Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\06-12-23\6-12-2023 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
June 12, 2023
7:00
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting
2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
3. SEWER REPORTS a. Director of Public Work’s Report b. Pennoni Engineer’s Report c. Big Fish Environmental Report 4. APPROVAL OF MINUTES a. May 8, 2023
5. APPROVAL OF INVOICES • Pennoni #1172058 $37.25 • Pennoni #1172059 $5,164.00 • Pennoni #1172060 $5,770.00 • Pennoni #1172061 $1,253.25 • Maillie #94627 $707.00 (paid) • Exeter Supply Co #371543 $905.59 (paid) • Exeter Supply Co #371544 $1,030.64 (paid) • West Goshen Sewer Authority #EG22-B $19,143.34 (paid) • West Goshen Sewer Authority #EG22-T $47,756.64 (paid) • Lenni Electric #230545 $1,352.00 (paid) • Lenni Electric #230546 $2,008.00 (paid) • Yale #S123058116.001 $17.35 (paid) • Gawthrop Greenwood #272291 $587.00 (paid) • E & W Equipment Co #704 $40,495.80 (paid) • Kappe Associates #23-276-M $6,415.00 (paid)
6. LIAISON REPORTS 7. FINANCIAL REPORTS a. May 2023
8. OLD BUSINESS a. 1010 Hershey Mill Rd (“Miller Property”) Subdivision Application: Review and comments
due by July 25, 2023 – see Mark for full application and plans i. 4/18/23 letter to TR Moser re: Hershey Mill Pump Station Upgrade Costs
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\06-12-23\6-12-2023 Agenda.doc
9. 2023 Goals: Goal Status
Ridley Creek plant compliance January, February, March, April, & May were in compliance and met all requirements.
Continue to implement infiltration and inflow for the sewer system
Ongoing.
Caustic Soda Project
Caustic soda controls are complete. Inspection was done on Wednesday. PWD has to tap the three influent pipes, and then we will be done. Replace sewer line - Hershey Mill Estates trunk line
Waiting on contractor to complete grading
10. NEW BUSINESS 11. CAPACITY REQUESTS
12. ANY OTHER MATTER 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT
AREA COD 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Municipal Authority From: Mark Miller Re: June 12, 2023, Monthly Report Monthly Flows: The average daily flow to West Goshen was 762,463 per day. Meters: Were read on a daily basis. Allied Control was on site last week to calibrate the meters. There were no adjustments to any of the meters. C.C. Collection:
• Pipe Data View was utilized to clean and televise the lines in the Marydell development. PECO has crews installing new electric lines there so we televised to make sure they didn’t hit our lines, and it turned out they drilled through our sewer main on Wilson Lane. Public Works had to excavate the main and replace a section of pipe. The contractor will be recharged for our time and material.
• The televising crew found three sections of pipe that needed a point repair. The three point repairs were made without having to plug the line.
• The pump stations were visited on a daily basis and wet wells were washed down.
• A resident contacted the township with a sewer lateral blockage. We televised the lateral once we were made aware of the problem; found heavy root buildup; and removed the tree and ground the stump. The property owner had already call Roto Rooter and signed a contract to replace the lateral. C.C. Interceptor: Nothing to report R.C. Collection: The pump station was visited on a daily basis. The wet well was cleaned and the oil level was checked on the generator. We cleared the right of ways in the Wentworth Development and we had to utilize our tree contractor to remove a large ash tree.
Ridley Creek Plant:
• Routine maintenance was performed. • We tapped the SBR pipe for the caustic soda injection. John Laidley completed his work on the caustic soda controls. (photos attached)
• We have Pipe Data scheduled for this week to vacuum out the tank before fill the tank. I had to order a wash-down shower as part of the project. Alarms: 14 were received. PA One Call: 84 were received and marked out. Monthly Rainfall: 2.1 inches of rain for the month of March Lateral Repairs or Caps: We did five repairs: two in Bow Tree and three in Clocktower.
Photograph showing an orange crane truck positioning a cylindrical concrete structure next to a treatment plant building and retaining wall, with an extension ladder leaning against the structure and three workers on site.
Crane boom label: LIFTING THE COMMUNITY - SINCE 1917
Photograph of five white vertical pipes curving along an interior wall next to a bolted circular wall flange and a lower pipe valve, with a handwritten black marker arrow and label on the wall.
Caustic Soda Feed lines
Photograph of an interior treatment plant pipe gallery showing large horizontal and vertical pipes with valves along a concrete wall and white conduit pipes running near the top of the wall, with a handwritten black marker arrow and label.
Conduit
Pipe labels: SBR EFFLUENT, WAS
Photograph of the exterior cylindrical grey storage tank installed on a concrete pad enclosed by a concrete block retaining wall next to a building, equipped with a yellow fixed vertical ladder and piping.
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-655-4451 F: 302-654-2895
www.pennoni.com
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
June 8, 2023
Ridley Creek Sewage Treatment Plant (RCSTP)
• Caustic Soda Conversion – The caustic soda tank and associated pumps, piping, and controls have been installed. Jim Wood from Data Design Services inspected the tank on June 7, 2023, as the PADEP certified installer to complete the PADEP Storage Tank Permit/Registration Application. The Township must attach and provide photographic proof of NFPA hazard diamond labels on the tank to Data Design Services before they submit the PADEP Storage Tank Permit/Registration Application. We will continue to provide assistance as needed during any of the Township’s remaining construction of the system, including tapping the SBR influent pipes and installation of the emergency shower.
• UV Disinfection System – The system is being fabricated, and delivery is scheduled for mid-August 2023. The general and electrical contract bids went live on PennBID on May 22, 2023, and a pre-bid meeting occurred on June 8, 2023.
An updated tentative schedule for the remaining mechanical and electrical contracts’ bidding follows:
• Bids Due – June 27, 2023 • Award Consideration – July 10, 2023 at the Municipal Authority Meeting • 1st Notice to Proceed to Contractors: Temporary Bypass Work – August 1, 2023 • Delivery of UV Equipment – Mid-August 2023 • Complete Temporary Bypass Work and Initiate Use of Bypass System – October 2, 2023 • Two Week Trial and Sampling of Temporary Bypass System – October 2-16, 2023 • Township to Perform Concrete Channel Work – October 16-December 7, 2023 • 2nd Notice to Proceed to Contractors: Permanent Work – December 8, 2023 • Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – January 8, 2024 • Two Week Trial of New UV System in Permanent Channel –January 8-22, 2024 • Install Second UV Module into Permanent Channel – January 24, 2024 • Two Week Trial of Second New UV System in Permanent Channel – January 24-February 7, 2024 • Construction Completed – Mid-February, 2024
• Generator #2 Replacement – No activity by Pennoni since our last report. Premium Power Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we expect delivery of the entire system around January 2024. We will prepare design for the electrical installation and any slab replacement/modifications in the summer 2023.
• Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of the RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided financial data that we have begun to analyze, and we will provide our observations upon completion of the analysis.
Sanitary Sewer Pipe Rehab
• Chester Creek Sewer Rehab – No activity by Pennoni since our last report.
EGMAU23001 June 8, 2023 Page 2 East Goshen Municipal Authority Engineer’s Report
P:\Projects\EGMA\Memos to Board\2023\Engineers Report 2023-06-08.docx
The Township is going to commission a TV investigation of the remainder of the Chester Creek interceptor to at least West Chester Pike. We will review and identify any additional needed pipe and manhole repairs beyond those previously identified further upstream and in Supplee Valley. A bid package will then be developed for manhole-to-manhole pipe lining, pipe lining point repairs, pipe and manhole injection grouting, and other applicable rehabilitation along the Chester Creek interceptor. Pipe lining in Supplee Valley will be included to the extent that budget is available, likely as Add Items in the bid.
It is our understanding that there is $260,000 available for the work this year ($130,000 in 2023 and $130,000 carried over from 2022). We are currently anticipating that the interceptor work could be a little over half of the budget, leaving approximately $100,000 for Supplee Valley. This would address approximately one-third to half of the remaining unlined sewers in the neighborhood. The budget and scope will be defined more precisely upon completion of the remaining interceptor TV inspection.
• Hershey’s Mill Estates – Punchlist work and permanent restoration remain to be completed. We are awaiting a schedule from the contractor, but we anticipate that work will occur in July in an effort to avoid topsoiling and seeding in the ongoing period of dry weather.
• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.
New Connections
• 1010 Hershey Mill Road (Moser) – We are reviewing the sanitary sewer design as part of the Land Development process.
• 301 Reservoir Road (5-Lot Residential Subdivision) – No activity since our last report.
• 1712 E. Boot Road – No activity since our last report.
• 14 Reservoir Road – We reviewed plans for a sewer connection for one new house on a proposed flag lot subdivision and provided comments to the design consultant.
END OF REPORT
RCSTP Monthly Operations Report
June 2023
Executive Summary The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for May 2023. All supplemental reports were submitted for April 2023 with the eDMR Discharge to the Applebrook irrigation lagoon resumed during May. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes decreased slightly to a daily average of 71.6 compared to the previous month at 72.2 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering increased from 396,135 to 510,482 gallons the month. There were no odor complaints during the month.
Table 1
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for May 2023. The monthly average total phosphorus was reported as 0.12 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The draft month-to-date average TSS is reported as 4.9 mg/L compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment performed well during April. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS, and total phosphorus. Daily analysis of the final effluent flow equalization grabs samples for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002 continued through May.
