Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
October 12, 2020
7:00 PM
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting
2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
3. SEWER REPORTS
a. Director of Public Works Report. b. Pennoni Engineer's Report. c. Big Fish Environmental Report
4. APPROVAL OF MINUTES
a. September 14, 2020
5. APPROVAL OF INVOICES
Pennoni Invoice #1040599 Pennoni Invoice # I 040604 Pennoni Invoice #1040607 Yale Invoice# Sl 1650645.001 Lenni Electric Invoice# 200837
Teledyne Instruments Invoice #S020419254
6. LIAISON REPORTS
7. FINANCIAL REPORTS
a. September Financial Repmi
8. OLD BUSINESS
a. Westtown Way Pump Station Review
F:\Data\Shared Data\Agendas\Municipal Authority\2020\10-12-2020 -.doc
$ 5,845.50 $ 601.50 $ 222.25 $ 441.17 $ 7,875.02 Paid $ 7,912.90 P
9. Goals:
Goal Status
On - going, MA Rep attending WGSA meetings monthly. WGSA plans to go to bid in early 2021 on Continue to Monitor Upgrades at WGSTP and WWPS Westtown Way Pump Station
Continue to Implement Infiltration and Inflow Currently have 4 portable meters on R.C. Lines for the Sewer System Just finished TVing Supplee Valley Implement planned capital projects: RCSTP Emergency Generator Replacement Installed and completed $152,890 DCED grant awarded. Project to be deferred Caustic Soda Project until 2021
Hunt Country Pump Station Mag Meter Replacement 2021 Hunt Country Pump Station Muffin Monster Replacement 2021 Hunt Country Pump Station Bypass Pump 2021 Manhole and flow meter ordered for Hibberd Lane. Two other flow meters deferred till 2021 Two New RC Permanent Flow Meters Flow meter has arrived, waiting on meter pit
10. NEW BUSINESS
a. 632 Thorncroft Drive
11. CAPACITY REQUESTS
12. ANY OTHER MATTER
13. CORRESPONDENCE AND REPORTS OF INTEREST
14. PUBLIC COMMENT
15. ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipa\ Authority\2020\I08l2w2020 w,doc
AREA CODE 610
692-7171
October 9, 2020
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKI='., WEST CHESTER, PA 19380-6199
To: Municipal Authority
From: Mark Miller
Re: September 2020 Monthly Report
Monthly Flows:
Meters:
C.C. Collection:
R.C. Collection:
R.C. Plant:
The average daily flow to West Goshen was 714,000 per day.
The meters were been read on a daily basis. We have had some problems with the Reservoir Road meter. Allied Control has ordered the parts, we are waiting their arrival. We have installed the portable flow meters and are reading them on a weekly basis, the data is sent to Mike
EIiis's office for their review.
The stations were visited on a daily basis. We had no problems for the
month. We continued to open up the sewer right of ways so we could get through in the event of an emergency. We will be working on the Ash bridge Farms right of ways in the upcoming month.
On Wednesday during routine maintenance we found a radiator leaking on the generator. To replace the generator we are looking at $3800.00. We are going to pull the radiator out and send it out to be repaired. It will be out of service for ten days. We have arranged to rent a generator until ours is back in service.
The stations were visited on a daily basis. We had no problems for the month. The fence around the Hershey mill generator still needs to be completed. The landscaping should be planted sometime in October. We also cut the sewer right of ways. We had a new lateral connection at 936 Cornwallis Drive.
Routine maintenance was performed as needed. The two pumps that were sent to Deckmen Electric have returned. The aeration pump was in good condition the impellers that we switched two years ago were in great condition. The sludge pump was a different story, they had to replace the primary and secondary seals and rewind the motor. The motors were dropped into SBR 3; Lenni Electric will wire them up. We
Alarms:
PA 1 Calls:
Monthly Rainfall:
Lateral Caps:
had received a call from a resident who was concerned with his lateral; we televised the lateral and found a large root ball at the main connection. We used our root cutter and removed the blockage. While we were on site, we took the time to pull a half dozen manholes to check the condition of the manholes. I also showed the men where the
Meadowbrook/Cornwallis system was routed and tied in. The lines were in very good condition and the manholes were dry. While looking into a storm water problem on Hibberd Lane I pulled two sewer lateral caps and found both were broken. I talked to Kevin and Steven and we decided that we would inspect every lateral cap and install new caps with Cast Iron Buffalo boxes at ground level. This will
eliminate the landscapers running them over. I am going to look into the GPS for the cleanouts while were doing the repairs.
The new Generator was brought on line Tuesday; they encountered an alarm problem with the oil-sending unit, which will be replaced. Our generator technician had the vendor run the generator through several load tests, all were successful by the end of the day, and the new unit was placed in service.
We responded to 12 alarms for September.
We responded to over 95 PA One Calls for the month of September.
4.23 inches for the month of September.
We replaced 6 lateral caps.
Invoices
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
October 8, 2020
• Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-6S5-4451
F: 302-654-289S
www .pennoni.com
• Generator Replacement-We evaluated an inquiry from the electrician to tie an additional circuit and equipment into the new generator.
• SBR #3 Assessment-We performed construction observation during Dutchland's CIM coating repairs. We are also finalizing our visual condition assessment report, which we anticipate submitting by October 19.
• Caustic Soda Conversion - We will initiate design work upon confirmation of the grant approval from PA DCED.
Tallmadge Drive Sewer Main Replacement
• The 2-year maintenance bond period ends March 21, 2021.
Capital Improvement Planning
• We reviewed scoping for projects in the 5-year CIP and provided update budgetary cost opinions.
l&I Support and Reporting
• We reviewed the first week of meter data from the new portable meter locations in the Ridley Creek collection system.
Ridley Creek Collection System Permanent Meters
• We understand that the manhole and permanent meter for the Hibberd Lane location has been ordered. We will provide construction phase assistance as needed.
New Connections
• No activity by Pennoni since our last report.
Act 537 Planning
• As discussed at the May MA meeting, the need for an Act 537 Plan Update will be revisited in early 2021.
Westtown Way Pump Station
• We completed review of documentation including concept plans, reports, calculations, and engineering estimates for potential value engineering options. We issued comments on October 8 to East Goshen Township for consideration.
END OF REPORT
(ai'g Fish
Environmental Services Inc.
Executive Summary
RCSTP Monthly Operations Report: October 2020
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge limitations for the month of August 2020. Discharge to the Applebrook irrigation lagoon remained on line. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. There were no reported odor complaints during the month.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for the August 2020 DMR.
Table 1 August 2020- Final Effluent - Outfall 001
Flow CBOD5 TSS NH4-N Phosphorus, Total Fecal Coliform
NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ Discharge Limitations Average mg/L month mg/L month mg/L month mg/L month Geo Mean 0.75 20 125 10 131 2.5 44 0.5 3 200 40 15 Sample Date August 3, 2020 0.168 4 5,6 August 4, 2020 0.712 3.2 19.0 7 41.6 0,636 3.78 0.15 0,89 10 August 10, 2020 0.186 3 4.7 August 11, 2020 0.185 3.4 5.2 2 3.1 0.673 1.04 0.12 0.19 1 August 18, 2020 0,248 3,0 6.2 3 6,2 0.100 0.21 0.12 0,25 6 August 25, 2020 0.198 2.3 3.8 9 14.9 0.100 0.17 0.20 0.33 4
Average 0.306 3.0 8.6 5 14.1 0.38 1.30 0.15 0.41 5 Minimum 0.185 2.3 3.8 2 3.1 0.10 0.17 0.12 0.19 1 Maximum 0.712 3.4 19.0 9 41.6 0,67 3.78 0.20 0.89 10
Compliance with the NPDES discharge permit was achieved. The monthly average total phosphorus was reported as 0.15 mg/L as compared to the permit limitation of 0.5 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 5 mg/L as
compared to the discharge limitation of 10 mg/L. The TSS weekly averages are presented below in Table 2. BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 7
Geo Mean
1,000
1.0000
0.0000 0.7782 0.6021
0.5951 0.0000 1.0000
Table 2
RCSTP Monthly Operations Report: October 2020
Auaust 2020 Final Effluent Weeklv TSS Averaaes
Week 1 6 mq/L Week2 3 mq/L Week3 3 ma/L Week4 9 ma/L
The final effluent test results demonstrate that the biological treatment process performed well during August and September. Sequencing batch reactors (SBRs) numbered 1, 2 and 4 were in service during August and September. SBR 3 remained out of service for repairs. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002, continues to remain on line. Table 3 illustrates the Applebrook sample data reported for outfall 002 for the August 2020 DMR.
Table 3 August 2020 -Applebrook -Out Fall 002
Flow CBOD5 TSS NH4-N Phosphorus,Total Fecal Coliform
NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ Geo Discharge Limitations Average mg/L month mg/L month mg/L month mg/L month Geo Mean Mean
0.135 25 30 2.5 44 0.5 3 200 1,000 40 45
August 3, 2020 0.1422 4 5.60
August 4, 2020 0.1548 3.2 4.1 7 9.04 0.636 0.82 0.15 0.19 10 1.0000
August 10, 2020 0.1670 3 4.18
August 11, 2020 0.1623 3.4 4.6 2 2.71 0.673 0.91 0.12 0.16 1 0.0000
August 18, 2020 0.1503 3.0 3.8 3 3.76 0.100 0.13 0.12 0.15 6 0.7782
August 25, 2020 0.1576 2.3 3.0 9 11.83 0.100 0.13 0.20 0.26 4 0.6021
Average 0.146 3.0 3.9 5 6.3 0.38 0.50 0.15 0.19 5 0.5951
Minimum 0.150 2.3 3.0 2 2.71 0.10 0.13 0.12 0.15 1 0,0000
Maximum 0.167 3,4 4.6 9 11.8 0,67 0.91 0.20 0.26 10 1.0000
BIG FISH ENVIRONMENTAL SERVICES, INC.1554 Paoli Pike #262, West Chester PA 19380-6102
Page 2 of 7
Environmental Services Inc.
RCSTP Monthly Operations Report: October 2020
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentration and organic loading values. The monthly average daily concentrations were observed to be less than the design parameters for the treatment process.
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during August 2020.
Table 4 August 2020 - Influent Wastewater
Phosphorus,Total, Flow BODs TSS NH4-N TKN, mg/L mg/L Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57 Sample Date
August 4, 2020 0.6293 229 1,202 318 1,669 28.5 150 26.1 137 4.8 25.2
August 11, 2020 0.35581 205 608 330 979 35.4 105 42.9 127 7.8 23.1
August 18, 2020 0.32944 87.7 241 182 500 32.9 90 32.8 90 5.3 14.6
August 25, 2020 0.46754 270 1,053 245 955 32.3 126 38.3 149 5.3 20.7
Average 0.4455 198 776 269 1,026 32 118 35.0 126 5.8 20.9 Minimum 0.3294 88 241 182 500
29
90 26.1 90 4.8 14.6 Maximum 0.6293 270 1,202 330 1,669 35 150 42.9 149 7.8 25.2
Table 5 illustrates the available data for the final effluent composite sample data reported for outfall 001 for use with the September 2020 DMR.
The foam on the SBR surface remains at approximately 70 to 100% coverage of the surface area. The foam thickness is approximately 3 to 4 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.
BIG FISH ENVIRONMENTAL SERVICES, INC.1554 Paoli Pike #262, West Chester PA 19380-6102
Page 3 of 7
(aig Fish
Environmental Services Inc.
Table 5
RCSTP Monthly Operations Report: October 2020
September 2020- Final Effluent- Outfall 001
Flow CBODs TSS NH4-N Phosphorus, Total Fecal Coliform
NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ Discharge Limitations Average mg/L month mg/L month mg/L month mg/L month Geo Mean
0.75 20 125 10 131 2,5 44 0.5 3 200
40 15
Sample Date
September 1, 2020 0.191 2,8 4.5 5 8.0 0.125 0.20 0.12 0.19 5
September 2, 2020 0.18 4 6,0
September 8, 2020 0,174 2.0 2.9 6 8.7 0.100 0.15 0.21 0.30 3
September 9, 2020 0.19 0.00 0.15 0.24
September 15, 2020 0.196 3.2 5.2 6 9,8 0.10 0.16 0.13 0.21 40
September 22, 2020 0.198 2.9 4.8 4 6.6 0.100 0.17 0.20 0.33 5
September 29, 2020 0.2 0.17 0.28
Average 0.190 2.7 4.3 5 7.8 0.10 0.12 0.17 0.27 16
Minimum 0.174 2.0 2.9 4 6.0 0.10 0.00 0.13 0.21 3
Maximum 0.200 3.2 5.2 6 9.8 0.10 0.17 0.21 0.33 40
Table 6 illustrates the available data for the Applebrook composite sample data reported for outfall 002 for use with the September 2020 DMR.
Table 6 September 2020-Applebrook -Out Fall 002
Geo Mean
1,000
0.6990
0.4771
1.6021
0.6990
0.9261
0.4771
1.6021
Flow CBODs TSS NH4-N Phosphorus,Total Fecal Coliform
NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ Geo Discharge Limitations Average mg/L month mg/L month mg/L month mg/L month Geo Mean Mean
0.135 25 30 2.5 44 0.5 3 200 1,000
40 45
September 1, 2020 0.1438 2.8 3.4 5 6.00 0.125 0.15 0.12 0.14 5 0.6990
September 2, 2020 0.1406 4 4.69
September 8, 2020 0.1386 2.0 2.3 6 6.94 0.100 0.12 0.21 0.24 3 0.4771
September 9, 2020 0.1478 0.15 0.18
September 15, 2020 0.1452 3.2 3.9 6 7.27 0.100 0.12 0.13 0.16 40 1.6021
September 22, 2020 0.1494 2.9 3.6 4 4.98 0.100 0.12 0.20 0.25 5 0.6990
September 29, 2020 0.1501 0.17 0.21
Average 0.146 2.7 3.3 5 6.0 0.10 0.12 0.17 0.21 16 0.9261
Minimum 0.139 2.0 2.3 4 4.69 0.10 0.12 0.13 0.16 3 0.4771
Maximum 0.150 3.2 3.9 6 7.3 0.10 0.12 0.21 0.25 40 1.6021
BIG FISH ENVIRONMENTAL SERVICES, INC.1554 Paoli Pike #262, West Chester PA 19380-6102
Page 4 of 7
(ai'g Fish
Environmental Services Inc.
