Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
December 12, 2022
7:00
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report
- APPROVAL OF MINUTES November 14, 2022
- APPROVAL OF INVOICES Gawthrop Invoice #266389 $ 500.00 Gawthrop Invoice #265299 $ 420.00 Pd 11/16 Deckman Invoice #4825 $ 4514.00 Pd 11/16 Colonial Elect. Invoice #14850138 $ 450.27 Pd 11/16 Yale Elect. Invoice #S121654188.001 $ 96.91 Pd 11/16
- LIAISON REPORTS
- FINANCIAL REPORTS November Financial Report
- OLD BUSINESS Hershey Mill Trunk Line
F:\Data\Shared Data\Agendas\Municipal Authority\2022\12-12-2022.doc
- 2022 Goals: Goal Status Ridley Creek Plant Compliance January,February,March,April,May,June,July,August, September, October and November were in compliance and met all requirements *Note DEP Annual Insp. Continue to Monitor Upgrades at WGSTP and Westtown Way Pump Station On – going Continue to Implement Infiltration and Inflow for the Sewer System On-going Caustic Soda Project Tank has been delivered awaiting PA DEP approval once installed. Replace sewer line Hershey Mill Estate trunk line replacement Bid documents finalized. Bid advertised Nov. 1, bids due Dec. 5 th if grant application is approved. Three new meters for Ridley Creek Collection Hibberd Lane was installed 2021 RCSTP influent flow meter replacement 2022 Blacksmith Shop (2023) Line Road - Deferred
- NEW BUSINESS Sewer Availability Letter from Commonwealth Engineers; Fee schedule for 2023 from Pennoni
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2022\12-12-2022.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | December 12, 2022 Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 658,909 per day.
Meters: The meters were read on a daily basis. We had the meters calibrated on November 21, 2022, there are no adjustments done. It was noted that three of the meters need transducer brackets replaced.
C.C. Collection: All pump stations were visited on a daily basis, the wet wells were washed down and the FOG rods were cleaned. We did get a call for a sewer backup at Ellis Lane however; the problem was on the homeowner’s side of the sewer.
C.C. Interceptor:
R.C. Collection: The pump stations were visited on a daily basis; the wet wells were cleaned. We did respond to four alarms due to power outages. The generators ran and kept the stations in service.
Ridley Creek Plant: We have started work on the caustic soda system; the pump table was built in the shop and taken down to the plant to be put in place. Lenni Electric has been running the ridge conduit for the alarms and power for the pumps. They also installed additional conduit for some of the communication lines that Verizon installed. We had a problem on December 1 when a limb came in contact with a high voltage line; PECO was on location when the line dropped. We had to call Lenni in to throw the disconnect 33KV switch. Once power was installed, Lenni threw the switch and we brought the plant back on line. Kevin is setting up the schedule to clean the main trunk line from the new meter pit into the screen room. John Laidley will be on hand so he can zero out the new flow meter.
We have started clearing the lay down area at the Hershey Mill sewer project. Stumps were excavated and the soil was hauled out. Millings were hauled in and a level area was constructed.
Alarms: We responded to 22 alarms for November.
PA 1 Calls: We responded to over 35 PA One Calls for the month November.
Monthly Rainfall: 3.15 inches of rain for the month of November.
Lateral repairs or Caps: We had nine cleanout repairs for November.
[Photograph of workers with shovels hand-digging around an exposed sanitary sewer pipe in a muddy creek bed, with a backhoe positioned on the bank above and two handwritten sticky notes attached.]
Sanitary Sewer in the Ridley Creek. This was caused by Hurricane IDA. Crew encased pipe in concrete.
Hand digging around Sanitary Sewer
[Photograph of a Public Works crew working in a creek bed with shovels and a water pump to expose a sanitary sewer pipe, flanked by a CAT 306 excavator and a CASE Extendahoe backhoe, with a handwritten sticky note attached.]
PW crew exposing Sanitary Sewer
CAT 306 | FOLEY CAT | CASE EXTENDAHOE
[Photograph of a concrete-encased sanitary sewer pipe in a creek bed covered with a gray tarp weighted down by stones, with a pump intake hose in the foreground and orange bypass hoses, white sandbags, and a yellow CAT excavator in the background.]
[Photograph of a sanitary sewer pipe encased in concrete within wooden formwork across a creek bed, with a pump hose in the foreground and a handwritten sticky note attached.]
Pipe encased in concrete.
Pennoni
Christiana Executive Campus121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
December 9, 2022
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We obtained the attached cost quote from a PADEP “certified installer” for inspection and sign-off of the PADEP bulk tank permit application as the system is installed by the PWD. The permit application will be submitted to PADEP after installation with the certified installer’s certification. We are also setting up a meeting with the operator to determine the alarm needs for the caustic system (i.e. leak detection, liquid level, chemical feed pump failure, etc.).
- UV Disinfection System – The system is being fabricated by Glasco, and delivery is expected in late February or early March 2023. The bidding and contracting schedule for the mechanical and electrical work remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants. Those awards had been expected to occur in November, but the funding agency, PA DCED, informed us that the awards will now occur in January at the earliest, but it could be later than that. The MA authorized bidding at the November MA meeting with the intention to advertise the solicitations in early December. However, we now propose to extend the advertisement to occur when the CFA’s public meeting schedule to make the LSA awards is announced. The UV solicitations can then be advertised approximately one month in advance of the CFA meeting so that UV bids will be received and can be awarded right after the CFA meeting. The tentative revised bidding schedule follows, based upon the CFA meeting occurring in late January: Bid Advertisement – late December/early January; Bids Due – late January/early February; Award Consideration – February 13, 2023 at the Municipal Authority Meeting
- Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.
Westtown Way Pump Station
- No update since our last report.
Sanitary Sewer Pipe Rehab
- Supplee Valley – No have updated the construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood and will submit to the Township for review. We anticipate bidding the project in January 2023 with construction in early 2023.
- Hershey’s Mill Estates – We administered the bidding process including responding to prospective bidders’ questions, conducting two on-site pre-bid meetings, re-designing portions of the access routes and sewer alignment based upon the site meetings, adding storm sewer replacement scope, coordinating for pre-construction site clearing and site preparation by the Township, preparing and issuing Addendum #1 consisting of a new plan set and updated specification sections, and conducting
EGMAU22001
December 9, 2022
Page 2
East Goshen Municipal Authority
Engineer’s Report
bid opening. Bids were received on December 8, and an unofficial bid tabulation is attached. We are preparing an official bid tabulation and reviewing bid documents, and we will confirm the bid and scope with the low bidder and also check references in order to make an award recommendation.
If the CFA LSA grant award meeting is scheduled to occur in January, we will recommend award at the January MA meeting conditioned that the contract cannot be executed/signed until after the CFA meeting since that grant requires that contracts not be signed or Notice to Proceed (NTP) issued until after grant awards are made. PA DCED confirmed that the contract can be signed and NTP issued immediately after the CFA meeting so we do not have to wait several months for the subsequent grant agreement to be provided and executed, if the grant is awarded.
If the CFA meeting is not scheduled in January, we can discuss with the low bidder about extending the contract award timeframe beyond the 60 days that is provided in the bid document, in which case award consideration would then be projected to occur at the February MA meeting.
- Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.
I&I Program
- No activity since our last report.
New Connections
- 301 Reservoir Road – We provided alternatives to the developer’s design engineer for potential public sewer connection locations for the proposed 5-lot subdivision.
Industrial Pretreatment Ordinance
- No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.
END OF REPORT
P:\Projects\EGMA\Memos to Board\2022\Engineers Report 2022-12-09.docx
Data Design Services II, Inc.
319 Exton CommonsExton, PA 19341
www.datadesignsvcs.com
| 610-524-6357 | Phone |
|---|---|
| 610-524-6359 | Fax |
| 484-459-8175 | Cell |
| Jim.Wood@datadesignsvcs.com |
Quotation #: 20220982
November 23, 2022
|
To:
Pennoni Associates 121 Continental Drive Suite 207 Newark, DE 19713 Attn: Erika Addison 302-351-5263 eaddison@pennoni.com |
Please Address Purchase Order to: Data Design Services II, Inc. 319 Exton Commons Exton, PA 19341 orders@datadesignsvcs.com |
|---|
| F.O.B.: Jobsite | Terms: TBD – see note 3 | Estimated Shipping Date: TBD |
|---|
REF: TANK REGISTRATION
In request for a PO for this tank registration we are pleased to quote the following:
Item #1: PENNSYLVANIA TANK CERTIFICATION (1 DAY, 1 TANK)
| Daily Rate: | $850.00 / DAY |
|---|---|
| Mileage to and from site: | $10.00 (5 Miles each way) ($1.00 / PER MILE x 10 MILES) |
| Tank Registration: | $385.00 / PER TANK |
| TOTAL: | $1,245.00 |
NOTES:
- This quotation is valid for 30 days.
- Quoted pricing DOES NOT INCLUDE any state or local taxes. Customer must submit proper tax exemption certificate with order. If not submitted, customer is responsible for all applicable state, local, or other taxes and/or fees.
- RE: CREDIT – Data Design Services, Inc. offers credit terms upon receipt and review of your credit information, to include current creditor contacts (with phone & fax numbers) and bank information. Data Design Services, Inc. reserves the right to request initial and/or progress payments; initial orders may require a down-payment; Data Design Services, Inc. reserves the right to refuse credit offering due to unsatisfactory and/or incomplete credit submittal information; Data Design Services, Inc. reserves the right to re-invoice for interest/penalty charges if not paid in a timely fashion
- Interest at the rate of 1-1/2% per month will be charged for invoices past 45 days old.
- Please address your Purchase Order to: Data Design Services II, Inc. 319 Exton Commons Exton, PA 19341 orders@datadesignsvcs.com www.datadesignsvcs.com
DDS QUOTE #20220982
Page 2 of 2
- Unless expressly stated herein, nothing is to be considered to be inferred or implied.
Thank you for the opportunity to be of service. Please contact us with any questions.
Sincerely,
Jim Wood
Data Design Services, Inc.
