Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 12, 2024
7:00
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN'S REPORT/OTHER MEMBERS' REPORTS
- APPOINTMENT OF OFFICERS
- SEWER REPORTS Director of Public Work's Report; Pennoni Engineer's Report; Big Fish Environmental Report
- APPROVAL OF MINUTES January 8, 2024
- APPROVAL OF INVOICES Pennoni Invoice #1207641 $521.50 Pennoni Invoice #1207642 $1,755.50 Pennoni Invoice #1207643 $302.75 Pennoni Invoice #1207644 $799.75 Pennoni Invoice #1207645 $744.50 Rain for Rent Invoice #1964926 $14,805.16 (paid) Rain for Rent Invoice #1965714 $4,069.12 (paid) Gawthrop Greenwood Invoice #285170 $528.50
- LIAISON REPORTS
- FINANCIAL REPORTS January 2024
- OLD BUSINESS Approval of Payment Application #1: RCSTP UV Disinfection System Replacement; Approval of Payment Application #2: Chester Creek Interceptor Inspection & Repair
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\02-12-24\Meeting Materials\02-12-2024 Agenda.doc
- 2024 Goals: Goal Status Ridley Creek plant compliance January was in compliance and met all requirements. Continue to implement infiltration and inflow for the sewer system Update construction as it moves forward RCSTP UV Disinfection System Temporary setups are in production. Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1 st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis. Long-term sustainability Caustic soda functionality Study sewer line expansion
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER UV Project: Construction Phase Supplemental Proposal (Pennoni)
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\02-12-24\Meeting Materials\02-12-2024 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1680 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
| Date: | February 12, 2024 |
|---|---|
| To: | Municipal Authority |
| From: | Mark Miller |
| Re: | Monthly Report |
PA Rural Water Association:
Kevin and several other employees applied to get their Sewer Plant Operator Licenses. The PA Rural Water Association Manager, Paul Giunta, called me and asked if our guys were aware of how much math and bioscience were involved in getting operators' licenses. After speaking with Paul and Kevin, our guys decided to obtain their collection licenses. On January 25th & 26th, they took the course that readied them for the exam. Testing dates and locations will be announced in February. Rural Water will assist our guys to get them through the testing by setting up temporary meters and smoke testing. Rural Water's assistance is courtesy of the state, so there is no cost to the township. I will be using Rural Water to assist as we start the INI investigation.
Monthly Flows: The average daily flow to West Goshen was 912,910 per day.
Meters:
- Meters were read on a daily basis. Flows are all over the place and we are in the process of identifying the areas to concentrate on. Our goal is to go out at night and pull manholes to check flows. We will be setting up portable flowmeters in the areas we suspect of INI.
C.C. Collection:
- After the Arctic temperatures and high winds, we rented a tree chipper on tracks to clear the sewer right-of-ways on all three systems. The worst was the interceptor line. I estimate that they ran 60 trees through this chipper (picture attached) . At one point, only generators were running the sewer plant, Hunt Country, and Ashbridge. Our guys worked around the clock, clearing what trees they could from streets. Line Road was like a war zone. Once it was daylight, we went up to the smallest street in the township, Ivy Lane, which was blocked with trees and wires. Since that important guy lives there, we cleared the trees so they could get out. We're not sure how long it took PECO to get them power.
- All pump stations were visited on a daily basis. All generators' fluid levels were checked. Due to long outages, we filled our 500-gallon tank and went to each station to fill the generators.
223-225 Baldwin Dr (pictures attached):
- Saturday, February 3 rd : I received a call from the 911 center for a lateral clog at 225 Baldwin Dr. We plunged the trap, which cleared the sewage, then used the mini camera and found what looked like a rock. We then brought out the sewer main camera to locate the block. Upon further investigating, we found the lateral had been broken, not by a rock, but by a chunk of pipe. We called in a PA One Call because we plan to excavate the broken lateral. We will also be installing a new trap and cleanout. While we were there, the neighbor came over reporting a similar problem, so we will be doing work on his lateral as well.
- Thursday, February 8th: We excavated the laterals 16 ft deep, exposing electric, Verizon, and water service lines. The trench caved in, taking out the water service. PW employees worked until we found the lateral after the trench collapsed several more times. Once the lateral was located, we removed the section of pipe along with the rock, installed a cleanout and stack at the right of the line, and backfilled with stone. Aqua was on site to repair the water service.
C.C. Interceptor:
- The line was physically inspected to make sure all the castings were secure, meaning making sure that all lids were bolted. Due to the recent storms, many trees came down. The areas between Baldwin Drive and the Meadows Development, and from Grand Oak up to Wilson Dr, were the worst.
- For INI work, I want to install the portable meters where the apartments and townhomes tie in. Once we figure out the flows, we will work our way into the complexes.
R.C. Collection:
- We received a call for a possible lateral clog, but when I got there, the lady showed me what she thought was her lateral, but it turned out to be her water shutoff valve box.
- We kept an eye on Hunt Country during the power outage.
- The pump station was visited on a daily basis and routine maintenance was performed. We had to call John Laidley to redo the set points for the pumps.
Ridley Creek Plant:
- The temporary UV system is up and running (pictures attached) and the lab reports shows we meet the parameters. We assisted with the demo of the old UV System in order to get the sand blasting contractor in to do his work. Once the concrete is scarified, Chas and Steve will begin the task of laying block to raise the walls.
- We filled sandbags to block the control room and blower room in the event that the temporary pumps fail and the filters overflow.
- The new Muffin Monster and Moyne Sludge Pump have been installed. I utilized the contractor with the assistance of Matthew, the plant operator.
- During the storm, Matthew stayed at the plant for over 24 hours.
Alarms: 42
PA One Calls: 110
Monthly Rainfall: 7.85”
Lateral Repairs or Caps: 3 laterals, 6 caps
[Photograph showing public works crew and equipment, including a yellow mini-excavator and an orange tracked wood chipper, clearing fallen trees along a wooded right-of-way.]
Interceptor Clearing ROW
[Photograph of a deep trench excavation in a residential neighborhood with a CAT excavator in the foreground, a crane boom lowering a Trench Tech trench box, workers in high-visibility jackets standing near the pit, and a handwritten sticky note in the lower left corner.]
225 Baldwin Dr
Lateral
18' deep 20'L x 27'
CAT
TRENCH TECH
1-800-443-6832
LIFTING THE COMMUNITY SINCE 1817
[Photograph of a red utility crane truck parked on a residential street using its boom to hoist a Trench Tech trench box beside an open excavation pit while three workers in high-visibility jackets stand next to the trench.]
SPW
LIFTING THE COMMUNITY SINCE 1817
TRENCH TECH
1-800-443-6832
[Photograph of a temporary white tent structure set up on asphalt outside a facility building, surrounded by traffic cones, with hoses running along the ground.]
UV House
[Photograph inside a white tent structure showing a blue temporary UV treatment unit connected to large white flanged pipes and valves, with a handwritten sticky note in the lower left corner.]
Temp UV
Before
[Photograph showing an industrial water treatment facility with concrete channels, electrical control boxes, yellow wiring/cables, piping, and a hose, with handwritten text "Before" on the wall.]
After
[Photograph showing the concrete channel cleared of equipment, with plastic sheeting hanging on the right wall and the word "After" written on the back concrete block wall.]
Pennoni
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
February 9, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – No activity by Pennoni since our last report. Once the outdoor emergency shower is installed, the tank can be put into operation. We previously prepared a draft O&M Manual information for the system that was submitted to the Township and operator for review. We will set up a meeting to review so that the Manual can be finalized.
- UV Disinfection System – Larger hoses (6" instead of 3" used in the first trial on January 3) were purchased by Public Works and have been installed by the Contractor. A second bypass trial was run on January 23. The trial was successful, and the temporary bypass system is now active. Sampling results from the temporary bypass system thereafter were acceptable, so the existing UV system was authorized to be removed. The Township disassembled and removed the existing UV equipment on February 5. Preparatory mechanical abrasion work for the permanent concrete channel raising was performed by a separate contractor hired by the Township on February 7 and 8. Public Works will begin concrete forming, reinforcing, and concrete placement work the week of February 12 and plans to finish around the end of February. The concrete is anticipated to be cured by mid-March. Installation of the UV module in the permanent raised channel will subsequently follow. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024; Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024; Township to Perform Concrete Channel Work – February 5 to Mid-March 2024; 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 8, 2024; Two Week Trial of New UV System in Permanent Channel – April 8-22, 2024; Install Second UV Module into Permanent Channel – April 23, 2024; Two Week Trial of Second New UV System in Permanent Channel – April 23-May 7, 2024; Construction Completed – Mid-May 2024
- Generator #2 Replacement – Premium Power Services released the Cummins' 500 kW diesel generator for fabrication in early March 2023. As of December 13, the estimated ship date is now March 26, 2024. Premium Power Services will follow up with Cummins in February to confirm manufacturing is still on track for this shipping date. We are continuing to prepare electrical design and structural concrete pad plans for the new generator for use by the Township in construction, and we expect to complete the plans by February 23.
Sanitary Sewer Pipe Rehab
- Chester Creek Sewer Rehab – The contractor, Insituform, previously completed cleaning and televising of all of the contracted sewers. We reviewed the videos, and there are only minor deficiencies. We determined repairs for the deficiencies with Public Works. One scoped lateral pipe lining repair was eliminated from the Contractor's scope because Public Works was able to perform an excavated repair that addressed the deficiency. The Contractor has completed all manhole pressure grouting and pipe grouting work that was included as part of the Base Bid items. Additional grouting of one manhole, one pipe joint, and one lateral are required based on deficiencies discovered in the field. The Contractor still needs to perform manhole-to-manhole cured-in-place piping for one sewer run. They temporarily demobilized at the end of February and plan to remobilize in mid-
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU23001
East Goshen Municipal Authority
February 9, 2024
Engineer's Report
Page 2 of 2
March to complete the work.
