Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July 15, 2024
7:00
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
- APPOINTMENT OF OFFICERS
- SEWER REPORTS Director of Public Work’s Report; Pennoni Engineer’s Report; Big Fish Environmental Report
- APPROVAL OF MINUTES June 10, 2024
- APPROVAL OF INVOICES Pennoni 1229134 $595.00 Pennoni 1229135 $463.75 Pennoni - credit for invoice #1221070 & applied to #1229135 -$226.00 Pennoni 1229136 $1,412.50 Pennoni 1229137 $5,109.75 Pennoni for Zimmerman Environmental - RCSTP UV Disinfection System Replacement Payment Application #2 $52,769.70 Pennoni for Lenni Electric - RCSTP UV Disinfection System Replacement Payment Application #3 $10,110.42 Pennoni - Chester Creek Interceptor Inspection & Repair Change Order #2 $4,360.00 Gawthrop Greenwood 291598 $492.00 Gawthrop Greenwood 293276 $1,048.00 Lenni Electric 240631 $267.50
- LIAISON REPORTS
- FINANCIAL REPORTS a. June 2024
- OLD BUSINESS
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\07-15-24\Meeting Materials\07-15-2024 Agenda.doc
10. 2024 Goals:
| Goal | Status |
|---|---|
| Ridley Creek plant compliance | January through June were in compliance with PADEP permit requirements. |
| Continue to implement infiltration and inflow for the sewer system | Ongoing. |
| RCSTP UV Disinfection System Construction Completion | The UV replacement is 99% complete. |
| Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. | Attend meetings on quarterly basis. |
| Long-term sustainability | Continue development of 10-year sustainability plan and study sewer rates annually. Currently under development with completion by May. |
- NEW BUSINESS Memo from Kevin Miller
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\07-15-24\Meeting Materials\07-15-2024 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
Date: July 15, 2024
To: Municipal Authority
From: Mark Miller
Re: Monthly Report
Monthly Flows: The average daily flow to West Goshen was 833,288 per day.
Meters:
- Were read on a daily basis
- Flows are down, mainly because of the lack of rain and our infiltration repairs.
C.C. Collection:
- All pump stations were visited on a daily basis.
- As you may know, we pull pumps on a six-month rotation. In January, we pull the number 2 pumps, and in July, we pull number 1 pumps.
- This month we started at the Barkway Pump Station and when we pulled the number 2 pump, the rail system collapsed.
- This is being treated as an emergency as we currently have the station held together with rubber bands and bailing twine. Kevin and I met with John Roddy from MGK on July 8 th to come up with a permanent repair.
- Once we got Barkway situated, the crew moved on to the other stations, pulling and installing the pumps. Since moving on from Deckman, we are trying another pump servicing vendor as we were not happy with the last one we used. I reached out to Phoenixville Sewer to see what they were using since they moved on from Deckman and they are using BDS Electric.
- We reached out to BDS Electric who has several locations and they are very interested in doing the work. We dropped off six pumps to BDS to get a repair estimate.
C.C. Interceptor:
- Nothing to report
R.C. Collection:
- Routine maintenance was performed on a daily basis.
- We pulled the pumps at Hershey Mill and Hunt Country.
- On Sunday, 7/7/24, we received a seal failure at the Hershey Milll Station. Kevin checked the wires, and the ohm reading indicated a seal failure. The pump was pulled and washed down. We drained the oil from the pump and found water in the oil sample. The pump was shipped off to BDS Electric.
Ridley Creek Plant:
UV System
- The PWD assisted the plant operator with much-needed cleanup after the UV installation.
- The new UV is fully operational.
- We are awaiting a startup date from Glasco to go over the unit. We have an issue with the length of one of the cords. Mike Ellis reached out to Glasco for a replacement.
Applebrook Golf Course
- Jared from Applebrook Golf Course asked if we could send them more water. We are currently pumping 32,000 gallons a day.; The present pump is the original pump.; The 2 nd pump burnt up and a replacement will cost $7,000.00 Jared approved the purchase, so I placed the order with BDS Electric.; Jared approved the purchase, so I placed the order with BDS Electric.; The new pump will triple the flow to Applebrook. And should be here by the end of the week of July 15 th .
Alarms: 8
PA One Calls: 60
Monthly Rainfall: 2.55”
Lateral Repairs or Caps: 2 (in Bow Tree)
Pennoni
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
July 11, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – Pyrz performed the tank repairs to the tank’s outside insulation.
Matt Mullin provided as-built photos of the caustic soda plumbing on July 10. We are currently updating the as-built plans accordingly with the provided plumbing information.
We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
UV Disinfection System – Zimmerman installed the jib crane and the second UV module, shrouds, and guides on June 11. On June 20, Lenni installed power to the jib crane and relocated the control panel to its permanent location, but it was discovered that the cords to connect the second UV module to the control panel are too short. Pennoni contacted Glasco on June 25 in regard to obtaining a new, longer cord for the module. Glasco responded on July 2 stating that they would review and provide a response accordingly. We contacted Glasco on July 10 for an update on the cords and are waiting for a response. After this issue is resolved, the two week trial of the second UV module will begin. Glasco will also be scheduled to perform a post-startup inspection of the permanent UV installation.
The temporary system has been fully disassembled. Pennoni informed Glasco on June 25 that the temporary channel is ready for pickup and for them to coordinate with Mark Miller on the specific day and time of the pickup.
An updated tentative construction schedule follows with completed work in italics:
- Delivery of Permanent UV Equipment – October 30, 2023
- Delivery of Bypass Pumps and Hoses – Week of November 13, 2023
- Initiate Temporary Bypass Work – Mid-November 2023
- Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024
- Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024
- Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing)
- 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024
- Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024
- Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024
- Install Second UV Module into Permanent Channel –– June 11, 2024
- Two Week Trial of Second New UV System in Permanent Channel – July 17 – 31, 2024
- Construction Completed –Early-Mid August 2024
We processed Lenni’s third payment application and certified payrolls for weeks 1 through 30 for the temporary and permanent electrical work completed and provided a payment recommendation letter on July 10.
We processed Zimmerman’s second payment application and certified payrolls for weeks 1 through 3 for the temporary and permanent general contract work and provided a payment recommendation letter on July 10.
- Generator #2 Replacement – No activity by Pennoni since the last report.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU24001
Engineer’s Report
East Goshen Municipal Authority
July 11, 2024
Page 2 of 2
- Electrical Surge Evaluation – The Municipal Authority has requested that the electric supply into the plant be evaluated. We recommend that a data logger be installed on the PECO main supply line into the plant. The preferred location to do the testing would be at the Main Distribution Panel (MDP) which is outside near the PECO Transformer. We spoke with Lenni Electric, who concurs with this recommendation, but has not previously installed data loggers before. We are currently reaching out to other parties to install a data logger and to obtain quotes. After which, we can evaluate the type(s) of equipment needed to mitigate any adverse power conditions.
Sanitary Sewer Pipe Rehab
- Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. The Contractor still needs to provide the final payment application, closeout documents, and remaining prevailing wage certifications in order to mark the project as completed.
- Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley. The sewers have been televised. Public Works will provide the videos to Pennoni for review, and we will then prepare a bid document. The goal is to construct this work by the end of 2024.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – No activity by Pennoni since the last report.
- 301 Reservoir Road (5-Lot Residential Subdivision) – The Applicant submitted the Sewage Facilities Planning Mailer to PADEP on July 11.
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
- 14 Reservoir Road – PADEP approved the Sewage Facilities Planning Mailer exemption on June 5. We received a new plan submission that is currently under review.
Capital Improvement Plan
- We met with Mark Miller and Dave Ware to discuss long term capital improvement planning. Cost estimates were prepared for pipe lining neighborhoods with asbestos cement pipe. Pipe lining has been prioritized by neighborhood. We are creating a 20+ year capital improvement plan to include pipe lining, manhole lining, pump station upgrades, and wastewater treatment plant upgrades. A draft will be submitted before the August MA meeting for discussion.
Barkway Pump Station
- We are evaluating pump sizing for a diesel bypass pump. We are also contacting vendors for quotes for the bypass pump and for replacement of the submersible pumps.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
July 2024
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2024. All supplemental reports were submitted for June 2024. Caustic usage increased to 51 gallons per day from 40 gallons per day last month. Aluminum sulfate solution volumes decreased to a daily average of 70.5 gallons from the previous standard of 74.8 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for June 2024. The monthly average total phosphorus was reported as 0.16 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 4.6 mg/L compared to the discharge limitation of 10 mg/L.
The final effluent test results demonstrate that the biological treatment performed well during June. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.