JW
www.datadesignsvcs.com
UNOFFICIAL BID TABULATION
East Goshen Municipal Authority
Contract: HME-2022, Hershey's Mill Estates Sanitary Sewer Replacement
Extended Price Analysis
| Reference Number | Description | Type | UOM | Quantity | Joao & Bradley Construction Co., Inc. | DiRocco Bros., Inc. | Mason Dixon Contractors | G&B Construction | McKenney Construction | DOLI Construction Corporation | Bright Construction Group | Anrich,Inc. | Jurich, Inc. | MOR Construction Services, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Base Bid | ||||||||||||||
| 1 | Mobilization and Demobilization. Price complete, in place, per lump sum: | Base | L.S. | 1 | $20,000.00 | $77,800.00 | $62,000.00 | $95,000.00 | $21,000.00 | $100,000.00 | $100,000.00 | $10,450.00 | $193,622.00 | $86,000.00 |
| 2 | Tree Removal and Site Preparation. Price complete, in place, per lump sum: | Base | L.S. | 1 | $30,000.00 | $14,240.00 | $210,412.34 | $28,500.00 | $6,900.00 | $50,000.00 | $49,767.00 | $66,950.00 | $38,064.00 | $178,000.00 |
| 3 | Install, Maintain, and Remove Erosion and Sediment Controls. Price complete, in place, per lump sum: | Base | L.S. | 1 | $65,000.00 | $68,809.00 | $63,000.00 | $25,000.00 | $33,090.00 | $30,000.00 | $50,000.00 | $52,125.00 | $43,784.00 | $68,000.00 |
| 4 | Site Dewatering. Price complete, in place, per lump sum: | Base | L.S. | 1 | $10,000.00 | $69,960.00 | $50,000.00 | $31,500.00 | $43,820.00 | $40,000.00 | $100,000.00 | $65,050.00 | $47,907.00 | $56,000.00 |
| 5 | New Precast Concrete Manhole. Price complete, in place, per each: | Base | EA. | 5 | $27,500.00 | $81,004.00 | $39,472.50 | $67,130.00 | $48,500.00 | $37,500.00 | $27,500.00 | $30,000.00 | $53,750.00 | $67,000.00 |
| 6 | Precast Concrete Manhole Replacement. Price complete, in place, per each: | Base | EA. | 3 | $17,100.00 | $58,128.00 | $14,330.19 | $450.00 | $33,600.00 | $19,500.00 | $19,500.00 | $18,150.00 | $29,550.00 | $56,250.00 |
| 7 | 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with 2A Stone or Imported Soil Backfill. Price complete, in place, per linear foot: | Base | L.F. | 453 | $61,155.00 | $39,691.86 | $55,519.68 | $67,950.00 | $83,352.00 | $135,900.00 | $86,070.00 | $132,276.00 | $86,523.00 | $158,550.00 |
| 8 | 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: | Base | L.F. | 1,938.00 | $193,800.00 | $198,451.20 | $108,082.26 | $290,700.00 | $335,274.00 | $484,500.00 | $339,150.00 | $498,066.00 | $408,918.00 | $678,300.00 |
| 9 | 12" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: | Base | L.F. | 224 | $22,400.00 | $23,813.44 | $12,492.48 | $33,600.00 | $43,008.00 | $58,240.00 | $42,560.00 | $60,704.00 | $48,832.00 | $70,560.00 |
| 10 | 6" and 8" Dia. C900, DR-18 Lateral. Price complete, in place, per linear foot: | Base | L.F. | 250 | $15,000.00 | $39,690.00 | $13,462.50 | $37,500.00 | $36,250.00 | $25,000.00 | $30,000.00 | $72,000.00 | $40,000.00 | $76,250.00 |
| 11 | Replace Cleanouts. Price complete, in place, per each: | Base | EA. | 11 | $20,900.00 | $16,500.00 | $79,700.72 | $16,500.00 | $22,000.00 | $11,000.00 | $2,750.00 | $17,611.00 | $19,250.00 | $10,450.00 |
| 12 | Install, Maintain, and Remove Temporary Cofferdam Diversions. Price complete, in place, per lump sum: | Base | L.S. | 1 | $5,500.00 | $6,500.00 | $43,458.06 | $10,000.00 | $25,000.00 | $25,000.00 | $10,000.00 | $28,650.00 | $38,926.00 | $25,000.00 |
| 13 | Sanitary Sewer Bypass Pumping and Flow Control. Price complete, in place, per lump sum: | Base | L.S. | 1 | $10,000.00 | $28,000.00 | $87,497.59 | $42,500.00 | $73,000.00 | $25,000.00 | $120,000.00 | $37,200.00 | $72,247.00 | $47,500.00 |
| 14 | Connect Sanitary Sewer to Existing Manholes. Price complete, in place, per each manhole: | Base | EA. | 10 | $5,000.00 | $20,000.00 | $30,485.10 | $10,000.00 | $20,000.00 | $10,000.00 | $25,000.00 | $12,760.00 | $12,000.00 | $42,000.00 |
| 15 | Install R-6 Rip Rap with Geotextile Rock Bank Stabilization. Price complete, in place, per ton: | Base | TONS | 50 | $7,500.00 | $5,000.00 | $3,508.50 | $7,500.00 | $8,000.00 | $6,250.00 | $6,000.00 | $12,600.00 | $10,000.00 | $26,250.00 |
| 16 | 24" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: | Base | L.F. | 35 | $4,725.00 | $4,370.10 | $2,472.40 | $5,250.00 | $10,150.00 | $5,250.00 | $5,250.00 | $2,100.00 | $6,335.00 | $6,825.00 |
| 17 | 36" Dia. HDPE Storm Sewer Pipe Installation Price complete, in place, per linear foot: | Base | L.F. | 25 | $3,500.00 | $4,370.00 | $2,472.50 | $3,750.00 | $7,000.00 | $5,000.00 | $4,375.00 | $2,100.00 | $5,925.00 | $5,375.00 |
| 18 | Site Restoration. Price complete, in place, per lump sum: | Base | L.S. | 1 | $70,000.00 | $15,000.00 | $23,710.91 | $10,000.00 | $42,000.00 | $50,000.00 | $75,000.00 | $40,750.00 | $138,244.00 | $125,000.00 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 19 | Replace Concrete Curb. Price complete, in place, per linear foot: | Base | L.F. | 120 | $3,600.00 | $10,200.00 | $12,033.60 | $14,400.00 | $6,600.00 | $4,800.00 | $7,800.00 | $12,660.00 | $12,120.00 | $18,000.00 |
| 20 | Miscellaneous Excavation and Backfill. Price complete, in place, per cubic yard: | Base | C.Y. | 500 | $12,500.00 | $42,500.00 | $35,990.00 | $60,000.00 | $14,500.00 | $10,000.00 | $100,000.00 | $33,000.00 | $95,000.00 | $97,500.00 |
| 21 | Rock Removal. Price complete, in place, per cubic yard: | Base | C.Y. | 25 | $5,000.00 | $6,250.00 | $7,005.50 | $11,250.00 | $5,500.00 | $12,500.00 | $7,500.00 | $17,575.00 | $7,975.00 | $16,250.00 |
| 22 | Abandon Existing Manhole. Price complete, in place, per each: | Base | EA. | 1 | $25,000.00 | $2,500.00 | $2,693.15 | $1,000.00 | $1,500.00 | $2,500.00 | $500.00 | $1,170.00 | $1,753.00 | $9,500.00 |
| 23 | Storm Sewer Headwall. Price complete, in place, per lump sum: | Base | L.S. | 1 | $17,000.00 | $5,500.00 | $3,238.62 | $15,000.00 | $26,000.00 | $10,000.00 | $8,500.00 | $4,677.00 | $19,514.00 | $17,500.00 |
| 24 | Trench Plug. Price complete, in place, per each: | Base | EA. | 5 | $4,000.00 | $7,500.00 | $13,198.10 | $2,500.00 | $11,000.00 | $3,750.00 | $5,000.00 | $4,460.00 | $11,000.00 | $17,500.00 |
| Base Bid Total | $656,180.00 | $845,777.60 | $976,237.70 | $886,980.00 | $957,044.00 | $1,161,690.00 | $1,222,222.00 | $1,233,084.00 | $1,441,239.00 | $1,959,560.00 | ||||
| Add Items | ||||||||||||||
| 1 | Precast Concrete Manhole Replacement. Price complete, in place, per each: | Option | EA. | 6 | $33,000.00 | $68,628.00 | $26,816.04 | $80,556.00 | $54,000.00 | $45,000.00 | $27,000.00 | $34,920.00 | $60,000.00 | $112,500.00 |
| 2 | Drop Manhole Replacement. Price complete, in place, per each: | Option | EA. | 1 | $7,500.00 | $12,438.00 | $5,560.84 | $7,500.00 | $14,000.00 | $10,000.00 | $7,500.00 | $8,382.00 | $15,000.00 | $19,500.00 |
| 3 | 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: | Option | L.F. | 132 | $13,200.00 | $15,875.64 | $7,117.44 | $19,800.00 | $19,272.00 | $29,700.00 | $23,100.00 | $38,544.00 | $27,852.00 | $37,719.00 |
| 4 | 8" Dia. C900, DR-18 Gravity Sewer Pipe Installation with Excavated Soil Backfill. Price complete, in place, per linear foot: | Option | L.F. | 144 | $15,120.00 | $23,814.72 | $7,764.48 | $21,600.00 | $23,904.00 | $36,000.00 | $25,200.00 | $36,864.00 | $30,384.00 | $41,148.00 |
| 5 | DEDUCTION - Connect Sanitary Sewer To Existing Manholes (Same Unit Price as Base Bid Item #14). Price complete, in place, per each manhole: | Option | EA. | 7 | ($3,500.00) | ($19,950.00) | ($21,339.57) | ($7,000.00) | ($14,000.00) | ($7,000.00) | ($17,500.00) | ($8,932.00) | ($7,000.00) | ($29,400.00) |
| 6 | 6" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: | Option | L.F. | 114 | $10,260.00 | $7,620.90 | $5,110.62 | $17,100.00 | $2,052.00 | $9,690.00 | $9,690.00 | $29,184.00 | $14,934.00 | $10,830.00 |
| 7 | 24" Dia. HDPE Storm Sewer Pipe with Rip Rap Apron Installation. Price complete, in place, per linear foot: | Option | L.F. | 40 | $6,000.00 | $7,620.00 | $3,314.00 | $6,000.00 | $3,840.00 | $6,000.00 | $7,000.00 | $11,640.00 | $7,240.00 | $7,800.00 |
| 8 | 15" Dia. HDPE Storm Sewer Pipe Installation. Price complete, in place, per linear foot: | Option | L.F. | 10 | $1,500.00 | $7,620.00 | $1,346.60 | $1,500.00 | $450.00 | $1,750.00 | $1,250.00 | $2,700.00 | $1,600.00 | $2,650.00 |
| Add Item Total | $83,080.00 | $123,667.26 | $35,690.45 | $147,056.00 | $103,518.00 | $131,140.00 | $83,240.00 | $153,302.00 | $150,010.00 | $202,747.00 | ||||
| Grand Total | $739,260.00 | $969,444.86 | $1,011,928.15 | $1,034,036.00 | $1,060,562.00 | $1,292,830.00 | $1,305,462.00 | $1,386,386.00 | $1,591,249.00 | $2,162,307.00 | ||||
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
December 2022
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality for the month of November. All supplemental reports were submitted for the month of October with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued in September. Chemical usage utilized for, and total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes were slightly increased to a daily average of 70.0 as compared to the previous month at 69.1 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.
