Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

December 12, 2022
7:00

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report
  4. APPROVAL OF MINUTES November 14, 2022
  5. APPROVAL OF INVOICES Gawthrop Invoice #266389 $ 500.00 Gawthrop Invoice #265299 $ 420.00 Pd 11/16 Deckman Invoice #4825 $ 4514.00 Pd 11/16 Colonial Elect. Invoice #14850138 $ 450.27 Pd 11/16 Yale Elect. Invoice #S121654188.001 $ 96.91 Pd 11/16
  6. LIAISON REPORTS
  7. FINANCIAL REPORTS November Financial Report
  8. OLD BUSINESS Hershey Mill Trunk Line

F:\Data\Shared Data\Agendas\Municipal Authority\2022\12-12-2022.doc

  1. 2022 Goals: Goal Status Ridley Creek Plant Compliance January,February,March,April,May,June,July,August, September, October and November were in compliance and met all requirements *Note DEP Annual Insp. Continue to Monitor Upgrades at WGSTP and Westtown Way Pump Station On – going Continue to Implement Infiltration and Inflow for the Sewer System On-going Caustic Soda Project Tank has been delivered awaiting PA DEP approval once installed. Replace sewer line Hershey Mill Estate trunk line replacement Bid documents finalized. Bid advertised Nov. 1, bids due Dec. 5 th if grant application is approved. Three new meters for Ridley Creek Collection Hibberd Lane was installed 2021 RCSTP influent flow meter replacement 2022 Blacksmith Shop (2023) Line Road - Deferred
  2. NEW BUSINESS Sewer Availability Letter from Commonwealth Engineers; Fee schedule for 2023 from Pennoni
  3. CAPACITY REQUESTS
  4. ANY OTHER MATTER
  5. CORRESPONDENCE AND REPORTS OF INTEREST
  6. PUBLIC COMMENT
  7. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2022\12-12-2022.doc

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

To: Municipal Authority
From: Mark Miller
Re: December 12, 2022 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 658,909 per day.

Meters: The meters were read on a daily basis. We had the meters calibrated on November 21, 2022, there are no adjustments done. It was noted that three of the meters need transducer brackets replaced.

C.C. Collection: All pump stations were visited on a daily basis, the wet wells were washed down and the FOG rods were cleaned. We did get a call for a sewer backup at Ellis Lane however; the problem was on the homeowner’s side of the sewer.

C.C. Interceptor:

R.C. Collection: The pump stations were visited on a daily basis; the wet wells were cleaned. We did respond to four alarms due to power outages. The generators ran and kept the stations in service.

Ridley Creek Plant: We have started work on the caustic soda system; the pump table was built in the shop and taken down to the plant to be put in place. Lenni Electric has been running the ridge conduit for the alarms and power for the pumps. They also installed additional conduit for some of the communication lines that Verizon installed. We had a problem on December 1 when a limb came in contact with a high voltage line; PECO was on location when the line dropped. We had to call Lenni in to throw the disconnect 33KV switch. Once power was installed, Lenni threw the switch and we brought the plant back on line. Kevin is setting up the schedule to clean the main trunk line from the new meter pit into the screen room. John Laidley will be on hand so he can zero out the new flow meter.

We have started clearing the lay down area at the Hershey Mill sewer project. Stumps were excavated and the soil was hauled out. Millings were hauled in and a level area was constructed.

Alarms: We responded to 22 alarms for November.

PA 1 Calls: We responded to over 35 PA One Calls for the month November.

Monthly Rainfall: 3.15 inches of rain for the month of November.

Lateral repairs or Caps: We had nine cleanout repairs for November.

[Photograph of workers with shovels hand-digging around an exposed sanitary sewer pipe in a muddy creek bed, with a backhoe positioned on the bank above and two handwritten sticky notes attached.]

Sanitary Sewer in the Ridley Creek. This was caused by Hurricane IDA. Crew encased pipe in concrete.

Hand digging around Sanitary Sewer

[Photograph of a Public Works crew working in a creek bed with shovels and a water pump to expose a sanitary sewer pipe, flanked by a CAT 306 excavator and a CASE Extendahoe backhoe, with a handwritten sticky note attached.]

PW crew exposing Sanitary Sewer

CAT 306 | FOLEY CAT | CASE EXTENDAHOE

[Photograph of a concrete-encased sanitary sewer pipe in a creek bed covered with a gray tarp weighted down by stones, with a pump intake hose in the foreground and orange bypass hoses, white sandbags, and a yellow CAT excavator in the background.]

[Photograph of a sanitary sewer pipe encased in concrete within wooden formwork across a creek bed, with a pump hose in the foreground and a handwritten sticky note attached.]

Pipe encased in concrete.

Pennoni

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

December 9, 2022

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We obtained the attached cost quote from a PADEP “certified installer” for inspection and sign-off of the PADEP bulk tank permit application as the system is installed by the PWD. The permit application will be submitted to PADEP after installation with the certified installer’s certification. We are also setting up a meeting with the operator to determine the alarm needs for the caustic system (i.e. leak detection, liquid level, chemical feed pump failure, etc.).
  • UV Disinfection System – The system is being fabricated by Glasco, and delivery is expected in late February or early March 2023. The bidding and contracting schedule for the mechanical and electrical work remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants. Those awards had been expected to occur in November, but the funding agency, PA DCED, informed us that the awards will now occur in January at the earliest, but it could be later than that. The MA authorized bidding at the November MA meeting with the intention to advertise the solicitations in early December. However, we now propose to extend the advertisement to occur when the CFA’s public meeting schedule to make the LSA awards is announced. The UV solicitations can then be advertised approximately one month in advance of the CFA meeting so that UV bids will be received and can be awarded right after the CFA meeting. The tentative revised bidding schedule follows, based upon the CFA meeting occurring in late January: Bid Advertisement – late December/early January; Bids Due – late January/early February; Award Consideration – February 13, 2023 at the Municipal Authority Meeting
  • Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.

Westtown Way Pump Station

  • No update since our last report.

Sanitary Sewer Pipe Rehab

  • Supplee Valley – No have updated the construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood and will submit to the Township for review. We anticipate bidding the project in January 2023 with construction in early 2023.
  • Hershey’s Mill Estates – We administered the bidding process including responding to prospective bidders’ questions, conducting two on-site pre-bid meetings, re-designing portions of the access routes and sewer alignment based upon the site meetings, adding storm sewer replacement scope, coordinating for pre-construction site clearing and site preparation by the Township, preparing and issuing Addendum #1 consisting of a new plan set and updated specification sections, and conducting

EGMAU22001

December 9, 2022

Page 2

East Goshen Municipal Authority

Engineer’s Report

bid opening. Bids were received on December 8, and an unofficial bid tabulation is attached. We are preparing an official bid tabulation and reviewing bid documents, and we will confirm the bid and scope with the low bidder and also check references in order to make an award recommendation.

If the CFA LSA grant award meeting is scheduled to occur in January, we will recommend award at the January MA meeting conditioned that the contract cannot be executed/signed until after the CFA meeting since that grant requires that contracts not be signed or Notice to Proceed (NTP) issued until after grant awards are made. PA DCED confirmed that the contract can be signed and NTP issued immediately after the CFA meeting so we do not have to wait several months for the subsequent grant agreement to be provided and executed, if the grant is awarded.

If the CFA meeting is not scheduled in January, we can discuss with the low bidder about extending the contract award timeframe beyond the 60 days that is provided in the bid document, in which case award consideration would then be projected to occur at the February MA meeting.

  • Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.

I&I Program

  • No activity since our last report.

New Connections

  • 301 Reservoir Road – We provided alternatives to the developer’s design engineer for potential public sewer connection locations for the proposed 5-lot subdivision.

Industrial Pretreatment Ordinance

  • No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.

END OF REPORT

P:\Projects\EGMA\Memos to Board\2022\Engineers Report 2022-12-09.docx

Data Design Services II, Inc.

319 Exton Commons
Exton, PA 19341
www.datadesignsvcs.com
610-524-6357 Phone
610-524-6359 Fax
484-459-8175 Cell
Jim.Wood@datadesignsvcs.com Email

Quotation #: 20220982

November 23, 2022

To: Pennoni Associates
121 Continental Drive Suite 207
Newark, DE 19713
Attn: Erika Addison
302-351-5263
eaddison@pennoni.com
Please Address Purchase Order to:
Data Design Services II, Inc.
319 Exton Commons
Exton, PA 19341
orders@datadesignsvcs.com
F.O.B.: Jobsite Terms: TBD – see note 3 Estimated Shipping Date: TBD

REF: TANK REGISTRATION

In request for a PO for this tank registration we are pleased to quote the following:

Item #1: PENNSYLVANIA TANK CERTIFICATION (1 DAY, 1 TANK)

Daily Rate: $850.00 / DAY
Mileage to and from site: $10.00 (5 Miles each way)
($1.00 / PER MILE x 10 MILES)
Tank Registration: $385.00 / PER TANK
TOTAL: $1,245.00

NOTES:

  1. This quotation is valid for 30 days.
  2. Quoted pricing DOES NOT INCLUDE any state or local taxes. Customer must submit proper tax exemption certificate with order. If not submitted, customer is responsible for all applicable state, local, or other taxes and/or fees.
  3. RE: CREDIT – Data Design Services, Inc. offers credit terms upon receipt and review of your credit information, to include current creditor contacts (with phone & fax numbers) and bank information. Data Design Services, Inc. reserves the right to request initial and/or progress payments; initial orders may require a down-payment; Data Design Services, Inc. reserves the right to refuse credit offering due to unsatisfactory and/or incomplete credit submittal information; Data Design Services, Inc. reserves the right to re-invoice for interest/penalty charges if not paid in a timely fashion
  4. Interest at the rate of 1-1/2% per month will be charged for invoices past 45 days old.
  5. Please address your Purchase Order to: Data Design Services II, Inc. 319 Exton Commons Exton, PA 19341 orders@datadesignsvcs.com www.datadesignsvcs.com

DDS QUOTE #20220982

Page 2 of 2

  1. Unless expressly stated herein, nothing is to be considered to be inferred or implied.

Thank you for the opportunity to be of service. Please contact us with any questions.

Sincerely,

Jim Wood
Data Design Services, Inc.

