Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\09-11-23\MA Meeting Materials 9-11-23\9-11-2023 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
September 11, 2023
7:00
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE • Ask if anyone will be taping the meeting 2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
3. SEWER REPORTS • Director of Public Work’s Report • Pennoni Engineer’s Report • Big Fish Environmental Report 4. APPROVAL OF MINUTES • August 14, 2023 5. APPROVAL OF INVOICES • There are no Pennoni invoices this month. • Lenni Invoice #230571 $18,930.40 (paid) 6. LIAISON REPORTS 7. FINANCIAL REPORTS a. August 2023
8. OLD BUSINESS
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\09-11-23\MA Meeting Materials 9-11-23\9-11-2023 Agenda.doc
9. 2023 Goals: Goal Status
Ridley Creek plant compliance January, February, March, April, May, June, July, & August were in compliance and met all requirements.
Continue to implement infiltration and inflow for the sewer system
Ongoing.
RCSTP UV Disinfection System
Getting materials ready. The temporary tank is here and the jib crane is being ordered. Replace sewer line - Hershey Mill Estates trunk line
Complete.
10. NEW BUSINESS 11. CAPACITY REQUESTS
12. ANY OTHER MATTER • Award bid for Chester County Interceptor 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171
To: Municipal Authority From: Mark Miller Re: September 11, 2023, Monthly Report Monthly Flows: The average daily flow to West Goshen was 732,643 per day. Meters: • Were read on a daily basis. • Allied Controls was onsite to perform the quarterly calibration on the interceptor meters. • Lynn noticed a low flow reading at the Hibberd Lane Meter. We went and rebooted the meter but it was still reading low. John Laidley was notified and he came out and ran a diagnostic check on the meter. C.C. Collection: The pump stations were visited on daily basis with no problems to report. C.C. Interceptor: Was inspected as part of our routine maintenance. The line was mowed and vegetation was removed from around the manhole. R.C. Collection: The pump stations were visited on a daily basis with no problems to report. Ridley Creek Plant: • Routine maintenance was performed. • We had another problem with the pump for Applebrook: it appears that the overload block burned up. • On August 28th, we came in at 2:00 am and pumped the final effluent pit down and utilized Pipe Data View to clean the tank. We are also looking at how many spikes we have taken from PECO. • Number 2 generator broke a drive belt and the idler pulley went bad and had to be replaced. Hershey Mill Trunk Line: We met with the contractor last week and walked the line. He is scheduled to come after Labor Day to lay topsoil and seed various areas. They will begin to remove the filter sock in the areas that are established.
Westtown Way Pump Station: I stopped down last Wednesday and there was nothing going on - they are still waiting on materials. Dave and I have a meeting at the end of the month with Mike Moffa and the other partners.
Alarms: 12 PA One Calls: 57 Monthly Rainfall: 2.40” Lateral Repairs or Caps: 1 lateral repair (Linden Ln) & 10 caps
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-655-4451 F: 302-654-2895
www.pennoni.com EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
September 8, 2023
Ridley Creek Sewage Treatment Plant (RCSTP)
• Caustic Soda Conversion – Once the outdoor emergency shower is installed, the tank can be put into operation. We also prepared draft O&M Manual information for the system that will be submitted to the Township and operator for review.
• UV Disinfection System – The temporary channel was delivered to the Township on August 24. As of August 15, Glasco stated about 3-4 weeks were still needed for fabrication of the UV modules before delivery, and we are awaiting a definitive delivery date.
The contractors, Lenni and Zimmerman, provided their bonds and insurance documents. All were found acceptable. The contracts were subsequently executed.
A pre-construction meeting with both contractors, John Laidley (controls contractor), Big Fish, Pennoni, and the Township was held on August 15. The 1st Notice to Proceed letters for the temporary work will be issued within the upcoming week.
We coordinated with vendors and obtained cost quotes for the jib crane and the bypass pumps with control boxes. We obtained three quotes for the jib crane, and we understand the Township has placed an order. We obtained two quotes for the purchase of two submersible pumps and control boxes, and we are awaiting a third at the time of this report. Purchasing is less expensive than renting for the expected 5-month duration of construction. The lead times for the jib crane and pumps are 3- 4 weeks after orders are placed.
An updated tentative construction schedule follows:
o 1st Notice to Proceed to Contractors: Temporary Bypass Work – September 11-12, 2023 o Initiate Temporary Bypass Work – Week of September 11, 2023 o Delivery of Permanent UV Equipment – Mid-September 2023 o Delivery of Jib Crane and Bypass Pumps – Early-Mid October 2023 o Complete Temporary Bypass Work and Initiate Use of Bypass System – November 8, 2023 o Two Week Trial and Sampling of Temporary Bypass System – November 8-22, 2023 o Township to Perform Concrete Channel Work – November 27, 2023-January 18, 2024 o 2nd Notice to Proceed to Contractors: Permanent Work – January 19, 2024 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – February 29, 2024 o Two Week Trial of New UV System in Permanent Channel – February 29-March 14, 2024 o Install Second UV Module into Permanent Channel – March 18, 2024 o Two Week Trial of Second New UV System in Permanent Channel – March 19-April 2, 2024 o Construction Completed – Early April 2024
EGMAU23001 September 8, 2023 Page 2 East Goshen Municipal Authority Engineer’s Report
P:\Projects\EGMA\Memos to Board\2023\Engineers Report 2023-09-08.docx
• Generator #2 Replacement – Premium Power Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we expect delivery of the entire system around January 2024. We have initiated design for the electrical installation and are evaluating the need for slab replacement/modifications. We will prepare a slab design if needed.
• Operating Cost Analysis – We are continuing to coordinate with Scott Towler for the evaluation of industry WWTP operating costs in an effort to benchmark RCSTP costs against other similar WWTPs.
Sanitary Sewer Pipe Rehab
• Chester Creek Sewer Rehab – The bid went live on PennBID on August 17, and a virtual pre-bid meeting occurred on August 23. We responded to bidders’ questions and issued one addendum. Bids were opened on PennBID on September 7. There were 3 bids. We provided an award recommendation and bid tabulation.
