Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

November 14, 2022

7:00

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting

2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS

3. SEWER REPORTS

a. Director of Public Works Report. b. Pennoni Engineer's Report. c. Big Fish Environmental Report

4. APPROVAL OF MINUTES

a. October 10, 2022

5. APPROVAL OF INVOICES

Pennoni Invoice #1141259 Pennoniinvoice #1141260 Pennoni Invoice # 1141261 Pennoni Invoice # 1141262 Excelsior Invoice #0911231-IN Yale Invoice #120860167.001 Lowes Invoice

6. LIAISON REPORTS

7. FINANCIAL REPORTS

a. October Financial Report

8. OLD BUSINESS

a. Hershey Mill Trunk Line

F:\Data\Shared Data\Agendas\Municipal Authority\2022\11-14-2022 - .doc

$ 501.53 $ 519.32 $ 3,504.25 $ 580.25 $ 5,221.00 $ 259.80 Paid 10/13 $ 58.20 Paid 10/13

9. 2022 Goals:

Goal Status January, February, Ma rch,Apri I, M ay,J u ne ,July ,August, d September and October were in compliance and met Ridley Creek Plant Compliance all requirements *Note DEP Annual lnsp.

Continue to Monitor Upgrades at WGSTP and On -going Westtown Way Pump Station Continue to Implement Infiltration and Inflow On-going for the Sewer System Caustic Soda Project Equipment order - Material have been ordered Pumps have arrived -Scheduled install 11/21/2022 Replace sewer line Hershey Mill Estate trunk The pipe was ordered July 20th Delivered on Sept. 7'h

line replacement The Bid has been advertised

Hibberd Lane is on line. Ridley Creek Plant is the next Three new meters for Ridley Creek Collection meter, in the process of replacing the meter at the plant. • Ridley Meter installed - Completed

10. NEW BUSINESS

a. Mike Ellis to discuss UV Mechanical and Electrical Contracts

11. CAPACITY REQUESTS

a. 14 Reservoir Road residential lot

12. ANY OTHER MATTER

13. CORRESPONDENCE AND REPORTS OF INTEREST

14. PUBLIC COMMENT

15. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2022\11-14-2022 - .doc

AREA CODE 6 1 0

692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

15B0 PAOLI PIKE, WEST CHESTER, PA 19380-6199

To:

From:

Municipal Authority

Mark Miller

Re: November 14, 2022 Monthly Report

Monthly Flows:

Meters:

C.C. Collection:

C.C. Interceptor:

The average daily flow to West Goshen was 659,687 per day.

The meters were read on a daily basis. No problems to report.

The pump stations were visited on a daily basis, the wet well was washed down and the level rods were cleaned. The generators were under

power for one hour each week. The generators were serviced for the winter. We were called out to 42 Waterview Lane for a sewer lateral break, since the area was recently dug by an Aqua Water subcontractor we had Aqua send out their contractor who did the hydro excavation, the pipe turned out to be ok. However, the manhole tie in was not to our standards so we went back on Monday and replaced the piping in the

manhole.

R.C. Collection: The pump stations were visited on a daily basis; the pump station wet wells were washed down along with the level rods. The Generators were serviced as routine maintenance for the winter. We installed two

batteries I the Hunt Country unit.

Ridley Creek Plant: The new meter was put in service; we have to do a zero flow test on the unit, which we will setup with John Laidley in the next couple of weeks. The boardwalk was completed. We replaced the blower motor on

number 4; lenni was on hand to do the wiring of the blower motor. I ordered a blower to replace number 5, the cost was $5,221.00 the supplier had one on the shelf so I had them ship it to us and it should arrive on Tuesday with the install scheduled for Wednesday. When I spoke with the sales clerk I asked to check on availability for another blower, he said they were 18 to 20 weeks out. I ordered a second blower, which we will have, for a spare. Since the SBR is going on 11

Alarms:

PA 1 Calls:

Monthly Rainfall:

years in service we are starting to have equipment failures and components are not readily available so I am ordering some of the components that should be on the shelfs. For the electronics, we have been ordering different components that John Laidly have recommended.

We responded to 18 alarms for October.

We responded to over 55 PA One Calls for the month October.

5.60 inches of rain for the month of October.

Lateral repairs or Caps: We had over three dozen cleanout repairs for October.

[Photograph showing construction of an elevated wooden boardwalk/pathway in a wetland area, with stacks of lumber, workers in high-visibility shirts, an auger machine, and yellow foundation posts.]

[Photograph showing two workers constructing the wooden framing and support posts for an elevated boardwalk over a concrete structure near wetland vegetation.]

[Photograph showing a completed elevated wooden boardwalk with railings and solar lights, leading through a natural wetland area toward trees.]

[Photograph showing an elevated wooden walkway with side railings and an observation bump-out platform overlooking a wetland area and tree line.]

November 4, 2022

To: Board of Supervisors

From: Jim Kane Address: 42 Lochwood Ln RE: Mark Miller- East Goshen Public Works Dept.

Board of Supervisors:

The purpose of this letter is to highlight the outstanding response and action taken by Mark Miller, Director of Public Works, and his team. In today's environment, we are all bombarded with negative feedback and criticism on multiple fronts. Therefore, I want to take the opportunity to provide my appreciation for the rapid attention to a sewer issue that resulted in an extraordinary and rapid display of township and contractor resources.

In the overnight hours of Wednesday, Nov. 2nd, we experienced a clogged sewer in which Roto-Rooter arrived the next morning and fixed the problem. However, they also stated that my sewer main was collapsed near the street and promptly indicated that they could rectify the issue the next day for $6K.

I left a message for Mark since it appeared that the alleged pipe failure was in the exact area of the water main upgrades that occurred earlier this year on Lochwood Ln. Mark contacted me within 30 minutes of my message and was at my property l O minutes after our conversation. Based on the location of the supposed collapse, Mark had township resources in addition to the Aqua contractor on site within the hour.

After excavating the area around the potential issue, it was determined that there was not a collapsed sewer main. I regret the vast amount of resources that were utilized for a problem that was non-existent based on the misdiagnosis of Roto-Rooter. However, I thank Mark for his exceptional efforts and professionalism in coordinating a tremendous response on behalf of the township in addition to his genuine concern that the issue was resolved.

Sincerely,

Jim Kane

EAST GOSHEN MUNICIPAL AUTHORITY

ENGINEER'S REPORT

November 9, 2022

Ridley Creek Sewage Treatment Plant (RCSTP)

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

T: 302-655-4451

F: 302-654-2895

www.pennoni.com

• Caustic Soda Conversion-We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We have prepared the PADEP tank permit application and have coordinated with a certified tank installer to perform an inspection when the system is installed by the PWD and to sign-off on the permit application. We are awaiting their fee quote for that inspection. The permit application will be submitted to PADEP after installation with the certified installer's certification. We are coordinating with PADEP for the timing to start using the system after the application is submitted and associated duration for issuance of the permit.

• UV Disinfection System - Glasco's shop drawings for the system were returned "Approved as Noted" on November 3. The lead time for the equipment is about 4 months. We therefore expect the equipment to be delivered in late February or early March 2023.

The bidding schedule remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants, which we tentatively understand is expected to occur in November. The proposed bidding schedule follows:

• Bid Advertisement -early December • Bids Due -early January • Award Consideration -January 9, 2023 at the Municipal Authority Meeting

We request authorization from the Municipal Authority to advertise the solicitation in December.

• Generator #2 Replacement-We are continuing with design and coordination with vendors on pricing for various size generators.

Westtown Way Pump Station

• No update since our last report.

Sanitary Sewer Pipe Rehab

• Supplee Valley- No activity since our last report. We will finalize an updated construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood. We anticipate bidding the project in late December with construction in early 2023.

• Hershey's Mill Estates -The bid documents were finalized, and the construction solicitation went live on PennBid on November 1. We have responded to prospective bidder's questions. The bid schedule follows:

• Non-Mandatory Pre-Bid Meeting -November 10 at the site • Bids Due -December 5 • Award Consideration - December 12 at the Municipal Authority Meeting

Since a LSA grant application was submitted for this project, construction contracts cannot be awarded if/until the grant is "approved". The above schedule is based upon the grant award notifications occurring in November before bids are due. If grant award notifications have not occurred by November 28, the bid deadline will be extended by one month.

EGMAU22001 East Goshen Municipal Authority

November 9, 2022 Page 2 Engineer's Report

• Ridley Creek Exposed Sewer Rehab - We obtained emergency permit authorization from PADEP for the proposed concrete encasement of the sewer main that is exposed in the stream bed. A full permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization.

l&I Program

• No activity since our last report.

New Connections

• Sewer Extension Study- No activity since our last report.

Industrial Pretreatment Ordinance

• No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.

END OF REPORT

P:\Projects\EGMA\Memos to Board\2022\Engineers Report 2022·11·09.docx

Big Fish Environmental Services Inc.

Executive Summary

RCSTP Monthly Operations Report

November 2022

The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality for the month of October. All supplemental reports were submitted for the month of September with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued during October. Chemical usage utilized for, and total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a daily average of 69.1 as compared to the previous month at 64.3 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.

Table 1 October 2022- Final Effluent• Outfall 001

Flow CBOD5 Total Nitrogen TSS NH4"N Total Phosphorus Fecal Coliform Ultraviolet Copper, Zinc, NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ lbs/ Geo Geo light Total Total Discharge limitations Average mg/L month mg/L month mg/L month mg/L month mg/L month Mean Mean intesity

0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000

Inst. Max 20 94 15 94 5 1 Report Report Report

Sample Date October 4, 2022 0.361 2.0 6.0 5.81 17.5 4.0 12.0 0.10 0.30 0.16 0.48 7 0.8451 NS NS NS

October 11, 2022 0.311 23.1 59.9 5.76 14.9 7.5 19.5 0.10 0.26 0.11 0.29 8 0.9031 NS NS NS

October 18, 2022 0.334 2.0 5.6 5.54 15.4 5.5 15.3 0.10 0.28 0.10 0.28 11 1.0414 NS NS NS

October 25, 2022 0.308 2.0 5.1 6.42 16.5 4.7 12.1 0.10 0.26 0.15 0.39 1 0.0000 NS NS NS

Average 0.329 7.3 19.2 5.88 16.1 5.4 14.7 0.10 0.27 0.13 0.36 7 0.6974 NA NA NA

Minimum 0.308 2.0 5.1 5.54 14.9 4.0 12.0 0.10 0.26 0.10 0.28 1 0.0000 NA NA NA

Maximum 0.361 23.1 59.9 6.42 17.5 7.5 19.5 0.10 0.30 0.16 0.48 11 1.0414 NA NA NA

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported to date for outfall 001 October 2022. The final effluent CBODs test result for October 11th is under review. The test result isn't consistent with the remaining water quality test results for the same day suggesting the concentration should be less than reported. The month to date average total phosphorus was reported as 0.13 mg/L as compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 5.4 mg/L as compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment process performed well during October. The sequencing batch reactors (SBRs) numbered 2, 3 and 4 were in service.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Discharge to the Applebrook irrigation lagoon, outfall 002 was discontinued through October 2022.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.

Table 3 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during October 2022.

Table 3

October 2022 - Influent Wastewater

Phosphorus,Total,

Flow BOD, CBOD5 TSS NH.-N TKN, mg/L mg/l

Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

MGD Average 335 1,098 NA NA 310 1,001 31 100 48 301 9.1 57

Sample Date October 4, 1011 0.398 168 558 37.8 126 190 631 23.8 79 34.4 114 3.12 10.4

October 11, 1011 0.360 264 792 204 612 217 651 27.9 84 41.5 124 4.31 12.9

October 18, 1011 0.363 252 762 220 665 250 756 33.2 100 3.50 10.6 5.12 15.5

October 15, 1011 0.385 204 655 214 687 222 713 27.7 89 42.4 136 3.99 12.8

Average 0.376 222 692 169 522 220 688 28 88 30.5 96 4.14 12.9

Minimum 0.360 168 558 37.8 126 190 631 24 79 3.5 11 3.12 10.4

Maximum 0.398 264 792 220 687 250 756 33 100 42.4 136 5.12 15.5

The foam on the SBR surface remained consistent with September with approximately 10% to 20% coverage of the surface area. The foam thickness is approximately 2 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.

PA DEP

Annual inspection. No violations were observed.