We also processed the Contractor's 2nd payment application.
- Hershey's Mill Estates – The Contractor previously completed all punchlist work with the exception of replacing a damaged PECO meter manhole lid at the top of the tennis court access drive. Public Works is coordinating with PECO for this repair, so we have recommended that final payment (which was previously conditionally approved by the MA) be released. The project is therefore considered complete.
- Other Chester Creek Pipe Manhole Rehab – We provided Costars contractor contacts, budgetary pricing, and scoping alternatives for rehabilitation of manholes with infiltration that Public Works has identified.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – No activity by Pennoni since our last report.
- 301 Reservoir Road (5-Lot Residential Subdivision) – No activity by Pennoni since our last report.
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
- 14 Reservoir Road – No activity by Pennoni since our last report.
Chapter 94 Reports
- We began to assemble documentation and initiated preparation of the 2023 Chapter 94 Reports for the Ridley Creek, Chester Creek, and Westtown systems.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
February
2024
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for January 2024. All supplemental reports were submitted for December 2023. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes increased slightly to a daily average of 79.3 from the previous standard of 77.8 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Table 1
| January 2024- Final Effluent - Outfall 001 | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | Ultraviolet light intesity | Copper, Total | Zinc, Total | ||||||
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | ||||
| 0.75 | 10 | 62 | Report | Report | 10 | 62 | 7.0 | 44 | 0.5 | 3 | 200 | 1,000 | ||||
| Inst. Max | 20 | 94 | 15 | 94 | 14 | 1 | Report | Report | Report | |||||||
| Sample Date | ||||||||||||||||
| January 2, 2024 | 0.437 | 2.0 | 7.3 | 4.85 | 17.7 | 5.5 | 20.0 | 0.10 | 0.36 | 0.11 | 0.40 | 1 | 0.0000 | NS | 0.004 | 0.028 |
| January 9, 2024 | 0.846 | 2.0 | 14.1 | 7.54 | 53.2 | 4.0 | 28.2 | 0.10 | 0.71 | 0.14 | 0.99 | 1 | 0.0000 | NS | NS | NS |
| January 16, 2024 | 0.409 | 2.0 | 6.8 | 4.82 | 16.4 | 4.0 | 13.6 | 0.10 | 0.34 | 0.10 | 0.34 | 1 | 0.0000 | NS | NS | NS |
| January 23, 2024 | 0.402 | 2.0 | 6.7 | 6.63 | 22.2 | 4.5 | 15.1 | 0.10 | 0.34 | 0.10 | 0.34 | 1 | 0.0000 | NS | NS | NS |
| January 30, 2024 | 0.511 | 2.0 | 8.5 | 3.84 | 16.4 | 4.0 | 17.0 | 0.10 | 0.43 | 0.10 | 0.43 | 1 | 0.0000 | NS | NS | NS |
| Average | 0.521 | 2.0 | 8.7 | 5.54 | 25.2 | 4.4 | 18.8 | 0.10 | 0.43 | 0.11 | 0.50 | 1 | 0.0000 | NA | NA | NA |
| Minimum | 0.402 | 2.0 | 6.7 | 3.84 | 16.4 | 4.0 | 13.6 | 0.10 | 0.34 | 0.10 | 0.34 | 1 | 0.0000 | NA | NA | NA |
| Maximum | 0.846 | 2.0 | 14.1 | 7.54 | 53.2 | 5.5 | 28.2 | 0.10 | 0.71 | 0.14 | 0.99 | 1 | 0.0000 | NA | NA | NA |
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for January 2024. The monthly average total phosphorus was reported as 0.11 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 4.4 mg/L compared to the 10 mg/L discharge limitation.
The final effluent test results demonstrate that the biological treatment performed well during January. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.
There was no discharge to Applebrook Golf Course (Outfall 002) for January.
Table 2 presents the pollutant data for the influent wastewater collected at the doghouse manhole during January 2024.
Table 2
| January 2024 - Influent Wastewaster | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Design Basis | Flow | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total , mg/L | ||||||
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||||
| January 2, 2024 | 0.452 | 385 | 1,451 | 229 | 863 | 370 | 1,395 | 42.5 | 160 | 65.0 | 245 | 6.8 | 25.8 |
| January 9, 2024 | 0.696 | 396 | 2,299 | 328 | 1,904 | 443 | 2,571 | 38.7 | 225 | 70.2 | 407 | 8.3 | 48.1 |
| January 16, 2024 | 0.457 | 134 | 511 | 130 | 495 | 114 | 434 | 22.9 | 87 | 37.1 | 141 | 3.73 | 14.2 |
| January 23, 2024 | 0.339 | 245 | 693 | 225 | 636 | 158 | 447 | 28 | 78 | 42.5 | 120 | 6 | 16.8 |
| January 30, 2024 | 0.424 | 138 | 488 | 135 | 477 | 58 | 205 | 21 | 73 | 36.3 | 128 | 4.48 | 15.8 |
| Average | 0.474 | 260 | 1,088 | 209 | 875 | 229 | 1,011 | 30.5 | 125 | 50.2 | 208 | 5.85 | 24.1 |
| Minimum | 0.339 | 134 | 488 | 130.0 | 477 | 58 | 205 | 20.7 | 73 | 36.3 | 120 | 3.73 | 14.2 |
| Maximum | 0.696 | 396 | 2,299 | 328 | 1,904 | 443 | 2,571 | 42.5 | 225 | 70.2 | 407 | 8.28 | 48.1 |
PA DEP
No activity
The inspection was completed on January 4th, 2024.
Pennoni Associates
The UV system replacement project continues.
1/3/24: UV bypass system was finished being set up and tested. It was determined that the originally specified 3" hoses were insufficient for the required flow volume. Hoses were upsized to 6".
1/23/24: UV bypass was set up for 6" hoses and placed online. The system was designed for 1100 gpm. It was tested up to 1300 gpm with excess capacity to spare. The bypass system will stay operational until the township completes the concrete work.
Significant Rainfall
During December, there were nine (9) days when rainfall occurred. Significant events occurred on the dates:
January 7th: 1.17"
January 10th: 4.00"
January 13th: 0.84"
January 16th: 2.5" snow
January 20th: 3.00" snow
January 28th: 0.78"
The total precipitation for the month was 7.43 inches of rain, and 5.5 inches of snow.
Page 2 of 3
Chemical Data
| Chemical | January 2024 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash, pounds | 310 | 9,600 |
| Aluminium Sulfate solution, gal* | 79.3 | 2,459 |
| Sludge Dewatering, gal** | 17,553 | 386,161 |
*Due to a change in Microsoft accounts, some data was lost on alum consumption. The average of 79.3 gallons was taken from 1/1/24 to 1/27/24. That average was then used to fill in the days where data was missing to calculate the total monthly consumption.
**22 days of sludge dewatering
There was a decrease of 16,418 gallons of sludge dewatering as compared to the previous month.
Minor Preventative Maintenance
- Flushed chemical feed lines to the SBRs.
- Cleaned final effluent weir trough daily.
- Skimmed surface of disc filters daily
- Drained and cleaned disc filters bi-weekly.
- Cleaned buildings and laboratory.
Major Repairs or Upgrades
1/26/24: The sludge feed pump and in-line grinder were replaced.
Flow Data
| Flow Meter Location | January 2024 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building* | 13.433 | 433,336 | 698,460 |
| Influent Wastewater to SBRs* | 17.506 | 564,724 | 1,044,132* |
| Internal Recycle** | 4.073 | 131,388 | 347,702 |
| Treated Effluent to Disc Filters | 15.028 | 484,787 | 845,744* |
| Final Effluent Discharge | 11.582 | 374,000 | 667,000 |
*The plant hydraulic design loading is 745,000 gpd.
The high flow greater than the hydraulic design loading resulted from a storm where we received 4" of rain in less than 12 hours. At peak flows, which lasted for approximately 2 hours, the plant received influent at almost 3 MGD. During that time, the flow was diverted to SBR 1, which had been set up as a holding tank in preparation for the storm. Roughly 96,000 gallons were diverted to SBR 1.
Page 3 of 3
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 8, 2024
The East Goshen Township Municipal Authority held their regular meeting on Monday, January 8, 2024 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings, Chairman
Dana Pizarro, Vice Chairman
Jack Yahraes
Carmen Battavio
Walter Wujcik
Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni representative), Dave Ware (Finance Director) and Ellen Koopman (Attorney).
COMMON ACRONYMS:
| ATS – Automatic Transfer Switch BFES – Big Fish Environmental Services BOS – Board of Supervisors CB – Conservancy Board DEP – Department of Environmental Protection EPA – Environmental protection Agency HC – Historical Commission I&I – Inflow & Infiltration LCSTP – Lockwood Chase Sewer Treatment Plant PWD – Public Works Department |
MA- Municipal Authority NPDES – National Pollutant Discharge Elimination System PC – Planning Commission PM – Prevention Maintenance PR – Park & Recreation Board RCSTP – Ridley Creek Sewer Treatment Plant SBR – Sequencing Batch Reactor SSO – Sanitary System Overflow WAS – Waste Activated Sludge |
|---|
Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our First Responders and Military.
He asked if anyone would be recording the meeting. There was no response.
Chairman's Report/Other Members Report
Dave mentioned that the BOS did not reappoint all ABC members. Jack was not reappointed yet so he can't vote at tonight's meeting.
