Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
May 11, 2020
7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report
- APPROVAL OF MINUTES April 13, 2020
- APPROVAL OF INVOICES Pennoni Invoice #1022333 $ 1,069.25 Pennoni Invoice #1022332 $ 468.75 Pennoni Invoice #1022334 $ 1,017.75 Gawthrop Invoice #223910 $ 500.00 Maillie #1000097986 $ 9,300.00
- LIAISON REPORTS
- FINANCIAL REPORTS April Financial Report
- OLD BUSINESS
- GOALS Continue to monitor the upgrades at West Goshen Sewer Plant and Westtown Way Pump Station; Continue to implement the Inflow and Infiltration Plan for the Sewer System.
F:\Data\Shared Data\Agendas\Municipal Authority\2020\5-11-20.doc
- Continue to operate the Sewer Treatment Plant in compliance with PADEP permit requirements, for Jan., Feb., March, April.
- Implement Planned Projects Program: Ridley Creek Sewer Treatment Plant Emergency Generator Replacement, generator received, installation expected in June Caustic Soda Project; Emergency Generator Replacement, generator received, installation expected in June; Caustic Soda Project; Pump Stations Hershey’s Mill Pump Station generator replacement Hunt Country Pump Station Mag meter replacement Hunt Country Pump Station Muffin Monster replacement Hunt Country Pump Station Bypass Pump; Hershey’s Mill Pump Station generator replacement; Hunt Country Pump Station Mag meter replacement; Hunt Country Pump Station Muffin Monster replacement; Hunt Country Pump Station Bypass Pump; Sewer System Two (2) new Ridley Creek Sewer System Permanent Flow Meters; Two (2) new Ridley Creek Sewer System Permanent Flow Meters
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2020\5-11-20.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
May 8, 2020
To: Municipal Authority
From: Mark Miller
Re: April 2020 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 802,000 per day.
Meters: The meters were read on a daily basis, as well as the portable meters. (See flow chart). The portable meters that are in Bowtree will be removed at the end of the month. Before being reinstalled they will need to be sent out for calibration.
C.C. Collection: The weather kept us very busy this month, between the rain and the high winds which knocked out power to the pump stations. We are also checking the pump stations and the muffin monsters on a daily basis for wipes and gloves. To date, we have not expirenced any problems with foreign objects at the pump stations. As I mentioned we had several power outages during the month of April due to high winds, at one point all stations were on emergency power. Hershey Mill Pump Station was on emergency power for 3 days before switching back.
We located some INI during routine maintenance on the Chester Creek Collection System, we took care of that last week. We were notified of a lateral blockage on Margo Lane that we cleared.
R.C. Collection: The stations were visited each day.
R.C. Plant:
Alarms: We responded to 47 alarms for March.
PA One Calls: We responded to over 136 PA One Calls for the month of March.
Monthly Rainfall: 7.43 inches for the month of April.
Lateral Caps: We replaced 8 lateral caps.
2020 Double Pond
| Apr-20 | Date | Average GPM | Total Daily Flow |
|---|---|---|---|
| Double Pond Manhole R589 | 4/1/2020 | 12.54 | 17,303.38 |
| 4/2/2020 | 13.03 | 17,976.20 | |
| 4/3/2020 | 10.08 | 13,907.14 | |
| 4/4/2020 | 12.48 | 17,591.72 | |
| 4/5/2020 | 11.05 | 15,579.24 | |
| 4/6/2020 | 10.63 | 14,986.25 | |
| 4/7/2020 | 10.36 | 14,295.35 | |
| 4/8/2020 | 11.07 | 15,274.21 | |
| 4/9/2020 | 8.67 | 11,962.93 | |
| 4/10/2020 | 10.24 | 14,506.70 | |
| 4/11/2020 | 8.52 | 12,006.22 | |
| 4/12/2020 | 11.71 | 16,509.25 | |
| 4/13/2020 | 7.3 | 10,288.92 | |
| 4/14/2020 | |||
| 4/15/2020 | 16.5 | 22,769.95 | |
| 4/16/2020 | 17.88 | 24,668.06 | |
| 4/17/2020 | 14.65 | 20,661.78 | |
| 4/18/2020 | 12.65 | 18,213.24 | |
| 4/19/2020 | 11.85 | 17,059.90 | |
| 4/20/2020 | 10.12 | 14,264.90 | |
| 4/21/2020 | 9.63 | 13,284.38 | |
| 4/22/2020 | 11.05 | 15,253.26 | |
| 4/23/2020 | 11.16 | 15,402.33 | |
| 4/24/2020 | 8.36 | 10,528.05 | |
| 4/25/2020 | 12.87 | 18,140.91 | |
| 4/26/2020 | 11.45 | 16,147.72 | |
| 4/27/2020 | 15.62 | 22,025.04 | |
| 4/28/2020 | 12.32 | 16,998.52 | |
| 4/29/2020 | 10.1 | 13,940.15 | |
| 4/30/2020 | 12.06 | 16,637.15 |
April Double Pond - 2020
Bar chart showing daily flow (0 to 30000) by Day of the month from 4/1/2020 to 4/29/2020.
Y-axis: daily flow (0, 5000, 10000, 15000, 20000, 25000, 30000)
X-axis: Day of the month (4/1/2020, 4/3/2020, 4/5/2020, 4/7/2020, 4/9/2020, 4/11/2020, 4/13/2020, 4/15/2020, 4/17/2020, 4/19/2020, 4/21/2020, 4/23/2020, 4/25/2020, 4/27/2020, 4/29/2020)
Legend:
- Average GPM
- Total Daily Flow
2020 Flows Eldridge
| Apr-20 | Date | Average GPM | Total Daily Flow |
|---|---|---|---|
| Eldridge Manhole R568 | 4/1/2020 | 22.33 | 30,816.66 |
| 4/2/2020 | 20.76 | 28,652.74 | |
| 4/3/2020 | 21.94 | 30,608.30 | |
| 4/4/2020 | 20.39 | 29,358.21 | |
| 4/5/2020 | 20.87 | 30,050.79 | |
| 4/6/2020 | 20.76 | 29,577.47 | |
| 4/7/2020 | 19.07 | 26,319.07 | |
| 4/8/2020 | 20.88 | 28,817.95 | |
| 4/9/2020 | 19.98 | 27,575.64 | |
| 4/10/2020 | 20.87 | 29,432.03 | |
| 4/11/2020 | 17.48 | 24,653.55 | |
| 4/12/2020 | 20.18 | 28,447.45 | |
| 4/13/2020 | 20.25 | 28,555.62 | |
| 4/14/2020 | |||
| 4/15/2020 | 23.17 | 31,978.04 | |
| 4/16/2020 | 20.21 | 27,895.48 | |
| 4/17/2020 | 22.74 | 32,058.27 | |
| 4/18/2020 | 20.76 | 30,206.07 | |
| 4/19/2020 | 21.96 | 31,945.61 | |
| 4/20/2020 | 19.12 | 27,245.34 | |
| 4/21/2020 | 20.03 | 27,643.84 | |
| 4/22/2020 | 20.25 | 27,941.14 | |
| 4/23/2020 | 18.82 | 25,970.47 | |
| 4/24/2020 | 18.05 | 24,911.01 | |
| 4/25/2020 | 21.75 | 30,989.23 | |
| 4/26/2020 | 20.04 | 28,562.40 | |
| 4/27/2020 | 19.84 | 28,270.62 | |
| 4/28/2020 | 23.74 | 32,764.54 | |
| 4/29/2020 | 20.61 | 28,441.48 | |
| 4/30/2020 | 20.99 | 29,276.35 |
April Eldridge - 2020
Bar chart showing daily flow (0 to 35000) by Day of the Month from 4/1/2020 to 4/29/2020.
Y-axis: daily flow (0, 5000, 10000, 15000, 20000, 25000, 30000, 35000)
X-axis: Day of the Month (4/1/2020, 4/3/2020, 4/5/2020, 4/7/2020, 4/9/2020, 4/11/2020, 4/13/2020, 4/15/2020, 4/17/2020, 4/19/2020, 4/21/2020, 4/23/2020, 4/25/2020, 4/27/2020, 4/29/2020)
Legend:
- Average GPM
- Total Daily Flow
- #REF!
2020 Flows Mileson Drive
| Apr-20 | Date | Average GPM | Total Daily Flow |
|---|---|---|---|
| Mileson Manhole R625 | 4/1/2020 | 15.58 | 21,493.91 |
| 4/2/2020 | 2.67 | 3,687.75 | |
| 4/3/2020 | 4.06 | 5,729.01 | |
| 4/4/2020 | 3.42 | 4,868.77 | |
| 4/5/2020 | |||
| 4/6/2020 | |||
| 4/7/2020 | 1.97 | 2,711.75 | |
| 4/8/2020 | |||
| 4/9/2020 | |||
| 4/10/2020 | |||
| 4/11/2020 | |||
| 4/12/2020 | |||
| 4/13/2020 | |||
| 4/14/2020 | |||
| 4/15/2020 | |||
| 4/16/2020 | |||
| 4/17/2020 | |||
| 4/18/2020 | |||
| 4/19/2020 | |||
| 4/20/2020 | |||
| 4/21/2020 | |||
| 4/22/2020 | |||
| 4/23/2020 | |||
| 4/24/2020 | |||
| 4/25/2020 | |||
| 4/26/2020 | |||
| 4/27/2020 | |||
| 4/28/2020 | |||
| 4/29/2020 | |||
| 4/30/2020 |
April Mileson - 2020
Bar chart showing daily flow (0 to 25000) by Day of the week from 4/1/2020 to 4/29/2020.
Y-axis: daily flow (0, 5000, 10000, 15000, 20000, 25000)
X-axis: Day of the week (4/1/2020, 4/3/2020, 4/5/2020, 4/7/2020, 4/9/2020, 4/11/2020, 4/13/2020, 4/15/2020, 4/17/2020, 4/19/2020, 4/21/2020, 4/23/2020, 4/25/2020, 4/27/2020, 4/29/2020)
Legend:
- Average GPM
- Total Daily Flow
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
May 8, 2020
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- Generator Replacement – The design of the concrete generator pad has been completed, and the construction plan was submitted to the Township for construction by the PW Dept. This was a re-design of the original intent, which was to re-use and expand the existing pad, because the anchor bolts for the generator would be located in close proximity to the joint between the new and existing pad. The existing pad is now proposed to be completely demolished with a completely new pad installed.