• Hershey’s Mill Estates – Punchlist work and permanent restoration is ongoing, and we have been performing part-time construction observation.
• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.
New Connections
• 1010 Hershey Mill Road (Moser) – We reviewed revised Land Development Plans and provided comments on the proposed sanitary sewer extension. We met virtually thereafter with the design consultant to discuss resolution of the comments.
• 301 Reservoir Road (5-Lot Residential Subdivision) – No activity since our last report.
• 1712 E. Boot Road – No activity since our last report.
• 14 Reservoir Road – No activity since our last report.
END OF REPORT
RCSTP Monthly Operations Report
September 2023
Executive Summary The Ridley Creek sewage treatment plant outfall 001 has met all effluent limitations regarding water quality for August 2023. All supplemental reports were submitted for July 2023 with the eDMR Discharge to the Applebrook irrigation lagoon being discontinued on August 19th. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes decreased slightly to a daily average of 68.6 from the previous average of 71.6 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Table 1
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for August 2023. The monthly average total phosphorus was reported as 0.12 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The average TSS is reported as 5.8 mg/L compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment performed well during August. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS, and total phosphorus. Daily analysis of the final effluent flow equalization grabs samples for total
Flow
MGD
Average mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month
Geo
Mean
Geo
Mean
0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000
Inst. Max 20 94 15 94 5 1
Sample Date
August 1, 2023 0.238 2.0 4.0 7.18 14.3 8.8 17.5 0.10 0.20 0.11 0.22 1 0.0000
August 8, 2023 0.252 2.0 4.2 7.39 15.5 6.0 12.6 0.10 0.21 0.10 0.21 2 0.3010
August 15, 2023 0.227 2.0 3.8 6.50 12.3 5.6 10.6 0.10 0.19 0.11 0.21 4 0.6021
August 22, 2023 0.295 2.0 4.9 6.95 17.1 4.8 11.8 0.10 0.25 0.17 0.42 1 0.0000
August 29, 2023 0.285 2.0 4.8 8.28 19.7 4.0 9.5 0.10 0.24 0.11 0.26 2 0.3010
Average 0.259 2.0 4.3 7.26 15.8 5.8 12.4 0.10 0.22 0.12 0.26 2 0.2408
Minimum 0.227 2.0 3.8 6.50 12.3 4.0 9.5 0.10 0.19 0.10 0.21 1 0.0000
Maximum 0.295 2.0 4.9 8.28 19.7 8.8 17.5 0.10 0.25 0.17 0.42 4 0.6021
Fecal Coliform
August 2023- Final Effluent - Outfall 001
NPDES Permit
Discharge
Limitations
CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus
Page 2 of 4
phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Discharge to the Applebrook irrigation lagoon, outfall 002 discontinued on August 19th.
Table 2 illustrates the final effluent composite sample data reported for outfall 002 for August 2023.Table 2
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be within the design parameters for the treatment process.
Table 3 presents the pollutant data for the influent wastewater collected at the doghouse manhole during August 2023.
Table 3
Flow
MGD
Average mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month
Geo
Mean
Geo
Mean
0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000
40 45
August 1, 2023 0.0367 2.0 0.6 7.18 2.20 8.80 2.69 0.10 0.20 0.11 0.22 1 0.0000
August 8, 2023 0.0381 2.0 0.6 7.39 2.35 6.00 1.91 0.10 0.21 0.10 0.21 2 0.3010
August 15, 2023 0.0346 2.0 0.6 6.50 1.88 5.60 1.62 0.10 0.19 0.11 0.21 4 0.6021
August 22, 2023 0.0000
August 29, 2023 0.0000
Average 0.0219 2.0 0.61 7.02 2.14 6.80 2.07 0.10 0.20 0.11 0.21 2 0.3010
Minimum 0.0000 2.0 0.58 6.50 1.88 5.60 1.62 0.10 0.19 0.10 0.21 1 0.0000
Maximum 0.0381 2.0 0.64 7.39 2.35 8.80 2.69 0.10 0.21 0.11 0.22 4 0.6021
Phosphorus,Total
August 2022 - Applebrook - Out Fall 002
NPDES Permit
Discharge
Limitations
CBOD5 Total Nitrogen TSS NH4-N Fecal Coliform
Flow
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
August 1, 2023 0.271 188 424 206 465 250 564 41.9 95 61.0 138 6.0 13.5
August 8, 2023 0.307 165 422 190 486 198 507 44.5 114 58.1 149 7.03 18.0
August 15, 2023 0.239 210 419 182 363 196 391 44.0 88 56.0 112 6.01 12.0
August 22, 2023 0.310 208 538 285 738 238 616 41.6 108 57.0 148 6.24 16.1
August 29, 2023 0.288 231 556 211 508 230 553 54.6 131 74.0 178 7.62 18.3
Average 0.283 200 472 215 512 222 526 45.3 107 61.2 145 6.57 15.6
Minimum 0.239 165 419 182.0 363 196 391 41.6 88 56.0 112 5.97 12.0
Maximum 0.310 231 556 285 738 250 616 54.6 131 74.0 178 7.62 18.3
MGD
Average
August 2023 - Influent Wastewaster
Design Basis
BOD5 CBOD5 TSS NH4-N TKN, mg/L
Phosphorus,Total
, mg/L
Sample Date
Page 3 of 4
The foam on the SBR surface remained consistent during August, with approximately 5% to 15% coverage of the surface area. The foam thickness is approximately 2 inches and is light to medium brown. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio 0.06 while ensuring the ammonia effluent discharge concentration remains within the 2.5 mg/L seasonal limits.
PA DEP
No activity
Pennoni Associates
Correspondence, emails, and review of plans and documents for the UV system.
Significant Rainfall
During August, there were eight (8) days when rainfall occurred and three (3) days where rainfall exceeded 0.5 inches in 24 hours.
August 7th 0.52 inches
August 8th 0.62 inches
August 11th 0.52 inches
The total rainfall for August was a total 2.55 inches.
