Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
June 13, 2022
Members please meet at 6:00 pm at the sewer plant Dinner will be provided at the Twp. After the tour.
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting
2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS
3. SEWER REPORTS
a. Director of Public Works Repmt. b. Pennoni Engineer's Report. c. Big Fish Environmental Repo1t
4. APPROVAL OF MINUTES
a. May 9, 2022
5. APPROVAL OF INVOICES
Pennoni Invoice April #1117370 Pennoni Invoice April #1117371 Pennoni Invoice April #1117373 Deckman Invoice April #4202 Pennoni Invoice #1121791 Pennoni Invoice # 1121793 Pennoni Invoice #1121794 Pennoni Invoice #1121795 Gawthrop Invoice #258154 Teledyde Instrnments Invoice #S020537408 TelTek Colonial Elect. Invoice #14291798 Gawthrop Invoice #255872 Mallie Invoice #1000121613
6. LIAISON REPORTS
F:\Data\Shared Data\Agendas\Mun icipal Authority\2022\6-13-2022.doc
$ 3,426.25 $ 1,876.25 $ 1,283.50 $ 8,632.00 paid 4/14 $ 530.00 $ 121.60 $ 2,610.50 $ 938.00 $ 360.00 $ 5,605.00 $ 2,861.05 $ 440.00 paid 5/4 $ 3,250.00 paid 5/3
7. FINANCIAL REPORTS
a. May Financial Report
• Financial Updates or the Municipal Authority
8. OLD BUSINESS
a. Need to approve the sewer connect from 1344 Morstein Road Kyong-Ale Thomas
9. 2022 Goals:
Goal Status January,February,March,April and May were in compliance and met all requirements *Note DEP Ridley Creek Plant Compliance Annual lnsp.
Continue to Monitor Upgrades at WGSTP and On -going Westtown Way Pump Station Continue to Implement Infiltration and Inflow On-going for the Sewer System Caustic Soda Project
Equipment order Replace sewer line Hershey Mill Estate trunk line replacement Engineer will bring you up to date under old business. Hunt Country Pump Station Mag Meter
On Hold Hunt Country Pump Station Muffin Monster Replacement On Hold
Hunt Country Pump Station Bypass Pump On Hold Hibberd Lane is on line. Ridley Creek Plant is the next meter, in the process of replacing the meter at the plant. Three new meters for Ridley Creek Collection • Ridley Meter and manhole have been ordered (Delivery 3 months) • Is on site, should be installed in the next couple weeks
F:\Data\Shared Data\Agendas\Municipal Authority\2022\6-13-2022.doc
10. NEW BUSINESS
a. UV Replacement project e-mail from Mike Ellis b. Need approval from the updated quote from Pyrz for the caustic soda tank c. Hershey's Mill Sewer PA DEP permit d. Proposal for Phase 1 Bog Turtle Survey
11. CAP A CITY REQUESTS
12. ANY OTHER MATTER
13. CORRESPONDENCE AND REPORTS OF INTEREST
14. PUBLIC COMMENT
15. ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2022\6313-2022.doc
AREA CODE 61 0
692·7171 EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PA0L.I PIKE, WEST CHESTER, PA 19380-6199
To: Municipal Authority
From: Mark Miller
Re: June 13, 2022 Monthly Report
Monthly Flows:
Meters:
C.C. Collection:
R.C. Collection:
The average daily flow to West Goshen was 709,470 per day.
The meters were Calibrated by Allied Control on June 15, 2022. No repairs needed. The meters have been read on a daily basis.
The Public Works Department televised the sanitary sewers in Waterview
Farms, this was done to make sure there were no problems after Aqua installed new lines. All the pump stations were visited on a daily basis. The Public Works Department also vacuumed the wet wells and cleaned the floats and FOG rods.
The pumping stations were visited on a daily basis. The Public Works
Department vacuumed out the wet wells and cleaned the floats and FOG rods. We had a problem at the Hunt Country Pump Station when PECO lost a phase, the station was on back up power for 8 hours until PECO made repairs.
Ridley Creek Plant: Routine maintenance was performed at the plant. John Laidley was on site to install the new remote control for the Filter Feed Controls so the operator can turn equipment on and off during storm events remotely. Our generator contractor was on site, while performing routine maintenance to the generator he noticed that the generator was low on antifreeze. Upon further investigation, Paul found that the lower hose failed and the generator had shut down. We are going to have John Laidley install a dialer on both generators that will call out in the event of an equipment failure.
The equipment cabinet air condition on the Centrifuge quit working, we received quotes to replace the air conditioner unit prices range $6,800.00
to $8,180.00. I called Lenni and Jimmy found a unit for $5,500.00 which was ordered. The new unit is two weeks out and Lenni will take care of the installation.
Alarms: We responded to 15 alarms for May.
PA One Calls: We responded to over 90 PA One Calls for the month May.
Monthly Rainfall: 6.85 inches of rain for the month of May.
Lateral repairs or Caps: 2 laterals were repaired on Madison Drive due to a landscaper hitting The clean outs. 4 additional repairs were done in May.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
[Photograph of an EGPW utility crane truck and an Ace Disposal vacuum tanker truck parked at a pump station at dusk, accompanied by a handwritten sticky note.]
- Ashbridge Pump Station
- EGPW
- USDOT 10073[illegible]
- ACE DISPOSAL
- 610-644-3605
- 1-800-746-2[illegible]
[Photograph looking down into an open concrete pump station vault where a worker wearing a safety harness, helmet, and gloves is working beside a ladder, hoses, and cables, accompanied by a handwritten sticky note.]
- Hershey Mill Pump Station
(b
ti\ ,5 >--
, . ; · 3 -;::,
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
June 10, 2022
Ridley Creek Sewage Treatment Plant (RCSTP)
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
• Caustic Soda Conversion - We confirmed tank fill pipe sizing with the chemical supplier and obtained an updated quote for the tank with larger fill (4") and vent (6") penetration from Pyrz Water.
• UV Disinfection System -Glasco is preparing the design submittal. They initially expected to submit it by the end of May, but we have not received it, and we are awaiting a schedule and update from them.
The overall lead time for the Glasco equipment was initially estimated to be approximately 5 months
(including submittals) from contract execution on April 8, so equipment delivery was expected around September 2022. However, this schedule may be extended pending the design submittal timeline.
The installation of the system and other electrical and controls work is tentatively planned to occur in
late fall-early winter once awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants are announced. Bid documents for the mechanical and electrical construction contracts will be finalized this summer for bidding to occur in fall; the schedule will be refined over the next couple months pending updates on the CFA's schedule for grant award announcements.
• NPDES Permit Renewal - The permit renewal was officially issued, effective April 1, 2022 and runs through March 31, 2027. We are coordinating with Big Fish on the new treatment plant sampling requirements in the renewed permit.
Ridley Creek Collection System Permanent Meters
• No activity since our last report.
Westtown Way Pump Station
• No update since our last report. The following update is from HRG in our May report:
Excavation and subgrade preparation for the exterior electrical pad has been completed, and interior work such as initial pump removal tasks has also commenced. Unsuitable soils and concrete deposits were encountered underground for the electrical pad and had to be removed and replaced with suitable materials. A change order is expected.
All equipment is currently expected to be delivered on schedule with the exception of the electrical switchboard which is tentatively delayed until early 2023. The switchboard delay may extend the entire project since they may not be able to install the new VFDs, and thereby install new pumps, until the switchboard is installed. The entire project may therefore be extended until mid-2023. The contr_actors have been asked to provide updated schedules at the next Township progress meeting later this month [May].
Sanitary Sewer Pipe Rehab
• Supplee Valley -No activity since our last report.
• Hershey's Mill Estates -The PADEP General Permit GP-11 "Stream Obstructions" was approved, and the permit is attached.
EGMAU22001 East Goshen Municipal Authority
June 10, 2022 Page 2 Engineer's Report
Since a LSA grant application was submitted for this project, construction contracts cannot be awarded if/until the grant is "approved". We therefore currently plan to bid the project in the late fall-early winter with construction projected in early to mid-2023.
• Ridley Creek Exposed Sewer Rehab - There is a ductile iron sewer main exposed in the Ridley Creek stream bed immediately north of N. Boot Road near Bellingham. We previously initiated preparation of a draft DEP emergency General Permit application to encase the pipe in concrete and add rip rap to the immediately upstream stream bed.
A bog turtle habitat survey will be conducted by a 3'' party "Qualified Bog Turtle Surveyor (QBTS)" to address the associated requirement in the PNDI Search. The survey is scheduled for June 16. If the QBTS does not identify habitat within 300 feet, approval from the US Fish and Wildlife Service (USFWS) is not required. The emergency permit application will be submitted to PADEP upon clearance of the bog turtle habitat.
l&I Program
• No activity since our last report.
New Connections
• Sewer Extension Study- No activity since our last report.
• 1344 Morstein Road -We reviewed a contractor's sketch for a low pressure sewer lateral to connect the subject property to the public sewer in Eastwick Circle. We have comments and concerns on the proposed approach, and we are contacting the contractor to discuss.
Industrial Pretreatment Ordinance
• No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.
END OF REPORT
P:\Projects\EGMA\Memos to Board\2022\Engineers Report 2022-06-10.docx
RCSTP Monthly Operations Report
June 2022
Environmental Services Inc.
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 and 002 reported non-compliance with three (3) parameters identified as only "Report" with no effluent limitations regarding water quality. The parameters listed are effluent total nitrogen, Ultraviolet light intensity and influent CBODs. The non-compliance was the result of the new NPDES permit becoming effective April 1, 2022. All supplemental reports were submitted for the month of April with the DMR. Discharge to the Applebrook irrigation lagoon remained in service. Chemical usage utilized for pH and total
alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were reduced to a daily average of 58.5 as compared to the previous moth at 67.7 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. There were no odor complaints during the month.
Treatment Process Operation Table 1 illustrates the final effluent composite sample data reported for outfall 001 May. Compliance with the NPDES discharge permit was not fully achieved during April1 and May1.
May 2022- Final Effluent• Outfall 001
Flow CBOD5 Total Nitrogen TSS NHrN Total Phosphorus Fecal Coliform Ultraviolet Copper, Zinc, NPDES Permit lbs/ lbs/ lbs/ lbs/ lbs/ Geo Geo light MGD Total Total intesity Discharge limitations Average mg/L month mg/L month mg/L month mg/L month mg/L month Mean Mean
0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000
Inst. Max 20 94
15
94 5 1 Report Report Report
Sample Date
May 3, 2022 0.260 2.0 4.3 NS NS 5.6 12.1 0.10 0.22 0.15 0.33 56 1.7482 NS NS
Mayl0, 2022 0.289 2.0 4.8 5.8 14.03 4.0 NS 0.10 0.24 0.16 0.39 7 0.8451 NS NS
May 17, 2022 0.264 2.0 4.4 NS NS 8.5 18.7 1.10 2.42 0.15 0.33 12 1.0792 NS NS
May 24, 2022 0.292 2.0
4.9
6.7 16.37 4.0 9.7 0.10 0.24 0.10 0.24 5 0.6990 NS NS
May 31, 2022 0.260 2.0 4.3 6.4 13.83 4.0 8.7 0.10 0.22 0.10 0.22 1 0.0000 NS NS
Average 0.273 2.0 4.6 6.3 14.7 5.2 12 0.30 0.67 0.13 0.30 16 0.8743 NA NA
Minimum 0.260 2.0 4.3 5.8 13.8 4.0 8.7 0.10 0.22 0.10 0.22 1 0.0000 NA NA
Maximum 0.292 2.0 4.9 6.7 16.4 8.5 19 1.10 2.42 0.16 0.39 56 1.7482 NA NA
1A new NPDES permit was issued and became effective beginning April 1, 2022.
The monthly average total phosphorus was reported as 0.13 mg/L as compared to the permit limitation of 0.5 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 6.5 mg/L as compared to the discharge limitation of 10 mg/L. The TSS weekly averages are presented below in Table 2.
NS NS NS NS NS
NA NA NA
Table 2 Mav 2021 Final Effluent Weeklv TSS Averaaes
Week 1 5.6 moil Week2 4.0 moil Week3 8.5 mail . Week4 4.0 mqil Week5 4.0 moil
The final effluent test results demonstrate that the biological treatment process performed well during May. Sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MlSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002 continued through May.
Table 3 presents the available pollutant data for the Applebrook discharge reported as outfall 002 on the May 2022 DMR.
Table 3
May 2022 - Applebrook - Out Fall 002
Flow CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total Fecal Coliform
NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ lbs/ Geo Geo Discharge Limitations Average mg/L month mg/L month mg/L month mg/L month mg/L month Mean Mean 0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000 40 45 May 3, 2022 0.0419 2.0 0.70 NS NS 5.6 1.96 0.10 0.03 0.15 0.05 56 1.7482 May 10, 2022 0.0391 2.0 0.65 5.82 1.90 4.0 1.30 0.10 0.03 0.16 0.05 7 0.8451 May 17, 2022 0.0418 2.0 0.70 NS NS 8.5 2.96 1.10 0.38 0.15 0.05 12 1.0792 May 24, 2022 0.0443 2.0 0.74 6.72 2.48 4.0 1.48 0.10 0.04 0.10 0.04 5 0.6990 May 31, 2022 0.0443 2.0 0.74 6.38 2.36 4.0 1.48 0.10 0.04 0.10 0.04 1 0.0000 Average 0.0423 2.0 0.71 6.31 2.25 5.2 1.8 0.30 0.10 0.13 0.05 16 0.8743 Minimum 0.0391 2.0 0.65 5.82 1.90 4.0 1.3 0.10 0.03 0.10 0.04 1 0.0000 Maximum 0.0443 2.0 0.74 6.72 2.48 8.5 3.0 1.10 0.38 0.16 0.05 56 1.7482
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The
monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during May 2022.
Page 2 of 5
Table 4 May 2022 - Influent Wastewater
Phosphorus,Total,
Flow BOD5 CBOD5 TSS NH4-N TKN, mg/L mg/L
Design Basis mg/L lbs/day mg/L lbs/day mg/l lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
MGD
Average 335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
Sample Date
May 3, 2022 0.361 167 804 NS NS 180 843 31.8 96 33.1 100 4.68 14.1
May 10, 2022 0.394 793 1,609 161 533 157 516 31.7 108 59.0 194 7.80 15.7
May 17, 2022 0.461 237 910 251 968 228 876 43.7 168 61.1 135 8.63 33.2
May 24, 2022 0.404 231 779 133 786 58 196 44.9 151 62.7 211 7.84 26.4
May 31, 2022 0.401 295 987 214 716 282 943 25.1 84 53.6 179 6.11 10.4
Average 0.4043 365 1,218 215 751 201 675 36 121 53.9 184 7.0 24.0
Minimum 0.3610 231 779 162 533 58 196 25 84 33.2 100 4.7 14.1
Maximum 0.4606 793 2,609 252 968 281 943 45 168 62.7 135 8.6 33.1
The foam on the SBR surface reduced to approximately 15% to 30% coverage of the surface area. The foam thickness is approximately 3 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L. 3
PADEP
A new NPDES Permit became effective April 1, 2022 and expires March 31, 2027. The permit was issued March 21, 2022.
In summary, a few new water quality parameters were added to the permit, however, they are listed as "Report" without any pollutant loading or effluent limitations. The Effluent Outfalls 001 and 002 parameters include Total Nitrogen, Total Copper, Total Zinc and Ultraviolet light
intensity. Effluent total nitrogen is a weekly sample, whereas Ultraviolet light intensity is required daily. Total copper and total zinc are required for quarterly monitoring and reporting. In addition, the influent is required to be monitored for weekly CBODs reporting.
The technology for measuring and Ultraviolet light intensity is questionable and not readily available. Discussions are ongoing with PA DEP.
Pennoni Associates
Received the new NPDES permit effective April 1, 2022 on May 4, 2022.
Chemical Usage:
May 2022
Chemical Daily Average
Soda Ash, pounds 300
Aluminium Sulfate solution, gal 58.5
Page 3 of 5
Total Monthly
9,300
1,815
Centrifuge sludge d.ewatering, 15,2452 365,870 gallons
2The centrifuge Is not operated on a daily basis throughout the month.
Flow data:
May 2022
Flow Meter Location Total Volume for Average Daily Daily Maximum Month, MG Flow, gpd Flow, gpd
Influent Wastewater to 12.753 411,378 567,640 Screening Building*
Influent Wastewater to 14.484 467,221 607,232 SBRs*
Internal Recycle** 2.043 65,901 134,580
Treated Effluent to Disc 14.422 465,227 584,832 Filters
Final Effluent Discharge
9.160 295,000 403,000
Applebrook Golf Course 1.339 43,186 47,920
During May, the average monthly influent wastewater flow measured at the "field" flow meter was 411,378 gallons/day as compared to the influent flow into the SBRs as 467,221 gallons/day. The difference between the daily averages is 55,843 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows. During the
month of May, the internal recycle rates were elevated as a result of the increased frequency and intensity of rainfall events.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Cleaned buildings and laboratory
Significant Rainfall
During May, there were thirteen (13) days when rainfall occurred. There were three (3) events of rainfall meeting or exceeding 0.50 inches.
May 7th
May 8th
1.62 inches
0.65 inches
Page 4 of 5
May 19th 0.66 inches
There were three events of consecutive rainfall event
May 6th through 8th for a total of 2.52 inches of rainfall
May 14th through 15th for a total of 0.62 inches of rainfall
May 27th through 29th for a total of 0.65 inches of rainfall
Page 5 of 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
DRAFT EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 9, 2022
The East Goshen Township Municipal Authority held their regular meeting on Monday, May 9, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman; Kevin Cummings, Vice Chairman; Phil Mayer Dana Pizarro Jack Y ahraes
Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni), Stacey Fuller (Attorney), and Scott Towler (Big Fish) on speaker phone.
COMMON ACRONYMS: EFES -Big Fish Environmental Services BOS - Board of Supervisors CB - Conservancy Board DEP - Department of Environmental Protection EPA - Environmental protection Agency HC - Historical Commission l&I - Inflow & Infiltration LCSTP - Lockwood Chase Sewer Treatment Plant
Call to Order & Pledge of Allegiance
MA- Municipal Authority NP DES -National Pollutant Discharge Elimination System PC -Planning Commission PM -Prevention Maintenance
PR - Park & Recreation Board RCSTP - Ridley Creek Sewer Treatment Plant SER - Sequencing Batch Reactor SSO - Sanitmy System Ove1flow WAS - Waste Activated Sludge
Since there was not a quorum this was not an official meeting.
Chairman's Report 1. Walter attended the PMAA management workshop and spoke about the topics of discussion.
SEWER REPORTS 1. Director of Public Works, Mark Miller's report for April 2022 Monthly Flows -The average daily flow to West Goshen was 706,755 per day.
Meters: The meters were read on a daily basis with no problems to report for the month.
C.C. Collection: The pump stations were visited on a daily basis. The wet wells were washed down and oil was checked in the generators. We received a complaint of a sink hole behind #8 School Lane. Upon further investigation we found that the pipe had pulled out of the hub. We excavated that lateral and made the repair. We received an odor complaint from a resident on Glenbrook Lane. We found that the odor was from the neighbor's mulch.
R.C. Collection: The pumping stations were visited on a daily basis. The wet wells were washed down and the oil was checked in the generators.
MA 5-9-22 draft 1
1 2 Ridley Creek Plant: The new meter pit has been ordered as well as the Caustic Soda Equipment. 3 4 Alarms: We responded to 19 alarms for April. 5 6 PA One Calls: We responded to over 88 PA One Calls for the month of April. 7 8 Monthly Rainfall: 7 .15 inches of rain for the month of April. 9 10 Lateral Repairs or Caps: 6 caps were replaced in April. 11 12 13 14 15 16 2. Pennoni Engineer's Report dated May 4, 2022
17 Ridley Creek Sewage Treatment Plant (RCSTP)
18 • Caustic Soda Conversion - We are coordinating with the chemical supplier for tank fill pipe 19 sizing needs and will obtain an updated quote for the tank (with adjusted tank vent, fill line, 20 and suction penetration sizes) from Pyrz Water accordingly for Township execution.
21 • UV Disinfection System - Glasco is preparing the design submittal which we expect to 22 receive for review in the next couple of weeks.
23 The overall lead time for the Glasco equipment is approximately 5 months (including 24 submittals) from contract execution on April 8, so we expect equipment delivery around 25 September 2022. The installation of the system and other electrical and controls work is 26 tentatively planned to occur in late fall-early winter once awards for the Commonwealth
27 Financing Authority (CF A) Local Share Account (LSA) grants are announced. Bid 28 documents for the mechanical and electrical constrnction contracts will be finalized this 29 summer for bidding to occur in fall; the schedule will be refined over the next couple months 30 pending updates on the CFA's schedule for grant award announcements.
31 NPDES Permit Renewal - The attached permit renewal was officially issued effective April 32 1, 2022 and runs through March 31, 2027.
33
34 Ridley Creek Collection System Permanent Meters
35 • No activity since our last report.
