | 2 | 5.3 | 0.146 | 0.38 | 0.19 | 0.50 | 1 | 0.0000 |
| June 5, 2019 | 0.355 | 1 | 3.0 | ||||||||
| June 11, 2019 | 0.472 | 2.0 | 7.9 | 2 | 7.9 | 0.102 | 0.40 | 0.43 | 1.69 | 1 | 0.0000 |
| June 13, 2019 | 0.435 | ||||||||||
| June 18, 2019 | 0.362 | 2.0 | 6.0 | 2 | 6.0 | 0.408 | 1.23 | 0.25 | 0.75 | 1 | 0.0000 |
| June 21, 2019 | 0.467 | ||||||||||
| June 25, 2019 | 0.382 | ||||||||||
| June 28, 2019 | 0.389 | ||||||||||
| Average | 0.397 | 2.0 | 6.4 | 2 | 5.5 | 0.219 | 0.67 | 0.29 | 0.98 | 1 | 0.0000 |
| Minimum | 0.315 | 2.0 | 5.3 | 1 | 3.0 | 0.102 | 0.38 | 0.19 | 0.50 | 1 | 0.0000 |
| Maximum | 0.472 | 2.0 | 7.9 | 2 | 7.9 | 0.408 | 1.23 | 0.43 | 1.69 | 1 | 0.0000 |
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during May and June. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
The foam on the SBR surface was observed to decrease slightly to approximately 30 to 80% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures combined with increasing the F:M ratios to 0.06 have assisted to reduce the foam concentrations.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
Continued maintenance activities of cleaning the alum static mixer injector, flushing of the alum chemical piping to the SBRs and weekly draining and cleaning of the disc filters.
The influent organic loadings remain below those of the influent design loadings. Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2019
Table 4: June 2019 - Influent Wastewater
| Sample Date / Design Basis | Flow (MGD) | BOD5 (mg/L) | BOD5 (lbs/day) | TSS (mg/L) | TSS (lbs/day) | NH4-N (mg/L) | NH4-N (lbs/day) | TKN, mg/L (mg/L) | TKN, mg/L (lbs/day) | Phosphorus, Total, mg/L (mg/L) | Phosphorus, Total, mg/L (lbs/day) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Design Basis (Average) | MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 |
| June 4, 2019 | 0.412 | 45 | 155 | 220 | 756 | 26.7 | 92 | 34.7 | 119 | 5.0 | 17.2 |
| June 11, 2019 | 0.543 | 136 | 467 | 204 | 701 | 24.3 | 110 | 49.3 | 223 | 5.1 | 23.1 |
| June 18, 2019 | 0.532 | 81 | 280 | 124 | 426 | 24.9 | 110 | 35.7 | 158 | 3.6 | 16.0 |
| June 25, 2019 | 0.521 | ||||||||||
| Average | 0.502 | 87 | 301 | 183 | 628 | 25.3 | 104 | 39.9 | 167 | 4.6 | 18.7 |
| Minimum | 0.412 | 45 | 155 | 124 | 426 | 24.3 | 92 | 34.7 | 119 | 3.6 | 16.0 |
| Maximum | 0.543 | 136 | 467 | 220 | 756 | 26.7 | 110 | 49.3 | 223 | 5.1 | 23.1 |
During June, the final effluent outfall 001 monthly average flow to Ridley Creek was measured and recorded as 0.402 MGD. This represents approximately 53.6% of the facility's average daily design hydraulic loading of 0.750 MGD. This is slight increase as compared to the monthly average for May. The increase is attributed to the significant volume of rainfall during the month of June.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
During June, influent flow measured at the manhole in the field prior to the Screening building was observed to have higher flow volumes as compared to the influent flow meter to the SBRs. The flow measurements from this flow meter located in the manhole is the "field" are not believed to be consistently accurate, therefore the flow measurements recorded into the SBRs is used for DMR reporting.
Flows measured through the disc filters are consistent with those to the SBRs. The flow meter located within the "field" is believed to be inaccurate, therefore the flow measured to the SBRs was used to calculate the influent loadings.
Significant Rainfall Events
During June, there were sixteen (16) days when rainfall occurred. Five (5) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period. There was one period of continuous rainfall over seven (7) consecutive days. A total of 9.88 inches of rainfall measured during the month. These events occurred on:
- June 11th: 2.40 inches
- June 13th: 0.62 inches
- June 16th: 0.65 inches
- June 17th: 0.24 inches
- June 18th: 0.06 inches
- June 19th: 0.06 inches
- June 20th: 3.14 inches
- June 21st: 1.25 inches
- June 22nd: 0.04 inches
Seven consecutive days of rainfall for a total of 5.44 inches
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times. On June 20th, influent wastewater flow was diverted to the offline SBR, SBR 2, to alleviate the hydraulic overloading on the SBRs and reduce the influent fill-decant cycle. The recorded influent flow to the SBRs on June 19th was 1,019,520 gallons followed by a recorded flow of 917,904 gallons on June 20th. A total of 318,660 (31.3%) gallons of internal recycle flow from the disc filters was recorded on June 19th. Subtracting our the internal recycle flow for June 19th, a more representative influent flow from the collection system of 708,660 gallons is likely,
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
July 2019
therefore indicating that despite the severe rainfall volume, the plant remained within the hydraulic design of 750,000 gallons.
PA DEP
The annual inspection by PADEP was performed. No issues were identified. A copy of the report has been requested.
Chemical Usage:
| June 2019 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 316 | 9.400 |
| Aluminum Sulfate solution | 48.3 | 1,448 |
=
Flow data:
| May 2019 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 17.017 | 567,241 | 868,220 |
| Influent Wastewater to SBRs | 16.546 | 531,913 | 1,012,096 |
| Internal Recycle | 0.779 | 59,925 | 318,660 |
| Treated Effluent to Disc Filters | 15.958 | ||
| Final Effluent Discharge | 12.067 | 402,233 | 832,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
*The field flow meter appears not to be functioning accurately. The filed field flow meter volume should be less than the influent to the SBRs as a result of the internal recycle flow rates.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Coordination with McGovern to clean SBR3 is planned for July. Availability of McGovern's tank crew is the critical path.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 6
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 10, 2019
The East Goshen Township Municipal Authority held their regular public meeting on Monday, June 10, 2019 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Phil Mayer, and Dana Pizarro. Also in attendance were: Jon Altshul (Asst. Township Manager), Mark Miller (Director of Public Works), Brian Miller (Pennoi) and Patrick McKenna (Attorney), and Michele Truitt (resident).
COMMON ACRONYMS:
- BFES - Big Fish Environmental Services
- BOS - Board of Supervisors
- CB - Conservancy Board
- DEP - Department of Environmental Protection
- EPA - Environmental protection Agency
- HC - Historical Commission
- I&I - Inflow & Infiltration
- LCSTP - Lockwood Chase Sewer Treatment Plant
- MA- Municipal Authority
- NPDES - National Pollutant Discharge Elimination System
- PC - Planning Commission
- PM - Prevention Maintenance
- PR - Park & Recreation Board
- RCSTP - Ridley Creek Sewer Treatment Plant
- SBR - Sequencing Batch Reactor
- SSO - Sanitary System Overflow
- WAS - Waste Activated Sludge
Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
There was a moment of silence to remember our troops, veterans and first responders.
Kevin asked if anyone would be recording the meeting. There was no response.
Chairman's Report
- Phil attended the West Goshen meeting. There was less than 6M gpd. South Five Points Road pump station was discussed. They discussed possibly forming a joint township planning commission to do future planning.
Sewer Reports
1. Director of Public Works, Mark Miller's report for May:
Monthly Flows: The average daily flows to West Goshen were 815,000 gpd.
Meters: The meters were read on a daily basis. Flows have dropped considerably. Mark gave possible locations for permanent meters.
C.C. Collection: The pump stations have been visited on a daily basis with no problems to report. As you may have heard, Sunoco had several inadvertent returns along Boot Road. As a precaution, we televised our sewer line each time to make sure our sewers were not compromised. All the work that was done was recharged back to Sunoco. On May 31st we were notified of a sewage blockage at Airport and Wilson Drive. It turns out that the blockage was West Goshen Township not ours, however, we ended up assisting them to clear the blockage. They will take care of notifying DEP. Goshen Valley had a sewer break underneath the 900 building. As a result, the property owners started to call DEP who in turn contacted the Township. We worked with the property management company to get the line repaired which required us to make sure the repairs were done in a timely matter. The Muffin
MA 6-10-19 draft — 1
Monster arrived last week. We will get it installed after we complete our road paving projects.
R.C. Collection: The pumping stations were visited on a daily basis with no problems to report.
Ridley Creek Plant: We worked with Big Fish to get the sludge tank drained so we could switch out the valve for the sludge tank, which was completed as soon as they finished cleaning the tank. Both valves have now been replaced. We completed the tree planting on the embankment. Two of the neighbors called to say thank you and were very appreciative of the Municipal Authority members for being responsive to their requests. The new AC unit was put in the electrical room at the plant today.
Alarms: We responded to 18 alarms for May.
PA One Calls: We received 100 PA One Calls for the month of May.
Rainfall: 7.67 inches for May
2. Pennoni Engineer's Report for May
Invoices - Invoices with summaries were provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
We began evaluating the existing Spectrum Detroit Diesel "Generator 1" for replacement. This included a site visit, review of the existing generator specifications, and a review of the original site design plans and expansion improvement plans to develop the minimum electrical output requirement for the replacement generator.
Barkway Pump Station Grinder
The Muffin Monster manhole and equipment was delivered to the Public Works garage in late May approximately 6 weeks ahead of schedule.
Tallmadge Drive Sewer Main Replacement
The 2-year maintenance bond period is until March 21, 2021.
I&I Support and Reporting
We performed field visits with Mark Miller to identify potential locations in the Ridley Creek collection system for the next round of portable metering. It is our understanding that the metering contractor will be confirming the viability of the proposed manhole locations and will install three meters accordingly.
New Connections
We reviewed a financial security estimate for the sewer system for the proposed daycare on Wilson Drive.
Hershey's Mill Pump Station
We performed a field visit with Mark Miller to confirm the proposed location for the replacement generator. We will prepare a photo rendering of the pump station site with the new exterior generator as it would be viewed from Hershey's Mill community entrance drive, for use in coordination with the Condo Association. We have also coordinated the approach to obtaining floodplain approval for the new generator with Mark Gordon. A topographical survey will be needed to determine the elevation of the base floodplain (BFE) versus the proposed generator location in order to determine if/how to meet the requirement to elevate mechanical and electrical appurtenances at least 1.5' above the BFE. We will provide a proposal for the survey, floodplain coordination, and generator design.
MA 6-10-19 draft — 2
Permanent Flow Meter Manholes
We started investigation and research into permanent flow meter manholes and meter systems for installation for two locations in the collection system, including a field visit to the planned locations with Mark Miller. The concept is to install manholes (to ensure straight pipe runs through the meter), run electricity to them, and provide remote monitoring and data recording functionality. We are obtaining scoping and pricing from vendors for a variety of different flow metering technologies, such as Parshall or Palmer-Bowlus type flumes, ultrasonic, and lasers. We intend to provide a memo of alternatives and associated costs prior to the July MA meeting.
