Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\12-11-23\12-11-2023 Agenda.doc

EAST GOSHEN MUNICIPAL AUTHORITY

December 11, 2023

7:00

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE • Ask if anyone will be taping the meeting 2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS

3. SEWER REPORTS • Director of Public Work’s Report • Pennoni Engineer’s Report • Big Fish Environmental Report (not available at time of agenda printing) 4. APPROVAL OF MINUTES • November 13, 2023 5. APPROVAL OF INVOICES • Pennoni Invoice #1199247 $546.25 • Pennoni Invoice #1199248 $575.50 • Premium Power Services Invoice #30568 $17,500.00 (paid) • Gatti Morrison Invoice #525512 $1,359.00 (paid) • Colonial Electric Supply Invoice #15490278 $1,808.78 (paid) • Colonial Electric Supply Invoice #15499508 $890.77 (paid) • Yale Electric Supply Invoice #S124442513.001 $222.66 (paid) • Gawthrop Greenwood Invoice #281972 $431.00 6. LIAISON REPORTS 7. FINANCIAL REPORTS a. November 2023

8. OLD BUSINESS • Approval of Payment Application #1: Chester Creek Interceptor Inspection & Repair

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\12-11-23\12-11-2023 Agenda.doc

9. 2023 Goals: Goal Status

Ridley Creek plant compliance

January, February, March, April, May, June, July, August, September, October, & November were in compliance and met all requirements.

Continue to implement infiltration and inflow for the sewer system

Ongoing

RCSTP UV Disinfection System

Temporary setups are in production.

10. NEW BUSINESS • Mark Miller: Request for motion to purchase new lift station pump for the wet well at the treatment plant • Pennoni: 1. Proposal for Chester Creek Interceptor Inspection & Repair 2. Proposal for RCSTP Generator 2 Replacement 3. 2024 Reappointment Letter • Scott Towler: 2024 Big Fish Reappointment Letter • Dave Ware: 2024 Proposed Municipal Authority Budget 11. CAPACITY REQUESTS

12. ANY OTHER MATTER 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171

To: Municipal Authority From: Mark Miller Re: December 11, 2023, Monthly Report The Public Works Department has been extremely busy this past month working the Interceptor. We assisted the video contractor to gain access to various areas along Chester Creek and while doing the clearing, we located several issues that will need attention:

• We found that the line that runs under the stream up to the Milltown stores has significant sag. The laterals from the stores have no cover and they are suspended in the area. The drainage ditch that they run through has been eroded away and will be repaired in the next few weeks. • We had to remove an 8” ductile iron abandoned force main from the old Milltown pump station which ran through the bottom of Manhole 8, and we had to raise seven manholes that had been covered over. You may heard that a sewage treatment plant and a water treatment plant were CYBER attacked by the Iranian government, which has affected our sewage flow meters. The township’s new computer consultants are working with Allied Control to install firewalls. Below is the rest of my report: Monthly Flows: The average daily flow to West Goshen was 721,972 per day. Meters: Were read on a daily basis. Since the meters were taken out of service we will need to read the meters manually until the problem is corrected. C.C. Collection:

• We were notified of two sewer lateral problems which resulted in the property owners having to hire a plumber to replace the broken traps and the cleanouts. The PWD televised the laterals and showed the homeowners. • The pump stations were visited on a daily basis and wet wells were cleaned. • We received a seal failure alarm at the Barkway Station on Thanksgiving Day. We disconnected the seal fail switch to get us through the holiday. This past week, we pulled all number 2 pumps from each station and sent them out to be serviced.

C.C. Interceptor:

• As I stated above, we have been busy taking care of several issues that were found by the contractor. • The PWD located and raised 4 manholes in the Dutts Mill townhouse development. R.C. Collection:

• The pumping stations were visited on a daily basis and wet wells cleaned. • #2 pumps were pulled at the stations. • We were called for a sewer blockage on Bowtree Dr – a trap need to be replaced. Ridley Creek Plant: • Routine maintenance at the plant • Lenni has started to install conduit. • Zimmerman is set up to start installing the temporary UV system on December 4th. • We met with Mike Ellis onsite to discuss the pump location and decided to add an additional float for the temporary pumps. • John Laidley was out to replace the floats in the wet well. • The parts have arrived to rebuild the centrifuge and that work will be completed after the holidays. • The new Muffin Monster arrived for the sludge room. • We are still waiting for the Moyne screw pump - we were told not to expect it until the end of February. Alarms: 18 (power outages) PA One Calls: 75 Monthly Rainfall: 4.00” Lateral Repairs or Caps: 2 in Fairway, 3 in Bow Tree, 1 in Mill Creek

EAST GOSHEN MUNICIPAL AUTHORITY ENGINEER’S REPORT December 8, 2023

Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2

Ridley Creek Sewage Treatment Plant (RCSTP)

• Caustic Soda Conversion – During a site visit on October 4, it was noticed that the tank’s outside insulation was cracked in some locations and loose/peeling off in others. The supplier, Pyrz, repaired the tank’s insulation in November.

Once the outdoor emergency shower is installed, the tank can be put into operation.

We previously prepared a draft O&M Manual information for the system that was submitted to the Township and operator for review. We will set up a meeting to review so that the Manual can be finalized.

• UV Disinfection System – All temporary and permanent equipment has been delivered. Lenni installed the control boxes for the temporary pumps and initiated installation of permanent conduit and wiring. Zimmerman, the general contractor, has not yet mobilized, but we tentatively anticipate that he will start working next week. We attended a field meeting on November 27 at the plant with Lenni, Mark Miller, the plant operator, and John Laidley (controls) to review progress of the electrical work, proposed equipment layout, and temporary alarms and controls setups. We thereafter evaluated alternative locations for the new UV electrical/controls cabinet to improve ease of channel raising concrete work. We also analyzed and recommended pump float and high level alarm settings along with proposed controls logic for the high level floats to automatically shut off the filter feed pumps.

An updated tentative construction schedule follows with completed work in italics:

o Delivery of Permanent UV Equipment – October 30, 2023 o Delivery of Bypass Pumps and Hoses – Week of November 13, 2023 o Initiate Temporary Bypass Work – Mid-November 2023 o Complete Temporary Bypass Work and Initiate Use of Bypass System – Week of January 2, 2024 o Two Week Trial and Sampling of Temporary Bypass System – January 8-22, 2024 o Township to Perform Concrete Channel Work – January 23-February 23, 2024 o 2nd Notice to Proceed to Contractors: Permanent Work – February 26, 2024 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – March 25, 2024 o Two Week Trial of New UV System in Permanent Channel –March 25-April 8, 2024 o Install Second UV Module into Permanent Channel – April 9, 2024 o Two Week Trial of Second New UV System in Permanent Channel – April 10-24, 2024 o Construction Completed – Early May 2024

• Generator #2 Replacement – Premium Power Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively, so we expect delivery of the entire system around January 2024.

We are continuing to prepare electrical design and structural concrete pad plans for the new generator for use by the Township in construction.

• Operating Cost Analysis – We are continuing to coordinate with Scott Towler for the evaluation of industry WWTP operating costs in an effort to benchmark RCSTP costs against other similar WWTPs.

EGMAU23001 Engineer’s Report East Goshen Municipal Authority December 8, 2023 Page 2 of 2

Sanitary Sewer Pipe Rehab

• Chester Creek Sewer Rehab – The contractor, Insituform, has performed cleaning and televising of approximately 75% of the contracted sewers. We reviewed the videos, and there are only minor deficiencies. We are evaluating potential repairs for the deficiencies and will coordinate with the Township and contractor to determine if there is available budget since those repairs were not known at the time of award and were thereby not awarded.

We reviewed shop drawings and construction submittals for the pipe lining and repairs that were in the contract award. We anticipate construction of the repairs will commence upon completion of the cleaning and televising work.

Additionally, the Contractor submitted the first pay application, and we provided a payment recommendation.

• Hershey’s Mill Estates – The Contractor has completed all punchlist work. The only outstanding item is a damaged PECO meter manhole at the top of the tennis court access drive. We reviewed the Contractor’s Maintenance Bond, Statement of Surety, and Contractor’s Release and found all documents satisfactory.

• LSA Grant Application – We provided information to Dave Ware for preparation of the grant application for pipe lining and rehabilitation of the Chester Creek Interceptor Phases 1 and 2 and the remainder of pipe lining in Supplee Valley. We understand the grant application was submitted on November 30.

New Connections

• Millstone Meadows (1010 Hershey Mill Road) – We reviewed the 3rd submission of the Subdivision and Land Development Plan, including the revised sanitary sewer extension design. A revised, 4th submission was made thereafter and is currently under review.

• 301 Reservoir Road (5-Lot Residential Subdivision) – We reviewed a revised submission of Subdivision and Land Development Plans, including the proposed sanitary sewer main extension along Reservoir Road to the site.

• 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.

• 14 Reservoir Road – No activity by Pennoni since our last report.

END OF REPORT

RCSTP Monthly Operations Report

December 2023

Executive Summary The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for November 2023. All supplemental reports were submitted for October 2023. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes increased slightly to a daily average of 71.7 from the previous standard of 70.7 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.

Table 1

*Sample results were not available at the time of the report preparation. Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for November 2023. The monthly average total phosphorus was reported as 0.14 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 4.5 mg/L compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment performed well during November. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.

Flow

MGD

Average mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month

Geo

Mean

Geo

Mean

0.75 10 62 Report Report 10 62 7.0 44 0.5 3 200 1,000

Inst. Max 20 94 15 94 14 1

Sample Date

November 7, 2023 0.256 2.0 4.3 6.60 14.1 4.8 10.2 0.10 0.21 0.10 0.21 1 0.0000

November 14, 2023 0.274 2.0 4.6 7.46 17.0 5.0 11.4 0.10 0.23 0.17 0.39 1 0.0000

November 21, 2023 0.408 2.7 9.2 * 4.0 13.6 0.10 0.34 * 28 1.4472

November 28, 2023 0.304 2.0 5.1 * 5.0 12.7 * 0.10 0.25 1 0.0000

Average 0.311 2.2 5.8 7.03 15.6 4.7 12.0 0.10 0.26 0.12 0.29 8 0.3618

Minimum 0.256 2.0 4.3 6.60 14.1 4.0 10.2 0.10 0.21 0.10 0.21 1 0.0000

Maximum 0.408 2.7 9.2 7.46 17.0 5.0 13.6 0.10 0.34 0.17 0.39 28 1.4472

TSS NH4-N Total Phosphorus

November 2023- Final Effluent - Outfall 001

NPDES Permit

Discharge Limitations

CBOD5 Total Nitrogen Fecal Coliform

Page 2 of 4

Table 2 illustrates the final effluent composite sample data reported for outfall 002 for November 2023.

Table 2

*Sample results were not available at the time of the report preparation.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility were reported as unusually elevated compared to historical and plant-design pollutant concentrations. Typical influent pollutant concentrations are generally within the design concentration and organic loading values. The elevated pollutant concentrations are attributed to the sample suction line dislodged into the flow channel, resulting in the collection of an unrepresentative sample. The Plant Operator replaced the suction tubing and repositioned the sampling probe. The Technician from the laboratory was instructed to check for sample “abnormalities” (aka appearing to have an abundance of solids in the sample bottle) and notify the Plant Operator.

PA DEP

No activity

Pennoni Associates

The UV system replacement project continues.

Significant Rainfall

During November, there were four (4) days when rainfall occurred. Significant events occurred on the 21st resulting in 2.23 inches and on the 27th with 1.32 inches of precipitation. The total precipitation for October was 3.64 inches.

Flow

MGD

Average mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month

Geo

Mean

Geo

Mean

0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000

40 45 14

November 7, 2023 0.0315 2.0 0.53 6.60 1.73 4.8 1.26 0.10 0.21 0.10 0.21 1 0.0000

November 14, 2023 0.0329 2.0 0.55 7.46 2.05 5.0 1.37 0.10 0.23 0.17 0.39 1 0.0000

November 21, 2023 0.0411 2.7 0.93 * 4.0 1.37 0.10 0.34 * 28 1.4472

November 28, 2023 0.0339 2.0 0.57 * 5.0 1.41 * 0.10 0.25 1 0.0000

Average 0.0349 2.2 0.64 7.03 1.89 4.70 1.35 0.10 0.26 0.12 0.29 8 0.3618

Minimum 0.0315 2.0 0.53 6.60 1.73 4.00 1.26 0.10 0.21 0.10 0.21 1 0.0000

Maximum 0.0411 2.7 0.93 7.46 2.05 5.00 1.41 0.10 0.34 0.17 0.39 28 1.4472

Fecal Coliform

November 2022 - Applebrook - Out Fall 002

NPDES Permit

Discharge Limitations

CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total

Page 3 of 4

Table 3 presents the pollutant data for the influent wastewater collected at the doghouse manhole during November 2023.

Table 3

*Sample results were not available at the time of the report preparation.

