Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
September 9, 2019
7:00 PM

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE

a. Ask if anyone will be taping the meeting

2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS

3. SEWER REPORTS

a. Director of Public Works Report.
b. Pennoni Engineer's Report.
c. Big Fish Environmental Report.

4. APPROVAL OF MINUTES

a. August 12, 2019

4. APPROVAL OF INVOICES

Pennoni Invoice #876341 $ 4,979.00
Pennoni Invoice #876342 $ 1,565.50
Pennoni Invoice #876343 $ 104.71
Gawthrop Greenwood, Invoice #213818 $ 220.00

6. LIAISON REPORTS

7. FINANCIAL REPORTS

a. August Financial Report

8. OLD BUSINESS

a. Pricing for Hershey Mill and Ridley Creek generators

9. GOALS

a. Continue to monitor the upgrades at West Goshen Sewer Plant. Members have been attending meetings.
b. Continue to implement the I&I Plan – on-going
c. Continue to run the plant to DEP permit requirements

F:\Data\Shared Data\Agendas\Municipal Authority\2019\9-9-2019 - .doc

10 NEW BUSINESS

a. Pennoni Memo - PCCS Permanent Sanitary metering.
b. Pennoni Memo – Hershey's Mill Pump Station Generator Replacement
c. Pennoni Memo – RCSTP Generator – 1 Replacement
d. Pennoni Memo – Proposal for Hershey's Mill Pump Station Generator Replacement
e. Pricing for Metering Manhole from OCF
f. Pricing for Metering Manhole from Tracom
g. Quote from Hartco for an Ultrasonic Module
h. Quote from Hartco for a portable Laser flow system

11. CAPACITY REQUESTS

12. ANY OTHER MATTER

13. CORRESPONDENCE AND REPORTS OF INTEREST

a.

14. PUBLIC COMMENT

15. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2019\9-9-2019 - .doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

September 6, 2019

To: Municipal Authority

From: Mark Miller

Re: August 2019 Monthly Report

Monthly Flows: West Goshen flow average is 780.000 for the month of August.

Meters: The meters were read on a daily basis. The meters were calibrated on August 23rd no problems were noted.

C.C. Collection: The pump stations were visited on a daily basis with no problems to report. We were notified of a sewer back up on Sturbridge Lane, we attempted to plunge the lateral until it was clear. The lateral was televised where we found the lateral had a significant sag. The homeowner was advised of the problem.

R.C. Collection: The stations were visited on a daily basis with no problems to report. A contractor working from PECO struck a lateral on Sleepy Hollow Lane, the contractor excavated the lateral and we made the repairs. We also replaced 14 casting while paving.

R.C. Plant: The plant operator reported that a limb was hanging over tank one, we trimmed the trees around the tanks. We installed the rebuilt pump for the Applebrook spray irrigation and started sending water to the golf course.

Alarms: We responded to 25 alarms for August.

PA One Calls: We responded to over 75 PA One Calls for the month of August.

Monthly Rainfall: 1.55 inches for August.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
September 6, 2019

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • We continued coordination with the vendor (Cummins) on product selection, fuel tank sizing, and cost for replacement of the existing Spectrum Detroit Diesel "Generator 1". We have requested a formal cost quote addressed to the Township for consideration at the September MA meeting, but we have not yet received it at the time of this report. We are working with the vendor to provide it ASAP so that we can forward to the MA prior to the meeting.

Barkway Pump Station Grinder

  • No activity since our last report. The Muffin Monster manhole and equipment was delivered to the Township in late May.

Tallmadge Drive Sewer Main Replacement

  • The 2-year maintenance bond period ends March 21, 2021.

I&I Support and Reporting

  • No activity since our last report.

New Connections

  • A new home is proposed at 204 Line Road that will require a grinder pump system. We are awaiting a plan submission to review.

Hershey's Mill Pump Station Generator Replacement

  • We performed topographic, existing conditions, and property boundary survey of the pump station site and creek and are developing an existing conditions plan. The plan will be utilized for floodplain impact determination and site design (namely to determine required height of the generator above grade).
  • We prepared a second rendering of the site with the proposed generator in-place for use by the Township in coordination with the Hershey's Mill Homeowner's Association. This rendering is as viewed from Greenhill Road; the prior rendering was a view from the Hershey's Mill entrance drive.
  • We continued coordination with the vendor (Cummins) on product selection, fuel tank sizing, and cost. We have requested a formal cost quote addressed to the Township for consideration at the September MA meeting, but we have not yet received it at the time of this report. We are working with the vendor to provide it ASAP so that we can forward to the MA prior to the meeting.

EGMAU19001
East Goshen Municipal Authority   September 6, 2019   Page 2
Engineer's Report

Permanent Flow Meter Manholes

  • We continued coordination with the Township and vendor on permanent flow meter manholes and meter systems for installation at two locations in the Ridley Creek collection system, specifically on field determining specific depths of the manholes, exact locations, and associated cost impacts.

END OF REPORT

P:\Projects\EGMA\Memos to Board\2019\Engineers Report 2019-09-06.docx

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
August 2019

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of July 2019. Discharge to the Applebrook irrigation lagoon remained off line during July and August. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for the July 2019 DMR.

Table 1
July 2019- Final Effluent - Outfall 001

NPDES Permit Discharge Limitations Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus,Total , mg/L mg/L Phosphorus,Total , mg/L lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
July 1, 2019 0.342 2 5.7
July 2, 2019 0.371 2.6 8.0 1 3.1 0.100 0.31 0.26 0.80 1 0.0000
July 9, 2019 0.384 2.0 6.4 6 19.2 0.100 0.32 0.24 0.77 1 0.0000
July 16, 2019 0.356 6.8 20.2 4 11.9 0.203 0.60 0.22 0.65 1 0.0000
July 23, 2019 0.434 2.0 7.2 4 14.5 0.100 0.36 0.14 0.51 6 0.7782
July 25, 2019 0.372 1 3.1
July 26, 2019 0.350 6 17.5
July 29, 2019 0.342 5 14.3
July 30, 2019 0.342 4.7 13.4 4 11.4 0.1 0.29 0.11 0.31 1 0.0000
Average 0.366 3.6 11.1 4 11.2 0.121 0.38 0.19 0.61 2 0.1556
Minimum 0.342 2.0 6.4 1 3.1 0.100 0.29 0.11 0.31 1 0.0000
Maximum 0.434 6.8 20.2 6 19.2 0.203 0.60 0.26 0.80 6 0.7782

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
August 2019

The treatment process performed well during July with no abnormalities. The process monitoring, and control data indicates the facility will remain within compliance of the NPDES permit.

There were periodic BOD5 and TSS sample concentration atypically less or greater typical "normal" conditions. These variations are attributed to the varying influent wastewater flows without the influence of rainfall. Although there were variations, the monthly average influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentration and organic loading values.

Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during July 2019.

Table 2
July 2019 - Influent Wastewater

Design Basis Flow MGD Average BOD5 mg/L BOD5 lbs/day TSS mg/L TSS lbs/day NH4-N mg/L NH4-N lbs/day TKN, mg/L mg/L TKN, mg/L lbs/day Phosphorus,Total, mg/L mg/L Phosphorus,Total, mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
July 2, 2019 0.436 249 905 222 807 33.4 121 60.5 220 9.8 35.6
July 9, 2019 0.474 202 734 207 753 31.8 126 45.4 180 6.8 26.9
July 16, 2019 0.443 557 2,025 212 771 32.7 121 55.5 205 5.8 21.4
July 23, 2019 0.526 75.4 274 223 811 28.5 125 38.5 169 6.3 27.6
July 30, 2019 0.410 188 683 220 800 32.0 109 53.8 184 4.3 14.7
Average 0.458 254 924 217 788 31.7 120 50.7 191 6.6 25.3
Minimum 0.410 75 274 207 753 28.5 109 38.5 169 4.3 14.7
Maximum 0.526 557 2,025 223 811 33.4 126 60.5 220 9.8 35.6

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report:
August 2019

Table 3 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the August 2019 DMR.

