Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 10, 2020
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer's Report.; Big Fish Environmental Report
- APPROVAL OF MINUTES January 13, 2020
- APPROVAL OF INVOICES Pennoni Invoice #1010641 $ 429.00 Pennoni Invoice #1010660 $ 464.25 Pennoni Invoice #1010885 $ 1,390.67 Gawthrop Invoice #219667 $ 558.05 pd 1/16/20 Evoqua #904274789 $ 10,984.60 pd 1/15/20
- LIAISON REPORTS
- FINANCIAL REPORTS January Financial Report
- OLD BUSINESS
- GOALS
F:\Data\Shared Data\Agendas\Municipal Authority\2020\2-10-2020.doc
- Continue to monitor the upgrades at West Goshen Sewer Plant. Members have been attending meetings.
- Continue to implement the I&I Plan – on-going
- Continue to run the plant to DEP permit requirements
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2020\2-10-2020.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 3, 2020
To: Municipal Authority
From: Mark Miller
Re: January 2020 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 791,000 per day.
Meters: The meters were read on a daily basis, as well as the portable meters.
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. The wet wells were cleaned, pressure wasted and vacuumed out. All the generators were serviced by out generator contractor. We inspected our lines that run along the streams for any signs of INI.
R.C. Collection: The stations were visited and the wet wells were cleaned. We inspected the lines along the streams, we found a 6” clean out broken off and taking in water. The cleanout was repaired and a casting was installed over it for protection. We also raised a manhole and casting along the stream.
R.C. Plant: Public Works performed routine maintenance at the plant. The grit chamber as part of the routine maintenance.
Alarms: We responded to 20 alarms for January.
PA One Calls: We responded to over 50 PA One Calls for the month of January.
Monthly Rainfall: 3.83 inches for the month of January.
Lateral Caps: We replaced 24 lateral caps.
On January 22, 2020 we started the excavation and installation of the Muffin Monster. Once we dug down to the pipe we hit solid rock, trench shoring was built prior to anyone entering the hole. The crew jackhammered a foot of the rock so we were able to get a layer of stone under the manhole.
We set the manhole and we than poured 2 yards of concrete around the exterior. Conduit was laid for the hydraulic hose lines. The motor and controls were installed in the building. The hole was backfilled, seeded and straw was laid down for soil and erosion. The job was completed Thursday 24th.
[Photograph of excavation pit with excavator arm digging down to exposed pipe in rocky soil]
14' x 15' deep.
Excavation
We hit rock.
[Photograph of four workers in a shored trench box placing stone bedding around exposed pipe]
Stone bedding
[Photograph of tall fiberglass Muffin Monster manhole structure on a flatbed trailer being prepared for hoisting by workers]
Muffin Monster
manhole
[Photograph of crane lowering the cylindrical manhole (labeled "OUTLET") into the shored trench as workers guide it into place]
Setting Manhole
[Photograph of workers in trench box connecting piping to the base of the installed manhole]
Connecting
Manhole
[Photograph of concrete chute pouring wet concrete around the base of the installed manhole in the trench]
Concrete around
manhole
[Photograph of backfilled ground showing installed manhole cover flush with grade, utility marking flags, CAT excavator in the background, and pump station building structure on the right]
[Photograph of interior equipment showing Muffin Monster control panel mounted on unistrut framing above a Parker H-PAK hydraulic power unit and pump motor]
Control installation
[Photograph of restored site area covered with straw for soil erosion control around the installed manhole outside the building]
Project Restored
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
February 7, 2020
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
Generator Replacement – We reviewed the generator equipment submittal and did not have any comments. The generator is currently being fabricated. We will provide a design of the concrete pad expansion for construction by Public Works prior to generator delivery.
Barkway Pump Station Grinder
- We provided construction office support during Public Works’ installation of the Muffin Monster.
Tallmadge Drive Sewer Main Replacement
- The 2-year maintenance bond period ends March 21, 2021.
I&I Support and Reporting
- No activity since our last report. We will perform an analysis of I&I in calendar year 2019 as part of the upcoming Chapter 94 Reports.
Hershey’s Mill Pump Station Generator Replacement
- We reviewed the generator equipment submittal and did not have any comments. The generator is currently being fabricated. We are finalizing design plans that will be submitted the week of February 10 for use by the Public Works Dept for construction.
Permanent Flow Meter Manholes
- No activity since our last report. The two permanent flow meter manholes and equipment are planned to be constructed in 2020 by Public Works. We will obtain new vendor cost quotations once a timeframe for construction is determined.
Chapter 94 Reports
- We initiated preparation of the 2019 Chapter 94 Reports.
New Connections
- No activity since our last report.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations
Report:
February 2020
Executive Summary
The Ridley Creek sewage treatment plant outfalls 001 and 002 achieved compliance with the permit discharge limitations for the month of December 2019, with an exception of the weekly TSS maximum for December 16th. This sample result is believed to be in error and not consistent with plant data and observations. Discharge to the Apple brook irrigation lagoon remains off line. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for the December 2019 DMR.
Table 1
December 2019- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total, mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| December 3, 2019 | 0.345 | 2.3 | 5.2 | 2 | 5.8 | 0.297 | 0.85 | 0.20 | 0.58 | 16 | 1.2041 |
| December 6, 2019 | 0.365 | 2 | 6.1 | 0.14 | 0.43 | ||||||
| December 10, 2019 | 0.368 | 2.9 | 6.0 | 4 | 12.3 | 0.158 | 0.48 | 0.29 | 0.89 | 1 | 0.0000 |
| December 13, 2019 | 0.341 | 1 | 2.8 | ||||||||
| December 17, 2019 | 0.455 | 4.4 | 8.2 | 16 | 60.7 | 0.143 | 0.54 | 0.10 | 0.38 | 1 | 0.0000 |
| December 24, 2019 | 0.470 | 3.2 | 7.1 | 4 | 15.7 | 0.533 | 2.09 | 0.20 | 0.78 | 1 | 0.0000 |
| December 31, 2019 | 0.359 | 3.1 | 6.1 | 9 | 26.9 | 0.663 | 1.99 | 0.33 | 0.99 | ||
| Average | 0.428 | 3.6 | 7.1 | 9.7 | 34.4 | 0.446 | 1.54 | 0.21 | 0.72 | 5 | 0.3010 |
| Minimum | 0.359 | 3.1 | 6.1 | 4.0 | 15.7 | 0.143 | 0.54 | 0.10 | 0.38 | 1 | 0.0000 |
| Maximum | 0.470 | 4.4 | 8.2 | 16.0 | 60.7 | 0.663 | 2.09 | 0.33 | 0.99 | 1 | 0.0000 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations
Report:
February 2020
The biological treatment process performed well during December. The TSS sample collected on January 16th was reported at 16 mg/L. This result is not consistent with the on-site data measuring the TSS in the range of 0 to 5 mg/L. There have been ongoing issues with the current contract laboratory resulting in compliance issues.