3. Big Fish Environmental Services - The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of April 2019. Discharge to the Applebrook irrigation lagoon remained off line during April and May 2019. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Kevin mentioned the lower I&I. Mark commented that residents are calling when they cut off a cap. Kevin will do an article for the newsletter and may include illegal hookups.
Approval of Minutes
The minutes of the May 13, 2019 meeting were approved as corrected.
Approval of Invoices
1. After discussion of the Hershey's Mill generator, Phil moved to approve payment of the following Pennoni invoices:
- Pennoni invoice #860767: $305.50
- Pennoni invoice #860768: $439.00
- Pennoni invoice #860769: $486,50
Dana seconded the motion. The motion passed unanimously.
2. Phil moved to approve payment of the Maillie invoice #1000088750 for $2,643.00. Jack seconded the motion. The motion passed unanimously.
3. Dana moved to approve payment of the Horn Plumbing Invoice for $1,972.50. Phil seconded the motion. The motion passed unanimously.
Financial Reports
Jon Altshul provided the following written report:
In May, the Municipal Authority recorded $8,798 in revenues (from inter-fund transfers) and $13,437 in expenses for a negative variance of $4,639. As of May 31st, the fund balance was $23,102.
Any Other Matter
1. Michele Truitt mentioned a large pool of water at Cherry Lane. She also asked if Hershey's Mill has their own sewer system. Mark verified this and explained that the Township owns the station that is outside of the Hershey's Mill community.
MA 6-10-19 draft — 3
Adjournment
There being no further business, Jack moved to adjourn the meeting. Phil seconded the motion. The meeting was adjourned at 7:40 p.m. The next regular meeting will be held on Monday, July 8, 2019 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 6-10-19 draft — 4
Pennoni — INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 865644
Invoice Date: 06/27/2019
Project: EGMAU18005
Project Name: Hershey's Mill Generator Replace
For Services Rendered through: 6/17/2019
Vendor coordination for scoping and pricing of generator sound attenuation and fuel tank sizing options; and evaluation of floodplain impacts and related approvals needed for new exterior generator and pad.
Phase : 01 -- Concept Design
| Total Phase : 01 -- Concept Design | Amount |
|---|---|
| Labor : | 456.75 |
| Expense : | 0.00 |
| Phase Total : | 456.75 |
| Amount Due This Invoice | $456.75 |
| Billing Summary | Amount |
|---|---|
| Fee : | 5,000.00 |
| Prior Billings : | 4,529.50 |
| Current Billings : | 456.75 |
| Total Billings : | 4,986.25 |
Phase : 01 -- Concept Design — Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.75 | 127.00 | 349.25 |
| Senior Professional | 0.50 | 121.00 | 60.50 |
| Associate Professional | 0.50 | 94.00 | 47.00 |
| Labor Total: | 3.75 | 456.75 |
Total Phase : 01 -- Concept Design — Labor : $456.75 | Expense : $0.00
Total Project : EGMAU18005 -- Hershey's Mill Generator Replace — Labor : $456.75 | Expense : $0.00
OK [Signature]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU18005 Invoice Summary
Invoice Date 6/27/2019
| Field | Value |
|---|---|
| Project: | EGMAU18005 |
| Pennoni Job No.: | Hershey's Mill Generator Replacement |
| Invoice No: | 865644 |
| Invoice Period: | 5/13/2019 to 6/17/2019 |
| Date: | 6/27/2019 |
| Initial Authorization: | $ 5,000.00 |
| Contract Amount: | $ 5,000.00 |
| Previously Invoiced: | $ 4,529.50 |
| Current Invoice: | $ 456.75 |
| Invoiced to Date ($): | $ 4,986.25 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ 13.75 |
| Remaining Budget (%): | 0% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | Hershey's Mill Generator Replacement |
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ 4,529.50 |
| Current Invoice: | $ 456.75 |
| Invoiced to Date ($): | $ 4,986.25 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ 13.75 |
| Remaining Budget (%): | 0% |
Comments: Vendor coordination for scoping and pricing of generator sound attenuation and fuel tank sizing options; and evaluation of floodplain impacts and related approvals needed for new exterior generator and pad.
Pennoni — INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 865645
Invoice Date: 06/27/2019
Project: EGMAU19001
Project Name: 2019 General Services
For Services Rendered through: 6/17/2019
Prepared for and attended May and June MA meetings; prepared June Engineer's Report; coordinated with RCSTP Operator to address questions and comments on May Operator's report from May MA meeting; initiated Sewers Ordinance amendment; and RCSTP DRBC docket research follow-up to May MA meeting.
Permanent RCCS Metering: field visit to observe two potential permanent metering locations in the Ridley Creek Collection System, and evaluation and vendor coordination for product alternatives and costs for permanent metering.
Barkway PS Muffin Monster construction assistance: reviewed additional construction submittals and coordinated equipment delivery schedule and location with Township and vendor.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Amount |
|---|---|
| Labor : | 4,076.00 |
| Expense : | 0.00 |
| Phase Total : | 4,076.00 |
| Amount Due This Invoice | $4,076.00 |
| Billing Summary | Amount |
|---|---|
| Fee : | 27,000.00 |
| Prior Billings : | 5,023.25 |
| Current Billings : | 4,076.00 |
| Total Billings : | 9,099.25 |
[Signature]
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMAU19001 -- 2019 General Services | Invoice # : 865645
...Continued from previous page
Phase : **** -- Professional Services — Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 11.25 | 127.00 | 1,428.75 |
| Senior Professional | 16.75 | 121.00 | 2,026.75 |
| Associate Professional | 3.25 | 94.00 | 305.50 |
| Engineering Technician | 3.75 | 84.00 | 315.00 |
| Labor Total: | 35.00 | 4,076.00 |
Total Phase : **** -- Professional Services — Labor : $4,076.00 | Expense : $0.00
Total Project : EGMAU19001 -- 2019 General Services — Labor : $4,076.00 | Expense : $0.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. — Page: 2
East Goshen Municipal Authority
EGMAU19001 Invoice Summary
Invoice Date 6/27/2019
| Field | Value |
|---|---|
| Project: | EGMAU19001 |
| Pennoni Job No.: | 2019 General Services |
| Invoice No: | 865645 |
| Invoice Period: | 5/13/2019 to 6/17/2019 |
| Date: | 6/27/2019 |
| Initial Authorization: | $ 27,000.00 |
| Contract Amount: | $ 27,000.00 |
| Previously Invoiced: | $ 5,023.25 |
| Current Invoice: | $ 4,076.00 |
| Invoiced to Date ($): | $ 9,099.25 |
| Invoiced to Date (%): | 34% |
| Remaining Budget ($): | $ 17,900.75 |
| Remaining Budget (%): | 66% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | 2019 General Services |
| Phase Budget: | $ 27,000.00 |
| Previously Invoiced: | $ 5,023.25 |
| Current Invoice: | $ 4,076.00 |
| Invoiced to Date ($): | $ 9,099.25 |
| Invoiced to Date (%): | 34% |
| Remaining Budget ($): | $ 17,900.75 |
| Remaining Budget (%): | 66% |
Comments: Prepared for and attended May and June MA meetings; prepared June Engineer's Report; coordinated with RCSTP Operator to address questions and comments on May Operator's report from May MA meeting; initiated Sewers Ordinance amendment; and RCSTP DRBC docket research follow-up to May MA meeting.
Permanent RCCS Metering: field visit to observe two potential permanent metering locations in the Ridley Creek Collection System, and evaluation and vendor coordination for product alternatives and costs for permanent metering.
Barkway PS Muffin Monster construction assistance: reviewed additional construction submittals and coordinated equipment delivery schedule and location with Township and vendor.
Pennoni — INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 865646
Invoice Date: 06/27/2019
Project: EGMAU19002
Project Name: 2019 I&I Support and Reports
For Services Rendered through: 6/17/2019
Strategize new portable metering locations with PW Director.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Amount |
|---|---|
| Labor : | 95.25 |
| Expense : | 0.00 |
| Phase Total : | 95.25 |
| Amount Due This Invoice | $95.25 |
| Billing Summary | Amount |
|---|---|
| Fee : | 11,000.00 |
| Prior Billings : | 6,578.50 |
| Current Billings : | 95.25 |
| Total Billings : | 6,673.75 |
Phase : **** -- Professional Services — Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 127.00 | 95.25 |
| Labor Total: | 0.75 | 95.25 |
Total Phase : **** -- Professional Services — Labor : $95.25 | Expense : $0.00
Total Project : EGMAU19002 -- 2019 I&I Support and Reports — Labor : $95.25 | Expense : $0.00
[Signature]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19002 Invoice Summary
Invoice Date 6/27/2019
| Field | Value |
|---|---|
| Project: | EGMAU19002 |
| Pennoni Job No.: | 2019 I&I Support and Reports |
| Invoice No: | 865646 |
| Invoice Period: | 5/13/2019 to 6/17/2019 |
| Date: | 6/27/2019 |
| Initial Authorization: | $ 11,000.00 |
| Contract Amount: | $ 11,000.00 |
| Previously Invoiced: | $ 6,578.50 |
| Current Invoice: | $ 95.25 |
| Invoiced to Date ($): | $ 6,673.75 |
| Invoiced to Date (%): | 61% |
| Remaining Budget ($): | $ 4,326.25 |
| Remaining Budget (%): | 39% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | 2019 I&I Support and Reports |
| Phase Budget: | $ 11,000.00 |
| Previously Invoiced: | $ 6,578.50 |
| Current Invoice: | $ 95.25 |
| Invoiced to Date ($): | $ 6,673.75 |
| Invoiced to Date (%): | 61% |
| Remaining Budget ($): | $ 4,326.25 |
| Remaining Budget (%): | 39% |
Comments: Strategize new portable metering locations with PW Director.