RCSTP Monthly Operations Report: October 2020
Table 7 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during September 2020. The influent wastewater pollutant loadings remain within the design criteria for the treatment process and equipment.
Table 7 September 2020 - Influent Wastewater
Phosphorus,Total, Flow BOD5 TSS NH4•N TKN, mg/L mg/L Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day MGD Average 335 2,098 320 2,001 32 200 48 301 9.1 57 Sample Date
September 1, 2020 0.4259 218 774 530 1,883 38.7 137 46.0 163 6.0 21.3
September 8, 2020 0.4189 189 660 234 818 35.5 124 49.3 172 5.5 19.2
September 15, 2020 0.4605 184.0 707 235 903 34.7 133 46.6 179 6.0 23.0
September 22, 2020 0.3675 382.0 1,171 243 745 37.7 116 46.9 144 5.3 16.2
September 29, 2020 0.4472
Average 0.4240 243 828 311 1,087 37 128 47.2 165 5.7 20.0 Minimum 0.3675 184 660 234 745 35 116 46.0 144 5.3 16.2 Maximum 0.4605 382 1,171 530 1,883 39 137 49.3 179 6.0 23.0
During September, the average monthly influent wastewater flow measured at the "field" flow meter was 427,064 gallons//day as compared to the influent flow into the SBRs as 412,561 gallon/day. The difference was 14,503 gallons/day.
The field flow meter, influent flow channel, grinder and fine screen are inspected routinely for any noticeable signs (blinding of screens) that may contribute to increased head losses through the channel. The depth of grit in the channel prior to the fine grinder is also monitored for depth and for scheduling cleaning of the channel.
PADEP
No activity
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 5 of 7
RCSTP Monthly Operations Report: October 2020
Environmental Services Inc.
Significant Rainfall
During September, there were nine (9) days when rainfall occurred. Two (2) storm events resulting in a daily precipitation amount equal to or greater than 0.50 inches. These events occurred on:
September 11th
September 30th 0.62 inches 1.43 inches
Consecutive Storm events included:
September 1st through 4th for a total of 0.29 inches September 26th through 28th for a total of 0.77 inches
A total of 3.11 inches of rainfall measured during the month.
Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfalls 001 and 002. Adjustments included reducing aeration minutes per cycle, extending decant minutes per cycle and reducing settling times.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs. Cleaned final effluent weir trough daily Skimmed surface of disc filters daily Drained and cleaned disc filters bi-weekly Cleaned buildings and laboratory Replaced influent sampler pump tubing
Ch I U emica saae:
Chemical Soda Ash Aluminum Sulfate solution
Seotember 2020
Dailv Averaae
300 81.4
Total Month Iv
9,600 2,442
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 6 of 7
RCSTP Monthly Operations Report: October 2020
Flow data:
September 2020 Flow Meter Location Total Volume Average Daily Daily Maximum for Month, MG Flow, gpd Flow, gpd Influent Wastewater to 12.811 427,064 527,720 Screening Building* Influent Wastewater to 12.377 412,561 496,384 SBRs* Internal Recycle** 0.138 22,946 49,164 Treated Effluent to Disc 12.381 412,702 475,520 Filters Final Effluent Discharge 5.459 181,967 212,000
Applebrook Golf Course 4.248 141,590 165,000
SBR3
• Representatives from Dutch land were on site on the 14th and 15th to perform repairs on SBR 3 • The Motive and waste pump bases were sand blasted and painted the 18th. A second coat of paint was applied on the 21st. • The sump pump removed on 22nd to prepare SBR for service.
Disc Filters
• Replaced a back-wash valve on disc filter number 1. The valve was failing to fully close.
LMI Alum Feed Pump
• Replaced the 1-inch ball valve. The seals failed and were leaking.
Lenni Electric working on New Emergency Generator
• On the 29th Electricians were on site working on the new generator • On the 30th, Colonial Electric delivered supplies for the new generator • On 1st October, assist Electricians pulling wires for the new generator.
BIG FISH ENVIRONMENTAL SERVICES, INC.1554 Paoli Pike #262, West Chester PA 19380-6102
Page 7 of 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
33 34 35 36 37 38 39 40 41 42
43 44 45 46 47 48 49
DRAFT EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
September 14, 2020
The East Goshen Township Municipal Authority held their regular meeting on Monday, September 14, 2020 at 7:00 pm. Due to restrictions caused by the COVID-19 virus, the meeting was held via electronic conferencing Zoom. Members in attendance were: Chairman Phil Mayer, Jack Yahraes, Dana Pizarro, Kevin Cummings and Walter Wujcik. Also in attendance were: Jon Altshul (Township Asst. Manager), Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Robert Jefferson (Gawthrop), Michael Lynch (Township Supervisor); Scott Towler (Plant Operator)
COMMON ACRONYMS:
MA- Municipal Authority EFES - Big Fish Environmental Services
BOS - Board a/Supervisors CB - Conservancy Board
NP DES-National Pollutant Discharge Elimination System
PC - Planning Commission DE? - Department of Environmental Protection EPA - Environmental protection Agency HC - Historical Commission l&I -Inflow & Infiltration LCSTP- Lockwood Chase Sewer Treatment Plant
Call to Order & Pledge of Allegiance
PM- Prevention Maintenance PR-Park & Recreation Board RCSTP - Ridley Creek Sewer Treatment Plant SER - Sequencing Batch Reactor SSO - Sanitmy System Ove,jlow
WAS- Waste Activated Sludge
Phil called the meeting to order at 7:05 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember our medical and healthcare staffs, troops, veterans and first responders. Phil asked if anyone would be recording the meeting. There was no response.
Chairman's Report 1. Phil repmied that the West Goshen Sewer Plant was in compliance. With the Hurricane there were some after flows. They are working on the design issues with the Westtown Pump Station. They received two grant awards, one from PASWS for $411,000 and the other from H2OPA WS for $500,000. Jon asked about the miscellaneous legal expenses. Phil commented that the estimates from 5 months ago are the most recent.
Sewer Reports
1. Director of Public Works, Mark Miller's report for August 2020: Monthly Flows: The average daily flow to West Goshen was 739,000 gal/day. Meters: The meters were read on a daily basis. We did have a problem with the Reservoir Road meter. We tried to reset it, but the problem continued. Allied Control was out on
September 3 to calibrate the meters at which time they looked at the Reservoir Road meter and the totalizer was bad. The part has been ordered and will be installed as soon as we receive it. C.C. Collection: We visited the pump stations on a daily basis. All of the wet wells were washed down due to the high levels during the Hurricane Isaias. John Laidley was called in to reset the FOG Rods, which were out of control due to the high levels from the hurricane. During the storm, the pump stations ran well with no problems to report. All the stations were on emergency power for two days. We hauled fuel to all of the stations until power was restored. We cleaned and televised the lines in Suplee Valley. We called in for a possible
MA 9-14-20 draft 1
I sewer overflow between Meadow Drive and Baldwin Dr. After searching the entire area, 2 nothing was found. We started clearing the sewer right of ways. The work required us to 3 remove downed trees and repair washouts around manholes. 4 Hurricane Isaias: 5 The plant held its own. The plant went into storm mode. Our Operator remained on site until 6 the plant went back to normal. Matthew did an outstanding job operating the plant during and 7 after the storm. We lost the Internet and phone service. The plant had to be monitored 8 around the clock. The generators ran for 4 days. We shuttled fuel each day to fill the 9 generators. IO I have to say PECO was very responsive. I located two fuses that were destroyed causing our 11 power problems. PECO showed that we had power when we truly didn't. I explained to the 12 emergency operation center that they had two separate problems. The power was restored 13 Friday morning. As of Friday morning, we were still waiting on the internet service. It was 14 restored Saturday morning. 15 R.C. Collection: The pump station was visited on a daily basis. We ordered the new 16 metering manhole and the new flow meter for Hibberd Lane. The HutTicane kept us busy for I 7 days at the pump stations. Both stations were on emergency power for two days. Hershey 18 Mill carried over. We did contact DEP as required. I did not hear anything from DEP. The 19 Hershey Mill generator is up and running. Our generator contractor was on site and he took 20 care of running the generator under load and checking the installation. We cleared the sewer 21 right of ways. After the hurricane, the guys inspected the manholes along the creek. 22 Ridley Creek Plant: Routine maintenance was performed. We pulled the pumps out of the 23 SBR3 and they were taken to Deckman for repairs. While the tank is down, we will have a 24 contractor sand blast the fittings and piping and primer the paint.
25
Alarms: We responded to 39 alarms in August. 26 PA One Calls: We responded to over 70 PA One Calls for the month of August. 27 Rainfall: 12.76 inches for the month of August. 28 Lateral Caps: We replaced 8 lateral caps. 29 30 31 2. Pennoni Engineer's Report for Angust dated September 10, 2020 32 Invoices - Invoices with summaries were provided under separate cover. 33 Ridley Creek Sewage Treatment Plant (RCSTP) 34 35 36 37 38 39 40 41 42
43 44 45 46 47
•
•
Generator Replacement - No activity by Pennoni since out last report. We will provide construction phase assistance as needed. SBR #3 Assessment - We performed a visual condition assessment of the coatings, concrete and piping on August 26, and met with Mark Miller to discuss the assessment and recommended repairs. We also met with Dutchland on September IO to discuss and schedule the coating repairs. They will recoat the three isolated bubbles that were cut out during our assessment, repair peeling at the top of the coatings and repair bubbling on the floor coating. They plan to start on September 14 and anticipate the work will talce 2-3 days. Note: Dutchland is not charging for the repairs. Mike mentioned that for tank I, they took some cores and found the concrete was better than expected. He wants to take some cores as samples now to have tested. Phil pointed out that there is a Capital Budget line for linings. Mike is concerned about areas where there is no coating. Mike and Mark will discuss costs.
MA 9-14-20 draft 2
1 Tallmadge Drive Sewer Main Replacement 2 The 2-year maintenance bond period ends March 21, 2021. 3 I&I Support and Reporting 4 We coordinated with Mark Miller on locations for five metering locations for the next round 5 of portable metering. The metering will continue in the Ridley Creek collection system and 6 will occur along the interceptor and developments upstream of Bow Tree ( where the last 7 metering occurred) to strategically work through the entire collection system. 8 Ridley Creek Collection System Permanent Meters 9 We understand that the manhole and permanent meter for the Hibberd Lane location has been 10 ordered. We will provide construction phase assistance as needed. 11 New Connections 12 No activity by Pennoni since our last report. 13 Act 537 Planning- Grant Opportunity 14 As discussed at the May meeting, the need for an Act 537 Plan Update will be revisited in 15 early 2021. 16 Willistown Township 17 No activity by Pennoni since our last repmt regarding the possible Willistown sewer system 18 sale. 19 Westtown Way Pump Station 20 We continued review of documentation including plans, calculations, and engineering 21 estimates for potential value engineering options. We expect to issue a draft comment memo on 22 September 11 for consideration by the Township. 23 24 3. Big Fish Environmental Services - 25 He repo1ted that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the 26 permit discharge limitations for the month of July 2020. Discharge to the Applebrook irrigation 27 lagoon remained online. Chemical usage utilized for pH and total alkalinity remained consistent with 28 previous months. No significant mechanical or operational issues were observed during operation of 29 sludge dewatering equipment or SBR treatment process. There were no odor complaints during the 30 month. 31 They cleaned up the plant after the hurricane. The peak flow into the SBRs occurred during the 32 hurricane for over 1 million gpd. SBR 3 is being serviced. Upon completion of SBR 3, SBR 4 will 3 3 be removed from service for cleaning, inspection and repairs. It will remain offline until required for 34 service. He is getting better service from the lab. Two others he looked at would cost 15-20% more 35 and one wouldn't do Tuesday pickup. 36 37 Approval of Minutes 38 Jack moved to approve the August 10, 2020 minutes as amended. Walter seconded the motion. The 39 motion passed unanimously. 40 41 Approval of Invoices 42 Kevin moved to approve payment of the 15 invoices as listed on the agenda totaling $26,037.97. 43 Walter seconded the motion. There was no discussion. The motion passed unanimously. 44 45 Liaison Reports 46 1. Board of Supervisors - Mike Lynch repmted that there will be a live Zoning Board Hearing next 47 week in the Public Works Garage concerning the Malvern Institute.
MA 9-14-20 draft 3
1 2. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful Day will be Saturday 2 October 3, 2020. 3 4 Financial Reports 5 Jon Altshul provided the following written report: 6 In August, the Municipal Authority recorded $24,047 in revenues (via transfers) and $19,756 in 7 expenses for a positive variance of $4,291. As of August 31, the fund balance was $5,561. 8 9 MA Audit Committee - Jon mentioned that through conversations with Walter and Dana the 10 following items were discussed: 11 1. Quarterly Administrative charge backs are not being approved by the MA. He provided a 12 worksheet that lays out the formula for these charges. Presumably the formula was approved by the 13 MA a decade ago. The current members agreed to the current percentages. They will review these 14 items quaiierly. 15 2. Transfers - Jon explained that they transfer money from the Sewer Operating Fund for 16 either operating expenses or the purchase of new assets. They transfer from the Sewer Capital 1 7 Reserve Fund for replacement assets. 18 Phil thanked Walter and Dana for their work on the Audit Committee. 19 20 Goals 21 Goals for 2020 were reviewed. 22 23 Old Business 24 1. Caustic Soda Project - The PA DCED Small Water and Sewer Grant has been awarded for 25 $152,890.00. Mike Ellis explained that this will be used to change the caustic soda process from 26 manual to automatic. There will be a lai·ge tank outside with piping through the wall to the chemical 27 feed pumps to each SBR. The DEP does not require permits only notification. The Township Public 28 Works will do the installation along with sub-contractors. 10 to 15% of the engineering costs will be 29 covered by the grant. Dana moved to accept the proposal for engineer costs for the Caustic Soda 30 Project. Jack seconded the motion. The motion passed unanimously. Mike Lynch thanked Jon for 31 getting this grant. 32 33 New Business 34 1. 2021 Budget - The Proposed Budget for 2021 and the 2021-2025 Capital Improvement Program 35 were discussed. The MA members agreed with the Proposed Budget for 2021. 36 37 Adjournment 38 There being no further business Jack moved to adjourn the meeting. Walter seconded the motion. 39 The motion passed unanimously. The meeting was adjourned at 8:25 pm. 40 The next regular meeting will be held on Monday, October 12, 2020 at 7:00 pm. 41 42 Respectfully submitted, 43 44 45 Ruth Kiefer, Recording Secretary
MA 9-14-20 draft 4
Rick Smith East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 09/20/2020
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1040599 Invoice Date : 09/24/2020
Project : EGMAU20001 Project Name : 2020 General
Services
September Engineer's Report; reviewed September RCSTP operator's report; and prepared for and attended September MA meeting. Prepared updated cost estimates for projects in 5-year Capital Improvement Plan including budgetary estimating and scoping for remainder of Supplee Valley cured-in-place pipe lining. Performed visual structural and coating assessment for SBR #3, prepared draft report of observations and recommendations, attended field meetings with M. Miller and Dutchland to discuss and schedule CIM coating repairs and ductile iron influent pipe fittings re-coating, contacted contractors for DIP re-coating quotes, and performed on-site observation of Dutchland's CIM coating repairs.
