Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

August 12, 2024
7:00

  • CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  • CHAIRMAN'S REPORT/OTHER MEMBERS' REPORTS
  • APPOINTMENT OF OFFICERS
  • SEWER REPORTS Director of Public Work's Report; Pennoni Engineer's Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES July 15, 2024
  • APPROVAL OF INVOICES
Company Invoice # Amount Paid?
Pennoni 1233192 $113.00
Pennoni 1233193 $339.00
Pennoni 1233194 $5,142.50
Pennoni for Insituform Technologies - Chester Creek Interceptor Inspection & Repair Payment Application #5 $11,348.00
JWC Environmental 119462 $27,691.19 paid
West Goshen Sewer Authority EG23-B $95.64 paid
West Goshen Sewer Authority EG23-T $31,392.87 paid
Gawthrop Greenwood 293953 $315.00
  • LIAISON REPORTS
  • FINANCIAL REPORTS July 2024
  • OLD BUSINESS

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\08-12-24\Meeting Materials\08-12-2024 Agenda.doc

  • 2024 Goals:
Goal Status
Ridley Creek plant compliance January through July were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
RCSTP UV Disinfection System Construction Completion The UV replacement is 99% complete.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis.
Long-term sustainability Continue development of 10-year sustainability plan and study sewer rates annually. Currently under development with completion by May.
  • NEW BUSINESS Discuss EnerG Test quote for $9,144 (Mike Ellis); Approval to advertise for Supplee Valley pipe lining (Mike Ellis)
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\08-12-24\Meeting Materials\08-12-2024 Agenda.doc

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: August 12, 2024

To: Municipal Authority

From: Kevin Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 795,367 per day.

Meters:

  • Were read on a daily basis
  • No issues found with operating meters

C.C. Collection:

  • All pump stations were visited on a daily basis.

C.C. Interceptor:

  • Mowed & maintained

R.C. Collection:

  • Routine maintenance was performed on a daily basis.
  • Public Works crew pulled all manholes and inspected and marked out sewer lines in the Clocktower development in preparation for upcoming Riggs/Distler utility work.

Ridley Creek Plant:

  • Cleaned grit chamber
  • Jetted and flushed inflow pipe to the plant

Applebrook Golf Course:

  • PW crew replaced the Applebrook pump and it is now pumping 36,500 gallons per day.

Alarms: 6

PA One Calls: 73

Monthly Rainfall: 2.80”

Lateral Repairs or Caps: 4: 1 – Wentworth, 1 – Reservoir Rd, 1 – Baldwin Dr, & 1 – Katherine Ln

Pennoni

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT

August 9, 2024

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – Matt Mullin provided as-built photos of the caustic soda plumbing. We updated the as-built plans accordingly with the provided plumbing information and submitted the revised as-built plans to PADEP on July 23. We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
  • UV Disinfection System – On June 20, Lenni installed power to the jib crane and relocated the control panel to its permanent location, but it was discovered that the cords to connect the second UV module to the control panel are too short. Pennoni has since been coordinating with Glasco to obtain a new, longer cord for the module. Glasco picked up the temporary UV module cords to modify them to the correct length on July 25. Glasco will modify the temporary cords and return them in early August. After the new cords are installed, the two-week trial of the second UV module will begin. Glasco will also be scheduled to perform a post-startup inspection of the permanent UV installation. The temporary system has been fully disassembled. Pennoni informed Glasco on June 25 that the temporary channel is ready for pickup and for them to coordinate with Mark Miller on the specific day and time of the pickup. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024; Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024; Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing); 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024; Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024; Install Second UV Module into Permanent Channel –- June 11, 2024; Two Week Trial of Second New UV System in Permanent Channel – August 13 – 27, 2024; Construction Completed –Late August 2024
  • Generator #2 Replacement – No activity by Pennoni since the last report.
  • Electrical Supply Evaluation – We received a quote from EnerG Test for the installation of a power meter on the incoming electric supply line for $9,144.00. The testing would be performed for 25 days and will monitor and log power usage, voltage, phase, and other components of the electric supply. EnerG Test's engineers will analyze the results and provide a report within 30 days of completion of the monitoring. The report will address if there are unusual power/voltage spikes or drops and other anomalies. We recommend that their scope also include recommendations in their report to address any observed deficient conditions. For example, if the voltage is extremely inconsistent, a line conditioner (which acts as an electric filter) may be recommended on the main supply line. If problems are identified on the main feed, their report and recommendations can be provided to PECO to substantiate the problem with a request for PECO to implement the recommendations. Their proposal requires that arc flash labeling be on any electric equipment that they will be in contact with. Labeling is not on the Main Distribution Panel (MDP), so it will need to be installed before they install the power meter. A short circuit and arc flash analysis was performed as part of the RCSTP expansion in 2011. Labels were provided at that time, but there is not a label currently on the MDP. The Township will need to have the labels printed and attached to the MDP, and they should be attached to other applicable equipment while at it

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2

EGMAU24001
East Goshen Municipal Authority   August 9, 2024   Engineer's Report
Page 2 of 2

if other equipment is not currently labeled either. We can forward an electronic copy of the report that includes the labels from 2011.

Separate of the power monitoring – An updated arc flash study should be performed in the near future since it has been over five years since the last study and there have been electrical equipment changes, most notably the replacement of both generators. We could obtain a quote, and this be considered in 2025 budgeting. We anticipate it can occur separate of and after the power monitoring.

Sanitary Sewer Pipe Rehab

  • Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. We processed the fifth and final payment application and provided a payment recommendation letter. We also reviewed the Contractor's Maintenance Bond, Statement of Surety, and Contractor's Release and found all documents satisfactory. After approval of the final payment application, this project will be fully complete.
  • Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley as well as some manhole lining. We are finalizing the bid document and have updated the construction cost estimate. We anticipate the cost will be approximately $400,000, and we are coordinating with Dave Ware and Mark Miller on the available budget to establish Base Bid vs. Add Items. Funding from the planned 2025 Pipe Lining budget item is expected to be needed in conjunction with 2024 budget to cover the full cost of this work in one construction contract. The project is therefore proposed to be advertised in late August, bids due in late September, award consideration by the MA In October, and construction to occur in late 2024-early 2025 with all invoicing and payments to occur in 2025.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – We reviewed a revised Land Development Plan submission and issued a comment letter on July 25. In addition to other Land Development comments, a few minor sanitary sewer design comments remain outstanding.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – We assisted the Design Engineer with response to PADEP's comments on the Sewage Facilities Planning mailer. Responses were provided to PADEP, and PADEP issued a Planning exemption letter on August 6.
  • 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware if the grinder pump has been installed.
  • 14 Reservoir Road – PADEP approved the Sewage Facilities Planning Mailer exemption on June 5. We received a new plan submission and provided a comment letter on July 12. Amongst other things, two sanitary sewer design comments remain outstanding.