Pennoni — INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 865647
Invoice Date: 06/27/2019
Project: EGMAU19004
Project Name: RCSTP Generator Replacement
[Signature] OK
For Services Rendered through: 6/17/2019
Initiated concept design for RCSTP generator replacement via data gathering and research of existing generator make & model, loads, plans, and other information; site visit; research CoStars for participating vendors and generator products; and coordination with PW Director on replacement generator sizing
Phase : 01 -- Concept Design
| Total Phase : 01 -- Concept Design | Amount |
|---|---|
| Labor : | 877.25 |
| Expense : | 0.00 |
| Phase Total : | 877.25 |
| Amount Due This Invoice | $877.25 |
| Billing Summary | Amount |
|---|---|
| Fee : | 5,000.00 |
| Prior Billings : | 0.00 |
| Current Billings : | 877.25 |
| Total Billings : | 877.25 |
Phase : 01 -- Concept Design — Labor
| Class | Hours/Units | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 127.00 | 31.75 |
| Senior Professional | 1.00 | 121.00 | 121.00 |
| Associate Professional | 5.75 | 94.00 | 540.50 |
| Sr, Engineering Technician | 2.00 | 92.00 | 184.00 |
| Labor Total: | 9.00 | 877.25 |
Total Phase : 01 -- Concept Design — Labor : $877.25 | Expense : $0.00
Total Project : EGMAU19004 -- RCSTP Generator Replacement — Labor : $877.25 | Expense : $0.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19004 Invoice Summary
Invoice Date 6/27/2019
| Field | Value |
|---|---|
| Project: | EGMAU19004 |
| Pennoni Job No.: | RCSTP Generator Replacement |
| Invoice No: | 856647 |
| Invoice Period: | NTP to 6/17/2019 |
| Date: | 6/27/2019 |
| Initial Authorization: | $ 5,000.00 |
| Contract Amount: | $ 5,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 877.25 |
| Invoiced to Date ($): | $ 877.25 |
| Invoiced to Date (%): | 18% |
| Remaining Budget ($): | $ 4,122.75 |
| Remaining Budget (%): | 82% |
Budget by Phase:
| Field | Value |
|---|---|
| Phase Name: | RCSTP Generator Replacement |
| Phase Budget: | $ 5,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 877.25 |
| Invoiced to Date ($): | $ 877.25 |
| Invoiced to Date (%): | 18% |
| Remaining Budget ($): | $ 4,122.75 |
| Remaining Budget (%): | 82% |
Comments: Initiated concept design for RCSTP generator replacement via data gathering and research of existing generator make & model, loads, plans, and other information; site visit; research CoStars for participating vendors and generator products; and coordination with PW Director on replacement generator sizing
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.c
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
06/12/2019
Client No: 6604-001M
Invoice No. 211867
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 05/13/2019 | JKW | Review packet in preparation of meeting; Attend meeting. | 2.30 | |
| For Current Services Rendered | 2.30 | 460.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Jessica K. Wiesak | 2.30 | $200.00 | $460.00 |
| Previous Balance | $400.00 | |
|---|---|---|
| Total Current Charges | 460.00 | |
| 05/20/2019 | Payment | -400.00 |
| Balance Due | $460.00 |
OK
[Signature]
To ensure proper credit, please write client number on
your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be
charged on balances not paid 60 days after the invoice date.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA June Financial Report
Date: July 3, 2019
In June, the Municipal Authority recorded $58,556 in revenues (from inter-fund transfers) and $61,543 in expenses, primarily from the purchase of the Barkway Muffin Monster, for a negative variance of $2,986. As of June 30th, the fund balance was $20,116.
A complete list of YTD MA revenues and expenses is attached.
EAST GOSHEN TOWNSHIP
Other Funds
June 2019
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | (85.50) | (85.50) | (14.14) | (14.14) | |||
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | |||||||
| DCED GRANT | 07354 0400 | 32,307 | ||||||
| C.C. TAPPING FEES | 07364 1100 | |||||||
| R.C.TAPPING FEES | 07364 1110 | |||||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 845.64 | 845.64 | |||||
| MISCELLANEOUS REVENUE | 07380 1000 | 424.36 | 424.36 | |||||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | |||||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 311,118 | 155,559 | 209,862.55 | 54,303.55 | 55,559 | 58,265.00 | 2,706.00 |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | 357,000 | ||||||
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 16,366.22 | 16,366.22 | 305.50 | 305.50 | |||
| TOTAL REVENUE | 700,425 | 155,559 | 227,413.27 | 71,854.27 | 55,559 | 58,556.36 | 2,997.36 | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,000 | 16,000 | 15,175.18 | 824.82 | 8,000 | 7,587.59 | 412.41 |
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 2,262 | 1,131 | 634.00 | 497.00 | 188 | 188.00 | |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,663 | 9,663 | 9,650.00 | 13.00 | |||
| ENGINEERING SERVICES | 07424 3130 | 70,000 | 35,000 | 25,485.75 | 9,514.25 | 5,834 | 925.50 | 4,908.50 |
| LEGAL SERVICES | 07424 3140 | 8,000 | 4,000 | 1,980.00 | 2,020.00 | 660 | 660.00 | |
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | 13,803.22 | (13,803.22) | |||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | |||||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 4,529.50 | (4,529.50) | 305.50 | (305.50) | |||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | 102,660.00 | (102,660.00) | |||||
Report Date 1906 07/03/19 2 : 17 PM
EAST GOSHEN TOWNSHIP
Other Funds
June 2019
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | |||||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| RELINING | 07429 1500 | 130,000 | 65,000 | 65,000.00 | 32,500 | 32,500.00 | ||
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 67,000 | 33,500 | 59,302.71 | (25,802.71) | 16,750 | 52,724.00 | (35,974.00) |
| HERSHEYS MILL PUMP STATION CAPITAL | 07429 1503 | 125,000 | 62,500 | 62,500.00 | 31,250 | 31,250.00 | ||
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 87,000 | 43,500 | 43,500.00 | 21,750 | 21,750.00 | ||
| RCSTP CAPITAL | 07429 1505 | 169,500 | 84,750 | 84,750.00 | 42,375 | 42,375.00 | ||
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | |||||||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | |||||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER SINKING FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 700,425 | 355,044 | 233,220.36 | 121,823.64 | 159,307 | 61,542.59 | 97,764.41 | |
| NET RESULT FROM OPERATIONS | (199,485) | (5,807.09) | 193,677.91 | (103,748) | (2,986.23) | 100,761.77 |
Report Date 1906 07/03/19 2 : 17 PM
2019 YTD Municipal Authority Revenues and Expenses, as of 6/30/19
| Account # | Description | Per | Src | Debits | Credits | Date | Check# | Name | Description | Description 2 | Description 3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | ||||||||||
| 07341-1000 | INTEREST EARNINGS | 1901 | JE | 15.00 | - | 1/4/2019 | BANK FEES | REIMBURSE S/R FOR DEC.2018 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1901 | JE | - | 1.06 | 2/4/2019 | INTEREST | INTEREST EARNED JANUARY 2019 | 7100.1035 | ||
| 07341-1000 | INTEREST EARNINGS | 1902 | JE | 15.00 | - | 2/4/2019 | REIMBURSE | REIMBURSE S/R FOR JANUARY 2019 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1902 | JE | - | 0.66 | 3/4/2019 | INTEREST | INTEREST EARNED FEB.2019 | 7100.1035 | ||
| 07341-1000 | INTEREST EARNINGS | 1903 | JE | - | 0.62 | 3/31/2019 | INTEREST | INTEREST EARNED MARCH 2019 | 7100.1035 | ||
| 07341-1000 | INTEREST EARNINGS | 1904 | JE | 15.00 | - | 4/3/2019 | REIMBURSE | REIMBURSE S/R FOR MARCH 2019 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1904 | JE | - | 0.64 | 4/30/2019 | INTEREST | INTEREST EARNED APRIL 2019 | 7100.1035 | ||
| 07341-1000 | INTEREST EARNINGS | 1905 | JE | 15.00 | - | 5/3/2019 | REIMBURSE | REIMBURSE S/R FOR APRIL 2019 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1905 | JE | 15.00 | - | 5/6/2019 | BANK FEES | REIMBURSE S/R FOR FEB.2019 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1905 | JE | - | 0.66 | 6/4/2019 | INTEREST | INTEREST EARNED MAY 2019 07 | FUND | ||
| 07341-1000 | INTEREST EARNINGS | 1906 | JE | 15.00 | - | 6/4/2019 | REIMBURSE | REIMBURSE S/R FOR MAY 2019 | BANK FEES | ||
| 07341-1000 | INTEREST EARNINGS | 1906 | JE | - | 0.86 | 6/30/2019 | INTEREST | INTEREST EARNED JUNE 2019 07 | FUND | ||
| 07364-1130 | BEGINNING BALANCE | ||||||||||
| 07364-1130 | CONNECTION FEES - SEWER | 1901 | CR | - | 423.00 | 1/30/2019 | 2629 | STOFFLET, MICHAEL | |||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | CR | - | 423.00 | 2/11/2019 | 570 | JACOBS, ROBERT & CHERYL | |||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | CR | - | 423.00 | 2/19/2019 | 138 23 | GEORGE SMITH & CHRISTINA CONLE | |||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | 141.12 | - | 2/1/2019 | PINE ROCK | ANNUAL PINE ROCK - INTEREST | PMT - STOFFLET | ||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | 141.12 | - | 2/11/2019 | 2019 | ANNUAL PINE ROCK INTEREST PMT | JACOBS | ||
| 07364-1130 | CONNECTION FEES - SEWER | 1902 | JE | 141.12 | - | 2/19/2019 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC210 | ||
| 07380-1000 | BEGINNING BALANCE | ||||||||||
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | - | 141.12 | 2/1/2019 | PINE ROCK | ANNUAL PINE ROCK - INTEREST | PMT - STOFFLET | ||
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | - | 141.12 | 2/11/2019 | 2019 | ANNUAL PINE ROCK INTEREST PMT | JACOBS | ||
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | JE | - | 141.12 | 2/19/2019 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | RC210 | ||
| 07380-1000 | MISCELLANEOUS REVENUE | 1902 | RE | - | 1.00 | 2/19/2019 | 66923 1 | SALE OF GENERATOR TO BEALE TWP | MISCELLANEOUS REVENUE | ||
| 07392-0500 | BEGINNING BALANCE | ||||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1901 | JE | - | 57,399.61 | 1/15/2019 | XFER | XFER FR: SEWER TO MA 1/15/19 | |||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1902 | JE | - | 34,587.60 | 2/15/2019 | XFER | XFER FROM SEWER 05 TO MA 07 | |||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1903 | JE | - | 12,508.88 | 3/14/2019 | XFER | XFER $ FROM 05 TO MA 07 TO | COVER EXPENSES | ||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1904 | JE | - | 38,312.19 | 4/10/2019 | XFER | XFER TO 07 FROM 05 4/10/19 | |||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1905 | JE | - | 8,789.27 | 5/16/2019 | XFER | XFER $ FROM 05100.1030 TO MA | 7100.1035 | ||
| 07392-0500 | TRANSFER FROM SEWER OPERA | 1906 | JE | - | 58,265.00 | 6/17/2019 | XFER | XFER $ FROM SEWER TO MA | |||
| 07392-0900 | BEGINNING BALANCE | ||||||||||
| 07392-0900 | TRANSFER FROM SEWER CAP RI | 1901 | JE | - | 12,132.22 | 1/15/2019 | XFER | XFER FROM SEWER SINKING TO MA | 1/15/2019 | ||
| 07392-0900 | TRANSFER FROM SEWER CAP RI | 1902 | JE | - | 2,161.00 | 2/15/2019 | XFER | XFER FROM SEWER CAPITAL 09 TO | MA 07 | ||
| 07392-0900 | TRANSFER FROM SEWER CAP RI | 1903 | JE | - | 1,729.75 | 3/14/2019 | XFER | XFER $ FROM SEWER SINKING TO | MA 07 TO COVER EXPENSES | ||
| 07392-0900 | TRANSFER FROM SEWER CAP RI | 1905 | JE | - | 37.75 | 5/16/2019 | XFER | XFER $ TO MA 7100.1035 FROM | 9100.1035 | ||
| 07392-0900 | TRANSFER FROM SEWER CAP RI | 1906 | JE | - | 305.50 | 6/17/2019 | XFER | XFER $ FR: SEWER SINKING TO MA | |||
| 07424-1400 | BEGINNING BALANCE | ||||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 1903 | CD | 7,587.59 | - | 3/25/2019 | 3154 | EAST GOSHEN TOWNSHIP - GENERAL | QTR.1-2019 REIMBURSEMENT - MA | ||
| 07424-1400 | ADMINISTRATIVE WAGES | 1906 | CD | 7,587.59 | - | 6/28/2019 | 3166 | EAST GOSHEN TOWNSHIP - GENERAL | QTR.2 2019 REIMBURSEMENT - MA | ||
| 07424-3000 | BEGINNING BALANCE | ||||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1901 | CD | 8.00 | - | 1/15/2019 | 3147 | PMAA | PA MUNICIPAL AUTH.- PROUD HIST - BRIGHT FUTURE | ||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1902 | CD | 8.00 | - | 2/14/2019 | 3148 | YAHRAES, JOHN E. | REIMBURSEMENT - PROUD HISTOR PUBLICATION | ||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1902 | CD | (8.00) | - | 2/14/2019 | 3148 | YAHRAES, JOHN E. | VOID CK. 3148 | ||
| 07424-3000 | MISCELLANEOUS EXPENSE | 1905 | CD | 626.00 | - | 5/16/2019 | 3161 | DELAWARE RIVER BASIN COMMISSION | ANNUAL FEE D-2000-030 CP WAST WATER DISCHARGE | ||
| 07424-3110 | BEGINNING BALANCE | ||||||||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1903 | CD | 7,007.00 | - | 3/25/2019 | 3155 | MAILLIE FALCONIERO & CO. | 2018 FINANCIAL STMT. - MUNICIPA AUTHORITY | ||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 1905 | CD | 2,643.00 | - | 5/20/2019 | 3163 | MAILLIE FALCONIERO & CO. | EXAM. MUNIC.AUTH. 2018 FINANC STATEMENTS | ||
| 07424-3130 | BEGINNING BALANCE | ||||||||||
| 07424-3130 | ENGINEERING SERVICES | 1901 | CD | 4,864.00 | - | 1/15/2019 | 3146 | PENNONI ASSOCIATES INC. | SERV. THRU 12/30/18 2018 I&I SUP | ||
| 07424-3130 | ENGINEERING SERVICES | 1902 | CD | 5,170.00 | - | 2/15/2019 | 3150 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/27/19 CHAP.94 |
Maillie
Expertise Beyond The Numbers
Maillie LLP | maillie.com
PO Box 680, Oaks, PA 19456-0680
600 Willowbrook Lane, Suite 624, West Chester, PA 19382
PO Box 11847, Wilmington, DE 19850-1847
April 9, 2019
To the Members of the Board
East Goshen Municipal Authority
West Chester, Pennsylvania
We have audited the financial statements of the East Goshen Municipal Authority as of and for the year ended December 31, 2018, and have issued our report thereon dated March 27, 2019. Professional standards require that we advise you of the following matters relating to our audit.