Tallmadge Drive Sewer Main Replacement
- The 2-year maintenance bond period ends March 21, 2021.
I&I Support and Reporting
- No activity by Pennoni since our last report.
Hershey’s Mill Pump Station Generator Replacement
- No activity by Pennoni since our last report.
Chapter 94 Reports
- DEP has directed that hard copy reports will now be accepted via mail. They had previously directed that the reports be held until they determined a submission procedure. We are assembling hard copies for submission.
New Connections
- We evaluated alternatives for potential connection of an existing house at 222 Westtown Way to the public sewer system in coordination with Mark Miller.
Act 537 Planning – Grant Opportunity
There is an open grant through PA DCED’s Sewage Facilities Program for Act 537 Planning. The possibility of a revisit/update of the Township-wide Act 537 Plan has been discussed at recent MA meetings. The purpose of this program is to fund such plans. It was also the grant that was used for the Act 537 Planning associated with the Reservoir Rd Pump Station a few years ago. The MA may want to consider if an application should be pursued.
The application guidelines are attached and also available at https://dced.pa.gov/download/sewage-facilities-program-sfp-guidelines/?wpdmdl=81389.
Applications are due May 31. There would need to be a DEP-approved Task/Activity Report (TAR) in place to submit with the application. A TAR is a scope of work and detailed cost estimate. It may not be possible to obtain that TAR approval by May 31, but we could contact DEP to see if it could be done, if there is interest
EGMAU20001
East Goshen Municipal Authority
May 8, 2020
Page 2
Engineer’s Report
by the Township and MA in pursuing the grant. We have other municipal clients that do not yet have a TAR approval either but are aggressively pursuing with DEP to be able to apply for the grant.
A 50% match is required, and a resolution has to be included in the application. Costs for Township-wide planning vary dramatically depending on the scope and extent of alternatives evaluations and public involvement, generally between $25K-$70K. I would expect this to be on the lower end since most of the Township is already sewered, and the primary alternative to evaluate would be sewer extensions to areas with onlot systems and to determine updated build-out flow projections for the RCSTP and Chester Creek systems. Those projections were last estimated about 15 years ago, and led to the RCSTP Upgrade, Lockwood Chase STP Closure, and various sewer diversions. An updated projection would allow for an assessment of the future need/timeframe of the Reservoir Rd Pump Station, evaluation of flows in the West Goshen system vs. intermunicipal agreement capacity, and need for use of the 4th SBR tank and ultimate capacity at the RCSTP, amongst other things.
END OF REPORT
P:\Projects\EGMA\Memos to Board\2020\Engineers Report 2020-05-08.docx
PA pennsylvania
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
SEWAGE FACILITIES PROGRAM
Program Guidelines | November 2019
Photograph of the Pennsylvania State Capitol and Harrisburg skyline reflected in the Susquehanna River, with Facebook, Twitter, LinkedIn, and YouTube icons at the bottom left.
Commonwealth of Pennsylvania | Tom Wolf, Governor
PA Department of Community & Economic Development | dced.pa.gov
Sewage Facilities Program Guidelines
11/27/2019
Table of Contents
- Section I – Statement of Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
- Section II – Eligibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Eligible Applicants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1; B. Eligible Use of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
- Section III – Program Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 A. Applicant Cost Share Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2; B. Other Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2; C. Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
- Section IV – Grants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
- Section V – Application Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
- Section VI – Application Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
- Section VII – Procedure for Accessing Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
- Section VIII – Program Inquiries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
- Appendix I – Supplemental Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
- Appendix II – Authorized Official Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Sewage Facilities Program Guidelines
11/27/2019
Section I – Statement of Purpose
Act 13 of 2012 (Act of February 14, 2012 (P.L. 87, No. 13) (58 Pa.C.S. §2315(a) and (a.1)(1)(iii)) establishes the Marcellus Legacy Fund and allocates funds to the Commonwealth Financing Authority (the “Authority”) for statewide initiatives for complying with the act of January 24,1966 (1965 P. L.1535, No. 537), known as the Pennsylvania Sewage Facilities Act.
Section II – Eligibility
A. Eligible Applicants
Any of the following entities may apply for a grant under the Sewage Facilities Program (SFP):
- Municipality – Any county, city, borough, incorporated town, township or home rule municipality.
- Councils of Governments – An entity organized by units of local government under an intergovernmental agreement, which provides cooperative planning, coordination and technical assistance to its member governments on issues of mutual concern that cross jurisdictional lines, and which does not act under the direction and control of any single member government.
- Authorized Organization – An entity involved in research, restoration, rehabilitation, planning, acquisition, development, education or other activities, which furthers the protection, enhancement, conservation, preservation or enjoyment of this commonwealth’s environmental, conservation, recreation or similar resources. The organization must be a tax-exempt institution under section 501(c)(3) of the Internal Revenue Code of 1986 (Public Law 99-514, 26 U.S.C. § 501(c) (3)) and registered with the Bureau of Charitable Organizations or an educational institution involved in these authorized activities or a municipal authority.
- Institution of Higher Education – An entity that is an accredited university, college, seminary college, community college or two-year college.
- Watershed Organization – An entity recognized by the PA Department of Conservation and Natural Resources or the PA Department of Environmental Protection that was established to promote local watershed conservation efforts in an identified watershed.
- For Profit Businesses – other than “producers” of natural gas as defined in Act 13.
B. Eligible Use of Funds
Funds may be used by the applicant to pay for any of the following eligible project costs:
- Costs associated with the planning work required under the Pennsylvania Sewage Facilities Act.
- Administrative costs of the applicant necessary to administer the grant. Administrative costs will include advertising, legal, and audit costs as well as documented staff expenses. Administrative costs shall not exceed 2% of the grant.
Ineligible costs include but are not limited to public relations, outreach, communications, lobbying, litigation, fees for securing other financing, interest on borrowed funds, application preparation fees and other costs incurred prior to the approval of grant funds.
1
Sewage Facilities Program Guidelines
11/27/2019
Section III – Program Requirements
A. Applicant Cost Share Requirements
An eligible applicant shall provide matching funds of not less than 50% of the total project cost. No funds from this Act will be authorized if these entities already received re-imbursement for their eligible projects from the commonwealth for their activities.
B. Other Requirements
- Conflicts of Interest An officer, director, or employee of an applicant who is a party to or who has a private interest in a project shall disclose the nature and extent of the interest to the governing body of the applicant and may not vote on any action of the applicant concerning the project, nor participate in the deliberations of the applicant concerning the project.
- Nondiscrimination No assistance shall be awarded to an applicant under this program unless the applicant certifies that the applicant shall not discriminate against any employee or against any person seeking employment by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania Human Relations Act, which prohibits discrimination on the basis of race, color, religious creed, ancestry, age, sex, national origin, handicap or disability, or in violation of any applicable federal laws. All contracts for work to be paid with grant funds must contain the commonwealth’s official nondiscrimination clause.
- Project Records The applicant must maintain full and accurate records with respect to the project and must ensure adequate control over related parties in the project. The Authority requires access to such records, as well as the ability to inspect all work, invoices, materials, and other relevant records at reasonable times and places. Upon request of the Authority, the applicant must furnish all data, reports, contracts, documents, and other information relevant to the project.
- Pennsylvania Prevailing Wage Act All the construction work associated with the project may be subject to the Pennsylvania Prevailing Wage Act, as determined by the Pennsylvania Department of Labor and Industry.
- Certification of Expenses The applicant shall sign a payment request form certifying that the expenses were incurred and were in accordance with the scope of work approved by the CFA. In lieu of a formal project audit and prior to final closeout of the grant agreement, the applicant shall be required to submit copies of all canceled checks verifying the expenditure of the Sewage Facilities Program proceeds. Bank statements may also be submitted if electronic payment of the expenditure occurred.
- Bidding Requirements Applicants must comply with all applicable federal, state, and local laws and regulations dealing with bidding and procurement.
- Guideline Provisions These guideline provisions may be modified or waived by the Authority unless otherwise required by law.
2
Sewage Facilities Program Guidelines
11/27/2019
C. Fees
The Commonwealth Financing Authority charges a $100 non-refundable application fee for Sewage Facilities Program applications. The application fee must be paid electronically by credit or debit card or electronic check through our secure, third-party vendor. Payment of the application fee must be completed prior to the certification and submission of the Electronic Single Application. Detailed payment instructions will be provided on the Certification Tab of the Electronic Single Application once all required fields have been completed.
Section IV – Grants
- Maximum grant amount for planning projects is $100,000.
- Commencement of work prior to receiving Authority approval will result in the project being ineligible for funding consideration.
- To be eligible for reimbursement, project costs must be incurred within the time frame established by the grant agreement.
Section V – Application Procedures
- To apply for funding, the applicant must submit the electronic on-line PA Department of Community and Economic Development Single Application for Assistance located at www.esa.dced.state.pa.us. Required supplemental information outlined in Appendix I of these guidelines must be attached electronically to the application as directed on the Addenda tab. For technical inquiries regarding the submission of the on-line application, contact the Customer Service Center at (800) 379-7448 or (717) 787-3405. Once submitted, please print one (1) copy of the application, including the required supplemental information, and mail to: PA Department of Community and Economic Development Office of Business Financing – CFA Programs Division Sewage Facilities Program Commonwealth Keystone Building 400 North Street, 4th Floor Harrisburg, PA 17120-0225 Please reference the application ID number on any documents sent with the signature page.
- Applications will be accepted between February 1st and May 31st of each year. All applications and required supplemental information must be received by May 31st.
3
Sewage Facilities Program Guidelines
11/27/2019
Section VI – Application Evaluation
All applications for financial assistance will be reviewed by the Authority in conjunction with the PA Department of Community and Economic Development and the PA Department of Environmental Protection to determine eligibility of the proposed project as well as the competitiveness of the proposal. Applications are evaluated on a competitive basis using the following criteria:
- Project readiness.
