Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\07-10-23\MA 7-10-23 Meeting Materials\7-10-2023 Agenda.doc

EAST GOSHEN MUNICIPAL AUTHORITY

July 10, 2023

7:00

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting

2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS

3. SEWER REPORTS a. Director of Public Work’s Report b. Pennoni Engineer’s Report c. Big Fish Environmental Report 4. APPROVAL OF MINUTES a. June 12, 2023

5. APPROVAL OF INVOICES • Pennoni #1177224 $824.50 • Pennoni #1177226 $651.50 • Gawthrop Grumman #273862 $389.50 6. LIAISON REPORTS 7. FINANCIAL REPORTS a. June 2023

8. OLD BUSINESS

9. 2023 Goals: Goal Status

Ridley Creek plant compliance January, February, March, April, May, & June were in compliance and met all requirements.

Continue to implement infiltration and inflow for the sewer system

Ongoing. Found approximately 25,000 a day in Marydell. Caustic Soda Project

Complete. Replace sewer line - Hershey Mill Estates trunk line

Final restoration

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\07-10-23\MA 7-10-23 Meeting Materials\7-10-2023 Agenda.doc

10. NEW BUSINESS 11. CAPACITY REQUESTS

12. ANY OTHER MATTER 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171

To: Municipal Authority From: Mark Miller Re: July 10, 2023, Monthly Report Monthly Flows: The average daily flow to West Goshen was 750,623 per day. Meters: Were read on a daily basis. No problems to report. C.C. Collection: • Pumping stations were visited daily. We had a problem at the Barkway pump station which was storm-related. We had to pull the Muffin Monster because it kept tripping the breaker. Lenni was called out to pull the fuses until PECO came out to complete their work. • We had a manhole carryover in the Marydell Park off Barker Drive. We found roots in the line, which we removed. Once the line was cleared, we televised the line and found INI due to the pipe being broken. We immediately started to excavate the line to make the proper repair. Once we located the pipe, we found that the line had reverse pitch and we excavated 26’ of the sewer line. We also had to core-drill the manhole to get the proper slope (pictures attached). C.C. Interceptor: Nothing to report R.C. Collection: Pump stations were visited on a daily basis with no problems to report. Ridley Creek Plant: • We had to pull the utility water pump as it had failed. We installed the spare pump that was on the shelf.

• The caustic coda project is complete. We are still waiting on the emergency wash-down shower that was ordered from USA Bluebook. • The Moyno sludge pump is not able to grind the sludge from the tank into smaller particles, which causes the centrifuge to jam up. Watermark Environmental was contacted to see if they could supply a grinder (“Muffin Monster”) that would work. The cost for the grinder is $16,542.00 from Watermark Enviromental. The current Moyno pump model is no longer available and the compatible replacement model is $12,809.50.

Ridley Creek Plant continued

• ** I will need a motion from the Authority to purchase: 1) the Muffin Monster in the amount of $16,542.00 from Watermark Environmental; and 2) the Moyno pump in the amount of $12,809.50 from Geiger Pump and Equipment. This will be paid for out of the capital reserve. Alarms: 181 received PA One Call: 161 for the month Monthly Rainfall: 6.90” for the month of June Lateral Repairs or Caps: 4

Photograph of a yellow Bandit wood chipper and a worker in an aerial lift basket trimming a large tree.

Photograph of two workers in an excavated trench next to an exposed concrete manhole structure and sewer pipe.

Photograph of three workers in an excavated trench inspecting exposed underground pipes.

Photograph of two workers in an excavated trench cutting into the base of a concrete manhole structure.

Photograph of a newly installed white PVC pipe supported on bags of concrete mix inside an excavated trench.

Photograph of public works crew members with a utility crane truck working at an excavated manhole and newly installed sewer pipe in a gravel-lined trench.

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

T: 302-655-4451 F: 302-654-2895

www.pennoni.com EAST GOSHEN MUNICIPAL AUTHORITY

ENGINEER’S REPORT

July 7, 2023

Ridley Creek Sewage Treatment Plant (RCSTP)

• Caustic Soda Conversion – Jim Wood from Data Design Services previously inspected the tank and piping installations on June 7 as the PADEP certified installer to complete the PADEP Storage Tank Permit/Registration Application. The Township provided the required photographic proof of NFPA hazard diamond labels on the tank to Data Design Services on July 5. Data Design Services is now ready to submit the PADEP Storage Tank Permit/Registration Application. We will continue to provide assistance as needed during any of the Township’s remaining construction of the system, including tapping the SBR influent pipes and installation of the emergency shower.

• UV Disinfection System – The system is being fabricated, and delivery is scheduled for mid-August 2023.

The general and electrical contract bids were opened on PennBID on June 27. The unofficial bid tabulation is attached. There were three electrical bids, and no general contractor bids. We contacted general contractors that attended the pre-bid meeting to understand why they did not bid, and it was conveyed that there would be interest in a re-bid. We therefore re-bid the general contract portion of the project on PennBID on July 3. Bids are due on July 21. We recommend the MA consider a Special Meeting between July 25-28 to consider award of both contracts in order to facilitate NTP as soon as possible.

We also completed structural design and plans for raising of the concrete walls of the UV channel for construction by the PW Department.

An updated tentative schedule for the remaining mechanical and electrical contracts’ bidding follows; the milestones are now approximately two weeks later than previously planned:

• General Contract Bids Due – July 21 • Electrical and General Contract Award Consideration – July 25-28 Special MA Meeting • 1st Notice to Proceed to Contractors: Temporary Bypass Work – August 14, 2023 • Delivery of UV Equipment – Mid-August 2023 • Complete Temporary Bypass Work and Initiate Use of Bypass System – October 16, 2023 • Two Week Trial and Sampling of Temporary Bypass System – October 16-27, 2023 • Township to Perform Concrete Channel Work – October 30-December 21, 2023 • 2nd Notice to Proceed to Contractors: Permanent Work – December 22, 2023 • Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – January 22, 2024 • Two Week Trial of New UV System in Permanent Channel –January 22-February 2, 2024 • Install Second UV Module into Permanent Channel – February 5, 2024 • Two Week Trial of Second New UV System in Permanent Channel – February 6-20, 2024 • Construction Completed – End of February, 2024

• Generator #2 Replacement – No activity by Pennoni since our last report. Premium Power Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we expect delivery of the entire

EGMAU23001 July 7, 2023 Page 2 East Goshen Municipal Authority Engineer’s Report

P:\Projects\EGMA\Memos to Board\2023\Engineers Report 2023-07-07.docx

system around January 2024. We will prepare design for the electrical installation and any slab replacement/modifications in the summer 2023.

• Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of the RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided financial data that we have begun to analyze, and we will provide our observations upon completion of the analysis.

Sanitary Sewer Pipe Rehab

• Chester Creek Sewer Rehab – No activity by Pennoni since our last report.

The Township is going to commission a TV investigation of the remainder of the Chester Creek interceptor to at least West Chester Pike. We will review and identify any additional needed pipe and manhole repairs beyond those previously identified further upstream and in Supplee Valley. A bid package will then be developed for manhole-to-manhole pipe lining, pipe lining point repairs, pipe and manhole injection grouting, and other applicable rehabilitation along the Chester Creek interceptor. Pipe lining in Supplee Valley will be included to the extent that budget is available, likely as Add Items in the bid.

• Hershey’s Mill Estates – No activity since our last report. Punchlist work and permanent restoration remain to be completed. We are awaiting a schedule from the contractor, but we anticipate that work will occur in July in an effort to avoid topsoiling and seeding in the ongoing period of dry weather.

• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.

New Connections

• 1010 Hershey Mill Road (Moser) – No activity since our last report.

• 301 Reservoir Road (5-Lot Residential Subdivision) – No activity since our last report.

• 1712 E. Boot Road – No activity since our last report.

• 14 Reservoir Road – No activity since our last report.

END OF REPORT

UNOFFICIAL BID TABULATION East Goshen Municipal Authority Contract: RCSTP-2023-01 & RCSTP-2023-02, RCSTP UV Disinfection System Replacement

Extended Price Analysis

Reference Number Description Type UOM Quantity Lenni Electric Corporation AJM Electric, Inc. A. N. Lynch Co., Inc.

1 Temporary General Contract Work. Price complete, in place, per lump sum: Base L.S. 1 - - -

2 Permanent General Contract Work. Price complete, in place, per lump sum: Base L.S. 1 - - - - - -

Reference Number Description Type UOM Quantity Lenni Electric Corporation AJM Electric, Inc. A. N. Lynch Co., Inc.

1 Temporary Electrical Work. Price complete, in place, per lump sum: Base L.S. 1 $5,622.00 $5,600.00 $3,800.00

2 Permanent Electrical Work. Price complete, in place, per lump sum: Base L.S. 1 $15,912.00 $44,500.00 $61,200.00 $21,534.00 $50,100.00 $65,000.00 RCSTP-2023-02 (Electrical Contract) Base Bid Total

RCSTP-2023-01 (General Contract) Base Bid Total

RCSTP-2023-01 (General Contract) Base Bid

RCSTP-2023-02 (Electrical Contract) Base Bid

RCSTP Monthly Operations Report

July 2023

Executive Summary The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for June 2023. All supplemental reports were submitted for May 2023 with the eDMR Discharge to the Applebrook irrigation lagoon continued throughout June. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes decreased slightly to a daily average of 71.6 compared to the previous month at 72.2 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced some mechanical issues impacting production. There were no odor complaints during the month.

Table 1

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for June 2023. The monthly average total phosphorus was reported as 0.17 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The draft month-to-date average TSS is reported as 5.5 mg/L compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment performed well during June. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS, and total phosphorus. Daily analysis of the final effluent flow equalization grabs samples for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Flow

MGD

Average mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month

Geo

Mean

Geo

Mean

0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000

Inst. Max 20 94 15 94 5 1

Sample Date

June 6, 2023 2.0 8.37 5.6 0.10 0.20 19 1.2788

June 13, 2023 2.0 7.14 6.4 0.10 0.13 1 0.0000

June 20, 2023 2.0 7.11 5.0 0.10 0.19 5 0.6990

June 27, 2023 2.0 6.73 4.8 0.10 0.15 2 0.3010

Average 2.0 7.34 5.5 0.10 0.17 7 0.5697

Minimum 2.0 6.73 4.8 0.10 0.13 1 0.0000

Maximum 2.0 8.37 6.4 0.10 0.20 19 1.2788

June 2023- Final Effluent - Outfall 001

NPDES Permit

Discharge

Limitations

CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform

Page 2 of 3

Discharge to the Applebrook irrigation lagoon, outfall 002 continued through June.

Table 2 illustrates the final effluent composite sample data reported for outfall 002 for June 2023.

Table 2

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be within the design parameters for the treatment process.

Table 3 presents the pollutant data for the influent wastewater collected at the doghouse manhole during June 2023.

Table 3

The foam on the SBR surface remained consistent during June, with approximately 5% to 15% coverage of the surface area. The foam thickness is approximately 2 inches and is light to medium brown. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio 0.06 while ensuring the ammonia effluent discharge concentration remains within the 2.5 mg/L seasonal limits.

PA DEP

No activity

Flow

MGD Average mg/L

lbs/ month mg/L

lbs/ month mg/L

lbs/ month mg/L

lbs/ month mg/L

lbs/ month

Geo Mean

Geo Mean 0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000 40 45 June 6, 2023 2.0 8.37 5.60 0.10 0.20 19 1.2788 June 13, 2023 2.0 7.14 6.40 0.10 0.13 1 0.0000 June 20, 2023 2.0 7.11 5.00 0.10 0.19 5 0.6990 June 27, 2023 2.0 6.73 4.80 0.10 0.15 2 0.3010 Average 2.0 7.34 5.45 0.10 0.17 7 0.5697 Minimum 2.0 6.73 4.80 0.10 0.13 1 0.0000 Maximum 2.0 8.4 6.40 0.10 0.20 19 1.2788

Fecal Coliform

June 2022 - Applebrook - Out Fall 002

NPDES Permit

Discharge Limitations

CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total

Flow

mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57

June 6, 2023 285 212 172 50.3 72.2 7.8 June 13, 2023 304 283 340 29.5 60.0 5.15 June 20, 2023 339 315 300 48.8 75.0 7.51 June 27, 2023 252 236 270 49.1 4.93 Average 295 262 271 5 64.1 6.35 Minimum 252 212.0 172 30 49.1 4.93 Maximum 339 315 340 50 75.0 7.79

Sample Date

MGD Average

June 2023 - Influent Wastewaster

Design Basis

BOD5 CBOD5 TSS NH4-N TKN, mg/L

Phosphorus,Total,

mg/L

Page 3 of 3

Pennoni Associates

UV System construction update with proposed schedule.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly

Cleaned buildings and laboratory.

