Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
January 9, 2023
7:00
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report.; Pennoni Engineer’s Report.; Big Fish Environmental Report
- APPROVAL OF MINUTES December 12, 2022
- APPROVAL OF INVOICES Pennoni Invoice# 1150403 $ 861.51 Pennoni Invoice# 1150405 $ 9,690.50 Pennoni Invoice# 1150409 $ 3,384.75 Pennoni Invoice#1150401 $ 1,178.75
- LIAISON REPORTS
- FINANCIAL REPORTS December; Proposed 2023 Budget
- OLD BUSINESS Hershey Mill Trunk Line
F:\Data\Shared Data\Agendas\Municipal Authority\2023\1-09-2023.doc
- 2022 Goals: Goal Status Ridley Creek Plant Compliance January,February,March,April,May,June,July,August,September, October and November and December were in compliance and met all requirements *Note DEP Annual Insp. Continue to Monitor Upgrades at WGSTP and Westtown Way Pump Station On – going Continue to Implement Infiltration and Inflow for the Sewer System On-going Caustic Soda Project Tank has been delivered awaiting PA DEP approval once installed. Replace sewer line Hershey Mill Estate trunk line replacement Bid documents finalized. Bid advertised Nov. 1, bids due Dec. 5 th if grant application is approved. Three new meters for Ridley Creek Collection Hibberd Lane was installed 2021 RCSTP influent flow meter replacement 2022 Blacksmith Shop (2023) Line Road - Deferred
- NEW BUSINESS Municipal Authority 2023 Goals – Walter Wujcik; HME Construction Phase Proposal - Pennoni
- CAPACITY REQUESTS 1671 and 1681 E. Strasburg Road
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2023\1-09-2023.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Municipal Authority
From: Mark Miller
Re: January 9, 2023 Monthly Report
Monthly Flows: The average daily flow to West Goshen was 673,239 per day.
Meters: The meters were read on a daily basis.
C.C. Collection: All pump stations were visited on a daily basis; the wet wells were washed down. We received a call from a resident on Glenmont Lane who stated that sewage was backing up into his home. We went down and found that his trap was full of grease and the clean out stack pipe was out of the hub. I gave him a copy of the local contractors to call to get it repaired.
C.C. Interceptor: We are in the process of scheduling to televise the trunk line from Strasburg Road down to the Westtown Way meter. This work has to be done between the hours of 12:00 am to 5:00 am, and we have to plug the lines so we can get a full visual of the pipe.
R.C. Collection: The pump stations were visited on a daily basis. We received a seal failure alarm on Christmas day so I changed the run sequence so the pump would only run if the other pump could not keep up with the flow. We swapped the pump out the next day. We cleared the sanitary sewer line right of way thru the golf course. While we were clearing the right of way, we pulled the manhole lids to check the condition of the manholes, which were fine.
Hibberd Lane meter locked up this month, John Laidley was called in to repair the issue. The meter is up and running.
Ridley Creek Plant: We performed general maintenance as needed. We had a problem with pump #2 for the utility water. We are scheduled to clean the line from metering manhole into the screen room. We had Lenni cut out power to the plant while PECO did repairs on Line Road.
Hershey Mill sewer line Replacement:
I have been keeping the residents informed on what the status of the project is. I had asked Mike to have his people stake out the easements thinking this would get the residents attention, which it did. I have been speaking to residents advising then that we would be utilizing the easements. Public Works still has to put the roads in for the contractor, which we hope to de next week. We can discuss further at the meeting.
Alarms: We responded to 21 alarms for December.
PA 1 Calls: We responded to over 57 PA One Calls for the month December.
Monthly Rainfall: 6.20 inches of rain for the month of December.
Lateral repairs or Caps: We had two cleanout repairs for December.
Pennoni
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
January 6, 2023
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We conducted a pre-construction field meeting with Jim Woods (the PADEP “certified installer” consultant) and Public Works. Jim requested that vacuum control valves be added to the chemical feed pumping system and that thermal expansion be added to the exterior tank suction piping. We obtained cost quotes from Pyrz (supplier of the tank and chemical feed pumps) for the applicable equipment that has been forwarded to the Township and plant operator for review. Jim expects that PADEP will authorize the permit within approximately one week of submission of the application, at which point the tank and system can go into use. The permit application cannot be submitted until all work is complete. We also met virtually with Scott Towler to determine the alarms and controls scoping for the tank and chemical feeds. The controls will remain the same as those from the caustic trial with pump feed rates adjusted manually (not automatically controlled by pH or other conditions). There will be outside visual alarms for a tank leak (via interstitial monitoring between the tank walls) and tank high level. The tank level is also proposed to be visible through SCADA with remote alarm notifications for tank high and low levels only.
- UV Disinfection System – The system is being fabricated by Glasco, and delivery is expected in late February or early March 2023. The bidding and contracting schedule for the mechanical and electrical work remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants. Awards are expected to occur on January 12, but we are not aware that the agenda for the CFA meeting has been made available yet to confirm the grant awards will be considered. We are awaiting advertisement until the CFA’s public meeting is scheduled to make the LSA awards. The UV solicitations for mechanical and electrical work can then be advertised. The tentative bidding schedule follows, based upon the CFA meeting occurring on January 12: Bid Advertisement – late January; Bids Due – mid-to-late February; Award Consideration – March 13, 2023 at the Municipal Authority Meeting
- Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.
Westtown Way Pump Station
- No update since our last report.
Sanitary Sewer Pipe Rehab
- Supplee Valley – No have updated the construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood and will submit to the Township for review. We anticipate bidding the project in February 2023 with construction in early-to-mid 2023.
EGMAU23001 January 6, 2023 Page 2
East Goshen Municipal Authority Engineer’s Report
- Hershey’s Mill Estates – We prepared the Intent to Award and Precast Commitment letters to the low bidder, Joao & Bradley. We reviewed construction submittals and shop drawings for the manholes, storm sewer endwall, and bypass pumping plan. It is our understanding that the manholes and endwall have been ordered. We are awaiting the contractor’s bonds and insurance documents, which need to be in-hand to execute the contract. We recommend the MA formally award the contract to Joao & Bradley at the January 9th MA meeting conditioned that the contract not be signed until after the CFA’s January 12th meeting in which they are tentatively expected to award grants. An initial pre-construction meeting was conducted, and a second pre-construction meeting is scheduled for January 10. We also prepared a revised design of pipe slopes and manhole invert elevations since all manholes are now expected to be replaced given the bid pricing. The revised design provides for increased pipe slopes on certain pipe segments that are currently very flat. A Construction Issue set of plans was prepared accordingly and has been issued. We provided the Township with quantities of materials for storm sewer piping for the Township to order. We have contacted PADEP about the procedure for amending the GP-11 permit to include the additional wetland crossing at the upstream end of the project site to allow for additional construction access off of Tanglewood Drive and are awaiting their direction. A revised / supplemental permit application will be submitted pending their response. A field survey stakeout of the existing easement and proposed limit of disturbance, which extends outside the easement, was performed at the end of the Fox Glove Lane cul-de-sac for use by the Township in discussing the need for temporary construction easements with the two property owners. Provided the contract is executed by January 13, the contractor intends to mobilize the week of January 16 and begin pipe replacement on January 23, starting at the downstream end. They will provide a detailed schedule after the second pre-construction meeting.
- Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.
New Connections
- 301 Reservoir Road – We reviewed a Land Development sketch plan for the 5-lot residential subdivision and provided a comment letter including a comment that design and Sewage Facilities Planning for a public sewer extension is required.
- 1671 and 1681 Strasburg Road – We performed a cursory review of a sketch plan for an approximately 1,800-LF long low pressure sewer lateral to connect the proposed residential property to the sewer main immediately upstream of the treatment plant.
Industrial Pretreatment Ordinance
- No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.
END OF REPORT
P:\Projects\EGMA\Memos to Board\2023\Engineers Report 2023-01-06.docx
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
January 2023
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 is anticipated to achieve compliance with all effluent limitations regarding water quality for the month of December. All supplemental reports were submitted for the month of November with the eDMR. Discharge to the Applebrook irrigation lagoon remains offline. Chemical usage utilized for, and total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes were slightly increased to a daily average of 72.6 as compared to the previous month at 70.0 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues at around 500,000 gallons or more per month. There were no odor complaints during the month.
Table 1
December 2022- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 10 | 62 | Report | Report | 10 | 62 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Inst. Max | 20 | 94 | 15 | 94 | 5 | 1 | |||||||
| Sample Date | |||||||||||||
| December 6, 2022 | 0.395 | 2.7 | 8.9 | 6.87 | 22.6 | 11.5 | 37.9 | 0.10 | 0.33 | 0.18 | 0.59 | ||
| December 13, 2022 | 0.396 | 2.0 | 6.6 | 7.95 | 26.3 | 4.0 | 13.2 | 0.10 | 0.33 | 0.18 | 0.59 | 12 | 1.0792 |
| December 20, 2022 | 0.396 | 5.9 | 19.5 | 8.49 | 28.0 | 0.10 | 0.33 | 0.10 | 0.33 | 5 | 0.6990 | ||
| December 27, 2022 | 0.400 | 5.7 | 19.0 | 4.0 | 13.3 | 0.10 | 0.33 | 0.15 | 0.50 | 1 | 0.0000 | ||
| Average | 0.397 | 4.1 | 13.5 | 7.77 | 25.6 | 6.5 | 21.5 | 0.10 | 0.33 | 0.15 | 0.50 | 6 | 0.5927 |
| Minimum | 0.395 | 2.0 | 6.6 | 6.87 | 22.6 | 4.0 | 13.2 | 0.10 | 0.33 | 0.10 | 0.33 | 1 | 0.0000 |
| Maximum | 0.400 | 5.9 | 19.5 | 8.49 | 28.0 | 11.5 | 37.9 | 0.10 | 0.33 | 0.18 | 0.59 | 12 | 1.0792 |
*The test results for the weeks of December 20th and 27th are draft results as the results are in progress. The fecal coliform results from December 6th are under review for accuracy.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported to date for outfall 001 December 2022. The month-to-date average total phosphorus was reported as 0.15 mg/L as compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits, except for the December 6th test result of 11.5 mg/L. The results remain below the weekly maximum of 15 mg/L. The draft monthly average TSS is reported as 6.5 mg/L as compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment process performed well during October. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS, and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for
total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002 remains offline.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.