- Project is consistent with all local, state and regional comprehensive, regional resource management or economic development plans.
- The cost-effectiveness of the proposed project when compared to other alternatives.
- Whether the project serves existing populations or whether the project is intended to serve new development.
- The ability of the applicant to secure funding for the project.
- The proactive implementation of practices to promote sustainability of the system.
Section VII – Procedure for Accessing Funds
Upon approval of an application by the CFA, a grant agreement and commitment letter will be electronically issued to the applicant explaining the terms and conditions of the grant. The Grantee must provide the names, titles and e-mail addresses for two authorized individuals to receive and electronically sign the grant agreement. The grant agreement must be electronically signed and returned to the CFA within 45 days of the date of the commitment letter or the offer may be withdrawn by the CFA.
The applicant shall certify to the Authority that the planning expenses were incurred and were in accordance with the application approved by the Authority. The Authority will release funds to the applicant at not less than 30-day intervals.
Section VIII – Program Inquiries
Program inquiries should be directed to:
PA Department of Community and Economic Development
Office of Business Financing - CFA Programs Division
Sewage Facilities Program
Commonwealth Keystone Building
400 North Street, 4th Floor
Harrisburg, PA 17120-0225
Telephone: (717) 787-6245
Fax: (717) 772-3581
E-mail: ra-dcedsitedvpt@pa.gov
These guidelines can also be accessed online at dced.pa.gov
4
Sewage Facilities Program Guidelines
11/27/2019
Appendix I – Supplemental Information
In addition to completing the PA Department of Community and Economic Development Single Application for Assistance, please provide the following information when applying for planning grants:
Exhibit 1: Task/Activity Report
Include the approved Task/Activity Report or other appropriate form pursuant to 25 Pa Code §71.21 when applying for a grant concerning the portion of the funds distributed to the Commonwealth Financing Authority for funding statewide initiatives for complying with the act of January 24, 1966 (1965 P. L.1535, No. 537), known as the Pennsylvania Sewage Facilities Act. The Task/Activity Report must have been submitted and approved by DEP prior to the submission of the application.
Exhibit 2: Project Description
Provide a description of the project which discusses all of the following:
(a) the specific location of the project area;
(b) the historical and proposed use of land served by the project;
(c) the names of the municipalities that were involved with the project;
(d) how the project promotes the most efficient management of sewage facility resources and protects the health and safety of the citizens of the commonwealth;
(e) the sound management project practices planned to be implemented by the applicant to enhance the long-term sustainability of the sewage facility system including but not limited to energy efficiency improvements, water conservation, full cost pricing, asset management, and the installation of non-structural alternatives to minimize the amount of storm water that infiltrates the sewerage system;
(f) whether the project serves existing populations or new development.
Exhibit 3: Matching Funds Commitment
Provide funding commitment letters from all other project funding sources (including equity commitments).
- Funding commitments or term sheets provided by lending institutions must include the term, rate, and collateral conditions, and must be signed and dated.
- Funding commitments of equity from the applicant or private third party must be signed and dated (indicating the amount of funds being committed) and be accompanied by documentation (such as audited financial statements) showing the ability to commit such funds.
Exhibit 4: Resolution
For public sector applicants, provide a resolution duly adopted by the applicant’s governing board formally requesting the grant, designating an official to execute all documents, describing briefly the project scope, and identifying the grant amount.
5
Sewage Facilities Program Guidelines
11/27/2019
Appendix II – Authorized Official Resolution
Be it RESOLVED, that the _____________________________________________ (Name of Applicant) of _________________________ (Name of County) hereby request a Sewage Facilities Program (SFP) grant of $_________________ from the Commonwealth Financing Authority to be used for __________________________.
Be it FURTHER RESOLVED, that the Applicant does hereby designate ____________________ (Name and Title) and _________________________ (Name and Title) as the official(s) to execute all documents and agreements between the ____________________ (Name of Applicant) and the Commonwealth Financing Authority to facilitate and assist in obtaining the requested grant.
I, _________________, duly qualified Secretary of the _______________ (Name of Applicant), ____________________ (Name of County) ___________________, PA, hereby certify that the forgoing is a true and correct copy of a Resolution duly adopted by a majority vote of the ___________________________ (Governing Body) at a regular meeting held _________ (Date) and said Resolution has been recorded in the Minutes of the ______________________ (Applicant) and remains in effect as of this date.
IN WITNESS THEREOF, I affix my hand and attach the seal of the _______________ (Applicant), this ______ day of _______, 20____.
________________________________________________
Name of Applicant
________________________________________________
County
________________________________________________
Secretary
6
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of March 2020. Discharge to the Applebrook irrigation lagoon remained off line. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. On April 10th, the treatment plant received heating oil mixed within the influent wastewater. Operations were adjusted to prevent loss of the biomass, lessen impact on the disc filters and compliance with the NPDES permit. A copy of the letter sent to PADEP is included with this report and outlines the corrective actions employed.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for the March 2020 DMR.
Table 1
| March 2020- Final Effluent - Outfall 001 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 40 |
125 | 10 15 |
131 | 7.0 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Sample Date | |||||||||||
| March 3, 2020 | 0.319 | 3.2 | 5.9 | 5 | 13.3 | 0.102 | 0.27 | 0.12 | 0.32 | 1 | 0.0000 |
| March 10, 2020 | 0.337 | 3.2 | 6.0 | 6 | 16.9 | 0.202 | 0.57 | 0.19 | 0.53 | 1 | 0.0000 |
| March 16, 2020 | 0.343 | 4 | 11.4 | ||||||||
| March 17, 2020 | 0.325 | 3 | 5.7 | 4 | 10.8 | 0.157 | 0.43 | 0.16 | 0.43 | 2 | 0.3010 |
| March 24, 2020 | 0.342 | 2.1 | 5.0 | 3 | 8.6 | 0.100 | 0.29 | 0.19 | 3 | 0.4771 | |
| March 30, 2020 | 0.371 | 4 | 12.4 | ||||||||
| March 31, 2020 | 0.427 | 3.2 | 6.8 | 6 | 21.4 | 0.255 | 0.91 | 0.22 | 0.54 | 6 | 0.7782 |
| Average | 0.352 | 2.9 | 5.9 | 4.6 | 13.5 | 0.163 | 0.49 | 0.18 | 0.46 | 3 | 0.3113 |
| Minimum | 0.319 | 2.1 | 5.0 | 3.0 | 8.56 | 0.100 | 0.27 | 0.12 | 0.32 | 1 | 0.0000 |
| Maximum | 0.427 | 3.2 | 6.8 | 6.0 | 21.4 | 0.255 | 0.91 | 0.22 | 0.54 | 6 | 0.7782 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
Compliance with the NPDES discharge permit was achieved. The monthly average total phosphorus was reported as 0.18 mg/L as compared to the permit limitation of 0.5 mg/L. The TSS samples were consistently less than the monthly average of 10 mg/L. The TSS weekly averages are presented below in Table 2.
Table 2
| February 2020 Final Effluent Weekly TSS Averages | |
|---|---|
| Week 1 | 5 mg/L |
| Week 2 | 6 mg/L |
| Week 3 | 4 mg/L |
| Week 4 | 3 mg/L |
| Week 5 (3 days) | 5 mg/L |
The final effluent test results demonstrate that the biological treatment process performed well during March. Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during March and April. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002, remained off line.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentration and organic loading values. The monthly average daily concentrations were observed to be less than the design parameters for the treatment process.
The influent flow recorded at the flow meter installed within the “field” is compared daily against the flow recorded entering the SBRs. The flow entering the SBRs should be generally 5 to 10% greater than the flow recorded at the “field” flow meter based on historical records of the internal recycle flows. The average monthly influent wastewater flow measured at the “field” flow meter was 485,438 gallons//day as compared to the influent flow into the SBRs as 477,304 gallon/day. The average flow measured at the “field” was lower in volume than the flows to the SBRs as it should be.
The field flow meter, influent flow channel, grinder and fine screen are inspected routinely for any noticeable signs (blinding of screens) that may contribute to increased head losses through the channel. The depth of grit in the channel prior
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
to the fine grinder is also monitored for depth and for scheduling cleaning of the channel.
Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during March 2020.
Table 3
| March 2020 - Influent Wastewater | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| March 3, 2020 | 0.4324 | 291 | 1,049 | 280 | 1,010 | 31.5 | 114 | 39.0 | 141 | 5.0 | 18.0 |
| March 10, 2020 | 0.4454 | 285 | 1,059 | 243 | 903 | 27.1 | 101 | 31.2 | 116 | 3.6 | 13.4 |
| March 17, 2020 | 0.4381 | 194 | 709 | 267 | 976 | 39.3 | 144 | 41.4 | 151 | 5.1 | 18.6 |
| March 24, 2020 | 0.4849 | 227 | 918 | 238 | 962 | 30.7 | 124 | 37.3 | 151 | 3.0 | 12.1 |
| March 31, 2020 | 0.4983 | 259 | 1,076 | 350 | 1,455 | 29.4 | 122 | 44.3 | 184 | 6.0 | 24.9 |
| Average | 0.4598 | 251 | 962 | 276 | 1061 | 31.6 | 121 | 38.6 | 149 | 4.5 | 17.4 |
| Minimum | 0.4324 | 194 | 709 | 238 | 903 | 27.1 | 101 | 31.2 | 116 | 3.0 | 12.1 |
| Maximum | 0.4983 | 291 | 1076 | 350 | 1455 | 39.3 | 144 | 44.3 | 184 | 6.0 | 24.9 |
Table 4 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the April 2020 DMR.
The foam on the SBR surface remains at approximately 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.