Flow
MGD Average mg/L
lbs/ month mg/L
lbs/ month mg/L
lbs/ month mg/L
lbs/ month mg/L
lbs/ month
Geo Mean
Geo Mean 0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000 Inst. Max 20 94 15 94 5 1 Sample Date
May 9, 2023 0.151 2.0 2.5 5.56 7.0 4.0 5.0 0.10 0.13 0.10 0.13 1 0.0000 May 16, 2023 0.176 2.0 2.9 5.15 7.6 5.6 8.2 0.10 0.15 0.10 0.15 2 0.3010 May 23, 2023 0.181 2.0 3.0 8.12 12.3 4.0 6.0 0.10 0.15 0.13 0.20 3 0.4771
May 30, 2023 0.186 2.0 3.1 10.60 16.4 6.0 9.3 0.10 0.16 0.14 0.22 1 0.0000
Average 0.174 2.0 2.9 7.36 10.8 4.9 7.2 0.10 0.14 0.12 0.17 2 0.1945 Minimum 0.151 2.0 2.5 5.15 7.0 4.0 5.0 0.10 0.13 0.10 0.13 1 0.0000 Maximum 0.186 2.0 3.1 10.60 16.4 6.0 9.3 0.10 0.16 0.14 0.22 3 0.4771
May 2023- Final Effluent - Outfall 001
NPDES Permit Discharge Limitations
CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform
Page 2 of 4
Table 2 illustrates the final effluent composite sample data reported for outfall 002 for May 2023.
Table 2
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be within the design parameters for the treatment process.
Table 3 presents the pollutant data for the influent wastewater collected at the doghouse manhole during May 2023.
Table 3
The foam on the SBR surface remained consistent during May, with approximately 10% to 20% coverage of the surface area. The foam thickness is approximately 2 inches and is light to medium brown. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The
Flow
MGD
Average mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month
Geo
Mean
Geo
Mean
0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000
40 45
May 9, 2023 0.0992 2.0 1.7 5.56 4.60 4.00 3.31 0.10 0.13 0.10 0.13 1 0.0000
May 16, 2023 0.1248 2.0 2.1 5.15 5.36 5.60 5.83 0.10 0.15 0.10 0.15 2 0.3010
May 23, 2023 0.1173 2.0 2.0 8.12 7.94 4.00 3.91 0.10 0.15 0.13 0.20 3 0.4771
May 30, 2023 0.1156 2.0 1.9 10.6 10.2 6.00 5.78 0.10 0.16 0.14 0.22 1 0.0000
Average 0.1142 2.0 1.91 7.36 7.03 4.90 4.71 0.10 0.14 0.12 0.17 2 0.1945
Minimum 0.0992 2.0 1.65 5.15 4.60 4.00 3.31 0.10 0.13 0.10 0.13 1 0.0000
Maximum 0.1248 2.0 2.08 10.6 10.2 6.00 5.83 0.10 0.16 0.14 0.22 3 0.4771
Fecal Coliform
April 2022 - Applebrook - Out Fall 002
NPDES Permit
Discharge
Limitations
CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total
Flow
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
May 9, 2023 0.271 245 553 178 402 162 365 26.9 61 45.8 103 4.8 10.8
May 16, 2023 0.332 350 969 203 562 215 595 43.8 121 53.6 148 5.96 16.5
May 23, 2023 0.372 334 1,036 305 946 353 1,095 31.9 99 58.7 182 6.06 18.8
May 30, 2023 0.388 354 1,146 303 981 262 848 39.1 127 56.4 183 5.53 17.9
Average 0.341 321 926 247 723 248 726 5 102 53.6 154 5.59 16.0
Minimum 0.271 245 553 178.0 402 162 365 27 61 45.8 103 4.80 10.8
Maximum 0.388 354 1,146 305 981 353 1,095 44 127 58.7 183 6.06 18.8
Sample Date
May 2023 - Influent Wastewaster
Design Basis
BOD5 CBOD5 TSS NH4-N TKN, mg/L
Phosphorus,Total,
mg/L
MGD
Average
Page 3 of 4
operation strategy is to lower the MLSS to maintain a F:M ratio 0.06 while ensuring the ammonia effluent discharge concentration remains within the 2.5 mg/L seasonal limits.
PA DEP
No activity
Pennoni Associates
UV System construction update.
Significant Rainfall
During May, there were five (5) days when rainfall occurred. One (1) event had rainfall exceeding 0.5 inches in 24 hours.
May 1st 0.77 inches
The total rainfall for the month of May was a total 0.98 inches.
Chemical Usage:
May 2023
Chemical Daily Average Total Monthly
Soda Ash, pounds 300 9,300
Aluminum Sulfate solution, gal 71.6 2,221
Sludge Dewatering, gal* 21,270 510,482
*The centrifuge was operated 24 days during the month.
Flow data:
May 2023
Flow Meter Location Total Volume for
Month, MG
Average Daily
Flow, gpd
Daily Maximum
Flow, gpd
Influent Wastewater to Screening Building* 11.493 370,770 505,470
Influent Wastewater to SBRs* 12.378 399,277 510,592
Internal Recycle** 0.892 28,771 59,838
Treated Effluent to Disc Filters 11.984 386,581 526,720
Final Effluent Discharge
5.711 184,000 255,000
Page 4 of 4
Applebrook Golf Course 3.680 118,700 227,700
During May, the average monthly influent wastewater flow measured at the “field” flow meter was 370,770 gallons/day, compared to the influent flow into the SBRs as 390,277 gallons/day. The difference between the daily averages is 28,507 gpd, consistent with the average daily volume of internal recycle flow of 28,771 gpd. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly
Cleaned buildings and laboratory.
MA 5-8-23 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 May 8, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 May 8, 2023 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: 7 Kevin Cummings, Chairman 8 Dana Pizarro, Vice Chairman 9 Jack Yahraes 10 Carmen Battavio 11 Walter Wujcik 12 13 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 14 representative), Patrick McKenna (Attorney), Dave Ware (Finance Director), Michael Lynch 15 (Township Supervisor) and Scott Towler (Big Fish) on the phone. 16 17 18 COMMON ACRONYMS: 19 ATS – Automatic Transfer Switch 20 BFES – Big Fish Environmental Services MA- Municipal Authority 21 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 22 CB – Conservancy Board PC – Planning Commission 23 DEP – Department of Environmental Protection PM – Prevention Maintenance 24 EPA – Environmental protection Agency PR – Park & Recreation Board 25 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 26 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 27 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 28 PWD – Public Works Department WAS – Waste Activated Sludge 29 30 Call to Order & Pledge of Allegiance 31 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 32 He asked for a moment of silence for our First Responders and Military. 33 He asked if anyone would be recording the meeting. There was no response. 34 35 36 Chairman’s Report 37 Mark mentioned that he did give a card and small gift to Sue Smith to thank her for her years of 38 service. 39 40 41 SEWER REPORTS 42 1. Director of Public Works, Mark Miller’s report for May 8, 2023 43 Monthly Flows – The average daily flow to West Goshen was 771,564 gallons per day. 44 45 Meters: The meters were read on a daily basis. Lynn was entering the numbers and was quick to 46 point out that the Wilson Dr. meter was reading high. I sent the guys to clean the channel and the 47 transducer cone. Kevin called West Goshen to let them know that their side of the collection system 48 needed cleaning. He also suggested that they televise the pipe. Matt Halverson had his crew come 49
MA 5-8-23 draft 2
the following day to clean and televise. I contacted Allied Control who came out and calibrated the 1 meter. 2 3 C.C. Collection: We performed routine maintenance, mostly housekeeping chores. There were no 4 emergency call outs. Generator ran under load. Lenni visited the stations and performed their semi- 5 annual electrical inspections. All lugs in the panels were checked for tightness and amperage 6 readings were done on the equipment. A report was filled out for each station. We are going to 7 schedule a night to replace the air releases as they are showing signs of weeping. The work needs to 8 be performed when flows are down. 9 10 C.C. Interceptor: Nothing to report. 11 12 R.C. Collection: The pump stations were visited on a daily basis. There were no problems to report. 13 Lenni was onsite to perform their inspection and maintenance. 14 15 Ridley Creek Plant: Caustic soda upgrades are ongoing; tank and conduit lines were installed, and 16 next, John Laidley is due in to do electronics (pictures attached). 17 18 Alarms: 26 were received and most were weather related (power outages). 19 20 PA 1 Calls: Keeping us busy – over 100 for the month of April 21 22 Monthly Rainfall: 7.00 inches of rain for the month of April. 23 24 Lateral Repairs or Caps: Four repairs (caps & cleanouts) were done by Steven. 25 26 27 2. Pennoni Engineer’s Report dated May 5, 2023 28 29
Ridley Creek Sewage Treatment Plant (RCSTP) 30
Caustic Soda Conversion – The caustic soda tank has been installed. Electrical and controls 31 work is ongoing. We coordinated with the Township and controls contractor on the controls 32 logic for the caustic soda feed pumps. We will continue to provide assistance as needed 33 during any of the Township’s remaining construction of the system. 34
UV Disinfection System – The system is being fabricated, and we confirmed with the vendor that 35 delivery is tentatively scheduled for mid-August 2023. We are currently finalizing the plans, bid 36 documents, and technical specifications for the mechanical and electrical contracts accordingly. 37
An updated tentative schedule for the mechanical and electrical contracts’ bidding follows; 38
Bid Advertisement – May 22, 2023 39 Bids Due – June 23, 2023 40 Award Consideration – July 10, 2023 at the Municipal Authority Meeting 41 Delivery of UV Equipment – Mid-August 2023 42 1st Notice to Proceed to Contractors: Temporary Bypass Work – Mid-August 2023 43 Township to Begin Concrete Channel Raising – Mid-September 2023 44
MA 5-8-23 draft 3
2nd Notice to Proceed to Contractors: Permanent Work – Mid-November 2023 1 Construction Completed – January 2024 2
We are evaluating the construction portion of this schedule further with the operator because 3 it results in the bulk of construction during hurricane season. 4
We are approaching the $30,000 estimated budget for the design, UV fabrication 5 administration and submittals review, and bid services for the project. We anticipate an 6 additional $10,000 will be needed to finalize the bid documents and structural (channel wall 7 raising) design, submit plans to PADEP, and administer the bid. We also estimate $10,000 for 8 construction phase services, for a total supplement of $20,000. All effort will be billed at our 9 approved hourly rates. 10
