Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\12-11-23\12-11-2023 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
December 11, 2023
7:00
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE • Ask if anyone will be taping the meeting 2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
3. SEWER REPORTS • Director of Public Work’s Report • Pennoni Engineer’s Report • Big Fish Environmental Report (not available at time of agenda printing) 4. APPROVAL OF MINUTES • November 13, 2023 5. APPROVAL OF INVOICES • Pennoni Invoice #1199247 $546.25 • Pennoni Invoice #1199248 $575.50 • Premium Power Services Invoice #30568 $17,500.00 (paid) • Gatti Morrison Invoice #525512 $1,359.00 (paid) • Colonial Electric Supply Invoice #15490278 $1,808.78 (paid) • Colonial Electric Supply Invoice #15499508 $890.77 (paid) • Yale Electric Supply Invoice #S124442513.001 $222.66 (paid) • Gawthrop Greenwood Invoice #281972 $431.00 6. LIAISON REPORTS 7. FINANCIAL REPORTS a. November 2023
8. OLD BUSINESS • Approval of Payment Application #1: Chester Creek Interceptor Inspection & Repair
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\12-11-23\12-11-2023 Agenda.doc
9. 2023 Goals: Goal Status
Ridley Creek plant compliance
January, February, March, April, May, June, July, August, September, October, & November were in compliance and met all requirements.
Continue to implement infiltration and inflow for the sewer system
Ongoing
RCSTP UV Disinfection System
Temporary setups are in production.
10. NEW BUSINESS • Mark Miller: Request for motion to purchase new lift station pump for the wet well at the treatment plant • Pennoni: 1. Proposal for Chester Creek Interceptor Inspection & Repair 2. Proposal for RCSTP Generator 2 Replacement 3. 2024 Reappointment Letter • Scott Towler: 2024 Big Fish Reappointment Letter • Dave Ware: 2024 Proposed Municipal Authority Budget 11. CAPACITY REQUESTS
12. ANY OTHER MATTER 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171
To: Municipal Authority From: Mark Miller Re: December 11, 2023, Monthly Report The Public Works Department has been extremely busy this past month working the Interceptor. We assisted the video contractor to gain access to various areas along Chester Creek and while doing the clearing, we located several issues that will need attention:
• We found that the line that runs under the stream up to the Milltown stores has significant sag. The laterals from the stores have no cover and they are suspended in the area. The drainage ditch that they run through has been eroded away and will be repaired in the next few weeks. • We had to remove an 8” ductile iron abandoned force main from the old Milltown pump station which ran through the bottom of Manhole 8, and we had to raise seven manholes that had been covered over. You may heard that a sewage treatment plant and a water treatment plant were CYBER attacked by the Iranian government, which has affected our sewage flow meters. The township’s new computer consultants are working with Allied Control to install firewalls. Below is the rest of my report: Monthly Flows: The average daily flow to West Goshen was 721,972 per day. Meters: Were read on a daily basis. Since the meters were taken out of service we will need to read the meters manually until the problem is corrected. C.C. Collection:
• We were notified of two sewer lateral problems which resulted in the property owners having to hire a plumber to replace the broken traps and the cleanouts. The PWD televised the laterals and showed the homeowners. • The pump stations were visited on a daily basis and wet wells were cleaned. • We received a seal failure alarm at the Barkway Station on Thanksgiving Day. We disconnected the seal fail switch to get us through the holiday. This past week, we pulled all number 2 pumps from each station and sent them out to be serviced.
C.C. Interceptor:
• As I stated above, we have been busy taking care of several issues that were found by the contractor. • The PWD located and raised 4 manholes in the Dutts Mill townhouse development. R.C. Collection:
• The pumping stations were visited on a daily basis and wet wells cleaned. • #2 pumps were pulled at the stations. • We were called for a sewer blockage on Bowtree Dr – a trap need to be replaced. Ridley Creek Plant: • Routine maintenance at the plant • Lenni has started to install conduit. • Zimmerman is set up to start installing the temporary UV system on December 4th. • We met with Mike Ellis onsite to discuss the pump location and decided to add an additional float for the temporary pumps. • John Laidley was out to replace the floats in the wet well. • The parts have arrived to rebuild the centrifuge and that work will be completed after the holidays. • The new Muffin Monster arrived for the sludge room. • We are still waiting for the Moyne screw pump - we were told not to expect it until the end of February. Alarms: 18 (power outages) PA One Calls: 75 Monthly Rainfall: 4.00” Lateral Repairs or Caps: 2 in Fairway, 3 in Bow Tree, 1 in Mill Creek
EAST GOSHEN MUNICIPAL AUTHORITY ENGINEER’S REPORT December 8, 2023
Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2
Ridley Creek Sewage Treatment Plant (RCSTP)
• Caustic Soda Conversion – During a site visit on October 4, it was noticed that the tank’s outside insulation was cracked in some locations and loose/peeling off in others. The supplier, Pyrz, repaired the tank’s insulation in November.
Once the outdoor emergency shower is installed, the tank can be put into operation.
We previously prepared a draft O&M Manual information for the system that was submitted to the Township and operator for review. We will set up a meeting to review so that the Manual can be finalized.
• UV Disinfection System – All temporary and permanent equipment has been delivered. Lenni installed the control boxes for the temporary pumps and initiated installation of permanent conduit and wiring. Zimmerman, the general contractor, has not yet mobilized, but we tentatively anticipate that he will start working next week. We attended a field meeting on November 27 at the plant with Lenni, Mark Miller, the plant operator, and John Laidley (controls) to review progress of the electrical work, proposed equipment layout, and temporary alarms and controls setups. We thereafter evaluated alternative locations for the new UV electrical/controls cabinet to improve ease of channel raising concrete work. We also analyzed and recommended pump float and high level alarm settings along with proposed controls logic for the high level floats to automatically shut off the filter feed pumps.
An updated tentative construction schedule follows with completed work in italics:
o Delivery of Permanent UV Equipment – October 30, 2023 o Delivery of Bypass Pumps and Hoses – Week of November 13, 2023 o Initiate Temporary Bypass Work – Mid-November 2023 o Complete Temporary Bypass Work and Initiate Use of Bypass System – Week of January 2, 2024 o Two Week Trial and Sampling of Temporary Bypass System – January 8-22, 2024 o Township to Perform Concrete Channel Work – January 23-February 23, 2024 o 2nd Notice to Proceed to Contractors: Permanent Work – February 26, 2024 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – March 25, 2024 o Two Week Trial of New UV System in Permanent Channel –March 25-April 8, 2024 o Install Second UV Module into Permanent Channel – April 9, 2024 o Two Week Trial of Second New UV System in Permanent Channel – April 10-24, 2024 o Construction Completed – Early May 2024
• Generator #2 Replacement – Premium Power Services released the Cummins’ 500 kW diesel generator for fabrication in early March 2023. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively, so we expect delivery of the entire system around January 2024.
We are continuing to prepare electrical design and structural concrete pad plans for the new generator for use by the Township in construction.
• Operating Cost Analysis – We are continuing to coordinate with Scott Towler for the evaluation of industry WWTP operating costs in an effort to benchmark RCSTP costs against other similar WWTPs.
EGMAU23001 Engineer’s Report East Goshen Municipal Authority December 8, 2023 Page 2 of 2
Sanitary Sewer Pipe Rehab
• Chester Creek Sewer Rehab – The contractor, Insituform, has performed cleaning and televising of approximately 75% of the contracted sewers. We reviewed the videos, and there are only minor deficiencies. We are evaluating potential repairs for the deficiencies and will coordinate with the Township and contractor to determine if there is available budget since those repairs were not known at the time of award and were thereby not awarded.
We reviewed shop drawings and construction submittals for the pipe lining and repairs that were in the contract award. We anticipate construction of the repairs will commence upon completion of the cleaning and televising work.
Additionally, the Contractor submitted the first pay application, and we provided a payment recommendation.
• Hershey’s Mill Estates – The Contractor has completed all punchlist work. The only outstanding item is a damaged PECO meter manhole at the top of the tennis court access drive. We reviewed the Contractor’s Maintenance Bond, Statement of Surety, and Contractor’s Release and found all documents satisfactory.
• LSA Grant Application – We provided information to Dave Ware for preparation of the grant application for pipe lining and rehabilitation of the Chester Creek Interceptor Phases 1 and 2 and the remainder of pipe lining in Supplee Valley. We understand the grant application was submitted on November 30.
New Connections
• Millstone Meadows (1010 Hershey Mill Road) – We reviewed the 3rd submission of the Subdivision and Land Development Plan, including the revised sanitary sewer extension design. A revised, 4th submission was made thereafter and is currently under review.
• 301 Reservoir Road (5-Lot Residential Subdivision) – We reviewed a revised submission of Subdivision and Land Development Plans, including the proposed sanitary sewer main extension along Reservoir Road to the site.
• 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
• 14 Reservoir Road – No activity by Pennoni since our last report.
END OF REPORT
RCSTP Monthly Operations Report
December 2023
Executive Summary The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for November 2023. All supplemental reports were submitted for October 2023. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes increased slightly to a daily average of 71.7 from the previous standard of 70.7 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Table 1
*Sample results were not available at the time of the report preparation. Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for November 2023. The monthly average total phosphorus was reported as 0.14 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 4.5 mg/L compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment performed well during November. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.
Flow
MGD
Average mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month
Geo
Mean
Geo
Mean
0.75 10 62 Report Report 10 62 7.0 44 0.5 3 200 1,000
Inst. Max 20 94 15 94 14 1
Sample Date
November 7, 2023 0.256 2.0 4.3 6.60 14.1 4.8 10.2 0.10 0.21 0.10 0.21 1 0.0000
November 14, 2023 0.274 2.0 4.6 7.46 17.0 5.0 11.4 0.10 0.23 0.17 0.39 1 0.0000
November 21, 2023 0.408 2.7 9.2 * 4.0 13.6 0.10 0.34 * 28 1.4472
November 28, 2023 0.304 2.0 5.1 * 5.0 12.7 * 0.10 0.25 1 0.0000
Average 0.311 2.2 5.8 7.03 15.6 4.7 12.0 0.10 0.26 0.12 0.29 8 0.3618
Minimum 0.256 2.0 4.3 6.60 14.1 4.0 10.2 0.10 0.21 0.10 0.21 1 0.0000
Maximum 0.408 2.7 9.2 7.46 17.0 5.0 13.6 0.10 0.34 0.17 0.39 28 1.4472
TSS NH4-N Total Phosphorus
November 2023- Final Effluent - Outfall 001
NPDES Permit
Discharge Limitations
CBOD5 Total Nitrogen Fecal Coliform
Page 2 of 4
Table 2 illustrates the final effluent composite sample data reported for outfall 002 for November 2023.
Table 2
*Sample results were not available at the time of the report preparation.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility were reported as unusually elevated compared to historical and plant-design pollutant concentrations. Typical influent pollutant concentrations are generally within the design concentration and organic loading values. The elevated pollutant concentrations are attributed to the sample suction line dislodged into the flow channel, resulting in the collection of an unrepresentative sample. The Plant Operator replaced the suction tubing and repositioned the sampling probe. The Technician from the laboratory was instructed to check for sample “abnormalities” (aka appearing to have an abundance of solids in the sample bottle) and notify the Plant Operator.
PA DEP
No activity
Pennoni Associates
The UV system replacement project continues.
Significant Rainfall
During November, there were four (4) days when rainfall occurred. Significant events occurred on the 21st resulting in 2.23 inches and on the 27th with 1.32 inches of precipitation. The total precipitation for October was 3.64 inches.
Flow
MGD
Average mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month mg/L
lbs/
month
Geo
Mean
Geo
Mean
0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000
40 45 14
November 7, 2023 0.0315 2.0 0.53 6.60 1.73 4.8 1.26 0.10 0.21 0.10 0.21 1 0.0000
November 14, 2023 0.0329 2.0 0.55 7.46 2.05 5.0 1.37 0.10 0.23 0.17 0.39 1 0.0000
November 21, 2023 0.0411 2.7 0.93 * 4.0 1.37 0.10 0.34 * 28 1.4472
November 28, 2023 0.0339 2.0 0.57 * 5.0 1.41 * 0.10 0.25 1 0.0000
Average 0.0349 2.2 0.64 7.03 1.89 4.70 1.35 0.10 0.26 0.12 0.29 8 0.3618
Minimum 0.0315 2.0 0.53 6.60 1.73 4.00 1.26 0.10 0.21 0.10 0.21 1 0.0000
Maximum 0.0411 2.7 0.93 7.46 2.05 5.00 1.41 0.10 0.34 0.17 0.39 28 1.4472
Fecal Coliform
November 2022 - Applebrook - Out Fall 002
NPDES Permit
Discharge Limitations
CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total
Page 3 of 4
Table 3 presents the pollutant data for the influent wastewater collected at the doghouse manhole during November 2023.
Table 3
*Sample results were not available at the time of the report preparation.