Capital Improvement Plan

  • We prepared a 1 st draft of a 20+ year capital improvement plan that includes pipe lining, manhole lining, pump station upgrades, metering, wastewater treatment plant upgrades and equipment replacement, and other improvements. The plan is currently under review with Finance and Public Works. We anticipate the plan will be iteratively edited over the next few weeks, and an updated draft will be presented to the MA in September.

END OF REPORT

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report
August 2024

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2024. All supplemental reports were submitted for July 2024. Caustic usage increased to 54 gallons from 51 per day last month. Aluminum sulfate solution volumes decreased to 68.8 gallons per day from the previous standard of 70.5 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.

Table 1

July 2024- Final Effluent - Outfall 001

NPDES Permit Discharge Limitations Flow CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform Ultraviolet light intesity Copper, Total Zinc, Total
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000
Inst. Max 20 94 15 94 5 1 Report Report Report
Sample Date
July 2, 2024 0.240 2.0 4.0 9.16 18.3 4.0 8.0 0.10 0.20 0.12 0.24 1 0.0000 NS 0.002 0.033
July 9, 2024 0.217 2.0 3.6 7.42 13.4 4.0 7.2 0.10 0.18 0.30 0.54 1 0.0000 NS NS NS
July 16, 2024 0.289 2.0 4.8 10.10 24.3 4.0 9.6 0.10 0.24 0.14 0.34 1 0.0000 NS NS NS
July 23, 2024 0.250 2.0 4.2 7.36 15.3 4.8 10.0 0.10 0.21 0.14 0.29 1 0.0000 NS NS NS
July 30, 2024
Average 0.249 2.0 4.2 8.51 17.9 4.2 8.7 0.10 0.21 0.18 0.35 1 0.0000 NA NA NA
Minimum 0.217 2.0 3.6 7.36 13.4 4.0 7.2 0.10 0.18 0.12 0.24 1 0.0000 NA NA NA
Maximum 0.289 2.0 4.8 10.10 24.3 4.8 10.0 0.10 0.24 0.30 0.54 1 0.0000 NA NA NA

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for July 2024. The monthly average total phosphorus was reported as 0.18 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples consistently showed single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 4.2 mg/L compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment performed well during July. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.

Table 2 represents the influent wastewater data entering the wastewater treatment facility collected at the doghouse manhole adjacent to the influent pump station.in July, 2024

Table 2

July 2024 - Influent Wastewater

Design Basis Flow BOD5 CBOD5 TSS NH4-N TKN, mg/L Phosphorus,Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
Sample Date
July 2, 2024 0.298 483 1,200 379 942 580 1,441 32.4 81 94.6 235 12.9 32.1
July 9, 2024 0.383 615 1,964 485 1,549 880 2,811 36.6 117 92.5 295 11.80 37.7
July 16, 2024 0.383 1,180 3,769 689 2,201 900 2,875 39.5 126 135.0 431.2 16.90 54.0
July 23, 2024 0.372 625 1,939 496 1,539 690 2,141 39.5 123 66.8 207.2 12.40 38.5
July 30, 2024
Average 0.359 726 2,218 512 1,558 763 2,317 37 112 97.2 292 13.50 40.6
Minimum 0.298 483 1,200 379.0 942 580 1,441 32 81 66.8 207 11.80 32.1
Maximum 0.383 1,180 3,769 689 2,201 900 2,875 40 126 135.0 431 16.90 54.0

Table 3 represents the water quality data of the flow pumped to Applebrook Golf Course in July 2024

Table 3

July 2024 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations Flow CBOD5 Total Nitrogen TSS NH4-N Phosphorus,Total Fecal Coliform
MGD Average mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month mg/L lbs/ month Geo Mean Geo Mean
0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000
40 45
July 2, 2024 0.0220 2.0 0.37 9.16 18.33 4.0 0.73 0.10 0.02 0.12 0.02 1 0.0000
July 9, 2024 0.0290 2.0 0.48 7.42 1.79 4.0 0.97 0.10 0.02 0.30 0.07 1 0.0000
July 16, 2024 0.0270 2.0 0.45 10.10 2.27 4.0 0.90 0.10 0.02 0.14 0.03 1 0.0000
July 23, 2024 0.0280 2.0 0.47 7.36 1.72 4.8 1.12 0.10 0.02 0.14 0.03 1 0.0000
July 30, 2024
Average 0.0265 2.0 0.44 8.51 6.03 4.2 0.9 0.10 0.02 0.18 0.04 1 0.0000
Minimum 0.0220 2.0 0.37 7.36 1.72 4.0 0.7 0.10 0.02 0.12 0.02 1 0.0000
Maximum 0.0290 2.0 0.48 10.10 18.33 4.8 1.1 0.10 0.02 0.30 0.07 1 0.0000

Page 2 of 4

PA DEP

No activity

Pennoni Associates

No activity

Significant Rainfall

During July, there were nine (9) days when rainfall occurred.

One (1) event exceeded 0.50 inches of rain in a 24-hour period:

7/22/24: 0.57”

Total Rainfall for July was 3.02 inches

Chemical Data

Chemical July 2024
Daily Average Total Monthly
Caustic Soda, gal 53.68 1,664
Aluminum Sulfate solution, gal 68.8 2,133
Sludge Dewatering, gal* 21,570 539,257

*25 days of sludge dewatering

There was an increase of 102,991 gallons of sludge dewatering during July compared to June.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily.

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly.

Cleaned buildings and laboratory.

Major Repairs or Upgrades

-Applebrook pump replaced

-SBR 1 blower installed

Upcoming Repairs or Upgrades

Page 3 of 4

- Influent channel Muffin Monster to be replaced

-Disk filter pump to be rebuilt

Flow Data

Flow Meter Location July 2024
Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 10.729 346,105 420,110
Influent Wastewater to SBRs 11.178 360,591 412,688
Internal Recycle 0.544 17,533 49,078
Treated Effluent to Disc Filters 10.792 348,149 404,672
Final Effluent Discharge 7.445 240,000 297,000
Applebrook Golf Course 0.830 26,789 33,232

The plant hydraulic design loading is 745,000 gpd.

There were no high-flow events during July

Page 4 of 4

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 15, 2024

The East Goshen Township Municipal Authority held their regular meeting on Monday, July 15, 2024 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Jack Yahraes
Carmen Battavio
Kevin Cummings

Also in attendance were: Mark Miller (Director of Public Works), Michele Truitt (Supervisor)
Dave Ware (Finance Director), Robert Jefferson (Attorney) and Erika Addison (Pennoni).

COMMON ACRONYMS:

ATS – Automatic Transfer Switch MA- Municipal Authority
BFES – Big Fish Environmental Services NPDES – National Pollutant Discharge Elimination System
BOS – Board of Supervisors PC – Planning Commission
CB – Conservancy Board PM – Prevention Maintenance
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge
PWD – Public Works Department

Call to Order & Pledge of Allegiance
Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Dana asked for a moment of silence for our troops, police, EMTs and first responders.
Dana asked if anyone would be recording the meeting. There was no response.

Chairman's Report/Other Members Report
None

SEWER REPORTS

1. Director of Public Works, Mark Miller's report for July 15, 2024.

Monthly Flows – The average daily flow to West Goshen was 833,288 gallons per day.