Table 3
August 2019- Final Effluent - Outfall 001

NPDES Permit Discharge Limitations Flow MGD Average CBOD5 mg/L CBOD5 lbs/month TSS mg/L TSS lbs/month NH4-N mg/L NH4-N lbs/month Phosphorus,Total , mg/L mg/L Phosphorus,Total , mg/L lbs/month Fecal Coliform Geo Mean Fecal Coliform Geo Mean
0.75 20 125 10 131 2.5 44 0.5 3 200 1,000
40 42
Sample Date
August 5, 2019 0.335 2 5.6
August 6, 2019 0.319 2.0 5.3 3 8.0 0.100 0.27 0.32 0.85 3 0.4771
August 12, 2019 0.336 2 5.6
August 13, 2019 0.323 2.0 5.4 3 8.1 0.100 0.27 0.61 1.64 1 0.0000
August 15, 2019 0.345
August 20, 2019 0.339 0.69 1.95
August 22, 2019 0.304
August 27, 2019 0.316
August 29, 2019 0.278
Average 0.322 2.0 5.4 3 6.8 0.100 0.27 0.54 1.48 2 0.2386
Minimum 0.278 2.0 5.3 2 5.6 0.100 0.27 0.32 0.85 1 0.0000
Maximum 0.345 2.0 5.4 3 8.1 0.100 0.27 0.69 1.95 3 0.4771

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during July. SBR 3 was removed from service during August and SBR 2 placed into service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

It is important to point out that the final effluent total phosphorus concentration has increased during the month of August. During the month of August, several troubleshooting measures were enacted to determine the root cause of the increase as well as implementing corrective actions, namely increasing the alum feed to the SBRs assist with total phosphorus removal.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: August 2019

Troubleshooting including increased process monitoring of each SBR's performance with respect to settleability of the mixed liquor prior to decanting. To evaluate the SBR's sludge settleability, a settled sludge volume (SSV) test is performed on the mixed liquor on a sample collected within twenty (20) minutes of the conclusion of the REACT cycle. The SSV test is performed daily on the SBRs. To further evaluate the sludge settleability, measurements of the clear supernatant (clear water above the sludge blanket) were obtained towards the end of the SETTLE cycle. The test results and observations indicated no issues or abnormalities with how well the sludge settled. Additional samples were collected from the effluent decant discharge pipes during the DECANT cycle of each SBR. The clarity of the effluent remained consistent with the sludge settleability.

On August 9th, SBR 3 was removed from service for an annual inspection and BR 2 was placed into service. In review of the final effluent total phosphorus date and more importantly the elevated TSS concentrations in the Post EQ tanks, it appears that placing SBR 2 in service coincided with the elevated Post EQ tank TSS during August (the elevated Post EQ TSS during July is related to the higher volumes of rainfall during July and typical lowers when the rain induced flows become lower). Figure 1 illustrates the final effluent and Post EQ Tank TSS concentrations during July and August.

Figure 1: TSS - July & August 2019

[Line chart showing Concentration, mg/L (0.0 to 60.0) across samples 1 to 23 for Post EQ TSS and FE TSS during July and August 2019.]

The figure illustrates no decline in the Post EQ tank TSS, however, concentrations maintain those concentrations typical of solids carryover from the SBRs. As shown in figure 2, the final effluent total phosphorus concentrations increased during

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: August 2019

August. There is a direct relationship at the TSS concentrations increase, the total phosphorus concentration will increase. The alum feed rates were increased, nearly doubling the feed rates to the SBRs. The alum feed prior to the SBRs was increased, however, caution is exercised not to overfeed alum into the disc filters. Overdosing alum in the disc filters could blind the filter as well as lower the final effluent pH beyond the discharge limitations.

Figure 2: FE Total Phosphorus - July & August 2019

[Scatter plot showing FE Total Phosphorus (0.000 to 0.800) from 01-Jul, 08-Jul, 15-Jul, 22-Jul, 29-Jul, 05-Aug, 12-Aug, to 19-Aug.]

In review of the data, troubleshooting measures and corrective actions, it is believed that the effluent valve for SBR 2 is not fully closed or seated. All SBRs are decanted clear effluent, however, there is a solids carryover into the Post EQ tanks. The plant was performing well up until SBR 2 was placed on line. The effluent valve will be evaluated and inspected to confirm it is in the fully closed position. Any adjustments will be performed. Continuing to increase the alum feed and increased cleaning of the disc filters should assist to lower the total phosphorus concentration within discharge permit limitations. Lastly, collection of addition final effluent samples for total phosphorus is under consideration. The long-term solution is to return SBR 3 to service after its cleaning on September 11th and follow up inspection.

After troubleshooting the effluent valve/actuator assembly for SBR 2, it was determined to not function as intended. The valve was observed to open, however, it did not fully close. The firm Tri-Sate (local firm that provides part and repairs) was contacted without success. On Wednesday, September 4th, the actuator from SBR 3 was removed and installed on SBR 2. The performance of the actuator will be monitored as well as a gradual decline on the Post EQ tank

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: August 2019

TSS. Tr-Sate will be contacted to evaluate the failed actuator for repair or replacement.

The foam on the SBR surface was observed to decrease slightly to approximately 0 to 30% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. The warmer water temperatures combined with increasing the F:M ratios to 0.06 and the rainfall during June and July have assisted to reduce the foam concentrations.

The influent organic loadings remain below those of the influent design loadings. Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2019

Table 4: August 2019 - Influent Wastewater

Sample Date / Design Basis Flow (MGD) BOD5 (mg/L) BOD5 (lbs/day) TSS (mg/L) TSS (lbs/day) NH4-N (mg/L) NH4-N (lbs/day) TKN, mg/L (mg/L) TKN, mg/L (lbs/day) Phosphorus, Total, mg/L (mg/L) Phosphorus, Total, mg/L (lbs/day)
Design Basis Average 335 2,098 320 2,001 32 200 48 301 9.1 57
August 6, 2019 0.493 167 687 349 1,435 32.3 133 58.2 239 7.8 32.1
August 13, 2019 0.391 82 336 158 650 29.8 97 110 5 0.0
August 20, 2019 0.510
August 27, 2019 0.439
Average 0.458 124 511 254 1043 31.1 115 84.1 122 7.8 16.0
Minimum 0.391 82 336 158 650 29.8 97 58.2 5 7.8 0.0
Maximum 0.510 167 687 349 1435 32.3 133 110.0 239 7.8 32.1

During August, the final effluent outfall 001 monthly average flow to Ridley Creek was measured and recorded as 0.415 MGD. This represents approximately 55.4% of the facility's average daily design hydraulic loading of 0.750 MGD. This is a slight increase as compared to the monthly average for July, however, it reflects previous "normal" flows.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: August 2019

During August, influent flow measured at the manhole in the field prior to the Screening building was observed to be functioning as intended. This is the second consecutive month the flows measured at the "field" flow meter were lower than those measured entering the SBR.