MA 6-12-23 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 June 12, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 June 12, 2023 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: 7 Kevin Cummings, Chairman 8 Dana Pizarro, Vice Chairman 9 Jack Yahraes 10 Carmen Battavio 11 Walter Wujcik 12 13 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 14 representative), Stacey Fuller (Attorney), Dave Ware (Finance Director), and Michael Lynch 15 (Township Supervisor). 16 17 18 COMMON ACRONYMS: 19 ATS – Automatic Transfer Switch 20 BFES – Big Fish Environmental Services MA- Municipal Authority 21 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 22 CB – Conservancy Board PC – Planning Commission 23 DEP – Department of Environmental Protection PM – Prevention Maintenance 24 EPA – Environmental protection Agency PR – Park & Recreation Board 25 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 26 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 27 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 28 PWD – Public Works Department WAS – Waste Activated Sludge 29 30 Call to Order & Pledge of Allegiance 31 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 32 He asked for a moment of silence for our First Responders and Military. 33 He asked if anyone would be recording the meeting. There was no response. 34 35 36 Chairman’s Report 37 None 38 39 40 SEWER REPORTS 41 1. Director of Public Works, Mark Miller’s report for June 12, 2023 42 Monthly Flows – The average daily flow to West Goshen was 762,463 gallons per day. 43 44 Meters: The meters were read on a daily basis. Allied Control was on site last week to calibrate the 45 meters. There were no adjustments to any of the meters. 46 47 C.C. Collection: Pipe Data View was utilized to clean and televise the lines in the Marydell 48 development. PECO has crews installing new electric lines there, so we televised to make sure they 49

MA 6-12-23 draft 2

didn’t hit our lines. It turned out they drilled through our sewer main on Wilson Lane. Public Works 1 had to excavate the main and replace a section of pipe. The contractor will be recharged for our time 2 and material. 3 The televising crew found three sections of pipe that needed a point repair. The three point repairs 4 were made without having to plug the line. 5 The pump stations were visited on a daily basis, and wet wells were washed down. 6 A resident contacted the township with a sewer lateral blockage. We televised the lateral once we 7 were made aware of the problem and found heavy root buildup. We removed the tree and ground the 8 stump. The property owner had already called Roto Rooter and signed a contract to replace the 9 lateral. 10 11 C.C. Interceptor: Nothing to report. 12 13 R.C. Collection: The pump stations were visited on a daily basis. The wet well was cleaned, and the 14 oil level was checked on the generator. We cleared the right of ways in the Westworth Development, 15 and we had to utilize our tree contractor to remove a large ash tree. 16 17 Ridley Creek Plant: Routine maintenance was performed. 18 We tapped the SBR pipe for the caustic soda injection. John Laidley completed his work on the 19 caustic soda controls. 20 We have Pipe Data scheduled for this week to vacuum out the tank before we fill the tank. I had to 21 order a wash down shower as part of the project. 22 23 24 Alarms: 14 were received. 25 26 PA 1 Calls: 84 were received and marked out. 27 28 Monthly Rainfall: 1.21 inches of rain for the month of May. 29 30 Lateral Repairs or Caps: We did five repairs; two in Bow Tree and three in Clocktower. 31 32 33 2. Pennoni Engineer’s Report dated June 8, 2023 34 35

Ridley Creek Sewage Treatment Plant (RCSTP) 36

Caustic Soda Conversion – The caustic soda tank and associated pumps, piping, and controls 37 have been installed. Jim Wood from Data Design Services inspected the tank on June 7, 2023, 38 as the PADEP certified installer to complete the PADEP Storage Tank Permit/Registration 39 Application. The Township must attach and provide photographic proof of NFPA hazard 40 diamond labels on the tank to Data Design Services before they submit the PADEP Storage 41 Tank Permit/Registration Application. We will continue to provide assistance as needed 42 during any of the Township’s remaining construction of the system, including tapping the 43 SBR influent pipes and installation of the emergency shower. 44

MA 6-12-23 draft 3

UV Disinfection System – The system is being fabricated, and delivery is scheduled for mid- 1 August 2023. The general and electrical contract bids went live on PennBID on May 22, 2 2023, and a pre-bid meeting occurred on June 8, 2023. 3

An updated tentative schedule for the remaining mechanical and electrical contracts’ bidding 4 follows: 5

Bids Due – June 27, 2023 6 Award Consideration – July 10, 2023 at the Municipal Authority Meeting 7 1st Notice to Proceed to Contractors: Temporary Bypass Work – August 1, 2023 8 Delivery of UV Equipment – Mid-August 2023 9 Complete Temporary Bypass Work and Initiate Use of Bypass System – October 2, 10 2023 11 Two Week Trial and Sampling of Temporary Bypass System – October 2-16, 2023 12 Township to Perform Concrete Channel Work – October 16-December 7, 2023 13 2nd Notice to Proceed to Contractors: Permanent Work – December 8, 2023 14 Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – January 8, 2024 15 Two Week Trial of New UV System in Permanent Channel –January 8-22, 2024 16 Install Second UV Module into Permanent Channel – January 24, 2024 17 Two Week Trial of Second New UV System in Permanent Channel – January 24- 18 February 7, 2024 19 Construction Completed – Mid-February, 2024 20