Chemical Data
November 2023
Chemical Daily Average Total Monthly
Soda Ash, pounds 300 9,300
Aluminum Sulfate solution, gal 70.7 2,151
Sludge Dewatering, gal* 23,360 490,554
*21 days of sludge dewatering
There was an increase of 67,518 gallons of sludge dewatering during the month. This is typical for this treatment facility to maintain the desired F:M ratio to achieve nutrient removal and manage the foam on the surface of the SBR basins.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Flow
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
November 7, 2023 0.320 495 1,319 377 1,005 540 1,439 40.0 107 72.3 193 70.9 188.9
November 14, 2023 0.309 741 1,910 617 1,591 1270 3,274 36.5 94 82.6 213 8.90 22.9
November 21, 2023 0.411 659 2,261 590 2,024 795 2,728 * 79.3 272 *
November 28, 2023 0.347 794 2,296 1,070 3,095 1370 3,962 * 89.7 259 10.70 30.9
Average 0.347 672 1,947 664 1,929 994 2,851 38.3 100 81.0 234 30.17 80.9
Minimum 0.309 495 1,319 377.0 1,005 540 1,439 36.5 94 72.3 193 8.90 22.9
Maximum 0.411 794 2,296 1,070 3,095 1,370 3,962 40.0 107 89.7 272 70.90 188.9
Sample Date
TKN, mg/L
Phosphorus,Total
, mg/L
MGD
Average
November 2023 - Influent Wastewaster
Design Basis
BOD5 CBOD5 TSS NH4-N
Page 4 of 4
Flow Data
November 2023
Flow Meter Location Total Volume for
Month, MG
Average Daily
Flow, gpd
Daily Maximum
Flow, gpd
Influent Wastewater to
Screening Building* 9.990 332,989 447,670
Influent Wastewater to
SBRs* 11.862 694,411 497,612
Internal Recycle** 1.872 62,422 102,898
Treated Effluent to Disc
Filters 11.506 383.527 467.779
Final Effluent Discharge
8.673 289,000 408,000
Applebrook Golf Course 1.023 34,083 42,656
MA 11-13-23 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 November 13, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 November 13, 2023 at 7:00 pm. at the Township Building. 7 Members in attendance are indicated in BOLD: 8 Kevin Cummings, Chairman 9 Dana Pizarro, Vice Chairman 10 Jack Yahraes 11 Carmen Battavio 12 Walter Wujcik 13 14 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 15 representative), Ellen Koopman (Attorney), Dave Ware (Finance Director), and Michael Lynch 16 (Township Supervisor), and Scott Towler (on phone) 17 18 19 COMMON ACRONYMS: 20 ATS – Automatic Transfer Switch 21 BFES – Big Fish Environmental Services MA- Municipal Authority 22 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 23 CB – Conservancy Board PC – Planning Commission 24 DEP – Department of Environmental Protection PM – Prevention Maintenance 25 EPA – Environmental protection Agency PR – Park & Recreation Board 26 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 27 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 28 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 29 PWD – Public Works Department WAS – Waste Activated Sludge 30 31 Call to Order & Pledge of Allegiance 32 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 33 He asked for a moment of silence for our First Responders and Military. 34 He asked if anyone would be recording the meeting. There was no response. 35 36 37 Chairman’s Report 38 None 39 40 SEWER REPORTS 41 1. Director of Public Works, Mark Miller’s report for November 13, 2023 42 43 Monthly Flows – The average daily flow to West Goshen was 723,959 gallons per day. 44 45 Meters: The meters were read on a daily basis with no problems to report. 46 47 48 49
MA 11-13-23 draft 2
C.C. Collection: The pump stations were visited on a daily basis with no problems to report. 1 2 C.C. Interceptor: We inspected the lids and castings while we were clearing the right of way. 3 4 R.C. Collection: The pump stations were visited on a daily basis with no problems to report. 5 6 Ridley Creek Plant: 7 • Transducer went bad in the Ridley STP wet well. John Laidley came to replace it and 8 check the floats. We’re looking into a float back-up system. 9 • The UV system has been delivered. 10 • The wet well electronic cabinet is rotted out. We have ordered a replacement cabinet and 11 are scheduling the work. 12 13 Alarms: 7 (storm related) 14 15 PA 1 Calls: 182 16 17 Monthly Rainfall: 1.76” 18 19 Lateral Repairs or Caps: Two lateral at 301 Reservoir Rd were dug and capped off. 20 21 22 2. Pennoni Engineer’s Report dated November 8, 2023 23 24
Ridley Creek Sewage Treatment Plant (RCSTP) 25
• Caustic Soda Conversion – During a site visit on October 4, it was noticed that the tank’s 26 outside insulation was cracked in some locations and loose/peeling off in others. We 27 contacted the supplier, Pyrz, to alert them of this issue. Pyrz is scheduling to make the repairs, 28 which we expect to happen in November. They indicated repairs will take about a half day of 29 work to allow the spray insulation to set and coat it. 30
Once the insulation is repaired and the outdoor emergency shower is installed, the tank can be 31 put into operation. 32
We previously prepared a draft O&M Manual information for the system that was submitted 33 to the Township and operator for review. We will set up a meeting to review so that the 34 Manual can be finalized. 35
• UV Disinfection System – The temporary channel was delivered to the Township on August 36 24. The UV modules were delivered to the Township on October 30, and the submersible 37 bypass pumps were delivered on November 2. The bypass hoses are scheduled for delivery 38 the week of November 13. Upon receipt of the hoses, construction can begin, starting with the 39 general contractor setting up the temporary channel and flow bypass system. 40
41
MA 11-13-23 draft 3
An updated tentative construction schedule follows with completed work in italics: 1
o Delivery of Permanent UV Equipment – October 30, 2023 2 o Delivery of Bypass Pumps and Hoses – Week of November 13-17, 2023 3 o Initiate Temporary Bypass Work – Mid-November 2023 4 o Complete Temporary Bypass Work and Initiate Use of Bypass System – December 5 20, 2023 6 o Two Week Trial and Sampling of Temporary Bypass System – December 20, 2023- 7 January 3, 2024 8 o Township to Perform Concrete Channel Work – January 8-February 29, 2024 9 o 2nd Notice to Proceed to Contractors: Permanent Work – March 1, 2024 10 o Redirect Flow back to Permanent Channel (30 days of 2nd NTP) – April 1, 2024 11 o Two Week Trial of New UV System in Permanent Channel –April 1-15, 2024 12 o Install Second UV Module into Permanent Channel – April 16, 2024 13 o Two Week Trial of Second New UV System in Permanent Channel – April 17-May 1, 14 2024 15 o Construction Completed – Early May 2024 16
• Generator #2 Replacement – Premium Power Services released the Cummins’ 500 kW diesel 17 generator for fabrication in early March 2023. The lead times on the generator and ATS are 18 43 weeks and 22 weeks respectively, so we expect delivery of the entire system around 19 January 2024. 20
We are currently preparing electrical design and structural concrete pad plans for the new 21 generator for use by the Township in construction. 22
• Operating Cost Analysis – We are continuing to coordinate with Scott Towler for the 23 evaluation of industry WWTP operating costs in an effort to benchmark RCSTP costs against 24 other similar WWTPs. 25
Sanitary Sewer Pipe Rehab 26
• Chester Creek Sewer Rehab – We are reviewing shop drawings and construction submittals 27 from the contractor, Insituform. They will schedule the work upon approval of those 28 submittals. 29
• Hershey’s Mill Estates – The contractor is scheduled to complete minor punchlist work – removing 30 E&S controls, cleaning up construction debris, and opening/unsealing new residential cleanout lids – 31 by November 10. We will perform a site visit to verify the remaining punchlist work has been 32 completed. 33
The contractor submitted the 3rd (final) pay application, and we provided a payment 34 recommendation. We also processed Change Order #2 to formally document changes to as-built 35 quantities for unit price bid items. 36
• LSA Grant Application – We are assembling information and assisting Dave Ware with preparation of 37 the grant application for pipe lining and rehabilitation of the Chester Creek Interceptor Phases 1 and 38 2 and the remainder of pipe lining in Supplee Valley. The application is due November 30. 39
MA 11-13-23 draft 4
New Connections 1
• Millstone Meadows (1010 Hershey Mill Road) – We received the 3rd submission of 2 Subdivision and Land Development Plans. We are currently reviewing the plans, including 3 the revised sanitary sewer extension design. 4
• 301 Reservoir Road (5-Lot Residential Subdivision) – We received a revised submission of 5 Subdivision and Land Development Plans that is currently under review. We also discussed 6 modifications to the proposed sewer extension alignment with Mark Miller. 7
• 1712 E. Boot Road – The low pressure sewer was constructed via directional drilling from the 8 property and connected to the public sewer manhole. We performed an inspection of the 9 completed work at the manhole connection, and it was found acceptable with the exception of 10 debris/mud that needs to be cleaned from the manhole channel. The grinder pump has not yet 11 been installed. 12
14 Reservoir Road – We reviewed a revised Subdivision and Land Development plan submission, 13 which includes connection of one new lot to public sewer via grinder pump. We provided outstanding 14 comments to the Township and Applicant. 15 16 17 3. Big Fish Environmental Services – 18 The Ridley Creek sewage treatment plant outfall 001 has met all effluent limitations regarding water 19 quality for October 2023. All supplemental reports were submitted for the month of September 2023. 20 Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum 21 sulfate solution volumes decreased slightly to a daily average of 70.7 gpd from the previous average 22 of 72. gallons per day. No significant mechanical or operational issues were observed during the 23 sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no 24 mechanical issues impacting production. There were no odor complaints during the month. 25 Walter mentioned that on page 3 the daily maximum flow doesn’t seem right. Mark will check with 26 Scott. 27 28 Approval of Minutes 29 The minutes of the October 16, 2023 meeting were approved. 30 31 Approval of Invoices 32 1. Walter moved to approve payment of the following Pennoni invoices: 33 a. Invoice #1194870 $ 27.75 (paid) 34 b. Invoice #1194871 $ 209.25 (paid) 35 c. Invoice #1194872 $ 928.25 (paid) 36 d. Invoice #1194874 $ 8,612.50 (paid) 37 Carmen seconded the motion. The motion passed unanimously. 38 2. Jack moved to approve payment of the Philadelphia Bearing & Drive Solutions invoice 39 #6522098 in the amount of $17,834.75 (paid). Walter seconded the motion. The motion passed 40 unanimously. 41 3. Carmen moved to approve payment of JWC Environmental Invoice #116551 in the amount of 42 $16,542.00 (paid). Dana seconded the motion. The motion passed unanimously. 43
MA 11-13-23 draft 5
4. Walter moved to approve payment of Gawthrop Greenwood Invoice #280886 in the amount of 1 $472.00. Jack seconded the motion. The motion passed unanimously. 2 5. Carmen moved to approve payment of E & W Equipment Co. Invoice #755 in the amount of 3 $80,991.00. Jack seconded the motion. The motion passed unanimously. 4 5 6 7 Liaison Reports 8 1. Conservancy Board – Walter reported that the CRC planted over 100 trees in Applebrook Park 9 along the brook next to the Commerce building. There were 50 volunteers and all equipment was 10 supplied. 11 2. Board of Supervisors – Mike Lynch reported that the two new Supervisors are Mr. Hicks and Ms. 12 Emery. The proposed 2024 Budget will be available on the website for review tomorrow. PLTF has 13 been working on the blue hydrogen hub from the Marcus Shale. It will involve a new pipeline. 14 15 Financial Reports 16 Dave Ware gave the following report: 17 Year to date October 2023, the Municipal Authority recorded $613,704 in revenues (primarily from 18 Sewer Operating transfers and Sewer Capital Reserve transfers and tapping fees) and $609,817 in 19 expenses (Engineering Services, Audit fees, Administrative Wages, Hershey’s Mill Estates Sewer 20 costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital 21 improvements to the Westtown Way Pump station, auditor and legal fees). The net result of 22 operations is $3,887. As of October 31, 2023, the fund balance was ($35,485). This negative 23 balance is a function of balance versus cash reporting. There is $44,544 in invoices being held so the 24 actual cash balance is $9,058. 25 26 Old Business 27 ° Hershey’s Mill Estates Sanitary Sewer Replacement: 28 1. Change Order #2 – The Change Order #2 reflects a net decrease in contract price of 29 $78,572.00. Carmen moved to approve Change Order #2 for Hershey’s Mill Estates 30 Sanitary Sewer Replacement Contract No. HME-2022 which reflects a net decrease in the 31 contract price of $78,572.00 as presented. Walter seconded the motion. The motion 32 passed unanimously. Kevin signed the Change Order #2. 33 2. Payment Application #3 – The contractor Joao & Bradley Construction Co., Inc. has 34 submitted the third and final invoice for work completed. Mike Ellis mentioned that they 35 have observed the work-in-progress and recommend approval. Kevin moved to approve 36 the Payment Application #3 in the amount of $111,778.15 conditioned that payment not 37 be made until the closeout documents are provided. Jack seconded the motion. The 38 motion passed unanimously. 39 40 41 Goals 42 The Goals for 2024 will be discussed at the next meeting. A sewer rate increase was discussed. 43 44 New Business - None 45 46 47
MA 11-13-23 draft 6
Capacity Requests 1 1. 301 Reservoir Road – Mark reviewed this plan to subdivide for 3 new single family homes. 2 3 Any Other Matter – None 4 5 Correspondence- None 6 7 Public Comment - None 8 9 Adjournment 10 There being no further business Walter moved to adjourn the meeting. Jack seconded the motion. 11 The motion passed unanimously. The meeting was adjourned at 8:00 pm. 12 The next regular meeting will be held on Monday, December11, 2023 at 7:00 pm. 13 14 Respectfully submitted, 15 16 17 Ruth Kiefer, Recording Secretary 18
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1199247
Invoice Date : 11/22/2023
Project : EGMAU21004
Project Name : HM Estates Sewer Design & Permitting
For Services Rendered Through 11/12/2023
Construction Admin & Inspections: Reviewed contractor closeout documents and as-built redlines. Reviewed final pay application and processed Change Order #2.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Wetland & Watercourse Investigation | ,750.00 | ,750.00 | 100.00% | ,750.00 | bash.00 |
| 02 -- Phase I Bog Turtle Habitat Assessment | ,750.00 | ,750.00 | 100.00% | ,750.00 | bash.00 |
| 03 -- Survey | 7,200.00 | 7,200.00 | 100.00% | 7,200.00 | bash.00 |
| 04 -- Design | 6,100.00 | 6,100.00 | 100.00% | 6,100.00 | bash.00 |
| 05 -- Permitting | ,000.00 | ,000.00 | 100.00% | ,000.00 | bash.00 |
| 06 -- Property Line Stakeout est. | ,000.00 | ,520.50 | ,520.50 | bash.00 | |
| 07 -- Geotechnical NTE | 0,000.00 | ,271.25 | 62.71% | ,271.25 | bash.00 |
| 08 -- Bid Assistance NTE | ,690.50 | ,690.50 | 100.00% | ,690.50 | bash.00 |
| 09 -- Construction Admin & Inspection NTE | 0,000.00 | 1,811.75 | 87.26% | 2,358.00 | 46.25 |
| Total : | 49,490.50 | 40,094.00 | 40,640.25 | 46.25 |
Phase: 09 -- Construction Admin & Inspection
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 149.00 | 74.50 |
| Associate Professional | 4.25 | 111.00 | 471.75 |
| Labor | 546.25 | ||
Phase Subtotal: 46.25
Amount Due This Invoice: 46.25
[Stamp: PAID]
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 19-409-6050
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
West Goshen HM Estates Sewer Design Permitting
EGMAU21004 Invoice Summary
Invoice Date 11/22/2023
| Project: | EGMAU21004 |
|---|---|
| Pennoni Job No.: | HM Estates Sewer Design & Permitting |
| Invoice No: | 1199247 |
| Invoice Period: | 10/16/2023 to 11/12/2023 |
| Date: | 11/22/2023 |
| Initial Authorization: | $ 64,800.00 |
| Contract Amount: | $ 149,490.50 |
| Previously Invoiced: | $ 140,094.00 |
| Current Invoice: | $ 546.25 |
| Invoiced to Date ($): | $ 140,640.25 |
| Invoiced to Date (%): | 94% |
| Remaining Budget ($): | $ 8,850.25 |
| Remaining Budget (%): | 6% |
Budget by Phase:
| Phase Name: | HM Estates Sewer Design & Permitting |
|---|---|
| Phase Budget: | $ 149,490.50 |
| Previously Invoiced: | $ 140,094.00 |
| Current Invoice: | $ 546.25 |
| Invoiced to Date ($): | $ 140,640.25 |
| Invoiced to Date (%): | 94% |
| Remaining Budget ($): | $ 8,850.25 |
| Remaining Budget (%): | 6% |
Comments: Construction Admin & Inspections: Reviewed contractor closeout documents and as-built redlines. Reviewed final pay application and processed Change Order #2.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1199248
Invoice Date : 11/22/2023
Project : EGMAU23001
Project Name : 2023 General Services
For Services Rendered Through 11/12/2023
Prepared November Engineer's Report.