Appoint of Officers
The slate of officers was reviewed:
- Chairman – Dana Pizarro
- Vice Chairman – Walter Wujcik
- Secretary – Carmen Battavio
- Treasurer – Vacant
- Asst Sec/Treas – Kevin Cummings
Walter made a motion to elect the slate of officers with Treasurer vacant until the BOS reappoints Jack. Dana seconded the motion. The motion passed unanimously. Kevin turned the meeting over to Dana.
MA 1-8-24 draft 1
SEWER REPORTS
1. Director of Public Works, Mark Miller's report for January 8, 2023
Monthly Flows – The average daily flow to West Goshen was 729,830 gallons per day.
Meters: The meters were read on a daily basis. The meters affected by the cyberattack have been repaired. It was slow going but Allied added a more advanced security program.
C.C. Collection:
- The pump stations were visited on a daily basis, wet wells were cleaned after being washed down, and the generators were checked over.
- We did some visual INI inspections in the middle of the night to lay out where we will do camera work.
- We did 5 sewer lateral repairs on the system.
- We had a problem at the Ashbridge pump when a metal spike became wedged in the muffin monster. We pulled the unit and were able to remove it. The muffin monster was reinstalled and placed back in service.
C.C. Interceptor:
- We pulled manholes along the system in the early morning hours to lay out where we will do further investigation.
R.C. Collection:
- The pumping stations were visited on a daily basis.
- Wet wells were cleaned on a routine basis.
- Oil levels were checked on the generators.
- Run times were reset.
Ridley Creek Plant
- We performed routine maintenance on a daily basis, and we have been putting in time checking on the contractors.
- On Friday at 4 am, we started to clean the trunk line five hundred feet from the screen room. The Vac truck was on site to remove the large quantity of grit. The Plant was put back into operation.
- The new Muffin Monster and Moyne screw pump arrived for the sludge room. We plan to install in February.
Alarms: 34 all weather related
PA 1 Calls: 87
- Aqua is replacing the water line on Cooper Circle and Reservoir Rd. This was difficult to mark out because we don't have lateral locations, so we televised the main and marked where the lateral ties into the main.
MA 1-8-24 draft 2
Monthly Rainfall: 10.32"
Lateral Repairs or Caps: 12
2. Pennoni Engineer's Report dated January 5, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – No activity by Pennoni since our last report. Once the outdoor emergency shower is installed, the tank can be put into operation. We previously prepared a draft O&M Manual information for the system that was submitted to the Township and operator for review. We will set up a meeting to review so that the Manual can be finalized.
- UV Disinfection System – The temporary bypass system electrical, mechanical, and controls work has been constructed. A start-up test of the temporary bypass system was conducted on January 3 and was witnessed by a Glasco representative. The temporary bypass channel and the associated new UV module in it functioned properly. Larger diameter temporary hoses (6" instead of 3" used in the trial) are needed to be able to pump a peak wet weather flow from the filters to the temporary channel. We are coordinating with Public Works for the larger hoses. Once the larger hoses are installed, a second trial will be run. If that trial is successful, the temporary bypass system will be activated. Due to the forecast for significant wet weather between January 6-10, we are tentatively targeting early the week of January 15 for the second trial. We also met with PADEP's inspector at the RCSTP on January 4 to review the temporary bypass system with him prior to putting it online. He did not have any comments or concerns. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – Week of January 15, 2024; Two Week Trial and Sampling of Temporary Bypass System – by January 31, 2024; Township to Perform Concrete Channel Work – February 1-29, 2024; 2nd Notice to Proceed to Contractors: Permanent Work – March 4, 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 8, 2024; Two Week Trial of New UV System in Permanent Channel – April 8-22, 2024; Install Second UV Module into Permanent Channel – April 23, 2024; Two Week Trial of Second New UV System in Permanent Channel – April 23-May 7, 2024; Construction Completed – Mid-May 2024
- Generator #2 Replacement – Premium Power Services released the Cummins' 500 kW diesel generator for fabrication in early March 2023. As of December 13, the estimated ship date is now March 26, 2024. Premium Power Services will follow up with Cummins in February to confirm manufacturing is still on track for this shipping date.
MA 1-8-24 draft 3
We are continuing to prepare electrical design and structural concrete pad plans for the new generator for use by the Township in construction.
Sanitary Sewer Pipe Rehab
- Chester Creek Sewer Rehab – The contractor, Insituform, has performed cleaning and televising of all of the contracted sewers. We reviewed the videos, and there are only minor deficiencies. We are evaluating potential repairs for the deficiencies and will coordinate with the Township and contractor to determine if there is available budget since those repairs were not known at the time of award and were thereby not awarded. We are awaiting a schedule for the repair work from the Contractor, but we anticipate construction of the repairs will commence within the next two weeks. Additionally, the Contractor submitted the second pay application. We are currently reviewing the pay application and will provide a payment recommendation.
- Hershey's Mill Estates – The Contractor previously completed all punchlist work with the exception of replacing a damaged PECO meter manhole lid at the top of the tennis court access drive.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – We reviewed the 4 th submission of the Subdivision and Land Development Plan, including the revised sanitary sewer extension design. Only minor sewer comments remain.
- 301 Reservoir Road (5-Lot Residential Subdivision) – No activity by Pennoni since our last report.
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
- 14 Reservoir Road – No activity by Pennoni since our last report.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for December 2023. All supplemental reports were submitted for the month of November 2023. Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum sulfate solution volumes increased slightly to a daily average of 77.8 gpd from the previous standard of 71.7 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
It was mentioned that there is a typo in the very last paragraph on his report – December 25, 267.
Also, the Influent Waste Water was discussed.
Approval of Minutes
The minutes of the December 11, 2023 meeting were approved as amended.
MA 1-8-24 draft 4
Approval of Invoices
- Kevin moved to approve payment of the following Pennoni invoices: Invoice #1203179 $ 203.75 (paid); Invoice #1203180 $ 2,263,50 (paid); Incoixe #1203181 $ 1,463.75 (paid); Invoice #1203182 $ 1,394.50 (paid); Invoice #1203183 $ 185.50 (paid) Walter seconded the motion. The motion passed unanimously.
- Kevin moved to approve payment of the following Rain for Rent invoices: Invoice #1957476 $19,023.62 (paid); Invoice #1957478 $ 3,698.32 (paid); Invoice #1957480 $10,276.23 (paid) Walter seconded the motion. The motion passed unanimously.
- Walter moved to approve payment of the Foley Rents invoice #INV0219629 in the amount of $5,571.00 (paid) Kevin seconded the motion. The motion passed unanimously.
- Walter moved to approve payment of the PMAA invoice ID #212 in the amount of $880.25 (paid). Kevin seconded the motion. The motion passed unanimously. This is for the 2024 dues. Mark mentioned that PMAA is coming out the end of January to provide courses for the Public Works staff.
- Walter moved to approve payment of the Colliflower Invoice #02203416 in the amount of $317.86 (paid). Kevin seconded the motion. The motion passed unanimously.
- Kevin moved to approve payment of the Geiger Invoice #12306571 in the amount of $12,809.50 (paid). Walter seconded the motion. The motion passed unanimously.
- Walter moved to approve payment of the Hicks Hay Company Invoice #20475 in the amount of $407.00 (paid). Kevin seconded the motion. The motion passed unanimously.
- Walter moved to approve payment of Gawthrop Greenwood Invoice #283287 in the amount of $964.00. Kevin seconded the motion. The motion passed unanimously.
Liaison Reports
1. Conservancy Board – Walter mentioned that they have selected April 20, 2024 for Keep East Goshen Beautiful Day. At their meeting this week they will review plantings for 2024.
Financial Reports
Dave Ware gave the following report:
Year to date December 2023, the Municipal Authority recorded $796,371 in revenues (primarily from Sewer Operating transfers and Sewer Capital Reserve transfers and tapping fees) and $793,549 in expenses (Engineering Services, Audit fees, Administrative Wages, Hershey's Mill Estates Sewer costs, Caustic Soda project costs, capital costs at the Ridley Creek Sanitary Treatment Plant, capital improvements to the Westtown Way Pump station, auditor and legal fees). The net result of operations is $2,822. As of December 31, 2023, the fund balance was $7,993.
For the RC Interceptor, he has moved $130,000 for relining, $160,000 for inventory and $120,000 for extra expenses if needed. He has funds ready for the Vac truck.
West Goshen Grants – Dave reported that the grant is on their phase 3 so East Goshen won't get any of it. Kevin suggested getting details.
Dave reviewed his report of Sewer Rates – Comparison of ARPA funds vs Zero ARPA funds. This showed the number of customers and numbers for 2022 and 2023 and suggested rate increase.
MA 1-8-24 draft 5
Old Business - None
Goals – The goals were discussed with the following additions:
- Goal #2 – Under Status, change to "Update Construction as it moves forward"
- Goal #4 - Add "Municipal Authority representative to attend West Goshen MA meetings the 1st Wednesday at 6 pm at the West Goshen Township Building". Under Status – Add "attend meetings on a quarterly basis.
Add the following new goals:
- 5 – Long Term Sustainability
- 6 – Caustic Acid Functionability
- 7 – Study Sewer Line Expansion
New Business –
Meeting Dates for 2024 - The following dates were listed for 2024 meetings:
January 8, February 12, March 11, April 8, May 13, June 10
July 8, August 12, September 9, October 21, November 18 and December 9
The October and November meetings were changed due to holidays.
Capacity Requests - None
Any Other Matter – None
Correspondence- None
Public Comment - None
Adjournment
At 8:00 Walter moved to adjourn the meeting and go into Executive Session to discuss professional services. Kevin seconded the motion. The motion passed unanimously.
At 8:10 the meeting was opened to the general public. Kevin moved to accept The Big Fish proposal as of January 1, 2024 to increase the base fee to $11,512.84 and the hourly fee for sludge dewatering and mechanical services to $68.00 per hour. Walter seconded the motion. The motion passed unanimously.