The aluminum sulfate solution feed rate slightly decreased during April, as compared to March, while maintaining compliance with the NPDES permit.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
Table 4
| April 2020- Final Effluent - Outfall 001 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total | Fecal Coliform | |||||
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 10 | 131 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Weekly Max | 40 | 15 | |||||||||
| Sample Date | |||||||||||
| April 7, 2020 | 0.315 | 2 | 4.6 | 6 | 15.8 | 0.100 | 0.26 | 0.21 | 0.55 | 1 | 0.0000 |
| April 14, 2020 | 0.381 | 6.6 | 9.8 | 8 | 25.4 | 0.903 | 2.87 | 0.43 | 1.37 | 53 | 1.7243 |
| April 15, 2020 | 0.388 | 5 | 16.2 | ||||||||
| April 16, 2020 | 0.416 | 0.18 | 0.62 | ||||||||
| April 21, 2020 | 0.374 | 4.2 | 7.3 | 8 | 25.0 | 0.100 | 0.31 | 0.34 | 1.06 | 5 | 0.6990 |
| April 28, 2020 | 0.356 | 2.4 | 5.4 | 5 | 14.8 | 0.101 | 0.30 | 0.28 | 0.83 | 1 | 0.0000 |
| Average | 0.372 | 3.8 | 6.8 | 6.4 | 19.4 | 0.301 | 0.94 | 0.29 | 0.89 | 15 | 0.6058 |
| Minimum | 0.315 | 2.0 | 4.6 | 5.0 | 14.8 | 0.100 | 0.26 | 0.18 | 0.55 | 1 | 0.0000 |
| Maximum | 0.416 | 6.6 | 9.8 | 8.0 | 25.4 | 0.903 | 2.87 | 0.43 | 1.37 | 53 | 1.7243 |
Discharge to the Applebrook irrigation lagoon, outfall 002, was placed on line during April 2020. Table 5 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the April 2020 DMR.
Table 5
| April 2020 - Applebrook - Out Fall 002 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total | Fecal Coliform | |||||
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.135 | 25 | 30 | 2.5 | 0.5 | 200 | 1,000 | |||||
| 40 | 45 | ||||||||||
| Sample Date | |||||||||||
| April 7, 2020 | 0.0355 | 2.0 | 0.59 | 6 | 1.78 | 0.100 | 0.03 | 0.21 | 0.06 | 1 | 0.0000 |
| April 14, 2020 | 0.0558 | 6.6 | 3.07 | 8 | 3.72 | 0.903 | 0.42 | 0.43 | 0.20 | 53 | 1.7243 |
| April 15, 2020 | 0.0597 | 5 | 2.49 | ||||||||
| April 16, 2020 | 0.0460 | 0.18 | 0.07 | ||||||||
| April 21, 2020 | 0.0426 | 4.2 | 1.49 | 8 | 2.84 | 0.100 | 0.04 | 0.34 | 0.12 | 5 | 0.6990 |
| April 28, 2020 | 0.0350 | 2.4 | 0.70 | 5 | 1.46 | 0.101 | 0.03 | 0.28 | 0.08 | 1 | 0.0000 |
| Average | 0.0458 | 3.8 | 1.46 | 6 | 2.46 | 0.301 | 0.13 | 0.29 | 0.11 | 15 | 0.6058 |
| Minimum | 0.0350 | 2.0 | 0.59 | 5 | 1.46 | 0.100 | 0.03 | 0.18 | 0.06 | 1 | 0.0000 |
| Maximum | 0.0597 | 6.6 | 3.07 | 8 | 3.72 | 0.903 | 0.42 | 0.43 | 0.20 | 53 | 1.7243 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
The influent organic loadings remain below those of the influent design loadings. Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during February 2020.
Table 6
| April 2020 - Influent Wastewater | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||
| April 7, 2020 | 0.4767 | 144 | 572 | 340 | 1,352 | 32.4 | 129 | 43.1 | 171 | 6.1 | 24.3 |
| April 14, 2020 | 0.562 | 223 | 1,045 | 228 | 1,069 | 19.6 | 92 | 32.1 | 150 | 4.0 | 18.7 |
| April 21, 2020 | 0.532 | 180 | 799 | 450 | 1,997 | 31.7 | 141 | 49.0 | 217 | 7.0 | 31.1 |
| April 28, 2020 | 0.4882 | 216 | 879 | 275 | 1,120 | 30.1 | 123 | 36.1 | 147 | 5.5 | 22.4 |
| Average | 0.5147 | 191 | 824 | 323 | 1384 | 28.5 | 121 | 40.1 | 172 | 5.7 | 24.1 |
| Minimum | 0.4767 | 144 | 572 | 228 | 1069 | 19.6 | 92 | 32.1 | 147 | 4.0 | 18.7 |
| Maximum | 0.5620 | 223 | 1045 | 450 | 1997 | 32.4 | 141 | 49.0 | 217 | 7.0 | 31.1 |
PA DEP
A letter was sent to PADEP regarding oil spill. Bill Collins, PA DEP, conducted an inspection of the treatment plant and review of operations on April 14th. Mr. Collins was pleased with the operations, final effluent and his inspection of the wetlands and receiving stream.
Significant Rainfall
During April, there were twelve (12) days when rainfall occurred. Three (3) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches, with two (2) storms exceeding 1 inch of rainfall measured during a 24-hour period. These events occurred on:
April 8th 0.51 inches
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
April 13th 2.25.inches
April 24th 1.10 inches
On two events, precipitation occurred over consecutive days. April 13th through the 15th included three (3) days of consecutive days of rainfall totaling 1.55 inches. April 24th through the 27th included four (4) consecutive days totaling 2.61 inches of rainfall. A total of 4.94 inches of rainfall measured during the month.
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfalls 001 and 002. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
Chemical Usage:
| April 2020 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash | 397 lbs/day | 12,300 lbs |
| Aluminum Sulfate solution | 72.7 gpd | 2,182 gallons |
Flow data:
| April 2020 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 16.638 | 554,607 | 982,470 |
| Influent Wastewater to SBRs | 15.655* | 521,830 | 853,888 |
| Internal Recycle | 0.340** | 42,521 | 154,598 |
| Treated Effluent to Disc Filters | 15.018 | 500,604 | 917,780 |
| Final Effluent Discharge | 11.029 | 367,633 | 730,000 |
| Applebrook Golf Course | 1.091 | 43,638 | 59,712 |
*The total flow measured into the SBRs is greater than the total flow measured at the “field” flow meter. The difference does not represent or is indicative on an overflow. The difference is attributed to the inconsistent accuracy with “field” flow meter.
**The internal recycle flow is only represented by a total of eight (8) days where the flow recorded at the “field” flow meter was less than the flow recorded into the SBRs.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 7
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report:
May 2020
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Cleaned buildings and laboratory
Disc Filter Cloth Media
Aqua Aerobics, the disc filter and media manufacturer was contacted for guidance towards cleaning the cloth media after exposure to oil. The manufacturer has no experience with removing oil from the cloth media and offered a procedure to clean the cloth media of fats, oil and grease (FOG).
Review of the filter backwash pump run times, disc filter number 2 is experiencing an approximate 29% increase in filter back wash time since the oil spill. It appears that this cloth media for this filter was adversely impacted more than disc filter number 1. The flow control between the two filters is a gate valve located close to filter number 2. Although the gate valve is adjusted to equally balance the flows between filters, historically, filter number 2 tends to receive more flow than filter number 1.
A price quote was obtained for replacement disc filter cloth media which is approximately $19,000 excluding installation. Replacement of the cloth filter media is labor intensive requiring three operators at approximately 30 man-hours per filter.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 7
[Logo: Big Fish Environmental Services Inc.]
April 14, 2020
DEP Southeast Regional Office
Clean Water Program
2 E. Main Street
Norristown, PA 19401-4915.
Attn: Environmental Program Manager
RE: East Goshen Municipal Authority STP & Sewer
NPDES Permit No. PA0050504
April 10, 2020 Oil Spill entering the STP
Dear Madam/Sir:
This letter is a follow up to the telephone call and message provided to the DEP Southeast Regional Office on April 10, 2020 reporting oil observed to be present within the influent sewage entering the Ridley Creek Sewage Treatment Plant.
At approximately 3:15 PM on Friday, April 10, 2020, the plant operator at sewage treatment plant (STP), and noticed an odor of fuel oil. Upon further inspection, fuel oil was discovered in the influent grinder/auger channel. The Township Public Works Director was immediately notified of the situation. Township personnel were dispatched to the sewage treatment plant to begin locating the source of the oil and Lewis Environmental was contacted to assist with remediation of the fuel oil.
The plant operator implemented several process adjustments to minimize and prevent as much oil as possible from entering the biological treatment process (sequencing batch reactors). These changes included raising the influent wet well level set points to lessen the “drawn down” of oil through the pumps and conveyed to the downstream treatment units. Additional measures were placed in action to divert the influent sewage into an empty SBR basin. By approximately 4:30 p.m., all sewage entering the sewage treatment plant was being diverted into the empty SBR basin to isolate the sewage/oil mixture from entering the treatment process.
The source of the oil was identified at approximately 4:14 PM and eliminated. The source was a 500 gallon fuel tank containing around 200 gallons of heating oil. The maximum volume of oil which could have entered the sewer system is estimated at 300 gallons.
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 2
[Logo: Big Fish Environmental Services Inc.]
Township staff and their contractor (Pipe Data View) cleaned the sanitary sewer mains from the point of discharge to the sewage treatment plant. This worked continued through the night and was completed around 4:00 AM on Saturday, April 11, 2020.
During the time the sewage was diverted to the empty SBR basin, there was no discharge from outfalls 001 or 002. On site analysis of the final effluent water quality analysis, biological treatment units (SBRs) process control monitoring and inspection of the wetlands and receiving stream, the presence of oil was not observed. Lewis Environmental representatives were on site on Saturday, April 11, 2020 to address remediation of the contents in the empty SBR basin. Remediation and availability for use of the SBR basin is planned to be completed on or before April 17, 2020.
In summary, the sewage treatment plant continuously achieved compliance with NPDES permit discharge parameters without adverse effects to the biological process or treatment equipment. The Municipal Authority will proactively replace the cloth media on the disc filters to ensure unimpeded performance of the filters.