Meters: The meters were read on a daily basis.
• Flows are down mainly because of the lack of rain and our infiltration repairs.

MA 7-15-24 draft   1

C.C. Collection:

  • All pump stations were visited on a daily basis.
  • As you may know, we pull pumps on a six-month rotation. In January we pull the number 2 pumps, and in July we pull number 1 pumps.
  • This month we started at the Barkway Pump Station and when we pulled the number 2 pump, the rail system collapsed.
  • This is being treated as an emergency as we currently have the station held together with rubber bands and bailing twine. Kevin and I met with John Roddy from MGK on July 8 th to come up with a permanent repair.
  • Once we got Barkway situated, the crew moved on to the other stations, pulling and installing the pumps. Since moving on from Deckman, we are trying another pump servicing vendor as we were not happy with the last one we used. I reached out to Phoenixville Sewer to see what they were using since the moved on from Deckman and they are using BDS Electric
  • We reached out to BDS Electric who has several locations, and they are very interested in doing the work. We dropped off six pumps to BDS to get a repair estimate.

C.C. Interceptor:

  • Nothing to report.

R.C. Collection:

  • Routine maintenance was performed on a daily basis.
  • We pulled the pumps at Hershey Mill and Hunt Country.
  • On Sunday, 7/7/24, we received a seal failure at the Hershey Mill Station. Kevin checked the wires, and the ohm reading indicated a seal failure. The pump was pulled and washed down.
  • We drained the oil from the pump and found water in the oil sample. The pump was shipped off to BDS Electric.

Ridley Creek Plant
UV Systen

  • The Public Works Department assisted the plant operator with much-needed cleanup after the UV installation.
  • The new UV is fully operational.
  • We are awaiting a startup date from Glasco to go over the unit.
  • We have an issue with the length of one of the cords. Mike Ellis reached out to Glasco for a replacement.

Applebrook Golf Course

  • Jared from Applebrook Golf Course asked if we could send them more water.
  • We are currently pumping 32,000 gallons a day.
  • The present pump is the original pump.
  • The 2 nd pump burnt up and a replacement will cost $7,000.00. Jared approved the purchase, so I placed the order with BDS Electric.
  • The new pump will triple the flow to Applebrook, and should be here by the end of the week of July 15 th .

MA 7-15-24 draft   2

Alarms: 8

PA 1 Calls: 60

Monthly Rainfall: 2.55”

Lateral Repairs or Caps: 2 (in Bow Tree)

2. Pennoni Engineer's Report dated July 15, 2024

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – Pyrz performed the tank repairs to the tank's outside insulation. Matt Mullin provided as-built photos of the caustic soda plumbing on July 10. We are currently updating the as-built plans accordingly with the provided plumbing information. We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized. UV Disinfection System – Zimmerman installed the jib crane and the second UV module, shrouds, and guides on June 11. On June 20, Lenni installed power to the jib crane and relocated the control panel to its permanent location, but it was discovered that the cords to connect the second UV module to the control panel are too short. Pennoni contacted Glasco on June 25 in regard to obtaining a new, longer cord for the module. Glasco responded on July 2 stating that they would review and provide a response accordingly. We contacted Glasco on July 10 for an update on the cords and are waiting for a response. After this issue is resolved, the two week trial of the second UV module will begin. Glasco will also be scheduled to perform a post-startup inspection of the permanent UV installation. The temporary system has been fully disassembled. Pennoni informed Glasco on June 25 that the temporary channel is ready for pickup and for them to coordinate with Mark Miller on the specific day and time of the pickup. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024; Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024; Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing); 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024; Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024; Install Second UV Module into Permanent Channel –- June 11, 2024

MA 7-15-24 draft   3

  • Two Week Trial of Second New UV System in Permanent Channel – July 17 – 31, 2024
  • Construction Completed –Early-Mid August 2024

We processed Lenni's third payment application and certified payrolls for weeks 1 through 30 for the temporary and permanent electrical work completed and provided a payment recommendation letter on July 10.
We processed Zimmerman's second payment application and certified payrolls for weeks 1 through 3 for the temporary and permanent general contract work and provided a payment recommendation letter on July 10.

  • Generator #2 Replacement – No activity by Pennoni since the last report.
  • Electrical Surge Evaluation – The Municipal Authority has requested that the electric supply into the plant be evaluated. We recommend that a data logger be installed on the PECO main supply line into the plant. The preferred location to do the testing would be at the Main Distribution Panel (MDP) which is outside near the PECO Transformer. We spoke with Lenni Electric, who concurs with this recommendation, but has not previously installed data loggers before. We are currently reaching out to other parties to install a data logger and to obtain quotes. After which, we can evaluate the type(s) of equipment needed to mitigate any adverse power conditions.

Sanitary Sewer Pipe Rehab

  • Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. The Contractor still needs to provide the final payment application, closeout documents, and remaining prevailing wage certifications in order to mark the project as completed.
  • Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley. The sewers have been televised. Public Works will provide the videos to Pennoni for review, and we will then prepare a bid document. The goal is to construct this work by the end of 2024.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – No activity by Pennoni since the last report.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – The Applicant submitted the Sewage Facilities Planning Mailer to PADEP on July 11.
  • 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware that the grinder pump has been installed.
  • 14 Reservoir Road – PADEP approved the Sewage Facilities Planning Mailer exemption on June 5. We received a new plan submission that is currently under review.

MA 7-15-24 draft   4

Capital Improvement Plan

  • We met with Mark Miller and Dave Ware to discuss long term capital improvement planning. Cost estimates were prepared for pipe lining neighborhoods with asbestos cement pipe. Pipe lining has been prioritized by neighborhood. We are creating a 20+ year capital improvement plan to include pipe lining, manhole lining, pump station upgrades, and wastewater treatment plant upgrades. A draft will be submitted before the August MA meeting for discussion.

Barkway Pump Station

  • We are evaluating pump sizing for a diesel bypass pump. We are also contacting vendors for quotes for the bypass pump and for replacement of the submersible pumps.

3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2024. All supplemental reports were submitted for June 2024. Caustic usage increased to 51 gallons per day from 40 gallons per day last month. Aluminum sulfate solution volumes decreased to a daily average of 70.5 gpd from the previous standard of 74.8 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.

Approval of Minutes
The minutes of the June 10, 2024 meeting were approved.

Approval of Invoices
1. Kevin moved to approve payment of the following Pennoni invoices:

• Invoice # 1229134 $ 595.00
• Invoice # 1229135 $ 463.75
• Credit for Invoice #1221070 & applied to #1229135 -$226.00
• Invoice #1229136 $1,412.50
• Invoice #1229137 $5,109.75

Walter seconded the motion. The motion passed unanimously.

2. Kevin moved to approve Payment Application #2 for Zimmerman Environmental RCSTP UV Disinfection System Replacement in the amount of $52,769.70. Waler seconded the motion. The motion passed unanimously.