Generator #2 Replacement – No activity by Pennoni since our last report. Premium Power 21 Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. 22 The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we 23 expect delivery of the entire system around January 2024. We will prepare design for the 24 electrical installation and any slab replacement/modifications in the summer 2023. 25

Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of 26 the RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided 27 financial data that we have begun to analyze, and we will provide our observations upon 28 completion of the analysis. 29

Sanitary Sewer Pipe Rehab 30

Chester Creek Sewer Rehab – No activity by Pennoni since our last report. 31

The Township is going to commission a TV investigation of the remainder of the Chester 32 Creek interceptor to at least West Chester Pike. We will review and identify any additional 33 needed pipe and manhole repairs beyond those previously identified further upstream and in 34 Supplee Valley. A bid package will then be developed for manhole-to-manhole pipe lining, 35 pipe lining point repairs, pipe and manhole injection grouting, and other applicable 36 rehabilitation along the Chester Creek interceptor. Pipe lining in Supplee Valley will be 37 included to the extent that budget is available, likely as Add Items in the bid. 38

It is our understanding that there is $260,000 available for the work this year ($130,000 in 39 2023 and $130,000 carried over from 2022). We are currently anticipating that the interceptor 40 work could be a little over half of the budget, leaving approximately $100,000 for Supplee 41

MA 6-12-23 draft 4

Valley. This would address approximately one-third to half of the remaining unlined sewers 1 in the neighborhood. The budget and scope will be defined more precisely upon completion of 2 the remaining interceptor TV inspection. 3

Hershey’s Mill Estates – Punchlist work and permanent restoration remain to be completed. 4 We are awaiting a schedule from the contractor, but we anticipate that work will occur in July 5 in an effort to avoid topsoiling and seeding in the ongoing period of dry weather. 6

Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared 7 and will be submitted to PADEP in follow-up to the emergency authorization now that 8 construction has been completed. 9

New Connections 10

1010 Hershey Mill Road (Moser) – We are reviewing the sanitary sewer design as part of the 11 Land Development process. 12

301 Reservoir Road (5-Lot Residential Subdivision) – No activity since our last report. 13

1712 E. Boot Road – No activity since our last report. 14

14 Reservoir Road – We reviewed plans for a sewer connection for one new house on a 15 proposed flag lot subdivision and provided comments to the design consultant. 16

17 18 3. Big Fish Environmental Services – 19 The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations 20 regarding water quality for May 2023. All supplemental reports were submitted for the month of 21 April 2023 with the eDMR. Discharge to the Applebrook irrigation lagoon resumed during May. 22 Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminium 23 sulfate solution volumes decreased slightly to a daily average of 71.6 compared to the previous 24 month at 72.2 gpd to achieve phosphorus removal. No significant mechanical or operational issues 25 were observed during the sludge dewatering equipment or SBR treatment process. Sludge 26 dewatering increased from 396,135 to 510,482 gallons per month. There were no odor complaints 27 during the month. 28 There was a question on the average of 5 on Table 3. 29 30 Approval of Minutes 31 The minutes of the May 8, 2023 meeting were approved as amended. 32 33 Approval of Invoices 34 1. Jack moved to approve payment of the following Pennoni invoices: 35 a. Pennoni Invoice #1172058 $ 37.25 36 b. Pennoni Invoice #1172059 $ 5,164.00 37 c. Pennoni Invoice #1172060 $ 5,770.00 38 d. Pennoni Invoice #1172061 $ 1,253.25 39 Walter seconded the motion. The motion passed unanimously. 40 41

MA 6-12-23 draft 5

2. Carmen moved to approve the Maillie invoice #94627 in the amount of $707.00 (paid). 1 Walter seconded the motion. The motion passed unanimously. 2 3 3. Jack moved to approve payment of the Exeter Supply Co paid invoices: 4 a. Invoice #371543 $ 905.59 5 b. Invoice #371544 $1,030.64 6 Walter seconded the motion. The motion passed unanimously. 7 8 4. Dana moved to approve the West Goshen Sewer Authority paid invoices as follows: 9 #EG22-B $ 19,143.34 10 #EG22-T $ 47,756.64 11 Carmen seconded the motion. The motion passed unanimously. 12 13 5. Jack moved to approve payment of the paid Lenni Electric invoices as follows: 14 #230545 $ 1,352.00 15 #230546 $ 2,008.00 16 Walter seconded the motion. The motion passed unanimously. 17 18 6. Dana moved to approve payment of the Yale paid invoice #S123058116.001 in the amount of 19 $17.35. Carmen seconded the motion. The motion passed unanimously. 20 21 7. Dana moved to approve payment of the Gawthrop Greenwood paid invoice #272291 in the 22 amount of $587.00. Jack seconded the motion. The motion passed unanimously. 23 24 8. Walter moved to approve payment of the E & W Equipment Co. paid invoice #704 in the amount 25 of $40,495.80. Carmen seconded the motion. The motion passed unanimously. 26 27 9. Dana moved to approve payment of the Kappe Associates paid invoice #23-276-M in the amount 28 of $6,415.00. Walter seconded the motion. The motion passed unanimously. 29 30 Liaison Reports 31 1. Board of Supervisors – Mike Lynch reported that the Milltown Dam is closed to bidding. The 32 Milltown Pocket Park is moving along. They are working of the Street Trees Ordinance. 33 34 Financial Reports 35 Dave Ware presented the following report: 36 Year to date May 2023, the Municipal Authority recorded $403,110 in revenues (primarily from 37 Sewer Operating and Sewer Capital Reserve transfers and tapping fees) and $403,361 in expenses 38 (Engineering Services, Audit fees, Administrative Wages, Hershey’s Mill Estates Sewer costs, 39 Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital 40 improvements to the Westtown Way Pump station, and legal fees), for a net result of operations of 41 ($251). As of May 31, 2023, the fund balance was $4,921. 42 For the BOS, Dave presented a report with three proposals showing estimated expenses and revenues 43 and when to increase sewer rates. There was discussion about these proposals. 44 45 46 47