36
37 Westtown Way Pump Station
MA 5-9-22 draft 2
1 * HRG provided the following update: Excavation and subgrade preparation for the exterior electrical pad 2 has been completed, and interior work such as initial pump removal tasks has also commenced. 3 Unsuitable soils and concrete deposits were encountered underground for the electrical pad and had to 4 be removed and replaced with suitable materials. A change order is expected. 5 All equipment is currently expected to be delivered on schedule, with the exception of the electrical 6 switchboard which is tentatively delayed until early 2023. The switchboard delay may extend the 7 entire project since they may not be able to install the new VFDs and thereby stall new pumps until the 8 switchboard is installed. The entire project may therefore be extended until mid-2023. The 9 contractors have been asked to provide updated schedules at the next Township progress meeting later 10 this month.
11
12 Sanitary Sewer Pipe Rehab
13 • Supplee Valley - No activity since our last report.
14 • Hershey's Mill Estates - We previously submitted the GP-11 "Stream Obstructions" plans 15 and permit application to DEP on March 8 via email and again on April 1. Per DEP request a 16 few weeks thereafter, we resubmitted in a different format through their online system on 17 April 27 for them to initiate the formal review. The confirmed the same day that the review 18 has now been scheduled. Since an LSA grant application was submitted for this project, 19 construction contracts cannot be awarded if/until the grant is "approved". We therefore 20 currently plan to bid the project in the late fall-early winter with construction projected in 21 early to mid-2023.
22 • Ridley Creek Exposed Sewer Rehab - There is a ductile iron sewer main exposed in the 23 Ridley Creek stream bed immediately north of N. Boot Road new Bellingham. We initiated 24 preparation of a draft DEP emergency General Permit application to encase the pipe in 25 concrete and add riprap to the immediately upstream stream bed. We also performed the 26 PND I environmental search, which returned a requirement to perform a bog turtle habitat 27 survey. The PNDI Receipt is attached. We are coordinating with the 3rd party "Qualified Bog 28 Turtle Surveyor (QBTS)" to provide a quote to conduct the survey. If the QBTS does not 29 identify habitat within 300 feet, approval from the US Fish and Wildlife Service (USFWS) is 30 not required. The emergency permit application will be submitted to P ADEP upon clearance 31 of the bog Turtle habitat.
32 I&I Program
33 • No activity since our last report.
34 New Connections
35 • Sewer Extension Study- No activity since our last report.
36 Industrial Pretreatment Ordinance
37 • No activity since our last report. As discussed at the May 2021 MA meeting, a headworks 38 study with sampling at the RCSTP can be conducted to set contaminant limits. 39 40
MA 5-9-22 draft 3
1 2 3. Big Fish Environmental Services - 3 The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the permit discharge 4 limitations for the month of April and May 2022. All supplemental reports for April 2022 were 5 submitted with the DMR. Discharge to the Applebrook in-igation lagoon remained in service. 6 Chemical usage utilized for pH and total alkalinity remained consistent with previous months. 7 Aluminium sulfate solution volumes were elevated daily dosages at a daily average of 76. 7 gpd as 8 compared to the previous month at 68.1 gpd to achieve phosphorus removal. No significant 9 mechanical or operational issues were observed during operation of sludge dewatering equipment or 10 SBR treatment process. There were no odor complaints during the month. 11 Scott discussed the new permit. 12 13 Approval of Minutes 14 Since there was not a quorum, the April minutes were not reviewed. 15 16 Approval of Invoices
17 Since there was not a quorum no invoices were approved. 18 19 Liaison Reports - None 20 21 Financial Reports - None 22 23 Old Business - None 24 25 Goals - No discussion 26 27 New Business - None 28 29 Capacity Request - None 30 31 Any Other Matter - None 32 33 Correspondence- None 34 35 Public Comment - None 36 37 38 Adjournment 39 There being no further business the meeting was adjourned at 8:00 pm. 40 The next regular meeting will be held on Monday, June 13, 2022 at 7:00 pm.
41
42 Respectfully submitted, 43 44 45 Ruth Kiefer, Recording Secretary
MA 5-9-22 draft 4
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 03/20/2022
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1113816 Invoice Date : 03/31/2022
Project: EGMAU21004 Project Name : HM Estates Sewer
Design & Permitting
Phase 04: Continued preparation of specifications and update of cost estimate.
Phase 05: Completed GP-11 permit application for stream obstructions and submitted to PADEP.
Phase 07: Submitted geotechnical report to the MA and Township.
Phase Code/ Name
01 -- Wetland & Watercourse Investigation 02 -- Phase I Bog Turtle Habitat Assessment 03 -- Survey 04 -- Design 05 -- Permitting 06 -- Property Line Stakeout 07 -- Geotechnicaf
Phase: 07 -- Geotechnical
Labor Class
Authority Engineer
Total:
est. NTE
Contract Previously % Amount Billed Complete
$6,750.00 $6,750.00 100.00% $6,750.00 $6,750.00 100.00% $17,200.00 $17,200.00 100.00% $26,100.00 $24,756.02 95.74% $8,000.00 $3,839.59 86.33% $5,000.00 $7,520.50 $10,000.00 $6,165.50 62.71% $79,800.00 $72,981.61
Hours Rate 0.75 141.00
Complete
To Date
$6,750.00 $6,750.00 $17,200.00 $24,987.03
$6,906.45 $7,520.50 $6,271.25 $76,385.23
Amount This Invoice
$0.00 $0.00 $0.00 $231.01 $3,066.86
$0.00 $105.75 $3,403.62
Amount
105.75
Labor
- - - 105.75
Phase Subtotal $105.75
Amount Due This Invoice $3,403.62
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced:
Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):
West Goshen HM Estates Sewer Design Permitting
EGMAU21004 Invoice Summary
Invoice Date 3/31/2022
EGMAU21004 HM Estates Sewer Design & Permitting
1113816
1/17/2022 to $ 64,800.00 Date: $ 79,800.00 $ 72,981.61 $ 3,403.62 $ 76,385.23
96% $ 3,414.77 4%
HM Estates Sewer Design & Permitting
$ 79,800.00 $ 72,981.61 $ 3,403.62 $ 76,385.23
3/20/2022 3/31/2022
Remaining Budget($): $ Remaining Budget(%):
96% 3,414.77 4%
Comments: Phase 04: Continued preparation of specifications and update of cost estimate.
Phase 05: Completed GP-11 permit application for stream obstructions and submitted to PADEP.
Phase 07: Submitted geotechnical report to the MA and Township.
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 03/20/2022
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No: 1113817 Invoice Date: 03/31/2022
Project: EGMAU22001 Project Name : 2022 General
Services
General Consultation - February and March Engineer's Reports; preparation for and attendance at February and March MA meetings including review of RCSTP operator's reports; prepared updated cost estimates and project schedules for HME Sewer Replacement and UV Replacement for PA DCED Local Share Account grant application, and evaluated schedule impacts of grant program (delayed starts) on both projects.
Sewer Extension Study - Finalized and submitted summary memo re: septic vs. public sewer extension life cycle cost analysis to MA and Township, and revised and re-issued to address MA comments; provided info on potential grant programs for sewer extension construction and planning to Township; and provided 2007 extension public survey and letters to MA as examples.
RCSTP NPDES Permit Renewal - Reviewed draft NPDES permit issued by PADEP.
RCSTP Influent Meter Replacement - Updated manhole design depths based on measurements from Public Works, and obtained updated manhole and meter cost quotes from vendors.
Billing Limits
Total Billings
Limit Remaining
Labor
Authority Engineer Senior Professional
Project Professional Associate Professional
Graduate Professional
Totals Total Labor
Current 4,156.75
Hours
16.25 .75 3.75 4.00 9.50 34.25
Prior 3,127.25
Rate 141.00 134.00 118.00 105.00 95.00
To-Date 7,284.00 35,000.00 27,716.00
Amount 2,291.25 100.50 442.50 420.00 902.50 4,156.75
Total this Invoice
4,156.75
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
2022 General Services EGMAU22001 Invoice Summary
Invoice Date 3/31/2022
EGMAU22001 2022 General Services 1113817 1/17/2022 $ 35,000.00 $ 35,000.00 $ 3,127.25 $ 4,156.75 $ 7,284.00 21% $ 27,716.00 79%
2022 General Services $ 35,000.00 $ $ $
3,127.25 4,156.75 7,284.00
to Date:
Remaining Budget($): $ Remaining Budget(%):
21% 27,716.00 79%
3/20/2022 3/31/2022
Comments: General Consultation - February and March Engineer's Reports; preparation for and attendance at February and March MA meetings including review of RCSTP operator's reports;
prepared updated cost estimates and project schedules for HME Sewer Replacement and UV Replacement for PA DCED Local Share Account grant application, and evaluated schedule impacts of grant program (delayed starts) on both projects.
Sewer Extension Study- Finalized and submitted summary memo re: septic vs. public sewer extension life cycle cost analysis to MA and Township and revised and re-issued to address
MA comments; provided info on potential grant programs for sewer extension construction and planning to Township; and provided 2007 extension public survey and letters to MA as examples.
RCSTP NPDES Permit Renewal - Reviewed draft NPDES permit issued by PADEP.
RCSTP Influent Meter Replacement - Updated manhole design depths based on measurements from Public Works and obtained updated manhole and meter cost quotes from vendors.
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike
INVOICE
West Chester, PA 19380-6199
For Services Rendered Through 03/20/2022
Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1113818 Invoice Date : 03/31/2022
Project: EGMAU22003 Project Name: 2021 Chapter 94
Reports
Continued preparation of RCSTP, West Goshen (Chester Creek), and Westtown Service Areas Chapter 94 Reports.
Billing Limits
Total Billings
Limit Remaining
Labor
Authority Engineer Staff Professional Graduate Professional
Totals Total Labor
Current 6,657.25
Hours
1.00 27.50 36.75 65.25
Prior
0.00
Rate 141.00 110.00 95.00
To-Date 6,657.25 8,000.00 1,342.75
Amount
141.00 3,025.00 3,491.25 6,657.25 6,657.25
Total this Invoice $6 657.25 =======
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
2021 Chapter 94 Reports EGMAU22003 Invoice Summary
Invoice Date 3/31/2022
EGMAU22003 2021 Chapter 94 Reports 1113818 NTP $ 8,000,00 $ 8,000,00 $ $ 6,657,25 $ 6,657,25 83% $ 1,342,75 17%
2021 Chapter 94 Reports $ 8,000,00 $ $ 6,657,25 $ 6,657,25
to Date:
Remaining Budget($): $ Remaining Budget(%):
83% 1,342,75 17%
3/20/2022 3/31/2022
Comments: Continued preparation of RCSTP, West goshen (Chester Creek), and Westotwn Service Areas Chapter 94 Reports.
Derek Davis East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 03/20/2022
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No: 1113819 Invoice Date: 03/31/2022
Project : EGMAU22004 Project Name : RCSTP UV
Replacement
Continued electrical design; conducted electrical scoping virtual meeting with Lenni Electric to obtain cost quote; prepared sequence of construction for UV replacement including bypass system installation; created plan of Glasco UV system design overlaid on existing conditions RCSTP plans; site visits to observe Glasco and Trojan UV systems and obtain recommendations and feedback from plant operators in Upper Gwynedd Township and Hazleton; reviewed Glasco's initial Costars quote; prepared summary memo of alternative UV systems and recommendations for product selection; evaluated hoist vs. jib crane alternatives and obtained product cost quotes; scheduled and conducted detailed field scoping meeting at RCSTP w/ Glasco's technical reps, vendor, Township, operator, and electrical, mechanical, and controls contractors; reviewed revised Glasco Costars quote after meeting to include additional scope; responded to scoping questions from contractors and operator; reviewed contractors' quotes; prepared overall cost summary memo; evaluated contracting approach for electrical and mechanical construction work; and debriefed Kappe on reason why Trojan was not selected.
Labor
Authority Engineer Senior Professional Associate Professional
Totals Total Labor
Hours
20.00 36.50 55.75 112.25
Rate 141.00 134.00 105.00
Amount 2,820.00 4,891.00 5,853.75 13,564.75 13,564.75
Total this Invoice =====$=13='=5=64=·=7=5
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
RCSTP UV Replacement EGMAU22004 Invoice Summary
Invoice Date 3/31/2022
EGMAU22004 RCSTP UV Replacement
1113819 1/17/2022 $ $ . $ 2,537.25
$ 13,564.75 $ 16,102.00 #DIV/0! $ (16,102.00) #DIV/0!
RCSTP UV Replacement
$ $ $ $
$
2,537.25 13,564.75 16,102.00 #DIV/0!
(16,102.00) #DIV/0!
to Date:
3/20/2022 3/31/2022
Comments: Continued electrical design; conducted electrical scoping virtual meeting with Lenni Electric to
obtain cost quote; prepared sequence of construction for UV replacement including bypass system installation; created plan of Glasco UV system design overlaid on existing conditions RCSTP plans; site visits to observe Glasco and Trojan UV systems and obtain recommendations and feedback from plant operators in Upper Gwynedd Township and Hazleton; reviewed Glasco's initial Costars quote; prepared summary memo of alternative UV systems and recommendations for product selection; evaluated hoist vs. jib crane alternatives and obtained product cost quotes; scheduled and conducted detailed field scoping meeting at RCSTP w/ Glasco's technical reps, vendor, Township, operator, and electrical, mechanical, and controls contractors; reviewed revised Glasco Costars quote after meeting to include additional scope; responded to scoping questions from contractors and operator; reviewed contractors' quotes; prepared overall cost summary memo; evaluated contracting approach for electrical and mechanical construction work; and debriefed Kappe on reason why Trojan was not selected.
Mail lie®
ACCOUNTANTS • ADVISORS
East Goshen Municipal Authority Attn: Mr. Derek J. Davis
1580 Paoli Pike West Chester, PA 19380-6107
500 North Lewis Road Limerick, PA 19468 Phone: 610-935-1420
EIN: 23-1518888
Web: www.maillie.com E-mail: firm@maillie.com
Client Number: 2500 Invoice: 1000120865
Date: Due Date:
02/28/2022 Upon Receipt
Billing for time incurred to February 28, 2022, for the following services:
Audit of tt1e 2021 East Goshen Municipal Authority financial statements and preparation of your audit report thereon
J\PPROVED BY: _____ _ DATE PAID: --------
CHECK#: ----,----=-=--- ,·: Hi\F{G E. D TO: ◊,ta 4. 3[10
02/28/2022 7,000.00 01/31/2022 0.00
Please return this portion with payment.
12/31/2021 0.00
Billed Time & Expenses
Invoice Total
11/30/2021 0.00 10/31/2021 + 0.00
$7,000.00
$7,000.00
$7,000.00
Total $7,000.00
ID: 2500 Date: 02/28/2022 Due Date: Upon Receipt
Invoice: 1000120865
East Goshen Municipal Authority
Please make checks payable to Maillie LLP.
Amount Due: $7,000.00
Amount Enclosed: $ _____ _
To pay by ACH, email payment details to Payments@maillie.com and use this ACH information:
Customers Bank Routing#: 031302971 Account#: 6874053 99 Bridge Street Phoenixville, PA 19460
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 05/15/2022
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No: 1121791 Invoice Date : 05/27/2022
Project : EGMAU20004 Project Name : RCSTP Caustic Soda
Conversion
Obtained cost quotes from tank vendors; and coordinated with current RCSTP chemical supplier on delivery and equipment requirements for new caustic tank.
Contract Previously % Complete Amount Phase Code / Name Amount Billed Complete To Date This Invoice
01 •· Design and Permitting $26,500.00 $21,200.00 82.00% $21,730.00 $530.00 02 •· Construction Phase Services est. $5,400.00 $0.00 $0.00 $0.00 Total: $31,900.00 $21,200.00 $21,730.00 $530.00
Amount Due This Invoice $530.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget:
Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
West Goshen RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 5/27/2022
EGMAU20004 RCSTP Caustic Soda Conversion
1121791 1/17/2022 to $ 31,900.00 Date: $ 31,900.00 $ 21,200.00 $ 530.00 $ 21,730.00 68% $ 10,170.00 32%
RCSTP Caustic Soda Conversion
$ 31,900.00 $ $ $
21,200.00 530.00 21,730.00
5/15/2022 5/27/2022
Remaining Budget($): $
68% 10,170.00 32% Remaining Budget(%):
Comments: Obtained cost quotes from tank vendors; and coordinated with current RCSTP chemical supplier on delivery and equipment requirements for new caustic tank.
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 05/15/2022
INVOICE
Resubmitted GP-11 permit application to DEP twice upon their request.
Contract Phase Code I Name Amount
01 •· Wetland & Watercourse Investigation $6,750.00 02 •· Phase I Bog Turtle Habitat Assessment $6,750.00 03 •· Survey $17,200.00 04 •· Design $26,100.00 05 •· Permitting $8,000.00 06 -- Property Line Stakeout est. $5,000.00 07 •· Geotechnical NTE $10,000.00 Total: $79,800.00
Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No: 1121793 Invoice Date: 05/27/2022
Project: EGMAU21004 Project Name : HM Estates Sewer
Design & Permitting
Previously % Complete Billed Complete To Date
$6,750.00 100.00% $6,750.00 $6,750.00 100.00% $6,750.00 $17,200.00 100.00% $17,200.00 $24,987.03 95.74% $24,987.03 $6,906.45 87.85% $7,028.05 $7,520.50 $7,520.50 $6,271.25 62.71% $6,271.25 $76,385.23 $76,506.83
Amount Due This Invoice
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Amount This Invoice
$0.00 $0.00 $0.00 $0.00 $121.60
$0.00 $0.00 $121.60
$121.60
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice:
Invoiced to Date ($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):
West Goshen HM Estates Sewer Design Permitting
EGMAU21004 Invoice Summary
Invoice Date 5/27/2022
EGMAU21004 HM Estates Sewer Design & Permitting
1121793 3/21/2022 to $ 64,800.00 Date: $ 79,800.00 $ 76,385.23 $ 121.60 $ 76,506.83 96% $ 3,293.17 4%
HM Estates Sewer Design & Permitting
$ 79,800.00 $ 76,385.23 $ $
121.60 76,506.83
5/15/2022 5/27/2022
Remaining Budget($): $ Remaining Budget(%):
96% 3,293.17 4%
Comments: Resubmitted GP-11 permit application to DEP twice upon their request.
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 05/15/2022
INVOICE Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No: 1121794 Invoice Date : 05/27/2022
Project : EGMAU22001 Project Name : 2022 General
Services
General Consultation - May Engineer's Report; preparation for and attendance at May MA meeting including review of RCSTP operator's report; coordinate with operator on new NP DES Permit sampling requirements; and assistance to Codes Officer on Planning Commission and BOS review and resolution of East Whiteland Twp's Act 537 Plan for sewer system sale.
Boot Road Sewer Rehab Creek Crossing - Continued preparation of GP-11 Stream Obstructions permit application documents and E&S Plans; obtained quote from subconsultant for Qualified Bog Turtle Habitat Survey; and re-ran PNDI environmental search for clarified location of sewer line.
Billing Limits
Total Billings
Limit Remaining
Labor
Authority Engineer Staff Professional Associate Professional Graduate Professional
Totals Total Labor
Current 2,610.50
Hours
6.75 2.25 1.00 13.75 23.75
Prior 10,710.25
Rate 141.00 110.00 105.00 95.00
To-Date 13,320.75 35,000.00 21,679.25
Amount
951.75 247.50 105.00 1,306.25 2,610.50 J
Total this Invoice
1..1
u' /\I l\r G
i v
tt¥i
2,610.50
$2,610.50
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice:
Invoiced to Date($): Invoiced to Date(%):
2022 General Services EGMAU22001 Invoice Summary
Invoice Date 5/27/2022
EGMAU22001 2022 General Services 1121794 4/18/2022 $ 35,000.00 $ 35,000.00 $ 10,710.25 $ 2,610.50 $ 13,320.75 38% $ 21,679.25 62%
2022 General Services $ 35,000.00 $ $ $
10,710.25 2,610.50 13,320.75
to Date:
Remaining Budget($): $
38% 21,679.25 62% Remaining Budget(%):
5/15/2022 5/27/2022
Comments: General Consultation - May Engineer's Report; preparation for and attendance at May MA meeting including review of RCSTP operator's report; coordinate with operator on new NPDES Permit sampling requirements; and assistance to Codes Officer on Planning Commission and BOS review and resolution of East Whiteland Twp's Act 537 Plan for sewer system sale.
Boot Road Sewer Rehab Creek Crossing - Continued preparation of GP-11 Stream Obstructions permit application documents and E&S Plans; obtained quote from subconsultant for Qualified Bog Turtle Habitat Survey; and re-ran PNDI environmental search for clarified location of sewer line.
INVOICE
Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199
For Services Rendered Through 05/15/2022
Design of overhead jib crane and overlow weir.
Billing Limits
Total Billings
Limit Remaining
Labor
Senior Professional
Totals Total Labor
Current
938.00
Hours
7.00 7.00
Remit Payment To: Pennoni Associates Inc.
P.O. Box 827328 Philadelphia, PA 19182-7328
Invoice No : 1121795 Invoice Date : 05/27/2022
Project : EGMAU22004 Project Name : RCSTP UV
Replacement
Prior 17,385.50
Rate 134.00
To-Date 18,323.50 30,000.00 11,676.50
Amount
938.00 938.00 938.00
Total this Invoice $938.00 ===========
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: Pennoni Job No.: Invoice No: Invoice Period:
Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
RCSTP UV Replacement EGMAU22004 Invoice Summary
Invoice Date 5/27/2022
EGMAU22004 RCSTP UV Replacement
1121795 4/18/2022 $ 30,000.00 $ 30,000.00 $ 17,385.50 $ 938.00 $ 18,323.50
to Date:
Remaining Budget($): $ Remaining Budget(%):
61% 11,676.50 39%
Budget by Phase:
Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):
RCSTP UV Replacement
$ 30,000.00 $ $ $
17,385.50 938.00 18,323.50
Remaining Budget($): $
61% 11,676.50 39% Remaining Budget(%):
Comments: Design of overhead jib crane and overflow weir.