Chemical Data

November 2023

Chemical Daily Average Total Monthly

Soda Ash, pounds 300 9,300

Aluminum Sulfate solution, gal 70.7 2,151

Sludge Dewatering, gal* 23,360 490,554

*21 days of sludge dewatering

There was an increase of 67,518 gallons of sludge dewatering during the month. This is typical for this treatment facility to maintain the desired F:M ratio to achieve nutrient removal and manage the foam on the surface of the SBR basins.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily.

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly.

Cleaned buildings and laboratory.

Flow

mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57

November 7, 2023 0.320 495 1,319 377 1,005 540 1,439 40.0 107 72.3 193 70.9 188.9

November 14, 2023 0.309 741 1,910 617 1,591 1270 3,274 36.5 94 82.6 213 8.90 22.9

November 21, 2023 0.411 659 2,261 590 2,024 795 2,728 * 79.3 272 *

November 28, 2023 0.347 794 2,296 1,070 3,095 1370 3,962 * 89.7 259 10.70 30.9

Average 0.347 672 1,947 664 1,929 994 2,851 38.3 100 81.0 234 30.17 80.9

Minimum 0.309 495 1,319 377.0 1,005 540 1,439 36.5 94 72.3 193 8.90 22.9

Maximum 0.411 794 2,296 1,070 3,095 1,370 3,962 40.0 107 89.7 272 70.90 188.9

Sample Date

TKN, mg/L

Phosphorus,Total

, mg/L

MGD

Average

November 2023 - Influent Wastewaster

Design Basis

BOD5 CBOD5 TSS NH4-N

Page 4 of 4

Flow Data

November 2023

Flow Meter Location Total Volume for

Month, MG

Average Daily

Flow, gpd

Daily Maximum

Flow, gpd

Influent Wastewater to

Screening Building* 9.990 332,989 447,670

Influent Wastewater to

SBRs* 11.862 694,411 497,612

Internal Recycle** 1.872 62,422 102,898

Treated Effluent to Disc

Filters 11.506 383.527 467.779

Final Effluent Discharge

8.673 289,000 408,000

Applebrook Golf Course 1.023 34,083 42,656

MA 11-13-23 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 November 13, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 November 13, 2023 at 7:00 pm. at the Township Building. 7 Members in attendance are indicated in BOLD: 8 Kevin Cummings, Chairman 9 Dana Pizarro, Vice Chairman 10 Jack Yahraes 11 Carmen Battavio 12 Walter Wujcik 13 14 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 15 representative), Ellen Koopman (Attorney), Dave Ware (Finance Director), and Michael Lynch 16 (Township Supervisor), and Scott Towler (on phone) 17 18 19 COMMON ACRONYMS: 20 ATS – Automatic Transfer Switch 21 BFES – Big Fish Environmental Services MA- Municipal Authority 22 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 23 CB – Conservancy Board PC – Planning Commission 24 DEP – Department of Environmental Protection PM – Prevention Maintenance 25 EPA – Environmental protection Agency PR – Park & Recreation Board 26 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 27 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 28 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 29 PWD – Public Works Department WAS – Waste Activated Sludge 30 31 Call to Order & Pledge of Allegiance 32 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 33 He asked for a moment of silence for our First Responders and Military. 34 He asked if anyone would be recording the meeting. There was no response. 35 36 37 Chairman’s Report 38 None 39 40 SEWER REPORTS 41 1. Director of Public Works, Mark Miller’s report for November 13, 2023 42 43 Monthly Flows – The average daily flow to West Goshen was 723,959 gallons per day. 44 45 Meters: The meters were read on a daily basis with no problems to report. 46 47 48 49

MA 11-13-23 draft 2

C.C. Collection: The pump stations were visited on a daily basis with no problems to report. 1 2 C.C. Interceptor: We inspected the lids and castings while we were clearing the right of way. 3 4 R.C. Collection: The pump stations were visited on a daily basis with no problems to report. 5 6 Ridley Creek Plant: 7 • Transducer went bad in the Ridley STP wet well. John Laidley came to replace it and 8 check the floats. We’re looking into a float back-up system. 9 • The UV system has been delivered. 10 • The wet well electronic cabinet is rotted out. We have ordered a replacement cabinet and 11 are scheduling the work. 12 13 Alarms: 7 (storm related) 14 15 PA 1 Calls: 182 16 17 Monthly Rainfall: 1.76” 18 19 Lateral Repairs or Caps: Two lateral at 301 Reservoir Rd were dug and capped off. 20 21 22 2. Pennoni Engineer’s Report dated November 8, 2023 23 24

Ridley Creek Sewage Treatment Plant (RCSTP) 25

• Caustic Soda Conversion – During a site visit on October 4, it was noticed that the tank’s 26 outside insulation was cracked in some locations and loose/peeling off in others. We 27 contacted the supplier, Pyrz, to alert them of this issue. Pyrz is scheduling to make the repairs, 28 which we expect to happen in November. They indicated repairs will take about a half day of 29 work to allow the spray insulation to set and coat it. 30

Once the insulation is repaired and the outdoor emergency shower is installed, the tank can be 31 put into operation. 32

We previously prepared a draft O&M Manual information for the system that was submitted 33 to the Township and operator for review. We will set up a meeting to review so that the 34 Manual can be finalized. 35

• UV Disinfection System – The temporary channel was delivered to the Township on August 36 24. The UV modules were delivered to the Township on October 30, and the submersible 37 bypass pumps were delivered on November 2. The bypass hoses are scheduled for delivery 38 the week of November 13. Upon receipt of the hoses, construction can begin, starting with the 39 general contractor setting up the temporary channel and flow bypass system. 40

41

MA 11-13-23 draft 3

An updated tentative construction schedule follows with completed work in italics: 1

o Delivery of Permanent UV Equipment – October 30, 2023 2 o Delivery of Bypass Pumps and Hoses – Week of November 13-17, 2023 3 o Initiate Temporary Bypass Work – Mid-November 2023 4 o Complete Temporary Bypass Work and Initiate Use of Bypass System – December 5 20, 2023 6 o Two Week Trial and Sampling of Temporary Bypass System – December 20, 2023- 7 January 3, 2024 8 o Township to Perform Concrete Channel Work – January 8-February 29, 2024 9 o 2nd Notice to Proceed to Contractors: Permanent Work – March 1, 2024 10 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – April 1, 2024 11 o Two Week Trial of New UV System in Permanent Channel –April 1-15, 2024 12 o Install Second UV Module into Permanent Channel – April 16, 2024 13 o Two Week Trial of Second New UV System in Permanent Channel – April 17-May 1, 14 2024 15 o Construction Completed – Early May 2024 16

• Generator #2 Replacement – Premium Power Services released the Cummins’ 500 kW diesel 17 generator for fabrication in early March 2023. The lead times on the generator and ATS are 18 43 weeks and 22 weeks respectively, so we expect delivery of the entire system around 19 January 2024. 20

We are currently preparing electrical design and structural concrete pad plans for the new 21 generator for use by the Township in construction. 22

• Operating Cost Analysis – We are continuing to coordinate with Scott Towler for the 23 evaluation of industry WWTP operating costs in an effort to benchmark RCSTP costs against 24 other similar WWTPs. 25

Sanitary Sewer Pipe Rehab 26

• Chester Creek Sewer Rehab – We are reviewing shop drawings and construction submittals 27 from the contractor, Insituform. They will schedule the work upon approval of those 28 submittals. 29

• Hershey’s Mill Estates – The contractor is scheduled to complete minor punchlist work – removing 30 E&S controls, cleaning up construction debris, and opening/unsealing new residential cleanout lids – 31 by November 10. We will perform a site visit to verify the remaining punchlist work has been 32 completed. 33

The contractor submitted the 3rd (final) pay application, and we provided a payment 34 recommendation. We also processed Change Order #2 to formally document changes to as-built 35 quantities for unit price bid items. 36

• LSA Grant Application – We are assembling information and assisting Dave Ware with preparation of 37 the grant application for pipe lining and rehabilitation of the Chester Creek Interceptor Phases 1 and 38 2 and the remainder of pipe lining in Supplee Valley. The application is due November 30. 39

MA 11-13-23 draft 4

New Connections 1

• Millstone Meadows (1010 Hershey Mill Road) – We received the 3rd submission of 2 Subdivision and Land Development Plans. We are currently reviewing the plans, including 3 the revised sanitary sewer extension design. 4

• 301 Reservoir Road (5-Lot Residential Subdivision) – We received a revised submission of 5 Subdivision and Land Development Plans that is currently under review. We also discussed 6 modifications to the proposed sewer extension alignment with Mark Miller. 7

• 1712 E. Boot Road – The low pressure sewer was constructed via directional drilling from the 8 property and connected to the public sewer manhole. We performed an inspection of the 9 completed work at the manhole connection, and it was found acceptable with the exception of 10 debris/mud that needs to be cleaned from the manhole channel. The grinder pump has not yet 11 been installed. 12

14 Reservoir Road – We reviewed a revised Subdivision and Land Development plan submission, 13 which includes connection of one new lot to public sewer via grinder pump. We provided outstanding 14 comments to the Township and Applicant. 15 16 17 3. Big Fish Environmental Services – 18 The Ridley Creek sewage treatment plant outfall 001 has met all effluent limitations regarding water 19 quality for October 2023. All supplemental reports were submitted for the month of September 2023. 20 Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum 21 sulfate solution volumes decreased slightly to a daily average of 70.7 gpd from the previous average 22 of 72. gallons per day. No significant mechanical or operational issues were observed during the 23 sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no 24 mechanical issues impacting production. There were no odor complaints during the month. 25 Walter mentioned that on page 3 the daily maximum flow doesn’t seem right. Mark will check with 26 Scott. 27 28 Approval of Minutes 29 The minutes of the October 16, 2023 meeting were approved. 30 31 Approval of Invoices 32 1. Walter moved to approve payment of the following Pennoni invoices: 33 a. Invoice #1194870 $ 27.75 (paid) 34 b. Invoice #1194871 $ 209.25 (paid) 35 c. Invoice #1194872 $ 928.25 (paid) 36 d. Invoice #1194874 $ 8,612.50 (paid) 37 Carmen seconded the motion. The motion passed unanimously. 38 2. Jack moved to approve payment of the Philadelphia Bearing & Drive Solutions invoice 39 #6522098 in the amount of $17,834.75 (paid). Walter seconded the motion. The motion passed 40 unanimously. 41 3. Carmen moved to approve payment of JWC Environmental Invoice #116551 in the amount of 42 $16,542.00 (paid). Dana seconded the motion. The motion passed unanimously. 43

MA 11-13-23 draft 5

4. Walter moved to approve payment of Gawthrop Greenwood Invoice #280886 in the amount of 1 $472.00. Jack seconded the motion. The motion passed unanimously. 2 5. Carmen moved to approve payment of E & W Equipment Co. Invoice #755 in the amount of 3 $80,991.00. Jack seconded the motion. The motion passed unanimously. 4 5 6 7 Liaison Reports 8 1. Conservancy Board – Walter reported that the CRC planted over 100 trees in Applebrook Park 9 along the brook next to the Commerce building. There were 50 volunteers and all equipment was 10 supplied. 11 2. Board of Supervisors – Mike Lynch reported that the two new Supervisors are Mr. Hicks and Ms. 12 Emery. The proposed 2024 Budget will be available on the website for review tomorrow. PLTF has 13 been working on the blue hydrogen hub from the Marcus Shale. It will involve a new pipeline. 14 15 Financial Reports 16 Dave Ware gave the following report: 17 Year to date October 2023, the Municipal Authority recorded $613,704 in revenues (primarily from 18 Sewer Operating transfers and Sewer Capital Reserve transfers and tapping fees) and $609,817 in 19 expenses (Engineering Services, Audit fees, Administrative Wages, Hershey’s Mill Estates Sewer 20 costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital 21 improvements to the Westtown Way Pump station, auditor and legal fees). The net result of 22 operations is $3,887. As of October 31, 2023, the fund balance was ($35,485). This negative 23 balance is a function of balance versus cash reporting. There is $44,544 in invoices being held so the 24 actual cash balance is $9,058. 25 26 Old Business 27 ° Hershey’s Mill Estates Sanitary Sewer Replacement: 28 1. Change Order #2 – The Change Order #2 reflects a net decrease in contract price of 29 $78,572.00. Carmen moved to approve Change Order #2 for Hershey’s Mill Estates 30 Sanitary Sewer Replacement Contract No. HME-2022 which reflects a net decrease in the 31 contract price of $78,572.00 as presented. Walter seconded the motion. The motion 32 passed unanimously. Kevin signed the Change Order #2. 33 2. Payment Application #3 – The contractor Joao & Bradley Construction Co., Inc. has 34 submitted the third and final invoice for work completed. Mike Ellis mentioned that they 35 have observed the work-in-progress and recommend approval. Kevin moved to approve 36 the Payment Application #3 in the amount of $111,778.15 conditioned that payment not 37 be made until the closeout documents are provided. Jack seconded the motion. The 38 motion passed unanimously. 39 40 41 Goals 42 The Goals for 2024 will be discussed at the next meeting. A sewer rate increase was discussed. 43 44 New Business - None 45 46 47