Billing Limits
Total Billings
Limit Remaining
Labor
Authority Engineer Senior Professional Associate Professional Graduate Professional
Sr. Engineering Technician
Totals Total Labor
Current 5,845.50
Hours
8.00 10.75 8.75 21.50 7.50 56.50
Prior 16,092.00
Rate 132.00 125.00 97.00 88.00 94.00
To-Date 21,937.50 28,000.00 6,062.50
Amount 1,056.00 1,343.75 848.75 1,892.00 705.00 5,845.50
Total this Invoice
5,845.50
$5 845.50
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice:
Invoiced to Date($): Invoiced to Date (%):
Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):
East Goshen Municipal Authority
EGMAU20001 Invoice Summary
Invoice Date 9/24/2020
EGMAU20001 2020 General Services
1040599 8/17/2020 $ 27,000.00 $ 28,000.00 $ 16,092,00 $ 5,845.50 $ 21,937.50 78% $ 6,062.50 22%
2020 General Services $ 28,000.00 $ 16,092.00 $ $
5,845.50 21,937.50
to Date:
Remaining Budget($): $ Remaining Budget(%):
78% 6,062.50 22%
9/20/2020 9/24/2020
Comments: September Engineer's Report; reviewed September RCSTP operator's report; and prepared for and attended September MA meeting. Prepared updated cost estimates for projects in 5- year Capital Improvement Plan including budgetary estimating and scoping for remainder of Supplee Valley cured-in-place pipe lining. Performed visual structural and coating assessment for SBR #3, prepared draft report of observations and recommendations, attended field meetings with M. Miller and Dutchland to discuss and schedule CIM coating repairs and ductile iron influent pipe fittings re-coating, contacted contractors for DIP re-coating quotes, and performed on-site observation of Dutchland's CIM coating repairs.
Rick Smith East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 09/20/2020
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1040604 Invoice Date : 09/24/2020
Project : EGMAU20002 Project Name : 2020 l&I Support and
Reports
Attended meeting with M. Miller to determine locations for next round of portable collection system metering, and prepared follow-up exhibit and written recommendations of proposed locations.
Billing Limits
Total Billings
Limit Remaining
Labor
Authority Engineer Associate Professional
Totals Total Labor
Current
601.50
Hours
1.25 4.50 5.75
Prior 5,281.75
Rate 132.00 97.00
To-Date 5,883.25 11,000.00 5,116.75
Amount
165.00 436.50 601.50 601.50
Total this Invoice ======'$=6=01"'.=5=0
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):
East Goshen Municipal Authority
EGMAU20002 Invoice Summary
Invoice Date 9/24/2020
EGMAU20002 2020 General Services
1036928 8/17/2020 $ 11,000.00 $ 11,000.00 $ 5,281.75 $ 601.50 $ 5,883.25 53% $ 5,116.75 47%
2020 General Services
$ 11,000.00 $ 5,281.75 $ 601.50 $ 5,883.25
to Date:
Remaining Budget($): $
53% 5,116.75 47% Remaining Budget(%):
9/20/2020 9/24/2020
Comments: Attended meeting with M. Miller to determine locations for next round of portable collection system metering, and prepared follow-up exhibit and written recommendations of proposed locations.
Rick Smith East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 09/20/2020
INVOICE Remit Payment To: Pennon i Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1040607 Invoice Date : 09/24/2020
Project : EGMAU20005 Project Name : West Goshen Sewer
System Consultation
Continued preparation of comment memo on Westtown Way Pump Station value engineering review; and initial discussion of comments with M. Miller.
Labor
Authority Engineer Senior Professional
Totals Total Labor
Hours
.50 1.25 1.75
Rate Amount 132.00 125.00
Total this Invoice
66.00 156.25 222.25
./ /
222.25
$222.25
.·
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Arnau nt: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
West Goshen Sewer System Consultation
EGMAU20005 Invoice Summary
Invoice Date 9/24/2020
EGMAU20005 West Goshen Sewer System Consultation
1037327 8/17/2020 to $ 5,000.00 Date: $ 5,000.00 $ 2,817.75 $ 222.25 $ 3,040.00 61% $ 1,960.00 39%
West Goshen Sewer System Consultation
$ 5,000.00 $ 2,817.75 $ 222.25 $ 3,040.00
9/20/2020 9/24/2020
Remaining Budget($): $ Remaining Budget(%):
61% 1,960.00 39%
Comments: Continued preparation of comment memo on Westtown Way Pump Station value engineering review; and initial discussion of comments with M. Miller.
lllf "'a I e ELECTRIC i111111iiw I 4 SUPPLY co INVOICE
CUSTOMER NUMBER SUB ACCOUNT#
200 GARFIELD AVENUE 117491 117491
WEST CHESTER PA 19380-ARPROVtD BY: 610-719-9253 Fax DATE PAID: ------
INVOICE NUMBER INVOICE DATE
S116506452.001 09/29/20 CHECK#: REMIT TO: CHARGEDTO-:Q74rJq _/!5-" US ELECTRICAL SERVICES, INC.
BILL TO:
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
CUSTOMER PO # JOB NAME / RELEASE #
RIDLEY CREEK GEN
PO BOX 412485 BOSTON MA 02241-2485
SHIP TO:
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
ORDERED BY SALESPERSON
HOUSE ACCOUNT
WRITER SHIP VIA TERMS SHIP DATE ORDER DATE
DAVID A SMITH WILL CALL NET 15TH 09/29/20
ORDER QTY SHIP QTY DESCRIPTION UNIT PRICE 3ea 3ea KRY 078077 FA30 3" PVC FEMALE 368.043 C ADAPTER 5ea 5ea KRY 078072FA10 1" PVC FEMALE 68.591 C ADAPTER 5ea 5ea TOPAZELE RB3 1" X 1/2" RIGID 178.336 C REDUCING BUSHING !! TAGGED ITEM !! 6ea 6ea EGS SC-50 1/2" DIC SQZ FLEX CONN 55.037 C 50ft 50ft FLEX 1/2" STEEL UL 100' COIL 72.944 C 6ea 6ea EGS SC-300 3" DIC SQZ FLEX CONN 2060.083 C !! TAGGED ITEM !! 20ft 20ft FLEX 3" STEEL UL 25' COIL 1188.916 C 3ea 3ea EGS PB-800-D 3" 105D PLSTC INSBSH 126.239 C 2ea 2ea STLCTY 52171-1/2-3/4-E 4SQ 2-1/8 203.709 C DEEP BOX MADE IN USA 2ea 2ea STLCTY RS11 4" RAISED COVER SINGLE 180.171 C F/RECPT 2ea 2ea CWD 1877W-BOX SGL RCPT-NEMA5-20R 2.356 ea 1pk 1pk RACO 5269-0 1/2 GRY ZINC PLUG BG4 46.000 C (1 PK= 4 PCS)
R,0.\,1 COf,+"''
c-CW\y
[
SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE • Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With ,1 Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download /Ç
and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact ' ' replica of your paper bill. Contact the Credit Department at 717-606-1317 and get set up today! •
I I
Invoice is due by 11/15/20.
For complete Terms & Conditions go to:
https://tinyurl. com/Yale-Customer-TC
. . A llr-lElectrlcal Company V1s1t us at www.uses1.com SN'-1CC-Slnc
20201l)9/29 07 :08 :45 PM
joe
$116506462.1 Subtotal
Shipping Chgs
Tax
Payments
Amount Due
TO VIEW ONLINE GO TO: HTTP://USESI.BILL TRUST.COM USE THIS ENROLLMENT TOKEN: VHD QLP SLM
,,,
09/28/20
EXT PRICE
11.04
3.43
8.92
3.30 36.47 123.60
237.78 3.79 4.07
3.60
4.71 0.46
441.17
0.00
0.00
0.00
441.17
Page 1 of 1
200 GARFIELD AVENUE WEST CHESTER, PA 19380-4512 610-719-9253 Fax 610-719-0650
SOLD TO:
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE
Ill Ill II II II I I I I Ill llll Ill 111111111111111
Sh" T" k t ID IC e SHIP DATE ORDER NUMBER PAGE NO.
09/29/2020 S116506452.001 1 of 2
CUST PO#: RIDLEY CREEK GEN
JOB/REL#: .
SHIP TO:
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER, PA 19380-6107 WEST CHESTER, PA 19380-6107
CUSTOMER NUMBER CUSTOMER PHONE# ORDERED BY SALESPERSON
117491
WRITER
DAVID A SMITH
/610)-719-9253
ORDER QTY SHIP QTY
3ea 3ea
5ea 5ea
5ea 5ea
6ea 6ea 50ft 50ft 6ea 6ea
20ft 20ft 3ea 3ea 2ea 2ea
2ea 2ea
2ea 2ea 1pk 1pk
** Continued on Next Page *
Printed By: SMIDAV on 9/29/2020 7:08:46'AM EST
610-692-7171 HOUSE ACCOUNT
- - -
- -
-
- -
SHIP VIA WAREHOUSE ORDER DATE FREIGHT ALLOWED
WILL CALL Ship: WECH Price: WECH 09/28/2020 No
DESCRIPTION UNIT PRICE EXT PRICE
KRY 078077 FA30 3" PVC FEMALE ADAPTER KRY 078072 FA10 1" PVC FEMALE ADAPTER TOPAZELE RB3 1" X 1/2" RIGID REDUCING BUSHING !! TAGGED ITEM!!
EGS SC-50 1 /2" D/C SQZ FLEX CONN
FLEX 1/2" STEEL UL 100' COIL EGS SC-300 3" D/C SQZ FLEX CONN !! TAGGED ITEM!!
FLEX 3" STEEL UL 25' COIL EGS PB-800-D 3" 105D PLSTC INSBSH STLCTY 52171-1/2-3/4-E 4SQ 2-1/8 DEEP BOX MADE IN USA STLCTY RS11 4" RAISED COVER SINGLE
F/RECPT CWD 1877W-BOX SGL RCPT-NEMA5-20R RACO 5269-0 1/2 GRY ZINC PLUG BG4 (1 PK= 4 PCS)
APPROVED BY: --
DATE PAID: ____ _
('f-lECI< #: _____ _ - C:1--'!•RGCD TO: ___ _
368.043/c
68.591/c
178.336/c
55.037/c 72.944/c 2060.083/c
1188.916/c 126.239/c 203.709/c
180.171/c
2.356/ea 46.000/c
Subtotal
Shipping Chgs
Tax
Payments
Amount Due
11.04
3.43
8.92
3.30 36.47 123.60
237.78 3.79 4.07
3.60
4.71 0.46
Service Invoice LENNI ELECTRIC
CORPORATION
1020 Andrew Drive West Chester PA 19380
610-436-9922
Billed To: East Goshen Township
1580 Paoli Pike West Chester PA 19380
Scheduled: 06/08/2020
Time:
Description
HERSHEY'S MILL GENERATOR INSTALL
JUNE THROUGH AUGUST 2020
Employee:
Project:
UM
32053
Invoice#: 200837
Date: 08/31/2020
HERSHEYS MILL STATION
1490 HERSHEY MILL RD WEST CHESTER PA 19380
Order#:
Quantity Price Ext Price
SET UP GENERATOR AND WIRING; TEST GENERATOR OPERATION; DEMO WIRING TO GENERATOR, HE;ATER AND
BATTERY CHARGER; RUN CONDUITS FROM GENERATOR TO BUILDING AND CORE HOLES; SET ATS, LOAD DISC AND
PIPED IN; PIPED IN NORMAL POWER; RUN CONDUIT FOR LOAD AND CONTROLS; PULLED WIRE TO GENERATOR; PULLED
AND LANDED WIRING; REPLACED METER SOCKET, MAIN DISCONNECT SWITCH AND COMPLETED START UP;
DISCONNECTED PORTABLE GEN SET.
ELECTRICIAN
APPRENTICE
MISC MATERIALS
HR
HR
LS
78.50
12.00
1.00
86.50
69.00
256.77
BULK OF MATERIALS PLACED ON EAST GOSHEN ACCOUNT
Notes:
Terms are Net 30 days.
APPROVED BY: [AAJ,u\___ DATE PAID: ______ _
CHECK#: ______ --=-_ CHARGED TO:_L)lLf J. I SD3
C ,:, f', -LJ tJ'<- w (;-(flr,..A<!J
Non-Taxable Amount:
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
Taxable Amount: Sales Tax:
Amount Due
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
6,790.25
828.00
256.77
7,875.02 0.00 0.00
7,875.02
1{-:1 .. · TELEDYNE INSTRUMENTS, INC. V¼i Everywhereyoulook"
I Page 1 of 2 12497 Collections Center Drive Chicago, IL 60693 ABA# 121-000-358 . Feder::11,1D: 95-4888283 0 o:
Acct# 12331-07806
Invoice
Bill To:
East Goshen Township .
1580 Paoli Pike WEST CHESTER, PA 19380
Ship To: East Goshen Township
1580 Paoli Pike East Goshen Township
1580 Paoli Pike WEST CHESTER, PA 19380 WEST CHESTER, PA 19380
Sales Order Customer PO .€ustomer Reference· . Pa' ment Terms Discount Customer No lnvojce No 00477247 Carrier UPS Ground Delivery Terms ·oR IG=S&rf,t\d
17369
, l ., '
Line· Item Number ..