JW

www.datadesignsvcs.com

UNOFFICIAL BID TABULATION
East Goshen Municipal Authority
Contract: HME-2022, Hershey's Mill Estates Sanitary Sewer Replacement
Extended Price Analysis

Reference Number Description Type UOM Quantity Joao & Bradley Construction Co., Inc. DiRocco Bros., Inc. Mason Dixon Contractors G&B Construction McKenney Construction DOLI Construction Corporation Bright Construction Group Anrich,Inc. Jurich, Inc. MOR Construction Services, Inc.
Base Bid
1 Mobilization and Demobilization. Price complete, in place, per lump sum: Base L.S. 1 $20,000.00 $77,800.00 $62,000.00 $95,000.00 $21,000.00 $100,000.00 $100,000.00 $10,450.00 $193,622.00 $86,000.00
2 Tree Removal and Site Preparation. Price complete, in place, per lump sum: Base L.S. 1 $30,000.00 $14,240.00 $210,412.34 $28,500.00 $6,900.00 $50,000.00 $49,767.00 $66,950.00 $38,064.00 $178,000.00
3 Install, Maintain, and Remove Erosion and Sediment Controls. Price complete, in place, per lump sum: Base L.S. 1 $65,000.00 $68,809.00 $63,000.00 $25,000.00 $33,090.00 $30,000.00 $50,000.00 $52,125.00 $43,784.00 $68,000.00
4 Site Dewatering. Price complete, in place, per lump sum: Base L.S. 1 $10,000.00 $69,960.00 $50,000.00 $31,500.00 $43,820.00 $40,000.00 $100,000.00 $65,050.00 $47,907.00 $56,000.00
5 New Precast Concrete Manhole. Price complete, in place, per each: Base EA. 5 $27,500.00 $81,004.00 $39,472.50 $67,130.00 $48,500.00 $37,500.00 $27,500.00 $30,000.00 $53,750.00 $67,000.00
6 Precast Concrete Manhole Replacement. Price complete, in place, per each: Base EA. 3 $17,100.00 $58,128.00 $14,330.19 $450.00 $33,600.00 $19,500.00 $19,500.00 $18,150.00 $29,550.00 $56,250.00
7 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with 2A Stone or Imported Soil Backfill. Price complete, in place, per linear foot: Base L.F. 453 $61,155.00 $39,691.86 $55,519.68 $67,950.00 $83,352.00 $135,900.00 $86,070.00 $132,276.00 $86,523.00 $158,550.00
8 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: Base L.F. 1,938.00 $193,800.00 $198,451.20 $108,082.26 $290,700.00 $335,274.00 $484,500.00 $339,150.00 $498,066.00 $408,918.00 $678,300.00
9 12" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: Base L.F. 224 $22,400.00 $23,813.44 $12,492.48 $33,600.00 $43,008.00 $58,240.00 $42,560.00 $60,704.00 $48,832.00 $70,560.00
10 6" and 8" Dia. C900, DR-18 Lateral. Price complete, in place, per linear foot: Base L.F. 250 $15,000.00 $39,690.00 $13,462.50 $37,500.00 $36,250.00 $25,000.00 $30,000.00 $72,000.00 $40,000.00 $76,250.00
11 Replace Cleanouts. Price complete, in place, per each: Base EA. 11 $20,900.00 $16,500.00 $79,700.72 $16,500.00 $22,000.00 $11,000.00 $2,750.00 $17,611.00 $19,250.00 $10,450.00
12 Install, Maintain, and Remove Temporary Cofferdam Diversions. Price complete, in place, per lump sum: Base L.S. 1 $5,500.00 $6,500.00 $43,458.06 $10,000.00 $25,000.00 $25,000.00 $10,000.00 $28,650.00 $38,926.00 $25,000.00
13 Sanitary Sewer Bypass Pumping and Flow Control. Price complete, in place, per lump sum: Base L.S. 1 $10,000.00 $28,000.00 $87,497.59 $42,500.00 $73,000.00 $25,000.00 $120,000.00 $37,200.00 $72,247.00 $47,500.00
14 Connect Sanitary Sewer to Existing Manholes. Price complete, in place, per each manhole: Base EA. 10 $5,000.00 $20,000.00 $30,485.10 $10,000.00 $20,000.00 $10,000.00 $25,000.00 $12,760.00 $12,000.00 $42,000.00
15 Install R-6 Rip Rap with Geotextile Rock Bank Stabilization. Price complete, in place, per ton: Base TONS 50 $7,500.00 $5,000.00 $3,508.50 $7,500.00 $8,000.00 $6,250.00 $6,000.00 $12,600.00 $10,000.00 $26,250.00
16 24" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: Base L.F. 35 $4,725.00 $4,370.10 $2,472.40 $5,250.00 $10,150.00 $5,250.00 $5,250.00 $2,100.00 $6,335.00 $6,825.00
17 36" Dia. HDPE Storm Sewer Pipe Installation Price complete, in place, per linear foot: Base L.F. 25 $3,500.00 $4,370.00 $2,472.50 $3,750.00 $7,000.00 $5,000.00 $4,375.00 $2,100.00 $5,925.00 $5,375.00
18 Site Restoration. Price complete, in place, per lump sum: Base L.S. 1 $70,000.00 $15,000.00 $23,710.91 $10,000.00 $42,000.00 $50,000.00 $75,000.00 $40,750.00 $138,244.00 $125,000.00
19 Replace Concrete Curb. Price complete, in place, per linear foot: Base L.F. 120 $3,600.00 $10,200.00 $12,033.60 $14,400.00 $6,600.00 $4,800.00 $7,800.00 $12,660.00 $12,120.00 $18,000.00
20 Miscellaneous Excavation and Backfill. Price complete, in place, per cubic yard: Base C.Y. 500 $12,500.00 $42,500.00 $35,990.00 $60,000.00 $14,500.00 $10,000.00 $100,000.00 $33,000.00 $95,000.00 $97,500.00
21 Rock Removal. Price complete, in place, per cubic yard: Base C.Y. 25 $5,000.00 $6,250.00 $7,005.50 $11,250.00 $5,500.00 $12,500.00 $7,500.00 $17,575.00 $7,975.00 $16,250.00
22 Abandon Existing Manhole. Price complete, in place, per each: Base EA. 1 $25,000.00 $2,500.00 $2,693.15 $1,000.00 $1,500.00 $2,500.00 $500.00 $1,170.00 $1,753.00 $9,500.00
23 Storm Sewer Headwall. Price complete, in place, per lump sum: Base L.S. 1 $17,000.00 $5,500.00 $3,238.62 $15,000.00 $26,000.00 $10,000.00 $8,500.00 $4,677.00 $19,514.00 $17,500.00
24 Trench Plug. Price complete, in place, per each: Base EA. 5 $4,000.00 $7,500.00 $13,198.10 $2,500.00 $11,000.00 $3,750.00 $5,000.00 $4,460.00 $11,000.00 $17,500.00
Base Bid Total $656,180.00 $845,777.60 $976,237.70 $886,980.00 $957,044.00 $1,161,690.00 $1,222,222.00 $1,233,084.00 $1,441,239.00 $1,959,560.00
Add Items
1 Precast Concrete Manhole Replacement. Price complete, in place, per each: Option EA. 6 $33,000.00 $68,628.00 $26,816.04 $80,556.00 $54,000.00 $45,000.00 $27,000.00 $34,920.00 $60,000.00 $112,500.00
2 Drop Manhole Replacement. Price complete, in place, per each: Option EA. 1 $7,500.00 $12,438.00 $5,560.84 $7,500.00 $14,000.00 $10,000.00 $7,500.00 $8,382.00 $15,000.00 $19,500.00
3 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: Option L.F. 132 $13,200.00 $15,875.64 $7,117.44 $19,800.00 $19,272.00 $29,700.00 $23,100.00 $38,544.00 $27,852.00 $37,719.00
4 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: Option L.F. 144 $15,120.00 $23,814.72 $7,764.48 $21,600.00 $23,904.00 $36,000.00 $25,200.00 $36,864.00 $30,384.00 $41,148.00
5 DEDUCTION - Connect Sanitary Sewer To Existing Manholes (Same Unit Price as Base Bid Item #14). Price complete, in place, per each manhole: Option EA. 7 ($3,500.00) ($19,950.00) ($21,339.57) ($7,000.00) ($14,000.00) ($7,000.00) ($17,500.00) ($8,932.00) ($7,000.00) ($29,400.00)
6 6" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: Option L.F. 114 $10,260.00 $7,620.90 $5,110.62 $17,100.00 $2,052.00 $9,690.00 $9,690.00 $29,184.00 $14,934.00 $10,830.00
7 24" Dia. HDPE Storm Sewer Pipe with Rip Rap Apron Installation. Price complete, in place, per linear foot: Option L.F. 40 $6,000.00 $7,620.00 $3,314.00 $6,000.00 $3,840.00 $6,000.00 $7,000.00 $11,640.00 $7,240.00 $7,800.00
8 15" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: Option L.F. 10 $1,500.00 $7,620.00 $1,346.60 $1,500.00 $450.00 $1,750.00 $1,250.00 $2,700.00 $1,600.00 $2,650.00
Add Item Total $83,080.00 $123,667.26 $35,690.45 $147,056.00 $103,518.00 $131,140.00 $83,240.00 $153,302.00 $150,010.00 $202,747.00
Grand Total $739,260.00 $969,444.86 $1,011,928.15 $1,034,036.00 $1,060,562.00 $1,292,830.00 $1,305,462.00 $1,386,386.00 $1,591,249.00 $2,162,307.00

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report

December 2022

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality for the month of November. All supplemental reports were submitted for the month of October with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued in September. Chemical usage utilized for, and total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes were slightly increased to a daily average of 70.0 as compared to the previous month at 69.1 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.