Discharge to the Applebrook irrigation lagoon, outfall 002 remains offline.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentration and organic loading values. The monthly average daily concentrations were observed to be less than the design parameters for the treatment process.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2019.
Table 2
December 2019 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| December 3, 2019 | 0.3765 | 642 | 2,016 | 500 | 1,570 | 48.2 | 151 | 75.3 | 236 | 10.2 | 32.0 |
| December 10, 2019 | 0.4081 | 143 | 487 | 114 | 388 | 30.2 | 103 | 38.4 | 131 | 4.7 | 16.0 |
| December 17, 2019 | 0.4946 | 276 | 1,138 | 130 | 536 | 39.6 | 163 | 39.6 | 163 | 4.5 | 18.6 |
| December 24, 2019 | 0.5487 | 161.0 | 737 | 206 | 943 | 27.5 | 126 | 33.8 | 155 | 4.1 | 18.8 |
| December 31, 2019 | 0.4051 | 181 | 612 | 480 | 1,622 | 29.4 | 99 | 5.8 | 20 | 5.8 | 19.6 |
| Average | 0.4466 | 281 | 998 | 286 | 1012 | 35.0 | 129 | 38.580 | 141 | 5.9 | 21.0 |
| Minimum | 0.3765 | 143 | 487 | 114 | 388 | 27.5 | 99 | 5.800 | 20 | 4.1 | 16.0 |
| Maximum | 0.5487 | 642 | 2016 | 500 | 1622 | 48.2 | 163 | 75.300 | 236 | 10.2 | 32.0 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
February 2020
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during December and January.
Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing. Table 3 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the January 2020 DMR. The plant is anticipated to achieve compliance with the NPDES permit discharge limitations.
Table 3
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total, mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| 40 | 42 | ||||||||||
| Sample Date | |||||||||||
| January 7, 2020 | 0.406 | 4.1 | 7.5 | 4 | 13.5 | 0.221 | 0.75 | 0.15 | 0.51 | 1 | 0.0000 |
| January 14, 2020 | 0.345 | 2 | 4.9 | 5 | 14.4 | 0.190 | 0.55 | 0.20 | 0.58 | 1 | 0.0000 |
| January 17, 2020 | 0.255 | 2 | 4.3 | ||||||||
| January 21, 2020 | 0.35 | 2 | 4.9 | 3 | 8.8 | 0.236 | 0.69 | 0.11 | 0.32 | 1 | 0.0000 |
| January 24, 2020 | 0.307 | 2 | 5.1 | ||||||||
| January 28, 2020 | 0.387 | 0.15 | 0.48 | ||||||||
| Average | 0.342 | 2.7 | 5.76 | 3 | 9.21 | 0.22 | 0.66 | 0.153 | 0.47 | 1 | 0.0000 |
| Minimum | 0.255 | 2.0 | 4.88 | 2 | 4.25 | 0.19 | 0.55 | 0.110 | 0.32 | 1 | 0.0000 |
| Maximum | 0.406 | 4.1 | 7.49 | 5 | 14.39 | 0.24 | 0.75 | 0.200 | 0.58 | 1 | 0.0000 |
The foam on the SBR surface remains at 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. Increased sludge wasting has been implemented to assist to lower the F:M ratio and assist with foam management. This operation strategy to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 7.0 mg/L has been demonstrated to be effective.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
February 2020
The aluminum sulfate solution feed rate remains slightly elevated to ensure compliance with the NPDES permit required an additional order of chemicals. The total phosphorus concentrations for the month of January 2020 achieved compliance with a monthly average of 0.15 mg/L and maximum monthly concentration of 0.20 mg/L.
The final effluent TSS sample concentrations are reported at a current monthly average of 3 mg/L and weekly maximum of 5 mg/L. The plant is anticipated to remain in compliance, including after the significant rain event on January 25th.
Contract Laboratory Services
During the past couple of years there have been periodic issues with the quality of sample analysis and overall service from ALS, current NELAP certified laboratory providing the sample analysis and reporting for use for the NPDES report. Unfortunately, these issues have resulted in occasional “non-compliance” with the NPDES. The most recent event was reported on December 16th for a TSS of 16. The contract laboratory previously utilized a reporting system which provided an email alert when a sample result was above the NPDES permit limitations. Deviation from this alert system, lack of timeliness completing sample analysis and overall quality of service necessitates seeking a new NELAP certified laboratory to perform the sample analysis and reporting for the RCSTP facility. Quotations are being pursued with an anticipated change to be effective March 2020.
PA DEP
No activity
Significant Rainfall
During January, there were twelve (12) days when precipitation occurred. On January 25th, a significant storm event occurred resulting in 2.20 inches of rainfall by 11:00 AM. Another 0.24 inches occurred throughout the day and into the evening. A total of 3.47 inches of rainfall measured during the month. events occurred on:
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfall 001. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle reducing settling times and increasing time on site to manage plant operations and observe effluent quality.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
February 2020
The influent organic loadings remain below those of the influent design loadings. Table 5 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2019
Table 5
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| January 7, 2020 | 0.375 | 303 | 948 | 268 | 838 | 32.4 | 101 | 51.6 | 161 | 5.2 | 16.3 |
| January 14, 2020 | 0.3472 | 223 | 646 | 206 | 597 | 31.7 | 92 | 41.9 | 121 | 4.9 | 14.2 |
| January 21, 2020 | 0.365 | 49 | 149 | 109 | 332 | 34.1 | 104 | 37.4 | 114 | 4.8 | 14.6 |
| January 28, 2020 | 0.3956 | ||||||||||
| Average | 0.3707 | 192 | 581 | 194 | 589 | 32.7 | 99 | 43.633 | 132 | 5.0 | 15.0 |
| Minimum | 0.3472 | 49 | 149 | 109 | 332 | 31.7 | 92 | 37.400 | 114 | 4.8 | 14.2 |
| Maximum | 0.3956 | 303 | 948 | 268 | 838 | 34.1 | 104 | 51.600 | 161 | 5.2 | 16.3 |
Chemical Usage:
| January 2020 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 300 | 9,300 |
| Aluminum Sulfate solution | 77.4 | 2,321 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 6
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report:
February 2020
Flow data:
| January 2020 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 12.223 | 394,302 | 612,340 |
| Influent Wastewater to SBRs | 14.479 | 467,076 | 722,688* |
| Internal Recycle | 2.259 | 75,292 | 202,078 |
| Treated Effluent to Disc Filters | 14.205 | 458,228 | 737,280* |
| Final Effluent Discharge | 11.214 | 359,000 | 599,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
*The flow to the SBR should be equal or greater than the flow measured into the disk filters. The elevated disk filter flow is largely attributed to the timing of collecting the meter readings.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Cleaned buildings and laboratory
Change alum pump tubes
Minor Repairs
Replaced broken solenoids on Centrifuge dumpster chutes
On February 4th, assisted with replacement of all four (4) SBR final effluent valve actuators
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 6
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 9, 2019
The East Goshen Township Municipal Authority held their regular public meeting on Monday, December 9, 2019 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Dana Pizarro, Jack Yahraes, Phil Mayer and Walter Wujcik. Also in attendance were: Jon Altshul (Township Asst. Manager), Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Robert Jefferson (Gawthrop), Michael Lynch (Township Supervisor) and Carmen Battavio (Township Supervisor).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental Protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our troops, veterans and first responders. Kevin asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
Phil attended the West Goshen Sewer meeting last week. The digester is complete within 5% of the original estimated cost. They are working to decrease the Westtown Way costs. Mark explained that this is a very old facility. They are applying for a grant of $1.4 million for total projects.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for November:
Monthly Flows: The average daily flow to West Goshen was 740,000 gal/day.