Chester Creek Interceptor Sewer Rehab: Initiated review of construction submittals; pre-construction and schedule coordination with contractor and Township. Prepared documentation for LSA grant application.
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 575.50 | 39,423.25 | 39,998.75 |
| Limit | 42,000.00 | ||
| Remaining | 2,001.25 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 149.00 | 298.00 |
| Associate Professional | 2.50 | 111.00 | 277.50 |
| Totals | 4.50 | 575.50 | |
| Total Labor | 575.50 | ||
Total this Invoice: 75.50
[Stamp: PAID]
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2023 General Services
EGMAU23001Invoice Summary
Invoice Date 11/22/2023
| Project: | EGMAU23001 |
|---|---|
| Pennoni Job No.: | 2023 General Services |
| Invoice No: | 1199248 |
| Invoice Period: | 10/16/2023 to 11/12/2023 |
| Date: | 11/22/2023 |
| Initial Authorization: | $ 42,000.00 |
| Contract Amount: | $ 42,000.00 |
| Previously Invoiced: | $ 39,423.25 |
| Current Invoice: | $ 575.50 |
| Invoiced to Date ($): | $ 39,998.75 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 2,001.25 |
| Remaining Budget (%): | 5% |
Budget by Phase:
| Phase Name: | 2023 General Services |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ 39,423.25 |
| Current Invoice: | $ 575.50 |
| Invoiced to Date ($): | $ 39,998.75 |
| Invoiced to Date (%): | 95% |
| Remaining Budget ($): | $ 2,001.25 |
| Remaining Budget (%): | 5% |
Comments: Prepared November Engineer's Report.
Chester Creek Interceptor Sewer Rehab: Initiated review of construction submittals; pre-construction and schedule coordination with contractor and Township. Prepared documentation for LSA grant application.
Premium Power Services, LLC
505 Schoolhouse Road
Kennett Square, PA 19348
Phone: (610) 444-1232 Fax: (610) 444-2120
Invoice
| Date | Invoice |
|---|---|
| 9/1/2023 | 30568 |
Bill To
East Goshen Township Office
Accounts Payable
1580 Paoli Pike
West Chester, PA 19380-6199
| P.O. No. | Terms |
|---|---|
| 17409 | Net 30 |
| Description | Amount |
|---|---|
| Partial invoice for Ridley Creek Generator Supply and Commission as detailed in proposal #PEN-JMC012423. - Supply (1) Cummins 1000amp automatic transfer switch. |
17,500.00 |
[Stamp: PAID]
APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505
Thank you for your business. We impose a 2% surcharge on Visa and Mastercard payments.
| Subtotal | 7,500.00 |
|---|---|
| Sales Tax (0.0%) | bash.00 |
| Total | 7,500.00 |
GATTI MORRISON CONSTRUCTION SERVICE INC.
801 First Avenue, King Of Prussia, PA 19406, Tel: (610) 992-9700, Fax: (610) 992-9672, www.gattimorrison.com
6352 Chapmans Road, Allentown, PA 18106, Tel: (610) 992-9101, Fax: (610) 992-9102
INVOICE
| Invoice No. | Page |
|---|---|
| 525512 | 1 |
| Invoice Date | Cust No. |
| 10/11/23 | EAST05 |
| Total Amount | |
| ,359.00 | |
COPY
BILL TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
SHIP TO
SHOP
LYNN 610-692-7171
1580 PAOLI PIKE
WEST CHESTER, PA 19380
| Deliv Rec. | PO Number | Slpn | Order Date | Ship Date | Ship Via | FOB | Terms | Loc |
|---|---|---|---|---|---|---|---|---|
| 490225 | LYNN | KM | 10/04/23 | 10/10/23 | OUR TRUCK | DELIVERED | NET 30 DAYS | 1 |
| Item Number | Qty Order | Qty Ship | UOM | Description | Unit Price | Extended Price |
|---|---|---|---|---|---|---|
| HA-WSS-0100 | 1 | 1 | BX | SWELLSTOP WATERSTOP 3/4" X 1" 100'/BOX | 75.00 | 275.00 |
| HA-WSS-P00Q | 4 | 4 | EA | SWELLSTOP PRIMER/ADHESIVE QUART CAN | 0.00 | 160.00 |
| KA-SIA-0110 | 1 | 1 | UN | SIKA ARMATEC 110 3.5 GAL UN (BAG+CTN) | 35.00 | 235.00 |
| KA-SIT-107G | 8 | 8 | UN | SIKATOP SEAL #107 GRAY BAG+JUG 2.65 GL | 0.00 | 640.00 |
| KA-SIG-0050 | 2 | 2 | BG | SIKAGROUT 212 NS GROUT 50 LB | 2.00 | 24.00 |
| FUEL S/C KOP - NON TAXED | 25.00 |
[Stamp: PAID]
APPROVED BY: MM
DATE PAID:
CHECK #:
CHARGED TO: 07 429-1505
5 FUEL S/C WILL APPLY TO DELIVERIES
MK:SEWER TREATMENT PLANT
| Freight | 0.00 |
|---|---|
| Misc Charges | 0.00 |
| Sales Tax | 0.00 |
| Total > | ,359.00 |
PAY BY THIS INVOICE, STATEMENT WILL NOT FOLLOW
PLEASE REMIT PAYMENTS TO THE KING OF PRUSSIA ADDRESS
colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com
Divisions of Colonial Electric:
colonial (colonialelectric.com/cmp)
colonial teltek (colonialteltek.com)
Bright Light (brightlightdesigncenter.com)
Annapolis Lighting (annapolislighting.com)
Original Invoice
INVOICE
| INVOICE NUMBER | INVOICE DATE |
|---|---|
| 15492078 | 11/15/23 |
PLEASE REMIT PAYMENT TO:
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564
Billing Questions?
Call: THOMAS KARACKAI
484-679-2295
BILLING ADDRESS
10780 1 AB 0.537 E0086X I0148 D12071457618 S2 P10000284 0001:0001
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
SHOP
1751 TOWNE DR
WEST CHESTER PA 19380
| CUSTOMER PO | ORDER DATE | ORDERED BY | SHIP DATE | SHIPPED VIA | FREIGHT TERM |
|---|---|---|---|---|---|
| 32353-23 | 11/14/23 | DANIELLE | 11/15/23 | PPD | |
| COMMENTS | CO. UNIT / WH | ENTERED BY | ACCOUNT ID | ORIGINAL INVOICE | SALESPERSON |
| 02 / DC | 9795 | E163 | QT406077 | 0001 |
| LINE | SKU | CUSTOMER SKU | DESCRIPTION | ORD QTY | SHIP QTY | BO QTY | UNIT PRICE | UM | EXTENDED AMT |
|---|---|---|---|---|---|---|---|---|---|
| 10 | RIG1 | RIG1 1" RIGID CONDUIT $ | 100 | 100 | 0 | 428.96 | C | 428.96 | |
| 20 | 84765607334 | CALPVC1 PVC COATED RIG | 100 | 100 | 0 | 1061.40 | C | 1061.40 | |
| 30 | FREECPL100 | FREE 1" PVC COAT CPLG | 10 | 10 | 0 | 0.00 | E | 0.00 | |
| 40 | 78636401382 | STRUTDPALSLT12-10 1-5/8 AL SLT | 30 | 30 | 0 | 725.01 | C | 217.50 | |
| 50 | 60000007280 | HAYC1102X1AL 1 ALUM PIPE STRAP | 20 | 20 | 0 | 233.21 | C | 46.64 | |
| 60 | 78285635013 | BOLTROD3/8 3/8" BLT ROD 6' $ | 60 | 60 | 0 | 90.47 | C | 54.28 | |
| 70 | MESSAGE | ALL STOCK |
[Stamp: PAID]
APPROVED BY: MM
CHARGED TO: 07429-1505
Invoice Due By: 12/15/2023
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
For a Complete List of Locations Please Visit www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com
Accepted By: Joe / JOE
| SUBTOTAL | 1808.78 |
|---|---|
| S&H CHGS | |
| 0.00% TAX | 0.00 |
| PAY THIS AMOUNT | 1808.78 |
Page 1 of 1
colonial electric supply company, inc.
Since 1972...Powered By Excellence!
201 W. Church Road
King of Prussia, PA 19406
610-312-8100
www.colonialelectric.com
Divisions of Colonial Electric:
colonial (colonialelectric.com/cmp)
colonial teltek (colonialteltek.com)
Bright Light (brightlightdesigncenter.com)
Annapolis Lighting (annapolislighting.com)
Original Invoice
INVOICE
| INVOICE NUMBER | INVOICE DATE |
|---|---|
| 15499508 | 11/20/23 |
PLEASE REMIT PAYMENT TO:
Colonial Electric Supply Company, Inc.
PO BOX 414564
Boston MA 02241-4564
Billing Questions?
Call: THOMAS KARACKAI
484-679-2295
BILLING ADDRESS
11497 1 AB 0.537 E0091X I0146 D12088346132 S2 P10005658 0001:0001
EAST GOSHEN TOWNSHIP
ATTN: ACCOUNTS PAYABLE
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIPPING ADDRESS
EAST GOSHEN TOWNSHIP
RIDLEY CREEK SEWAGE PLANT
1751 TOWNE DR
WEST CHESTER PA 19380
| CUSTOMER PO | ORDER DATE | ORDERED BY | SHIP DATE | SHIPPED VIA | FREIGHT TERM |
|---|---|---|---|---|---|
| 32353-24 | 11/17/23 | DANIELLE | 11/20/23 | PPD | |
| COMMENTS | CO. UNIT / WH | ENTERED BY | ACCOUNT ID | ORIGINAL INVOICE | SALESPERSON |
| 02 / DC | 9795 | E163 | QT407588 | 0001 |
| LINE | SKU | CUSTOMER SKU | DESCRIPTION | ORD QTY | SHIP QTY | BO QTY | UNIT PRICE | UM | EXTENDED AMT |
|---|---|---|---|---|---|---|---|---|---|
| 10 | 84765607255 | CALPV1000B2010 1IN PVC PIP S | 30 | 30 | 0 | 17.21 | E | 516.30 | |
| 20 | 84765607321 | CALPV1000T37 1IN PVC CONBDY | 2 | 2 | 0 | 154.65 | E | 309.30 | |
| 30 | 78599150950 | SC500 BEAM CLAMP 1/4"-20 $ | 50 | 50 | 0 | 130.33 | C | 65.17 | |
| 40 | MESSAGE | ALL STOCK |
[Stamp: PAID]
APPROVED BY: MM
CHARGED TO: 07429-1505
Invoice Due By: 12/20/2023
Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month.