Chemical Data
August 2023
Chemical Daily Average Total Monthly
Soda Ash, pounds 300 9,300
Aluminum Sulfate solution, gal 68.6 2,127
Sludge Dewatering, gal* 16,032 384,773
*24 days of sludge dewatering
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Page 4 of 4
Flow Data
August 2023
Flow Meter Location Total Volume for
Month, MG
Average Daily
Flow, gpd
Daily Maximum
Flow, gpd
Influent Wastewater to
Screening Building* 9.152 295,230 363,490
Influent Wastewater to
SBRs* 11.507 371,201 455,713
Internal Recycle** 2.355 75,972 101,246
Treated Effluent to Disc
Filters 11.221 361,961 484,096
Final Effluent Discharge
8.182 264,000 346,000
Applebrook Golf Course 0.556 35,397 41,664
MA 8-14-23 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 August 14, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 August 14, 2023 at 7:00 pm. at the Township Building. Members in attendance are indicated in 7 BOLD: 8 Kevin Cummings, Chairman 9 Dana Pizarro, Vice Chairman 10 Jack Yahraes 11 Carmen Battavio 12 Walter Wujcik 13 14 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 15 representative), Ellen Koopman (Attorney), Dave Ware (Finance Director), and Michael Lynch 16 (Township Supervisor). 17 18 19 COMMON ACRONYMS: 20 ATS – Automatic Transfer Switch 21 BFES – Big Fish Environmental Services MA- Municipal Authority 22 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 23 CB – Conservancy Board PC – Planning Commission 24 DEP – Department of Environmental Protection PM – Prevention Maintenance 25 EPA – Environmental protection Agency PR – Park & Recreation Board 26 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 27 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 28 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 29 PWD – Public Works Department WAS – Waste Activated Sludge 30 31 Call to Order & Pledge of Allegiance 32 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 33 He asked for a moment of silence for our First Responders and Military. 34 He asked if anyone would be recording the meeting. There was no response. 35 36 37 Chairman’s Report 38 None 39 40 41 SEWER REPORTS 42 1. Director of Public Works, Mark Miller’s report for August 14, 2023 43 44 Monthly Flows – The average daily flow to West Goshen was 742,524 gallons per day. 45 46 Meters: The meters were read on a daily basis. We had a power problem with the Hibberd Lane 47 meter and had to reboot to get it back in operation. 48 49
MA 8-14-23 draft 2
1 2 C.C. Collection: 3 Pumping stations were checked on a daily basis with no problems to report. We did have a power 4 failure on the Ashbridge station for an extended period of time. We replaced lids and castings on 5 Killern Lane (3) and Parry Circle (2) as part of our paving program. 6 7 C.C. Interceptor: Routine mowing and manhole inspections were performed. 8 9 R.C. Collection: The pumping stations were checked on a daily basis. We had no problems for the 10 month. We replaced 57 castings and lids in the Bowtree Development as part of our paving program. 11 12 Ridley Creek Plant: 13 We had to pull the utility water pump for Applebrook golf course. It appears that a metal object was 14 sucked up into the pump causing extensive damage. 15 16 Alarms: 27 were received, most due to power failures from storms 17 18 PA 1 Calls: 68 for the month 19 20 Monthly Rainfall: 7.65 inches of rain for the month of July. 21 22 Lateral Repairs or Caps: Replaced 16 in Bowtree and 7 on the Chester Creek system. 23 24 25 2. Pennoni Engineer’s Report dated August 11, 2023 26 27
Ridley Creek Sewage Treatment Plant (RCSTP) 28
• Caustic Soda Conversion – We received the 60-day Temporary Tank Permit from PADEP on 29 July 21, 2023. Once the outdoor emergency shower is installed, the tank can be put into 30 operation. 31
• UV Disinfection System – The system is being fabricated, and delivery was previously 32 scheduled for mid-August 2023. We are awaiting a definitive delivery date from the vendor. 33
The general and electrical construction contract bids were awarded at a Special MA Meeting 34 on July 27. Lenni was awarded the electrical contract, and Zimmerman was awarded the 35 general contract. We notified them of the awards, and they are preparing their bonds and 36 insurance documents. Upon receipt of those documents, the contract will be executed and the 37 1st Notice to Proceed will be issued. To be prepared for construction to commence 38 immediately upon NTP, a pre-construction meeting with both contractors, John Laidley 39 (controls contractor), Big Fish, Pennoni, and the Township is scheduled for August 15. 40
Additionally, we met with Chas (Public Works) on August 9 at the RCSTP to go over the 41 concrete structural work the Township will complete for the project. 42
MA 8-14-23 draft 3
We obtained the attached quotes from Rain for Rent to purchase vs. renting pumps that will 1 be temporarily set in the filter tanks to bypass flow to the temporary UV channel. We asked 2 the supplier to confirm their quote and Costars pricing, and we are awaiting a revised 3 submission. The intention is to purchase three pumps (one for each filter and one back-up) 4 rather than rent due to a minimal cost different between purchasing and renting and to 5 mitigate cost risk if the project takes longer than planned and the rental period has to be 6 extended. 7
We also obtained the attached quote for the crane and hoist for which we are also following 8 up with the vendor on Costars affiliation before recommending approval. 9
An updated tentative construction schedule follows: 10