3. Kevin moved to approve Payment Application #3 for Lenni Electric RCSTP UV Disinfection System Replacement in the amount of $10,110.42. Jack seconded the motion. The motion passed unanimously.

MA 7-15-24 draft   5

4. Walter moved to approve payment of Change Order #2 for Chester Creek Interceptor Inspection & Repair in the amount of $4,360.00. Jack seconded the motion. The motion passed unanimously.

5. Jack moved to approve payment of the following Gawthrop Greenwood invoices:

  • Invoice #291598 in the amount of $492.00
  • Invoice #293276 in the amount of $1,048.00

Walter seconded the motion. The motion passed unanimously.

6. Kevin moved to approve payment of the Lenni Electric invoice #240631 in the amount of $267.50. Walter seconded the motion. The motion passed unanimously.

Liaison Reports
1. Board of Supervisors - Michele reported that we had a very successful Community Day. She thanked the sponsors and Jason Lang, Director of Parks & Recreation. The BOS will only meet once in July and August. They approved an increase in sewer rates. They will meet every Tuesday in September to work on the budget.

Financial Reports
Dave Ware provided the following report:
Year to date June 2024, the Municipal Authority recorded $402,803.49 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $397,824.84 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, engineering and audit expenses). The net result of operations is $4,978.65. As of June 30, 2024, the fund balance was $12,540.81.

Old Business
None

Goals – The goals were reviewed.

New Business
1. Memo from Kevin Miller regarding the Barkway Pump Station. They were doing regular maintenance on Pump #1 when the guide rails and flange collapsed. The issue was temporarily resolved but his recommendation is to overhaul the interior of the wet well to meet updated needs. Mark reported that they spoke with MGK Industries Inc., and it will cost $54,560.00 for 3 pumps (1 will be a spare) and about 6 weeks to get everything. Jack moved to approve the purchase of 3 pumps not to exceed $60,000.00. Walter seconded the motion. The motion passed unanimously.

Any Other Matter -
1. Maillie Audit Review Letter – Dale Umbenhauer represented Maillie. Kevin pointed out his concern about wording in the letter regarding risks. Dale explained the new standards they are required to use now. If there were any risks due to fraud, etc., it would require a separate letter. He assured the MA members that there are no problems.

MA 7-15-24 draft   6

2. Greenhill Sewer Authority – Erika needs to determine the cost of this proposed project. DEP notification was discussed.

Correspondence- None

Public Comment - None

Adjournment
There being no further business Jack moved to adjourn the meeting. Walter seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, August 12, 2024 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 7-15-24 draft   7

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1233192
Invoice Date : 07/25/2024
Project : EGMAU20004
Project Name : RCSTP Caustic Soda Conversion

For Services Rendered Through 07/14/2024

Updated as-built drawings based on updated plumbing information from RCSTP operator.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Design and Permitting $26,500.00 $26,500.00 100.00% $26,500.00 $0.00
02 -- Construction Phase Services est. $5,400.00 $3,463.50 $3,576.50 $113.00
Total : $31,900.00 $29,963.50 $30,076.50 $113.00

Phase: 02 -- Construction Phase Services

Labor

Class Hours Rate Amount
Associate Professional 1.00 113.00 113.00
Labor 113.00
Phase Subtotal $113.00
Amount Due This Invoice $113.00

Outstanding Invoices

Number Date Balance
1229134 6/26/2024 595.00
Total 595.00

APPROVED BY: [signature] 7/25/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1520

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

West Goshen RCSTP Caustic Soda Conversion
EGMAU20004 Invoice Summary
Invoice Date 7/25/2024

Project: EGMAU20004
Pennoni Job No.: RCSTP Caustic Soda Conversion
Invoice No: 1233192
Invoice Period: 6/17/2024 to 7/14/2024
Initial Authorization: $ 31,900.00 Date: 7/25/2024
Contract Amount: $ 31,900.00
Previously Invoiced: $ 29,963.50
Current Invoice: $ 113.00
Invoiced to Date ($): $ 30,076.50
Invoiced to Date (%): 94%
Remaining Budget ($): $ 1,823.50
Remaining Budget (%): 6%

Budget by Phase:

Phase Name: RCSTP Caustic Soda Conversion
Phase Budget: $ 31,900.00
Previously Invoiced: $ 29,963.50
Current Invoice: $ 113.00
Invoiced to Date ($): $ 30,076.50
Invoiced to Date (%): 94%
Remaining Budget ($): $ 1,823.50
Remaining Budget (%): 6%

Comments: Updated as-built drawings based on updated plumbing information from RCSTP operator.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1233193
Invoice Date : 07/25/2024
Project : EGMAU22004
Project Name : RCSTP UV Replacement

For Services Rendered Through 07/14/2024

Coordinated with Glasco for longer UV module cords. Processed Lenni's pay application #3 and Zimmerman's pay application #2.

Phase 02 Construction Phase Services

Labor

Class Hours Rate Amount
Associate Professional 3.00 113.00 339.00
Totals 3.00 339.00
Total Labor 339.00

Billing Limits

Current Prior To-Date
Total Billings 339.00 15,346.50 15,685.50
Limit 16,000.00
Remaining 314.50
Total this Phase $339.00
Total this Invoice $339.00

Outstanding Invoices

Number Date Balance
1229135 6/26/2024 463.75
Total 463.75

APPROVED BY: [signature] 7/25/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

RCSTP UV Replacement
EGMAU22004 Invoice Summary
Invoice Date 07/25/2024

Project: EGMAU22004
Pennoni Job No.: RCSTP UV Replacement
Invoice No: 1233193
Invoice Period: 6/17/2024 to 7/14/2024
Initial Authorization: $ 30,000.00 Date: 7/25/2024
Contract Amount: $ 60,000.00
Previously Invoiced: $ 59,242.25
Current Invoice: $ 339.00
Invoiced to Date ($): $ 59,581.25
Invoiced to Date (%): 99%
Remaining Budget ($): $ 418.75
Remaining Budget (%): 1%

Budget by Phase:

Phase Name: RCSTP UV Replacement
Phase Budget: $ 60,000.00
Previously Invoiced: $ 59,242.25
Current Invoice: $ 339.00
Invoiced to Date ($): $ 59,581.25
Invoiced to Date (%): 99%
Remaining Budget ($): $ 418.75
Remaining Budget (%): 1%

Comments: Coordinated with Glasco for longer UV module cords. Processed Lenni's pay application #3 and Zimmerman's pay application #2.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1233194
Invoice Date : 07/25/2024
Project : EGMAU24001
Project Name : 2024 General Services

For Services Rendered Through 07/14/2024

Submitted July Engineer's Report.

Continued hydraulic analysis of Ridley Creek collection system to convey potential diversion from Hershey Mill community's wastewater treatment plant.

Prepared draft long-term Capital Improvement Plan project list and budget estimates. Attended meeting with Township staff to review Plan. Created map of neighborhoods proposed for pipe lining. Initated updates to Plan based on staff comments.

Additional work on Chester Creek Interceptor construction project that was beyond Pennoni's original project scope: Processed change order and final payment.