Table 2 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during December 2022.
Table 2
December 2022 - Influent Wastewater
| Design Basis | Flow | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||||
| December 6, 2022 | 0.508 | 363 | 1,538 | 346.0 | 1,466 | 43 | 182 | 30.8 | 130 | 53.3 | 226 | 6.06 | 25.7 |
| December 13, 2022 | 0.387 | 224 | 724 | 202 | 653 | 148 | 478 | 29.1 | 94 | 46.2 | 149 | 4.88 | 15.8 |
| December 20, 2022 | 0.455 | 328 | 1,245 | 341 | 1,294 | 34.7 | 132 | 5.30 | 20.1 | ||||
| December 27, 2022 | 0.515 | 323 | 1,387 | 294 | 1,263 | 29.4 | 126 | 5.49 | 23.6 | ||||
| Average | 0.466 | 310 | 1,223 | 296 | 1,138 | 162 | 641 | 31 | 121 | 49.8 | 188 | 5.43 | 21.3 |
| Minimum | 0.387 | 224 | 724 | 202.0 | 653 | 43 | 182 | 29 | 94 | 46.2 | 149 | 4.88 | 15.8 |
| Maximum | 0.515 | 363 | 1,538 | 346 | 1,466 | 294 | 1,263 | 35 | 132 | 53.3 | 226 | 6.06 | 25.7 |
The foam on the SBR surface remained consistent with November with approximately 15% to 20% coverage of the surface area. The foam thickness is approximately 2 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.
PA DEP
No activity
Pennoni Associates
No activity
Page 2 of 4
Significant Rainfall
During December, there were eleven (11) days when rainfall or snow occurred. There were three (3) events where the rainfall exceeded 0.5 inches in a 24-hour period.
December 7th 1.03 inches
December 16th 1.35 inches
December 23rd 1.42 inches
The total rainfall for the month of December was a total 5.65 inches.
Chemical Usage:
| December 2022 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Soda Ash, pounds | 300 | 9,600 |
| Aluminium Sulfate solution, gal | 72.6 | 2,251 |
| Sludge Dewatering, gal* | 24,018 | 528,415 |
*The centrifuge was operated 22 days during the month.
Flow data:
| December 2022 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building* | 14.381 | 463,911 | 694,440 |
| Influent Wastewater to SBRs* | 14.670 | 473,220 | 680,832 |
| Internal Recycle** | 0.434 | 13,997 | 40,060 |
| Treated Effluent to Disc Filters | 14.058 | 453,475 | 610,304 |
| Final Effluent Discharge | 11.812 | 381,000 | 541,00 |
| Applebrook Golf Course | 0 | 0 | 0 |
During December, the average monthly influent wastewater flow measured at the “field” flow meter was 463,911 gallons/day as compared to the influent flow into the SBRs as 473,220 gallons/day. The difference between the daily averages is 9,309 gpd, which is consistent with the average daily volume of internal recycle flow of 13,997 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.
Page 3 of 4
Minor Preventative Maintenance
- Flushed chemical feed lines to the SBRs.
- Cleaned final effluent weir trough daily
- Skimmed surface of disc filters daily
- Drained and cleaned disc filters bi-weekly
- Cleaned buildings and laboratory
Page 4 of 4
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
December 12, 2022
The East Goshen Township Municipal Authority held their regular meeting on Monday, December 12, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings, Vice Chairman
Dana Pizarro
Jack Yahraes
Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni representative), Patrick McKenna (Attorney), Dave Ware (Finance Director), Michael Lynch (Township Supervisor) and Scott Towler (Big Fish) on the phone.
COMMON ACRONYMS:
| Acronym | Meaning |
|---|---|
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PM – Prevention Maintenance |
| EPA – Environmental protection Agency | PR – Park & Recreation Board |
| HC – Historical Commission | RCSTP – Ridley Creek Sewer Treatment Plant |
| I&I – Inflow & Infiltration | SBR – Sequencing Batch Reactor |
| LCSTP – Lockwood Chase Sewer Treatment Plant | SSO – Sanitary System Overflow |
| PWD – Public Works Department | WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our troops and First Responders.
He asked if anyone would be recording the meeting. There was no response.
Chairman’s Report
- Walter mentioned that he started preparing for whoever will be Chairman next year.
- West Goshen – Dave reported that they are finishing the electrical at the Westtown Way Pump Station. They have supply chain issues.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for December 12, 2022
Monthly Flows – The average daily flow to West Goshen was 658,909 per day.
Meters: The meters were read on a daily basis. We had the meters calibrated on November 21, 2022. There were no adjustments done. It was noted that three of the meters need transducer brackets replaced.
MA 11-14-22 draft 1
C.C. Collection: All pump stations were visited on a daily basis. The wet wells were washed down and the FOG rods were cleaned. We did get a call for a sewer backup at Ellis Lane. However, the problem was on the homeowner’s side of the sewer.
C.C. Interceptor:
R.C. Collection: The pump stations were visited on a daily basis. The wet wells were cleaned. We did respond to four alarms due to power outages. The generators ran and kept the stations in service.
Ridley Creek Plant: We have started work on the caustic soda system. The pump table was built in the shop and taken down to the plant to be put in place. Lenni Electric has been running the bridge conduit for the alarms and power for the pumps. They also installed additional conduit for some of the communication lines that Verizon installed. We had a problem on December 1 when a limb came in contact with a high voltage line. PECO was on location when the line dropped. We had to call Lenni in to throw the disconnect 33KV switch. Once power was installed, Lenni threw the switch and we brought the plant back on line. Kevin is setting up the schedule to clean the main trunk line from the new meter pit into the screen room. John Laidley will be on hand so he can zero out the new flow meter.
We have started clearing the lay down area at the Hershey Mill sewer project. Stumps were excavated and the soil was hauled out. Millings were hauled in and a level area was constructed.
Alarms: We responded to 22 alarms for November.
PA 1 Calls: We responded to over 35 PA One Calls for the month of November.
Monthly Rainfall: 3.15 inches of rain for the month of November.
Lateral Repairs or Caps: We had nine cleanout repairs for November.
We had a clog at Glenmont Lane today.
2. Pennoni Engineer’s Report dated December 9, 2022
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We are prepared to assist the PW Department with construction layout for the concrete pad and installation work, if needed. We obtained the attached cost quote from a PADEP “certified installer” for inspection and sign-off of the PADEP bulk tank permit application as the system is installed by the PWD. The permit application will be submitted to PADEP after installation with the certified installer’s certification. We are also setting up a meeting with the operator to determine the alarm needs for the caustic system (i.e. leak detection, liquid level, chemical feed pump failure, etc.). Dana moved to approve $1,245 fee for Data Design Services. Jack seconded the motion. The motion passed unanimously.
- UV Disinfection System – The system is being fabricated by Glasco, and delivery is expected in late February or early March 2023.
MA 11-14-22 draft 2
The bidding and contracting schedule for the mechanical and electrical work remains dependent on the notification of awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants. Those awards had been expected to occur in November, but the funding agency, PA DCED, informed us that the awards will now occur in January at the earliest, but it could be later than that.
The MA authorized bidding at the November MA meeting with the intention to advertise the solicitations in early December. However, we now propose to extend the advertisement to occur when the CFA’s public meeting schedule to make the LSA awards is announced. The UV solicitations can then be advertised approximately one month in advance of the CFA meeting so that UV bids will be received and can be awarded right after the CFA meeting. The tentative revised bidding schedule follows, based upon the CFA meeting occurring in late January:
- Bid Advertisement – late December/early January
- Bids Due – late January/early February
- Award Consideration – February 13, 2023 at the Municipal Authority Meeting
- Generator #2 Replacement – We are continuing with design and coordination with vendors on pricing for various size generators.
Westtown Way Pump Station
- No update since our last report.
Sanitary Sewer Pipe Rehab
- Supplee Valley – No have updated the construction scope and construction cost estimate for pipe lining the remainder of the asbestos cement sewers in the neighborhood and will submit to the Township for review. We anticipate bidding the project in January 2023 with construction in early 2023.
- Hershey’s Mill Estates – We administered the bidding process including responding to prospective bidders’ questions, conducting two on-site pre-bid meetings, re-designing portions of the access routes and sewer alignment based upon the site meetings, adding storm sewer replacement scope, coordinating for pre-construction site clearing and site preparation by the Township, preparing and issuing Addendum #1 consisting of a new plan set and updated specification sections, and conducting bid opening. Bids were received on December 8, and an unofficial bid tabulation is attached. We are preparing an official bid tabulation and reviewing bid documents, and we will confirm the bid and scope with the low bidder and also check references in order to make an award recommendation.
If the CFA LSA grant award meeting is scheduled to occur in January, we will recommend award at the January MA meeting conditioned that the contract cannot be executed/signed until after the CFA meeting since that grant requires that contracts not be signed or Notice to Proceed (NTP) issued until after grant awards are made. PA DCED confirmed that the contract can be signed and NTP issued immediately after the CFA meeting so we do not have to wait several months for the subsequent grant agreement to be provided and executed, if the grant is awarded.
If the CFA meeting is not scheduled in January, we can discuss with the low bidder about extending the contract award timeframe beyond the 60 days that is provided in the bid document, in which case award consideration would then be projected to occur at the
MA 11-14-22 draft 3
February MA meeting.
- Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.
I&I Program
- No activity since our last report.
New Connections
- 301 Reservoir Road – We provided alternatives to the developer’s design engineer for potential public sewer connection locations for the proposed 5-lot subdivision.
Industrial Pretreatment Ordinance
- No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.
Comment: Kevin asked for a comparison of our costs to peer plants in the area.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with all effluent limitations regarding water quality for the month of November. All supplemental reports were submitted for the month of October with the eDMR. Discharge to the Applebrook irrigation lagoon was discontinued during September. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a daily average of 70.0 as compared to the previous month at 69.1 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering continues to be increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.
Approval of Minutes
The minutes of the November 14, 2022 meeting were approved as amended.
Approval of Invoices
- Jack moved to approve payment of the Gawthrop Inoivce #266389 in the amount of $500.00. Dana seconded the motion. The motion passed unanimously.
- Kevin moved to approve payment of the following invoices that were paid on November 16, 2022: Invoice Amount Gawthrop Invoice #265299 $ 420.00 Deckman Invoice #4825 $4,514.00 Colonial Elect. Invoice #14850138 $ 450.27 Yale Electric Invoice #S121654188.001 $ 96.91 Jack Seconded the motion. The motion passed unanimously.