MA 11-13-23 draft 6

Capacity Requests 1 1. 301 Reservoir Road – Mark reviewed this plan to subdivide for 3 new single family homes. 2 3 Any Other Matter – None 4 5 Correspondence- None 6 7 Public Comment - None 8 9 Adjournment 10 There being no further business Walter moved to adjourn the meeting. Jack seconded the motion. 11 The motion passed unanimously. The meeting was adjourned at 8:00 pm. 12 The next regular meeting will be held on Monday, December11, 2023 at 7:00 pm. 13 14 Respectfully submitted, 15 16 17 Ruth Kiefer, Recording Secretary 18

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1199247
Invoice Date : 11/22/2023
Project : EGMAU21004
Project Name : HM Estates Sewer Design & Permitting

For Services Rendered Through 11/12/2023

Construction Admin & Inspections: Reviewed contractor closeout documents and as-built redlines. Reviewed final pay application and processed Change Order #2.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Wetland & Watercourse Investigation ,750.00 ,750.00 100.00% ,750.00 bash.00
02 -- Phase I Bog Turtle Habitat Assessment ,750.00 ,750.00 100.00% ,750.00 bash.00
03 -- Survey 7,200.00 7,200.00 100.00% 7,200.00 bash.00
04 -- Design 6,100.00 6,100.00 100.00% 6,100.00 bash.00
05 -- Permitting ,000.00 ,000.00 100.00% ,000.00 bash.00
06 -- Property Line Stakeout est. ,000.00 ,520.50 ,520.50 bash.00
07 -- Geotechnical NTE 0,000.00 ,271.25 62.71% ,271.25 bash.00
08 -- Bid Assistance NTE ,690.50 ,690.50 100.00% ,690.50 bash.00
09 -- Construction Admin & Inspection NTE 0,000.00 1,811.75 87.26% 2,358.00 46.25
Total : 49,490.50 40,094.00 40,640.25 46.25

Phase: 09 -- Construction Admin & Inspection

Labor

Class Hours Rate Amount
Authority Engineer 0.50 149.00 74.50
Associate Professional 4.25 111.00 471.75
Labor 546.25

Phase Subtotal: 46.25

Amount Due This Invoice: 46.25

[Stamp: PAID]

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 19-409-6050

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

West Goshen HM Estates Sewer Design Permitting

EGMAU21004 Invoice Summary

Invoice Date 11/22/2023

Project: EGMAU21004
Pennoni Job No.: HM Estates Sewer Design & Permitting
Invoice No: 1199247
Invoice Period: 10/16/2023 to 11/12/2023
Date: 11/22/2023
Initial Authorization: $ 64,800.00
Contract Amount: $ 149,490.50
Previously Invoiced: $ 140,094.00
Current Invoice: $ 546.25
Invoiced to Date ($): $ 140,640.25
Invoiced to Date (%): 94%
Remaining Budget ($): $ 8,850.25
Remaining Budget (%): 6%

Budget by Phase:

Phase Name: HM Estates Sewer Design & Permitting
Phase Budget: $ 149,490.50
Previously Invoiced: $ 140,094.00
Current Invoice: $ 546.25
Invoiced to Date ($): $ 140,640.25
Invoiced to Date (%): 94%
Remaining Budget ($): $ 8,850.25
Remaining Budget (%): 6%

Comments: Construction Admin & Inspections: Reviewed contractor closeout documents and as-built redlines. Reviewed final pay application and processed Change Order #2.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1199248
Invoice Date : 11/22/2023
Project : EGMAU23001
Project Name : 2023 General Services

For Services Rendered Through 11/12/2023

Prepared November Engineer's Report.

Chester Creek Interceptor Sewer Rehab: Initiated review of construction submittals; pre-construction and schedule coordination with contractor and Township. Prepared documentation for LSA grant application.

Billing Limits

Current Prior To-Date
Total Billings 575.50 39,423.25 39,998.75
Limit 42,000.00
Remaining 2,001.25

Labor

Class Hours Rate Amount
Authority Engineer 2.00 149.00 298.00
Associate Professional 2.50 111.00 277.50
Totals 4.50 575.50
Total Labor 575.50

Total this Invoice: 75.50

[Stamp: PAID]

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

2023 General Services

EGMAU23001Invoice Summary

Invoice Date 11/22/2023

Project: EGMAU23001
Pennoni Job No.: 2023 General Services
Invoice No: 1199248
Invoice Period: 10/16/2023 to 11/12/2023
Date: 11/22/2023
Initial Authorization: $ 42,000.00
Contract Amount: $ 42,000.00
Previously Invoiced: $ 39,423.25
Current Invoice: $ 575.50
Invoiced to Date ($): $ 39,998.75
Invoiced to Date (%): 95%
Remaining Budget ($): $ 2,001.25
Remaining Budget (%): 5%

Budget by Phase:

Phase Name: 2023 General Services
Phase Budget: $ 42,000.00
Previously Invoiced: $ 39,423.25
Current Invoice: $ 575.50
Invoiced to Date ($): $ 39,998.75
Invoiced to Date (%): 95%
Remaining Budget ($): $ 2,001.25
Remaining Budget (%): 5%

Comments: Prepared November Engineer's Report.

Chester Creek Interceptor Sewer Rehab: Initiated review of construction submittals; pre-construction and schedule coordination with contractor and Township. Prepared documentation for LSA grant application.

Premium Power Services, LLC
505 Schoolhouse Road
Kennett Square, PA 19348
Phone: (610) 444-1232 Fax: (610) 444-2120

Invoice

Date Invoice
9/1/2023 30568

Bill To
East Goshen Township Office
Accounts Payable
1580 Paoli Pike
West Chester, PA 19380-6199

P.O. No. Terms
17409 Net 30
Description Amount
Partial invoice for Ridley Creek Generator Supply and Commission as detailed in proposal #PEN-JMC012423.

- Supply (1) Cummins 1000amp automatic transfer switch.
17,500.00

[Stamp: PAID]

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505

Thank you for your business. We impose a 2% surcharge on Visa and Mastercard payments.

Subtotal 7,500.00
Sales Tax (0.0%) bash.00
Total 7,500.00

GATTI MORRISON CONSTRUCTION SERVICE INC.
801 First Avenue, King Of Prussia, PA 19406, Tel: (610) 992-9700, Fax: (610) 992-9672, www.gattimorrison.com
6352 Chapmans Road, Allentown, PA 18106, Tel: (610) 992-9101, Fax: (610) 992-9102

INVOICE

Invoice No. Page
525512 1
Invoice Date Cust No.
10/11/23 EAST05
Total Amount
,359.00

COPY

BILL TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380

SHIP TO
SHOP
LYNN 610-692-7171
1580 PAOLI PIKE
WEST CHESTER, PA 19380

Deliv Rec. PO Number Slpn Order Date Ship Date Ship Via FOB Terms Loc
490225 LYNN KM 10/04/23 10/10/23 OUR TRUCK DELIVERED NET 30 DAYS 1
Item Number Qty Order Qty Ship UOM Description Unit Price Extended Price
HA-WSS-0100 1 1 BX SWELLSTOP WATERSTOP 3/4" X 1" 100'/BOX 75.00 275.00
HA-WSS-P00Q 4 4 EA SWELLSTOP PRIMER/ADHESIVE QUART CAN 0.00 160.00
KA-SIA-0110 1 1 UN SIKA ARMATEC 110 3.5 GAL UN (BAG+CTN) 35.00 235.00
KA-SIT-107G 8 8 UN SIKATOP SEAL #107 GRAY BAG+JUG 2.65 GL 0.00 640.00
KA-SIG-0050 2 2 BG SIKAGROUT 212 NS GROUT 50 LB 2.00 24.00
FUEL S/C KOP - NON TAXED 25.00

[Stamp: PAID]

APPROVED BY: MM
DATE PAID:
CHECK #:
CHARGED TO: 07 429-1505

5 FUEL S/C WILL APPLY TO DELIVERIES
MK:SEWER TREATMENT PLANT

Freight 0.00
Misc Charges 0.00
Sales Tax 0.00
Total > ,359.00

PAY BY THIS INVOICE, STATEMENT WILL NOT FOLLOW
PLEASE REMIT PAYMENTS TO THE KING OF PRUSSIA ADDRESS

colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com

Divisions of Colonial Electric:
colonial (colonialelectric.com/cmp)
colonial teltek (colonialteltek.com)
Bright Light (brightlightdesigncenter.com)
Annapolis Lighting (annapolislighting.com)

Original Invoice

INVOICE

INVOICE NUMBER INVOICE DATE
15492078 11/15/23

PLEASE REMIT PAYMENT TO:
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564

Billing Questions?
Call: THOMAS KARACKAI
484-679-2295

BILLING ADDRESS
10780 1 AB 0.537 E0086X I0148 D12071457618 S2 P10000284 0001:0001
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
SHOP
1751 TOWNE DR
WEST CHESTER PA 19380

CUSTOMER PO ORDER DATE ORDERED BY SHIP DATE SHIPPED VIA FREIGHT TERM
32353-23 11/14/23 DANIELLE 11/15/23 PPD
COMMENTS CO. UNIT / WH ENTERED BY ACCOUNT ID ORIGINAL INVOICE SALESPERSON
02 / DC 9795 E163 QT406077 0001
LINE SKU CUSTOMER SKU DESCRIPTION ORD QTY SHIP QTY BO QTY UNIT PRICE UM EXTENDED AMT
10 RIG1 RIG1 1" RIGID CONDUIT $ 100 100 0 428.96 C 428.96
20 84765607334 CALPVC1 PVC COATED RIG 100 100 0 1061.40 C 1061.40
30 FREECPL100 FREE 1" PVC COAT CPLG 10 10 0 0.00 E 0.00
40 78636401382 STRUTDPALSLT12-10 1-5/8 AL SLT 30 30 0 725.01 C 217.50
50 60000007280 HAYC1102X1AL 1 ALUM PIPE STRAP 20 20 0 233.21 C 46.64
60 78285635013 BOLTROD3/8 3/8" BLT ROD 6' $ 60 60 0 90.47 C 54.28
70 MESSAGE ALL STOCK

[Stamp: PAID]

APPROVED BY: MM
CHARGED TO: 07429-1505

Invoice Due By: 12/15/2023

Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.

For a Complete List of Locations Please Visit www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com

Accepted By: Joe / JOE

SUBTOTAL 1808.78
S&H CHGS
0.00% TAX 0.00
PAY THIS AMOUNT 1808.78

Page 1 of 1

colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com

Divisions of Colonial Electric:
colonial (colonialelectric.com/cmp)
colonial teltek (colonialteltek.com)
Bright Light (brightlightdesigncenter.com)
Annapolis Lighting (annapolislighting.com)

Original Invoice

INVOICE

INVOICE NUMBER INVOICE DATE
15499508 11/20/23

PLEASE REMIT PAYMENT TO:
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564

Billing Questions?
Call: THOMAS KARACKAI
484-679-2295

BILLING ADDRESS
11497 1 AB 0.537 E0091X I0146 D12088346132 S2 P10005658 0001:0001
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
RIDLEY CREEK SEWAGE PLANT
1751 TOWNE DR
WEST CHESTER PA 19380

CUSTOMER PO ORDER DATE ORDERED BY SHIP DATE SHIPPED VIA FREIGHT TERM
32353-24 11/17/23 DANIELLE 11/20/23 PPD
COMMENTS CO. UNIT / WH ENTERED BY ACCOUNT ID ORIGINAL INVOICE SALESPERSON
02 / DC 9795 E163 QT407588 0001
LINE SKU CUSTOMER SKU DESCRIPTION ORD QTY SHIP QTY BO QTY UNIT PRICE UM EXTENDED AMT
10 84765607255 CALPV1000B2010 1IN PVC PIP S 30 30 0 17.21 E 516.30
20 84765607321 CALPV1000T37 1IN PVC CONBDY 2 2 0 154.65 E 309.30
30 78599150950 SC500 BEAM CLAMP 1/4"-20 $ 50 50 0 130.33 C 65.17
40 MESSAGE ALL STOCK

[Stamp: PAID]

APPROVED BY: MM
CHARGED TO: 07429-1505

Invoice Due By: 12/20/2023

Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.

For a Complete List of Locations Please Visit www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com

Accepted By: Joe / JOE

SUBTOTAL 890.77
S&H CHGS
0.00% TAX 0.00
PAY THIS AMOUNT 890.77

Page 1 of 1

Yale ELECTRIC SUPPLY CO. - INVOICE

A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER PA 19380-4512
610-719-9253 Fax

CUSTOMER NUMBER SUB ACCOUNT # INVOICE NUMBER INVOICE DATE
117491 117491 S124442513.001 11/28/23

REMIT TO:
US ELECTRICAL SERVICES, INC.
PO BOX 412485
BOSTON MA 02241-2485

BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107

CUSTOMER PO # JOB NAME / RELEASE # ORDERED BY SALESPERSON
UV TEMP PUMP HOUSE ACCOUNT
WRITER SHIP VIA TERMS SHIP DATE ORDER DATE
DAVID A SMITH WILL CALL NET 15TH 11/28/23 11/27/23
ORDER QTY SHIP QTY DESCRIPTION UNIT PRICE EXT PRICE
2ea 2ea ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512
TB 5234-TB 1" STR L/T FLEX CONN
MADE IN USA
!! TAGGED ITEM !!
1535.610 c 30.71
1000ft 1000ft CAB CAT6 RISER 23GA 4PR SOL CMR
BLUE PVC JKT 1000' REEL-IN-BOX
191.950 m 191.95

PAID
APPROVED BY: MA
DATE PAID:
CHECK #:
CHARGED TO: 07429-1505

SAVE TIME SAVE MONEY
SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE
Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill.
Contact the Credit Department at 717-606-1317 and get set up today!