Meters: The meters were read on a daily basis with no problems to report. Allied Control was on site the last week of November to calibrate the meters. We also had the technician install the meter at Ridley Creek Plant. The Hicks meter that measures the flow on the interceptor was acting up, so Allied Control was notified and came out to do repairs. The sensor was removed and a spare sensor was installed. The removed sensor was sent back to be repaired.
C.C. Collection: The pump stations were visited on a daily basis. We cleaned and televised 20,000 feet of pipe. We located one broken lateral on Heather Lane. We also found two fractured manhole lids in the Millcreek Development.
R.C. Collection: The pump stations were visited on a daily basis with no problems to report.
Ridley Creek Plant: We removed brush along the perimeter fence. We also cleaned the grit chamber and piping from outside the fence into the screen room. I met Mike and Brian at the plant to go over the pad for the new generator.
Alarms: We responded to 16 alarms in November, which were all weather related.
MA 12-09-19 final | 1
PA One Calls: We responded to over 51 PA One Calls for the month of November.
Rainfall: 2.4 inches for November.
Lateral Caps: We replaced 16 lateral caps and repaired 5 cleanout pipes due to lawn mower damage.
2. Pennoni Engineer’s Report for October dated December 6, 2019
Invoices – Invoices with summaries were provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
Generator Replacement – We had a site meeting with Mark to review the site conditions associated with the proposed replacement of the existing Spectrum Detroit Diesel “Generator 1” and confirm the specific scope of replacement including pad location and size, conduit reuse, transfer switch replacement location (inside), maintaining the existing disconnect switch, and construction phasing and temporary back-up power approach. We prepared a concept plan of the new pad location. A design of the pad expansion will follow. We also evaluated the possibility of adding the centrifuge to the generator load during emergency conditions. It is not currently connected to either generator. The proposed 450kW generator will provide adequate power for emergency operation of the centrifuge, but additional wiring and conduit will be required due to the location of the centrifuge control. We are currently evaluating the detailed scope of those additions.
Caustic Soda Conversion – We reviewed the DCED Small Water & Sewer Grant application and prepared a budgetary cost opinion and plan exhibits to accompany the application.
Barkway Pump Station Grinder
No activity since our last report. The Muffin Monster manhole and equipment was delivered to the Township in late May.
Tallmadge Drive Sewer Main Replacement
The 2-year maintenance bond period ends March 21, 2021.
I&I Support and Reporting
We coordinated the approach to Supplee Valley pipe lining for 2020 with Mark. Public Works will televise all pipes in the neighborhood in early 2020, and we will develop a rehabilitation program upon review of the videos with the tentative plan for construction in the summer.
New Connections
We continued to perform oversight during construction of the low-pressure force main lateral for the proposed new home at 204 Line Road (Dixon property). The force main construction has been completed and the system passed pressure testing. The grinder pump will be installed at a later date when the house is built. We also reviewed revised plans for the grinder pump unit and provided comments to the design engineer.
Hershey’s Mill Pump Station Generator Replacement
We continued preparation of the design drawings for the generator replacement with an outdoor sound attenuated generator and a new transfer switch mounted inside the existing building. The generator size is confirmed and coordination with the vendor regarding pricing is complete. The generator can be ordered.
Permanent Flow Meter Manholes
No activity since our last report. The two permanent flow meter manholes and equipment are planned to be constructed in 2020 by Public Works. We will obtain new vendor cost quotations once a timeframe for construction is determined since the quotes are only valid for 30-60 days.
MA 12-09-19 final | 2
3. Big Fish Environmental Services – Executive Summary for December
The Ridley Creek sewage treatment plant outfalls 001 and 002 achieved compliance with the permit discharge limitations for the month of October 2019. Discharge to the Applebrook irrigation lagoon continued during October. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. The aluminum sulfate solution remains slightly elevated to assist total phosphorus removal. One Watson Marlow alum feed pump was determined to periodically trip resulting in a Siemens panel alarm often during off hours. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Kevin was glad they are back in compliance. Their insurance has been verified and they are waiting for the signed letter from Scott.
Approval of Minutes
Jack moved to approve the November 4, 2019 minutes as amended. Walter seconded the motion. The motion passed unanimously.
Approval of Invoices
1. Dana moved to approve payment of the following Pennoni invoices:
| Pennoni Invoice #1003813 | $ 5,280.75 |
|---|---|
| Pennoni Invoice #1003818 | $ 1,028.25 |
| Pennoni Invoice #1003821 | $ 2,156.75 |
| Pennoni Invoice #1003895 | $ 3,489.05 |
Walter seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of the Gawthrop Greenwood invoice #217184 in the amount of $340.00. Walter seconded the motion. The motion passed unanimously.
Liaison Reports
1. Conservancy Board – Walter reported that they planted 7 trees at the Historic Area. Keep East Goshen Beautiful Day will be held on Saturday April 18, 2020.
2. Board of Supervisors – Mike reported that the BOS approved the 2020 budget. On December 17, 2019 they will hold a hearing for the proposed TND overlay. The woodworking request was approved with 24 conditions. Planning Commission member Brad Giresi has resigned.