MA 11-14-22 draft 4
Liaison Reports
- Conservancy Board – Walter mentioned that the board did the fall planting on Saturday November 19, 2022.
- BOS – Mike Lynch commented that the BOS will approve the 2023 budget on December 20, 2022. The property tax increase is still in front. He commented about the great job Dave Ware did through this process. Mike attended a meeting at New Garden Township. They started the sale of their sewer system in 2012 and was finalized in 2019. Aqua established a new rate about 70% higher than the previous. The meeting was attended by about 300 people and was well done. There was a very large increase proposed before the Municipal Authority decided to sell. The comments from residents were that they would rather pay to the MA than Aqua where they are paying for the executives. Mike explained Act 12.
Financial Reports
1. November Financial Report - Dave Ware provided the following report:
In November 2022, the Municipal Authority recorded $15,696.80 in revenues (primarily from Sewer Operating and Sewer Capital Reserve transfers) and $31,664.60 in expenses (General Engineering Services, Legal Services, Hershey’s Mill Engineering Services, Hershey’s Mill Pump Station – rebuilt hydromatic pump, and Capital expenditures at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($15,967.80). As of November 30, 2022, the fund balance was ($11,137.03).
The 2023 proposed budget was discussed. Kevin moved that the Proposed 2023 Budget be added to the January agenda. Dana seconded the motion. The motion passed unanimously.
Old Business
1. Hershey Mill Trunk Line – Mike Ellis mentioned that the references have been checked on the low bidder and he described a recent job they did at 40% lower and the work was good. The low bidder is 30% less than the next bid. Supplies were discussed. We have the pipe but no manholes. After discussion, Kevin moved to send a letter to the low bidder to order the manholes and East Goshen will reimburse for the cost regardless of lead time. Jack seconded the motion. The motion passed unanimously. Mark and Mike will make up the letter and send it to Patrick for review. Mike will call the low bidder to see what the lead time is on manholes. Mike Lynch asked about the cost estimate for this project. Mike Ellis commented that the original estimate was $1.5M and is now at about $1M.
Mark Miller mentioned that he sent letters to the residents. There is one property located next to the Township easement who hasn’t returned Mark’s calls. Mark described the other areas where they will bring in supplies instead of having to go through the wetland. There is one tree he will need to fertilize which will cost $1,200.00.
Goals
The goals were reviewed.
New Business
1. 301 Reservoir Road – A letter was received from Commonwealth Engineers, Inc. outlining proposed subdivision of the property and requesting an additional 1,055 gpd (5 EDU’s at 211 gpd/EDU). There is capacity. They are requesting a standard Sewer Availability Letter. Kevin
MA 11-14-22 draft 5
moved to provide a letter to Commonwealth Engineers, Inc. for the requested 1,055 gpd (5 EDU’s at 211 gpd/EDU). Jack seconded the motion. The motion passed unanimously.
2. Pennoni 2023 Fee Schedule – The 2023 fee schedule was reviewed. Kevin moved to retain Pennoni as the Municipal Authority’s engineer and approve their rates as provided for 2023. Dana seconded the motion. The motion passed unanimously.
Any Other Matter - None
Correspondence- None
Public Comment - None
Adjournment
There being no further business Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:25 pm.
The next regular meeting will be held on Monday, January 9, 2023 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 11-14-22 draft 6
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1150403
Invoice Date : 12/29/2022
Project : EGMAU20004
Project Name : RCSTP Caustic Soda Conversion
For Services Rendered Through 12/18/2022
Identified and obtained cost quote from "certified installer" to sign off on PADEP bulk tank permit application, set up pre-construction meeting with "certified installer" and Township, alarms scoping with Township and operator, and guidance to Township on slab construction.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Design and Permitting | $26,500.00 | $22,196.28 | 87.01% | $23,057.79 | $861.51 |
| 02 -- Construction Phase Services est. | $5,400.00 | $689.50 | $689.50 | $0.00 | |
| Total : | $31,900.00 | $22,885.78 | $23,747.29 | $861.51 |
Amount Due This Invoice $861.51
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
West Goshen RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 12/29/2022
| Description | Amount | Reference | Date/Range |
|---|---|---|---|
| Project: | EGMAU20004 | ||
| Pennoni Job No.: | RCSTP Caustic Soda Conversion | ||
| Invoice No: | 1150403 | ||
| Invoice Period: | 10/3/2022 | to | 12/18/2022 |
| Initial Authorization: | $ 31,900.00 | Date: | 12/29/2022 |
| Contract Amount: | $ 31,900.00 | ||
| Previously Invoiced: | $ 22,885.78 | ||
| Current Invoice: | $ 861.51 | ||
| Invoiced to Date ($): | $ 23,747.29 | ||
| Invoiced to Date (%): | 74% | ||
| Remaining Budget ($): | $ 8,152.71 | ||
| Remaining Budget (%): | 26% |
Budget by Phase:
| Phase Summary | Amount |
|---|---|
| Phase Name: | RCSTP Caustic Soda Conversion |
| Phase Budget: | $ 31,900.00 |
| Previously Invoiced: | $ 22,885.78 |
| Current Invoice: | $ 861.51 |
| Invoiced to Date ($): | $ 23,747.29 |
| Invoiced to Date (%): | 74% |
| Remaining Budget ($): | $ 8,152.71 |
| Remaining Budget (%): | 26% |
Comments: Identified and obtained cost quote from "certified installer" to sign off on PADEP bulk tank permit application, set up pre-construction meeting with "certified installer" and Township, alarms scoping with Township and operator, and guidance to Township on slab construction.
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1150405
Invoice Date : 12/29/2022
Project : EGMAU21004
Project Name : HM Estates Sewer
Design & Permitting
For Services Rendered Through 12/18/2022
Phases 04 and 05 - Finalized plans, specifications, and bid documents.
Phase 08 - Set up solicitation on PennBID, provided advertisement to Township, conducted 1st pre-bid meeting at the site, responded to questions from prospective bidders, follow-up pre-bid meeting including preparation and issuance of Addendum #1 plans and specs updates and guidance to Township on additional sanitary and storm sewer piping materials to purchase, conducted for 2nd pre-bid site meeting conducted bid opening, prepared unofficial bid tabulation, discussed LSA grant status with funding agency, strategized award approach with Township due to delayed LSA grant awards, and performed reference checks for the low bidder.
Phase 09 - Prepared Intent to Award and Manhole Ordering Payment Commitment letters to contractor, reviewed manhole and endwall shop drawings, and initiated preparation of Construction Issue plan set with improved pipe slopes since all manholes are expected to be awarded for replacement.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Wetland & Watercourse Investigation | $6,750.00 | $6,750.00 | 100.00% | $6,750.00 | $0.00 |
| 02 -- Phase I Bog Turtle Habitat Assessment | $6,750.00 | $6,750.00 | 100.00% | $6,750.00 | $0.00 |
| 03 -- Survey | $17,200.00 | $17,200.00 | 100.00% | $17,200.00 | $0.00 |
| 04 -- Design | $26,100.00 | $25,506.35 | 100.00% | $26,100.00 | $593.65 |
| 05 -- Permitting | $8,000.00 | $7,028.05 | 100.00% | $8,000.00 | $971.95 |
| 06 -- Property Line Stakeout | est. $5,000.00 | $7,520.50 | $7,520.50 | $0.00 | |
| 07 -- Geotechnical | NTE $10,000.00 | $6,271.25 | 62.71% | $6,271.25 | $0.00 |
| 08 -- Bid Assistance | est. $7,500.00 | $0.00 | $9,690.50 | $9,690.50 | |
| 09 -- Construction Admin & Inspection | est. $0.00 | $0.00 | $1,386.00 | $1,386.00 | |
| Total : | $87,300.00 | $77,026.15 | $89,668.25 | $12,642.10 |
Phase: 08 -- Bid Assistance
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 16.00 | 141.00 | 2,256.00 |
| Staff Professional | 8.75 | 110.00 | 962.50 |
| Associate Professional | 52.50 | 105.00 | 5,512.50 |
| Sr. Eng Tech | 9.50 | 101.00 | 959.50 |
| Labor | 9,690.50 |
Phase Subtotal: $9,690.50
Phase: 09 -- Construction Admin & Inspection
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
| Project | Description | Document | Invoice Number |
|---|---|---|---|
| Project EGMAU21004 | HM Estates Sewer Design & Permitting | Invoice | 1150405 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.50 | 141.00 | 493.50 |
| Associate Professional | 8.50 | 105.00 | 892.50 |
| Labor | 1,386.00 |
Phase Subtotal: $1,386.00
Amount Due This Invoice: $12,642.10
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
West Goshen HM Estates Sewer Design Permitting
EGMAU21004 Invoice Summary
Invoice Date 12/29/2022
| Field | Value | Field | Value |
|---|---|---|---|
| Project: | EGMAU21004 | ||
| Pennoni Job No.: | HM Estates Sewer Design & Permitting | ||
| Invoice No: | 1150405 | ||
| Invoice Period: | 10/3/2022 | to | 12/18/2022 |
| Initial Authorization: | $ 64,800.00 | Date: | 12/29/2022 |
| Contract Amount: | $ 87,300.00 | ||
| Previously Invoiced: | $ 77,026.15 | ||
| Current Invoice: | $ 12,642.10 | ||
| Invoiced to Date ($): | $ 89,668.25 | ||
| Invoiced to Date (%): | 103% | ||
| Remaining Budget ($): | $ (2,368.25) | ||
| Remaining Budget (%): | -3% |
Budget by Phase:
| Phase Metric | Value |
|---|---|
| Phase Name: | HM Estates Sewer Design & Permitting |
| Phase Budget: | $ 87,300.00 |
| Previously Invoiced: | $ 77,026.15 |
| Current Invoice: | $ 12,642.10 |
| Invoiced to Date ($): | $ 89,668.25 |
| Invoiced to Date (%): | 103% |
| Remaining Budget ($): | $ (2,368.25) |
| Remaining Budget (%): | -3% |
Comments: Phases 04 and 05 - Finalized plans, specifications, and bid documents.
Phase 08 - Set up solicitation on PennBID, provided advertisement to Township, conducted 1st pre-bid meeting at the site, responded to questions from prospective bidders, follow-up pre-bid meeting including preparation and issuance of Addendum #1 plans and specs updates and guidance to Township on additional sanitary and storm sewer piping materials to purchase, conducted for 2nd pre-bid site meeting conducted bid opening, prepared unofficial bid tabulation, discussed LSA grant status with funding agency, strategized award approach with Township due to delayed LSA grant awards, and performed reference checks for the low bidder.