OUR RESPONSIBILITY IN RELATION TO THE FINANCIAL STATEMENT AUDIT
As communicated in our engagement letter dated November 27, 2018, our responsibility, as described by professional standards, is to form and express an opinion(s) about whether the financial statements that have been prepared by management with your oversight are presented fairly, in all material respects, in conformity with accounting principles generally accepted in the United States of America. Our audit of the financial statements does not relieve you or management of your respective responsibilities.
Our responsibility, as prescribed by professional standards, is to plan and perform our audit to obtain reasonable, rather than absolute, assurance about whether the financial statements are free of material misstatement. An audit of financial statements includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control over financial reporting. Accordingly, as part of our audit, we considered the internal control of the East Goshen Municipal Authority solely for the purpose of determining our audit procedures and not to provide any assurance concerning such internal control.
We are also responsible for communicating significant matters related to the audit that are, in our professional judgment, relevant to your responsibilities in overseeing the financial reporting process. However, we are not required to design procedures for the purpose of identifying other matters to communicate to you.
PLANNED SCOPE AND TIMING OF THE AUDIT
We conducted our audit consistent with the planned scope and timing we previously communicated to you.
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
To the Members of the Board
East Goshen Municipal Authority
- 2 -
April 9, 2019
COMPLIANCE WITH ALL ETHICS REQUIREMENTS REGARDING INDEPENDENCE
The engagement team, others in our firm, as appropriate, our firm and our network firms have complied with all relevant ethical requirements regarding independence.
QUALITATIVE ASPECTS OF THE ENTITY'S SIGNIFICANT ACCOUNTING PRACTICES
Significant Accounting Policies
Management has the responsibility to select and use appropriate accounting policies. A summary of the significant accounting policies adopted by the East Goshen Municipal Authority is included in Note A to the financial statements. There have been no initial selection of accounting policies and no changes in significant accounting policies or their application during the year. No matters have come to our attention that would require us, under professional standards, to inform you about (1) the methods used to account for significant unusual transactions and (2) the effect of significant accounting policies in controversial or emerging areas for which there is a lack of authoritative guidance or consensus.
Significant Accounting Estimates
Accounting estimates are an integral part of the financial statements prepared by management and are based on management's current judgments. Those judgments are normally based on knowledge and experience about past and current events and assumptions about future events. Certain accounting estimates are particularly sensitive because of their significance to the financial statements and because of the possibility that future events affecting them may differ markedly from management's current judgments.
Financial Statement Disclosures
The financial statement disclosures are neutral, consistent and clear.
SIGNIFICANT DIFFICULTIES ENCOUNTERED DURING THE AUDIT
We encountered no significant difficulties in dealing with management relating to the performance of the audit.
UNCORRECTED AND CORRECTED MISSTATEMENTS
For purposes of this communication, professional standards require us to accumulate all known and likely misstatements identified during the audit, other than those that we believe are trivial, and communicate them to the appropriate level of management. We did not identify any misstatements during our audit.
Certified Public Accountants and Business Consultants
Maillie
Expertise Beyond The Numbers
To the Members of the Board
East Goshen Municipal Authority
- 3 -
April 9, 2019
DISAGREEMENTS WITH MANAGEMENT
For purposes of this letter, professional standards define a disagreement with management as a matter, whether or not resolved to our satisfaction, concerning a financial accounting, reporting, or auditing matter, which could be significant to the East Goshen Municipal Authority's financial statements or the auditors' report. No such disagreements arose during the course of the audit.
REPRESENTATIONS REQUESTED FROM MANAGEMENT
We have requested certain written representations from management, which are included in the management representation letter dated March 27, 2019.
MANAGEMENT'S CONSULTATIONS WITH OTHER ACCOUNTANTS
In some cases, management may decide to consult with other accountants about auditing and accounting matters. Management informed us that, and to our knowledge, there were no consultations with other accountants regarding auditing and accounting matters.
OTHER SIGNIFICANT MATTERS, FINDINGS OR ISSUES
In the normal course of our professional association with the East Goshen Municipal Authority, we generally discuss a variety of matters, including the application of accounting principles and auditing standards, operating and regulatory conditions affecting the entity and operational plans and strategies that may affect the risks of material misstatement. None of the matters discussed resulted in a condition to our retention as the East Goshen Municipal Authority's auditors.
This report is intended solely for the information and use of the Members of the Board and management of the East Goshen Municipal Authority and is not intended to be and should not be used by anyone other than these specified parties.
Very truly yours,
[Signature] Maillie LLP
MAILLIE LLP
Certified Public Accountants and
Business Consultants
Certified Public Accountants and Business Consultants
[Seal] WEST GOSHEN TOWNSHIP EST. 1817
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
WEST CHESTER, PENNSYLVANIA
BASIC FINANCIAL STATEMENTS
AND SUPPLEMENTARY INFORMATION
DECEMBER 31, 2018 AND 2017
WEST GOSHEN SEWER AUTHORITY
WEST CHESTER, PENNSYLVANIA
(A Component Unit of West Goshen Township)
TABLE OF CONTENTS
| Section | PAGE |
|---|---|
| INDEPENDENT AUDITOR'S REPORT | 1 - 2 |
| MANAGEMENT'S DISCUSSION AND ANALYSIS | 3 - 9 |
| BASIC FINANCIAL STATEMENTS | |
| Statements of Net Position | 10 |
| Statements of Revenues, Expenses, and Changes in Net Position | 11 |
| Statements of Cash Flows | 12 |
| Notes to Financial Statements | 13 - 21 |
| Independent Auditor's Report on Internal Control Over Financial Reporting and on Compliance and Other Matters Based on an Audit of Financial Statements Performed in Accordance with Government Auditing Standards | 22 - 23 |
BTCPA
BARBACANE THORNTON & COMPANY
INDEPENDENT AUDITOR'S REPORT
June 4, 2019
To the Officers
West Goshen Sewer Authority
West Chester, Pennsylvania
Report on the Financial Statements
We have audited the accompanying financial statements of the West Goshen Sewer Authority (“the Authority”), a component unit of West Goshen Township, West Chester, Pennsylvania, as of and for the years ended December 31, 2018 and 2017, and the related notes to the financial statements, which collectively comprise the Authority's basic financial statements as listed in the table of contents.
Management's Responsibility for the Financial Statements
Management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error.
Auditor's Responsibility
Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards, issued by the Comptroller General of the United States. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation
- 1 -
3411 Silverside Road • 200 Springer Building • Wilmington, DE 19810-4803
302.478.8940 • www.btcpa.com
To the Officers
West Goshen Sewer Authority
and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.
Opinion
In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the West Goshen Sewer Authority, West Chester, Pennsylvania, as of December 31, 2018 and 2017, and the respective changes in financial position and cash flows thereof for the years then ended in accordance with accounting principles generally accepted in the United States of America.
Other Matters
Required Supplementary Information
Accounting principles generally accepted in the United States of America require that the management's discussion and analysis on pages 3 through 9 be presented to supplement the basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board, who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. We have applied certain limited procedures to the required supplementary information in accordance with auditing standards generally accepted in the United States of America, which consisted of inquiries of management about the methods of preparing the information and comparing the information for consistency with management's responses to our inquiries, the basic financial statements, and other knowledge we obtained during our audit of the basic financial statements. We do not express an opinion or provide any assurance on the information because the limited procedures do not provide us with sufficient evidence to express an opinion or provide any assurance.
Other Reporting Required by Government Auditing Standards
In accordance with Government Auditing Standards, we have also issued our report dated June 4, 2019, on our consideration of the Authority's internal control over financial reporting and on our tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements and other matters. The purpose of that report is to describe the scope of our testing of internal control over financial reporting and compliance and the results of that testing, and not to provide an opinion on internal control over financial reporting or on compliance. That report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the Authority's internal control over financial reporting and compliance.
[Signature] Barbacane, Thornton & Company LLP
BARBACANE, THORNTON & COMPANY LLP
- 2 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED
This discussion and analysis of the West Goshen Sewer Authority (“the Authority”) of West Goshen, Pennsylvania, provides an overview of the Authority's performance for the year ended December 31, 2018. Please read it in conjunction with the Authority's financial statements, which begin on page 10.
FINANCIAL HIGHLIGHTS
- The Authority reported $6,670,467 of capital improvement projects and equipment purchases during 2018.
- Tapping fees for 2018 were $277,632; an increase of $248,138 from 2017.
- Lease rental for 2018 was $639,098; an increase of $414,143 from 2017.