684310000
Serial Number( s):
1Z6343870397363394
Net30 0054768 S020419254 Teled· .ne Contact Information · Invoice !Date Frink, E lizabeth Ann 800/228-4373. .9/8/2020 Named IDestination
--Ā---··-·-· .. ·-·-· Packing. L=is=t=-·=· :_:_· =· - .::.· == .. ·-= .. ·=· -=·-: :·-=-=·=-==t·=
-R=M =-_ -= ā=-N=·-=':l.!!1=-=b=e=r-=1 -U04B7'3'34 Des'cription T<!X U/ Quantity Unit Price Amo.unt
MODE L 310 USNC 1 OM BM 4300 Y ea 5,541.00 5,541.00
624300005 · Signature Ultrasonic Flow Meter 684310000 · Signature Ultrasonic Flow Meter 684310000 - Signature Ultrasonic Flow Meter 604314005 - TIEN E T 310 ULTRASONIC Sensor1 Om (32.8 ft) cable 604307015 - Battery Backup 604304044 - AC Line Cord 604307104 - LE910 Modem 604307023 - E xpansion Box 604304050 - TIENet Cable (130 Feet) ***For replacement parts refer to the replacement parts list that is included in the instruction manual***
604307015: 220H02036
604307023: 220H03196
'60'4307104>·
220H01850
604314005: 220J01464
624300005: 220H02783
APPROVED BY: MJ{f>--.__-._.
DATE PAlD:.+0 -...;._,_;;.. ......... ---- "'- CH ECK#: ___ ,-- CHARGED TO:C} 14-J. Cf, J 56.
(.
These items are controlled by the U.S. Government and authorized for export only lo the country of uflimale destination for use by the uflimale consignee or end-user(s) herein identified. They may not be resold, translerred, or otherwise disposed of, lo any other country or lo any person other than the authorized uflimale consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations.
Seller's acceptance of 1his Order is expressly condilioned upon lhe Buyer's assent to Seller's Terms and Conditions of Safe as stated in Seller's Offer and found at the applicable Teledyne company internet website !isled below. Seller is proceeding with lhe performance of Buyer's Order strictly on this basis. Teledyne ISCO is an indirect subsidiary of Teledyne Technologies Incorporated. Teledyne Elhics Line 1-877-666-6968.
TELEDYNE
V'"l ISCO f:·12rr,\; , .. ); cycui,*; ·,1-;:· www.teledyneisco.com + 1-800-228-4373
Continued Next Page
TELEDYNE INSTRUMENTS, INC.
Eveiywhereyoulook··
I Page 2 of 2 12497 Collections Center Drive Chicago, IL 60693
Federa,11D: 95-4888283
Invoice Bill To:
East Goshen Towns hip 1580 Paoli Pike WEST CHESTER, PA 19380
ABA# 121-000-358 Acct# 12331-07806 od o: East Goshen Towns hip
1580 Paoli Pike WEST CHESTER, PA 19380
Ship To:
East Goshen Township 1580 Paoli Pike WEST CHESTER, PA 19380
Sales Order CustomerPO •.Customer Reference Pa ment Terms Discount Customer No Invoice No 00477247 17369 Net 30 0054768 S020419254 Carrier Trackin Number Teled ne Contact Information UPS Ground 1Z6343870397363394 Frink, Elizabeth Ann 800/228-4373 e-D_eɑl_iv_eɒryɓ_ Tɔe_rm_s ____ ɕ--ɖ-+-N_a_m_eɗd_D_· _eɘst_inatio_n ___________ . Packing}::ist
ORIG0S&HAd · -· -- -· - - - -- 00487334 Line .Item Number
682540200
Serial Number(s):
Description SWR FL 5.1 KB Flowlink 5.1 Software, two user licenses. For retrieving measurement, parameter, and sample data from lsco 2100 Series Modules and 2101 Field Wizard, 4100 Series Flow Loggers, 4200 Series Flow
Meters, Pulsed Doppler Flow Meters, Signature Flow Meters, 6700 Series/Avalanche Samplers, 676 and 677 Logging Rain Gauge Systems, and 581 Rapid Transfer Device. Stores data in a database and generates a variety of user-customizable graphs and tables. Data can also be exported in ASCII format for analysis by programs such as Microsoft Excel, HTML format for viewing in a web browser, and PDF format for viewing in Adobe Reader. Operates on Windows XP, Vista, 7, Server 2003, and Server 2008. Supplied on CD-ROM. Software supports multiple languages, one of which is selected during installation.
602544200: 220B01521
Quantity
Y ea
Unit Pri.ce
1,800.00
Shipping & Handling
These items are controlled by the U.S. Government and authorized for export only to the country of ullimB.te destination for use by the ultimate consignee or end-user{s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user{s), either in their original form or alter being incorporated into other items, Sales Tax without first obtaining approval from the U.S. government or as otherwise autt1orized by U.S. law and regu_lations. ___ _ Seller's acceptance of this Order is expressly conditioned upon the Buyer's assen! to Seller's Taims and Conditions of Sale as slated in Seller's Offer and found at the applicable Teledyne company internet website listed below. Seller is proceeding with the performance of Buyer's Order strictly on this basis. Teledyne ISCO is an indirect subsidiary of Teledyne Technologies Incorporated. Teledyne Ethics Line 1-877-666-6968.
. . TELEDYNE
i""i ISCO Evs:w,-vi1e;t:•youlo,_,k www.teledynelsco.com + 1-800-228-4373
Invoice Amount
Invoice Dale
9/8/2020
Amount
1,800.00
124.00
447.90
7,912.90 USD
4a TELEDVNE ,-"Ill DETCON 4055 Technology Forest Blvd., Suite 100 The Woodlands, TX 77381
Phone: (713) 559-9200 Fax: (713) 893-6729
Shipper has not been confirmed!
Ship to : East Goshen Township
¨ 1580 Paoli Pk .
Œ · West Chester PA 19380 f_O 13'(: USA f'-\'pr\O\J
----
Sold to :
Shipping List 521687
Customer No 015151
Sales Order Shipper
Pendergast Safety Equipment Company 8400 Enterprise Avenue Philadelphia PA 19153 USA
l)f\t-p)\\\l', __________
o- ______. - \ \
011:C\i, ,--------;;, - --- 1 cc1tl'c r, ,o:.-Yt.<-. 'L/>. p ') <r.,1 '
Ship Date Customer PO # of Boxes Weight Ship VIA Bill of Lading
-- - -- - -- - - - - - - - ------ --- ----- ---- ... . 05/11/2020 309325A 0 o_oooo UPS Collect
FOB
-- -- -- NamedPlace
Item Fae/ Part/ Rev/ Description/ Details Order Quantity Ship Quantity
000001 Default Sales Order 112083-00 Item 001
GMl-64066 Rev 000 U/M EA 4.0000
02 Sensor for PS200 LoUSN(s) 39012548 Qty 1.0000 4.0000 39012508 1.0000 38553201 1.0000 37553524 1.0000
000002 Default Sales Order 112083-00 Item 002
GMl-64825 Rev 000 U/M EA 1.0000
LEL Sensor LoUSN(s) 0338626040030 Qty 1.0000 1.0000
000003 Default Sales Order 112083-00 Item 003
GMl-64067 Rev 000 U/M EA 1.0000
Dual Tox. H2S/CO Sensor LoUSN(s) 0438683494010 Qty 1.0000 1.0000
000004 Default Sales Order 112083-00 Item 004
998-PH0000-000 Rev 000 U/M EA 1.0000
PACKING AND HANDLING
1.0000
... UPS COLLECT# 8R9462' ..
... TAG ALL PAPERWORK/PACKING LIST- ATTN: M. MILLER ...
THANK YOU FOR YOUR BUSINESS. THIS IS AN ACKNOWLEDGMENT OF YOUR PURCHASE ORDER. PLEASE REVIEW YOUR SALES ORDER CONFIRMATION AND REPORT DISCREPANCIES WITHIN THREE DAYS OF RECEIPT OF THIS ACKNOWLEDGEMENT TO DETCON-SALES@TELEDYNE_COM, OTHERWISE, THIS ORDER WILL BE PROCESSED AS STATED IN THIS DOCUMENT.
Terms of Sale: Unless otherwise stated in writing, all sales will be governed by Detcon Standard Terms and Conditions of Sale.
INCOTERMS: Free Carrier (FCA, Named Place) .,;;fll
£), h·/ C-0 -.- Customer Copy Page 1 of 2
Al TELEDYNE · ,-'lf!iil DETCON 4055 Technology Forest Blvd,, Suite 100 The Woodlands, TX 77381
Phone: (713) 559-9200 Fax: (713) 893-6729
Ship to: East Goshen Township
1580 Paoli Pk West Chester PA 19380 USA
Shipper has not been confirmed!
Sold to:
Shipping List 521687
Customer No 015151
Sales Order Shipper
Pendergast Safety Equipment Company 8400 Enterprise Avenue Philadelphia PA 19153 USA
Ship Date Customer PO # of Boxes Weight Ship VIA Bill of Lading FOB
05/11/2020
- -- - -- - -- - - 309325A ' 0
-- - - - - - -- --- --- -- . . .... 0.0000 UPS Collect -Narii8dPlaCe
Item Fae/ Part/ Rev/ Description/ Details I Order Quantity I Ship Quantity
ECCN # EAR99 SCHEDULE B # (HS Code/Tariff Code/Foreign Trade#) 9027:10:0000
COUNTRY OF ORIGIN: Detcon Equipment Manufactured in USA GMI Equipment Manufactured in Scotland Oldham Equipment Manufactured in USA, China or France Simtronics Equipment Manufactured in USA, Norway, or France
ALL APPLICABLE FREIGHT/CRATING AND/OR DROP SHIP CHARGES WILL BE ADDED TO INVOICE/PROFORMA INVOICE. ALL PRICES QUOTED ARE FREE CARRIER (FCA, Named Place), AND ARE IN ACCORDANCE WITH INCOTERMS 2010.
ALL DOCUMENT/PACKAGING REQUIREMENTS MUST BE DETAILED ON YOUR PURCHASE ORDER. ADDITIONAL COSTS RESULTING FROM LEGALIZATION OF DOCUMENTS WILL BE ADDED TO YOUR ORDER CONFIRMATION AND INVOICE. A REVISED PO MAY ALSO BE REQUIRED.
CONSIGNEE MUST POSSESS A VALID HAZARDOUS IMPORT LICENSE, ON ALL ORDERS FOR CALIBRATION GAS AND/OR BATTERIES.
FINAL DESTINATION (COUNTRY ONLY) IS REQUIRED TO PROCESS ALL QUOTATIONS AND ORDERS, FOR EQUIPMENT. ORDERS CONTAINING CALIBRATION GAS REQUIRE THE END USER NAME, ADDRESS, AND CONTACT INFORMATION.
EXPORT CONTROL INFORMATION: RESALE, ONWARD SHIPMENT, OR DIVERSION OF DETCON/GMI/OLDHAM/SIMTRONICS PRODUCTS TO EMBARGOED DESTINATIONS INCLUDING BUT NOT LIMITED TO IRAN, SYRIA, SUDAN, AND NORTH KOREA IS STRICTLY PROHIBITED.
PLEASE REFERENCE QUOTE NUMBER ON ALL PURCHASE ORDERS, TO ENSURE ALL PREVIOUSLY ESTIMATED DELIVERY DATES OR COMMITMENT DATES ARE HONORED.
Customer Copy Page2of2
Memo
To: Municipal Authority From: Jon Altshul Re: MA September Financial Report Date: October 8, 2020
In September, the Municipal Authority recorded $36,595 in revenues (including a tap in fee for 938 Cornwallis and $28,891 in transfers) and $36,775 in expenses, for a negative variance of$180. As of September 30, the fund balance was $5,381.
A complete list of 2020 YTD MA revenues and expenses is attached.
Attached also find a revised estimate for East Gosh en's share of WGSA expenses for 2021. I am proposing to the Board of Supervisors that the cost of all of the WGSA except the Westtown Way Pump Station be paid for directly from the Sewer Operating Fund. This is how these capital expenses were paid for prior to the 2017 bond sale.