Table 1

November 2022- Final Effluent - Outfall 001

NPDES Permit Discharge Limitations Flow CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform Ultraviolet light intesity Copper, Total Zinc, Total
MGD mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000
Inst. Max 20 94 15 94 5 1 Report Report Report
Sample Date
November 1, 2022 0.306 2.0 5.1 7.46 19.0 4.0 10.2 0.10 0.26 0.16 0.41 20 1.3010 NS NS NS
November 8, 2022 0.292 2.0 4.9 6.66 16.2 4.5 11.0 0.10 0.24 0.16 0.39 41 1.6128 NS NS NS
November 8, 2022 0.447 2.0 7.5 6.40 23.9 5.5 20.5 0.10 0.37 0.15 0.56 68 1.8325 NS NS NS
November 22, 2022 0.311 2.0 5.2 6.16 16.0 4.0 10.4 0.10 0.26 0.14 0.36 13 1.1139 NS NS NS
November 29, 2022 0.278 2.0 4.6 4.25 9.9 4.0 10.2 0.10 0.23 0.11 0.25 3 0.4771 NS NS NS
Average 0.327 2.0 5.5 6.19 17.0 4.6 12.8 0.10 0.27 0.14 0.40 29 1.2675 NA NA NA
Minimum 0.278 2.0 4.6 4.25 9.9 4.0 10.2 0.10 0.23 0.11 0.25 3 0.4771 NA NA NA
Maximum 0.447 2.0 7.5 7.46 23.9 5.5 20.5 0.10 0.37 0.16 0.56 68 1.8325 NA NA NA

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported to date for outfall 001 November 2022. The month-to-date average total phosphorus was reported as 0.14 mg/L as compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 4.6 mg/L as compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment process performed well during October. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Discharge to the Applebrook irrigation lagoon, outfall 002 was discontinued through November 2022.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.

Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during November 2022.

Table 2

November 2022 - Influent Wastewater

Design Basis Flow BOD5 CBOD5 TSS NH4-N TKN, mg/L Phosphorus,Total , mg/L
MGD mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
Average 335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
Sample Date
November 1, 2022 0.374 428 1,334 223.0 695 528 1,646 29.3 91 61.7 192 5.78 18.0
November 8, 2022 0.394 414 1,361 403 1,325 600 1,972 31.3 103 59.8 197 6.47 21.3
November 15, 2022 0.484 340 1,373 321 1,296 282 1,139 28.6 115 50.6 204 5.48 22.1
November 22, 2022 0.365 226 689 218 664 160 488 26.2 80 47.70 145.4 5.16 15.7
November 29, 2022 0.369 306 942 253 779 322 991 46.0 142 69.1 213 4.86 15.0
Average 0.397 343 1,140 284 952 378 1,247 32 106 57.8 190 5.55 18.4
Minimum 0.365 226 689 218.0 664 160 488 26 80 47.7 145 4.86 15.0
Maximum 0.484 428 1,373 403 1,325 600 1,972 46 142 69.1 213 6.47 22.1

The foam on the SBR surface remained consistent with September with approximately 15% to 20% coverage of the surface area. The foam thickness is approximately 2 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.

PA DEP

No activity

Pennoni Associates

No activity

Page 2 of 4

Significant Rainfall

During November, there were eight (8) days when rainfall or snow occurred. There were two (2) events where the rainfall exceeded 0.5 inches in a 24-hour period.

November 12th 0.75 inches

November 16th 1.23 inches

The total rainfall for the month of November was a total 3.17 inches.

Chemical Usage:

November 2022
Chemical Daily Average Total Monthly
Soda Ash, pounds 290 9,000
Aluminium Sulfate solution, gal 70.0 2,100
Sludge Dewatering, gal* 22,870 480,276

*The centrifuge was operated 21 days during the month.

Flow data:

November 2022
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building* 11.711 391,314 544,500
Influent Wastewater to SBRs* 12.401 413,359 573,952
Internal Recycle** 0.646 22,258 44,530
Treated Effluent to Disc Filters 12.144 413,359 573,952
Final Effluent Discharge 9.465 316,000 447,000
Applebrook Golf Course 0 0 0

During November, the average monthly influent wastewater flow measured at the “field” flow meter was 391,314 gallons/day as compared to the influent flow into the SBRs as 413,359 gallons/day. The difference between the daily averages is 22,045 gpd, which is consistent with the average daily volume of internal recycle flow of 22,258 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.

Page 3 of 4

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly
  • Cleaned buildings and laboratory

Page 4 of 4

DRAFT

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 14, 2022

The East Goshen Township Municipal Authority held their regular meeting on Monday, November 14, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings, Vice Chairman
Dana Pizarro
Jack Yahraes
Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni representative), and Ellen Koopman (Attorney)

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
PWD – Public Works Department WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our troops and First Responders. He asked if anyone would be recording the meeting. There was no response.

Chairman’s Report

  1. Walter reported that he prepared an article for the Newsletter describing the projects the MA is working on.

SEWER REPORTS

1. Director of Public Works, Mark Miller’s report for November 14 2022

Monthly Flows – The average daily flow to West Goshen was 659,687 per day.

Meters: The meters were read on a daily basis. No problems to report.

C.C. Collection: The pump stations were visited on a daily basis. The wet well was washed down and the level rods were cleaned. The generators were under power for one hour each week. The generators were serviced for the winter. We were called out to 42 Waterview Lane for a sewer lateral break. Since the area was recently dug by the Aqua Water subcontractor, we had Aqua send out their

MA 11-14-22 draft

1

contractor who did the hydro excavation. The pipe turned out to be ok. However, the manhole tie in was not to our standards so we went back on Monday and replaced the piping in the manhole.

C.C. Interceptor:

R.C. Collection: The pump stations were visited on a daily basis. The pump station wet wells were washed down along with the level roads. The generators were serviced as routine maintenance for the winter. We installed two batteries in the Hunt Country unit.

Ridley Creek Plant: The new meter was put in service; we have to do a zero flow test on the unit, which we will setup with John Laidley in the next couple of weeks. The boardwalk was completed. We replaced the blower motor on number 4. Lenni was on hand to do the wiring of the blower motor. I ordered a blower to replace number 5. The cost was $5,221.00. The supplier had one on the shelf so I had them ship it to us and it should arrive on Tuesday with the install scheduled for Wednesday. When I spoke with the sales clerk, I asked to check on availability for another blower. He said they were 18 to 20 weeks out. I ordered a second blower which we will have for a spare. Since the SBR is going on 11 years in service, we are starting to have equipment failures and components are not readily available. So, I am ordering some of the components that should be on the shelves. For the electronics, we have been ordering different components that John Laidley has recommended.

Alarms: We responded to 18 alarms for October.

PA 1 Calls: We responded to over 55 PA One Calls for the month of October.

Monthly Rainfall: 5.60 inches of rain for the month of October.

Lateral Repairs or Caps: We had over three dozen cleanout repairs for October.

2. Pennoni Engineer’s Report dated November 9, 2022

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We have prepared the PADEP tank permit application and have coordinated with a certified tank installer to perform an inspection when the system is installed by the PWD and to sign-off on the permit application. We are awaiting their fee quote for that inspection. The permit application will be submitted to PADEP after installation with the certified installer’s certification. We are coordinating with PADEP for the timing to start using the system after the application is submitted and associated duration for issuance of the permit.
  • UV Disinfection System – Glasco’s shop drawings for the system were returned “Approved as Noted” on November 3. The lead time for the equipment is about 4 months. We therefore expect the equipment to be delivered in late February or early March 2023.

MA 11-14-22 draft

2

The bidding schedule remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants, which we tentatively understand is expected to occur in November. The proposed bidding schedule follows:

  • Bid Advertisement – early December
  • Bids Due – early January
  • Award Consideration – January 9, 2023 at the Municipal Authority Meeting

We request authorization from the Municipal Authority to advertise the solicitation in December.

  • Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.

Westtown Way Pump Station

  • No update since our last report.

Sanitary Sewer Pipe Rehab

  • Supplee Valley – No activity since our last report. We will finalize an updated construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood. We anticipate bidding the project in late December with construction in early 2023.
  • Hershey’s Mill Estates – The bid documents were finalized, and the construction solicitation went live on PennBid on November 1. We have responded to prospective bidder’s questions. The bid schedule follows: Non-Mandatory Pre-Bid Meeting – November 10 at the site; Bids Due – December 5; Award Consideration – December 12 at the Municipal Authority Meeting

Since a LSA grant application was submitted for this project, construction contracts cannot be awarded if/until the grant is “approved”. The above schedule is based upon the grant award notifications occurring in November before bids are due. If grant award notifications have not occurred by November 28, the bid deadline will be extended by one month.

  • Ridley Creek Exposed Sewer Rehab – We obtained emergency permit authorization from PADEP for the proposed concrete encasement of the sewer main that is exposed in the streambed. A full permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization.

I&I Program

  • No activity since our last report.

New Connections

  • Sewer Extension Study – No activity since our last report.

MA 11-14-22 draft

3

Industrial Pretreatment Ordinance

  • No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.

Comments – Mike mentioned that the application for the UV tank permit is ready. He found a certified installer who said that our Public Works Department can do the install and he will check it. Mike is requesting approval to put bid ads out for the tank. Dana moved to authorize Pennoni to advertise bids for the UV project. Jack seconded the motion. The motion passed unanimously.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality for the month of October. All supplemental reports were submitted for the month of September with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued during October. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a daily average of 69.1 as compared to the previous month at 64.3 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.
The DEP report was discussed.

Approval of Minutes

The minutes of the October 10, 2022 meeting were approved as amended.

Approval of Invoices

  1. Dana moved to approve payment of the following Pennoni Invoices: #1141259 $ 501.53 #1141260 $ 519.32 #1141261 $3,504.25 #1141262 $ 580.25 Jack seconded the motion. The motion passed unanimously.
  2. Jack moved to approve payment of the Excelsior Invoice #0911231-IN in the amount of $5,221.00. Dana seconded the motion. The motion passed unanimously.
  3. Dana moved to approve the paid invoices for Yale #120860167.001 in the amount of $259.80 and Lowes in the amount of $58.20. Jack seconded the motion. The motion passed unanimously.

Liaison Reports

  1. Conservancy Board – Walter mentioned that the board did a site walk to decide where to put the trees. The board will purchase 10 trees and three will be provided by PHS. The planting will be Saturday November 19, 2022.

MA 11-14-22 draft

4

  1. BOS – Mike Lynch reported that the police contract renewal was finalized and approved by the police union. It is a 3 year agreement. The proposed 2023 Township budget includes an increase in the local East Goshen real estate tax of .5 which will make it 1.75. This tax has not been increased for 20 years. We can’t rely on other taxes, i.e., earned income tax. Mike spoke about the increase in the cost of services, i.e., fire, police, etc. The school district needs an SRO, police officer, which will be about $75,000 for the next 4 years. You can check the BOS minutes for their 10/18 meeting which includes Mike’s full statement.