Barkway Pump Station: Reserarched historical plans for pump replacements and wet well upgrades. Analyzed bypass pump siziing. Contacted vendor for quote for new bypass pump and replacement submersible pumps.

Evaluated potentisl DCED grant opportunities for future pipe lining work.

Billing Limits Current Prior To-Date
Total Billings 5,142.50 12,259.50 17,402.00
Limit 42,000.00
Remaining 24,598.00

::::::::Authority Engineer::

Labor

Labor Hours Rate Amount
Township Engineer .25 153.00 38.25
Authority Engineer 8.25 153.00 1,262.25
Associate Professional 34.00 113.00 3,842.00
Totals 42.50 5,142.50
Total Labor 5,142.50

APPROVED BY: [Signature] 7/25/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

Total this Invoice $5,142.50

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project Project Code Description Type Status
Project EGMAU24001 2024 General Services Invoice <Draft>

Outstanding Invoices

Number Date Balance
1229137 6/26/2024 5,109.75
Total 5,109.75

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

2024 General Services

EGMAU24001 Invoice Summary

Invoice Date 07/25/2024

Description Amount Reference Date/Range
Project: EGMAU24001
Pennoni Job No.: 2024 General Services
Invoice No: 1233194
Invoice Period: 6/17/2024 to 7/14/2024
Initial Authorization: $ 42,000.00 Date: 7/25/2024
Contract Amount: $ 42,000.00
Previously Invoiced: $ 12,259.50
Current Invoice: $ 5,142.50
Invoiced to Date ($): $ 12,259.50
Invoiced to Date (%): 29%
Remaining Budget ($): $ 29,740.50
Remaining Budget (%): 71%

Budget by Phase:

Phase Summary Amount
Phase Name: 2024 General Services
Phase Budget: $ 42,000.00
Previously Invoiced: $ 12,259.50
Current Invoice: $ 5,142.50
Invoiced to Date ($): $ 12,259.50
Invoiced to Date (%): 29%
Remaining Budget ($): $ 29,740.50
Remaining Budget (%): 71%

Comments: Submitted May and June Engineer's Reports. Reviewed agenda packets and RCSTP operator's reports in preparation for May and June MA meetings. Attended May MA meeting.

Planning for Supplee Valley CIPPL project with Township staff. Initiated preparation of bid document.

RCSTP project updates w/ M. Miller. Evaluated actual caustic soda usage volume for first month of operation in comparison to that projected in study (actual is less than projected). Initiated evaluation of alternatives to monitor and data log electrical spikes at RCSTP.

Initiated preparation of 10-year Capital Improvement Plan project list and budget estimates.

Initiated hydraulic analysis of Ridley Creek collection system to convey potential diversion flows from Hershey Mill community's wastewater treatment plant. Responded to questions on possible diversion from Hershey Mill community representatives.

Additional work on Chester Creek Interceptor construction project that was not part of Pennoni's original project scope: performed review of post-construction pipe lining video, inspection of pipe lining punchlist work, and processed Change Order #2 and Pay Application #4.

Pennoni

July 26, 2024

EGMAU23003

East Goshen Municipal Authority
Attn: Mark Miller, Director of Public Works
1580 Paoli Pike
West Chester, PA 19380

RE: Payment Application #5 Recommendation
Chester Creek Interceptor Inspection and Repair, Contract No. CCSS-2023

Dear Mr. Miller:

The Contractor, Insituform Technologies, LLC, has submitted the fifth and final invoice for work completed for the subject project. We have reviewed the work-in-progress, including lateral reinstatements, and we confirm that the described work has been completed.

We have reviewed the attached Payment Application #5 provided by the Contractor, and we recommend payment in the amount of $11,348.00. Overall, the contract is 100% complete.

The Contractor closeout documents are attached, consisting of the Statement of Surety, Contractor's Release, Maintenance Bond, and President Officer Appointment Letter. The Contractor previously submitted the Maintenance Bond, and we note that the 2-year maintenance period began at the date of substantial completion, which was May 20, 2024.

The certified payrolls for the entire project are also attached.

If you have any questions, please contact me at your convenience.

Sincerely,
PENNONI ASSOCIATES INC.

[Signature]
Michael J. Ellis, PE
Associate Vice President

/ela

Enclosures: Application and Certification for Payment #5
Payment Estimate #5
Closeout Documents
Certified Payrolls

cc: Shivon Shiwpal, Insituform Technologies
Dave Ware, Township Finance Director
Derek Davis, Township Manager

Christiana Executive Campus | T: 302-655-4451 | www.pennoni.com
121 Continental Drive, Suite 207 | Page 1 of 1
Newark, DE 19713

APPLICATION AND CERTIFICATE FOR PAYMENT

AIA DOCUMENT G702 (Instructions on reverse side) PAGE 1 OF 2

TO PROJECT APPLICATION Distribution
TO: East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380
PROJECT: Chester Creek Interceptor
Contract No: CCSS-2023
APPLICATION NO: 5 - Final
PERIOD TO: 5/18/2024 - 7/5/2024
Distribution to:
[ ] Owner
[ ] Engineer
[ ] Contractor
[ ]
FROM: Insituform Technologies, LLC
580 Goddard Ave
Chesterfield, MO 63005
VIA (ENGINEER): Pennoni Associates Inc.
Christiana Executive Campus
121 Continental DR, Suite 207
Newark, DE 19713
Engineer's PROJECT NO:
CONTRACT DATE:

CONTRACTOR'S APPLICATION FOR PAYMENT

Application is made for Payment, as shown below, in connection with the Contract, Continuation Sheet, AIA Document G703, is attached.

CHANGE ORDER SUMMARY
Change Orders approved in previous months by Owner ADDITIONS DEDUCTIONS
TOTAL $ 12,750.00 $ 16,400.00
Approved this Month: Number CO 2, Date Approved 7/10/2024 $ 7,000.00 $ 2,640.00
TOTALS $ 19,750.00 $ 19,040.00
Net change by Change Orders $ 710.00
Line Item Amount
1 ORIGINAL CONTRACT SUM $ 214,850.00
2 Net Change by Change Orders $ 710.00
3 CONTRACT SUM TO DATE $ 215,560.00
4 TOTAL COMPLETED & STORED TO DATE (Column G on G703) $ 215,560.00
5 RETAINAGE:
a. 0% of Completed Work (Column D+E on G703): $ -
b. % of Stored Material (Column F on G703):
Total Retainage (Line 5a + 5b or Total in Column I of G703)
$ -
6 TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) $ 215,560.00
7 LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from previous Certificate) 204,212.00
8 CURRENT PAYMENT DUE $ 11,348.00
9 BALANCE TO FINISH, PLUS RETAINAGE (Line 3 less Line 6) $ -

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

CONTRACTOR: Insituform Technologies, LLC
By: [Signature]
Date: 7/11/2024

Subscribed and sworn to before me this 11th day of July 2024
Notary Public: Debbie S. Sewell
My Commission expires: Jan 02 2026
[Notary Seal: Debbie S. Sewell, Notary Public, State of Delaware, My Commission Expires Jan 02 2026]

PAID
APPROVED BY: [Signature] 7/29/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-3700
3700

ENGINEER'S CERTIFICATE FOR PAYMENT

In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.