- Capital contributions from other townships for 2018 were $1,463,432.
- Investment income for 2018 was $258,005; an increase of $168,919 from 2017.
- As of December 31, 2018, the Authority reported an ending net position of $24,301,082, an increase of $1,074,515 as compared to the prior year.
- The Authority incurred $131,442 in legal fees, including an effort to prevent the United States Environmental Protection Agency and DEP from adopting unachievable nutrient limits.
USING THIS ANNUAL REPORT
This annual report consists of three parts: management's discussion and analysis, financial statements, and notes. The notes explain in more detail some of the information in the financial statements.
Required Financial Statements
The financial statements report information about the Authority using full accrual accounting methods as utilized by similar business activities in the private sector. These statements offer short and long-term financial information about its activities.
The statement of net position includes all of the Authority's assets and liabilities and provides information about the nature and amounts of investments in resources (assets) and obligations (liabilities). It also provides the basis for evaluating the capital structure of the Authority and assessing the liquidity and financial flexibility of the Authority. All of the current year's revenues and expenses are accounted for in the statement of revenues, expenses, and changes in net position. This statement measures the Authority's profitability and creditworthiness. The statement of cash flows provides information about the Authority's cash receipts and cash payments during the reporting period. The statement reports cash receipts, cash payments, and net changes in cash resulting from operations, investing, and capital and related financing activities and provides answers to such questions as “From where did cash come?,” “For what was cash used?,” and “What was the change in cash balance during the reporting period?”
- 3 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
FINANCIAL ANALYSIS OF THE AUTHORITY
One of the most important questions asked about the Authority's finances is, “Is the Authority better or worse off as a result of the year's activities?” The statement of net position and the statement of revenues, expenses, and changes in net position tables supply information about the Authority's activities in a way that will help answer this question. These two statements report the net position of the Authority and changes in them. You can think of the Authority's net position (the difference between assets and liabilities) as one way to measure financial health or financial position. Over time, increases or decreases in the Authority's net position is one indicator of whether its financial health is improving or deteriorating. However, you will need to also consider other non-financial factors such as changes in economic conditions, population growth, and new or changed legislation.
The Authority's assets exceeded liabilities by $24,301,082, $23,226,567, and $22,441,940 at the close of 2018, 2017, and 2016, respectively. Our analysis focuses on the net position (Table 1) and the changes in net position (Table 2) of the Authority.
Table 1
WEST GOSHEN SEWER AUTHORITY'S NET POSITION
DECEMBER 31, 2018, 2017, AND 2016
| Item | 2018 | 2017 | 2016 |
|---|---|---|---|
| Assets: | |||
| Current and Other Assets | $ 16,215,775 | $ 21,609,087 | $ 6,099,393 |
| Capital Assets | 26,636,921 | 20,799,058 | 18,033,913 |
| Total Assets | 42,852,696 | 42,408,145 | 24,133,306 |
| Current Liabilities | 1,222,509 | 1,179,584 | 1,221,366 |
| Noncurrent Liabilities | 17,329,105 | 18,001,994 | 470,000 |
| Total Liabilities | 18,551,614 | 19,181,578 | 1,691,366 |
| Net Position: | |||
| Net Investment in Capital Assets | 16,940,256 | 16,239,000 | 17,115,913 |
| Unrestricted | 7,360,826 | 6,987,567 | 5,326,027 |
| Total Net Position | $ 24,301,082 | $ 23,226,567 | $ 22,441,940 |
The largest portion of the Authority's net position reflects its investment in capital assets (land, buildings, equipment, infrastructure, and construction-in-progress) less any related debt used to acquire those assets that is still outstanding net of unspent debt proceeds. The majority of the outstanding debt of the Authority was incurred for capital investment required to replace aged and deteriorated infrastructure, to improve operations and personnel safety, and to prepare for future treatment requirements. Although the Authority's investment in its capital assets is reported net of related debt, it should be noted that the resources needed to repay this debt must be provided from other sources, since the capital assets themselves cannot be used to liquidate these liabilities.
- 4 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
The Authority's unrestricted net position in the amount of $7,360,826, $6,987,567, and $5,326,027, for 2018, 2017, and 2016, respectively, may be used to meet the Authority's operating expenses. During 2018, the Authority's operating expenses were $194,149 less than in 2017. During 2017, the Authority's operating expenses were $179,890 than 2016.
At the end of 2018, the Authority was able to report a positive balance in net position with an increase of $1,074,515 from the net position of 2017. The net position for the Authority during this reporting period increased, in large part, due to inter-governmental capital contributions.
At the end of 2017, the Authority was able to report a positive balance in net position with an increase of $784,627 from the net position of 2016. The revenues for the Authority during this reporting period increased, in large part, due to an increase in charges for services, lease rentals, and investment income.
Table 2 shows the changes in net position for the years ended December 31, 2018, 2017, and 2016.
Table 2
WEST GOSHEN SEWER AUTHORITY'S CHANGES IN NET POSITION
FOR THE YEARS ENDED DECEMBER 31, 2018, 2017, AND 2016
| Item | 2018 | 2017 | 2016 |
|---|---|---|---|
| Revenues: | |||
| Program Revenues: | |||
| Charges for Services (Tapping Fees) | $ 277,632 | $ 29,494 | $ 202,810 |
| Capital Contributions (from other Townships) | 1,463,432 | 2,031,352 | 532,477 |
| General Revenues: | |||
| Lease Rentals, Township of West Goshen | 639,098 | 224,955 | 441,112 |
| Investment Income (net of fees) | 258,005 | 89,086 | - |
| Other | 142,283 | 101,385 | 138,080 |
| Total Revenues | 2,780,450 | 2,476,272 | 1,314,479 |
| Expenses: | |||
| Operating Expenses | 1,115,698 | 1,309,847 | 1,129,957 |
| Interest Expense | 581,208 | 173,040 | 14,111 |
| Nonoperating Expenses | 9,029 | 208,758 | - |
| Total Expenses | 1,705,935 | 1,691,645 | 1,144,068 |
| Change in Net Position | 1,074,515 | 784,627 | 170,411 |
| Net Position, January 1 | 23,226,567 | 22,441,940 | 22,271,529 |
| Net Position, December 31 | $ 24,301,082 | $ 23,226,567 | $ 22,441,940 |
West Goshen Township incorporated the Authority in 1958 for the sole purpose of financing construction of a sewage collection system and treatment plant, which is operated and maintained by the Township
- 5 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
under a long-term lease. Revenues for the Authority include lease rentals from West Goshen Township, tapping fees, and capital contributions from other townships.
As indicated by the following charts, revenue is composed of rent paid by West Goshen Township (23.0%), charges for services (tapping fees, 10.0%), capital contributions from other townships (52.6%), investment income (9.3%), grants (1.8%), and other income (3.3%). Expenses are composed of depreciation expense (48.8%), interest (34.1%), legal and other fees associated with the EPA lawsuit (7.7%), administrative (3.6%), engineering fees (4.0%), and miscellaneous (1.8%).
2018 Revenue Sources
| Category | Percentage |
|---|---|
| Charges for Services (Tapping Fees) | 10.0% |
| Lease Rental, West Goshen Township | 23.0% |
| Receipts from other Townships | 52.6% |
| Grants | 1.8% |
| Other | 3.3% |
| Investment Income | 9.3% |
2018 Expenses
| Category | Percentage |
|---|---|
| Interest on Bonds | 34.1% |
| Engineering | 4.0% |
| Depreciation | 48.8% |
| Administrative | 3.6% |
| Legal | 7.7% |
| Misc | 1.8% |
- 6 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
Summary of Organization and Business
The West Goshen Sewer Authority, at the request of the Township Board of Supervisors, constructed the West Goshen Township Sewerage System. Although the Authority retains ownership of the system, it is leased to the Township through the Board of Supervisors. West Goshen Township is responsible for operating the entire system, for maintenance and repair, and for establishing and collecting sewer rentals from users of the system. All sewer revenues of the Township are pledged for the payment of the sewer system operating expenses and lease rentals. Lease rentals in the amount of $639,098 were paid to the Authority for 2018. In 2018, the West Goshen Board of Supervisors approved an increase in sewer use fees set to begin in 2019.
The sewerage system, particularly the pumping stations, force mains, interceptors, and treatment plant, was constructed with sufficient capacity to take care of the Township needs many years into the future. When new developments are constructed and/or the service is extended to existing homes, developers and residents are charged a tapping fee to connect to the system. Revenue generated from tapping fees for 2018 amounted to $277,632. Tapping fee revenue can be used to pay down debt or to pay for capital projects.
In 2012, the Authority filed Civil Action against the United States Environmental Protection Agency ("EPA"), to challenge action taken by the EPA in its establishment of a total phosphorus ("TP") total maximum daily load ("TMDL") for Goose Creek. In December 2013, the Authority entered into an Interim Settlement Agreement with the EPA for the reassessment and reconsideration of Goose Creek. As a result of the reassessment, a second Interim Settlement Agreement was reached in October 2018 to further reduce effluent TP from a monthly average of 0.8 mg/L to a monthly average of 0.1 mg/L by December 2022 with the ultimate goal of demonstrating whether or not a U.S. EPA-approved tertiary treatment system can treat to levels of TP lower than 0.1 mg/L.
In addition to taking care of the needs of the Township, there is sufficient capacity available in the present system to permit the Authority to provide a limited amount of sewerage service outside of the Township. The Authority currently has written agreements with West Whiteland Township, East Goshen Township, Westtown Township, and Thornbury Township to purchase sewerage capacity in the Treatment Plant. The agreements also require the contributing townships to share in costs relating to capital improvements to the plant, pump stations, and collection system. Revenue generated from capital projects for 2018 amounted to $1,463,432.
CAPITAL ASSETS AND DEBT ADMINISTRATION
Capital Assets
The Authority's investment in capital assets as of December 31, 2018, 2017, 2016 amounted to $26,636,921, $20,799,058, and $18,033,913, respectively, net of accumulated depreciation. This investment in capital assets includes land and land improvements, the wastewater treatment plant, pumping stations, sewer interceptors and force mains, machinery and equipment, and any construction-in-progress. The total increase in the Authority's investment in capital assets for the current
- 7 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
fiscal year was $5,837,863, net of accumulated depreciation. The amount of accumulated depreciation to date is $23,391,790.