Significant Rainfall Events

During August, there were seven (7) day when rainfall occurred. One (1) storm event resulting in a daily precipitation amount equal to or greater than 0.50 inches measured during a 24-hour period. A total of 2.34 inches of rainfall measured during the month. The event occurred on:

August 15th 1.21 inches

Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.

PA DEP

No activity

Chemical Usage:

August 2019
Chemical Daily Average Total Monthly
Soda Ash 255 7,600
Aluminum Sulfate solution 61..5 1,845

For the past several months, there have been significant issues with the chemical supplier. Soda ash, light is used to maintain the total alkalinity and buffer for pH. The supplier has been unable to provide this product and in place provided soda ash, dense. The dense soda ash is less soluble and tends to settle to the bottom of the tank. Additionally, deliveries of liquid aluminum sulfate solution have been inconsistent. A recent order of approximately 1,800 gallons resulting in a partial delivery of approximately 1,100 gallons. These are two (2) critical chemicals to support the treatment process and compliance with the discharge permit limitations. Assistance or guidance from the Township is appreciated.

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 8

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report: August 2019

Flow data:

August 2019
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building* 12.875 415,333 529,390
Influent Wastewater to SBRs 13.734 443,016 494,208
Internal Recycle 1.213 63,862 196,980
Treated Effluent to Disc Filters 13.016 433,865 472,192
Final Effluent Discharge 9.845 317,581 356,000
Applebrook Golf Course 0 0 0

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 8 of 8

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 12, 2019

The East Goshen Township Municipal Authority held their regular public meeting on Monday, August 12, 2019 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Phil Mayer, and Walter Wujcik. Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoi), Patrick McKenna (Attorney) and Gabriel Long (Intern).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops, veterans and first responders. Kevin asked if anyone would be recording the meeting. There was no response.

Chairman's Report

  1. Phil attended the West Goshen meeting and reported that the Phase 1 project is almost done. They are procuring materials for Phase 2. They have found other things that need to be done so they are over the original $9 million budget by about $2 million. They will have a new schedule/cost in the next few weeks.

Sewer Reports

1. Director of Public Works, Mark Miller's report for July:

Monthly Flows: The average daily flows to West Goshen were 880,000 for the month of July.

Meters: The meters were read on a daily basis. We had some rain events, which created some challenges however we got thru them.

C.C. Collection: The pump stations have been visited on a daily basis. We had some minor problems with the alarm panel at the Barkway Pump Station. John Laldley was called and the problem was corrected. As part of our paving program we replaced all the sewer castings and lids on Barkway Lane and North Tulip Lane. We raised the manholes along the stream at Ashbridge Farms. Two sewer laterals were repaired by homeowners during the month. Each of the repairs were inspected by township staff. While prepping the roads in Vista Farms for overlay, the manhole casting and lids were checked for problems. We found some that needed minor masonry repairs which were done.

MA 8-12-19 draft — 1

R.C. Collection: The pumping stations were visited on a daily basis, bar screens and walls were cleaned at the two stations. While prepping the roads for a paving overlay, we found a significant leak in the Rossmore development estimated to be between 20,000 to 25,000 gallons a day. We excavated the area around the manhole and pumped the ground water while we made the repair. Also, while working in the development we replaced 16 manhole castings and lids that were damaged.

Ridley Creek Plant: Nothing to report.

Alarms: We responded to 32 alarms in July.

PA One Calls: We responded to over 70 PA One Calls for the month of July. We had a PA One Call in the Audubon development. However, the sanitary sewers in the development are considered private. That being said, the Homeowners Association has no clue where anything is, so I went in and worked with the Carr and Duff Company and marked all the manholes, which was a challenge. The contractor hired an underground locating company to locate the laterals before they drilled.

Rainfall: 11.85 inches for July. We had several significant rain events.

New Sewer Camera and Trailer -We received our new sewer camera and trailer on Friday. It was on display for the MA members to see before the meeting.

Discussion item: Now that we have this new camera, I would like to reach out to the various apartment complexes and townhome communities and arrange to televise the sanitary sewer lines and create videos of the sewers. Any defects we find they will be responsible for making the repairs. However, I would like to talk to Pat to set up some guidelines prior to doing the work.

2. Pennoni Engineer's Report for May

Invoices – Invoices with summaries were provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

We continued evaluating the existing Spectrum Detroit Diesel "Generator1" for replacement. A summary memo has been prepared to recommend a replacement generator model with budgetary pricing. This memo requires input from the Township regarding fuel storage sizing.

A proposal will be provided separately for full design of a replacement generator following general approval of the budgetary pricing provided in the generator memo.

Barkway Pump Station Grinder

No activity since our last report. The Muffin Monster manhole and equipment was delivered to the Township in late May.

Tallmadge Drive Sewer Main Replacement

The 2-year maintenance bond period ends March 21, 2021.

I&I Support and Reporting

No activity since our last report.

New Connections

No activity since our last report.

Hershey's Mill Pump Station

We have determined the preferred sizing and location of the replacement generator and diesel fuel tank in coordination with Mark Miller.

A summary memo has been prepared describing the recommended generator with budgetary pricing for the generator and constructed concrete pad. Additionally, we have prepared a

MA 8-12-19 draft — 2

photo rendering of the pump station site with the new exterior generator, as it would be viewed from Hershey's Mill community entrance drive for use in coordination with the Condo Association.

A proposal has been provided separately for survey, floodplain coordination and generator design.

Permanent Flow Meter Manholes

We continued investigation and research into permanent flow meter manholes and meter systems for installation for two locations in the Ridley Creek collection system. A summary memo has been prepared describing the permanent flow metering product options available, as well as their advantages and disadvantages. Our evaluation concluded that the new manhole option remains the most suitable choice, and budgetary pricing has been provided for recommended products.

3. Big Fish Environmental Services – The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of June 2019. Discharge to the Applebrook irrigation lagoon remained off line during June and July 2019. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.

Mike provided a graph showing the phosphorus levels. There was a jump in June but they came back down to normal.

Approval of Minutes

The minutes of the July 8, 2019 meeting were approved as corrected.

Approval of Invoices

1. Walter moved to approve payment of the following Pennoni invoices:

Pennoni Invoice #870502 $ 1,534.50
Pennoni Invoice #870503 $ 102.25

Phil seconded the motion. The motion passed unanimously.

2. Phil moved to approve the Horn Plumbing and Heating invoice #1424722 in the amount of $1,973.00. Walter seconded the motion. The motion passed unanimously.

Financial Reports

Jon Altshul provided the following written report:

In July, the Municipal Authority recorded $5,950 in revenues (from inter-fund transfers) and $8,198 in expenses, for a negative variance of $2,248. As of July 26th, the fund balance was $17,868. Walter commented that there is no payment to Big Fish included in the financial reports. Mark will find out how Big Fish is paid.

Liaison Reports

None

Goals

Kevin submitted the article for the Township Newsletter.

MA 8-12-19 draft — 3

New Business

  1. PCCS Permanent Sanitary metering – Mike provided a map proposing to install two permanent meters, one at Hibberd Lane and the other at Boot Road near the Blacksmith Shop. He explained where other meters were installed and how they monitor flows. They reviewed ultrasonic and laser and are recommending the ultrasonic. Make explained how it works with new manholes. He reviewed the quotes from OCF and TRACOM. A decision was tabled until the next meeting.
  2. Hershey's Mill Pump Station Generator replacement – Mike explained the need for a larger 60kw generator. The facility would have to be expanded so a survey is needed. Cost and installation were discussed. Walter moved to approve Pennoni's proposal for the Hershey's Mill generator replacement not to exceed $22,400.00. Phil seconded the motion. The motion passed unanimously.
  3. RCSTP Generator – Mike explained that a replacement in kind (48 hrs) will fit on the existing pad. $150,000 was budgeted for 72 hrs and expansion of the pad.