Table 1
November 2022- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | Ultraviolet light intesity | Copper, Total | Zinc, Total | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | ||||
| 0.75 | 10 | 62 | Report | Report | 10 | 62 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | ||||
| Inst. Max | 20 | 94 | 15 | 94 | 5 | 1 | Report | Report | Report | |||||||
| Sample Date | ||||||||||||||||
| November 1, 2022 | 0.306 | 2.0 | 5.1 | 7.46 | 19.0 | 4.0 | 10.2 | 0.10 | 0.26 | 0.16 | 0.41 | 20 | 1.3010 | NS | NS | NS |
| November 8, 2022 | 0.292 | 2.0 | 4.9 | 6.66 | 16.2 | 4.5 | 11.0 | 0.10 | 0.24 | 0.16 | 0.39 | 41 | 1.6128 | NS | NS | NS |
| November 8, 2022 | 0.447 | 2.0 | 7.5 | 6.40 | 23.9 | 5.5 | 20.5 | 0.10 | 0.37 | 0.15 | 0.56 | 68 | 1.8325 | NS | NS | NS |
| November 22, 2022 | 0.311 | 2.0 | 5.2 | 6.16 | 16.0 | 4.0 | 10.4 | 0.10 | 0.26 | 0.14 | 0.36 | 13 | 1.1139 | NS | NS | NS |
| November 29, 2022 | 0.278 | 2.0 | 4.6 | 4.25 | 9.9 | 4.0 | 10.2 | 0.10 | 0.23 | 0.11 | 0.25 | 3 | 0.4771 | NS | NS | NS |
| Average | 0.327 | 2.0 | 5.5 | 6.19 | 17.0 | 4.6 | 12.8 | 0.10 | 0.27 | 0.14 | 0.40 | 29 | 1.2675 | NA | NA | NA |
| Minimum | 0.278 | 2.0 | 4.6 | 4.25 | 9.9 | 4.0 | 10.2 | 0.10 | 0.23 | 0.11 | 0.25 | 3 | 0.4771 | NA | NA | NA |
| Maximum | 0.447 | 2.0 | 7.5 | 7.46 | 23.9 | 5.5 | 20.5 | 0.10 | 0.37 | 0.16 | 0.56 | 68 | 1.8325 | NA | NA | NA |
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported to date for outfall 001 November 2022. The month-to-date average total phosphorus was reported as 0.14 mg/L as compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 4.6 mg/L as compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment process performed well during October. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.
Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002 was discontinued through November 2022.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during November 2022.
Table 2
November 2022 - Influent Wastewater
| Design Basis | Flow | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total , mg/L | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| Average | 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||||
| November 1, 2022 | 0.374 | 428 | 1,334 | 223.0 | 695 | 528 | 1,646 | 29.3 | 91 | 61.7 | 192 | 5.78 | 18.0 |
| November 8, 2022 | 0.394 | 414 | 1,361 | 403 | 1,325 | 600 | 1,972 | 31.3 | 103 | 59.8 | 197 | 6.47 | 21.3 |
| November 15, 2022 | 0.484 | 340 | 1,373 | 321 | 1,296 | 282 | 1,139 | 28.6 | 115 | 50.6 | 204 | 5.48 | 22.1 |
| November 22, 2022 | 0.365 | 226 | 689 | 218 | 664 | 160 | 488 | 26.2 | 80 | 47.70 | 145.4 | 5.16 | 15.7 |
| November 29, 2022 | 0.369 | 306 | 942 | 253 | 779 | 322 | 991 | 46.0 | 142 | 69.1 | 213 | 4.86 | 15.0 |
| Average | 0.397 | 343 | 1,140 | 284 | 952 | 378 | 1,247 | 32 | 106 | 57.8 | 190 | 5.55 | 18.4 |
| Minimum | 0.365 | 226 | 689 | 218.0 | 664 | 160 | 488 | 26 | 80 | 47.7 | 145 | 4.86 | 15.0 |
| Maximum | 0.484 | 428 | 1,373 | 403 | 1,325 | 600 | 1,972 | 46 | 142 | 69.1 | 213 | 6.47 | 22.1 |
The foam on the SBR surface remained consistent with September with approximately 15% to 20% coverage of the surface area. The foam thickness is approximately 2 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.
PA DEP
No activity
Pennoni Associates
No activity
Page 2 of 4
Significant Rainfall
During November, there were eight (8) days when rainfall or snow occurred. There were two (2) events where the rainfall exceeded 0.5 inches in a 24-hour period.
November 12th 0.75 inches
November 16th 1.23 inches
The total rainfall for the month of November was a total 3.17 inches.
Chemical Usage:
| November 2022 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash, pounds | 290 | 9,000 |
| Aluminium Sulfate solution, gal | 70.0 | 2,100 |
| Sludge Dewatering, gal* | 22,870 | 480,276 |
*The centrifuge was operated 21 days during the month.
Flow data:
| November 2022 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 11.711 | 391,314 | 544,500 |
| Influent Wastewater to SBRs* | 12.401 | 413,359 | 573,952 |
| Internal Recycle** | 0.646 | 22,258 | 44,530 |
| Treated Effluent to Disc Filters | 12.144 | 413,359 | 573,952 |
| Final Effluent Discharge | 9.465 | 316,000 | 447,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
During November, the average monthly influent wastewater flow measured at the “field” flow meter was 391,314 gallons/day as compared to the influent flow into the SBRs as 413,359 gallons/day. The difference between the daily averages is 22,045 gpd, which is consistent with the average daily volume of internal recycle flow of 22,258 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.
Page 3 of 4
Minor Preventative Maintenance
- Flushed chemical feed lines to the SBRs.
- Cleaned final effluent weir trough daily
- Skimmed surface of disc filters daily
- Drained and cleaned disc filters bi-weekly
- Cleaned buildings and laboratory
Page 4 of 4
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 14, 2022
The East Goshen Township Municipal Authority held their regular meeting on Monday, November 14, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings, Vice Chairman
Dana Pizarro
Jack Yahraes
Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni representative), and Ellen Koopman (Attorney)
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| PWD – Public Works Department | WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our troops and First Responders. He asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
- Walter reported that he prepared an article for the Newsletter describing the projects the MA is working on.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for November 14 2022
Monthly Flows – The average daily flow to West Goshen was 659,687 per day.
Meters: The meters were read on a daily basis. No problems to report.
C.C. Collection: The pump stations were visited on a daily basis. The wet well was washed down and the level rods were cleaned. The generators were under power for one hour each week. The generators were serviced for the winter. We were called out to 42 Waterview Lane for a sewer lateral break. Since the area was recently dug by the Aqua Water subcontractor, we had Aqua send out their
MA 11-14-22 draft
1
contractor who did the hydro excavation. The pipe turned out to be ok. However, the manhole tie in was not to our standards so we went back on Monday and replaced the piping in the manhole.
C.C. Interceptor:
R.C. Collection: The pump stations were visited on a daily basis. The pump station wet wells were washed down along with the level roads. The generators were serviced as routine maintenance for the winter. We installed two batteries in the Hunt Country unit.
Ridley Creek Plant: The new meter was put in service; we have to do a zero flow test on the unit, which we will setup with John Laidley in the next couple of weeks. The boardwalk was completed. We replaced the blower motor on number 4. Lenni was on hand to do the wiring of the blower motor. I ordered a blower to replace number 5. The cost was $5,221.00. The supplier had one on the shelf so I had them ship it to us and it should arrive on Tuesday with the install scheduled for Wednesday. When I spoke with the sales clerk, I asked to check on availability for another blower. He said they were 18 to 20 weeks out. I ordered a second blower which we will have for a spare. Since the SBR is going on 11 years in service, we are starting to have equipment failures and components are not readily available. So, I am ordering some of the components that should be on the shelves. For the electronics, we have been ordering different components that John Laidley has recommended.
Alarms: We responded to 18 alarms for October.
PA 1 Calls: We responded to over 55 PA One Calls for the month of October.
Monthly Rainfall: 5.60 inches of rain for the month of October.
Lateral Repairs or Caps: We had over three dozen cleanout repairs for October.
2. Pennoni Engineer’s Report dated November 9, 2022
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We have prepared the PADEP tank permit application and have coordinated with a certified tank installer to perform an inspection when the system is installed by the PWD and to sign-off on the permit application. We are awaiting their fee quote for that inspection. The permit application will be submitted to PADEP after installation with the certified installer’s certification. We are coordinating with PADEP for the timing to start using the system after the application is submitted and associated duration for issuance of the permit.
- UV Disinfection System – Glasco’s shop drawings for the system were returned “Approved as Noted” on November 3. The lead time for the equipment is about 4 months. We therefore expect the equipment to be delivered in late February or early March 2023.
MA 11-14-22 draft
2
The bidding schedule remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants, which we tentatively understand is expected to occur in November. The proposed bidding schedule follows:
- Bid Advertisement – early December
- Bids Due – early January
- Award Consideration – January 9, 2023 at the Municipal Authority Meeting
We request authorization from the Municipal Authority to advertise the solicitation in December.
- Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.
Westtown Way Pump Station
- No update since our last report.
Sanitary Sewer Pipe Rehab
- Supplee Valley – No activity since our last report. We will finalize an updated construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood. We anticipate bidding the project in late December with construction in early 2023.
- Hershey’s Mill Estates – The bid documents were finalized, and the construction solicitation went live on PennBid on November 1. We have responded to prospective bidder’s questions. The bid schedule follows: Non-Mandatory Pre-Bid Meeting – November 10 at the site; Bids Due – December 5; Award Consideration – December 12 at the Municipal Authority Meeting
Since a LSA grant application was submitted for this project, construction contracts cannot be awarded if/until the grant is “approved”. The above schedule is based upon the grant award notifications occurring in November before bids are due. If grant award notifications have not occurred by November 28, the bid deadline will be extended by one month.
- Ridley Creek Exposed Sewer Rehab – We obtained emergency permit authorization from PADEP for the proposed concrete encasement of the sewer main that is exposed in the streambed. A full permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization.