Generator #2 Replacement – No activity by Pennoni since our last report. Premium Power Services 11 released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times 12 on the generator and ATS are 43 weeks and 22 weeks respectively, so we expect delivery of the 13 entire system around January 2024. We will prepare design for the electrical installation and any slab 14 replacement/modifications in the summer 2023. 15
Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of the 16 RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided financial data that 17 we have begun to analyze, and we will provide our observations upon completion of the analysis. 18
Sanitary Sewer Pipe Rehab 19
Chester Creek Sewer Rehab – The Township is going to commission a TV investigation of 20 the remainder of the Chester Creek interceptor to at least West Chester Pike. We will review 21 and identify any additional needed pipe and manhole repairs beyond those previously 22 identified further upstream and in Supplee Valley. A bid package will then be developed for 23 manhole-to-manhole pipe lining, pipe lining point repairs, pipe and manhole injection 24 grouting, and other applicable rehabilitation along the Chester Creek interceptor. Pipe lining 25 in Supplee Valley will be included to the extent that budget is available, likely as Add Items 26 in the bid. 27
It is our understanding that there is $260,000 available for the work this year ($130,000 in 28 2023 and $130,000 carried over from 2022). We are currently anticipating that the interceptor 29 work could be a little over half of the budget, leaving approximately $100,000 for Supplee 30 Valley. This would address approximately one-third to half of the remaining unlined sewers 31 in the neighborhood. The budget and scope will be defined more precisely upon completion of 32 the remaining interceptor TV inspection. 33
Hershey’s Mill Estates – The contractor performed manhole vacuum testing and sewer pipe pressure 34 testing. TV inspections, punchlist work, and permanent restoration remain to be completed. 35
We processed Payment Application #2 and provided a payment recommendation letter to the 36 Township. We also reviewed three Change Orders, only one of which was agreed to proceed with. 37 We processed that Change Order accordingly, which is for a cast-in-place concrete footing extension 38 for the storm sewer headwall. 39
MA 5-8-23 draft 4
Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared 1 and will be submitted to PADEP in follow-up to the emergency authorization now that 2 construction has been completed. 3
New Connections 4
1010 Hershey Mill Road (Moser) – We are preparing a letter confirming capacity in the 5 conveyance system as requested by the design consultant for the Planning Module. We 6 anticipate the design consultant will then finalize and submit the Sewage Facilities Planning 7 Module for review. 8
301 Reservoir Road (5-Lot Residential Subdivision) – We reviewed a plan for the proposed 9 gravity sewer extension, and we will provide comments to the design consultant. 10
1712 E. Boot Road – We are reviewing the plan for a proposed grinder pump and low 11 pressure sewer service connection to the existing residence. 12
NOTE – After discussion of the UV Disinfection System, Dana made a motion to approve the 13 following: 14 1. Increase the Design Phase budget by $10,000 15 2. Increase the Construction Phase budget by $10,000 16 for a total supplement not to exceed $20,000. Carmen seconded the motion. The motion passed 17 unanimously. 18 19 20 3. Big Fish Environmental Services – 21 The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations 22 regarding water quality for April 2023. All supplemental reports were submitted for the month of 23 March 2023 with the eDMR. Discharge to the Applebrook irrigation lagoon resumed on April 17th. 24 Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminium 25 sulfate solution volumes increased slightly to a daily average of 72.2 compared to the previous month 26 at 71.6 gpd to achieve phosphorus removal. No significant mechanical or operational issues were 27 observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering 28 decreased from 553,982 to 396,135 gallons per month. There were no odor complaints during the 29 month. 30 He discussed flows and reporting process. They are sending outflow to Applebrook of 134,000 31 gallons per month. Kevin asked if there is anyplace to get data from other municipalities so we can 32 make a comparison. Scott will follow up. 33 34 Approval of Minutes 35 The minutes of the April 10, 2023 meeting were approved as amended. 36 37 Approval of Invoices 38 1. Jack moved to approve payment of the following Pennoni invoices: 39 a. Pennoni Invoice #1167569 $ 2,926.75 40 b. Pennoni Invoice #1167570 $ 3,663.25 41 c. Pennoni Invoice #1167571 $ 1,377.25 42 Carmen seconded the motion. The motion passed unanimously. 43 44
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1172058
Invoice Date : 05/25/2023
Project : EGMAU20004
Project Name : RCSTP Caustic Soda Conversion
For Services Rendered Through 05/14/2023
Provided guidance to Township on feed pump controls logic and emergency shower requirements.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Design and Permitting | $26,500.00 | $26,500.00 | 100.00% | $26,500.00 | $0.00 |
| 02 -- Construction Phase Services est. | $5,400.00 | $1,391.50 | $1,428.75 | $37.25 | |
| Total : | $31,900.00 | $27,891.50 | $27,928.75 | $37.25 |
Phase: 02 -- Construction Phase Services
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 149.00 | 74.50 |
| Labor | 74.50 | ||
| Phase Subtotal | $37.25 | ||
| Amount Due This Invoice | $37.25 |
[signature] 6/8/23
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
West Goshen RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 5/25/2023
| Project: | EGMAU20004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP Caustic Soda Conversion | ||
| Invoice No: | 1172058 | ||
| Invoice Period: | 2/13/2023 | to | 5/14/2023 |
| Initial Authorization: | $ 31,900.00 | Date: | 5/25/2023 |
| Contract Amount: | $ 31,900.00 | ||
| Previously Invoiced: | $ 27,891.50 | ||
| Current Invoice: | $ 37.25 | ||
| Invoiced to Date ($): | $ 27,928.75 | ||
| Invoiced to Date (%): | 88% | ||
| Remaining Budget ($): | $ 3,971.25 | ||
| Remaining Budget (%): | 12% |
Budget by Phase:
| Phase Name: | RCSTP Caustic Soda Conversion |
|---|---|
| Phase Budget: | $ 31,900.00 |
| Previously Invoiced: | $ 27,891.50 |
| Current Invoice: | $ 37.25 |
| Invoiced to Date ($): | $ 27,928.75 |
| Invoiced to Date (%): | 88% |
| Remaining Budget ($): | $ 3,971.25 |
| Remaining Budget (%): | 12% |
Comments: Provided guidance to Township on feed pump controls logic and emergency shower requirements.
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1172059
Invoice Date : 05/25/2023
Project : EGMAU21004
Project Name : HM Estates Sewer Design & Permitting
For Services Rendered Through 05/14/2023
Construction Admin & Inspections: Performed inspections during pipe air testing, mandrel testing, TV inspections, and manhole vacuum testing, manhole restoration work and re-testing, completion work on cleanout stacks, and E&S inspections. Performed punchlist inspection. Processed Pay Application #2 including field quantity measurements, processed Change Order #1, and coordinated for resolution of other change order requests with the contractor.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Wetland & Watercourse Investigation | $6,750.00 | $6,750.00 | 100.00% | $6,750.00 | $0.00 |
| 02 -- Phase I Bog Turtle Habitat Assessment | $6,750.00 | $6,750.00 | 100.00% | $6,750.00 | $0.00 |
| 03 -- Survey | $17,200.00 | $17,200.00 | 100.00% | $17,200.00 | $0.00 |
| 04 -- Design | $26,100.00 | $26,100.00 | 100.00% | $26,100.00 | $0.00 |
| 05 -- Permitting | $8,000.00 | $8,000.00 | 100.00% | $8,000.00 | $0.00 |
| 06 -- Property Line Stakeout est. | $5,000.00 | $7,520.50 | $7,520.50 | $0.00 | |
| 07 -- Geotechnical NTE | $10,000.00 | $6,271.25 | 62.71% | $6,271.25 | $0.00 |
| 08 -- Bid Assistance NTE | $9,690.50 | $9,690.50 | 100.00% | $9,690.50 | $0.00 |
| 09 -- Construction Admin & Inspection NTE | $60,000.00 | $44,305.50 | 82.45% | $49,469.50 | $5,164.00 |
| Total : | $149,490.50 | $132,587.75 | $137,751.75 | $5,164.00 |
Phase: 09 -- Construction Admin & Inspection
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 149.00 | 298.00 |
| Associate Professional | 4.00 | 111.00 | 444.00 |
| Sr. Eng Tech | 6.00 | 107.00 | 642.00 |
| Engineering Tech | 42.00 | 90.00 | 3,780.00 |
| Labor | 5,164.00 | ||
| Phase Subtotal | $5,164.00 | ||
| Amount Due This Invoice | $5,164.00 |
[signature] 6/8/23
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
West Goshen HM Estates Sewer Design Permitting
EGMAU21004 Invoice Summary
Invoice Date 5/25/2023
| Project: | EGMAU21004 | ||
|---|---|---|---|
| Pennoni Job No.: | HM Estates Sewer Design & Permitting | ||
| Invoice No: | 1172059 | ||
| Invoice Period: | 4/16/2023 | to | 5/14/2023 |
| Initial Authorization: | $ 64,800.00 | Date: | 5/25/2023 |
| Contract Amount: | $ 149,490.50 | ||
| Previously Invoiced: | $ 132,587.75 | ||
| Current Invoice: | $ 5,164.00 | ||
| Invoiced to Date ($): | $ 137,751.75 | ||
| Invoiced to Date (%): | 92% | ||
| Remaining Budget ($): | $ 11,738.75 | ||
| Remaining Budget (%): | 8% |
Budget by Phase:
| Phase Name: | HM Estates Sewer Design & Permitting |
|---|---|
| Phase Budget: | $ 149,490.50 |
| Previously Invoiced: | $ 132,587.75 |
| Current Invoice: | $ 5,164.00 |
| Invoiced to Date ($): | $ 137,751.75 |
| Invoiced to Date (%): | 92% |
| Remaining Budget ($): | $ 11,738.75 |
| Remaining Budget (%): | 8% |
Comments: Construction Admin & Inspections: Performed inspections during pipe air testing, mandrel testing, TV inspections, and manhole vacuum testing, manhole restoration work and re-testing, completion work on cleanout stacks, and E&S inspections. Performed punchlist inspection. Processed Pay Application #2 including field quantity measurements, processed Change Order #1, and coordinated for resolution of other change order requests with the contractor.