Pennoni Associates

No activity

Page 2 of3

Chemical Usage:

October 2022

Chemical Daily Average Total Monthly

Soda Ash, pounds 300 9,300

Aluminium Sulfate solution, gal 69.1 2,142

Flow data:

October 2022

Flow Meter Location Total Volume for Average Daily Daily Maximum Month, MG Flow, gpd Flow, gpd

Influent Wastewater to 11.193 385,964 600,760 Screening Building*

Influent Wastewater to 12.013 SBRs* 414,230 576,000

Internal Recycle** 0.844 29,119 59,512

Treated Effluent to Disc 11.577 Filters 399,192 556,512

Final Effluent Discharge

9.208 318,000 483,000

Applebrook Golf Course 0 0 0

During October, the average monthly influent wastewater flow measured at the "field" flow meter was 385,964 gallons/day as compared to the influent flow into the SB Rs as 414,230 gallons/day. The difference between the daily averages is 28,266 gpd, which is consistent with the average daily volume of internal recycle flow of 29,119 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly

Cleaned buildings and laboratory

Page 3 of3

pennsylvania

DEPARTMENT Of ENVIRONMENTAL

,_, PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

Permit Number Inspection Date Entry Time Exit Time Inspection Type Inspection ID I PA0050504 I I 10/21/2022 I I 09:10 I I 10:32 I I CEI I I 3444017

Municipality East Goshen County Chester

Facility Name RIDLEY CREEK STP Permittee EA ST GOSHEN MUNI AUTH Name CHESTER CNTY

24-Hour Emergency Contact Person/Phone Matthew Mullin/ (610) 675-7044 Email ----

Physical Location Address 1751 TOWNE DR, WEST CHESTER, PA, 19380

Permit Expiration Date 03/31/2027 Next Submittal ---- ---- DueDate

Violations*

No Violations Noted

Person Interviewed Matthew Mullin Date 10/21/2022 Inspector WILLIAM J COLLINS Date 10/21/2022

Signature Signature

@Jt]

Phone Number

\Jfd(

Phone Number (610) 675-7044 (484) 250-5139

Title---- Title WTR QLTY SPCST

Email---- Email wilcollins@pa.gov

I

This document is official notification that a representative of the Department of Environmental Protection inspected the above facility. The findings of this inspection are shown above and on any attached pages. * Any violations which were noted during the inspection are indicated. Violations may also be discovered upon examination of the results of laboratory analyses of the discharge and/or review of Department records.

Page 1 of 21

• pennsylvania JJI/II DEPARTMENT OF ENVIRONMENTAL '1111!!1/ PROTECTION

Facility Details Section

Responsible Official

Business Phone

Permittee Address

Certified Operator

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

DEREK F DAVIS Title TOWNSHIP MGR

(610) 692-7171 Email ddavis@eastgoshen.org

1580 PAOLI PIKE, WEST CHESTER, PA, 19380-6107

TOWLER SCOTT A I Client ID 196106

Certificates A,E-1,2,3,4 I Certification Status Active I Expiration Date 12/31/2023

Is a Copy of the permit(s) on-site? Yes

Has the interviewed operator/person reviewed the facility's permit(s)? Yes

Non-Compliances

1. 25 Pa. Code 302.1201: Circuit rider failed to make available the general work plan and/or the system specific management plan.

2. 25 Pa. Code 302.1201: Circuit rider failed to make available the general work plan and/or the system specific management plan.

Comments

This CEI was conducted alongside Matthew Mullin. Headworks- good condition SBR- sbr 1 is offline, 2,3 and 4 were functioning correctly Post EQ- no issues observed

Disc filters- working properly UV- no issues Sludge holding- no issues Final effluent appeared clear Receiving stream was in good condition

Participants: ----

Page 2 of 21

• pennsylvania rJlf/U DEPARTMENT OF ENVIRONMENTAL ,aa PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

1 Mon,Rpts&Rcds: 00007247 - SBR PLANT

Influent Sampling

MRR-1 Is influent monitoring required by the permit?

MRR-2 Are influent samples collected?

MRR-3 Is the influent sampling location prior to all treatment?

MRR-4 Is the influent sampling location prior to all return flows?

MRR-5 Are representative influent samples collected?

Effluent Sampling

MRR-6 Is the effluent sample collected at the location identified in the permit?

MRR-7 Where is the effluent sample collection location?

MRR-8 Is the effluent sample location after all treatment?

MRR-9 Are representative effluent samples collected?

Sample Collection

MRR-10 Are samples collected as required by the permit?

MRR-11 Is proper sampling equipment/ containers used during collection?

MRR-12 Are the proper type of samples collected in accordance with the permit?

MRR-13 Are the samples collected at the frequency in accordance with the permit?

MRR-14 Is the proper sample size (minimum aliquot 100 ml) collected?

MRR-15 Is proper temperature control provided during collection, storage and shipping?

MRR-16 Is the temperature of the sampler or storage refrigerator monitored using an NIST

traceable thermometer and recorded?

MRR-17 Is the sample storage temperature <=6 °c?

MRR-18 What is the sample storage temperature?

On-site Lab Accreditation-by-Rule

MRR-19 Does the facility analyze accredited-by-rule parameters only?

MRR-20 Which accredited-by-rule parameters are analyzed by the on-site lab?

MRR-21 Is the on-site lab registered?

Yes

Yes

Yes

Yes

Yes

Yes

End of UV

Yes

Yes

Yes

Not Observed

Yes

Yes

Yes

Not Observed

Yes

Yes

4.5 C

Yes

pH DO

Yes

Page 3 of 21

pennsylvania

DEPARTMENT OF ENVIRONMENTAL

,_, PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

I MRR-22 Laboratory Registration ID

Lab Accreditation

MRR-23 Does the on-site laboratory analyze permit parameters?

MRR-29 Are permit parameters analyzed by a contract lab?

Contract Lab Name, City, Phone MRR-30

Notes: Suburban Testina Labs 1037F MacArthur Rd. Readina PA 19605 610-375-4090

MRR-31 Contract Laboratory Accreditation ID

MRR-32 Is the contract lab accredited for those permit parameters?

MRR-33 Have any changes occurred with the accredited-by-rule or the accredited parameters

or labs?

Analysis

MRR-35 Are approved test methods (per 40 CFR Part 136 or others) used for permit

parameters?

MRR-36 Are the methods used sufficiently sensitive for permit parameters?

MRR-37 Are the samples analyzed within the required holding time?

MRR-38 Are laboratory equipment/meters calibrated in accordance with the manufacturers'

specifications?

MRR-39 Are laboratory meters operated and maintained in accordance with the manufacturers'

specifications?

MRR-40 Are pH buffers and other reagent standards current?

Records

MRR-41 Are sampling, calibration, laboratory results, chain-of-custody and other required

records readily available for review and complete?

MRR-42 Do the sampling records include collector, date/time, location information?

MRR-43 Do the analysis records include the analyst's name, the analysis date and time, the test

method used, the quantitation limits, and the results?

MRR-44 Are the required facility records retained for a minimum of 3 years?

MRR-45 Are the required sludge use and disposal records retained for a minimum of 5 years?

MRR-46 Was access provided to information or to facility records upon request?

Reports

MRR-47 Identify the month/year of the DMRs and supporting data reviewed.

MRR-48 Are the reviewed DMRs and supplemental reports properly completed?

MRR-49 Are the reviewed bench sheets/lab reports consistent with the reported data?

15-05032 I

No

Yes

See notes

06-00208

Yes

No

Not Observed

Not Observed

Not Observed

Not Observed

Not Observed

Yes

Yes

Yes

Yes

Yes

Yes

Yes

4/'22-8/'22

Yes

Not Observed

Page 4 of 21

• pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

MRR-50 Are samples collected more frequently than required in the permit?

MRR-51 Are additional sample results incorporated into the DMR calculations?

MRR-52 Are DMRs submitted on time?

MRR-53 Are the required supplemental reports submitted?

MRR-54 Is the facility using the eDMR system, if required?

2 Flow Measurement: 00007247 - SBR PLANT

Flow Measurement

Q-2 If influent flows are measured, are they measured before all return lines and after hauled-in waste?

Q-3 Is a flume present?

Q-6 Is a weir present?

Q-7 Are weirs clean with a visible air space below nappe?

Q-8

What is the max flow that can be measured at the primary device (flume or weir)?

Meter & Recorder

Q-9

Does the permit require continuous flow monitoring and recording?

Q-10 Does the facility have the required flow monitoring and recording capabilities?

Q-11 What type of flow meter is used?

Q-12 What type of flow recorder is used?

Q-13 Are the meter and recorder operable and operating?

Q-14 What is the date of the most recent flow meter calibration?

Q-15 What is the calibration range of the flow meter?

Q-16 What is the flow range of the recorder?

Q-17 What is the current flow meter reading (MGD or gpm)?

High Flows I Q-18 Does the permit require a High Flow Management Plan?

3 TP Treatment Plant: 00007247 - SBR PLANT

Yes

Yes

Yes

Yes

Yes

Not Applicable

No

Yes

Yes

3.0 MGD

Yes

Yes

Ultrasonic

Totalizer 7-day Chart

Yes

9/'22

Unknown

0-2500 gpm

186 gpm

No

Page 5 of 21

• pennsylvania J,a/J DEPARTMENT OF ENVIRONMENTAL ,ai!!9 PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

Treatment Units

TP-1 Are all treatment units operable?

TP-2 Are the treatment units/equipment as described in the WQM permit(s) or in the previous inspection report?

Stand-by Power

TP-7 Is stand-by power provided?

TP-8 Type of Stand-by Power

TP-9 How often is the stand-by power unit maintained?

TP-10 How often is the stand-by power unit exercised?

TP-11 Is the stand-by power unit exercised under load?

TP-12 Is the stand-by power system operable and maintained?

Alarms

TP-13 Is an alarm system available?

TP-14 Type of Alarm

TP-15 How often is the alarm system tested?

TP-16 What conditions trigger an alarm? Select all that apply.

TP-17 Is the alarm system(s) operable?

Chemicals

TP-18 Are chemicals used for treatment or otherwise added to the waste stream?

Which chemicals are added? TP-19

Notes: Soda ash/ Alum/ Polvmer What is the purpose of the chemical addition? TP-20

Notes: oH adiustment/ Phos removal/ Coaaulation of solids Where are the chemicals added? TP-21

Notes: SBR/ SBR/ Centrifuae

TP-22 Are chemicals properly handled and stored to prevent a pollution incident?

Bypasses I TP-23 Did a treatment plant bypass occur since the last inspection?

Yes

Yes

Yes

Emergency

generator

Quarterly

Weekly

No

Yes

Yes

Auto Dialer

Weekly

Power failure High level Pump faults Pump failure

Yes

Yes

See notes

See notes

See notes

Yes

No I

Page 6 of 21

• pennsylvan;a f,al!j DEPARTMENT OF ENVIRONMENTAL - PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

Planned Changes I TP-35 Have any changes (new pollutants, different or increased volume or loadings) to the waste stream from industrial or hauled-in wastes occurred since the last inspection?

4 O&M: 00007247 - SBR PLANT

O&M

OM-1 Which of the following treatment plant and equipment records are available?

OM-2 Is a daily operations log on-site?

OM-3 Is the daily operations log up to date?

OM-4 Which operational conditions/actions are recorded in the log?

OM-5 Are process control parameters monitored? (Record the monitoring frequency and current results)

OM-6 Is an influent/process control supplemental report form completed and submitted with the DMR?

OM-7 Does the daily operations log include maintenance and repair records?

OM-8 Is a routine preventative maintenance (PM) schedule and log maintained?

OM-9 Is a repair log on-site?

OM-10 Are the PM and repair logs up to date?

Were major equipment repairs/replacements done since the last inspection? OM-11

Notes: SBR blowers

OM-12 Is a spare parts inventory, either written or electronic, maintained?

OM-13 Are spare parts and equipment (pumps, motors) maintained on-site or readily

available?

Solids Management

OM-14 What is the sludge storage capacity?

OM-15 How much sludge was removed from the facility in the past year?

OM-16 How does the facility determine how much sludge to waste?

No I

O&M Manual

As-built drawings Maintenance

schedule Equipment

Manuals

Yes

Yes

Observations

Process adjustments

Problems or

Concerns

Yes

Yes

No

Yes

Yes

Yes

Yes

Yes

Yes

Unknown

45.8 dry tons

MLSS results

Page 7 of 21

• pennsylvan;a rJ/1/B DEPARTMENT OF ENVIRONMENTAL - PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

OM-17 Is sludge/biosolids production & disposal information submitted on the applicable supplemental report form with the DMR?

OM-18 Does the facility test the removed sludge for %TS?

OM-19 Who provides sludge hauling/disposal/land application?

OM-20 Where is the sludge disposal/biosolids application location?

OM-21 How and where are other solid materials, such as collected screenings and grit,

disposed?

OM-22 Has the facility obtained or assured that contracted agents have the necessary permits

and approvals for the disposal of solid materials?

OM-23 Are solid materials handled and disposed of in compliance with a disposal permit and requirements?

OM-24 Is the facility in compliance with all other Part C Special Conditions regarding Solids

Management?

Hauled in Wastes I OM-25 Does the facility accept hauled-in wastes?

Stormwater I OM-37 Does the permit include a special condition or other requirements regarding stormwater management?