I&I Program
- No activity since our last report.
New Connections
- Sewer Extension Study – No activity since our last report.
MA 11-14-22 draft
3
Industrial Pretreatment Ordinance
- No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.
Comments – Mike mentioned that the application for the UV tank permit is ready. He found a certified installer who said that our Public Works Department can do the install and he will check it. Mike is requesting approval to put bid ads out for the tank. Dana moved to authorize Pennoni to advertise bids for the UV project. Jack seconded the motion. The motion passed unanimously.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality for the month of October. All supplemental reports were submitted for the month of September with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued during October. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a daily average of 69.1 as compared to the previous month at 64.3 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.
The DEP report was discussed.
Approval of Minutes
The minutes of the October 10, 2022 meeting were approved as amended.
Approval of Invoices
- Dana moved to approve payment of the following Pennoni Invoices: #1141259 $ 501.53 #1141260 $ 519.32 #1141261 $3,504.25 #1141262 $ 580.25 Jack seconded the motion. The motion passed unanimously.
- Jack moved to approve payment of the Excelsior Invoice #0911231-IN in the amount of $5,221.00. Dana seconded the motion. The motion passed unanimously.
- Dana moved to approve the paid invoices for Yale #120860167.001 in the amount of $259.80 and Lowes in the amount of $58.20. Jack seconded the motion. The motion passed unanimously.
Liaison Reports
- Conservancy Board – Walter mentioned that the board did a site walk to decide where to put the trees. The board will purchase 10 trees and three will be provided by PHS. The planting will be Saturday November 19, 2022.
MA 11-14-22 draft
4
- BOS – Mike Lynch reported that the police contract renewal was finalized and approved by the police union. It is a 3 year agreement. The proposed 2023 Township budget includes an increase in the local East Goshen real estate tax of .5 which will make it 1.75. This tax has not been increased for 20 years. We can’t rely on other taxes, i.e., earned income tax. Mike spoke about the increase in the cost of services, i.e., fire, police, etc. The school district needs an SRO, police officer, which will be about $75,000 for the next 4 years. You can check the BOS minutes for their 10/18 meeting which includes Mike’s full statement.
Financial Reports
1. October Financial Report - Dave Ware provided the following report:
In October 2022, the Municipal Authority recorded $133,719.84 in revenues (primarily from Sewer Capital Reserve transfers) and $134,562.00 in expenses (General Engineering Services, Legal Services, Hershey’s Mill Sewer materials and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($842.16). As of October 31, 2022 the fund balance was $4,570.97.
Old Business
1. Hershey Mill Trunk Line – Mike Ellis mentioned that many contractors have been out for site walks. Mark and Mike spoke about the easement and the route for the contractors to come in. It is estimated the project will take about 100 days. Mark sent letters to all of the residents backing up on the site and will go out to meet with them. Bids are due December 5th. Subject to the grant, bids will be awarded in December. Mike is expecting 6-8 bids. Mike is recommending budgeting $7,500 for the bid phase instead of the $5,000 in the 2021 proposal. Dana moved to approve budget for the bid phase up to a maximum of $7,500.00. Jack seconded the motion. The motion passed unanimously.
Goals
Dana gave Mark changes to the goals regarding the Capital Improvement Program.
New Business
Capacity Request
1. 14 Reservoir Road – The plan was reviewed for the subdivision of this lot. Jack moved to approve the capacity request for 14 Reservoir Road. Dana seconded the motion. The motion passed unanimously.
Any Other Matter - None
Correspondence- None
Public Comment - None
MA 11-14-22 draft
5
Adjournment
There being no further business Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, December 12, 2022 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 11-14-22 draft
6
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
12/08/2022
Client No: 6604M
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 420.00 | 500.00 | 0.00 | -420.00 | $500.00 |
[signature]
12/9/22
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
12/08/2022
Client No: 6604-001M
Invoice No. 266389
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 11/09/2022 PMM |
Email from S. Smith regarding meeting materials. | 0.20 | 40.00 |
| 11/10/2022 EBK |
Review and analyze materials ahead of meeting | 0.30 | 60.00 |
| 11/14/2022 EBK |
Attend monthly meeting | 1.80 | 360.00 |
| 11/15/2022 EBK |
Draft summary report on monthly meeting | 0.20 | 40.00 |
| For Current Services Rendered | 2.50 | 500.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 0.20 | $200.00 | $40.00 |
| Ellen Koopman | 2.30 | 200.00 | 460.00 |
| Previous Balance | $420.00 |
|---|---|
| Total Current Charges | 500.00 |
| 11/23/2022 Payment | -420.00 |
| Balance Due | $500.00 |
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
11/14/2022
Client No: 6604M
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 400.00 | 420.00 | 0.00 | -400.00 | $420.00 |
Pd. 11/16
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
11/14/2022
Client No: 6604-001M
Invoice No. 265299
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 10/07/2022 PMM EBK |
Email from S. Smith with agenda and meeting materials. Review and analyze materials ahead of meeting |
0.20 0.20 |
40.00 40.00 |
| 10/10/2022 EBK |
Attend monthly meeting | 1.70 | 340.00 |
| For Current Services Rendered | 2.10 | 420.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 0.20 | $200.00 | $40.00 |
| Ellen Koopman | 1.90 | 200.00 | 380.00 |
| Previous Balance | $400.00 |
|---|---|
| Total Current Charges | 420.00 |
| 10/21/2022 Payment | -400.00 |
| Balance Due | $420.00 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Deckman Motor & Pump, Inc.
49 W. Front Street
Bridgeport, PA 19405
610-272-6944
DECKMAN MOTOR & PUMP INC
INVOICE 4825
DATE 11/03/2022
TERMS Net 30
BILL TO
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
SHIP TO
Mark-cell 610-656-2742
email sent 11-2 cyr
| SHIP VIA | P.O. NUMBER | TECH | WORK ORDER # |
|---|---|---|---|
| Cust Pick Up | Hershey Mills | WES | 30670 |
| ITEM | DESCRIPTION | QTY | EACH | AMOUNT |
|---|---|---|---|---|
| RBM | Rebuilt - Hydromatic Pump, Date: 04-05 Model: S4NX750EC, Serial No: S89374 7.5 HP, 1750 RPM, 230 Volts, 3 Phase Clean, sandblast, new stator, impeller (7.65"), wear ring, bearings, o-rings, seals, seal probes, add oil and paint | 1 | 4,514.00 | 4,514.00 |
| SUBTOTAL | 4,514.00 |
|---|---|
| TAX | 0.00 |
| TOTAL | 4,514.00 |
| TOTAL DUE | $4,514.00 |
APPROVED BY: _______
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1503
PAID 11/16
Picked Up/Received By: [signature]
We Appreciate Your Business
We Accept Visa, MasterCard, Discover & American Express
Deckman Motor & Pump, Inc.
49 W. Front Street
Bridgeport, PA 19405
610-272-6944
DECKMAN MOTOR & PUMP INC
INVOICE 4825
DATE 11/03/2022
TERMS Net 30
BILL TO
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
SHIP TO
Mark-cell 610-656-2742
email sent 11-2 cyr
| SHIP VIA | P.O. NUMBER | TECH | WORK ORDER # |
|---|---|---|---|
| Cust Pick Up | Hershey Mills | WES | 30670 |
| ITEM | DESCRIPTION | QTY | EACH | AMOUNT |
|---|---|---|---|---|
| RBM | Rebuilt - Hydromatic Pump, Date: 04-05 Model: S4NX750EC, Serial No: S89374 7.5 HP, 1750 RPM, 230 Volts, 3 Phase Clean, sandblast, new stator, impeller (7.65"), wear ring, bearings, o-rings, seals, seal probes, add oil and paint | 1 | 4,514.00 | 4,514.00 |
| SUBTOTAL | 4,514.00 |
|---|---|
| TAX | 0.00 |
| TOTAL | 4,514.00 |
| TOTAL DUE | $4,514.00 |
PICK UP RECEIPT
APPROVED BY: MM
DATE PAID: _______
CHECK #: _______
CHARGED TO: [crossed out]
Capital
Utility water
Picked Up/Received By: _______
We Appreciate Your Business
We Accept Visa, MasterCard, Discover & American Express
Original Invoice
INVOICE
| INVOICE NUMBER | INVOICE DATE |
|---|---|
| 14850138 | 10/03/22 |
PLEASE REMIT PAYMENT TO
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564
Billing Questions?
Call: THOMAS KARACKAI
484-679-2295
colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com
Divisions of Colonial Electric:
colonial major projects - colonialelectric.com/cmp
colonial teltek - colonialteltek.com
Bright Light - brightlightdesigncenter.com
Annapolis Lighting - annapolislighting.com
PAID 11/16
BILLING ADDRESS
4552 1 AB 0.491 E0060X 10086 D9750442833 S2 P9293113 0001:0002
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
PUBLIC WORKS SHOP IN
WEST CHESTER PA 19380
APPROVED BY: MM
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1505
Ridley Meter
| CUSTOMER PO | ORDER DATE | ORDERED BY | SHIP DATE | SHIPPED VIA | FREIGHT TERM |
|---|---|---|---|---|---|
| RIDLEY CREEK FLOW | 09/30/22 | DANIELLE | 10/03/22 | PPD |
| COMMENTS | CO. UNIT / WH | ENTERED BY | ACCOUNT ID | ORIGINAL INVOICE | SALESPERSON |
|---|---|---|---|---|---|
| 02 / DC | 4722 | E163 | QT253763 | 0001 |
| LINE | SKU | CUSTOMER SKU | DESCRIPTION | ORD QTY | SHIP QTY | BO QTY | UNIT PRICE | UM | EXTENDED AMT |
|---|---|---|---|---|---|---|---|---|---|
| 10 | 78590106117 | HOM24L70RB 70MLO 2/4C N3R CTR | 1 | 1 | 0 | 52.00 | E | 52.00 | |
| 20 | 78590106530 | HOM240 2P 40A CIRC BRKR $ | 1 | 1 | 0 | 15.56 | E | 15.56 | |
| 30 | 78590141672 | QOB120 1P 20A BOLT-ON BREAKE $ | 2 | 2 | 0 | 34.42 | E | 68.84 | |
| 40 | 07847771276 | LEVGFNT2W 20A SLIM GFCI WHT | 1 | 1 | 0 | 20.37 | E | 20.37 | |
| 50 | CAR1/2 | CAR1/2 1/2"SCHED 40 PVC COND $ | 10 | 10 | 0 | 109.85 | C | 10.99 | |
| 60 | 03448106201 | CARE943D 1/2 SCHED 40 MALE $ | 2 | 2 | 0 | 67.81 | C | 1.36 | |
| 70 | NIP1/2XCL | NIP1/2XCL 1/2"XCLOSE CONDUIT $ | 1 | 1 | 0 | 215.42 | C | 2.15 | |
| 80 | 78174720101 | BPT101-S 1/2" STEEL LOCKNUT $ | 4 | 4 | 0 | 15.37 | C | 0.61 | |
| 90 | 09532711432 | MUL11432 4" GFI COVER $ | 1 | 1 | 0 | 229.00 | C | 2.29 | |
| 100 | 78101140363 | BLN228 3/8 SPRING NUT $ | 10 | 10 | 0 | 190.08 | C | 19.01 | |
| 110 | CAR3/4 | CAR3/4 3/4" SCHED 40 PVC CON $ | 10 | 10 | 0 | 130.49 | C | 13.05 | |
| 120 | 03448106202 | CARE943E 3/4" SCHED 40 MALE $ | 2 | 2 | 0 | 109.32 | C | 2.19 | |
| 130 | 78174720102 | BPT102-S 3/4" STEEL LOCKNUT $ | 2 | 2 | 0 | 17.57 | C | 0.35 | |
| 140 | 03448123314 | CARFLEX3/4-CUT | 6 | 6 | 0 | 159.09 | C | 9.55 | |
| 141 | MESSAGE | 1 X 6 ON COIL | |||||||
| 150 | 03448108788 | CARLT43E 3/4 STR L/T FLEX CO $ | 2 | 2 | 0 | 505.14 | C | 10.10 | |
| 330 | NS8888 | 78592836284 | STAH N242412HWT NEMA4X HNGD | 1 | 0 | 1 | 1459.00 | E | 0.00 |
Invoice Due By: 11/2/2022
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
For a Complete List of Locations
Please Visit
www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com
Page 1 of 2
0001:0002
Original Invoice
INVOICE
| INVOICE NUMBER | INVOICE DATE |
|---|---|
| 14850138 | 10/03/22 |
PLEASE REMIT PAYMENT TO
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564
Billing Questions?