5/15/2022 5/27/2022
(Gi
Olluhror 01\."tRIO,ood, PC
,,_,Ol,l)T,>l/.ti¥
Gawthrop Greenwood, PC
Afforneys at law
Please Note: Please Mail checks to:
P.O. Box 562 West Chester, PA 19381-0562
·17 East Gay St!'eet, Suite 100 I
(p) 610-696-822_ West Chesler, PA 19381-0562 (f) 610-344-092'.i gglaw@gawlhrop.com www.gawtluop.c,
To Make a Payment with a Credit Card, please visit: https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380
General Authority Services
04/08/2022 PMM
04/11)2022 PMM
Timekeeper
Email from S. Smith with meeting materials; Review and analyze same.
Attend Authority Board meeting.
For Current Services Rendered
Recapitulation
Patrick M. McKenna
Hours
1.80
05/09/2022
Previous Balance
Total Current Charges
Payment
Balance Due
To ensure proper credit, please write your client number on
your check when returning payment. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Client No: Invoice No.
Hourly Rate
$200.00
Hours
0.30
1.50
1.80
Page: 1 05/12/2022 6604-001M 258154
60.00
300.00
360.00
Total $360.00
$440.00
360.00
-440.00
$360.00
TELEDYNE INSTRUMENTS, INC.
Everywhereyol.1look
I Page 1 of 1 12497 Collections Center Drive Chicago, IL 60693 ABA/1121-000-358 Federal ID: 95-4888283
Invoice
Bill To:
East Goshen Township
1580 Paoli Pike WEST CHESTER, PA 19380 United States
0 o:
Acct/I 12331-07806
East Goshen Township 1580 Paoli Pike WEST CHESTER, PA 19380
United States
Ship To:
East Goshen Township Mark Miller 1580 Paoli Pike WEST CHESTER, PA 19380
United States
Sales Order Customer PO Customer Reference Pa ment Terms Discount Customer No Invoice No 00583579 42237001 Net 30 0054768 S020537408 Carrier Teled ne Contact Information Invoice Date UPS Ground 1Z6343870395760182 Frink, Elizabeth Ann 800/228-4373 5/17/2022 Named Destination RMA Number Delivery Terms ORIG-S&HAd
Packing List -- --·--·----------------------+--------- -- ----,------
Line Item Number Description Please note part number 604307104 has been replaced with 604307105. IMEI 350344984305845 S/N 222E02027
684310000 MODEL 310 USNC 1 OM BM 4300
00618060 Tax U/ Quantity
ea
Unit Price Amount
5,436.00 5,436.00
624300005 - Signature Ultrasonic Flow Meter 684310000 - Signature Ultrasonic Flow Meter 684310000 - Signature Ultrasonic Flow Meter
Serial Number(s):
604314005 - TIEN ET 310 ULTRASONIC Sensor1 Om (32.8 ft) cable 604307015 - Battery Backup 604304044 - AC Line Cord 604307105 - TC4 Modem ***For replacement parts refer to the replacement parts list that is included in the instruction manual***
604307015: 222D02021
604307105: 222E02027
604314005: 222E01706
624300005: 222E01643
Shipping & Handling
These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user{s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations. Seller's acceptance of this Order is expressly conditioned upon lhe Buyer's assen I to Seller's Terms and Conditions of Sale as stated in Seller's Offer and found at the applicable Teledyne company internet website listed below. Seller is proceeding with lhe performance of Buyer's Order strictly on this basis. Teledyne ISCO is an indirect subsidiary of Teledyne Technologies Incorporated. Teledyne Ethics Line 1 •877-666-6968.
4 TELEDYNE P" ISCO l°'J(!r)1\\'I 10,cyou!onk' www.tcledyncisco.com + 1 ·800·228-4373 Thank you for your order
-------
Invoice Amount
169.00
5,605.00 USD
Bill To:
TELEDYNE INSTRUMENTS, INC.
Everywhereyoulook' Federal Id: 95-4888283
Packing List
East Goshen Township 1580 Paoli Pike WEST CHESTER, PA 19380 United States
00583579 11111111111111111111111111111111111111111111111111 00618060 Sold To: East Goshen Township 1580 Paoli Pike WEST CHESTER, PA 19380 United States
Ship To: East Goshen Township Mark Miller
1580 Paoli Pike WEST CHESTER, PA 19380
United States
Sales Order 7 Customer PO 1 Customer• Reference ·. ...
. l Packina List . I Shio Date 00583579 142237001 I 100618060 I 5/17/2022
Page 1 of 1
. ... .
Ship[iing Instructions . : •·• l Named Destination •.· lUltimate Destination · . · · ·· ,: :_' : ·- .. ... · .· •. ·.· .. ·. l Delivery Terms :
Domestic ONLY-Origin - S&H Added Telec;lyne Contact
Frink Elizabeth Ann Line I Item Number
. . . ·· :··. .
ȴ 7Rev ·.. .·· .
----,:-
---:-
_:-,', . .
Contact Phone •.· . 800/228-4373 Description ··•· .. · ....
I C.arrier•·. UPS Ground .. ...
.
· .. · .
.·. .'. "' · ..
I Contact Email
.
.· ..
.. ·.· .. .. .
. IRMA Numbe I .. .
I Elizabeth.Frink@Teledvne.com .. . .. ·. I Shipped I Back-I U/MI t.;arton . -: ._-. . . I : I :r,.i,.;. Please note part number 604307104 has been replaced with 604307105. IMEI 350344984305845 S/N 222E02027
684310000 MODEL 310 USNC 10M BM 4300 1 0 ea \
Origin: United States
APPROVED BY,"
Destination: Serial Number(s): 604307015: 222D02021
DATE PAID: 604307105: ,. 222E02027 CHECK#:
604314005: CHARGED TO:
222E01706 C tW ; *"" \ n::p I e, c NJ 624300005: R ... ) \ ..,-1 lvu✓l .... 04, 222E01643 ISC022578 624300005 - Signature Ultrasonic Flow Meter 684310000 - Signature Ultrasonic Flow Met 684310000 -Signature Ultrasonic Flow Meter 604314005 -TIENET 310 ULTRASONIC Sensor10m (32.8 ft).cable 604307015 - Battery Backup 604304044 - AC Line Cord 604307105 - TC4 Modem "'For replacement parts refer to the replacement parts list
that is included in the instruction manual'"
These items are controlled by the U.S. Government and authorized for export only to the country of u!Hmate destination for use bh the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other counti or !o anyJ.erson other than the aut orized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approva from the .S. government or as otherwise authorized by U.S. law and regulations.
Teledyne ISCO is a registered business name of Teledyne Instruments, Inc., a subsidiary of Teledyne Technologies Incorporated. 1-877-666-6968
.-4li!:IL TELEDYNE
IP"! ISCO l.'·/·Oli'c'I ,,,.,:you··• www.tel edyneisco. corn + 1-800-228·4373
Teledyne Ethics Line
-
Divisions of Colonial Electric: Original Invoice INVOICE colonial electric supply company, inc. Since ·/972 ... Powered By Exce/le11ce/ 201 W. Church Road -?.l, n! l
colonialelectric.comlcmp fallek
colonialteltek.com
King of Prussia, PA 19406 610-312-8100 ,_:°www.colonialelectric.com • Bright Light ? Annapolis Lighting
Colonial Electric Supply Company, Inc. PO BOX 414564 Boston MA 02241-4564 brightlightdesigncenter.com
BILLING ADDRESS 10995 1 MB 0.485 E0370X !0675 09113243093 S2 P9025097 0001:0002
1•11ll 1 11 1 11111 1
1 11••1 111111 1 1
1111
1 l1111'• 111111'••' 1111 11 1 1l 1'1•
EAST GOSHEN TOWNSHIP ATTN: ACCOUNTS PAYABLE 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
CUSTOMER PO ORDER DATE ORDERED BY
annapolislighting.com
Billing Questions? Call: THOMAS KARACKAI 484-679-2295
SHIPPING ADDRESS
$ APF'ROVED BY:
EAST GOSHEN TOJ.= PAID: _______ _ EAST GOSHEN TWP ""
1580PAOLI PIKE CHECK#: . _ WEST CHESTER PKjqLGED TO:.Ql'±J
SHIP DATE SHIPPED VIA FREIGHT TERM SPARE PART ASHBRIDGE 10/22/21 05/14/22 COMMENTS CO. UNIT/WH ENTERED BY ACCOUNT ID ORIGINAL INVOICE SALESPERSON 02 I DC QT148326 I CUSTOMER SKU DESCRIPTION I ORD QTY I SHIP QTY I BO QTY I UNIT PRICE lI EXTENDED AMT 10 NS8888 62398002088 HMND PJU201610TF 20X16X10IN 2 2 0 327.12 E TW 20 MESSAGE DELIVERY: 10 TO 12-WEEKS 30 MESSAGE *************************** ..
40 NS8888 62398095244 HMND P2068 BACK PANEL 2 2 0 29.95 E 50 NS8888 01508190130 FAZ-B20/2-NA-L 2 2 0 93.80 E 60 MESSAGE DELIVERY: 12 TO 14-WEEKS 70 MESSAGE *************************** ...
80 NS8888 01023809316 FAZ-B5/1-NA-L-SP 2 2 0 47.50 E 90 MESSAGE DELIVERY: 12 TO 14-WEEKS 100 MESSAGE *************************** ...
110 NS8888 78211357421 CH3 HT8SP51 STANDARD L-PL T 2 2 0 8.70 E 120 MESSAGE DELIVERY: 4 TO 6-WEEKS 130 MESSAGE *************************** •••
140 NS8888 78211372859 CH3 HT8JBH1DAA5 3POS SSW 2 2 0 109.65 E 150 MESSAGE DELIVERY: 2-WEEKS 160 MESSAGE *************************** •••
170 NS8888 78211397102 CH3 AE16DNS0AC 3P 120V IEC 2 2 0 503.60 E STA 180 MESSAGE DELIVERY:2-WEEKS 190 MESSAGE *************************** ***
210 NS8888 78358523108 HUBW HBL2320SW LKG RCPT-NMA 2 2 0 101.35 E L6 220 MESSAGE DELIVERY; 12 TO 14-WEEKS 230 MESSAGE ***************************
Invoice Due By: 6/13/2022
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month. All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer
Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
For a Complete List of Locations
Please Visit www.colonialelectric.com
654.24
59.90 187.60
95.00
17.40
219.30
1007.20
202.70
www.BrlghtLightDesignCenter.com www.AnnapolisLlghting.com Page 1 of 2 0001:0002
Divisions of Colonial Electric: Original Invoice INVOICE
electric supply company. inc. Sinc;e 1972 ... Powered By Excef/ence/ 201 W. Church Road
colonial
colonialelectric.com/cmp Tiitek
colonialteltek.com . · 1· colonial
King of Prussia, PA 19406 610-312-8100 www.colonialelectric.com • Bright Light Annapolis Lighting
Colonial Electric Supply Company, Inc. PO BOX 414564
l
brighllightdesigncenter.com
BILLING ADDRESS 10995 1 MB 0.485 E0370X I0676 09113243093 S2 P9025097 0002:0002
I 111 I I I I I I 11, I I 11 I I,• I 111111,1 • • • 1 •II I I I I 11111111,, I I 111111, I I I 11
EAST GOSHEN TOWNSHIP ATTN: ACCOUNTS PAYABLE 1580 PAOLI PIKE WEST CHESTER PA 19380-6107
CUSTOMER PO ORDER DATE ORDERED BY SPARE PART ASHBRIDGE 10/22/21
COMMENTS CO. UNIT/ WH ENTERED BY 02 / DC
I CUSTOMER SKU DESCRIPTION ...
250 NS8888 78358503982 HUBW HBL3331GC LKG
PLUG-2P3W30 260 MESSAGE DELIVERY:2-WEEKS 270 MESSAGE ***************************
280 SOW10/3-CUT SOW10/3-CUT 10/3 SO BLACK
COR$ 281 MESSAGE 1 X 30 ON COIL 290 NS8888 78211397101 CH3 AE16DNOAC 3P 120V IEC
STAR 300 78211341348 78211341348 CH3 C320KGS1 CNCTR AUX CNT 310 78211396757 78211396757 CH3 H2011 B-3 NM STR OL
RELAY H 320 NS8888 78358523108 HUBW HBL2320SW LKG RCPT-NMA
L6 330 78358503782 78358503782 HUBW HBL2321 GRD LKG
PLUG-NM L 340 SOW10/3-CUT SOW10/3-CUT 10/3 SO BLACK
COR$ 341 MESSAGE NO CHARGE-OVERAGE LINE 280
Invoice Due y: 6 13 2022
annapolis!ighting.com Boston MA 02241-4564
SHIPPING ADDRESS
Billing Questions?
Call:THOMAS KARACKAI 484-679-2295
EAST GOSHEN TOWNSHIP EAST GOSHEN TWP
1580 PAOLI PIKE WEST CHESTER PA 19380
SHIP DATE SHIPPED VIA FREIGHT TERM 05/14/22 ACCOUNT ID ORIGINAL INVOICE SALESPERSON QT148326 I ORD QTY I SHIP QTY I BO QTY I UNIT PRICE I UM I EXTENDED AMT
2 2 0 45.15 E 90.30
30 30 0 3181.76 M 95.45
0 0 0 448.60 E 0.00
0 0 0 55.00 E 0.00 2 2 0 92.40 E 184.80
0 0 0 101.35 E 0.00
2 2 0 23.58 E 47.16
4 4 0 0.00 M 0.00
2861.05
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month. All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http:// www.colonialeleclric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
0.00
0002:0002
For a Complete List of Locations
Please Visit www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com
Accepted By 2861.05
CUMMINS Page 2 of 2
colonial
electric supply
Since 1972 ... Powered By Excellence!
www.colonialelectric.com
Corporate Office 201 WChurch Road King of Prussia, PA 19406 Phone: (610) 312-8100 Fax: (610) 312-8131
Downingtown (610) 873-6400 Reading (610) 374-2134
Glenolden (610) 870-0160 Warminster (215) 672-5600
Myerstown (717) 376-3039 Vineland (856) 462-63009 Collegeville (61 O) 489-7600
Line
Ship To EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
WEST CHESTER
-sold To
EAST GOSHEN TOWNSHIP
[Fl
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER
Sku WH Location
Sig Req'd
PA 19380
E163
PA 19380
Description
PACKING LIST
Lancaster (717} 405-3101 Hammonton (609) 704-99501 Pleasantville {609) 645-811 o
Customer PO
Invoice No. j14291798
Allentown (610) 435-9691 Brooklyn (718) 210-0590 Wilmington (302) 998-9993
I Date Ordered
1 SPARE PART ASHBRIDGE I 10/22/21
Shipped Via Freight I Source Co. Unit/WH
PAD cc 02 I DC
I QT148326 I I 0001
Origal lnvoi Salesperson Comments
Job No Contact
ANNE Phone: 610-436-9922
Ordered Back Ordered Shipped
Date Page 05/12/22 1 of 4
Northeast Philadelphia (215) 464-0800 Center City Philadelphia (215) 928-0800 Cape May Court House (609) 465-7144
Ordered By Date Required
JIMH 05/13/22
Entered By Account ID
9795 E163
Payment Terms
N30D
J
I
Unit Price UM Extended Amt 10 NS8888 HMND PJU201610TF 20X16X10IN TW 2 0 2 327.12 E 654.24 GUST SKU: 62398002088
20 MESSAGE DELIVERY: 10 TO 12-WEEKS 30 MESSAGE *****************************
40 NS8888 HMND P2068 BACK PANEL 2 0 2 29.95 E 59.90 CUST SKU: 62398095244
50 NS8888 FAZ-B20/2-NA-L 2 0 2 93.80 E 187.60 GUST SKU: 01508190130 60 MESSAGE DELIVERY: 12 TO 14-WEEKS 70 MESSAGE ******************************
80 NS8888 FAZ-B5/1-NA-L-SP 2 0 2 47.50 E 95.00 GUST SKU: 01023809316
90 MESSAGE DELIVERY: 12 TO 14-WEEKS 100 MESSAGE ******************************
110 NS8888 CH3 HT8SP51 STANDARD L-PLT 2 0 2 8.70 E 17.40
Continued Next Page Il ll I Il I 111111111
colonial
Corporate Office 201 W.Church Road PACKING LIST electric supply
Since 1972 ... Powered By Excellence!
King of Prussia, PA 19406 Phone: (610) 312-8100 Fax: (610) 312-8131
www.colonialelectric.com Downingtown (610) 873-6400 Reading {610) 374-2134
Glenolden (610) 870-0160 Warminster (215) 672-5600
Myerstown (717) 376-3039 Vineland (856) 462-63009
Collegeville {61 0) 489-7600
Ship To EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE [F]
WEST CHESTER
Ǟ Sold To
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER
Line Sku WH Location 120 MESSAGE 130 MESSAGE
140 NS8888
150 MESSAGE 160 MESSAGE
PA 19380
E163
PA 19380
Description DELIVERY: 4 TO 6-WEEKS ******************************
CUST SKU: 78211372859 CH3 HT8JBH1DAA5 3POS SSW CUST SKU: 78211372859
DELIVERY: 2-WEEKS ******************************
Invoice No. 14291798
Lancaster (717) 405-3101 Hammonton (609) 704-99501 Pleasantville (609) 645-8110
Allentown (610) 435-9691
Brooklyn {718) 210-0590 WIimington (302) 998-9993
Customer PO
SPARE PART ASHBRIDGE
Shipped Via
Original Invoice
I QT148326 I
Job No
Freight I Source
PAD cc
_Salesperson
0001
Contact
Date Ordered
10/22/21
Co. Unit/WH
02 I DC I
Comments
ANNE Phone: 610-436-9922
Ordered Back Ordered Shipped
2 0
170 NS8888 CH3 AE16DNS0AC 3P 120V IEC STA 2 0 CUST SKU: 78211397102
180 MESSAGE DELIVERY:2-WEEKS 190 MESSAGE ******************************
210 NS8888 HUBW HBL2320SW LKG RCPT-NMA L6 2 0 CUST SKU: 78358523108 220 MESSAGE DELIVERY; 12 TO 14-WEEKS 230 MESSAGE ******************************
Continued Next Page
2
2
2
Date Page 05/12/22 2 of 4
Northeast Philadelphia (215) 464-0800 Center City Philadelphia (215} 928-0800 Cape May Court House (609) 465-7144
Ordered By Date Required
JIMH 05/13/22
Entered B)" Account ID
9795 E163
I
Payment Terms
N30O
Unit Price UM Extended Amt
109.65 E 219.30
503.60 E 1007.20
101.35 E 202.70
colonial
electric supply
Corporate Office 201 W.Church Road PACKING LIST
Invoice No. Since 1972 ... Powered By Excellence!
King of Prussia, PA 19406 Phone: (610) 312-8100 Fax: (610) 312-8131 14291798
www.colonialelectric.com
Downingtown (610) 873-6400 Reading (610) 374-2134
Glenolden (610) 870-0160 Warminster {215) 672-5600
Myerstown (717) 376-3039 Vineland (856) 462-63009 Collegeville (61 0) 489-7600
Lancaster (717) 405-3101 Hammonton (609) 704-99501 Pleasantville (609) 645-811 o
Allentown (610) 435-9691
Brooklyn (718) 210-0590 Wilmington (302) 998-9993
.- Sh. To ,p EAST GOSHEN TOWNSHIP Customer PO Date Ordered
EAST GOSHEN TWP SPARE PART ASHBRIDGE 10/22/21 1580 PAOLI PIKE [Fl
Shipped Via Freight Source Co. Unit/WH
WEST CHESTER PA 19380 PAD cc 02 I DC
ėsold To
Original Invoice Salesperson Comments
EAST GOSHEN TOWNSHIP E163 QT148326 0001
ATTN: ACCOUNTS PAYABLE Job No Contact 1580 PAOLI PIKE ANNE Phone: 610-436-9922 WEST CHESTER PA 19380
Line Sku WH Location Description Ordered Back Ordered Shipped 250 NS8888 HUBW HBL3331GC LKG PLUG-2P3W30 2 0 2 CUST SKU: 78358503982 260 MESSAGE DELIVERY:2-WEEKS 270 MESSAGE ******************************
280 SOW10/3-CUT Wire SOW10/3-CUT 10/3 SO BLACK COR$ 30 0 30 281 MESSAGE 1 X30 ON COIL 290 NS8888 CH3 AE16DN0AC 3P 120V IEC STAR 0 0 0 CUST SKU: 78211397101 300 78211341348 CH3 C320KGS1 CNCTR AUX CNT 0 0 0 CUST SKU: 78211341348 310 78211396757 CH3 H20118-3 NM STR OL RELAY H 2 0 2 CUST SKU: 78211396757 320 NS8888 HUBW HBL2320SW LKG RCPT-NMA L6 0 0 0 CUST SKU: 78358523108 330 78358503782 HUBW HBL2321 GRD LKG PLUG-NM L 2 0 2
RETURNS POLICY: All returns must have prior authorization. Returns under $25.00 will not be TP: 1
Date Page 05/12/22 3 of 4
Northeast Philadelphia (215) 464-0800 Center City Philadelphia (215) 928-0800 Cape May Court House (609) 465-7144
Ordered By Date Required
JIMH 05/13/22
Entered By Account ID
9795 E163
Payment Tenns
N30D
Unit Price UM Extended Amt 45.15 E 90.30
3181.76 M 95.45
448.60 E 0.00
55.00 E 0.00
92.40 E 184.80
101.35 E 0.00
23.58 E 47.16
Subtotal 2861. 05 X accepted. No cash refunds will be given for material returned. Returns must be undamaged 17:26:28 Transportation in manufacturers original carton and may be subject to a restocking fee. 0.00 Picked by Cartons Packages Reels SPECIAL ORDERS: A deposit is required on special order merchandise, and these orders are non-cancelable and non-returnable. .0% Tax 0.00 TERMS & CONDITIONS: Colonial's current standard terms and conditions of sale can be found at CoiJs Pieces ; Bundles Skids www.colonialelectric.com!TermsOfSa!e or a copy can be obtained from Colonia/'s Customer Total 2861.05 i
Financial Services Dept. All terms and conditions are subject to change.