Table 3
WEST GOSHEN SEWER AUTHORITY'S CAPITAL ASSETS
DECEMBER 31, 2018, 2017, AND 2016
| 2018 | 2017 | 2016 | |
|---|---|---|---|
| Buildings and Improvements | $ 12,464,637 | $ 12,450,427 | $ 12,693,602 |
| Equipment | 10,493,223 | 9,737,928 | 8,750,586 |
| Land Improvements | 606,360 | 606,360 | 606,360 |
| Land | 82,083 | 82,083 | 82,083 |
| Infrastructure | 16,883,150 | 16,883,150 | 16,387,299 |
| Construction-in-progress | 9,499,258 | 3,598,296 | 1,522,155 |
| Total Capital Assets | 50,028,711 | 43,358,244 | 40,042,085 |
| Less Accumulated Depreciation | (23,391,790) | (22,559,186) | (22,008,172) |
| Capital Assets, Net of Depreciation | $ 26,636,921 | $ 20,799,058 | $ 18,033,913 |
In 2015, a comprehensive review of the wastewater collection, conveyance, and treatment system was conducted. The result indicated that significant improvements and capital investments were required to replace aged and deteriorated infrastructure, to improve operations and personnel safety, and to prepare for future treatment requirements. These recommendations were detailed in the 2015 Capital Improvement Plan ("CIP") that was presented to and subsequently adopted by the Authority in 2016. Major capital additions for the current fiscal year included the following:
- Pump station by-pass connections,
- Sanitary sewer system rehabilitation project – 2017,
- Headworks improvement project,
- Enhanced chemical system upgrade,
- Various construction-in-progress projects:
- Sanitary sewer system rehabilitation project – 2018,
- Sludge facility upgrade,
- Pump Station No. 2 upgrade,
- Pump Station No. 10 upgrade,
- Pump Station No. 11 upgrade,
- Pump Station No. 13 upgrade,
- Digester replacements,
- Entrance improvements,
- CoMag tertiary treatment project
- 8 -
WEST GOSHEN SEWER AUTHORITY
MANAGEMENT'S DISCUSSION AND ANALYSIS - UNAUDITED (CONT'D)
Additional information about the Authority's capital assets is presented in Note 4 to the financial statements.
Long-term Debt
The Authority identified that their capital improvement campaign was going to require additional funding outside of their existing reserve funds. As a result, the Authority sold sewer revenue and guaranteed sewer revenue bonds to secure $17,055,000 in additional capital improvement funding in 2017. As of December 31, 2018, the Authority had $18,001,994 in long-term debt outstanding (including the unamortized premium) versus $18,059,883 in 2017 and $918,000 in 2016. Additional information about the Authority's long-term debt can be found in Note 5 to the financial statements.
NEXT YEAR'S PROJECTS
Based, in part, on the 2015 CIP, the Authority has begun implementing a program of systematic upgrades and improvements to the wastewater system where appropriate. Projects listed previously as major capital additions for the current fiscal year and identified as construction-in-progress are planned to continue into the coming year.
REQUEST FOR INFORMATION
This financial report was designed to provide a general overview of the West Goshen Sewer Authority's finances for those with an interest in the government's finances. Questions concerning any of the information provided herein or requests for additional financial information should be addressed to: Secretary, West Goshen Sewer Authority, 848 South Concord Road, West Chester, PA 19382.
- 9 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
STATEMENTS OF NET POSITION
DECEMBER 31, 2018 AND 2017
| 2018 | 2017 | |
|---|---|---|
| ASSETS | ||
| Current Assets: | ||
| Cash and cash equivalents | $ 599,419 | $ 2,904,053 |
| Cash and cash equivalents - restricted | 4,352,138 | 9,842,110 |
| Cash and cash equivalents - developers' deposits | 55,515 | 53,302 |
| Investments | 5,016,828 | 1,468,158 |
| Investments - restricted | 1,531,165 | 489,630 |
| Accounts receivable | 1,716,331 | 2,226,043 |
| Accrued interest | 33,573 | 13,793 |
| Total Current Assets | 13,304,969 | 16,997,089 |
| Noncurrent Assets: | ||
| Investments | 488,780 | 1,443,913 |
| Investments - restricted | 2,422,026 | 3,168,085 |
| Total Noncurrent Investments | 2,910,806 | 4,611,998 |
| Capital Assets: | ||
| Depreciable capital assets, net | 17,055,580 | 17,118,679 |
| Land | 82,083 | 82,083 |
| Construction-in-progress | 9,499,258 | 3,598,296 |
| Net Capital Assets | 26,636,921 | 20,799,058 |
| Total Noncurrent Assets | 29,547,727 | 25,411,056 |
| TOTAL ASSETS | $ 42,852,696 | $ 42,408,145 |
| LIABILITIES AND NET POSITION | ||
| Current Liabilities: | ||
| Developers' deposits | $ 55,515 | $ 53,302 |
| Accounts payable | 481,255 | 1,068,393 |
| Accrued interest payable | 12,850 | - |
| Long-term debt, current portion | 672,889 | 57,889 |
| Total Current Liabilities | 1,222,509 | 1,179,584 |
| Noncurrent Liabilities: | ||
| Long-term debt | 17,329,105 | 18,001,994 |
| Total Noncurrent Liabilities | 17,329,105 | 18,001,994 |
| Total Liabilities | 18,551,614 | 19,181,578 |
| Net Position: | ||
| Net investment in capital assets | 16,940,256 | 16,239,000 |
| Unrestricted | 7,360,826 | 6,987,567 |
| Total Net Position | 24,301,082 | 23,226,567 |
| TOTAL LIABILITIES AND NET POSITION | $ 42,852,696 | $ 42,408,145 |
The accompanying notes are an integral part of these financial statements.
- 10 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
STATEMENTS OF REVENUES, EXPENSES, AND CHANGES IN NET POSITION
FOR THE YEARS ENDED DECEMBER 31, 2018 AND 2017
| 2018 | 2017 | |
|---|---|---|
| OPERATING REVENUES: | ||
| Lease rentals, West Goshen Township | $ 639,098 | $ 224,955 |
| Tapping fees | 277,632 | 29,494 |
| Transfer from sewer revenue account - primary government | 44,436 | 48,380 |
| Other income | 46,641 | 53,005 |
| TOTAL OPERATING REVENUES | 1,007,807 | 355,834 |
| OPERATING EXPENSES: | ||
| Administrative expenses | 61,074 | 80,932 |
| Debt issuance expenses | - | 192,946 |
| Depreciation expense | 832,604 | 795,382 |
| Engineering fees | 68,520 | 63,062 |
| Miscellaneous expenses | 22,058 | 12,810 |
| Professional fees | 131,442 | 164,715 |
| TOTAL OPERATING EXPENSES | 1,115,698 | 1,309,847 |
| OPERATING LOSS | (107,891) | (954,013) |
| NONOPERATING REVENUES (EXPENSES): | ||
| Investment income, net of fees | 258,005 | 89,086 |
| Grants | 51,206 | - |
| Interest expense | (581,208) | (173,040) |
| Unrealized loss on investments | (9,029) | (7,519) |
| Loss on disposal of capital assets | - | (201,239) |
| TOTAL NONOPERATING EXPENSES | (281,026) | (292,712) |
| Capital contributions | 1,463,432 | 2,031,352 |
| CHANGE IN NET POSITION | 1,074,515 | 784,627 |
| NET POSITION, BEGINNING OF YEAR | 23,226,567 | 22,441,940 |
| NET POSITION, END OF YEAR | $ 24,301,082 | $ 23,226,567 |
The accompanying notes are an integral part of these financial statements.
- 11 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
STATEMENTS OF CASH FLOWS
FOR THE YEARS ENDED DECEMBER 31, 2018 AND 2017
| 2018 | 2017 | |
|---|---|---|
| CASH FLOWS FROM OPERATING ACTIVITIES: | ||
| Lease rentals and transfers received from West Goshen Township | $ 639,098 | $ 224,955 |
| Received from customers | 2,341,853 | 471,323 |
| Paid to suppliers for goods and services | (1,337,630) | (1,197,307) |
| NET CASH PROVIDED (USED) BY OPERATING ACTIVITIES | 1,643,321 | (501,029) |
| CASH FLOWS FROM INVESTING ACTIVITIES: | ||
| Sale of investments | (2,898,043) | (2,131,208) |
| Investment income, net of fees | 238,226 | 83,069 |
| NET CASH USED BY INVESTING ACTIVITIES | (2,659,817) | (2,048,139) |
| CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES: | ||
| Proceeds of debt issuance | - | 18,112,772 |
| Debt retirements | (5,000) | (918,000) |
| Interest paid | (621,247) | (225,929) |
| Grants received | 51,206 | - |
| Cash paid for the acquisition and construction of capital assets | (6,200,856) | (2,730,596) |
| NET CASH (USED) PROVIDED BY CAPITAL AND RELATED FINANCING ACTIVITIES | (6,775,897) | 14,238,247 |
| NET (DECREASE) INCREASE IN CASH AND CASH EQUIVALENTS | (7,792,393) | 11,689,079 |
| CASH AND CASH EQUIVALENTS, BEGINNING OF YEAR | 12,799,465 | 1,110,386 |
| CASH AND CASH EQUIVALENTS, END OF YEAR | $ 5,007,072 | $ 12,799,465 |
| RECONCILIATION OF OPERATING LOSS TO NET CASH PROVIDED (USED) BY OPERATING ACTIVITIES: | ||
| Operating loss | $ (107,891) | $ (954,013) |
| Adjustments to reconcile operating loss to net cash provided (used) by operating activities: | ||
| Depreciation | 832,604 | 795,382 |
| Changes in assets and liabilities: | ||
| Decrease in accounts receivable | 1,973,144 | 340,444 |
| Decrease in accounts payable | (1,056,749) | (701,577) |
| Increase in developers' deposits | 2,213 | 18,735 |
| NET CASH PROVIDED (USED) BY OPERATING ACTIVITIES | $ 1,643,321 | $ (501,029) |
| Cash and cash equivalents - unrestricted | $ 599,419 | $ 2,904,053 |
| Cash and cash equivalents - restricted | 4,352,138 | 9,842,110 |
| Cash and cash equivalents - developers' deposits | 55,515 | 53,302 |
| $ 5,007,072 | $ 12,799,465 | |
| NONCASH INVESTING, AND CAPITAL AND RELATED FINANCING ACTIVITIES: | ||
| Unrealized loss on investments | $ (9,029) | $ (7,519) |
| Capital contributions receivable from participating townships | $ 1,463,432 | $ 2,031,352 |
| Capital asset acquired through the incurrence of accounts payable | $ 469,611 | $ 1,031,170 |
| Amortization of bond premium | $ 52,889 | $ 52,889 |
The accompanying notes are an integral part of these financial statements.
- 12 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 1 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The financial statements of the West Goshen Sewer Authority ("the Authority") have been prepared in conformity with generally accepted accounting principles ("GAAP") as applied to governmental units. The Governmental Accounting Standards Board ("GASB") is the accepted standard-setting body for establishing governmental accounting and financial reporting principles. The significant accounting principles and policies utilized by the Authority are described below.
Reporting Entity
The Authority was incorporated by West Goshen Township, West Chester, Pennsylvania, for the purpose of financing construction of a sewage collection system and treatment plant, which is operated and maintained by the Township under a long-term lease. The Authority's operations are monitored by Township personnel and, therefore, no personnel service costs are incurred. The Authority is a component unit of the reporting entity of West Goshen Township.
Measurement Focus and Basis of Accounting and Financial Statement Presentation
The term "measurement focus" is used to denote what is being measured and reported in the Authority's operating statement. The Authority is accounted for on the flow of economic resources measurement focus. The fundamental objective of this focus is to measure whether the Authority is better or worse off economically as a result of events and transactions of the period.
The term "basis of accounting" is used to determine when a transaction or event is recognized on the Authority's operating statement. The Authority uses the accrual basis of accounting. Under this basis, revenues are recorded when earned and expenses are recorded when incurred, even though actual payment or receipt may not occur until after the period ends.