o 1st Notice to Proceed to Contractors: Temporary Bypass Work – August 21, 2023 11 o Delivery of UV Equipment – Mid-August 2023 12 o Complete Temporary Bypass Work and Initiate Use of Bypass System – October 23, 2023 13 o Two Week Trial and Sampling of Temporary Bypass System – October 23-November 3, 2023 14 o Township to Perform Concrete Channel Work – November 6-December 28, 2023 15 o 2nd Notice to Proceed to Contractors: Permanent Work – December 29, 2023 16 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – January 29, 2024 17 o Two Week Trial of New UV System in Permanent Channel –January 29-February 9, 2024 18 o Install Second UV Module into Permanent Channel – February 12, 2024 19 o Two Week Trial of Second New UV System in Permanent Channel – February 13-27, 2024 20 o Construction Completed – Early March, 2024 21
• Generator #2 Replacement – No activity by Pennoni since our last report. Premium Power 22 Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. 23 The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we 24 expect delivery of the entire system around January 2024. We plan to initiate design for the 25 electrical installation and any slab replacement/modifications in the next month. 26
• Operating Cost Analysis – We are coordinating with Scott Towler for the evaluation of 27 industry WWTP operating costs in an effort to benchmark RCSTP costs against other similar 28 WWTPs. 29
Sanitary Sewer Pipe Rehab 30
• Chester Creek Sewer Rehab – We are finalizing the bid document for inspection and 31 rehabilitation of the interceptor sewers from East Strasburg Road to the Westtown Way meter 32 pit. The bid approach follows: 33
1. The sewers highlighted in yellow on the attached “Quad Map 3” exhibit were TV’d by 34 Township Public Works earlier in 2023. Specific repairs are included in the Base Bid 35 based upon that TV inspection including full-length cured-in-place pipe lining of the 36 sewer from MH C027 to C026, manhole and pipe injection grouting in several isolated 37 locations to seal leaks, removal of asphalt debris, and a top hat seal at a leaking lateral 38 connection to the main. One lateral will also be TV’d as part of the contract to locate 39 the source of heavy clean water, and we are including pipe lining of that lateral as a 40 bid item should that repair be determined necessary after the contractor TVs the 41
MA 8-14-23 draft 4
lateral. 1
2. The Base Bid also includes cleaning and TV’ing of the interceptor sewers downstream 2 of MH C026 all the way to the Westtown Way meter pit. Those sewers are depicted in 3 the purple in the exhibit (disregard the purple sewers upstream of MH C035; those are 4 not in the scope). We will review the TV investigations as they are performed by the 5 contractor and determine necessary repairs. 6
3. Since repairs in those downstream sewers will not be known until the contractor 7 performs the TV’ing, the bid document includes numerous Add Items for typical 8 repairs to obtain competitive pricing. Bid quantities for those items, such as pipe lining 9 and manhole grouting, are based on the same percentage of repairs needed for the 10 yellow highlighted sewers. This approach will allow for competitive pricing, and for 11 the Township to commission as many repairs as possible within the available budget 12 once TV’ing is completed. 13
4. Supplee Valley pipe lining is NOT included in this bid document since the available 14 budget for that will not be known until the Chester Creek interceptor work is 15 completed. If there is remaining budget after the Chester Creek interceptor work, a 16 separate solicitation will then be put out for Supplee Valley sewers. 17
The proposed project schedule follows: 18
o Advertisements – August 16 and 21 19 o Bids Due – September 5 20 o Award Consideration – September 11th BOS meeting 21 o Construction – October thru December 22
• Hershey’s Mill Estates – No activity since our last report. Punchlist work and permanent 23 restoration remain to be completed. The contractor previously stated they would perform the 24 remaining work in September, and we have reached out to them for a more definitive 25 schedule. 26
• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared 27 and will be submitted to PADEP in follow-up to the emergency authorization now that 28 construction has been completed. 29
New Connections 30
• 1010 Hershey Mill Road (Moser) – We reviewed the PADEP Sewage Facilities Planning 31 Mailer. The Mailer has been found acceptable, and it was signed by the Township. It has been 32 returned to the Design Consultant to submit to PADEP. The Applicant also submitted revised 33 Land Development Plans, and we are currently reviewing the sanitary sewer design on those 34 plans. 35
• 301 Reservoir Road (5-Lot Residential Subdivision) – No activity since our last report. 36
• 1712 E. Boot Road – We reviewed PADEP Sewage Facilities Planning Mailer, which was 37 found acceptable and was subsequently signed by the Township. It has been returned to the 38
MA 8-14-23 draft 5
Applicant to submit to PADEP. 1
• 14 Reservoir Road – No activity since our last report 2