Financial Reports

1. October Financial Report - Dave Ware provided the following report:
In October 2022, the Municipal Authority recorded $133,719.84 in revenues (primarily from Sewer Capital Reserve transfers) and $134,562.00 in expenses (General Engineering Services, Legal Services, Hershey’s Mill Sewer materials and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($842.16). As of October 31, 2022 the fund balance was $4,570.97.

Old Business

1. Hershey Mill Trunk Line – Mike Ellis mentioned that many contractors have been out for site walks. Mark and Mike spoke about the easement and the route for the contractors to come in. It is estimated the project will take about 100 days. Mark sent letters to all of the residents backing up on the site and will go out to meet with them. Bids are due December 5th. Subject to the grant, bids will be awarded in December. Mike is expecting 6-8 bids. Mike is recommending budgeting $7,500 for the bid phase instead of the $5,000 in the 2021 proposal. Dana moved to approve budget for the bid phase up to a maximum of $7,500.00. Jack seconded the motion. The motion passed unanimously.

Goals

Dana gave Mark changes to the goals regarding the Capital Improvement Program.

New Business

Capacity Request
1. 14 Reservoir Road – The plan was reviewed for the subdivision of this lot. Jack moved to approve the capacity request for 14 Reservoir Road. Dana seconded the motion. The motion passed unanimously.

Any Other Matter - None

Correspondence- None

Public Comment - None

MA 11-14-22 draft

5

Adjournment

There being no further business Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, December 12, 2022 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 11-14-22 draft

6

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
12/08/2022
Client No: 6604M

Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
420.00 500.00 0.00 -420.00 $500.00

[signature]
12/9/22

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
12/08/2022
Client No: 6604-001M
Invoice No. 266389

General Authority Services

Fees

Date Description Hours Amount
11/09/2022
PMM
Email from S. Smith regarding meeting materials. 0.20 40.00
11/10/2022
EBK
Review and analyze materials ahead of meeting 0.30 60.00
11/14/2022
EBK
Attend monthly meeting 1.80 360.00
11/15/2022
EBK
Draft summary report on monthly meeting 0.20 40.00
For Current Services Rendered 2.50 500.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna 0.20 $200.00 $40.00
Ellen Koopman 2.30 200.00 460.00
Previous Balance $420.00
Total Current Charges 500.00
11/23/2022 Payment -420.00
Balance Due $500.00

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/14/2022
Client No: 6604M

Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
400.00 420.00 0.00 -400.00 $420.00

Pd. 11/16

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/14/2022
Client No: 6604-001M
Invoice No. 265299

General Authority Services

Fees

Date Description Hours Amount
10/07/2022
PMM
EBK
Email from S. Smith with agenda and meeting materials.
Review and analyze materials ahead of meeting
0.20
0.20
40.00
40.00
10/10/2022
EBK
Attend monthly meeting 1.70 340.00
For Current Services Rendered 2.10 420.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna 0.20 $200.00 $40.00
Ellen Koopman 1.90 200.00 380.00
Previous Balance $400.00
Total Current Charges 420.00
10/21/2022 Payment -400.00
Balance Due $420.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Deckman Motor & Pump, Inc.
49 W. Front Street
Bridgeport, PA 19405
610-272-6944

DECKMAN MOTOR & PUMP INC

INVOICE 4825

DATE 11/03/2022
TERMS Net 30

BILL TO
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

SHIP TO
Mark-cell 610-656-2742
email sent 11-2 cyr

SHIP VIA P.O. NUMBER TECH WORK ORDER #
Cust Pick Up Hershey Mills WES 30670
ITEM DESCRIPTION QTY EACH AMOUNT
RBM Rebuilt - Hydromatic Pump, Date: 04-05 Model: S4NX750EC, Serial No: S89374 7.5 HP, 1750 RPM, 230 Volts, 3 Phase Clean, sandblast, new stator, impeller (7.65"), wear ring, bearings, o-rings, seals, seal probes, add oil and paint 1 4,514.00 4,514.00
SUBTOTAL 4,514.00
TAX 0.00
TOTAL 4,514.00
TOTAL DUE $4,514.00

APPROVED BY: _______
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1503

PAID 11/16

Picked Up/Received By: [signature]

We Appreciate Your Business
We Accept Visa, MasterCard, Discover & American Express

Deckman Motor & Pump, Inc.
49 W. Front Street
Bridgeport, PA 19405
610-272-6944

DECKMAN MOTOR & PUMP INC

INVOICE 4825

DATE 11/03/2022
TERMS Net 30

BILL TO
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

SHIP TO
Mark-cell 610-656-2742
email sent 11-2 cyr

SHIP VIA P.O. NUMBER TECH WORK ORDER #
Cust Pick Up Hershey Mills WES 30670
ITEM DESCRIPTION QTY EACH AMOUNT
RBM Rebuilt - Hydromatic Pump, Date: 04-05 Model: S4NX750EC, Serial No: S89374 7.5 HP, 1750 RPM, 230 Volts, 3 Phase Clean, sandblast, new stator, impeller (7.65"), wear ring, bearings, o-rings, seals, seal probes, add oil and paint 1 4,514.00 4,514.00
SUBTOTAL 4,514.00
TAX 0.00
TOTAL 4,514.00
TOTAL DUE $4,514.00

PICK UP RECEIPT

APPROVED BY: MM
DATE PAID: _______
CHECK #: _______
CHARGED TO: [crossed out]

Capital
Utility water

Picked Up/Received By: _______

We Appreciate Your Business
We Accept Visa, MasterCard, Discover & American Express

Original Invoice

INVOICE

INVOICE NUMBER INVOICE DATE
14850138 10/03/22

PLEASE REMIT PAYMENT TO
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564

Billing Questions?
Call: THOMAS KARACKAI
484-679-2295

colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com

Divisions of Colonial Electric:
colonial major projects - colonialelectric.com/cmp
colonial teltek - colonialteltek.com
Bright Light - brightlightdesigncenter.com
Annapolis Lighting - annapolislighting.com

PAID 11/16

BILLING ADDRESS
4552 1 AB 0.491 E0060X 10086 D9750442833 S2 P9293113 0001:0002
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
PUBLIC WORKS SHOP IN
WEST CHESTER PA 19380

APPROVED BY: MM
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1505

Ridley Meter

CUSTOMER PO ORDER DATE ORDERED BY SHIP DATE SHIPPED VIA FREIGHT TERM
RIDLEY CREEK FLOW 09/30/22 DANIELLE 10/03/22 PPD
COMMENTS CO. UNIT / WH ENTERED BY ACCOUNT ID ORIGINAL INVOICE SALESPERSON
02 / DC 4722 E163 QT253763 0001
LINE SKU CUSTOMER SKU DESCRIPTION ORD QTY SHIP QTY BO QTY UNIT PRICE UM EXTENDED AMT
10 78590106117 HOM24L70RB 70MLO 2/4C N3R CTR 1 1 0 52.00 E 52.00
20 78590106530 HOM240 2P 40A CIRC BRKR $ 1 1 0 15.56 E 15.56
30 78590141672 QOB120 1P 20A BOLT-ON BREAKE $ 2 2 0 34.42 E 68.84
40 07847771276 LEVGFNT2W 20A SLIM GFCI WHT 1 1 0 20.37 E 20.37
50 CAR1/2 CAR1/2 1/2"SCHED 40 PVC COND $ 10 10 0 109.85 C 10.99
60 03448106201 CARE943D 1/2 SCHED 40 MALE $ 2 2 0 67.81 C 1.36
70 NIP1/2XCL NIP1/2XCL 1/2"XCLOSE CONDUIT $ 1 1 0 215.42 C 2.15
80 78174720101 BPT101-S 1/2" STEEL LOCKNUT $ 4 4 0 15.37 C 0.61
90 09532711432 MUL11432 4" GFI COVER $ 1 1 0 229.00 C 2.29
100 78101140363 BLN228 3/8 SPRING NUT $ 10 10 0 190.08 C 19.01
110 CAR3/4 CAR3/4 3/4" SCHED 40 PVC CON $ 10 10 0 130.49 C 13.05
120 03448106202 CARE943E 3/4" SCHED 40 MALE $ 2 2 0 109.32 C 2.19
130 78174720102 BPT102-S 3/4" STEEL LOCKNUT $ 2 2 0 17.57 C 0.35
140 03448123314 CARFLEX3/4-CUT 6 6 0 159.09 C 9.55
141 MESSAGE 1 X 6 ON COIL
150 03448108788 CARLT43E 3/4 STR L/T FLEX CO $ 2 2 0 505.14 C 10.10
330 NS8888 78592836284 STAH N242412HWT NEMA4X HNGD 1 0 1 1459.00 E 0.00

Invoice Due By: 11/2/2022
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.

For a Complete List of Locations
Please Visit
www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com

Page 1 of 2
0001:0002

Original Invoice

INVOICE

INVOICE NUMBER INVOICE DATE
14850138 10/03/22

PLEASE REMIT PAYMENT TO
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564

Billing Questions?
Call: THOMAS KARACKAI
484-679-2295

colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com

Divisions of Colonial Electric:
colonial major projects - colonialelectric.com/cmp
colonial teltek - colonialteltek.com
Bright Light - brightlightdesigncenter.com
Annapolis Lighting - annapolislighting.com

BILLING ADDRESS
4552 1 AB 0.491 E0060X 10087 D9750442833 S2 P9293113 0002:0002
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
PUBLIC WORKS SHOP IN REAR
WEST CHESTER PA 19380

CUSTOMER PO ORDER DATE ORDERED BY SHIP DATE SHIPPED VIA FREIGHT TERM
RIDLEY CREEK FLOW 09/30/22 DANIELLE 10/03/22 PPD
COMMENTS CO. UNIT / WH ENTERED BY ACCOUNT ID ORIGINAL INVOICE SALESPERSON
02 / DC 4722 E163 QT253763 0001
LINE SKU CUSTOMER SKU DESCRIPTION ORD QTY SHIP QTY BO QTY UNIT PRICE UM EXTENDED AMT
10 MESSAGE EN
FACTORY STOCK 7-10 DAYS
20 78592840131 ROBBP2424AL 24X24 ALUM BP 1 1 0 221.85 E 221.85
30 MESSAGE COLONIAL STOCK
SUBTOTAL 450.27
S&H CHGS
0.00% TAX 0.00
PAY THIS AMOUNT 450.27

Accepted By: [signature] CUMMINS

Invoice Due By: 11/2/2022
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.