Any Other Matter

None

Adjournment

There being no further business, Jack moved to adjourn the meeting. Walter seconded the motion. The meeting was adjourned at 8:20. The next regular meeting will be held on Monday, September 9, 2019 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

MA 8-12-19 draft — 4

Pennoni — INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 876341
Invoice Date : 09/06/2019
Project : EGMAU19001
Project Name : 2019 General Services

For Services Rendered through: 8/11/2019

Prepared July Engineer's Report. Researched and provided contract operations information to the Township.

Permanent RCCS Metering: continued evaluation and vendor coordination for product alternatives and costs for new permanent metering within the Ridley Creek Collection System, and prepared and submitted summary & recommendations memo.

Hershey's Mill PS Generator: updated and submitted rendering of proposed generator as viewed from Hershey's Mill entrance (rendering scope was not part of HMPS generator design & permitting proposal).

Phase : **** -- Professional Services

Summary Amount
Total Phase : **** -- Professional Services — Labor : 4,979.00
Expense : 0.00
Phase Total : 4,979.00
Amount Due This Invoice $4,979.00
Fee : 27,000.00
Prior Billings : 10,633.75
Current Billings : 4,979.00
Total Billings : 15,612.75

OK [Signature]

Phase : **** -- Professional Services — Labor

Class Hours/Units Rate Amount
Authority Engineer 4.00 127.00 508.00
Senior Professional 5.00 121.00 605.00
Associate Professional 38.00 94.00 3,572.00
Engineering Technician 3.50 84.00 294.00
Labor Total: 50.50 4,979.00
Total Phase : **** -- Professional Services — Labor : $4,979.00
Expense : $0.00
Total Project : EGMAU19001 -- 2019 General Services — Labor : $4,979.00
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU19001 Invoice Summary
Invoice Date 9/6/2019

Project: EGMAU19001
Pennoni Job No.: 2019 General Services
Invoice No: 876341
Invoice Period: 7/15/2019 to 8/11/2019
Initial Authorization: $ 27,000.00 Date: 9/6/2019
Contract Amount: $ 27,000.00
Previously Invoiced: $ 10,633.75
Current Invoice: $ 4,979.00
Invoiced to Date ($): $ 15,612.75
Invoiced to Date (%): 58%
Remaining Budget ($): $ 11,387.25
Remaining Budget (%): 42%

Budget by Phase:

Phase Name: 2019 General Services
Phase Budget: $ 27,000.00
Previously Invoiced: $ 10,633.75
Current Invoice: $ 4,979.00
Invoiced to Date ($): $ 15,612.75
Invoiced to Date (%): 58%
Remaining Budget ($): $ 11,387.25
Remaining Budget (%): 42%

Comments: Prepared July Engineer's Report. Researched and provided contract operations information to the Township.

Permanent RCCS Metering: continued evaluation and vendor coordination for product alternatives and costs for new permanent metering within the Ridley Creek Collection System, and prepared and submitted summary & recommendations memo.

Hershey's Mill PS Generator: updated and submitted rendering of proposed generator as viewed from Hershey's Mill entrance (rendering scope was not part of HMPS generator design & permitting proposal).

Pennoni — INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 876342
Invoice Date : 09/06/2019
Project : EGMAU19004
Project Name : RCSTP Generator Replacement

OK [Signature]

For Services Rendered through: 8/11/2019

Evaluated existing and proposed generator load requirements and sizing for replacement generator; vendor coordination for fuel tank alternatives, sizing, and pricing; finalized and submitted memo with generator replacement recommendations and costs.

Phase : 01 -- Concept Design

Summary Amount
Total Phase : 01 -- Concept Design — Labor : 1,565.50
Expense : 0.00
Phase Total : 1,565.50
Amount Due This Invoice $1,565.50
Fee : 5,000.00
Prior Billings : 979.50
Current Billings : 1,565.50
Total Billings : 2,545.00

Phase : 01 -- Concept Design — Labor

Class Hours/Units Rate Amount
Authority Engineer 1.25 127.00 158.75
Senior Professional 0.75 121.00 90.75
Associate Professional 14.00 94.00 1,316.00
Labor Total: 16.00 1,565.50
Total Phase : 01 -- Concept Design — Labor : $1,565.50
Expense : $0.00
Total Project : EGMAU19004 -- RCSTP Generator Replacement — Labor : $1,565.50
Expense : $0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU19004 Invoice Summary
Invoice Date 9/6/2019

Project: EGMAU19004
Pennoni Job No.: RCSTP Generator Replacement
Invoice No: 876342
Invoice Period: 7/15/2019 to 8/11/2019
Initial Authorization: $ 5,000.00 Date: 9/6/2019
Contract Amount: $ 5,000.00
Previously Invoiced: $ 979.50
Current Invoice: $ 1,565.50
Invoiced to Date ($): $ 2,545.00
Invoiced to Date (%): 51%
Remaining Budget ($): $ 2,455.00
Remaining Budget (%): 49%

Budget by Phase:

Phase Name: RCSTP Generator Replacement
Phase Budget: $ 5,000.00
Previously Invoiced: $ 979.50
Current Invoice: $ 1,565.50
Invoiced to Date ($): $ 2,545.00
Invoiced to Date (%): 51%
Remaining Budget ($): $ 2,455.00
Remaining Budget (%): 49%

Comments: Evaluated existing and proposed generator load requirements and sizing for replacement generator; vendor coordination for fuel tank alternatives, sizing, and pricing; finalized and submitted memo with generator replacement recommendations and costs.

Pennoni — INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 876343
Invoice Date : 09/06/2019
Project : EGMAU19005
Project Name : HMPS Survey & Design for Generator

For Services Rendered through: 8/11/2019

Initiated site design work for replacement generator.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Survey $7,800.00 $0.00 0.00% $0.00 $0.00
02 -- Civil $5,800.00 $0.00 1.81% $104.71 $104.71
03 -- MEP $8,800.00 $0.00 0.00% $0.00 $0.00
Total : $22,400.00 $0.00 $104.71 $104.71

Amount Due This Invoice: $104.71

OK [Signature]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMAU19005 Invoice Summary
Invoice Date 9/6/2019

Project: EGMAU19005
Pennoni Job No.: HMPS Survey & Design for Generator
Invoice No: 876343
Invoice Period: NPT to 8/11/2019
Initial Authorization: $ 22,400.00 Date: 9/6/2019
Contract Amount: $ 22,400.00
Previously Invoiced: $ -
Current Invoice: $ 104.71
Invoiced to Date ($): $ 104.71
Invoiced to Date (%): 0%
Remaining Budget ($): $ 22,295.29
Remaining Budget (%): 100%

Budget by Phase:

Phase Name: HMPS Survey & Design for Generator
Phase Budget: $ 22,400.00
Previously Invoiced: $ -
Current Invoice: $ 104.71
Invoiced to Date ($): $ 104.71
Invoiced to Date (%): 0%
Remaining Budget ($): $ 22,295.29
Remaining Budget (%): 100%