Call: THOMAS KARACKAI
484-679-2295
colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com
Divisions of Colonial Electric:
colonial major projects - colonialelectric.com/cmp
colonial teltek - colonialteltek.com
Bright Light - brightlightdesigncenter.com
Annapolis Lighting - annapolislighting.com
BILLING ADDRESS
4552 1 AB 0.491 E0060X 10087 D9750442833 S2 P9293113 0002:0002
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
PUBLIC WORKS SHOP IN REAR
WEST CHESTER PA 19380
| CUSTOMER PO | ORDER DATE | ORDERED BY | SHIP DATE | SHIPPED VIA | FREIGHT TERM |
|---|---|---|---|---|---|
| RIDLEY CREEK FLOW | 09/30/22 | DANIELLE | 10/03/22 | PPD |
| COMMENTS | CO. UNIT / WH | ENTERED BY | ACCOUNT ID | ORIGINAL INVOICE | SALESPERSON |
|---|---|---|---|---|---|
| 02 / DC | 4722 | E163 | QT253763 | 0001 |
| LINE | SKU | CUSTOMER SKU | DESCRIPTION | ORD QTY | SHIP QTY | BO QTY | UNIT PRICE | UM | EXTENDED AMT |
|---|---|---|---|---|---|---|---|---|---|
| 10 | MESSAGE | EN FACTORY STOCK 7-10 DAYS |
|||||||
| 20 | 78592840131 | ROBBP2424AL 24X24 ALUM BP | 1 | 1 | 0 | 221.85 | E | 221.85 | |
| 30 | MESSAGE | COLONIAL STOCK |
| SUBTOTAL | 450.27 |
|---|---|
| S&H CHGS | |
| 0.00% TAX | 0.00 |
| PAY THIS AMOUNT | 450.27 |
Accepted By: [signature] CUMMINS
Invoice Due By: 11/2/2022
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
For a Complete List of Locations
Please Visit
www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com
Page 2 of 2
0002:0002
Yale ELECTRIC SUPPLY CO.
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER PA 19380-4512
610-719-9253 Fax
INVOICE
| CUSTOMER NUMBER | SUB ACCOUNT # |
|---|---|
| 117491 | 117491 |
| INVOICE NUMBER | INVOICE DATE |
|---|---|
| S121654188.001 | 10/10/22 |
REMIT TO:
US ELECTRICAL SERVICES, INC.
PO BOX 412485
BOSTON MA 02241-2485
BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| CUSTOMER PO # | JOB NAME / RELEASE # | ORDERED BY | SALESPERSON |
|---|---|---|---|
| Flow meter plant | .. | HOUSE ACCOUNT |
| WRITER | SHIP VIA | TERMS | SHIP DATE | ORDER DATE |
|---|---|---|---|---|
| ROBERT S KASSEES | PICK UP | NET 15TH | 10/10/22 | 10/10/22 |
| ORDER QTY | SHIP QTY | DESCRIPTION | UNIT PRICE | EXT PRICE |
|---|---|---|---|---|
| ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512 | ||||
| 2ea | 2ea | KRY 078089 TA20 2" PVC MALE TERMINAL ADAPTER | 217.970 c | 4.36 |
| 2ea | 2ea | CRS 16X 2-IN STEEL LOCKNUT | 68.490 c | 1.37 |
| 2ea | 2ea | CRS 936 2" PLASTIC INSULATING BUSHING 105 DEG C | 83.760 c | 1.68 |
| 1ea | 1ea | KRY 078145 LB20 2" TYPE LB ACCESS FTG | 2762.450 c | 27.62 |
| 2ea | 2ea | KRY 078545 SCH40 2" X 90D PVC ELBOW 40STD2090 | 782.180 c | 15.64 |
| 5ea | 5ea | KRY 078006 CP20 2" PVC COUPLING | 144.040 c | 7.20 |
| 4ea | 4ea | KRY 078380 PS20 2" PVC 2 HOLE PIPE STRAP | 157.670 c | 6.31 |
| 4ea | 4ea | BLINE B2213-PA-ZN 2" EMT-HW STRAP | 723.800 c | 28.95 |
| 4ea | 4ea | CRS 5B 2" EMT/RIGID/IMC CONDUIT HANGER W/BOLT | 94.480 c | 3.78 |
PAID 11/16
APPROVED BY: WP
DATE PAID: _______
CHECK #: _______
CHARGED TO: 07429.1505
Flow Meter Ridley
SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE
Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill.
Contact the Credit Department at 717-606-1317 and get set up today!
PROOF OF DELIVERY SIGNATURE
2022/10/10 10:22:31 AM S121654188.1
[signature] Joe
| Subtotal | 96.91 |
|---|---|
| Shipping Chgs | 0.00 |
| Tax | 0.00 |
| Payments | 0.00 |
| Amount Due | 96.91 |
Invoice is due by 11/15/22.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
A U.S. Electrical Company
Visit us at www.usesi.com
TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM USE THIS ENROLLMENT TOKEN: VHD QLP SLM
Page 1 of 1
Yale ELECTRIC SUPPLY CO.
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER, PA 19380-4512
610-719-9253
Fax 610-719-0650
Ship Ticket
| SHIP DATE | ORDER NUMBER | PAGE NO. |
|---|---|---|
| 10/10/2022 | S121654188.001 | 1 of 1 |
| CUST PO#: | Flow meter plant |
|---|---|
| JOB/REL#: | .. |
SOLD TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
| CUSTOMER NUMBER | CUSTOMER PHONE# | ORDERED BY | SALESPERSON |
|---|---|---|---|
| 117491 | 610-692-7171 | HOUSE ACCOUNT |
| WRITER | SHIP VIA | WAREHOUSE | ORDER DATE | FREIGHT ALLOWED |
|---|---|---|---|---|
| ROBERT S KASSEES (302)-737-3778 |
PICK UP | Ship: WECH Price: WECH | 10/10/2022 | No |
| ORDER QTY | SHIP QTY | DESCRIPTION | UNIT PRICE | EXT PRICE |
|---|---|---|---|---|
| 2ea | 2ea | KRY 078089 TA20 2" PVC MALE TERMINAL ADAPTER | 217.970/c | 4.36 |
| 2ea | 2ea | CRS 16X 2-IN STEEL LOCKNUT | 68.490/c | 1.37 |
| 2ea | 2ea | CRS 936 2" PLASTIC INSULATING BUSHING 105 DEG C | 83.760/c | 1.68 |
| 1ea | 1ea | KRY 078145 LB20 2" TYPE LB ACCESS FTG | 2762.450/c | 27.62 |
| 2ea | 2ea | KRY 078545 SCH40 2" X 90D PVC ELBOW 40STD2090 | 782.180/c | 15.64 |
| 5ea | 5ea | KRY 078006 CP20 2" PVC COUPLING | 144.040/c | 7.20 |
| 4ea | 4ea | KRY 078380 PS20 2" PVC 2 HOLE PIPE STRAP | 157.670/c | 6.31 |
| 4ea | 4ea | BLINE B2213-PA-ZN 2" EMT-HW STRAP | 723.800/c | 28.95 |
| 4ea | 4ea | CRS 5B 2" EMT/RIGID/IMC CONDUIT HANGER W/BOLT | 94.480/c | 3.78 |
2022/10/10 10:22:31 AM S121654188.1
[signature] Joe
| Subtotal | 96.91 |
|---|---|
| Shipping Chgs | 0.00 |
| Tax | 0.00 |
| Payments | 0.00 |
| Amount Due | 96.91 |
Any shortage, damaged or incorrect material must be reported within 24 hours.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
Printed By: KASROB on 10/10/2022 10:22:52 AM EST
Memo
| To: | Municipal Authority |
|---|---|
| From: | Dave Ware |
| Re: | MA November 2022 Financial Report |
| Date: | December 8, 2022 |
In November 2022, the Municipal Authority recorded $15,696.80 in revenues (primarily from Sewer Operating and Sewer Capital Reserve transfers) and $31,664.60 in expenses (General Engineering Services, Legal Services, Hershey’s Mill Engineering Service, Hershey’s Mill Pump Station – rebuilt hydromatic pump, and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($15,967.80). As of November 30, 2022, the fund balance was ($11,137.03).