There being no further business Walter moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:15 pm.
The next regular meeting will be held on Monday, February 12, 2024 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 1-8-24 draft 6
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1207641
Invoice Date : 01/26/2024
Project : EGMAU23001
Project Name : 2023 General Services
For Services Rendered Through 01/14/2024
Prepared for and attended December MA meeting Including review of monthly RCSTP operator's report. Discussed 5-year capital improvement plan with Finance Director.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 521.50 | 41,462.50 | 41,984.00 |
| Limit | 42,000.00 | ||
| Remaining | 16.00 |
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.50 | 149.00 | 521.50 |
| Totals | 3.50 | 521.50 | |
| Total Labor | 521.50 | ||
| Total this Invoice | $521.50 |
APPROVED BY: [signature] 2/1/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2023 General Services
EGMAU23001Invoice Summary
Invoice Date 1/26/2024
| Project: | EGMAU23001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2023 General Services | ||
| Invoice No: | 1207641 | ||
| Invoice Period: | 12/11/2023 to 1/14/2024 | Date: | 1/26/2024 |
| Initial Authorization: | $ 42,000.00 | ||
| Contract Amount: | $ 42,000.00 | ||
| Previously Invoiced: | $ 40,887.00 | ||
| Current Invoice: | $ 521.50 | ||
| Invoiced to Date ($): | $ 41,408.50 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 591.50 | ||
| Remaining Budget (%): | 1% |
Budget by Phase:
| Phase Name: | 2023 General Services |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ 40,887.00 |
| Current Invoice: | $ 521.50 |
| Invoiced to Date ($): | $ 41,408.50 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 591.50 |
| Remaining Budget (%): | 1% |
Comments: Prepared for attended December MA meeting including review of monthly RCSTP perator's report. Discussed 5-year capital improvement plan with Finance Director.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1207642
Invoice Date : 01/26/2024
Project : EGMAU23003
Project Name : Chester Creek Interceptor Rehab Phase 1
For Services Rendered Through 01/14/2024
Reviewed additional videos of the Interceptor TW work from the contractor, prepared summary and exhibit of video observations and reviewed Pay Application #2.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,755.50 | 1,394.50 | 3,150.00 |
| Limit | 12,000.00 | ||
| Remaining | 8,850.00 |
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | .75 | 149.00 | 111.75 |
| Authority Engineer | 1.25 | 153.00 | 191.25 |
| Associate Professional | 8.25 | 111.00 | 915.75 |
| Associate Professional | 4.75 | 113.00 | 536.75 |
| Totals | 15.00 | 1,755.50 | |
| Total Labor | 1,755.50 | ||
| Total this Invoice | $1,755.50 |
APPROVED BY: [signature] 2/1/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3700
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Chester Creek Interceptor Rehab Phase 1
EGMAU23003 Invoice Summary
Invoice Date 1/26/2024
| Project: | EGMAU23003 | ||
|---|---|---|---|
| Pennoni Job No.: | Chester Creek Interceptor Rehab Phase 1 | ||
| Invoice No: | 1207642 | ||
| Invoice Period: | 12/11/2023 to 1/14/2024 | Date: | 1/26/2024 |
| Initial Authorization: | $ 12,000.00 | ||
| Contract Amount: | $ 12,000.00 | ||
| Previously Invoiced: | $ 1,394.50 | ||
| Current Invoice: | $ 1,755.50 | ||
| Invoiced to Date ($): | $ 3,150.00 | ||
| Invoiced to Date (%): | 26% | ||
| Remaining Budget ($): | $ 8,850.00 | ||
| Remaining Budget (%): | 74% |
Budget by Phase:
| Phase Name: | Chester Creek Interceptor Rehab Phase 1 |
|---|---|
| Phase Budget: | $ 12,000.00 |
| Previously Invoiced: | $ 1,394.50 |
| Current Invoice: | $ 1,755.50 |
| Invoiced to Date ($): | $ 3,150.00 |
| Invoiced to Date (%): | 26% |
| Remaining Budget ($): | $ 8,850.00 |
| Remaining Budget (%): | 74% |
Comments: Reviewed additional cideos of the interceptor TW work from the contractor, prepared summary and exhibit of video obsercvations and reviewed Pay Application #2.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1207643
Invoice Date : 01/26/2024
Project : EGMAU23004
Project Name : RCSTP Generator_2 Replacement
For Services Rendered Through 01/14/2024
Contacted generator supplier for delivery schedule update. Continued preparation of electrical design and structural design for concrete pad expansion.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 302.75 | 185.50 | 488.25 |
| Limit | 15,000.00 | ||
| Remaining | 14,511.75 |
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | .50 | 149.00 | 74.50 |
| Senior Professional | 1.00 | 145.00 | 145.00 |
| Associate Professional | .75 | 111.00 | 83.25 |
| Totals | 2.25 | 302.75 | |
| Total Labor | 302.75 | ||
| Total this Invoice | $302.75 |
APPROVED BY: [signature] 2/1/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP Generator - 2 Replacement
EGMAU23004 Invoice Summary
Invoice Date 1/26/2024
| Project: | EGMAU23004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP Generator - 2 Replacement | ||
| Invoice No: | 1207643 | ||
| Invoice Period: | 12/11/2023 to 1/14/2024 | Date: | 1/26/2024 |
| Initial Authorization: | $ 15,000.00 | ||
| Contract Amount: | $ 15,000.00 | ||
| Previously Invoiced: | $ 185.50 | ||
| Current Invoice: | $ 302.75 | ||
| Invoiced to Date ($): | $ 488.25 | ||
| Invoiced to Date (%): | 3% | ||
| Remaining Budget ($): | $ 14,511.75 | ||
| Remaining Budget (%): | 97% |
Budget by Phase:
| Phase Name: | RCSTP Generator - 2 Replacement |
|---|---|
| Phase Budget: | $ 15,000.00 |
| Previously Invoiced: | $ 185.50 |
| Current Invoice: | $ 302.75 |
| Invoiced to Date ($): | $ 488.25 |
| Invoiced to Date (%): | 3% |
| Remaining Budget ($): | $ 14,511.75 |
| Remaining Budget (%): | 97% |
Comments: Contacted generator supplier for delivery schedule update. Continued preparation of electrical and structural design for concrete pad expansion.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1207644
Invoice Date : 01/26/2024
Project : EGMAU24001
Project Name : 2024 General Services
For Services Rendered Through 01/14/2024
Prepared for and attended January MA meeting including review of monthly RCSTP operator's report, and prepared January Engineer's Report.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 799.75 | 0.00 | 799.75 |
| Limit | 42,000.00 | ||
| Remaining | 41,200.25 |
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.75 | 153.00 | 573.75 |
| Associate Professional | 2.00 | 113.00 | 226.00 |
| Totals | 5.75 | 799.75 | |
| Total Labor | 799.75 | ||
| Total this Invoice | $799.75 |
APPROVED BY: [signature] 2/1/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2024 General Services
EGMAU24001Invoice Summary
Invoice Date 1/26/2024
| Project: | EGMAU24001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2024 General Services | ||
| Invoice No: | 1207644 | ||
| Invoice Period: | NTP | to | 1/14/2024 |
| Initial Authorization: | $ 42,000.00 | Date: | 1/26/2024 |
| Contract Amount: | $ 42,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 799.75 | ||
| Invoiced to Date ($): | $ 799.75 | ||
| Invoiced to Date (%): | 2% | ||
| Remaining Budget ($): | $ 41,200.25 | ||
| Remaining Budget (%): | 98% |
Budget by Phase:
| Phase Name: | 2024 General Services |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 799.75 |
| Invoiced to Date ($): | $ 799.75 |
| Invoiced to Date (%): | 2% |
| Remaining Budget ($): | $ 41,200.25 |
| Remaining Budget (%): | 98% |
Comments: Prepared for and attended Januaru MA meeting including review of monthly RCSTP operator's report and prepared January Engineer's Report.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1207645
Invoice Date : 01/26/2024
Project : EGMAU24002
Project Name : 2023 Chapter 94 Reports
For Services Rendered Through 01/14/2024
Initiated preparation of Chapter 94 Reports.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 744.50 | 0.00 | 744.50 |
| Limit | 42,000.00 | ||
| Remaining | 41,255.50 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Authority Engineer | .25 | 153.00 | 38.25 |
| Associate Professional | 6.25 | 113.00 | 706.25 |
| Totals | 6.50 | 744.50 | |
| Total Labor | 744.50 | ||
| Total this Invoice | $744.50 |
APPROVED BY: [signature] 2/1/24
DATE PAID: _________
CHECK #: _________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2023 Chapter 94 Reports
EGMAU24002 Invoice Summary
Invoice Date 1/26/2024
| Project: | EGMAU24002 | ||
|---|---|---|---|
| Pennoni Job No.: | 2023 Chapter 94 Reports | ||
| Invoice No: | 1207645 | ||
| Invoice Period: | NTP | to | 1/14/2024 |
| Initial Authorization: | $ 42,000.00 | Date: | 1/26/2024 |
| Contract Amount: | $ 42,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 744.50 | ||
| Invoiced to Date ($): | $ 744.50 | ||
| Invoiced to Date (%): | 2% | ||
| Remaining Budget ($): | $ 41,255.50 | ||
| Remaining Budget (%): | 98% |
Budget by Phase:
| Phase Name: | 2023 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 744.50 |
| Invoiced to Date ($): | $ 744.50 |
| Invoiced to Date (%): | 2% |
| Remaining Budget ($): | $ 41,255.50 |
| Remaining Budget (%): | 98% |
Comments: Initiated preparation of Chapter 94 Reports.