Table 1
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.75 | 10 | 62 | Report | Report | 10 | 62 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Inst. Max | 20 | 94 | 15 | 94 | 5 | 1 | |||||||
| Sample Date | |||||||||||||
| June 4, 2024 | 0.297 | 2.0 | 5.0 | 8.24 | 20.4 | 4.5 | 11.1 | 0.10 | 0.25 | 0.28 | 0.69 | 1 | 0.0000 |
| June 11, 2024 | 0.267 | 2.0 | 4.5 | 7.00 | 15.6 | 4.2 | 9.4 | 0.10 | 0.22 | 0.10 | 0.22 | 1 | 0.0000 |
| June 18, 2024 | 0.248 | 2.0 | 4.1 | 8.90 | 18.4 | 5.8 | 12.0 | 0.10 | 0.21 | 0.10 | 0.21 | 1 | 0.0000 |
| June 25, 2024 | 0.217 | 2.0 | 3.6 | 8.35 | 15.1 | 4.0 | 7.2 | 0.10 | 0.18 | 0.14 | 0.25 | 5 | 0.6990 |
| Average | 0.257 | 2.0 | 4.3 | 8.12 | 17.4 | 4.6 | 9.9 | 0.10 | 0.21 | 0.16 | 0.34 | 2 | 0.1747 |
| Minimum | 0.217 | 2.0 | 3.6 | 7.00 | 15.1 | 4.0 | 7.2 | 0.10 | 0.18 | 0.10 | 0.21 | 1 | 0.0000 |
| Maximum | 0.297 | 2.0 | 5.0 | 8.90 | 20.4 | 5.8 | 12.0 | 0.10 | 0.25 | 0.28 | 0.69 | 5 | 0.6990 |
Table 2 presents the pollutant data for the influent wastewater collected at the doghouse manhole during June 2024.
Table 2
| Design Basis | Flow | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||||
| June 4, 2024 | 0.362 | 563 | 1,700 | 537 | 1,621 | 554 | 1,673 | 29.8 | 90 | 78.5 | 237 | 10.7 | 32.3 |
| June 11, 2024 | 0.332 | 417 | 1,155 | 349 | 966 | 440 | 1,218 | 28.4 | 79 | 66.1 | 183 | 7.91 | 21.9 |
| June 18, 2024 | 0.322 | 445 | 1,195 | 496 | 1,332 | 396 | 1,063 | 31.5 | 85 | 63.1 | 169 | 8.35 | 22.4 |
| June 25, 2024 | 0.283 | 532 | 1,256 | 515 | 1,216 | 453 | 1,069 | 37.2 | 88 | 80.9 | 191 | 10.10 | 23.8 |
| Average | 0.325 | 489 | 1,326 | 474 | 1,284 | 461 | 1,256 | 32 | 85 | 72.2 | 195 | 9.27 | 25.1 |
| Minimum | 0.283 | 417 | 1,155 | 349.0 | 966 | 396 | 1,063 | 28 | 79 | 63.1 | 169 | 7.91 | 21.9 |
| Maximum | 0.362 | 563 | 1,700 | 537 | 1,621 | 554 | 1,673 | 37 | 90 | 80.9 | 237 | 10.70 | 32.3 |
The Applebrook pump was turned on on June 5, 2024. Table 3 represents the water quality data of the flow pumped to Applebrook Golf Course in June 2024.
Table 3
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Phosphorus,Total | Fecal Coliform | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.135 | 25 | Report | Report | 30 | 7.0 | 44 | 0.5 | 3 | 200 | 1,000 | |||
| 40 | 45 | ||||||||||||
| June 4, 2024 | NO DISCHARGE | ||||||||||||
| June 11, 2024 | 0.0301 | 2.0 | 0.50 | 7.00 | 1.76 | 4.2 | 1.05 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| June 18, 2024 | 0.0317 | 2.0 | 0.53 | 8.90 | 2.35 | 5.8 | 1.53 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| June 25, 2024 | 0.0309 | 2.0 | 0.52 | 8.35 | 2.15 | 4.0 | 1.03 | 0.10 | 0.03 | 0.14 | 0.04 | 5 | 0.6990 |
| Average | 0.0309 | 2.0 | 0.52 | 8.08 | 2.09 | 4.7 | 1.2 | 0.10 | 0.03 | 0.11 | 0.03 | 2 | 0.2330 |
| Minimum | 0.0301 | 2.0 | 0.50 | 7.00 | 1.76 | 4.0 | 1.0 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| Maximum | 0.0317 | 2.0 | 0.53 | 8.90 | 2.35 | 5.8 | 1.5 | 0.10 | 0.03 | 0.14 | 0.04 | 5 | 0.6990 |
PA DEP
No activity
Page 2 of 4
Pennoni Associates
The UV system replacement project continues.
Significant Rainfall
During June, there were thirteen (13) days when rainfall occurred.
Two (2) events exceeded 0.50 inches of rain in 24 hours:
6/6/24: 0.90”
6/30/24: 0.66”
Total Rainfall for June was 1.93 inches
Chemical Data
| Chemical | June 2024 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Caustic Soda, gal | 51.10 | 1,533 |
| Aluminum Sulfate solution, gal | 70.5 | 2,115 |
| Sludge Dewatering, gal* | 22,961 | 436,266 |
*19 days of sludge dewatering
There was a decrease of 85,611 gallons of sludge dewatering during June compared to May.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Major Repairs or Upgrades
-UV shrouds and rack securement brackets installed
-UV jib crane installed
-second UV light rack placed in the channel
Page 3 of 4
Upcoming Repairs or Upgrades
- SHT Blower anti-vibration pad replacement
-New UV system to be 100% completed
Flow Data
| Flow Meter Location | June 2024 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building | 10.070 | 335,670 | 395,590 |
| Influent Wastewater to SBRs | 11.644 | 388,124 | 463,568 |
| Internal Recycle | 1.574 | 52,454 | 84,350 |
| Treated Effluent to Disc Filters | 11.339 | 377,978 | 475,712 |
| Final Effluent Discharge | 7.754 | 258,000 | 364,000 |
| Applebrook Golf Course | 0.801 | 27,638 | 39,248 |
The plant hydraulic design loading is 745,000 gpd.
There were no high-flow events during June.
Page 4 of 4
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 10, 2024
The East Goshen Township Municipal Authority held their regular meeting on Monday, June 10, 2024 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Jack Yahraes
Carmen Battavio
Kevin Cummings
Also in attendance were: Mark Miller (Director of Public Works), Michele Truitt (Supervisor)
Dave Ware (Finance Director), Patrick McKenna (Attorney) and Scott Towler via phone.
COMMON ACRONYMS:
ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services
BOS – Board of Supervisors
CB – Conservancy Board
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
HC – Historical Commission
I&I – Inflow & Infiltration
LCSTP – Lockwood Chase Sewer Treatment Plant
PWD – Public Works Department
MA- Municipal Authority
NPDES – National Pollutant Discharge Elimination System
PC – Planning Commission
PM – Prevention Maintenance
PR – Park & Recreation Board
RCSTP – Ridley Creek Sewer Treatment Plant
SBR – Sequencing Batch Reactor
SSO – Sanitary System Overflow
WAS – Waste Activated Sludge
Call to Order & Pledge of Allegiance
Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Walter asked for a moment of silence for our troops and first responders.
Walter asked if anyone would be recording the meeting. There was no response.
New Business
1. Hershey’s Mill Village - Ed McFalls and Dan Dailey (engineer) were here to represent the Green Hill Sewer Association, which is the sewer treatment plant for Hershey’s Mill. Scott Towler, Ridley Creek Plant operator, was present by phone. Ed commented that several times they have had seeps near the garden and found it was ground water. This year it was treated water from the lagoon. They had a company come to check it out. The estimate to pump it out is $235,000. They are asking if they can connect to East Goshen to pump down their lagoon which would cut some of the cost. They also spray the water to the golf course. Dan mentioned that they are getting other options and pricing. He mentioned the locations of several manholes. He feels Wineberry may be the best option. Ed commented that the seep is between the old and new lagoons. They process 230Kgal/day. They have used a bacteria treatment which is cutting the amount of sludge.
Scott voiced his concerns. He suggested pumping this water at night.
Maps of the area were reviewed and discussed. Patrick spoke about easements.
MA 6-10-24 draft 1
Dan discussed timing for the project depending on the option they select. He hasn’t done the engineering yet. They just wanted to present the issue and see what the Municipal Authority could do. Permits will be needed. The MA members would like to help.
Chairman’s Report/Other Members Report
Michele reported that she attended the West Goshen meeting. July 3 is their next meeting. She commented that we should pick three dates for a tour, and they prefer the end of the summer. Flow is going through the Westtown Pump Station. The contractor they used was not efficient and has had several fines against him. They have a punch list with 26 items remaining. The pumps are making an unusual noise. They were delivered a year ago and weren’t used until now. They only have a one year warranty. A vendor to inspect the pumps will cost about $16,000. The MA members thanked Michele for attending the meeting. She will not be able to go to the July 3 meeting.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for June 10, 2024.
Monthly Flows – The average daily flow to West Goshen was 869,105 gallons per day.