Financial Reports
Jon Altshul provided the following written report:
In November, the Municipal Authority recorded $6,379 in revenues (from an inter-fund transfer) and $7,178 in expenses, for a negative variance of $814. As of November 30th, the fund balance was $41,438.
Budget and Capital Improvement Plan
Jon provided a draft of the 2020 budget. Jon discussed options for the West Goshen Pump Station 2021 project. Kevin requested a spreadsheet that defines the projects and costs. Jack moved to approve the proposed 2020 Municipal Authority budget. He further moved that they adopt the 2020-2024 Capital Improvement Plan (CIP) for the Municipal Authority as proposed. Walter seconded the motion. The motion passed unanimously.
MA 12-09-19 final | 3
PA Small Water and Sewer Grant
Jon mentioned that the cost of the caustic soda project will be $153,000 and recommended that the Municipal Authority apply for the PA Small Water and Sewer Grant. Phil moved to apply for a PA Small Water and Sewer Grant in the amount of $153,000 to be used for the caustic soda project. Dana second the motion. The motion passed unanimously.
New Business
1. Lockwood Chase Easement Agreement – Phil moved to approve termination of the Lockwood Chase Easement Agreement. Jack seconded the motion. The motion passed unanimously.
2. Jon mentioned that the annual ABCs planning meeting will be held on Tuesday, January 28, 2020 at 6:00 pm. This is a change from the previous Saturday morning meeting.
3. Pennoni – Kevin moved to approve Pennoni as the Municipal Authority Engineer and approve the 2.6% increase in fees. Dana seconded the motion. The motion passed unanimously.
Any Other Matter
Jack mentioned that the rotation of officers for 2020 should be:
Chairman – Phil
Vice Chairman – Dana
Secretary – Jack
Treasurer – Walter
Alternate Secretary/Treasurer – Kevin
This was approved by the members.
Public Comment
None
Adjournment
There being no further business Walter moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, January 13, 2020 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 12-09-19 final | 4
Pennoni
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
INVOICE
| Rick Smith East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 |
Invoice No : 1010641 Invoice Date : 01/30/2020 Project : EGMAU20001 Project Name : 2020 General Services |
|---|
For Services Rendered Through 01/19/2020
Prepare for and attend January MA meeting.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 429.00 | 0.00 | 429.00 |
| Limit | 27,000.00 | ||
| Remaining | 26,571.00 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Authority Engineer | 3.25 | 132.00 | 429.00 |
| Totals | 3.25 | 429.00 | |
| Total Labor | 429.00 |
Total this Invoice: $429.00
[Signature: 2/7/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU20001 Invoice Summary
Invoice Date 1/30/2020
| Project: | EGMAU20001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2020 General Services | ||
| Invoice No: | 1010641 | ||
| Invoice Period: | NTP | to | 1/19/2020 |
| Initial Authorization: | $ 27,000.00 | Date: | 1/30/2020 |
| Contract Amount: | $ 27,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 429.00 | ||
| Invoiced to Date ($): | $ 429.00 | ||
| Invoiced to Date (%): | 2% | ||
| Remaining Budget ($): | $ 26,571.00 | ||
| Remaining Budget (%): | 98% |
Budget by Phase:
| Phase Name: | 2020 General Services |
|---|---|
| Phase Budget: | $ 27,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 429.00 |
| Invoiced to Date ($): | $ 429.00 |
| Invoiced to Date (%): | 2% |
| Remaining Budget ($): | $ 26,571.00 |
| Remaining Budget (%): | 98% |
Comments: Prepare for and attend January MA meeting.
Pennoni
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
INVOICE
| Louis Smith, Twp Mgr. East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 |
Invoice No : 1010660 Invoice Date : 01/30/2020 Project : EGMAU19001 Project Name : 2019 General Services |
|---|
For Services Rendered Through 01/19/2020
FINAL INVOICE
Finalized and submitted exhibits and cost estimate for DCED Small Water and Sewer Grant Application for RCSTP Caustic Soda Conversion, provided electrical pre-construction support for the Barkway Pump Station Muffin Monster, and prepared for and attended December MA meeting
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 464.25 | 26,128.75 | 26,593.00 |
| Limit | 27,000.00 | ||
| Remaining | 407.00 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Authority Engineer | 1.75 | 127.00 | 222.25 |
| Senior Professional | 2.00 | 121.00 | 242.00 |
| Totals | 3.75 | 464.25 | |
| Total Labor | 464.25 |
Total this Invoice: $464.25
[Signature: 2/7/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19001 Invoice Summary
Invoice Date 1/30/2020
| Project: | EGMAU19001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2019 General Services | ||
| Invoice No: | 1010660 | ||
| Invoice Period: | 12/9/2019 | to | 1/19/2020 |
| Initial Authorization: | $ 27,000.00 | Date: | 1/30/2020 |
| Contract Amount: | $ 27,000.00 | ||
| Previously Invoiced: | $ 26,128.75 | ||
| Current Invoice: | $ 464.25 | ||
| Invoiced to Date ($): | $ 26,593.00 | ||
| Invoiced to Date (%): | 98% | ||
| Remaining Budget ($): | $ 407.00 | ||
| Remaining Budget (%): | 2% |
Budget by Phase:
| Phase Name: | 2019 General Services |
|---|---|
| Phase Budget: | $ 27,000.00 |
| Previously Invoiced: | $ 26,128.75 |
| Current Invoice: | $ 464.25 |
| Invoiced to Date ($): | $ 26,593.00 |
| Invoiced to Date (%): | 98% |
| Remaining Budget ($): | $ 407.00 |
| Remaining Budget (%): | 2% |
Comments: FINAL INVOICE
Finalized and submitted exhibits and cost estimate for DCED Small Water and Sewer Grant Application for RCSTP Caustic Soda Conversion, provided electrical pre-construction support for the Barkway Pump Station Muffin Monster, and prepared for and attended December MA meeting.