AMOUNT CERTIFIED: $ 11,348.00
(Attach explanation if amount certified differs from the amount applied for.)

ENGINEER:
BY: [Signature]
DATE: 7/26/2024

This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

AIA DOCUMENT G702 • APPLICATION AND CERTIFICATE FOR PAYMENT • MAY 1983 EDITION • AIA
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, DC 20006

PAYMENT ESTIMATE NO. 5 - Final

PROJECT NO.: CCSS-2023
DATE: 7/5/2024
PERIOD: 5/18/2024 - 7/5/2024
OWNER: East Goshen Municipal Authority

ITEM DESCRIPTION OF WORK BID QUANTITY UNIT PRICE TOTAL EXTENSION WORK COMPLETED PREVIOUS ESTIMATE WORK COMPLETED CURRENT ESTIMATE TOTALS
QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT
1 Clean and Televise 24 Sanitary Sewer. 4900.00 $ 15.00 $ 73,500.00 5350 $ 80,250.00 $ - 5,350.0 $ 80,250.00
2 Televise 4" and 6" Sanitary Sewer Lateral. 40.00 $ 50.00 $ 2,000.00 32 $ 1,600.00 $ - 32.0 $ 1,600.00
3 Cured-In-Place Pipe Lining of 24" Pipe within Township Roads 360.00 $ 300.00 $ 108,000.00 351.2 $ 105,360.00 $ - 351.2 $ 105,360.00
4 Cured-In-Place Pipe Lining of 4" or 6" lateral $ 400.00 $ - $ - $ - 0.0 $ -
5 Lateral T-Connection and Excavated Transitio $ 4,000.00 $ - $ - $ - 0.0 $ -
6 Lateral Reinstatements. 3.00 $ 200.00 $ 600.00 $ - 3 $ 600.00 3.0 $ 600.00
7 Pipe Grouting. 2.00 $ 2,500.00 $ 5,000.00 2 $ 5,000.00 $ - 2.0 $ 5,000.00
8 Manhole Pressure Grouting. Price complete, in place, per each manhol 4.00 $ 1,500.00 $ 6,000.00 5 $ 7,500.00 $ - 5.0 $ 7,500.00
9 Grout 75.00 $ 50.00 $ 3,750.00 185 $ 9,250.00 $ - 185.0 $ 9,250.00
10 Remove Asphalt/Debris from Pipe 1.00 $ - $ - 1 $ - $ - 1.0 $ -
11 Cut Lateral and Install T- Connection 1.00 $ - $ - 1 $ - $ - 1.0 $ -
CO1 Additional cost to grout a weeping lateral in C027-C026 1.00 $ 6,000.00 $ 6,000.00 1 $ 6,000.00 $ - 1.0 $ 6,000.00
CONTRACT TOTAL $ 204,850.00 TOTAL $ 214,960.00 $ 600.00 TOTAL $ 215,560.00

JWC Environmental®

2850 Red Hill Ave., STE 125
Santa Ana, CA 92705
(949) 833-3888

Field Value
Invoice No: 119462
Date: 7/12/2024
Order No: S046842
Page No: 1
F.O.B: Origin
Sold To Ship To
East Goshen Township
1580 Paoli Pike
West Chester , PA 19380
US - UNITED STATES
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
US - UNITED STATES

TIN: 45-2771126 DUNNS# 61-059-2388

CUSTOMER ID CUSTOMER PO PAYMENT TERMS FREIGHT TERMS
6005886 24-01052 Net 30 Freight: Prepaid
SALES REP ID SHIPPING METHOD SHIP DATE INVOICE DUE DATE
035 Old Dominion Freight Line 7/12/2024 8/11/2024
LI# QUANTITY PART DESCRIPTION X
ORD SHP BCK
1 1 1 0 EVAL_CA CMD3210-XDS2.0
S020646-2-1
2 1 1 0 CMD3210-XDS2.0 CMD3210-XDS2.0 Upgrade
7-tooth
2-zone Monster Stack™
Zone 2: 7-tooth .438 thick cam cutters
Zone 1: 7-tooth .438 thick cam cutters, double-stacked
Alloy Steel
Buna N Elastomers
Cork & Rubber Gaskets
Drum Side Rails
Vertical Shaft Support with Grease Line
Motor Type: Electric
Less Motor
Less Reducer
Less Spool
With 1/4" Perforated Drum with brushes
Paint: Epoxy Green
Grinder SN: S046842-2-1
3 2 2 0 MANUALS O&M MANUALS
Included with equipment
(2) Copies
4 1 1 0 AMA0160-3200-480-35 BRUSH KIT, AMA3200-480 35DEG
5 1 1 0 Shipping Shipping & Handling Included

PAID

APPROVED BY: [Signature] 7/23/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-7490
Ridley Creek

Description Amount
SUB TOTAL: $27,691.19
SALES TAX: $0.00
TOTAL AMOUNT DUE: $27,691.19

PLEASE REFERENCE THIS INVOICE NUMBER ON YOUR CHECK AND REMIT TO:
JWC Environmental Inc.
2850 Red Hill Ave Ste 125
Santa Ana, CA 92705

IF PAYING BY ACH OR WIRE: ACH/WIRE INSTRUCTIONS

Dana Gieder

From: Mike Moffa <MMoffa@westgoshen.org>
Sent: Tuesday, July 16, 2024 1:29 PM
To: David Ware; Derek Davis; Mark Miller; Dana Gieder
Cc: Tina Charron; Chris Bashore; Matthew Froncillo; Christine Riffey
Subject: West Goshen Wastewater - Capital Project Billing
Attachments: West Goshen Sewer Authority Capital Cost Payments from Outside Municipalities.pdf; WG SA, 2023 Bond Projects - EG.pdf; WG SA, 2023 Tapping Fund Projects - EG.pdf

Follow Up Flag: Follow up
Flag Status: Completed

Good afternoon,

Please find attached two invoices for your township’s share of the 2023 Capital Purchases of the West Goshen Sewer Authority. These costs are independent of, and in addition to, the O&M costs forwarded to you yesterday. Unlike the O&M invoices, we ask that a separate check is made for each of the Sewer Authority invoices. Please see the attached memo, WG Sewer Authority Capital Cost Payments from Outside Municipalities, for an explanation of why separate checks are required.

Please note, the total amount due is $13,957 less than the projection provided for your township at our 9/21/2023 partner meeting. The invoices attached are as follows and should be made payable to the West Goshen Sewer Authority:

  • WG SA, 2023 Bond Fund Projects - EG. Amount Due $95.64.
  • WG SA, 2023 Tapping Fund Projects - EG. Amount Due $31,392.87.