Special Conditions

OM-42 Is the facility subject to industrial pretreatment requirements, or does the permit include a Part C Special Condition regarding Industrial Pretreatment?

OM-45 Does the permit contain a condition regarding whole effluent toxicity (WET) tests?

OM-48 Are any other special conditions in the permit not covered in this inspection report?

5 DP Discharge Point: 001 - OUTFALL 001

Outfall

DP-1 Outfall Observations

DP-2 Were field measurements taken?

DP-4 Were effluent samples collected for laboratory analysis?

Downstream

DP-10 Is the receiving stream clear of floating or deposited materials, scum, sheen, foam, oil, grease or other substances associated with the discharge?

DP-11 Were downstream field measurements taken?

DP-13 Were downstream samples collected for laboratory analysis?

Upstream

Yes

Yes

Charles Blosenski Lanchester

Landfill

Dumpster

Yes

Yes

Yes

No I

No I

No

No

No

See photo

No

No

Yes

No

No

Page 8 of 21

• pennsylvan;a

DEPARTMENT OF ENVIRDNMENTAl PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

DP-19 Was the stream observed upstream from the outfall?

DP-20 Were upstream field measurements taken?

DP-22 Were upstream samples collected for laboratory analysis?

6 CV Conveyance: 00007247 • SBR PLANT

Collection System

CV-1 Does the permitted entity own, operate & maintain the entire collection system?

CV-4 Is collection system maintenance performed?

CV-5 Is maintenance regularly scheduled?

CV-6 Is maintenance done as problems occur?

CV-7 Which types of maintenance are performed?

Yes

No

No

Yes

Yes

Yes

Yes I Jetting/televising

CV-8 Does the system experience infiltration and/or inflow that causes or could cause O&M problems or interferes with treatment? Yes

CV-9 Is an l&I program in place? Yes

CV-10 Select the l&I detection work performed since last inspection Televising

CV-11 Select the 1&1 removal work performed since last inspection Pipe Repair

Sanitary Sewer Overflows I CV-12 Have any sanitary sewer overflows occurred since Lhe last inspection? No

7 PS Pump Stations: 00007247 - SBR PLANT

Pump Stations

PS-1 How many pump stations are part of the facility's collection system? 2

PS-2 Are pump station flows recorded? Yes

Metered

PS-3 How are flows measured? Estimated from pump

run times

PS-4 What type of flow meter/sensor is in use? Daily Magnetic

PS-5 When was the most recent flow meter calibration done? 9/'22

PS-7 Are pump stations monitored with alarms? Yes

Page 9 of 21

• pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

PS-8 Are the alarms operable?

PS-9 Are the pump stations equipped with backup auxiliary power?

PS-10 Type of Stand-by Power

PS-11 Is the stand-by power system operable?

PS-12 Is the stand-by power system maintained in accordance with manufacturer's recommendations?

PS-13 How often is the stand-by power unit maintained?

PS-14 How often is the stand-by power unit exercised?

PS-15 Is the stand-by power unit exercised under load?

OpCert: 00007247 • SBR PLANT

Operator Certification

OP-1 Is a properly certified operator employed for the treatment plant?

OP-2 Is at least one collection system pump station part of the permitted facility?

OP-3 Is an operator with a valid E-4 certificate employed for the operation of the facility's collection system pump station(s)?

OP-4 How many properly certified available operators make process control decisions at this facility?

OP-5 Is at least one available operator's current certificate displayed at the treatment plant?

OP-6 Have the available operators been provided with a copy of the current NPDES/WQM Permits?

OP-7 On which days of the week is an available operator at the plant?

OP-8 How many hours are spent at the plant by the available operator(s) each day (weekdays/weekends/holidays)?

OP-9 Does the operator notify the owner about violations or conditions that may cause a violation, and needed resources?

OP-10 How does the operator notify the owner about known violations or conditions that may cause a violation, and about needed resources?

OP-11 Does the owner respond to the operator's notification about needed resources?

OP-12 Does the operator act to resolve the condition(s) and/or violation(s)?

OP-13 Are non-certified or not properly certified persons expected to perform work that requires process control decisions?

How are non-certified/not properly certified persons directed to perform process OP-14 control work?

Not Observed

Yes

Emergency

generator

Not Observed

Not Observed

Quarterly

Weekly

Yes

Yes

Yes

Yes

2

Yes

Yes

Monday Wednesday

5

Yes

Email Phone call

Yes

Yes

Yes

Available operator on-

site Available operator on

call SOPs

Page 10 of 21

pennsylvania

DEPARTMENT OF ENVIRONMENTAL

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER . ,.., PROTECTION

SEWAGE INSPECTION REPORT

OP-15 Has the owner elected to develop SOPs?

OP-16 Has the owner designated an operator in responsible charge to develop SOPs?

OP-17 Name of operator in responsible change

OP-18 Has the designated operator in responsible charge developed and/or approved SOPs?

OP-19 If the available operator/operator in charge (OIC) has changed, was a change of operator form submitted to DEP within 10 days?

Circuit Rider

OP-20 Is the facility operated by a circuit rider?

OP-21 How many facilities does the circuit rider operate?

OP-22 Is the required General Work Plan complete, signed by the owner and available for review upon request?

OP-23 Is the required System Specific Management Plan complete, signed by the owner and available for review upon request?

Yes

Yes

Matthew

Mullin

Yes

Not Applicable

Yes

2

No 1

No 2

Page 11 of 21

pennsylvania

.,... DEPARTMENT OF ENVIRONMENTAL ,a PROTECTION

I inspection Images

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Influent grinder Description: Influent mechanical screen

Page 12 of 21

• pennsylvania rJ/1/U DEPARTMENT OF ENVIRONMENTAL - PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: SBR 1 Description: SBR 2

Page 13 of 21

• pennsylvania rJI/D DEPARTMENT OF ENVIRONMENTAL - PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: SBR 3 - Settle Description: SBR 4 - Mix/fill

Page 14 of 21

9 pennsylvania J DEPARTMENT OF ENVIRONMENTAL - PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Post aeration 1/ SBR decant Description: Sludge holding 1

Page 15 of 21

• pennsylvania rJI//B DEPARTMENT OF ENVIRONMENTAL ., PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Post aeration 2/ SBR decant Description: Sludge holding 2

Page 16 of 21

• pennsylvania

DEPARTMENT OF ENVIRONMENTAL PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Disc filter 1 Description: Disc filter 2

Page 17 of 21

• pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Head of UV Description: Final effluent

Page 18 of 21

• pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Final effluent weir Description: Effluent stream

Page 19 of 21

1!!!i! pennsylvania DEPARTMENT OF ENVIRONMENTAL fai, PROTECTION

#:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

#:

Description: Confluence of effluent stream with receiving

stream

Description: Downstream of confluence

Page 20 of 21

#:

• pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

• BUREAU OF CLEAN WATER

SEWAGE INSPECTION REPORT

Description: Upstream of confluence

Page 21 of 21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

38 39 40 41 42 43

44 45 46 47 48

DRAFT EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

October 10, 2022

The East Goshen Township Municipal Authority held their regular meeting on Monday,

October 10, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairmau Kevin Cummings, Vice Chairman Phil Mayer Dana Pizarro Jack Yahraes

Also in attendance were: Mark Miller (Director of Public Works), Dave Ware (Director of Finance), Mike Ellis (Pennoni representative), and Ellen Koopman (Attorney)

COMMON ACRONYMS: EFES -Big Fish Environmental Services BOS -Board of Supervisors

CB - Conservancy Board DEP -Department of Environmental Protection EPA - Environmental protection Agency HC -Historical Commission I&I -Inflow & Infiltration LCSTP -Lockwood Chase Sewer Treatment Plant

Call to Order & Pledge of Allegiance

MA- Municipal Authority NP DES -National Pollutant Discharge Elimination System PC -Planning Commission PM -Prevention Maintenance

PR -Park & Recreation Board RCSTP -Ridley Creek Sewer Treatment Plant SER -Sequencing Batch Reactor SSO - Sanitmy System Ove,jlow

WAS- Waste Activated Sludge

Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our troops and First Responders. He asked if anyone would be recording the meeting. There was no response.

Chairman's Report 1. Walter sadly announced the resignation of Phil Mayer who is moving out of the township. This will be his last meeting. Jack appreciated Phil's attendance to the West Goshen meetings and presented him with a gold plunger!!!! Thanks Phil. 2. Dana reported that he met with Mark Miller and Dave Ware to make a plan about sustaining the Municipal Authority and increasing rates. He will have the MA members review the article he will have ready for the Spring Newsletter.

SEWER REPORTS

1. Director of Public Works, Mark Miller's report for September 2022 Monthly Flows -The average daily flow to West Goshen was 663,181 per day.

Meters: The meters were read on a daily basis. No problems to report.

MA 10-10-22 draft 1

1 C.C. Collection: The pumping stations were visited on a daily basis. Wet wells were washed down 2 along with the FOG rod. 3 4 C.C. Interceptor: 5 6 R.C. Collection: The pumping stations were visited on a daily basis and wet wells washed down. 7 We had a seal failure at the Hershey Mill Pump Station. The pump was pulled and taken down to 8 Deckmans for repair. The reported that moisture was seeping into the motor head. New seals were 9 put in and the impeller was replaced due to it being worn down. We had a problem with the alarm at 10 Hunt Country Pump Station. John Laidley made the repairs. We did some right of way clearing 11 behind Achorn Way. We installed delineators on the manholes. 12 13 14 Ridley Creek Plant: We have been working on the Boardwalk out to the new meter pit. Lenni came 15 out and hung the cabinet. The conduit has been installed by the PWD. We should have the decking 16 complete next Tuesday. John Laidly is scheduled to install the meter on October 20th• 17 18 Alarms: We responded to 17 alarms for September. 19 20 PA 1 Calls: We responded to over 66 PA One Calls for the month of September. 21 22 Monthly Rainfall: 6.30 inches of rain for the month of September. 23 24 Lateral Repairs or Caps: We had eight cleanout repairs. 25 26 27 2. Pennoni Engineer's Report dated October 7, 2022 28

29 Ridley Creek Sewage Treatment Plant (RCSTP)

30 • Caustic Soda Conversion - The caustic tank and feed pumps have been delivered to the 31 Township's PW Garage. We are prepared to assist the PW Department with constmction 32 layout for the concrete pad and installation work, if needed. We are also coordinating with 33 Pyrz (tank supplier) to finalize the PADEP tank permit application. The tank and feed system 34 can be installed, but the tank cannot be filled with chemical until the permit is issued

35 • UV Disinfection System -We previously completed our review of Glasco's shop drawings, and we are 36 working with the Township's controls integrator (John Laidley) and operator for input to finalize 37 "approval" comments beyond those we had provided in August. The system can then be fabricated 38 by Glasco. Glasco's lead time for the equipment is about 4 months following approval of submittals. 39 If final approval occurs in October, the equipment should be delivered in the February timeframe.

40 41 42 43 44 45

We are also continuing to prepare the bid documents and plans for the mechanical and electrical construction. The schedule for bidding remains dependent on the notification of awards for the Commonwealth Financing Authority (CF A) Local Share Account (LSA) grants, which we tentatively understand is expected to occur in November. However, we propose to hold off the mechanical and electrical solicitations based upon the aforementioned UV system fabrication schedule and until after the LSA grant awards, as follows:

MA 10-10-22 draft 2

1 • Bid Advertisement - early December 2 • Bids Due - early January 3 • Award Consideration -January 9, 2023 at the Municipal Authority Meeting

4 • Generator #2 Replacement - We are continuing with design and coordination with vendors on 5 pricing for various size generators.

6 Westtown Way Pump Station

7 • No update since our last report.

8 Sanitary Sewer Pipe Rehab

9 • Supplee Valley - No activity since our last report. We will finalize an updated constrnction 10 scope and constrnction cost estimate for pipe lining the remainder of the asbestos cement 11 sewers in the neighborhood. We anticipate bidding the project in late 2022 with construction 12 in early 2023.

13 • Hershey's Mill Estates - Since a LSA grant application was submitted for this project, construction 14 contracts cannot be awarded if/until the grant is "approved". We thereby request authorization for 15 the following solicitation schedule, based upon the LSA grant award notifications occurring in 16 November before bids are due. If grant award notifications have not occurred by a week before bids 17 are due (by November 28), the bid deadline will be extended accordingly during the solicitation:

18 • Bid Advertisements- October 31 and November 4 19 • Pre-Bid Meeting - November 9 or 10 20 • Bids Due - December 5 21 • Award Consideration- December 12 at the Municipal Authority Meeting

22 • Ridley Creek Exposed Sewer Rehab - We conducted an emergency permit pre-application 23 phone meeting with PADEP for the proposed concrete encasement of the sewer main that is 24 exposed in the streambed, and we emailed requested project information to them for 25 consideration of emergency permit authorization. We have also finalized the full PADEP GP- 26 11 permit application for submission to P ADEP upon their authorization. The emergency 27 authorization would require work be completed within 30 calendar days.