3 3. Big Fish Environmental Services – 4 The Ridley Creek sewage treatment plant outfall 001 has met all effluent limitations regarding water 5 quality for July 2023. All supplemental reports were submitted for the month of June 2023 with the 6 eDMR. Discharge to the Applebrook irrigation lagoon continued throughout June. Chemical usage 7 utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution 8 volumes remained consistent at a daily average of 71.6 to achieve phosphorus removal. No 9 significant mechanical or operational issues were observed during the sludge dewatering equipment 10 or SBR treatment process. Sludge dewatering experienced some mechanical issues impacting 11 production. There were no odor complaints during the month. 12 13 Approval of Minutes 14 The minutes of the regular July 10, 2023 meeting were approved. The minutes for the special 15 meeting on July 27, 2023 were approved as amended. 16 17 18 Approval of Invoices 19 1. Jack moved to approve payment of the following Pennoni invoices: 20 a. Pennoni Invoice #1181046 $ 2,900.00 21 b. Pennoni Invoice #1181152 $ 5,626.50 22 Walter seconded the motion. The motion passed unanimously. 23 24 2. Walter moved to approve the Gawthrop Greenwood invoices: 25 a. Invoice #275334 $ 348.50 26 b. Invoice #27923 $1,791.50 27 Jack seconded the motion. The motion passed unanimously. 28 29 3. Walter moved to approve payment of the JWC Environmental invoice #COSTARS#391243 in 30 the amount of $16,542.00. Jack seconded the motion. The motion passed unanimously. 31 4. Jack moved to approve payment of the Geiger invoice #Q-230706-12576-L6-0 in the amount of 32 $12,809.50. Walter seconded the motion. The motion passed unanimously. 33 5. Jack moved to approve payment of the BDS (RCSTP pump) invoice #RFQ 6816910 in the 34 amount of $17,625.00. Walter seconded the motion. The motion passed unanimously. 35 6. Walter moved to approve payment of the Chester County Coating invoice #38775 in the amount 36 of $209.00 (paid). Jack seconded the motion. The motion passed unanimously. 37 38 Liaison Reports 39 1. Conservancy Board – Walter reported that the Board received a proposal from CRC Watersheds to 40 plant 125 trees in Applebrook. They will give their presentation to the Board of Supervisors at their 41 meeting tomorrow. 42 1. Board of Supervisors – Mike Lynch reported that David Woodward, Public Works Director for 43 West Goshen passed away. 44 45 46
MA 8-14-23 draft 6
Financial Reports 1 Dave Ware presented the following report: 2 Year to date July 2023, the Municipal Authority recorded $484,172 in revenues (primarily from 3 Sewer Operating and Sewer Capital Reserve transfers and tapping fees) and $528,226 in expenses 4 (Engineering Services, Audit fees, Administrative Wages, Hershey’s Mill Estates Sewer costs, 5 Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital 6 improvements to the Westtown Way Pump station, auditor and legal fees). The net result of 7 operations of ($44,054). As of July 31, 2023, the fund balance was ($38,882). This negative 8 balance is a function of balance versus cash reporting. There is $46,977 in invoices being held so the 9 actual cash balance is $8,094. 10 11 Old Business 12 None 13 14 Goals 15 The Goals were reviewed. 16 17 New Business – 18 New Equipment at Ridley Creek Plant: 19 1. Jack moved to approve Pennoni’s request for a supplement of $4,000 to cover costs for the UV re- 20 bid project. Walter seconded the motion. The motion passed unanimously. 21 22 Capacity Requests - None 23 24 Any Other Matter – 25 1. Willistown residents, Julie Frissora and Beau Pettinos were present at this meeting. Willistown is 26 working to form a Municipal Authority, so they came to see how East Goshen’s MA operates. Kevin 27 welcomed them and commented that East Goshen is willing to assist them. 28 29 Correspondence- None 30 31 32 Public Comment - None 33 34 35 Adjournment 36 There being no further business Walter moved to adjourn the meeting. Jack seconded the motion. 37 The motion passed unanimously. The meeting was adjourned at 8:00 pm. 38 The next regular meeting will be held on Monday, September 11, 2023 at 7:00 pm. 39 40 Respectfully submitted, 41 42 43 Ruth Kiefer, Recording Secretary 44
LEC
LENNI ELECTRIC
CORPORATION
1020 Andrew Drive
West Chester PA 19380
610-436-9922
Service Invoice
Invoice#: 230571
Date: 05/31/2023
[Stamp: PAID]
Billed To:
East Goshen Township
1580 Paoli Pike
West Chester PA 19380
Project: 32353
RIDLEY CREEK STATION
1751 TOWN DR.
WEST CHESTER PA 19380
| Scheduled: | Time: | Employee: | Order#: |
|---|---|---|---|
| 04/07/2023 |
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| RIDLEY CREEK STATION PIPING FOR CAUSTIC SODA TANK 4-7-23, 4-10-23, 4-11-23, 4-12-23, 4-13-23, 4-20-23, 4-21-23, 4-24-23 4-25-23, 4-26-23, 4-27-23, 4-28-23, 5-3-23, 5-4-23, 5-11-23 RAN 1" RIGID PIPE FOR CAUSTIC SODA TANK; RAN DATA CONDUIT FOR CONTROL ROOM; CORE HOLES AND RELOCATE PIPE FOR CAUSTIC SODA TANK AND COMPLETED PIPING OUTSIDE; PULLED ALL WIRE; INSTALLED DEVICES; WIRED CONTROL PANELS; INSTALLED UNISTRUT FOR PLUMBING CONDUITS; RAN CONDUITS FOR HOSE LINES; COMPLETE. |
||||
| ELECTRICIAN | HR | 113.00 | 90.00 | 10,170.00 |
| APPRENTICE | HR | 101.00 | 72.00 | 7,272.00 |
| LABORER | HR | 12.00 | 70.00 | 840.00 |
| THQB GFT BREAKER | EA | 1.00 | 156.25 | 156.25 |
| THQB GFEP BREAKER | EA | 1.00 | 196.25 | 196.25 |
| MISC. HARDWARE | LS | 1.00 | 15.90 | 15.90 |
[Stamp / Notation:
APPROVED BY: MSM
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1520
Capital Project]
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
| Description | Amount |
|---|---|
| Non-Taxable Amount: | 18,930.40 |
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due: | 18,930.40 |
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
Service Invoice
Continued...
Invoice#: 230571
Date: 05/31/2023
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| SERVICE TRUCK | DY | 7.00 | 40.00 | 280.00 |
Notes:
Page 2 of 2
Memo
To: Municipal Authority
From: Dave Ware
Re: MA August 2023 YTD Financial Report
Date: September 7, 2023
YTD August 2023, the Municipal Authority recorded $514,158 in revenues (primarily from Sewer Operating transfers, Sewer Capital Reserve transfers, and tapping fees) and $510,928 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station, auditor and legal fees). The net result of operations is $3,229. As of August 31, 2023, the fund balance was ($38,575). This negative balance is a function of balance versus cash reporting. There is $46,977 in invoices being held so the actual cash balance is $3,229.