(Gi
Gl,wthrop Grttn.,,.'000, PC
Atwnll)'JOt!Aw
Gawthrop Greenwood, PC
Allorneys al Law
Please Note: Please Mail checks to:
P.O. Box 562 West Chester, PA 19381-0562
17 East Gay Street, Suite 100 I
(p) 610-696-8225 West Chester, PA 19381-0562 (f) 610-344-0922 gglaw@gawthrop.com www.gawthrop.com
To Make a Payment with a Credit Card, please visit: https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380
General Authority Services
03/11/2022 PMM Email from S. Smith regarding meeting agenda.
03/14/2022 SLF
Timekeeper
Preparation for and attendance at Board meeting
For Current Services Rendered
Recapitulation
Stacey L. Fuller Patrick M. McKenna
Previous Balance
Total Current Charges
03/15/2022 Payment
Balance Due
Hours
2.00 0.20
To ensure proper credit, please write your client number on
your check when returning payment. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Client No: Invoice No.
Hourly Rate
$200.00
200.00
Hours
0.20
2.00
2.20
Page: 1 04/11/2022 6604-001M 255872
40.00
400.00
440.00
Total $400.00
40.00
$360.00
440.00
-360.00
$440.00
Mail lie®
ACCOUNTANTS • ADVISORS
East Goshen Municipal Authority Attn: Mr. Derek J. Davis 1580 Paoli Pike West Chester, PA 19380-6107
500 North Lewis Road Limerick, PA 19468 Phone: 610-935-1420
EIN: 23-1518888
Web: www.maillie.com E-mail: firm@maillie.com
Client Number: 2500 Invoice:
Date: Due Date:
1000121613
03/31/2022 Upon Receipt
Billing for time incurred to March 31, 2022, for the following services:
Final billing on the 2021 East Goshen Municipal Authority financial statements and preparation of your audit report thereon
03/31/2022 3,250.00 02/28/2022 0.00
Billed Time & Expenses
Invoice Total
l\PPHOVED BY: ------- DATE PAID: ____ _
CHECK#: ------- CH I\ R GED TO: Q7'j.1t/, 3ll ()
01/31/2022 0.00 12/31/2021 0.00 11/30/2021 + 0.00
$3,250.00
$3,250.00
$3,250.00
Total $3,250.00
Please return this portion with payment.
ID: 2500 Date: 03/31/2022 Due Date: Upon Receipt
Invoice: 1000121613
East Goshen Municipal Authority
Please make checks payable to Maillie LLP.
Amount Due: $3,250.00
Amount Enclosed: $ _____ _
To pay by ACH, email payment details to Payments@maillie.com and use this ACH information:
Customers Bank Routing#: 031302971 Account#: 6874053 99 Bridge Street Phoenixville, PA 19460
Memo
To:
From: Re: Date:
Municipal Authority Dave Ware MA April 2022 Financial Report June 9, 2022
In April 2022, the Municipal Authority recorded $36,415 in revenues (transfers from Sewer Operating and Sewer Capital Reserve) and $36,414 in expenses (General Engineering Services, 2 Rebuilt Fairbanks
Pumps for the Ashbridge Pump Station, Engineering for Hershey's Mill Estates Sewer Replacement and Engineering for RCSTP UV Replacement), for a net result of operations of $0. As of April 30, 2022, the fund balance was $9,128.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Other Funds April 2022 Municipal Authority
Annual Y-T-D Y-T-D Y-T-D M-T-D M-T-D M-T-D Account Title Acct # Budget Budget Actual Variance Budget Actual Variance
REVENUE
INTEREST EARNINGS 01341 1000 0.69 0. 69 0.15 0,15 DCED GRANT 01354 0400 152,980 C.C. TAPPING FEES 01364 1100 2,000 R.C.TAPPING FEES 01364 1110 2,000 CONNECTION FEES - SEWER 01364 1130 1,000 335 281.88 (52.92) MISCELLANEOUS REVENUE 01380 1000 141.12 141.12 TRANSFER FROM SEWER OPERATING 01392 0500 130,000 39,021.55 39,021.55 10,814.00 10,814.00 TRANSFER FROM SEWER CAP RESERVE 01392 0900 416,930 248,228 52,634.15 (195,593.18) 90,393 25,600.31 (64,192.14)
TOTAL REVENUE 164,910 248,563 92,085.99 (156,416.14) 90,393 36,414.52 (53,918.59)
EXPENSES
ADMINISTRATIVE WAGES 01424 1400 30,529 1,281 8,312.05 (1,091.55) MISCELLANEOUS EXPENSE 01424 3000 1,500 1,345 1,540.25 (195.21) 180 119 .19 MUN!C.AUTH. -AUDITING 01424 3110 10,300 10,300 1,000.00 3,300.00 2,223 2,222.14 ENGINEERING SERVICES 01424 3130 45,000 14,113 20,555.25 (6,442.21) 9,181 10,814.00 (1,632.15) LEGAL SERVICES 01424 3140 8,000 2,852 1,560.00 1,291.51 2,121 2,120.64 R.C. CAPITAL-STP 01424 1440 315,000 CAP.REPLACEMENT R.C, 01424 1490 41,400 RELINING 01426 3001 130,000 BARKWAY PUMP STATION CAPITAL 01429 1501 2,215.00 (2,215.00) ASHBRIDGE PUMP STATION CAPITAL 01429 1502 8,632.00 (8,632.00) 8,632.00 (8,632.00) HERSHEYS MILL PUMP STATION CAPITAL 01429 1503 29,268.51 (29,268.51) 3,403.62 (3,403.62) HUNT CO PUMP STATION CAPITAL 01429 1504 1,810.00 (1,810.00) RCSTP CAPITAL 01429 1505 46,891 50,911 13,564.15 31,351.15 13,526 13,564.15 (38 ,85) WEST GOSHEN CAPITAL 01429 6100 136,284
TOTAL EXPENSES 164,910 86,801 94,511.81 (1,111.34) 21,830 36,414.31 (8,584.05)
NET RESULT FROM OPERATIONS 161,156 (2,491.88) (164,248.08) 62,563 0,15 (62,562.64)
Memo
To:
From: Re: Date:
Municipal Authority Dave Ware MA May 2022 Financial Report June 9, 2022
In May 2022, the Municipal Authority recorded $10,576 in revenues (transfers from Sewer Operating and Sewer Capital Reserve plus Tapping Fees) and $10,276 in expenses (General Engineering Services,
Legal Services, and Engineering for RCSTP UV Replacement), for a net result of operations of $300. As of
May 31, 2022, the fund balance was $9,428.
A complete list of 2022 full year MA revenues and expenses is attached.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Other Funds
May 2022 Municipal Authority
Annual Y-T-D Y-T-D Y-T-D M-T-D M-T-D M-T-D Account Title Acct # Budget Budget Actual Variance Budget Actual Variance
REVENUE
INTEREST EARNINGS 07341 1000 0,78 0, 78 0,09 0,09 DCED GRANT 07354 0400 152,980 C,C, TAPPING FEES 07364 1100 2,000 2,000 12,000.00) 2,000 12,000.00) R.C,TAPPING FEES 07364 lllO 2,000 300,00 300,00 300,00 300,00 CONNECTION FEES - SEWER 07364 1130 1,000 335 281.88 152, 92) MISCELLANEOUS REVENUE 07380 1000 141.12 141.12 TRANSFER FROM SEWER OPERATING 07392 0500 130,000 44,001.05 44,001.05 4,973,50 4,973.50 TRANSFER FROM SEWER CAP RESERVE 07392 0900 476,930 383,818 57,937.25 1325,880,80) 135,590 5,302.50 1130,287,62)
TOTAL REVENUE 764,910 386,153 102,662,08 1283,490, 77) 137,590 10,576.09 1127,014,03)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 30,529 7,281 8,372.05 11,091.55) MISCELLANEOUS EXPENSE 07424 3000 1,500 1,345 1,540.25 1195, 27) MUNIC.AUTH.-AUDITING 07424 3110 10,300 10,300 10,250.00 50,00 3,250,00 13,250.00) ENGINEERING SERVICES 07424 3130 45,000 16,665 25,857.75 19,192.69) 2,552 5,302,50 12,750.42) LEGAL SERVICES 07424 3140 8,000 2,852 2,000.00 851.57 440,00 1440,00) R.C, CAPITAL-STP 07424 7440 315,000 CAP.REPLACEMENT R.C, 07424 7490 41,400 RELINING 07426 3001 130,000 BAAKWAY PUMP STATION CAPITAL 07429 1501 2,215.00 12,215.00) ASHBRIDGE PUMP STATION CAPITAL 07429 1502 8,632.00 18,632,00) HERSHEYS MILL PUMP STATION CAPITAL 07429 1503 29,268,57 (29,268.57) HUNT CO PUMP STATION CAPITAL 07429 1504 1,870.00 (1,870.00) RCSTP CAPITAL 07429 1505 46,897 56,711 14,848.25 41,922.82 5,855 1,283.50 4,571.07 WEST GOSHEN CAPITAL 01429 6100 136,284
TOTAL EXPENSES 764,910 95,213 104,853.87 (9,640.69) 8,407 10,276.00 (1,869.35)
NET RESULT FROM OPERATIONS 290,940 (2,191.79) 1293, 131.46) 129,183 300,09 1128,883,38)
MUNICIPAL AUTHORITY May 31, 2022 YTD Financials
Account# Description Per Src Tnc# Debits Credits Balance Date Check# Name Description Description 2
07341-1000 BEGINNING BALANCE 0 07341-1000 INTEREST EARNINGS 2201 JE 82114 0.19 0 1/31/2022 INTEREST INTEREST EARNED JANUARY 2022 07 FUND
07341-1000 INTEREST EARNINGS 2202 JE 82467 0.18 0 44620 INTEREST INTEREST EARNED FEBRUARY 2022 7100.1035
07341-1000 INTEREST EARNINGS 2203 JE 82815 0.17 0 3/31/2022 INTEREST INTEREST EARNED MARCH 2022 07 FUND
07341-1000 INTEREST EARNINGS 2204 JE 83206 0.15 0 4/30/2022 INTEREST INTEREST EARNED APRIL 2022 7100
07341-1000 INTEREST EARNINGS 2205 JE 83641 0.09 0 44712 INTEREST INTEREST EARNED MAY 2022 07 FUND
07364-1110 BEGINNING BALANCE 0 07364-1110 R.C.TAPPING FEES 2205 RE 83419 300.00 0 44699 83419 1 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPING FEES
07364-1130 BEGINNING BALANCE 0 07364-1130 CONNECTION FEES - SEWER 2202 CR 82091 423.00 0 44594 2714 STOFFLET, MICHAEL
07364-1130 CONNECTION FEES - SEWER 2202 JE 82092 141.12 0 44594 PINE RK ANNUAL PINK ROCK INSTALLMENT INTEREST PORTION - STOFFLET
07380-1000 BEGINNING BALANCE 0 07380-1000 MISCELLANEOUS REVENUE 2202 JE 82092 141.12 0 44594 PINE RK ANNUAL PINK ROCK INSTALLMENT INTEREST PORTION - STOFFLET
07392-0500 BEGINNING BALANCE 0 07392-0500 TRANSFER FROM SEWER OPERATING 2201 JE 81851 5,497.00 0 44574 XFER XFER $TO MA FROM SEWER & SEWER CAP.RE: DEC.EXPENSES
07392-0500 TRANSFER FROM SEWER OPERATING 2202 JE 82281 6,324.50 0 44608 XFER XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXPENSES
07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82519 660.00 0 44628 XFER XFER $ FROM SEWER & SEWER CAPITAL TO MA
07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82561 360.00 0 44631 XFER XFER $ FROM 05 TO 07 MA AUTH.
07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82627 7,000.00 0 44638 XFER XFER $ FROM 05 TO 07 RE: 07 EXPENSES
07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82773 8,372.05 0 44650 XFER XFER $ FROM 05 TO 07 TO COVER MA EXPENSE - EGT QTR.1
07392-0500 TRANSFER FROM SEWER OPERATING 2204 JE 82986 10,814.00 0 44665 XFER MA XFER $ FROM 05 & 09 TO MA RE: APRIL EXPENSES
07392-0500 TRANSFER FROM SEWER OPERATING 2205 JE 83218 3,690.00 0 44685 XFER XFER $ FROM 05 TO MA TO COVER EXPENSES
07392-0500 TRANSFER FROM SEWER OPERATING 2205 JE 83370 1,283.50 0 44694 XFER XFER $ TO MA RE: MAY EXPENSES FROM 05 & 09
07392-0900 BEGINNING BALANCE 0 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2201 JE 81851 18,986.13 0 44574 XFER XFER $TO MA FROM SEWER & SEWER CAP.RE: DEC.EXPENSES
07392-0900 TRANSFER FROM SEWER CAP RESERVE 2202 JE 82281 1,217.25 0 44608 XFER XFER $ FROM OS & 09 RE: JAN. 2022 MA EXPENSES
07392-0900 TRANSFER FROM SEWER CAP RESERVE 2203 JE 82519 6,831.00 0 44628 XFER XFER $ FROM SEWER & SEWER CAPITAL TO MA
07392-0900 TRANSFER FROM SEWER CAP RESERVE 2204 JE 82986 25,600.37 0 44665 XFER MA XFER $ FROM OS & 09 TO MA RE: APRIL EXPENSES
07392-0900 TRANSFER FROM SEWER CAP RESERVE 2205 JE 83370 5,302.50 0 44694 XFER XFER $TO MA RE: MAY EXPENSES FROM OS & 09
07424-1400 BEGINNING BALANCE 0 07424-1400 ADMINISTRATIVE WAGES 2203 CD 82771 8,372.05 0 44650 3311 EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2022 REIMBURSMENT
07424-3000 BEGINNING BALANCE 0 07424-3000 MISCELLANEOUS EXPENSE 2201 CD 81850 880.25 0 44574 3303 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2022 ACTIVE MEMBERSHIP DUES
07424-3000 MISCELLANEOUS EXPENSE 2203 CD 82517 660.00 0 44628 3306 DELAWARE RIVER BASIN COMMISSION ANNL MONITORING & COORDINATION FEE
07424-3110 BEGINNING BALANCE 0 07424-3110 MUNIC.AUTH.-AUDITING 2203 CD 82626 7,000.00 0 44638 3310 MAILLIE FALCONI ERO & CO. MUNICIPAL AUTH.2021 FINANCIAL AUDIT
07424-3110 MUNIC.AUTH.-AUDITING 2205 CD 83214 3,250.00 0 44684 3314 MAILLIE FALCONI ERO & CO. FINAL BILLING - 2021 MUNICIPAL AUTH FINANCIAL STATEMENTS
07424-3130 BEGINNING BALANCE 0 07424-3130 ENGINEERING SERVICES 2201 CD 81850 4,076.75 0 44574 3302 PENNON! ASSOCIATES INC. SERVICES THRU 12/19/21 2021 GEN.SER
07424-3130 ENGINEERING SERVICES 2202 CD 82280 5,664.50 0 44608 3305 PENNON! ASSOCIATES INC. SERVICES THRU 1/16/22 - GEN.SERVICE
07424-3130 ENGINEERING SERVICES 2204 CD 82985 10,814.00 0 44665 3313 PENNON! ASSOCIATES INC. SERVICES THRU 3/20/22 2022 GEN.SERV
07424-3130 ENGINEERING SERVICES 2205 CD 83360 5,302.50 0 44693 3316 PENNON! ASSOCIATES INC. SERVICES THRU 4/17 /22 2022 GEN.SERV
07424-3140 BEGINNING BALANCE 0 07424-3140 LEGAL SERVICES 2201 CD 81850 540.00 0 44574 3300 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - NOVEMBER 2021
07424-3140 LEGAL SERVICES 2202 CD 82280 660.00 0 44608 3304 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - DEC.2021 GEN.AUTH.
07424-3140 LEGAL SERVICES 2203 CD 82560 360.00 0 44631 3308 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE FEB.2022 GEN.AUTH.
07424-3140 LEGAL SERVICES 2205 CD 83217 440.00 0 44685 3315 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 3/11-3/14/22 GEN.AUTH
07429-1501 BEGINNING BALANCE 0 07429-1501 BARKWAY PUMP STATION CAPITAL 2201 CD 81850 2,215.00 0 44574 3299 DECKMAN MOTOR & PUMP INC. REBUILT HYDROMATIC PUMP
07429-1502 BEGINNING BALANCE 0 07429-1502 ASHBRIDGE PUMP STATION CAPITAL 2204 CD 82985 8,632.00 0 44665 3312 DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIRBANKS PUMPS
07429-1503 BEGINNING BALANCE 0 07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2201 CD 81850 2,709.00 0 44574 3299 DECKMAN MOTOR & PUMP INC. 2 - REBUILT HYDROMATIC PUMPS 07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2201 CD 81850 11,255.01 0 44574 3301 JWC ENVIRONMENTAL MUFFIN MONSTER 07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2201 CD 81850 3,852.69 0 44574 3302 PENNON! ASSOCIATES INC. SERVICES THRU 12/19/21 HM ESTATES 07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2202 CD 82280 1,217.25 0 44608 3305 PENNON! ASSOCIATES INC. SERVICES THRU 1/16/22 - HM ESTATES
U:\DWare\Municipal Authority\2022\05 May\May 2022 YTD Financials.xlsx
MUNICIPAL AUTHORITY May 31, 2022 YTD Financials
Account# I Description !Per lsrc!Trx# !Debits !credits I Balance I Date !Check# !Name I Description I Description 2
07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2203 CD 82517 6,831.00 0 44628 3307 KAPPE ASSOCIATES MAGNETIC FLOW METER
07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2203 CD 82617 (11,255.01) 0 44637 3301 JWC ENVIRONMENTAL VOID CK.#3301 - LOST IN MAIL 07429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 2203 CD 82617 11,255.01 0 44637 3309 JWC ENVIRONMENTAL REPLACEMENT CK.FOR 3301 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2204 CD 82985 3,403.62 0 44665 3313 PENNONI ASSOCIATES INC. SERVICES THRU 3/20/22 HM ESTATES
07429-1504 BEGINNING BALANCE 0 07429-1504 HUNT CO PUMP STATION CAPITAL 2201 CD 81850 1,870.00 0 44574 3299 DECKMAN MOTOR & PUMP INC. REBUILT HYDROMATIC PUMP 07429-1505 BEGINNING BALANCE 0 07429-1505 RCSTP CAPITAL 2204 CD 82985 13,564.75 0 44665 3313 PENNON I ASSOCIATES INC. SERVICES THRU 3/20/22 RCSTP UV REP. 07429-1505 RCSTP CAPITAL 2205 CD 83360 1,283.50 0 44693 3316 PENNONI ASSOCIATES INC. SERVICES THRU 4/17/22 RCSTP UV
U:\DWare\Municipal Authority\2022\05 May\May 2022 YTD Financials.xlsx
Memo
To: From:
Municipal Authority
Dave Ware Re: Date:
Financial Update for the MA - Current obligations and long term funding June 9, 2022
Gentlemen, Considering the conversations and preliminary studies by Pennoni regarding a possible sewer expansion which would necessitate a minimum of $20.0M of new debt, I thought it prudent to illuminate our current financial situation as it pertains to sewer reserves, current projects, rates, and our current shortfall.
Our current total sewer debt service (principal & interest) through 2037 is $11.9M. This includes roughly $1.0M annually through 2032, and then $1.0M total remaining from 2033 through 2037. (*See additional information in the packet). Mark Miller was kind enough to put together an Inventory List for
Ridley Creek Sanitary Treatment Plant (including Pump Stations and Collection System) which indicates that East Goshen Township should have just over $4.6M already in reserve to replace all of the capital items currently in operation. Our current Sewer Capital Reserve Fund balance is $2.3M. I believe the primary reason for this funding gap is due to the calculation of sewer rates based on the current budget year, rather than additionally accounting for un-capitalized sewer assets, future projects, etc...For instance, the average single family household's quarterly bill has increased only 4.0% total, or 0.5% per year, over the 8 year period 2012 through 2019.