For a Complete List of Locations
Please Visit
www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com

Page 2 of 2
0002:0002

Yale ELECTRIC SUPPLY CO.
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER PA 19380-4512
610-719-9253 Fax

INVOICE

CUSTOMER NUMBER SUB ACCOUNT #
117491 117491
INVOICE NUMBER INVOICE DATE
S121654188.001 10/10/22

REMIT TO:
US ELECTRICAL SERVICES, INC.
PO BOX 412485
BOSTON MA 02241-2485

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

CUSTOMER PO # JOB NAME / RELEASE # ORDERED BY SALESPERSON
Flow meter plant .. HOUSE ACCOUNT
WRITER SHIP VIA TERMS SHIP DATE ORDER DATE
ROBERT S KASSEES PICK UP NET 15TH 10/10/22 10/10/22
ORDER QTY SHIP QTY DESCRIPTION UNIT PRICE EXT PRICE
ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512
2ea 2ea KRY 078089 TA20 2" PVC MALE TERMINAL ADAPTER 217.970 c 4.36
2ea 2ea CRS 16X 2-IN STEEL LOCKNUT 68.490 c 1.37
2ea 2ea CRS 936 2" PLASTIC INSULATING BUSHING 105 DEG C 83.760 c 1.68
1ea 1ea KRY 078145 LB20 2" TYPE LB ACCESS FTG 2762.450 c 27.62
2ea 2ea KRY 078545 SCH40 2" X 90D PVC ELBOW 40STD2090 782.180 c 15.64
5ea 5ea KRY 078006 CP20 2" PVC COUPLING 144.040 c 7.20
4ea 4ea KRY 078380 PS20 2" PVC 2 HOLE PIPE STRAP 157.670 c 6.31
4ea 4ea BLINE B2213-PA-ZN 2" EMT-HW STRAP 723.800 c 28.95
4ea 4ea CRS 5B 2" EMT/RIGID/IMC CONDUIT HANGER W/BOLT 94.480 c 3.78

PAID 11/16

APPROVED BY: WP
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1505
Flow Meter Ridley

SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE
Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill.
Contact the Credit Department at 717-606-1317 and get set up today!

PROOF OF DELIVERY SIGNATURE
2022/10/10 10:22:31 AM S121654188.1
[signature] Joe

Subtotal 96.91
Shipping Chgs 0.00
Tax 0.00
Payments 0.00
Amount Due 96.91

Invoice is due by 11/15/22.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
A U.S. Electrical Company
Visit us at www.usesi.com
TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM USE THIS ENROLLMENT TOKEN: VHD QLP SLM
Page 1 of 1

Yale ELECTRIC SUPPLY CO.
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER, PA 19380-4512
610-719-9253
Fax 610-719-0650

Ship Ticket

SHIP DATE ORDER NUMBER PAGE NO.
10/10/2022 S121654188.001 1 of 1
CUST PO#: Flow meter plant
JOB/REL#: ..

SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107

CUSTOMER NUMBER CUSTOMER PHONE# ORDERED BY SALESPERSON
117491 610-692-7171 HOUSE ACCOUNT
WRITER SHIP VIA WAREHOUSE ORDER DATE FREIGHT ALLOWED
ROBERT S KASSEES
(302)-737-3778
PICK UP Ship: WECH Price: WECH 10/10/2022 No
ORDER QTY SHIP QTY DESCRIPTION UNIT PRICE EXT PRICE
2ea 2ea KRY 078089 TA20 2" PVC MALE TERMINAL ADAPTER 217.970/c 4.36
2ea 2ea CRS 16X 2-IN STEEL LOCKNUT 68.490/c 1.37
2ea 2ea CRS 936 2" PLASTIC INSULATING BUSHING 105 DEG C 83.760/c 1.68
1ea 1ea KRY 078145 LB20 2" TYPE LB ACCESS FTG 2762.450/c 27.62
2ea 2ea KRY 078545 SCH40 2" X 90D PVC ELBOW 40STD2090 782.180/c 15.64
5ea 5ea KRY 078006 CP20 2" PVC COUPLING 144.040/c 7.20
4ea 4ea KRY 078380 PS20 2" PVC 2 HOLE PIPE STRAP 157.670/c 6.31
4ea 4ea BLINE B2213-PA-ZN 2" EMT-HW STRAP 723.800/c 28.95
4ea 4ea CRS 5B 2" EMT/RIGID/IMC CONDUIT HANGER W/BOLT 94.480/c 3.78

2022/10/10 10:22:31 AM S121654188.1
[signature] Joe

Subtotal 96.91
Shipping Chgs 0.00
Tax 0.00
Payments 0.00
Amount Due 96.91

Any shortage, damaged or incorrect material must be reported within 24 hours.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC

Printed By: KASROB on 10/10/2022 10:22:52 AM EST

Memo

To: Municipal Authority
From: Dave Ware
Re: MA November 2022 Financial Report
Date: December 8, 2022

In November 2022, the Municipal Authority recorded $15,696.80 in revenues (primarily from Sewer Operating and Sewer Capital Reserve transfers) and $31,664.60 in expenses (General Engineering Services, Legal Services, Hershey’s Mill Engineering Service, Hershey’s Mill Pump Station – rebuilt hydromatic pump, and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($15,967.80). As of November 30, 2022, the fund balance was ($11,137.03).

A complete list of 2022 full year MA revenues and expenses is attached.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
October 2022

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 5.71 2.74
07-354-0400 DCED GRANT 152,980.00 0 0
07-364-1100 C.C. TAPPING FEES 2,000.00 2,300.00 2,060.00
07-364-1110 R.C.TAPPING FEES 2,000.00 1,791.36 11,508.00
07-364-1130 CONNECTION FEES - SEWER 1,000.00 563.76 2,108.20
07-380-1000 MISCELLANEOUS REVENUE 0.00 282.24 2,664.48
07-392-0500 TRANSFER FROM SEWER OPERATING 130,000.00 82,107.15 84,232.16
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 476,930.00 265,426.86 179,592.49
Total Revenue 764,910.00 352,477.08 282,168.07
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 30,529.00 25,116.15 23,135.82
07-424-3000 MISCELLANEOUS EXPENSE 1,500.00 1,665.25 1,693.25
07-424-3110 MUNIC.AUTH.-AUDITING 10,300.00 10,250.00 10,000.00
07-424-3130 ENGINEERING SERVICES 45,000.00 42,469.00 50,242.31
07-424-3140 LEGAL SERVICES 8,000.00 6,140.00 8,233.82
07-424-7440 R.C. CAPITAL-STP 315,000.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 41,400.00 0 -10,984.77
07-426-3001 RELINING 130,000.00 0 0
07-429-1501 BARKWAY PUMP STATION CAPITAL 0.00 2,215.00 5,117.00
07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 0.00 11,493.05 30,324.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 153,398.99 76,579.96
07-429-1504 HUNT CO PUMP STATION CAPITAL 0.00 1,870.00 8,277.00
07-429-1505 RCSTP CAPITAL 46,897.00 120,403.18 65,925.98
07-429-6100 WEST GOSHEN CAPITAL 136,284.00 0 0
07-491-5001 BANK FEES 0.00 0 379.50
07-492-0100 TRANSFER TO GENERAL FUND 0.00 212.99 0
Total Expenses 764,910.00 375,233.61 268,923.87
Net Result From Operations 0.00 -22,756.53 13,244.20

Municipal Authority
YTD Revenues and Expenses thru 11/30/2022

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/22 Revenue Journal INTEREST EARNED JANUARY 2022 07 FUND 0.19
07-341-1000 INTEREST EARNINGS 02/28/22 Revenue Journal INTEREST EARNED FEBRUARY 2022 07100.1035 0.18
07-341-1000 INTEREST EARNINGS 03/31/22 Revenue Journal INTEREST EARNED MARCH 2022 07 FUND 0.17
07-341-1000 INTEREST EARNINGS 04/30/22 Revenue Journal INTEREST EARNED APRIL 2022 07100 0.15
07-341-1000 INTEREST EARNINGS 05/31/22 Revenue Journal INTEREST EARNED MAY 2022 07 FUND 0.09
07-341-1000 INTEREST EARNINGS 06/30/22 Revenue Journal INTEREST EARNED JUNE 2022 07 FUND 0.10
07-341-1000 INTEREST EARNINGS 07/31/22 Revenue Journal INTEREST EARNED JULY 2022 07 FUND 0.42
07-341-1000 INTEREST EARNINGS 08/31/22 Revenue Journal INTEREST EARNED AUGUST 2022 0.92
07-341-1000 INTEREST EARNINGS 09/30/22 Revenue Journal INTEREST EARNED SEPTEMBER 2022 0.29
07-341-1000 INTEREST EARNINGS 11/04/22 Revenue Journal INTEREST EARNED OCTOBER 2022 3.20
07-364-1100 C.C. TAPPING FEES 07/13/22 Revenue Journal 1344 MORSTEIN RD C.C. TAPPING FEES 2,000.00
07-364-1100 C.C. TAPPING FEES 07/13/22 Revenue Journal 1344 MORSTEIN RD C.C. TAPPING FEES 300.00
07-364-1110 R.C.TAPPING FEES 05/18/22 Revenue Journal 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPI 300.00
07-364-1110 R.C.TAPPING FEES 08/01/22 Revenue Journal TAP IN FEE 1577 COLONIAL R.C.TAPPING FEE 297.84
07-364-1110 R.C.TAPPING FEES 08/01/22 Revenue Journal SEWER INSP FEE 1577 COLONIAL R.C.TAPPING 300.00
07-364-1110 R.C.TAPPING FEES 09/01/22 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 10/03/22 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 11/01/22 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1130 CONNECTION FEES - SEWER 02/02/22 Revenue Journal STOFFLET, MICHAEL 423.00
07-364-1130 CONNECTION FEES - SEWER 08/18/22 Revenue Journal PAPPANO, JOSEPH & PATRICIA 423.00
07-392-0500 TRANSFER FROM SEWER OPERATING 01/13/22 Revenue Journal XFER $ TO MA FROM SEWER & SEWER CAP.RE: 5,497.00
07-392-0500 TRANSFER FROM SEWER OPERATING 02/16/22 Revenue Journal XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP 6,324.50
07-392-0500 TRANSFER FROM SEWER OPERATING 03/08/22 Revenue Journal XFER $ FROM SEWER & SEWER CAPITAL TO MA 660.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/11/22 Revenue Journal XFER $ FROM 05 TO 07 MA AUTH. 360.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/18/22 Revenue Journal XFER $ FROM 05 TO 07 RE: 07 EXPENSES 7,000.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/30/22 Revenue Journal XFER $ FROM 05 TO 07 TO COVER MA EXPENSE 8,372.05
07-392-0500 TRANSFER FROM SEWER OPERATING 04/14/22 Revenue Journal XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE 10,814.00
07-392-0500 TRANSFER FROM SEWER OPERATING 05/04/22 Revenue Journal XFER $ FROM 05 TO MA TO COVER EXPENSES 3,690.00
07-392-0500 TRANSFER FROM SEWER OPERATING 06/07/22 Revenue Journal CORRECT MA $ XFER TRX 83370 5/13/22 5,302.50
07-392-0500 TRANSFER FROM SEWER OPERATING 06/16/22 Revenue Journal XFER FUNDS TO MA FROM SEWER & SEWER CAPI 2,970.50
07-392-0500 TRANSFER FROM SEWER OPERATING 07/01/22 Revenue Journal XFER $ FROM 05 TO 07 TO COVER MA EXPENSE 8,372.05
07-392-0500 TRANSFER FROM SEWER OPERATING 07/13/22 Revenue Journal XFER $ FROM 05 & 09 TO MA AUTHORITY RE: 2,111.25
07-392-0500 TRANSFER FROM SEWER OPERATING 08/16/22 Revenue Journal XFER $ FROM SEWER & SEWER CAP. TO MA TO 920.00
07-392-0500 TRANSFER FROM SEWER OPERATING 09/13/22 Revenue Journal XFER TO MA TO COVER AUG.EXPENSES 2,451.00
07-392-0500 TRANSFER FROM SEWER OPERATING 09/30/22 Revenue Journal XFER FR: 05 TO 07 RE: Q3 2022 CHGBACK 8,372.05
07-392-0500 TRANSFER FROM SEWER OPERATING 10/19/22 Revenue Journal XFER FROM 05 TO COVER 07 EXPENSES 4,966.00
07-392-0500 TRANSFER FROM SEWER OPERATING 11/17/22 Revenue Journal XFER TO 07 FROM 05 TO COVER EXPENSES 3,924.25
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/13/22 Revenue Journal XFER $ TO MA FROM SEWER & SEWER CAP.RE: 18,986.13