MA 6-12-23 draft 6

Old Business 1 1. 1010 Hershey Mill Rd. (Miller Property) – Mark reviewed the plan. The developer, Moser, 2 called Mark with questions. There will be a sewer easement to Goshen Downs. 3 4 5 Goals 6 The Goals were reviewed. Kevin mentioned that a manual for the Caustic Soda project needs to be 7 developed. 8 9 New Business - None 10 11 Capacity Requests - None 12 13 Any Other Matter – None 14 15 Correspondence- None 16 17 18 Public Comment - None 19 20 21 Adjournment 22 There being no further business Jack moved to adjourn the meeting. Carmen seconded the motion. 23 The motion passed unanimously. The meeting was adjourned at 8:15 pm. 24 The next regular meeting will be held on Monday, July 10, 2023 at 7:00 pm. 25 26 Respectfully submitted, 27 28 29 Ruth Kiefer, Recording Secretary 30

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1177224
Invoice Date : 07/03/2023
Project : EGMAU20004
Project Name : RCSTP Caustic Soda Conversion

For Services Rendered Through 06/18/2023

Set up and attended site visit of installed system with "certified installer" for PADEP permit sign-off, updated permit forms, and responded to questions from Township on pipe fitting materials.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Design and Permitting $26,500.00 $26,500.00 100.00% $26,500.00 $0.00
02 -- Construction Phase Services est. $5,400.00 $1,428.75 $2,253.25 $824.50
Total : $31,900.00 $27,928.75 $28,753.25 $824.50

Phase: 02 -- Construction Phase Services

Labor

Class Hours Rate Amount
Authority Engineer 1.25 149.00 186.25
Associate Professional 5.75 111.00 638.25
Labor 824.50

Phase Subtotal: $824.50

Amount Due This Invoice: $824.50

[Stamp]
APPROVED BY: [Signature] 7/6/23
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1520

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

West Goshen RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 7/3/2023

Project: EGMAU20004
Pennoni Job No.: RCSTP Caustic Soda Conversion
Invoice No: 1177224
Invoice Period: 5/15/2023 to 6/18/2023
Initial Authorization: $ 31,900.00 Date: 7/3/2023
Contract Amount: $ 31,900.00
Previously Invoiced: $ 27,928.75
Current Invoice: $ 824.50
Invoiced to Date ($): $ 28,753.25
Invoiced to Date (%): 90%
Remaining Budget ($): $ 3,146.75
Remaining Budget (%): 10%

Budget by Phase:

Phase Name: RCSTP Caustic Soda Conversion
Phase Budget: $ 31,900.00
Previously Invoiced: $ 27,928.75
Current Invoice: $ 824.50
Invoiced to Date ($): $ 28,753.25
Invoiced to Date (%): 90%
Remaining Budget ($): $ 3,146.75
Remaining Budget (%): 10%

Comments: Set up and attended site visit of installed system with "certified installer" for PADEP permit sign-off, updated permit forms and responded to questions from Township on pipe fitting materials

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1177226
Invoice Date : 07/03/2023
Project : EGMAU23001
Project Name : 2023 General Services

For Services Rendered Through 06/18/2023

Prepared June Engineer's Report and attended June MA meeting. Responded to questions from design consultant and provided guidance on sewage planning for new connections at Applebrook and 1712 E. Boot Road and pipe rehabilitation work in the Hershey's Mill private community.

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 651.50 13,308.00 13,959.50
Limit 42,000.00
Remaining 28,040.50

Labor

Class Hours Rate Amount
Authority Engineer 4.00 149.00 596.00
Associate Professional .50 111.00 55.50
Totals 4.50 651.50
Total Labor 651.50
Total this Invoice $651.50

[Stamp]
APPROVED BY: [Signature] 7/6/23
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

2023 General Services
EGMAU23001Invoice Summary
Invoice Date 7/3/2023

Project: EGMAU23001
Pennoni Job No.: 2023 General Services
Invoice No: 1177226
Invoice Period: 5/15/2023 to 6/18/2023
Initial Authorization: $ 42,000.00 Date: 7/3/2023
Contract Amount: $ 42,000.00
Previously Invoiced: $ 13,308.00
Current Invoice: $ 651.50
Invoiced to Date ($): $ 13,959.50
Invoiced to Date (%): 33%
Remaining Budget ($): $ 28,040.50
Remaining Budget (%): 67%

Budget by Phase:

Phase Name: 2023 General Services
Phase Budget: $ 42,000.00
Previously Invoiced: $ 13,308.00
Current Invoice: $ 651.50
Invoiced to Date ($): $ 13,959.50
Invoiced to Date (%): 33%
Remaining Budget ($): $ 28,040.50
Remaining Budget (%): 67%

Comments: Prepared June Engineer's Report and attended June MA meeting. Responded to questions from design consultant and provided guidance on sewage planning for new connections at Applebrook and 1712 E. Boot Road and pipe rehabilitation work in the Hershey's Mill private community.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.c

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
06/09/2023
Client No: 6604-001M
Invoice No. 273862

[Stamp]
APPROVED BY: [Signature] 7/6/23
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140

General Authority Services

Fees

Date Timekeeper Description Hours Amount
05/08/2023 PMM Email from L. Werkheiser regarding meeting packet; Review and analyze meeting materials in preparation for Board meeting; Attend Board meeting. 1.90 389.50
For Current Services Rendered 1.90 389.50

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna 1.90 $205.00 $389.50
Previous Balance $587.00
Total Current Charges 389.50
05/15/2023 Payment -587.00
Balance Due $389.50

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.c

Please Note:
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
06/09/2023
Client No: 6604M

Account Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services 587.00 389.50 0.00 -587.00 $389.50

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dave Ware
Re: MA June 2023 YTD Financial Report
Date: July 10, 2023

YTD June 2023, the Municipal Authority recorded $475,043 in revenues (primarily from Sewer Operating transfers, Sewer Capital Reserve transfers, and tapping fees) and $472,429 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station, and legal fees). The net result of operations of $2,614. As of June 30, 2023, the fund balance was $1,040.