Meters: The meters were read on a daily basis.
- Allied Control was out to calibrate all the meters with no problems to report. I reached out to Paul Mamsic to get his expert opinion to see if the meters need to be replaced. Paul was going to speak with his technician after the latest calibrations.
- I also asked about installing a temporary meter above the current meter. This can be and will be done once we receive the proper pipe band.
C.C. Collection:
- All pump stations were visited on a daily basis.
- Wet wells were hosed down along with routine maintenance.
- We did not have any problems during the month.
- We utilized Mike Patterson to make building repairs to the Ashbridge pump station.
C.C. Interceptor:
- Nothing to report.
R.C. Collection:
- The pump stations were visited on a daily basis
- Wet wells were hosed down.
- Oil and fuel levels were checked.
Ridley Creek Plant
- Public Works wrapped up the hose and equipment from the UV work.
- We straightened up the entire plant before the insurance carrier came for their inspection. The inspector was impressed with everything she saw.
MA 6-10-24 draft 2
- The UV company kind of threw a wrench into the project by requiring some additional brackets which will result in additional work.
Alarms: 17 (all power outages)
PA 1 Calls: 109
Monthly Rainfall: 3.05”
Lateral Repairs or Caps: 5 (caps only)
2. Pennoni Engineer’s Report dated June 10, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We were informed by Mark Miller that the tank’s outside insulation is again pulling away from the tank in some locations. We contacted the supplier, Pyrz, to alert them of this issue on April 5. Pyrz has been in contact with the RCSTP operator to schedule the tank repairs.
The outdoor emergency shower was installed. On April 11, the tank was filled and put into operation. We provided chemical feed pump rates to the operator for system startup. The chemical feed pump and injection point fittings began to leak. The fittings have since been tightened and are currently not leaking.
We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review once the system is ready for operation so that the Manual can be finalized.
UV Disinfection System – To remedy the open strip that allows UV light to escape and to account for Glasco’s latest design, Glasco has fabricated a shroud and vertical guides at no extra cost. The shrouds and vertical guides were delivered to the plant on May 23. We contacted Glasco on May 23 to ensure that it was required to install the vertical guides, as installation of the guides will require the channel to be drained and the plant shut down. On May 29, Glasco confirmed that the vertical guides must be installed to keep the UV modules in place and allow them to be safely removed from the channel. Mark Miller has been in contact with the contractor, Zimmerman, and tentatively plan to install the second UV module, shroud, and guides overnight the week of June 10. Lenni will be scheduled thereafter to install the control panel in its permanent location on a follow-up night.
The jib crane is expected to be install around that same also. The temporary system will then be fully disassembled, and the temporary channel will be returned to Glasco.
An updated tentative construction schedule follows with completed work in italics:
- Delivery of Permanent UV Equipment – October 30, 2023
- Delivery of Bypass Pumps and Hoses – Week of November 13, 2023
- Initiate Temporary Bypass Work – Mid-November 2023
MA 6-10-24 draft 3
- Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024
- Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024
- Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing)
- 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024
- Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024
- Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024
- Install Second UV Module into Permanent Channel –– June 14, 2024
- Two Week Trial of Second New UV System in Permanent Channel – June 14 – June 28, 2024
- Construction Completed –Early-Mid July 2024
- Generator #2 Replacement – Public Works has constructed the concrete pad expansion for the generator, and the generator was delivered to the RCSTP on April 8. It is our understanding that electrical work and setting of the generator on the concrete pad is being scheduled with Lenni.
- Electrical Surge Evaluation – The Municipal Authority asked at the last meeting that the electric supply into the plant be evaluated. We recommend that a data logger be installed on the PECO main supply line into the plant. We spoke with Lenni Electric, who concurs with this recommendation, but has not previously installed data loggers before. Lenni and Pennoni are both looking into other parties to install a data logger and to obtain quotes.
Sanitary Sewer Pipe Rehab
- Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. We received the pre and post videos of the pipe relining work on May 8. The post video showed that the lateral reinstatements along MH C027-C026 were not brushed. The Contractor returned to the site and performed the lateral brushing work on May 20. The Contractor still needs to provide the final payment application, closeout documents, and prevailing wage certifications. We also processed the Contractor’s fourth payment application and provided a recommendation letter on May 29.
- Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley. The sewers have been televised. Public Works will provide the videos to Pennoni for review, and we will then prepare a bid document. The goal is to construct this work by the end of 2024.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – The Chester County Conservation District questioned portions of the proposed sanitary sewer main routing in their review of the project plans to avoid proposed stormwater features. We are coordinating with the design consultant to revise accordingly to the extent feasible.
- 301 Reservoir Road (5-Lot Residential Subdivision) – We received a revised Land Development Plan submission and provided our comment letter on May 14.
MA 6-10-24 draft 4
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
- 14 Reservoir Road – PADEP provided comments on the Sewage Facilities Planning Mailer submission, and we provided responses to the design consultant.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for May 2024. All supplemental reports were submitted for the May 2024. Chemical usage utilized for total alkalinity has changed compared to previous months because we have now entirely switched from dry powdered soda ash to liquid caustic soda. Aluminum sulfate solution volumes decreased to a daily average of 74.8 gpd from the previous standard of 84.7 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Approval of Minutes
The minutes of the May 13, 2024 meeting were approved as amended.
Approval of Invoices
1. Jack moved to approve payment of the Maillie paid invoice #106389 in the amount of $3,750.00.
Kevin seconded the motion. The motion passed unanimously.
Dave mentioned that the Maillie rep will be at the July meeting.
Liaison Reports
1. Board of Supervisors - Michele reported that at their last meeting they discussed the possible sewer rate increase. East Goshen Park will need running water in the fountains. Their meetings this summer are June 18, July 16 and August 20.
2. Conservancy Board - Walter reported that they are looking to partner with other conservancies to monitor the streams.
Financial Reports
Dave Ware provided the following report:
Year to date May 2024, the Municipal Authority recorded $273,107.82 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $268,465.58 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, engineering and audit expenses). The net result of operations is $4,642.24. As of May 31, 2024, the fund balance was $12,204.40.
Old Business
1. Approval of Payment Application #4 - The contractor, Insituform Technologies, LLC, has submitted the fourth invoice for work completed for the Chester Creek Interceptor. Mike Ellis verified that the described work has been completed. Dave mentioned that he is looking into possible grants. Kevin made a motion to pay the amount of $117,677. as indicated on Payment Application #4. Jack seconded the motion. The motion passed unanimously.
MA 6-10-24 draft 5
2. Westtown Way Pump Station - The MA members selected the September 9, 2024 meeting at 5:00 pm to do the tour. The Pump Station will be first then the West Goshen Plant.
Goals – The goals were reviewed.
Any Other Matter -
1. PUC Fine – The PUC PA One Call fine and Brubacher letter of response in support of East Goshen Township were reviewed. Mark will follow up on this.
Correspondence- None
Public Comment - None
Adjournment
There being no further business Jack moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:40 pm.
Due to the holiday and scheduled vacations, the next regular meeting will be held on Monday, July 15, 2024 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 6-10-24 draft 6
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No: 1229134
Invoice Date: 06/26/2024
Project: EGMAU20004
Project Name: RCSTP Caustic Soda Conversion
For Services Rendered Through 06/16/2024
Prepared record plan of as-built tank, chemical feed pumps, and piping; and submitted record plan with equipment specifications to PADEP for their records. Coordinated with operator on resolution of leaks at pipe fittings.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Design and Permitting | $26,500.00 | $26,500.00 | 100.00% | $26,500.00 | $0.00 |
| 02 -- Construction Phase Services est. | $5,400.00 | $2,868.50 | $3,463.50 | $595.00 | |
| Total : | $31,900.00 | $29,368.50 | $29,963.50 | $595.00 |
Phase: 02 -- Construction Phase Services
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 153.00 | 114.75 |
| Associate Professional | 4.25 | 113.00 | 480.25 |
| Labor | 595.00 | ||
| Phase Subtotal | $595.00 | ||
| Amount Due This Invoice | $595.00 | ||
APPROVED BY: [signature] 06/28/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-020
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 06/26/2024
| Project: | EGMAU20004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP Caustic Soda Conversion | ||
| Invoice No: | 1229134 | ||
| Invoice Period: | 4/14/2024 | to | 6/16/2024 |
| Initial Authorization: | $ 31,900.00 | Date: | 6/26/2024 |
| Contract Amount: | $ 31,900.00 | ||
| Previously Invoiced: | $ 29,368.50 | ||
| Current Invoice: | $ 595.00 | ||
| Invoiced to Date ($): | $ 29,963.50 | ||
| Invoiced to Date (%): | 94% | ||
| Remaining Budget ($): | $ 1,936.50 | ||
| Remaining Budget (%): | 6% |
Budget by Phase:
| Phase Name: | RCSTP Caustic Soda Conversion |
|---|---|
| Phase Budget: | $ 31,900.00 |
| Previously Invoiced: | $ 29,368.50 |
| Current Invoice: | $ 595.00 |
| Invoiced to Date ($): | $ 29,963.50 |
| Invoiced to Date (%): | 94% |
| Remaining Budget ($): | $ 1,936.50 |
| Remaining Budget (%): | 6% |
Comments: Prepared record plan of as-built tank, chemical feed pumps, and piping; and submitted record plan with equipment specifications to PADEP for their records. Coordinated with operator on resolution of leaks at pipe fittings.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1229135
Invoice Date : 06/26/2024
Project : EGMAU22004
Project Name : RCSTP UV Replacement
For Services Rendered Through 06/16/2024
Continued coordination for installation scope and schedule of 2nd permanent module, shroud, and steel channels with Township, operator, contractor, and supplier; and reviewed contractor's certified payrolls.