Maillie
ACCOUNTANTS • ADVISORS
500 N Lewis Rd
Limerick, PA 19468
(610) 935-1420
EIN: 23-1518888
Web: www.maillie.com
Email: firm@maillie.com
David Ware
East Goshen Municipal Authority
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
Date: 3/31/2023
Invoice Number: 94627
Client: 2500.000
Due Date: Upon Receipt
Billing for time incurred from March 1, 2023 through March 31, 2023 for the following services:
Final billing on December 31, 2022 audit
Invoice Total: $707.00
[stamp: PAID]
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07-424-3110
Please return this portion with payment.
ID: 2500
East Goshen Municipal Authority
Date: 3/31/2023
Due Date: Upon Receipt
Invoice: 94627
Amount Due: $707.00
Amount Enclosed: $ ___________________
Please make checks payable to Maillie LLP.
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1172060
Invoice Date : 05/25/2023
Project : EGMAU22004
Project Name : RCSTP UV Replacement
For Services Rendered Through 05/14/2023
Prepared specifications; continued electrical design including site visit for electrical design and scoping with electrician; continued structural design for raising concrete channel walls; reviewed updated temporary UV channel submittal from Glasco; developed bid schedule; and coordinated equipment delivery schedule with vendor.
Phase 01 Professional Services
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.75 | 149.00 | 260.75 |
| Senior Professional | 20.75 | 145.00 | 3,008.75 |
| Associate Professional | 20.50 | 111.00 | 2,275.50 |
| Engineering Tech | 2.50 | 90.00 | 225.00 |
| Totals | 45.50 | 5,770.00 | |
| Total Labor | 5,770.00 |
Billing Limits
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 5,770.00 | 28,489.25 | 34,259.25 |
| Limit | 40,000.00 | ||
| Remaining | 5,740.75 |
Total this Phase: $5,770.00
Total this Invoice: $5,770.00
[signature] 6/8/23
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP UV Replacement
EGMAU22004 Invoice Summary
Invoice Date 05/25/2023
| Project: | EGMAU22004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP UV Replacement | ||
| Invoice No: | 1172060 | ||
| Invoice Period: | 12/19/2022 | to | 5/14/2023 |
| Initial Authorization: | $ 30,000.00 | Date: | 5/25/2023 |
| Contract Amount: | $ 50,000.00 | ||
| Previously Invoiced: | $ 28,489.25 | ||
| Current Invoice: | $ 5,770.00 | ||
| Invoiced to Date ($): | $ 34,259.25 | ||
| Invoiced to Date (%): | 69% | ||
| Remaining Budget ($): | $ 15,740.75 | ||
| Remaining Budget (%): | 31% |
Budget by Phase:
| Phase Name: | RCSTP UV Replacement | 1129796 |
|---|---|---|
| Phase Budget: | $ 50,000.00 | |
| Previously Invoiced: | $ 28,489.25 | |
| Current Invoice: | $ 5,770.00 | |
| Invoiced to Date ($): | $ 34,259.25 | |
| Invoiced to Date (%): | 69% | |
| Remaining Budget ($): | $ 15,740.75 | |
| Remaining Budget (%): | 31% |
Comments: Prepared specifications; continued electrical design including site visit for electrical design and scoping with electrician; continued structural design for raising concrete channel walls; reviewed updated temporary UV channel submittal from Glasco; developed bid schedule; and coordinated equipment delivery schedule with vendor.
[signature] 6/8/23
[Pennoni logo]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1172061
Invoice Date : 05/25/2023
Project : EGMAU23001
Project Name : 2023 General Services
For Services Rendered Through 05/14/2023
Prepared May Engineer's Report and attended May MA meeting. Reviewed RCSTP operator's report. Initiated analysis of RCSTP operating costs for industry baseline cost evaluation. Reviewed sewer lateral plan for proposed 1712 E. Boot Rd sewer connection. Discussed 1010 Hershey's Mill Rd (Moser) land development sewer capacity certification procedure with PW Director.
Billing Limits
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,253.25 | 12,054.75 | 13,308.00 |
| Limit | 42,000.00 | ||
| Remaining | 28,692.00 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.50 | 149.00 | 670.50 |
| Associate Professional | 5.25 | 111.00 | 582.75 |
| Totals | 9.75 | 1,253.25 | |
| Total Labor | 1,253.25 |
Total this Invoice: $1,253.25
[signature] 6/8/23
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2023 General Services
EGMAU23001Invoice Summary
Invoice Date 5/25/2023
| Project: | EGMAU23001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2023 General Services | ||
| Invoice No: | 1172061 | ||
| Invoice Period: | 4/17/2023 | to | 5/14/2023 |
| Initial Authorization: | $ 42,000.00 | Date: | 5/25/2023 |
| Contract Amount: | $ 42,000.00 | ||
| Previously Invoiced: | $ 12,054.75 | ||
| Current Invoice: | $ 1,253.25 | ||
| Invoiced to Date ($): | $ 13,308.00 | ||
| Invoiced to Date (%): | 32% | ||
| Remaining Budget ($): | $ 28,692.00 | ||
| Remaining Budget (%): | 68% |
Budget by Phase:
| Phase Name: | 2023 General Services |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ 12,054.75 |
| Current Invoice: | $ 1,253.25 |
| Invoiced to Date ($): | $ 13,308.00 |
| Invoiced to Date (%): | 32% |
| Remaining Budget ($): | $ 28,692.00 |
| Remaining Budget (%): | 68% |
Comments: Prepared May Engineer's Report and attended May MA meeting. Reviewed RCSTP operator's report. Initiated analysis of RCSTP operating costs for industry baseline cost evaluation. Reviewed sewer lateral plan for proposed 1712 E. Boot Rd sewer connection. Discussed 1010 Hershey's Mill Rd (Moser) land development sewer capacity certification procedure with PW Director
[signature] 6/8/23
MA 5-8-23 draft 5
2. Jack moved to approve Colonial Electric paid invoice #15149626 in the amount of $890.32. 1 Kevin seconded the motion. The motion passed unanimously. 2 3. Walter moved to approve payment of the Exeter Supply Co paid invoice #371531 in the amount of 3 $2,574.00. Dana seconded the motion. The motion passed unanimously. 4 5 4. Carmen moved to approve the Gap Power paid invoices as follows: 6 #1829012 $ 441.00 7 #1830342 $1,329.93 8 Dana seconded the motion. The motion passed unanimously. 9 10 5. Jack moved to approve payment of the Main Line Concrete & Supply invoice #515921 in the 11 amount of $1,930.00. Carmen seconded the motion. The motion passed unanimously. 12 13 6. Walter moved to approve payment of the 10 paid Yale invoices totaling $4,313.05. Jack seconded 14 the motion. The motion passed unanimously. 15 16 Liaison Reports 17 1. Conservancy Board – Walter reported that they collected the same amount of trash as last year on 18 KEGBD. East Goshen received the USA Tree City designation, and the CB planted a tree in Clymers 19 Woods. 20 2. Board of Supervisors – Mike Lynch reported that the Willistown BOS had a special meeting, 21 which he attended, and they finally voted not to sell to Aqua. They are thinking of forming a 22 Municipal Authority. Carmen mentioned that a study was done about having a Municipal Authority. 23 Dave mentioned that coming to the meetings showed him the amount of work, expenses, etc. that are 24 involved with the Municipal Authority. 25 26 Financial Reports 27 Dave Ware presented the following report: 28 Year to date April 2023, the Municipal Authority recorded $322,521 in revenues (primarily from 29 Sewer Operating and Sewer Capital Reserve transfers) and $323,103 in expenses (Engineering 30 Services, Audit fees, Administrative Wages, Hershey’s Mill Estates Sewer costs, Caustic Soda 31 project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, and capital improvements to 32 the Westtown Way Pump station), for a net result of operations of ($582). As of April 30, 2023, the 33 fund balance was $4,590. 34 35 Old Business 36 1. TR Moser – Mark discussed the Hershey Mill Road upgrade station with the Moser development. 37 38 Goals 39 The Goals were reviewed. 40 41 New Business 42 1. Public Works Staffing – Dave commented that he is going to the BOS to ask for 2 more field staff 43 members. Mark spoke about all that Public Works does. Dave provided charts showing the increase 44 in time and dollars spent on sewer/stormwater projects. Carmen agreed that Public Works is 45 understaffed. Mark needs to replace a staff member who just left and request 2 additional staff 46 members. 47
MA 5-8-23 draft 6
Capacity Requests 1 1 1712 Boot Road – Mark explained what they want to do to replace the house with a new one and 2 hook into the sewer system. Carmen moved to approve this capacity request for 1712 Boot Road. 3 Walter seconded the motion. The motion passed unanimously. 4 5 Any Other Matter – None 6 7 Correspondence- None 8 9 West Goshen News 10 a. Westtown Way Pump Station – contractor is doing what they can. The VFDs won’t be 11 delivered until July 28th. The VFDs must be in place when they do the bypass pumping in 12 September or October 13 b. West Goshen Sewer Plant – They applied for a grant to replace the screw pump and were 14 awarded $610,000. Comag system is working very well and is meeting DEP requirements. 15 16 17 Public Comment - None 18 19 20 Adjournment 21 There being no further business Dana moved to adjourn the meeting. Jack seconded the motion. The 22 motion passed unanimously. The meeting was adjourned at 8:35 pm. 23 The next regular meeting will be held on Monday, June 12, 2023 at 7:00 pm. 24 25 Respectfully submitted, 26 27 28 Ruth Kiefer, Recording Secretary 29
EXETER SUPPLY CO., INC.