Account Title Acct I
REVENUB
IIITBREST EAID!!IIGS 01341 1000 CAPITAL RESERVE·INTBREST 01341 1010 IIITEREST EAID!ED - CONSTRUCTION 01341 1020 DCED GRAN! 01354 0400 C. C, TAPPING FEES 01364 1100 R.C,TAPPIIIG FEES 01364 1110 M. C. LOAN PAYMENTS 01364 1120 CONNECTION FEES • SEWER 01364 1130 MISCELLANEOUS REVENUE 01380 1000 TRAIISFER FROM GENERAL ACCT 01392 0100 TRAIISFER FROM SEWER OPERATIIIG 01392 0500 TRANSFER FROM SEWER CAP RESV 01392 0501 TRAIISFER·ANllUAL CAP .RESERVE 01392 0510 GRANT REVENUE 01392 0800 LOA!! PROCEEDS - SEWER PROJECT 01392 0804 TRANSFER FROM SEWER CAP RESERVE 01392 0900
TOTAL REVENUE
EXPENSES
ADMINISTRATIVE WAGES 01424 1400 R,C. LOAN ISSUANCE COSTS 01424 1500 MISCELLANEOUS EXPENSE 01424 3000 MUN IC .AUTB, ·AUDITIIIG 01424 3110 ENGIIIEERIIIG SERVICES 01424 3130 LEGAL SERVICES 01424 3140 W.G. C.C.STP-UPGRADE 01424 HOO MANHOLE COVER REPLACEMENTS 01424 7405 C.C. CAPITAL - METERS 01424 1410 C.C. CAPITAL- COLLECTION 01424 1420 C. C. CAPITAL- INTERCEPTOR 01424 7430 CAPITAL PROJ. -ENGINEERING 01424 7431 R.C. CAPITAL-SIP 01424 1440 R.C. CAPITAL - COLLECTION 01424 1450 R.C,-CAP. PROJ.-ENGIIIEER 01424 1451 CAP.REPLACEMENT R,C. 01424 1490 CAPITAL REPLACEMENT ASHBRIDGE 01424 1491 RERSHEY MILL STATION - ENGIIIEER 01426 1000 HERSHEY MILL STATION - CONSTRUCTION 01426 2000 TALLMADGE DRIVE 01426 3000
Annual Budget
565
319,435 211,000
EAST GOSHEN TOWNSHIP
Other Funds Septenter 2020 Municipal Authority
Y-T-D Budget
424
239,511 201,150
Y-1-D Actual
(130.20)
3,231.00
1,148.00
1,215.52 564. 48
34,446.15 265,919.19
Y-T-D Variance
(130.20)
3,231.00
1,148.00
1,215.52 140. 48
(205,130.25)
58,229.19
M-T-D Budget
41
26,620 23,083
M-T-D Actual
(14.62)
1,148.00
429.88 141.12
11,941.50 16,949.12
M-T-D Variance
(14. 62)
1,148.00
429.88 94.04
(14,618.08)
(6,134.21)
--------- ----------- -------------- -------------- ----------- -------------- --------------
591,000 441,151 312,515.34 (135,235.66) 49,150 36,595.00 (13,155.00)
32,000 24,000 23,653.32 346.68 2,661 1,884.44 (5,211.11)
118 .00 (118.00) 9,300.00 (9,300.00) 60,000 45,000 31,694.00 13,306.00 5,000 11,201.50 (6,201.50) 8,000 6,000 4,098.05 1,901.95 661 140.00 (13. 33)
26,264.60 (26,264.60)
6,294.49 (6,294.49)
Report Date 2009 10/08/20 2 : 10 PM
Account Title
RESERVOIR PUMP STATION - EIIGINEER RESERVOIR PUMP STATION CONSTRUCTION RELINING BARKWAY PUMP S!A!IOII CAPITAL HERSHEY$ MILL PUMP STATION CAPITAL HUNT CO PUMP STATION CAPITAL RCSIP CAPITAL ASBESTOS CONCRETE ENGINEERING DIVERSION PROJ,- LEGAL WEST GOSHEN CAPITAL M.C.-DVRFA-DEBI SERVICE M.A.-R.C. DEBI SERVICE DVRFA PUMPING STATIONS - PRINCIPAL M. C, -DVRFA-IN!EREST PAYMII M.A.-R.C. INTEREST DVRFA PUMPING STATIONS - INTEREST TRANSFER 10 GENERAL FUND TRANSFER 10 SEW, OPERATING !RF 10 SEWER CAPITAL RESERVE FUND TRANSFER 10 AU!HORIIY CAI FUND
TOTAL EXPENSES
NE! RESULT FROM OPERATIONS
Acct I
01428 1000 01428 2000 01429 1500 01429 1501 01429 1503 01429 1504 01429 1505 01429 3130 01429 3166 01429 6100 01411 1000 01411 1010 01411 2000 01412 1000 07412 1010 01412 2000 01492 0100 01492 0500 01492 0550 01492 0990
Annual Budget
45,000 81,000 365,000
591,000
EAST GOSHEN IOWIISHIP
Other Funds Septerrber 2020 Municipal Authority
Y-T-D Budget
33,150 65,250 213,150
Y-1-D Actual
2,810.99 60,491.16
166,615.93
441,150 332,001.14
Y-T-D Variance
(2,810.99) (26,141.16)
65,250.00 101,134.01
115, 142,86
(19,491.80) (19,492.80)
M-1-D Budget
3,150 1,250 30,411
49,150
M-1-D Actual
12,112.83
4, 116,29
36, 115,06
(180,06)
M-1-D Variance
(8,422.83)
1,250.00 25,640.38
12,914.94
(180,06)
Report Date 2009 10/08/20 2 : 10 PM
September 30, 2020 YTD Revenues & Expenses--East Goshen Municipal Authority
Account# Description Pee Debits Credits Date Check# Name Description Description 2 07341-1000 BEGINNING BALANCE 07341-1000 INTEREST EARNINGS 2001 15.00 1/2/2020 BANK FEES REIMBURSE 5/R FOR DEC.2019 BANK FEES 07341-1000 INTEREST EARNINGS 2001 0.65 1/31/2020 INTEREST INTEREST EARNED JANUARY 2020 7100.1035 07341-1000 INTEREST EARNINGS 2002 15.00 2/4/2020 REIMB.FEES REIMBURSE S/R FOR JANUARY 2020 ACH & POSITIVE PAY BANK FEES 07341-1000 INTEREST EARNINGS 2002 0.64 2/29/2020 INTEREST INTEREST EARNED FEBRUARY 2020 7100.1035 07341-1000 INTEREST EARNINGS 2003 15.00 3/2/2020 BANK FEES REIMBURSE S/R FOR FEB.2020 BANK FEES 07341-1000 INTEREST EARNINGS 2003 0.62 3/31/2020 INTEREST INTEREST EARNED MARCH 2020 7100.1035 07341-1000 INTEREST EARNINGS 2004 15.00 4/6/2020 BANK FEES REIMBURSE S/R FOR MARCH 2020 BANK FEES 07341-1000 INTEREST EARNINGS 2004 1.77 4/30/2020 INTEREST INTERERST EARNED APRIL 2020 7100.1035 07341-1000 INTEREST EARNINGS 2005 lS.00 5/4/2020 REIMBURSE REIMBURSE S/R FOR APRIL 2020 POSITIVE PAY & ACH BANK FEES 07341-1000 INTEREST EARNINGS 2005 0.11 5/31/2020 INTEREST INTEREST EARNED MAY 2020 7100.1035 07341-1000 INTEREST EARNINGS 2006 15.00 6/1/2020 BANK FEES REIMBURSE S/R FOR MAY 2020 BANK FEES 07341-1000 INTEREST EARNINGS 2006 0.09 6/30/2020 INTEREST INTEREST EARNED JUNE 2020 7100.1035 07341-1000 INTEREST EARNINGS 2007 15.00 7/2/2020 REIMBURSE REIMBURSE S/R FOR JUNE 2020 BANK FEES 07341-1000 INTEREST EARNINGS 2007 0.13 7/31/2020 INTEREST INTEREST EARNED JULY 2020 7100.1035 07341-1000 INTEREST EARNINGS 2008 15.00 8/6/2020 BANK FEES REIMBURSE 5/R FOR JULY 2020 BANK FEES 07341-1000 INTEREST EARNINGS 2008 0.41 9/2/2020 INTEREST JNTEREST EARNED AUGUST 2020 7100.1035 07341-1000 INTEREST EARNINGS 2009 15.00 9/2/2020 REIMBURSE REIMBURSE S/R FOR AUG.2020 BANK FEES 07341-1000 INTEREST EARNINGS 2009 0.38 9/30/2020 INTEREST INTEREST EARNED SEPT.2020 7100.1035 07354-0400 BEGINNING BALANCE 07354-0400 OCED GRANT 2002 3,231.00 2/1/2020 LAST 10% DCED GRANT - MUFFIN MONSTER DCED GRANT 07364-1110 BEGINNING BALANCE 07364-1110 R.C.TAPPING FEES 2009 7,148.00 9/11/2020 TRX#75514 REVERSE TRX# 75514 07364-1110 R.C.TAPPING FEES 2009 7,148.00 9/11/2020 75514 1 TAP IN FEE FOR 938 CORNWALLIS R.C.TAPPING FEES 07364-1110 R.C.TAPPING FEES 2009 7,148.00 9/11/2020 75567 1 TAP IN FEE FOR 938 CORNWALLIS R.C.TAPPING FEES 07364-1130 BEGINNING BALANCE 07364-1130 CONNECTION FEES - SEWER 2002 423.00 2/3/2020 2670 STOFFLET, MICHAEL 07364-1130 CONNECTION FEES - SEWER 2002 423.00 2/26/2020 659 JACOBS, ROBERT & CHERYL 07364-1130 CONNECTION FEES- SEWER 2002 423.00 2/28/2020 869 GEORGE SMITH & CHRISTINA CONLE 07364-1130 CONNECTION FEES - SEWER 2002 141.12 2/3/2020 PINE ROCK ANNUAL PINE ROCK INSTALLMENT 07364-1130 CONNECTION FEES - SEWER 2002 141.12 2/26/2020 PINE ROCK ANNUL PINE ROCK INSTALLMENT 07364-1130 CONNECTION FEES - SEWER 2002 141.12 2/28/2020 PINE ROCK ANNUAL PINE ROCK INSTALLMENT 07364-1130 CONNECTION FEES - SEWER 2009 423.00 9/16/2020 30837183 PAPPANO, JOSEPH & PATRICIA 07364-1130 CONNECTION FEES - SEWER 2009 141.12 9/16/2020 PINE ROCK PINE ROCK INSTALLMENT 07364-1130 CONNECTION FEES - SEWER 2009 148.00 9/11/2020 TRX#75514 REVERSE TRX# 75514 07364-1130 CONNECTION FEES - SEWER 2009 148.00 9/11/2020 75514 2 TAP IN FEE FOR 938 CORNWALLIS CONNECTION FEESȬ SEWER 07364-1130 CONNECTION FEES - SEWER 2009 148.00 9/11/2020 75567 2 TAP IN FEE FOR 938 CORNWALLIS CONNECTION FEES - SEWER 07380-1000 BEGINNING BALANCE 07380-1000 MISCELLANEOUS REVENUE 2002 141.12 2/3/2020 PINE ROCK ANNUAL PINE ROCK INSTALLMENT 07380-1000 MISCELLANEOUS REVENUE 2002 141.12 2/26/2020 PINE ROCK ANNUL PINE ROCK INSTALLMENT 07380-1000 MISCELLANEOUS REVENUE 2002 141.12 2/28/2020 PINE ROCK ANNUAL PINE ROCK INSTALLMENT 07380-1000 MISCELLANEOUS REVENUE 2009 141.12 9/16/2020 PINE ROCK PINE ROCK INSTALLMENT 07392-0500 BEGINNING BALANCE 07392-0500 TRANSFER FROM SEWER OPER 2002 1,451.30 2/12/2020 XFER XFER FROM SEWER TO MA 07392ȭ0500 TRANSFER FROM SEWER OPER 2002 1,451.30 2/12/2020 REVERSE REVERSE XFER TO MA FROM SEWER OPERATING 07392-0500 TRANSFER FROM SEWER OPER 2004 3,666.00 4/15/2020 XFER XFER TO MUN.AUTH. FROM SEWER OPERATING AND SEWER CAPITAL 07392-0500 TRANSFER FROM SEWER OPER 2005 1,986.50 5/12/2020 XFER XFER $ FROM 05 SEWER OPERATING TO MA 5/12/20 07392-0500 TRANSFER FROM SEWER OPER 2006 1,677.25 6/12/2020 XFER XFER $ FROM OS TO MA FUND
07392-0500 TRANSFER FROM SEWER OPER 2006 5,000.00 6/29/2020 XFER XFER $ FROM SEWER TO MA 07392-0500 TRANSFER FROM SEWER OPER 2007 1,062.75 7/15/2020 XFER XFER TO 07 FROM OS 07392-0500 TRANSFER FROM SEWER OPER 2008 9,112.75 8/11/2020 XFER XFER $ FROM SEWER TO MA - AUG. INVOICES 07392-0500 TRANSFER FROM SEWER OPER 2009 11,941.50 9/15/2020 XFER XFER $ FROM SEWER TO MA 9/15/2020 07392-0501 BEGINNING BALANCE 07392-0501 TRANSFER FROM SEWER CAP F 2002 4,391.80 2/11/2020 RECLASS RECLASS TRXS 72036 & 72044 07392-0501 TRANSFER FROM SEWER CAP F 2002 10,984.60 2/11/2020 RECLASS RECLASS TRXS 72036 & 72044 07392-0501 TRANSFER FROM SEWER CAP F 2002 16,832.16 2/12/2020 XFER XFER $ FROM SEWER CAPITAL TO MA 07392-0501 TRANSFER FROM SEWER CAP F 2003 18,342.17 3/12/2020 XFER XFER $ FROM SEWER CAPITAL TO MUNICIPAL AUTH. 3/12/20 07392-0501 TRANSFER FROM SEWER CAP F 2003 1,451.30 3/17/2020 XFER XFER FROM SEWER OPERATlNG TO MA FEB.2020 07392-0501 TRANSFER FROM SEWER CAP F 2004 156,237.00 4/3/2020 XFER XFER $ FROM SEWER CAPITAL TO MUNIC.AUTH. 07392-0501 TRANSFER FROM SEWER CAP F 2004 1,422.50 4/15/2020 XFER XFER TO MUN.AUTH. FROM SEWER OPERATING AND SEWER CAPITAL 07392-0501 TRANSFER FROM SEWER CAP F 2004 1,451.30 4/17/2020 XFER XFER FROM 09 TO 07 2/12/20 07392-0501 TRANSFER FROM SEWER CAP F 2004 1,451.30 4/20/2020 REVERSE REVERSE TRX. 73370 07392-0501 TRANSFER FROM SEWER CAP F 2004 1,451.30 4/20/2020 XFER XFER TO 09 FROM 07- 3/13/20 07392-0501 TRANSFER FROM SEWER CAP F 2004 15,000.00 4/27/2020 XFER XFER $ FROM SEWER CAPITAL TO MA 4/27/20 07392-0501 TRANSFER FROM SEWER CAP F 2005 1,069.25 5/12/2020 XFER XFER FROM 09 SEWER CAPITAL RESERVE TO MA 5/12/20 07392-0501 TRANSFER FROM SEWER CAP F 2007 5,457.65 7/1/2020 REIMBURSE REIMBURSE MA OPERATING FOR 09 EXPENSES 07392-0501 TRANSFER FROM SEWER CAP F 2007 4,345.00 7/17/2020 XFER XFER FR: SEWER CAP.RESERVE TO MUNICIPAL AUTH. 07392-0501 TRANSFER FROM SEWER CAP F 2008 9,861.00 8/11/2020 XFER XFER FROM SEWER CAPITAL RESER. TO