The Authority adheres to the provisions of the GASB Codification of Governmental Accounting and Financial Reporting Standards ("the Codification"). The Codification established standards for external financial reporting for all state and local governmental entities, which includes a statement of net position; a statement of revenues, expenses, and changes in net position; and a statement of cash flows. It requires the classification of net position in one of three components. Net investment in capital assets consists of capital assets, net of accumulated depreciation and reduced by the outstanding balances of borrowing attributable to acquiring, constructing, or improving those assets. If there are significant unspent related debt proceeds at year end, the portion of the debt attributable to the unspent proceeds is not included in the calculation of net investment in capital assets. Rather, that portion of the debt is included in the same net position component as unspent proceeds. Net position is reported as restricted when
- 13 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 1 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (cont'd)
constraints placed on their use are either externally imposed by creditors (such as through debt covenants), grantors, contributors, or laws or regulations of other governments or imposed by law through constitutional provisions or enabling legislation. Those restrictions affect net position arising from special revenue and capital funds. Unrestricted net position consists of accumulated resources that do not meet the definition of "net investment in capital assets" or "restricted."
Use of Estimates in the Preparation of Financial Statements
The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.
Cash and Cash Equivalents
Cash deposits consist of demand and time deposits and money market funds with financial institutions and are carried at cost. For purposes of the statement of cash flows, all cash deposits and highly liquid investments with an original maturity of three months or less when acquired are considered to be cash equivalents.
Investments
Investments are recorded at fair value.
In establishing the fair value of investments, the Authority uses the following hierarchy. The lowest level of valuation available is used for all investments.
Level 1 – Valuations based on quoted market prices in active markets for identical assets or liabilities that the entity has the ability to access.
Level 2 – Valuations based on quoted prices of similar products in active markets or identical products in markets that are not active or for which all significant inputs are observable, directly or indirectly.
Level 3 – Valuations based on inputs that are unobservable and significant to the overall fair value measurement.
- 14 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 1 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (cont'd)
Developers' Deposits
Developers' deposits represent cash deposits made by contractors in relation to various construction projects. The Authority acts as an agent for these deposits and, accordingly, no revenue is recorded. Both assets and liabilities are recorded for the initial amount of deposit.
Restricted Assets
Restricted cash and cash equivalents and investments consist of unspent bond proceeds from the Guaranteed Sewer Revenue Bonds, Series of 2017 and developer deposits.
Revenues and Expenses
Revenues and expenses are distinguished between operating and nonoperating items. Operating revenues generally result from providing services in connection with the Authority's principal ongoing operations. The principal operating revenues of the Authority are lease rentals from West Goshen Township and tapping fees.
Operating expenses include the costs associated with the engineering, administrative expenses, professional fees, and depreciation on capital assets. All revenues and expenses not meeting these definitions are reported as nonoperating revenues and expenses.
Use of Restricted and Unrestricted Net Position
When an expense is incurred for purposes for which both restricted and unrestricted net position is available, the Authority's policy is to apply restricted net position first.
Capital Assets
The Authority defines capital assets as assets with an initial, individual cost of more than $5,000 and an estimated useful life in excess of one year.
Capital assets of the Authority are recorded at either their actual cost or estimated historical cost. Donated assets are valued at their estimated fair value on the date donated. Depreciation of all exhaustible capital assets is charged as an expense against their operations. Depreciation is computed using the straight-line method over estimated asset lives as follows:
| Asset Category | Estimated Asset Life |
|---|---|
| Infrastructure | 20 - 40 years |
| Buildings and building improvements | 25 - 40 years |
| Land improvements | 10 - 20 years |
| Equipment | 5 - 20 years |
- 15 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 1 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (cont'd)
Major additions and betterments are capitalized while expenses for maintenance and repairs that do not add value to the asset or materially extend asset lives are charged to operations as incurred.
Long-term Obligations
On the statement of net position, long-term obligations are broken out between current and non-current liabilities dependent on when payment will become due. Bond premiums and discounts are netted against outstanding obligation balances and amortized over the life of the debt. All amortized amounts are amortized using the straight-line method. All issuance costs associated with a debt issuance are expensed when incurred.
NOTE 2 DEPOSITS AND INVESTMENTS
Deposits
Custodial Credit Risk
Custodial credit risk is the risk that in the event of a bank failure, the Authority's deposits may not be returned. The Authority does not have a policy for custodial credit risk on deposits. At December 31, 2018, the carrying amount of the Authority's deposits was $5,007,072, and the bank balance was $5,016,586. Of the bank balance, $240,721 was covered by federal depository insurance. The remaining $4,775,865 of the Authority's deposits were invested in money market funds managed by Goldman Sachs. Goldman Sachs is registered with the Securities and Exchange Commission and subject to regulatory oversight. The objective of the fund is to maintain a stable net asset value of $1 per share. In addition, the fund is rated by nationally recognized rating organizations (Moody's Investors Service rating of Aaa-mf and Standard & Poor's rating of AAAm as of December 31, 2018) and is subject to an independent annual audit.
At December 31, 2017, the carrying amount of the Authority's deposits was $12,799,465, and the bank balance was $12,766,418. Of the bank balance, $250,000 was covered by federal depository insurance, and $251,660 was exposed to custodial credit risk because it was uninsured and uncollateralized. The remaining $12,264,758 of the Authority's deposits was invested in domestic money market funds managed by Goldman Sachs. Goldman Sachs is registered with the Securities and Exchange Commission and subject to regulatory oversight. The objective of the fund is to maintain a stable net asset value of $1 per share. In addition, the fund is rated by nationally recognized rating organizations (Moody's Investors Service rating of Aaa-mf and Standard & Poor's rating of AAAm as of December 31, 2017) and is subject to an independent annual audit.
- 16 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 2 DEPOSITS AND INVESTMENTS (cont'd)
Investments
Statutes authorize the Authority to invest in obligations of the U.S. Treasury; agencies and instrumentalities; deposits in savings accounts or time deposits or share accounts of institutions insured by the Federal Deposit Insurance Corporation ("FDIC"), the Federal Savings and Loan Insurance Corporation ("FSLIC") or the National Credit Union Share Insurance Fund ("NCUSIF"). The Authority also is authorized to invest in obligations of the United States of America or any of its agencies or instrumentalities backed by the full faith and credit of the United States of America, or the Commonwealth of Pennsylvania or any of its agencies or instrumentalities.
As of December 31, 2018, the Authority had the following investments and maturities:
| Investment Type | Fair Value | Level 1 | Less Than One Year | One to Five Years |
|---|---|---|---|---|
| Negotiable certificates of deposit | $ 9,458,799 | $ 9,458,799 | $ 6,547,993 | $ 2,910,806 |
As of December 31, 2017, the Authority had the following investments and maturities:
| Investment Type | Fair Value | Level 1 | Less Than One Year | One to Five Years |
|---|---|---|---|---|
| Negotiable certificates of deposit | $ 6,569,786 | $ 6,569,786 | $ 1,957,788 | $ 4,611,998 |
Interest Rate Risk
The Authority does not have an investment policy that limits investment maturities as a means of managing its exposure to fair value losses arising from increasing interest rates. At December 31, 2018 and 2017, all of the Authority's investments had maturity dates of five years or less.
Custodial Credit Risk
For an investment, custodial credit risk is the risk that, in the event of the failure of the counterparty, the Authority will not be able to recover the value of its investments or collateral security that are in the possession of an outside party. As of December 31, 2018 and 2017, none of the Authority's investments were subject to custodial credit risk.
Concentration and Credit Risk
The Authority does not have an investment policy to address the concentration and credit risk of its investments. As of December 31, 2018 and 2017, the Authority's investments consisted of certificates of deposit in increments of $250,000 or less invested in numerous banks.
- 17 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 3 GUARANTY AGREEMENT
The sewage collection system and treatment plant is leased to and operated by West Goshen Township, who has guaranteed payment of the Guaranteed Sewer Revenue Bonds, Series of 2017 through a guaranty agreement dated June 27, 2017. All sewer revenues of the Township are pledged for the payment of operating expenses of the system and debt payments.
NOTE 4 CAPITAL ASSETS
A summary of changes in the Authority's capital assets is as follows:
2018
| Balance 01/01/18 | Additions | Deletions | Reclassification | Balance 12/31/18 | |
|---|---|---|---|---|---|
| Collection system - infrastructure | $ 16,883,150 | $ - | $ - | $ - | $ 16,883,150 |
| Land improvements | 606,360 | - | - | - | 606,360 |
| Buildings and building improvements | 12,450,427 | 14,210 | - | - | 12,464,637 |
| Equipment | 9,737,928 | - | - | 755,295 | 10,493,223 |
| 39,677,865 | 14,210 | - | 755,295 | 40,447,370 | |
| Accumulated depreciation | (22,559,186) | (832,604) | - | - | (23,391,790) |
| Land | 82,083 | - | - | - | 82,083 |
| Construction-in-progress | 3,598,296 | 6,656,257 | - | (755,295) | 9,499,258 |
| NET CAPITAL ASSETS | $ 20,799,058 | $ 5,837,863 | $ - | $ - | $ 26,636,921 |
2017
| Balance 01/01/17 | Additions | Deletions | Reclassification | Balance 12/31/17 | |
|---|---|---|---|---|---|
| Collection system - infrastructure | $ 16,387,299 | $ - | $ - | $ 495,851 | $ 16,883,150 |
| Land improvements | 606,360 | - | - | - | 606,360 |
| Buildings and building improvements | 12,693,602 | - | (243,175) | - | 12,450,427 |
| Equipment | 8,750,586 | - | (202,432) | 1,189,774 | 9,737,928 |
| 38,437,847 | - | (445,607) | 1,685,625 | 39,677,865 | |
| Accumulated depreciation | (22,008,172) | (795,382) | 244,368 | - | (22,559,186) |
| Land | 82,083 | - | - | - | 82,083 |
| Construction-in-progress | 1,522,155 | 3,761,766 | - | (1,685,625) | 3,598,296 |
| NET CAPITAL ASSETS | $ 18,033,913 | $ 2,966,384 | $ (201,239) | $ - | $ 20,799,058 |
- 18 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 5 LONG-TERM DEBT
Delaware Valley Regional Finance Authority – Guaranteed Note, Series of 1998 with interest at variable rates not to exceed 25 percent per annum, as invoiced monthly. The note was fully paid off in the year ended December 31, 2017.
A schedule of changes in the note payable is as follows:
2017
| Outstanding 01/01/17 | Retirements | Outstanding 12/31/17 | Amounts Due in One Year | |
|---|---|---|---|---|
| Sewer Note | $ 918,000 | $ 918,000 | $ - | $ - |
In June 2017, the Authority issued Guaranteed Sewer Revenue Bonds, Series of 2017 for the purpose of the current refunding and redemption of the Authority's Guaranteed Note, Series of 1998, the payment of the costs to construct improvements to the public sanitary sewer system of the Authority leased to the Township, and the payment of all costs and expenses related to the issuing of the bonds. The bonds mature through May 2037 with interest payable semi-annually at interest rates ranging from .90 percent to 3.25 percent.