Page 1 of 4

Municipal Authority
YTD Revenues and Expenses thru 11/30/2022

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/16/22 Revenue Journal XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP 1,217.25
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/08/22 Revenue Journal XFER $ FROM SEWER & SEWER CAPITAL TO MA 6,831.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/14/22 Revenue Journal XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE 25,600.37
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/07/22 Revenue Journal CORRECT MA $ XFER TRX 83370 5/13/22 1,283.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/16/22 Revenue Journal XFER FUNDS TO MA FROM SEWER & SEWER CAPI 12,592.90
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/13/22 Revenue Journal XFER $ FROM 05 & 09 TO MA AUTHORITY RE: 21,785.60
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/28/22 Revenue Journal XFER $ FROM 09 TO 07 TO COVER 07 EXPENSE 16,131.57
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/16/22 Revenue Journal XFER $ FROM SEWER & SEWER CAP. TO MA TO 18,030.91
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/31/22 Revenue Journal Xfer $ from 09 to 07 for expenses 212.99
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/08/22 Revenue Journal TRANSFER FROM 09 TO COVER 07 EXPENSES 545.94
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/13/22 Revenue Journal XFER TO MA TO COVER AUG.EXPENSES 2,120.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/29/22 Revenue Journal XFER FROM 09 TO 07 TO COVER EXPENSES 160.44
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/14/22 Revenue Journal XFER $ TO COVER 07 EXPENSES 318.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/19/22 Revenue Journal XFER FROM 09 TO COVER 07 EXPENSES 122,917.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/26/22 Revenue Journal XFER FROM 09 TO 07 FOR MA EXPENSES 5,221.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/16/22 Revenue Journal XFER FROM 09 TO 07 FOR EXPENSES 5,417.41
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/17/22 Revenue Journal XFER TO 07 FROM 09 TO COVER EXPENSES 1,601.10
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/18/22 Revenue Journal XFER $ FROM 09 TO 07 TO COVER EXPENSE 4,453.00
07-424-1400 ADMINISTRATIVE WAGES 03/30/22 Expd EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2 8,372.05
07-424-1400 ADMINISTRATIVE WAGES 06/30/22 Expd EAST GOSHEN TOWNSHIP - GENERAL QTR.2-202 8,372.05
07-424-1400 ADMINISTRATIVE WAGES 09/30/22 Pay Check: 3356 22-00350 Q3 2022 MUNIC.AUTH CHARGEBACK 8,372.05
07-424-3000 MISCELLANEOUS EXPENSE 01/13/22 Expd PENNSYLVANIA MUNICIPAL AUTHORITIES ASSO 880.25
07-424-3000 MISCELLANEOUS EXPENSE 03/08/22 Expd DELAWARE RIVER BASIN COMMISSION ANNL MON 660.00
07-424-3000 MISCELLANEOUS EXPENSE 06/30/22 Expd PETTY CASH PA MUNIC. AUTH.WORKSHOP - W.W 125.00
07-424-3110 MUNIC.AUTH.-AUDITING 03/18/22 Expd MAILLIE FALCONIERO & CO. MUNICIPAL AUTH. 7,000.00
07-424-3110 MUNIC.AUTH.-AUDITING 05/03/22 Expd MAILLIE FALCONIERO & CO. FINAL BILLING - 3,250.00
07-424-3130 ENGINEERING SERVICES 01/13/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 12 4,076.75
07-424-3130 ENGINEERING SERVICES 02/16/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 1/ 5,664.50
07-424-3130 ENGINEERING SERVICES 04/14/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 3/ 10,814.00
07-424-3130 ENGINEERING SERVICES 05/12/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 4/ 5,302.50
07-424-3130 ENGINEERING SERVICES 06/16/22 Expd PENNONI ASSOCIATES INC. SERV. THRU 5/15/ 2,610.50
07-424-3130 ENGINEERING SERVICES 07/13/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 6/ 1,051.25
07-424-3130 ENGINEERING SERVICES 08/16/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 7/ 3,408.25
07-424-3130 ENGINEERING SERVICES 09/13/22 Pay Check: 3353 22-00112 SERV.THRU 8/14/22 GEN.SERV. 1,471.00
07-424-3130 ENGINEERING SERVICES 10/18/22 Pay Check: 3362 22-00476 SERVICES THRU 9/18/22 GEN.SERV 4,566.00
07-424-3130 ENGINEERING SERVICES 11/17/22 Pay Check: 3369 22-00749 SERV.THRU 10/16/22 2022 GEN.SE 3,504.25
07-424-3140 LEGAL SERVICES 01/13/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 540.00
07-424-3140 LEGAL SERVICES 02/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 660.00

Page 2 of 4

Municipal Authority
YTD Revenues and Expenses thru 11/30/2022

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3140 LEGAL SERVICES 03/11/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 360.00
07-424-3140 LEGAL SERVICES 05/04/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 440.00
07-424-3140 LEGAL SERVICES 06/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 360.00
07-424-3140 LEGAL SERVICES 07/13/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERVI 1,060.00
07-424-3140 LEGAL SERVICES 08/16/22 Expd GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 920.00
07-424-3140 LEGAL SERVICES 09/13/22 Pay Check: 3352 22-00109 LEGAL SERV. JULY 2022 GEN.AUT 400.00
07-424-3140 LEGAL SERVICES 09/13/22 Pay Check: 3352 22-00110 LEGAL SERV. AUG.2022 GEN.AUTH 580.00
07-424-3140 LEGAL SERVICES 10/18/22 Pay Check: 3361 22-00475 LEGAL SERV. 9/2022 GEN.AUTH. 400.00
07-424-3140 LEGAL SERVICES 11/17/22 Pay Check: 3368 22-00746 LEGAL SERV. GEN.AUTH 10/2022 420.00
07-429-1501 BARKWAY PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. REBUILT HYDROM 2,215.00
07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 04/14/22 Expd DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIR 8,632.00
07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 06/16/22 Expd COLONIAL ELECTRIC SUPPLY REPLACE DISCONN 2,861.05
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. 2 - REBUILT HY 2,709.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd JWC ENVIRONMENTAL MUFFIN MONSTER 11,255.01
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/13/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 12 3,852.69
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 02/16/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 1/ 1,217.25
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 03/08/22 Expd KAPPE ASSOCIATES MAGNETIC FLOW METER 6,831.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 04/14/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 3/ 3,403.62
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 06/16/22 Expd PENNONI ASSOCIATES INC. SERV. THRU 5/15/ 121.60
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 10/18/22 Pay Check: 3360 22-00474 HME SEWER REPLACEMENT MATERIAL 118,975.50
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 11/16/22 Pay Check: 3366 22-00626 REBUILT HYDROMATIC PUMP 4,514.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 11/17/22 Pay Check: 3369 22-00748 SERV.THRU 10/16/22 HM ESTATES 519.32
07-429-1504 HUNT CO PUMP STATION CAPITAL 01/13/22 Expd DECKMAN MOTOR & PUMP INC. REBUILT HYDROM 1,870.00
07-429-1505 RCSTP CAPITAL 04/14/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 3/ 13,564.75
07-429-1505 RCSTP CAPITAL 05/12/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 4/ 1,283.50
07-429-1505 RCSTP CAPITAL 06/16/22 Expd PENNONI ASSOCIATES INC. SERV. THRU 5/15/ 4,005.25
07-429-1505 RCSTP CAPITAL 06/16/22 Expd TELEDYNE INSTRUMENTS INC. ULTRASONIC FLO 5,605.00
07-429-1505 RCSTP CAPITAL 07/13/22 Expd COLONIAL ELECTRIC SUPPLY ELECTRICAL PART 3,055.60
07-429-1505 RCSTP CAPITAL 07/13/22 Expd TRACOM FIBERGLASS PRODUCTS FIBERGLASS MA 18,730.00
07-429-1505 RCSTP CAPITAL 07/28/22 Expd EXETER SUPPLY COMPANY INC MAX-ADAPTERS-1 3,010.68
07-429-1505 RCSTP CAPITAL 07/28/22 Expd LEC - LENNI ELECTRIC CORPORATION TROUBLE 6,148.48
07-429-1505 RCSTP CAPITAL 07/28/22 Expd MAIN LINE CONCRETE 3 CYDS CONCRETE 4000 1,638.30
07-429-1505 RCSTP CAPITAL 07/28/22 Expd NEW ENTERPRISE STONE & LIME INC. 47.61 T 5,334.11
07-429-1505 RCSTP CAPITAL 08/05/22 Expd LOWES BUSINESS ACCOUNT/GECF TREATED LUMB 7,034.29
07-429-1505 RCSTP CAPITAL 08/16/22 Expd EXETER SUPPLY COMPANY INC SEWER PVC PIPE 3,292.35
07-429-1505 RCSTP CAPITAL 08/16/22 Expd FOLEY INC. EXCAVATOR, COUPLER & BUCKET R 5,611.00
07-429-1505 RCSTP CAPITAL 08/16/22 Expd KNOX EQUIPMENT RENTALS INC. LIGHT BANK R 544.50
07-429-1505 RCSTP CAPITAL 08/16/22 Expd MAIN LINE CONCRETE 3.5 YDS CONCRETE 4000 671.00