PROOF OF DELIVERY SIGNATURE: 2023/11/28 08:52:09 AM S124442513.1

Summary Item Amount
Subtotal 222.66
Shipping Chgs 0.00
Tax 0.00
Payments 0.00
Amount Due 222.66

Invoice is due by 01/15/24.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
A U.S. Electrical Services Inc. Company | Visit us at www.usesi.com
TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM | USE THIS ENROLLMENT TOKEN: VHD QLP SLM | Page 1 of 1

Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

Page: 1
12/05/2023

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Client No: 6604-001M
Invoice No. 281972

General Authority Services

Fees

Date / Timekeeper Description Hours Amount
11/09/2023
PMM
Email from L. Werkheiser in preparation for Board meeting. 0.20 41.00
11/13/2023
EBK
Review and analyze materials for monthly meeting
Travel to/from and attend monthly meeting
2.00 390.00
For Current Services Rendered 2.20 431.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 0.20 05.00 1.00
Ellen B. Koopman, Esquire 2.00 195.00 390.00
Previous Balance 72.00
Total Current Charges 431.00
11/30/2023 Payment -472.00
Balance Due 31.00

APPROVED BY: [signature] 12/6/23
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

Page: 1
12/05/2023

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Client No: 6604M

Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
472.00 431.00 0.00 -472.00 31.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dave Ware
Re: MA November 2023 YTD Financial Report
Date: December 7, 2023

YTD November 2023, the Municipal Authority recorded $708,804 in revenues (primarily from Sewer Operating transfers, Sewer Capital Reserve transfers, and tapping fees) and $704,590 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station and auditor and legal fees). The net result of operations is $4,214. As of November 30, 2023, the fund balance was ($50,319). This negative balance is a function of balance versus cash reporting. There is $59,705 in invoices being held so the actual cash balance is $9,386.

Attached is a complete list of 2023 full year MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
November 2023

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 255.64 5.71
07-354-0400 DCED GRANT 152,980.00 0 0
07-364-1100 C.C. TAPPING FEES 2,300.00 0.00 2,300.00
07-364-1110 R.C.TAPPING FEES 2,000.00 5,776.24 1,791.36
07-364-1130 CONNECTION FEES - SEWER 1,000.00 563.76 563.76
07-380-1000 MISCELLANEOUS REVENUE 282.24 282.24 282.24
07-392-0500 TRANSFER FROM SEWER OPERATING 100,000.00 135,263.29 82,107.15
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,471,553.00 566,662.88 265,426.86
Total Revenue 1,730,115.24 708,804.05 352,477.08
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 32,055.45 29,687.04 25,116.15
07-424-3000 MISCELLANEOUS EXPENSE 1,748.79 1,759.25 1,665.25
07-424-3110 MUNIC.AUTH.-AUDITING 10,815.00 10,500.00 10,250.00
07-424-3130 ENGINEERING SERVICES 47,250.00 48,661.25 42,469.00
07-424-3140 LEGAL SERVICES 8,400.00 7,709.00 6,140.00
07-424-7440 R.C. CAPITAL-STP 355,793.00 0.00 0.00
07-424-7490 CAP.REPLACEMENT R.C. 488,847.00 34,376.75 0.00
07-426-3001 RELINING 260,000.00 0.00 0.00
07-429-1501 BARKWAY PUMP STATION CAPITAL 0.00 0.00 2,215.00
07-429-1502 ASHBRIDGE PUMP STATION CAPITAL 0.00 0.00 11,493.05
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 78,000.00 10,240.62 153,398.99
07-429-1504 HUNT CO PUMP STATION CAPITAL 0.00 0.00 1,870.00
07-429-1505 RCSTP CAPITAL 260,000.00 233,347.32 120,403.18
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 0.00 90,113.64 0.00
07-429-1520 RCSTP - CAUSTIC SODA 0.00 55,932.87 0.00
07-429-6100 WEST GOSHEN CAPITAL 187,206.00 182,262.24 0.00
07-492-0100 TRANSFER TO GENERAL FUND 0.00 0.00 212.99
Total Expenses 1,730,115.24 704,589.98 375,233.61
Net Result From Operations 0.00 4,214.07 -22,756.53

Municipal Authority

YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/23 Revenue Journal INTEREST EARNED JAN 2023 2.65
07-341-1000 INTEREST EARNINGS 02/28/23 Revenue Journal INTEREST EARNED FEBRUARY 2023 6.32
07-341-1000 INTEREST EARNINGS 03/31/23 Revenue Journal INTEREST EARNED MARCH 2023 23.37
07-341-1000 INTEREST EARNINGS 04/30/23 Revenue Journal INTEREST EARNED APRIL 2023 12.47
07-341-1000 INTEREST EARNINGS 05/31/23 Revenue Journal INTEREST EARNED MAY 2023 32.83
07-341-1000 INTEREST EARNINGS 06/30/23 Revenue Journal INTEREST EARNED JUNE 2023 67.17
07-341-1000 INTEREST EARNINGS 07/31/23 Revenue Journal INTEREST EARNED JULY 2023 10.61
07-341-1000 INTEREST EARNINGS 08/31/23 Revenue Journal INTEREST EARNED AUGUST 2023 9.11
07-341-1000 INTEREST EARNINGS 09/30/23 Revenue Journal INTEREST EARNED SEPTEMBER 2023 29.99
07-341-1000 INTEREST EARNINGS 10/31/23 Revenue Journal INTEREST EARNED SEPTEMBER 2023 31.43
07-341-1000 INTEREST EARNINGS 11/30/23 Revenue Journal INTEREST EARNED NOVEMBER 2023 29.69
07-364-1110 R.C.TAPPING FEES 01/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 02/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 03/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 04/03/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 05/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 06/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 06/28/23 Revenue Journal TAP IN FEE 1712 E BOOT RD 2,000.00
07-364-1110 R.C.TAPPING FEES 06/28/23 Revenue Journal SEWER INSPECTION FEE 1712 E BOOT RD 500.00
07-364-1110 R.C.TAPPING FEES 07/03/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 08/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 09/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 10/02/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1110 R.C.TAPPING FEES 11/01/23 Revenue Journal 1577 COLONIAL LN 297.84
07-364-1130 CONNECTION FEES - SEWER 01/27/23 Revenue Journal CONNECTION FEE INSTALLMENT INV# 12838 281.88
07-364-1130 CONNECTION FEES - SEWER 03/23/23 Revenue Journal CONNECTION FEE INSTALLMENT INV# 12839 281.88
07-380-1000 MISCELLANEOUS REVENUE 01/27/23 Revenue Journal PINE ROCK INTEREST PORTION - STOFFLET 141.12
07-380-1000 MISCELLANEOUS REVENUE 03/23/23 Revenue Journal PINE ROCK INTEREST PORTION - PAPPANO 141.12
07-392-0500 TRANSFER FROM SEWER OPERATING 01/20/23 Revenue Journal XFER TO 07 FROM 05 RE: MA EXPENSES 3,384.75
07-392-0500 TRANSFER FROM SEWER OPERATING 01/30/23 Revenue Journal XFER $ TO MA07 FROM 05-SEWER 14,572.43
07-392-0500 TRANSFER FROM SEWER OPERATING 01/31/23 Revenue Journal XFER $ FROM 05 TO 07 RE: MA EXPENSES 3,000.00
07-392-0500 TRANSFER FROM SEWER OPERATING 02/17/23 Revenue Journal XFER TO 07 FROM 05 RE: EXPENSES 36,455.37
07-392-0500 TRANSFER FROM SEWER OPERATING 02/23/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 2,877.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/22/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 715.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/23/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 880.25
07-392-0500 TRANSFER FROM SEWER OPERATING 03/24/23 Revenue Journal XFER TO 07 FROM 05 RE: EXPENSES 6,738.25
07-392-0500 TRANSFER FROM SEWER OPERATING 03/29/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 8,000.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/31/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 8,944.84
07-392-0500 TRANSFER FROM SEWER OPERATING 04/17/23 Revenue Journal FROM 05 SEWER OP TO 07 MA 4,992.75
07-392-0500 TRANSFER FROM SEWER OPERATING 05/10/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 707.00
07-392-0500 TRANSFER FROM SEWER OPERATING 05/10/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 5,627.50

Page 1 of 6

Municipal Authority

YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0500 TRANSFER FROM SEWER OPERATING 06/08/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 1,253.25
07-392-0500 TRANSFER FROM SEWER OPERATING 06/30/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 10,398.41
07-392-0500 TRANSFER FROM SEWER OPERATING 07/13/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 1,041.00
07-392-0500 TRANSFER FROM SEWER OPERATING 08/08/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 60.00
07-392-0500 TRANSFER FROM SEWER OPERATING 08/24/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 5,040.00
07-392-0500 TRANSFER FROM SEWER OPERATING 09/27/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 10,343.79
07-392-0500 TRANSFER FROM SEWER OPERATING 10/11/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 104.00
07-392-0500 TRANSFER FROM SEWER OPERATING 10/13/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 17,834.75
07-392-0500 TRANSFER FROM SEWER OPERATING 10/17/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 16,542.00
07-392-0500 TRANSFER FROM SEWER OPERATING 10/18/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 15,755.75
07-392-0500 TRANSFER FROM SEWER OPERATING 11/07/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 8,612.50
07-392-0500 TRANSFER FROM SEWER OPERATING 11/27/23 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 1,047.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/12/23 Revenue Journal XFER $ FROM 09 TO 07 TO COVER CAP.EXP. 41,381.95
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/20/23 Revenue Journal XFER TO 07 FROM 09 RE: MA EXPENSES 11,730.76
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/30/23 Revenue Journal XFER $ TO MA07 FROM 09- SEWER CAP 5,221.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/10/23 Revenue Journal FROM 09 SEWER CAP RESERVE TO 07 MA 115,362.26
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/23/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 8,690.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/01/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 20,201.84
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/09/23 Revenue Journal XFER $ TO 07 FROM 09 1,264.96
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/22/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 1,961.86
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/24/23 Revenue Journal XFER TO 07 FROM 09 RE: EXPENSES 11,080.96
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/29/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 5,221.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/05/23 Revenue Journal XFER FROM 09 SEWER OP TO 07 MA 1,041.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/21/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 977.06
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/25/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 4,801.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/26/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 252.28
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/28/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 688.81
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/04/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 5,069.52
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/10/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 1,953.58
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/19/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 66,899.98
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/08/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 56,078.05
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/13/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 450.18
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/20/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 888.22
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/03/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 6,746.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/11/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 209.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/13/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 824.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/08/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 22.12
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/24/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 5,626.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/31/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 18,930.40
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/07/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 17,500.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 09/22/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 3,137.72