117 Prospect Street
Reading, PA 19606
Phone: 610-779-4230
INVOICE
Page No 1
OFFICE
| P.O. Number | Authorization | Invoice# | Invoice Date | Terms | Order Date |
|---|---|---|---|---|---|
| 371543 | 4/30/23 | Net 30 Days | 4/20/23 |
| Ship Via | Order # | Bill of Lading | Ppd/Col | Shipped From | Salesperson |
|---|---|---|---|---|---|
| CUST PICK UP | 07447300 | Downingtown, PA | Scott Siderio |
Cust # 270260
Entered By: 503
05/03/23 15:00
Sold To:
EAST GOSHEN MUN. AUTH.
1580 PAOLI PIKE
WEST CHESTER PA 19380
Ship To:
EAST GOSHEN MUN. AUTH.
1580 PAOLI PIKE
WEST CHESTER PA 19380
Job Info:
| Ordered | B/O | Shipped | Our Stock #/Description/Your Part # | Unit Price | UM | Extended Price | CD% |
|---|---|---|---|---|---|---|---|
| 4 | 4 | B-25008-3N CORP BALL STOP CC X CTS COMP. 3/4" |
118.11 | EA | 472.44 | ||
| 1 | 1 | 313-051407-000 SERVICE SADDLE 4.74X5.14 X 3/4CC |
59.71 | EA | 59.71 | ||
| 3 | 3 | 313-143207-000 SERVICE SADDLE 12.62-14.32 12X3/4CC |
124.48 | EA | 373.44 |
[stamp: PAID]
APPROVED BY: MM
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07429 - 1520
| Cash Discount Available | Interest of 1.5% per Month on Past Due Invoices | Sub Total | Freight | Sales Tax | Invoice Total |
|---|---|---|---|---|---|
| 905.59 | 0.00 | 905.59 |
All merchandise returned for credit must be authorized and include order or invoice #. A service charge will apply. Title to the above materials shall remain in Exeter Supply Co., Inc. until the full purchase price is paid; that said materials shall not be removed by customer from place of delivery, sold, mortgaged, or othersise encumbered, nor shall a lien be permitted to be acquired thereon by attachment, levy, or otherwise; that said materials shall be kept insured by customer against loss or damage for the amount remaining due for the benefit of Exeter Supply Co., Inc. as its interest may appear; and that in default of paying when due, or if there is a breach of any of the above conditions, Exeter Supply Co., Inc. at its option may take immediate possession of said materials and supplies without notice.
EXETER SUPPLY CO., INC.
117 Prospect Street
Reading, PA 19606
Phone: 610-779-4230
INVOICE
Page No 1
OFFICE
| P.O. Number | Authorization | Invoice# | Invoice Date | Terms | Order Date |
|---|---|---|---|---|---|
| STEVE BIONDI | 371544 | 4/30/23 | Net 30 Days | 4/24/23 |
| Ship Via | Order # | Bill of Lading | Ppd/Col | Shipped From | Salesperson |
|---|---|---|---|---|---|
| CUST PICK UP | 07448690 | Downingtown, PA | Scott Siderio |
Cust # 270260
Entered By: 503
05/03/23 15:00
Sold To:
EAST GOSHEN MUN. AUTH.
1580 PAOLI PIKE
WEST CHESTER PA 19380
Ship To:
EAST GOSHEN MUN. AUTH.
1580 PAOLI PIKE
WEST CHESTER PA 19380
Job Info:
| Ordered | B/O | Shipped | Our Stock #/Description/Your Part # | Unit Price | UM | Extended Price | CD% |
|---|---|---|---|---|---|---|---|
| 300 | 300 | SCH40-2 SCH 40 PIPE 2" |
3.04 | FT | 912.00 | ||
| 15 | 15 | SCH40-2CO SCH. 40 COUPLING 2" |
2.12 | EA | 31.80 | ||
| 10 | 10 | SCH40-290 SCH40 PVC PRESSURE 90 BEND 2" |
3.54 | EA | 35.40 | ||
| 1 | 1 | SCH40-CEM1500QT SCH40 PVC CEMENT QUART 1536S QUART |
27.64 | EA | 27.64 | ||
| 1 | 1 | SCH40-PRIM8700Q SCH40 PVC PRIMER QUART |
23.80 | EA | 23.80 |
[stamp: PAID]
APPROVED BY: MM
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07429 - 1520
| Cash Discount Available | Interest of 1.5% per Month on Past Due Invoices | Sub Total | Freight | Sales Tax | Invoice Total |
|---|---|---|---|---|---|
| 1,030.64 | 0.00 | 1,030.64 |
All merchandise returned for credit must be authorized and include order or invoice #. A service charge will apply. Title to the above materials shall remain in Exeter Supply Co., Inc. until the full purchase price is paid; that said materials shall not be removed by customer from place of delivery, sold, mortgaged, or othersise encumbered, nor shall a lien be permitted to be acquired thereon by attachment, levy, or otherwise; that said materials shall be kept insured by customer against loss or damage for the amount remaining due for the benefit of Exeter Supply Co., Inc. as its interest may appear; and that in default of paying when due, or if there is a breach of any of the above conditions, Exeter Supply Co., Inc. at its option may take immediate possession of said materials and supplies without notice.
[Seal: West Goshen Township 1817]
West Goshen Sewer Authority
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360
INVOICE
Date: May 5, 2023
Invoice #: EG22-B
For: 2022 WG Sewer Authority Bond Fund Expenses
Bill To: East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| DESCRIPTION | AMOUNT |
|---|---|
| Costs (Bond related) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2022 through December 31, 2022 (details attached). | 114,837.09 |
[stamp: PAID]
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07-429-6100
| SUBTOTAL | $114,837.09 |
|---|---|
| Capacity % | 16.67% |
| OTHER | $0.00 |
| TOTAL | $19,143.34 |
Please make check payable to: West Goshen Sewer Authority
THANK YOU!
West Goshen Sewer Authority
BOND FUND
Expense Detail - 2022
East Goshen Township
| Project | Vendor | Amount Allocated |
|---|---|---|
| AERATION | OPTIMUM CONTROLS CORPORATION | 6,249.00 |
| SCADA SYSTEM | AMAZON CAPITAL SERVICES, INC. | 465.11 |
| SCADA SYSTEM | AMAZON CAPITAL SERVICES, INC. | 765.09 |
| SCADA SYSTEM | HELP NOW | 743.00 |
| SCADA SYSTEM | HELP NOW | 1,000.00 |
| SCADA - Blower Building | OPTIMUM CONTROLS CORPORATION | 16,335.75 |
| SCADA - Lift Station | OPTIMUM CONTROLS CORPORATION | 30,964.00 |
| SCADA - Fiber Patch Panels | OPTIMUM CONTROLS CORPORATION | 917.12 |
| SCADA - Blower Building | OPTIMUM CONTROLS CORPORATION | 4,462.92 |
| SCADA - Fiber Patch Panels | OPTIMUM CONTROLS CORPORATION | 47,991.00 |
| SCADA - EQ Building | OPTIMUM CONTROLS CORPORATION | 1,158.69 |
| SCADA - Blower Building | OPTIMUM CONTROLS CORPORATION | 1,630.14 |
| SCADA - Headworks Building | OPTIMUM CONTROLS CORPORATION | 2,155.27 |
| Total Allocated | 114,837.09 |
Page 2 of 2
[Seal: West Goshen Township 1817]
West Goshen Sewer Authority
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360
INVOICE
Date: May 5, 2023
Invoice #: EG22-T
For: 2022 WG Sewer Authority Tapping Fee Fund Expenses
Bill To: East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| DESCRIPTION | AMOUNT |
|---|---|
| Costs (Non-Bond related) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2022 through December 31, 2022 (details attached). | 286,482.53 |
[stamp: PAID]
APPROVED BY: ___________________
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07-429-6100
| SUBTOTAL | $286,482.53 |
|---|---|
| Capacity % | 16.67% |
| OTHER | $0.00 |
| TOTAL | $47,756.64 |
Please make check payable to: West Goshen Sewer Authority
THANK YOU!