Comments: nitiated site design work for replacement generator.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
Date: 08/09/2019
Client No: 6604-001M
Invoice No. 213818

General Authority Services

Fees

Date Timekeeper Description Hours Amount
07/05/2019 PMM Review and analyze meeting materials. 0.20
07/16/2019 PMM Email from J Altshul regarding letter for DEP for muffin monster purchase and grant. 0.20
07/18/2019 PMM Review and analyze materials from J Altshul for letter to DCED regarding muffin monster grant; Letter to B Ennis and J Altshul regarding local procurement process compliance; Email to J Altshul regarding same. 0.70
For Current Services Rendered 1.10 220.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna 1.10 $200.00 $220.00
Previous Balance $720.00
Total Current Charges 220.00
07/19/2019 Payment -460.00
07/25/2019 Payment -260.00
Total Payments -720.00
Balance Due $220.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA August Financial Report
Date: September 6, 2019

In August, the Municipal Authority recorded 33,154 in revenues (including $29,078 from the PA Small Water and Sewer Grant or 90% of the total cost of the Barkway Muffin Monster and $4,090 from transfers in) and $1,857 in expenses, for a positive variance of $31,297. As of July 26th, the fund balance was $49,166.

A complete list of YTD MA revenues and expenses is attached.

I have also attached the Municipal Authority pages from last year’s CIP. In anticipation of next year’s budget, I would also like to discuss the 2020 figures.

EAST GOSHEN TOWNSHIP
Other Funds
August 2019
Municipal Authority

Account TitleAcct #Annual BudgetY-T-D BudgetY-T-D ActualY-T-D VarianceM-T-D BudgetM-T-D ActualM-T-D Variance
REVENUE
INTEREST EARNINGS07341 1000(113.76)(113.76)(13.89)(13.89)
CAPITAL RESERVE-INTEREST07341 1010
INTEREST EARNED - CONSTRUCTION07341 1020
DCED GRANT07354 040032,30729,078.0029,078.0029,078.0029,078.00
C.C. TAPPING FEES07364 1100
R.C.TAPPING FEES07364 1110
M.C. LOAN PAYMENTS07364 1120
CONNECTION FEES - SEWER07364 1130845.64845.64
MISCELLANEOUS REVENUE07380 1000424.36424.36
TRANSFER FROM GENERAL ACCT07392 0100
TRANSFER FROM SEWER OPERATING07392 0500311,118155,559218,481.3062,922.303,987.503,987.50
TRANSFER FROM SEWER CAP RESV07392 0501357,000
TRANSFER-ANNUAL CAP.RESERVE07392 0510
GRANT REVENUE07392 0800
LOAN PROCEEDS - SEWER PROJECT07392 0804
TRANSFER FROM SEWER CAP RESERVE07392 090017,802.4717,802.47102.25102.25
TOTAL REVENUE700,425155,559266,518.01110,959.0133,153.8633,153.86
EXPENSES
ADMINISTRATIVE WAGES07424 140032,00016,00015,175.18824.82
R.C. LOAN ISSUANCE COSTS07424 1500
MISCELLANEOUS EXPENSE07424 30002,2621,508634.00874.00188188.00
MUNIC.AUTH.-AUDITING07424 31109,6639,6639,650.0013.00
ENGINEERING SERVICES07424 313070,00046,66631,191.5015,474.505,8331,534.504,298.50
LEGAL SERVICES07424 31408,0005,3402,920.002,420.00670220.00450.00
W.G. C.C.STP-UPGRADE07424 7400
MANHOLE COVER REPLACEMENTS07424 7405
C.C. CAPITAL - METERS07424 7410
C.C. CAPITAL- COLLECTION07424 7420
C.C. CAPITAL- INTERCEPTOR07424 7430
CAPITAL PROJ.-ENGINEERING07424 7431
R.C. CAPITAL-STP07424 744015,776.22(15,776.22)
R.C. CAPITAL - COLLECTION07424 7450
R.C.-CAP. PROJ.-ENGINEER07424 7451
CAP.REPLACEMENT R.C.07424 7490
CAPITAL REPLACEMENT ASHBRIDGE07424 7491
HERSHEY MILL STATION - ENGINEER07426 10004,986.25(4,986.25)
HERSHEY MILL STATION - CONSTRUCTION07426 2000
TALLMADGE DRIVE07426 3000102,660.00(102,660.00)

PAGE 9

Report Date 1908 09/06/19 8 : 48 AM

EAST GOSHEN TOWNSHIP
Other Funds
August 2019
Municipal Authority

Account TitleAcct #Annual BudgetY-T-D BudgetY-T-D ActualY-T-D VarianceM-T-D BudgetM-T-D ActualM-T-D Variance
RESERVOIR PUMP STATION - ENGINEER07428 1000
RESERVOIR PUMP STATION CONSTRUCTION07428 2000
RELINING07429 1500130,00065,00065,000.00
BARKWAY PUMP STATION CAPITAL07429 150167,00033,50059,302.71(25,802.71)
HERSHEYS MILL PUMP STATION CAPITAL07429 1503125,00062,50062,500.00
HUNT CO PUMP STATION CAPITAL07429 150487,00043,50043,500.00
RCSTP CAPITAL07429 1505169,50084,750979.5083,770.50102.25(102.25)
ASBESTOS CONCRETE ENGINEERING07429 3130
DIVERSION PROJ.- LEGAL07429 3166
WEST GOSHEN CAPITAL07429 6100
M.C.-DVRFA-DEBT SERVICE07471 1000
M.A.-R.C. DEBT SERVICE07471 1010
DVRFA PUMPING STATIONS - PRINCIPAL07471 2000
M.C.-DVRFA-INTEREST PAYMN07472 1000
M.A.-R.C. INTEREST07472 1010
DVRFA PUMPING STATIONS - INTEREST07472 2000
TRANSFER TO GENERAL FUND07492 0100
TRANSFER TO SEW.OPERATING07492 0500
TRF TO SEWER SINKING FUND07492 0550
TRANSFER TO AUTHORITY CAP FUND07492 0990
TOTAL EXPENSES700,425368,427243,275.36125,151.646,6911,856.754,834.25
NET RESULT FROM OPERATIONS(212,868)23,242.65236,110.65(6,691)31,297.1137,988.11