Page 2 of 6

Municipal Authority

YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/13/23 Revenue Journal XFER FROM 09 SEWER OPERATING TO 07 MA 5,028.13
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/18/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 11,234.25
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/24/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 1,408.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/01/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 156.69
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/07/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 956.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/20/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 1,650.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/27/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 80,991.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/29/23 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 1,359.00
Total Revenue 708,804.05
07-424-1400 ADMINISTRATIVE WAGES 03/31/23 Pay Check: 3402 23-00878 QTR 1 2023 MA CHARGE BACK 8,944.84
07-424-1400 ADMINISTRATIVE WAGES 06/30/23 Pay Check: 3431 23-01745 QTR 2 2023 MA CHARGE BACK 10,398.41
07-424-1400 ADMINISTRATIVE WAGES 09/29/23 Expd QTR 3 2023 MA CHARGE BACK 10,343.79
07-424-3000 MISCELLANEOUS EXPENSE 03/22/23 Pay Check: 3395 23-00707 2023 ANNUAL DAILY DISCHARGE CA 715.00
07-424-3000 MISCELLANEOUS EXPENSE 03/23/23 Expd REIMBURSE 01 FOR 07 CC EXPENSE 880.25
07-424-3000 MISCELLANEOUS EXPENSE 08/08/23 Expd REIMBURSE 01 FOR 07 CC EXPENSE 60.00
07-424-3000 MISCELLANEOUS EXPENSE 10/11/23 Pay Check: 3442 23-02597 GEN, SEWER, MUN AUTH CHECKS 104.00
07-424-3110 MUNIC.AUTH.-AUDITING 02/15/23 Pay Check: 3389 23-00406 PROGRESS BILLING EGT MUA123122 1,793.00
07-424-3110 MUNIC.AUTH.-AUDITING 03/29/23 Pay Check: 3401 23-00870 PROGRESS BILLING AUD EGT MUA 8,000.00
07-424-3110 MUNIC.AUTH.-AUDITING 05/10/23 Pay Check: 3417 23-01270 PROGRESS BILLING AUDIT EGT MUA 707.00
07-424-3130 ENGINEERING SERVICES 01/20/23 Pay Check: 3379 23-00111 SERV.THRU 12/18/22 GEN.SERV.22 3,384.75
07-424-3130 ENGINEERING SERVICES 02/23/23 Pay Check: 3392 23-00443 SERV THRU 011523 GEN SERVICES 2,294.00
07-424-3130 ENGINEERING SERVICES 03/24/23 Pay Check: 3399 23-00816 SERV THRU 021223 CHAPTER 94 RE 2,246.00
07-424-3130 ENGINEERING SERVICES 03/24/23 Pay Check: 3399 23-00815 SERV THRU 021223 GENERAL SERVI 3,482.75
07-424-3130 ENGINEERING SERVICES 04/17/23 Pay Check: 3406 23-01018 SERV THRU 031923 GENERAL SERVI 2,614.75
07-424-3130 ENGINEERING SERVICES 04/17/23 Pay Check: 3406 23-01019 SERV THRU 031923 CHAPTER 94 RE 1,654.50
07-424-3130 ENGINEERING SERVICES 05/10/23 Pay Check: 3420 23-01302 SERV THRU 041623 2023 GEN SERV 3,663.25
07-424-3130 ENGINEERING SERVICES 05/10/23 Pay Check: 3420 23-01303 SERV THRU 041623 2022 CHAPT 94 1,377.25
07-424-3130 ENGINEERING SERVICES 06/08/23 Pay Check: 3425 23-01576 SERV THRU 051423 2023 GEN SERV 1,253.25
07-424-3130 ENGINEERING SERVICES 07/13/23 Pay Check: 3435 23-01882 SERV THRU 061823 2023 GEN SERV 651.50
07-424-3130 ENGINEERING SERVICES 08/24/23 Pay Check: 3437 23-02177 SERV THRU 071623 2023 GEN SERV 2,900.00
07-424-3130 ENGINEERING SERVICES 10/18/23 Pay Check: 3447 23-02710 SERV THRU 091723 2023 GEN SERV 13,951.25
07-424-3130 ENGINEERING SERVICES 11/07/23 Pay Check: 3449 23-02855 SERV THRU 101523 2023 GEN SERV 8,612.50
07-424-3130 ENGINEERING SERVICES 11/27/23 Pay Check: 3453 23-02954 SERV THRU 111223 2023 GEN SERV 575.50
07-424-3140 LEGAL SERVICES 02/23/23 Pay Check: 3391 23-00442 LEGAL SERV. JAN 2023 GEN AUTH 583.00
07-424-3140 LEGAL SERVICES 03/24/23 Pay Check: 3398 23-00812 LEGAL SERV FEB 2023 GEN AUTHOR 389.50
07-424-3140 LEGAL SERVICES 03/24/23 Pay Check: 3398 23-00813 LEGAL SERV DEC 2022 GEN AUTHOR 620.00
07-424-3140 LEGAL SERVICES 04/17/23 Pay Check: 3405 23-01020 LEGAL SERV MARCH 2023 GEN AUTH 431.00
07-424-3140 LEGAL SERVICES 04/17/23 Pay Check: 3405 23-01017 LEGAL SERV FEB 2023 GEN AUTH 292.50
07-424-3140 LEGAL SERVICES 05/10/23 Pay Check: 3419 23-01304 LEGAL SERV APRIL 2023 GEN AUTH 587.00

Page 3 of 6

Municipal Authority

YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3140 LEGAL SERVICES 07/13/23 Pay Check: 3434 23-01883 LEGAL SERV MAY 2023 GEN AUTH 389.50
07-424-3140 LEGAL SERVICES 08/24/23 Pay Check: 3436 23-02176 LEAL SERV JUNE 2023 GEN AUTH 348.50
07-424-3140 LEGAL SERVICES 08/24/23 Pay Check: 3436 23-02175 LEGAL SERV JULY 2023 GEN AUTH 1,791.50
07-424-3140 LEGAL SERVICES 10/18/23 Pay Check: 3446 23-02706 LEGAL SERV SEPT 2023 GEN AUTH 658.50
07-424-3140 LEGAL SERVICES 10/18/23 Pay Check: 3446 23-02705 LEGAL SERV AUG 2023 GEN AUTH 1,146.00
07-424-3140 LEGAL SERVICES 11/27/23 Pay Check: 3452 23-02953 LEGAL SERV OCT 2023 GEN AUTH 472.00
07-424-7490 CAP.REPLACEMENT R.C. 10/13/23 Pay Check: 3443 23-01990 RCSTP-REPLACEMENT MYERS PUMP 17,834.75
07-424-7490 CAP.REPLACEMENT R.C. 10/17/23 Pay Check: 3445 23-01869 10K0804 INLINE MUFFIN MONSTER 16,542.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/20/23 Pay Check: 3379 23-00110 SERV.THRU 12/18/22 HM EST SEWR 9,690.50
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 02/06/23 Pay Check: 3385 23-00331 STONE, AASHTO #57 550.12
07-429-1505 RCSTP CAPITAL 01/10/23 Pay Check: 3377 23-00030 CONDUITS, STRAPS, LOCKNUTS + 1,161.95
07-429-1505 RCSTP CAPITAL 01/10/23 Pay Check: 3378 23-00075 PULSAFEEDER - RCSPT CAUSTIC SO 40,220.00
07-429-1505 RCSTP CAPITAL 01/20/23 Pay Check: 3379 23-00109 SERV.THRU 12/18/22 RCSTP SODA 861.51
07-429-1505 RCSTP CAPITAL 01/20/23 Pay Check: 3379 23-00112 SERV.THRU 12/18/22 RCSTP UV 1,178.75
07-429-1505 RCSTP CAPITAL 01/27/23 Pay Check: 3380 23-00151 HELIFLOW 408 PD BLOWER 5,221.00
07-429-1505 RCSTP CAPITAL 02/06/23 Pay Check: 3384 23-00305 50HP 3540RPM BALDOR MOTOR 4,683.69
07-429-1505 RCSTP CAPITAL 03/24/23 Pay Check: 3399 23-00817 SERV THRU 021223 RCSTP CAU SOD 4,144.21
07-429-1505 RCSTP CAPITAL 03/29/23 Pay Check: 3400 23-00827 HELIFLOW 408 LHBD BLOWER 5,221.00
07-429-1505 RCSTP CAPITAL 06/08/23 Pay Check: 3422 23-01548 UV DISINFECTION SYS PYMT- 30% 40,495.80
07-429-1505 RCSTP CAPITAL 06/08/23 Pay Check: 3425 23-01575 SERV THRU 051423 RCSTP UV REPL 5,770.00
07-429-1505 RCSTP CAPITAL 06/08/23 Pay Check: 3425 23-01573 SERV THRU 051423 RCSTP CAU SOD 37.25
07-429-1505 RCSTP CAPITAL 07/13/23 Pay Check: 3435 23-01881 SERV THRU 061823 RCSTP CAU SOD 824.50
07-429-1505 RCSTP CAPITAL 08/24/23 Pay Check: 3437 23-02178 SERV THRU 060823 RCSTP UV REPL 5,626.50
07-429-1505 RCSTP CAPITAL 09/07/23 Pay Check: 3439 23-02333 PARTIAL PYMT RC GENERATOR SUPP 17,500.00
07-429-1505 RCSTP CAPITAL 09/22/23 Pay Check: 3440 23-02474 441T TWINTIER REBAR TYING TOOL 3,008.05
07-429-1505 RCSTP CAPITAL 09/22/23 Pay Check: 3440 23-02474 441T TWINTIER REBAR TYING TOOL -30.08
07-429-1505 RCSTP CAPITAL 09/22/23 Pay Check: 3441 23-02452 ROD 1/2X20' UV PROJECT 159.75
07-429-1505 RCSTP CAPITAL 10/18/23 Pay Check: 3447 23-02709 SERV THRU 091723 RCSTP UV REPL 10,769.75
07-429-1505 RCSTP CAPITAL 10/24/23 Pay Check: 3448 23-02754 ADHESIVE DISPENSER& CARTRIDGES 1,408.75
07-429-1505 RCSTP CAPITAL 11/01/23 Pay Check: 701 23-02825 VARIOUS PURCHASES- SEE NOTES 156.69
07-429-1505 RCSTP CAPITAL 11/07/23 Pay Check: 3449 23-02854 SERV THRU 101523 RCSTP UV REPL 928.25
07-429-1505 RCSTP CAPITAL 11/20/23 Pay Check: 3450 23-02919 RCSTP-5/8" REBAR VARIOUS LENGT 1,650.00
07-429-1505 RCSTP CAPITAL 11/27/23 Pay Check: 3451 23-02952 UV DISINFECTION SYS PYMT- 60% 80,991.00
07-429-1505 RCSTP CAPITAL 11/29/23 Pay Check: 3454 23-02976 SWELLSTOP WATERSTOP, PRIMER 1,359.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00148 6,904.64
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00364 430.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00429 1,708.22
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00412 17,817.91
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00411 3,771.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00381 6,498.99
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00415 4,866.25

Page 4 of 6

Municipal Authority

YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00153 2,642.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/21/23 Expd RECLASS HERSH.MILL EST. PURCH.23-00152 5,025.79
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/23/23 Pay Check: 3392 23-00444 SERV THRU 011523 HM ESTATES SW 8,690.50
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/28/23 Pay Check: 3393 23-00536 STONE, AASHTO #57 329.79 TON 8,244.78
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/28/23 Pay Check: 3393 23-00534 STONE, AASHTO #57 251.05 TON 6,276.27
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 02/28/23 Pay Check: 3393 23-00535 STONE, AASHTO #57 227.23 TON 5,680.79
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/09/23 Pay Check: 3394 23-00582 SPLIT COUPLERS 305.40
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/09/23 Pay Check: 3394 23-00581 SEWER HUB ADAPTERS,COUPLERS + 959.56
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/22/23 Pay Check: 3396 23-00723 36" MARMAC POLYSEAL COUPLER 803.20
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/22/23 Pay Check: 3397 23-00731 JOHN DEERE 550K RENTL 2/28-3/1 434.50
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/22/23 Pay Check: 3397 23-00730 JOHNDEERE 550K RENTL 2/23-2/24 724.16
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 03/24/23 Pay Check: 3399 23-00814 SERV THRU 021223 HM ESTATES SE 6,936.75
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 04/25/23 Pay Check: 3410 23-01141 SINGLE SIDED STRAW MAT,PINS 1,407.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 04/25/23 Pay Check: 3410 23-01141 SINGLE SIDED STRAW MAT,PINS -14.07
07-429-1520 RCSTP - CAUSTIC SODA 04/05/23 Pay Check: 3403 23-00889 VARIOUS PURCHASES- SEE NOTES 215.75
07-429-1520 RCSTP - CAUSTIC SODA 04/05/23 Pay Check: 3404 23-00906 ROD 5/8 X 20 FT-CAUSTIC SODA 826.00
07-429-1520 RCSTP - CAUSTIC SODA 04/21/23 Pay Check: 3407 23-01081 3" TWISTER CORE BITS 441.00
07-429-1520 RCSTP - CAUSTIC SODA 04/21/23 Pay Check: 3407 23-01081 3" TWISTER CORE BITS -4.41
07-429-1520 RCSTP - CAUSTIC SODA 04/21/23 Pay Check: 3408 23-01056 GALV CAP, GFCI RCPT, GREY COVR 168.21
07-429-1520 RCSTP - CAUSTIC SODA 04/21/23 Pay Check: 3408 23-01057 GALV CAP, STEEL CLAMPBACK 372.26
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3409 23-01131 PVC CONDBY, DEV BOX, CTD CPLG 890.32
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01112 (30) BUSS FUSES 2,160.00
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01144 GALV BLCK CAP,COMPRESSION CPLG 286.08
07-429-1520 RCSTP - CAUSTIC SODA 04/25/23 Pay Check: 3411 23-01128 IRON THRDED T BODY, SHEET STEE 72.17
07-429-1520 RCSTP - CAUSTIC SODA 04/26/23 Pay Check: 700 23-01151 CAUSTIC SODA-(2) HVY DUTY TARP 252.28
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01177 BLINE SS CHANNEL SLOTTED HOLES 374.17
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01176 EMT HW STRAP,MACH SCREW ANCHOR 233.47
07-429-1520 RCSTP - CAUSTIC SODA 04/28/23 Pay Check: 3412 23-01175 GALV RED CAP, COMM SWITCH, 81.17
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3413 23-01225 PVC BELL END PIPE, PVC COUPLNG 2,574.00
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3414 23-01227 10 YD CONCRETE 4500 PSI 1,930.00
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3415 23-01219 (30) BLINE EMT-HW STRAP 83.82
07-429-1520 RCSTP - CAUSTIC SODA 05/03/23 Pay Check: 3415 23-01212 OUTLET BOX, SS SWITCH,HW STRAP 481.70
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3416 23-01276 SCH 40 2" PIPE, 2" COUPLING 1,030.64
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3416 23-01275 CORP BALL STOP, SERVICE SADDLE 905.59
07-429-1520 RCSTP - CAUSTIC SODA 05/10/23 Pay Check: 3418 23-01295 TAYMAC GRY METAL INUSE COVER 17.35
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3423 23-01553 RC WWTP CHEMICAL STORAGE TANK 6,415.00
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3424 23-01554 RIDLEY CREEK-RAN CONDUIT 2,008.00
07-429-1520 RCSTP - CAUSTIC SODA 06/08/23 Pay Check: 3424 23-01555 RIDLEY CR-RAN CONDUIT FOR TANK 1,352.00
07-429-1520 RCSTP - CAUSTIC SODA 06/13/23 Pay Check: 3428 23-01617 BALL CORP STOP,BRASS THRD NIPL 450.18
07-429-1520 RCSTP - CAUSTIC SODA 06/20/23 Pay Check: 3429 23-01658 BRASS THREADED NIPPLE&COUPLING 57.22
07-429-1520 RCSTP - CAUSTIC SODA 06/20/23 Pay Check: 3430 23-01654 PULSAFEEDER TUBING & KOPKIT 831.00