All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http://www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.
For a Complete List of Locations Please Visit www.colonialelectric.com
www.BrightLightDesignCenter.com www.AnnapolisLighting.com
Accepted By: Joe / JOE
| SUBTOTAL | 890.77 |
|---|---|
| S&H CHGS | |
| 0.00% TAX | 0.00 |
| PAY THIS AMOUNT | 890.77 |
Page 1 of 1
Yale ELECTRIC SUPPLY CO. - INVOICE
A U.S. Electrical Services Inc. Company
200 GARFIELD AVENUE
WEST CHESTER PA 19380-4512
610-719-9253 Fax
| CUSTOMER NUMBER | SUB ACCOUNT # | INVOICE NUMBER | INVOICE DATE |
|---|---|---|---|
| 117491 | 117491 | S124442513.001 | 11/28/23 |
REMIT TO:
US ELECTRICAL SERVICES, INC.
PO BOX 412485
BOSTON MA 02241-2485
BILL TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
SHIP TO:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| CUSTOMER PO # | JOB NAME / RELEASE # | ORDERED BY | SALESPERSON |
|---|---|---|---|
| UV TEMP PUMP | HOUSE ACCOUNT |
| WRITER | SHIP VIA | TERMS | SHIP DATE | ORDER DATE |
|---|---|---|---|---|
| DAVID A SMITH | WILL CALL | NET 15TH | 11/28/23 | 11/27/23 |
| ORDER QTY | SHIP QTY | DESCRIPTION | UNIT PRICE | EXT PRICE |
|---|---|---|---|---|
| 2ea | 2ea | ORDER PICKED UP IN WEST CHESTER, PA - 19380-4512 TB 5234-TB 1" STR L/T FLEX CONN MADE IN USA !! TAGGED ITEM !! |
1535.610 c | 30.71 |
| 1000ft | 1000ft | CAB CAT6 RISER 23GA 4PR SOL CMR BLUE PVC JKT 1000' REEL-IN-BOX |
191.950 m | 191.95 |
PAID
APPROVED BY: MA
DATE PAID:
CHECK #:
CHARGED TO: 07429-1505
SAVE TIME SAVE MONEY
SAVE TIME AND MONEY WITH OUR FREE E-BILLING SERVICE
Choose from three easy ways to receive your invoices: email, fax or Invoice Gateway, our secure online site. With Invoice Gateway, you are notified by email when new invoices are posted. You can search, sort, view, print, download and pay your bills on this site. With email and fax delivery, your invoices are sent once per day and you get an exact replica of your paper bill.
Contact the Credit Department at 717-606-1317 and get set up today!
PROOF OF DELIVERY SIGNATURE: 2023/11/28 08:52:09 AM S124442513.1
| Summary Item | Amount |
|---|---|
| Subtotal | 222.66 |
| Shipping Chgs | 0.00 |
| Tax | 0.00 |
| Payments | 0.00 |
| Amount Due | 222.66 |
Invoice is due by 01/15/24.
For complete Terms & Conditions go to: https://tinyurl.com/Yale-Customer-TC
A U.S. Electrical Services Inc. Company | Visit us at www.usesi.com
TO VIEW ONLINE GO TO: HTTP://USESI.BILLTRUST.COM | USE THIS ENROLLMENT TOKEN: VHD QLP SLM | Page 1 of 1
Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Page: 1
12/05/2023
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Client No: 6604-001M
Invoice No. 281972
General Authority Services
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 11/09/2023 PMM |
Email from L. Werkheiser in preparation for Board meeting. | 0.20 | 41.00 |
| 11/13/2023 EBK |
Review and analyze materials for monthly meeting Travel to/from and attend monthly meeting |
2.00 | 390.00 |
| For Current Services Rendered | 2.20 | 431.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna, Esquire | 0.20 | 05.00 | 1.00 |
| Ellen B. Koopman, Esquire | 2.00 | 195.00 | 390.00 |
| Previous Balance | 72.00 |
|---|---|
| Total Current Charges | 431.00 |
| 11/30/2023 Payment | -472.00 |
| Balance Due | 31.00 |
APPROVED BY: [signature] 12/6/23
CHARGED TO: 07-424-3140
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Page: 1
12/05/2023
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Client No: 6604M
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 472.00 | 431.00 | 0.00 | -472.00 | 31.00 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
To: Municipal Authority
From: Dave Ware
Re: MA November 2023 YTD Financial Report
Date: December 7, 2023
YTD November 2023, the Municipal Authority recorded $708,804 in revenues (primarily from Sewer Operating transfers, Sewer Capital Reserve transfers, and tapping fees) and $704,590 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station and auditor and legal fees). The net result of operations is $4,214. As of November 30, 2023, the fund balance was ($50,319). This negative balance is a function of balance versus cash reporting. There is $59,705 in invoices being held so the actual cash balance is $9,386.
Attached is a complete list of 2023 full year MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
November 2023
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 255.64 | 5.71 |
| 07-354-0400 | DCED GRANT | 152,980.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0.00 | 2,300.00 |
| 07-364-1110 | R.C.TAPPING FEES | 2,000.00 | 5,776.24 | 1,791.36 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,000.00 | 563.76 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 282.24 | 282.24 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 100,000.00 | 135,263.29 | 82,107.15 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1,471,553.00 | 566,662.88 | 265,426.86 |
| Total Revenue | 1,730,115.24 | 708,804.05 | 352,477.08 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 32,055.45 | 29,687.04 | 25,116.15 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,748.79 | 1,759.25 | 1,665.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 10,815.00 | 10,500.00 | 10,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 47,250.00 | 48,661.25 | 42,469.00 |
| 07-424-3140 | LEGAL SERVICES | 8,400.00 | 7,709.00 | 6,140.00 |
| 07-424-7440 | R.C. CAPITAL-STP | 355,793.00 | 0.00 | 0.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 488,847.00 | 34,376.75 | 0.00 |
| 07-426-3001 | RELINING | 260,000.00 | 0.00 | 0.00 |
| 07-429-1501 | BARKWAY PUMP STATION CAPITAL | 0.00 | 0.00 | 2,215.00 |
| 07-429-1502 | ASHBRIDGE PUMP STATION CAPITAL | 0.00 | 0.00 | 11,493.05 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 78,000.00 | 10,240.62 | 153,398.99 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 0.00 | 0.00 | 1,870.00 |
| 07-429-1505 | RCSTP CAPITAL | 260,000.00 | 233,347.32 | 120,403.18 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 0.00 | 90,113.64 | 0.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 55,932.87 | 0.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 187,206.00 | 182,262.24 | 0.00 |
| 07-492-0100 | TRANSFER TO GENERAL FUND | 0.00 | 0.00 | 212.99 |
| Total Expenses | 1,730,115.24 | 704,589.98 | 375,233.61 | |
| Net Result From Operations | 0.00 | 4,214.07 | -22,756.53 | |
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/23 | Revenue Journal | INTEREST EARNED JAN 2023 | 2.65 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/23 | Revenue Journal | INTEREST EARNED FEBRUARY 2023 | 6.32 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/23 | Revenue Journal | INTEREST EARNED MARCH 2023 | 23.37 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/23 | Revenue Journal | INTEREST EARNED APRIL 2023 | 12.47 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/23 | Revenue Journal | INTEREST EARNED MAY 2023 | 32.83 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/23 | Revenue Journal | INTEREST EARNED JUNE 2023 | 67.17 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/23 | Revenue Journal | INTEREST EARNED JULY 2023 | 10.61 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/23 | Revenue Journal | INTEREST EARNED AUGUST 2023 | 9.11 |
| 07-341-1000 | INTEREST EARNINGS | 09/30/23 | Revenue Journal | INTEREST EARNED SEPTEMBER 2023 | 29.99 |
| 07-341-1000 | INTEREST EARNINGS | 10/31/23 | Revenue Journal | INTEREST EARNED SEPTEMBER 2023 | 31.43 |
| 07-341-1000 | INTEREST EARNINGS | 11/30/23 | Revenue Journal | INTEREST EARNED NOVEMBER 2023 | 29.69 |
| 07-364-1110 | R.C.TAPPING FEES | 01/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 02/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 03/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 04/03/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 05/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/28/23 | Revenue Journal | TAP IN FEE 1712 E BOOT RD | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 06/28/23 | Revenue Journal | SEWER INSPECTION FEE 1712 E BOOT RD | 500.00 |
| 07-364-1110 | R.C.TAPPING FEES | 07/03/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 08/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 09/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 10/02/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 11/01/23 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/27/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12838 | 281.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 03/23/23 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 12839 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/27/23 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 03/23/23 | Revenue Journal | PINE ROCK INTEREST PORTION - PAPPANO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/20/23 | Revenue Journal | XFER TO 07 FROM 05 RE: MA EXPENSES | 3,384.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 05-SEWER | 14,572.43 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/31/23 | Revenue Journal | XFER $ FROM 05 TO 07 RE: MA EXPENSES | 3,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/17/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 36,455.37 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 2,877.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/22/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 715.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/23/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 880.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/24/23 | Revenue Journal | XFER TO 07 FROM 05 RE: EXPENSES | 6,738.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/29/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/31/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,944.84 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/17/23 | Revenue Journal | FROM 05 SEWER OP TO 07 MA | 4,992.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 707.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/10/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,627.50 |
Page 1 of 6
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/08/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,253.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/30/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 10,398.41 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/13/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,041.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/08/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 60.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/24/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,040.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 09/27/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 10,343.79 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/11/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 104.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/13/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 17,834.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/17/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 16,542.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 10/18/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 15,755.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 11/07/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,612.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 11/27/23 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,047.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/12/23 | Revenue Journal | XFER $ FROM 09 TO 07 TO COVER CAP.EXP. | 41,381.95 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/20/23 | Revenue Journal | XFER TO 07 FROM 09 RE: MA EXPENSES | 11,730.76 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/30/23 | Revenue Journal | XFER $ TO MA07 FROM 09- SEWER CAP | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/10/23 | Revenue Journal | FROM 09 SEWER CAP RESERVE TO 07 MA | 115,362.26 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/23/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,690.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/01/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 20,201.84 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/09/23 | Revenue Journal | XFER $ TO 07 FROM 09 | 1,264.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/22/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,961.86 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/24/23 | Revenue Journal | XFER TO 07 FROM 09 RE: EXPENSES | 11,080.96 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/29/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,221.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/05/23 | Revenue Journal | XFER FROM 09 SEWER OP TO 07 MA | 1,041.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/21/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 977.06 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/25/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,801.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/26/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 252.28 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/28/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 688.81 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/04/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,069.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/10/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,953.58 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/19/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 66,899.98 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/08/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 56,078.05 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/13/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 450.18 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/20/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 888.22 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/03/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,746.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/11/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 209.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/13/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 824.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/08/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 22.12 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/24/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,626.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/31/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 18,930.40 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/07/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 17,500.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 09/22/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,137.72 |
Page 2 of 6