Phase 02 Construction Phase Services
Labor
| Labor | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.00 | 153.00 | 153.00 |
| Associate Professional | 4.75 | 113.00 | 536.75 |
| Totals | 5.75 | 689.75 | |
| Total Labor | 689.75 | ||
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 689.75 | 14,656.75 | 15,346.50 |
| Limit | 16,000.00 | ||
| Remaining | 653.50 | ||
| Total this Phase | $689.75 | ||
| Total this Invoice | $689.75 | ||
Outstanding Invoices
| Number | Date | Balance |
|---|---|---|
| 1221070 | 4/30/2024 | -226.00 |
| Total | -226.00 |
-226
463.75
APPROVED BY: [signature] 06/28/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-150
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP UV Replacement
EGMAU22004 Invoice Summary
Invoice Date 06/26/2024
| Project: | EGMAU22004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP UV Replacement | ||
| Invoice No: | 1229135 | ||
| Invoice Period: | 4/14/2024 to 6/16/2024 | Date: | 6/26/2024 |
| Initial Authorization: | $ 30,000.00 | ||
| Contract Amount: | $ 60,000.00 | ||
| Previously Invoiced: | $ 58,552.50 | ||
| Current Invoice: | $ 689.75 | ||
| Invoiced to Date ($): | $ 59,242.25 | ||
| Invoiced to Date (%): | 99% | ||
| Remaining Budget ($): | $ 757.75 | ||
| Remaining Budget (%): | 1% |
Budget by Phase:
| Phase Name: | RCSTP UV Replacement |
|---|---|
| Phase Budget: | $ 60,000.00 |
| Previously Invoiced: | $ 58,552.50 |
| Current Invoice: | $ 689.75 |
| Invoiced to Date ($): | $ 59,242.25 |
| Invoiced to Date (%): | 99% |
| Remaining Budget ($): | $ 757.75 |
| Remaining Budget (%): | 1% |
Comments: Continued coordination for installation scope and schedule of 2nd permanent module, shroud, and steel channels with Township, operator, contractor, and supplier; and reviewed contractor's certified payrolls.
Dana Gieder
From: Julian Coppertino <JCoppertino@Pennoni.com>
Sent: Monday, July 1, 2024 9:59 AM
To: Dana Gieder
Subject: RE: EGMAU June Invoices
Attachments: EGMAU22004 Invoice#1221070 April 2024 (revised).pdf
Hello, please see attached for requested invoice copy.
I believe the version we sent you in April had the wrong total on it, and because that was paid, you now have a credit of $226.00. Please let us know if you would like to apply the credit towards the current invoice#1229135.
Best regards,
Julian Coppertino
Pennoni
515 Grove Street, Suite 1B | Haddon Heights, NJ 08035
Direct: +1 856-656-2941
www.pennoni.com | JCoppertino@Pennoni.com
From: Dana Gieder <dgieder@eastgoshen.org>
Sent: Friday, June 28, 2024 11:47 AM
To: Julian Coppertino <JCoppertino@Pennoni.com>
Subject: RE: EGMAU June Invoices
Hi Julian,
Can you send me inv # 1221070 on inv #1229135 it shows an outstanding balance of $-226.00 do we have a credit from that invoice?
Thank you,
Dana Gieder
Staff Accountant/Accounts Payable
East Goshen Township
dgieder@eastgoshen.org
610-692-7171
From: Julian Coppertino <JCoppertino@Pennoni.com>
Sent: Friday, June 28, 2024 8:19 AM
To: David Ware <dware@eastgoshen.org>; Mark Miller <mmiller@eastgoshen.org>; Lynn Werkheiser <lwerkheiser@eastgoshen.org>; Dana Gieder <dgieder@eastgoshen.org>
Cc: Michael Ellis <MEllis@Pennoni.com>; Derek Davis <ddavis@eastgoshen.org>
Subject: RE: EGMAU June Invoices
Hello, please see the attached for EGMAU June 2024 Invoices, which covers the period through 06/16/2024. If you have any questions, please let me know. Thank you.
1
Julian Coppertino
Pennoni
515 Grove Street, Suite 1B | Haddon Heights, NJ 08035
Direct: +1 856-656-2941
www.pennoni.com | JCoppertino@Pennoni.com
From: Julian Coppertino
Sent: Tuesday, April 30, 2024 9:37 AM
To: dware@eastgoshen.org; mmiller@eastgoshen.org; Lynn Werkheiser <lwerkheiser@eastgoshen.org>; dgieder@eastgoshen.org
Cc: Michael Ellis <MEllis@Pennoni.com>; Derek Davis <ddavis@eastgoshen.org>
Subject: EGMAU April Invoices
Hello, please see the attached for EGMAU April 2024 Invoices. If you have any questions, please let me know. Thank you.
Julian Coppertino
Pennoni
515 Grove Street, Suite 1B | Haddon Heights, NJ 08035
Direct: +1 856-656-2941
www.pennoni.com | JCoppertino@Pennoni.com
Digital tools that transform projects!
2
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1221070
Invoice Date : 04/30/2024
Project : EGMAU22004
Project Name : RCSTP UV Replacement
For Services Rendered Through 04/14/2024
Construction Phase Services: Prepared structural design and sketch for jib crane mounting to partially grouted walls; coordinated with Glasco for missing equipment (eye screens and cabling) and for shrouds around modules; responded to contractor questions on permanent module installations; coordinated for permanent module startup; and consultation with Public Works on as-built channel adjustments to address vendor requests.
Phase 02 Construction Phase Services
Labor
| Role | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.00 | 153.00 | 306.00 |
| Senior Professional | 2.25 | 148.00 | 333.00 |
| Associate Professional | 6.25 | 113.00 | 706.25 |
| Totals | 10.50 | 1,345.25 | |
| Total Labor | 1,345.25 | ||
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 1,345.25 | 13,311.50 | 14,656.75 |
| Limit | 16,000.00 | ||
| Remaining | 1,343.25 |
Total this Phase: $1,345.25
Total this Invoice: $1,345.25
[Handwritten notes: DW 5/18/24; Original Invoice Was for 1,571.25; $-226.- credit]
APPROVED BY: ___________
DATE PAID: ___________
CHECK #: ___________
CHARGED TO: 05-429-1050
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
RCSTP UV Replacement
EGMAU22004 Invoice Summary
Invoice Date 04/30/2024
| Project: | EGMAU22004 | ||
|---|---|---|---|
| Pennoni Job No.: | RCSTP UV Replacement | ||
| Invoice No: | 1221070 | ||
| Invoice Period: | 2/13/2024 to 4/14/2024 | Date: | 4/30/2024 |
| Initial Authorization: | $ 30,000.00 | ||
| Contract Amount: | $ 60,000.00 | ||
| Previously Invoiced: | $ 57,207.25 | ||
| Current Invoice: | $ 1,345.25 | ||
| Invoiced to Date ($): | $ 58,552.50 | ||
| Invoiced to Date (%): | 98% | ||
| Remaining Budget ($): | $ 1,447.50 | ||
| Remaining Budget (%): | 2% |
Budget by Phase:
| Phase Name: | RCSTP UV Replacement |
|---|---|
| Phase Budget: | $ 60,000.00 |
| Previously Invoiced: | $ 57,207.25 |
| Current Invoice: | $ 1,345.25 |
| Invoiced to Date ($): | $ 58,552.50 |
| Invoiced to Date (%): | 98% |
| Remaining Budget ($): | $ 1,447.50 |
| Remaining Budget (%): | 2% |
Comments: Construction Phase Services: Processed Pay Application #2 from Lenni Electric and Pay Application #1 from Zimmerman Mechanical, reviewed prevailing wage certifications, updates on concrete channel raising by PW Department, and initiated structural design for jib crane mounting to partially grouted walls.