Phase 09 - Prepared Intent to Award and Manhole Ordering Payment Commitment letters to contractor, reviewed manhole and endwall shop drawings, and initiated preparation of Construction Issue plan set with improved pipe slopes since all manholes are expected to be awarded for replacement
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1150409
Invoice Date : 12/29/2022
Project : EGMAU22001
Project Name : 2022 General Services
For Services Rendered Through 12/18/2022
October and November Engineer's Reports. Prepared for and attended October's and November's MA meetings including review of RCSTP operator's reports.
Ridley Creek Sewer Main Concrete Encasement: Pre-application meeting for emergency permitting with PADEP, prepared and submitted emergency permit application package to PADEP, reviewed emergency permit approval from PADEP, pre-construction coordination with M. Miller, and prepared full GP-11 permit application for submission in follow-up to emergency authorization.
Evaluated alternatives and feasibility of sewer connection for proposed house at 1671-1681 Strasburg Road.
Billing Limits
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 3,384.75 | 27,321.50 | 30,706.25 |
| Limit | 35,000.00 | ||
| Remaining | 4,293.75 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 13.25 | 141.00 | 1,868.25 |
| Associate Professional | 8.25 | 105.00 | 866.25 |
| Graduate Professional | 5.25 | 95.00 | 498.75 |
| Sr. Eng Tech | 1.50 | 101.00 | 151.50 |
| Totals | 28.25 | 3,384.75 | |
| Total Labor | 3,384.75 |
Total this Invoice: $3,384.75
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2022 General Services
EGMAU22001 Invoice Summary
Invoice Date 12/29/2022
| Field | Value | Field | Value |
|---|---|---|---|
| Project: | EGMAU22001 | ||
| Pennoni Job No.: | 2022 General Services | ||
| Invoice No: | 1150409 | ||
| Invoice Period: | 10/3/2022 | to | 12/18/2022 |
| Initial Authorization: | $ 35,000.00 | Date: | 12/29/2022 |
| Contract Amount: | $ 35,000.00 | ||
| Previously Invoiced: | $ 27,321.50 | ||
| Current Invoice: | $ 3,384.75 | ||
| Invoiced to Date ($): | $ 30,706.25 | ||
| Invoiced to Date (%): | 88% | ||
| Remaining Budget ($): | $ 4,293.75 | ||
| Remaining Budget (%): | 12% |
Budget by Phase:
| Phase Metric | Value |
|---|---|
| Phase Name: | 2022 General Services |
| Phase Budget: | $ 35,000.00 |
| Previously Invoiced: | $ 27,321.50 |
| Current Invoice: | $ 3,384.75 |
| Invoiced to Date ($): | $ 30,706.25 |
| Invoiced to Date (%): | 88% |
| Remaining Budget ($): | $ 4,293.75 |
| Remaining Budget (%): | 12% |
Comments: October and November Engineer's Reports. Prepared for and attended November's MA meeting including review of RCSTP operator's report.
Ridley Creek Sewer Main Concrete Encasement: Pre-application meeting for emergency permitting with PADEP, prepared and submitted emergency permit application package to PADEP, reviewed emergency permit approval from PADEP, pre-construction coordination with M. Miller, and and prepared full GP-11 permit application for submission in follow-up to emergency authorization.
Evaluated alternatives and feasibility of sewer connection for proposed house at 1671-1681 Strasburg Road.
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1150410
Invoice Date : 12/29/2022
Project : EGMAU22004
Project Name : RCSTP UV
Replacement
For Services Rendered Through 12/18/2022
Continued preparation of structural design for raising the concrete walls in the channel and returned UV equipment submittals with comments for fabrication.
Billing Limits
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,178.75 | 27,310.50 | 28,489.25 |
| Limit | 30,000.00 | ||
| Remaining | 1,510.75 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | .25 | 141.00 | 35.25 |
| Senior Professional | 7.75 | 134.00 | 1,038.50 |
| Associate Professional | 1.00 | 105.00 | 105.00 |
| Totals | 9.00 | 1,178.75 | |
| Total Labor | 1,178.75 |
Total this Invoice: $1,178.75
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP UV Replacement
EGMAU22004 Invoice Summary
Invoice Date 12/29/2022
| Field | Value | Field | Value |
|---|---|---|---|
| Project: | EGMAU22004 | ||
| Pennoni Job No.: | RCSTP UV Replacement | ||
| Invoice No: | 1150410 | ||
| Invoice Period: | 10/3/2022 | to | 12/18/2022 |
| Initial Authorization: | $ 30,000.00 | Date: | 12/29/2022 |
| Contract Amount: | $ 30,000.00 | ||
| Previously Invoiced: | $ 27,310.50 | ||
| Current Invoice: | $ 117.75 | ||
| Invoiced to Date ($): | $ 27,428.25 | ||
| Invoiced to Date (%): | 91% | ||
| Remaining Budget ($): | $ 2,571.75 | ||
| Remaining Budget (%): | 9% |
Budget by Phase:
| Phase Metric | Value |
|---|---|
| Phase Name: | RCSTP UV Replacement 1129796 |
| Phase Budget: | $ 30,000.00 |
| Previously Invoiced: | $ 27,310.50 |
| Current Invoice: | $ 117.75 |
| Invoiced to Date ($): | $ 27,428.25 |
| Invoiced to Date (%): | 91% |
| Remaining Budget ($): | $ 2,571.75 |
| Remaining Budget (%): | 9% |
Comments: Continued preparation of structural design for raising the concrete walls in the channel and returned UV equipment submittals with comments for fabrication.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Dave Ware |
| Re: | 2023 Proposed Budget for the MA |
| Date: | January 9, 2023 |
Gentlemen,
I wanted to share the 2023 Proposed Municipal Authority Budget with you all.
Expenses are driving the revenue needed from the Sewer Operating Fund and Sewer Capital Reserve Fund for 2023. We also anticipate grant reimbursement for the RCSTP Caustic Soda project.
The majority of expenses are necessitated by projects and ongoing infrastructure maintenance. We anticipate upgrades to the Hershey Mill Pump Station, relining of Supplee Valley AC pipe, final payments for the Westtown Way Pump Station improvements, rebuild/install SBR and Sludge pumps at the RCSTP, replace the RCSTP generator, completion of the Hershey's Mill Estates Sewer Rehabilitation, completion of the Caustic Soda Project, manhole lining, new RC flow meter and media for filters, and a replacement Muffin Monster. That's over $1.5M needed from Reserves and the Operating Fund. Even with the sewer fixed rate increase of $20/QTR implemented in Q4 2022, I project a $159K balance reduction in the Sewer Operating Fund and a $648K reduction in the Sewer Reserve Fund. Hopefully, with the majority of work done in 2023 as outlined in the 5 Year Capital Plan (included in the agenda), we will be able to transfer more dollars each year from Operating to Reserve, and that the current interest rate environment will help grow those savings. In 2023, I plan to work on an extensive asset management plan for the sewer plant and system to understand the need for sewer rate increases for the next 10 years. Then I can begin the process of educating our populace about the system, its costs and age, and the plan of any rate increase as well as why.
I hope this provides some clarity to the figures shared in the 2023 MA Budget. Please note that I have not included outstanding grant money that has not been awarded as of this date.
Sincerely,
[signature]
Dave Ware
Director of Finance
East Goshen Township
Recommended motion: Mr. Chairman, I make the motion we adopt the 2023 Proposed Municipal Authority Budget with both revenue and expenses of $1,730,115 for a $0 net result.