Thank you for your cooperation and please do not hesitate to contact me with any questions,

Michael Moffa
Wastewater Superintendent
West Goshen STP
848 S. Concord Road / West Chester, PA 19382
O: 610.696.0900 / F: 610.429.9360

[West Goshen Township Seal]

1

[West Goshen Township Seal]

Memorandum

To: Mike Moffa
From: Christine Riffey
Date: April 15, 2024
Re: West Goshen Sewer Authority Capital Cost Payments from Outside Municipalities

At the end of each fiscal year, the West Goshen Sewer Authority submits capital cost reimbursement requests to each of the four outside municipalities with which a treatment agreement has been engaged. Per these agreements, each municipality is responsible for a certain cost share of various repairs and improvements made to the sewer plant and sewer system. These reimbursement requests are billed utilizing two distinct invoices based on the financing source for each specific repair or improvement.

In 2017, the West Goshen Sewer Authority obtained a bond in order to fund specific repair projects related to the sewer system. The bond requirements mandate that all expenses, and subsequent reimbursements, be managed through the bond trustee, which involves a separate account to be strictly maintained and utilized by a third party for all transactions related to projects funded through bond proceeds. To date, these bond projects remain ongoing. While the West Goshen Sewer Authority uses bond funds for certain specified projects, other projects are funded through general operating revenues which are directly managed by Township.

When reimbursement requests are submitted, the funds to be received need to be recognized by two different parties, at two different financial institutions. Bond funds cannot be comingled with operating funds and it is not possible to deposit a single check into two separate banks. Therefore, it is necessary for each municipality to submit two individual checks in accordance to the invoices that were distributed.

Please do not hesitate to contact me with additional questions or for further information.

Page 1

West Goshen Sewer Authority
[West Goshen Township Seal]
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360

INVOICE

Field Value
Date: July 15, 2024
Invoice #: EG23-B
For: 2023 WG Sewer Authority Bond Fund Expenses
Bill To: East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
DESCRIPTION AMOUNT
Costs (Bond funded) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2023 through December 31, 2023 (details attached). 573.70

PAID

APPROVED BY: [Signature] 7/23/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-6100

Item Amount
SUBTOTAL $573.70
Capacity % 16.67%
OTHER $0.00
TOTAL $95.64

Please make check payable to:
WEST GOSHEN SEWER AUTHORITY

THANK YOU!

West Goshen Sewer Authority

BOND FUND

Expense Detail - 2023
East Goshen Township

Project Vendor Amount Allocated
SCADA (Equipment) REFUND AMAZON SHIP CHARGES -5.99
SCADA (Equipment) REFUND AMAZON SHIP CHARGES -20.31
SCADA (Equipment) HELP NOW 600.00
Total Allocated 573.70

Page 2 of 2

West Goshen Sewer Authority
[West Goshen Township Seal]
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360

INVOICE

Field Value
Date: July 15, 2024
Invoice #: EG23-T
For: 2023 WG Sewer Authority Tapping Fee Fund Expenses
Bill To: East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
DESCRIPTION AMOUNT
Costs (Tapping Fund) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2023 through December 31, 2023 (details attached). 188,319.53

PAID

APPROVED BY: [Signature] 7/29/24
DATE PAID:
CHECK #:
CHARGED TO: 07-429-6100

Item Amount
SUBTOTAL $188,319.53
Capacity % 16.67%
OTHER $0.00
TOTAL $31,392.87

Please make check payable to:
WEST GOSHEN SEWER AUTHORITY

THANK YOU!

West Goshen Sewer Authority

TAPPING FEE FUND

Expense Detail - 2023
East Goshen Township

Project Vendor Amount Allocated
ACTUATED VALVE L-B WATER SERVICE, INC. 8,666.10
ACTUATED VALVE OPTIMUM CONTROLS CORPORATION 3,744.37
EQ BLOWER ROOF WILLIAM M DUNLEAVY & CO, INC. 7,200.00
HEADWORKS - CONVEYOR LINER KAPPE ASSOCIATES INC 5,200.00
MAG STRAINER - REIMBURSE SEWER WEST GOSHEN TOWNSHIP 5,673.68
PRIMARY CLARIFIER #1 G.M.H. ASSOCIATES OF AMERICA, INC. 22,661.00
PRIMARY CLARIFIER #1 G.M.H. ASSOCIATES OF AMERICA, INC. 22,661.00
PRIMARY CLARIFIER #1 G.M.H. ASSOCIATES OF AMERICA, INC. 1,435.76
PRIMARY CLARIFIER #1 GS DEVELOPERS INC. 1,180.00
PRIMARY CLARIFIER #1 GS DEVELOPERS INC. 4,620.00
RAS VFD REPLACEMENT OPTIMUM CONTROLS CORPORATION 7,194.00
RAS VFD REPLACEMENT OPTIMUM CONTROLS CORPORATION 961.62
SCADA - PROF SERVICES HELP NOW 950.00
SCADA - PROF SERVICES OPTIMUM CONTROLS CORPORATION 7,245.00
SCADA - PROF SERVICES OPTIMUM CONTROLS CORPORATION 19,950.00
SCADA - PROF SERVICES OPTIMUM CONTROLS CORPORATION 14,440.00
UV REHAB PARTS XYLEM WATER SOLUTIONS USA INC. 10,783.40
UV REHAB PARTS XYLEM WATER SOLUTIONS USA INC. 5,979.00
UV REHAB PARTS XYLEM WATER SOLUTIONS USA INC. 16,417.80
WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 307.50
WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 1,595.00
WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 665.00
TMDL UNRUH TURNER BURKE & FREES 42.00
TMDL HERBERT, ROWLAND & GRUBIC, INC. 300.00
TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLE 2,419.30
TMDL UNRUH TURNER BURKE & FREES 231.00
TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLE 1,664.50
TMDL UNRUH TURNER BURKE & FREES 84.00
TMDL HERBERT, ROWLAND & GRUBIC, INC. 1,200.00
TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLE 6,642.50
TMDL HERBERT, ROWLAND & GRUBIC, INC. 200.00
TMDL UNRUH TURNER BURKE & FREES 231.00
TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLE 2,737.00
TMDL HERBERT, ROWLAND & GRUBIC, INC. 600.00
TMDL UNRUH TURNER BURKE & FREES 63.00
TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLE 1,686.00
TMDL HERBERT, ROWLAND & GRUBIC, INC. 500.00
TMDL UNRUH TURNER BURKE & FREES 189.00
Total Allocated 188,319.53

Page 2 of 2

Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

Page: 1
08/05/2024
Client No: 6604-001M
Invoice No. 293953

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

APPROVED BY: [Signature] 8/6/24
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140

General Authority Services

Fees

Date / Timekeeper Description Hours Amount
07/12/2024
PMM
Email from L. Werkheiser with meeting agenda and materials; Review and analyze same. 0.30 61.50
07/15/2024
RCJ
Attend meeting of Authority Board. 1.30 253.50
For Current Services Rendered 1.60 315.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 0.30 $205.00 $61.50
Robert C. Jefferson, Esquire 1.30 195.00 253.50
Description Amount
Previous Balance $1,540.00
Total Current Charges 315.00
07/23/2024 Payment -492.00
07/23/2024 Payment -1,048.00
Total Payments -1,540.00
Balance Due $315.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to:
P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating

Page: 1
08/05/2024
Client No: 6604M

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
1,540.00 315.00 0.00 -1,540.00 $315.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dave Ware
Re: MA July 2024 YTD Financial Report
Date: August 5, 2024

YTD July 2024, the Municipal Authority recorded $534,087.84 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $528,781.16 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, engineering and audit expenses). The net result of operations is $5,306.68. As of July 31, 2024, the fund balance was $6,688.76.