PAGE 10

Report Date 1908 09/06/19 8 : 48 AM

2019 YTD Municipal Authority Transactions through August 31st

Account #DescriptionPerDebitsCreditsDateNameDescriptionDescription 3
07341-1000BEGINNING BALANCE
07341-1000INTEREST EARNINGS19011501/4/2019REIMBURSE S/R FOR DEC.2018BANK FEES
07341-1000INTEREST EARNINGS190101.062/4/2019INTEREST EARNED JANUARY 20197100.1035
07341-1000INTEREST EARNINGS19021502/4/2019REIMBURSE S/R FOR JANUARY 2019BANK FEES
07341-1000INTEREST EARNINGS190200.663/4/2019INTEREST EARNED FEB.20197100.1035
07341-1000INTEREST EARNINGS190300.623/31/2019INTEREST EARNED MARCH 20197100.1035
07341-1000INTEREST EARNINGS19041504/3/2019REIMBURSE S/R FOR MARCH 2019BANK FEES
07341-1000INTEREST EARNINGS190400.644/30/2019INTEREST EARNED APRIL 20197100.1035
07341-1000INTEREST EARNINGS19051505/3/2019REIMBURSE S/R FOR APRIL 2019BANK FEES
07341-1000INTEREST EARNINGS19051505/6/2019REIMBURSE S/R FOR FEB.2019BANK FEES
07341-1000INTEREST EARNINGS190500.666/4/2019INTEREST EARNED MAY 2019 07FUND
07341-1000INTEREST EARNINGS19061506/4/2019REIMBURSE S/R FOR MAY 2019BANK FEES
07341-1000INTEREST EARNINGS190600.866/30/2019INTEREST EARNED JUNE 2019 07FUND
07341-1000INTEREST EARNINGS19071507/1/2019REIMBURSE S/R FOR BANK FEESJun-19
07341-1000INTEREST EARNINGS190700.637/31/2019INTEREST EARNED JULY 20197100.1035
07341-1000INTEREST EARNINGS19081508/2/2019REIMBURSE S/R FOR JULY 2019BANK FEES
07341-1000INTEREST EARNINGS190801.119/3/2019INTEREST EARNED AUGUST 20197100.1035
07341-1000INTEREST EARNINGS19091509/3/2019REIMBURSE S/R FOR AUGUST 2019BANK FEES
07354-0400BEGINNING BALANCE
07354-0400DCED GRANT19080290788/9/2019WATER & SEWER GRANTDCED GRANT
07364-1130BEGINNING BALANCE
07364-1130CONNECTION FEES - SEWER190104231/30/2019STOFFLET, MICHAEL
07364-1130CONNECTION FEES - SEWER190204232/11/2019JACOBS, ROBERT & CHERYL
07364-1130CONNECTION FEES - SEWER190204232/19/2019GEORGE SMITH & CHRISTINA CONLE
07364-1130CONNECTION FEES - SEWER1902141.1202/1/2019ANNUAL PINE ROCK - INTERESTPMT - STOFFLET
07364-1130CONNECTION FEES - SEWER1902141.1202/11/2019ANNUAL PINE ROCK INTEREST PMTJACOBS
07364-1130CONNECTION FEES - SEWER1902141.1202/19/2019ANNUAL PINE ROCK INSTALLMENTRC210
07380-1000BEGINNING BALANCE
07380-1000MISCELLANEOUS REVENUE19020141.122/1/2019ANNUAL PINE ROCK - INTERESTPMT - STOFFLET
07380-1000MISCELLANEOUS REVENUE19020141.122/11/2019ANNUAL PINE ROCK INTEREST PMTJACOBS
07380-1000MISCELLANEOUS REVENUE19020141.122/19/2019ANNUAL PINE ROCK INSTALLMENTRC210
07380-1000MISCELLANEOUS REVENUE1902012/19/2019SALE OF GENERATOR TO BEALE TWPMISCELLANEOUS REVENUE
07392-0500BEGINNING BALANCE
07392-0500TRANSFER FROM SEWER OPERA1901057399.611/15/2019XFER FR: SEWER TO MA 1/15/19
07392-0500TRANSFER FROM SEWER OPERA1902034587.62/15/2019XFER FROM SEWER 05 TO MA 07
07392-0500TRANSFER FROM SEWER OPERA1903012508.883/14/2019XFER $ FROM 05 TO MA 07 TOCOVER EXPENSES
07392-0500TRANSFER FROM SEWER OPERA1904038312.194/10/2019XFER TO 07 FROM 05 4/10/19
07392-0500TRANSFER FROM SEWER OPERA190508789.275/16/2019XFER $ FROM 05100.1030 TO MA7100.1035
07392-0500TRANSFER FROM SEWER OPERA19060582656/17/2019XFER $ FROM SEWER TO MA
07392-0500TRANSFER FROM SEWER OPERA190704631.257/16/2019XFER $ FROM SEWER TO MA7/16/2019
07392-0500TRANSFER FROM SEWER OPERA190803987.58/13/2019XFER $ FROM 05100.1030 & 09100.1035 TO MA 07100.1035
07392-0900BEGINNING BALANCE
07392-0900TRANSFER FROM SEWER CAP R1901012132.221/15/2019XFER FROM SEWER SINKING TO MA1/15/2019
07392-0900TRANSFER FROM SEWER CAP R1902021612/15/2019XFER FROM SEWER CAPITAL 09 TOMA 07
07392-0900TRANSFER FROM SEWER CAP R190301729.753/14/2019XFER $ FROM SEWER SINKING TOMA 07 TO COVER EXPENSES
07392-0900TRANSFER FROM SEWER CAP R1905037.755/16/2019XFER $ TO MA 7100.1035 FROM9100.1035
07392-0900TRANSFER FROM SEWER CAP R19060305.56/17/2019XFER $ FR: SEWER SINKING TO MA
07392-0900TRANSFER FROM SEWER CAP R1907013347/16/2019XFER FROM SEWER SINKING TO MA7/16/2019
07392-0900TRANSFER FROM SEWER CAP R19080102.258/13/2019XFER $ FROM 05100.1030 & 09100.1035 TO MA 07100.1035
07424-1400BEGINNING BALANCE
07424-1400ADMINISTRATIVE WAGES19037587.5903/25/2019EAST GOSHEN TOWNSHIP - GENERALQTR.1-2019 REIMBURSEMENT - MA
07424-1400ADMINISTRATIVE WAGES19067587.5906/28/2019EAST GOSHEN TOWNSHIP - GENERALQTR.2 2019 REIMBURSEMENT - MA
07424-3000BEGINNING BALANCE
07424-3000MISCELLANEOUS EXPENSE1901801/15/2019PMAAPA MUNICIPAL AUTH.- PROUD HISTORY " - BRIGHT F
07424-3000MISCELLANEOUS EXPENSE1902802/14/2019YAHRAES, JOHN E.REIMBURSEMENT - PROUD HISTORY..." PUBLICATI
07424-3000MISCELLANEOUS EXPENSE1902-802/14/2019YAHRAES, JOHN E.VOID CK. 3148
07424-3000MISCELLANEOUS EXPENSE190562605/16/2019DELAWARE RIVER BASIN COMMISSIONANNUAL FEE D-2000-030 CP WASTE WATER DIS
07424-3110BEGINNING BALANCE
07424-3110MUNIC.AUTH.-AUDITING1903700703/25/2019MAILLIE FALCONIERO & CO.2018 FINANCIAL STMT. - MUNICIPAL AUTHORIT