Invoice period is from 2/12/2024 through 3/17/2024. Effort in 2023 is invoiced at 2023 hourly rates. Effort in 2024 is invoiced at 2024 hourly rates.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1229136
Invoice Date : 06/26/2024
Project : EGMAU23003
Project Name : Chester Creek Interceptor Rehab Phase 1
For Services Rendered Through 06/16/2024
Construction phase services: Lateral leak location identification and repair scoping, coordination for Manhole C027-C026 cured-in-place pipe lining, and inspection of the pipe lining.
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 1,412.50 | 10,549.25 | 11,961.75 |
| Limit | 12,000.00 | ||
| Remaining | 38.25 |
Labor
| Role | Hours | Rate | Amount |
|---|---|---|---|
| Associate Professional | 12.50 | 113.00 | 1,412.50 |
| Totals | 12.50 | 1,412.50 | |
| Total Labor | 1,412.50 | ||
Total this Invoice: $1,412.50
APPROVED BY: [Signed: 6/28/24]
DATE PAID: ___________
CHECK #: ___________
CHARGED TO: 07-424-3700
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Chester Creek Interceptor Rehab Phase 1
EGMAU23003 Invoice Summary Invoice
Date 06/26/2024
| Project: | EGMAU23003 | ||
|---|---|---|---|
| Pennoni Job No.: | Chester Creek Interceptor Rehab Phase 1 | ||
| Invoice No: | 1229136 | ||
| Invoice Period: | 3/17/2024 to 6/16/2024 | Date: | 6/26/2024 |
| Initial Authorization: | $ 12,000.00 | ||
| Contract Amount: | $ 12,000.00 | ||
| Previously Invoiced: | $ 10,549.25 | ||
| Current Invoice: | $ 1,412.50 | ||
| Invoiced to Date ($): | $ 11,961.75 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ 38.25 | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | Chester Creek Interceptor Rehab Phase 1 |
|---|---|
| Phase Budget: | $ 12,000.00 |
| Previously Invoiced: | $ 10,549.25 |
| Current Invoice: | $ 1,412.50 |
| Invoiced to Date ($): | $ 11,961.75 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ 38.25 |
| Remaining Budget (%): | 0% |
Comments: Construction phase services: Lateral leak location identification and repair scoping, coordination for Manhole C027-C026 cured-inplace pipe lining, and inspection of the pipe lining.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1229137
Invoice Date : 06/26/2024
Project : EGMAU24001
Project Name : 2024 General Services
For Services Rendered Through 06/16/2024
Submitted May and June Engineer's Reports. Reviewed agenda packets and RCSTP operator's reports in preparation for May and June MA meetings. Attended May MA meeting.
Planning for Supplee Valley CIPPL project with Township staff. Initiated preparation of bid document.
RCSTP project updates w/ M. Miller. Evaluated actual caustic soda usage volume for first month of operation in comparison to that projected in study (actual is less than projected). Initiated evaluation of alternatives to monitor and data log electrical spikes at RCSTP.
Initiated preparation of 10-year Capital Improvement Plan project list and budget estimates.
Initiated hydraulic analysis of Ridley Creek collection system to convey potential diversion flows from Hershey Mill community's wastewater treatment plant. Responded to questions on possible diversion from Hershey Mill community representatives.
Additional work on Chester Creek Interceptor construction project that was not part of Pennoni's original project scope: performed review of post-construction pipe lining video, inspection of pipe lining punchlist work, and processed Change Order #2 and Pay Application #4.
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 5,109.75 | 7,149.75 | 12,259.50 |
| Limit | 42,000.00 | ||
| Remaining | 29,740.50 |
Labor
| Role | Hours | Rate | Amount |
|---|---|---|---|
| Township Engineer | 1.00 | 153.00 | 153.00 |
| Authority Engineer | 10.75 | 153.00 | 1,644.75 |
| Senior Professional | 1.00 | 148.00 | 148.00 |
| Associate Professional | 28.00 | 113.00 | 3,164.00 |
| Totals | 40.75 | 5,109.75 | |
| Total Labor | 5,109.75 | ||
Total this Invoice: $5,109.75
APPROVED BY: [Signed: 6/28/24]
DATE PAID: ___________
CHECK #: ___________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
2024 General Services
EGMAU24001 Invoice Summary
Invoice Date 06/26/2024
| Project: | EGMAU24001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2024 General Services | ||
| Invoice No: | 1229137 | ||
| Invoice Period: | 4/14/2024 to 6/16/2024 | Date: | 6/26/2024 |
| Initial Authorization: | $ 42,000.00 | ||
| Contract Amount: | $ 42,000.00 | ||
| Previously Invoiced: | $ 7,149.75 | ||
| Current Invoice: | $ 5,109.75 | ||
| Invoiced to Date ($): | $ 12,259.50 | ||
| Invoiced to Date (%): | 29% | ||
| Remaining Budget ($): | $ 29,740.50 | ||
| Remaining Budget (%): | 71% |
Budget by Phase:
| Phase Name: | 2024 General Services |
|---|---|
| Phase Budget: | $ 42,000.00 |
| Previously Invoiced: | $ 7,149.75 |
| Current Invoice: | $ 5,109.75 |
| Invoiced to Date ($): | $ 12,259.50 |
| Invoiced to Date (%): | 29% |
| Remaining Budget ($): | $ 29,740.50 |
| Remaining Budget (%): | 71% |
Comments: Submitted May and June Engineer's Reports. Reviewed agenda packets and RCSTP operator's reports in preparation for May and June MA meetings. Attended May MA meeting.
Planning for Supplee Valley CIPPL project with Township staff. Initiated preparation of bid document.
RCSTP project updates w/ M. Miller. Evaluated actual caustic soda usage volume for first month of operation in comparison to that projected in study (actual is less than projected). Initiated evaluation of alternatives to monitor and data log electrical spikes at RCSTP.
Initiated preparation of 10-year Capital Improvement Plan project list and budget estimates.
Initiated hydraulic analysis of Ridley Creek collection system to convey potential diversion flows from Hershey Mill community's wastewater treatment plant. Responded to questions on possible diversion from Hershey Mill community representatives.
Additional work on Chester Creek Interceptor construction project that was not part of Pennoni's original project scope: performed review of post-construction pipe lining video, inspection of pipe lining punchlist work, and processed Change Order #2 and Pay Application #4.
Pennoni
July 10, 2024
EGMAU22004
East Goshen Municipal AuthorityAttn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application #2 Recommendation Letter
RCSTP UV Disinfection System Replacement, Contract No. RCSTP-2023-01 (General Contract)
Dear Mr. Miller:
The Contractor, Zimmerman Environmental, has submitted the second invoice for work completed for the subject project. We have observed the temporary and permanent general contract work-in-progress, including breakdown of the temporary UV system, installation of the permanent UV system and controls, and installation of the jib crane, and we confirm that the described work has been completed.
We have reviewed the attached Payment Application #2 provided by the Contractor, and we recommend payment in the amount of $52,769.70. Overall, the contract is about 97% complete.
The certified payrolls for the first three weeks of construction are also attached.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
/ela
Enclosures: Application and Certification for Payment #2
Certified Payrolls (Weeks 1-3)
cc:
Dave Ware, Township Finance Director
Derek Davis, Township Manager
Lynn Werkheiser, Township Public Works
Jeff Zimmerman, Zimmerman Environmental
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
Contractor's Application for Payment
| Owner: | East Goshen Municipal Authority | Owner's Project No.: | RCSTP-2023-01 |
|---|---|---|---|
| Engineer: | Pennoni Associates Inc | Engineer's Project No.: | |
| Contractor: | Zimmerman Environmental | Contractor's Project No.: | |
| Project: | Ridley Creek Sewage Treatment Plant UV Disinfection System Replacement | ||
| Contract: | General Construction | ||
| Application No.: | 2 | Application Date: | 6/25/2024 |
| Application Period: | From 10/1/2024 to 6/25/2024 | ||
| 1. Original Contract Price | $ | 90,997.00 |
|---|---|---|
| 2. Net change by Change Orders | $ | - |
| 3. Current Contract Price (Line 1 + Line 2) | $ | 90,997.00 |
| 4. Total Work completed and materials stored to date (Sum of Column G Lump Sum Total and Column J Unit Price Total) |
$ | 88,372.08 |
| 5. Retainage | ||
| a. 5% X $ 88,372.08 Work Completed | $ | 4,418.60 |
| b. X $ - Stored Materials | $ | - |
| c. Total Retainage (Line 5.a + Line 5.b) | $ | 4,418.60 |
| 6. Amount eligible to date (Line 4 - Line 5.c) | $ | 83,953.48 |
| 7. Less previous payments (Line 6 from prior application) | $ | 31,183.78 |
| 8. Amount due this application | $ | 52,769.70 |
| 9. Balance to finish, including retainage (Line 3 - Line 4 + Line 5c) | $ | 7,043.52 |
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment;
(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and
(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective.