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/13/23 | Revenue Journal | XFER FROM 09 SEWER OPERATING TO 07 MA | 5,028.13 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/18/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 11,234.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 10/24/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,408.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/01/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 156.69 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/07/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 956.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/20/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,650.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/27/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 80,991.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 11/29/23 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,359.00 |
| Total Revenue | 708,804.05 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/31/23 | Pay Check: 3402 | 23-00878 QTR 1 2023 MA CHARGE BACK | 8,944.84 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/30/23 | Pay Check: 3431 | 23-01745 QTR 2 2023 MA CHARGE BACK | 10,398.41 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 09/29/23 | Expd | QTR 3 2023 MA CHARGE BACK | 10,343.79 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/22/23 | Pay Check: 3395 | 23-00707 2023 ANNUAL DAILY DISCHARGE CA | 715.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/23/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 880.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 08/08/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 60.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 10/11/23 | Pay Check: 3442 | 23-02597 GEN, SEWER, MUN AUTH CHECKS | 104.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 02/15/23 | Pay Check: 3389 | 23-00406 PROGRESS BILLING EGT MUA123122 | 1,793.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/29/23 | Pay Check: 3401 | 23-00870 PROGRESS BILLING AUD EGT MUA | 8,000.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/10/23 | Pay Check: 3417 | 23-01270 PROGRESS BILLING AUDIT EGT MUA | 707.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/20/23 | Pay Check: 3379 | 23-00111 SERV.THRU 12/18/22 GEN.SERV.22 | 3,384.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/23/23 | Pay Check: 3392 | 23-00443 SERV THRU 011523 GEN SERVICES | 2,294.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00816 SERV THRU 021223 CHAPTER 94 RE | 2,246.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/24/23 | Pay Check: 3399 | 23-00815 SERV THRU 021223 GENERAL SERVI | 3,482.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01018 SERV THRU 031923 GENERAL SERVI | 2,614.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/17/23 | Pay Check: 3406 | 23-01019 SERV THRU 031923 CHAPTER 94 RE | 1,654.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01302 SERV THRU 041623 2023 GEN SERV | 3,663.25 |
| 07-424-3130 | ENGINEERING SERVICES | 05/10/23 | Pay Check: 3420 | 23-01303 SERV THRU 041623 2022 CHAPT 94 | 1,377.25 |
| 07-424-3130 | ENGINEERING SERVICES | 06/08/23 | Pay Check: 3425 | 23-01576 SERV THRU 051423 2023 GEN SERV | 1,253.25 |
| 07-424-3130 | ENGINEERING SERVICES | 07/13/23 | Pay Check: 3435 | 23-01882 SERV THRU 061823 2023 GEN SERV | 651.50 |
| 07-424-3130 | ENGINEERING SERVICES | 08/24/23 | Pay Check: 3437 | 23-02177 SERV THRU 071623 2023 GEN SERV | 2,900.00 |
| 07-424-3130 | ENGINEERING SERVICES | 10/18/23 | Pay Check: 3447 | 23-02710 SERV THRU 091723 2023 GEN SERV | 13,951.25 |
| 07-424-3130 | ENGINEERING SERVICES | 11/07/23 | Pay Check: 3449 | 23-02855 SERV THRU 101523 2023 GEN SERV | 8,612.50 |
| 07-424-3130 | ENGINEERING SERVICES | 11/27/23 | Pay Check: 3453 | 23-02954 SERV THRU 111223 2023 GEN SERV | 575.50 |
| 07-424-3140 | LEGAL SERVICES | 02/23/23 | Pay Check: 3391 | 23-00442 LEGAL SERV. JAN 2023 GEN AUTH | 583.00 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00812 LEGAL SERV FEB 2023 GEN AUTHOR | 389.50 |
| 07-424-3140 | LEGAL SERVICES | 03/24/23 | Pay Check: 3398 | 23-00813 LEGAL SERV DEC 2022 GEN AUTHOR | 620.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01020 LEGAL SERV MARCH 2023 GEN AUTH | 431.00 |
| 07-424-3140 | LEGAL SERVICES | 04/17/23 | Pay Check: 3405 | 23-01017 LEGAL SERV FEB 2023 GEN AUTH | 292.50 |
| 07-424-3140 | LEGAL SERVICES | 05/10/23 | Pay Check: 3419 | 23-01304 LEGAL SERV APRIL 2023 GEN AUTH | 587.00 |
Page 3 of 6
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3140 | LEGAL SERVICES | 07/13/23 | Pay Check: 3434 | 23-01883 LEGAL SERV MAY 2023 GEN AUTH | 389.50 |
| 07-424-3140 | LEGAL SERVICES | 08/24/23 | Pay Check: 3436 | 23-02176 LEAL SERV JUNE 2023 GEN AUTH | 348.50 |
| 07-424-3140 | LEGAL SERVICES | 08/24/23 | Pay Check: 3436 | 23-02175 LEGAL SERV JULY 2023 GEN AUTH | 1,791.50 |
| 07-424-3140 | LEGAL SERVICES | 10/18/23 | Pay Check: 3446 | 23-02706 LEGAL SERV SEPT 2023 GEN AUTH | 658.50 |
| 07-424-3140 | LEGAL SERVICES | 10/18/23 | Pay Check: 3446 | 23-02705 LEGAL SERV AUG 2023 GEN AUTH | 1,146.00 |
| 07-424-3140 | LEGAL SERVICES | 11/27/23 | Pay Check: 3452 | 23-02953 LEGAL SERV OCT 2023 GEN AUTH | 472.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 10/13/23 | Pay Check: 3443 | 23-01990 RCSTP-REPLACEMENT MYERS PUMP | 17,834.75 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 10/17/23 | Pay Check: 3445 | 23-01869 10K0804 INLINE MUFFIN MONSTER | 16,542.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00110 SERV.THRU 12/18/22 HM EST SEWR | 9,690.50 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/06/23 | Pay Check: 3385 | 23-00331 STONE, AASHTO #57 | 550.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3377 | 23-00030 CONDUITS, STRAPS, LOCKNUTS + | 1,161.95 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/23 | Pay Check: 3378 | 23-00075 PULSAFEEDER - RCSPT CAUSTIC SO | 40,220.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00109 SERV.THRU 12/18/22 RCSTP SODA | 861.51 |
| 07-429-1505 | RCSTP CAPITAL | 01/20/23 | Pay Check: 3379 | 23-00112 SERV.THRU 12/18/22 RCSTP UV | 1,178.75 |
| 07-429-1505 | RCSTP CAPITAL | 01/27/23 | Pay Check: 3380 | 23-00151 HELIFLOW 408 PD BLOWER | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/06/23 | Pay Check: 3384 | 23-00305 50HP 3540RPM BALDOR MOTOR | 4,683.69 |
| 07-429-1505 | RCSTP CAPITAL | 03/24/23 | Pay Check: 3399 | 23-00817 SERV THRU 021223 RCSTP CAU SOD | 4,144.21 |
| 07-429-1505 | RCSTP CAPITAL | 03/29/23 | Pay Check: 3400 | 23-00827 HELIFLOW 408 LHBD BLOWER | 5,221.00 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3422 | 23-01548 UV DISINFECTION SYS PYMT- 30% | 40,495.80 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3425 | 23-01575 SERV THRU 051423 RCSTP UV REPL | 5,770.00 |
| 07-429-1505 | RCSTP CAPITAL | 06/08/23 | Pay Check: 3425 | 23-01573 SERV THRU 051423 RCSTP CAU SOD | 37.25 |
| 07-429-1505 | RCSTP CAPITAL | 07/13/23 | Pay Check: 3435 | 23-01881 SERV THRU 061823 RCSTP CAU SOD | 824.50 |
| 07-429-1505 | RCSTP CAPITAL | 08/24/23 | Pay Check: 3437 | 23-02178 SERV THRU 060823 RCSTP UV REPL | 5,626.50 |
| 07-429-1505 | RCSTP CAPITAL | 09/07/23 | Pay Check: 3439 | 23-02333 PARTIAL PYMT RC GENERATOR SUPP | 17,500.00 |
| 07-429-1505 | RCSTP CAPITAL | 09/22/23 | Pay Check: 3440 | 23-02474 441T TWINTIER REBAR TYING TOOL | 3,008.05 |
| 07-429-1505 | RCSTP CAPITAL | 09/22/23 | Pay Check: 3440 | 23-02474 441T TWINTIER REBAR TYING TOOL | -30.08 |
| 07-429-1505 | RCSTP CAPITAL | 09/22/23 | Pay Check: 3441 | 23-02452 ROD 1/2X20' UV PROJECT | 159.75 |
| 07-429-1505 | RCSTP CAPITAL | 10/18/23 | Pay Check: 3447 | 23-02709 SERV THRU 091723 RCSTP UV REPL | 10,769.75 |
| 07-429-1505 | RCSTP CAPITAL | 10/24/23 | Pay Check: 3448 | 23-02754 ADHESIVE DISPENSER& CARTRIDGES | 1,408.75 |
| 07-429-1505 | RCSTP CAPITAL | 11/01/23 | Pay Check: 701 | 23-02825 VARIOUS PURCHASES- SEE NOTES | 156.69 |
| 07-429-1505 | RCSTP CAPITAL | 11/07/23 | Pay Check: 3449 | 23-02854 SERV THRU 101523 RCSTP UV REPL | 928.25 |
| 07-429-1505 | RCSTP CAPITAL | 11/20/23 | Pay Check: 3450 | 23-02919 RCSTP-5/8" REBAR VARIOUS LENGT | 1,650.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/27/23 | Pay Check: 3451 | 23-02952 UV DISINFECTION SYS PYMT- 60% | 80,991.00 |
| 07-429-1505 | RCSTP CAPITAL | 11/29/23 | Pay Check: 3454 | 23-02976 SWELLSTOP WATERSTOP, PRIMER | 1,359.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00148 | 6,904.64 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00364 | 430.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00429 | 1,708.22 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00412 | 17,817.91 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00411 | 3,771.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00381 | 6,498.99 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00415 | 4,866.25 |
Page 4 of 6
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00153 | 2,642.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/21/23 | Expd | RECLASS HERSH.MILL EST. PURCH.23-00152 | 5,025.79 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/23/23 | Pay Check: 3392 | 23-00444 SERV THRU 011523 HM ESTATES SW | 8,690.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00536 STONE, AASHTO #57 329.79 TON | 8,244.78 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00534 STONE, AASHTO #57 251.05 TON | 6,276.27 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 02/28/23 | Pay Check: 3393 | 23-00535 STONE, AASHTO #57 227.23 TON | 5,680.79 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00582 SPLIT COUPLERS | 305.40 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/09/23 | Pay Check: 3394 | 23-00581 SEWER HUB ADAPTERS,COUPLERS + | 959.56 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3396 | 23-00723 36" MARMAC POLYSEAL COUPLER | 803.20 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00731 JOHN DEERE 550K RENTL 2/28-3/1 | 434.50 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/22/23 | Pay Check: 3397 | 23-00730 JOHNDEERE 550K RENTL 2/23-2/24 | 724.16 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 03/24/23 | Pay Check: 3399 | 23-00814 SERV THRU 021223 HM ESTATES SE | 6,936.75 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | 1,407.00 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 04/25/23 | Pay Check: 3410 | 23-01141 SINGLE SIDED STRAW MAT,PINS | -14.07 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3403 | 23-00889 VARIOUS PURCHASES- SEE NOTES | 215.75 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/05/23 | Pay Check: 3404 | 23-00906 ROD 5/8 X 20 FT-CAUSTIC SODA | 826.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | 441.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3407 | 23-01081 3" TWISTER CORE BITS | -4.41 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01056 GALV CAP, GFCI RCPT, GREY COVR | 168.21 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/21/23 | Pay Check: 3408 | 23-01057 GALV CAP, STEEL CLAMPBACK | 372.26 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3409 | 23-01131 PVC CONDBY, DEV BOX, CTD CPLG | 890.32 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01112 (30) BUSS FUSES | 2,160.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01144 GALV BLCK CAP,COMPRESSION CPLG | 286.08 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/25/23 | Pay Check: 3411 | 23-01128 IRON THRDED T BODY, SHEET STEE | 72.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/26/23 | Pay Check: 700 | 23-01151 CAUSTIC SODA-(2) HVY DUTY TARP | 252.28 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01177 BLINE SS CHANNEL SLOTTED HOLES | 374.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01176 EMT HW STRAP,MACH SCREW ANCHOR | 233.47 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 04/28/23 | Pay Check: 3412 | 23-01175 GALV RED CAP, COMM SWITCH, | 81.17 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3413 | 23-01225 PVC BELL END PIPE, PVC COUPLNG | 2,574.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3414 | 23-01227 10 YD CONCRETE 4500 PSI | 1,930.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01219 (30) BLINE EMT-HW STRAP | 83.82 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/03/23 | Pay Check: 3415 | 23-01212 OUTLET BOX, SS SWITCH,HW STRAP | 481.70 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01276 SCH 40 2" PIPE, 2" COUPLING | 1,030.64 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3416 | 23-01275 CORP BALL STOP, SERVICE SADDLE | 905.59 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/10/23 | Pay Check: 3418 | 23-01295 TAYMAC GRY METAL INUSE COVER | 17.35 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3423 | 23-01553 RC WWTP CHEMICAL STORAGE TANK | 6,415.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3424 | 23-01554 RIDLEY CREEK-RAN CONDUIT | 2,008.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/08/23 | Pay Check: 3424 | 23-01555 RIDLEY CR-RAN CONDUIT FOR TANK | 1,352.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/13/23 | Pay Check: 3428 | 23-01617 BALL CORP STOP,BRASS THRD NIPL | 450.18 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/20/23 | Pay Check: 3429 | 23-01658 BRASS THREADED NIPPLE&COUPLING | 57.22 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 06/20/23 | Pay Check: 3430 | 23-01654 PULSAFEEDER TUBING & KOPKIT | 831.00 |
Page 5 of 6
Municipal Authority
YTD Revenues and Expenses thru 11/30/2023
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1520 | RCSTP - CAUSTIC SODA | 07/03/23 | Pay Check: 3432 | 23-01739 RC WWTP CHEMICAL STORAGE TANK | 6,746.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 07/11/23 | Pay Check: 3433 | 23-01860 GATE & POST- BLAST PRIMER | 209.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 08/08/23 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 22.12 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 08/31/23 | Pay Check: 3438 | 23-02291 RC PIPING FOR CAUSTICSODA TANK | 18,930.40 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 10/13/23 | Pay Check: 3444 | 23-02664 HEATED SAFETY EYEWASH/SHOWER | 5,028.13 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 10/18/23 | Pay Check: 3447 | 23-02707 SERV THRU 091723 RCSTP CAU SOD | 464.50 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 11/07/23 | Pay Check: 3449 | 23-02853 SERV THRU 101523 RCSTP CAU SOD | 27.75 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 02/06/23 | Pay Check: 3383 | 23-00366 WWPS PYMT LAST INSTALLMENT | 115,362.26 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 06/12/23 | Pay Check: 3426 | 23-01363 2022 WG SEWER AUTH BOND FUND E | 19,143.34 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 06/12/23 | Pay Check: 3427 | 23-01364 2022 WG SEWER AUTH TAPPING FEE | 47,756.64 |
| Total Expense | 704,589.98 | ||||
| Net Operating | 4,214.07 |
Page 6 of 6
610-692-7171 www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 Date: December 6, 2023 To: Municipal Authority From: Mark Miller, Director of Public Works RE: New Lift Station Pump Purchase On November 29, 2023, we pulled the three pumps at the lift station to check the impellers and general condition as part of our regular preventative maintenance. After looking at the pumps, I would like to make the following recommendations:
1. We purchase a new lift station pump in the amount of $33,647.00 (quote attached) 2. Once the new pump is received, we need to start pulling the other pumps out to be rebuilt. The rebuild costs will be approximately $8,500 to $12,000 per pump.