Page 5 of 6

Municipal Authority
YTD Revenues and Expenses thru 11/30/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1520 RCSTP - CAUSTIC SODA 07/03/23 Pay Check: 3432 23-01739 RC WWTP CHEMICAL STORAGE TANK 6,746.00
07-429-1520 RCSTP - CAUSTIC SODA 07/11/23 Pay Check: 3433 23-01860 GATE & POST- BLAST PRIMER 209.00
07-429-1520 RCSTP - CAUSTIC SODA 08/08/23 Expd REIMBURSE 01 FOR 07 CC EXPENSE 22.12
07-429-1520 RCSTP - CAUSTIC SODA 08/31/23 Pay Check: 3438 23-02291 RC PIPING FOR CAUSTICSODA TANK 18,930.40
07-429-1520 RCSTP - CAUSTIC SODA 10/13/23 Pay Check: 3444 23-02664 HEATED SAFETY EYEWASH/SHOWER 5,028.13
07-429-1520 RCSTP - CAUSTIC SODA 10/18/23 Pay Check: 3447 23-02707 SERV THRU 091723 RCSTP CAU SOD 464.50
07-429-1520 RCSTP - CAUSTIC SODA 11/07/23 Pay Check: 3449 23-02853 SERV THRU 101523 RCSTP CAU SOD 27.75
07-429-6100 WEST GOSHEN CAPITAL 02/06/23 Pay Check: 3383 23-00366 WWPS PYMT LAST INSTALLMENT 115,362.26
07-429-6100 WEST GOSHEN CAPITAL 06/12/23 Pay Check: 3426 23-01363 2022 WG SEWER AUTH BOND FUND E 19,143.34
07-429-6100 WEST GOSHEN CAPITAL 06/12/23 Pay Check: 3427 23-01364 2022 WG SEWER AUTH TAPPING FEE 47,756.64
Total Expense 704,589.98
Net Operating 4,214.07

Page 6 of 6

610-692-7171 www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 Date: December 6, 2023 To: Municipal Authority From: Mark Miller, Director of Public Works RE: New Lift Station Pump Purchase On November 29, 2023, we pulled the three pumps at the lift station to check the impellers and general condition as part of our regular preventative maintenance. After looking at the pumps, I would like to make the following recommendations:

1. We purchase a new lift station pump in the amount of $33,647.00 (quote attached) 2. Once the new pump is received, we need to start pulling the other pumps out to be rebuilt. The rebuild costs will be approximately $8,500 to $12,000 per pump.

• PUMP P11: 10,299.1 hours • PUMP P12: 9,975.2 hours • PUMP P13: 12,259 hours

[Logo: xylem]

December 4, 2023

EAST GOSHEN TOWNSHIP
WEST CHEST PA 19380

Quote # 2023-MAL-1547
Project Name: East Goshen - 2023
Job Name: Ridley Creek WWTP Influent PS

Attn: Mark Miller
Xylem Water Solutions USA, Inc. is pleased to provide a quote for the following Flygt equipment.

Co-Stars Contract # 016-E23-311

Xylem Water Solutions USA, Inc.
Flygt Products
2330 Yellow Springs Rd
Malvern, PA 19355
Tel 610/408-6500
Fax 610/647-5563

3171.095-0016 Replacement

Qty Part Number Description Unit Price Extended Price
1 3171.095-0016 Flygt Model NP-3171.095 6" volute Submersible pump equipped with a 460 Volt / 3 phase / 60 Hz 30 HP 1750 RPM motor, 434 impeller, 1 x 50 Ft. length of SUBCAB 4G25+S(2x0,5) submersible cable, FLS leakage detector, volute is prepared for Flush Valve $ 30,147.00 $ 30,147.00
1 14-69 98 30N SHIPPING AND HANDLING-NO TAX $ 3,500.00 $ 3,500.00
Total Price $ 33,647.00

Terms & Conditions

This order is subject to the Standard Terms and Conditions of Sale – Xylem Americas effective on the date the order is accepted which terms are available at http://www.xyleminc.com/en-us/Pages/terms-conditions-of-sale.aspx and incorporated herein by reference and made a part of the agreement between the parties.

Purchase Orders: Please make purchase orders out to: Xylem Water Solutions USA, Inc.
Freight Terms: 3 DAP - Delivered At Place 08 - Jobsite (per IncoTerms 2020)
See Freight Payment (Delivery Terms) below.
Taxes: State, local and other applicable taxes are not included in this quotation.
Back Charges: Buyer shall not make purchases nor shall Buyer incur any labor that would result in a back charge to Seller without prior written consent of an authorized employee of Seller.
Shortages: Xylem will not be responsible for apparent shipment shortages or damages incurred in shipment that are not reported within two weeks from delivery to the

[Logo: FLYGT a xylem brand]

Page 1 of 3

jobsite. Damages should be noted on the receiving slip and the truck driver advised of the damages. Please contact our office as soon as possible to report damages or shortages so that replacement items can be shipped and the appropriate claims made.

Terms of Delivery: PP/Add Order Position
Terms of Payment: 100% N30 after invoice date.
Xylem's payment shall not be dependent upon Purchaser being paid by any third party unless Owner denies payment due to reasons solely attributable to items related to the equipment being provided by FLYGT.

Validity: This Quote is valid for thirty (30) days.
Please note that this pricing is valid for 30 days and contingent upon final approval of submittals and release to fabrication by (within 90 days of bid date).
This quotation is subject to change if any changes to the specifications or plans are made that alter the scope of supply.

Schedule: Shipment lead times are approximately 5-6 weeks after order acceptance.
COVID 19: Delivery lead-times may be impacted by the current COVID-19 virus pandemic relative to transportation logistics.

Sincerely,

[Signature: AJ Wilson]
AJ Wilson
Sales Representative
Phone: 610-408-6515
Cell: 610-314-6856
aj.wilson@xylem.com

[Signature: Emily Cooper]
Emily Cooper
Customer Service
Phone: 610-408-6503
emily.cooper@xylem.com

[Logo: FLYGT a xylem brand]

Page 2 of 3

[Logo: xylem]

Xylem Water Solutions USA, Inc.
Flygt Products

Customer Acceptance

This order is subject to the Standard Terms and Conditions of Sale – Xylem Americas effective on the date the order is accepted which terms are available at http://www.xyleminc.com/en-us/Pages/terms-conditions-of-sale.aspx and incorporated herein by reference and made a part of the agreement between the parties.

A signed copy of this Quote is acceptable as a binding contract.

Purchase Orders: Please make purchase orders out to: Xylem Water Solutions USA, Inc.

Quote #: 2023-MAL-1547
Customer Name: EAST GOSHEN TOWNSHIP
Job Name: Ridley Creek WWTP Influent PS
Total Amount: $ 33,647.00
(excluding freight)

Signature: _________________________
Name: _________________________
(PLEASE PRINT)

Company/Utility: _________________________
PO: _________________________

Address: _________________________
Date: _________________________

_________________________
Phone: _________________________

_________________________
Email: _________________________

_________________________
Fax: _________________________

[Logo: FLYGT a xylem brand]

Page 3 of 3

Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2

December 8, 2023

EGMAU23001P

East Goshen Municipal Authority Attn: Mark Miller, Public Works Director 1580 Paoli Pike West Chester, PA 19380

RE: Proposal for Chester Creek Interceptor Inspection and Repair East Goshen Township, Pennsylvania

Dear Mr. Miller:

Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction services for the inspection and repair of the Chester Creek Interceptor in East Goshen Township.

Background East Goshen Township televised pipes along a portion of the Chester Creek Interceptor on January 26-27, 2023. Pennoni provided a sanitary sewer inspection summary, dated March 28, 2023, based on the results of the televised pipes. It was recommended that approximately 360 LF of existing pipe be lined with cured-in-place pipe lining, two pipes be pipe grouted, four manholes be pressure grouted, asphalt/debris be removed from one pipe, and one lateral be replaced to address the leaks, infiltration, and blockages discovered in the pipe videos. In addition, it was recommended that the downstream 4,900 LF of pipe along the Chester Creek Interceptor be televised to assess the condition of the interceptor to determine if additional repairs to the system are necessary. We prepared bid documents and conducted the bidding process, and construction award was made. The project is under construction, and we have been performing construction phase services as requested, consisting of pre-construction coordination, conducting the pre-construction meeting, reviewing construction material submittals, and reviewing initial videos of a portion of the downstream interceptor that has already been televised by the contractor.

All work to-date has been performed under our 2023 General Engineering task. However, that task is approaching budget, and capital projects are not intended to be performed under that task. Therefore, the purpose of this proposal is to create a separate task order to fund the remainder of engineering for the project through a separate capital project.

The scope of this proposal is to provide construction phase support services for the remainder of construction.

Scope of Services Pennoni will provide construction engineering support as requested, which is expected to include: review of inspection videos of the remainder of the contracted interceptor extents, recommendations for any additional repairs, coordination with the contractor and Township for pricing and budget feasibility for any such repairs, additional construction submittal reviews, part-time inspection of rehabilitation work including cured-in-place pipe lining, review of post- construction videos, processing of pay applications, review of prevailing wage certifications, and processing of project closeout.

We are estimating 80 hours of on-site construction inspection and 24 hours of engineering office support for the remainder of construction within this proposal.

EGMAU23001P Chester Creek Interceptor East Goshen Municipal Authority December 8, 2023 Page 2 of 2

Deliverables We will provide recommendations for any further repairs based on review of inspection videos along with payment application recommendation letters.

Schedule Performance of services will be conducted based on the contractor’s construction schedule.

Fee We will perform the Scope of Services on a Time and Materials basis at the hourly rates to be billed at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee not to exceed Twelve Thousand Dollars ($12,000.00) without prior approval of the Authority.

Billing and Payment Invoices will be submitted monthly. Payment is due within 30 days of invoicing.

Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.

If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.

Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Authority Engineer ACCEPTED BY:

________________________________________________________ Written Name:

East Goshen Municipal Authority

DATE:

___________________

Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2

December 8, 2023

EGMAU23001P

East Goshen Municipal Authority Attn: Mark Miller, Public Works Director 1580 Paoli Pike West Chester, PA 19380

RE: Proposal for RCSTP Generator 2 Replacement East Goshen Township, Pennsylvania

Dear Mr. Miller:

Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction phase services and remaining design services for the proposed replacement of the existing emergency generator “Generator 2” at the Ridley Creek Sewage Treatment Plant (RCSTP).

Background The RCSTP contains two emergency generators on-site. Generator 1 was replaced in 2019. Generator 2 is a 500 KW / 625KVA diesel-fueled Cummins generator. This generator was installed as part of the 2008-2009 expansion and is due for replacement.

We have already performed sizing analysis for the Generator 2 replacement, obtained quotes, and assisted with acquisition of the generator and automatic transfer switch. We also evaluated concept alternatives for siting and constructability of the replacement generator, performed multiple site visits, and initiated preparation of plans. All work to-date has been performed under our 2023 General Engineering task. However, that task is approaching budget, and capital projects are not intended to be performed under that task. Therefore, the purpose of this proposal is to create a separate task order to fund the remainder of engineering for the project through a separate capital project.

The scope of this proposal is to finalize design and plans including associated electric work, new/expanded concrete pad, construction sequence to maintain backup power during construction to maximum extent practical, and other limited plan information needed for the Township Public Works Department to perform construction. It also includes limited construction phase support.

Scope of Services Pennoni will provide the following professional engineering services:

• Prepare a design for the selected generator layout based on electrical requirements and existing site conditions.

• Prepare a construction plan set consisting of a cover sheet, demolition and site plan, electrical plan, erosion and sediment (E&S) control plan, E&S details and notes, and construction details and notes including concrete pad.