MA AUGUST INVOICES 07392-0501 TRANSFER FROM SEWER CAP F 2008 5,087.54 8/28/2020 XFER XFER $ FROM SEWER CAP.RESERVE TO MA 07392-0501 TRANSFER FROM SEWER CAP F 2009 9,074.10 9/15/2020 XFER XFER FROM SEWER CAP .RESERVE TO MA 9/15/20 07392-0501 TRANSFER FROM SEWER CAP F 2009 7,875.02 9/28/2020 XFER XFER $ FROM 09 SEWER SINKING T007 07392-0900 BEGINNING BALANCE 07392-0900 TRANSFER FROM SEWER CAP F 2001 4,391.80 1/15/2020 XFER XFER $ FROM SEWER SINKING TO MA RE: JANUARY EXPENSES 07392-0900 TRANSFER FROM SEWER CAP F 2001 10,984.60 1/15/2020 XFER XFER $ FROM SEWER SINKING TO MA RE: JAN.2020 ADDL'EXP. 07392-0900 TRANSFER FROM SEWER CAP F 2002 4,391.80 2/11/2020 RECLASS RECLASS TRXS 72036 & 72044 07392-0900 TRANSFER FROM SEWER CAP F 2002 10,984.60 2/11/2020 RECLASS RECLASS TRXS 72036 & 72044 07424-1400 BEGINNlNG BALANCE 07424-1400 ADMINISTRATIVE WAGES 2003 7,884.44 3/30/2020 3198 EAST GOSHEN TOWNSHIP- GENERAL QTR.1 2020 REIMBURSEMENT - M 07424-1400 ADMINISTRATIVE WAGES 2006 7,884.44 6/26/2020 3208 EAST GOSHEN TOWNSHIP - GENERAL QTR.2 2020 REIMBURSEMENT - M 07424-1400 ADMINISTRATIVE WAGES 2009 7,884.44 9/25/2020 3226 EAST GOSHEN TOWNSHIP - GENERAL QTR.3 2020 REIMBURSENT MUN.t 07424-3000 BEGINNING BALANCE 07424-3000 MISCELLANEOUS EXPENSE 2003 100.00 3/12/2020 3194 PMAA PMAA SPRING WORKSHOP - W.W! 07424-3000 MISCELLANEOUS EXPENSE 2003 638.00 3/19/2020 3196 DELAWARE RIVER BASIN COMMISSION 2020 ANNUAL FEE D-2000-030 CP 07424-3000 MISCELLANEOUS EXPENSE 2008 40.00 8/6/2020 NSF FEE REIMBURSE S/R FOR NSF FEE IN MA FUND 07424-3110 BEGINNING BALANCE 07424-3110 MUNIC.AUTH.-AUDITING 2003 9,300.00 3/26/2020 3197 MAILLtE FALCONIERO & CO. EXAM.-FINANCIAL STATEMNTS 12 MUNICIPAL AUTHORITY 07424-3130 BEGINNING BALANCE 07424-3130 ENGINEERING SERVICES 2001 1,666.00 1/15/2020 3183 PENNONI ASSOCIATES INC. SERVICES THRU 12/8/19 2019 GEȹ 07424-3130 ENGINEERING SERVICES 2002 893.25 2/12/2020 3187 PENNON] ASSOCIATES INC. SERVICE THRU 1/19/20 2020 GEN. 07424-3130 ENGINEERING SERVICES 2003 2,508.00 3/11/2020 3193 PENNON\ ASSOCIATES INC. SERVICE THRU 2/16/20 2020 GEN. 07424-3130 ENGINEERING SERVICES 2004 3,366.00 4/15/2020 3202 PENNON! ASSOCIATES INC. SERVICES THRU 3/22/20 2020 1&1: 07424-3130 ENGINEERING SERVICES 2005 1,486.50 5/12/2020 3205 PENNONI ASSOCIATES INC. SERVICE THRU 4/19/20 2020 GEN. 07424-3130 ENGINEERING SERVICES 2006 717.25 6/11/2020 3207 PENNONI ASSOCIATES INC. SERVICES THRU 5/17/20 2020 GH 07424-3130 ENGINEERING SERVICES 2007 742.75 7/15/2020 3213 PENNONI ASSOCIATES INC. SERVICES THRU 6/21/20 2020 GH 07424-3130 ENGINEERING SERVICES 2008 9,112.75 8/11/2020 3216 PENNONI ASSOCIATES INC. SERVICES THRU 7 /19/20 2020 l&I 07424-3130 ENGINEERING SERVICES 2009 11,201.50 9/15/2020 3225 PENNON! ASSOCIATES INC. SERVICETHRU 8/16/20 W.GOSHE[ 07424-3140 BEGINNING BALANCE 07424-3140 LEGAL SERVICES 2001 558.05 1/16/2020 3185 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE· 12/6·12/11/19 07424·3140 LEGAL SERVICES 2003 720.00 3/11/2020 3191 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - 1/13/20 GEN.AU-
07424-3140 LEGAL SERVICES 2004 300.00 4/15/2020 3201 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 3/6-3/9/20 GEN.Al 07424-3140 LEGAL SERVlCES 2005 500.00 5/12/2020 3204 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 4/7-4/13/20 GEN.J 07424-3140 LEGAL SERVICES 2006 960.00 6/11/2020 3206 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 5/8-5/14/20 GEN 07424-3140 LEGALSERVICES 2007 320.00 7/15/2020 3212 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 6/5-6/8/20 GEN.Al 07424-3140 LEGAL SERVICES 2009 740.00 9/15/2020 3223 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 7 /8-7 /13/20 GEN.) 07424-7490 BEGINNING BALANCE 07424-7490 CAP.REPLACEMENT R.C. 2001 10,984.60 1/15/2020 3184 EVOQUA WATER TECHNOLOGlES LLC DECANTER VALVES 07424-7490 CAP.REPLACEMENT R.C. 2002 15,280.00 2/12/2020 3188 TRI-STATE TECHNICAL SALES CORP. ELECTRIC VALVES FOR SBR TANKS 07426-1000 BEGINNING BALANCE 07426-1000 HERSHEY MILL STATION - ENGi 2001 3,805.05 1/15/2020 3183 PENNON! ASSOCIATES INC. SERV. THRU 12/8/19 HMPS SURVE DESIGN FOR GENERATOR 07426-1000 HERSHEY MILL STATION - ENGi 2002 1,390.67 2/12/2020 3187 PENNON\ ASSOCIATES INC. SERVICE THRU 1/19/20 HMPS SUR DESIGN FOR GENERATOR 07426-1000 HERSHEY MILL STATION - ENGi 2003 1,098.77 3/11/2020 3193 PENNON! ASSOCIATES INC. SERV. THRU 2/16/20 HMPS SURVE 07429-1501 BEGlNNING BALANCE 07429-1501 BARKWAY PUMP STATION CAP 2002 91.57 2/12/2020 3186 CONTRACTOR'S CHOICE SLlNGS & STIHL HD LOCK-BLADE K 07429-1501 BARKWAY PUMP STATION CAP 2002 69.92 2/12/2020 3189 YALE ELECTRIC SUPPLY CO FENDER WASHER, PVC ADAPTER,'. & GRAY LlQUIDTITE 07429-1501 BARKWAY PUMP STATION CAP 2003 2,649.50 3/11/2020 3192 LEC - LENN! ELECTRIC CORPORATION MUFFIN MONSTER PIPED & WIRE[ 07429-1503 BEGINNING BALANCE 07429-1503 HERSHEY$ MILL PUMP STATlOI 2004 37,409.00 4/3/2020 3199 PREMIUM POWER SERVICES LLC. 60k W GENERATOR HERSHEY MILL 07429-1503 HERSHEY$ MILL PUMP STAT!OI 2007 1,850.00 7/2/2020 3210 O'ROURKE & SONS INC. REBAR$- HERSHEY MILL GENERAT 07429-1503 HERSHEY$ MILL PUMP STATIOI 2007 4,345.00 7/16/2020 3214 LEC - LENNI ELECTRIC CORPORATION HERSHEY PS UPGRADE SERVICE 07429-1503 HERSHEY$ MILL PUMP STATIOI 2008 2,448.97 8/27/2020 3218 COLONIAL ELECTRIC SUPPLY ELECTRICAL SUPPLIES- HM GENER 07429-1503 HERSHEYS MILL PUMP STATIOI 2008 2,271.96 8/27/2020 3220 YALE ELECTRIC SUPPLY CO ELECTRICAL SUPPLIES- HM GENER 07429-1503 HERSHEYS MILL PUMP STATIOI 2009 12.81 9/15/2020 3221 COLONIAL ELECTRIC SUPPLY PVC PIPING CARl-1/2 07429-1503 HERSHEYS MILL PUMP STATIOI 2009 4,28S.00 9/15/2020 3224 PT EQUIPMENT LLC. TEMP. GENERATOR RENTAL JULY I 07429-1503 HERSHEY$ MILL PUMP STATIO! 2009 7,875.02 9/28/2020 3227 LEC- LENNI ELECTRIC CORPORATION HERSH.MILL GENERATOR INSTALL. Aug-20 07429-1505 BEGINNING BALANCE 07429-1505 RCSTP CAPITAL 2001 586.75 1/15/2020 3183 PENNON! ASSOCIATES INC. SERV. THRU 12/8/19 RCSTP GENE! 07429-1505 RCSTP CAPITAL 2003 8,884.00 3/11/2020 3190 DECKMAN MOTOR & PUMP INC. REBUILT SBR PUMP #2 07429-150S RCSTP CAPITAL 2003 2,798.40 3/11/2020 3192 LEC - LENN] ELECTRIC CORPORATION RIDLEY CREEK MCC BREAKER BUCI 07429-1505 RCSTP CAPITAL 2003 2,911.50 3/11/2020 3193 PENNON! ASSOCIATES INC. SERV. THRU 2/16/20 RCSTP GENE! 07429-1505 RCSTP CAPITAL 2003 1,160.48 3/19/2020 3195 ABLE EQUIPMENT RENTAL INC. CRANE CARRY DECK RENTAL 3/9-3 07429-1505 RCSTP CAPITAL 2004 118,828.00 4/3/2020 3199 PREMIUM POWER SERVJCES LLC. 450k W GENERATOR RCSTP 07429-1505 RCSTP CAPITAL 2004 1,422.50 4/15/2020 3202 PENNON! ASSOCIATES INC. SERV. THRU 3/22/20 2020 RCSTP ( REPLACEMENT 07429-150S RCSTP CAPITAL 2004 14,688.00 4/24/2020 3203 DECKMAN MOTOR & PUMP INC. REBUILT FLYGT PUMP- RCSTP 07429-1505 RCSTP CAPITAL 2005 1,069.25 5/12/2020 3205 PENNONI ASSOCIATES INC. SERVICE THRU 4/19/20 RCSTP GEɌ 07429-1505 RCSTP CAPITAL 2007 3,451.50 7/2/2020 3209 MAIN LINE CONCRETE CONCRETE - FOR RCSTP GENERAT< 07429-1505 RCSTP CAPITAL 2007 156.65 7/2/2020 3211 PIPE XPRESS INC. PIPING & CONDUITS- RCSTP GENE PAD 07429-1505 RCSTP CAPITAL 2008 500.00 8/11/2020 3215 ABEL BROTHERS TOWING & AUTO LIFT NEW GENERATOR ONTO RCSl 07429-1505 RCSTP CAPITAL 2008 5,016.00 8/11/2020 3217 TRI-STATE TECHNICAL SALES CORP. VALVES, BRACKETS & ADAPTERS 8 SERVICE TO TROUBLESHOOT UNITS 07429-1505 RCSTP CAPITAL 2008 366.61 8/27/2020 3219 HOME DEPOT CREDIT SERVICES BITS & ANCHORS - RCSTP GENERA 07429-1505 RCSTP CAPITAL 2009 4,776.29 9/15/2020 3222 DECKMAN MOTOR & PUMP INC. REBUILT MYERS PUMP
SEWER FUND
Miscellaneous Capita! Improvements Priority A Interceptor Rehabilitation Priority B Interceptor Rehabilitation UV Control Upgrade Effluent Flow Meter Trickling Filter Beaėing Replacement Clarifier Drive Replacement & Rehab. Screw Pump Replacement Cemetary Sewer Rehab. & ARV Replacement Sanitary Sewer Rehabilitation/ Repairs
Fern Hill PS Spare Pump Purchase Fern Hill PS Improvements Spruce Avenue PS Pump Replacement Ellis Lane PS Improvements Montgomery Avenue PS Improvements Washington Street PS Improvements Lift Pump VFDs RAS Building VFDs RAS/Raw Pump TMDL Litigation
Total
BOND FUND
Taylor Run PS Improvements Trinity Drive Way PS Improvements WWTP Phase II (CoMag/Dewatering) Westtown Way PS Improvements Aeration Basin Improvements
Digester Replacements Downing Avenue PS lmrpovements
Total
Totals
S1-1,\--es w 0--SA
A<; 0 F
2020 2021 11,669 12,503 28,509
.. 15,003 3,712 .. 4,983 ..
.. 22,505
.. 4,168
.. ..
.. ..
.. 6,668 2,834 2,834 23,198 92,190
2020 2021
paid paid 1,867,036 9,400 paid paid
0 1,876,436
2020 2021 23,19s 1 1,968,626 I
March 26, 2020
MUNICIPAL AUTHORITY EXPENSES: 3rd QTR 2020
ABC Secretarial Services (Preparing & distributing packets):
Secretarial Services (Taking & Preparing Minutes):
Director of Finance/Treasurer
Staff Accountant: (Barb/AP)
Director of Public Works:
Manager:
Kelly Brophy Staff Accountant
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE WEST CHESTER, PA 19380
(610) 692-7171
15% of Monthly Wages & Benefits = .................... .
6 Hours @ $35.00 per hour= ........................... .. .
5% of Quarterly Wages & Benefits ..................... .
5% of Quarterly Wages & Benefits ...................... .
5% of Quarterly Wages & Benefits ...................... .
3% of Quarterly Wages & Benefits ....................... .
TOTAL DUE TO GENERAL FUND .................. ..
AMOUNT NOTES
$1,_214?1_ 15% of salary & benefits
$210.00 6 hours @ $35 hours/hour
$1,833.42 5% of salary & benefits
$1,023.27 5% of salary & benefits
_$2, 176.48 5% of salary & benefits
$1,426.56 3% of salary & benefits
$7,884.44
07424-1400
/: / / /
March 28, 2017 Page.6
2018 SANITARY SEWEƸ SYSTEM REPAIR PROJECT
The 2018 Sanitary Sewer System Repair Project consists of replacement, repairs, and rehabilitation of priority repair areas identified by the Township through closed circuit televisual inspections (CCTV) and visual manhole inspections. The conceptual cost estimate below is based on size aiƹd scope of2016 Sanitary . Sewer System Repairs.