• PUMP P11: 10,299.1 hours • PUMP P12: 9,975.2 hours • PUMP P13: 12,259 hours
[Logo: xylem]
December 4, 2023
EAST GOSHEN TOWNSHIP
WEST CHEST PA 19380
Quote # 2023-MAL-1547
Project Name: East Goshen - 2023
Job Name: Ridley Creek WWTP Influent PS
Attn: Mark Miller
Xylem Water Solutions USA, Inc. is pleased to provide a quote for the following Flygt equipment.
Co-Stars Contract # 016-E23-311
Xylem Water Solutions USA, Inc.
Flygt Products
2330 Yellow Springs Rd
Malvern, PA 19355
Tel 610/408-6500
Fax 610/647-5563
3171.095-0016 Replacement
| Qty | Part Number | Description | Unit Price | Extended Price |
|---|---|---|---|---|
| 1 | 3171.095-0016 | Flygt Model NP-3171.095 6" volute Submersible pump equipped with a 460 Volt / 3 phase / 60 Hz 30 HP 1750 RPM motor, 434 impeller, 1 x 50 Ft. length of SUBCAB 4G25+S(2x0,5) submersible cable, FLS leakage detector, volute is prepared for Flush Valve | $ 30,147.00 | $ 30,147.00 |
| 1 | 14-69 98 30N | SHIPPING AND HANDLING-NO TAX | $ 3,500.00 | $ 3,500.00 |
| Total Price | $ 33,647.00 | |||
Terms & Conditions
This order is subject to the Standard Terms and Conditions of Sale – Xylem Americas effective on the date the order is accepted which terms are available at http://www.xyleminc.com/en-us/Pages/terms-conditions-of-sale.aspx and incorporated herein by reference and made a part of the agreement between the parties.
Purchase Orders: Please make purchase orders out to: Xylem Water Solutions USA, Inc.
Freight Terms: 3 DAP - Delivered At Place 08 - Jobsite (per IncoTerms 2020)
See Freight Payment (Delivery Terms) below.
Taxes: State, local and other applicable taxes are not included in this quotation.
Back Charges: Buyer shall not make purchases nor shall Buyer incur any labor that would result in a back charge to Seller without prior written consent of an authorized employee of Seller.
Shortages: Xylem will not be responsible for apparent shipment shortages or damages incurred in shipment that are not reported within two weeks from delivery to the
[Logo: FLYGT a xylem brand]
Page 1 of 3
jobsite. Damages should be noted on the receiving slip and the truck driver advised of the damages. Please contact our office as soon as possible to report damages or shortages so that replacement items can be shipped and the appropriate claims made.
Terms of Delivery: PP/Add Order Position
Terms of Payment: 100% N30 after invoice date.
Xylem's payment shall not be dependent upon Purchaser being paid by any third party unless Owner denies payment due to reasons solely attributable to items related to the equipment being provided by FLYGT.
Validity: This Quote is valid for thirty (30) days.
Please note that this pricing is valid for 30 days and contingent upon final approval of submittals and release to fabrication by (within 90 days of bid date).
This quotation is subject to change if any changes to the specifications or plans are made that alter the scope of supply.
Schedule: Shipment lead times are approximately 5-6 weeks after order acceptance.
COVID 19: Delivery lead-times may be impacted by the current COVID-19 virus pandemic relative to transportation logistics.
Sincerely,
[Signature: AJ Wilson]
AJ Wilson
Sales Representative
Phone: 610-408-6515
Cell: 610-314-6856
aj.wilson@xylem.com
[Signature: Emily Cooper]
Emily Cooper
Customer Service
Phone: 610-408-6503
emily.cooper@xylem.com
[Logo: FLYGT a xylem brand]
Page 2 of 3
[Logo: xylem]
Xylem Water Solutions USA, Inc.
Flygt Products
Customer Acceptance
This order is subject to the Standard Terms and Conditions of Sale – Xylem Americas effective on the date the order is accepted which terms are available at http://www.xyleminc.com/en-us/Pages/terms-conditions-of-sale.aspx and incorporated herein by reference and made a part of the agreement between the parties.
A signed copy of this Quote is acceptable as a binding contract.
Purchase Orders: Please make purchase orders out to: Xylem Water Solutions USA, Inc.
Quote #: 2023-MAL-1547
Customer Name: EAST GOSHEN TOWNSHIP
Job Name: Ridley Creek WWTP Influent PS
Total Amount: $ 33,647.00
(excluding freight)
Signature: _________________________
Name: _________________________
(PLEASE PRINT)
Company/Utility: _________________________
PO: _________________________
Address: _________________________
Date: _________________________
_________________________
Phone: _________________________
_________________________
Email: _________________________
_________________________
Fax: _________________________
[Logo: FLYGT a xylem brand]
Page 3 of 3
Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2
December 8, 2023
EGMAU23001P
East Goshen Municipal Authority Attn: Mark Miller, Public Works Director 1580 Paoli Pike West Chester, PA 19380
RE: Proposal for Chester Creek Interceptor Inspection and Repair East Goshen Township, Pennsylvania
Dear Mr. Miller:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction services for the inspection and repair of the Chester Creek Interceptor in East Goshen Township.
Background East Goshen Township televised pipes along a portion of the Chester Creek Interceptor on January 26-27, 2023. Pennoni provided a sanitary sewer inspection summary, dated March 28, 2023, based on the results of the televised pipes. It was recommended that approximately 360 LF of existing pipe be lined with cured-in-place pipe lining, two pipes be pipe grouted, four manholes be pressure grouted, asphalt/debris be removed from one pipe, and one lateral be replaced to address the leaks, infiltration, and blockages discovered in the pipe videos. In addition, it was recommended that the downstream 4,900 LF of pipe along the Chester Creek Interceptor be televised to assess the condition of the interceptor to determine if additional repairs to the system are necessary. We prepared bid documents and conducted the bidding process, and construction award was made. The project is under construction, and we have been performing construction phase services as requested, consisting of pre-construction coordination, conducting the pre-construction meeting, reviewing construction material submittals, and reviewing initial videos of a portion of the downstream interceptor that has already been televised by the contractor.
All work to-date has been performed under our 2023 General Engineering task. However, that task is approaching budget, and capital projects are not intended to be performed under that task. Therefore, the purpose of this proposal is to create a separate task order to fund the remainder of engineering for the project through a separate capital project.
The scope of this proposal is to provide construction phase support services for the remainder of construction.
Scope of Services Pennoni will provide construction engineering support as requested, which is expected to include: review of inspection videos of the remainder of the contracted interceptor extents, recommendations for any additional repairs, coordination with the contractor and Township for pricing and budget feasibility for any such repairs, additional construction submittal reviews, part-time inspection of rehabilitation work including cured-in-place pipe lining, review of post- construction videos, processing of pay applications, review of prevailing wage certifications, and processing of project closeout.
We are estimating 80 hours of on-site construction inspection and 24 hours of engineering office support for the remainder of construction within this proposal.
EGMAU23001P Chester Creek Interceptor East Goshen Municipal Authority December 8, 2023 Page 2 of 2
Deliverables We will provide recommendations for any further repairs based on review of inspection videos along with payment application recommendation letters.
Schedule Performance of services will be conducted based on the contractor’s construction schedule.
Fee We will perform the Scope of Services on a Time and Materials basis at the hourly rates to be billed at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee not to exceed Twelve Thousand Dollars ($12,000.00) without prior approval of the Authority.
Billing and Payment Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Authority Engineer ACCEPTED BY:
________________________________________________________ Written Name:
East Goshen Municipal Authority
DATE:
___________________
Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 2
December 8, 2023
EGMAU23001P
East Goshen Municipal Authority Attn: Mark Miller, Public Works Director 1580 Paoli Pike West Chester, PA 19380
RE: Proposal for RCSTP Generator 2 Replacement East Goshen Township, Pennsylvania
Dear Mr. Miller:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction phase services and remaining design services for the proposed replacement of the existing emergency generator “Generator 2” at the Ridley Creek Sewage Treatment Plant (RCSTP).
Background The RCSTP contains two emergency generators on-site. Generator 1 was replaced in 2019. Generator 2 is a 500 KW / 625KVA diesel-fueled Cummins generator. This generator was installed as part of the 2008-2009 expansion and is due for replacement.
We have already performed sizing analysis for the Generator 2 replacement, obtained quotes, and assisted with acquisition of the generator and automatic transfer switch. We also evaluated concept alternatives for siting and constructability of the replacement generator, performed multiple site visits, and initiated preparation of plans. All work to-date has been performed under our 2023 General Engineering task. However, that task is approaching budget, and capital projects are not intended to be performed under that task. Therefore, the purpose of this proposal is to create a separate task order to fund the remainder of engineering for the project through a separate capital project.
The scope of this proposal is to finalize design and plans including associated electric work, new/expanded concrete pad, construction sequence to maintain backup power during construction to maximum extent practical, and other limited plan information needed for the Township Public Works Department to perform construction. It also includes limited construction phase support.
Scope of Services Pennoni will provide the following professional engineering services:
• Prepare a design for the selected generator layout based on electrical requirements and existing site conditions.
• Prepare a construction plan set consisting of a cover sheet, demolition and site plan, electrical plan, erosion and sediment (E&S) control plan, E&S details and notes, and construction details and notes including concrete pad.
• Prepare a structural design for a new or expanded concrete pad for the generator. • Prepare electrical design for the installation of the new generator and any associated equipment.
• Provide construction engineering support as requested.
EGMAU23001P RCSTP Generator 2 Replacement East Goshen Municipal Authority December 8, 2023 Page 2 of 2
We assume that no permitting will be required, and that Public Works will perform the construction so bid documents and cost estimates are not needed.
Deliverables Deliverables consist of a construction plan set.
Schedule Performance of services will commence upon receipt of Notice to Proceed (NTP). We anticipate final construction plans will be provided approximately eight weeks after NTP.
Fee We will perform the Scope of Services on a Time and Materials basis at the hourly rates to be billed at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee not to exceed Fifteen Thousand Dollars ($15,000.00) without prior approval of the Authority.
Billing and Payment Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Associate Vice President
ACCEPTED BY:
________________________________________________________ Written Name:
East Goshen Municipal Authority
DATE:
___________________
From: Michael Ellis To: Derek Davis; Mark Miller; David Ware Cc: Lynn Werkheiser; Nathan M. Cline Subject: 2024 EGT & EGMA Annual Services Date: Monday, November 20, 2023 4:10:29 PM Attachments: ATT00001.png 2024 EG Annual Services Ltr.pdf
Hi Derek, Mark, and Dave, Please find attached our annual services and rates letter for 2024 for the Township and MA. As previously communicated, the rates reflect an average 2.2% increase due to inflationary conditions (vs 3.2% Federal COLA for 2024) and salary pressures to retain our experienced and talented staff to ensure continued provision of high quality service to the Township and MA. Please do not hesitate to call Nate or me if you have any comments or questions. Thank you! Mike
Michael Ellis, PE Municipal Division Manager
Pennoni 121 Continental Drive, Suite 207 | Newark, DE 19713 Direct: +1 302-351-5236 | Mobile: +1 302-561-4235 www.pennoni.com | MEllis@Pennoni.com
Watch Now: I-95 CAP Groundbreaking!
Christiana Executive Campus 121 Continental Drive, Suite 207 T: 302-655-4451 www.pennoni.com Newark, DE 19713 Page 1 of 1
November 20, 2023 East Goshen Township Attn: Derek Davis, Township Manager 1580 Paoli Pike West Chester, PA 19380 RE: Fee Schedule for Year 2024 East Goshen Township and East Goshen Municipal Authority Dear Derek: Pennoni is proud to serve East Goshen Township and East Goshen Municipal Authority, and we look forward to working with you again in 2024. Our rates for 2024 for Township and Authority Engineering services are listed below for the categories of staff that most frequently provide services to the Township and Authority. The rates reflect an average increase of 2.2%, which is below the 2024 federal cost of living adjustment (COLA) of 3.2%. Authority/Township Engineer ............................................................ $153/hr Senior Professional ............................................................................ $148/hr Project Professional .......................................................................... $131/hr Staff Professional .............................................................................. $120/hr Associate Professional...................................................................... $113/hr Senior Engineering Technician .......................................................... $109/hr Graduate Professional ....................................................................... $104/hr Engineering Technician ...................................................................... $92/hr We will continue to provide services to the Township and Authority as requested. For typical general engineering services to the Authority, we recommend budgeting the following under the expectation of a similar level of effort in 2024 as in 2023. Similar to previous years, we will establish separate accounts for each activity listed below, and each activity will be invoiced separately.
• General Consultation and monthly meetings ..................................... $43,000 • Chapter 94 reports ................................................................................. $9,000
TOTAL ................ $52,000 Other Authority capital projects outside of general services, as requested, will be proposed separately, such as the following project that is planned for 2024:
• Chester Creek Interceptor Phase 2 and Supplee Valley Sewer Rehabilitation We thank you again for the confidence you have placed in Pennoni over the years and look forward to continuing to serve you in the future! Sincerely, PENNONI ASSOCIATES INC. Michael J. Ellis, PE Nathan M. Cline, PE Associate Vice President Associate Vice President
BIG FISH ENVIRONMENTAL SERVICES, INC. 1554 Paoli Pike #262, West Chester PA 19380-6102
Page 1 of 1
December 7, 2023
Mr. Mark Miller, Director of Public Work East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199
Subject: Professional Services for Ridley Creek STP O&M
Mr. Miller:
Big Fish Environmental Services, Inc. has successfully provided the operation and maintenance services for the Ridley Creek Sewage Treatment plant since 2012. I have been involved with the facility’s construction beginning in 2009. During this tenure, the fees were last increased at the beginning of January 2016. I request that the Township increase the base fee from $8,823.63 to $11,512.84 and adjust the hourly fee for sludge dewatering and mechanical services from $58.82 to $68.00. The wastewater industry is very competitive in obtaining qualified plant operators within an industry at an attrition rate higher than the rate of those entering the industry. This fee increase is directly related to increasing the compensation for the lead Plant Operator, Matthew Mullin, Jr. Mathew is a licensed PA DEP licensed WW Operator and possesses a degree in mechanical engineering from the University of Delaware. The remaining increase is to assist with operations assistance provided by Walton Water Services.