Should you have any questions or require additional information, please contact Scott A. Towler at scott_towler@comcast.net or 345-325-3282 or Mark Miller, DPW East Goshen Township at mmiller@eastgoshen.org or 610-692-7171.
Kind regards,
[Signature: Scott A. Towler]
Scott A. Towler, PE, LO
Operator-in-Responsible-Charge
Cc: Rick Smith, East Goshen Township
Jon Altshul, East Goshen Township
Mark Miller, East Goshen Township
Michael Ellis, PE, Pennoni Associates
Matthew Mullin, BFESI
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 2
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 13, 2020
The East Goshen Township Municipal Authority held their regular public meeting on Monday, April 13, 2020 at 7:00 pm. Due to restrictions caused by the COVID-19 virus, the meeting was held via electronic conferencing Zoom. Members in attendance were: Chairman Phil Mayer, Kevin Cummings, Dana Pizarro, and Walter Wujcik. Also in attendance were: Jon Altshul (Township Asst. Manager), Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Patrick McKenna (Gawthrop), Scott Towler (Plant Operator) and Michael Lynch (Township Supervisor).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Phil called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our medical and healthcare staffs, troops, veterans and first responders. Also remember Jack Yahraes on the passing of his wife, Kathryn.
Phil asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
1. West Goshen - Phil reported that he attended West Goshen’s meeting via conferencing. The Sewer Treatment Plant was in compliance. They don’t have estimates for Westtown Way yet. They are trying to get a waiver to continue construction. The staff is rotating to work 1 week then 2 weeks off.
Sewer Reports
1. Director of Public Works, Mark Miller’s report for March 2020:
Monthly Flows: The average daily flow to West Goshen was 699,000 gal/day.
Meters: The meters were read on a daily basis, as well as portable meters. We still have a 4th meter to install, however, the COVID 19 has extended the installation date.
C.C. Collection: We were pretty busy for the month. We did routine maintenance at the stations. We had to replace two 6” check valves at the Ashbridge Pump Station. The original ones were failing as they were not closing. We also had to replace the original air release valve on Manley Road. We replaced the lateral for 1204 Boot Road.
R.C. Collection: The stations were visited each day. We noticed an influx of rags at the stations during the month of March which was probably due to the toilet paper shortage. We changed out the 6” check valves at Hershey Mill Pump Station. Lenni Electric was utilized to install the electric service from the pole into the station. They will also be upgrading the circuit panel and breakers. Public Works has started the demo of the old generator and the building as well. We excavated for a new pad.
MA 4-13-20 draft 1
Ridley Creek Plant: The computers in the lab and the SBR building were replaced this month. The SBR computer was sent out to Wonder Ware to be factory programmed prior to the install. PWD cleaned the grit chamber as part of our routine maintenance. As I reported to you in my email, the SBR motive pump went down the first week of March. Deckmens jumped right on it when we dropped it off. The estimate was $14,735.00. Whenever I have a large expense like that, I will always make you aware of it. I always have Deckmens give a replacement cost so I have something to compare repair cost with. The problem with the FLYGHT pumps is getting parts in a timely manner as it takes 3 to 4 weeks to get the parts. I would recommend purchasing a spare pump, however I would ask Jon when would be the best time to place the order due to the cost of $25,890.00, delivery would be 8 to 10 weeks.
Note: The pump is being repaired and will cost about $15,000.00. Jon noted that the purchase of a spare pump is not in the budget. He would have to see what other projects can be pushed to next year to allow money to purchase a spare pump. Mark agreed with Jon and suggested waiting until the end of the summer. They took pump #2 and moved it over.
The generators for Hershey Mill and Ridley have arrived. We have begun to install the new pads.
Alarms: We responded to 23 alarms in March.
PA One Calls: We responded to over 57 PA One Calls for the month of March.
Rainfall: 4.75 inches for March.
Lateral Caps: We replaced 6 lateral caps.
West Goshen: They have demolished the trickling filter and have started excavation and yard piping for the Co-Mag System.
Mark discussed the situation due to a fuel leak Friday. He took a walk into the wetlands and saw no evidence of an oil leak. He took pictures. It was confined to the sewer plant. The flow was diverted to SBR2. They will clean the system from Paoli Pike to the sewer plant. An inspection will be done tomorrow. The filters took at hit. He wants to order media which were all covered in fuel. They are about 8 years old. He did power wash them but it will wear them out. Scott monitored effluent. There was no toxicity. There was discussion of insurance coverages. Phil thanked Mark and Scott for handling this situation over a holiday weekend.
2. Pennoni Engineer’s Report for March dated April 1, 2020
Invoices – Invoices with summaries were provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
Generator Replacement – The generator was delivered in early March. We are revising the concrete pad expansion plans for construction by Public Works prior to generator installation and we anticipate submitting the revised plans the week of April 6.
Tallmadge Drive Sewer Main Replacement
The 2-year maintenance bond period ends March 21, 2021.
I&I Support and Reporting
No activity since our last report.
Hershey’s Mill Pump Station Generator Replacement
The generator was delivered in early March. We previously provided design plans for use by Public Works for construction of the electric work and concrete pad.
MA 4-13-20 draft 2
Chapter 94 Reports
We completed the 2019 Chapter 94 reports for the Ridley Creek STP, Chester Creek system. and Westtown system. They are due annually by March 31st, but DEP has directed that the hard copy plans not be submitted until they provide direction for where and how to submit. They do not want electronic submissions.
New Connections
We performed construction observation at 204 Line Road during installation of the grinder pump and gravity sewer from the house to the grinder pump tank.
Note: the Ridley Creek generator replacement design was to reuse the current pad, but the pad will have to be replaced. Mike should have a new plan for Mark tomorrow.
Mike mentioned that Chart 1 table for the Chapter 94 report is the current month’s flows. The DEP only wants current data. He can add another table showing 3 month rolling numbers for use by the MA.
3. Big Fish Environmental Services – Scott reported that the plant achieved compliance during March. When the rain slows down and it gets warm, there will be less foam. The ammonia for winter was 7.0. For April 1 it was 2.5. They are in transition now. He explained the transition process. There was a typo in his last report. TKN in February was 33.7 not 337. He explained the process of getting samples. We had 2.5 inches of rain today. They can’t use the empty tank because the fuel residue is in it, so they are pushing the extra flow through the plant.
The Field Flow Meter is not consistent. They are starting to get gaps. There are 2 meters the Field Flow which meters the community and the SBR which includes internal use.
On Table 4 the DMR for March – He just got the data last week and reviewed it.
The discharge to Applebrook is 33,000 gal/day.
Approval of Minutes
Kevin moved to approve the March 9, 2020 minutes as amended. Walter seconded the motion. The motion passed unanimously.
Approval of Invoices
1. Pennoni - After discussion, Kevin moved to approve payment of the following Pennoni invoices:
| Pennoni Invoice #1018272 | $ 1,422.50 |
|---|---|
| Pennoni Invoice #1018273 | $ 556.00 |
| Pennoni Invoice #1018268 | $ 341.50 |
| Pennoni Invoice #1018269 | $ 2,468.50 |
Walter seconded the motion. The motion passed unanimously.
2. DRBC-Delaware River Annual Fee Invoice #202165 for $638.00. Jon explained this fee. Dana moved to approve payment of the DRBC invoice for $638.00. Walter seconded the motion. The motion passed unanimously.
3. Kevin moved to approve payment of the Able Rental Crane invoice #1117433-0001 in the amount of $1,160.48. Walter seconded the motion. The motion passed unanimously.
MA 4-13-20 draft
3
4. PMAA Workshop – This has been delayed until late May. Walter will attend. Kevin moved to approve payment of the PMAA Workshop in the amount of $100.00. Dana seconded the motion. The motion passed unanimously.
5. Kevin moved to approve payment of the following Gawthrop invoices:
| Gawthrop invoice #222100 | $ 720.00 |
|---|---|
| Gawthrop invoide #223088 | $ 300.00 |
Walter seconded the motion. The motion passed unanimously.
6. Power Premium invoices were discussed. Mike feels they are including the 5-year warranty cost of $4,600.00 in this cost, because the original cost for the service was $114,000. He recommends a follow up on this. Kevin moved to approve payment of the Premium Power invoice #61518 (RCSTP generator) in the amount of $118,828.00 which we believe includes a 5-year warranty. Walter seconded the motion. The motion passed unanimously.
Kevin moved to approve payment of the Power Premium invoice #16515 (HM PS generator) in the amount of $37,409.00. Dana seconded the motion. The motion passed unanimously. Phil asked Mark to check on the warranty.
Liaison Reports
1. Board of Supervisors – Mike Lynch mentioned that there will be no Zoning Hearing Board meetings for the Malvern Institute until a full public meeting can be held in a public setting.
Jon mentioned that at tomorrow’s meeting they will approve a resolution to maintain sewer rates at the quarter 1 level for one more quarter.
2. Conservancy Board – Walter mentioned that Keep East Goshen Beautiful Day is cancelled.
Financial Reports
Jon Altshul provided the following written report:
In March, the Municipal Authority recorded $19,779.00 in revenues (via a transfer from Sewer Capital Reserve) and $40,653.00 in expenses, for a negative variance of $20,874.00. As of February 29th, the fund balance was $5,353.
Dana pointed out the Mallie audit of $9,300 doesn't show on the budget. Reports were discussed. Jon will make a correction.
Goals
Goals for 2020 were discussed. The members want to add dates to the different projects to show their progress.
New Business
1. Sanitary Sewer Manhole Adjustment/Segment A of the Paoli Pike Trail - Memo received from Mark Gordon mentioned that during engineering work for Segment A of the Paoli Pike Trail it has been determined that an existing sanitary sewer Manhole needs to be raised 2.7 feet. Mark Miller has the materials and Public Works will provide the labor. Kevin moved that the Municipal Authority authorize the Chairman to sign the Project Agreement for Incorporated Work so that it can be forwarded to the PA DEP to raise the manhole 2.7 feet. Walter seconded the motion. The motion passed unanimously.