Below is a summary of Capital needed to attain the level of reserves I believe is needed to provide a level of security of funding for our sewer infrastructure in addition to the annual amounts transferred for Capital and Pipe Re-Lining already in place.
I Summary of Capital Plan Needed
Total Sewer Capital Reserves Needed
*(Capital Inventory List from Mark Miller not including sewer re-lining) Current Sewer Reserves
Needed for Reserves
RCSTP UV Disinfection System Replacement West Goshen Sewer Authority Capital Project
Hershey's Mill Estates Sewer Replacement
Additional Need for Reserves
Total Needed for Reserves
10 Year Proposed Capital Plan (To be revisited for accuracy annually)
U:\dware\municipal authority\
4,620,462
2,299,857
2,320,604
310,000 215,000 550,000
1,075,000
3,395,604
3,430,309
The logistics of my proposed 10 year Capital Plan investment are based similarly to West Goshen's current plan. I would leave 2021 sewer rates in place in 2022, but through an increase in the variable rate, the fixed rate, or a combination, raise the rate in 2023 such that the average single family household quarterly bill would increase $15.00, or $60.00 annually. The current average single family quarterly bill is $169.84, increasing to $184.84 in 2023, slightly above the average Chester County rate of $177 /Qtr and the median of $180/Qtr. This would increase revenue by $343K annually, which would be an additional capital contribution. That rate would remain for subsequent years subject to an annual analysis validating its methodology and whether the 10 year Capital Plan remains on track. It could need to be adjusted based on inflation, unforeseen projects, etc...The intention is to not overly burden current sewer customers, but provide time before an increase would go into effect, during which they could be educated on why the rate increase is necessary for the prolonged funding of this necessary infrastructure. Again, this is a preliminary idea, but I would like feedback on the current financial situation from the Municipal Authority as well as the time-table that I've laid out.
I respect your practical and historical knowledge in these matters in which you are so well versed. Thank you in advance for your input and I look forward to discussion.
Sincerely,
Dave Ware Director of Finance East Goshen Township
U:\dware\municipal authority\
Total Sewer Obligations by Source and Year
Source I Payment Type I 2022 I 2023 I 2024 I 202S I 2026 I 2027 I 2028 I 2029 I 2030 I 2031 I 2032 I 2033 I 2034 I 2035 I 2036 I 2037 I $ Outstanding I
Principal 125,000 130,000 135,000 135,000 140,000 145,000 145,000 150,000 155,000 160,000 160,000 165,000 170,000 175,000 185,000 190,000 2,465,000 Interest 66,789 61,789 59,189 56,489 53,789 50,989 47,908 44,645 40,895 36,245 31,445 26,645 21,695 16,595 11,345 5,795 632,245 2017 General Obligation Bond Total 191,789 191,789 194,189 191,489 193,789 195,989 192,908 194,645 195,895 196,245 191,445 191,645 191,695 191,595 196,345 195,795 3,097,245
Principal 117,000 121,000 125,000 129,000 133,000 137,000 142,000 146,000 151,000 156,000 161,000 166,000 1,684,000 Interest 51,345 47,778 44,089 40,277 36,344 32,289 28,112 23,782 19,331 14,727 9,970 5,061 353,105 2013 De!Val Note Total 168,345 168,778 169,089 169,277 169,344 169,289 170,112 169,782 170,331 170,727 170,970 171,061 2,037,105
Principal 405,000 421,000 438,000 455,000 473,000 492,000 512,000 533,000 554,000 576,000 599,000 5,458,000 Interest 208,118 191,763 174,755 157,073 138,699 119,592 99,713 79,022 57,499 35,125 11,860 1,273,219 2008 De!Val Note Total 613,118 612,763 612,755 612,073 611,699 611,592 611,713 612,022 611,499 611,125 610,860 6,731,219
Principal 647,000 672,000 698,000 719,000 746,000 774,000 799,000 829,000 860,000 892,000 920,000 331,000 170,000 175,000 185,000 190,000 9,607,000 Interest 326,252 301,330 278,032 253,839 228,832 202,870 175,732 147,449 117,725 86,097 53,275 31,706 21,695 16,595 11,345 5,795 2,258,569 Total Obligations Total 973,252 973,330 976,032 972,839 974,832 976,870 974,732 976,449 977,725 978,097 973,275 362,706 191,695 191,595 196,345 195,795 11,865,569
Note: Approximately $1.0M paid annually through 2032. Then $1.0M total from 2033-2037.
1 of 3
1,200,000
1,000,000
800,000
600,000
400,000
200,000
2022 2023
Total Sewer Debt By Source and Year (Principal & Interest)
2024 I
2025 2026 2027 2028 2029 2030 2031 2032 2033
2017 General Obligation Bond Total ■ 2013 Delval Note Total ■2008 Delval Note Total
2 of 3
2034 2035 2036 2037
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
2022
Sewer Debt By Source and Year (Principal, Interest, Total)
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
■2017 General Obligation Bond Principal ■ 2017 General Obligation Bond Interest ■ 2017 General Obligation Bond Total
■ 2013 Delval Note Principal ■ 2013 Delval Note Interest ■ 2013 Delval Note Total
■ 2008 DelVal Note Principal ■ Total Obligations Principal
■2008 Delval Note Interest
■ Total Obligations Interest
3 of 3
■ 2008 Delval Note Total
Total Obligations Total
2035 2036 2037
1/17/22
Steve Botella Construction & Excavation Inc.
190 Locksley Rd Glen Mills, Pa 19342
610.399.3359 PA042512
'RECEIVED
MAY 1 6 2022
BY·
•• •••••• ·•••• .......... ••••••••• j
Kyong-Ale Thomas 1344 Moorstein Rd West Chester, Pa 19380
267-250-4528
This is an estimate to connect the house at address above to public sewer to include: • •
• •
• • •
• • •
Install an E-One DH071-93 grinder pump near the septic tanks Provide all electrical labor and materials to install the control panel. Install the pump control panel on the septic tank side of the house Directional Drill from the pump to the sewer main in Eastwick Circle and pull back 1-1/4 inch hdpe with tracer wire. Make a connection at the sewer main in the grass area of the cul-de-sac with a saddle, 5ft of 4 inch pipe and one clean out. Pump out the existing septic tanks/cesspool up to 3000 gallons and fill with dirt . Finish grade, seed and straw disturbed areas Botella will not be responsible for damage to any unmarked or mis-marked utilities Plumbing, electrical permits, testing and electrical inspection is not included All materials remain the property of Botella Construction until final payment In the event the contractor discovers rock or any other obstruction that requires additional time, equipment or materials, an additional cost will be charged .
• roTAL:$38,76o/dO'-C3 J-1'"/vv
TERMS: $10,000.00 deposit, Balance upon completion of the sewer work . .
ACCEPTED:· · ., ., .. -·····'··· _,.,.,--4 '···.·4
DATE: ,/// ,,. / Sincerely,
Steve Botella
I 3 '-< Y t\\.ei (J V' .,... -L; IV'
l 17
\ ( I
\ I'
\
I
!
J..1' 14-P -v-lJ TV· '1' Dup
) .__ __________ ___
\
\
EAST GOSHEN TOWNSHIP CONTRACTOR INFORMATION FORM
1580 PAOLI PIKE. WEST CHESTER. PA 19380-6199 PHONE (610)-692-7171 FAX (610)-692-8950 Website www.eastqoshen.org
codes@eastgoshen.org
PLEASE PRINT
Complete the applicable items and provide information as required by the East Goshen Township Code: §124.
1. D Complete Contractor Information Form below. 2. D Copy of General Liability Insurance certificate. §124-5. EAST GOSHEN TOWNSHIP SHALL BE LISTED AS A CERTIFICATE HOLDER ON ALL INSURANCE CERTIFICATES. 3. D Copy of Worker's Compensation Insurance. (If applicable) If you are self-employed and are not required to carry Worker's Compensation, or claim religious exemption from Worker's Compensation, you must provide a completed affidavit with your application. See Item# 4. 4. D Signed Affidavit regarding Worker's Compensation. (Page 2 of Application) The Commonwealth of PA requires contractors to be covered by Worker's Compensation Insurance.
(This applies only to contractors who do NOT have employees) If you do not have employees, and additional contractors and/or subcontractors are working on the project, ALL must complete and submit Individual contractor Information forms.
5. D Check for $25.00 (if applicable) Commercial Contractors & New Home Construction Contractors/Subcontractors. NOTE: Residential home improvement contractors shall provide a copy of their PA HIC # and thereby are not required to submit the contractor's registration fee to East Goshen Township unless they are working on new dwellings or commercial projects or do not quality under the requirements of the PA Home Improvement Consumer Protection Act 132.
Please contact the Township Code Department with any questions you might have regarding the above instructions.
Business Name:
Address:
City/State:
Phone#:
Fax: E-mail: ------------
Business Owners' Name: Sn tr-e-- ;fo-relL
Contractor Type (@ applicable) D General /41umbing D Mechanical D Electrical D Other
Classification (@ ): □Residential D Commercial □ Residential and Commercial
J PAHIC p / /, TWP Registration# ______ PA HIC # -( a.,, 0t.(;). S{ 2-Expiration Date O //--Z {? '3
geby verify and affirm that all information on this application is true, correct and complete to the best of my ability ahli!t
e
rinderstand that if this application and information has been made with fraudulent intent, I may I be guilty of a misdemeanor of the second degree punishable by a fine up to $5000 and/or imprisonment up to two years upon conviction, pursuant to 18PA C.S.A. #4904 relating to unsworn lsifi ation to auth jities. Date: 5}1 I L/ Signature of Applicant· (;.....c::;:---.,,...--:;;,,,.,.,_,,._,,r __ .....,,..,;,-
Please Print:
F:\Data\Shared Data\Code Dept\Appllcatton & Forms\Current Forms and Appllcations\Contractor lnfonnaUon Fonn 11-15-2010.doc
Prepared by/Return to: Matthew M. McKean, Esq. MacElree Harvey, Ltd. 17 W. Miner St., P.O. Box 660 West Chester, PA 19381-0660
(610) 436-0100
UPI Nos.: 53-1-45 53-1-11.1
SANITARY SEWER EASEMENT AGREEMENT
THIS SANITARY SEWER EASEMENT AGREEMENT (the "Agreement") is made
this __ day of May, 2022, between ROBERT J. YOEGEL and MARYELLEN
YOEGEL, adult individuals (hereinafter called the "Granters") and KYONG-AIE
THOMAS, an adult individual (hereinafter called the "Grantee").
Background
WHEREAS, the Granters own a certain parcel of real property situate in East
Goshen Township, Chester County, Pennsylvania, more particularly described in Exhibit
"A" hereto, being UPI No. 53-1-45 (the "Granters' Property"); and
WHEREAS, the Grantee owns certain real property located in East Goshen
Township, Chester County, Pennsylvania, more particularly described in Exhibit "B"
hereto, being UPI No. 53-1-11.1 (the "Grantee's Property"); and
WHEREAS, the Grantee seeks to connect the Grantee's Property to the public
sewer system as shown on the "Sanitary Sewer Easement Plan" drawn by G.D.
Houtman & Son, Inc., dated March 21, 2022, and approved by the Board of Supervisors
of East Goshen Township on -------ů 2022 (the "Plan"), made a part
hereof as Exhibit "C", and
4453904v2 251569.70432
WHEREAS, the Plan shows sanitary sewer lines through the Granters' Property,
and therefore the Grantee requires a sanitary sewer easement from the Granters in
order to connect the sewer line to the public sewer system as shown on the Plan; and
WHEREAS, the Granters desire to grant, and the Grantee desires to accept, an
easement for a sanitary sewer pipeline under the Granters' Property (the "Easement"),
as shown at Exhibit C and as described more particularly in the legal description
attached hereto and made a part hereof as Exhibit "D".
NOW, THEREFORE, in consideration of the foregoing recitals which are
incorporated herein by reference, and intending to be legally bound hereby, the
Granters hereby establish, for the Grantee and the Grantee's successors and assigns,
the following perpetual sanitary sewer easement, right-of-way, restrictions and
servitudes upon Grantor's Property:
1. Incorporation of Background. The above-stated Background is
incorporated herein by reference as if fully set forth.
2. Grant of Easement.
a. The Granters hereby grant, bargain and sell unto the Grantee, her
successors and assigns, a 20 foot wide sanitary sewer easement (the "Easement Area")
across the Granters' Property as shown on Exhibit "C" and as described in Exhibit "D"
attached hereto and made part hereof to have and to hold the said Easement Area
described unto the said Grantee, her successors and assigns, to and for the use of the
said Grantee, her successors and assigns, as and for the purposes herein described.
The rights in and to the Easement Area granted herein shall run with the land in
perpetuity and bind the future owners of Granters' Property and Grantee's Property.
4453904v2 251569.70432
b. The Granters hereby grant, bargain and sell unto the Grantee, her
successors and assigns the right on, under and through the Easement Area, to
excavate, construct, install, operate, replace, renew and maintain, in perpetuity, the
sanitary sewer pipeline, accessories, and appurtenances together with rights of ingress,
egress and regress in, to, over, upon, through, along and from said Easement Area for
these purposes, as specified herein. The exercise of said rights being defined and
limited as follows. The Grantee's rights pursuant to this Agreement are limited to the
Easement Area shown at Exhibit C and described at Exhibit D hereto and solely for the
purposes described in this Agreement.
3. Covenants Running With Land. The Easement and right-of-way hereby
created and the rights and restrictions herein contained, shall run with the land and shall
inure to the benefit of and be binding upon the present and future owners of the
Granters' Property and the Grantee's Property and their respective heirs, legal and
personal representatives and assigns, successors in interest, and mortgagees and any
tenants and any other persons or entities to whom they may grant rights and privileges
under the Easement. Such rights and privileges shall be granted in writing.
4. Completion of Construction. Any work related to the initial construction of
the sewer connection which occurs on the Granters' Property, including below the
surface of the Granters' Property, shall be completed no later than fifteen (15) days of
the commencement of the that portion of the work.
5. Compliance. The Grantee, her successors and assigns, shall exercise the
rights herein granted, in accordance with sound and accepted engineering and
construction practices, and in strict compliance with any permits issued and with any
4453904v2 251569.70432
rules and regulations governing the installation of the sanitary sewer pipeline and
related facilities, and shall perform any and all work within the Easement Area as may
be required in a careful and expeditious manner. The Grantee shall exercise her rights
hereunder without interference with the Granters' use of the Grantors' Property not
contained within the boundaries of the Easement Area.
6. Restoration. The Grantee, no later than thirty (30) days following the
exercise of any of her rights and privileges granted hereunder, shall back-fill any areas
excavated, compact the ground as may be appropriate, and restore any and all
disturbed surface of the ground. Any disturbance of ground of the Grantors' Property
which was, prior to the construction, covered by grass shall be completely restored with
natural turf of the same type and color within thirty (30) days of the completion of the
construction of the sanitary sewer pipeline. Merely re-seeding disturbed areas of grass
covered ground on the Grantors' Property shall not be considered sufficient "restoration"
for purposes of this Agreement.
7. Limitations on Access to the Grantors' Property. Should the Grantee or
her successors, employees, agents or assigns need to access the Easement Area for a
purpose authorized in this Agreement, she shall first notify the owners of the Grantors'
Property in writing at forty-eight (48) hours beforehand. Access to the Easement Area
for any purpose authorized by this Agreement shall be limited to between the hours of
8:30 a.m. and 6 p.m.
8. Use. This Easement is made subject to the right of the Grantors, and their
successors and assigns, to the use and enjoyment of the Easement Area for any
4453904v2 251569. 70432
purpose not inconsistent with the use, operation and maintenance of the said sanitary
sewer pipelines, accessories, and appurtenances.
9. No Obstruction. The Grantors, for themselves and their heirs, successors
and assigns, hereby covenant and agree to and with the Grantee, her successors and
assigns, that no building, structure, or other impediments to the Grantee's free and
unobstructed access to the Easement Area shall be placed, located, constructed or
permitted to remain on or within the Easement Area. Any plants within the Easement
Area as of the date of this Agreement may be maintained and replaced by the Granters.
10. Maintenance. The Grantee shall be responsible for the construction,
repair, replacement, and maintenance of the sanitary sewer pipeline and any of its
associated accessories and appurtenances and the cost thereof, as well as any
restoration of the Easement Area or any other part of the Granters' Property and the
costs associated with such restoration. The Grantees shall be responsible for
maintaining the surface of the Easement Area other than maintenance for which the
Grantee is responsible for under this Agreement.
11. Warranty. The Granters, their heirs, successors and assigns, do by these
presents, covenant, grant and agree to and with the Grantee, her successors and
assigns, all and singular the hereditaments and premises herein described and granted,
or mentioned and intended so to be, unto the Grantee, her successors and assigns,
against it, the Granters, their heirs successors and assigns, and against all and every
other person or persons, whomsoever lawfully claiming or to claim the same or any part
thereof, by, from or under them, SHALL AND WILL WARRANT AND FOREVER
DEFEND.
4453904v2 251569.70432
12. Indemnification. The Grantee and her successors and assigns shall
release, indemnify, defend, protect and save harmless the Granters and their
successors and assigns from and against any and all demands, claims, suits, damages,
liabilities, costs and expenses, including without limitation, reasonable court costs and
attorneys' fees, resulting from any and all loss of life or property, or from injury or
damage to persons or property of any person, firm or entity including, but not limited to,
the current and future owners of the Granters' Property, their employees, agents and
invitees, East Goshen Township, or the Greenhill Homeowners Association caused in
whole or in part by the construction, use, operation, maintenance, repair, renewal,
reconstruction or alteration of the sanitary sewer pipeline or its accessories or
appurtenances or the Easement Area by any person or entity other than the owners of
the Granters' Property or their employees, agents, and invitees. This release and
indemnity shall survive any termination of the sanitary sewer easement.
13. Termination or Modification. This Easement created herein shall not be
extinguished, altered, amended, or limited except by a writing in form sufficient to be
recorded, executed by the then record owners of the Lots and also executed by all
mortgagees then holding mortgages of record.
14. Compliance: Governing Law. This Easement and any subsequent
easement or access provided pursuant to the terms of this Easement, shall comply with
all state and local ordinances, rules, and regulations. This Easement shall be construed,
4453904v2 251569.70432
interpreted, and applied in accordance with the laws of the Commonwealth of
Pennsylvania.
IN WITNESS WHEREOF, the parties have signed this Easement on the day and
year first indicated hereinabove.
4453904v2 251569.70432
GRANTORS:
GRANTEE:
ACKNOWLEDGMENTS
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CHESTER
ss.
On this, the J 6 cay of /Vl Pi.l/, , 2022, before me, the undersigned officer, personally appeared Robert J. Yo gel, known to me or satisfactorily proven, to be the person whose name is subscribed to the foregoing instrument, and acknowledged that he executed the same for the purposes therein contained.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal.
commonwealth of Pennsylvania • Notary SHI
Carol A. Gettz, Notary Public
Cheater County My commission expires Meroh 12, 2026
Commission number 1188036 Member, Pennsylvania A1110cletlon of Notarlaa
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CHESTER
ss.
:/8 On this, the ID day of fVl O< L/ , 2022, before me, the undersigned officer, personally appeared Maryellen Yoegel, known to me or satisfactorily proven, to be the person whose name is subscribed to the foregoing instrument, and acknowledged that she executed the same for the purposes therein contained.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal.
Commonwealth or Pennaylvanla • Notary Seel
carol A, Gettz, Notary Public
ChHterCounty My commission expires March 12, 2028
Commlaslon number 1188038 Member, Pennsy1vanlaA11oclatlon of Notarlea
4453904v2 251569. 70432
LaAd! °"
Notary Public
My Commission Expires:
My Commission Expires:
ACKNOWLEDGMENT
COMMONWEALTH OF PENNSYLVANIA
ss. COUNTY OF CHESTER
#) On this, the .5 - day of /\.Jj Cti , 2022, before me, the undersigned officer, personally appeared Thoms Kyong-Aie, known to me or satisfactorily proven, to be the person whose name is subscribed to the foregoing instrument, and acknowledged that he executed the same for the purposes therein contained.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
4453904v2 251569.70432
°'-
Notary Publi b
My Commission Expires:
Commonwealth of Pennsylvania• NoteTY seat
Carol A, Gettz, Notary Publlc
Chester County Myc:ommlSBlon expires March 12,2026
Commlaslonnumbar 1188036 Member, Penneylvanla Asaoclallon of Notaries
- c-=:i -- i
'
95.31' 1R-;;,,_ l:.l:!. _w KYO!VC AIE THOMAS
I I I I I I g iJ
20' ,.
:: I
14 --._
t/P/ ,1'53-1-11. 1
(IP/
I g. I fg t/P/ ,lf5J-1-# I /5.J-1-45 t;· If @
hl' ;'.' [=
f i ,t R I "' /il
GRAPHIC SCALE
I 1
(Dfm:T) 11m:h-20 tt.