28 Hershey's Mill Estates - Mike asked the MA members to okay his bid schedule as shown above. 29 Phil moved to allow Mike to advertise for bids for HME per his schedule. Jack seconded the motion. 30 The motion passed unanimously.

31 l&I Program

32 • No activity since our last report.

33 New Connections

34 • Sewer Extension Study - No activity since our last report. 3 5 • I 671 & I 681 Strasburg Road - We evaluated feasibility of a sewer service for a proposed 36 new house and barn, which would likely be a grinder pump and low pressure sewer pipe with 3 7 a crossing of the Ridley Creek and connection to the existing sewer main immediately 38 upstream of the RCSTP. We provided plan, permitting, and other connection requirements to 39 the Township for response to the property owner's inquiry.

MA I 0-10-22 draft 3

1 Industrial Pretreatment Ordinance

2 No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with 3 sampling at the RCSTP can be conducted to set contaminant limits 4 5 6 3. Big Fish Environmental Services - 7 The Ridley Creek sewage treatment plant outfall 001 and 002 is anticipated to achieve compliance 8 with all effluent limitations regarding water quality for the month of September. All supplemental 9 reports were submitted for the month of August with the eDMR. Discharge to the Applebrook 10 irrigation lagoon remained in service. Chemical usage utilized for pH and total alkalinity remained 11 consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a 12 daily average of 65.8 as compared to the previous month at 64.3 gpd to achieve phosphorus removal. 13 No significant mechanical or operational issues were observed during operation of sludge dewatering 14 equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential 15 odors during the sludge holding tank decanting process. There were no odor complaints during the 16 month. 17 18 Walter reviewed the Big Fish report and noted that Table I and Table 4 may have some dates 19 missing. Also, there was mention on page 4 of snow! 20 21 Approval of Minutes 22 The minutes of the September 12, 2022 meeting were approved as amended. 23 24 Approval of Invoices 25 I. Phil moved to approve payment of the following Pennoni Invoices: 26 #1137796 $ 4,566.00 27 #1137797 $ 3,941.50 28 Dana seconded the motion. The motion passed unanimously. 29 2. Phil moved to approve the paid invoice of Exeter Supply #315639 in the amount of 30 $118,975.50. This was for the pipe for Hershey's Mill. Jack seconded the motion. The motion 31 passed unanimously. 32 3 3 Liaison Reports 34 I. Conservancy Board - Walter mentioned that the board has a meeting this week and will 35 discuss a location for their fall planting. 36 37 38 Financial Reports 39 I. September Financial Report - Dave Ware provided the following report: 40 In September 2022, the Municipal Authority recorded $13,948 in revenues (primarily from Sewer 41 Capital Reserve transfers) and $14,126 in expenses (Quarterly Administrative Wages, General 42 Engineering Services, Legal Services, and Capital expenditures at the Ridley Creek Sanitary 43 Treatment Plant), for a net result of operations of <$178.00>. As of September 30, 2022 the fund 44 balance was $5,413. 45 Dave mentioned that they have new financial software which improved the format of the reports. He 46 also mentioned that they are working on the 2023 budget which has a shortage of $700k. He is 47 working to be ready for unexpected problems like Hershey's Mill Estates.

MA 10-10-22 draft 4

1 Old Business 2 None 3 4 Goals 5 Update the Hershey Mill Estate project. 6 7 New Business 8 1. 1671 & 1681 E, Strasburg Road- Connors Residence Sewer Request- Mark explained that Mrs. 9 Connors wants to build a house, a barn and a horse stable on this property and wants to connect to the 10 existing public sewer. Other properties in the area are on septic. Mike reviewed options for sewer 11 and estimated costs. 12 13 Capacity Request - None 14 15 16 Any Other Matter 17 1. Dana has approached the Rossmore HOA to get a right of way to replace his septic system. 18 2. After discussion of the letter from PMAA, Dave suggested putting a copy of it and the Facts and 19 Strategies for Combating Privatization of Municipal Authorities on the township website. 20 21 Correspondence- None 22 23 Public Comment - None 24 25 26 Adjournment 27 There being no further business Jack moved to adjourn the meeting. Phil seconded the motion. The 28 motion passed unanimously. The meeting was adjourned at 8:00 pm. 29 The next regular meeting will be held on Monday, November 14, 2022 at 7:00 pm. 30 31 Respectfully submitted, 32 33 34 Ruth Kiefer, Recording Secretary

MA 10-10-22 draft 5

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

For Services Rendered Through 10/16/2022

INVOICE Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice No : 1141259 Invoice Date : 10/20/2022

Project : EGMAU20004 Project Name : RCSTP Caustic Soda

Conversion

Phase 01 - Prepared PADEP bulk tank permit application and coordinated with vendors for permit-required installation certification approach.

Phase 02 - Coordinated tank delivery with vendor and Township.

Phase Code / Name

01 •· Design and Permitting 02 •· Construction Phase Services est. Total:

Phase: 02 -- Construction Phase Services

Labor Class

Authority Engineer

Phase Subtotal

Contract Previously % Amount Billed Complete

$26,500.00 $21,730.00 83.76% $5,400.00 $654.25 $31,900.00 $22,384.25

Hours Rate 0.25 141.00

Labor

Amount Due This Invoice

Complete Amount To Date This Invoice

$22,196.28 $466.28 $689.50 $35.25 $22,885.78 $501.53

Amount

35.25

- - - - - - - - 35.25

$35.25

$501.53

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):

West Goshen RCSTP Caustic Soda Conversion

EGMAU20004 Invoice Summary

Invoice Date 10/20/2022

EGMAU20004 RCSTP Caustic Soda Conversion

1141259 8/15/2022 to $ 31,900.00 Date: $ 31,900.00 $ 22,384.25 $ 501.53 $ 22,885.78 72% $ 9,014.22 28%

RCSTP Caustic Soda Conversion

$ 31,900.00 $ 22,384.25 $ $

501.53 22,885.78

10/2/2022 10/20/2022

Remaining Budget($): $ Remaining Budget(%):

72% 9,014.22 28%

Comments: Phase 01 - Prepared PADEP bulk tank permit application and coordinated with vendors for permit-required installation certification approach.

Phase 02 - Coordinated tank delivery with vendor and Township.

INVOICE

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

For Services Rendered Through 10/16/2022

Preparation of near-final plans and specifications.

Phase Code/ Name

01 •· Wetland & Watercourse Investigation 02 -- Phase I Bog Turtle Habitat Assessment 03 •· Survey 04 -- Design 05 -- Permitting 06 •· Property Line Stakeout est. 07 •· Geotechnical NTE Total:

Contract

Amount

$6,750.00 $6,750.00 $17,200.00 $26,100.00

$8,000.00 $5,000.00 $10,000.00 $79,800.00

Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice No : 1141260 Invoice Date : 10/20/2022

Project: EGMAU21004 Project Name : HM Estates Sewer

Design & Permitting

Previously % Complete Billed Complete To Date

$6,750.00 100.00% $6,750.00 $6,750.00 100.00% $6,750.00 $17,200.00 100.00% $17,200.00 $24,987.03 97.73% $25,506.35 $7,028.05 87.85% $7,028.05 $7,520.50 $7,520.50 $6,271.25 62.71% $6,271.25 $76,506.83 $77,026.15

Amount Due This Invoice

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Amount This Invoice

$0.00 $0.00 $0.00 $519.32

$0.00 $0.00 $0.00 $519.32

$519.32

West Goshen HM Estates Sewer Design Permitting

EGMAU21004 Invoice Summary

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice:

Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):

Invoice Date 10/20/2022

EGMAU21004 HM Estates Sewer Design & Permitting

1141260 5/16/2022 to $ 64,800.00 Date: $ 79,800.00 $ 76,506.83 $ 519.32 $ 77,026.15 97% $ 2,773.85 3%

HM Estates Sewer Design & Permitting

$ 79,800.00 $ $ $

76,506.83 519.32 77,026.15

Remaining Budget ($): $ Remaining Budget(%):

97% 2,773.85 3%

Comments: Preparation of near-final plans and specifications.

10/2/2022 10/20/2022

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

For Services Rendered Through 10/16/2022

INVOICE Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice No: 1141261 Invoice Date : 10/20/2022

Project : EGMAU22001 Project Name : 2022 General

Services

October Engineer's Report. Prepared for and attended October's MA meeting including review of RCSTP operator's report.

Ridley Creek Sewer Main Concrete Encasement: Pre-application meeting for emergency permitting with PADEP, prepared and submitted emergency permit application package to PADEP, reviewed emergency permit approval from PADEP, pre-construction coordination with M. Miller, and and prepared full GP-11 permit application for submission in

follow-up to emergency authorization.

Evaluated alternatives and feasibility of sewer connection for proposed house at 1671-1681 Strasburg Road.

Billing Limits

Total Billings

Limit Remaining

Labor

Authority Engineer Associate Professional Graduate Professional

Totals Total Labor

Current 3,504.25

Hours

10.50 .50 20.75 31.75

Prior 23,817.25

Rate 141.00 105.00 95.00

To-Date 27,321.50 35,000.00 7,678.50

Amount 1,480.50 52.50 1,971.25 3,504.25 3,504.25

Total this Invoice $3,504.25 =========:::::::::::::==

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount:

Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):

2022 General Services EGMAU22001 Invoice Summary

Invoice Date 10/20/2022

EGMAU22001 2022 General Services 1141261 9/19/2022 $ 35,000.00 $ 35,000.00 $ 23,817.25 $ 3,504.25 $ 27,321.50 78% $ 7,678.50 22%

2022 General Services $ 35,000.00

$ 23,817.25 $ 3,504.25 $ 27,321.50

to Date:

Remaining Budget($): $

78% 7,678.50 22% Remaining Budget(%):

10/2/2022 10/20/2022

Comments: October Engineer's Report. Prepared for and attended October's MA meeting including review of RCSTP operator's report.

Ridley Creek Sewer Main Concrete Encasement: Pre-application meeting for emergency permitting with PADEP, prepared and submitted emergency permit application package to PADEP, reviewed emergency permit approval from PADEP, pre-construction coordination with M. Miller, and and prepared full GP-11 permit application for submission in follow-up to emergency authorization.

Evaluated alternatives and feasibility of sewer connection for proposed house at 1671-1681 Strasburg Road.

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

INVOICE

For Services Rendered Through 10/16/2022

Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice No : 1141262 Invoice Date : 10/20/2022

Project : EGMAU22004 Project Name : RCSTP UV

Replacement

Continued preparation of plans for mechanical and electrical bid documents and initiated structural design for raising of concrete walls of UV channel.

Billing Limits

Total Billings

Limit Remaining

Labor

Senior Professional Associate Professional

Totals Total Labor

Outstanding Invoices

Number 1137797 Total

Date 9/28/2022

Current

580.25

Hours

1.00 4.25 5.25

Balance 3,941.50 3,941.50

Prior 26,730.25

Rate 134.00 105.00

To-Date 27,310.50 30,000.00 2,689.50

Amount

134.00 446.25 580.25

Total this Invoice

580.25

$580.25

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount:

Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget($): Remaining Budget (% ):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%):

Remaining Budget($): Remaining Budget(%):

RCSTP UV Replacement EGMAU22004 Invoice Summary

Invoice Date 10/20/2022

EGMAU22004 RCSTP UV Replacement

1141262 9/19/2022 to $ 30,000.00 Date: $ 30,000.00 $ 26,730.25 $ 580.25 $ 27,310.50 91% $ 2,689.50 9%

RCSTP UV Replacement

$ 30,000.00 $ 26,730.25 $ 580.25 $ 27,310.50 91% $ 2,689.50 9%

10/2/2022 10/20/2022

1129796

Comments: Continued preparation of plans for mechanical and electrical bid documents and initiated structural design for raising concrete walls of UV channel.

• EXCELSIOR ►

EB!3 BLOWER SYSTEMS

Excel sior B lower Systems, In c .