West Goshen Sewer Authority
TAPPING FEE FUND
Expense Detail - 2022
East Goshen Township
| Project | Vendor | Amount Allocated |
|---|---|---|
| BOILER (BUILDING HEAT) | BRANDYWINE VALLEY HEATING & AC | 19,885.00 |
| BOILER (BUILDING HEAT) | FERGUSON ENTERPRISES, INC. | 543.53 |
| BOILER (BUILDING HEAT) | FERGUSON ENTERPRISES, INC. | 10,182.55 |
| BOILER (BUILDING HEAT) | FERGUSON ENTERPRISES, INC. | 371.06 |
| LEGAL (HEADWORKS) - Screw Pump | UNRUH TURNER BURKE & FREES | 180.00 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 7,152.00 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 9,186.21 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 20,475.18 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 22,661.00 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 18,650.79 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 41,570.82 |
| PRIMARY CLAIRIFIER REHAB #1 | G.M.H. ASSOCIATES OF AMERICA, INC. | 14,304.00 |
| PRIMARY CLAIRIFIER REHAB #1 | MCMASTER-CARR SUPPLY COMPANY | 2,999.50 |
| PRIMARY CLAIRIFIER REHAB #1 | MCMASTER-CARR SUPPLY COMPANY | 800.27 |
| SCADA - PROFESSIONAL SERVICES | AMAZON CAPITAL SERVICES, INC. | 173.92 |
| SCADA - PROFESSIONAL SERVICES | HELP NOW | 200.00 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 1,475.64 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 2,076.44 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 832.82 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 61,645.00 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 32,015.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 191.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 2,263.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 347.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 233.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 2,193.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 1,763.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER | 314.00 |
| TMDL | HERBERT, ROWLAND & GRUBIC, INC. | 38.00 |
| TMDL | HERBERT, ROWLAND & GRUBIC, INC. | 665.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 40.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 200.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 140.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 40.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 100.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 40.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 40.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 40.00 |
| UV SYSTEM ACTUATED VALVE | TRI-STATE TECHNICAL SALES CORP | 5,316.00 |
| WAS FLOW METER | NORTH EAST TECHNICAL SALES, INC. | 5,137.30 |
| Total Allocated | 286,482.53 |
[handwritten note in margin bracketed to TMDL entries: 8,648.50 / 1,441.70 (EGT)]
Page 2 of 2
LEC
LENNI ELECTRIC CORPORATION
1020 Andrew Drive
West Chester PA 19380
610-436-9922
Service Invoice
Invoice#: 230545
Date: 05/31/2023
Billed To:
East Goshen Township
1580 Paoli Pike
West Chester PA 19380
Project: 32353
RIDLEY CREEK STATION
1751 TOWN DR.
WEST CHESTER PA 19380
Scheduled: 05/04/2023
Employee:
Order#:
Time:
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| RIDLEY CREEK STATION SULFATE TANK PIT 5-4-23 AND 5-5-23 RAN CONDUIT FOR RECEPTACLE FOR SULFATE PIT PULLED WIRE INSTALLED DEVICE AND POWERED UP. |
||||
| ELECTRICIAN | HR | 8.00 | 92.00 | 736.00 |
| LABORER | HR | 8.00 | 72.00 | 576.00 |
| SERVICE TRUCK | LS | 1.00 | 40.00 | 40.00 |
Notes:
[stamp: PAID]
APPROVED BY: MM
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07429-1520
[signature] 6/8/23
| Non-Taxable Amount: | 1,352.00 |
|---|---|
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due | 1,352.00 |
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
LEC
LENNI ELECTRIC CORPORATION
1020 Andrew Drive
West Chester PA 19380
610-436-9922
Service Invoice
Invoice#: 230546
Date: 05/31/2023
Billed To:
East Goshen Township
1580 Paoli Pike
West Chester PA 19380
Project: 32353
RIDLEY CREEK STATION
1751 TOWN DR.
WEST CHESTER PA 19380
Scheduled: 05/05/2023
Employee:
Order#:
Time:
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| RIDLEY CREEK STATION 5-5-23 AND 5-8-23 RAN CONDUIT FOR CONVENIENCE RECEPTACLE PULLED WIRE INSTALLED DEVICE AND POWERED UP. |
||||
| ELECTRICIAN | HR | 12.00 | 92.00 | 1,104.00 |
| LABORER | HR | 12.00 | 72.00 | 864.00 |
| SERVICE TRUCK | LS | 1.00 | 40.00 | 40.00 |
Notes:
[stamp: PAID]
APPROVED BY: MM
DATE PAID: ___________________
CHECK #: ___________________
CHARGED TO: 07429-1520
[signature] 6/8/23
| Non-Taxable Amount: | 2,008.00 |
|---|---|
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due | 2,008.00 |
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
Yale ELECTRIC SUPPLY CO.
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER PA 19380-4512
610-719-9253 Fax
INVOICE
| CUSTOMER NUMBER | SUB ACCOUNT # |
|---|---|
| 117491 | 117491 |
| INVOICE NUMBER | INVOICE DATE |
| S123058116.001 | 05/08/23 |
REMIT TO:
US ELECTRICAL SERVICES, INC.
PO BOX 412485
BOSTON MA 02241-2485
BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| CUSTOMER PO # | JOB NAME / RELEASE # | ORDERED BY | SALESPERSON |
|---|---|---|---|
| THE PLANT | HOUSE ACCOUNT |
| WRITER | SHIP VIA | TERMS | SHIP DATE | ORDER DATE |
|---|---|---|---|---|
| DAVID A SMITH | NO PRINT PICK UP | NET 15TH | 05/08/23 | 05/08/23 |
| ORDER QTY | SHIP QTY | DESCRIPTION | UNIT PRICE | EXT PRICE |
|---|---|---|---|---|
| 1ea | 1ea | ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512 TAYMAC MX3200 GRY METAL VERT IN USE COVER |
1734.520 c | 17.35 |
PAID
APPROVED BY: MW
DATE PAID:
CHECK #:
CHARGED TO: 07429-1520
Caustic Soda Project
SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE
Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill.
Contact the Credit Department at 717-606-1317 and get set up today!
PROOF OF DELIVERY SIGNATURE
2023/05/08 08:26:52 AM S123058116.1
[Signature]
JOE
| Subtotal | 17.35 |
|---|---|
| Shipping Chgs | 0.00 |
| Tax | 0.00 |
| Payments | 0.00 |
| Amount Due | 17.35 |
Invoice is due by 06/15/23.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
A U.S. Electrical Company
Visit us at www.usesi.com
TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM USE THIS ENROLLMENT TOKEN: VHD QLP SLM
Page 1 of 1
Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
PAID
Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
05/09/2023
Client No: 6604-001M
Invoice No. 272291
APPROVED BY: [Signature] 5/10/23
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 04/06/2023 PMM |
Email from L. Werkheiser regarding meeting agenda. | 0.20 | 41.00 |
| 04/10/2023 EBK |
Review and analyze meeting materials Travel to/from and attend meeting Review and analyze notes to identify action items |
2.80 | 546.00 |
| For Current Services Rendered | 3.00 | 587.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna | 0.20 | $205.00 | $41.00 |
| Ellen Koopman | 2.80 | 195.00 | 546.00 |
| Previous Balance | $723.50 |
|---|---|
| Total Current Charges | 587.00 |
| 04/19/2023 | Payment | -292.50 |
|---|---|---|
| 04/19/2023 | Payment | -431.00 |
| Total Payments | -723.50 | |
East Goshen Municipal Authority
General Authority Services
Page: 2
05/09/2023
Client No: 6604-001M
Invoice No. 272291
| Balance Due | $587.00 |
|---|
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
E&W EQUIPMENT COMPANY, LLC
E & W Equipment Co., LLC
INVOICE
INVOICE #704
DATE: MAY 31, 2023
TO:
Mr. Mark Miller
East Goshen Township Municipal Authority
PAYABLE TO:
E&W Equipment Company, LLC
901 School Street
Moosic, PA 18507
570-677-1919
| SALESPERSON | JOB | PURCHASE ORDER | PAYMENT TERMS |
|---|---|---|---|
| n/a | Ridley Creek WWTP UV System |
Signed proposal 4/8/2022 |
Upon receipt |
| ITEM # | DESCRIPTION | UNIT PRICE | QUANTITY | LINE TOTAL |
|---|---|---|---|---|
| 1 | UV Disinfection system (30% upon approved drawings) | $134,985.00 | 0.3 | $40,495.80 |
| SUBTOTAL | $40,495.80 | |||
| TAX | $0.00 | |||
| TOTAL | $40,495.80 | |||
PAID
APPROVED BY: MM [Signature] 6/8/23
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505
Capital
Kappe Associates, Inc.
100 Wormans Mill Court
Frederick, Md. 21701
Tele# 301-846-0200
Fax# 301-846-0808
www.kappe-inc.com
KAPPE ASSOCIATES INC.®
since 1946
Invoice
| Date | Invoice # |
|---|---|
| 6/5/23 | 23-276-M |
Bill To
East Goshen Township
1580 Paoli Pike
West Chester, PA. 19380
APPROVED BY: MM [Signature] 6/8/23
DATE PAID:
CHECK #:
CHARGED TO: 07 429-1520
Caustic Soda
| P.O. No. | Project |
|---|---|
| Verbal | 23-276-M |
| Description | Quantity | Rate | Amount |
|---|---|---|---|
| Ridley Creek WWTP Customer request for service Chemical Storage Tank: -Setup chemical feed pump system - Meet with Lennie Electric. Determine conduit needs for installation Influent flow meter Inspection: Meter reading higher than expected - verify meter operation Service date: 04/20/23 Labor / Hourly |
4 | 150.00 | 600.00 |
| Chemical Storage Tank: -Setup chemical feed system -Build and install distribution header for 5 chemical feed pumps Service Date: 05/10/23 Labor / Hourly |
5 | 150.00 | 750.00 |
| Lot - Pipe, fittings and flanges | 1 | 1,082.00 | 1,082.00 |
| Follow-up from 05/10/23 service call Chemical storage Tank: Continue setup of chemical feed pump system Mount Tank Level sensor Finish distribution header piping Setup chemical feed pumps Install discharge tubing Service Date: 05/11/23 Labor / Day |
1 | 1,200.00 | 1,200.00 |
| Tank Level Sensor | 1 | 2,307.00 | 2,307.00 |
| Lot Fittings | 1 | 202.00 | 202.00 |
| 300' Tubing | 1 | 274.00 | 274.00 |
PAID
| Terms: Net 30 Days - 1.5% per month interest on unpaid balance over 30 days. | Total | $6,415.00 |
|---|
Memo
To: Municipal Authority
From: Dave Ware
Re: MA May 2023 YTD Financial Report
Date: June 8, 2023
YTD May 2023, the Municipal Authority recorded $403,110 in revenues (primarily from Sewer Operating transfers, Sewer Capital Reserve transfers, and tapping fees) and $303,361 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station, and legal fees). The net result of operations of ($251). As of May 31, 2023, the fund balance was $4,921.