Attached is a complete list of 2023 full year MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
August 2023
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 164.53 | 2.22 |
| 07-354-0400 | DCED GRANT | 152,980.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0.00 | 2,300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 2,000.00 | 4,882.72 | 897.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,000.00 | 563.76 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 282.24 | 282.24 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 100,000.00 | 65,023.00 | 62,393.85 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1,471,553.00 | 443,241.34 | 122,672.22 |
| Total Revenue | 1,730,115.24 | 514,157.59 | 189,112.13 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 32,055.45 | 19,343.25 | 16,744.10 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,748.79 | 1,655.25 | 1,665.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 10,815.00 | 10,500.00 | 10,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 47,250.00 | 25,522.00 | 32,927.75 |
| 07-424-3140 | LEGAL SERVICES | 8,400.00 | 5,432.50 | 4,340.00 |
| 07-424-7440 | R.C. CAPITAL-STP | 355,793.00 | 0.00 | 0.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 488,847.00 | 0.00 | 0.00 |
| 07-426-3001 | RELINING | 260,000.00 | 0.00 | 0.00 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 0.00 | 0.00 | 2,215.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 0.00 | 0.00 | 11,493.05 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 78,000.00 | 10,240.62 | 29,390.17 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 0.00 | 0.00 | 1,870.00 |
| 07-429-1505 | RCSTP CAPITAL | 260,000.00 | 115,446.16 | 84,032.62 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 0.00 | 90,113.64 | 0.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 50,412.49 | 0.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 187,206.00 | 182,262.24 | 0.00 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 0.00 | 0.00 | 212.99 |
| Total Expenses | 1,730,115.24 | 510,928.15 | 195,140.93 | |
| Net Result From Operations | 0.00 | 3,229.44 | -6,028.80 | |
Municipal Authority
YTD Revenues and Expenses thru 8/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/23 | Revenue Journal | INTEREST EARNED JAN 2023 | 2.65 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/23 | Revenue Journal | INTEREST EARNED FEBRUARY 2023 | 6.32 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/23 | Revenue Journal | INTEREST EARNED MARCH 2023 | 23.37 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/23 | Revenue Journal | INTEREST EARNED APRIL 2023 | 12.47 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/23 | Revenue Journal | INTEREST EARNED MAY 2023 | 32.83 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/23 | Revenue Journal | INTEREST EARNED JUNE 2023 | 67.17 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/23 | Revenue Journal | INTEREST EARNED JULY 2023 | 10.61 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/23 | Revenue Journal | INTEREST EARNED AUGUST 2023 | 9.11 |
| 07-364-1110 | R.C.TAPPING FEES | 01/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 02/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 03/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 04/03/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 05/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/28/23 | Revenue Journal | TAP IN FEE 1712 E BOOT RD | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 06/28/23 | Revenue Journal | SEWER INSPECTION FEE 1712 E BOOT RD | 500.00 |
| 07-364-1110 | R.C.TAPPING FEES | 07/03/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/27/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12838 | 281.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 03/23/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12839 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/27/23 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 03/23/23 | Revenue Journal | PINE ROCK INTEREST PORTION - PAPPANO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/20/23 | Revenue Journal | XFER TO 07 FROM 05 RE: MA EXPENSES | 3,384.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 05-SEWER | 14,572.43 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/31/23 | Revenue Journal | XFER $ FROM 05 TO 07 RE: MA EXPENSES | 3,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/17/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 36,455.37 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 2,877.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/22/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 715.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 880.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/24/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 6,738.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/29/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/31/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,944.84 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/17/23 | Revenue Journal | FROM 05 SEWER OP TO 07 MA | 4,992.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 707.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,627.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/08/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,253.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/30/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 10,398.41 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/13/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,041.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/08/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 60.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/24/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,040.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/12/23 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER CAP.EXP. | 41,381.95 |
Page 1 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/20/23 | Revenue Journal | XFER TO 07 FROM 09 RE: MA EXPENSES | 11,730.76 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 09- SEWER CAP | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/10/23 | Revenue Journal | FROM 09 SEWER CAP RESERVE TO 07 MA | 115,362.26 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/23/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,690.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/01/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 20,201.84 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/09/23 | Revenue Journal | XFER $ TO 07 FROM 09 | 1,264.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/22/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,961.86 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/24/23 | Revenue Journal | XFER TO 07 FROM 09 RE: EXPENSES | 11,080.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/29/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/05/23 | Revenue Journal | XFER FROM 09 SEWER OP TO 07 MA | 1,041.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/21/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 977.06 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/25/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,801.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/26/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 252.28 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/28/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 688.81 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/04/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,069.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/10/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,953.58 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/19/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 66,899.98 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/08/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 56,078.05 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/13/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 450.18 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/20/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 888.22 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/03/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,746.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/11/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 209.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/13/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 824.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/08/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 22.12 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/24/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,626.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/31/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 18,930.40 |
| Total Revenue | 514,157.59 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/31/23 | Pay Check: 3402 | 23-00878 QTR 1 2023 MA CHARGE BACK | 8,944.84 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/30/23 | Pay Check: 3431 | 23-01745 QTR 2 2023 MA CHARGE BACK | 10,398.41 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/22/23 | Pay Check: 3395 | 23-00707 2023 ANNUAL DAILY DISCHARGE CA | 715.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/23/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 880.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 08/08/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 60.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 02/15/23 | Pay Check: 3389 | 23-00406 PROGRESS BILLING EGT MUA123122 | 1,793.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/29/23 | Pay Check: 3401 | 23-00870 PROGRESS BILLING AUD EGT MUA | 8,000.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/10/23 | Pay Check: 3417 | 23-01270 PROGRESS BILLING AUDIT EGT MUA | 707.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/20/23 | Pay Check: 3379 | 23-00111 SERV.THRU 12/18/22 GEN.SERV.22 | 3,384.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/23/23 | Pay Check: 3392 | 23-00443 SERV THRU 011523 GEN SERVICES | 2,294.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00816 SERV THRU 021223 CHAPTER 94 RE | 2,246.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00815 SERV THRU 021223 GENERAL SERVI | 3,482.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01018 SERV THRU 031923 GENERAL SERVI | 2,614.75 |