Attached is a complete list of 2023 full year MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
June 2023

REVENUE

Account Id Account Description Annual Budget Current YTD Prior YTD
07-341-1000 INTEREST EARNINGS 0.00 144.81 0.88
07-354-0400 DCED GRANT 152,980.00 0 0
07-364-1100 C.C. TAPPING FEES 2,300.00 0.00 0.00
07-364-1110 R.C.TAPPING FEES 2,000.00 4,287.04 300.00
07-364-1130 CONNECTION FEES - SEWER 1,000.00 563.76 281.88
07-380-1000 MISCELLANEOUS REVENUE 282.24 282.24 141.12
07-392-0500 TRANSFER FROM SEWER OPERATING 100,000.00 58,882.00 50,990.55
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,471,553.00 410,882.82 66,511.15
Total Revenue 1,730,115.24 475,042.67 118,225.58

EXPENSES

Account Id Account Description Annual Budget Current YTD Prior YTD
07-424-1400 ADMINISTRATIVE WAGES 32,055.45 19,343.25 16,744.10
07-424-3000 MISCELLANEOUS EXPENSE 1,748.79 1,595.25 1,665.25
07-424-3110 MUNIC.AUTH.-AUDITING 10,815.00 10,500.00 10,250.00
07-424-3130 ENGINEERING SERVICES 47,250.00 21,970.50 28,468.25
07-424-3140 LEGAL SERVICES 8,400.00 2,903.00 2,360.00
07-424-7440 R.C. CAPITAL-STP 355,793.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 488,847.00 35,092 0.00
07-426-3001 RELINING 260,000.00 0 0
07-429-1501 BARKWAY PUMP STATION CAPITAL 0.00 0.00 2,215.00
07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 0.00 0.00 11,493.05
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 78,000.00 10,240.62 29,390.17
07-429-1504 HUNT CO PUMP STATION CAPITAL 0.00 0.00 1,870.00
07-429-1505 RCSTP CAPITAL 260,000.00 108,995.16 24,458.50
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 0.00 55,021.27 0.00
07-429-1520 RCSTP - CAUSTIC SODA 0.00 24,504.97 0.00
07-429-6100 WEST GOSHEN CAPITAL 187,206.00 182,262 0
Total Expenses 1,730,115.24 472,428.63 128,914.32
Net Result From Operations 0.00 2,614.04 -10,688.74

Municipal Authority

YTD Revenues and Expenses thru 6/30/2023

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-341-1000INTEREST EARNINGS01/31/23Revenue JournalINTEREST EARNED JAN 20232.65
07-341-1000INTEREST EARNINGS02/28/23Revenue JournalINTEREST EARNED FEBRUARY 20236.32
07-341-1000INTEREST EARNINGS03/31/23Revenue JournalINTEREST EARNED MARCH 202323.37
07-341-1000INTEREST EARNINGS04/30/23Revenue JournalINTEREST EARNED APRIL 202312.47
07-341-1000INTEREST EARNINGS05/31/23Revenue JournalINTEREST EARNED MAY 202332.83
07-341-1000INTEREST EARNINGS06/30/23Revenue JournalINTEREST EARNED JUNE 202367.17
07-364-1110R.C.TAPPING FEES01/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES02/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES03/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES04/03/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES05/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES06/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES06/28/23Revenue JournalTAP IN FEE 1712 E BOOT RD2,000.00
07-364-1110R.C.TAPPING FEES06/28/23Revenue JournalSEWER INSPECTION FEE 1712 E BOOT RD500.00
07-364-1130CONNECTION FEES - SEWER01/27/23Revenue JournalCONNECTION FEE INSTALLMENT INV# 12838281.88
07-364-1130CONNECTION FEES - SEWER03/23/23Revenue JournalCONNECTION FEE INSTALLMENT INV# 12839281.88
07-380-1000MISCELLANEOUS REVENUE01/27/23Revenue JournalPINE ROCK INTEREST PORTION - STOFFLET141.12
07-380-1000MISCELLANEOUS REVENUE03/23/23Revenue JournalPINE ROCK INTEREST PORTION - PAPPANO141.12
07-392-0500TRANSFER FROM SEWER OPERATING01/20/23Revenue JournalXFER TO 07 FROM 05 RE: MA EXPENSES3,384.75
07-392-0500TRANSFER FROM SEWER OPERATING01/30/23Revenue JournalXFER $ TO MA07 FROM 05-SEWER14,572.43
07-392-0500TRANSFER FROM SEWER OPERATING01/31/23Revenue JournalXFER $ FROM 05 TO 07 RE: MA EXPENSES3,000.00
07-392-0500TRANSFER FROM SEWER OPERATING02/17/23Revenue JournalXFER TO 07 FROM 05 RE: EXPENSES36,455.37
07-392-0500TRANSFER FROM SEWER OPERATING02/23/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA2,877.00
07-392-0500TRANSFER FROM SEWER OPERATING03/22/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA715.00
07-392-0500TRANSFER FROM SEWER OPERATING03/23/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA880.25
07-392-0500TRANSFER FROM SEWER OPERATING03/24/23Revenue JournalXFER TO 07 FROM 05 RE: EXPENSES6,738.25
07-392-0500TRANSFER FROM SEWER OPERATING03/29/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,000.00
07-392-0500TRANSFER FROM SEWER OPERATING03/31/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,944.84
07-392-0500TRANSFER FROM SEWER OPERATING04/17/23Revenue JournalFROM 05 SEWER OP TO 07 MA4,992.75
07-392-0500TRANSFER FROM SEWER OPERATING05/10/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA707.00
07-392-0500TRANSFER FROM SEWER OPERATING05/10/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,627.50
07-392-0500TRANSFER FROM SEWER OPERATING06/08/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA1,253.25
07-392-0500TRANSFER FROM SEWER OPERATING06/30/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA10,398.41
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/12/23Revenue JournalXFER $ FROM 09 TO 07 TO COVER CAP.EXP.41,381.95
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/20/23Revenue JournalXFER TO 07 FROM 09 RE: MA EXPENSES11,730.76
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/30/23Revenue JournalXFER $ TO MA07 FROM 09- SEWER CAP5,221.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/10/23Revenue JournalFROM 09 SEWER CAP RESERVE TO 07 MA115,362.26
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/23/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA8,690.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/01/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA20,201.84
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/09/23Revenue JournalXFER $ TO 07 FROM 091,264.96