331 June Ave Blandon, PA 19510

(610) 921-9558

Invoice

COPY

Sold To:

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE W EST CHESTER, PA 19380 Confirm To: MARK MILLER 610-692-7171

Ship VIA

Phone No:

610- 692- 7171

Invoice Number: 0911231-IN

Invoice Date: 8/26/2022

Order Number: 0087220

Order Date 8/25/2022

Salesperson: WW 01

Customer Number: EAST055

Ship To: EAST GOSHEN T OWNSHIP

1751 TOWNE DRIVE WEST CH ESTER, PA 19380

Terms Customer P.O. MARK MILLER EBS DELIV ERY

FreiAht Terms PP &ALLOW

F.O.B. BLAND ON, PA NE T 30 DAYS

Item Code Unit Ordered Shipped Back Ordered

106-HF408-LHBD-CCW HF408-LHBD CCW RO T, H'

EACH 1 1

S/N S652343

APPROVED BY:- __,,( __ r-- __ DATE PAID:. _____ _

CHECK------­ CHARGED TO: 6 +f;;_q ./5'0

8/30/2022 REMI T TO: Excel sior B lower Sys

331 JuneAve BLAND ON.PA 19510

All Prices in US Dollars. Terms and Conditions of Sale 1.2 apply

Available at www.excelsiorblower.com/terms-conditions/

Price

0 5,221.00

Net Invoice:

Less D i scount:

Freiqht: Sa les Tax:

Invoice Total: $

Page:

Amount

5,221.00

5,221.00

0.00

0.00

0.00

5,221.00

1111r a I e ELECTRIC INVOICE

ð - ----------- - SUPPLY CO.

ï

CUSTOMER NUMBER SUB ACCOUNT# A U.S. Electrical Services Inc. Company 200 GARFIELD AVENUE 117491 117491 WEST CHESTER PA 19380-4512 \ t,. \ t f'\. 7 I 610-719-9253 Fax APPROVED BY:_ )['!}SJ).'( /Uf (1, U

/, INVOICE NUMBER JNVOIGE-DAIE ñ

DATE PAID:: ____ _ S120860167.001 1

0/ 06/23/22

REMl,;..,TO: _/ CHECK #: Q .. 1 q ·a/( :,so S'

US ELECTRICAL SERVICES, INC.

BILL TO:

EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE

CH/\RGED TO:

WEST CHESTER PA 19380-6107

CUSTOMER PO # JOB NAME / RELEASE #

FLOW METER SERVICE

PO BOX 412485 BOSTON MA 02241-2485

SHIP TO:

EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

ORDERED BY · SALESPERSON

HOUSE ACCOUNT

WRITER SHIP VIA TERMS SHIP DATE ORDER DATE

DAVID A SMITH WILL CALL NET 15TH 06/23/22

ORDER QTY SHIP QTY DESCRIPTION UNIT PRICE ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512 10ft 10ft BLINE B54SH-120GLV 13/16" X 1-5/8" 526.680 C X 10' 14GA 9/16" X 1-1/8" SLOHED HOLES GALVANIZED 1ea · 1ea CH BR24L70RP 70A MLO AL-BUS 1PH 3W 60.850 ea 120/240V 2-4 CIRCUITS NEMA3R LOADCENTER 1ea 1ea CH DS100H1 1" PLATE TYPE 20.880 ea DISCONNECT HUB 1ea 1ea CH BR220 20A 2P PLUG-IN 120/240V 18.950 ea 10KIC CIRCUIT BREAKER 1ea 1ea RACO 5386-0 1 G DEEP WP BOX W/3 1428.770 C 3/4HUBS GRAY 1ea 1ea TAYMAC MX3200 GRY METAL VERT IN 1821.170 C USE COVER 1ea 1ea CWD TWRSGF20V 125V RECEPTACLE 29.130 ea !! TAGGED ITEM!! 1ea 1ea CRS ST2 3/4" ZINC INSULATED MYERS 549.060 C HUB 4ea 4ea ARL NML T7 3/4" SNAP21T 216.460 C NON-METALLIC CONNECTOR 8ea 8ea BLINE N224-ZN 1/4 LONG SPRING NUT 317.880 C 5ft 5ft NMLT 3/4" GRAY NON-METALLIC 104.780 C LIQUIDTITE 500' REEL

Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With I✓ Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download ò ó

SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE

ô

•, and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill. Contact the Credit Department at 717-606-1317 and get set up today! . . - -

I

Invoice is due by 07/15/22.

I

For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC

PROOF OF DELIVERY SIGNATURE 2022/06/23 03:39:41 PM S120860167.001 IV\ .. A 11JJE1ectncal Company V1s1t us at www.uses1.com L.tv_1k_e ________ __. ......,__se:,..:.-;':i';; trc

Subtotal

Shipping Chgs

. Tax

Payments

Amount Due

TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM USE THIS ENROLLMENT TOKEN: VHD QLP SLM

06/16/22

EXT PRICE

52.67

60.85

20.88

18.95

14.29

18.21

29.13

5.49

8.66

25.43 5.24

259.80

0.00

0.00

0.00

259.80

Page 1 of 1

LowE·s· N,JWR°oVING.

DATE

8/22/2022

8/22/2022

8/22/2022

8/23/2022

9/6/2022

9/6/2022

9/6/2022

9/12/2022

Total:

Vendor# 1817 9/17/2022

INV.AMT. 1401.3000 1430.2330 1433.2450 1437.2460 1438.2450

453.85 453.85

-25.69 -25.69

141.84 141.84

58.20

245.63 245.63

-13.91 -13.91

160.55 160.55

40.00 40.00

1,060.47 40.00 160.55 659.88 0.00 141.84

/

;· _

/ $1,060.47

DilAiDlppri;rmov;.;ed-;:;: ---*+ ,

,L',),6-t-1

liJ. ,

b { / 1

(

(.///

Date Paid: ________ .,..

Check#: ----I Charqed tc SEE ABOVE DISTRIBUTION

Original Receipts on file.

©

.-.. ,

58.20

58.20

STREET SIGN POSTS

CREDIT FOR TAX FOR ABOVE

MAIL BOX REPLACEMENTS

PARTS FOR RCSTP DECK/ NEW METER

STREET SIGN POSTS

!CREDIT FOR TAA FOR ABOVE

IPARTS FOR TRUCK#8

LATE PAYMENT

\

Photograph of a Lowe's receipt with handwritten notes and a yellow highlight.

LOWE'S HOME CENTERS, LLC (the word HOME is struck through)
1250 CORNERSTONE BOULEVARD (BOULEVARD struck through)
DOWNINGTOWN, PA 19335 (610) 343-7000

- SALE -
SALES#: S1729HW1 1522829 TRANS#: 2273432 08-23-22 (date circled)

  • 67359 1/2-IN X 12-IN GALV CARRG 48.00; 4.68 DISCOUNT EACH -0.68; 12 @ 4.00
  • 63449 GALV ROUND WASHER 1/2IN 4.68; 0.42 DISCOUNT EACH -0.03; 12 @ 0.39
  • 67342 HH 1-CT 1/2-IN 13 GALV HE 5.52; 0.48 DISCOUNT EACH -0.02; 12 @ 0.46

SUBTOTAL: 58.20
TAX: 0.00
INVOICE 02137 TOTAL: 58.20
LCC: 58.20 (circled, highlighted)

TOTAL DISCOUNT: 8.76
LCC: XXXXXXXXXXXX9631 AMOUNT:58.20 AUTHCD: 001256
SWIPED REFID:975130 08/23/22 12:49:57
LBA/PO: N
STORE: 1729 TERMINAL: 02 08/23/22 12:50:32
# OF ITEMS PURCHASED: 36
EXCLUDES FEES, SERVICES AND SPECIAL ORDER ITEMS

THANK YOU FOR SHOPPING LOWE'S. FOR DETAILS ON OUR RETURN POLICY, VISIT LOWES.COM/RETURNS. A WRITTEN COPY OF THE RETURN POLICY IS AVAILABLE AT OUR CUSTOMER SERVICE DESK

STORE MANAGER: ANUJ JAIE (AJ)

LOWE'S PRICE PROMISE. FOR MORE DETAILS, VISIT LOWES.COM/PRICEPROMISE

SHARE YOUR FEEDBACK! ENTER FOR A CHANCE TO BE ONE OF FIVE $500 WINNERS DRAWN MONTHLY! ¡ENTRE EN EL SORTEO MENSUAL PARA SER UNO DE LOS CINCO GANADORES DE $500! ENTER BY COMPLETING A SHORT SURVEY WITHIN ONE WEEK AT: www.lowes.com/survey. YOUR ID #021372 172922 358083. NO PURCHASE NECESSARY TO ENTER OR WIN. VOID WHERE PROHIBITED. MUST BE 18 OR OLDER TO ENTER. OFFICIAL RULES & WINNERS AT: www.lowes.com/survey

STORE: 1729 TERMINAL: 02 08/23/22 12:50:32

Handwritten: Ridley Deck

APPROVED BY: (signature, initials) (handwritten date 11/10/22)
DATE PAID:
CHECK #:
CHARGED TO: 07429.1505 (handwritten)

Handwritten: Ridley New Meter

Memo

To:

From: Re: Date:

Municipal Authority Dave Ware MA September 2022 Financial Report October 7, 2022

In October 2022, the Municipal Authority recorded $133,719.84 in revenues (primarily from Sewer Capital Reserve transfers) and $134,562.00 in expenses (General Engineering Services, Legal Services, Hershey's Mill Estates Sewer materials, and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($842.16). As of October 31, 2022, the fund balance was $4,570.97.

A complete list of 2022 full year MA revenues and expenses is attached.

U:\dware\municipal authority\

Account Id REVENUE

07-341-1000 07-354-0400 07-364-1100 07-364-1110 07-364-1130 07-380-1000 07-392-0500 07-392-0900

EXPENSES

07-424-1400 07-424-3000 07-424-3110 07-424-3130 07-424-3140 07-424-7440 07-424-7 490 07-426-3001 07-429-1501 07-429-1502 07-429-1503 07-429-1504 07-429-1505 07-429-6100 07-491-5001 07-492-0100

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

October 2022

Account Description Annual Budget

INTEREST EARNINGS 0.00 DCED GRANT 152,980.00 C.C. TAPPING FEES 2,000.00 R.C.TAPPING FEES 2,000.00 CONNECTION FEES - SEWER 1,000.00 MISCELLANEOUS REVENUE 0.00 TRANSFER FROM SEWER OPERATING 130,000.00 TRANSFER FROM SEWER CAP RESERVE 476,930.00 Total Revenue 764,910.00

ADMINISTRATIVE WAGES 30,529.00 MISCELLANEOUS EXPENSE 1,500.00 MUNIC.AUTH.-AUDITING 10,300.00 ENGINEERING SERVICES 45,000.00 LEGAL SERVICES 8,000.00 R.C. CAPITAL-STP 315,000.00 CAP.REPLACEMENT R.C. 41,400.00 RELINING 130,000.00 BARKWAY PUMP STATION CAPITAL 0.00 ASHBRIDGE PUMP STATION CAPITAL 0.00 HERSHEYS MILL PUMP STATION CAPITAL 0.00 HUNT CO PUMP STATION CAPITAL 0.00 RCSTP CAPITAL 46,897.00 WEST GOSHEN CAPITAL 136,284.00 BANK FEES 0.00 TRANSFER TO GENERAL FUND 0.00 Total Expenses 764,910.00

Net Result From Operations 0.00

CurrentYTD PriorYTD

2.51 2.53 0 0 2,300.00 2,060.00 1,493.52 11,508.00 563.76 1,127.52 282.24 2,664.48 78,182.90 71,624.91 253,955.35 178,365.32 . 336,780:28 267,352.76

25,116.15 23,135.82 1,665.25 1,518.25 10,250.00 10,000.00 38,964.75 38,130.06 5,720.00 7,913.82 0 0 0 -10,984.77 0 0 2,215.00 5,117.00 11,493.05 30,324.00 148,365.67 75,352.79 1,870.00 8,277.00 97,955.95 65,925.98 0 0 0 345.00 212.99 0 343,828.81 255,054.95

-7,048.53 12,297.81

Municipal Authority YTD Revenues and Expenses thru 10/31/2022

Account.Number Account oescription Date Type Transaction Data/Comment Amount 07-341-1000 INTEREST EARNINGS 01/31/22 Revenue Journal INTEREST EARNED JANUARY 2022 07 FUND 0.19 07-341-1000 INTEREST EARNINGS 02/28/22 Revenue Journal INTEREST EARNED FEBRUARY 2022 07100.1035 0.18 07-341-1000 INTEREST EARNINGS 03/31/22 Revenue Journal INTEREST EARNED MARCH 2022 07 FUND 0.17 07-341-1000 INTEREST EARNINGS 04/30/22 Revenue Journal INTEREST EARNED APRIL 2022 07100 0.15 07-341-1000 INTEREST EARNINGS 05/31/22 Revenue Journal INTEREST EARNED MAY 2022 07 FUND 0.09 07-341-1000 INTEREST EARNINGS 06/30/22 Revenue Journal INTEREST EARNED JUNE 2022 07 FUND 0.10 07-341-1000 INTEREST EARNINGS 07 /31/22 Revenue Journal INTEREST EARNED JULY 2022 07 FUND 0.42 07-341-1000 INTEREST EARNINGS 08/31/22 Revenue Journal INTEREST EARNED AUGUST 2022 0.92 07-341-1000 INTEREST EARNINGS 09/30/22 Revenue Journal INTEREST EARNED SEPTEMBER 2022 0.29