Pennoni
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
INVOICE
| Louis Smith, Twp Mgr. East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 |
Invoice No : 1010885 Invoice Date : 01/30/2020 Project : EGMAU19005 Project Name : HMPS Survey & Design for Generator |
|---|
For Services Rendered Through 01/19/2020
Continued electrical design and plan preparation; reviewed final Costars cost and scope quotation for generator purchase; coordinated with Township to order generator; and reviewed generator equipment submittals from vendor.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Survey | $7,800.00 | $7,800.00 | 100.00% | $7,800.00 | $0.00 |
| 02 -- Civil | $5,800.00 | $4,433.30 | 88.00% | $5,106.67 | $673.37 |
| 03 -- MEP | $8,800.00 | $7,677.26 | 95.00% | $8,394.56 | $717.30 |
| Total : | $22,400.00 | $19,910.56 | $21,301.23 | $1,390.67 |
Amount Due This Invoice: $1,390.67
[Signature: 2/7/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19005 Invoice Summary
Invoice Date 1/30/2020
| Project: | EGMAU19005 | ||
|---|---|---|---|
| Pennoni Job No.: | HMPS Survey & Design for Generator | ||
| Invoice No: | 1010885 | ||
| Invoice Period: | 12/9/2019 | to | 1/19/2020 |
| Initial Authorization: | $ 22,400.00 | Date: | 1/30/2020 |
| Contract Amount: | $ 22,400.00 | ||
| Previously Invoiced: | $ 19,910.56 | ||
| Current Invoice: | $ 1,390.67 | ||
| Invoiced to Date ($): | $ 21,301.23 | ||
| Invoiced to Date (%): | 95% | ||
| Remaining Budget ($): | $ 1,098.77 | ||
| Remaining Budget (%): | 5% |
Budget by Phase:
| Phase Name: | HMPS Survey & Design for Generator |
|---|---|
| Phase Budget: | $ 22,400.00 |
| Previously Invoiced: | $ 19,910.56 |
| Current Invoice: | $ 1,390.67 |
| Invoiced to Date ($): | $ 21,301.23 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 1,098.77 |
| Remaining Budget (%): | 5% |
Comments: Continued electrical design and plan preparation; reviewed final Costars cost and scope quatation for generator purchase; coordinated with Township to order generator; and reviewed generator equipment submittals from vendor.
[Logo: Gawthrop Greenwood, PC Attorneys at Law]
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
01/13/2020
Client No: 6604M
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 1,660.00 | 455.00 | 103.05 | -1,660.00 | $558.05 |
PAID 1/16/20
[Signature: 2/7/20]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Logo: Gawthrop Greenwood, PC Attorneys at Law]
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
01/13/2020
Client No: 6604-001M
Invoice No. 219667
General Authority Services
Fees
| Hours | ||||
|---|---|---|---|---|
| 12/06/2019 | ||||
| PMM | Email from S Smith regarding meeting agenda. | 0.20 | ||
| RCJ | Email (1) to client with attachment regarding potential contract with Big Fish | 0.20 | ||
| 12/09/2019 | ||||
| RCJ | Review documents in preparation for Authority meeting; attend Authority meeting. | 1.40 | ||
| 12/10/2019 | ||||
| PMM | Emails (2) from/to J Altshul regarding Lockwood Chase easement extinguishment agreement. | 0.40 | ||
| 12/11/2019 | ||||
| OC | Record an Agreement to Extinguish Easement with Lockwood Community Association. | 0.20 | ||
| For Current Services Rendered | 2.40 | 455.00 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 0.60 | $200.00 | $120.00 |
| Robert C. Jefferson | 1.60 | 200.00 | 320.00 |
| Office Clerk | 0.20 | 75.00 | 15.00 |
Expenses
| S Beebe - mileage | 5.00 |
|---|---|
| Recorder of Deeds - record an Agreement to Extinguish Easement with Lockwood Community Association | 96.75 |
| Postage | 1.30 |
| Total Expenses Thru 12/31/2019 | 103.05 |
| Previous Balance | $1,660.00 |
Page: 2
01/13/2020
Client No: 6604-001M
Invoice No. 219667
East Goshen Municipal Authority
General Authority Services
| Date | Description | Amount |
|---|---|---|
| Total Current Charges | 558.05 | |
| 12/12/2019 | Payment | -340.00 |
| 12/12/2019 | Payment | -1,320.00 |
| Total Payments | -1,660.00 | |
| Balance Due | $558.05 |
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
[Logo: EVOQUA WATER TECHNOLOGIES]
Evoqua Water Technologies LLC
N19W23993 Ridgeview Pkwy, Suite 200
WAUKESHA WI 53188-1000
USA
60900
Invoice
| Billing No.: | 904274789 |
|---|---|
| Billing Date: | 12/16/2019 |
| Sales Order/Contract: | 977863 |
| Customer No.: | 1034934 |
| Customer PO No.: | 17780 |
| Incoterms(part 1): | FOB Free on board |
| Incoterms(part 2): | Free on board |
| Payment Terms: | within 30 days Due net |
| Bill-to: 1034934 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 Tel. Number: 6106927171 |
Site address: 1034934 EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 |
|---|---|
| Remit-to address: Evoqua Water Technologies LLC 28563 Network Place Chicago, IL 60673-1285 United States Telephone# 1-800-524-6324 |
[Signature: 1/15/20] |
| Line Item | Material Description | Old Part Number | Origin | Qty./UOM | Unit Price Currency USD | Total Price Currency USD | Tax Currency USD | Total Currency USD |
|---|---|---|---|---|---|---|---|---|
| 001000 | W3T206084 VALVE-EXCLDNG,4",SS304 (SOLIDS DECANTER) ECCN: EAR99 HTS: 8481400000 |
US | 32 EA | 339.05 | 10,849.60 | 0.00 | 10,849.60 |
| Net Total | 10,849.60 USD |
|---|---|
| Shipping and Handling | 135.00 USD |
| State Tax 0.000 % | 0.00 USD |
| County Tax 0.000 % | 0.00 USD |
| City Tax 0.000 % | 0.00 USD |
| Dist/Other Tax 0.000 % | 0.00 USD |
| Total Amount Including Tax | 10,984.60 USD |
APPROVED BY: _________
DATE PAID: _________
CHECK #: _________
CHARGED TO: _________
Destination Control Statement: the above commodities, software or technology are being sold pursuant to United States Export Regulations. Export, re-export or other diversion contrary to law is prohibited. These items are not to be used directly or indirectly in prohibited nuclear, chemical/biological or missile weapons activities.
PAID IN JANUARY
07 MA 429-7400
09 FUND REPLACEMENT
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 09429 7400
Decanter Valves
Page 1 of 1
[Logo: Parameters Industries, Inc. Precision Production & Short-Run Machining]
900 West Sunset Drive
Waukesha, Wisconsin 53189
Phone: (262) 549-3448
Facsimile: (262) 549-1073
PARAMETERS INDUSTRIES, INC.