RAIN FOR RENT
INVOICE
Rain For Rent New Jersey
1197 Aura Rd
Monroeville NJ 08343
United States
856-881-6162
24/7 Emergency 800-742-7246
www.rainforrent.com
| Your sales person | REMIT PAYMENTS TO: |
|---|---|
| JOE PEVERELLE | Rain for Rent RAIN FOR RENT FILE 52541 LOS ANGELES, CA 90074-2541 |
| CONTRACT # | 1188339 | INVOICE# | INVOICE DATE | PO or JOB# | PAYMENT DUE |
|---|---|---|---|---|---|
| CUSTOMER | East Goshen Township | 1964926 | 1/15/2024 | 24-00041 | 2/14/2024 |
| CUSTOMER # | 142983 | PLEASE PAY | $14,805.16 | ||
| NAME | East Goshen Township | SHIPPED TO JOBSITE: NAME: East Goshen Township ADDRESS: 1580 Paoli Pike West Chester PA 19380 PHONE: |
|||
| ADDRESS | 1580 Paoli Pike West Chester PA 19380 |
||||
| PHONE | |||||
Notes:
Ordered by Mark Miller 610-692-7171
| QTY | UOM | DESCRIPTION | PRODUCT # | STATUS | DATE OUT | BILLED THRU | DAYS BILLED | PRICE | AMOUNT | TAXABLE |
|---|---|---|---|---|---|---|---|---|---|---|
| 8.00 | EA | Hose 6" x 50' Layflat Camlock 75PSI | 712552 | SALES | 0.00 | $1,549.11 | $12,392.88 | |||
| 4.00 | EA | Adapter 6" Al Part B Camlock | 1018204 | SALES | 0.00 | $107.48 | $429.92 | |||
| 4.00 | EA | Adapter 6" Female Cam x MNPT AL | 305087 | SALES | 0.00 | $334.31 | $1,337.24 | |||
| 3.00 | EA | Delivery Hauling 1 truck @ 3 hrs- delivery of hose/fittings 1/12/24 |
M110 | SERVICES | 0.00 | $168.00 | $504.00 | |||
| 1.00 | EA | Fuel Surcharge | FSC | SERVICES | 0.00 | $141.12 | $141.12 |
PAID
APPROVED BY: [signature] 1/26/24
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-429-1505
| TOTAL SALES: | $14,160.04 |
|---|---|
| TOTAL RENTALS: | $0.00 |
| TOTAL SERVICES: | $645.12 |
| TOTAL OTHER: | $0.00 |
| SUBTOTAL: | $14,805.16 |
| TOTAL: | $14,805.16 |
FOR PROPER CREDIT, PLEASE INCLUDE INVOICE NUMBER ON YOUR PAYMENT.
PAST DUE AMOUNTS ARE SUBJECT TO A SERVICE CHARGE OF 1.50%
CUSTOMER, (RENTEE OR BUYER as context requires), shall be deemed to accept all terms, conditions and provisions hereof upon execution of this agreement; ordering; or delivery of equipment to customer, whichever comes first.
PAYMENT TERMS: NET 30
SIGNATURE: ________ DATE: ________
Printed Date: 1/15/2024
Page 1 of 1
RAIN FOR RENT
INVOICE
Rain For Rent New Jersey
1197 Aura Rd
Monroeville NJ 08343
United States
856-881-6162
24/7 Emergency 800-742-7246
www.rainforrent.com
| Your sales person | REMIT PAYMENTS TO: |
|---|---|
| JOE PEVERELLE | Rain for Rent RAIN FOR RENT FILE 52541 LOS ANGELES, CA 90074-2541 |
| CONTRACT # | 1188686 | INVOICE# | INVOICE DATE | PO or JOB# | PAYMENT DUE |
|---|---|---|---|---|---|
| CUSTOMER | East Goshen Township | 1965714 | 1/18/2024 | SIGNED QUOTE - MARK MILLER | 2/17/2024 |
| CUSTOMER # | 142983 | PLEASE PAY | $4,069.12 | ||
| NAME | East Goshen Township | SHIPPED TO JOBSITE: NAME: East Goshen Township ADDRESS: 1580 Paoli Pike West Chester PA 19380 PHONE: |
|||
| ADDRESS | 1580 Paoli Pike West Chester PA 19380 |
||||
| PHONE | |||||
| QTY | UOM | DESCRIPTION | PRODUCT # | STATUS | DATE OUT | BILLED THRU | DAYS BILLED | PRICE | AMOUNT | TAXABLE |
|---|---|---|---|---|---|---|---|---|---|---|
| 4.00 | EA | Hose 6" x 10' Hd Tank Truck Camlock 150PSI | 712890 | SALES | 0.00 | $856.00 | $3,424.00 | |||
| 3.00 | EA | Delivery Hauling 1 truck @ 3 hrs- delivery 1/17/24 |
M110 | SERVICES | 0.00 | $168.00 | $504.00 | |||
| 1.00 | EA | Fuel Surcharge | FSC | SERVICES | 0.00 | $141.12 | $141.12 |
PAID
APPROVED BY: [signature]
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-429-1505
| TOTAL SALES: | $3,424.00 |
|---|---|
| TOTAL RENTALS: | $0.00 |
| TOTAL SERVICES: | $645.12 |
| TOTAL OTHER: | $0.00 |
| SUBTOTAL: | $4,069.12 |
| TOTAL: | $4,069.12 |
FOR PROPER CREDIT, PLEASE INCLUDE INVOICE NUMBER ON YOUR PAYMENT.
PAST DUE AMOUNTS ARE SUBJECT TO A SERVICE CHARGE OF 1.50%
CUSTOMER, (RENTEE OR BUYER as context requires), shall be deemed to accept all terms, conditions and provisions hereof upon execution of this agreement; ordering; or delivery of equipment to customer, whichever comes first.
PAYMENT TERMS: NET 30
SIGNATURE: ________ DATE: ________
Printed Date: 1/18/2024
Page 1 of 1
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 02/07/2024 Client No: 6604-001M Invoice No. 285170 |
|---|
General Authority Services
Fees
| Date / Timekeeper | Description | Hours | Amount |
|---|---|---|---|
| 01/05/2024 PMM |
Email from L. Werkheiser regarding meeting materials. | 0.20 | 41.00 |
| 01/08/2024 EBK |
Review and analyze monthly meeting materials Travel to/from and attend monthly meeting |
2.30 | 448.50 |
| 01/09/2024 EBK |
Review email from L Werkheiser and attached 2024 Municipal Authority goals | 0.20 | 39.00 |
| For Current Services Rendered | 2.70 | 528.50 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna, Esquire | 0.20 | $205.00 | $41.00 |
| Ellen B. Koopman, Esquire | 2.50 | 195.00 | 487.50 |
| Previous Balance | $964.00 |
|---|---|
| Total Current Charges | 528.50 |
| 01/16/2024 Payment | -533.00 |
| 01/16/2024 Payment | -431.00 |
| Total Payments | -964.00 |
| Balance Due | $528.50 |
APPROVED BY: [signature] 2/8/24
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3140
| East Goshen Municipal Authority | Page: 2 02/07/2024 Client No: 6604-001M Invoice No. 285170 |
|---|
General Authority Services
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 02/07/2024 Client No: 6604M |
|---|
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 964.00 | 528.50 | 0.00 | -964.00 | $528.50 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Dave Ware |
| Re: | MA January 2024 YTD Financial Report |
| Date: | February 8, 2024 |
YTD January 2024, the Municipal Authority recorded $32,103 in revenues (primarily from Sewer Capital Reserve transfers) and $29,196 in expenses (RCSTP UV replacement capital costs and legal fees). The net result of operations is $2,907. As of January 31, 2024, the fund balance was $10,469.
Attached is a complete list of 2023 full year MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD January 2024
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 35.21 | 2.65 |
| 07-354-0400 | DCED GRANT | 0.00 | 0 | 0 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0.00 | 0.00 |
| 07-364-1110 | R.C.TAPPING FEES | 8,574.09 | 297.84 | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,127.52 | 281.88 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 564.06 | 141.12 | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 109,517.00 | 964.00 | 20,957.18 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 837,464.00 | 30,382.95 | 58,333.71 |
| Total Revenue | 959,546.67 | 32,103.00 | 80,014.38 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 39,847.10 | 0.00 | 0.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 3,286.22 | 0.00 | 0.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 21,630.00 | 0.00 | 0.00 |
| 07-424-3130 | ENGINEERING SERVICES | 48,667.50 | 0.00 | 3,384.75 |
| 07-424-3140 | LEGAL SERVICES | 8,652.00 | 533.00 | 0.00 |
| 07-424-7440 | R.C. CAPITAL-STP | 0.00 | 0.00 | 0.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 310,500.00 | 0.00 | 6,904.64 |
| 07-426-3001 | RELINING | 0.00 | 0.00 | 0.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 85,000.00 | 0.00 | 17,358.29 |
| 07-429-1505 | RCSTP CAPITAL | 366,963.85 | 28,662.95 | 48,643.21 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 75,000.00 | 0.00 | 0.00 |
| Total Expenses | 959,546.67 | 29,195.95 | 76,290.89 | |
| Net Result From Operations | 0.00 | 2,907.05 | 3,723.49 | |
Municipal Authority
YTD Revenues and Expenses thru 1/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/24 | Revenue Journal | INTEREST EARNED JANUARY 2024 | 35.21 |
| 07-364-1110 | R.C.TAPPING FEES | 01/02/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/25/24 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 13262 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/25/24 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/09/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 431.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/11/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 533.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/02/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,720.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/05/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 94.02 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 97.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,805.16 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 9,530.65 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/31/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,136.12 |
| Total Revenue | 32,103.00 | ||||
| 07-424-3140 | LEGAL SERVICES | 01/11/24 | Pay Check: 3474 | 24-00076 LEGAL SERV DEC 2023 GEN AUTH | 533.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/05/24 | Pay Check: 3472 | 24-00033 TYPE B C&G 3" COUPLER X M NPT | 94.02 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/24 | Pay Check: 703 | 24-00056 VARIOUS PURCHASES- SEE NOTES | 97.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/17/24 | Pay Check: 3475 | 24-00098 RC ST-RAN CONDUIT FOR TEMP PUM | 9,530.65 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 4" FNPT X 6" MCAM | 429.92 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 6" FRMALE CAM X MNPT | 1,337.24 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 HOSE 6" X 50' CAMLOCK LAYFLAT | 12,392.88 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 DELIVERY | 645.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3477 | 24-00210 SAND BAR (YELLOW) & BAGS | 67.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3478 | 24-00237 HOSE 6"X10' HD TANK TRUCK CAML | 4,069.12 |
| Total Expense | 29,195.95 | ||||
| Net Operating | 2,907.05 |
Page 1 of 1
Pennoni
January 10, 2024
EGMAU22004
East Goshen Municipal Authority
Attn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application #1 Recommendation Letter
RCSTP UV Disinfection System Replacement, Contract No. RCSTP-2023-02 (Electrical Contract)
Dear Mr. Miller:
The Contractor, Lenni Electric Corporation, has submitted the first invoice for work completed for the subject project. We have observed the permanent electrical work-in-progress, including installation of permanent conduit and wiring, and we confirm that the described work has been completed.