U:\dware\municipal authority\
REFUSE FUND, Adopted 2023 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Budget | 2022 Projection | 2023 Adopted Budget | $ Increase (vs '22 Proj) | % Increase |
|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 530,140 | 494,810 | 494,810 | 566,726 | |||
| REVENUE | |||||||
| INTEREST EARNINGS | 06341 1000 | 165 | 175 | 614 | 6,000 | 5,386 | 877.9% |
| REVENUE - REFUSE FEES | 06364 2000 | 994,965 | 1,312,604 | 1,312,604 | 1,317,332 | 4,728 | 0.4% |
| REVENUE - REFUSE PENALTIES | 06364 2010 | 9,743 | 13,532 | 10,532 | 10,853 | 321 | 3.1% |
| REVENUE - LIEN PAYMENTS | 06364 2025 | 26,313 | 20,298 | 22,798 | 24,713 | 1,915 | 8.4% |
| REVENUE - REFUSE CERTIFICATION FEES | 06364 2030 | 1,250 | 1,200 | 2,205 | 2,250 | 45 | 2.0% |
| REVENUE - MISCELLANEOUS GRANTS | 06364 2040 | 38,694 | 10,000 | 58,481 | 30,710 | (27,771) | -47.5% |
| MISCELLANEOUS REFUSE REVENUE | 06380 1000 | 3,075 | - | - | 168,000 | 168,000 | |
| TOTAL REVENUE | 1,074,206 | 1,357,809 | 1,407,234 | 1,559,859 | 152,625 | 10.8% | |
| EXPENSES | |||||||
| REFUSE - WAGES | 06427 1400 | 65,889 | 68,000 | 68,000 | 71,400 | 3,400 | 5.0% |
| MATERIALS & SUPPLIES | 06427 2440 | 5,686 | - | 5,095 | 159,000 | 153,905 | 3020.7% |
| GENERAL EXPENSE | 06427 3000 | 130 | 205 | 205 | 215 | 10 | 5.0% |
| ADMIN - PAYMENT PORTAL | 06427 3001 | 6,891 | 5,172 | 7,172 | 7,250 | 78 | 1.1% |
| PROFESSIONAL SERVICES | 06427 3100 | - | - | - | 17,667 | 17,667 | |
| LEGAL SERVICES | 06427 3140 | 4,616 | 5,000 | 1,000 | 5,000 | 4,000 | 400.0% |
| POSTAGE | 06427 3250 | 4,726 | 4,813 | 4,813 | 15,250 | 10,437 | 216.9% |
| ADVERTISING & PRINTING | 06427 3400 | 722 | 1,040 | 1,648 | 2,000 | 352 | 21.3% |
| ADMIN.BLDG.OVERHEAD | 06427 3730 | 5,976 | 8,195 | 8,195 | 8,000 | (195) | -2.4% |
| CONTRACTED SERV. | 06427 4500 | 694,920 | 912,598 | 912,598 | 985,606 | 73,008 | 8.0% |
| LANDFILL FEES | 06427 4502 | 308,812 | 321,132 | 316,132 | 322,938 | 6,807 | 2.2% |
| COUNTY-HAZARD.WASTE PROG. | 06427 4503 | - | - | - | - | - | |
| RECYCLING FEES | 06427 4504 | 10,546 | 31,654 | 10,000 | 10,000 | (0) | 0.0% |
| LOCK BOX FEE | 06427 5000 | - | - | - | - | - | |
| Bank Fees | 06427 5001 | 621 | - | 460 | 500 | 40 | 8.7% |
| TRANSFER TO CREDIT CARD FUND | 06492 0110 | - | - | - | - | - | |
| TOTAL EXPENSES | 1,109,535 | 1,357,809 | 1,335,318 | 1,604,826 | 269,508 | 20.2% | |
| NET RESULT FROM OPERATIONS | (35,330) | 0 | 71,915 | (44,967) | |||
| ESTIMATED ENDING FUND BALANCE | 494,810 | 494,810 | 566,726 | 521,758 | |||
U:\DWare3 Budget\All Other Funds\All Funds Proposed 2023 Budget Summary.xlsx 1/5/2023 9 of 15
[Township logo: Respecting the Past, Serving the Present, Preparing for the Future]
2023-2027 Capital Improvement Program
Hershey’s Mill Estates Sewer, Milltown Dam, & WG STP
| Category | 2023 | 2024 | 2025 | 2026 | 2027 |
|---|---|---|---|---|---|
| Milltown Dam | $ 2,563,170.00 | $ 1,670,900 | |||
| Hershey Mill Estates Sewer | $ 488,846.72 | ||||
| Bow Tree Pond I | $ 500,000 | ||||
| West Goshen Sanitary Treatment Plant Improvements (Including Westtown Way Pump Station) | $ 573,703.74 | $ 68,217 | $ 12,503 | $ 35,478 | $ 49,039 |
| Total | $ 4,125,720.46 | $ 1,739,117 | $ 12,503 | $ 35,478 | $ 49,039 |
| Category | 2023 | 2024 | 2025 | 2026 | 2027 |
|---|---|---|---|---|---|
| Capital Reserve Fund | $ 1,347,283 | $ 555,900 | |||
| Sewer Capital Reserve Fund | $ 676,053 | $ 68,217 | $ 12,503 | $ 35,478 | $ 49,039 |
| Grants | $ 915,000 | ||||
| Series 2017 Bonds | $ 1,602,385 | $ 200,000 | |||
| Infrastructure Sustainability Fund | $ 500,000 | ||||
| Total | $ 4,125,720.46 | $ 1,739,117 | $ 12,503 | $ 35,478 | $ 49,039 |
Notes:
- Assumes that ½ of Milltown Mill Dam work occurs in 2023, ½ in 2024.
- Hershey’s Mill Estates Sewer Rehabilitation starts in 2022.
6
[Township logo: Respecting the Past, Serving the Present, Preparing for the Future]
2023-2027 Capital Improvement Program
Sewer Capital Maintenance
(RC STP & Pump Stations)
(Except West Goshen Upgrades & HM Estates)
| Category | 2023 | 2024 | 2025 | 2026 | 2027 |
|---|---|---|---|---|---|
| Hunt Country/HM Lift Station Pump Replacement | $ 20,000 | $ 20,000 | |||
| Hunt Country P/S Mag Meter | $ 15,000 | ||||
| Hunt Country P/S Muffin Monster | $ 67,000 | ||||
| Hunt Country P/S Bypass Pump | $ 5,000 | ||||
| Relining AC sewer lines and brick manholes | $ 260,000 | $ 130,000 | $ 130,000 | $ 130,000 | $ 130,000 |
| Ridley Creek STP rebuild 2 SBR pumps | $ 25,000 | ||||
| Ridley Creek STP rebuild 2 Sludge pumps | $ 10,000 | ||||
| Ridley Creek STP New Media for filters | $ 18,000 | ||||
| Ridley Creek STP replace generator | $ 225,000 | ||||
| Ridley Creek STP Collection Flow Meter | $ 24,000 | ||||
| Ridley Creek STP Caustic Soda Project* | $ 47,500 | ||||
| Ridley Creek STP Filter Feed Pump** | $ 18,000 | $ 18,000 | $ 26,000 | $ 18,000 | $ 18,000 |
| Ridley Creek STP Blower Replacement | $ 9,000 | $ 9,000 | $ 9,000 | $ 9,000 | $ 9,000 |
| Ridley Creek STP UV System | $ 150,000 | ||||
| Chester Creek Coll manhole lining (Eastwick Circle) for 5 manholes | $ 50,000 | ||||
| Chester Creek Coll HM Pumpstation upgrade | $ 78,000 | ||||
| Chester Creek Coll Muffin Monster swap out | $ 18,000 | $ 18,000 | $ 18,000 | ||
| Total | $ 932,500 | $ 264,000 | $ 203,000 | $ 157,000 | $ 175,000 |
| Category | 2023 | 2024 | 2025 | 2026 | 2027 |
|---|---|---|---|---|---|
| Capital Reserve Fund | |||||
| Sewer Capital Reserve Fund | $ 885,000 | $ 264,000 | $ 203,000 | $ 157,000 | $ 175,000 |
| Grants | $ 47,500 | ||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 932,500 | $ 264,000 | $ 203,000 | $ 157,000 | $ 175,000 |
* DCED has awarded MA $152,980 grant for Caustic Soda project.
** 2025 Filter Feed Pump is for centrifuge rebuild.
7
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
December 2022
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 6.55 | 2.93 |
| 07-354-0400 | DCED GRANT | 152,980.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,000.00 | 2,300.00 | 2,060.00 |
| 07-364-1110 | R.C.TAPPING FEES | 2,000.00 | 2,089.20 | 11,508.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,000.00 | 563.76 | 3,367.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 0.00 | 282.24 | 2,664.48 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 130,000.00 | 82,607.15 | 90,338.41 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 476,930.00 | 286,656.90 | 179,592.49 |
| Total Revenue | 764,910.00 | 374,505.80 | 289,534.07 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 30,529.00 | 33,488.20 | 30,920.37 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,500.00 | 1,665.25 | 1,693.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 10,300.00 | 10,250.00 | 10,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 45,000.00 | 42,469.00 | 55,388.56 |
| 07-424-3140 | LEGAL SERVICES | 8,000.00 | 6,640.00 | 9,193.82 |
| 07-424-7440 | R.C. CAPITAL-STP | 315,000.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 41,400.00 | 0 | -10,984.77 |
| 07-426-3001 | RELINING | 130,000.00 | 0 | 0 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 0.00 | 2,215.00 | 5,117.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 0.00 | 11,493.05 | 30,324.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 153,398.99 | 76,692.71 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 0.00 | 1,870.00 | 8,277.00 |
| 07-429-1505 | RCSTP CAPITAL | 46,897.00 | 125,624.18 | 67,250.98 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 136,284.00 | 0 | 0 |
| 07-491-5001 | BANK FEES | 0.00 | 0 | 414.00 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 0.00 | 212.99 | 0 |
| Total Expenses | 764,910.00 | 389,326.66 | 284,286.92 | |
| Net Result From Operations | 0.00 | -14,820.86 | 5,247.15 | |
Municipal Authority
YTD Revenues and Expenses thru 12/31/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/22 | Revenue Journal | INTEREST EARNED JANUARY 2022 07 FUND | 0.19 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/22 | Revenue Journal | INTEREST EARNED FEBRUARY 2022 07100.1035 | 0.18 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/22 | Revenue Journal | INTEREST EARNED MARCH 2022 07 FUND | 0.17 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/22 | Revenue Journal | INTEREST EARNED APRIL 2022 07100 | 0.15 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/22 | Revenue Journal | INTEREST EARNED MAY 2022 07 FUND | 0.09 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/22 | Revenue Journal | INTEREST EARNED JUNE 2022 07 FUND | 0.10 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/22 | Revenue Journal | INTEREST EARNED JULY 2022 07 FUND | 0.42 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/22 | Revenue Journal | INTEREST EARNED AUGUST 2022 | 0.92 |
| 07-341-1000 | INTEREST EARNINGS | 09/30/22 | Revenue Journal | INTEREST EARNED SEPTEMBER 2022 | 0.29 |
| 07-341-1000 | INTEREST EARNINGS | 11/04/22 | Revenue Journal | INTEREST EARNED OCTOBER 2022 | 3.20 |
| 07-341-1000 | INTEREST EARNINGS | 12/05/22 | Revenue Journal | INTEREST EARNED NOVEMBER 2022 | 0.84 |
| 07-364-1100 | C.C. TAPPING FEES | 07/13/22 | Revenue Journal | 1344 MORSTEIN RD C.C. TAPPING FEES | 2,000.00 |
| 07-364-1100 | C.C. TAPPING FEES | 07/13/22 | Revenue Journal | 1344 MORSTEIN RD C.C. TAPPING FEES | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 05/18/22 | Revenue Journal | 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPI | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/22 | Revenue Journal | TAP IN FEE 1577 COLONIAL R.C.TAPPING FEE | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/22 | Revenue Journal | SEWER INSP FEE 1577 COLONIAL R.C.TAPPING | 300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 09/01/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 10/03/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 11/01/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 12/01/22 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 02/02/22 | Revenue Journal | STOFFLET, MICHAEL | 423.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 02/02/22 | Revenue Journal | ANNUAL PINK ROCK INSTALLMENT INTEREST PO | -141.12 |