900 West Sunset Drive
Waukesha, WI 53189
Ph: 262-549-3448 Fax: 262-549-1073
Packing List
Number: 83082
Date: 11-Dec-19
| To: Evoqua Water Tech - MC-IMA065 P.O. Box 5056- MC-IMA065 Portland, OR 97208-4356 USA Ph: 262-547-0141 Fax: 262-521-8272 |
Ship To: East Goshen Township 1580 Paoli Pike West Chester, PA 19380 USA Ph: Fax: |
|---|
| Terms | Ship Via | Salesperson |
|---|---|---|
| Fed Ex Freight |
| Quantity | Description |
|---|---|
| NLR/EAR99 EIN#: 39-1403119 MANUFACTURED IN USA |
|
| 32 | Part: W3T206084 Rev: VALVE-EXCLDING, 4" 304SS SOLIDS DECANTER MATT MULLIN 610-675-7696 PO #17780 Job: 142194-010 PO: 4501328670 LN: 010 |
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 5422 3700
Page 1 of 1
[Logo: EVOQUA WATER TECHNOLOGIES]
BILL OF LADING
[Logo: PENSKE]
| SHIP FROM PARAMETERS INDUSTRIES INC 900 W SUNSET DR WAUKESHA, WI 53189, USA Contact: Gayle Huebner Phone Number: 262-549-3448 Pickup Date/Time: 12/11/2019 2:30:00PM - 12/11/2019 7:00:00PM |
Master Bill of Lading: 59439261 Bill of Lading Number: 166226625 Tracking Number: EVOQUA14683632-5349954632 CARRIER NAME: FEDEX FREIGHT SCAC: FXFE Pro Number: 5349954632 [Barcode] |
|---|---|
| SHIP TO EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380, USA Contact: Phone Number: Delivery Date/Time: 12/11/2019 2:31:00PM - 12/16/2019 4:00:00PM |
Freight Charge Terms: Prepaid [ ] Collect [ ] Third party [X] |
| SEND FREIGHT INVOICE TO: Evoqua Water Technologies c/o Penske P.O. Box 981763 El Paso, TX 79998-1763 https://apps.pensketruckleasing.net/pops/validate.htm freightpayment@penske.com |
PO Number: 4501328670 Cost Center: Service Order Number: WBS Project Number: Internal Order Number: Sales Order Number: Delivery Number: SAP Shipment Number: Scheduling Agreement: |
| Special Instructions: MATT MULLIN 610-675-7696 |
|
CUSTOMER ORDER INFORMATION
| PART/ITEM # | ADDITIONAL SHIPPER INFO | Handling Unit/Container | Handling Unit/Weight | DIMENSIONS |
|---|---|---|---|---|
| EVOQUA ITEMS | Water Treatment System | Skid | 280 LB | 27.96 x 27.96 x 35.04 in |
CARRIER INFORMATION
| HANDLING UNIT CONTAINER | PACKAGE | WEIGHT | H.M. (X) | COMMODITY DESCRIPTION | LTL ONLY | ||
|---|---|---|---|---|---|---|---|
| Qty | Type | Package Description | NMFC # | CLASS | |||
| 1 | Skid | 280 LB | Commodities requiring special or additional care of attention in handling or stowing must be so marked and packaged as to ensure safe transportation with ordinary care. See Section 2(e) of NMFC Item 360 Water Treatment System - |
50 | |||
| 280.00 lb | |||||||
NON-STACKABLE
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 422 3700
For the skimmer Decanter
12/11/2019 4:26:11PM
Page 1 of 2
60900
EVOQUA WATER TECHNOLOGIES
Evoqua Water Technologies LLC
N19W23993 Ridgeview Pkwy, Suite 200
WAUKESHA WI 53188-1000
USA
Invoice
COPY
| Billing No.: | 904274789 |
|---|---|
| Billing Date: | 12/16/2019 |
| Sales Order/Contract: | 977863 |
| Customer No.: | 1034934 |
| Customer PO No.: | 17780 |
| Incoterms(part 1): | FOB Free on board |
| Incoterms(part 2): | Free on board |
| Payment Terms: | within 30 days Due net |
Bill-to: 1034934
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
Tel. Number: 6106927171
Site address: 1034934
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380
Remit-to address:
Evoqua Water Technologies LLC
28563 Network Place
Chicago, IL 60673-1285
United States
Telephone# 1-800-524-6324
| Line Item | Material Description | Old Part Number | Origin | Qty./UOM | Unit Price Currency USD | Total Price Currency USD | Tax Currency USD | Total Currency USD |
|---|---|---|---|---|---|---|---|---|
| 001000 | W3T206084 VALVE-EXCLDNG,4",SS304 (SOLIDS DECANTER) ECCN: EAR99 HTS: 8481400000 |
US | 32 EA | 339.05 | 10,849.60 | 0.00 | 10,849.60 |
| Net Total | 10,849.60 USD |
|---|---|
| Shipping and Handling | 135.00 USD |
| State Tax 0.000 % | 0.00 USD |
| County Tax 0.000 % | 0.00 USD |
| City Tax 0.000 % | 0.00 USD |
| Dist/Other Tax 0.000 % | 0.00 USD |
| Total Amount Including Tax | 10,984.60 USD |
APPROVED BY: ________
DATE PAID: ________
CHECK #: ________
CHARGED TO: ________
Destination Control Statement: the above commodities, software or technology are being sold pursuant to United States Export Regulations. Export, re-export or other diversion contrary to law is prohibited. These items are not to be used directly or indirectly in prohibited nuclear, chemical/biological or missile weapons activities.
APPROVED BY: [signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 09429 7400 07 MA 429-7490
09 FUND REPLACEMENT
Decanter Valves
Page 1 of 1
Parameters Industries, Inc.
Precision Production & Short-Run Machining
900 West Sunset Drive
Waukesha, Wisconsin 53189
Phone: (262) 549-3448
Facsimile: (262) 549-1073
PARAMETERS INDUSTRIES, INC.