07424-3110MUNIC.AUTH.-AUDITING1905264305/20/2019MAILLIE FALCONIERO & CO.EXAM. MUNIC.AUTH. 2018 FINANCIAL STATEMEN
07424-3130BEGINNING BALANCE
07424-3130ENGINEERING SERVICES1901486401/15/2019PENNONI ASSOCIATES INC.SERV. THRU 12/30/18 2018 I&I SUPPT.
07424-3130ENGINEERING SERVICES1902517002/15/2019PENNONI ASSOCIATES INC.SERVICE THRU 1/27/19 CHAP.94
07424-3130ENGINEERING SERVICES1903605503/14/2019PENNONI ASSOCIATES INC.SERVICE THRU 2/24/19 2019 GEN.SERV
07424-3130ENGINEERING SERVICES19042875.2504/10/2019PENNONI ASSOCIATES INC.SERVICES THRU 3/17/19 2019 GENERAL
07424-3130ENGINEERING SERVICES1905559605/15/2019PENNONI ASSOCIATES INC.SERVICES THRU 4/14/19 2019 GEN.SERV
07424-3130ENGINEERING SERVICES1906925.506/17/2019PENNONI ASSOCIATES INC.SERV.THRU 5/12/19 2019 GEN.SERVICE
07424-3130ENGINEERING SERVICES19074171.2507/16/2019PENNONI ASSOCIATES INC.SERVICE THRU 6/17/19 - 2019 I&I SUPPORT
07424-3130ENGINEERING SERVICES19081534.508/13/2019PENNONI ASSOCIATES INC.SERVICE THRU 7/14/19 2019 GEN.SERV.
07424-3140BEGINNING BALANCE
07424-3140LEGAL SERVICES190144001/15/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERV. 12/7-12/28/18 GEN.AUTH.
07424-3140LEGAL SERVICES190262002/15/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE 1/2-1/14/19 GEN.AUTH
07424-3140LEGAL SERVICES190326003/14/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICES - FEB.2019 GEN.AUTH.
07424-3140LEGAL SERVICES190426004/18/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE MARCH 2019 - GEN.AUTH
07424-3140LEGAL SERVICES190540005/15/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE - 4/2019 GEN.SERVICE
07424-3140LEGAL SERVICES190746007/16/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE 5/13/19
07424-3140LEGAL SERVICES190726007/22/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE 6/10/19 GEN.AUTHORITY
07424-3140LEGAL SERVICES190822008/13/2019GAWTHROP GREENWOOD & HALSTEDLEGAL SERVICE - JULY 2019 GEN.AUTH.
07424-7440BEGINNING BALANCE
07424-7440R.C. CAPITAL-STP190111830.7201/15/2019JWC ENVIRONMENTALSCREEN REPLACEMENT
07424-7440R.C. CAPITAL-STP19051972.505/20/2019HORN PLUMBING & HEATING INC50% DEPOSIT - MINI SPLIT HVAC UNIT
07424-7440R.C. CAPITAL-STP1907197307/3/2019HORN PLUMBING & HEATING INCFINAL 50% MINI SPLIT HVAC UNIT
07426-1000BEGINNING BALANCE
07426-1000HERSHEY MILL STATION - ENGIN1901301.501/15/2019PENNONI ASSOCIATES INC.SERV. 1/5/19 THRU 12/30/18 HERSHEY MILL GENERATC
07426-1000HERSHEY MILL STATION - ENGIN1902216102/15/2019PENNONI ASSOCIATES INC.SERVICE THRU 1/27/19 H.M.GENERATOR
07426-1000HERSHEY MILL STATION - ENGIN19031729.7503/14/2019PENNONI ASSOCIATES INC.SERVICE THRU 2/24/19 HM GENERATOR
07426-1000HERSHEY MILL STATION - ENGIN190531.7505/15/2019PENNONI ASSOCIATES INC.SERVICES THRU 4/14/19 HM GENERATOR
07426-1000HERSHEY MILL STATION - ENGIN1906305.506/17/2019PENNONI ASSOCIATES INC.SERV. THRU 5/12/19 H.M. GENERATOR
07426-1000HERSHEY MILL STATION - ENGIN1907456.7507/16/2019PENNONI ASSOCIATES INC.SERV. THRU 6/17/19 - H.M.GENERATOR
07426-3000BEGINNING BALANCE
07426-3000TALLMADGE DRIVE190142431.401/15/2019IRON EAGLE EXCAVATING INC.EXCAVATING - TALLMADGE DR. SEWER REPLACEM
07426-3000TALLMADGE DRIVE1901908201/15/2019PENNONI ASSOCIATES INC.SERV.THRU 12/30/18 TALLMADGE DR.
07426-3000TALLMADGE DRIVE19024578.2502/15/2019PENNONI ASSOCIATES INC.SERVICE THRU 1/27/19 TALLMADGE
07426-3000TALLMADGE DRIVE190221326.402/15/2019IRON EAGLE EXCAVATING INC.SANITARY SEWER BYPASS PUMPING & FLO CONTROL, SEWER LATERAL & GRAVITY PIPE
07426-3000TALLMADGE DRIVE19032949.2503/14/2019PENNONI ASSOCIATES INC.SERVICE THRU 2/24/19 TALLMDG SEWER
07426-3000TALLMADGE DRIVE190420403.704/10/2019IRON EAGLE EXCAVATING INC.EXCAVATING - TALLMADGE DR. SEWER REPLACEM
07426-3000TALLMADGE DRIVE1904141.2504/10/2019PENNONI ASSOCIATES INC.SERVICES THRU 3/17/19 TALLMADGE SEWER
07426-3000TALLMADGE DRIVE19051647.7505/15/2019PENNONI ASSOCIATES INC.SERVICES THRU 4/14/19 TALLMADGE DR.
07429-1501BEGINNING BALANCE
07429-1501BARKWAY PUMP STATION CAPI1901582.2101/15/2019PENNONI ASSOCIATES INC.SERVICE THRU 12/30/18 BARKWAY PS MM
07429-1501BARKWAY PUMP STATION CAPI19022793.4502/15/2019PENNONI ASSOCIATES INC.SERVICE THRU 1/27/19 BARKWY MUF.MON
07429-1501BARKWAY PUMP STATION CAPI19032386.1303/14/2019PENNONI ASSOCIATES INC.SERVICE THRU 2/24/19 BARKWAY PS
Account #DescriptionPerDebitsCreditsDateNameDescriptionDescription 3
07429-1501BARKWAY PUMP STATION CAPI1904297.404/10/2019PENNONI ASSOCIATES INC.SERVICES THRU 3/17/19 BARKWAY PSMUFFIN M
07429-1501BARKWAY PUMP STATION CAPI1905519.5205/15/2019PENNONI ASSOCIATES INC.SERVICES THRU 4/14/19 BARKWY PS MUF
07429-1501BARKWAY PUMP STATION CAPI19065272406/17/2019JWC ENVIRONMENTALMUFFIN MONSTER
07429-1505BEGINNING BALANCE
07429-1505RCSTP CAPITAL1907877.2507/16/2019PENNONI ASSOCIATES INC.SERV.THRU 6/17/19 - RCSTP GENERATOR
07429-1505RCSTP CAPITAL1908102.2508/13/2019PENNONI ASSOCIATES INC.SERV.THRU 7/14/19 RCSTP GENERATORREPLACEM