| 07-364-1130 | CONNECTION FEES - SEWER | 08/18/22 | Revenue Journal | PAPPANO, JOSEPH & PATRICIA | 423.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 08/18/22 | Revenue Journal | ANNUAL PINE ROCK INSTALLMENT INTEREST PO | -141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 02/02/22 | Revenue Journal | ANNUAL PINK ROCK INSTALLMENT INTEREST PO | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 08/18/22 | Revenue Journal | ANNUAL PINE ROCK INSTALLMENT INTEREST PO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/13/22 | Revenue Journal | XFER $ TO MA FROM SEWER & SEWER CAP.RE: | 5,497.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/16/22 | Revenue Journal | XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP | 6,324.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/08/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAPITAL TO MA | 660.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/11/22 | Revenue Journal | XFER $ FROM 05 TO 07 MA AUTH. | 360.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/18/22 | Revenue Journal | XFER $ FROM 05 TO 07 RE: 07 EXPENSES | 7,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/30/22 | Revenue Journal | XFER $ FROM 05 TO 07 TO COVER MA EXPENSE | 8,372.05 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/14/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE | 10,814.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/04/22 | Revenue Journal | XFER $ FROM 05 TO MA TO COVER EXPENSES | 3,690.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/13/22 | Revenue Journal | XFER $ TO MA RE: MAY EXPENSES FROM 05 & | 1,283.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | -1,283.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | 5,302.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/16/22 | Revenue Journal | XFER FUNDS TO MA FROM SEWER & SEWER CAPI | 2,970.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/01/22 | Revenue Journal | XFER $ FROM 05 TO 07 TO COVER MA EXPENSE | 8,372.05 |
Page 1 of 5
Municipal Authority
YTD Revenues and Expenses thru 12/31/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/13/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA AUTHORITY RE: | 2,111.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/16/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAP. TO MA TO | 920.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 09/13/22 | Revenue Journal | XFER TO MA TO COVER AUG.EXPENSES | 2,451.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 09/30/22 | Revenue Journal | XFER FR: 05 TO 07 RE: Q3 2022 CHGBACK | 8,372.05 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/19/22 | Revenue Journal | XFER FROM 05 TO COVER 07 EXPENSES | 4,966.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 11/17/22 | Revenue Journal | XFER TO 07 FROM 05 TO COVER EXPENSES | 3,924.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 12/15/22 | Revenue Journal | XFER $ TO 07 RE: EXPENSES | 500.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/13/22 | Revenue Journal | XFER $ TO MA FROM SEWER & SEWER CAP.RE: | 18,986.13 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/16/22 | Revenue Journal | XFER $ FROM 05 & 09 RE: JAN. 2022 MA EXP | 1,217.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/08/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAPITAL TO MA | 6,831.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/14/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA RE: APRIL EXPE | 25,600.37 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/13/22 | Revenue Journal | XFER $ TO MA RE: MAY EXPENSES FROM 05 & | 5,302.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | -5,302.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/07/22 | Revenue Journal | CORRECT MA $ XFER TRX 83370 5/13/22 | 1,283.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/16/22 | Revenue Journal | XFER FUNDS TO MA FROM SEWER & SEWER CAPI | 12,592.90 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/13/22 | Revenue Journal | XFER $ FROM 05 & 09 TO MA AUTHORITY RE: | 21,785.60 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/28/22 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER 07 EXPENSE | 16,131.57 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/16/22 | Revenue Journal | XFER $ FROM SEWER & SEWER CAP. TO MA TO | 18,030.91 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/31/22 | Revenue Journal | Xfer $ from 09 to 07 for expenses | 212.99 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/08/22 | Revenue Journal | TRANSFER FROM 09 TO COVER 07 EXPENSES | 545.94 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/13/22 | Revenue Journal | XFER TO MA TO COVER AUG.EXPENSES | 2,120.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/29/22 | Revenue Journal | XFER FROM 09 TO 07 TO COVER EXPENSES | 160.44 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/14/22 | Revenue Journal | XFER $ TO COVER 07 EXPENSES | 318.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/19/22 | Revenue Journal | XFER FROM 09 TO COVER 07 EXPENSES | 122,917.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/26/22 | Revenue Journal | XFER FROM 09 TO 07 FOR MA EXPENSES | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/16/22 | Revenue Journal | XFER FROM 09 TO 07 FOR EXPENSES | 5,417.41 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/17/22 | Revenue Journal | XFER TO 07 FROM 09 TO COVER EXPENSES | 1,601.10 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/18/22 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER EXPENSE | 4,453.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 12/01/22 | Revenue Journal | XFER $ FROM 09 TO 07 RE: MA EXPENSES | 16,009.04 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 12/14/22 | Revenue Journal | XFER FROM 09 TO 07 | 5,221.00 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/30/22 | Expd | EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2 | 8372.05 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/30/22 | Expd | EAST GOSHEN TOWNSHIP - GENERAL QTR.2-202 | 8372.05 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 09/30/22 | Pay Check: 3356 | 22-00350 Q3 2022 MUNIC.AUTH CHARGEBACK | 8372.05 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 12/29/22 | Pay Check: 3376 | 22-01049 Q4-2022 MUN.AUTH.CHARGEBACK | 8372.05 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 01/13/22 | Expd | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSO | 880.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/08/22 | Expd | DELAWARE RIVER BASIN COMMISSION ANNL MON | 660 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 06/30/22 | Expd | PETTY CASH PA MUNIC. AUTH.WORKSHOP - W.W | 125 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/18/22 | Expd | MAILLIE FALCONIERO & CO. MUNICIPAL AUTH. | 7000 |
Page 2 of 5
Municipal Authority
YTD Revenues and Expenses thru 12/31/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/03/22 | Expd | MAILLIE FALCONIERO & CO. FINAL BILLING - | 3250 |
| 07-424-3130 | ENGINEERING SERVICES | 01/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 12 | 4076.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 1/ | 5664.5 |
| 07-424-3130 | ENGINEERING SERVICES | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 10814 |
| 07-424-3130 | ENGINEERING SERVICES | 05/12/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 4/ | 5302.5 |
| 07-424-3130 | ENGINEERING SERVICES | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 2610.5 |
| 07-424-3130 | ENGINEERING SERVICES | 07/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 6/ | 1051.25 |
| 07-424-3130 | ENGINEERING SERVICES | 08/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 7/ | 3408.25 |
| 07-424-3130 | ENGINEERING SERVICES | 09/13/22 | Pay Check: 3353 | 22-00112 SERV.THRU 8/14/22 GEN.SERV. | 1471 |
| 07-424-3130 | ENGINEERING SERVICES | 10/18/22 | Pay Check: 3362 | 22-00476 SERVICES THRU 9/18/22 GEN.SERV | 4566 |
| 07-424-3130 | ENGINEERING SERVICES | 11/17/22 | Pay Check: 3369 | 22-00749 SERV.THRU 10/16/22 2022 GEN.SE | 3504.25 |
| 07-424-3140 | LEGAL SERVICES | 01/13/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 540 |
| 07-424-3140 | LEGAL SERVICES | 02/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 660 |
| 07-424-3140 | LEGAL SERVICES | 03/11/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 360 |
| 07-424-3140 | LEGAL SERVICES | 05/04/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 440 |
| 07-424-3140 | LEGAL SERVICES | 06/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 360 |
| 07-424-3140 | LEGAL SERVICES | 07/13/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERVI | 1060 |
| 07-424-3140 | LEGAL SERVICES | 08/16/22 | Expd | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. | 920 |
| 07-424-3140 | LEGAL SERVICES | 09/13/22 | Pay Check: 3352 | 22-00109 LEGAL SERV. JULY 2022 GEN.AUT | 400 |
| 07-424-3140 | LEGAL SERVICES | 09/13/22 | Pay Check: 3352 | 22-00110 LEGAL SERV. AUG.2022 GEN.AUTH | 580 |
| 07-424-3140 | LEGAL SERVICES | 10/18/22 | Pay Check: 3361 | 22-00475 LEGAL SERV. 9/2022 GEN.AUTH. | 400 |
| 07-424-3140 | LEGAL SERVICES | 11/17/22 | Pay Check: 3368 | 22-00746 LEGAL SERV. GEN.AUTH 10/2022 | 420 |
| 07-424-3140 | LEGAL SERVICES | 12/15/22 | Pay Check: 3375 | 22-00960 LEGAL SERVICE - NOVEMBER 2022 | 500 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. REBUILT HYDROM | 2215 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 04/14/22 | Expd | DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIR | 8632 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 06/16/22 | Expd | COLONIAL ELECTRIC SUPPLY REPLACE DISCONN | 2861.05 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. 2 - REBUILT HY | 2709 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | JWC ENVIRONMENTAL MUFFIN MONSTER | 11255.01 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/13/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 12 | 3852.69 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 1/ | 1217.25 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 03/08/22 | Expd | KAPPE ASSOCIATES MAGNETIC FLOW METER | 6831 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 03/17/22 | Expd | JWC ENVIRONMENTAL VOID CK.#3301 - LOST I | -11255.01 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 03/17/22 | Expd | JWC ENVIRONMENTAL REPLACEMENT CK.FOR 330 | 11255.01 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 3403.62 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 121.6 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 10/18/22 | Pay Check: 3360 | 22-00474 HME SEWER REPLACEMENT MATERIAL | 118975.5 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 11/16/22 | Pay Check: 3366 | 22-00626 REBUILT HYDROMATIC PUMP | 4514 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00748 SERV.THRU 10/16/22 HM ESTATES | 519.32 |
Page 3 of 5
Municipal Authority
YTD Revenues and Expenses thru 12/31/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 01/13/22 | Expd | DECKMAN MOTOR & PUMP INC. REBUILT HYDROM | 1870 |
| 07-429-1505 | RCSTP CAPITAL | 04/14/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 3/ | 13564.75 |
| 07-429-1505 | RCSTP CAPITAL | 05/12/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 4/ | 1283.5 |
| 07-429-1505 | RCSTP CAPITAL | 06/16/22 | Expd | PENNONI ASSOCIATES INC. SERV. THRU 5/15/ | 4005.25 |