The increase is comparable to an annual increase of 3%. In comparison, the previous increase was based on the local CPI. Using CPI as a basis for an increase, the proposed fee would be nearly $17,000. I feel that the proposed annual base fee of $11,512.84 and new hourly rate of $65/hour is reasonable.
I look forward to continuing to service the Township and provide professional services for the RCTP O&M.
Kind regards,
Scott A. Towler, PE, LO
Scott A. Towler
Memo
To: Municipal Authority
From: Dave Ware
Re: 2024 Proposed Budget for the MA
Date: December 7, 2023
Gentlemen,
I wanted to share the 2024 Proposed Municipal Authority Budget with you all, as well as the 2024 Adopted Budget for Sewer Operating Fund and Sewer Capital Reserve Fund.
I anticipate nearly $1.0M of expenses in 2024 to fund additional relining, Chester Creek Interceptor Project (Phase 1 and Phase 2), Supplee Valley relining, replacement generator, replacement pumps at RCSTP, and upgrades to the Hershey Mill Pump Station. Also included in the ARPA Fund budget is over $100K to offset the cost of the Caustic Soda and UV Replacement Projects.
Without adjusting sewer rates next July the Sewer Operating Fund is expected to have nearly a $200K balance reduction, and the Sewer Capital Reserve Fund a nearly $500K balance reduction. That's nearly $700K needed from Reserves and the Operating Fund. The 5 Year Capital Plan for EGT Sewer Capital Maintenance is included. Looking at the recent costs of relining and televising, we should be putting $260K per year into the Sewer Capital Reserve Fund as opposed to the $130K we currently transfer. We will maximize balances through PLGIT Prime interest Rates and possibly short-term notes after continued review of interest rate projections. I applied for $350K to offset our costs anticipated for Supplee Valley and the Chester Creek Interceptor.
I hope this provides some clarity to the figures shared in the 2024 MA Budget. I will begin updating the 10-year Sewer Plan as we begin the new year in preparation for a sewer rate increase proposal. As always, please call or email with any questions.
Sincerely,
[Signature: Dave Ware]
Dave Ware
Director of Finance
East Goshen Township
U:\dware\municipal authority\
2024-2028 Capital Improvement Program
[Logo: Respecting the Past, Serving the Present, Preparing for the Future]
EGT Sewer Capital Maintenance
(RC STP & Pump Stations)
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Hunt Country/HM Lift Station Pump Replacement | $ 20,000 | $ 20,000 | |||
| Hunt Country P/S Mag Meter | $ 15,000 | ||||
| Hunt Country P/S Muffin Monster | $ 67,000 | ||||
| Hunt Country P/S Bypass Pump | $ 2,000 | ||||
| Relining AC sewer lines and brick manholes | $ 130,000 | $ 130,000 | $ 130,000 | $ 130,000 | $ 130,000 |
| Ridley Creek STP rebuild 2 SBR pumps | $ 16,000 | ||||
| Ridley Creek STP rebuild 2 Sludge pumps | $ 7,500 | ||||
| Ridley Creek STP replace generator | $ 225,000 | ||||
| Ridley Creek STP Filter Feed Pump** | $ 30,000 | $ 20,000 | $ 20,000 | $ 20,000 | |
| Ridley Creek STP Blower Replacement | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 | $ 12,000 |
| Chester Creek Coll manhole lining (?) for 5 manholes | $ 50,000 | ||||
| Chester Creek Coll HM Pumpstation upgrade | $ 85,000 | ||||
| Chester Creek Interceptor Phase 2/Supplee Valley Re-lining | $ 366,964 | $ 315,000 | |||
| Chester Creek Coll Muffin Monster swap out | $ 22,000 | $ 22,000 | |||
| Total | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
| Category | 2024 | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|---|
| Capital Reserve Fund | |||||
| Sewer Capital Reserve Fund | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
| Grants | |||||
| Series 2017 Bonds | |||||
| Infrastructure Sustainability Fund | |||||
| Total | $ 892,464 | $ 613,000 | $ 182,000 | $ 184,000 | $ 162,000 |
- Ongoing maintenance and pump station upgrades per RCSTP Asset Depreciation inventory and staff recommendation.
- Replacement generator needed in 2024.
- Proactive Chester Creek Interceptor inspection & cleaning; Phase 1 in 2023, Phase 2 in 2024; Supplee Valley re-lining. Staff will seek grant funds to offset sewer capital fund contribution.
19
MUNICIPAL AUTHORITY, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 6,372 | 11,619 | 5,171 | 5,171 | 5,171 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 07341 1000 | 3 | 7 | - | 290 | - | (290) | -100.0% | - |
| INTEREST EARNED - CONSTRUCTION | 07341 1020 | - | - | - | - | - | - | - | |
| DCED GRANT | 07354 0400 | - | - | 152,980 | - | - | - | (152,980) | |
| C.C. TAPPING FEES | 07364 1100 | 2,060 | 2,300 | 2,300 | 2,300 | 2,300 | - | 0.0% | - |
| R.C.TAPPING FEES | 07364 1110 | 11,508 | 2,089 | 2,000 | 8,574 | 8,574 | - | 0.0% | 6,574 |
| CONNECTION FEES - SEWER | 07364 1130 | 3,368 | 564 | 1,000 | 1,128 | 1,128 | - | 0.0% | 128 |
| MISCELLANEOUS REVENUE (PINE ROCK) | 07380 1000 | 2,664 | 282 | 282 | 564 | 564 | - | 0.0% | 282 |
| TRANSFER FROM GENERAL ACCT | 07392 0100 | - | - | - | - | - | - | - | |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 90,338 | 90,979 | 100,000 | 117,764 | 109,517 | (8,247) | -7.0% | 9,517 |
| TRANSFER FROM SEWER CAP RESV | 07392 0501 | - | - | - | - | - | - | - | |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 179,592 | 286,657 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) |
| TOTAL REVENUE | 289,534 | 382,879 | 1,730,115 | 766,527 | 959,547 | 193,020 | 25.2% | (770,568) | |
| EXPENSES | |||||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 30,920 | 33,488 | 32,055 | 38,687 | 39,847 | 1,161 | 3.0% | 7,792 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 1,693 | 1,665 | 1,749 | 3,191 | 3,286 | 96 | 3.0% | 1,538 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,000 | 10,250 | 10,815 | 21,000 | 21,630 | 630 | 3.0% | 10,815 |
| ENGINEERING SERVICES | 07424 3130 | 55,389 | 42,469 | 47,250 | 47,250 | 48,668 | 1,418 | 3.0% | 1,418 |
| LEGAL SERVICES | 07424 3140 | 9,194 | 6,640 | 8,400 | 8,400 | 8,652 | 252 | 3.0% | 252 |
| R.C. CAPITAL-STP | 07424 7440 | - | - | 355,793 | - | - | - | (355,793) | |
| CAP.REPLACEMENT R.C. | 07424 7490 | (10,985) | - | 488,847 | - | 310,500 | 310,500 | (178,347) | |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | - | - | - | - | - | - | - | |
| TALLMADGE DRIVE | 07426 3000 | - | - | - | - | - | - | - | |
| RELINING | 07426 3001 | - | - | 260,000 | 260,000 | - | (260,000) | -100.0% | (260,000) |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | - | - | - | - | - | - | - | |
| BARKWAY PUMP STATION CAPITAL | 07429 1501 | 5,117 | 2,215 | - | - | - | - | - | |
| ASHBRIDGE PUMP STATION CAPITAL | 07429 1502 | 30,324 | 11,493 | - | - | - | - | - | |
| HERSHEYS MILL PUMP STATION CAPITAL | 07429 1503 | 76,693 | 153,399 | 78,000 | 78,000 | 85,000 | 7,000 | 9.0% | 7,000 |
| HUNT CO PUMP STATION CAPITAL | 07429 1504 | 8,277 | 1,870 | - | - | - | - | - | |
| RCSTP CAPITAL | 07429 1505 | 67,251 | 125,837 | 260,000 | 260,000 | 366,964 | 106,964 | 41.1% | 106,964 |
| WEST GOSHEN CAPITAL | 07429 6100 | - | - | 187,206 | 50,000 | 75,000 | 25,000 | 50.0% | (112,206) |
| Bank Fees | 07491 5001 | 414 | - | - | - | - | - | - | |
| TRANSFER TO GENERAL FUND | 07492 0100 | - | - | - | - | - | - | - | |
| TOTAL EXPENSES | 284,287 | 389,327 | 1,730,115 | 766,527 | 959,547 | 193,020 | 25.2% | (770,568) | |
| NET RESULT FROM OPERATIONS | 5,247 | (6,448) | 0 | (0) | 0 | 1 | 0 | ||
| ESTIMATED ENDING FUND BALANCE | 11,619 | 5,171 | 5,172 | 5,171 | 5,171 | ||||
31
SEWER OPERATING FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 1,000,248 | 1,021,129 | 1,158,670 | 1,158,670 | 971,770 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 05341 1000 | 418 | 7,664 | 12,000 | 35,191 | 30,000 | (5,191) | -14.8% | 18,000 |
| REVENUE - SEWER FEES | 05364 1000 | 3,546,858 | 3,749,490 | 4,148,573 | 3,895,183 | 3,895,183 | - | 0.0% | (253,390) |
| REVENUE - SEWER PENALTIES | 05364 1010 | 28,773 | 34,559 | 45,076 | 27,476 | 27,476 | - | 0.0% | (17,600) |
| REVENUE - LIEN PAYMENTS | 05364 1025 | 72,133 | 52,830 | 69,614 | 19,678 | 19,678 | - | 0.0% | (49,936) |
| REVENUE - SEWER CERTIFICATION FEES | 05364 1030 | 2,380 | 4,270 | 4,000 | 2,173 | 2,173 | - | 0.0% | (1,827) |
| REVENUE - WG CONVEYANCE FEE | 05364 1040 | 15,935 | 22,649 | 20,935 | 54,571 | 54,571 | - | 0.0% | 33,636 |
| ADMIN.COST FROM WESTTOWN | 05364 1060 | 4,827 | 2,896 | 4,827 | 4,713 | 4,713 | - | 0.0% | (113) |
| O&M FEES FOR BARKWAY PUMP STATION | 05364 1070 | 21,625 | 12,562 | 21,625 | 22,666 | 22,666 | - | 0.0% | 1,041 |
| O&M FEES FOR ASHBRIDGE PUMP STATION | 05364 1080 | 1,807 | - | 1,807 | 4,867 | 4,867 | - | 0.0% | 3,059 |
| MISCELLANEOUS SEWER REVENUE | 05380 1000 | 181 | - | - | - | - | - | - | |
| SEWER INSURANCE CLAIMS | 05391 2000 | 8,845 | - | - | - | - | - | - | |
| TOTAL REVENUE | 3,703,781 | 3,886,920 | 4,328,456 | 4,066,518 | 4,061,327 | (5,191) | -0.1% | (267,129) | |
| CHESTER CREEK EXPENSES | |||||||||
| C.C. METERS -WAGES | 05420 1400 | 12,891 | 14,175 | 19,169 | 2,043 | 2,104 | 61 | 3.0% | (17,064) |
| C.C. INTERCEPTOR - WAGES | 05420 1401 | 5,204 | 16,865 | 3,985 | 21,942 | 22,600 | 658 | 3.0% | 18,615 |
| C.C. COLLECTION - WAGES | 05420 1402 | 38,874 | 28,629 | 40,637 | 35,151 | 36,205 | 1,055 | 3.0% | (4,432) |