Contractor: Zimmerman Environmental
Signature: [Signed: Jeff Zimmerman] Date: 6/25/2024
Recommended by Engineer
By: [Signed: Michael J. Ellis]
Title: Associate Vice President
Date: July 10, 2024
Approved by Owner
By: ___________________________
Title: ___________________________
Date: ___________________________
Approved by Funding Agency
By: ___________________________ By: ___________________________
Title: ___________________________ Title: ___________________________
Date: ___________________________ Date: ___________________________
[Handwritten / Stamp: APPROVED BY: DW 7/11/24; DATE PAID: ________; CHECK #: ________; CHARGED TO: 07-424-1505; UV]
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.
Pennoni
July 10, 2024
EGMAU22004
East Goshen Municipal AuthorityAttn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380
RE: Payment Application #3 Recommendation Letter
RCSTP UV Disinfection System Replacement, Contract No. RCSTP-2023-02 (Electrical Contract)
Dear Mr. Miller:
The Contractor, Lenni Electric Corporation, has submitted the third invoice for work completed for the subject project. We have observed the temporary and permanent electrical work-in-progress, including installation and breakdown of temporary power and control wiring for the temporary UV system, installation of the BCC/SCC to its permanent position, interconnecting the effluent flow meter to the BCC/SCC, and installation of the electrical components for the crane hoist, and we confirm that the described work has been completed.
We have reviewed the attached Payment Application #3 provided by the Contractor, and we recommend payment in the amount of $10,110.42. Overall, the contract is about 95% complete.
The certified payrolls for weeks 1 through 30 of construction are also attached.
If you have any questions, please contact me at your convenience.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
/ela
Enclosures: Application and Certification for Payment #3
Project Quantities Summary Report
Certified Payrolls (Weeks 1-30)
cc:
Dave Ware, Township Finance Director
Derek Davis, Township Manager
Lynn Werkheiser, Township Public Works
Scott Welsh, Lenni Electric
Lorraine Bizzarro, Lenni Electric
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
APPLICATION FOR PAYMENT NO. 3
Job # 22335
PAGE 1 OF 2
| TO (OWNER): | East Goshen Municipal Authority | PROJECT NO.: | RCSTP-2023-02 | PERIOD TO: | 06/30/24 |
|---|---|---|---|---|---|
| FROM (CONTRACTOR): | Lenni Electric Corporation, 1020 Andrew Drive, West Chester, PA 19380 | CONTRACT DATE: | 04/27/22 | ||
| CONTRACT FOR: | Ridley Creek STP UV Disinfection System Replacement | ||||
CHANGE ORDER SUMMARY
| Change Orders approved in previous months by Owner | ADDITIONS | DELETIONS |
|---|---|---|
| TOTAL |
| Approved this Month Number | Date Approved | ADDITIONS | DELETIONS |
|---|---|---|---|
| TOTALS | |||
| Net change by Change Orders | |||
| 1. | ORIGINAL CONTRACT SUM | $ | 21534.00 |
|---|---|---|---|
| 2. | Net change by Change Orders | $ | |
| 3. | CONTRACT SUM TO DATE (Line 1±2) | $ | 21534.00 |
| 4. | TOTAL COMPLETED TO DATE (Columns B+C on Page 2) | $ | 19942.80 |
| 5. | RETAINAGE: ____% of Completed Work | $ | 1994.28 |
| 6. | TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5) | $ | 17948.52 |
| 7. | LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Application) | $ | 7838.10 |
| 8. | CURRENT AMOUNT DUE | $ | 10110.42 |
| 9. | BALANCE TO FINISH, PLUS RETAINAGE (Line 3 less Line 6) | $ | 3585.48 |
CONTRACTOR'S CERTIFICATION:
The undersigned Contractor certifies that (1) all previous progress payments received from Owner on account of Work done under the Contract have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by prior Applications for Payment numbered 1 through _, inclusive and that such payments have been made in compliance with the Pennsylvania Prompt Pay Act, Act 142 of 1994; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to Owner at time of payment, free and clear of all liens, claims, security interests and encumbrances (except such as are covered by Bond acceptable to Owner indemnifying Owner against any such lien, claim, security interest, or encumbrance); and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective, as that term is defined in the Contract Documents.
Dated: June 26, 2024
Lenni Electric Corporation CONTRACTOR
By: [Signed] (Authorized Signature)
Sworn to and subscribed before me this 26th day of June, 2024.
[Notary Seal: Commonwealth of Pennsylvania - Notary Seal, Anne M. Pence, Notary Public, Chester County, My commission expires May 9, 2028, Commission number 1269340, Member, Pennsylvania Association of Notaries]
Payment of the above CURRENT AMOUNT DUE is recommended.
Dated: July 10, 2024
Pennoni Associates ENGINEER
By: [Signed: Michael J. Ellis] (Authorized Signature)
[Handwritten / Stamp: APPROVED BY: DW 7/11/24; DATE PAID: ________; CHECK #: ________; CHARGED TO: 07-424-1505; UV]
I:\Jobs\Specs\Forms\PmtAppLS.XLS (LS)
LENNI ELECTRIC CORPORATION1020 ANDREW DRIVE
WEST CHESTER, PA. 19380
JOB # 22335
Chester County
Ridley Creek STP UV
APPLICATION NUMBER: 3
APPLICATION DATE: 6/30/2024
PERIOD TO: 6/30/2024
ARCHITECT'S PROJECT NO:
| ITEM # | DESCRIPTION OF WORK | SCHEDULED VALUE | WORK COMPLETED PREVIOUS | WORK COMPLETED CURRENT | PRESENTLY STORED MATERIAL | TOTAL TO DATE | % COMPLETE | BALANCE TO FINISH | RETAINAGE |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary Electrical Work | $5,622.00 | $3,935.40 | $1,686.60 | $0.00 | $5,622.00 | 100.00% | $0.00 | $562.20 |
| 2 | Permanent Electrical Work | $15,912.00 | $4,773.60 | $9,547.20 | $0.00 | $14,320.80 | 90.00% | $1,591.20 | $1,432.08 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | #DIV/0! | $0.00 | $0.00 | ||
| TOTALS | $21,534.00 | $8,709.00 | $11,233.80 | $0.00 | $19,942.80 | 92.61% | $1,591.20 | $1,994.28 | |
Pennoni
July 12, 2024
EGMAU23003
East Goshen Municipal AuthorityAttn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380
RE: Change Order No. 2
Chester Creek Interceptor Inspection and Repair, Contract No. CCSS-2023
Dear Mr. Miller:
We have prepared Change Order No.2 for the subject project. This change order formalizes the as-built changes in bid item quantities.
This change order increases the quantity of manhole pressure grouting and grout, and reduces the quantity of cured-in-place pipe lining of 24" pipe within Township roads.
Change Order No. 2 reflects a net increase in contract price of $4,360.00; the resultant contract price is thereby $215,560.00. We recommend approval of Change Order No. 2 as presented herein.