We have reviewed the attached Payment Application #1 provided by the Contractor, and we recommend payment in the amount of $4,296.24. Overall, the contract is about 22% complete.
The certified payrolls for the first three weeks of construction are also attached.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
[signature]
Michael J. Ellis, PE
Associate Vice President
/ela
Enclosures: Application and Certification for Payment #1
Project Quantities Summary Report
Prevailing Wage Certifications (3 weeks)
cc: Dave Ware, Township Finance Director
Derek Davis, Township Manager
Scott Welsh, Lenni Electric
Lorraine Bizzarro, Lenni Electric
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
APPLICATION FOR PAYMENT NO. 1
Job #22335
TO (OWNER): East Goshen Municipal Authority
PROJECT NO.: RCSTP-2023-02
PERIOD TO: 10/31/23
FROM (CONTRACTOR): Lenni Electric Corporation, 1020 Andrew Drive, West Chester, PA 19380
CONTRACT DATE: 04/27/22
CONTRACT FOR: Ridley Creek STP UV Disinfection System Replacement
PAGE 1 OF 2
CHANGE ORDER SUMMARY
| Change Orders approved in previous months by Owner | Number | Date Approved | ADDITIONS | DELETIONS |
|---|---|---|---|---|
| TOTAL | ||||
| Approved this Month | ||||
| TOTALS | ||||
| Net change by Change Orders |
| 1. ORIGINAL CONTRACT SUM | $ 21534.00 |
|---|---|
| 2. Net change by Change Orders | $ |
| 3. CONTRACT SUM TO DATE (Line 1±2) | $ 21534.00 |
| 4. TOTAL COMPLETED TO DATE (Columns B+C on Page 2) | $ 4773.60 |
| 5. RETAINAGE: ___% of Completed Work | $ 477.36 |
| 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5) | $ 4296.24 |
| 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Application) | $ 0.00 |
| 8. CURRENT AMOUNT DUE | $ 4296.24 |
| 9. BALANCE TO FINISH, PLUS RETAINAGE (Line 3 less Line 6) | $ 17237.76 |
CONTRACTOR'S CERTIFICATION:
The undersigned Contractor certifies that (1) all previous progress payments received from Owner on account of Work done under the Contract have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by prior Applications for Payment numbered 1 through _ inclusive and that such payments have been made in compliance with the Pennsylvania Prompt Pay Act, Act 142 of 1994; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to Owner at time of payment, free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to Owner indemnifying Owner against any such lien, claim, security interest, or encumbrance); and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective, as that term is defined in the Contract Documents.
Dated: December 21, 2023
CONTRACTOR: Lenni Electric Corporation
By: [Signature] (Authorized Signature)
Sworn to and subscribed before me this 21st day of December, 2023
[Signature: Anne M. Pence]
APPROVED BY: [Initials] 1/11/23
DATE PAID: ___________
CHECK #: ___________
CHARGED TO: 07-429-1504 RCSTP UV
Payment of the above CURRENT AMOUNT DUE is recommended.
Dated: January 10, 2024
ENGINEER
By: [Signature: M J Ellis] (Authorized Signature)
[Notary Seal: Commonwealth of Pennsylvania - Notary Seal, Anne M. Pence, Notary Public, Chester County, My commission expires May 9, 2024, Commission number 1269340, Member, Pennsylvania Association of Notaries]
I:\Jobspecs\Forms\PmtAppLS.XLS (LS)
LENNI ELECTRIC CORPORATION
1020 ANDREW DRIVE
WEST CHESTER, PA. 19380
JOB # 22335
Chester County
Ridley Creek STP UV
APPLICATION NUMBER: 1
APPLICATION DATE: 12/21/2023
PERIOD TO: 12/21/2023
ARCHITECT'S PROJECT NO:
| ITEM # | DESCRIPTION OF WORK | SCHEDULED VALUE | WORK COMPLETED PREVIOUS | WORK COMPLETED CURRENT | PRESENTLY STORED MATERIAL | TOTAL TO DATE | % COMPLETE | BALANCE TO FINISH | RETAINAGE |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary Electrical Work | $5,622.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00% | $5,622.00 | $0.00 |
| 2 | Permanent Electrical Work | $15,912.00 | $0.00 | $4,773.60 | $0.00 | $4,773.60 | 30.00% | $11,138.40 | $477.36 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| TOTALS | $21,534.00 | $0.00 | $4,773.60 | $0.00 | $4,773.60 | 22.17% | $16,760.40 | $477.36 |
WEEKLY PAYROLL CERTIFICATION FOR PUBLIC WORKS PROJECTS
ALL INFORMATION MUST BE COMPLETED
[x] Contractor or [ ] Subcontractor (Please check one)
| CONTRACTOR Lenni Electric Corporation ADDRESS 1020 Andrew Drive West Chester, PA 19380 |
SUBCONTRACTOR ADDRESS |
|---|---|
| PAYROLL NUMBER #1 | PROJECT AND LOCATION Ridley Creek Station STP UV 1751 Towne Drive East Goshen Chester County, PA |
| WEEK ENDING DATE PE:12/2/23 Ck: 12/6/23 | PROJECT SERIAL # PROJECT # |
LABOR & INDUSTRY
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGE DIVISION
7TH & FORSTER STREETS
HARRISBURG PA 17120
1-800-932-0665
| EMPLOYEE NAME | APPR. RATE (%) | WORK CLASSIFICATION | DAY AND DATE | S-TIME / O-TIME | BASE HOURLY RATE | TOTAL FRINGE BENEFITS (C=Cash) (FB=Contributions)* | TOTAL DEDUCTIONS | GROSS PAY FOR PREVAILING RATE JOB(S) | CHECK # | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S | M | T | W | T | F | S | |||||||||
| See Attached | HOURS WORKED EACH DAY | C: FB: |
|||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
*SEE REVERSE SIDE
PAGE NUMBER _____ OF _____
LLC-25 REV 10-03 (Page 1)
Department of Labor
Company: Lenni Electric Corporation
1020 Andrew Drive
West Chester PA 19380
Project: Ridley Creek STP UV
1751 Towne Drive
East Goshen Township
Chester County
Report Period: 11/26/2023 to 12/02/2023
Payroll#:
| Employee Information | No of Dep | Work Classification | S 11/26 | M 11/27 | T 11/28 | W 11/29 | T 11/30 | F 12/01 | S 12/02 | Total Hours | Rate of Pay | Gross Amount | FICA | Fed Tax | State Tax | SDI | Other | Total | Net Wage | Payroll Check # | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Savage Joseph M XXX-XX-9844 |
Electrician L | O S |
8.00 | 8.00 | 57.98 | 463.84 | |||||||||||||||
| Total Payroll for Employee: | 1,867.52 | 142.87 | 512.02 | 57.33 | 1.31 | 222.62 | 936.15 | 931.37 | 53592 | ||||||||||||
| Davis Jared D XXX-XX-6652 |
Electrician A | O S |
8.00 | 8.00 | 50.23 | 401.84 | |||||||||||||||
| Total Payroll for Employee: | 1,337.84 | 102.35 | 145.49 | 41.07 | 0.94 | 38.64 | 328.49 | 1,009.35 | 53593 | ||||||||||||
| Total For All Employees: | O S |
16.00 | 16.00 | 865.68 | |||||||||||||||||
| Total Payroll for All Employees: | 3,205.36 | 245.22 | 657.51 | 98.40 | 2.25 | 261.26 | 1,264.64 | 1,940.72 | |||||||||||||
Page 1
THE NOTARIZATION MUST BE COMPLETED ON FIRST AND LAST SUBMISSIONS ONLY. ALL OTHER INFORMATION MUST BE COMPLETED WEEKLY.
*FRINGE BENEFITS EXPLANATION (FB): Bona fide benefits contribution, except those required by Federal or State Law (unemployment tax, workers' compensation, income taxes, etc.)