Tƺe estimated Project cost is $512;000 m;d is expected to be substantially completed by November 2018. It is not known at this time if any of these improvements will result in ·shared costs with the municipal prutners.
PUMP STATION PHASE II IMPROVEMENTS
Pump Station Phase II Improvements include major repairs to the Trinity. Drive _Pump Station, Westtown Way Pump Sta!ion, and Taylor Rtin Pump Station as Well as replacement of the Downing Avenue Pump Station.
Trinity Drive (Pump Station No. 2)
Repairs to the Trinity Drive Pump Station generally includes ƻhe following:
I. Replace submersibly pumps .
2. Replace 4-inch diameter forcemaƼn
. ' 3. Replace non-functioning 4-inch diameter mag meter and install new data logger
4. Installƽtion of fall protection system
5. Repair spa.Hing/cracked concrete around wet well
6. Replace water service to pump station· .
7. Install sey,rage grinder on wet well influent
8. Minor site improvements • ·
The repairs ani necessary to replace aged and deteriorated equipment as well as to correct issues with the pumps incliiding, but not limited to, clogging due to rags, lack of automatic alternating operation, head conditions (impaired pump capacity) most likely as a result of forcemain condition (reduced diameter or increased ro1:1ghness coefficient typical in ƾast -iron forcemains ).
Westtown Way (Pump Station No. 13)
Repairs to the Westtown Way Pump Statioh generally includes the following:
I. Upgrade electrical equipment in the wet well to meet hazru·dous area requirements
2. Rehabilitate deteriorated ferrous metal and concrete components
3. Evaluate installation- of a wet well mixing system to-keep grease. in suspension in the wastewater and prevent from accumulatin& in the wet wel_I
4. Relocation of the influent sewage grii1der to the end of the influent channel to reduce the headloss impact and therefore reduce g1:it accumulation .. 'This may require the installation of new a new railing system to support the sewage grinder. .
Herbert, Rowland & Grubic, Inc.
March 28, 2017 . Page 7
5. Minor building improvements:
A. Replace existing windows
B. Repair, replace and upgrade existing HV AC equipment
C. Block in any building penetrations no lq11ger need.ed
D. Seal leaking wall penetrations
E. Cut new floor drain piping into the floor.
6. Rep.lace existing valve with a new gate valve. This will require the installation of a temporary line stop or new valve outside of the pump station in order to prevent wastewater from draining out of the force_ main.
7. Replacement of the existing emergency generator
8. The existing diesel foe! tanI<: for the emergency generator is located outside above the wet W<lll. If the emergency generator is replaced with an exterior rated unit, a sub base foe! tank can be combined into the base fOT the new generator.
9. InstaH new VFDs
. IO. Evaluate replacement ofMCC
11. Install mount-anywhere style discharѾe flow meter
12. 'Install gas detection equipment in the wet well
13. Evaluat<, the effectiveness. of switching to a series pumping configuration should be performed due to high head conditions
14. Installation of a data logger or influent flow meter to monitor _influent flows to the pump station
15. Modify 1puver over the wet well so the base of the louver is more than 18 inches above the top of the wet well tan)c. , .
Woodcres1/DowningAvenue (Pump Station No.10) . .
Repairs to the, Trinity Drive Pump Station generally includes replacement of the current dry well /.wet we\] style pump station with a submersible style pump station due to the following:
1. Existi_ng comminutor is ·no longer operational
2: Concrete and ferrous metal deterioration from exposure to hydrogen sulfide gas was observed in the wet well ·
3. Evidence ofinfiltration in the dry well
4. Observed corrosion of the below gtade steel dry well, pruticularly neax the pipe penetrations
5: Township Staff repmted that maintenance of the existing eqnipment in the dry well is very difficult given the ru-rangement o:fthevarions pumps, piping, valves, controls,'and other components in the small d1y well' al'ea ·
6. The existing pumps are 41 years old
, Herbert, Rowland & Grubic, Inc.
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com Westtown Way Pump Station Review Comments
October 8, 2020
Pennoni reviewed the 20-sheet plan set titled "Westtown Way Pump Station Improvements Project" dated July 2020, the design report titled "Westtown Way Pumping Station No. 13 Rehabilitation Design Engineer's Report" dated July 2020, the "Westtown Way PS Dry Pit Pump Selection" memorandum dated June 26, 2020, existing pump calculation spreadsheets dated May 2, 2018, proposed pump calculation spreadsheets dated June 30, 2020, and the "Value Engineering Opinion of Probable Construction Cost Estimate" dated May 2020, all prepared by HRG for the Westtown Way Pump Station (WWPS). We also reviewed daily WWPS flow meter data for six separate months between 2018 and 2020.
Our scope was to evaluate value engineering and cost savings opportunities and proposed features that exceed minimum needs. We focused on the highest cost impact components in the cost estimate, specifically the pump sizing, dry pit submersible pump solution, and electrical service. We offer the following associated comments for consideration by East Goshen Township and Municipal Authority.
Station Flow Capacity The pump station rehabilitation appears to be based upon a pumping rate that is far in excess of that needed, thereby resulting in larger pumps, motors, and other associated rehabilitation and operational cost impacts. A detailed explanation follows:
It is our understanding that the WWPS Chapter 94 rating is 7.7 MGD. However, the peak pumping rate of the existing Fairbanks Morse pumps is 6.192 MGD (4,300 gpm) according to the HRG reports. The station is being designed to maintain a similar capacity at 6.624 MGD {4,600 gpm), but the actual flow to the station is significantly less than this design basis. The report states that no notable future flow increases are projected since the tributary area is fully developed. We therefore suggest that the existing flow conditions should be the basis of design instead of those flow conditions that were projected when the WWPS was originally constructed.
The East Goshen-West Goshen intermunicipal agreement is based upon an average design flow for the WWPS of 1.825 MGD, with 1.0 MGD allocated to East Goshen (54.8%). According to the six months of flow data, the monthly average flow generally ranges from 1.172 MGD to 1.398 MGD with a maximum monthly average of 1.889 MGD during a very wet period in January 2019. Although the station is being designed to match the existing oversized pump capacity, the Engineer's Report states that the design average daily flow should be 1.580 MGD, which is consistent with the actual flows. This stated flow would also be consistent with a planning flow rate of 300 gpd/EDU for the existing ±5,181 tributary EDUs. However, given that East Goshen's average flow to the WWPS has been 0.735 MGD over the past five years, below East Goshen's intermunicipal agreement capacity of 1.0 MGD, we suggest the intermunicipal agreement capacity of 1.825 MGD is a more practical design basis for pump station rehabilitation.
The suggested peak factor for a pump station of this size based on Ten States Standards is approximately 2. 7. The Engineer's Report references the same peaking factor. With an average design flow rate of 1.825 MGD, the peak instantaneous flow would therefore be 4.927 MGD (1.825 MGD x 2.7 peak factor) or 3,422 gpm. This peak flow is approximately 26% less than the basis of design peak flow of 6.624 MGD (4,600 gpm) that is proposed to maintain existing pump rates. Further, the maximum day flow during the six months of meter data was 2.485 MGD. While this is not an instantaneous peak flow rate, it is well within our suggested 4.927
MGD peak rating. The proposed pumps are therefore considered to be significantly oversized.
EGMAU20005 East Goshen Municipal Authority
October 8, 2020 Page 2 Westtown Way Pump Station
The following table below summarizes the aforementioned flows, including the peaking factors associated with the various pump size alternatives (based on an average flow of 1.825 MGD).
Flow Condition MGD Peak Factor Over gpm 1.825 MGD Pump Rate Based on 1.825 MGD Allocation 4.927 3,422 2.7 Existing Peak Pump Rate 6.192 4,300 3.4 Design Peak Pump Rate 6.624 4,600 3.6 Chapter 94 Rating 7.7 5,347 4.2
The calculations provided by HRG indicate selection of three 250 horsepower dry pit submersible pumps.
Considering typical operations of a triplex pump station, two pumps operating together must meet the peak flowrate at the head condition.
Based on the above data, the proposed pumps will provide significant excess capacity over the required peak. A reduction of the proposed pump rate would decrease the capital cost for rehabilitation including the costs of the incoming power equipment, generator, pumps, and VFDs. The hatch installation and structural modifications may be simplified since the hatches may be smaller. The size of the discharge piping and valves may be able to be reduced. The service platforms for the generator and electrical equipment will be smaller.
It is also projected to decrease operational costs since the higher flow rate creates additional dynamic head through the system, thereby increasing the horsepower and power consumption needed for the pumps, and in turn adding to electricity costs.
Additionally, there may be an opportunity to reduce the pump sizing even further since there can be a reduction of horsepower per gallon pumped once the force main is filled to the peak elevation, thereby reducing the static head to the discharge elevation after the initial pump start.
Extended Shaft Sewage Pumps Two of the existing pumps are extended shaft sewage pumps and the third, or added, pump is labeled lA and appears to be a dry pit submersible pump. The extended shaft sewage pump motors are located on the intermediate floor. As noted by HRG, moving an extended shaft sewage pump is awkward because the pump extended shaft does not allow for the placement of a hoist beam above the pump. Removal of an extended shaft sewage pump requires that the pump be moved from underneath the motor and hoisted through a floor opening. The station does not have permanent hoisting equipment, so we understand that temporary equipment is currently used.
Overall, the presented dry pit pump installation can be characterized as a typical retrofit. The use of dry pit submersibles for a sewage station retrofit is preferred by most end users but is not mandatory. The dry pit submersible design allows for the direct removal of the pump. The motors are protected from flooding by design. The maintenance issues associated with the shafts are removed. Even though the chance of flooding the dry well to the intermediate level where the motors are located is remote, there is still a risk. The use of dry pit submersibles removes the flood risk associated with the extended shaft motors.
That said, we expect the dry pit submersible installation will be more costly than the replacement of the
existing extended shaft sewage pumps. The submersible pumps are typically more expensive, and the piping needs to be reconfigured to allow for installation of the submersible pumps. Neither HRG or Pennoni has obtained pricing for comparable extended shaft pumps, but HRG has suggested that they may be approximately 10% less costly for initial purchase and installation. Their cost opinion estimates the
EGMAU20005 East Goshen Municipal Authority
October 8, 2020 Page 3 Westtown Way Pump Station
submersible pumps at $493,000, so there could be a capital savings on the order of $50,000 by using extended shaft pumps.
HRG's memo suggests that these initial capital cost savings may be offset by efficiency reductions and associated long-term operational costs for extended shaft pumps. We recommend that the efficiency and operational cost impacts be determined with more certainty to determine if there is in fact an offset.
The submersible pump installation also requires structural modification and installation of four larger floor hatches and two new floor hatches. Should the pumps be replaced with three extended shaft sewage pumps, it may only be necessary to install the two new floor hatches, and the other four existing hatches can remain as-is or will not need to be enlarged as much. The pressure relief valve and its discharge would also need to be relocated to provide an area to remove Pump lA. Either permanent hoisting equipment should be installed, or a rolling gantry crane could be used to remove the pumps and motors. We estimate that the HRG cost opinion, including contingency, contains $300,000-$400,000 for the structural work and installation of floor hatches. It may be reasonable to anticipate a savings of $50,000 - $100,000 on structural work if extended shaft pumps are used, but this cost reduction cannot be determined with certainty at this time since the specific structural upgrades are not known.
The electrical installation is more expensive for rerouting the conduit and wiring as well for submersible pumps, but we have not estimated the potential electrical cost savings associated with extended shaft pumps.
Without the benefit of mechanical, structural, and electrical re-design and vendor price quotes, it may be reasonable to anticipate an overall capital cost savings of $100,000 - $200,000 by using extended shaft pumps.
Electric Upgrade From online imagery, it appears the station is powered from a PECO pole on Westtown Way. The Medium Voltage (MV) service cabling is presumed to run under the roadway and then run underground through Barker
Park to the existing MV Switchgear (approximately 350 feet). It would be prudent to have this MV service cable tested to determine its condition and continued viability prior to finalizing the improvements design. If this cabling should require replacement, then that cost impact should be reflected in the project estimate/budgeting.
Based on the location of the PECO MV lines, we agree with the proposed replacement of the MV transformer and West Goshen maintaining ownership of the MV transformer.
Cost Estimate The general construction estimate overall seems to be conservative, but we offer the following cost-related comments:
Contract WW-1 Cost Opinion
• Item 2 - Bypass piping costs seem high as a per day rate, but duration of required bypassing depends upon efficiency of the contractor. • Items 8 and 9 -The generator and electrical gear platforms seem high at a total of $130,000. Elevated concrete pad foundations may be less costly. • Various Items-Structural steel cost totals $93,000 in material costs at $5 per pound. There are likely additional costs to install the steel. Typical structural steel fabrication costs are $2 to $3 per pound. • Item 47 -The hoist is estimated as $40,000. A 5-ton rail mounted hoist is approximately $15,000 with the cabling system. • Item 52 -Extent of HVAC work is not clear for the $50,000 estimated.
EGMAU20005 East Goshen Municipal Authority
Contract WW-2 Cost Opinion
October 8, 2020 Page4 Westtown Way Pump Station
• Item 13 - Misc. Electrical Conduit, Wire, and Work seem low at $25,000 to install the equipment shown.
General
• Even though some of the line items seem conservative, the contingency is listed as 10%, which we consider low for a conceptual design estimate.
Questions for West Goshen and/or the Design Engineer
• Is there a reason the station needs to be designed to maintain the high existing peak flow rating? • Are there available pump options to accommodate the lower minimum peak pump rate to save capital and ongoing costs? • The 6 x 6 hatches seem large for the pump sizes shown and potentially dangerous. What is the criteria for the hatch size? • Has the use of guard rail been considered rather than pump hatches to protect the intermediate floor openings? • Has consideration been given to combining the generator and incoming electrical gear platforms into one elevated concrete pad foundation? • The pump calculations are showing a high point elevation of 443 ft, a FM discharge elevation of 329 ft, and a suction head elevation of 262 ft. The static head of 180 ft is calculated on the high point elevation, rather than the FM discharge elevation. Has the designer considered the use of air release valves located at high points to vent trapped air to assure a full pipe to the FM discharge so that static head requirements and pump horsepower can be reduced?