A complete list of 2022 full year MA revenues and expenses is attached.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
October 2022
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 5.71 | 2.74 |
| 07-354-0400 | DCED GRANT | 152,980.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,000.00 | 2,300.00 | 2,060.00 |
| 07-364-1110 | R.C.TAPPING FEES | 2,000.00 | 1,791.36 | 11,508.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,000.00 | 563.76 | 2,108.20 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 0.00 | 282.24 | 2,664.48 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 130,000.00 | 82,107.15 | 84,232.16 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 476,930.00 | 265,426.86 | 179,592.49 |
| Total Revenue | 764,910.00 | 352,477.08 | 282,168.07 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 30,529.00 | 25,116.15 | 23,135.82 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,500.00 | 1,665.25 | 1,693.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 10,300.00 | 10,250.00 | 10,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 45,000.00 | 42,469.00 | 50,242.31 |
| 07-424-3140 | LEGAL SERVICES | 8,000.00 | 6,140.00 | 8,233.82 |
| 07-424-7440 | R.C. CAPITAL-STP | 315,000.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 41,400.00 | 0 | -10,984.77 |
| 07-426-3001 | RELINING | 130,000.00 | 0 | 0 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 0.00 | 2,215.00 | 5,117.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 0.00 | 11,493.05 | 30,324.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 153,398.99 | 76,579.96 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 0.00 | 1,870.00 | 8,277.00 |
| 07-429-1505 | RCSTP CAPITAL | 46,897.00 | 120,403.18 | 65,925.98 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 136,284.00 | 0 | 0 |
| 07-491-5001 | BANK FEES | 0.00 | 0 | 379.50 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 0.00 | 212.99 | 0 |
| Total Expenses | 764,910.00 | 375,233.61 | 268,923.87 | |
| Net Result From Operations | 0.00 | -22,756.53 | 13,244.20 | |
Municipal Authority
YTD Revenues and Expenses thru 11/30/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/22 | Revenue Journal | INTEREST EARNED JANUARY 2022 07 FUND | 0.19 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/22 | Revenue Journal | INTEREST EARNED FEBRUARY 2022 07100.1035 | 0.18 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/22 | Revenue Journal | INTEREST EARNED MARCH 2022 07 FUND | 0.17 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/22 | Revenue Journal | INTEREST EARNED APRIL 2022 07100 | 0.15 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/22 | Revenue Journal | INTEREST EARNED MAY 2022 07 FUND | 0.09 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/22 | Revenue Journal | INTEREST EARNED JUNE 2022 07 FUND | 0.10 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/22 | Revenue Journal | INTEREST EARNED JULY 2022 07 FUND | 0.42 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/22 | Revenue Journal | INTEREST EARNED AUGUST 2022 | 0.92 |
| 07-341-1000 | INTEREST EARNINGS | 09/30/22 | Revenue Journal | INTEREST EARNED SEPTEMBER 2022 | 0.29 |
| 07-341-1000 | INTEREST EARNINGS | 11/04/22 | Revenue Journal | INTEREST EARNED OCTOBER 2022 | 3.20 |
| 07-364-1100 | C.C. TAPPING FEES | 07/13/22 | Revenue Journal | 1344 MORSTEIN RD C.C. TAPPING FEES | 2,000.00 |
| 07-364-1100 | C.C. TAPPING FEES | 07/13/22 | Revenue Journal | 1344 MORSTEIN RD C.C. TAPPING FEES | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 05/18/22 | Revenue Journal | 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPI | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/22 | Revenue Journal | TAP IN FEE 1577 COLONIAL R.C.TAPPING FEE | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/22 | Revenue Journal | SEWER INSP FEE 1577 COLONIAL R.C.TAPPING | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 09/01/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 10/03/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 11/01/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 02/02/22 | Revenue Journal | STOFFLET, MICHAEL | 423.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 08/18/22 | Revenue Journal | PAPPANO, JOSEPH & PATRICIA | 423.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/13/22 | Revenue Journal | XFER $ TO MA FROM SEWER & SEWER CAP.RE: | 5,497.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/16/22 | Revenue Journal | XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP | 6,324.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/08/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAPITAL TO MA | 660.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/11/22 | Revenue Journal | XFER $ FROM 05 TO 07 MA AUTH. | 360.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/18/22 | Revenue Journal | XFER $ FROM 05 TO 07 RE: 07 EXPENSES | 7,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/30/22 | Revenue Journal | XFER $ FROM 05 TO 07 TO COVER MA EXPENSE | 8,372.05 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/14/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE | 10,814.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/04/22 | Revenue Journal | XFER $ FROM 05 TO MA TO COVER EXPENSES | 3,690.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | 5,302.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/16/22 | Revenue Journal | XFER FUNDS TO MA FROM SEWER & SEWER CAPI | 2,970.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/01/22 | Revenue Journal | XFER $ FROM 05 TO 07 TO COVER MA EXPENSE | 8,372.05 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/13/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA AUTHORITY RE: | 2,111.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/16/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAP. TO MA TO | 920.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 09/13/22 | Revenue Journal | XFER TO MA TO COVER AUG.EXPENSES | 2,451.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 09/30/22 | Revenue Journal | XFER FR: 05 TO 07 RE: Q3 2022 CHGBACK | 8,372.05 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/19/22 | Revenue Journal | XFER FROM 05 TO COVER 07 EXPENSES | 4,966.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 11/17/22 | Revenue Journal | XFER TO 07 FROM 05 TO COVER EXPENSES | 3,924.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/13/22 | Revenue Journal | XFER $ TO MA FROM SEWER & SEWER CAP.RE: | 18,986.13 |
Page 1 of 4
Municipal Authority
YTD Revenues and Expenses thru 11/30/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/16/22 | Revenue Journal | XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP | 1,217.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/08/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAPITAL TO MA | 6,831.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/14/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE | 25,600.37 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | 1,283.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/16/22 | Revenue Journal | XFER FUNDS TO MA FROM SEWER & SEWER CAPI | 12,592.90 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/13/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA AUTHORITY RE: | 21,785.60 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/28/22 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER 07 EXPENSE | 16,131.57 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/16/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAP. TO MA TO | 18,030.91 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/31/22 | Revenue Journal | Xfer $ from 09 to 07 for expenses | 212.99 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/08/22 | Revenue Journal | TRANSFER FROM 09 TO COVER 07 EXPENSES | 545.94 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/13/22 | Revenue Journal | XFER TO MA TO COVER AUG.EXPENSES | 2,120.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/29/22 | Revenue Journal | XFER FROM 09 TO 07 TO COVER EXPENSES | 160.44 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/14/22 | Revenue Journal | XFER $ TO COVER 07 EXPENSES | 318.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/19/22 | Revenue Journal | XFER FROM 09 TO COVER 07 EXPENSES | 122,917.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/26/22 | Revenue Journal | XFER FROM 09 TO 07 FOR MA EXPENSES | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/16/22 | Revenue Journal | XFER FROM 09 TO 07 FOR EXPENSES | 5,417.41 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/17/22 | Revenue Journal | XFER TO 07 FROM 09 TO COVER EXPENSES | 1,601.10 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/18/22 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER EXPENSE | 4,453.00 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/30/22 | Expd | EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2 | 8,372.05 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/30/22 | Expd | EAST GOSHEN TOWNSHIP - GENERAL QTR.2-202 | 8,372.05 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 09/30/22 | Pay Check: 3356 | 22-00350 Q3 2022 MUNIC.AUTH CHARGEBACK | 8,372.05 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 01/13/22 | Expd | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSO | 880.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/08/22 | Expd | DELAWARE RIVER BASIN COMMISSION ANNL MON | 660.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 06/30/22 | Expd | PETTY CASH PA MUNIC. AUTH.WORKSHOP - W.W | 125.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/18/22 | Expd | MAILLIE FALCONIERO & CO. MUNICIPAL AUTH. | 7,000.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/03/22 | Expd | MAILLIE FALCONIERO & CO. FINAL BILLING - | 3,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 12 | 4,076.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 1/ | 5,664.50 |
| 07-424-3130 | ENGINEERING SERVICES | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 10,814.00 |
| 07-424-3130 | ENGINEERING SERVICES | 05/12/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 4/ | 5,302.50 |
| 07-424-3130 | ENGINEERING SERVICES | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 2,610.50 |
| 07-424-3130 | ENGINEERING SERVICES | 07/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 6/ | 1,051.25 |
| 07-424-3130 | ENGINEERING SERVICES | 08/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 7/ | 3,408.25 |
| 07-424-3130 | ENGINEERING SERVICES | 09/13/22 | Pay Check: 3353 | 22-00112 SERV.THRU 8/14/22 GEN.SERV. | 1,471.00 |
| 07-424-3130 | ENGINEERING SERVICES | 10/18/22 | Pay Check: 3362 | 22-00476 SERVICES THRU 9/18/22 GEN.SERV | 4,566.00 |
| 07-424-3130 | ENGINEERING SERVICES | 11/17/22 | Pay Check: 3369 | 22-00749 SERV.THRU 10/16/22 2022 GEN.SE | 3,504.25 |