• Prepare a structural design for a new or expanded concrete pad for the generator. • Prepare electrical design for the installation of the new generator and any associated equipment.

• Provide construction engineering support as requested.

EGMAU23001P RCSTP Generator 2 Replacement East Goshen Municipal Authority December 8, 2023 Page 2 of 2

We assume that no permitting will be required, and that Public Works will perform the construction so bid documents and cost estimates are not needed.

Deliverables Deliverables consist of a construction plan set.

Schedule Performance of services will commence upon receipt of Notice to Proceed (NTP). We anticipate final construction plans will be provided approximately eight weeks after NTP.

Fee We will perform the Scope of Services on a Time and Materials basis at the hourly rates to be billed at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee not to exceed Fifteen Thousand Dollars ($15,000.00) without prior approval of the Authority.

Billing and Payment Invoices will be submitted monthly. Payment is due within 30 days of invoicing.

Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.

If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.

Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Associate Vice President

ACCEPTED BY:

________________________________________________________ Written Name:

East Goshen Municipal Authority

DATE:

___________________

From: Michael Ellis To: Derek Davis; Mark Miller; David Ware Cc: Lynn Werkheiser; Nathan M. Cline Subject: 2024 EGT & EGMA Annual Services Date: Monday, November 20, 2023 4:10:29 PM Attachments: ATT00001.png 2024 EG Annual Services Ltr.pdf

Hi Derek, Mark, and Dave, Please find attached our annual services and rates letter for 2024 for the Township and MA. As previously communicated, the rates reflect an average 2.2% increase due to inflationary conditions (vs 3.2% Federal COLA for 2024) and salary pressures to retain our experienced and talented staff to ensure continued provision of high quality service to the Township and MA. Please do not hesitate to call Nate or me if you have any comments or questions. Thank you! Mike

Michael Ellis, PE Municipal Division Manager

Pennoni 121 Continental Drive, Suite 207 | Newark, DE 19713 Direct: +1 302-351-5236 | Mobile: +1 302-561-4235 www.pennoni.com | MEllis@Pennoni.com

Watch Now: I-95 CAP Groundbreaking!

Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 1

November 20, 2023 East Goshen Township Attn: Derek Davis, Township Manager 1580 Paoli Pike West Chester, PA 19380 RE: Fee Schedule for Year 2024 East Goshen Township and East Goshen Municipal Authority Dear Derek: Pennoni is proud to serve East Goshen Township and East Goshen Municipal Authority, and we look forward to working with you again in 2024. Our rates for 2024 for Township and Authority Engineering services are listed below for the categories of staff that most frequently provide services to the Township and Authority. The rates reflect an average increase of 2.2%, which is below the 2024 federal cost of living adjustment (COLA) of 3.2%. Authority/Township Engineer ............................................................ $153/hr Senior Professional ............................................................................ $148/hr Project Professional .......................................................................... $131/hr Staff Professional .............................................................................. $120/hr Associate Professional...................................................................... $113/hr Senior Engineering Technician .......................................................... $109/hr Graduate Professional ....................................................................... $104/hr Engineering Technician ...................................................................... $92/hr We will continue to provide services to the Township and Authority as requested. For typical general engineering services to the Authority, we recommend budgeting the following under the expectation of a similar level of effort in 2024 as in 2023. Similar to previous years, we will establish separate accounts for each activity listed below, and each activity will be invoiced separately.

• General Consultation and monthly meetings ..................................... $43,000 • Chapter 94 reports ................................................................................. $9,000

TOTAL ................ $52,000 Other Authority capital projects outside of general services, as requested, will be proposed separately, such as the following project that is planned for 2024:

• Chester Creek Interceptor Phase 2 and Supplee Valley Sewer Rehabilitation We thank you again for the confidence you have placed in Pennoni over the years and look forward to continuing to serve you in the future! Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Nathan M. Cline, PE Associate Vice President Associate Vice President

BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102

Page 1 of 1

December 7, 2023

Mr. Mark Miller, Director of Public Work East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199

Subject: Professional Services for Ridley Creek STP O&M

Mr. Miller:

Big Fish Environmental Services, Inc. has successfully provided the operation and maintenance services for the Ridley Creek Sewage Treatment plant since 2012. I have been involved with the facility’s construction beginning in 2009. During this tenure, the fees were last increased at the beginning of January 2016. I request that the Township increase the base fee from $8,823.63 to $11,512.84 and adjust the hourly fee for sludge dewatering and mechanical services from $58.82 to $68.00. The wastewater industry is very competitive in obtaining qualified plant operators within an industry at an attrition rate higher than the rate of those entering the industry. This fee increase is directly related to increasing the compensation for the lead Plant Operator, Matthew Mullin, Jr. Mathew is a licensed PA DEP licensed WW Operator and possesses a degree in mechanical engineering from the University of Delaware. The remaining increase is to assist with operations assistance provided by Walton Water Services.

The increase is comparable to an annual increase of 3%. In comparison, the previous increase was based on the local CPI. Using CPI as a basis for an increase, the proposed fee would be nearly $17,000. I feel that the proposed annual base fee of $11,512.84 and new hourly rate of $65/hour is reasonable.

I look forward to continuing to service the Township and provide professional services for the RCTP O&M.

Kind regards,

Scott A. Towler, PE, LO

Scott A. Towler

Memo

To: Municipal Authority
From: Dave Ware
Re: 2024 Proposed Budget for the MA
Date: December 7, 2023

Gentlemen,

I wanted to share the 2024 Proposed Municipal Authority Budget with you all, as well as the 2024 Adopted Budget for Sewer Operating Fund and Sewer Capital Reserve Fund.

I anticipate nearly $1.0M of expenses in 2024 to fund additional relining, Chester Creek Interceptor Project (Phase 1 and Phase 2), Supplee Valley relining, replacement generator, replacement pumps at RCSTP, and upgrades to the Hershey Mill Pump Station. Also included in the ARPA Fund budget is over $100K to offset the cost of the Caustic Soda and UV Replacement Projects.

Without adjusting sewer rates next July the Sewer Operating Fund is expected to have nearly a $200K balance reduction, and the Sewer Capital Reserve Fund a nearly $500K balance reduction. That's nearly $700K needed from Reserves and the Operating Fund. The 5 Year Capital Plan for EGT Sewer Capital Maintenance is included. Looking at the recent costs of relining and televising, we should be putting $260K per year into the Sewer Capital Reserve Fund as opposed to the $130K we currently transfer. We will maximize balances through PLGIT Prime interest Rates and possibly short-term notes after continued review of interest rate projections. I applied for $350K to offset our costs anticipated for Supplee Valley and the Chester Creek Interceptor.

I hope this provides some clarity to the figures shared in the 2024 MA Budget. I will begin updating the 10-year Sewer Plan as we begin the new year in preparation for a sewer rate increase proposal. As always, please call or email with any questions.

Sincerely,

[Signature: Dave Ware]
Dave Ware
Director of Finance
East Goshen Township

U:\dware\municipal authority\

2024-2028 Capital Improvement Program

[Logo: Respecting the Past, Serving the Present, Preparing for the Future]

EGT Sewer Capital Maintenance
(RC STP & Pump Stations)

Category 2024 2025 2026 2027 2028
Hunt Country/HM Lift Station Pump Replacement $ 20,000 $ 20,000
Hunt Country P/S Mag Meter $ 15,000
Hunt Country P/S Muffin Monster $ 67,000
Hunt Country P/S Bypass Pump $ 2,000
Relining AC sewer lines and brick manholes $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 130,000
Ridley Creek STP rebuild 2 SBR pumps $ 16,000
Ridley Creek STP rebuild 2 Sludge pumps $ 7,500
Ridley Creek STP replace generator $ 225,000
Ridley Creek STP Filter Feed Pump** $ 30,000 $ 20,000 $ 20,000 $ 20,000
Ridley Creek STP Blower Replacement $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000
Chester Creek Coll manhole lining (?) for 5 manholes $ 50,000
Chester Creek Coll HM Pumpstation upgrade $ 85,000
Chester Creek Interceptor Phase 2/Supplee Valley Re-lining $ 366,964 $ 315,000
Chester Creek Coll Muffin Monster swap out $ 22,000 $ 22,000
Total $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
Category 2024 2025 2026 2027 2028
Capital Reserve Fund
Sewer Capital Reserve Fund $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
Grants
Series 2017 Bonds
Infrastructure Sustainability Fund
Total $ 892,464 $ 613,000 $ 182,000 $ 184,000 $ 162,000
  • Ongoing maintenance and pump station upgrades per RCSTP Asset Depreciation inventory and staff recommendation.
  • Replacement generator needed in 2024.
  • Proactive Chester Creek Interceptor inspection & cleaning; Phase 1 in 2023, Phase 2 in 2024; Supplee Valley re-lining. Staff will seek grant funds to offset sewer capital fund contribution.

19

MUNICIPAL AUTHORITY, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 6,372 11,619 5,171 5,171 5,171
REVENUE
INTEREST EARNINGS 07341 1000 3 7 - 290 - (290) -100.0% -
INTEREST EARNED - CONSTRUCTION 07341 1020 - - - - - - -
DCED GRANT 07354 0400 - - 152,980 - - - (152,980)
C.C. TAPPING FEES 07364 1100 2,060 2,300 2,300 2,300 2,300 - 0.0% -
R.C.TAPPING FEES 07364 1110 11,508 2,089 2,000 8,574 8,574 - 0.0% 6,574
CONNECTION FEES - SEWER 07364 1130 3,368 564 1,000 1,128 1,128 - 0.0% 128
MISCELLANEOUS REVENUE (PINE ROCK) 07380 1000 2,664 282 282 564 564 - 0.0% 282
TRANSFER FROM GENERAL ACCT 07392 0100 - - - - - - -
TRANSFER FROM SEWER OPERATING 07392 0500 90,338 90,979 100,000 117,764 109,517 (8,247) -7.0% 9,517
TRANSFER FROM SEWER CAP RESV 07392 0501 - - - - - - -
TRANSFER FROM SEWER CAP RESERVE 07392 0900 179,592 286,657 1,471,553 635,907 837,464 201,557 31.7% (634,089)
TOTAL REVENUE 289,534 382,879 1,730,115 766,527 959,547 193,020 25.2% (770,568)
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 30,920 33,488 32,055 38,687 39,847 1,161 3.0% 7,792
MISCELLANEOUS EXPENSE 07424 3000 1,693 1,665 1,749 3,191 3,286 96 3.0% 1,538
MUNIC.AUTH.-AUDITING 07424 3110 10,000 10,250 10,815 21,000 21,630 630 3.0% 10,815
ENGINEERING SERVICES 07424 3130 55,389 42,469 47,250 47,250 48,668 1,418 3.0% 1,418
LEGAL SERVICES 07424 3140 9,194 6,640 8,400 8,400 8,652 252 3.0% 252
R.C. CAPITAL-STP 07424 7440 - - 355,793 - - - (355,793)
CAP.REPLACEMENT R.C. 07424 7490 (10,985) - 488,847 - 310,500 310,500 (178,347)
HERSHEY MILL STATION - ENGINEER 07426 1000 - - - - - - -
TALLMADGE DRIVE 07426 3000 - - - - - - -
RELINING 07426 3001 - - 260,000 260,000 - (260,000) -100.0% (260,000)
RESERVOIR PUMP STATION - ENGINEER 07428 1000 - - - - - - -
BARKWAY PUMP STATION CAPITAL 07429 1501 5,117 2,215 - - - - -
ASHBRIDGE PUMP STATION CAPITAL 07429 1502 30,324 11,493 - - - - -
HERSHEYS MILL PUMP STATION CAPITAL 07429 1503 76,693 153,399 78,000 78,000 85,000 7,000 9.0% 7,000
HUNT CO PUMP STATION CAPITAL 07429 1504 8,277 1,870 - - - - -
RCSTP CAPITAL 07429 1505 67,251 125,837 260,000 260,000 366,964 106,964 41.1% 106,964
WEST GOSHEN CAPITAL 07429 6100 - - 187,206 50,000 75,000 25,000 50.0% (112,206)
Bank Fees 07491 5001 414 - - - - - -
TRANSFER TO GENERAL FUND 07492 0100 - - - - - - -
TOTAL EXPENSES 284,287 389,327 1,730,115 766,527 959,547 193,020 25.2% (770,568)
NET RESULT FROM OPERATIONS 5,247 (6,448) 0 (0) 0 1 0
ESTIMATED ENDING FUND BALANCE 11,619 5,171 5,172 5,171 5,171