Page 3 of 4

Municipal Authority

YTD Revenues and Expenses thru 11/30/2022

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1505 RCSTP CAPITAL 08/16/22 Expd PENNONI ASSOCIATES INC. SERVICES THRU 7/ 461.50
07-429-1505 RCSTP CAPITAL 08/16/22 Expd TRENCHTECH INC. SHORING TO INSTALL METER 3,122.56
07-429-1505 RCSTP CAPITAL 08/16/22 Expd YALE ELECTRIC SUPPLY CO ELECTRICAL PARTS 919.75
07-429-1505 RCSTP CAPITAL 09/07/22 Pay Check: 3350 22-00049 DECK SCREWS, ANCHORS PLUS 471.07
07-429-1505 RCSTP CAPITAL 09/07/22 Pay Check: 3350 22-00049 DOUBLE JOINT HANGERS & NAILS 74.87
07-429-1505 RCSTP CAPITAL 09/13/22 Pay Check: 3353 22-00111 SERV.THRU 8/14/22 RCSTP SODA 192.75
07-429-1505 RCSTP CAPITAL 09/13/22 Pay Check: 3353 22-00113 SERV.THRU 8/14/22 RCSTP UV 1,928.00
07-429-1505 RCSTP CAPITAL 09/19/22 Pay Check: 3354 22-00191 SELECT STUDS, QUIKRETE, JOIST. 475.70
07-429-1505 RCSTP CAPITAL 09/28/22 Pay Check: 3355 22-00297 DECK SCREENS & DRILL BITS 160.44
07-429-1505 RCSTP CAPITAL 10/11/22 Pay Check: 3357 22-00389 SKID STEER RENTL W/ATTACHMENTS 1,140.00
07-429-1505 RCSTP CAPITAL 10/11/22 Pay Check: 3358 22-00404 PARTS FOR RCSTP DECK 58.20
07-429-1505 RCSTP CAPITAL 10/18/22 Pay Check: 3362 22-00477 SERV.THRU 9/18/22 RCSTP UV 3,941.50
07-429-1505 RCSTP CAPITAL 10/25/22 Pay Check: 3363 22-00497 Heliflow 408 PD Blower 5,221.00
07-429-1505 RCSTP CAPITAL 11/07/22 Pay Check: 3364 22-00449 ELECTRICAL PARTS RCSTP METER 259.80
07-429-1505 RCSTP CAPITAL 11/16/22 Pay Check: 3365 22-00619 VARIOUS PARTS FOR RCSTP METER 450.27
07-429-1505 RCSTP CAPITAL 11/16/22 Pay Check: 3367 22-00727 ADAPTERS, LOCKNUTS, FITTINGS + 96.91
07-429-1505 RCSTP CAPITAL 11/16/22 Pay Check: 3367 22-00728 MOUNT FIXTURE, PIPE, PVC PLUS 356.23
07-429-1505 RCSTP CAPITAL 11/17/22 Pay Check: 3369 22-00747 SERV.THRU 10/16/22 RCSTP SODA 501.53
07-429-1505 RCSTP CAPITAL 11/17/22 Pay Check: 3369 22-00750 SERV.THRU 10/16/22 RCSTP UV 580.25
07-429-1505 RCSTP CAPITAL 11/18/22 Expd CRED.CARD EXPENSE - BADBOY BLASTER 4,453.00
07-429-1505 RCSTP CAPITAL 11/30/22 Pay Check: 3370 22-00764 REBUILT MYERS PUMPS (2) 8,621.00
07-429-1505 RCSTP CAPITAL 11/30/22 Pay Check: 3371 22-00788 INSTALL NEW FLOW METER RCSTP 5,916.82
07-429-1505 RCSTP CAPITAL 11/30/22 Pay Check: 3372 22-00804 INSTALL WIDE WALK GATE -RCSTP 1,450.00
07-429-1505 RCSTP CAPITAL 11/30/22 Pay Check: 3373 22-00819 TAYMAC GRAY IN-USE COVERS 21.22
07-492-0100 TRANSFER TO GENERAL FUND 08/31/22 Expd Reimburse 01 for 07 cred.card expense 212.99

Page 4 of 4

[Logo: COMMONWEALTH ENGINEERS, INC.]
114 East Lancaster Avenue ~ Second Floor ~ Downingtown, PA 19335
Telephone: (610) 518-9003 ~ Fax: (610) 518-9004 ~ comeng@cei-1.com

December 8, 2022

Mr. Mark S. Miller
Director of Public Works
East Goshen Township Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Email: mmiller@eastgoshen.org
Telephone: 610 692 7171

Re: Sewer Availability Letter

Dear Mr. Miller,

Commonwealth Engineers, Inc., hereby requests a standard Sewer Availability Letter for the below detailed project:

Applicant: Planebrook Partners, LLC
Project Name: 301 Reservoir Road
Project Location: 301 Reservoir Road, West Chester
Tax Parcel No. : 5304P 0129 0000)
Township: East Goshen Township
Project Description: Proposed subdivision of this 6.8 +/- acre parcel into 5 lots. One lot would contain the existing single-family dwelling and outbuildings (currently utilizing public water and on-site septic), which shall remain. Connection to public sewer for the existing house is proposed. The existing barn will be converted to a single-family dwelling and the remaining 3 proposed lots will each contain 1 single-family dwelling. We are requesting an additional 1,055 gpd (5 EDU’s at 211 gpd/EDU)

I’ve also attached a site plan for ease of reference. Please call if you have any questions or require additional information.

Sincerely,

[signature: Stacy Turner]
Stacy Turner

Attachment: Sketch Plan dated November 9, 2022

cc: Michael Ellis, P.E., Municipal Division Manager, Pennoni Associates, Inc.,
121 Continental Drive, Suite 207, Newark, DE 19713 (via email: MEllis@Pnnoni.com)

G:\ACTIVE JOBS\2020\202040 Planebrook (301 Reservoir Rd-Papa)\01 Administrative Files\03 Sewer & Water\202040 Sewer Will Serve Request 2022-12-08.doc

PROFESSIONAL CIVIL ENGINEERING

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

SKETCH PLAN FOR 301 RESERVOIR ROAD - EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA

[Engineering sketch plan showing a proposed 5-lot residential subdivision at 301 Reservoir Road (Tax Parcel 53-6-129), including location map, legend, general notes, R-2 zoning compliance table, and lot layout with existing buildings and proposed stormwater management area.]

Title Block

COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE - SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE (610) 518-9000 - FAX (610) 518-9004 | COMWENG@AOL.COM

DATE: NOVEMBER 9, 2022 | SCALE: AS SHOWN | SURVEY: CEI | DRAWN: MDK | CHECKED: VRE | DRAWING NO. 202600-01 | SHEET: 1 OF 1 | GRAPHIC SCALE: 1" = 50' (0, 50, 100, 150 FEET)

Location Map (Scale 1" = 1,000')

Labels: SITE, RESERVOIR ROAD, LOCKWOOD LA, BALDWIN LA, ROCKLAND CIR, BARKER DR, BRASS RING DR, ALISON LN, STURBRIDGE LA, WATER VIEW RD, Goshen Fire Co 1, Westtown Reservoir, Branch

Legend

  • PRECAUTIONARY STEEP SLOPES (15% TO 25%)
  • PROHIBITIVE STEEP SLOPES (OVER 25%)
  • EXISTING INTERMEDIATE CONTOUR
  • EXISTING INDEX CONTOUR
  • EXISTING WETLANDS LINE
  • EXISTING 100-YEAR FLOODPLAIN
  • STREAM LINE
  • WOOD / TREE LINE
  • SHRUB / HEAVY VEGETATION LINE
  • EXISTING SANITARY SEWER LINE
  • EXISTING STORM SEWER LINE
  • EXISTING WATER LINE
  • EXISTING RIGHT-OF-WAY LINE
  • EXISTING EDGE-OF-PAVING
  • EXISTING CURBING
  • EXISTING BUILDING
  • EXISTING SOIL LINE