| 07-424-3140 | LEGAL SERVICES | 01/13/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 540.00 |
| 07-424-3140 | LEGAL SERVICES | 02/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 660.00 |
Page 2 of 4
Municipal Authority
YTD Revenues and Expenses thru 11/30/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3140 | LEGAL SERVICES | 03/11/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 360.00 |
| 07-424-3140 | LEGAL SERVICES | 05/04/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 440.00 |
| 07-424-3140 | LEGAL SERVICES | 06/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 360.00 |
| 07-424-3140 | LEGAL SERVICES | 07/13/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 1,060.00 |
| 07-424-3140 | LEGAL SERVICES | 08/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. | 920.00 |
| 07-424-3140 | LEGAL SERVICES | 09/13/22 | Pay Check: 3352 | 22-00109 LEGAL SERV. JULY 2022 GEN.AUT | 400.00 |
| 07-424-3140 | LEGAL SERVICES | 09/13/22 | Pay Check: 3352 | 22-00110 LEGAL SERV. AUG.2022 GEN.AUTH | 580.00 |
| 07-424-3140 | LEGAL SERVICES | 10/18/22 | Pay Check: 3361 | 22-00475 LEGAL SERV. 9/2022 GEN.AUTH. | 400.00 |
| 07-424-3140 | LEGAL SERVICES | 11/17/22 | Pay Check: 3368 | 22-00746 LEGAL SERV. GEN.AUTH 10/2022 | 420.00 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. REBUILT HYDROM | 2,215.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 04/14/22 | Expd | DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIR | 8,632.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 06/16/22 | Expd | COLONIAL ELECTRIC SUPPLY REPLACE DISCONN | 2,861.05 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. 2 - REBUILT HY | 2,709.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | JWC ENVIRONMENTAL MUFFIN MONSTER | 11,255.01 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 12 | 3,852.69 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 1/ | 1,217.25 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 03/08/22 | Expd | KAPPE ASSOCIATES MAGNETIC FLOW METER | 6,831.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 3,403.62 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 121.60 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 10/18/22 | Pay Check: 3360 | 22-00474 HME SEWER REPLACEMENT MATERIAL | 118,975.50 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 11/16/22 | Pay Check: 3366 | 22-00626 REBUILT HYDROMATIC PUMP | 4,514.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00748 SERV.THRU 10/16/22 HM ESTATES | 519.32 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. REBUILT HYDROM | 1,870.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 13,564.75 |
| 07-429-1505 | RCSTP CAPITAL | 05/12/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 4/ | 1,283.50 |
| 07-429-1505 | RCSTP CAPITAL | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 4,005.25 |
| 07-429-1505 | RCSTP CAPITAL | 06/16/22 | Expd | TELEDYNE INSTRUMENTS INC. ULTRASONIC FLO | 5,605.00 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/22 | Expd | COLONIAL ELECTRIC SUPPLY ELECTRICAL PART | 3,055.60 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/22 | Expd | TRACOM FIBERGLASS PRODUCTS FIBERGLASS MA | 18,730.00 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | EXETER SUPPLY COMPANY INC MAX-ADAPTERS-1 | 3,010.68 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | LEC - LENNI ELECTRIC CORPORATION TROUBLE | 6,148.48 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | MAIN LINE CONCRETE 3 CYDS CONCRETE 4000 | 1,638.30 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | NEW ENTERPRISE STONE & LIME INC. 47.61 T | 5,334.11 |
| 07-429-1505 | RCSTP CAPITAL | 08/05/22 | Expd | LOWES BUSINESS ACCOUNT/GECF TREATED LUMB | 7,034.29 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | EXETER SUPPLY COMPANY INC SEWER PVC PIPE | 3,292.35 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | FOLEY INC. EXCAVATOR, COUPLER & BUCKET R | 5,611.00 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | KNOX EQUIPMENT RENTALS INC. LIGHT BANK R | 544.50 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | MAIN LINE CONCRETE 3.5 YDS CONCRETE 4000 | 671.00 |
Page 3 of 4
Municipal Authority
YTD Revenues and Expenses thru 11/30/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 7/ | 461.50 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | TRENCHTECH INC. SHORING TO INSTALL METER | 3,122.56 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | YALE ELECTRIC SUPPLY CO ELECTRICAL PARTS | 919.75 |
| 07-429-1505 | RCSTP CAPITAL | 09/07/22 | Pay Check: 3350 | 22-00049 DECK SCREWS, ANCHORS PLUS | 471.07 |
| 07-429-1505 | RCSTP CAPITAL | 09/07/22 | Pay Check: 3350 | 22-00049 DOUBLE JOINT HANGERS & NAILS | 74.87 |
| 07-429-1505 | RCSTP CAPITAL | 09/13/22 | Pay Check: 3353 | 22-00111 SERV.THRU 8/14/22 RCSTP SODA | 192.75 |
| 07-429-1505 | RCSTP CAPITAL | 09/13/22 | Pay Check: 3353 | 22-00113 SERV.THRU 8/14/22 RCSTP UV | 1,928.00 |
| 07-429-1505 | RCSTP CAPITAL | 09/19/22 | Pay Check: 3354 | 22-00191 SELECT STUDS, QUIKRETE, JOIST. | 475.70 |
| 07-429-1505 | RCSTP CAPITAL | 09/28/22 | Pay Check: 3355 | 22-00297 DECK SCREENS & DRILL BITS | 160.44 |
| 07-429-1505 | RCSTP CAPITAL | 10/11/22 | Pay Check: 3357 | 22-00389 SKID STEER RENTL W/ATTACHMENTS | 1,140.00 |
| 07-429-1505 | RCSTP CAPITAL | 10/11/22 | Pay Check: 3358 | 22-00404 PARTS FOR RCSTP DECK | 58.20 |
| 07-429-1505 | RCSTP CAPITAL | 10/18/22 | Pay Check: 3362 | 22-00477 SERV.THRU 9/18/22 RCSTP UV | 3,941.50 |
| 07-429-1505 | RCSTP CAPITAL | 10/25/22 | Pay Check: 3363 | 22-00497 Heliflow 408 PD Blower | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/07/22 | Pay Check: 3364 | 22-00449 ELECTRICAL PARTS RCSTP METER | 259.80 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3365 | 22-00619 VARIOUS PARTS FOR RCSTP METER | 450.27 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3367 | 22-00727 ADAPTERS, LOCKNUTS, FITTINGS + | 96.91 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3367 | 22-00728 MOUNT FIXTURE, PIPE, PVC PLUS | 356.23 |
| 07-429-1505 | RCSTP CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00747 SERV.THRU 10/16/22 RCSTP SODA | 501.53 |
| 07-429-1505 | RCSTP CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00750 SERV.THRU 10/16/22 RCSTP UV | 580.25 |
| 07-429-1505 | RCSTP CAPITAL | 11/18/22 | Expd | CRED.CARD EXPENSE - BADBOY BLASTER | 4,453.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3370 | 22-00764 REBUILT MYERS PUMPS (2) | 8,621.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3371 | 22-00788 INSTALL NEW FLOW METER RCSTP | 5,916.82 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3372 | 22-00804 INSTALL WIDE WALK GATE -RCSTP | 1,450.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3373 | 22-00819 TAYMAC GRAY IN-USE COVERS | 21.22 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 08/31/22 | Expd | Reimburse 01 for 07 cred.card expense | 212.99 |
Page 4 of 4
[Logo: COMMONWEALTH ENGINEERS, INC.]
114 East Lancaster Avenue ~ Second Floor ~ Downingtown, PA 19335
Telephone: (610) 518-9003 ~ Fax: (610) 518-9004 ~ comeng@cei-1.com
December 8, 2022
|
Mr. Mark S. Miller |
Email: mmiller@eastgoshen.org |
|---|
Re: Sewer Availability Letter
Dear Mr. Miller,
Commonwealth Engineers, Inc., hereby requests a standard Sewer Availability Letter for the below detailed project:
| Applicant: | Planebrook Partners, LLC |
|---|---|
| Project Name: | 301 Reservoir Road |
| Project Location: | 301 Reservoir Road, West Chester |
| Tax Parcel No. : | 5304P 0129 0000) |
| Township: | East Goshen Township |
| Project Description: | Proposed subdivision of this 6.8 +/- acre parcel into 5 lots. One lot would contain the existing single-family dwelling and outbuildings (currently utilizing public water and on-site septic), which shall remain. Connection to public sewer for the existing house is proposed. The existing barn will be converted to a single-family dwelling and the remaining 3 proposed lots will each contain 1 single-family dwelling. We are requesting an additional 1,055 gpd (5 EDU’s at 211 gpd/EDU) |
I’ve also attached a site plan for ease of reference. Please call if you have any questions or require additional information.
Sincerely,
[signature: Stacy Turner]
Stacy Turner
Attachment: Sketch Plan dated November 9, 2022
cc: Michael Ellis, P.E., Municipal Division Manager, Pennoni Associates, Inc.,
121 Continental Drive, Suite 207, Newark, DE 19713 (via email: MEllis@Pnnoni.com)
G:\ACTIVE JOBS\2020\202040 Planebrook (301 Reservoir Rd-Papa)\01 Administrative Files\03 Sewer & Water\202040 Sewer Will Serve Request 2022-12-08.doc
PROFESSIONAL CIVIL ENGINEERING
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
SKETCH PLAN FOR 301 RESERVOIR ROAD - EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
[Engineering sketch plan showing a proposed 5-lot residential subdivision at 301 Reservoir Road (Tax Parcel 53-6-129), including location map, legend, general notes, R-2 zoning compliance table, and lot layout with existing buildings and proposed stormwater management area.]
Title Block
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE - SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE (610) 518-9000 - FAX (610) 518-9004 | COMWENG@AOL.COM
DATE: NOVEMBER 9, 2022 | SCALE: AS SHOWN | SURVEY: CEI | DRAWN: MDK | CHECKED: VRE | DRAWING NO. 202600-01 | SHEET: 1 OF 1 | GRAPHIC SCALE: 1" = 50' (0, 50, 100, 150 FEET)
Location Map (Scale 1" = 1,000')
Labels: SITE, RESERVOIR ROAD, LOCKWOOD LA, BALDWIN LA, ROCKLAND CIR, BARKER DR, BRASS RING DR, ALISON LN, STURBRIDGE LA, WATER VIEW RD, Goshen Fire Co 1, Westtown Reservoir, Branch
Legend
- PRECAUTIONARY STEEP SLOPES (15% TO 25%)
- PROHIBITIVE STEEP SLOPES (OVER 25%)
- EXISTING INTERMEDIATE CONTOUR
- EXISTING INDEX CONTOUR
- EXISTING WETLANDS LINE
- EXISTING 100-YEAR FLOODPLAIN
- STREAM LINE
- WOOD / TREE LINE
- SHRUB / HEAVY VEGETATION LINE
- EXISTING SANITARY SEWER LINE
- EXISTING STORM SEWER LINE
- EXISTING WATER LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EDGE-OF-PAVING
- EXISTING CURBING
- EXISTING BUILDING
- EXISTING SOIL LINE
General Notes
- OWNER: ROBERT F. PAPA, 301 RESERVOIR ROAD, WEST CHESTER, PA 19380-4523, TAX PARCEL NO. 53-06-0129, DEED REFERENCE: BOOK 5095, PAGE 873. APPLICANT/EQUITABLE OWNER: COMMONWEALTH HOME BUILDERS, 208 CARTER DRIVE, SUITE 13B - ENTERPRISE BUSINESS PARK, WEST CHESTER, PA 19382, PHONE: 610-431-7544.
- TOTAL TRACT AREA: 8.678 AC. (GROSS AREA); XXXXX AC. (NET LOT AREA). EXISTING LOTS: 1 RESIDENTIAL LOT. PROPOSED LOTS: 5 RESIDENTIAL LOTS.
- TOPOGRAPHY, DEED PLOT AND FEATURES ARE TAKEN FROM PENNSYLVANIA SPATIAL DATA ACCESS (PASDA) WEB SITE.
- NO PORTION OF THIS SITE LIES WITHIN A ZONE A, ZONE AE FEMA FLOOD PLAIN PER FEMA FLOOD PLAIN MAP 42029C0353G EFFECTIVE SEPTEMBER 29, 2017.