07-364-1100 C.C. TAPPING FEES 07/13/22 Revenue Journal 1344 MORSTEIN RD C.C. TAPPING FEES 2,000.00 07-364-1100 C.C. TAPPING FEES 07/13/22 Revenue Journal 1344 MORSTEIN RD C.C. TAPPING FEES 300.00

07-364-1110 R.C.TAPPING FEES 05/18/22 Revenue Journal 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPI 300.00 07-364-1110 R.C.TAPPING FEES 08/01/22 Revenue Journal TAP IN FEE 1577 COLONIAL R.C.TAPPING FEE 297.84 07-364-1110 R.C.TAPPING FEES 08/01/22 Revenue Journal SEWER INSP FEE 1577 COLONIAL R.C.TAPPING 300.00 07-364-1110 R.C.TAPPING FEES 09/01/22 Revenue Journal 1577 COLONIAL LN 297.84 07-364-1110 R.C.TAPPING FEES 10/03/22 Revenue Journal 1577 COLONIAL LN 297.84

07-364-1130 CONNECTION FEES - SEWER 02/02/22 Revenue Journal STOFFLET, MICHAEL 423.00 07-364-1130 CONNECTION FEES - SEWER 02/02/22 Revenue Journal ANNUAL PINK ROCK INSTALLMENT INTEREST PO -141.12 07-364-1130 CONNECTION FEES - SEWER 08/18/22 Revenue Journal PAPPANO, JOSEPH & PATRICIA 423.00 07-364-1130 CONNECTION FEES - SEWER 08/18/22 Revenue Journal ANNUAL PINE ROCK INSTALLMENT INTEREST PO -141.12

07-380-1000 MISCELLANEOUS REVENUE 02/02/22 Revenue Journal ANNUAL PINK ROCK INSTALLMENT INTEREST PO 141.12 07-380-1000 MISCELLANEOUS REVENUE 08/18/22 Revenue Journal ANNUAL PINE ROCK INSTALLMENT INTEREST PO 141.12

07-392-0500 TRANSFER FROM SEWER OPERATING 01/13/22 Revenue Journal XFER $TO MA FROM SEWER & SEWER CAP.RE: 5,497.00 07-392-0500 TRANSFER FROM SEWER OPERATING 02/16/22 Revenue Journal XFER $ FROM OS & 09 RE: JAN. 2022 MA EXP 6,324.50 07-392-0500 TRANSFER FROM SEWER OPERATING 03/08/22 Revenue Journal XFER $ FROM SEWER & SEWER CAPITAL TO MA 660.00 07-392-0500 TRANSFER FROM SEWER OPERATING 03/11/22 Revenue Journa! XFER $ FROM OS TO 07 MA AUTH. 360.00 07-392-0500 TRANSFER FROM SEWER OPERATING 03/18/22 Revenue Journal XFER $ FROM 05 TO 07 RE: 07 EXPENSES 7,000.00 07-392-0500 TRANSFER FROM SEWER OPERATING 03/30/22 Revenue Journal XFER $ FROM 05 TO 07 TO COVER MA EXPENSE 8,372.05 07-392-0500 TRANSFER FROM SEWER OPERATING 04/14/22 Revenue Journal XFER $ FROM OS & 09 TO MA RE: APRIL EXPE 10,814.00 07-392-0500 TRANSFER FROM SEWER OPERATING 05/04/22 Revenue Journal XFER $ FROM OS TO MA TO COVER EXPENSES 3,690.00 07-392-0500 TRANSFER FROM SEWER OPERATING 05/13/22 Revenue Journal XFER $TO MA RE: MAY EXPENSES FROM OS & 1,283.50 07-392-0500 TRANSFER FROM SEWER OPERATING 06/07/22 Revenue Journal CORRECT MA$ XFER TRX 83370 5/13/22 -1,283.50 07-392-0500 TRANSFER FROM SEWER OPERATING 06/07/22 Revenue Journal CORRECT MA$ XFER TRX 83370 5/13/22 5,302.50 07-392-0500 TRANSFER FROM SEWER OPERATING 06/16/22 Revenue Journal XFER FUNDS TO MA FROM SEWER & SEWER CAPI 2,970.50 07-392-0500 TRANSFER FROM SEWER OPERATING 07 /01/22 Revenue Journal XFER $ FROM OS TO 07 TO COVER MA EXPENSE 8,372.05 07-392-0500 TRANSFER FROM SEWER OPERATING 07 /13/22 Revenue Journal XFER $ FROM OS & 09 TO MA AUTHORITY RE: 2,111.25 07-392-0500 TRANSFER FROM SEWER OPERATING 08/16/22 Revenue Journal XFER $ FROM SEWER & SEWER CAP. TO MA TO 920.00 07-392-0500 TRANSFER FROM SEWER OPERATING 09/13/22 Revenue Journal XFER TO MA TO COVER AUG.EXPENSES 2,451.00

Page 1 o/4

Municipal Authority YTD Revenues and Expenses thru 10/31/2022

Account Number Account Description Date Type Transaction Data/Comment Amount 07-392-0500 TRANSFER FROM SEWER OPERATING 09/30/22 Revenue Journal XFER FR: 05 TO 07 RE: Q3 2022 CHG BACK 8,372.05 07-392-0500 TRANSFER FROM SEWER OPERATING 10/19/22 Revenue Journal XFER FROM 05 TO COVER 07 EXPENSES 4,966.00

07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/13/22 Revenue Journal XFER $TO MA FROM SEWER & SEWER CAP.RE: 18,986.13 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/16/22 Revenue Journal XFER $ FROM OS & 09 RE: JAN. 2022 MA EXP 1,217.25 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/08/22 Revenue Journal XFER $ FROM SEWER & SEWER CAPITAL TO MA 6,831.00 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/14/22 Revenue Journal XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE 25,600.37 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/13/22 Revenue Journal XFER $TO MA RE: MAY EXPENSES FROM OS & 5,302.50 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/07/22 Revenue Journal CORRECT MA$ XFER TRX 83370 S/13/22 -5,302.50 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/07/22 Revenue Journal CORRECT MA$ XFER TRX 83370 5/13/22 1,283.50 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/16/22 Revenue Journal XFER FUNDS TO MA FROM SEWER & SEWER CAP! 12,592.90 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/13/22 Revenue Journal XFER $ FROM 05 & 09 TO MA AUTHORITY RE: 21,785.60 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/28/22 Revenue Journal XFER $ FROM 09 TO 07 TO COVER 07 EXPENSE 16,131.57 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/16/22 Revenue Journal XFER $ FROM SEWER & SEWER CAP. TO MA TO 18,030.91 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/31/22 Revenue Journal Xfer $ from 09 to 07 for expenses 212.99 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/08/22 Revenue Journal TRANSFER FROM 09 TO COVER 07 EXPENSES 545.94 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/13/22 Revenue Journal XFER TO MA TO COVER AUG.EXPENSES 2,120.75 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/29/22 Revenue Journal XFER FROM 09 TO 07 TO COVER EXPENSES 160.44 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/14/22 Revenue Journal XFER $ TO COVER 07 EXPENSES 318.00 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/19/22 Revenue Journal XFER FROM 09 TO COVER 07 EXPENSES 122,917.00 07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/26/22 Revenue Journal XFER FROM 09 TO 07 FOR MA EXPENSES 5,221.00

07-424-1400 ADMINISTRATIVE WAGES 03/30/22 Expd EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2 8372.05 07-424-1400 ADMINISTRATIVE WAGES 06/30/22 Expd EAST GOSHEN TOWNSHIP - GENERAL QTR.2-202 8372.05 07-424-1400 ADMINISTRATIVE WAGES 09/30/22 Pay Check: 3356 22-00350 Q3 2022 MUNIC.AUTH CHARGEBACK 8372.05

07-424-3000 MISCELLANEOUS EXPENSE 01/13/22 Expd PENNSYLVANIA MUNICIPAL AUTHORITIES ASSO 880.25 07-424-3000 MISCELLANEOUS EXPENSE 03/08/22 Expd DELAWARE RIVER BASIN COMMISSION ANNL MON 660 07-424-3000 MISCELLANEOUS EXPENSE 06/30/22 Expd PETTY CASH PA MUNIC. AUTH.WORKSHOP - W.W 125

07-424-3110 MUNIC.AUTH.-AUDITING 03/18/22 Expd MAILLIE FALCONIERO & CO. MUNICIPAL AUTH. 7000 07-424-3110 MUNIC.AUTH.-AUDITING 05/03/22 Expd MAILLIE FALCONIERO & CO. FINAL BILLING - 3250

07-424-3130 ENGINEERING SERVICES 01/13/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 12 4076.75 07-424-3130 ENGINEERING SERVICES 02/16/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 1/ 5664.5 07-424-3130 ENGINEERING SERVICES 04/14/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 3/ 10814 07-424-3130 ENGINEERING SERVICES 05/12/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 4/ 5302.5 07-424-3130 ENGINEERING SERVICES 06/16/22 Expd PENNON I ASSOCIATES INC. SERV. THRU 5/15/ 2610.5 07-424-3130 ENGINEERING SERVICES 07/13/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 6/ 1051.25 07-424-3130 ENGINEERING SERVICES 08/16/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 7 / 3408.25 07-424-3130 ENGINEERING SERVICES 09/13/22 Pay Check: 3353 22-00112 SERV.THRU 8/14/22 GEN.SERV. 1471 07-424-3130 ENGINEERING SERVICES 10/18/22 Pay Check: 3362 22-00476 SERVICES THRU 9/18/22 GEN.SERV 4566

Page 2 of4

Municipal Authority YTD Revenues and Expenses thru 10/31/2022

Account Number Account Description Date Type Transaction Data/Comment Amount 07-424-3140 LEGAL SERVICES 01/13/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI S40 07-424-3140 LEGAL SERVICES 02/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 660 07-424-3140 LEGAL SERVICES 03/11/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 360 07-424-3140 LEGAL SERVICES 05/04/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 440 07-424-3140 LEGAL SERVICES 06/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 360 07-424-3140 LEGAL SERVICES 07/13/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 1060 07-424-3140 LEGAL SERVICES 08/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 920 07-424-3140 LEGAL SERVICES 09/13/22 Pay Check: 3352 22-00109 LEGAL SERV. JULY 2022 GEN.AUT 400 07-424-3140 LEGAL SERVICES 09/13/22 Pay Check: 3352 22-00110 LEGAL SERV. AUG.2022 GEN.AUTH 580 07-424-3140 LEGAL SERVICES 10/18/22 Pay Check: 3361 22-00475 LEGAL SERV. 9/2022 GEN.AUTH. 400

07-429-1501 BARKWAY PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. REBUILT HYDROM 2215

07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 04/14/22 Expd DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIR 8632 07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 06/16/22 Expd COLONIAL ELECTRIC SUPPLY REPLACE DISCONN 2861.05

07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. 2 - REBUILT HY 2709 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd JWC ENVIRONMENTAL MUFFIN MONSTER 11255.01 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 12 3852.69 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 02/16/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 1/ 1217.25 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 03/08/22 Expd KAPPE ASSOCIATES MAGNETIC FLOW METER 6831 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 03/17/22 Expd JWC ENVIRONMENTAL VOID CK.#3301 - LOST I -11255.01 07-429-1503 HERSHEY$ MILL PUMP STATION CAPITAL 03/17/22 Expd JWC ENVIRONMENTAL REPLACEMENT CK.FOR 330 11255.01 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 04/14/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 3/ 3403.62 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 06/16/22 Expd PENNONI ASSOCIATES INC. SERV. THRU 5/15/ 121.6 07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 10/18/22 Pay Check: 3360 22-00474 HME SEWER REPLACEMENT MATERIAL 118975.5

07-429-1504 HUNT CO PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. REBUILT HYDROM 1870