Page 1 of 4

Municipal Authority

YTD Revenues and Expenses thru 6/30/2023

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/22/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,961.86
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/24/23Revenue JournalXFER TO 07 FROM 09 RE: EXPENSES11,080.96
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/29/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA5,221.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/05/23Revenue JournalXFER FROM 09 SEWER OP TO 07 MA1,041.75
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/21/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA977.06
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/25/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,801.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/26/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA252.28
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/28/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA688.81
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/04/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA5,069.52
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/10/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,953.58
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/19/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA66,899.98
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/08/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA56,078.05
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/13/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA450.18
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/20/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA888.22
Total Revenue475,042.67
07-424-1400ADMINISTRATIVE WAGES03/31/23Pay Check: 340223-00878 QTR 1 2023 MA CHARGE BACK8,944.84
07-424-1400ADMINISTRATIVE WAGES06/30/23Pay Check: 343123-01745 QTR 2 2023 MA CHARGE BACK10,398.41
07-424-3000MISCELLANEOUS EXPENSE03/22/23Pay Check: 339523-00707 2023 ANNUAL DAILY DISCHARGE CA715.00
07-424-3000MISCELLANEOUS EXPENSE03/23/23ExpdREIMBURSE 01 FOR 07 CC EXPENSE880.25
07-424-3110MUNIC.AUTH.-AUDITING02/15/23Pay Check: 338923-00406 PROGRESS BILLING EGT MUA1231221,793.00
07-424-3110MUNIC.AUTH.-AUDITING03/29/23Pay Check: 340123-00870 PROGRESS BILLING AUD EGT MUA8,000.00
07-424-3110MUNIC.AUTH.-AUDITING05/10/23Pay Check: 341723-01270 PROGRESS BILLING AUDIT EGT MUA707.00
07-424-3130ENGINEERING SERVICES01/20/23Pay Check: 337923-00111 SERV.THRU 12/18/22 GEN.SERV.223,384.75
07-424-3130ENGINEERING SERVICES02/23/23Pay Check: 339223-00443 SERV THRU 011523 GEN SERVICES2,294.00
07-424-3130ENGINEERING SERVICES03/24/23Pay Check: 339923-00816 SERV THRU 021223 CHAPTER 94 RE2,246.00
07-424-3130ENGINEERING SERVICES03/24/23Pay Check: 339923-00815 SERV THRU 021223 GENERAL SERVI3,482.75
07-424-3130ENGINEERING SERVICES04/17/23Pay Check: 340623-01018 SERV THRU 031923 GENERAL SERVI2,614.75
07-424-3130ENGINEERING SERVICES04/17/23Pay Check: 340623-01019 SERV THRU 031923 CHAPTER 94 RE1,654.50
07-424-3130ENGINEERING SERVICES05/10/23Pay Check: 342023-01302 SERV THRU 041623 2023 GEN SERV3,663.25
07-424-3130ENGINEERING SERVICES05/10/23Pay Check: 342023-01303 SERV THRU 041623 2022 CHAPT 941,377.25
07-424-3130ENGINEERING SERVICES06/08/23Pay Check: 342523-01576 SERV THRU 051423 2023 GEN SERV1,253.25
07-424-3140LEGAL SERVICES02/23/23Pay Check: 339123-00442 LEGAL SERV. JAN 2023 GEN AUTH583.00
07-424-3140LEGAL SERVICES03/24/23Pay Check: 339823-00812 LEGAL SERV FEB 2023 GEN AUTHOR389.50
07-424-3140LEGAL SERVICES03/24/23Pay Check: 339823-00813 LEGAL SERV DEC 2022 GEN AUTHOR620.00
07-424-3140LEGAL SERVICES04/17/23Pay Check: 340523-01020 LEGAL SERV MARCH 2023 GEN AUTH431.00
07-424-3140LEGAL SERVICES04/17/23Pay Check: 340523-01017 LEGAL SERV FEB 2023 GEN AUTH292.50
07-424-3140LEGAL SERVICES05/10/23Pay Check: 341923-01304 LEGAL SERV APRIL 2023 GEN AUTH587.00
07-424-7490CAP.REPLACEMENT R.C.02/06/23Pay Check: 338623-00364 PALLET 200' 8" FILTER SOXX430.00
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00429 PVC PIPE, ADPTR, 2WAY CLEANOUT1,708.22