--------
--------
'¾-., "'' ..,,.
o I I I
I
/
"' I o I • I I
C!f?CLt
-------- --------.,
I ,,._. 'p ·~ ... 11.-•-... -·----- -=-.:.=-r....:..- ....... ---.-.;.....,_,. .. - -- =£: .. ::-::;-7 "='-::rs- ____ .,cm._ • ..., .... "'¥--------- ::F .. ";:.:- n'5! " -... -"":':.:.-- ---·-- I - ,., ______ ....... __ -.,. --oWlj,--/or ___ olh-
=-"':.'Sit.()=-' =t:..-=. II. -=-so::.-:::;,_ .. =-==-=--:-£· ---- :.:=#p.:$..:%&':i-:-'f.-:. ..--=-=---,..,---•m.-'J:...:IDIII' =:u:..-=..-!r.:' ..:C.. C:.":==:=.-:.=-*
REFERENCE: GREENHILL ROAD Subdivision, Subdivision Plan-Mercer Circle Dated Jan. 7, 1997, last revised Jan. 29, 1997 Prepared by Pennoni Associates Inc.
,- ,.. 20'
Morch 21, 2022
1251 fostwick C,;.:!e
SANITARY SEWER EASEMENT PLAN
PROPERTY OF ROBERT J. & MARY ELLEN YOEGEL EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
G.D. HOUTMAN & SON, INC. Sheet 1 of 1
CML ENGINEERS-V,NI) SURVEYORS thomos ""'"'""""'
A,8151'-l'C _ .. 1- -
39286
A9286
March 23, 2022
Description of Proposed Sanitary Sewer Easement through Lands of Robert J. & Mary Ellen Yoegel (UPI #53-1-45)
All that Certain parcel of ground Situate in East Goshen Township, the County of Chester, and the Commonwealth of Pennsylvania, described according to a Sanitary Sewer Easement Plan, Property of Robert J. & Mary Ellen Yoegel Prepared by G.D. Houtman & Son, Inc. Civil Engineers and Land Surveyors dated March 21, 2022 as foilows:
Beginning at a point of curve on the easterly right-of-way line of the cul-de-sac of
Eastwick Circle (40' Wide R/W), a corner of Lots #21 (UPI #53-1-44) & 22 (UPI #53-1-45);
thence leaving the easterly right-of-way line along the division line between Lots #21 & 22 and
along the northerly side of the proposed 20' Wide Sanitary Sewer Easement North 70 degrees 11
minutes 59 seconds East 190.67 feet to a point in line of Lands of Kyong Aie Thomas (UPI #53-
1-11.1); thence along said Lands of Thomas South 09 degrees 33 minutes 46 seconds East 20.32
feet to a point thence passing through Lot #22 (UPI #53-1-45) along the southerly side of the
Proposed 20' Wide Sanitary Sewer Easement South 70 degrees 11 minutes 59 seconds West
190.40 feet to a point of curve on the easterly right-of-way line Eastwick Circle (40' Wide R/W);
thence along a curve to the left with a radius of 60.00 feet an arc distance of 20.48 feet to a point,
a corner of Lots #21 (UPI #53-1-44) & 22 (UPI #53-1-45), the first mentioned point and place of
beginning
Containing within said Sanitary Sewer Easement 3,799 sf
Sue Smith
From: Sent:
Michael Ellis <MEllis@Pennoni.com> Friday, June 10, 2022 12:10 AM To: Sue Smith Cc: Mark Miller Subject: FW: UV Replacement Engineering Budget Recommendation
Sue,
Can you please include the below email on the MA agenda since there was not a quorum to consider it in May?
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni 121 Continental Drive, Suite 207 I Newark, DE 19713 Direct: +l (302) 351-5236 I Mobile: +l (302) 561-4235 www.pennoni.com I MEllis@Pennoni.com
From: Michael Ellis Sent: Wednesday, May 4, 2022 2:05 PM To: Mark Miller (mmiller@eastgoshen.org) <mmiller@eastgoshen.org>; David Ware <dware@eastgoshen.org> Cc: Derek Davis <ddavis@eastgoshen.org>; ssmith@eastgoshen.org Subject: UV Replacement Engineering Budget Recommendation
Hi Mark and Dave,
As discussed prior to and at the April MA meeting, the overall engineering effort for the UV Replacement project is recommended to be budgeted at $30,000. A budget had not previously been set since it was originally authorized as a separate "General Engineering" task in 2021. Since it evolved into a larger project thereafter, we created a separate billing project for it to track against a separate Township budget line item.
The effort through March was approximately $16,000 to scope the project, evaluate alternative vendors, prepare designs, and scope other mechanical, electrical, and controls work.
We anticipate an additional approximately $14,000 will be needed to prep the mech and electrical bid docs, structural design for channel wall height extensions, conduct bidding, and perform construction admin and inspections.
We thereby recommend an engineering budget be formally established and approved by the MA for an amount not-to exceed $30,000, to be billed at our approved hourly rates.
Mike
Michael Ellis, PE Municipal Division Manager
1
AREA CODE 610
692"7171 EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1 580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
We received the updated quote from Pyrz for the caustic tank. The cost went up by $980.00 to increase the 4" fill and 6" vent lines. The cost including the ultrasonic level sensor is now $34,465.00. The Municipal Authority approved the tank for $33,485.00 at their April meeting.
I suggest this be included on the MA agenda for you to approve the increased amount. We can obtain your signature on it, and provide it to Pyrz along with the approval for the caustic feed pumps.
Mike Ellis
Pyrz Water Supply Co. Inc.
P.O. Box 107 Harleysville, Pennsylvania 19438 (215) 256-8430 I Fax (215) 256-8567
www.pyrzwater.com
TO: Pennoni Associates QUOTATION NO: 58909 REVISION 1 DA TE: May 11, 2022
SUBJECT: East Goshen Twp Ridley Creek ATTN: Erika Addison
QUANTITY DESCRIPTION
We are pleased to quote as follows:
1 As.smann Model IMT3050 L 19 / L 19 Polyethylene Tank
SERVICE: Sodium Hydroxide 25%
CONFIGURATION: Double wall, vertical, cylindrical, flat bottom, domed top head
CAPACITY: 3050 US Gallons (nominal) in straight side DIMENSIONS: 96" DIAMETER 118.5" STRAIGHT WALL 137-3/4" OVERALL HEIGHT (not including top accessories)
CONSTRUCTION: Rotationally molded for a seamless, one-piece tank
MATERIAL: Linear Polyethylene
DESIGN: Tank rated for up to 1.9 specific gravity product No internal pressure or vacuum No windload or seismic calculations Tanks designed and fabricated in accordance with ASTM D1997-98 standards
SUPPORT: Tank to rest flat on floor or pad, bottom must be fully supported
MANWAY: (1) 16" DIA top access manway with lever locking manway
FITTINGS: (1) 6" PVC bulkhead fitting w/ EPDM gasket for VENT (TOP) (1) 4" PVC bulkhead fitting w/ EPDM gasket for FILL (TOP) (1) 2" PVC bulkhead fitting w/ EPDM gasket for LEVEL (TOP) (1) 2" 316SS Thru-Wall w/ EPDM gasket for PUMP SUCTION (SIDE) (1) 2" PVC bulkhead fitting w/ EPDM gasket for LEVEL INSTRUMENT
(TOP)
ACCESSORIES:
(1) Insulation Package: 2.5 lb./CF Urethane foam with mastic coating. "R"
value is approx. 13. 76 (1) Heat Tracing: Nema 4 control box with 115 vac dual thermostat, one
high limit, one maintenance. Heating elements are adhesive backed.
50 deg. Delta "T". (1) Polyethylene Restraint & Lifting Lug System with stainless cables (1) Interstitial Leak Detection System (1) FRP Ladder (1) Reverse Float Indicator (1) White phenolic plastic nameplate (1) 2" PVC Fill Piping (1) 2" Expansion Joints for side mounted fitting
TOTAL PRICE: F.O.B. points of origin with full freight allowed to jobsite ... $ 32,740.00
1 Ultrasonic Level Sensor with Transducer and inter-connecting cable and local indicator NOTE: Startup is not included.
TOTAL PRICE: F.O.B. points of origin with full freight allowed to jobsite ... $ 1,725.00
Not Included: Wiring, piping, installation, tubing, unions, ball valves, tank certification if
required, sales or use tax or any item not specifically noted above.
We hope to have the opportunity of furnishing the above for you.
Sincerely yours, PYRZ WATER SUPPLY CO., INC.
Steve Pyrz
3150-PM-BWEW0S00 Rev. 4/2021 Form pennsylvania r.z. DEPARTMENT OF ENVIRONMENTAL
V.i, PROTECTION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS
CHAPTER 105 WATER OBSTRUCTIONS AND ENCROACHMENT
GENERAL PERMIT REGISTRATION
SECTION A. APPLICANT INFORMATION D FERC Natural Gas Activity Docket Number Type of Facility Has a Water Quality Certification (WQC) request been sent to DEP? D Yes □No D Activity Subject to FERC approval and/or Oil & Gas Exploration, Production, Storage or Transmission if the activity is
regulated by FERC and provide the FERC docket number.
Applicant's Name/ Client I DEP Client ID# (if known) Employer ID# (EIN) East Goshen Municipal Authority 62683 23-6005479
Client Information - Please select Client Type/ Code from drop down box under the cotrect entity shown below. (or may be written in)
Government Non-Government Individual AUTH Authority
Mailing Address I
City State I ZIP+4 1580 Paoli Pike West Chester PA 19380
Contact Person - Last Name First Ml Suffix Telephone Miller Mark (610) 692-7171
Email Address mmiller@eastgoshen.org
SECTION B. CONSUL TANT INFORMATION (If applicable) □ N/A
Contact Person - Last Name First Ml Suffix I Consultants Title I Consulting Firm Ellis Michael J Authority Engineer Pennoni Associates
Mailing Address I City State I ZIP +4 121 Continental Drive, Suite 207 Newark DE 19713
Telephone I
Fax Employer ID# (EIN) (302) 351-5236 (302) 654-2895 23-1683429
Email mellis@pennoni.com
SECTION C. PROJECT INFORMATION
Project / Site Name DEP Site ID# (if known or leave blank) Hershey's Mill Estates Sanitary Sewer Replacement
!
Client Relationship - Please select Site-to-Client Double-click on shaded area below to select correct Site-to-Client Relationship/ Code from drop down box to the right. (or may Relationship / Code ! be written in) -> OWN Owner
County I Municipality □City D Borough [8] Township Note: Municipal & County Notification is Chester East Goshen Required
Site Location / Address I City State I
ZIP+4 Tanglewood Drive West Chester PA 19380
Collection Method: □ EMAP □ HGIS □ GISDR* □ ITPMP [8] GPS □ WAAS □ LORAN
Check the horizontal reference datum (or projection datum) employed in the collection method.
EMAP and HGIS (PNDI) have known datum and do not require checking here. □NAD27 [8] NAD83 □WGS84 (GEO84) LAT.: 40.016267 LONG.: -75.555523
NOTE: A Submerged Lands License Agreement (SLLA) with an annual fee, if applicable, may also be required for your project. You will be notified if an SLLA is required.
The Aquatic Resources Impact Table (SECTION E. PROPOSED IMPACTS} must be completed or equivalent submitted for this registration to be complete.
- 1 -
3150-PM-BWEW0500 Rev. 4/2021 Form
SECTION D. REGISTRATION CHECKLIST AND REQUIREMENTS
Please place an "X" next to each item (1-9) to ensure it is completed and/or provided.
Unless otherwise specified, all items are required to ensure a complete Registration package.
*'Provide ONE (1) ORIGINAL and ONE (1) COPY of the Registration package ..
Please provide a copy of the Registration form to the Municipality & County in which the work will be performed. Proof of receipt
is not required to be provided to DEP.
1. REGISTERING A GENERAL PERMIT (GP) check all that apply
Federal, State, county or municipal agencies or municipal authorities: □GP-1 Fish Habitat Enhancement Structures .............................................................. Per Project □GP-2 Small Docks and Boat Launching Ramps ........................... Per Dock I Ramp __ (#) x
D GP-3 Bank Rehabilitation, Bank Protection and Gravel Bar Removal .................................................................... Per Project __ (#) x
D GP-4 Intake and Outfall Structures .................................................... Per Structure __ (#) x
D GP-5 Utility Line Stream Crossings .................... Per Individual Utility __ (#) x __ (#) x
D GP-6 Agricultural Crossings and Ramps ............................... Per Crossing / Ramp __ (#) x
D GP-7 Minor Road Crossings' ............................................................ Per Crossing __ (#) x
IZI GP-8 Temporary Road Crossings' .................................................... Per Crossing __ (#) x
D GP-9 Agricultural Activities ...................................................................................... Per Project
D GP-1 0 Abandoned Mine Reclamation ....................................................................... Per Project
IZI GP-11 Maintenance, Testing, Repair, Rehabilitation, or Replacement of Water Obstructions and Encroachments1 ................................................. .
IZI Temporary Disturbance ($400/0.1 ac) ........................ . --ƽ--acres x $4,000 = IZI Permanent Disturbance ($800/0.1 ac) ........................ . --ƾ-- acres x $8,000 =
D GP-15 Private Residential Construction in Wetlands1 .................................................................... .
D Temporary Disturbance ($400/0.1ac) ........................ . --ƿ __ acres x $4,000;
$ 50
$ 175
$25 0
$ 200
$ 250
$ 50
$350
$ 175
$ 50
$ 5 00
$ 750
$Q
$Q
$ 750
$ __ D Permanent Disturbance ($8 00/0.1 ac) ........................ . acres x $8,000 = $ GP(s) FEE subtotal (b)
-2-
IZI EXEMPT from fees
;$ __
;$
;$ __
;$ __
=$ __
=$ __
=$ __
;$Q
;$ __
;$ __
+
+
=$Q
+
+
;$
$0
3150-PM-BWEW0500 Rev. 4/2021 Form
2. Location Map (USGS quad map) with project sile marked:
3. Color Photographs with dates, localions, and descriptions: D GP-3 [2J GP-11 ON/A
4. Project Description: (Example: Linear pipeline project using multiple GP-5's and GP-B's; One GP-7 for an access road to my property) See attached "Project Description"
5. Site Specific and/or Standard Drawings are (required for all) project's GP activities.
For Activities that qualify for GP-7 or GP-11
Plans, specifications, and reports for bridges and culverts across a stream which are to be used by the general public such as an access to an industrial, commercial or residential development, etc., shall be prepared by a registered professional engineer and shall be affixed with their seal and certification which shall read as follows on the drawings:
If the project includes a bridge or culvert replacement or the proposed work will change the waterway opening, please complete and provide the Bridge and/or Culvert Reglacement Proiects or Proiects That Change the Waterwa˓ Ogening (3150-PM-BWEW0552B) worksheet. If the project consists of similar work (replacement or change in waterway opening) on more than one structure, provide the data requested for each structure included in this Registration package.
"I (name) do hereby certify pursuant/a the penalties of 18 Pa. C.S.A. Sec. 4904 to the best of my knowledge, information and belief, that the information contained in the accompanying plans, specifications, and reporls has been prepared in accordance with accepted engineering practice, is true and correct, and is in confonnance with Chanter 105 of the rules and renu/ations of the Denartment of Environmental Protection." 6, Proposed Project Purpose depicting the site of the projects GP activities and impacts. Briefly discuss the need for the authorization.
7. Erosion & Sediment Control Plan (E&S Plan) (Required for all GP's but specifically required with submission with a registration of GP-11 or GP's for oil and gas related activities submitted to DEP.)
8. Pennsylvania Natural Diversity Inventory (PNDI): PNDI Search Receipt and clearance letters, if available. See additional requirements for submission with Avoidance Measures and/or Potential Impacts.
9. Activities which impact wetlands: (For State Regulated Impacts)
Please place an 'jX" next to the appropriate box indicating the information provided:
► N/A because no wetland impacts are proposed or no compensatory mitigation is necessary.
► A wetland delineation with complete data sheets in accordance with the 1987 Corps of Engineers
Wetland Delineation Manual AND the appropriate Regional Supplements to the Corps of Engineers Wetland Delineation Manual for use in Pennsylvania .............................................................................
► If direct or indirect wetland impacts are greater than 0.05 acre, a compensatory mitigation plan in accordance with the Department's Replacement criteria which provides compensation for both affected acreage, and functions at a minimum of one to one ratio. ► If compensatory mitigation onsite is determined not feasible: A check, number __ , in the amount of$ __ payable to the National Fish and Wildlife Foundation,
N.A. 1237, as compensatory mitigation for __ acres of impact in wetlands, in accordance with the Pennsylvania Wetland Replacement Project. .........................................................................................
(Additional Mitigation May Be Required by U.S. Army Corps)
NOTE: If the Pennsylvania Wetland Replacement Fund is proposed to be used as compensatory mitigation for waters of the Commonwealth the U.S. Army Corps of Engineers may also require additional mitigation if the proposed activity impacts waters of the United States.
- 3 -
Applicant DEP Use Entru Onlv [2J !Sl_
[2J 'fll
[2J liZ
[2J liZ
[2J QI
[2J QI
[2J QI'
[2J 'fi
[2J rr/
□ □
□ □
□ □
3150-PM-BWEW0557 Rev. 3/2018
Commonwealth of Pennsylvania, Department of Environmental Protection, Bureau of Waterways Engineering and Wetlands (pennsylvania DEP logo)
NOTE: Form 3150-PM-BWEW0557 or equivalent must be printed/submitted for this General Permit Registration or Joint Permit Application.
Applicant's Name / Client: East Goshen Municipal Authority
AQUATIC RESOURCE IMPACT TABLE
FOR PENNSYLVANIA CHAPTER 105 WATER OBSTRUCTION AND ENCROACHMENT APPLICATION / REGISTRATION
Project / Site Name: Hershey's Mill Estates Sanitary Sewer Replacement. Date: March 2022
The first three columns are marked DEP USE ONLY; the next twelve are Project Information, the last three PADEP / 105.
| PADEP Permit Number | Single Complete Crossing No. | Crossing Number | Fee | Structure / Activity unique identifier | Aquatic Resource Type | Latitude dd nad83 | Longitude dd nad83 | Waters Name | PA Code Chapter 93 Designation | Work Proposed | DEP Impact Type temp / perm | Watercourse Impact Top of Bank to Top of Bank, Length and Width in feet | Floodway Impact Top of Bank Landward, Length and Width in feet | Wetland Impact Dimension, Length and Width in feet |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| N/A | R083 | Perennial, PFO1A, PEM | 40.0184 | -75.5528 | UNT to Ridley Creek | HQ-TSF, MF | Placement of Riprap | Perm | 11 - 4 | N/A - | 11 - 4 | |||
| N/A | Storm Sewer | Perennial, PFO1A, PEM | 40.0174 | -75.5533 | UNT to Ridley Creek | HQ-TSF, MF | Placement of Riprap | Perm | 5 - 6 | N/A - | 5 - 6 | |||
| N/A | R080 | Perennial | 40.0165 | -75.5543 | UNT to Ridley Creek | HQ-TSF, MF | Placement of Riprap | Perm | 24 - 3 | N/A - | N/A - | |||
| N/A | R084 | PFO1A, PEM | 40.0191 | -75.5526 | N/A | N/A | Excavation | Temp | N/A - | N/A - | 245 - 15 | |||
| N/A | R083 | Perennial, PFO1A, PEM | 40.0184 | -75.5528 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 26 - 9 | N/A - | 48 - 21 | |||
| N/A | R082C | Perennial, PFO1A, PEM | 40.0178 | -75.5529 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 9 - 5 | N/A - | 160 - 15 | |||
| N/A | R082B | PFO1A, PEM | 40.0178 | -75.5531 | N/A | N/A | Excavation | Temp | N/A - | N/A - | 15 - 3 | |||
| N/A | R082A | PFO1A, PEM | 40.0175 | -75.5533 | N/A | N/A | Excavation | Temp | N/A - | N/A - | 70 - 3 | |||
| N/A | Storm Sewer | Perennial, PFO1A, PEM | 40.0174 | -75.5533 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 21 - 18 | N/A - | 25 - 18 | |||
| N/A | R080 | Perennial | 40.0165 | -75.5543 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 37 - 7 | N/A - | N/A - | |||
| N/A | R076 | Perennial, PFO1A, PEM | 40.0157 | -75.5567 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 21 - 10 | N/A - | 41 - 15 | |||
| N/A | R076-R075 | Perennial | 40.0154 | -75.5568 | UNT to Ridley Creek | HQ-TSF, MF | Excavation | Temp | 80 - 4 | N/A - | N/A - | |||
| N/A | R076-R073 | PFO1A, PEM | 40.0150 | -75.5567 | N/A | N/A | Excavation | Temp | N/A - | N/A - | 499 - 15 |
3150.PM-BWEW0S00 Rev. 4/2021 Form
SECTION F, CERTIFICATION I certify under penalty of law that the information provided in this permit registration is true and correct to the best of my knowledge and information and that I possess the authority to undertake the proposed action. I am aware that there are significant penalties for submitting false information, Including the possibility of fine and implisonment for knowing violations. (If any of the information and/or plans is found to be in error, falsified, or incomplete1 this authorization/verification may be subject to modification1 suspension, or revocation in accordance wi ic
:;:J-::,;/ ؖ ,
certi that this project complies with all !he conditions of the ؗ eneral permit. i '. /// r/.P s- 3- 2 &?Z ( Signature of Aؘ plicant / Owner Date
Mark Miller Typed / Printed Name
Public Work§ Director
Typed / Printed Title
This General Permit shall not be effective until the owner has had their E&S Plan reviewed by the appropriate Regional Office or District,
and, where required, obtained an SLLA from DEP.