Please specify the type of benefits provided and contributions per hour:
- Medical or hospital care: PPO High - $10.50/Hr; PPO Low - $8.40/Hr; Death & Disability $6.40/Hr
- Pension or retirement: $ 8.85/Hr
- Life insurance:
- Disability:
- Vacation, holiday:
- Other (please specify): Savings/Sub Plan - $7.75/Hr; Apprenticeship Training - $.20/Hr
CERTIFIED STATEMENT OF COMPLIANCE
- The undersigned, having executed a contract with East Goshen Twp. (AWARDING AGENCY, CONTRACTOR OR SUBCONTRACTOR) for the construction of the above-identified project, acknowledges that: The prevailing wage requirements and the predetermined rates are included in the aforesaid contract.; Correction of any infractions of the aforesaid conditions is the contractor's or subcontractor's responsibility.; It is the contractor's responsibility to include the Prevailing Wage requirements and the predetermined rates in any subcontract or lower tier subcontract for this project.
- The undersigned certifies that: Neither he nor his firm, nor any firm, corporation or partnership in which he or his firm has an interest is debarred by the Secretary of Labor and Industry pursuant to Section 11(e) of the PA Prevailing Wage Act, Act of August 15, 1961, P.L. 987 as amended, 43 P.S.§ 165-11(e).; No part of this contract has been or will be subcontracted to any subcontractor if such subcontractor or any firm, corporation or partnership in which such subcontractor has an interest is debarred pursuant to the aforementioned statute.
- The undersigned certifies that: the legal name and the business address of the contractor or subcontractor are: Lenni Electric Corporation 1020 Andrew Drive, West Chester, PA 19380; The undersigned is: [ ] a single proprietorship [x] a corporation organized in the state of Pennsylvania [ ] a partnership [ ] other organization (describe); The name, title and address of the owner, partners or officers of the contractor/subcontractor are: NAME TITLE ADDRESS Raymond M. Meehan President 1020 Andrew Drive West Chester, PA 19380
The willful falsification of any of the above statements may subject the contractor to civil or criminal prosecution, provided in the PA Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, August 9, 1963, 43 P.S. § 165.1 through 165.17.
12/6/23
(DATE)
[signature: Robyn Welsh]
(SIGNATURE)
Accountant
(TITLE)
Taken, sworn and subscribed before me this 7th Day of December A.D. 2023
[signature: Anne M. Pence]
Commonwealth of Pennsylvania - Notary Seal
Anne M. Pence, Notary Public
Chester County
My commission expires May 9, 2024
Commission number 1269340
Member, Pennsylvania Association of Notaries
LLC-25 REV 10-03 (Page 2)
WEEKLY PAYROLL CERTIFICATION FOR PUBLIC WORKS PROJECTS
ALL INFORMATION MUST BE COMPLETED
[x] Contractor or [ ] Subcontractor (Please check one)
| CONTRACTOR Lenni Electric Corporation ADDRESS 1020 Andrew Drive West Chester, PA 19380 |
SUBCONTRACTOR ADDRESS |
|---|---|
| PAYROLL NUMBER #2 | PROJECT AND LOCATION Ridley Creek Station STP UV 1751 Towne Drive East Goshen Chester County, PA |
| WEEK ENDING DATE PE12/9/23 Ck12/13/23 | PROJECT SERIAL # PROJECT # |
LABOR & INDUSTRY
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGE DIVISION
7TH & FORSTER STREETS
HARRISBURG PA 17120
1-800-932-0665
| EMPLOYEE NAME | APPR. RATE (%) | WORK CLASSIFICATION | DAY AND DATE | S-TIME / O-TIME | BASE HOURLY RATE | TOTAL FRINGE BENEFITS (C=Cash) (FB=Contributions)* | TOTAL DEDUCTIONS | GROSS PAY FOR PREVAILING RATE JOB(S) | CHECK # | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S | M | T | W | T | F | S | |||||||||
| NO WORKED PERFORMED | HOURS WORKED EACH DAY | C: FB: |
|||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
*SEE REVERSE SIDE
PAGE NUMBER _____ OF _____
LLC-25 REV 10-03 (Page 1)
THE NOTARIZATION MUST BE COMPLETED ON FIRST AND LAST SUBMISSIONS ONLY. ALL OTHER INFORMATION MUST BE COMPLETED WEEKLY.
*FRINGE BENEFITS EXPLANATION (FB): Bona fide benefits contribution, except those required by Federal or State Law (unemployment tax, workers' compensation, income taxes, etc.)
Please specify the type of benefits provided and contributions per hour:
- Medical or hospital care: PPO High - $10.50/Hr; PPO Low - $8.40/Hr; Death & Disability $6.40/Hr
- Pension or retirement: $ 8.85/Hr
- Life insurance:
- Disability:
- Vacation, holiday:
- Other (please specify): Savings/Sub Plan - $7.75/Hr; Apprenticeship Training - $.20/Hr
CERTIFIED STATEMENT OF COMPLIANCE
- The undersigned, having executed a contract with East Goshen Township (AWARDING AGENCY, CONTRACTOR OR SUBCONTRACTOR) for the construction of the above-identified project, acknowledges that: The prevailing wage requirements and the predetermined rates are included in the aforesaid contract.; Correction of any infractions of the aforesaid conditions is the contractor's or subcontractor's responsibility.; It is the contractor's responsibility to include the Prevailing Wage requirements and the predetermined rates in any subcontract or lower tier subcontract for this project.
- The undersigned certifies that: Neither he nor his firm, nor any firm, corporation or partnership in which he or his firm has an interest is debarred by the Secretary of Labor and Industry pursuant to Section 11(e) of the PA Prevailing Wage Act, Act of August 15, 1961, P.L. 987 as amended, 43 P.S.§ 165-11(e).; No part of this contract has been or will be subcontracted to any subcontractor if such subcontractor or any firm, corporation or partnership in which such subcontractor has an interest is debarred pursuant to the aforementioned statute.
- The undersigned certifies that: the legal name and the business address of the contractor or subcontractor are: Lenni Electric Corporation 1020 Andrew Drive, West Chester, PA 19380; The undersigned is: [ ] a single proprietorship [x] a corporation organized in the state of Pennsylvania [ ] a partnership [ ] other organization (describe); The name, title and address of the owner, partners or officers of the contractor/subcontractor are: NAME TITLE ADDRESS Raymond M. Meehan President 1020 Andrew Drive West Chester, PA 19380
The willful falsification of any of the above statements may subject the contractor to civil or criminal prosecution, provided in the PA Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, August 9, 1963, 43 P.S. § 165.1 through 165.17.
12/13/23
(DATE)
[signature: Robyn Welsh]
(SIGNATURE)
Accountant
(TITLE)
SEAL
Taken, sworn and subscribed before me this _____ Day of _____ A.D., _____
LLC-25 REV 10-03 (Page 2)
WEEKLY PAYROLL CERTIFICATION FOR PUBLIC WORKS PROJECTS
ALL INFORMATION MUST BE COMPLETED
[x] Contractor or [ ] Subcontractor (Please check one)
| CONTRACTOR Lenni Electric Corporation ADDRESS 1020 Andrew Drive West Chester, PA 19380 |
SUBCONTRACTOR ADDRESS |
|---|---|
| PAYROLL NUMBER #3 | PROJECT AND LOCATION Ridley Creek Station STP UV 1751 Towne Drive East Goshen Chester County, PA |
| WEEK ENDING DATE PE12/16/23Ck12/20/23 | PROJECT SERIAL # PROJECT # |
LABOR & INDUSTRY
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGE DIVISION
7TH & FORSTER STREETS
HARRISBURG PA 17120
1-800-932-0665
| EMPLOYEE NAME | APPR. RATE (%) | WORK CLASSIFICATION | DAY AND DATE | S-TIME / O-TIME | BASE HOURLY RATE | TOTAL FRINGE BENEFITS (C=Cash) (FB=Contributions)* | TOTAL DEDUCTIONS | GROSS PAY FOR PREVAILING RATE JOB(S) | CHECK # | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S | M | T | W | T | F | S | |||||||||
| NO WORKED PERFORMED | HOURS WORKED EACH DAY | C: FB: |
|||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
| 0% | C: FB: |
||||||||||||||
*SEE REVERSE SIDE
PAGE NUMBER _____ OF _____
LLC-25 REV 10-03 (Page 1)
THE NOTARIZATION MUST BE COMPLETED ON FIRST AND LAST SUBMISSIONS ONLY. ALL OTHER INFORMATION MUST BE COMPLETED WEEKLY.
*FRINGE BENEFITS EXPLANATION (FB): Bona fide benefits contribution, except those required by Federal or State Law (unemployment tax, workers' compensation, income taxes, etc.)
Please specify the type of benefits provided and contributions per hour:
1) Medical or hospital care: PPO High - $10.50/Hr; PPO Low - $8.40/Hr; Death & Disability $6.40/Hr
2) Pension or retirement: $ 8.85/Hr
3) Life insurance
4) Disability
5) Vacation, holiday
6) Other (please specify): Savings/Sub Plan - $7.75/Hr; Apprenticeship Training - $.20/Hr
CERTIFIED STATEMENT OF COMPLIANCE
1. The undersigned, having executed a contract with East Goshen Township (AWARDING AGENCY, CONTRACTOR OR SUBCONTRACTOR) for the construction of the above-identified project, acknowledges that:
(a) The prevailing wage requirements and the predetermined rates are included in the aforesaid contract.
(b) Correction of any infractions of the aforesaid conditions is the contractor's or subcontractor's responsibility.
(c) It is the contractor's responsibility to include the Prevailing Wage requirements and the predetermined rates in any subcontract or lower tier subcontract for this project.
2. The undersigned certifies that:
(a) Neither he nor his firm, nor any firm, corporation or partnership in which he or his firm has an interest is debarred by the Secretary of Labor and Industry pursuant to Section 11(e) of the PA Prevailing Wage Act, Act of August 15, 1961, P.L. 987 as amended, 43 P.S.§ 165-11(e).