Page 2 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01019 SERV THRU 031923 CHAPTER 94 RE | 1,654.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01302 SERV THRU 041623 2023 GEN SERV | 3,663.25 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01303 SERV THRU 041623 2022 CHAPT 94 | 1,377.25 |
| 07-424-3130 | ENGINEERING SERVICES | 06/08/23 | Pay Check: 3425 | 23-01576 SERV THRU 051423 2023 GEN SERV | 1,253.25 |
| 07-424-3130 | ENGINEERING SERVICES | 07/13/23 | Pay Check: 3435 | 23-01882 SERV THRU 061823 2023 GEN SERV | 651.50 |
| 07-424-3130 | ENGINEERING SERVICES | 08/24/23 | Pay Check: 3437 | 23-02177 SERV THRU 071623 2023 GEN SERV | 2,900.00 |
| 07-424-3140 | LEGAL SERVICES | 02/23/23 | Pay Check: 3391 | 23-00442 LEGAL SERV. JAN 2023 GEN AUTH | 583.00 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00812 LEGAL SERV FEB 2023 GEN AUTHOR | 389.50 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00813 LEGAL SERV DEC 2022 GEN AUTHOR | 620.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01020 LEGAL SERV MARCH 2023 GEN AUTH | 431.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01017 LEGAL SERV FEB 2023 GEN AUTH | 292.50 |
| 07-424-3140 | LEGAL SERVICES | 05/10/23 | Pay Check: 3419 | 23-01304 LEGAL SERV APRIL 2023 GEN AUTH | 587.00 |
| 07-424-3140 | LEGAL SERVICES | 07/13/23 | Pay Check: 3434 | 23-01883 LEGAL SERV MAY 2023 GEN AUTH | 389.50 |
| 07-424-3140 | LEGAL SERVICES | 08/24/23 | Pay Check: 3436 | 23-02176 LEAL SERV JUNE 2023 GEN AUTH | 348.50 |
| 07-424-3140 | LEGAL SERVICES | 08/24/23 | Pay Check: 3436 | 23-02175 LEGAL SERV JULY 2023 GEN AUTH | 1,791.50 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00110 SERV.THRU 12/18/22 HM EST SEWR | 9,690.50 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/06/23 | Pay Check: 3385 | 23-00331 STONE, AASHTO #57 | 550.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3377 | 23-00030 CONDUITS, STRAPS, LOCKNUTS + | 1,161.95 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3378 | 23-00075 PULSAFEEDER - RCSPT CAUSTIC SO | 40,220.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00109 SERV.THRU 12/18/22 RCSTP SODA | 861.51 |
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00112 SERV.THRU 12/18/22 RCSTP UV | 1,178.75 |
| 07-429-1505 | RCSTP CAPITAL | 01/27/23 | Pay Check: 3380 | 23-00151 HELIFLOW 408 PD BLOWER | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/06/23 | Pay Check: 3384 | 23-00305 50HP 3540RPM BALDOR MOTOR | 4,683.69 |
| 07-429-1505 | RCSTP CAPITAL | 03/24/23 | Pay Check: 3399 | 23-00817 SERV THRU 021223 RCSTP CAU SOD | 4,144.21 |
| 07-429-1505 | RCSTP CAPITAL | 03/29/23 | Pay Check: 3400 | 23-00827 HELIFLOW 408 LHBD BLOWER | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3422 | 23-01548 UV DISINFECTION SYS PYMT-30% | 40,495.80 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3425 | 23-01575 SERV THRU 051423 RCSTP UV REPL | 5,770.00 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3425 | 23-01573 SERV THRU 051423 RCSTP CAU SOD | 37.25 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/23 | Pay Check: 3435 | 23-01881 SERV THRU 061823 RCSTP CAU SOD | 824.50 |
| 07-429-1505 | RCSTP CAPITAL | 08/24/23 | Pay Check: 3437 | 23-02178 SERV THRU 060823 RCSTP UV REPL | 5,626.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00148 | 6,904.64 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00364 | 430.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00429 | 1,708.22 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00412 | 17,817.91 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00411 | 3,771.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00381 | 6,498.99 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00415 | 4,866.25 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00153 | 2,642.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00152 | 5,025.79 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/23/23 | Pay Check: 3392 | 23-00444 SERV THRU 011523 HM ESTATES SW | 8,690.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00536 STONE, AASHTO #57 329.79 TON | 8,244.78 |
Page 3 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00534 STONE, AASHTO #57 251.05 TON | 6,276.27 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00535 STONE, AASHTO #57 227.23 TON | 5,680.79 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00582 SPLIT COUPLERS | 305.40 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00581 SEWER HUB ADAPTERS,COUPLERS + | 959.56 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3396 | 23-00723 36" MARMAC POLYSEAL COUPLER | 803.20 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00731 JOHN DEERE 550K RENTL 2/28-3/1 | 434.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00730 JOHNDEERE 550K RENTL 2/23-2/24 | 724.16 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/24/23 | Pay Check: 3399 | 23-00814 SERV THRU 021223 HM ESTATES SE | 6,936.75 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | 1,407.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | -14.07 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3403 | 23-00889 VARIOUS PURCHASES- SEE NOTES | 215.75 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3404 | 23-00906 ROD 5/8 X 20 FT-CAUSTIC SODA | 826.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | 441.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | -4.41 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01056 GALV CAP, GFCI RCPT, GREY COVR | 168.21 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01057 GALV CAP, STEEL CLAMPBACK | 372.26 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3409 | 23-01131 PVC CONDBY, DEV BOX, CTD CPLG | 890.32 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01112 (30) BUSS FUSES | 2,160.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01144 GALV BLCK CAP,COMPRESSION CPLG | 286.08 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01128 IRON THRDED T BODY, SHEET STEE | 72.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/26/23 | Pay Check: 700 | 23-01151 CAUSTIC SODA-(2) HVY DUTY TARP | 252.28 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01177 BLINE SS CHANNEL SLOTTED HOLES | 374.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01176 EMT HW STRAP,MACH SCREW ANCHOR | 233.47 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01175 GALV RED CAP, COMM SWITCH, | 81.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3413 | 23-01225 PVC BELL END PIPE, PVC COUPLNG | 2,574.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3414 | 23-01227 10 YD CONCRETE 4500 PSI | 1,930.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01219 (30) BLINE EMT-HW STRAP | 83.82 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01212 OUTLET BOX, SS SWITCH,HW STRAP | 481.70 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01276 SCH 40 2" PIPE, 2" COUPLING | 1,030.64 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01275 CORP BALL STOP, SERVICE SADDLE | 905.59 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3418 | 23-01295 TAYMAC GRY METAL INUSE COVER | 17.35 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3423 | 23-01553 RC WWTP CHEMICAL STORAGE TANK | 6,415.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3424 | 23-01554 RIDLEY CREEK-RAN CONDUIT | 2,008.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3424 | 23-01555 RIDLEY CR-RAN CONDUIT FOR TANK | 1,352.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/13/23 | Pay Check: 3428 | 23-01617 BALL CORP STOP,BRASS THRD NIPL | 450.18 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/20/23 | Pay Check: 3429 | 23-01658 BRASS THREADED NIPPLE&COUPLING | 57.22 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/20/23 | Pay Check: 3430 | 23-01654 PULSAFEEDER TUBING & KOPKIT | 831.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 07/03/23 | Pay Check: 3432 | 23-01739 RC WWTP CHEMICAL STORAGE TANK | 6,746.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 07/11/23 | Pay Check: 3433 | 23-01860 GATE & POST- BLAST PRIMER | 209.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 08/08/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 22.12 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 08/31/23 | Pay Check: 3438 | 23-02291 RC PIPING FOR CAUSTICSODA TANK | 18,930.40 |
Page 4 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-6100 | WEST GOSHEN CAPITAL | 02/06/23 | Pay Check: 3383 | 23-00366 WWPS PYMT LAST INSTALLMENT | 115,362.26 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 06/12/23 | Pay Check: 3426 | 23-01363 2022 WG SEWER AUTH BOND FUND E | 19,143.34 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 06/12/23 | Pay Check: 3427 | 23-01364 2022 WG SEWER AUTH TAPPING FEE | 47,756.64 |
| Total Expense | 510,928.15 | ||||
| Net Operating | 3,229.44 |
Page 5 of 5
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713
T: 302-655-4451 F: 302-654-2895
www.pennoni.com
September 8, 2023 EGMAU23001 Mark Miller Director of Public Works East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Re: Award Recommendation Chester Creek Interceptor Inspection and Repair, Contract No. CCSS-2023 Dear Mr. Miller: We have tabulated the bids received through PennBid on September 7, 2023 for the referenced contract. The bid tabulation is attached. As reflected in the bid tabulation, the low bidder for the Base Bid is Insituform Technologies, LLC, who submitted a Total Base Bid of $214,850.00. The low bidder for the Total Base Bid AND all Add Items is Vortex Services, LLC, who submitted a Total Bid of $455,112.00. We understand the available budget for this project is $260,000.00. Therefore, we recommend that only the Base Bid be awarded. We found Insituform Technologies’ submitted proposal to be complete and accurate, and we are familiar with their experience on similar projects. Therefore, as the responsive low bidder, we recommend Insituform Technologies be awarded the contract only for the Base Bid in the amount of $214,850.00. Attached is the Official Bid Tabulation and Insituform’s bid package documents. Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE Associate Vice President Enclosures: As noted /ela cc: East Goshen Municipal Authority Derek Davis, Township Manager Dave Ware, Finance Director Patrick McKenna, Esq.