THIS ACKNOWLEDGED COPY OF THIS GENERAL PERMIT REGISTRATION PACKAGE AND THE E&S PLAN MUST BE
AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION,
SECTION G. DECISION I D.ISPOSITION -COMPLETED BY DEP
Decision Review:
A6ddA/· GP 081501222-005 and 111501222-015 DEP / District Reviewer Signature Abdel assa□i GP Reviewer's Typed I Printed Name
NOTE: See Aquatic Resource Impact Table for any additional authorizations. Disposition Status Comments ri ACKNOWLEDGED Date 512512022 Readv and OK to be issued
SLLA Required 'fl1Yes Attached □No □ INCOMPLETE I DEFICIENCY Date □ EXTENSION REQUEST Date □ WITHDRAWN Date
NOTE: If the GP registration Information Is Incomplete a copy of this registratlon form and requested additional Information will be sent to the applicant. A copy of the returned registration form and additional Information must be re-submitted within 60 calendar days unless extended by the extension date listed above.
M F RAL AUTHORIZATION Non-reporting PASPGP verification/ authorization attached. D Reporting -A copy of this General Permit registration package has been sent to the U.S. Army Corps of Engineers. Separate
federal authorization may be required NOTE: Please be advised that if the reporting box Is checked you do not have Federal authorization for this project and such authorization may be required prior to starting your project. In accordance with Sectlon 404ofthe Clean Water Act, a Department of the Army authoriutlon Is required for the discharge of dredged andlor fill material Into waters of the United States, including Jurisdictional wetlands. Section 10 of the Rivers and Harbors Act also requires Department of the Army authorization for any work in, over, or under a navigable water of the UnUed States, In accordance with procedures established with the U.S. Army
Corps of Engineers, you will be contacted directly by the Corps regarding Federal Authorization.
- 5.
PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT- 6
(PASPGP-6)
July 1, 2021
Please note: the full text of the P ASPGP-6 may be viewed on the Baltimore District web site at http://www.nab.usace.army.mil/Missions/Regulatory/PermitTypesandProcess.aspx or by calling the Corps at 814-235-0570
Permittee: East Goshen Municipal Authority Date of P ASPGP-6 Verification: 5/25/2022 State Authorization(s): GP111501222-015 &GP081501222-005
Corps District: □Baltimore District
U.S. Army Corps of Engineers State College Field Office 1631 South Atherton Street Suite 101 State College, Pennsylvania 16801-6260 Email: NAB-Regulatory@usace.army.mil IV I Philadelphia District
U.S. A1my Corps of Engineers Wanamaker Building 100 Penn Square East Regulato1y Branch Philadelphia, Pennsylvania 19107-3390 Email: PhiladelphiaDistrictRegulatory@usace.a1my.mil □Pittsburgh District
U.S. A1my Corps of Engineers, Regulatory Branch William S. Moorhead Federal Building, 20th floor 1000 Liberty A venue Pittsburgh, Pennsylvania 15222-4186 Email: Regulatory.Permits@usace.army.mil
It has been determined that your proposed project, which includes the discharge of dredged and/or fill material and/or the placement of structures into waters of the United States, including wetlands, qualifies for federal authorization under the provisions of Section 404 of the Clean Water Act and /or Section 10 of the River and Harbor Act of 1899, under the te1ms and conditions of the PASPGP-6.
All activities authorized under PASPGP-6 must comply with all conditions of the authorization, including General, Procedural, and Special Conditions. Failure to comply with all the conditions of the authorization, including project special conditions, will constitute a permit violation and may be subject to criminal, civil, or administrative penalties, and /or restoration.
1 June 11, 2021
The authorized activity must be performed in compliance with the following General Conditions to be authorized under PASPGP-6:
General Conditions:
I. Permit Conditions: The pe1mittee shall conduct all work and activities in waters of the United
States, including jurisdictional wetlands, in strict compliance with the approved authorization/verification including all final maps, plans, profiles, and design specifications.
2. 401 State Water Quality Certification (SWQC) Conditions: The permittee shall comply with the following conditions unless a project specific SWQC is required as identified below:
a. Prior to beginning any activity authorized by the Corps under PASPGP-6, the applicant shall obtain from the Department all necessary environmental permits, authorizations or approvals, and submit to the Department environmental assessments and other information necessary to obtain the permits and approvals, as required under state law, including The Clean Streams Law (35 P.S. §§ 691.1-691.1001), the Dam Safety and Encroachments Act (32 P.S. §§ 693.1-693.27), the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.l-1396.19b), the Noncoal Surface Mining Conservation and Reclamation Act (52 P.S. §§ 3301-3326), the Bituminous Mine Subsidence and Land Conservation Act (52 P.S. §§ 1406.1-1406.21), the Coal Refuse Disposal Control Act (52 P.S. §§ 30.51-30.66), the Solid Waste Management Act (35 P.S. §§ 6018.101-6018.1003), the Hazardous Sites Cleanup Act (35 P.S. §§ 6020.101- 6020.1305), the Land Recycling and Environmental Remediation Standards Act (35 P.S. §§ 6026. IO 1- 6026.908), 58 Pa.C.S. §§ 3201-3274 (related to development), the Air Pollution Control Act (35 P.S. §§ 4001-4015), the Storage Tank and Spill Prevention Act (35 P.S. §§ 6021.101- 6021.2104) and the regulations promulgated thereunder, including 25 Pa. Code Chapters 16, 71, 77, 78, 78a, 86-91, 92a, 93, 95, 96, 102, 105, 106, 127, 245 and 260a-299.
b. Fill material may not contain any wastes as defined in the Solid Waste Management Act.
c. Applicants and projects eligible for the PASPGP-6 must obtain all state permits or approvals, or both, necessaiy to ensure that the project meets the state's applicable water quality standards, including a project-specific SWQC.
Note: As part of PADEP's issuance of 401 SWQC for PASPGP-6 on February 12, 2021, the following was included to clarify the meaning of this condition:
This 40 I SWQC is only available for projects that do not require any federal authorization other than authorization from the Corps under Section 404 of the Act or Section IO of the Rivers and Harbors Act of 1899. Applicants seeking authorization for activities not eligible for coverage under PASPGP-6, or for activities that require another federal authorization (such as an interstate natural gas pipeline, a gas storage field or a nuclear or hydroelectric project requiring authorization by another federal agency), must submit a request to the Department for a project specific SWQC. The scope of the issuance of this SWQC is related only to the scope and applicability of the proposed PASPGP-6. Any activity or project requiring the Depa1tment to
2 June 11, 2021
issue 40 I SWQC that is beyond the scope of the proposed PASPGP-6 or other programmatically issued SWQC (e.g. Nationwide Pe1mits) will require the applicant to obtain a project-specific SWQC from the Department. This would include any activity or project requiring a SWQC associated with an authorization, pe1mit or license issued by a federal agency, such as Federal Energy Regulatmy Commission or Nuclear Regulatory Commission. Such activities or projects include, but are not limited to, an interstate natural gas pipeline, a gas storage field or a nuclear or hydroelectric project.
3. Terms and Conditions Related to Coastal Zone Management Act (CZMA) Certification: For those projects located within Pennsylvania's Coastal Zones, Non-Reporting Activities have General CZMA consistency determination and Reporting Activities must obtain individual CZMA consistency determination (see General Condition 30(b)).
4. Aquatic Life Movements: No activity may substantially disrnpt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that nmmally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constrncted to maintain low flows to sustain the movement of those aquatic species. If a bottomless crossing cannot be used, then culverts should be designed, constructed, and appropriately depressed, if possible, below the stream invert to minimize adverse effects to aquatic life movements.
5. Threatened and Endangered Species: By signing the Pennsylvania Natural Diversity Inventory (PNDI) receipt, the pe1mittee has agreed to comply with all avoidance measures identified by the PNDI receipt. The applicant may also agree in writing to comply with all avoidance measures identified in U.S. Fish and Wildlife Service (USFWS) correspondence, including IPaC, as pa1t of the application. To ensure compliance with the Endangered Species Act (ESA), those avoidance measures associated with federally listed, threatened, or endangered species are a condition of the PASPGP-6 verification, unless modified by the Corps.
If an activity is verified under the PASPGP-6, and a federally listed, threatened, or endangered species, or proposed species, is subsequently found to be present, all work must cease, and the Corps and USFWS ( or National Marine Fisheries Service (NMFS)) must be notified by telephone immediately ( contact information below). The PASPGP-6 verification is automatically suspended without additional notification to the permittee and will not be re-issued until consultation pursuant to Section 7 of the ESA is concluded and adverse effects to federally listed, threatened, endangered, and proposed species are avoided, or incidental take authorization issued.
Furthe1more, persons have an independent responsibility under Section 9 of the ESA to avoid any activity that could result in the "take" of a federally listed species.
3 June 11, 2021
USFWS: Pennsylvania Field Office 110 Radnor Rd; Suite 101 State College, PA 16801 office phone: 814 234-4090 fax: 814-234-0748 or 814 206-7452
NMFS: Ms. Jennifer Anderson Assistant Regional Administrator Protected Resources Division NOAA Fisheries 55 Greater Republic Drive Gloucester, Massachusetts O 1930
6. Spawning Areas: The permittee shall comply with all time-of-year-restrictions (see below) associated with spawning areas as set forth by the Pennsylvania Fish and Boat Commission (PFBC) or other designated agency. Discharges or structures in spawning or nursery areas shall not occur during spawning seasons unless written approval is obtained from the PFBC or another designated agency. In addition, work in areas used for other time sensitive life span activities of fish and wildlife (such as hibernation or migration) may necessitate the use of seasonal restrictions for avoidance of adverse impacts to vulnerable species. Impacts to these areas shall be avoided or minimized to the maximum extent practicable during all other times of the year.
Wild Trout October 1 - December 31 Class A Wild Trout October 1 - A ril 1
List of Trout Sh·eams found at: https://www.fishandboat.com/Fish/PennsylvaniaFishes/Trout/Pages/TroutWaterClassificatio ns.aspx.
7. Shellfish Production: No discharge of dredged and/or fill material and/or the placement of structures may occur in areas of concentrated shellfish production, unless the discharge is directly related to an authorized shellfish harvesting activity.
8. Adverse Effects From Impoundment: If the regulated activity creates an impoundment of water, the adverse effects on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow, including impacts to wetlands, shall be minimized to the maximum extent practicable.
9. Management of High Flows: To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-constrnction course, condition, capacity,
4 June 11, 2021
and location of open waters if it benefits the aquatic environment ( e.g., stream restoration or relocation activities).
IO. Erosion and Sediment Controls: Appropriate soil erosion and sediment controls, in
accordance with state regulations, must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perfotm work within waters of the United States, including jurisdictional wetlands, during periods of low-flow or no-flow, or during low tides.
11. Suitable Material: No activities, including discharges of dredged and/or fill material or the placement of structures, may consist of unsuitable material (i.e., asphalt, trash, debris, car bodies, etc.). No material discharged shall contain toxic pollutants in amounts that would violate the effluent limitation standards of§ 307 of the Clean Water Act (CW A).
12. Temporary Fill and Structures: Temporary fill (i.e., access roads and cofferdams) and structures in waters and/or wetlands authorized by PASPGP-6 shall be properly constructed and stabilized during use to prevent erosion and accretion. Temporary fill in wetlands shall be placed on geotextile fabric laid on existing wetland grade, unless such requirement is specifically waived by the Corps. Whenever possible, rubber or wooden mats should be used for equipment access through wetlands to the project area. Tempora1y fills and structures shall be removed, in their entirety, to an upland site, and suitably contained to prevent erosion and transpori to a waterway or wetland. Temporarily impacted areas shall be restored to their preconstruction contours, elevations, and hydrology, and revegetated with a wetland seed mix that contains non-invasive, native species, to the maximum extent practicable. Unless approved by the Corps, the restoration work must be completed within 30 days of the date the temporary fill/structure is no longer needed.
13. Equipment Working in Wetlands: Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
14. Installation and Maintenance: Any regulated structure or fill authorized by PASPGP-6 shall be properly installed and maintained to ensure public safety.
15. PASPGP-6 Authorization:
a. PASPGP-6 expires June 30, 2026, unless suspended or revoked.
b. Verifications of PASPGP-6 expire June 30, 2026, unless the PASPGP-6 permit is
suspended, revoked, or the PADEP authorization expires, whichever date occurs sooner. Activities authorized under PASPGP-6 that have commenced construction or are under contract to commence construction will remain authorized provided the activity is completed within 12 month of the date of the PASPGP-6 expiration, modification, or revocation; or until the expiration date of the project specific verification, whichever is sooner.
5 June I I, 2021
16. One-Time Use: A PASPGP-6 verification is valid to constrnct the project, or perform the activity, one time only, except for PASPGP-6 verifications specifically issued for reoccurring maintenance activities.
17. Water Supply Intakes: No regulated activity may occur in the proximity of a public water supply intake and adversely impact the public water supply. In order to minimize the effects of intakes on anadrornous fish eggs and larvae, and oyster larvae, intake structures should be equipped with screening (with mesh size no larger than 2 mm) of wedge wire or another material of equal or better performance. Where feasible, intakes should be located away from spawning or nursery grounds, or to minimize the impingement on, or entrainment of, eggs or larvae. In addition, intake velocities should not exceed 0.5 ft/sec.
18. Historic Properties: For all activities verified under a PASPGP-6, upon the unanticipated discovery of any previously unknown historic properties (historic or archeological), all work must cease immediately, and the permittee must notify the State Historic Preservation Officer (SHPO) and the Corps. The Corps will contact the tribes with whom they routinely consult, within 24 hours in accordance with each District's tribal consultation process. PASPGP-6 may be re-verified, and special conditions added ifnecessaiy, after an effect's determination on historic properties and/or tribal resources is made, in consultation with the SHPO, the tribes and other interested patiies. The PASPGP-6 verification may be modified and/or rescinded for the specific activity if an adverse effect on the historic property cannot be avoided, minimized, or mitigated.
19. Tribal Rights: No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.
20. Corps Civil Works Projects: The PASPGP-6 does not authorize any work which will interfere with an existing or proposed Corps Civil Works project, or any Corps-owned or managed propetiy or easement (i.e., flood control projects, darns, reservoirs, and navigation projects), unless specifically approved by the Corps in writing. Pursuant to 33 U.S.C 408, a review by, or permission from the Corps is required for activities that will alter or temporarily or permanently occupy or use a C01ps federally authorized Civil Works project. Any activity that requires Section 408 permission and/or review is not authorized by P ASPGP-6 until the appropriate Cotps office issues the Section 408 permission or completes its review to alter, occupy, or use the Corps Civil Works project, and Corps issues a written PASPGP-6 verification.
21. Navigation: No activity verified under PASPGP-6 may cause more than minimal adverse effect on navigation. No attempt shall be made by the pe1mittee to prevent the full and free use by the public of all navigable waters at or adjacent to the activity authorized herein. In addition, activities that require ternporaty causeways that prohibit continued navigational use of a waterway (i.e., temporary causeways extending greater than¾ the width across the waterway) shall be removed in their entirety upon completion of their use. Any safety lights and signals prescribed by the U.S. Coast Guard (USCG), through regulation or otherwise, must be installed and maintained at the perrnittee's expense on authorized facilities in navigable waters of the United States. The pe1mittee understands and agrees that, if further operations by the United States require the removal, relocation, or other alteration, of the
6 June 11, 2021
structure or work herein authorized, or if, in the opinion of the Secretary of the Army or an authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or obstrnctions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
22. Inspections: The pe1mittee shall allow a District Engineer or an authorized representative(s) to make periodic inspections at any time deemed necessary in order to ensure that the work is being performed in accordance with all the terms and conditions of PASPGP-6. The District Engineer may also require post-construction engineering drawings (as-built plans) for completed work.
23. Modifications of Prior Verifications: Any proposed modification of a previously verified Single and Complete project that results in a change in the verified impact to, or use of waters of the United States, including jurisdictional wetlands, must be approved by PADEP, or the Corps if applicable. Corps written approval is required if the prior verification was reviewed by the Corps, or if the proposed modification is a Reporting Activity under PASPGP-6. Project modifications that cause a Single and Complete Project to exceed 0.5 acre of loss of waters of the United States, including jurisdictional wetlands ( except those identified in Part II A.2. a. and b.), or greater than 1,000 linear feet of permanent jurisdictional stream loss ( except those identified in Part II A.2. a and b.), are not eligible for P ASPGP-6 and will be fo1warded to the Corps for review under an alternative permit review procedure.
24. Recorded Conservation Instrnments: As per Part III.D.27 and Part III.E.8 of this pe1mit, proposed Draft Conservation Instrnments may be submitted by the applicant as part of the permit application package for review and approval. When such proposed Conservation Instrnments are submitted by the applicant, proof of the recorded deed restriction, conservation easement, or deed restricted open space area shall be forwarded to the appropriate Corps District and appropriate PADEP offices, prior to the initiation of any permitted work, unless specifically waived by the Corps in writing. Conservation Instrument templates can be found at: http://www.nab. usace.army .mil/Missions/Regulatory/PermitTypesandProcess.aspx
25. Property Rights: PASPGP-6 does not obviate the need to obtain other federal, state, or local authorizations required by law, nor does the permit grant any prope1ty rights or exclusive privileges or authorize any injmy to the property or rights of others.
26. Navigable Waters of the United States (Section 10 Waters):
In addition to the other general conditions, the following conditions are applicable for activities in the eligible navigable waters of the United States identified in Appendix B:
a. For aerial tr·ansmission lines, the following minimum clearances are required for aerial electric power transmission lines crossing navigable waters of the United States. These clearances are related to the clearances over the navigable channel provided by the
7 June 11, 2021
existing fixed bridges, or the clearances which would be required by the USCG for new fixed bridges, in the vicinity of the proposed aerial transmission line. These clearances are based on the low point of the line under conditions producing the greatest sag, taking into consideration temperature, load, wind, length of span, and type of supports as outlined in the National Electric Safety Code:
500 700 750-765
1. Clearances for communication lines, stream gauging cables, ferry cables, and other aerial crossings must be a minimum of ten feet above clearances required for bridges,
unless specifically authorized otherwise by the District Engineer.
11. Corps regulation ER 1110-2-440 I prescribes minimum vertical clearances for power communication lines over Corps lake projects. In instances where both regulation and ER 1110-2-4401 apply, the greater minimum clearance is required.
b. Encasement: The top of any cable, encasement, or pipeline shall be located a minimum of
three feet below the existing bottom elevation of the streambed and shall be backfilled with suitable heavy material to the preconstmction bottom elevation. Where the cable, encasement, or pipeline is placed in rock, a minimum depth of one foot from the lowest point in the natural contour of the streambed shall be maintained. When crossing a maintained navigation channel, the requirements are a minimum of eight feet between the top of the cable, encasement, or pipeline and the authorized depth of the navigation channel. For maintained navigational channels, where the utility line is placed in rock, a minimum depth of two feet from the authorized depth of the navigation channel shall be maintained.
c.
As-Built Drawings: Within 60 days of completing an activity that involves an aerial transmission line, submerged cable, or submerged pipeline across a navigable water of the United States (i.e., Section 10 waters), the permittee shall furnish the Corps and National Oceanic and Atmospheric Administration, Nautical Data Branch, N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, Maiyland, 20910 with professional, certified as-built drawings, to scale, with control (i.e., latitude/longitude, state plane coordinates), depicting the alignment and minimum clearance of the aerial wires above the mean high water line at the time of survey or depicting the elevations and alignment of the buried cable or pipeline across the navigable waterway.
8 June 11, 2021
d.Aids to Navigation: The permittee must prepare and provide for USCG approval, a
Private Aids to Navigation Application (CG-2554). The application can be found at: https ://media.defense. gov /2017INov/20/200184613 5/-1 /- 1 /0/CG 25 54. pdf. The
completed application must be sent to the appropriate USCG office as indicated below:
i. Baltimore/Philadelphia Districts: Commander Fifth Coast Guard District,
431 Crawford Street, Room 100, Portsmouth, VA 23 704-5504, Attn: Mr. Matthew Creelman; by email to Matthew.K.Creelman2@uscg.mil; or by FAX to (757) 398-6303.
11. Pittsburgh District: Eighth Coast Guard District, Sector Ohio Valley, USCGC Osage, 300 McKown Ln, Sewickley, PA 15143; phone (412) 741-1180
Within 30 days of the date of receipt of the USCG approval, the permittee must provide a copy to the appropriate Corps district office.
27. PADEP Waiver: If the Corps determines a specific activity, which is eligible for a PADEP Non-reporting Waiver, has a significant adverse impact on life, property or important aquatic resources, the Corps may require the owner to modify the activity to eliminate the adverse condition or to obtain a Corps Individual Permit. In accordance with 33 CFR 325.7(a), "The District Engineer may reevaluate the circumstances and conditions of any permit, including regional permits, either on his own motion, at the request of the permittee, or a third party, or as the result of periodic progress inspections, and initiate action to modify, suspend, or revoke a permit as may be made necessary by considerations of the public interest. In the case of regional permits, this reevaluation may cover individual activities, categories of activities, or geographic areas."
28. Corps Water Releases: For projects located downstream of a Corps dam, the permittee should contact the appropriate Corps, Area Engineer Office, to obtain information on potential water releases and to provide contact information for notification of unscheduled water releases. It is recommended that no in-water work be performed during periods of high-water flow velocities. Any work performed at the project site is at the permittee's own risk.