900 West Sunset Drive
Waukesha, WI 53189
Ph: 262-549-3448 Fax: 262-549-1073
Packing List
| Number: 83082 | Date: 11-Dec-19 |
|---|
|
To Evoqua Water Tech - MC-IMA065 P.O. Box 5056- MC-IMA065 Portland, OR 97208-4356 USA Ph: 262-547-0141 Fax: 262-521-8272 |
Ship To East Goshen Township 1580 Paoli Pike West Chester, PA 19380 USA Ph: Fax: |
|---|
| Terms | Ship Via | Salesperson |
|---|---|---|
| Fed Ex Freight |
| Quantity | Description |
|---|---|
| NLR/EAR99 EIN#: 39-1403119 MANUFACTURED IN USA |
|
| 32 | Part: W3T206084 Rev: VALVE-EXCLDNG, 4" 304SS SOLIDS DECANTER MATT MULLIN 610-675-7696 PO #17780 Job: 142194-010 PO: 4501328670 LN: 010 |
APPROVED BY: [signature]
DATE PAID: ________
CHECK #:
CHARGED TO: 05422-3700
Page 1 of 1
EVOQUA WATER TECHNOLOGIES
BILL OF LADING
PENSKE
|
SHIP FROM PARAMETERS INDUSTRIES INC 900 W SUNSET DR WAUKESHA, WI 53189, USA Contact: Gayle Huebner Phone Number: 262-549-3448 Pickup Date/Time: 12/11/2019 2:30:00PM - 12/11/2019 7:00:00PM |
Master Bill of Lading: 59439261 Bill of Lading Number: 166226625 Tracking Number: EVOQUA14683632-5349954632 CARRIER NAME: FEDEX FREIGHT SCAC: FXFE Pro Number: 5349954632 |
|---|---|
|
SHIP TO EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380, USA Contact: Phone Number: Delivery Date/Time: 12/11/2019 2:31:00PM - 12/16/2019 4:00:00PM |
Freight Charge Terms: Prepaid [ ] Collect [ ] Third party [X] |
|
SEND FREIGHT INVOICE TO: Evoqua Water Technologies c/o Penske P.O. Box 981763 El Paso, TX 79998-1763 https://apps.pensketruckleasing.net/pops/validate.htm freightpayment@penske.com Special Instructions: MATT MULLIN 610-675-7696 |
PO Number: 4501328670 Cost Center: Service Order Number: WBS Project Number: Internal Order Number: Sales Order Number: Delivery Number: SAP Shipment Number: Scheduling Agreement: |
CUSTOMER ORDER INFORMATION
| PART/ITEM # | ADDITIONAL SHIPPER INFO | Handling Unit/Container | Handling Unit/Weight | DIMENSIONS |
|---|---|---|---|---|
| EVOQUA ITEMS | Water Treatment System | Skid | 280 LB | 27.96 x 27.96 x 35.04 in |
CARRIER INFORMATION
| HANDLING UNIT CONTAINER | PACKAGE | WEIGHT | H.M. (X) | COMMODITY DESCRIPTION | LTL ONLY | ||
|---|---|---|---|---|---|---|---|
| Qty | Type | Package Description | Commodities requiring special or additional care of attention in handling or stowing must be so marked and packaged as to ensure safe transportation with ordinary care. See Section 2(e) of NMFC Item 360 | NMFC # | CLASS | ||
| 1 | Skid | 280 LB | Water Treatment System - | 50 | |||
| 280.00 lb | |||||||
NON-STACKABLE
APPROVED BY: [signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 05422-3700
For the Skimmer Decanter
12/11/2019 4:26:11 PM
Page 1 of 2
EVOQUA WATER TECHNOLOGIES
BILL OF LADING
PENSKE
|
SHIP FROM PARAMETERS INDUSTRIES INC 900 W SUNSET DR WAUKESHA, WI 53189, USA Contact: Gayle Huebner Phone Number: 262-549-3448 Pickup Date/Time: 12/11/2019 2:30:00PM - 12/11/2019 7:00:00PM |
Master Bill of Lading: 59439261 Bill of Lading Number: 166226625 Tracking Number: EVOQUA14683632-5349954632 CARRIER NAME: FEDEX FREIGHT SCAC: FXFE Pro Number: 5349954632 |
|---|---|
|
SHIP TO EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380, USA Contact: Phone Number: Delivery Date/Time: 12/11/2019 2:31:00PM - 12/16/2019 4:00:00PM |
Freight Charge Terms: Prepaid [ ] Collect [ ] Third party [X] |
|
SEND FREIGHT INVOICE TO: Evoqua Water Technologies c/o Penske P.O. Box 981763 El Paso, TX 79998-1763 https://apps.pensketruckleasing.net/pops/validate.htm freightpayment@penske.com Special Instructions: MATT MULLIN 610-675-7696 |
PO Number: 4501328670 Cost Center: Service Order Number: WBS Project Number: Internal Order Number: Sales Order Number: Delivery Number: SAP Shipment Number: Scheduling Agreement: |
Where the rate is dependent on value, shippers are required to state specifically in writing the agreed or declared value of the property as follows:
"The agreed or declared value of the property is specifically stated by the shipper to be not exceeding ___________ per ___________".
COD Amount: $ ___________
Fee Terms: Prepaid [ ] Collect [ ]
Customer check acceptable: [ ]
NOTE Liability Limitation for loss or damage is this shipment may be applicable. See 49 U.S.C. 14706(c)(1)(A) and (B).
RECEIVED, subject to individually determined rates or contracts that have been agreed upon in writing between the carrier and shipper, if applicable, otherwise to the rates, classifications and rules that have been established by the carrier and are available to the shipper, on request. The shipper hereby certifies that he/she is familiar with all the terms and conditions of the NMFC Uniform Straight Bill of Lading, including those on the back thereof, and the said terms and conditions are hereby agreed to by the shipper and accepted for him/herself and his/her assigns.
The carrier shall not make delivery of this shipment without payment of freight and all other lawful charges.
Shipper Signature: ___________
|
SHIPPER SIGNATURE / DATE This is to certify that the above named materials are properly classified, packaged, marked and labeled, and are in proper condition for transportation according to the applicable regulations of the Department of Transportation. ________________________________________ |
Trailer Loaded: [ ] By Shipper [ ] By Driver |
Freight Counted: [ ] By Shipper [ ] By Driver / pallets said to contain [ ] By Driver / pieces |
CARRIER SIGNATURE / PICKUP DATE Carrier acknowledges receipt of packages and required placards. Carrier certifies emergency response information was made available and/or carrier has the DOT emergency response guidebook or equivalent documentation in the vehicle. Property described above is received in good order, except as noted. ________________________________________ |
|---|
12/11/2019 4:26:11PM
Page 2 of 2
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | MA January Financial Report |
| Date: | February 7, 2020 |
In January, the Municipal Authority recorded $15,362 in revenues (from an inter-fund transfer) and $17,600 in expenses, for a negative variance of $2,238. As of January 31st, the fund balance was $22,634.
A complete list of 2020 year-to-date MA revenues and expenses is attached.