07-429-1505 RCSTP CAPITAL 04/14/22 Expd PENNON! ASSOCIATES INC. SERVICES THRU 3/ 13564.75 07-429-1505 RCSTP CAPITAL 05/12/22 Expd PEN NONI ASSOCIATES INC. SERVICES THRU 4/ 1283.5 07-429-1505 RCSTP CAPITAL 06/16/22 Expd PEN NONI ASSOCIATES INC. SERV. THRU 5/15/ 4005.25 07-429-1505 RCSTP CAPITAL 06/16/22 Expd TELEDYNE INSTRUMENTS INC. ULTRASONIC FLO 5605 07-429-1505 RCSTP CAPITAL 07/13/22 Expd COLONIAL ELECTRIC SUPPLY ELECTRICAL PART 3055.6 07-429-1505 RCSTP CAPITAL 07/13/22 Expd TRACOM FIBERGLASS PRODUCTS FIBERGLASS MA 18730 07-429-1505 RCSTP CAPITAL 07/28/22 Expd EXETER SUPPLY COMPANY INC MAX-ADAPTERS-1 3010.68 07-429-1505 RCSTP CAPITAL 07 /28/22 Expd LEC - LENN! ELECTRIC CORPORATION TROUBLE 6148.48 07-429-1505 RCSTP CAPITAL 07/28/22 Expd MAIN LINE CONCRETE 3 CYD5 CONCRETE 4000 1638.3 07-429-1505 RCSTP CAPITAL 07/28/22 Expd NEW ENTERPRISE STONE & LIME INC. 47.61 T 5334.11 07-429-1505 RCSTP CAPITAL 08/05/22 Expd LOWES BUSINESS ACCOUNT/GECF TREATED LUMB 7034.29 07-429-1505 RCSTP CAPITAL 08/16/22 Expd EXETER SUPPLY COMPANY INC SEWER PVC PIPE 3292.35 07-429-1505 RCSTP CAPITAL 08/16/22 Expd FOLEY INC. EXCAVATOR, COUPLER & BUCKET R 5611 07-429-1505 RCSTP CAPITAL 08/16/22 Expd KNOX EQUIPMENT RENTALS INC. LIGHT BANK R 544.5

Page3 of4

Municipal Authority YTD Revenues and Expenses thru 10/31/2022

Account Number Account Description Date Type Transaction Data/Comment Amount 07-429-1505 RCSTP CAPITAL 08/16/22 Expd MAIN LINE CONCRETE 3.5 YDS CONCRETE 4000 671 07-429-1505 RCSTP CAPITAL 08/16/22 Expd PENNON I ASSOCIATES INC. SERVICES THRU 7 / 461.5 07-429-1505 RCSTP CAPITAL 08/16/22 Expd TRENCHTECH INC. SHORING TO INSTALL METER 3122.56 07-429-1505 RCSTP CAPITAL 08/16/22 Expd YALE ELECTRIC SUPPLY CO ELECTRICAL PARTS 919.75 07-429-lS0S RCSTP CAPITAL 09/07/22 Pay Check: 3350 22-00049 DECK SCREWS, ANCHORS PLUS 471.07 07-429-1505 RCSTP CAPITAL 09/07/22 Pay Check: 3350 22-00049 DOUBLE JOINT HANGERS & NAILS 74.87 07-429-1505 RCSTP CAPITAL 09/13/22 Pay Check: 3353 22-00111 SE RV.TH RU 8/14/22 RCSTP SODA 192.75 07-429-1505 RCSTP CAPITAL 09/13/22 Pay Check: 3353 22-00113 SERV.THRU 8/14/22 RCSTP UV 1928 07-429-1505 RCSTP CAPITAL 09/19/22 Pay Check: 3354 22-00191 SELECT STUDS, QUIKRETE, JOIST. 475.7 07-429-1505 RCSTP CAPITAL 09/28/22 Pay Check: 3355 22-00297 DECK SCREENS & DRILL BITS 160.44 07-429-1505 RCSTP CAPITAL 10/11/22 Pay Check: 3357 22-00389 SKID STEER RENTL W/ATTACHMENTS 1140 07-429-1505 RCSTP CAPITAL 10/11/22 Pay Check: 3358 22-00404 PARTS FOR RCSTP DECK 58.2 07-429-1505 RCSTP CAPITAL 10/11/22 Pay Check: 3359 22-00449 ELECTRICAL PARTS RCSTP METER 259.8 07-429-1505 RCSTP CAPITAL 10/18/22 Pay Check: 3362 22-00477 SERV.THRU 9/18/22 RCSTP UV 3941.5 07-429-1505 RCSTP CAPITAL 10/25/22 Pay Check: 3363 22-00497 Heliflow 408 PD Blower 5221

07-492-0100 TRANSFER TO GENERAL FUND 08/31/22 Expd Reimburse 01 for 07 cred.card expense 212.99

Page 4 of 4

Account Title Acct# 2021 Actual 2022 Budget 2022 Projection 2023 Proposed Budget $ Increase (vs '22 Proj) % Increase MUNICIPAL AUTHORITY, PROPOSED 2023 BUDGET ESTIMATED BEGINNING FUND BALANCE 6,372 11,619 11,619 934

REVENUE INTEREST EARNINGS 07341 1000 3 1 I (1) -100.0% INTEREST EARNED· CONSTRUCTION 07341 1020 DCED GRANT 07354 0400 152,980 152,980 152,980 C.C. TAPPING FEES 07364 1100 2,060 2,000 2,300 2,300 0.0% R.C.TAPPING FEES 07364 1110 11,508 2,000 2,000 2,000 0.0% CONNECTION FEES· SEWER 07364 1130 3,368 1,000 1,000 1,000 0.0% MISCELLANEOUS REVENUE (PINE ROCK) 07380 1000 2,664 282 282 0.0% TRANSFER FROM GENERAL ACCT 07392 0100 TRANSFER FROM SEWER OPERATING 07392 0500 90,338 130,000 130,000 100,000 (30,000) -23.1% TRANSFER FROM SEWER CAP RESV 07392 0501 TRANSFER FROM SEWER CAP RESERVE 07392 0900 179,592 476,930 476,930 1,471,553 994,623 208.5%

TOTAL REVENUE 289,534 764,910 612,514 1,730,115 1,117,602 182.5%

EXPENSES ADMINISTRATIVE WAGES 07424 1400 30,920 30,529 30,529 32,055 1,526 5.0% MISCELLANEOUS EXPENSE 07424 3000 1,693 1,500 1,665 1,749 83 5.0% MUNIC.AUTH.-AUDITING 07424 3110 10,000 10,300 10,300 10,815 515 5.0% ENGINEERING SERVICES 07424 3130 55,389 45,000 45,000 47,250 2,250 5.0% LEGAL SERVICES 07424 3140 9,194 8,000 8,000 8,400 400 5.0% R.C. CAPITAL-STP 07424 7440 315,000 162,020 355,793 193,773 119.6% CAP.REPLACEMENT R.C. 07424 7490 (10,985) 41,400 41,400 488,847 447,447 1080.8% HERSHEY MILL STATION· ENGINEER 07426 1000 TALLMADGE DRIVE 071126 3000 RELINING 07426 3001 130,000 130,000 260,000 130,000 100.0% RESERVOIR PUMP STATION· ENGINEER 07428 1000 BARKWAY PUMP STATION CAPITAL 07429 1501 5,117 2,215 (2,215) ·100.0% ASH BRIDGE PUMP STATION CAPITAL 07429 1502 30,324 11,493 HERSHEYS Mill PUMP STATION CAPITAL 07429 1503 76,693 29,390 78,000 48,610 165.4% HUNT CO PUMP STATION CAPITAL 07429 1504 8,277 1,870 (1,870) ·100.0% RCSTP CAPITAL 07429 1505 67,251 46,897 84,033 260,000 175,967 209.4% WEST GOSHEN CAPITAL 07429 6100 136,284 65,284 187,206 121,922 186.8% Bank Fees 07491 5001 414 TRANSFER TO GENERAL FUND 07492 0100

TOTAL EXPENSES 284,287 764,910 623,199 1,730,115 1,106,916 177.6%

NET RESULT FROM OPERATIONS 5,247 (10,686) 0

ESTIMATED ENDING FUND BALANCE 11,619 11,619 934 934

U:\OWare\2023 Budget\AII Other Funds\All Funds Proposed 2023 Budget Summary.xlsx 11/9/2022 9 of 14

2023-2027 Capital Improvement Program

liiciil flcspcctin;: the Past 4. ...... S<'rl'ing the Pre .... cnt Hershey's Mill Estates Sewer, Milltown Dam, & WG STP '41.i..YE:!! Pr,,porinJ: lnr the Future

Milltown Dam Hershey_ Mill Estates Sewer Bow Tree Pond I

$ 2,563,170.00 $ 1,670,900 $ 488,846.72 $ 500,000 West Goshen Sanitary Treatment Plant Improvements (Including Westtown Way Pump Stationl $ 573,703.74 $ 68,217 $ Total $ 4,gS,720.46 $ 1,739,117 $

Sewer Capital Reserve Fund $ 676,053 $ 68,217 Grants $ 915,000 Series 2017 Bonds $ 1,602,385 $ 200,000 Infrastructure Sustainability Fund $ 500,000 lrotal $4,125,720.46 $ 1,739,117

Notes: • Assumes that½ of Milltown Mill Dam work occurs in 2023, ½ in 2024. • Hershey's Mill Estates Sewer Rehabilitation starts in 2022.

$

$

12,503 $ 35,478 $ 49,039 12,503 $ 35,478 $ 49,039

12,503 $ 35,478 $ 49,039

12,503 $ 35,478 $ 49,0391

6

2023-2027 Capital Improvement Program

f?espedin;.: th(' J>a_ ... , A..:- ...,.t'1Ti11° the Pre••ent Sewer Capital Maintenance ,.E:! Pn:pari,,; {Or the Future (RC STP & Pump Stations) (Except West Goshen Upgrades & HM Estates)

Hunt Country/HM Lift Station Pump Replacement $ Hunt Country P/S Mag Meter $ Hunt Country P/S Muffin Monster $ Hunt Country P/S Bypass Pump $ Relining AC sewer lines and brick manholes $ 260,000 $ Ridley Creek STP rebuild 2 SBR pumps $ 25,000 Ridley Creek STP rebuild 2 Sludge pumps $ 10,000 I Ridley Creek STP New Media for filters $ 18,000 Ridley Creek STP replace generator $ 225,000 Ridley Creek STP Collection Flow Meter $ 24,000 Ridley Creek STP Caustic Soda Project* $ 47,500 Ridley Creek STP Filter Feed Pump** $ 18,000 $ Ridley Creek STP Blower Replacement $ 9,000 $ Ridley Creek STP UV System $ 150,000 Chester Creek Coll manhole lining (Eastwick Circle) for 5 manholes $ 50,000 Chester Creek Coll HM Pumpstation upgrade $ 78,000 Chester Creek Coll Muffin Monster swap out $ 18,000

Total $ 932,500 $

II • " : • ii •• , r ---·-- ------ ry Capital Reserve Fund Sewer Capital Reserve Fund Grants Series 2017 Bonds Infrastructure Sustainability Fund

Total

.. .

.. ! 2023

$ 885,000 $ 47,500

$ 932,500 * DCED has awarded MA $152,980 grant for Caustic Soda project. ** 2025 Filter Feed Pump is for centrifuge rebuild.

$

$

20,000 $ 20,000 15,000 67,000 5,000 130,000 $ 130,000

18,000 $ 26,000 9,000 $ 9,000

$ 18,000 264,000 $ 203,000

2024 2025

264,000 $ 203,000

264,000 $ 203,000

$ 130,000 $ 130,000

$ 18,000 $ 18,000 $ 9,000 $ 9,000

$ 18,000 $ 157,000 $ 175,000

2027

$ 157,000 $ 11s,aaa I

$ 157,000 $ 11s,ooo I

7

Sue Smith

From: Sent: To:

Michael Ellis <MEllis@Pennoni.com> Wednesday, November 9, 2022 10:58 AM Mark Miller; David Ware Cc: Derek Davis; Sue Smith Subject: Attachments:

HME Sewer Replacement - Bid Phase Services Hershey's Mill Estates Sewer Replacement Proposal.pdf

Hi Mark and Dave,

We have completed the approved design scope of work for the subject project and have moved into the bid phase. The MA's authorization for Pennoni services based on the attached 2/5/2021 proposal was for Tasks 1-5 (design through permitting). They wanted to wait to authorize bid phase services until design was completed.

We request the MA authorize bid phase services per the attached proposal at Monday's meeting. Now that design conditions are known, we expect comments and associated plan and bid modifications/ addenda based on contractors' input during the pre-bid meeting and through bid phase questions. We therefore recommend budgeting $7,500, instead

of the $5,000 in the 2021 proposal, to be conservative. The work will be performed on a Time & Materials basis at our approved hourly rates.

Please call or email with any questions.

Thanks!

Mike

Michael Ellis, PE Municipal Division Manager

Pennoni 121 Continental Drive, Suite 207 I Newark, DE 19713 Direct: +1 {302) 351-5236 I Mobile: +1 (302) 561-4235 www.pennoni.com I MEllis@Pennoni.com

Don't just work. Make an impact

1

EGMAU21004P

Rick Smith, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380

February 5, 2021

RE: Proposal for Hershey's Mill Estates Sewer Replacement

Dear Mr. Smith:

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

T: 302-655-4451 F: 302-654-2895 www.pennoni.com

Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for design, permitting, and surveying services for the proposed Hershey's Mill Estates sanitary sewer replacement.