29. State Authorization: The activity must receive state authorization. For the purpose of this requirement, any one of the following is considered as a state authorization:
a. A PADEP Chapter 105 Water Obstrnction and Encroachment Permit, including PADEP approved Environmental Assessment pursuant to 25 Pa. Code § 105 .15; or
b. A PADEP GP issued pursuant to 25 Pa. Code§ §105.441-105.449; or
c. A P ADEP approved Environmental Assessment for activities not otherwise requiring a PADEP permit pursuant to 25 Pa. Code§ 105.12; or
d. A PADEP Dam Permit, including maintenance or repairs of existing authorized dams,
including maintenance dredging; or
9 June 11, 2021
e. A PADEP Emergency Permit issued pursuant to 25 Pa. Code§ 105.64; or
f. A P ADEP permit for the constrnction of a bridge or culvert which allows for maintenance activities of bridges and culve1is; or
g. A PADEP Chapter 105 Dam Safety and Encroachment Enforcement Action.
30. Other Authorizations: Additional federal, state, and/or local authorizations or approvals may be required and where applicable must be secured by the applicant, prior to initiating any discharge of dredged and/or fill material, and/or the placement of strnctures into waters of the United States, including jurisdictional wetlands. These approvals include, but are not limited to:
a. A project specific 401 SWQC issued by PADEP or considered waived, consistent with Section 401 of the CW A.
P ADEP has issued 401 SWQC for activities authorized by PASPGP-6 with conditions. See General Condition 2 for conditions and for identification when a project specific 401 SWQC or a waiver thereof is required. If the permittee cannot comply with all of the conditions of the 401 SWQC previously issued for PASPGP-6, then the pe1mittee must obtain a project specific 401 SWQC or waiver for the proposed discharge in order for the activity to be authorized by PASPGP-6. The Cmps or ce1iifying authority may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality; and
b. Reporting Activities located within the designated CZM Areas. Require a CZMA
consistency determination issued by PADEP or a presumption of concurrence pursuant to Section 307 of the Federal Coastal Zone Management Act.
The District Engineer or P ADEP may require additional measures to ensure that the authorized activity is consistent with state CAM requirements; and
c. Fills within the 100-year floodplains. This activity must comply with applicable Federal Emergency Management Agency approved state or local floodplain management requirements.
31. Federal Liability: In issuing this permit and any subsequent activity verification, the federal government does not assume any liability, including but not limited to the following:
a. Damages to permitted project or users, thereof, as a result of other pe1mitted or unpermitted activities or from natural causes;
b. Damages to the permitted project or uses, thereof, as a result of current or future activities
undertaken by or on behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or strnctures caused by the activity authorized by this permit;
10 June 11, 2021
d. Design or construction deficiencies associated with the permitted work; and
e. Damage claims associated with any future modification, suspension, or revocation of the
PASPGP-6.
32. False and Incomplete Infonnation: The Corps may modify or rescind a previously issued project specific verification, if it determines that the original verification was issued based on false, incomplete and/or inaccurate information; or other info1mation becomes available whereby such action is necessary to ensure compliance with other federal laws and regulations.
33. Anadromous Fish Waters: To protect anadromous fish during their migration and spawning, no work can take place in the following anadromous fish wate1ways listed in the table below
from March 15 to June 30 unless approved in writing by the Corps. Questions on the applicability of this condition should be directed to the Corps, Philadelphia District.
IWaterwav nownstream extent Tnstream extent Unstream Tnstream atitude (N) on2:itude (E) 1elaware River in Rte. 220 Brid2:e DA/NY Border 41.999448 75.359573 Pennsvlvania
includin.,- W. Branch)
Lehi<'h River and confluence with 500 feet unstream of +0.690275 -75.503800 adiacent canals nelaware River he Cementon Dam ittle Lehi2:h confluence with 500 feet unstream of the +0.596318 -75.475570 Creek ehi<'h River owermost dam Rokendauoua confluence with State Route 4014 (West +0.793273 75.439262 Creek ehi.,-h River 'kenic Drive) Bushkill Creek ŭonfluence with ,oo feet unstream of the +0.694859 75.212406 nelaware River owermost dam IWaterwav nownstream extent Tnstream extent Jnstream Jnstream atitude (N) on2:itude (E) Brodhead Creek ·onfluence with 500 feet unstream of the 1.018667 75.201063 nelaware River Stroudsbur2: Water Co. Dam Bush Kill ·onfluence with ,oo feet uustream 1.111235 75.095824 nelaware River JfResica Falls Lackawaxen River ·onfluence with 500 feet unstream of the i0.984304 75.191569 nelaware River Woolen Mill Dam Dvberrv Creek 0onfluence with 'adwinDam H.612088 a 75.263391 ackawaxen River narbv Creek "onfluence with 'iOO feet unstream of ,9.907278 075.255432 nelaware River he confluence of Cobbs "reek and Darbv Creek
11 June 11, 2021
Schuvlkill River Rairmount Dam l500 feet uostream of the 40.326411 75.934417 Bini:raman St. Bridi:re in R eadin2: Pennsv lvania Neshaminv Creek ,....onfluence with l500 feet uostream of 140.143369 74.915828 Oelaware River he lowermost dam
34. Compliance Certification: Each permittee who receives a written PASPGP-6 verification letter from the Corps must provide a signed ce1tification documenting completion of the authorized activity and implementation of any required compensatmy mitigation. This ce1tification should indicate if the success of any required permittee-responsible mitigation was completed in accordance with the pe1mit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(1)(3) to confirm that the permittee secured the appropriate number and resource type of credits. The signature of the permittee is also required to certify the completion of the activity and mitigation. The completed ce1tification document must be submitted to the District Engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later.
35. Migratmy Birds and Bald and Golden Eagles: The permittee is responsible for ensuring that an action authorized by PASPGP-6 complies with the Migratmy Bird Treaty Act and the Bald and Golden Eagle Protection Act. The pe1mittee is responsible for contacting the appropriate local office of the USFWS to detennine what measures, if any, are necessary or appropriate to reduce adverse effects to migrato1y birds or eagles, including whether "incidental take" permits are necessaiy and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. The permittee should contact the appropriate local office of the USFWS to determine if such authorizations are required for a particular activity. Information on the conservation of migratory birds and Bald and Golden Eagles can be found at the following USFWS web site: http://www.fws.gov/northeast/pafo/
36. Migratory Bird Breeding Areas: Activities in waters of the United States, including jurisdictional wetlands, that serve as breeding areas for migrato1y birds must be avoided to
the maximum extent practicable. Recommendations pertaining to the conservation of migratmy birds can be found at the following USFWS web site: http://www.fws.gov/northeast/pafo/
By Authority of the Secretaiy of the Army:
LITZ JOHN THOMAS 1106467079 Olgltally signed by LITZ.JOHN.THOMAS.1106467079
• • • Date: 2021.06.24 16:54:1 s -04'00'
John T. Litz Colonel, U.S. Army Commander and District Engineer Baltimore District
12 June 11, 2021
PARK.DAVID.CHON Oigitallysignedby
PARK.DAVID.CHONGW0O.1044560808 GWQQ.1044560808 Date:2021.06.141026c03-04'00'
David C. Park Lieutenant Colonel, Corps of Engineers District Commander Philadelphia District
Colon&I, Corps of Engineers District Engineer Pi burgh District
13 June 11, 2021
PASPGP-6 PERMIT COMPLIANCE, SELF-CERTIFICATION - EXAMPLE
PASPGP-6 General Condition 34 requires submittal of a signed certification documenting the completion of the authorized activity and implementation of any required compensatory mitigation. This certification should indicate if the success of any required permittee-responsible mitigation was completed in accordance with the pe1·mit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(1)(3) to confirm that the permittee secured the appropriate number and resource type of credits. The signature of the permittee is also required to certify the completion of the activity and mitigation. The completed certification document must be submitted to the district engineer within 30 days of completion of the authorized activity 01· the implementation of any required compensatory mitigation, whichever occurs later. Below are Corps District mailing and email addresses, and a list of the information to be included as part of the certification submittal.
Project Name: Hershey's Mill Estates Sanitary
Sewer Replacement Applicant Name: East Goshen Municipal Authority
PADEP Permit No:
Corps Permit Number:
Wate1way:
Corps District:
GP081501222-005 and GP111501222-015
D Baltimore District
Date oflssuance: May 25, 2022
Date of Issuance:
County: Chester
U.S. A1my Corps of Engineers State College Field Office 163 l South Atherton Street Suite 101 State College, Pennsylvania 1680 l-6260 Email: NAB-Regulatory@usace.army.mil
F Philadelphia District U.S. Army Corps of Engineers Wanamaker Building
l 00 Penn Square East Regulat01y Branch Philadelphia, Pennsylvania 19107-3390 Email: PhiladelphiaDistrictRegulatory@usace.army.mil
D Pittsburgh District U.S. A1my Corps of Engineers, Regulat01y Branch William S. Moorhead Federal Building, 20th floor
I 000 Liberty A venue Pittsburgh, Pennsylvania 15222-4186 Email: Regulatory.Permits@usace.army.mil
The following information is required by PASPGP-6 General Condition 34:
D Date authorized work commenced. D Date authorized work completed. D Was all work, including any required mitigation, completed in accordance with your PASPGP-6 authorization, explain any deviations? D Was compensatory wetland/stream mitigation accomplished through an approved Mitigation Bank and/or In-Lieu fee program, if yes, attach proof of transaction, including resource type and number of credits purchased? Was pe1mittee compensatory wetland and/or stream mitigation required, if yes, was the required compensato1y mitigation completed in accordance with the permit and mitigation plan requirements? D Sign and date certification.
July 1, 2021
GHD
May 9, 2022
Mark Miller, Public Works Director East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Re: Proposal for Phase 1 Bog Turtle Survey East Goshen Township Proposed Sewer Rehabilitation East Goshen Township, Chester County, Pennsylvania
Dear Mr. Ellis:
FYI
Reference No. 11198802
GHD Services, Inc. (GHD) is pleased to submit this proposal to East Goshen Township. (Client) to conduct a bog turtle (G/yptemys muh/enbergi1) habitat assessment (Phase 1 survey) for a proposed sanitary sewer rehabilitation project located along the East Branch of Ridley Creek in East Goshen Township, Chester County, Pennsylvania (Site). The Site is generally located south of Paoli Pike, between N. Chester Road and the Applebrook Golf Club. This proposal provides a scope of work, cost estimate, and schedule for completing a bog turtle habitat assessment (Phase 1 Survey) for the Site.
1. Scope of Work
1.1 Bog Turtle Habitat Assessment & Report
A bog turtle habitat assessment will be conducted in accordance with the USFWS Guidelines for Bog Turtle Surveys (revised 2020) for all wetlands and streams on and within 300 feet of the Site. The Phase 1 survey will be conducted by Mr. Scott Bush, a USFWS recognized bog turtle surveyor. The habitat in each wetland on and adjoining the Site will be assessed for its suitability to support bog turtles based on the soil, plant community composition and structure, and hydrology. Documentation of each wetland/waterway assessed will be provided on USFWS Bog Turtle Habitat Evaluation Field Forms completed in the field as well as photographs.
GHD will prepare a Bog Turtle Habitat Assessment Report documenting the methodology and results of our bog turtle habitat assessment. GHD will provide a determination as to whether habitat suitable to
potentially support the bog turtle is present or absent on or adjoining the Site. Photographic documentation of the habitats present will be provided in the report. A draft copy of the Habitat
Assessment Report will be provided to you for review and comment prior to formal submission to the
USFWS for concurrence.
u11nu1t uwun 10,
410 Eagleview Boulevard Suite 110 Exton Pennsylvania 19341 USA T610 321 1800 F610 321 2763 W www.ghd.com
ISO 9001
UC1•llHII 011\li
frl:)1 § id
2. Business Conditions & Fee
We propose that the scope of work be performed in accordance with GHD's Standard Terms for
Professional Services (attached). The Scope of Work will be completed on a time and materials basis and our fee will not exceed the total estimated fee below.
Total Estimated Cost $2,500
If additional tasks are required beyond the proposed Scope of Work, GHD will submit a supplemental scope of work and cost estimate for your review and approval.
3. Schedule
GHD anticipates commencing with the fieldwork for the bog turtle habitat assessment within 5 days of receiving your authorization to proceed. If we identify potential habitat for the bog turtle on or adjoining the Site, we will verbally notify you immediately and work with you and USFWS to determine if additional studies are required. We will submit a draft copy of our report to you for review and comment prior to submitting the final report to USFWS.
Thank you for providing us with the opportunity to assist you on this project. If you would like us to proceed with the proposed Scope of Work, please sign and return a copy of GHD's Standard Terms for Professional Services to my attention. If you have any questions concerning this proposal, please feel free to contact me at (610) 646-7486 or scott.bush@ghd.com.
Sincerely,
GHD
Scott E. Bush, PWS
Senior Ecologist
SB/cm/1
Encl.
11198802-East Goshen Twp 2
East Goshen Township Sewer Rehab Scope, Fee, and Schedule per GHD proposal 5-8-2022 GHD Terms below.
Standard Terms for Professional Services
Reference No.: 11198802
GHD Limited ("GHD") and Client (as set out below) agree that any professional services performed by GHD for Client, relating to the scope of work, will be on the following standard terms:
1. Invoices for services rendered will be issued monthly payable on receipt. Amounts due will be increased at the rate of 1 1/2 percent per month after 30 days. GHD reserves the right, without penalty, to discontinue services in the event of non-payment of undisputed amounts. 2. GHD maintains statutory workers compensation insurance, and professional, pollution, general, auto, and employers liability insurance which GHD deems adequate. Certificates of insurance shall be provided on request. 3. GHD's services are solely for Client's benefit and may not be relied upon by any third party without GHD's express written consent. Any use, change, or distribution of Work Product without the written consent of GHD shall be at Client's risk and will not give rise to liability of GHD. 4. GHD shall perform its professional services in the manner consistent with the level of care and skill ordinarily exercised by other professional firms acting under similar circumstances and at similar times. GHD makes no other warranty, implied or expressed. 5. GHD shall indemnify and hold harmless Client for its services to the extent GHD's neglect or willful misconduct causes liability for the Client. Neither party shall be liable for any consequential loss, injury or damages suffered by the other party, including but not limited to loss of use, earnings, and
business interruption. 6. To the maximum extent permitted by law, GHD's liability and that of its employees, agents, directors, officers, and subcontractors to Client due to any negligent acts, errors or omissions, shall not exceed $1,000,000, except as to damages resulting from the gross negligence or willful misconduct of GHD. 7. Client acknowledges that the pre-existing presence, if any, of pollutants, and other potentially hazardous conditions at the project site were not caused by or are not the responsibility of GHD, and that this contractual arrangement does not transfer any legal responsibilities for such conditions to GHD. 8. GHD may terminate this Agreement for nonpayment or other default by Client. Terms agreed to under this Agreement shall survive any such termination. 9. Client hereby agrees that this agreement may be assigned to another entity within the GHD group of companies that will be directly or indirectly wholly-owned by GHD Group Pty Ltd. (a "Related Entity''). Any such Related Entity shall assume all of GHD's liabilities, duties and obligations in, to, and under this Agreement. Client hereby agrees that this assignment may be effected without any further notice or action on the part of GHD. Upon request, Client agrees to execute and deliver any further documents as may be reasonably requested by GHD or its successor to evidence such consent and/or assignment.
These Terms and Conditions are hereby accepted this jo-f-day ofJum;_..202z.
:::•;,.,.,., l,r
Title:
I have authority to Authorize the requested services
GHD f One Page Standard Terms I Rev. 0 - 07/01/2015 This completed form is a quality record
FYI
PMAA is pleased to announce the creation of the Municipal Authority
Communications Award!
Municipal authorities in Pennsylvania have been providing the citizens of our Commonwealth with a wide array of critical services for over 80 years. All too often authorities do their work efficiently and quietly, in the background, with their good work taken for granted, a consequence of the safe, reliable, and economical services provided. The better you do your job, the more likely you go unnoticed, and perhaps, unfortunately, underappredated.
In an effort to recognize and value the integral work done by authorities, PMAA is pleased to announce the creation of the Municipal Authority Communications Award.
Authorities are a success story that needs to be told. They meet the continuing environmental and regulatory challenges of an evolving world. They work in concert with their municipalities to manage and support the growth and vitality of our communities. In a time when privatization and monetization threaten this model of service, the authority story needs to move to the forefront more than ever before.
What does your authority do to raise the awareness of your projects and services? How do you communicate needed information, your messaging, YOUR STORY, and the VALUE you bring to your customers?
The Award will recognize member authorities that have established an effective communications strategy for their customers. Design, innovation, creativity, comprehensiveness and, of course, effectiveness are included in the award criteria.
Finalists will be announced, in August, with the awards presented on September 12th during the Awards Banquet at the Annual Conference in Erie.
In addition to finalists and winners in each category, honorable mention recognition will be given for excellent submissions.
Thank you for your membership and support of PMAA!
Communication can be delivered is many ways. Your authority may employ some, many or maybe all of the following:_
►Email blasts ►Text alerts ►Robo calls ►Information on billings ►Direct mailings ►Newsletters ►Press releases ►Billboards ►Newspaper ads ►TV ads ►Radio ads ►Website ►Social media ►Brochures ►Posters ►Banners ►Take away items
Your communication outreach could Include Information and education touchpolnts such as:
►Tours ►Community events ►Presentations before
schools and civic organizations ►Communications
unique to your authority
Municipal Authority Communications Award Application
Contact Name: Title: ---------------- --------------
Authority: --------------------------------
Address: ----------------------------------
City, State Zip: --------------------------------
Email: ________________ _ Phone: _____________ _
Authority Size:
Please complete, where applicable, in order to determine authority size:
►Number of connections:
►Number of customers:
►Population served:
►Annual gross revenues:
Submit the following with application:
1. An Executive Summary of your communication strategies, mediums utilized, etc. (approximately 500 words)
2. Attachments, links, or hard copy samples. Event and presentation outreach examples can be described in summaries with any accompanying pictures or images.
Please check what items you are submitting for review and evaluation: D Email blasts □Website □Text alerts □Robo calls □Information on billings □Direct mailings □Newsletters □Press releases D Billboards
· □ Social media □Brochures □Posters □Banners □Take away items □Tours D Community events
,- Finalists will be notified in early August. Authority
communications will be highlighted, and winners announced during the Annual Awards Banquet September 12th at the Annual Conference in Erie. All finalists will receive award
recognition as well.
,. Award winners will
not be eligible for consideration of the Award for 5 years and other finalists for 3 years.
Honorable mention recognitions are encouraged, with all other member authorities, to submit communication award applications
□Newspaper ads □Presentations before schools and civic organizations □TVads □Communications unique to your authority □Radio ads
Submit applications to the PMAA office no later than July 1st, 2022.
►Via email to info@municipalauthorities.org ►Via mail to PMAA, 1000 North Front Street, Suite 401, Wormleysburg, PA 17043
TheAuthorities FYI
PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION
TO:
FROM:
DATE:
PMAA Member Authorities
Douglas E. Bilheimer Executive Director
June 1, 2022
Notification of Voter Delegate
The PMAA Board of Directors' voted April 18, 1994, to implement, by its resolution, certain administrative recommendations set forth by the PMAA By-Law Revision Committee. These do not require prior amendment of the By-Laws because the existing By-Laws (Article IX, Sections 1 and 2) do provide the basic authorization for voting at meetings: one vote per active member to be cast by a delegate chosen by its own board of directors. The procedures approved by the Board are as follows:
1. Fifteen days before the meeting, each member authority will notify the Executive Director of the name of its official voting at the meeting and also the name of an alternate delegate, both of whom have been approved by the members' Board of Directors. The delegates shall either be an elected or an appointed official of the applicable authority.
2. As part of the registration procedure at the Annual Meeting, the named delegate shall be handed a "card", which he or she may hold up to cast the vote of that authority. It shall be the responsibility of each delegate, in the event he or she is not on the floor, to hand the card to the appropriate alternate delegate.
3. The presiding officer at the Annual Meeting shall have the discretion in each vote to designate voting by voice, by-a show of delegatecards, or by written ballot, unless upon motion duly made and adopted the Body itself votes to require written ballots.
4. In pursuance of the powers of the presiding officer, the President may designate a time limit for floor remarks by each person speaking, which shall be stated by the presiding officer at the opening of the
meeting.
Please note, this form does not need returned to our office if no one from your authority is attending the conference.
DEB/kaw Attachment
1000 North Front Street, Suite 401, Wormleysburg, PA 17043 717-737-7655 . 717-737-8431 (f}, info@municipalauthorities.org www.municipalauthorities.org ¾ facebook.corn/pamunicioalauthoritiP.!':ffi'I link,,.nin 1"1'\m/rnmn'>nuln¿m• ,_,_, __ , __ .... -.,À, - -
Notification of Voting Delegate & Alternate
Our Authority's Board of Directors hereby name the following individuals to serve as Voting Delegate and Alternate Delegate:
Voting Delegate
Name:
Title:
Alternate Delegate
Name:
Title:
Authority submitting this information:
Authority: _______________ _
Address:
City: _______ _ State: __ Zip: __ _
Designated Voting Delegate or Alternate Delegate will receive an identification card at the Registration Booth at the PMAA Annual Conference.