(b) No part of this contract has been or will be subcontracted to any subcontractor if such subcontractor or any firm, corporation or partnership in which such subcontractor has an interest is debarred pursuant to the aforementioned statute.
3. The undersigned certifies that:
(a) the legal name and the business address of the contractor or subcontractor are:
Lenni Electric Corporation 1020 Andrew Drive, West Chester, PA 19380
(b) The undersigned is: [ ] a single proprietorship [x] a corporation organized in the state of Pennsylvania [ ] a partnership [ ] other organization (describe)
(c) The name, title and address of the owner, partners or officers of the contractor/subcontractor are:
| NAME | TITLE | ADDRESS |
|---|---|---|
| Raymond M. Meehan | President | 1020 Andrew Drive West Chester, PA 19380 |
The willful falsification of any of the above statements may subject the contractor to civil or criminal prosecution, provided in the PA Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, August 9, 1963, 43 P.S. § 165.1 through 165.17.
12/20/23 (DATE)
Robyn Welsh (SIGNATURE)
Accountant (TITLE)
SEAL
Taken, sworn and subscribed before me this _____ Day of ___________ A.D., _____
LLC-25 REV 10-03 (Page 2)
Pennoni
February 8, 2024
EGMAU23003
East Goshen Municipal Authority
Attn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application #2 Recommendation
Chester Creek Interceptor Inspection and Repair, Contract No. CCSS-2023
Dear Mr. Miller:
The Contractor, Insituform Technologies, LLC, has submitted the second invoice for work completed for the subject project. We have reviewed the work-in-progress, including the cleaning and televising of the sanitary sewer lines, and we confirm that the described work has been completed.
We have reviewed the attached Payment Application #2 provided by the Contractor, and we recommend payment in the amount of $20,340.00. Overall, the contract is 38.1% complete.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Associate Vice President
/ea
Enclosures: Application and Certification for Payment #2
Payment Estimate #2
cc: Shivon Shiwpal, Insituform Technologies
Steven Scruggs, Insituform Technologies
Dave Ware, Township Finance Director
Derek Davis, Township Manager
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
APPLICATION AND CERTIFICATE FOR PAYMENT
AIA DOCUMENT G702 (Instructions on reverse side) PAGE 1 OF 2
TO: East Goshen Municipal Authority, 1580 Paoli Pike, West Chester, PA 19380
FROM: Insituform Technologies, LLC, 580 Goddard Ave, Chesterfield, MO 63005
PROJECT: Chester Creek Interceptor
Contract No: CCSS-2023
VIA (ENGINEER): Pennoni Associates Inc., Christiana Executive Campus, 121 Continental DR, Suite 207, Newark, DE 19713
APPLICATION NO: 2
PERIOD TO: 11/20/2023 - 12/19/2023
Engineer's PROJECT NO:
CONTRACT DATE:
Distribution to: [ ] Owner [ ] Engineer [ ] Contrator [ ] [ ]
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached.
CHANGE ORDER SUMMARY
| Change Orders approved in previous months by Owner | Number | Date Approved | ADDITIONS | DEDUCTIONS |
|---|---|---|---|---|
| TOTAL | ||||
| Approved this Month | ||||
| TOTALS | $ - | $ - | ||
| Net change by Change Orders |
| 1 ORIGINAL CONTRACT SUM | $ 214,850.00 |
|---|---|
| 2 Net Change by Change Orders | $ - |
| 3 CONTRACT SUM TO DATE | $ 214,850.00 |
| 4 TOTAL COMPLETED & STORED TO DATE (Column G on G703) | $ 81,850.00 |
| 5 RETAINAGE: a. 10% of Completed Work (Column D+E on G703) $ 8,185.00 b. % of Stored Material (Column F on G703) Total Retainage (Line 5a + 5b or Total in Column I of G703) |
$ 8,185.00 |
| 6 TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) | $ 73,665.00 |
| 7 LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from previous Certificate) | 53,325.00 |
| 8 CURRENT PAYMENT DUE | $ 20,340.00 |
| 9 BALANCE TO FINISH, PLUS RETAINAGE (Line 3 less Line 6) | $ 141,185.00 |
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR: Insituform Technologies, LLC
By: [Signature] Date: 2/7/24
Subscribed and sworn to before me this 7TH day of Feb, 2023
Notary Public: Debbie Sewell
My Commission expires: Jan 02 2026
[Notary Seal: DEBBIE S. SEWELL, MY COMMISSION EXPIRES Jan 02 2026, NOTARY PUBLIC STATE OF DELAWARE]
ENGINEER'S CERTIFICATE FOR PAYMENT
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED $ 20,340.00
(Attach explanation if amount certified differs from the amount applied for.)
Engineer:
BY: [Signature: M J Ellis] DATE: 2/8/2024
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUMENT G702 * APPLICATION AND CERTIFICATE FOR PAYMENT * MAY 1983 EDITION * AIA
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, DC 20006
PROJECT NO.: CCSS-2023
PAYMENT ESTIMATE NO. 2
PERIOD: 11/20/2023-12/19/2023
DATE: 2/2023
OWNER: East Goshen Municipal Authority
| ITEM | DESCRIPTION OF WORK | BID QUANTITY | UNIT PRICE | TOTAL EXTENSION | WORK COMPLETED PREVIOUS ESTIMATE | WORK COMPLETED CURRENT ESTIMATE | TOTALS | |||
|---|---|---|---|---|---|---|---|---|---|---|
| QTY | AMOUNT | QTY | AMOUNT | QTY | AMOUNT | |||||
| 1 | Clean and Televise 24 Sanitary Sewer. | 4900.00 | $ 15.00 | $ 73,500.00 | 3950 | $ 59,250.00 | 1400 | $ 21,000.00 | 5,350.0 | $ 80,250.00 |
| 2 | Televise 4" and 6" Sanitary Sewer Lateral. | 40.00 | $ 50.00 | $ 2,000.00 | $ - | 32 | $ 1,600.00 | 32.0 | $ 1,600.00 | |
| 3 | Cured-In-Place Pipe Lining of 24" Pipe within Township Roads | 360.00 | $ 300.00 | $ 108,000.00 | $ - | $ - | 0.0 | $ - | ||
| 4 | Cured-In-Place Pipe Lining of 4" or 6" lateral | 30.00 | $ 400.00 | $ 12,000.00 | $ - | $ - | 0.0 | $ - | ||
| 5 | Lateral T-Connection and Excavated Transitio | 1.00 | $ 4,000.00 | $ 4,000.00 | $ - | $ - | 0.0 | $ - | ||
| 6 | Lateral Reinstatements. | 3.00 | $ 200.00 | $ 600.00 | $ - | $ - | $ - | |||
| 7 | Pipe Grouting. | 2.00 | $ 2,500.00 | $ 5,000.00 | $ - | $ - | 0.0 | $ - | ||
| 8 | Manhole Pressure Grouting. Price complete, in place, per each manhol | 4.00 | $ 1,500.00 | $ 6,000.00 | $ - | $ - | 0.0 | $ - | ||
| 9 | Grout | 75.00 | $ 50.00 | $ 3,750.00 | $ - | $ - | 0 | $ - | ||
| 10 | Remove Asphalt/Debris from Pipe | 1.00 | $ - | $ - | $ - | $ - | 0 | $ - | ||
| 11 | Cut Lateral and Install T-Connection | 1.00 | $ - | $ - | $ - | $ - | 0 | $ - | ||
| CONTRACT TOTAL | $ 214,850.00 | $ - | $ 22,600.00 | TOTAL | $ 81,850.00 | |||||
Lynn Werkheiser
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Friday, February 9, 2024 10:06 AM
To: Mark Miller
Cc: David Ware; Lynn Werkheiser
Subject: UV Project - Construction Phase Supplement Proposal
Hi Mark,
As discussed, we respectfully request a supplemental authorization of $6,000 to complete construction phase services for the RCSTP UV Replacement project. The supplement will Not Be Exceeded without prior approval of the MA. Work will continue to be billed at our hourly rates.
For background, we were originally authorized for construction phase services for $10,000 Not to Exceed without prior approval of the MA. The actual required effort to-date has taken us to that budget as described hereafter, and additional effort will be needed as construction is still ongoing to perform remaining inspections, process pay applications, and closeout the construction contracts.
Additional efforts beyond those anticipated when the original budget was established follow:
- Re-design and contractor coordination of new BCC/SCC (controls) cabinet location as requested by Public Works to facilitate ease of channel concrete work including multiple field meetings. The re-designed solution was to temporarily install the BCC along the rear wall for the bypassing work and then relocate it alongside the channel to a permanent location thereafter. Logistics to minimize system downtime during the relocation were worked out with the contractors, the operator, Glasco, and UV supplier.
- Field meeting with PADEP to walkthrough the bypass and proposed permanent system prior to bypass start-up.
- Follow-up analysis to initial start-up testing not being able to convey peak filter flows through the bypass system. We coordinated with the Township and contractor to obtain larger hoses and fittings.
- Coordinated with general contractor, operator, and Township for 2 nd bypass start-up testing and activation.
The requested $6,000 supplement includes an allowance of $1,000 for potential structural design of a new support system for the jib crane. Public Works is going to drill exploratory holes in the CMU wall at the height that the crane will be mounted to determine if the walls are fully grouted in those locations. A question has been raised that grouting may not extend that high and/or may be in every other (or every few) CMU columns. If so, a new structural support system to mount the crane on the wall will be provided, likely involving through bolting the crane to a plate mounted on the external (opposite) side of the wall.
Please call if you would like to discuss.
Thanks!
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com
1