EAST GOSHEN TOWNSHIP
Other Funds
January 2020
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | (14.35) | (14.35) | (14.35) | (14.35) | |||
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | |||||||
| DCED GRANT | 07354 0400 | |||||||
| C.C. TAPPING FEES | 07364 1100 | |||||||
| R.C.TAPPING FEES | 07364 1110 | |||||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | |||||||
| MISCELLANEOUS REVENUE | 07380 1000 | 565 | 48 | (48.00) | 47 | (47.08) | ||
| TRANSFER FROM GENERAL ACCT | 07392 0100 | |||||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 319,435 | 26,620 | (26,620.00) | 26,620 | (26,619.58) | ||
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | 277,000 | 23,084 | (23,084.00) | 23,083 | (23,083.33) | ||
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 277,000 | 23,084 | 15,376.40 | (7,707.60) | 23,083 | 15,376.40 | (7,706.93) |
| TOTAL REVENUE | 874,000 | 72,836 | 15,362.05 | (57,473.95) | 72,833 | 15,362.05 | (57,471.28) | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,000 | 2,666 | 2,666.00 | 2,667 | 2,666.67 | ||
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | |||||||
| MUNIC.AUTH.-AUDITING | 07424 3110 | |||||||
| ENGINEERING SERVICES | 07424 3130 | 60,000 | 5,000 | 1,666.00 | 3,334.00 | 5,000 | 1,666.00 | 3,334.00 |
| LEGAL SERVICES | 07424 3140 | 8,000 | 666 | 558.05 | 107.95 | 667 | 558.05 | 108.62 |
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | |||||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | 10,984.60 | (10,984.60) | 10,984.60 | (10,984.60) | |||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 3,805.05 | (3,805.05) | 3,805.05 | (3,805.05) | |||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | |||||||
PAGE 9
Report Date 2001 02/07/20 8 : 26 AM
EAST GOSHEN TOWNSHIP
Other Funds
January 2020
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | |||||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| RELINING | 07429 1500 | |||||||
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 365,000 | 30,416 | 30,416.00 | 30,417 | 30,416.67 | ||
| HERSHEYS MILL PUMP STATION CAPITAL | 07429 1503 | 45,000 | 3,750 | 3,750.00 | 3,750 | 3,750.00 | ||
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 87,000 | 7,250 | 7,250.00 | 7,250 | 7,250.00 | ||
| RCSTP CAPITAL | 07429 1505 | 365,000 | 30,416 | 586.75 | 29,829.25 | 30,417 | 586.75 | 29,829.92 |
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | |||||||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | |||||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER CAPITAL RESERVE FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 962,000 | 80,164 | 17,600.45 | 62,563.55 | 80,167 | 17,600.45 | 62,566.22 | |
| NET RESULT FROM OPERATIONS | (88,000) | (7,328) | (2,238.40) | 5,089.60 | (7,333) | (2,238.40) | 5,094.93 |
PAGE 10
Report Date 2001 02/07/20 8 : 26 AM
January 2020, YTD MA Revenues and Expenses
| Account # | Description | Per | Src | Debits | Credits | Date | Check# | Name | Description | Description 2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | |||||||||
| 07341-1000 | INTEREST EARNINGS | 2001 | JE | 15.00 | - | 1/2/2020 | BANK FEES | REIMBURSE S/R FOR DEC.2019 | BANK FEES | |
| 07341-1000 | INTEREST EARNINGS | 2001 | JE | - | 0.65 | 1/31/2020 | INTEREST | INTEREST EARNED JANUARY 2020 | 7100.1035 | |
| 07392-0900 | BEGINNING BALANCE | |||||||||
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 2001 | JE | - | 4,391.80 | 1/15/2020 | XFER | XFER $ FROM SEWER SINKING TO | MA RE: JANUARY EXPENSES | |
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 2001 | JE | - | 10,984.60 | 1/15/2020 | XFER | XFER $ FROM SEWER SINKING TO | MA RE: JAN.2020 ADDL' EXP. | |
| 07424-3130 | BEGINNING BALANCE | |||||||||
| 07424-3130 | ENGINEERING SERVICES | 2001 | CD | 1,666.00 | - | 1/15/2020 | 3183 PENNONI ASSOCIATES INC. | SERVICES THRU 12/8/19 2019 GEN.SERV | ||
| 07424-3140 | BEGINNING BALANCE | |||||||||
| 07424-3140 | LEGAL SERVICES | 2001 | CD | 558.05 | - | 1/16/2020 | 3185 GAWTHROP GREENWOOD & HALSTE | LEGAL SERVICE - 12/6-12/11/19 | ||
| 07424-7490 | BEGINNING BALANCE | |||||||||
| 07424-7490 | CAP.REPLACEMENT R.C. | 2001 | CD | 10,984.60 | - | 1/15/2020 | 3184 EVOQUA WATER TECHNOLOGIES LLC | DECANTER VALVES | ||
| 07426-1000 | BEGINNING BALANCE | |||||||||
| 07426-1000 | HERSHEY MILL STATION - ENGINEER | 2001 | CD | 3,805.05 | - | 1/15/2020 | 3183 PENNONI ASSOCIATES INC. | SERV. THRU 12/8/19 HMPS SURVEY & | DESIGN FOR GENERATOR | |
| 07429-1505 | BEGINNING BALANCE | |||||||||
| 07429-1505 | RCSTP CAPITAL | 2001 | CD | 586.75 | - | 1/15/2020 | 3183 PENNONI ASSOCIATES INC. | SERV. THRU 12/8/19 RCSTP GENERATOR |
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
FYI
January 27, 2020
Dear Property Owner:
The purpose of this letter is to inform you that The Zoning Hearing Board will conduct a hearing on Monday, February 10, 2020, at 7:00 P.M., at the East Goshen Township Building, 1580 Paoli Pike, West Chester, Pennsylvania 19380. The East Goshen Township Zoning Hearing Board will conduct a public hearing pursuant to the December 10, 2019 Order of the Honorable Mark L. Tunnell, which remanded the appeal of the Malvern Institute before the Court of Common Pleas of Chester County, Pennsylvania, No. 2019-03106-ZB to the Zoning Hearing Board of East Goshen Township for a hearing, findings and issuance of a decision consistent with the Judge’s “Decision Sur Appeal”. This decision is available for review on the Township website.
Specifically, on February 10, 2020, the East Goshen Township Zoning Hearing Board will meet to develop the process to be followed in response to the Court’s directives, establishing the Zoning Hearing Board’s expectations for subsequent evidentiary-based hearing(s), as well as the date(s) of future hearings.
If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact the Township Building at (610) 692-7171, to discuss how those needs may be accommodated.
All meetings will be held at the Township Building and are open to the public. Please give me a call at 610-692-7171 or e-mail me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[signature]
Mark Gordon
Township Zoning Officer
Cc: All ABC’s
Brian Nagle, Esq. (VIA EMAIL ONLY)
Kristin Camp, Esq., Solicitor, East Goshen Township (VIA EMAIL ONLY)
John Nagel, Manager, East Whiteland Township (VIA EMAIL ONLY)
Sally Slook, Manager, Willistown Township (VIA EMAIL ONLY)
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\2020 ZHB Hearings on Appeal\1000 Letter re. ZHB hearings 01272020 .doc