Attached is a complete list of 2023 full year MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
May 2023
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 77.64 | 0.78 |
| 07-354-0400 | DCED GRANT | 152,980.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0.00 | 0.00 |
| 07-364-1110 | R.C.TAPPING FEES | 2,000.00 | 1,489.20 | 300.00 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,000.00 | 563.76 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 282.24 | 282.24 | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 100,000.00 | 47,230.34 | 44,001.05 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1,471,553.00 | 353,466.37 | 57,937.25 |
| Total Revenue | 1,730,115.24 | 403,109.55 | 102,662.08 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 32,055.45 | 8,944.84 | 8,372.05 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,748.79 | 1,595.25 | 1,540.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 10,815.00 | 10,500.00 | 10,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 47,250.00 | 20,717.25 | 25,857.75 |
| 07-424-3140 | LEGAL SERVICES | 8,400.00 | 2,903.00 | 2,000.00 |
| 07-424-7440 | R.C. CAPITAL-STP | 355,793.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 488,847.00 | 0 | 0.00 |
| 07-426-3001 | RELINING | 260,000.00 | 0 | 0 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 0.00 | 0.00 | 2,215.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 0.00 | 0.00 | 8,632.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 78,000.00 | 10,240.62 | 29,268.57 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 0.00 | 0.00 | 1,870.00 |
| 07-429-1505 | RCSTP CAPITAL | 260,000.00 | 62,692.11 | 14,848.25 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 0.00 | 90,113.64 | 0.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 13,391.57 | 0.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 187,206.00 | 182,262 | 0 |
| Total Expenses | 1,730,115.24 | 403,360.52 | 104,853.87 | |
| Net Result From Operations | 0.00 | -250.97 | -2,191.79 | |
Municipal Authority
YTD Revenues and Expenses thru 5/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/23 | Revenue Journal | INTEREST EARNED JAN 2023 | 2.65 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/23 | Revenue Journal | INTEREST EARNED FEBRUARY 2023 | 6.32 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/23 | Revenue Journal | INTEREST EARNED MARCH 2023 | 23.37 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/23 | Revenue Journal | INTEREST EARNED APRIL 2023 | 12.47 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/23 | Revenue Journal | INTEREST EARNED MAY 2023 | 32.83 |
| 07-364-1110 | R.C.TAPPING FEES | 01/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 02/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 03/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 04/03/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 05/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/27/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12838 | 281.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 03/23/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12839 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/27/23 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 03/23/23 | Revenue Journal | PINE ROCK INTEREST PORTION - PAPPANO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/20/23 | Revenue Journal | XFER TO 07 FROM 05 RE: MA EXPENSES | 3,384.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 05-SEWER | 14,572.43 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/31/23 | Revenue Journal | XFER $ FROM 05 TO 07 RE: MA EXPENSES | 3,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/17/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 36,455.37 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 2,877.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/22/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 715.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 880.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/24/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 6,738.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/29/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/31/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,944.84 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/17/23 | Revenue Journal | FROM 05 SEWER OP TO 07 MA | 4,992.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 707.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,627.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/12/23 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER CAP.EXP. | 41,381.95 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/20/23 | Revenue Journal | XFER TO 07 FROM 09 RE: MA EXPENSES | 11,730.76 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 09- SEWER CAP | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/10/23 | Revenue Journal | FROM 09 SEWER CAP RESERVE TO 07 MA | 115,362.26 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/23/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,690.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/01/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 20,201.84 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/09/23 | Revenue Journal | XFER $ TO 07 FROM 09 | 1,264.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/22/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,961.86 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/24/23 | Revenue Journal | XFER TO 07 FROM 09 RE: EXPENSES | 11,080.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/29/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/05/23 | Revenue Journal | XFER FROM 09 SEWER OP TO 07 MA | 1,041.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/21/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 977.06 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/25/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,801.50 |
Page 1 of 4
Municipal Authority
YTD Revenues and Expenses thru 5/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/26/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 252.28 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/28/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 688.81 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/04/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,069.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/10/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,953.58 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/19/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 66,899.98 |
| Total Revenue | 403,109.55 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/31/23 | Pay Check: 3402 | 23-00878 QTR 1 2023 MA CHARGE BACK | 8,944.84 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/22/23 | Pay Check: 3395 | 23-00707 2023 ANNUAL DAILY DISCHARGE CA | 715.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/23/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 880.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 02/15/23 | Pay Check: 3389 | 23-00406 PROGRESS BILLING EGT MUA123122 | 1,793.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/29/23 | Pay Check: 3401 | 23-00870 PROGRESS BILLING AUD EGT MUA | 8,000.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/10/23 | Pay Check: 3417 | 23-01270 PROGRESS BILLING AUDIT EGT MUA | 707.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/20/23 | Pay Check: 3379 | 23-00111 SERV.THRU 12/18/22 GEN.SERV.22 | 3,384.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/23/23 | Pay Check: 3392 | 23-00443 SERV THRU 011523 GEN SERVICES | 2,294.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00816 SERV THRU 021223 CHAPTER 94 RE | 2,246.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00815 SERV THRU 021223 GENERAL SERVI | 3,482.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01018 SERV THRU 031923 GENERAL SERVI | 2,614.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01019 SERV THRU 031923 CHAPTER 94 RE | 1,654.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01302 SERV THRU 041623 2023 GEN SERV | 3,663.25 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01303 SERV THRU 041623 2022 CHAPT 94 | 1,377.25 |
| 07-424-3140 | LEGAL SERVICES | 02/23/23 | Pay Check: 3391 | 23-00442 LEGAL SERV. JAN 2023 GEN AUTH | 583.00 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00812 LEGAL SERV FEB 2023 GEN AUTHOR | 389.50 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00813 LEGAL SERV DEC 2022 GEN AUTHOR | 620.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01020 LEGAL SERV MARCH 2023 GEN AUTH | 431.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01017 LEGAL SERV FEB 2023 GEN AUTH | 292.50 |
| 07-424-3140 | LEGAL SERVICES | 05/10/23 | Pay Check: 3419 | 23-01304 LEGAL SERV APRIL 2023 GEN AUTH | 587.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 01/27/23 | Pay Check: 3381 | 23-00148 WATER TIGHT CASTINGS & LIDS | 6,904.64 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/06/23 | Pay Check: 3386 | 23-00364 PALLET 200' 8" FILTER SOXX | 430.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3387 | 23-00429 PVC PIPE, ADPTR, 2WAY CLEANOUT | 1,708.22 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3387 | 23-00412 PVC FITTINGS,ADPTR,BEND, REDCR | 17,817.91 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3387 | 23-00411 24" N12 HDPE PIPE | 3,771.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3388 | 23-00381 1 % DISCOUNT | (65.65) |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3388 | 23-00381 DIAMOND PLATE BLACK MATS | 6,564.64 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 02/15/23 | Pay Check: 3390 | 23-00415 AASHTO#1 48.32TON #57 146.33TN | 4,866.25 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00110 SERV.THRU 12/18/22 HM EST SEWR | 9,690.50 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/31/23 | Expd | RECLASS EXETER INV.S 371365 & 371359 | 7,667.79 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/06/23 | Pay Check: 3385 | 23-00331 STONE, AASHTO #57 | 550.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3377 | 23-00030 CONDUITS, STRAPS, LOCKNUTS + | 1,161.95 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3378 | 23-00075 PULSAFEEDER - RCSPT CAUSTIC SO | 40,220.00 |