MA 4-13-20 draft
4
Adjournment
There being no further business Walter moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, May 11, 2020 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
MA 4-13-20 draft
5
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Louis Smith, Twp Mgr.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1022333
Invoice Date : 04/30/2020
Project : EGMAU19004
Project Name : RCSTP Generator Replacement
For Services Rendered Through 04/19/2020
Evaluated conflicts with proposed expanded concrete slab and generator anchor bolts; re-designed slab for complete demo of the existing pad and replacement.
Phase 01 Concept Design
Labor
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | .50 | 132.00 | 66.00 |
| Senior Professional | 7.25 | 125.00 | 906.25 |
| Associate Professional | 1.00 | 97.00 | 97.00 |
| Totals | 8.75 | 1,069.25 | |
| Total Labor | 1,069.25 |
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,069.25 | 11,844.50 | 12,913.75 |
| Limit | 13,000.00 | ||
| Remaining | 86.25 |
Total this Phase $1,069.25
Total this Invoice $1,069.25
[Handwritten: OK Jon Alt 5/8/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU19004 Invoice Summary
Invoice Date 4/30/2020
| Project: | EGMAU19004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP Generator Replacement | ||
| Invoice No: | 1022333 | ||
| Invoice Period: | 3/23/2020 | to | 4/19/2020 |
| Initial Authorization: | $ 5,000.00 | Date: | 4/30/2020 |
| Contract Amount: | $ 13,000.00 | ||
| Previously Invoiced: | $ 11,844.50 | ||
| Current Invoice: | $ 1,069.25 | ||
| Invoiced to Date ($): | $ 12,913.75 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 86.25 | ||
| Remaining Budget (%): | 1% |
Budget by Phase:
| Phase Name: | RCSTP Generator Replacement |
|---|---|
| Phase Budget: | $ 13,000.00 |
| Previously Invoiced: | $ 11,844.50 |
| Current Invoice: | $ 1,069.25 |
| Invoiced to Date ($): | $ 12,913.75 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 86.25 |
| Remaining Budget (%): | 1% |
Comments: Evaluated conflicts with proposed expanded concrete slab and generator anchor bolts; re-designed slab for complete demo of the existing pad and replacement.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Rick Smith
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1022332
Invoice Date : 04/30/2020
Project : EGMAU20001
Project Name : 2020 General Services
For Services Rendered Through 04/19/2020
April Engineer's Report, prepared for and attended April MA meeting, evaluated alternatives for connection of 222 Westtown Way residence to public sewer, and reviewed vendor's Hershey's Mill PS and Ridley Creek STP generator invoices vs. previously agreed upon costs and warranty provisions.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 468.75 | 1,697.25 | 2,166.00 |
| Limit | 28,000.00 | ||
| Remaining | 25,834.00 |
Labor
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.00 | 132.00 | 396.00 |
| Associate Professional | .75 | 97.00 | 72.75 |
| Totals | 3.75 | 468.75 | |
| Total Labor | 468.75 |
Total this Invoice $468.75
[Handwritten: Jon Alt OK 5/8/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU20001 Invoice Summary
Invoice Date 4/30/2020
| Project: | EGMAU20001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2020 General Services | ||
| Invoice No: | 1022332 | ||
| Invoice Period: | 3/23/2020 | to | 4/19/2020 |
| Initial Authorization: | $ 27,000.00 | Date: | 4/30/2020 |
| Contract Amount: | $ 28,000.00 | ||
| Previously Invoiced: | $ 1,697.25 | ||
| Current Invoice: | $ 468.75 | ||
| Invoiced to Date ($): | $ 2,166.00 | ||
| Invoiced to Date (%): | 8% | ||
| Remaining Budget ($): | $ 25,834.00 | ||
| Remaining Budget (%): | 92% |
Budget by Phase:
| Phase Name: | 2020 General Services |
|---|---|
| Phase Budget: | $ 28,000.00 |
| Previously Invoiced: | $ 1,697.25 |
| Current Invoice: | $ 468.75 |
| Invoiced to Date ($): | $ 2,166.00 |
| Invoiced to Date (%): | 8% |
| Remaining Budget ($): | $ 25,834.00 |
| Remaining Budget (%): | 92% |
Comments: April Engineer's Report, prepared for and attended April MA meeting, evaluated alternatives for connection of 222 Westtown Way residence to public sewer, and reviewed vendor's Hershey's Mill PS and Ridley Creek STP generator invoices vs. previously agreed upon costs and warranty provisions.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Rick Smith
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1022334
Invoice Date : 04/30/2020
Project : EGMAU20003
Project Name : 2019 Chapter 94 Reports
For Services Rendered Through 04/19/2020
Prepared Ridley Creek STP, West Goshen, and Westtown Chapter 94 Reports and submitted to the Township for review; and coordinated with DEP on report submission procedure.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,017.75 | 4,264.25 | 5,282.00 |
| Limit | 10,000.00 | ||
| Remaining | 4,718.00 |
Labor
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.75 | 132.00 | 363.00 |
| Associate Professional | 6.75 | 97.00 | 654.75 |
| Totals | 9.50 | 1,017.75 | |
| Total Labor | 1,017.75 |
Total this Invoice $1,017.75
[Handwritten: OK Jon Alt 5/8/20]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMAU20003 Invoice Summary
Invoice Date 4/30/2020
| Project: | EGMAU20003 | ||
|---|---|---|---|
| Pennoni Job No.: | 2019 Chapter 94 Reports | ||
| Invoice No: | 1022334 | ||
| Invoice Period: | 3/23/2020 | to | 4/19/2020 |
| Initial Authorization: | $ 10,000.00 | Date: | 4/30/2020 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 4,264.25 | ||
| Current Invoice: | $ 1,017.75 | ||
| Invoiced to Date ($): | $ 5,282.00 | ||
| Invoiced to Date (%): | 53% | ||
| Remaining Budget ($): | $ 4,718.00 | ||
| Remaining Budget (%): | 47% |
Budget by Phase:
| Phase Name: | 2019 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 4,264.25 |
| Current Invoice: | $ 1,017.75 |
| Invoiced to Date ($): | $ 5,282.00 |
| Invoiced to Date (%): | 53% |
| Remaining Budget ($): | $ 4,718.00 |
| Remaining Budget (%): | 47% |
Comments: Prepared Ridley Creek STP, West Goshen, and Westtown Chapter 94 Reports and submitted to the Township for review; and coordinated with DEP on report submission procedure.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
05/06/2020
Client No: 6604M
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 300.00 | 500.00 | 0.00 | -300.00 | $500.00 |
[Handwritten: OK Jon Alt]
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Page: 1
05/06/2020
Client No: 6604-001M
Invoice No. 223910
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Description | Hours |
|---|---|---|
| 04/07/2020 PMM |
Email from J. Altshul in preparation for virtual authority meeting. | 0.20 |
| 04/08/2020 PMM |
Email from S. D'Amore regarding Zoom meeting; Emails (2) to/from J. Altshul regarding notice for meeting. | 0.60 |
| 04/10/2020 PMM |
Email from S. D'Amore in preparation for Authority meeting; Email from J. Altshul regarding fuel oil leak from M&T Bank into sewer system. | 0.40 |
| 04/13/2020 PMM |
Review and analyze Board Meeting materials in preparation for meeting; Attend virtual Zoom meeting of Authority Board. | 1.30 |
| For Current Services Rendered | 2.50 500.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 2.50 | $200.00 | $500.00 |
| Previous Balance | $300.00 |
|---|---|
| Total Current Charges | 500.00 |
| 04/21/2020 Payment | -300.00 |
| Balance Due | $500.00 |
Maillie
Expertise Beyond The Numbers ®
[Handwritten: Paid]
PO Box 680
Oaks, PA 19456-0680
Phone: 610-935-1420
Web: www.maillie.com
E-mail: firm@maillie.com
East Goshen Municipal Authority
Attn: Mr. Rick Smith
1580 Paoli Pike
West Chester, PA 19380-6107
Client Number: 2500
Invoice: 1000097986
Date: 02/29/2020
Due Date: Upon Receipt
For examination of the financial statements of the Authority for the year ended December 31, 2019 and assistance with preparation of Management Discussion and Analysis report
$9,300.00
| Billed Time & Expenses | $9,300.00 |
|---|---|
| Invoice Total | $9,300.00 |
APPROVED BY: [signature]
DATE PAID: [blank]
CHECK #: [blank]
CHARGED TO: 07424 3110
| 02/29/2020 | 01/31/2020 | 12/31/2019 | 11/30/2019 | 10/31/2019+ | Total |
|---|---|---|---|---|---|
| 9,300.00 | 0.00 | 0.00 | 0.00 | 0.00 | $9,300.00 |
Please return this portion with payment.
Invoice: 1000097986
ID: 2500
East Goshen Municipal Authority
610-692-7171
Date: 02/29/2020
Due Date: Upon Receipt
Amount Due: $9,300.00
Amount Enclosed: $________
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA April Financial Report
Date: May 6, 2020
In April, the Municipal Authority recorded $174,861 in revenues (primarily via a transfer from Sewer Capital Reserve of $171,208 for the generators) and $176,014 in expenses (again, primarily for the generators), for a negative variance of $1,153. As of April 30, the fund balance was $4,200.
A complete list of 2020 YTD MA revenues and expenses is attached.