1 of 1
East Goshen Municipal Authority Tabulation of Bids Received by 10:00 AM Eastern on September 7, 2023 Contract No. CCSS-2023: Chester Creek Interceptor Inspection and Repair
ITEM NUMBER DESCRIPTION UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT
1 Clean and Televise 24” Sanitary Sewer 4,900 L.F. $15.00 $73,500.00 $19.78 $96,922.00 $40.00 $196,000.00 2 Televise 4” and 6” Sanitary Sewer Lateral 40 L.F. $50.00 $2,000.00 $160.00 $6,400.00 $120.00 $4,800.00 3 Cured-In-Place Pipe Lining of 24” Pipe within Township Roads 360 L.F. $300.00 $108,000.00 $211.00 $75,960.00 $180.00 $64,800.00 4 Cured-In-Place Pipe Lining of 4” or 6” Lateral 30 L.F. $400.00 $12,000.00 $516.00 $15,480.00 $540.00 $16,200.00 5 Lateral T-Connection and Excavated Transition 1 EA. $4,000.00 $4,000.00 $21,280.00 $21,280.00 $60,000.00 $60,000.00 6 Lateral Reinstatements 3 EA. $200.00 $600.00 $556.00 $1,668.00 $1,000.00 $3,000.00 7 Pipe Grouting 2 EA. $2,500.00 $5,000.00 $1,482.00 $2,964.00 $7,148.57 $14,297.14 8 Manhole Pressure Grouting 4 EA. $1,500.00 $6,000.00 $4,510.00 $18,040.00 $3,600.00 $14,400.00 9 Grout 75 GAL. $50.00 $3,750.00 $16.00 $1,200.00 $20.00 $1,500.00 10 Remove Asphalt/Debris from Pipe 1 L.S. $0.00 $0.00 $9,215.00 $9,215.00 $10,000.00 $10,000.00 11 Cut Lateral and Install T-Connection 1 L.S. $0.00 $0.00 $16,674.00 $16,674.00 $9,000.00 $9,000.00
$214,850.00 $265,803.00 $393,997.14
12 Cured-In-Place Pipe Lining of 24” Pipe within Township Roads 175 L.F. $340.00 $59,500.00 $295.00 $51,625.00 $200.00 $35,000.00 13 Cured-In-Place Pipe Lining of 24” Pipe within Easements 560 L.F. $280.00 $156,800.00 $199.00 $111,440.00 $300.00 $168,000.00 14 Lateral Reinstatements 5 EA. $200.00 $1,000.00 $556.00 $2,780.00 $1,000.00 $5,000.00 15 Pipe Grouting 4 EA. $2,500.00 $10,000.00 $1,482.00 $5,928.00 $7,200.00 $28,800.00 16 Manhole Pressure Grouting 7 EA. $1,500.00 $10,500.00 $2,128.00 $14,896.00 $3,600.00 $25,200.00 17 Grout 165 GAL. $50.00 $8,250.00 $16.00 $2,640.00 $20.00 $3,300.00
$246,050.00 $189,309.00 $265,300.00
$460,900.00 $455,112.00 $659,297.14
We Declare this to be a true Tabulation of Bids Received on September 7, 2023 by East Goshen Municipal Authority for Contract No. CCSS-2023.
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE, PA Reg. No. PE075139 FOR: PENNONI ASSOCIATES INC.
TOTAL BASE BID AND ADD ITEMS (BASED ON ESTIMATED QUANTITIES)
BID SECURITY REVIEW 10% of Bid 10% of Bid
ADD ITEMS
TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES)
TOTAL ADD ITEMS (BASED ON ESTIMATED QUANTITIES)
ESTIMATED QUANTITY/UNIT
BASE BID
10% of Bid
Mobile Dredging & Video Pipe,
Inc. 1566 Harding Highway Newfield, NJ 08344
(856) 697-1900
210 Bennett Road 580 Goddard Avenue
Vortex Services, LLC Insituform Technologies, LLC
Freehold, NJ 07728 Chesterfield, MO 63005
(732) 625-9300 (636) 530-8000
Hide Cells
Unhide Cells
U:\Accounts\EGMAU\EGMAU23001 - 2023 General Services\CONSTRUCTION\BID\Reservoir Road Sanitary Sewer Inspection and Repair\01 Bid Tabulations and Documents\CCSS-2023 Official Bid Tabulation