31

SEWER OPERATING FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 1,000,248 1,021,129 1,158,670 1,158,670 971,770
REVENUE
INTEREST EARNINGS 05341 1000 418 7,664 12,000 35,191 30,000 (5,191) -14.8% 18,000
REVENUE - SEWER FEES 05364 1000 3,546,858 3,749,490 4,148,573 3,895,183 3,895,183 - 0.0% (253,390)
REVENUE - SEWER PENALTIES 05364 1010 28,773 34,559 45,076 27,476 27,476 - 0.0% (17,600)
REVENUE - LIEN PAYMENTS 05364 1025 72,133 52,830 69,614 19,678 19,678 - 0.0% (49,936)
REVENUE - SEWER CERTIFICATION FEES 05364 1030 2,380 4,270 4,000 2,173 2,173 - 0.0% (1,827)
REVENUE - WG CONVEYANCE FEE 05364 1040 15,935 22,649 20,935 54,571 54,571 - 0.0% 33,636
ADMIN.COST FROM WESTTOWN 05364 1060 4,827 2,896 4,827 4,713 4,713 - 0.0% (113)
O&M FEES FOR BARKWAY PUMP STATION 05364 1070 21,625 12,562 21,625 22,666 22,666 - 0.0% 1,041
O&M FEES FOR ASHBRIDGE PUMP STATION 05364 1080 1,807 - 1,807 4,867 4,867 - 0.0% 3,059
MISCELLANEOUS SEWER REVENUE 05380 1000 181 - - - - - -
SEWER INSURANCE CLAIMS 05391 2000 8,845 - - - - - -
TOTAL REVENUE 3,703,781 3,886,920 4,328,456 4,066,518 4,061,327 (5,191) -0.1% (267,129)
CHESTER CREEK EXPENSES
C.C. METERS -WAGES 05420 1400 12,891 14,175 19,169 2,043 2,104 61 3.0% (17,064)
C.C. INTERCEPTOR - WAGES 05420 1401 5,204 16,865 3,985 21,942 22,600 658 3.0% 18,615
C.C. COLLECTION - WAGES 05420 1402 38,874 28,629 40,637 35,151 36,205 1,055 3.0% (4,432)
C.C. COLLECTION - WAGES - I&I 05420 1404 13,297 1,282 2,015 - - - (2,015)
ASHBRIDGE WAGES 05420 1405 13,531 11,284 12,844 8,427 8,680 253 3.0% (4,164)
MILL VALLEY - WAGES 05420 1406 7,584 10,925 22,762 7,968 8,207 239 3.0% (14,555)
C.C. METERS -VEHICLE OPER. 05420 2510 9,406 10,286 7,199 1,304 1,343 39 3.0% (5,856)
C.C. INTERCPT-VEHICLE OPER 05420 2511 2,318 13,750 3,649 15,923 16,401 478 3.0% 12,752
C.C. COLLEC.-VEHICLE OPER. 05420 2512 23,191 16,508 14,741 37,309 38,428 1,119 3.0% 23,688
C.C. COLLECT.-VEH OPER - I&I 05420 2514 6,547 778 817 - - - (817)
ASHBRIDGE - VEHICLE OPER 05420 2515 5,428 5,917 3,684 5,792 5,965 174 3.0% 2,281
MILL VALLEY - VEHICLE OPER 05420 2516 3,270 5,991 17,224 5,358 5,518 161 3.0% (11,706)
C.C. METERS - UTILITIES 05420 3600 121 125 135 107 110 3 3.0% (25)
C.C. INTERCEPTOR-UTILITIES 05420 3601 1,345 1,442 1,377 1,554 1,601 47 3.0% 224
C.C. COLLECTION -UTILITIES 05420 3602 6,885 8,741 6,949 8,785 9,048 264 3.0% 2,099
ASHBRIDGE - UTILITIES 05420 3603 5,991 6,492 7,172 6,362 6,553 191 3.0% (619)
MILL VAL./BARKWAY UTILITIES 05420 3604 3,695 4,449 3,900 4,231 4,358 127 3.0% 458
C.C. METERS-MAINT.& REPRS. 05420 3700 3,732 13,616 11,176 6,388 6,580 192 3.0% (4,596)
C.C. INTERCEPT.-MAINT.&REP 05420 3701 5,432 12,902 3,142 4,540 4,676 136 3.0% 1,535
C.C. COLLEC.-MAINT.& REPR. 05420 3702 64,812 41,160 118,968 139,082 50,000 (89,082) -64.1% (68,968)
C.C. INTERCEPT.-MAINT & REP - I&I 05420 3703 3,843 5,499 5,774 4,824 4,969 145 3.0% (805)
C.C. COLLECT.-MAINT & REP - I&I 05420 3704 15,083 7,844 8,237 8,782 9,045 263 3.0% 808
ASHBRIDGE-MAINT.&REPR 05420 3705 5,084 19,203 16,188 267 9,275 9,008 3378.0% (6,914)
BARKWAY -MAINT.& REPR. 05420 3706 2,204 525 1,409 133 137 4 3.0% (1,271)
C.C. WEST GOSHEN OPER/MAINT 05420 3850 608,660 539,224 700,000 985,655 992,000 6,345 0.6% 292,000
TOTAL CHESTER CREEK EXPENSES 868,427 797,613 1,033,152 1,311,926 1,243,804 (68,121) -5.2% 210,652

27

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
RIDLEY CREEK EXPENSES
R.C. STP- WAGES 05422 1400 11,501 49,539 20,696 66,857 68,862 2,006 3.0% 48,166
R.C. COLLEC.- WAGES 05422 1401 84,660 33,001 60,000 54,940 56,589 1,648 3.0% (3,411)
R.C. COLLECTIONS WAGES I&I 05422 1402 8,198 10,326 7,223 - - - (7,223)
R.C. STP- CHEMICALS 05422 2440 109,686 123,321 116,295 108,635 111,894 3,259 3.0% (4,401)
R.C. COLLEC.-CHEMICALS 05422 2441 - - - 7,356 7,577 221 3.0% 7,577
R.C. STP-VEHICLE OPER. 05422 2510 3,372 45,071 5,918 61,240 63,078 1,837 3.0% 57,160
R.C. COLLEC-VEHICLE OPER. 05422 2511 49,686 17,514 14,802 15,505 15,970 465 3.0% 1,167
R.C. COLLECT.-VEH OPERATING - I&I 05422 2512 4,222 7,545 3,631 - - - (3,631)
R.C. STP-MINOR EQUIP. 05422 2600 2,127 - - - 15,600 15,600 15,600
RC STP -UTILITIES 05422 3600 99,795 90,915 121,961 89,636 92,325 2,689 3.0% (29,636)
R.C. COLLEC.-UTILITIES 05422 3601 7,533 7,259 8,239 5,777 5,950 173 3.0% (2,289)
R.C. STP-MAINT.& REPAIRS 05422 3700 93,876 100,546 143,381 82,874 85,360 2,486 3.0% (58,020)
R.C. COLLEC.-MAINT.& REPR 05422 3701 72,762 57,922 62,172 46,073 47,455 1,382 3.0% (14,717)
R.C. COLLECTION-MAINT. & REP I&I 05422 3702 6,438 32,078 28,941 30,959 31,888 929 3.0% 2,946
RCSTP - APPLEBROOK 05422 3703 - - - 9,393 9,675
R.C. STP-CONTRACTED SERV. 05422 4500 192,074 214,511 221,578 204,914 211,062 6,147 3.0% (10,516)
R.C. SLUDGE-LAND CHESTER 05422 4502 43,070 44,208 43,971 52,681 54,262 1,580 3.0% 10,291
TOTAL RIDLEY CREEK EXPENSES 789,000 833,754 858,809 836,840 877,545 40,423 4.8% 18,737

28

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ADMINISTRATION
MISCELLANEOUS EXPENSE 05424 2700 182 182 201 243 250 7 3.0% 49
ADMIN.- WAGES 05429 1400 86,208 114,216 89,220 84,468 87,002 2,534 3.0% (2,217)
PA ONE CALL - WAGES 05429 1401 1,723 6,801 3,424 8,904 9,171 267 3.0% 5,748
PA ONE CALL - VEH OPER 05429 2501 - 2,180 - 8,473 8,727 8,727
ADMIN.-COMPUTER EXPENSES 05429 2600 - - 6,388 - - - (6,388)
ADMIN.-GENERAL EXPENSE 05429 3000 36,162 37,811 1,029 1,274 1,312 38 3.0% 282
ADMIN.-PAYMENT PORTAL 05429 3001 6,891 7,661 5,431 7,585 7,812 228 3.0% 2,382
ADMIN.- PROFESSIONAL SERV 05429 3100 1,965 2,000 2,065 2,619 2,698 79 3.0% 633
ADMIN - LEGAL 05429 3140 4,616 675 3,530 1,249 1,287 37 3.0% (2,243)
ADMIN.- POSTAGE 05429 3250 4,726 5,175 5,053 5,322 5,482 160 3.0% 429
ADMIN. - PRINTING 05429 3400 722 2,061 1,731 1,945 2,003 58 3.0% 272
ADMIN.- INSURANCE 05429 3500 33,963 32,611 26,901 46,454 47,847 1,394 3.0% 20,947
ADMIN.-BLDG.OVERHEAD 05429 3730 58,801 65,814 88,760 88,760 91,423 2,663 3.0% 2,663
CONTR. SERV. SUMMIT HOUSE 05429 4500 349,320 369,000 385,125 385,125 396,679 11,554 3.0% 11,554
CONTR. SERV. CIDER KNOLL 05429 4510 78,720 59,040 86,789 86,789 89,392 2,604 3.0% 2,604
CONTR. SERV. MALVERN INSTITUTE 05429 4520 7,446 7,949 10,732 10,732 11,054 322 3.0% 322
LOCK BOX FEE 05429 5000 - - 3,859 - - - (3,859)
Bank Fees 05429 5001 1,311 1,495 1,380 1,380 1,380 - -
DVRFA--PRINCIPAL PMT ON $9,500,000 05471 7220 389,000 405,000 421,000 421,000 438,000 17,000 4.0% 17,000
DVRFA - PRINCIPAL ON DIVERSION LOAN 05471 7240 114,000 117,000 121,000 121,000 125,000 4,000 3.3% 4,000
SERIES 2017 GO BONDS - PRINCIPAL 05471 7250 120,000 125,000 130,000 130,000 135,000 5,000 3.8% 5,000
DVRFA - INTEREST ON $9,500,000 LOAN 05472 7220 223,839 208,118 191,763 191,763 174,755 (17,008) -8.9% (17,008)
DVRFA - INTEREST ON DIVERSION LOAN 05472 7240 53,952 50,453 47,778 47,778 44,089 (3,689) -7.7% (3,689)
SERIES 2017 GO BONDS - INTEREST 05472 7250 71,589 66,789 61,789 61,789 59,189 (2,600) -4.2% (2,600)
TRANSFER TO MUNIC AUTHORITY 05492 0700 90,338 90,979 100,000 100,000 100,000 - 0.0% -
TRANSFER TO BOND FUND - SEWER 05492 0805 - 50,000 - - - - -
TRANSFER TO SEWER CAPITAL RESERVE 05492 0900 290,000 290,000 800,706 290,000 290,000 - 0.0% (510,706)
TOTAL ADMINISTRATIVE EXPENSES 2,025,473 2,118,013 2,595,652 2,104,652 2,129,553 24,647 1.2% (466,099)
TOTAL SEWER EXPENSES 3,682,900 3,749,379 4,487,612 4,253,418 4,250,903 (3,051) -0.1% (236,710)
NET RESULT FROM OPERATIONS 20,881 137,541 (159,156) (186,900) (189,575) (2,676) (30,419)
ESTIMATED ENDING FUND BALANCE 1,021,129 1,158,670 999,513 971,770 782,194

29

SEWER CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET

Account Title Acct # 2021 Actual 2022 Actual 2023 Budget 2023 Projection 2024 PROPOSED Budget $ Increase (vs '23 Proj) % Increase vs. 23 Budget
ESTIMATED BEGINNING FUND BALANCE 2,250,329 2,361,152 2,384,772 2,384,772 2,130,452
REVENUE
INTEREST EARNINGS 09341 1000 830 28,246 22,500 91,588 85,870 (5,717) -6.2% 63,370
TRFR FROM SEWER OP FOR SEWER CAP RESRV 09342 0500 290,000 290,000 800,706 290,000 290,000 - 0.0% (510,706)
TRANSFER FROM SEWER CAP RESERVE 09392 0300 - - - - - - -
TRANSFER FROM MUNICIPAL FUND 09392 0700 - - - - - - -
TOTAL REVENUE 290,830 318,246 823,206 381,588 375,870 (5,717) -1.5% (447,336)
EXPENSES
MACHINERY/EQUIPMENT - REPLACEMENT 09429 7400 - 7,969 - - - - -
MACHINERY/EQUIPMENT - NEW 09429 7450 - - - - - - -
Bank Fees 09491 5001 414 - - - - - -
TRANSFER TO MUNIC AUTHORITY 09492 0700 179,592 286,657 1,471,553 635,907 837,464 201,557 31.7% (634,089)
TOTAL EXPENSES 180,006 294,626 1,471,553 635,907 837,464 201,557 31.7% (634,089)
NET RESULT FROM OPERATIONS 110,823 23,620 (648,347) (254,320) (461,594) (207,274) 186,753
ESTIMATED ENDING FUND BALANCE 2,361,152 2,384,772 1,736,425 2,130,452 1,668,859

33