2020 Year-to-Date Municipal Authority Revenues and Expenses, as of 4/30/20
| Account # | Description | Per | Debits | Credits | Date | Check# | ID # | Name | Description | Description 2 | Description 3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 | BEGINNING BALANCE | ||||||||||
| 07341-1000 | INTEREST EARNINGS | 2001 | 15.00 | - | 1/2/2020 | BANK FEES | REIMBURSE S/R FOR DEC.2019 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 2001 | - | 0.65 | 1/31/2020 | INTEREST | INTEREST EARNED JANUARY 2020 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 2002 | 15.00 | - | 2/4/2020 | REIMB.FEES | REIMBURSE S/R FOR JANUARY 2020 | ACH & POSITIVE PAY BANK FEI | |||
| 07341-1000 | INTEREST EARNINGS | 2002 | - | 0.64 | 2/29/2020 | INTEREST | INTEREST EARNED FEBRUARY 2020 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 2003 | 15.00 | - | 3/2/2020 | BANK FEES | REIMBURSE S/R FOR FEB.2020 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 2003 | - | 0.62 | 3/31/2020 | INTEREST | INTEREST EARNED MARCH 2020 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 2004 | 15.00 | - | 4/6/2020 | BANK FEES | REIMBURSE S/R FOR MARCH 2020 | BANK FEES | |||
| 07341-1000 | INTEREST EARNINGS | 2004 | - | 1.77 | 4/30/2020 | INTEREST | INTEREST EARNED APRIL 2020 | 7100.1035 | |||
| 07341-1000 | INTEREST EARNINGS | 2005 | 15.00 | - | 5/4/2020 | REIMBURSE | REIMBURSE S/R FOR APRIL 2020 | POSITIVE PAY & ACH BANK FEI | |||
| 07354-0400 | BEGINNING BALANCE | ||||||||||
| 07354-0400 | DCED GRANT | 2002 | - | 3,231.00 | 2/1/2020 | LAST 10% | DCED GRANT - MUFFIN MONSTER | DCED GRANT | |||
| 07364-1130 | BEGINNING BALANCE | ||||||||||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | - | 423.00 | 2/3/2020 | 2670 | 011679 1 | STOFFLET, MICHAEL | |||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | - | 423.00 | 2/26/2020 | 659 | 011680 1 | JACOBS, ROBERT & CHERYL | |||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | - | 423.00 | 2/28/2020 | 869 | 011681 1 | GEORGE SMITH & CHRISTINA CONLE | |||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | 141.12 | - | 2/3/2020 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | 141.12 | - | 2/26/2020 | PINE ROCK | ANNUL PINE ROCK INSTALLMENT | ||||
| 07364-1130 | CONNECTION FEES - SEWER | 2002 | 141.12 | - | 2/28/2020 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07380-1000 | BEGINNING BALANCE | ||||||||||
| 07380-1000 | MISCELLANEOUS REVENUE | 2002 | - | 141.12 | 2/3/2020 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07380-1000 | MISCELLANEOUS REVENUE | 2002 | - | 141.12 | 2/26/2020 | PINE ROCK | ANNUL PINE ROCK INSTALLMENT | ||||
| 07380-1000 | MISCELLANEOUS REVENUE | 2002 | - | 141.12 | 2/28/2020 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||
| 07392-0500 | BEGINNING BALANCE | ||||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 2002 | - | 1,451.30 | 2/12/2020 | XFER | XFER FROM SEWER TO MA | ||||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 2002 | 1,451.30 | - | 2/12/2020 | REVERSE | REVERSE XFER TO MA FROM SEWER | OPERATING | |||
| 07392-0500 | TRANSFER FROM SEWER OPERAT | 2004 | - | 3,666.00 | 4/15/2020 | XFER | XFER TO MUN.AUTH. FROM SEWER | OPERATING AND SEWER CAPT | |||
| 07392-0501 | BEGINNING BALANCE | ||||||||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2002 | - | 4,391.80 | 2/11/2020 | RECLASS | RECLASS TRXS 72036 & 72044 | ||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2002 | - | 10,984.60 | 2/11/2020 | RECLASS | RECLASS TRXS 72036 & 72044 | ||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2002 | - | 16,832.16 | 2/12/2020 | XFER | XFER $ FROM SEWER CAPITAL TO | MA | |||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2003 | - | 18,342.17 | 3/12/2020 | XFER | XFER $ FROM SEWER CAPITAL TO | MUNICIPAL AUTH. 3/12/20 | |||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2003 | - | 1,451.30 | 3/17/2020 | XFER | XFER FROM SEWER OPERATING TO | MA FEB.2020 | |||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | - | 156,237.00 | 4/3/2020 | XFER | XFER $ FROM SEWER CAPITAL TO | MUNIC.AUTH. | |||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | - | 1,422.50 | 4/15/2020 | XFER | XFER TO MUN.AUTH. FROM SEWER | OPERATING AND SEWER CAPT | |||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | - | 1,451.30 | 4/17/2020 | XFER | XFER FROM 09 TO 07 2/12/20 | ||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | 1,451.30 | - | 4/20/2020 | REVERSE | REVERSE TRX. 73370 | ||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | 1,451.30 | - | 4/20/2020 | XFER | XFER TO 09 FROM 07- 3/13/20 | ||||
| 07392-0501 | TRANSFER FROM SEWER CAP RES | 2004 | - | 15,000.00 | 4/27/2020 | XFER | XFER $ FROM SEWER CAPITAL TO | MA 4/27/20 | |||
| 07392-0900 | BEGINNING BALANCE | ||||||||||
| 07392-0900 | TRANSFER FROM SEWER CAP RES | 2001 | - | 4,391.80 | 1/15/2020 | XFER | XFER $ FROM SEWER SINKING TO | MA RE: JANUARY EXPENSES | |||
| 07392-0900 | TRANSFER FROM SEWER CAP RES | 2001 | - | 10,984.60 | 1/15/2020 | XFER | XFER $ FROM SEWER SINKING TO | MA RE: JAN.2020 ADDL'EXP. | |||
| 07392-0900 | TRANSFER FROM SEWER CAP RES | 2002 | 4,391.80 | - | 2/11/2020 | RECLASS | RECLASS TRXS 72036 & 72044 | ||||
| 07392-0900 | TRANSFER FROM SEWER CAP RES | 2002 | 10,984.60 | - | 2/11/2020 | RECLASS | RECLASS TRXS 72036 & 72044 | ||||
| 07424-1400 | BEGINNING BALANCE | ||||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 2003 | 7,884.44 | - | 3/30/2020 | 3198 | 425 | EAST GOSHEN TOWNSHIP - GENERAL | QTR.1 2020 REIMBURSEMENT | ||
| 07424-3000 | BEGINNING BALANCE | ||||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 2003 | 100.00 | - | 3/12/2020 | 3194 | 1004 | PMAA | PMAA SPRING WORKSHOP - W | ||
| 07424-3000 | MISCELLANEOUS EXPENSE | 2003 | 638.00 | - | 3/19/2020 | 3196 | 3871 | DELAWARE RIVER BASIN COMMISSION | 2020 ANNUAL FEE D-2000-030 | ||
| 07424-3110 | BEGINNING BALANCE | ||||||||||
| 07424-3110 | MUNIC.AUTH.-AUDITING | 2003 | 9,300.00 | - | 3/26/2020 | 3197 | 808 | MAILLIE FALCONIERO & CO. | EXAM.- FINANCIAL STATEMENT | MUNICIPAL AUTHORITY | |
| 07424-3130 | BEGINNING BALANCE |
| Account # | Description | Per | Debits | Credits | Date | Check# | ID # | Name | Description | Description 2 | Description 3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3130 | ENGINEERING SERVICES | 2001 | 1,666.00 | - | 1/15/2020 | 3183 | 1052 | PENNONI ASSOCIATES INC. | SERVICES THRU 12/8/19 2019 | ||
| 07424-3130 | ENGINEERING SERVICES | 2002 | 893.25 | - | 2/12/2020 | 3187 | 1052 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/19/20 2020 ( | ||
| 07424-3130 | ENGINEERING SERVICES | 2003 | 2,508.00 | - | 3/11/2020 | 3193 | 1052 | PENNONI ASSOCIATES INC. | SERVICE THRU 2/16/20 2020 ( | ||
| 07424-3130 | ENGINEERING SERVICES | 2004 | 3,366.00 | - | 4/15/2020 | 3202 | 1052 | PENNONI ASSOCIATES INC. | SERVICES THRU 3/22/20 2020 | ||
| 07424-3140 | BEGINNING BALANCE | ||||||||||
| 07424-3140 | LEGAL SERVICES | 2001 | 558.05 | - | 1/16/2020 | 3185 | 528 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - 12/6-12/11/1 | ||
| 07424-3140 | LEGAL SERVICES | 2003 | 720.00 | - | 3/11/2020 | 3191 | 528 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE - 1/13/20 GEN | ||
| 07424-3140 | LEGAL SERVICES | 2004 | 300.00 | - | 4/15/2020 | 3201 | 528 | GAWTHROP GREENWOOD & HALSTED | LEGAL SERVICE 3/6-3/9/20 GE | ||
| 07424-7490 | BEGINNING BALANCE | ||||||||||
| 07424-7490 | CAP.REPLACEMENT R.C. | 2001 | 10,984.60 | - | 1/15/2020 | 3184 | 3691 | EVOQUA WATER TECHNOLOGIES LLC | DECANTER VALVES | ||
| 07424-7490 | CAP.REPLACEMENT R.C. | 2002 | 15,280.00 | - | 2/12/2020 | 3188 | 3217 | TRI-STATE TECHNICAL SALES CORP. | ELECTRIC VALVES FOR SBR TAI | ||
| 07426-1000 | BEGINNING BALANCE | ||||||||||
| 07426-1000 | HERSHEY MILL STATION - ENGINE | 2001 | 3,805.05 | - | 1/15/2020 | 3183 | 1052 | PENNONI ASSOCIATES INC. | SERV. THRU 12/8/19 HMPS SL DESIGN FOR GENERATOR | ||
| 07426-1000 | HERSHEY MILL STATION - ENGINE | 2002 | 1,390.67 | - | 2/12/2020 | 3187 | 1052 | PENNONI ASSOCIATES INC. | SERVICE THRU 1/19/20 HMPS DESIGN FOR GENERATOR | ||
| 07426-1000 | HERSHEY MILL STATION - ENGINE | 2003 | 1,098.77 | - | 3/11/2020 | 3193 | 1052 | PENNONI ASSOCIATES INC. | SERV. THRU 2/16/20 HMPS SL | ||
| 07429-1501 | BEGINNING BALANCE | ||||||||||