A schedule of changes in the bonds payable is as follows:
2018
| Outstanding 01/01/18 | Additions | Retirements | Outstanding 12/31/18 | Amounts Due in One Year | |
|---|---|---|---|---|---|
| Bonds payable | $17,055,000 | $ - | $ 5,000 | $17,050,000 | $ 620,000 |
| Deferred amounts: Issuance premium | 1,004,883 | - | 52,889 | 951,994 | 52,889 |
| TOTAL | $18,059,883 | $ - | $ 57,889 | $18,001,994 | $ 672,889 |
2017
| Outstanding 01/01/17 | Additions | Retirements | Outstanding 12/31/17 | Amounts Due in One Year | |
|---|---|---|---|---|---|
| Bonds payable | $ - | $17,055,000 | $ - | $17,055,000 | $ 5,000 |
| Deferred amounts: Issuance premium | - | 1,057,772 | 52,889 | 1,004,883 | 52,889 |
| TOTAL | $ - | $18,112,772 | $ 52,889 | $18,059,883 | $ 57,889 |
- 19 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 5 LONG-TERM DEBT
The bond matures as follows:
Series of 2017
| Year Ending December 31, | Principal | Interest |
|---|---|---|
| 2019 | $ 620,000 | $ 624,775 |
| 2020 | 640,000 | 605,875 |
| 2021 | 665,000 | 582,975 |
| 2022 | 685,000 | 563,681 |
| 2023 | 705,000 | 543,588 |
| 2024-2028 | 4,060,000 | 2,175,863 |
| 2029-2033 | 4,995,000 | 1,239,319 |
| 2034-2037 | 4,680,000 | 310,213 |
| Totals | $ 17,050,000 | $ 6,646,289 |
NOTE 6 RISK MANAGEMENT
The Authority has purchased commercial insurance policies for various risks of loss related to torts; theft, damage, or destruction of assets; errors or omissions; injuries to employees; or acts of God. Payments of premiums for these policies are recorded as expenses of the Authority by the primary government. Insurance settlements have not exceeded insurance coverage in any of the past three years. There were no significant reductions in coverage compared to the prior year.
NOTE 7 CONTINGENT LIABILITIES
The Authority is subject to various disputes and legal proceedings which arise in the normal course of its operations. In the opinion of management, the amount of ultimate liability with respect to these activities will not be material to the Authority's financial condition.
The Authority has been funding a legal effort to prevent the United States Environmental Protection Agency ("EPA") from adopting new nutrient discharge limitations. In 2012, the Authority filed Civil Action against the EPA to challenge action taken by the EPA in its establishment of a TMDL (phosphorus) for Goose Creek. In December 2013, the Authority entered into an Interim Settlement Agreement with the EPA for the reassessment and reconsideration of Goose Creek. As a result of the reassessment, a second Interim Settlement
- 20 -
WEST GOSHEN SEWER AUTHORITY
(A Component Unit of West Goshen Township)
NOTES TO FINANCIAL STATEMENTS
NOTE 7 CONTINGENT LIABILITIES (cont'd)
Agreement was reached in October 2018 to further reduce effluent TP from a monthly average of 0.8 mg/L to a monthly average of 0.1 mg/L by December 2022 with the ultimate goal of demonstrating whether or not a U.S. EPA-approved tertiary treatment system can treat to levels of TP lower than 0.1 mg/L. These limits will affect all stormwater and wastewater dischargers in Chester Creek, including the West Goshen Sewer Authority. The outcome of these efforts could have a substantial impact on the future financial picture of the Authority since significant modifications to the sewage treatment plant may be necessary in the future.
NOTE 8 CAPITAL IMPROVEMENT COMMITMENTS
As of December 31, 2018, anticipated construction commitments are as follows:
| Contract Amount | Completed 12/31/2018 | Estimated Balance to Complete | |
|---|---|---|---|
| Digesters | $ 5,351,944 | $ 3,300,919 | $ 2,051,025 |
| 2017 Sanitary Sewer | 1,242,125 | 973,813 | 268,312 |
| Headworks | 1,562,054 | 1,562,054 | - |
| Chemical System Upgrade | 103,819 | 103,819 | - |
| $ 8,259,942 | $ 5,940,605 | $ 2,319,337 |
In addition, the Authority has incurred costs totaling $3,558,653 for project costs that are not under a formal contract as of December 31, 2018.
NOTE 9 SUBSEQUENT EVENTS
The Authority has evaluated all subsequent events through June 4, 2019, the date the financial statements were available to be issued.
- 21 -
BTCPA
BARBACANE THORNTON & COMPANY
INDEPENDENT AUDITOR'S REPORT ON
INTERNAL CONTROL OVER FINANCIAL REPORTING AND
ON COMPLIANCE AND OTHER MATTERS BASED ON AN AUDIT
OF FINANCIAL STATEMENTS PERFORMED IN ACCORDANCE
WITH GOVERNMENT AUDITING STANDARDS
June 4, 2019
To the Officers
West Goshen Sewer Authority
West Chester, Pennsylvania
We have audited, in accordance with the auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards issued by the Comptroller General of the United States, the financial statements of the West Goshen Sewer Authority ("the Authority"), West Chester, Pennsylvania, which comprise the statement of net position as of December 31, 2018, and the related statements of revenues, expenses, and changes in net position, and cash flows for the year then ended, and the related notes to the financial statements, which collectively comprise the Authority's basic financial statements, and have issued our report thereon dated June 4, 2019.
Internal Control Over Financial Reporting
In planning and performing our audit of the financial statements, we considered the Authority's internal control over financial reporting ("internal control") to determine the audit procedures that are appropriate in the circumstances for the purpose of expressing our opinion on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of the Authority's internal control. Accordingly, we do not express an opinion on the effectiveness of the Authority's internal control.
A deficiency in internal control exists when the design or operation of a control does not allow management or employees, in the normal course of performing their assigned functions, to prevent, or detect and correct, misstatements on a timely basis. A material weakness is a deficiency, or a combination of deficiencies, in internal control, such that there is a reasonable possibility that a material misstatement of the Authority's financial statements will not be prevented, or detected and corrected, on a timely basis. A significant deficiency is a deficiency, or a combination of deficiencies, in internal control that is less severe than a material weakness, yet important enough to merit attention by those charged with governance.
- 22 -
3411 Silverside Road · 200 Springer Building · Wilmington, DE 19810-4803
302.478.8940 · www.btcpa.com
To the Officers
West Goshen Sewer Authority
Our consideration of internal control was for the limited purpose described in the first paragraph of this section and was not designed to identify all deficiencies in internal control that might be material weaknesses or significant deficiencies. Given these limitations, during our audit we did not identify any deficiencies in internal control that we consider to be material weaknesses. However, material weaknesses may exist that have not been identified.
Compliance and Other Matters
As part of obtaining reasonable assurance about whether the Authority's financial statements are free from material misstatement, we performed tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements, noncompliance with which could have a direct and material effect on the determination of financial statement amounts. However, providing an opinion on compliance with those provisions was not an objective of our audit, and accordingly, we do not express such an opinion. The results of our tests disclosed no instances of noncompliance or other matters that are required to be reported under Government Auditing Standards.
Purpose of This Report
The purpose of this report is solely to describe the scope of our testing of internal control and compliance and the results of that testing, and not to provide an opinion on the effectiveness of the Authority's internal control or on compliance. This report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the Authority's internal control and compliance. Accordingly, this communication is not suitable for any other purpose.
[Signature: Barbacane, Thornton & Company LLP]
BARBACANE, THORNTON & COMPANY LLP
- 23 -
The Authorities
PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION
[Stamp: FYI]
Notification of Voter Delegate
[Stamp: RECEIVED JUN 17 2019 By _________]
TO: PMAA Member Authorities
FROM: Douglas E. Bilheimer, Executive Director
DATE: June 13, 2019
The PMAA Board of Directors' voted April 18, 1994, to implement, by its resolution, certain administrative recommendations set forth by the PMAA By-Law Revision Committee. These do not require prior amendment of the By-Laws because the existing By-Laws (Article IX, Sections 1 and 2) do provide the basic authorization for voting at meetings: one vote per active member to be cast by a delegate chosen by its own board of directors. The procedures approved by the Board are as follows:
- Fifteen days before the meeting, each member authority will notify the Executive Director of the name of its official voting at the meeting and also the name of an alternate delegate, both of whom have been approved by the members' Board of Directors. The delegates shall either be an elected or an appointed official of the applicable authority.
- As part of the registration procedure at the Annual Meeting, the named delegate shall be handed a "card", which he or she may hold up to cast the vote of that authority. It shall be the responsibility of each delegate, in the event he or she is not on the floor, to hand the card to the appropriate alternate delegate.
- The presiding officer at the Annual Meeting shall have the discretion in each vote to designate voting by voice, by a show of delegate cards, or by written ballot, unless upon motion duly made and adopted the Body itself votes to require written ballots.
- In pursuance of the powers of the presiding officer, the President may designate a time limit for floor remarks by each person speaking, which shall be stated by the presiding officer at the opening of the meeting.
Please note, this form does not need returned to our office if no one from your authority is attending the conference.
DEB/kaw
Attachment
1000 North Front Street, Suite 401, Wormleysburg, PA 17043
717-737-7655 . 717-737-8431 (f) . info@municipalauthorities.org
www.municipalauthorities.org . facebook.com/pamunicipalauthorities . linkedin.com/company/pamunicipalauthorities
Notification of Voting Delegate & Alternate
Our Authority's Board of Directors hereby name the following individuals to serve as Voting Delegate and Alternate Delegate:
Voting Delegate
Name: ________________________________________________
Title: ________________________________________________
Alternate Delegate
Name: ________________________________________________
Title: ________________________________________________
Authority submitting this information:
Authority: ________________________________________________
Address: ________________________________________________
City: ____________________________ State: ______ Zip: _________
Designated Voting Delegate or Alternate Delegate will receive an identification card at the Registration Booth at the PMAA Annual Conference.
Please note this form must be returned to the PMAA office by Wednesday, August 21, 2019.
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
[Stamp: FYI]
June 11, 2019
Dear Property Owner:
The purpose of this letter is to inform you that East Goshen Township has received a Conditional Use application for 1339 Enterprise Dr., West Chester PA 19380. The property owner, Parsons Rental II d.b.a. Communications Test Design Inc., is seeking approval to modify the existing Conditional Use Approval from a "Warehouse and Distribution" use with incidental office space, to a "Manufacturing Facility for Precision Instruments and Similar Products" use with incidental office space.
The property is approximately 4 acres in size, is located in the BP (Business Park) Zoning District, and the existing building on the property has approximately 19,000 s.f. of floor area. Approximately 17,000 s.f. of the existing floor area will be used for manufacturing of precision electronic testing equipment, and approximately 2000 s.f. floor area will be utilized as incidental office space. This modification to the use will not create any changes to the exterior of the building or the parking lot. The traffic impact for the proposed manufacturing use will be similar to the existing use.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when Conditional use applications are received. The meeting dates for this matter are listed below and subject to change without further written notice:
July 10, 2019 – Planning Commission (7:00 PM)
July 16, 2019 – Board of Supervisors (7:00 PM – Conditional Use Hearing)
These meetings will be held at the Township Administration Building and will be open to the public. The Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-170 (1339 Enterprise Dr.)\Conditional Use 2019\1000 foot letter CU 06112019.doc