PROJECT UNDERSTANDING

Pennoni provided a condition assessment letter, dated January 8, 2021, regarding the sanitary sewer conditions from Tanglewood Drive to Greenhill Road in Hershey's Mill Estates. It was recommended that approximately 2,700 LF of 8-inch sanitary sewers from manhole R084 to R070 be replaced to address the pipe settlement, collapse, clogging, back-ups, and maintenance problems. The existing manholes are intended to be re-used to the maximum extent possible to minimize cost and disturbance. The pipe runs are intended to be replaced in the same location and elevation as they are now, with the exception of the piping through the tennis court and the Manhole R083 sewers as described hereafter. Manhole R082A and its associated piping located under the existing tennis court will be abandoned-in-place with new piping and manholes constructed around the perimeter of the tennis court to avoid reconstruction of the tennis courts and to facilitate future access for sewer maintenance. This new piping is expected to require approximately four new manholes.

A waterways permit pre-application meeting was conducted with PADEP and the U.S. Army Corps of Engineers on January 21, 2021. In order to minimize permitting through PADEP's General Permitting process, it was determined that Manhole R083, which is currently exposed in the stream channel, should be abandoned-in­ place. A replacement manhole will be installed away from the stream as part of the project. Otherwise, the stream will need to be relocated to permanently protect the manhole, which will trigger individual USACE permitting.

The scope of this proposal is to investigate and delineate wetlands, perform a bog turtle habitat assessment, conduct a field survey, prepare design plans and bid documents, prepare permit applications, and provide bid assistance.

SCOPE OF SERVICES

1. Wetland and Watercourse Investigation

Pennoni will complete a wetland and watercourse investigation of the project area for permitting purposes. Pennoni will investigate the entire proposed Limit of Disturbance, which for the purposes of this scope of work will encompass 25 feet on either side of the center line of the existing sewer line.

EGMAU21004P Rick Smith

February 5, 2021 Page 2 Hershey's Mill Estates Sewer Replacement

The purpose of the field investigation will be to determine the presence or absence of freshwater

wetlands and/or "Waters of the United States and Commonwealth" within the project limits. Waters of the United States and Commonwealth include lakes, ponds, reservoirs, swamps, marshes, wetlands, rivers and/or streams (including intermittent streams). Pennoni will evaluate the project area based upon the three-parameter approach enumerated in the US Army Corps of Engineers (USACE) Wetland Delineation

Manual, Technical Report Y-87-1 (1987) and USACE Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region -Version 2.0 (April 2012).

Flags will be set at the boundaries of wetlands and at the ordinary high water level of the stream. Flags and data points will be spatially located by Pennoni in Task #3 "Survey". The located wetland flags, data points, photo locations, and other applicable notes and/or map legends will be included in the project plans.

At the completion of the fieldwork, a Findings Letter will be prepared and will include a review of published resource materials, existing site conditions, and the results of the field investigation. The watercourse information will also be incorporated into the Findings Letter. Pennoni will provide one electronic draft copy of the Findings Letter to the Client for review and comment. Comments will be addressed, and a final report will be issued to the Client.

Pennoni will not be responsible for completion of Jurisdictional Determination and/or Functional Assessment of the identified wetlands and watercourses. If it is determined that these services are required, a separate proposal will be prepared and submitted to the Client for review and approval prior to the commencement of work.

2. Phase 1 Bog Turtle Habitat Assessment

According to the Pennsylvania Natural Diversity Inventory (PNDI) website search for the project, the project area contains a potential impact under the US Fish and Wildlife Service (USFWS) associated with the potential presence of bog turtles. As such, Pennoni will conduct a Phase I Bog Turtle Habitat Assessment project area within 300 feet of the proposed Limit of Disturbance to determine if potential

Bog Turtle Habitat is present. Habitat Assessment forms will be completed, and a summary report will be prepared and submitted to the USFWS.

This task includes the completion of a Phase I Bog Turtle Habitat Assessment but does not include a Phase II Bog Turtle study. If it is determined that a Phase II Bog Turtle study is required, a separate proposal will be prepared and submitted to the Client for review and approval prior to the commencement of work.

3. Survey

Pennoni will perform an existing conditions and topographic survey. The survey will include the elevations and locations of existing manholes from R084 to R070, the top of the bank and bottom of the stream elevations and locations, and the existing conditions 25 feet on either side of the centerline of the existing sanitary sewers, or to the top of the stream bank for areas where the stream is closer than 25 feet. Additionally, the location and elevation of existing manholes R147 to R082A will be surveyed.

4, Design

Pennoni will perform a visual condition assessment of the manholes to evaluate suitability for re-use. We will prepare a design to re-route the sewer around the tennis court as well as to install a new Manhole

EGMAU21004P Rick Smith

February 5, 2021 Page 3 Hershey's Mill Estates Sewer Replacement

R083 in a location further away from the stream. Other sewers will be replaced in their exact same location and depth in order to tie-in to existing manholes.

We will prepare a plan set consisting of a cover sheet, site plans, proposed sewer profiles, erosion and sediment (E&S) control plans, E&S details and notes, and construction details and notes. The plans will provide for reconstruction of the approximately 2,700 LF of Poor and Fair sewers from our condition assessment report in one construction project. We anticipate the site plans will depict both existing and proposed conditions on the same sheet(s). They will show the existing field conditions, the location and elevations of the existing and proposed sewers, and the relocation/demolition/abandonment of existing features located within the site.

We will also prepare technical specifications, bid form and bid document, and an engineer's opinion of probable construction cost.

We will make two submissions to East Goshen Township for review- a progress submission consisting of draft plans and a draft cost opinion, and a final submission consisting of plans, bid document, and cost opinion. The documents will be revised to address comments. We will meet in-person with the Township to review each submission. We will also attend two additional field scoping/review meetings.

5. Permitting

Pennoni will prepare and submit the following permit applications:

• PADEP General Permit 8 "Temporary Road Crossings" with a PASPGP-5 for USACE authorization • PADEP General Permit 11 "Maintenance, Testing, Repair, Rehabilitation or Replacement of Water Obstructions and Encroachments" for the Ridley Creek Tributary • Chester County Conservation District (CCCD) Erosion & Sedimentation Pollution Control review

We expect that no federal permitting will be required based upon the permit pre-application meeting with PADEP and USACE. We also assume that the Township will pay all permit application fees. Should any additional permitting, such as bog turtle impacts or wetlands remediation, become necessary during the course of the project, we will submit a separate proposal for such supplemental work.

6. Bid Assistance

Pennoni will provide construction bid assistance services consisting of attendance at one pre-bid meeting on-site, issuance of addenda, response to questions from prospective bidders, review of bids, and recommendation for construction contract award.

Bid assistance work will be billed on a Time and Materials basis per our annual hourly rate schedule. The estimated budget is based upon 44 hours of bid assistance.

DELIVERABLES

Deliverables include a design plan set, relevant permit applications, and bid documents.

SCHEDULE

Performance of services will commence upon receipt of Notice to Proceed (NTP). We anticipate Tasks 1-3 can be completed within 3-4 weeks of NTP, with a progress design submission approximately 3 weeks thereafter.

EGMAU21004P Rick Smith

February 5, 2021 Page 4 Hershey's Mill Estates Sewer Replacement

We propose a review meeting with the Township the following week, and the final design and permit applications to be completed 3-4 weeks thereafter, assuming receipt of bog turtle submission comments from USFWS during that period. The permit applications are therefore projected to occur approximately 11-12 week from NTP. Based upon a start date of February 9, 2021, the permit applications would occur in early May.

PADEP and CCCD are expected to take 90-120 days to review the permits, which would be August-September 2021. The project may be able to be bid during the permitting process to accelerate the construction timeframe.

We will seek opportunities to accelerate the schedule and permitting in an effort to bid the project in early summer for construction in summer-fall 2021.

FEE

Pennoni will provide the above referenced scope of services for Tasks 1 through 5 on a lump sum basis. Task 6 will be provided on a time and materials basis, to be billed at the Authority's approved rates for Pennoni for the calendar year in which work is performed for a fee not to exceed the amount listed in the table below without prior approval. A breakdown of fees follows:

TASK DESCRIPTION 1 Wetland and Watercourse Investigation 2 Phase I Bog Turtle Habitat Assessment 3 Survey 4 Design 5 Permitting

6 Bid Assistance

BILLING AND PAYMENT

LUMP SUM FEE (Tasks 1-5)

TOTAL ESTIMATED FEE

FEE $6,750.00 $6,750.00 $17,200.00 $26,100.00

$8,000.00 $64,800.00

$5,000.00 $69,800.00

Invoices will be submitted monthly. Payment is due within 30 days of invoicing.

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

T&M (Estimated)

EGMAU21004P

Rick Smith

February 5, 2021 Page 5 Hershey's Mill Estates Sewer Replacement

Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.

If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.

Respectfully submitted,

PENNON! ASSOCIATES INC .

. Ellis, PE

Engineer

ACCEPTED BY:

Rick Smith, Township Manager East Goshen Municipal Authority

DATE:

Memorandum

East Goshen Township

1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: dbrady@eastgoshen.org

Date: 10-22-2022 To: Mark Miller

Planning Commission Plan Review Request

From: Duane J. Brady Sr., Township Zoning Officer Re: 14 Reservoir Road SD/ Residential Lot

Dear Municipal Authority,

The Township has received a Subdivision Plan for 14 Reservoir Road West Chester, PA 19380.

The proposal is to create a second residential lot on the existing prope1iy.

Things to note:

► Existing single-family residential lot on 2-acre lot is to be subdivided into 2 lots. ► The existing dwelling and structures (In-ground pool, shed, and detached garage will remain, and the lot will be reduced to approximately 1.2 acres (48,560 square feet). ► Township bulk zoning requirements will be maintained. ► A new lot will be created with a leg access to the new dwelling. ► A new single-family residence is proposed to be 2,500 to 3,000 square feet. ► The new lot will be approximately 0.8 acres (34,460 square feet). ► The new lot will be a flag lot with a flagpole section variance by the Zoning Hearing

Board. The variance changed the pole portion from 40 feet to 24 feet wide.

If your committee wants to review the project, please confirm by emailing me at dbrady@eastgoshen.org

Thank you, /I X nwe u?-« 1-i -,

Duane J. Brady Sr. East Goshen Township Zoning Officer

TheAuthorities

PENN(YLVANIA. MUNICI AL AUTHORITIES AS!'..OCIAr ION

October 5, 2022

--"1 YEARS 'i) ThcAuthoritics

Subject: 2023 Authority Membership Dues Schedule Autltority Member

Dear PMAA Member:

As you know, for nearly 80 years, the Pennsylvania Municipal Authorities Association has been the primary voice of our

Commonwealth's public water, wastewater, solid waste, recreation and community-based services. The Association represents the interests of over 700 member municipal authorities who collectively provide vital services to six million

Pennsylvania citizens.

Over the years, PMAA has been at the forefront on important legislative and regulatory issues including:

• Drinking water protection and wastewater treatment standards • Water and wastewater infrastructure sustainability • Establishment and comprehensive development of tapping fees • Operator certification criteria and procedures • Issues such as nutrient negotiations and agreements • Prevention of PUC oversight

In recent years, government relations advocacy accomplished bidding threshold increase, stormwater management powers, eminent domain code cost limitations, and protection of authority monies.

Currently, PMAA has been involved with protections against overt attempts to create pathways to privatization. The Association stands strongly in promoting and maintaining the authority model of service delivery for the citizens of the Commonwealth.

Additionally, PMAA provides legal advocacy in court cases with significant statewide implications. Educational outreach, magazine, newsletter, website, and other publications and electronic communications are provided, as well as, a wide variety of endorsed member programs.

With PMAA representing your interests, your membership ensures that no one authority has to face all the challenges of authority management alone.

To maintain our effectiveness as an advocate for Pennsylvania authorities, we need your continued support. The

attached 2023 dues schedule represents an adjustment (an average annualized adjustment of 2% since the last change in 2016) allowing PMAA to continue to be the strongest voice for authorities.

Thank you for the trust you have in your Association.

Sincerely,

Melissa Komar President

Douglas E. Bilheimer Executive Director

2023 PMAA ACTIVE AUTHORITY MEMBER DUES SCHEDULE

Active Membership/Operating: Calculated at the rate of one mil on each dollar of the previous fiscal year's gross revenues of its project(s), up to $1.6 million in gross revenue annually, plus $100 (administrative fee).

Minimum dues are $200. Calculated on a base ofless than or equal to $100,000 of gross revenue, plus $100 ( administrative fee)

Dues categories with gross revenue exceeding $1.6 million are established as follows:

• 1.6 -2 million • 2 - 3 million • 3 - 5 million • 5-!0million • IO -20 million • Over 20 million

$2,400 $2,500 $2,600 $2,700 $2,800 $2,950

Active Membership/Leaseback: Calculated at the rate of one mil on each dollar of lease rental. The minimum dues are $200, and the maximum dues are $1,200 ( capped at

$1,100,000 in lease revenue, plus $100 administrative fee).