| 07-429-1505 | RCSTP CAPITAL | 06/16/22 | Expd | TELEDYNE INSTRUMENTS INC. ULTRASONIC FLO | 5605 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/22 | Expd | COLONIAL ELECTRIC SUPPLY ELECTRICAL PART | 3055.6 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/22 | Expd | TRACOM FIBERGLASS PRODUCTS FIBERGLASS MA | 18730 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | EXETER SUPPLY COMPANY INC MAX-ADAPTERS-1 | 3010.68 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | LEC - LENNI ELECTRIC CORPORATION TROUBLE | 6148.48 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | MAIN LINE CONCRETE 3 CYDS CONCRETE 4000 | 1638.3 |
| 07-429-1505 | RCSTP CAPITAL | 07/28/22 | Expd | NEW ENTERPRISE STONE & LIME INC. 47.61 T | 5334.11 |
| 07-429-1505 | RCSTP CAPITAL | 08/05/22 | Expd | LOWES BUSINESS ACCOUNT/GECF TREATED LUMB | 7034.29 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | EXETER SUPPLY COMPANY INC SEWER PVC PIPE | 3292.35 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | FOLEY INC. EXCAVATOR, COUPLER & BUCKET R | 5611 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | KNOX EQUIPMENT RENTALS INC. LIGHT BANK R | 544.5 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | MAIN LINE CONCRETE 3.5 YDS CONCRETE 4000 | 671 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | PENNONI ASSOCIATES INC. SERVICES THRU 7/ | 461.5 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | TRENCHTECH INC. SHORING TO INSTALL METER | 3122.56 |
| 07-429-1505 | RCSTP CAPITAL | 08/16/22 | Expd | YALE ELECTRIC SUPPLY CO ELECTRICAL PARTS | 919.75 |
| 07-429-1505 | RCSTP CAPITAL | 09/07/22 | Pay Check: 3350 | 22-00049 DECK SCREWS, ANCHORS PLUS | 471.07 |
| 07-429-1505 | RCSTP CAPITAL | 09/07/22 | Pay Check: 3350 | 22-00049 DOUBLE JOINT HANGERS & NAILS | 74.87 |
| 07-429-1505 | RCSTP CAPITAL | 09/13/22 | Pay Check: 3353 | 22-00111 SERV.THRU 8/14/22 RCSTP SODA | 192.75 |
| 07-429-1505 | RCSTP CAPITAL | 09/13/22 | Pay Check: 3353 | 22-00113 SERV.THRU 8/14/22 RCSTP UV | 1928 |
| 07-429-1505 | RCSTP CAPITAL | 09/19/22 | Pay Check: 3354 | 22-00191 SELECT STUDS, QUIKRETE, JOIST. | 475.7 |
| 07-429-1505 | RCSTP CAPITAL | 09/28/22 | Pay Check: 3355 | 22-00297 DECK SCREENS & DRILL BITS | 160.44 |
| 07-429-1505 | RCSTP CAPITAL | 10/11/22 | Pay Check: 3357 | 22-00389 SKID STEER RENTL W/ATTACHMENTS | 1140 |
| 07-429-1505 | RCSTP CAPITAL | 10/11/22 | Pay Check: 3358 | 22-00404 PARTS FOR RCSTP DECK | 58.2 |
| 07-429-1505 | RCSTP CAPITAL | 10/11/22 | Pay Check: 3359 | 22-00449 ELECTRICAL PARTS RCSTP METER | 259.8 |
| 07-429-1505 | RCSTP CAPITAL | 10/18/22 | Pay Check: 3362 | 22-00477 SERV.THRU 9/18/22 RCSTP UV | 3941.5 |
| 07-429-1505 | RCSTP CAPITAL | 10/25/22 | Pay Check: 3363 | 22-00497 Heliflow 408 PD Blower | 5221 |
| 07-429-1505 | RCSTP CAPITAL | 11/07/22 | Void Check: 3359 | 22-00449 ELECTRICAL PARTS RCSTP METER | 259.8 |
| 07-429-1505 | RCSTP CAPITAL | 11/07/22 | Pay Check: 3364 | 22-00449 ELECTRICAL PARTS RCSTP METER | 259.8 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3365 | 22-00619 VARIOUS PARTS FOR RCSTP METER | 450.27 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3367 | 22-00727 ADAPTERS, LOCKNUTS, FITTINGS + | 96.91 |
| 07-429-1505 | RCSTP CAPITAL | 11/16/22 | Pay Check: 3367 | 22-00728 MOUNT FIXTURE, PIPE, PVC PLUS | 356.23 |
| 07-429-1505 | RCSTP CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00747 SERV.THRU 10/16/22 RCSTP SODA | 501.53 |
| 07-429-1505 | RCSTP CAPITAL | 11/17/22 | Pay Check: 3369 | 22-00750 SERV.THRU 10/16/22 RCSTP UV | 580.25 |
| 07-429-1505 | RCSTP CAPITAL | 11/18/22 | Expd | CRED.CARD EXPENSE - BADBOY BLASTER | 4453 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3370 | 22-00764 REBUILT MYERS PUMPS (2) | 8621 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3371 | 22-00788 INSTALL NEW FLOW METER RCSTP | 5916.82 |
Page 4 of 5
Municipal Authority
YTD Revenues and Expenses thru 12/31/2022
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3372 | 22-00804 INSTALL WIDE WALK GATE -RCSTP | 1450 |
| 07-429-1505 | RCSTP CAPITAL | 11/30/22 | Pay Check: 3373 | 22-00819 TAYMAC GRAY IN-USE COVERS | 21.22 |
| 07-429-1505 | RCSTP CAPITAL | 12/14/22 | Pay Check: 3374 | 22-00868 HELIFLOW 408 PD BLOWER | 5221 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 08/31/22 | Expd | Reimburse 01 for 07 cred.card expense | 212.99 |
Page 5 of 5
East Goshen Municipal Authority – 2023 Goals
Responsibilities
The Municipal Authority, which is a legally separate entity from the Township, is responsible for financing the construction, expansion, monitoring, and upgrade of the Township’s sewage collection and treatment infrastructure
2022 Accomplishments
- Continued to operate the Ridley Creek Sewer Treatment Plant (RCSTP) in compliance with PADEP permit requirements. No permit exceedances in 2022. (pending December 2022 results)
- Monitored the Close-out of the West Goshen Sewer Treatment Plant (STP) Upgrades. The upgrade project is essentially complete.
- Continued to monitor the Westtown Way Pumping Station Improvements Project. Members attended West Goshen Sewer Authority (WGSA) meetings as necessary. Project completion timeline was extended to 2023 due to equipment supply delays.
- Continued to implement the Inflow & Infiltration (I&I) Plan for the Sewer System – The EGMA inspected 33,000 linear feet of sewer line and made 11 repairs (3 were significant). This task is on- going.
- Hershey Mill Estates Trunk Sewer Replacement – Design was completed and bids obtained. Project timeline was delayed to meet requirements of a potential Local Share Account (LSA) grant.
- UV (ultraviolet) Disinfection System Replacement - The equipment has been procured and installation timeline was delayed to meet the requirements of a potential LSA grant.
- Installed new flow meter – Installed new influent flow meter at the RCSTP.
2023 Goals
- Continue to Operate The RCSTP in compliance with PADEP permit requirements
- Continue to monitor the Westtown Way Pumping Station Improvements Project. Members will attend WGSA meetings as necessary. Project completion is expected by summer 2023.
- Hershey Mill Estates Trunk Sewer Replacement – Award contract to low bidder. Complete construction of Hershey Mill Estates sewer replacement (sewer pipe and manholes). Project timeline will be adjusted to meet requirements of a potential Local Share Account (LSA) grant.
- UV (ultraviolet) Disinfection System Replacement – Complete the installation of the replacement UV disinfection system at the RCSTP after the current round of LSA grants have been announced (timeline will be adjusted to meet the requirements of a potential LSA grant).
- Supplee Valley Sewer Pipe Lining – Complete the lining of the sewer system pipes in the Supplee Valley service area
- Caustic Soda Project – Complete the installation of the new caustic soda feed system.
- Install new flow meters for the Ridley Creek Collection system – Install new flow meter near the Blacksmith Shop.
- Continue to implement the I&I Plan for the Sewer System
2
[Pennoni logo]
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
F: 302-654-2895
www.pennoni.com
January 6, 2023
EGMAU21004
Derek Davis, Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
RE: Proposal for Construction Phase Services and Updated Bid Phase Effort
Hershey’s Mill Estates Sewer Replacement
Dear Mr. Davis:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction administration and inspection services for the Hershey’s Mill Estates sanitary sewer replacement. It also addresses increased effort that was required for the bid phase beyond that which was previously estimated.
SCOPE OF SERVICES
1. Bid Assistance
Pennoni provided bid assistance services consisting of attendance at pre-bid meetings on-site, issuance of addenda, response to questions from prospective bidders, re-design of the sewer alignment and access routes to address bidder comments to enhance bid competitiveness, storm sewer and other scope additions requested by the Township, assistance with ordering of materials by the Township, coordination on award and funding with the LSA grant funding agency (PA DCED), review of bids, and recommendation for construction contract award.
The bid assistance work was authorized by the Municipal Authority for payment on a Time and Materials basis for an estimated amount of $7,500.00 not to be exceeded without approval from the Municipal Authority. The scope and associated level of effort exceeded that which was originally projected since there were two pre-bid meetings (instead of one) and notable plan revisions, scope additions, and addenda based on bidders’ feedback in order to maximize the competitiveness of bids which yielded a low bid approximately $200,000 under budget. Our actual bid assistance effort was $9,690.50.
We request the Municipal Authority’s approval for the additional $2,190.50.
2. Construction Phase
Pennoni will provide professional services during the construction phase on a Time and Materials basis at our approved hourly rates. Services are expected to include:
- Review of construction submittals and shop drawings
- Attendance at pre-construction and progress meetings
- Assistance with ordering materials and equipment
- Response to Township and contractor questions and RFIs
- Preparation of a Construction Issue Plan set
EGMAU21004
January 6, 2023
Page 2
Mark Miller
Hershey’s Mill Estates Sewer Replacement
- Coordination with PADEP regarding the GP-11 permit compliance
- Application for a PADEP permit amendment for additional wetland crossing for secondary construction access off of Tanglewood Drive
- Survey and stakeout of the sanitary sewer easement off of Fox Glove Lane cul-de-sac
- Monitoring of stone and aggregate quantities from Township’s supplier
- Review and processing of contractor payment applications and any change orders
- Coordination with PA DCED for use of grant funding if the LSA grant is awarded
- Coordination with adjacent property owners
- Preparation of post-construction record plans based on survey data and redline markups from the contractor
- Nearly full-time inspections during pipe installation and trenching and part-time inspections during site preparation, restoration, and other work
The estimated fee for Construction Phase Services is a range based upon a 100-day construction duration as allowed by the construction contract. A schedule has not yet been provided by the contractor. For purposes of this proposal, we assume approximately 30-40 days of active pipe and trench work at 8 hrs/day of inspections and another approximately 30-40 days of site preparation, restoration, and other work at 2 to 4 hrs/day of inspections for a total of approximately 330 to 440 hours of inspections. We also included 8 hours of survey by a 2-person field crew, 120 hours of engineering/office support, and 10 hours for record plans.