2019-2023 Capital Improvement Program

Sewer & Municipal Authority
(Except West Goshen Upgrades)

Preserving the Past
Serving the Present
Protecting the Future

Category20192020202120222023
Sewer Camera with Trailer (R & Sewer Cap Resv Fund)$100,000--
Hershey's Mill P/S Generator (R)$125,000--
Hunt Country P/S Mag Meter (R)$15,000--
Hunt Country Muffin Monster (R)$67,000
Ridley Creek STP Generator (R)$150,000
Relining AC sewer lines and brick man holes (N)$130,000$130,000$130,000$130,000$130,000
Barkway P/S Muffin Monster (N & grants/Whitelands)$67,000
Hunt Country P/S Bypass Pump (N)$5,000
Ridley Creek Flow Meter (N)$12,000$12,000
Ridley Creek STP Air Spacer (N)$7,500--
Ridley Creek Caustic Soda Project (N)$160,000
Ridley Creek SBR Tank Lining (N)$61,000$61,000$61,000
Total Sewer Capital$678,500$302,000$191,000$191,000$191,000
Municipal Authority$578,500$302,000$191,000$191,000$191,000
Sewer Capital Reserve Fund$100,000

(R=replacement; N=new)

11/13/18

[Seal]

11

2019-2023 Capital Improvement Program

Sewer & Municipal Authority
(Except West Goshen Upgrades)

Preserving the Past
Serving the Present
Protecting the Future

Justification for New Assets

  • Relining brick manholes and asbestos cement sewer lines was identified three years ago as a long term maintenance priority for pre-mid-1970s sewer assets, which are at the end of their useful life.
  • Muffin Monster and Safety-Related improvements at Barkway Pump Station will address safety and pump efficiency concerns at this pump station, which has a 20 foot drop from ground level. About 60% of these costs are borne by East and West Whiteland. In addition, the Municipal Authority received a DCED grant for $32,307 for this project.
  • New flow meter along Line Road connecting to the Ridley Creek STP will allow us to measure I&I in that system. Currently, the only RC flow meters are at the plant.
  • Sequence Batch Reactor Tank Lining (4 total, 2021-2024) project reflects recoating hairline fractures in tanks from water line to top of tanks. These costs are substantially lower than was anticipated last year, as there is no damage below the water line.
  • Ridley Creek STP Air Splitter for control room to prevent overheating & equipment damage
  • Ridley Creek Caustic Soda project to improve worker safety and efficiency at the plant. Currently, caustic soda is manually poured into tanks.
  • Hunt Country Pump Station Bypass Pump Connection needed to allow for bypass pumping.

11/13/18

[Seal]

12

Sue Smith

From: Michael Ellis <MEllis@Pennoni.com>
Sent: Friday, September 6, 2019 10:25 AM
To: Sue Smith; Mark Miller; Rick Smith; Jon Altshul
Cc: Ruth Kiefer; Nathan M. Cline
Subject: Engineers Report
Attachments: Engineers Report 2019-09-06.pdf; Engineers Report 2019-09-06.docx

Hi All,

Our Engineer’s Report is attached in both PDF and Word formats. Invoices to follow.

Mark and I discussed including placeholder for the following items under Old Business if possible:

  • Purchase RCSTP replacement generator
  • Purchase HMPS replacement generator (conditional approval subject to floodplain analysis not changing the generator specs)
  • Purchase 2 permanent metering manholes and meters for the Ridley Creek Collection System

The generator vendor had committed to provide formal quotes for the RCSTP and HMPS replacement generators by Wednesday, but we have not received yet. I notified them that we need them today. Upon receipt, I can forward them via email to the Township and MA members.

We expected the updated permanent metering quotes by now also, but the vendor has requested a conference call later this morning to discuss some questions they have. I am hopeful they will provide updated quotes by Monday morning that I can forward to the Township and MA members.

Mike

Michael Ellis, PE
Municipal Division Manager

Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com

Pennoni
PARTNERS FOR WHAT'S POSSIBLE

What are Smart Solutions?
Smart Solutions are for everyone

1

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

FYI

September 5, 2019

Dear Property Owner:

The purpose of this letter is to inform you that the East Goshen Township Board of Supervisors will consider a Deed of Consolidation for two parcels owned by William and Evelyn Howard at 250 Line Rd. Malvern, PA 19355, at their meeting on September 17, 2019. The property owners are requesting approval to consolidate two parcels they own (UPI 53-5-16 and UPI 53-5-16.1). One of the parcels is improved with a single family home the other is a vacant parcel with no improvements.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when requests like this are received. The meeting date when this matter will be discussed and possibly approved is listed below and subject to change without further written notice:

September 17, 2019 – Board of Supervisors (7:00 PM)

This meeting will be held at the Township Administration Building and is open to the public. The Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.

Sincerely,

[Signature]

Mark A. Gordon
Township Zoning Officer

Cc: Sally Slook, Township Manager, Willistown Township

Would you like more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the “E-notification & Emergency Alert” button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones informed and safe during emergencies. Visit www.readychesco.org to sign up today!

F:\Data\Shared Data\Property Management\53-5\53-5-16 (250 Line Rd)\Deed of Consolidation\1000 foot letter re. consolidation 09052019.doc

FYI

CARLISLE

DEP issues notice about fish kill

Borough receives notice of violation in connection with contractor

TAMMIE GITT
The Sentinel

Styrene found in LeTort Spring Run in the area of a July 31 fish kill in North Middleton Township has raised questions about the safety of the process being used to rehabilitate sewer pipes in the Carlisle area.

pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

A notice of violation issued to the Borough of Carlisle by the Pennsylvania Department of Environmental Protection as a result of its investigation into the fish kill that happened near the Carlisle Barracks shows that styrene, a chemical, was found in three of five water samples taken from locations near the fish kill.

According to the notice, a contractor for the borough worked at a site about 50 feet upstream from the observed fish kill in the 600 block of Letort Lane in a channelized portion of the LeTort Spring Run to Post Road. The contractor used a process known as cure-in-place pipe (CIPP) installation as part of the rehabilitation project.

Carlisle Borough awarded a $8,245,274 contract for the Letort Interceptor Rehabilitation Project, which rehabilitates sewer pipes in that area, to Ric-Man Construction Florida Inc. of Deerfield Beach, Florida in July 2018.

Process

According to the CIPP Solutions Group, which recently

Please see DEP, Page A2

“Be assured, that the borough will plan to issue a public statement once the investigation has concluded, however it is too premature to do so at this time.”
Carlisle Borough Manager Susan Armstrong

DEP

From A1

completed a three-year study into the process, CIPP involves the chemical manufacture of new plastic pipe inside an existing pipe.

The process requires the handling of raw chemicals onsite but has the advantage of creating new plastic pipe without digging up the old one and it can be less expensive than other areas, according to the group's website.

In addition, the DEP investigation found an “unpermitted discharge of raw sewage” coming from a portable pump house that flowed onto the ground and into a channelized portion of LeTort Spring Run. The pump station was also used by the contractors.

According to the DEP notice to Carlisle, a release of pollution subjects the borough to “appropriate enforcement action.”

The borough has been asked to submit a written report of its own investigation into the incident, including the circumstances leading to the incident and the borough's role in the oversight of the project within 15 days.

Borough response

Carlisle Borough Manager Susan Armstrong said the borough continues to work with the DEP on the investigation of the incident and to provide the information requested.

“Be assured, that the Borough will plan to issue a public statement once the investigation has concluded, however it is too premature to do so at this time,” she wrote in an email.

The notice is not a final action from the DEP, which could yet determine if an enforcement action is appropriate.

The Pennsylvania Fish and Boat Commission is also investigating the incident.

“At this point, the PFBC and DEP investigations into the incident are separate and ours remains ongoing,” said Mike Parker, spokesman for the Pennsylvania Fish and Boat Commission, in an email to The Sentinel.

That styrene was found in close proximity to a site using the CIPP process is not surprising to Andrew J. Whelton, professor at Purdue University's Lyles School of Civil Engineering and Division of Environmental and Ecological Engineering. Whelton is a member of the team producing the study on CIPP.

“It's pretty typical that chemicals are released into the environment during this activity,” he said, noting that styrene is not the only chemical used or released.

Chemical release is not the only concern, Whelton said. If the contractor cut the pipe after they created it, the particles could get into the air, fall back into the stream and sink to the bottom.

It can take time for the stream to recover from a contamination. Whelton said a site his group tested in New York recently had contamination above state water quality standards after 22 days.

“It's not lining a pipe. It's manufacturing plastic outdoors with little environmental controls,” Whelton said.

Email Tammie at tgitt@cumberlink.com. Follow her on Twitter @TammieGitt.

FYI

[Signature] Rick