| 07429-1501 | BARKWAY PUMP STATION CAPIT, | 2002 | 91.57 | - | 2/12/2020 | 3186 | 317 | CONTRACTOR'S CHOICE | SLINGS & STIHL HD LOCK-BLA[ | ||
| 07429-1501 | BARKWAY PUMP STATION CAPIT, | 2002 | 69.92 | - | 2/12/2020 | 3189 | 1983 | YALE ELECTRIC SUPPLY CO | FENDER WASHER, PVC ADAPT & GRAY LIQUIDTITE | ||
| 07429-1501 | BARKWAY PUMP STATION CAPIT, | 2003 | 2,649.50 | - | 3/11/2020 | 3192 | 765 | LEC - LENNI ELECTRIC CORPORATION | MUFFIN MONSTER PIPED & W | ||
| 07429-1503 | BEGINNING BALANCE | ||||||||||
| 07429-1503 | HERSHEYS MILL PUMP STATION ( | 2004 | 37,409.00 | - | 4/3/2020 | 3199 | 4238 | PREMIUM POWER SERVICES LLC. | 60k W GENERATOR HERSHEY! | ||
| 07429-1505 | BEGINNING BALANCE | ||||||||||
| 07429-1505 | RCSTP CAPITAL | 2001 | 586.75 | - | 1/15/2020 | 3183 | 1052 | PENNONI ASSOCIATES INC. | SERV. THRU 12/8/19 RCSTP GI | ||
| 07429-1505 | RCSTP CAPITAL | 2003 | 8,884.00 | - | 3/11/2020 | 3190 | 356 | DECKMAN MOTOR & PUMP INC. | REBUILT SBR PUMP #2 | ||
| 07429-1505 | RCSTP CAPITAL | 2003 | 2,798.40 | - | 3/11/2020 | 3192 | 765 | LEC - LENNI ELECTRIC CORPORATION | RIDLEY CREEK MCC BREAKER E | ||
| 07429-1505 | RCSTP CAPITAL | 2003 | 2,911.50 | - | 3/11/2020 | 3193 | 1052 | PENNONI ASSOCIATES INC. | SERV. THRU 2/16/20 RCSTP GI | ||
| 07429-1505 | RCSTP CAPITAL | 2003 | 1,160.48 | - | 3/19/2020 | 3195 | 4233 | ABLE EQUIPMENT RENTAL INC. | CRANE CARRY DECK RENTAL 3 | ||
| 07429-1505 | RCSTP CAPITAL | 2004 | 118,828.00 | - | 4/3/2020 | 3199 | 4238 | PREMIUM POWER SERVICES LLC. | 450k W GENERATOR RCSTP | ||
| 07429-1505 | RCSTP CAPITAL | 2004 | 1,422.50 | - | 4/15/2020 | 3202 | 1052 | PENNONI ASSOCIATES INC. | SERV. THRU 3/22/20 2020 RCS REPLACEMENT | ||
| 07429-1505 | RCSTP CAPITAL | 2004 | 14,688.00 | - | 4/24/2020 | 3203 | 356 | DECKMAN MOTOR & PUMP INC. | REBUILT FLYGT PUMP - RCSTP |
EAST GOSHEN TOWNSHIP
Other Funds
April 2020
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| REVENUE | ||||||||
| INTEREST EARNINGS | 07341 1000 | (56.32) | (56.32) | (13.23) | (13.23) | |||
| CAPITAL RESERVE-INTEREST | 07341 1010 | |||||||
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | |||||||
| DCED GRANT | 07354 0400 | 3,231.00 | 3,231.00 | |||||
| C.C. TAPPING FEES | 07364 1100 | |||||||
| R.C.TAPPING FEES | 07364 1110 | |||||||
| M.C. LOAN PAYMENTS | 07364 1120 | |||||||
| CONNECTION FEES - SEWER | 07364 1130 | 845.64 | 845.64 | |||||
| MISCELLANEOUS REVENUE | 07380 1000 | 565 | 189 | 423.36 | 234.36 | 47 | (47.08) | |
| TRANSFER FROM GENERAL ACCT | 07392 0100 | |||||||
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 319,435 | 106,479 | 3,666.00 | (102,813.00) | 26,620 | 3,666.00 | (22,953.58) |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | 277,000 | 92,334 | 223,210.23 | 130,876.23 | 23,083 | 171,208.20 | 148,124.87 |
| TRANSFER-ANNUAL CAP.RESERVE | 07392 0510 | |||||||
| GRANT REVENUE | 07392 0800 | |||||||
| LOAN PROCEEDS - SEWER PROJECT | 07392 0804 | |||||||
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | |||||||
| TOTAL REVENUE | 597,000 | 199,002 | 231,319.91 | 32,317.91 | 49,750 | 174,860.97 | 125,110.97 | |
| EXPENSES | ||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,000 | 10,666 | 7,884.44 | 2,781.56 | 2,667 | 2,666.67 | |
| R.C. LOAN ISSUANCE COSTS | 07424 1500 | |||||||
| MISCELLANEOUS EXPENSE | 07424 3000 | 738.00 | (738.00) | |||||
| MUNIC.AUTH.-AUDITING | 07424 3110 | 9,300.00 | (9,300.00) | |||||
| ENGINEERING SERVICES | 07424 3130 | 60,000 | 20,000 | 8,433.25 | 11,566.75 | 5,000 | 3,366.00 | 1,634.00 |
| LEGAL SERVICES | 07424 3140 | 8,000 | 2,666 | 1,578.05 | 1,087.95 | 667 | 300.00 | 366.67 |
| W.G. C.C.STP-UPGRADE | 07424 7400 | |||||||
| MANHOLE COVER REPLACEMENTS | 07424 7405 | |||||||
| C.C. CAPITAL - METERS | 07424 7410 | |||||||
| C.C. CAPITAL- COLLECTION | 07424 7420 | |||||||
| C.C. CAPITAL- INTERCEPTOR | 07424 7430 | |||||||
| CAPITAL PROJ.-ENGINEERING | 07424 7431 | |||||||
| R.C. CAPITAL-STP | 07424 7440 | |||||||
| R.C. CAPITAL - COLLECTION | 07424 7450 | |||||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | |||||||
| CAP.REPLACEMENT R.C. | 07424 7490 | 26,264.60 | (26,264.60) | |||||
| CAPITAL REPLACEMENT ASHBRIDGE | 07424 7491 | |||||||
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 6,294.49 | (6,294.49) | |||||
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | |||||||
| TALLMADGE DRIVE | 07426 3000 | |||||||
PAGE 9
Report Date 2004 05/06/20 12 : 35 PM
EAST GOSHEN TOWNSHIP
Other Funds
April 2020
Municipal Authority
| Account Title | Acct # | Annual Budget | Y-T-D Budget | Y-T-D Actual | Y-T-D Variance | M-T-D Budget | M-T-D Actual | M-T-D Variance |
|---|---|---|---|---|---|---|---|---|
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | |||||||
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | |||||||
| RELINING | 07429 1500 | |||||||
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 2,810.99 | (2,810.99) | |||||
| HERSHEYS MILL PUMP STATION CAPITAL | 07429 1503 | 45,000 | 15,000 | 37,409.00 | (22,409.00) | 3,750 | 37,409.00 | (33,659.00) |
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 87,000 | 29,000 | 29,000.00 | 7,250 | 7,250.00 | ||
| RCSTP CAPITAL | 07429 1505 | 365,000 | 121,666 | 151,279.63 | (29,613.63) | 30,417 | 134,938.50 | (104,521.83) |
| ASBESTOS CONCRETE ENGINEERING | 07429 3130 | |||||||
| DIVERSION PROJ.- LEGAL | 07429 3166 | |||||||
| WEST GOSHEN CAPITAL | 07429 6100 | |||||||
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | |||||||
| M.A.-R.C. DEBT SERVICE | 07471 1010 | |||||||
| DVRFA PUMPING STATIONS - PRINCIPAL | 07471 2000 | |||||||
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | |||||||
| M.A.-R.C. INTEREST | 07472 1010 | |||||||
| DVRFA PUMPING STATIONS - INTEREST | 07472 2000 | |||||||
| TRANSFER TO GENERAL FUND | 07492 0100 | |||||||
| TRANSFER TO SEW.OPERATING | 07492 0500 | |||||||
| TRF TO SEWER CAPITAL RESERVE FUND | 07492 0550 | |||||||
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | |||||||
| TOTAL EXPENSES | 597,000 | 198,998 | 251,992.45 | (52,994.45) | 49,750 | 176,013.50 | (126,263.50) | |
| NET RESULT FROM OPERATIONS | 4 | (20,672.54) | (20,676.54) | (1,152.53) | (1,152.53) |
PAGE 10
Report Date 2004 05/06/20 12 : 35 PM
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
[Stamp: FYI]
April 30, 2020
Dear Property Owner:
The purpose of this letter is to inform you that Synthes USA has submitted a Land Development application for their facility at 1303 Goshen Parkway, West Chester, PA 19380. Synthes is proposing to add additional walkways, parking and an addition to their building. The applicant was granted Conditional Use approval for these proposed improvements to the property in 2017, and is now applying for Land Development approval.
The applicant proposes to add a +/- 1,200 square foot addition to the existing manufacturing facility, future equipment pads, future parking spaces, and future sidewalks on the property.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Land Development applications. The meeting dates for this matter are listed below and subject to change without further written notice:
May 6, 2020 – Planning Commission (7:00 PM)
May 13, 2020 – Conservancy Board (7:00 PM)
June 3, 2020 – Planning Commission (7:00 PM)
June 16, 2020 – Board of Supervisors (7:00 PM)
During Covid-19 Contingency Operations, all public meetings are being held via Video / Telephone Conferencing. Members of the public can participate in the May meeting via telephone only. To access the May 6th Planning Commission meeting using your telephone, call (929) 205-6099, use access code 893 5918 6610. The Planning Commission meeting will be live streamed via YouTube with a 20 second delay and will be available for rebroadcast. Future call in numbers for meetings will be provided on the Township Website prior to the meeting dates.
The Land Development Plan and Application will be available for review on the Township Website beginning Friday, May 1, 2020 no later than 5 PM. Use the following link; https://eastgoshen.org/boards/planning-commission/ and click on the May 6th meeting agenda to access the plans and application materials.
Please give me a call if you have any questions or need additional information.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
CC: All Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\1000 foot letter LD 042992020.doc