Page 2 of 4
Municipal Authority
YTD Revenues and Expenses thru 5/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00109 SERV.THRU 12/18/22 RCSTP SODA | 861.51 |
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00112 SERV.THRU 12/18/22 RCSTP UV | 1,178.75 |
| 07-429-1505 | RCSTP CAPITAL | 01/27/23 | Pay Check: 3380 | 23-00151 HELIFLOW 408 PD BLOWER | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/06/23 | Pay Check: 3384 | 23-00305 50HP 3540RPM BALDOR MOTOR | 4,683.69 |
| 07-429-1505 | RCSTP CAPITAL | 03/24/23 | Pay Check: 3399 | 23-00817 SERV THRU 021223 RCSTP CAU SOD | 4,144.21 |
| 07-429-1505 | RCSTP CAPITAL | 03/29/23 | Pay Check: 3400 | 23-00827 HELIFLOW 408 LHBD BLOWER | 5,221.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/23/23 | Pay Check: 3392 | 23-00444 SERV THRU 011523 HM ESTATES SW | 8,690.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00536 STONE, AASHTO #57 329.79 TON | 8,244.78 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00534 STONE, AASHTO #57 251.05 TON | 6,276.27 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00535 STONE, AASHTO #57 227.23 TON | 5,680.79 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00582 SPLIT COUPLERS | 305.40 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00581 SEWER HUB ADAPTERS,COUPLERS + | 959.56 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3396 | 23-00723 36" MARMAC POLYSEAL COUPLER | 803.20 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00731 JOHN DEERE 550K RENTL 2/28-3/1 | 434.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00730 JOHNDEERE 550K RENTL 2/23-2/24 | 724.16 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/24/23 | Pay Check: 3399 | 23-00814 SERV THRU 021223 HM ESTATES SE | 6,936.75 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | 1,407.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | (14.07) |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3403 | 23-00889 VARIOUS PURCHASES- SEE NOTES | 215.75 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3404 | 23-00906 ROD 5/8 X 20 FT-CAUSTIC SODA | 826.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | 441.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | (4.41) |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01056 GALV CAP, GFCI RCPT, GREY COVR | 168.21 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01057 GALV CAP, STEEL CLAMPBACK | 372.26 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3409 | 23-01131 PVC CONDBY, DEV BOX, CTD CPLG | 890.32 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01112 (30) BUSS FUSES | 2,160.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01144 GALV BLCK CAP,COMPRESSION CPLG | 286.08 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01128 IRON THRDED T BODY, SHEET STEE | 72.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/26/23 | Pay Check: 700 | 23-01151 CAUSTIC SODA-(2) HVY DUTY TARP | 252.28 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01177 BLINE SS CHANNEL SLOTTED HOLES | 374.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01176 EMT HW STRAP,MACH SCREW ANCHOR | 233.47 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01175 GALV RED CAP, COMM SWITCH, | 81.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3413 | 23-01225 PVC BELL END PIPE, PVC COUPLNG | 2,574.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3414 | 23-01227 10 YD CONCRETE 4500 PSI | 1,930.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01219 (30) BLINE EMT-HW STRAP | 83.82 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01212 OUTLET BOX, SS SWITCH,HW STRAP | 481.70 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01276 SCH 40 2" PIPE, 2" COUPLING | 1,030.64 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01275 CORP BALL STOP, SERVICE SADDLE | 905.59 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3418 | 23-01295 TAYMAC GRY METAL INUSE COVER | 17.35 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 02/06/23 | Pay Check: 3383 | 23-00366 WWPS PYMT LAST INSTALLMENT | 115,362.26 |
Page 3 of 4
Municipal Authority
YTD Revenues and Expenses thru 5/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-6100 | WEST GOSHEN CAPITAL | 05/19/23 | Pay Check: 3421 | 23-01363 2022 WG SEWER AUTH BOND FUND E | 19,143.34 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 05/19/23 | Pay Check: 3421 | 23-01364 2022 WG SEWER AUTH TAPPING FEE | 47,756.64 |
| Total Expense | 403,360.52 | ||||
Page 4 of 4
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: dbrady@eastgoshen.org
Planning Commission Plan Review Request
Date: May 19, 2023
To: Mark Miller
From: Duane J. Brady Sr., Township Zoning Officer
Re: 1010 Hershey Mill Road/Millstone Meadows SD
Preliminary/Final SD Plan.
Dear Municipal Authority,
The Township staff has received an SD application for 1010 Hershey Mill Road, Millstone Meadows (Miller Property). The proposal is to create a subdivision tract for 14 single-family homes using the Open Space Development Option (Zoning Ordinance section 240-36). A Conditional Use was granted by the Board of Supervisors on March 8, 2023, for a 15 Lot subdivision under the single-family open space development option with 19 conditions. The application has been reviewed for completeness and was accepted by Township Staff on May 16, 2023.
Things to note:
- The property is approximately 16 acres.
- The property is in the R-2 Low Density Residential District.
- The property contains two (2) Class II historic resources that are currently detailed in the East Goshen Township Historic Resource Inventory (Existing house and barn).
- The property has a stream which is a tributary of Ridley Creek and is classified as a High-Quality Stream and has wetlands.
Please complete your review and provide comments by July 25, 2023.
Thank you,
Duane J. Brady Sr.
Duane J. Brady Sr.
East Goshen Township
Zoning Officer
[Seal: East Goshen Township Incorporated 1817 Chester County, Pennsylvania]
1010 HERSHEY MILL ROAD - SKETCH PLAN - OPEN SPACE DEVELOPMENT LAYOUT PLAN
MILESTONE MEADOWS - PRELIMINARY/FINAL PLAN - SUBDIVISION PLAN
Engineering subdivision and open space development layout plan for Milestone Meadows (1010 Hershey Mill Road, East Goshen Township, Chester County, Pennsylvania), showing 16 single-family lots around Milestone Circle off Hershey Mill Road opposite Tanglewood Drive, with open space parcels 100 (8.09 acres), 101 (1.04 acres), and 102 (0.28 acres), infiltration basins #1 and #2, riparian buffers, wetlands, steep slopes, and a superimposed red property line curve table and title block.
VICINITY MAP
SCALE: 1" = 800' — PROJECT SITE, ANTHONY DRIVE, UPTON CIRCLE, HERSHEY MILL ROAD, TANGLEWOOD DRIVE, MILESTONE CIRCLE
PROJECT DATA & ZONING TABULATION
APPLICANT & EQUITABLE RECORD OWNER: GROVE MEADOW DEVELOPERS LLC, 1171 LANCASTER AVE, SUITE 201, BERWYN, PA 19312
RECORD OWNER: MARK S. & CHRISTINE S. MILLER, 210 N. ABERDEEN AVENUE, WAYNE, PA 19087
SOURCE OF TITLE: PIN# 53-1-19
SCOPE: SINGLE FAMILY OPEN SPACE DEVELOPMENT; TOTAL UNITS: 16 SINGLE FAMILY LOTS; TOTAL AREA: 16.12 ACRES (GROSS AREA), 15.93 ACRES (TRACT AREA); PROPOSED DENSITY: 0.998 UNITS/ACRE; WATER SERVICE: PUBLIC; SEWER SERVICE: PUBLIC
ZONING DATA TABULATION: LOW DENSITY RESIDENTIAL DISTRICT (R-2); LOT AREA, LOT WIDTH, FRONT YARD, SIDE YARD, REAR YARD [illegible]; BUILDING HEIGHT: 3 STORIES OR 35 FT.; MAX. BLDG. COVERAGE: 25 %; MAX. IMP. COVERAGE: 30 %
OPEN SPACE DEVELOPMENT OPTION: REQUIRED OPEN SPACE (55% OF TRACT) 8.76 ACRES
PROVIDED OPEN SPACE: PERIMETER OPEN SPACE (PARCEL 100) 8.09 ACRES; CENTRAL GREEN SPACE (PARCEL 101) 1.04 ACRES; QUALIFYING OPEN SPACE 9.13 ACRES (58 %); LESS THAN 50' IN WIDTH (PARCEL 102) 0.28 ACRES; TOTAL PROVIDED OPEN SPACE 9.41 ACRES
GENERAL NOTES
- 1. THE PROPOSED OPEN SPACE MAY NOT BE SEPARATELY SOLD, NOR SHALL SUCH LAND BE FURTHER DEVELOPED OR SUBDIVIDED.
- 2. THE OPEN SPACE AREA DESIGNATED AS PARCEL 100 AND 102 SHALL BE CONSIDERED A PASSIVE OPEN SPACE.
- 3. THE OPEN SPACE AREA DESIGNATED AS PARCEL 101 SHALL BE CONSIDERED AN ACTIVE OPEN SPACE AREA AND AVAILABLE FOR THE COMMUNITY USE.
- 4. THE OPEN SPACE AREAS SHALL BE PROTECTED BY A CONSERVATION EASEMENT. OWNERSHIP
- 5. FOR THE OPEN SPACE AREA SHALL BE BY A HOMEOWNER'S ASSOCIATION.
- 6. THE HOMEOWNER'S ASSOCIATIONS SHALL MANAGE THE OPEN SPACE.
- 7. THE PLANTINGS SHOWN ON THIS PLAN ARE TO SHOW GENERAL COMPLIANCE WITH THE TOWNSHIP ORDINANCES. FORMAL PLANTING PLANS SHALL BE PROVIDED WITH THE SUBDIVISION AND LAND DEVELOPMENT PLANS.
- 8. STORAGE SHEDS ARE NOT A PERMITTED ACCESSORY USE
LEGEND & HATCH LEGEND
- EXISTING LIGHT STANDARD
- EXISTING CURB
- PROPOSED CURB
- SOIL LINE
- RIPARIAN BUFFER
- WETLAND DELINEATION
- EXISTING WETLANDS
- EXISTING STREET SIGN
- EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING EDGE OF WOODS
- PROPOSED CONCRETE MONUMENT
- PROPOSED IRON PIN (TYP.)
- PROPOSED CURB TAPER
- PROPOSED HANDICAPPED RAMP
- RETAINING WALL
- HATCH LEGEND: STEEP SLOPES - 15-25%; STEEP SLOPES - 25%+
- GRAPHIC SCALE: 50, 0, 50, 100, 150 (1" = 50')
TITLE BLOCK & ENGINEER
dH Enterprises, a civil engineering design & management firm, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242. Registered Professional Engineer Seal: MICHAEL DUAIN HARTMAN, Commonwealth of Pennsylvania. Drawn By / Checked By: M.D. HARTMAN. Scale: 1" = 50'. Sheet 1 of 2 / 2 OF 17. Drawing No.: 22-001-S-D-1.0 / 22-001-F-D.