| C.C. COLLECTION - WAGES - I&I | 05420 1404 | 13,297 | 1,282 | 2,015 | - | - | - | (2,015) | |
| ASHBRIDGE WAGES | 05420 1405 | 13,531 | 11,284 | 12,844 | 8,427 | 8,680 | 253 | 3.0% | (4,164) |
| MILL VALLEY - WAGES | 05420 1406 | 7,584 | 10,925 | 22,762 | 7,968 | 8,207 | 239 | 3.0% | (14,555) |
| C.C. METERS -VEHICLE OPER. | 05420 2510 | 9,406 | 10,286 | 7,199 | 1,304 | 1,343 | 39 | 3.0% | (5,856) |
| C.C. INTERCPT-VEHICLE OPER | 05420 2511 | 2,318 | 13,750 | 3,649 | 15,923 | 16,401 | 478 | 3.0% | 12,752 |
| C.C. COLLEC.-VEHICLE OPER. | 05420 2512 | 23,191 | 16,508 | 14,741 | 37,309 | 38,428 | 1,119 | 3.0% | 23,688 |
| C.C. COLLECT.-VEH OPER - I&I | 05420 2514 | 6,547 | 778 | 817 | - | - | - | (817) | |
| ASHBRIDGE - VEHICLE OPER | 05420 2515 | 5,428 | 5,917 | 3,684 | 5,792 | 5,965 | 174 | 3.0% | 2,281 |
| MILL VALLEY - VEHICLE OPER | 05420 2516 | 3,270 | 5,991 | 17,224 | 5,358 | 5,518 | 161 | 3.0% | (11,706) |
| C.C. METERS - UTILITIES | 05420 3600 | 121 | 125 | 135 | 107 | 110 | 3 | 3.0% | (25) |
| C.C. INTERCEPTOR-UTILITIES | 05420 3601 | 1,345 | 1,442 | 1,377 | 1,554 | 1,601 | 47 | 3.0% | 224 |
| C.C. COLLECTION -UTILITIES | 05420 3602 | 6,885 | 8,741 | 6,949 | 8,785 | 9,048 | 264 | 3.0% | 2,099 |
| ASHBRIDGE - UTILITIES | 05420 3603 | 5,991 | 6,492 | 7,172 | 6,362 | 6,553 | 191 | 3.0% | (619) |
| MILL VAL./BARKWAY UTILITIES | 05420 3604 | 3,695 | 4,449 | 3,900 | 4,231 | 4,358 | 127 | 3.0% | 458 |
| C.C. METERS-MAINT.& REPRS. | 05420 3700 | 3,732 | 13,616 | 11,176 | 6,388 | 6,580 | 192 | 3.0% | (4,596) |
| C.C. INTERCEPT.-MAINT.&REP | 05420 3701 | 5,432 | 12,902 | 3,142 | 4,540 | 4,676 | 136 | 3.0% | 1,535 |
| C.C. COLLEC.-MAINT.& REPR. | 05420 3702 | 64,812 | 41,160 | 118,968 | 139,082 | 50,000 | (89,082) | -64.1% | (68,968) |
| C.C. INTERCEPT.-MAINT & REP - I&I | 05420 3703 | 3,843 | 5,499 | 5,774 | 4,824 | 4,969 | 145 | 3.0% | (805) |
| C.C. COLLECT.-MAINT & REP - I&I | 05420 3704 | 15,083 | 7,844 | 8,237 | 8,782 | 9,045 | 263 | 3.0% | 808 |
| ASHBRIDGE-MAINT.&REPR | 05420 3705 | 5,084 | 19,203 | 16,188 | 267 | 9,275 | 9,008 | 3378.0% | (6,914) |
| BARKWAY -MAINT.& REPR. | 05420 3706 | 2,204 | 525 | 1,409 | 133 | 137 | 4 | 3.0% | (1,271) |
| C.C. WEST GOSHEN OPER/MAINT | 05420 3850 | 608,660 | 539,224 | 700,000 | 985,655 | 992,000 | 6,345 | 0.6% | 292,000 |
| TOTAL CHESTER CREEK EXPENSES | 868,427 | 797,613 | 1,033,152 | 1,311,926 | 1,243,804 | (68,121) | -5.2% | 210,652 |
27
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| RIDLEY CREEK EXPENSES | |||||||||
| R.C. STP- WAGES | 05422 1400 | 11,501 | 49,539 | 20,696 | 66,857 | 68,862 | 2,006 | 3.0% | 48,166 |
| R.C. COLLEC.- WAGES | 05422 1401 | 84,660 | 33,001 | 60,000 | 54,940 | 56,589 | 1,648 | 3.0% | (3,411) |
| R.C. COLLECTIONS WAGES I&I | 05422 1402 | 8,198 | 10,326 | 7,223 | - | - | - | (7,223) | |
| R.C. STP- CHEMICALS | 05422 2440 | 109,686 | 123,321 | 116,295 | 108,635 | 111,894 | 3,259 | 3.0% | (4,401) |
| R.C. COLLEC.-CHEMICALS | 05422 2441 | - | - | - | 7,356 | 7,577 | 221 | 3.0% | 7,577 |
| R.C. STP-VEHICLE OPER. | 05422 2510 | 3,372 | 45,071 | 5,918 | 61,240 | 63,078 | 1,837 | 3.0% | 57,160 |
| R.C. COLLEC-VEHICLE OPER. | 05422 2511 | 49,686 | 17,514 | 14,802 | 15,505 | 15,970 | 465 | 3.0% | 1,167 |
| R.C. COLLECT.-VEH OPERATING - I&I | 05422 2512 | 4,222 | 7,545 | 3,631 | - | - | - | (3,631) | |
| R.C. STP-MINOR EQUIP. | 05422 2600 | 2,127 | - | - | - | 15,600 | 15,600 | 15,600 | |
| RC STP -UTILITIES | 05422 3600 | 99,795 | 90,915 | 121,961 | 89,636 | 92,325 | 2,689 | 3.0% | (29,636) |
| R.C. COLLEC.-UTILITIES | 05422 3601 | 7,533 | 7,259 | 8,239 | 5,777 | 5,950 | 173 | 3.0% | (2,289) |
| R.C. STP-MAINT.& REPAIRS | 05422 3700 | 93,876 | 100,546 | 143,381 | 82,874 | 85,360 | 2,486 | 3.0% | (58,020) |
| R.C. COLLEC.-MAINT.& REPR | 05422 3701 | 72,762 | 57,922 | 62,172 | 46,073 | 47,455 | 1,382 | 3.0% | (14,717) |
| R.C. COLLECTION-MAINT. & REP I&I | 05422 3702 | 6,438 | 32,078 | 28,941 | 30,959 | 31,888 | 929 | 3.0% | 2,946 |
| RCSTP - APPLEBROOK | 05422 3703 | - | - | - | 9,393 | 9,675 | |||
| R.C. STP-CONTRACTED SERV. | 05422 4500 | 192,074 | 214,511 | 221,578 | 204,914 | 211,062 | 6,147 | 3.0% | (10,516) |
| R.C. SLUDGE-LAND CHESTER | 05422 4502 | 43,070 | 44,208 | 43,971 | 52,681 | 54,262 | 1,580 | 3.0% | 10,291 |
| TOTAL RIDLEY CREEK EXPENSES | 789,000 | 833,754 | 858,809 | 836,840 | 877,545 | 40,423 | 4.8% | 18,737 | |
28
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ADMINISTRATION | |||||||||
| MISCELLANEOUS EXPENSE | 05424 2700 | 182 | 182 | 201 | 243 | 250 | 7 | 3.0% | 49 |
| ADMIN.- WAGES | 05429 1400 | 86,208 | 114,216 | 89,220 | 84,468 | 87,002 | 2,534 | 3.0% | (2,217) |
| PA ONE CALL - WAGES | 05429 1401 | 1,723 | 6,801 | 3,424 | 8,904 | 9,171 | 267 | 3.0% | 5,748 |
| PA ONE CALL - VEH OPER | 05429 2501 | - | 2,180 | - | 8,473 | 8,727 | 8,727 | ||
| ADMIN.-COMPUTER EXPENSES | 05429 2600 | - | - | 6,388 | - | - | - | (6,388) | |
| ADMIN.-GENERAL EXPENSE | 05429 3000 | 36,162 | 37,811 | 1,029 | 1,274 | 1,312 | 38 | 3.0% | 282 |
| ADMIN.-PAYMENT PORTAL | 05429 3001 | 6,891 | 7,661 | 5,431 | 7,585 | 7,812 | 228 | 3.0% | 2,382 |
| ADMIN.- PROFESSIONAL SERV | 05429 3100 | 1,965 | 2,000 | 2,065 | 2,619 | 2,698 | 79 | 3.0% | 633 |
| ADMIN - LEGAL | 05429 3140 | 4,616 | 675 | 3,530 | 1,249 | 1,287 | 37 | 3.0% | (2,243) |
| ADMIN.- POSTAGE | 05429 3250 | 4,726 | 5,175 | 5,053 | 5,322 | 5,482 | 160 | 3.0% | 429 |
| ADMIN. - PRINTING | 05429 3400 | 722 | 2,061 | 1,731 | 1,945 | 2,003 | 58 | 3.0% | 272 |
| ADMIN.- INSURANCE | 05429 3500 | 33,963 | 32,611 | 26,901 | 46,454 | 47,847 | 1,394 | 3.0% | 20,947 |
| ADMIN.-BLDG.OVERHEAD | 05429 3730 | 58,801 | 65,814 | 88,760 | 88,760 | 91,423 | 2,663 | 3.0% | 2,663 |
| CONTR. SERV. SUMMIT HOUSE | 05429 4500 | 349,320 | 369,000 | 385,125 | 385,125 | 396,679 | 11,554 | 3.0% | 11,554 |
| CONTR. SERV. CIDER KNOLL | 05429 4510 | 78,720 | 59,040 | 86,789 | 86,789 | 89,392 | 2,604 | 3.0% | 2,604 |
| CONTR. SERV. MALVERN INSTITUTE | 05429 4520 | 7,446 | 7,949 | 10,732 | 10,732 | 11,054 | 322 | 3.0% | 322 |
| LOCK BOX FEE | 05429 5000 | - | - | 3,859 | - | - | - | (3,859) | |
| Bank Fees | 05429 5001 | 1,311 | 1,495 | 1,380 | 1,380 | 1,380 | - | - | |
| DVRFA--PRINCIPAL PMT ON $9,500,000 | 05471 7220 | 389,000 | 405,000 | 421,000 | 421,000 | 438,000 | 17,000 | 4.0% | 17,000 |
| DVRFA - PRINCIPAL ON DIVERSION LOAN | 05471 7240 | 114,000 | 117,000 | 121,000 | 121,000 | 125,000 | 4,000 | 3.3% | 4,000 |
| SERIES 2017 GO BONDS - PRINCIPAL | 05471 7250 | 120,000 | 125,000 | 130,000 | 130,000 | 135,000 | 5,000 | 3.8% | 5,000 |
| DVRFA - INTEREST ON $9,500,000 LOAN | 05472 7220 | 223,839 | 208,118 | 191,763 | 191,763 | 174,755 | (17,008) | -8.9% | (17,008) |
| DVRFA - INTEREST ON DIVERSION LOAN | 05472 7240 | 53,952 | 50,453 | 47,778 | 47,778 | 44,089 | (3,689) | -7.7% | (3,689) |
| SERIES 2017 GO BONDS - INTEREST | 05472 7250 | 71,589 | 66,789 | 61,789 | 61,789 | 59,189 | (2,600) | -4.2% | (2,600) |
| TRANSFER TO MUNIC AUTHORITY | 05492 0700 | 90,338 | 90,979 | 100,000 | 100,000 | 100,000 | - | 0.0% | - |
| TRANSFER TO BOND FUND - SEWER | 05492 0805 | - | 50,000 | - | - | - | - | - | |
| TRANSFER TO SEWER CAPITAL RESERVE | 05492 0900 | 290,000 | 290,000 | 800,706 | 290,000 | 290,000 | - | 0.0% | (510,706) |
| TOTAL ADMINISTRATIVE EXPENSES | 2,025,473 | 2,118,013 | 2,595,652 | 2,104,652 | 2,129,553 | 24,647 | 1.2% | (466,099) | |
| TOTAL SEWER EXPENSES | 3,682,900 | 3,749,379 | 4,487,612 | 4,253,418 | 4,250,903 | (3,051) | -0.1% | (236,710) | |
| NET RESULT FROM OPERATIONS | 20,881 | 137,541 | (159,156) | (186,900) | (189,575) | (2,676) | (30,419) | ||
| ESTIMATED ENDING FUND BALANCE | 1,021,129 | 1,158,670 | 999,513 | 971,770 | 782,194 | ||||
29
SEWER CAPITAL RESERVE FUND, PROPOSED 2024 BUDGET
| Account Title | Acct # | 2021 Actual | 2022 Actual | 2023 Budget | 2023 Projection | 2024 PROPOSED Budget | $ Increase (vs '23 Proj) | % Increase | vs. 23 Budget |
|---|---|---|---|---|---|---|---|---|---|
| ESTIMATED BEGINNING FUND BALANCE | 2,250,329 | 2,361,152 | 2,384,772 | 2,384,772 | 2,130,452 | ||||
| REVENUE | |||||||||
| INTEREST EARNINGS | 09341 1000 | 830 | 28,246 | 22,500 | 91,588 | 85,870 | (5,717) | -6.2% | 63,370 |
| TRFR FROM SEWER OP FOR SEWER CAP RESRV | 09342 0500 | 290,000 | 290,000 | 800,706 | 290,000 | 290,000 | - | 0.0% | (510,706) |
| TRANSFER FROM SEWER CAP RESERVE | 09392 0300 | - | - | - | - | - | - | - | |
| TRANSFER FROM MUNICIPAL FUND | 09392 0700 | - | - | - | - | - | - | - | |
| TOTAL REVENUE | 290,830 | 318,246 | 823,206 | 381,588 | 375,870 | (5,717) | -1.5% | (447,336) | |
| EXPENSES | |||||||||
| MACHINERY/EQUIPMENT - REPLACEMENT | 09429 7400 | - | 7,969 | - | - | - | - | - | |
| MACHINERY/EQUIPMENT - NEW | 09429 7450 | - | - | - | - | - | - | - | |
| Bank Fees | 09491 5001 | 414 | - | - | - | - | - | - | |
| TRANSFER TO MUNIC AUTHORITY | 09492 0700 | 179,592 | 286,657 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) |
| TOTAL EXPENSES | 180,006 | 294,626 | 1,471,553 | 635,907 | 837,464 | 201,557 | 31.7% | (634,089) | |
| NET RESULT FROM OPERATIONS | 110,823 | 23,620 | (648,347) | (254,320) | (461,594) | (207,274) | 186,753 | ||
| ESTIMATED ENDING FUND BALANCE | 2,361,152 | 2,384,772 | 1,736,425 | 2,130,452 | 1,668,859 | ||||
33