DELIVERABLES
We will provide a record plan upon completion of construction based upon redline as-built markups from the contractor.
SCHEDULE
We will perform the scope of services based upon the contractor’s schedule.
FEE
Pennoni will provide the above referenced scope of services for Task 2 on a Time and Materials basis, to be billed at the Authority’s approved rates for Pennoni, for an estimated fee range of $50,000 to $60,000 based on the aforementioned assumptions on duration of work.
BILLING AND PAYMENT
Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
EGMAU21004
January 6, 2023
Page 3
Mark Miller
Hershey’s Mill Estates Sewer Replacement
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Respectfully submitted,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
ACCEPTED BY:
____________________________________________________
Derek Davis, Township Manager
East Goshen Municipal Authority
DATE:
______________________________
Sue Smith
From: Mark Miller
Sent: Thursday, January 5, 2023 8:06 PM
To: Sue Smith
Subject: Fwd: Force Main Sketch for Connor Property
Attachments: image001.png; image002.png; FW: 1671 and 1681 Strasburg Rd.
Sue put this under sewer requests.
1671 and 1681 E Strasburg Road
Please attach this to the bottom of report.
This is the property that I spoke of last month. The property owner won’t take no for answer. TR Moser sent over this plan doing directional drilling. I sent it over to Mike for his review. I think we need to discuss this plan. The property owner want to have Public Sewer.
Mark S. Miller
Director of Public Works
East Goshen Township
(610) 692-7171 x3402
mmiller@eastgoshen.org
Begin forwarded message:
From: Mark Miller <mmiller@eastgoshen.org>
Date: January 3, 2023 at 7:27:24 PM EST
To: "Moser TR." <tr@moserhomes.com>
Subject: Fwd: Force Main Sketch for Connor Property
TR
Attached is Mikes comments
Mark
Mark S. Miller
Director of Public Works
East Goshen Township
(610) 692-7171 x3402
mmiller@eastgoshen.org
Begin forwarded message:
From: Michael Ellis <MEllis@pennoni.com>
Date: January 3, 2023 at 5:58:08 PM EST
To: Mark Miller <mmiller@eastgoshen.org>
Subject: RE: Force Main Sketch for Connor Property
Mark,
1
It is extremely long (about 1800 LF), but it’s consistent with our attached email recommendation and is considered a better solution that running a sewer service along Strasburg Rd. All of the comments and procedures in that email still apply.
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com
From: Mark Miller <mmiller@eastgoshen.org>
Sent: Tuesday, January 3, 2023 1:29 PM
To: Michael Ellis <MEllis@Pennoni.com>
Subject: FW: Force Main Sketch for Connor Property
Mike
This is that force main I told you about a while ago. I think it’s a little long
Mark
Mark S. Miller
Director of Public Works
East Goshen Township
(610) 692-7171 x3402
mmiller@eastgoshen.org
From: TR.Moser <tr@moserhomes.com>
Sent: Tuesday, January 3, 2023 1:24 PM
To: Mark Miller <mmiller@eastgoshen.org>
Subject: FW: Force Main Sketch for Connor Property
Mark,
We know the township didn’t want us going up Strasburg road but could we tap into the public sewer via this plan?
Thank you,
T.R.
T.R. Moser
Managing Member
Moser Construction Management LLC
1171 Lancaster Ave. Suite 201
2
Berwyn PA 19312
Office: 610.725.0812
Mobile: 484.357.5022
moserhomes.com
From: Dave Gibbons <dgibbons@dlhowell.com>
Sent: Wednesday, December 07, 2022 3:18 PM
To: TR.Moser <tr@moserhomes.com>
Cc: Denny Howell <dhowell@dlhowell.com>; Denny Howell III <denny3@dlhowell.com>
Subject: Force Main Sketch for Connor Property
Good afternoon T.R.,
Attached is a plan that can be distributed to most likely both the Willistown Conservation Trust and East Goshen Township/Sewer Authority for their input. In this scenario we would propose both the barn and house have their own grinder pumps that come together and pump over to an existing manhole at the sewer treatment plant. The LPFM would be directional drilled through the sensitive areas and under Ridley Creek. The question I have with this is, would a full planning module be needed for this as well. I know a single grinder doesn’t need it but as soon as you approach 5 EDUs, I believe it becomes a force main, and not just a lateral.
Let us know if you have any questions, or need anything else to go with this.
Dave Gibbons, P.E.
Senior Engineer
Howell Engineering
Office: 610-918-9002
Cell: 484-653-9922
Request A Quote | KnowHowell.com
1250 Wrights Lane,
West Chester, PA 19380
3
Sue Smith
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Thursday, October 6, 2022 11:58 PM
To: Mark Miller; Kevin Miller
Subject: FW: 1671 and 1681 Strasburg Rd.
Attachments: Sewer Map 1681-1671 E Strasburg Ave.pdf
Kevin, sorry I didn’t cc: you…
From: Michael Ellis
Sent: Thursday, October 6, 2022 11:56 PM
To: Mark Miller (mmiller@eastgoshen.org) <mmiller@eastgoshen.org>
Subject: RE: 1671 and 1681 Strasburg Rd.
Mark,
It would obviously be a really long run for a typical grinder pump service pipe, but it appears to be the only option that doesn’t involve a main extension. The pump should be fine to pump that distance, but we will confirm.
We marked up the attached PDF sewer map noting that the closest other existing sewer main is near Hunters Circle or Christine Lane. I expect that the preference is to keep this property in the RCSTP service area though, and those options would involve several easements, PennDOT permits for road crossing, and undesirable lengthy service piping in the road ROW. Therefore, the connection to the sewer immediately upstream of the plant is likely the best solution.
There is a slight possibility that a gravity sewer may be technically feasible (we haven’t analyzed in detail yet), but that would likely be significantly more expensive to construct and potentially problematic with solids deposition given the pipe length and limited flow. The following requirements are therefore based upon a grinder pump solution.
A sewer to tie in immediately upstream of the plant would require the following:
- Preparation of plans with design calculations for the proposed pump to confirm it will work
- Recorded Grinder Pump Operation & Maintenance Agreement
- Sewage Facilities Planning exemption from PADEP
- Easements from the Township on Parcels 53-4-134.8 and 53-4-578
- PADEP permit for piping under the Ridley Creek (this would likely be through a General Permit GP-5 “Utility Line Stream Crossings”). This will likely require a topographic field survey for the permit plans. A PNDI environmental search receipt will be required. The PNDI receipt will almost certainly require a wetlands and bog turtle habitat assessment since there will likely be work to connect to the sewer main in the wetlands immediately upstream of the RCSTP; The assessment that we commissioned for the Reservoir Rd Pump Station project concluded that the area upstream of the RCSTP IS bog turtle habitat. Therefore, approval of US Fish & Wildlife Service for bog turtle protective measures will be required. Those measures will likely necessitate the applicant provide an environmental scientist on-site during construction to monitor for bog turtles with time-of-year restrictions, but there may be other requirements.; Chester County Conservation District approval of E&S plans is required for GP-5 permits.
- PADEP permit for temporary disturbance to wetlands, assuming that the connection to the existing sewer main would be in the wetlands area upstream of the RCSTP
- Policy has been not to tie pressure service pipes directly into the Township’s gravity sewer main. If that is the case here, they would need to tap the sewer main and run a gravity lateral whatever distance the Township will be responsible for. I would suggest approximately 10 linear feet if that policy is applicable here.
1
An 1,800 LF pipe of 1.25” diameter holds about 115 gallons of wastewater. Therefore, the detention time in the pipe should be about 1 day, which is not ideal but may not be a dealbreaker.
For the applicant’s cost considerations:
The Morstein Rd grinder pump and lateral construction cost approx $38,760 per Botella’s cost quote, which was for a grinder pump, approx 300 LF of low pressure service piping, and abandonment of the existing septic system. If the pump system was about $10K of that cost and the septic abandonment about $5K, then the unit price for piping via directional drill was about $80/LF ($23,760 / 300 LF). For about 1,800 LF for the subject property, the piping cost could therefore be nearly $140K. Adding in $10K for the pump & tank, and $15K-$20K for engineering, legal, & permitting, the whole project cost could be over $160K. Alternatively, as you know, a septic system typically costs around $35K-$40K.
Please call if you would like to discuss further.
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235
www.pennoni.com | MEllis@Pennoni.com
From: Mark Miller <mmiller@eastgoshen.org>
Sent: Wednesday, October 5, 2022 8:24:35 PM
To: Michael Ellis <MEllis@Pennoni.com>
Cc: Kevin Miller <kmiller@eastgoshen.org>
Subject: 1671 and 1681 Strasburg Rd.
Mike
I have a future resident who will be buying these two properties her intention is to construct a house and Barn for horses. The lady can see the plant and wants to get sewer service her distance may be 1700 to 1800 Lf. She would have to pump install a duplex system.
My question is this doable??? If so we will need to tell her what she will need to make it work
Thanks
Mark S. Miller
Director of Public Works
East Goshen Township
(610) 692-7171 x3402
mmiller@eastgoshen.org
2
COGF-L1R
(11-16-2022)
[Seal: DEPARTMENT OF COMMERCE UNITED STATES OF AMERICA]
UNITED STATES DEPARTMENT OF COMMERCE
U.S. Census Bureau
Washington, DC 20233-0001
The Office of Management and Budget (OMB) approval number for the Census of Governments, Survey of Local Government Finances is 0607-0585.
FYI
DUE DATE REMINDER
Recently, the U.S. Census Bureau mailed you a letter asking you to complete the 2022 Census of Governments, Survey of Local Government Finances. If you have submitted your survey in the past few weeks, thank you. If you have not yet reported, please do so before the due date noted below.
Authentication Code: SWKW-69ZT-XZKT
Due Date: December 20, 2022
- Register OR sign in at https://portal.census.gov
- Add your authentication code OR locate this report under “My Surveys.”
- Report by clicking on “REPORT NOW.” You can return to your account over multiple sessions to complete the survey.
For assistance with completing this survey, please sign into your Census Bureau account or call our customer help line at 1-800-832-2839, Monday through Friday, 8:00 a.m. to 5:00 p.m. Eastern time.
Thank you in advance for your time and participation, and for helping the U.S. Census Bureau measure America’s people and economy.
Sincerely,
[Signature: Stephanie L. Studds]
Stephanie L. Studds
Assistant Associate Director for Economic Programs
U.S. Census Bureau
[United States Census Bureau]
census.gov
ID 155531