If you have any questions or need additional information, please call.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
[Handwritten note: Approved Mark S Miller 7/12/2024]
Enclosures: Change Order No. 2
/ela
cc:
Shivon Shiwpal, Insituform Technologies
Dave Ware, Township Finance Director
Derek Davis, Township Manager
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
Gawthrop Greenwood, PC
Attorneys at Law
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Page: 1
06/10/2024
Client No: 6604-001M
Invoice No. 291598
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date / Initials | Description | Hours | Amount |
|---|---|---|---|
| 05/10/2024 PMM |
Email from L. Werkheiser with meeting agenda and materials. | 0.20 | 41.00 |
| 05/13/2024 PMM |
Preparation for and attend Authority Board meeting. | 1.70 | 348.50 |
| 05/28/2024 PMM |
Email from M. Miller regarding PUC notice of violation for One Call; Review and analyze PUC report for same; Telephone conference with M. Miller regarding same. | 0.50 | 102.50 |
| For Current Services Rendered | 2.40 | 492.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna, Esquire | 2.40 | $205.00 | $492.00 |
| Previous Balance | $471.50 |
|---|---|
| Total Current Charges | 492.00 |
| 05/21/2024 Payment | -471.50 |
| Balance Due | $492.00 |
[Handwritten / Stamp: APPROVED BY: DW 6/11/24; DATE PAID: ________; CHECK #: ________; CHARGED TO: 07-424-3140]
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Page: 1
06/10/2024
Client No: 6604M
1580 Paoli Pike
West Chester PA 19380
| Description | Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|---|
| 6604-001 General Authority Services | 471.50 | 492.00 | 0.00 | -471.50 | $492.00 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Page: 1
07/11/2024
Client No: 6604-001M
Invoice No. 293276
1580 Paoli Pike
West Chester PA 19380
[Handwritten / Stamp: APPROVED BY: DW 7/11/24; DATE PAID: ________; CHECK #: ________; CHARGED TO: 07-424-3140]
General Authority Services
Fees
| Date / Initials | Description | Hours | Amount |
|---|---|---|---|
| 06/04/2024 PMM |
Email from M. Miller regarding PUC fine. | 0.20 | 41.00 |
| 06/05/2024 JLB |
Research PUC appeal process; prepare appeal letter. | 1.00 | 125.00 |
| 06/05/2024 PMM |
Review and analyze issues regarding appeal of PUC determination for PA One Call. | 0.20 | 41.00 |
| 06/06/2024 JLB |
Review and revise appeal letter; email to M. Miller and D. Pizarro; research meeting dates and committee members; review Act 50 (PA One Call Law). | 1.00 | 125.00 |
| 06/07/2024 PMM |
Email from L. Werkheiser with meeting agenda and materials; Review and analyze meeting materials in preparation for Board meeting; Email from A. Smith at PUC regarding appeal for violation. | 0.50 | 102.50 |
| 06/10/2024 PMM |
Attend Authority Board meeting. | 1.50 | 307.50 |
| 06/12/2024 PMM |
Email from L. Werkheiser regarding rescheduled meeting date. | 0.20 | 41.00 |
| 06/12/2024 PMM |
Email from M. Truitt regarding July Board meeting. | 0.20 | 41.00 |
| 06/24/2024 JLB |
Phone conference and emails to/from M. Miller regarding PUC appeal; prepare affidavit. | 1.00 | 125.00 |
| 06/24/2024 PMM |
Review and analyze issues regarding additional documents to submit to PUC; Review and analyze draft affidavit for M. Miller for same. | 0.30 | 61.50 |
Page: 2
07/11/2024
Client No: 6604-001M
Invoice No. 293276
General Authority Services
| Date / Initials | Description | Hours | Amount |
|---|---|---|---|
| 06/25/2024 JLB |
Email to PUC regarding Damage Prevention Committee. | 0.30 | 37.50 |
| For Current Services Rendered | 6.40 | 1,048.00 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna, Esquire | 3.10 | $205.00 | $635.50 |
| Jody L. Bowden | 3.30 | 125.00 | 412.50 |
| Previous Balance | $492.00 |
|---|---|
| Total Current Charges | 1,048.00 |
| Balance Due | $1,540.00 |
[Note: 1,048.00 is circled in blue ink]
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
LEC LENNI ELECTRIC CORPORATION
1020 Andrew DriveWest Chester PA 19380
610-436-9922
Service Invoice
Invoice#: 240631
Date: 06/26/2024
Billed To:
East Goshen Township1580 Paoli Pike
West Chester PA 19380
Project:
32453RIDLEY CREEK STATION
1751 TOWN DR.
WEST CHESTER PA 19380
Scheduled: 06/20/2024
Employee:
Order#:
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| RIDLEY CREEK STATION 06-20-24 UNWIRE AND REMOVE SER CABLE FOR TEMP UV FEED; UNWIRE AND REMOVE FLOAT CABLES AND DATA WIRE FOR TEMP CONTROL. |
||||
| ELECTRICIAN | HR | 1.50 | 95.00 | 142.50 |
| APPRENTICE | HR | 1.50 | 78.00 | 117.00 |
| SERVICE TRUCK | LS | 0.20 | 40.00 | 8.00 |
Notes:
[Handwritten / Stamp: APPROVED BY: MSM [Signed] DW 7/8/24; DATE PAID: ________; CHECK #: ________; CHARGED TO: 07429-1505]
| Non-Taxable Amount: | 267.50 |
|---|---|
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due: | 267.50 |
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
Memo
To: Municipal Authority
From: Dave Ware
Re: MA June 2024 YTD Financial Report
Date: July 9, 2024
YTD June 2024, the Municipal Authority recorded $402,803.49 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $397,824.84 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, engineering and audit expenses). The net result of operations is $4,978.65. As of June 30, 2024, the fund balance was $12,540.81.
Attached is a complete list of 2024 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD June 2024
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 194.61 | 144.81 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 8,574.08 | 1,787.04 | 4,287.04 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,127.52 | 563.76 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 564.06 | 282.24 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 109,517.00 | 58,836.13 | 58,882.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 837,464.00 | 341,139.71 | 410,882.82 |
| Total Revenue | 959,546.66 | 402,803.49 | 475,042.67 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 39,847.10 | 22,380.52 | 19,343.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 3,286.22 | 1,056.61 | 1,595.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 21,630.00 | 11,250.00 | 10,500.00 |
| 07-424-3130 | ENGINEERING SERVICES | 48,667.50 | 11,676.75 | 21,970.50 |
| 07-424-3140 | LEGAL SERVICES | 8,652.00 | 2,886.50 | 2,903.00 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 0.00 | 9,154.75 | 0.00 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 310,500.00 | 0.00 | 0.00 |
| 07-429-0000 | CONTROL ACCOUNT | 0.00 | 0.00 | 0.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 85,000.00 | 0.00 | 10,240.62 |
| 07-429-1505 | RCSTP CAPITAL | 366,963.84 | 135,084.71 | 108,995.16 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 0.00 | 0.00 | 90,113.64 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 123.00 | 31,250.97 |
| Total Expenses | 959,546.66 | 397,824.84 | 479,174.63 | |
| Net Result From Operations | 0.00 | 4,978.65 | -4,131.96 | |
Municipal Authority
YTD Revenues and Expenses thru 6/30/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/24 | Revenue Journal | INTEREST EARNED JANUARY 2024 | 35.21 |
| 07-341-1000 | INTEREST EARNINGS | 02/29/24 | Revenue Journal | INTEREST EARNED FEBRUARY 2024 | 41.23 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/24 | Revenue Journal | INTEREST EARNED MARCH 2024 | 50.34 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/24 | Revenue Journal | INTEREST EARNED APRIL 2024 | 16.09 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/24 | Revenue Journal | INTEREST EARNED MAY 2024 | 13.17 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/24 | Revenue Journal | INTEREST EARNED JUNE 2024 | 38.57 |
| 07-364-1110 | R.C.TAPPING FEES | 01/02/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 02/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 03/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 04/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 05/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/04/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/25/24 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 13262 | 281.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 04/24/24 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 13263 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/25/24 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 04/24/24 | Revenue Journal | PINE ROCK INTEREST PORTION - PAPPANO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/09/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 431.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/11/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 533.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/14/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 4,349.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/22/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 500.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/11/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 749.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/15/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 6,041.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/21/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/26/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 245.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,190.26 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/01/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 62.61 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/03/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,874.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/09/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 431.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/14/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,996.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/21/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 3,750.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 492.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,190.26 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/02/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,720.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/05/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 94.02 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 97.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,805.16 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 9,530.65 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/31/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,136.12 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/06/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,860.00 |
Page 1 of 4
Municipal Authority