U:\Accounts\EGMAU\EGMAU20001- 2020 General Services\DOC PREP\Westtown Way Value Eng Review\Westtown Way PS Comments 2020-10- 07.docx
AREA CODE 61 0 692-7171
October 9, 2020
To Municipal Authority
From Mark Miller
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 1 9380-61 99
Ref. NEW Home 632 Thorncroft Dr.
The building department has received a plan to construct a new home on the vacant lot at 632 Thorncroft Drive. The builder is proposing a single family home with a paver patio and swimming pool. The paver patio is shown on the sanitary sewer right of way and the pool on far side of the easement.
In the event that we had to do a repair on the sanitary sewer our work would be hindered if we had to dig through a patio. Although the pool is outside of the right of way, we have concerns of running electric and water service through the right of way. Therefore, we may want a formal assurance that he homeowner would be responsible for any damage to their property as a result of maintenance, repair or
upgrades to the sewer line in the easement.
Staff would recommend the solicitor review the easement agreement, and draft a letter from the Municipal Authority stating their position on the matter.
F:\Data\Shared Data\Public Works Dept\Memos to Municipal Authority\632 Thorncroft drive Sewer Request October 9.docx
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 2, 2020
Dear Property Owner:
The purpose of this letter is to inform you that Robert Jordan, owner of a vacant parcel at 1631 E. Strasburg Rd., has applied for a Zoning Variance requesting relief from the zoning ordinance. Mr. Jordan is requesting dimensional relief from the steep slopes requirement of the ordinance; §240-25.C(S)(d)[l], §240-25.C(S)(d)[2] and, §240-40.A(l)(b). Mr. Jordan proposes to construct a new single family home on the property and the · proposed plan will require disturbance of steep slopes on the lot.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Zoning Variance applications.
This application will be discussed during the meetings outlined below and is subject to change without further written notice to surrounding properties:
Wednesday October 6, 2020 - Planning Commission meeting (7:00 pm)
Tuesday October 20, 2020 - Board of Supervisors meeting (7:00 pm)
Tuesday October 27, 2020 - Zoning Hearing Board (7:00 pm) (Zoning Hearing)
Due to COVID -19 all township meetings and hearings are being held virtually via video/ telephone conference. These meetings will be conducted remotely via Zoom teleconference. Members of the public can participate via telephone and view the teleconference on YouTube. Meeting access information can be found on the Township website at https://eastgoshen.org/ under the Latest News posts.
The public is welcome and encouraged to attend and participate in these meetings. The application information is available for public inspection at the Township Building.
Please call the Township staff at 610-692-7171 if you need assistance finding the meeting access information, or email me at mgordon@eastgoshen.org if you have any questions or need additional information.
Si;!,!,l___
Mark A. Gordon Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-4\53-4-135 (1631 E Strasburg Rd.)\2020 Dim Variance Request\1000 foot ZV ltr 10022020.doc
TheAuthorities
PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION
Fall Virtual Training Schedule
September 16 - November 12, 2020
Although our in-person events, including Board Member Training, Management Workshop and the Annual Conference, did not take place this year, we are working hard to bring you the same valuable experiences by offering these educational sessions virtually. These workshops apply to ALL authorities and will include topics such as stormwater, tenants' rights and fair credit reporting, COSTARS, acquisitions, accounting/finance for board members, litigation review, legislative and regulatory updates.
Now is a perfect time to experience these great learning opportunities all from the comfort of your office or home!
How does virtual training work? All workshops will be held via a webinar platform accessible from your computer or mobile device. You will receive links to each workshop the day of the event.
What do you need to participate?
• A computer (Mac or PC) or mobile device with high-speed internet access • Speakers or headphones to listen to the audio portion of the sessions • A valid email address for registration
An asterisk(*) after the webinar title denotes it is part of the Virtual Conference series. If you registered for the entire
Virtual Conference, you are automatically registered for the additional conference webinars at no additional charge. If you are not able to attend any of these sessions, please contact us and you will be sent a link to the recorded session.
Meeting dates are subject to change.
Make sure your authority is aware of today's issues by attending these educational sessions!
September 16 ► 1:00 - 2:00 pm Cost: $40 ►Physical Security from A-Z (1 PDH)* Bob Winters, United States Homeland Security Bob Winters, of the US Department of Homeland Security, Protective Advisor-Pittsburgh District, will provide a presentation on physical security essentials based on his over 300 security assessments conducted during his 15years with OHS. His presentation will mostly focus on low-cost/no-cost options and opportunities for consideration. His exploration of practices, policies, and procedures will be beneficial to any site, from those that have only door locks and physical keys to those with sophisticated access control and security camera systems.
September 23 ► 1:00 - 2:00 pm
►The New Normal - Responding to a Positive COVID-19 Case in the
Workplace and Reducing the Spread David Barron, Cozen O'Connor
Walter Stella, Cozen O'Connor
Cost: Free to Members
$40/non-members
With many states seeing significant spikes of COVID-19 cases for the first time, employers facing these issues for the first time can learn and build on the experiences from the first three months of the pandemic. This webinar will address best practices and applicable legal requirements in the following areas:
• Step by step protocol for handling a positive COVID-19 case in the workplace
1
• How to handle reinstatement for both symptomatic and asymptomatic employees who test positive or who are self-quarantined for exposure • Screening of employees for symptoms and temperature checks • Conducting investigation into source of COVID-19 cases for contact tracing and OSHA recording purposes September 30 ► 10:00 am - 12:00 noon ►Board Member Training
Cost:$50
•
•
•
Government Relations Update - PMAA Government Relations staff will provide an overview of association government relations activities, including newly enacted state law, tracked legislation currently under consideration in the Pennsylvania House and Senate, upcoming federal and state agency regulatory and policy initiatives, as well as other related areas of interest.
Accounting/Finance for Authority Board Members David Busch, Keystone Alliance Consulting Christopher Gibbons, Concord Public Finance A pair of Authority consultants will address Board responsibility for Financial Reporting including both external (Annual Audits, DCED Reporting, Continuing Disclosure for financings) and internal reports (Monthly reporting to the Board, bill payment, budget status, account balances and financial planning). They will also discuss budgeting, including both Capital (5 year plan) and annual operating (Preparation, Approval and Monitoring and Adjusting). Other topics will include Revenue Generation (rate increases, full cost:priclng and board process involved), Tapping Fees, Acquisitions, Annual revisions to Capital planning policy and closing with how to adopt sound financial, investment and project management policies. Public Official Ethics Refresher -Attorneys from the PA State Ethics Commission (PASEC) will provide a brief review of ethical standards, recent Ethics Commission rulings impacting Municipal Authority officials, and briefly address their required Statement of Financial Interest forms. The Ethics Act requires this form be filed each year the position (board &/or Mgt.) is held and the year following termination of service. October 7 ► 1:00 - 2:00 pm Cost: $40 ►Stormwater Authorities 2.0 - Optimizing Implementation & Programming through
the Next Permit Cycle (1 PDH)* Adrienne Vicari, PE, Herbert, Rowland & Grubic, Inc.
It's been seven years since Act 68 authorized the formation of municipal authorities for stormwater management, and programs have evolved significantly over that time. The presenter will look at the lessons communities have learned as implementation has progressed and will share best practices that are generating success across the state. It will also provide a preview of the challenges anticipated in the next MS4 cycle and offer guidance on how to address these challenges as the evolution of stormwater authorities continues.
October 14 ► 1:00 - 2:00 pm
►Successfully Utilizing COSTARS and Other Procurement Best Practices (1 PDH)* Joshua T. Fox, Herbert, Rowland & Grubic, Inc. John Shaffer, PennBid
Cost:$40
Whether purchasing equipment or putting construction projects out to bid, authorities have many options to consider when putting together a plan on their purchasing processes. These engaging presenters will provide an overview of the COSTARS program, its advantages, and its disadvantages, using real-world examples from nearly a dozen projects. It will also discuss how applying several simple Best Practices, supported by the analysis of over 7,000 PA projects and 31,000 sealed bids, can create conditions that attract more competent bidders, yielding more competitive pricing. Participants will leave with a better understanding of identifying basic requirements of the public bidding process, especially as it relates to the Municipality Authorities Act; when using COSTARS can be advantageous versus traditional competitive bidding; the advantages and disadvantages of purchasing through COSTARS as part of a larger project; understanding the analytics from large population of PA projects; implementing a few basic Best Practices that can lead to higher bidder participation, better pricing, and enhancing risk management.
2
October 21 ► 1:00 - 2:00 pm ►Tenants' Rights, Fair Credit Reporting & Customer Service Programs (CAPs)* Candace Hoover, Manheim Area Water & Sewer Authority Kathy L. Pape, McNees Wallace & Nurick, LLC John Sweet, PA Utility Law Project
Cost:$40
Explore the Utility Service Tenants' Rights Act and best practices for municipal authorities to protect against liability and shield the rights of tenants. Discuss fair credit reporting and best practices for establishing well-designed and funded customer service programs (CAPs).
October 28 ► 1:00 - 2:00 pm Cost: $40 ►How to Grow Your Authority and as a Result Reduce Future Rate Increases
A Case Study of an Authority Growth Strategy - LASA's Three Recent Acquisitions (1 PDH)* Michael A. Kyle, Lancaster Area Sewer Authority This presentation includes a case study of Lancaster Area Regional Sewer Authority (LASA) and three recent system acquisitions. The purpose of this presentation is threefold: 1) to demonstrate actual efficiencies gained through growth of a sewer utility, 2) identify tactics that other utilities can use to purposefully grow their systems in a way that benefits their customers, and 3) present a list of do's and don'ts. As a result of these acquisitions, LASA has experienced measurable reductions in operating costs, an expanded service area and has developed a reliable strategy that will be -- sharef
fwith attendees. - - - -
November 4 ► 10:00 am - 12:00 noon ►Management Workshop
Cost:$50
• PMAA Legislative/Regulatory Update - A comprehensive overview of association government relations activities, including newly enacted state law, tracked legislation currently under consideration in the Pennsylvania House and Senate, upcoming federal and state agency regulatory and policy initiatives, as well as other related areas of interest including available funding through the Army Corps of Engineers. • Cybersecurity for Municipal Authorities: Risks, Trends & Preparations to Avoid Disaster Adeolu A. Bakare, Esq. McNees, Wallace & Nurick LLC
Thomas Markey, Esq. and Certified Information Privacy Professional The presenters will address cybersecurity risks faced by municipal authorities, recent trends in cyberattacks, and
the regulatory response from state and federal government. Attendees will learn best practices to prepare for, and respond to, cyber threats in a digital world, including risk mitigation practices for employees and contractors. • Solicitors Update and Litigation Review Steven A. Hann, Esq., Hamburg, Rubin, Mullin, Maxwell & Lupin
Michael Witherel, Esq., Witherel & Associates PMAA solicitors will address recent litigation involving municipal authorities and PMAA solicitors will address recent litigation impacting Pennsylvania municipal authorities, as well as discuss recent federal, state and administrative initiatives that municipal authorities need to be aware of in 2020.
November 12 ►-i:00- 2:00 pm
►Addressing Legacy Stormwater Issues in Today's MS4 Environment (1 PDH)* Pierre 0. MaCoy, Susquehanna River Basin Commission Jeremy Miller, Hampden Township Sewer Authority
Cost:$40
Stormwater management standards have changed over time, evolving as our understanding of stormwater has evolved. Legacy BM P's may no longer be serving their intended purpose. The presenters will provide background on the evolution of stormwater management, unique difficulties in suburban karst landscape, and will present an innovative approach to dealing with legacy facilities.
For more detailed session information, please visit our website
www.municipalauthorities.org
3
,/,- TheAuthorities "-:(J,, . ' '·" ··•;c,,1,c,,.,,,,,.,; ,, · PMAA's Fall Virtual Training September 16 - November 12, 2020
REGISTRATION
Authority/Firm: _______________________________ _
Address:------------------------------------
City, State, Zip: ___________________ _ Phone: _________ _
An asterisk (*) after the webinar title denotes it is part of the Virtual Conference series. If you registered for the entire
Virtual Conference, you are automaticolly registered for the additional conference webinars at no additional charge. If you are not able to attend any of these sessions, please contact us and you will be sent a link to the recorded session.
►Name/Title: ___________________ E-mail: __________ _ D Check here if you need PDH certificates
D September 16 Physical Security from A-Z* $40 D September 23 The New Normal, etc. - Free to Members/$40 to non-members $. __ _ D September 30 Board Member Training $SO □October 7 Stormwater Authorities 2.0- Optimizing Implementation, etc.* $40 □October 14 Successfully Utilizing COSTARS & Other Procurement Best Practices* $40 □October 21 Tenants Rights, Fair Credit Reporting & Customer Service Programs* $40 □October 28 Case Study of an Authority Growth Strategy, etc.• $40 □November 4 Management Workshop $50 □November 12 Addressing Legacy Stormwater, etc.• $40
Subtotal $ ___ _
►Name/Title: ___________________ E-mail: __________ _ D Check here if you need PDH certificates
□September 16 Physical Security from A-Z* $40 □September 23 The New Normal, etc. - Free to members/$40 to non-members $ __ _ □September 30 Board Member Training $50 D October 7 Stormwater Authorities 2.0 - Optimizing Implementation, etc.• $40 □October 14 Successfully Utilizing COSTARS & Other Procurement Best Practices* $40 D October 21 Tenants Rights, Fair Credit Reporting & Customer Service Programs* $40 D October 28 Case Study of an Authority Growth Strategy, etc.• $40 □November 4 Management Workshop $50 D November 12 Addressing Legacy Stormwater Issues, etc.• $40
TOTALDUE: $ _____ _
Subtotal $. ___ _
Return registrations to the PMAA office at 1000 North Front Street, Suite 401, Wormleysburg, PA 17043. Payment is due with registration. Checks made payable to PMAA. We also accept:
□Visa □ MasterCard □ Discover
Card# ___________ _ Exp.: __ _ Security code: __ _