- SOILS TYPES AND BOUNDARIES ARE COMPILED FROM UNITED STATES DEPARTMENT OF AGRICULTURE, NATURAL RESOURCES CONSERVATION SERVICE WEB SOIL SURVEY (http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx).
- TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF, THERE ARE NO EXISTING WETLANDS ON THE SUBJECT TRACT OR WITHIN 100 FT OF ANY PROPOSED IMPROVEMENTS, NOR ANY SEPTIC SYSTEMS WITHIN 100 FT OF ANY PROPOSED IMPROVEMENTS.
- CONCRETE MONUMENTS SHOWN AS THUS SHALL BE PLACED WHERE INDICATED. PROPERTY CORNERS NOT MONUMENTED SHALL BE MARKED WITH IRON PINS.
- THE DEVELOPER SHALL CONFORM TO OR CAUSE CONFORMANCE WITH ALL OF THE IMPROVEMENTS SHOWN ON THIS PLAN AND IN THE EAST GOSHEN TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE AND ZONING ORDINANCE AS WELL AS ANY APPLICABLE COUNTY, STATE AND FEDERAL STATUTES.
- THE CONTRACTOR SHALL NOTIFY UNDERGROUND UTILITY USERS AT LEAST THREE DAYS PRIOR TO EXCAVATION TO ASCERTAIN FIELD LOCATIONS AS REQUIRED BY PA ACT 287, 172 AND 38 (AND ALL OTHER APPLICABLE AMENDMENTS), AS WELL AS CONFORM TO ALL PROVISIONS OF THE REFERENCED ACTS.
ZONING – R-2 RESIDENTIAL DISTRICT
| DESCRIPTION | REQUIRED | EXISTING UPI# 53-6-129 | PROPOSED LOT 1 | PROPOSED LOT 2 | PROPOSED LOT 3 | PROPOSED LOT 4 | PROPOSED LOT 5 |
|---|---|---|---|---|---|---|---|
| MINIMUM LOT AREA (NET OF ROW) | 1.0 AC. | 8.678 AC. | 1.080 AC. | 1.142 AC. | 1.448 AC. | 3.336 AC. | 1.073 AC. |
| MINIMUM LOT WIDTH AT BUILDING LINE | 150 FT | 150 FT (MIN) | 150 FT | 150 FT | 150 FT | 150 FT | 150 FT |
| MINIMUM LOT WIDTH AT STREET LINE | 60 FT (MIN) | 290.00 FT | 248.75 FT | 219.99 FT | 149.15 FT | 175.60 FT | 163.26 FT |
| MINIMUM FRONT YARD | 45 FT (MIN) | 45 FT (MIN) | 45 FT (MIN) | 45 FT (MIN) | 45 FT (MIN) | 45 FT (MIN) | 45 FT (MIN) |
| AVERAGE FRONT YARD* | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) |
| MINIMUM REAR YARD | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) | 50 FT (MIN) |
| MINIMUM SIDE YARD | 25 FT (MIN) | 25 FT (MIN) | 25 FT (MIN) | 25 FT (MIN) | 25 FT (MIN) | 25 FT (MIN) | 25 FT (MIN) |
| MAXIMUM BUILDING COVERAGE | 20% (MAX) | 20% (MAX) | 20% (MAX) | 20% (MAX) | 20% (MAX) | 20% (MAX) | 20% (MAX) |
| MAXIMUM IMPERVIOUS COVERAGE | 25% (MAX) | 25% (MAX) | 25% (MAX) | 25% (MAX) | 25% (MAX) | 25% (MAX) | 25% (MAX) |
| MAXIMUM BUILDING HEIGHT | 35'(PRIN)/20'(ACC) | 35 FT (MAX) | 35 FT (MAX) | 35 FT (MAX) | 35 FT (MAX) | 35 FT (MAX) | 35 FT (MAX) |
* TO OBTAIN SOME FLEXIBILITY IN PLACING BUILDINGS IN ALL RESIDENTIAL SUBDIVISIONS OF TWO OR MORE LOTS, AN AVERAGE BUILDING SETBACK LINE OF 50 FEET AND A MINIMUM BUILDING SETBACK OF 45 FEET SHALL BE REQUIRED.
Plan View & Lot Labels
- RESERVOIR ROAD (T-470) (SPEED LIMIT 35 MPH)
- COOPER CIRCLE
- Lot 1: NET AREA: 47,051 SF (1.080 AC.)
- Lot 2: NET AREA: 49,745 SF (1.142 AC.), EXISTING GARAGE (TO REMAIN), EXISTING BARN (TO REMAIN)
- Lot 3: NET AREA: 63,074 SF (1.448 AC.), EXISTING HOUSE (TO REMAIN)
- Lot 4: NET AREA: 145,327 SF (3.336 AC.), N/F ROBERT F. PAPA, TP# 53-6-129, DB 5095 PG 873
- Lot 5: NET AREA: 46,743 SF (1.073 AC.), PROPOSED STORMWATER MANAGEMENT AREA
- Boundary Dimensions: 290.00' N 24°44'26" E, 190.05' N 65°46'35" W, 179.66' N 24°44'26" E, 97.85' N 66°38'43" W, 102.16' N 73°59'00" W, 136.81' N 06°42'30" E, 85.00' N 65°00'00" W, 164.24' S 67°16'00" E, 145.00' N 64°46'00" W, S 32°11'17" E 207.84', 429.86' S 31°11'27" W, 410.00' S 65°15'35" W
- PENNSYLVANIA ONE CALL SYSTEM, INC. 1-800-242-1776 STOP - CALL BEFORE YOU DIG! | UPI No. 53-06-0129.000 | TAX PARCEL No. 53-6-129
[Logo: Pennoni]
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
December 8, 2022
East Goshen Township
Attn: Derek Davis, Township Manager
1580 Paoli Pike
West Chester, PA 19380
RE: Fee Schedule for Year 2023
East Goshen Township and East Goshen Municipal Authority
Dear Derek:
Pennoni is proud to serve East Goshen Township and East Goshen Municipal Authority, and we look forward to working with you again in 2023.
Our rates for 2023 for Township and Authority Engineering services are listed below for the categories of staff that most frequently provide services to the Township and Authority. The rates reflect an average increase of 6.0%, which is within the 2023 federal cost of living adjustment (COLA) of 8.7%.
| Authority/Township Engineer | $149/hr |
|---|---|
| Senior Professional | $145/hr |
| Project Professional | $128/hr |
| Staff Professional | $117/hr |
| Associate Professional | $111/hr |
| Senior Engineering Technician | $107/hr |
| Graduate Professional | $102/hr |
| Engineering Technician | $90/hr |
| Survey Crew (2-Person) | $200/hr |
We will continue to provide services to the Township and Authority as requested.
For typical general engineering services to the Authority, we recommend budgeting the following under the expectation of a similar level of effort in 2023 as in the past several years. Similar to previous years, we will establish separate accounts for each activity listed below, and each activity will be invoiced separately.
| • General Consultation and monthly meetings (also including SBR tank visual condition inspections, I&I support, and West Goshen project consultation) * | $42,000 |
|---|---|
| • Chapter 94 reports | $9,000 |
| TOTAL | $51,000 |
*I/I support has been a separate invoicing “project” in past years, but we suggest including it as part of the General Consultation project in 2023 since there has been less engineering effort associated with it in 2022 and as projected into 2023 than in past years since the Public Works Department is aggressively implementing previously established I/I programs.
| East Goshen Township | December 8, 2022 | Page 2 Year 2023 Annual Services |
|---|
Other Authority projects outside of general services, as requested, will be proposed separately, such as the following projects that are planned for 2023:
- Hershey’s Mill Estates Sewer Replacement Construction Phase Services
- RCSTP Generator Replacement
- Hunt Country Pump Station Metering, Muffin Monster, and Bypass System
- Supplee Valley Sewer Lining
We thank you again for the confidence you have placed in Pennoni over the years and look forward to continuing to serve you in the future!
Sincerely,
PENNONI ASSOCIATES INC.
|
[signature: Michael J. Ellis] Michael J. Ellis, PE |
[signature: Nathan M. Cline] Nathan M. Cline, PE |
|---|
FYI
RECEIPT
10/31/22
MediaNews Group
PENNSYLVANIA GROUP
| Account: | 884433 | Date: | 10/31/22 |
|---|---|---|---|
| Name: | DEREK DAVIS | Start Date: | 11/01/22 | Stop Date: 11/09/22 |
| Company: | EAST GOSHEN TOWNSHIP | Class: | 1201 - Legal Notices |
| Address: | 1580 PAOLI PIKE WEST CHESTER, PA 19380 |
Ad ID: | 2396632 |
| Ad Taker: | CRRDEAN | ||
| Telephone: | (610) 692-7171 | Sales Person: | Ryan Dean (018303) |
| Fax: | (000) 000-0000 | Words: | 244 |
| Description: | ADVERTISEMENT EAST GOSHEN MUNICIPAL | Lines: | 59 |
| Agate Lines: | 59 | ||
| Depth: | 6.556 | ||
| Inserts: | 4 | ||
| Blind Box: | |||
| PO Number: |
| Total: | $355.98 |
|---|---|
| Paid Amount: | $0.00 |
| Amount Due: | $355.98 |
Publication
Daily Local News, Daily Local News Digital
Ad sample
ADVERTISEMENT
EAST GOSHEN
MUNICIPAL AUTHORITY
WEST CHESTER,
PENNSYLVANIA
Sealed bids will be received electronically through PennBid™ by the East Goshen Municipal Authority for Hershey's Mill Estates Sanitary Sewer Replacement, Contract No. HME-2022 until 2:00 PM, prevailing time, on the 5th day of December 2022, at which time they will be publicly read at the East Goshen Township office, 1580 Paoli Pike, West Chester, PA 19380. All documents and solicitation details are available online anytime at no cost at PennBid™ (www.PennBid.net).
Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.
This project involves the construction of 2,907 L.F. of new and replacement 8-inch and 12-inch diameter gravity sewer pipe and eight precast concrete manholes.
A non-mandatory pre-bid meeting will be held on November 10, 2022, at 9:00 AM at the project site, adjacent to 1560 Tanglewood Drive, West Chester, PA 19380.
Bids must be submitted unconditionally. No bidder may withdraw bid within sixty (60) days after the scheduled closing time for receipt of bids.
The Owner reserves the right to waive any informality, or to reject any or all bids.
Pennsylvania Department of Labor and Industry Prevailing Wage Rates apply to this project.
DLN 11/1, 11/9; 1a
We Appreciate Your Business!
Thank You DEREK DAVIS!