YTD Revenues and Expenses thru 6/30/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/08/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 91.92 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/14/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,598.99 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/15/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 73,665.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/22/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,848.97 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/27/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 46,517.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/29/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 923.91 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/05/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,703.78 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/06/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 800.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/11/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,991.86 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/15/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 37,659.48 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/21/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,101.53 |
| Total Revenue | 402,803.49 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/26/24 | Pay Check: 706 | 24-00730 QTR 1 2024 MA CHARGE BACK | 11,190.26 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/27/24 | Pay Check: 708 | 24-01495 QTR 2 2024 MA CHARGE BACK | 11,190.26 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/11/24 | Pay Check: 3493 | 24-00582 2024 ANNUAL DAILY DISCHARGE CA | 749.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/26/24 | Pay Check: 3502 | 24-00722 PREP SEAL &PAINT BLOCK CHAMBER | 245.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 27.02 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 35.59 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 02/22/24 | Pay Check: 3486 | 24-00447 PROGRESS BILLING AUDIT EGT MUA | 500.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/21/24 | Pay Check: 3501 | 24-00676 PROGRESS BILLING AUDIT EGT MUA | 7,000.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/21/24 | Pay Check: 3509 | 24-01183 FINAL BILLING AUDIT EGT MUA | 3,750.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00380 SERV THRU 011424 23 CHAPTER 94 | 744.50 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00381 SERV THRU 011424 2024 GEN SERV | 799.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00384 SERV THRU 011424 2023 GEN SERV | 521.50 |
| 07-424-3130 | ENGINEERING SERVICES | 03/15/24 | Pay Check: 3497 | 24-00647 SERV THRU 021124 23 CHAPTER 94 | 649.75 |
| 07-424-3130 | ENGINEERING SERVICES | 03/15/24 | Pay Check: 3497 | 24-00648 SERV THRU 021124 2024 GEN SERV | 725.00 |
| 07-424-3130 | ENGINEERING SERVICES | 04/03/24 | Pay Check: 3503 | 24-00780 SERV THRU 031724 2024 GEN SERV | 1,609.50 |
| 07-424-3130 | ENGINEERING SERVICES | 04/03/24 | Pay Check: 3503 | 24-00779 SERV THRU 031724 23 CHAPTER 94 | 1,101.75 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/24 | Pay Check: 3508 | 24-01143 SERV THRU 041424 2024 GEN SERV | 4,015.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/24 | Pay Check: 3508 | 24-01142 SERV THRU 041424 23 CHAPTER 94 | 1,509.50 |
| 07-424-3140 | LEGAL SERVICES | 01/11/24 | Pay Check: 3474 | 24-00076 LEGAL SERV DEC 2023 GEN AUTH | 533.00 |
| 07-424-3140 | LEGAL SERVICES | 02/14/24 | Pay Check: 3481 | 24-00378 LEGAL SERV JAN 2024 GEN AUTH | 528.50 |
| 07-424-3140 | LEGAL SERVICES | 03/15/24 | Pay Check: 3496 | 24-00635 LEGAL SERVICES 2/5-2/12/24 GEN | 430.50 |
| 07-424-3140 | LEGAL SERVICES | 04/09/24 | Pay Check: 3505 | 24-00826 LEGAL SERV MARCH 2024 GEN AUTH | 431.00 |
| 07-424-3140 | LEGAL SERVICES | 05/14/24 | Pay Check: 3507 | 24-01141 LEGAL SERV APRIL 2024 GEN AUTH | 471.50 |
| 07-424-3140 | LEGAL SERVICES | 06/27/24 | Pay Check: 3511 | 24-01450 LEGAL SERV MAY 2024 GEN AUTH | 492.00 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 02/14/24 | Pay Check: 3483 | 24-00383 SERV THRU 011424 CHESTER CREEK | 1,755.50 |
Page 2 of 4
Municipal Authority
YTD Revenues and Expenses thru 6/30/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3700 | CHESTER CREEK ENGINEERING | 03/15/24 | Pay Check: 3497 | 24-00645 SERV THRU 021124 CHESTER CREEK | 4,235.75 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 04/03/24 | Pay Check: 3503 | 24-00782 SERV THRU 031724 CHESTER CREEK | 3,163.50 |
| 07-429-1505 | RCSTP CAPITAL | 01/05/24 | Pay Check: 3472 | 24-00033 TYPE B C&G 3" COUOLER X M NPT | 94.02 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/24 | Pay Check: 703 | 24-00056 VARIOUS PURCHASES- SEE NOTES | 97.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/17/24 | Pay Check: 3475 | 24-00098 RC ST-RAN CONDUIT FOR TEMP PUM | 9,530.65 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 4" FNPT X 6" MCAM | 429.92 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 6" FRMALE CAM X MNPT | 1,337.24 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 HOSE 6" X 50' CAMLOCK LAYFLAT | 12,392.88 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 DELIVERY | 645.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3477 | 24-00210 SAND BAR (YELLOW) & BAGS | 67.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3478 | 24-00237 HOSE 6"X10' HD TANK TRUCK CAML | 4,069.12 |
| 07-429-1505 | RCSTP CAPITAL | 02/06/24 | Pay Check: 3479 | 24-00271 TROUGH AND CMU WALL ABLATION | 6,860.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/08/24 | Pay Check: 704 | 24-00317 VARIOUS PURCHASES- SEE NOTES | 91.92 |
| 07-429-1505 | RCSTP CAPITAL | 02/14/24 | Pay Check: 3482 | 24-00379 RCSTP- UV REPLACEMENT PYMT 1 | 4,296.24 |
| 07-429-1505 | RCSTP CAPITAL | 02/14/24 | Pay Check: 3483 | 24-00382 SERV THRU 011424 RCSTP GENERAT | 302.75 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3484 | 24-00426 UV SYSTEM INSTALLATION-FILTER | 1,427.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3484 | 24-00425 DISK FILTER#1 FAILURE, ALARM T | 300.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3485 | 24-00436 PIPING FOR NEW MUFFIN MONSTER | 3,980.40 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3487 | 24-00437 ELECTICAL PARTS-INSTL MUFFIN M | 141.57 |
| 07-429-1505 | RCSTP CAPITAL | 02/27/24 | Pay Check: 3489 | 24-00513 FLYGT NP-3171.095 6" SUBMERSIB | 33,647.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/29/24 | Pay Check: 705 | 24-00520 VARIOUS PURCHASES- SEE NOTES | 794.81 |
| 07-429-1505 | RCSTP CAPITAL | 02/29/24 | Pay Check: 705 | 24-00520 VARIOUS PURCHASES- SEE NOTES | 129.10 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3490 | 24-00539 PURCHASE TENT HEATERS &DELIVER | 2,149.78 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3491 | 24-00530 (20) ROD 5/8 X 20' (#5) | 356.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3491 | 24-00550 5.5 YD CONCRETE 4000 PSI | 1,198.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/06/24 | Pay Check: 3492 | 24-00567 20X20 TENT RENTAL UV CONCRETE | 800.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/11/24 | Pay Check: 3494 | 24-00606 DUMPSTER RENTAL- CONSTRUCTION | 450.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/11/24 | Pay Check: 3495 | 24-00607 RCSTP-UV DISINFEC RPLCMT PYMT2 | 3,541.86 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3497 | 24-00646 SERV THRU 021124 RCSTP GENERAT | 3,658.25 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3497 | 24-00644 SERV THRU 031124 RCSTP UV REPL | 2,698.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3498 | 24-00659 (5) 5 GALLONS WHITE PAINT | 118.95 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3499 | 24-00625 RCSTP- UV DISINFECTION SYS REP | 31,183.78 |
| 07-429-1505 | RCSTP CAPITAL | 03/21/24 | Pay Check: 3500 | 24-00698 INSTALL EMER. SHOWER & EYEWASH | 3,101.53 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 18.49 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 313.32 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 226.26 |
| 07-429-1505 | RCSTP CAPITAL | 04/03/24 | Pay Check: 3503 | 24-00783 SERV THRU 031724 RCSTP UV REPL | 661.50 |
| 07-429-1505 | RCSTP CAPITAL | 04/03/24 | Pay Check: 3503 | 24-00781 SERV THRU 031724 RCSTP GENERAT | 1,028.50 |
| 07-429-1505 | RCSTP CAPITAL | 04/09/24 | Pay Check: 3504 | 24-00872 20X20 FRAME TENT RENTAL4/3-5/1 | 800.00 |
Page 3 of 4
Municipal Authority
YTD Revenues and Expenses thru 6/30/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 04/09/24 | Pay Check: 3506 | 24-00869 CONCRETE PUMPING- 1751 TOWNE | 575.00 |
| 07-429-1505 | RCSTP CAPITAL | 05/14/24 | Pay Check: 3508 | 24-01144 SERV THRU 041424 RCSTP UV REPL | 1,571.25 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/14/24 | Pay Check: 3508 | 24-01145 SERV THRU 041424 RCSTP CAU SOD | 123.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/14/24 | Pay Check: 3480 | 24-00376 CHESTERCREEK INTERCEPTOR PYMT1 | 20,340.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/14/24 | Pay Check: 3480 | 24-00377 CHESTERCREEK INTERCEPTOR PYMT2 | 53,325.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/27/24 | Pay Check: 3488 | 24-00516 CHESTERCREEK INTERCEPTOR PYMT3 | 12,870.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 06/06/24 | Pay Check: 3510 | 24-01292 CHESTERCREEK INTERCEPTOR PYMT4 | 117,677.00 |
| Total Expense | 397,824.84 | ||||
| Net Operating | 4,978.65 | ||||
Page 4 of 4
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Date: July 9, 2024
To: East Goshen Township Municipal Authority
From: Kevin M. Miller
Re: Barkway Pump Station
Early last week, the Public Works Department was doing their preventative maintenance on the Barkway Pump Station. While conducting their work of switching out Pump #1, the guide rails and flange part of the lift station collapsed. When this happened, the crew could no longer continue pumping until the guide rails and flanges were restored. To accomplish this, the crew brought in a vacuum truck to remove the sewage. Once the bottom of the pump station was visible, the restoration could begin. After some time, the issue was temporarily resolved to put the pump station back in service.
In closing, the Barkway Pump Station has significant design faults that are creating insufficient maintenance efficiency. For example, the discharge from the flange to the piping is not a compatible size. This is causing the pump to not sit (on center) where it should and leads to unwanted torque on the guiderails.
Our recommendation would be to overhaul the interior of the wet well to meet updated needs and specifications. By doing this, we will increase maintenance efficiency and not create a hazard by performing routine maintenance.
[Photograph showing corroded pump equipment, mounting flanges, guide rails, and a ribbed green hose inside the wet well.]
Pump seated
Barkway
On Line. May 1999
[Photograph looking down into the dark bottom of a wet well showing pipes, a pump carrier assembly with an attached arrow label pointing up to it, a green ribbed hose, a yellow measuring tape showing numbers 7, 8, 9, 10, 11, 12, 13, 14, 15, and two handwritten paper labels taped to the image.]
Bottom Wet Well
Worn out carriers
Station on line MAY 1999
BarkWAY