Page 2 of 4

Municipal Authority

YTD Revenues and Expenses thru 6/30/2023

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00412 PVC FITTINGS,ADPTR,BEND, REDCR17,817.91
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00411 24" N12 HDPE PIPE3,771.00
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338823-00381 1 % DISCOUNT(65.65)
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338823-00381 DIAMOND PLATE BLACK MATS6,564.64
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 339023-00415 AASHTO#1 48.32TON #57 146.33TN4,866.25
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL01/20/23Pay Check: 337923-00110 SERV.THRU 12/18/22 HM EST SEWR9,690.50
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL02/06/23Pay Check: 338523-00331 STONE, AASHTO #57550.12
07-429-1505RCSTP CAPITAL01/10/23Pay Check: 337723-00030 CONDUITS, STRAPS, LOCKNUTS +1,161.95
07-429-1505RCSTP CAPITAL01/10/23Pay Check: 337823-00075 PULSAFEEDER - RCSPT CAUSTIC SO40,220.00
07-429-1505RCSTP CAPITAL01/20/23Pay Check: 337923-00109 SERV.THRU 12/18/22 RCSTP SODA861.51
07-429-1505RCSTP CAPITAL01/20/23Pay Check: 337923-00112 SERV.THRU 12/18/22 RCSTP UV1,178.75
07-429-1505RCSTP CAPITAL01/27/23Pay Check: 338023-00151 HELIFLOW 408 PD BLOWER5,221.00
07-429-1505RCSTP CAPITAL02/06/23Pay Check: 338423-00305 50HP 3540RPM BALDOR MOTOR4,683.69
07-429-1505RCSTP CAPITAL03/24/23Pay Check: 339923-00817 SERV THRU 021223 RCSTP CAU SOD4,144.21
07-429-1505RCSTP CAPITAL03/29/23Pay Check: 340023-00827 HELIFLOW 408 LHBD BLOWER5,221.00
07-429-1505RCSTP CAPITAL06/08/23Pay Check: 342223-01548 UV DISINFECTION SYS PYMT- 30%40,495.80
07-429-1505RCSTP CAPITAL06/08/23Pay Check: 342523-01575 SERV THRU 051423 RCSTP UV REPL5,770.00
07-429-1505RCSTP CAPITAL06/08/23Pay Check: 342523-01573 SERV THRU 051423 RCSTP CAU SOD37.25
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/21/23ExpdRECLASS HERSH.MILL EST. PURCH.23-001486,904.64
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/21/23ExpdRECLASS HERSH.MILL EST. PURCH.23-001532,642.00
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/21/23ExpdRECLASS HERSH.MILL EST. PURCH.23-001525,025.79
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/23/23Pay Check: 339223-00444 SERV THRU 011523 HM ESTATES SW8,690.50
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00536 STONE, AASHTO #57 329.79 TON8,244.78
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00534 STONE, AASHTO #57 251.05 TON6,276.27
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00535 STONE, AASHTO #57 227.23 TON5,680.79
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/09/23Pay Check: 339423-00582 SPLIT COUPLERS305.40
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/09/23Pay Check: 339423-00581 SEWER HUB ADAPTERS,COUPLERS +959.56
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339623-00723 36" MARMAC POLYSEAL COUPLER803.20
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339723-00731 JOHN DEERE 550K RENTL 2/28-3/1434.50
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339723-00730 JOHNDEERE 550K RENTL 2/23-2/24724.16
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/24/23Pay Check: 339923-00814 SERV THRU 021223 HM ESTATES SE6,936.75
07-429-1510HERSHEY'S MILL ESTATES PROJECT04/25/23Pay Check: 341023-01141 SINGLE SIDED STRAW MAT,PINS1,407.00
07-429-1510HERSHEY'S MILL ESTATES PROJECT04/25/23Pay Check: 341023-01141 SINGLE SIDED STRAW MAT,PINS(14.07)
07-429-1520RCSTP - CAUSTIC SODA04/05/23Pay Check: 340323-00889 VARIOUS PURCHASES- SEE NOTES215.75
07-429-1520RCSTP - CAUSTIC SODA04/05/23Pay Check: 340423-00906 ROD 5/8 X 20 FT-CAUSTIC SODA826.00
07-429-1520RCSTP - CAUSTIC SODA04/21/23Pay Check: 340723-01081 3" TWISTER CORE BITS441.00
07-429-1520RCSTP - CAUSTIC SODA04/21/23Pay Check: 340723-01081 3" TWISTER CORE BITS(4.41)
07-429-1520RCSTP - CAUSTIC SODA04/21/23Pay Check: 340823-01056 GALV CAP, GFCI RCPT, GREY COVR168.21
07-429-1520RCSTP - CAUSTIC SODA04/21/23Pay Check: 340823-01057 GALV CAP, STEEL CLAMPBACK372.26
07-429-1520RCSTP - CAUSTIC SODA04/25/23Pay Check: 340923-01131 PVC CONDBY, DEV BOX, CTD CPLG890.32

Page 3 of 4

Municipal Authority
YTD Revenues and Expenses thru 6/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01112 (30) BUSS FUSES 2,160.00
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01144 GALV BLCK CAP,COMPRESSION CPLG 286.08
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01128 IRON THRDED T BODY, SHEET STEE 72.17
07-429-1520 RCSTP - CAUSTIC SODA 04/26/23 Pay Check: 700 23-01151 CAUSTIC SODA-(2) HVY DUTY TARP 252.28
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01177 BLINE SS CHANNEL SLOTTED HOLES 374.17
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01176 EMT HW STRAP,MACH SCREW ANCHOR 233.47
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01175 GALV RED CAP, COMM SWITCH, 81.17
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3413 23-01225 PVC BELL END PIPE, PVC COUPLNG 2,574.00
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3414 23-01227 10 YD CONCRETE 4500 PSI 1,930.00
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3415 23-01219 (30) BLINE EMT-HW STRAP 83.82
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3415 23-01212 OUTLET BOX, SS SWITCH,HW STRAP 481.70
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3416 23-01276 SCH 40 2" PIPE, 2" COUPLING 1,030.64
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3416 23-01275 CORP BALL STOP, SERVICE SADDLE 905.59
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3418 23-01295 TAYMAC GRY METAL INUSE COVER 17.35
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3423 23-01553 RC WWTP CHEMICAL STORAGE TANK 6,415.00
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3424 23-01554 RIDLEY CREEK-RAN CONDUIT 2,008.00
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3424 23-01555 RIDLEY CR-RAN CONDUIT FOR TANK 1,352.00
07-429-1520 RCSTP - CAUSTIC SODA 06/13/23 Pay Check: 3428 23-01617 BALL CORP STOP,BRASS THRD NIPL 450.18
07-429-1520 RCSTP - CAUSTIC SODA 06/20/23 Pay Check: 3429 23-01658 BRASS THREADED NIPPLE&COUPLING 57.22
07-429-1520 RCSTP - CAUSTIC SODA 06/20/23 Pay Check: 3430 23-01654 PULSAFEEDER TUBING & KOPKIT 831.00
07-429-6100 WEST GOSHEN CAPITAL 02/06/23 Pay Check: 3383 23-00366 WWPS PYMT LAST INSTALLMENT 115,362.26
07-429-6100 WEST GOSHEN CAPITAL 05/19/23 Pay Check: 3421 23-01363 2022 WG SEWER AUTH BOND FUND E 19,143.34
07-429-6100 WEST GOSHEN CAPITAL 06/12/23 Pay Check: 3427 23-01364 2022 WG SEWER AUTH TAPPING FEE 47,756.64
Total Expense 472,428.63

Page 4 of 4