General Notes

  1. OWNER: ROBERT F. PAPA, 301 RESERVOIR ROAD, WEST CHESTER, PA 19380-4523, TAX PARCEL NO. 53-06-0129, DEED REFERENCE: BOOK 5095, PAGE 873. APPLICANT/EQUITABLE OWNER: COMMONWEALTH HOME BUILDERS, 208 CARTER DRIVE, SUITE 13B - ENTERPRISE BUSINESS PARK, WEST CHESTER, PA 19382, PHONE: 610-431-7544.
  2. TOTAL TRACT AREA: 8.678 AC. (GROSS AREA); XXXXX AC. (NET LOT AREA). EXISTING LOTS: 1 RESIDENTIAL LOT. PROPOSED LOTS: 5 RESIDENTIAL LOTS.
  3. TOPOGRAPHY, DEED PLOT AND FEATURES ARE TAKEN FROM PENNSYLVANIA SPATIAL DATA ACCESS (PASDA) WEB SITE.
  4. NO PORTION OF THIS SITE LIES WITHIN A ZONE A, ZONE AE FEMA FLOOD PLAIN PER FEMA FLOOD PLAIN MAP 42029C0353G EFFECTIVE SEPTEMBER 29, 2017.
  5. SOILS TYPES AND BOUNDARIES ARE COMPILED FROM UNITED STATES DEPARTMENT OF AGRICULTURE, NATURAL RESOURCES CONSERVATION SERVICE WEB SOIL SURVEY (http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx).
  6. TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF, THERE ARE NO EXISTING WETLANDS ON THE SUBJECT TRACT OR WITHIN 100 FT OF ANY PROPOSED IMPROVEMENTS, NOR ANY SEPTIC SYSTEMS WITHIN 100 FT OF ANY PROPOSED IMPROVEMENTS.
  7. CONCRETE MONUMENTS SHOWN AS THUS SHALL BE PLACED WHERE INDICATED. PROPERTY CORNERS NOT MONUMENTED SHALL BE MARKED WITH IRON PINS.
  8. THE DEVELOPER SHALL CONFORM TO OR CAUSE CONFORMANCE WITH ALL OF THE IMPROVEMENTS SHOWN ON THIS PLAN AND IN THE EAST GOSHEN TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE AND ZONING ORDINANCE AS WELL AS ANY APPLICABLE COUNTY, STATE AND FEDERAL STATUTES.
  9. THE CONTRACTOR SHALL NOTIFY UNDERGROUND UTILITY USERS AT LEAST THREE DAYS PRIOR TO EXCAVATION TO ASCERTAIN FIELD LOCATIONS AS REQUIRED BY PA ACT 287, 172 AND 38 (AND ALL OTHER APPLICABLE AMENDMENTS), AS WELL AS CONFORM TO ALL PROVISIONS OF THE REFERENCED ACTS.

ZONING – R-2 RESIDENTIAL DISTRICT

DESCRIPTION REQUIRED EXISTING UPI# 53-6-129 PROPOSED LOT 1 PROPOSED LOT 2 PROPOSED LOT 3 PROPOSED LOT 4 PROPOSED LOT 5
MINIMUM LOT AREA (NET OF ROW) 1.0 AC. 8.678 AC. 1.080 AC. 1.142 AC. 1.448 AC. 3.336 AC. 1.073 AC.
MINIMUM LOT WIDTH AT BUILDING LINE 150 FT 150 FT (MIN) 150 FT 150 FT 150 FT 150 FT 150 FT
MINIMUM LOT WIDTH AT STREET LINE 60 FT (MIN) 290.00 FT 248.75 FT 219.99 FT 149.15 FT 175.60 FT 163.26 FT
MINIMUM FRONT YARD 45 FT (MIN) 45 FT (MIN) 45 FT (MIN) 45 FT (MIN) 45 FT (MIN) 45 FT (MIN) 45 FT (MIN)
AVERAGE FRONT YARD* 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN)
MINIMUM REAR YARD 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN) 50 FT (MIN)
MINIMUM SIDE YARD 25 FT (MIN) 25 FT (MIN) 25 FT (MIN) 25 FT (MIN) 25 FT (MIN) 25 FT (MIN) 25 FT (MIN)
MAXIMUM BUILDING COVERAGE 20% (MAX) 20% (MAX) 20% (MAX) 20% (MAX) 20% (MAX) 20% (MAX) 20% (MAX)
MAXIMUM IMPERVIOUS COVERAGE 25% (MAX) 25% (MAX) 25% (MAX) 25% (MAX) 25% (MAX) 25% (MAX) 25% (MAX)
MAXIMUM BUILDING HEIGHT 35'(PRIN)/20'(ACC) 35 FT (MAX) 35 FT (MAX) 35 FT (MAX) 35 FT (MAX) 35 FT (MAX) 35 FT (MAX)

* TO OBTAIN SOME FLEXIBILITY IN PLACING BUILDINGS IN ALL RESIDENTIAL SUBDIVISIONS OF TWO OR MORE LOTS, AN AVERAGE BUILDING SETBACK LINE OF 50 FEET AND A MINIMUM BUILDING SETBACK OF 45 FEET SHALL BE REQUIRED.

Plan View & Lot Labels

  • RESERVOIR ROAD (T-470) (SPEED LIMIT 35 MPH)
  • COOPER CIRCLE
  • Lot 1: NET AREA: 47,051 SF (1.080 AC.)
  • Lot 2: NET AREA: 49,745 SF (1.142 AC.), EXISTING GARAGE (TO REMAIN), EXISTING BARN (TO REMAIN)
  • Lot 3: NET AREA: 63,074 SF (1.448 AC.), EXISTING HOUSE (TO REMAIN)
  • Lot 4: NET AREA: 145,327 SF (3.336 AC.), N/F ROBERT F. PAPA, TP# 53-6-129, DB 5095 PG 873
  • Lot 5: NET AREA: 46,743 SF (1.073 AC.), PROPOSED STORMWATER MANAGEMENT AREA
  • Boundary Dimensions: 290.00' N 24°44'26" E, 190.05' N 65°46'35" W, 179.66' N 24°44'26" E, 97.85' N 66°38'43" W, 102.16' N 73°59'00" W, 136.81' N 06°42'30" E, 85.00' N 65°00'00" W, 164.24' S 67°16'00" E, 145.00' N 64°46'00" W, S 32°11'17" E 207.84', 429.86' S 31°11'27" W, 410.00' S 65°15'35" W
  • PENNSYLVANIA ONE CALL SYSTEM, INC. 1-800-242-1776 STOP - CALL BEFORE YOU DIG! | UPI No. 53-06-0129.000 | TAX PARCEL No. 53-6-129

[Logo: Pennoni]

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com

December 8, 2022

East Goshen Township
Attn: Derek Davis, Township Manager
1580 Paoli Pike
West Chester, PA 19380

RE: Fee Schedule for Year 2023
East Goshen Township and East Goshen Municipal Authority

Dear Derek:

Pennoni is proud to serve East Goshen Township and East Goshen Municipal Authority, and we look forward to working with you again in 2023.

Our rates for 2023 for Township and Authority Engineering services are listed below for the categories of staff that most frequently provide services to the Township and Authority. The rates reflect an average increase of 6.0%, which is within the 2023 federal cost of living adjustment (COLA) of 8.7%.

Authority/Township Engineer $149/hr
Senior Professional $145/hr
Project Professional $128/hr
Staff Professional $117/hr
Associate Professional $111/hr
Senior Engineering Technician $107/hr
Graduate Professional $102/hr
Engineering Technician $90/hr
Survey Crew (2-Person) $200/hr

We will continue to provide services to the Township and Authority as requested.

For typical general engineering services to the Authority, we recommend budgeting the following under the expectation of a similar level of effort in 2023 as in the past several years. Similar to previous years, we will establish separate accounts for each activity listed below, and each activity will be invoiced separately.

• General Consultation and monthly meetings (also including SBR tank visual condition inspections, I&I support, and West Goshen project consultation) * $42,000
• Chapter 94 reports $9,000
TOTAL $51,000

*I/I support has been a separate invoicing “project” in past years, but we suggest including it as part of the General Consultation project in 2023 since there has been less engineering effort associated with it in 2022 and as projected into 2023 than in past years since the Public Works Department is aggressively implementing previously established I/I programs.

East Goshen Township December 8, 2022 Page 2
Year 2023 Annual Services

Other Authority projects outside of general services, as requested, will be proposed separately, such as the following projects that are planned for 2023:

  • Hershey’s Mill Estates Sewer Replacement Construction Phase Services
  • RCSTP Generator Replacement
  • Hunt Country Pump Station Metering, Muffin Monster, and Bypass System
  • Supplee Valley Sewer Lining

We thank you again for the confidence you have placed in Pennoni over the years and look forward to continuing to serve you in the future!

Sincerely,

PENNONI ASSOCIATES INC.

[signature: Michael J. Ellis]

Michael J. Ellis, PE
Associate Vice President

[signature: Nathan M. Cline]

Nathan M. Cline, PE
Associate Vice President

FYI

RECEIPT

10/31/22

MediaNews Group

PENNSYLVANIA GROUP

Account: 884433 Date: 10/31/22
Name: DEREK DAVIS Start Date: 11/01/22 | Stop Date: 11/09/22
Company: EAST GOSHEN TOWNSHIP Class: 1201 - Legal Notices
Address: 1580 PAOLI PIKE
WEST CHESTER, PA 19380
Ad ID: 2396632
Ad Taker: CRRDEAN
Telephone: (610) 692-7171 Sales Person: Ryan Dean (018303)
Fax: (000) 000-0000 Words: 244
Description: ADVERTISEMENT EAST GOSHEN MUNICIPAL Lines: 59
Agate Lines: 59
Depth: 6.556
Inserts: 4
Blind Box:
PO Number:
Total: $355.98
Paid Amount: $0.00
Amount Due: $355.98

Publication

Daily Local News, Daily Local News Digital

Ad sample

ADVERTISEMENT
EAST GOSHEN
MUNICIPAL AUTHORITY
WEST CHESTER,
PENNSYLVANIA

Sealed bids will be received electronically through PennBid™ by the East Goshen Municipal Authority for Hershey's Mill Estates Sanitary Sewer Replacement, Contract No. HME-2022 until 2:00 PM, prevailing time, on the 5th day of December 2022, at which time they will be publicly read at the East Goshen Township office, 1580 Paoli Pike, West Chester, PA 19380. All documents and solicitation details are available online anytime at no cost at PennBid™ (www.PennBid.net).

Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.

This project involves the construction of 2,907 L.F. of new and replacement 8-inch and 12-inch diameter gravity sewer pipe and eight precast concrete manholes.

A non-mandatory pre-bid meeting will be held on November 10, 2022, at 9:00 AM at the project site, adjacent to 1560 Tanglewood Drive, West Chester, PA 19380.

Bids must be submitted unconditionally. No bidder may withdraw bid within sixty (60) days after the scheduled closing time for receipt of bids.

The Owner reserves the right to waive any informality, or to reject any or all bids.

Pennsylvania Department of Labor and Industry Prevailing Wage Rates apply to this project.

DLN 11/1, 11/9; 1a

We Appreciate Your Business!
Thank You DEREK DAVIS!