Attached is a complete list of 2024 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

YTD July 2024

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 224.80 155.42
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 8,574.08 2,084.88 4,584.88
07-364-1130 CONNECTION FEES - SEWER 1,127.52 563.76 563.76
07-380-1000 MISCELLANEOUS REVENUE 564.06 282.24 282.24
07-392-0500 TRANSFER FROM SEWER OPERATING 109,517.00 94,097.57 59,923.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 837,464.00 436,834.59 418,662.32
Total Revenue 959,546.66 534,087.84 484,171.62
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 39,847.10 22,380.52 19,343.25
07-424-3000 MISCELLANEOUS EXPENSE 3,286.22 1,056.61 1,595.25
07-424-3110 MUNIC.AUTH.-AUDITING 21,630.00 11,250.00 10,500.00
07-424-3130 ENGINEERING SERVICES 48,667.50 16,786.50 22,622.00
07-424-3140 LEGAL SERVICES 8,652.00 3,934.50 3,292.50
07-424-3700 CHESTER CREEK ENGINEERING 0.00 10,567.25 0
07-424-7490 CAP.REPLACEMENT R.C. 310,500.00 27,691.19 0.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 85,000.00 0 10,240.62
07-429-1505 RCSTP CAPITAL 366,963.84 198,696.08 109,819.66
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 0.00 0 90,113.64
07-429-1520 RCSTP - CAUSTIC SODA 0.00 718.00 31,459.97
07-429-3700 CHESTER CREEK CAPITAL 0.00 204,212.00 0
07-429-6100 WEST GOSHEN CAPITAL 75,000.00 31,488.51 182,262.24
Total Expenses 959,546.66 528,781.16 481,249.13
Net Result From Operations 0.00 5,306.68 2,922.49

Municipal Authority

YTD Revenues and Expenses thru 7/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000INTEREST EARNINGS01/31/24Revenue JournalINTEREST EARNED JANUARY 202435.21
07-341-1000INTEREST EARNINGS02/29/24Revenue JournalINTEREST EARNED FEBRUARY 202441.23
07-341-1000INTEREST EARNINGS03/31/24Revenue JournalINTEREST EARNED MARCH 202450.34
07-341-1000INTEREST EARNINGS04/30/24Revenue JournalINTEREST EARNED APRIL 202416.09
07-341-1000INTEREST EARNINGS05/31/24Revenue JournalINTEREST EARNED MAY 202413.17
07-341-1000INTEREST EARNINGS06/30/24Revenue JournalINTEREST EARNED JUNE 202438.57
07-341-1000INTEREST EARNINGS07/31/24Revenue JournalINTEREST EARNED JULY 202430.19
07-364-1110R.C.TAPPING FEES01/02/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES02/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES03/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES04/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES05/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES06/04/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES07/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1130CONNECTION FEES - SEWER01/25/24Revenue JournalCONNECTION FEE INSTALLMENT INV# 13262281.88
07-364-1130CONNECTION FEES - SEWER04/24/24Revenue JournalCONNECTION FEE INSTALLMENT INV# 13263281.88
07-380-1000MISCELLANEOUS REVENUE01/25/24Revenue JournalPINE ROCK INTEREST PORTION - STOFFLET141.12
07-380-1000MISCELLANEOUS REVENUE04/24/24Revenue JournalPINE ROCK INTEREST PORTION - PAPPANO141.12
07-392-0500TRANSFER FROM SEWER OPERATING01/09/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA431.00
07-392-0500TRANSFER FROM SEWER OPERATING01/11/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA533.00
07-392-0500TRANSFER FROM SEWER OPERATING02/14/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA4,349.75
07-392-0500TRANSFER FROM SEWER OPERATING02/22/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA500.00
07-392-0500TRANSFER FROM SEWER OPERATING03/11/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA749.00
07-392-0500TRANSFER FROM SEWER OPERATING03/15/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA6,041.00
07-392-0500TRANSFER FROM SEWER OPERATING03/21/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,000.00
07-392-0500TRANSFER FROM SEWER OPERATING03/26/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA245.00
07-392-0500TRANSFER FROM SEWER OPERATING03/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,190.26
07-392-0500TRANSFER FROM SEWER OPERATING04/01/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA62.61
07-392-0500TRANSFER FROM SEWER OPERATING04/03/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,874.75
07-392-0500TRANSFER FROM SEWER OPERATING04/09/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA431.00
07-392-0500TRANSFER FROM SEWER OPERATING05/14/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,996.50
07-392-0500TRANSFER FROM SEWER OPERATING05/21/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA3,750.00
07-392-0500TRANSFER FROM SEWER OPERATING06/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA492.00
07-392-0500TRANSFER FROM SEWER OPERATING06/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,190.26
07-392-0500TRANSFER FROM SEWER OPERATING07/16/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,570.25
07-392-0500TRANSFER FROM SEWER OPERATING07/29/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA27,691.19
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/02/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,720.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/05/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA94.02
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/10/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA97.00

Page 1 of 4

Municipal Authority

YTD Revenues and Expenses thru 7/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/26/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA14,805.16
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/26/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA9,530.65
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/31/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,136.12
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA6,860.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/08/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA91.92
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/14/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,598.99
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/15/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA73,665.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/22/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA5,848.97
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/27/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA46,517.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/29/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA923.91
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/05/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,703.78
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA800.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/11/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,991.86
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/15/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA37,659.48
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/21/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,101.53
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/01/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA558.07
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/03/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,690.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/09/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,375.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/14/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,694.25
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA117,677.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/16/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA64,206.37
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/29/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA31,488.51
Total Revenue534,087.84
07-424-1400ADMINISTRATIVE WAGES03/26/24Pay Check: 70624-00730 QTR 1 2024 MA CHARGE BACK11,190.26
07-424-1400ADMINISTRATIVE WAGES06/27/24Pay Check: 70824-01495 QTR 2 2024 MA CHARGE BACK11,190.26
07-424-3000MISCELLANEOUS EXPENSE03/11/24Pay Check: 349324-00582 2024 ANNUAL DAILY DISCHARGE CA749.00
07-424-3000MISCELLANEOUS EXPENSE03/26/24Pay Check: 350224-00722 PREP SEAL &PAINT BLOCK CHAMBER245.00
07-424-3000MISCELLANEOUS EXPENSE04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES27.02
07-424-3000MISCELLANEOUS EXPENSE04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES35.59
07-424-3110MUNIC.AUTH.-AUDITING02/22/24Pay Check: 348624-00447 PROGRESS BILLING AUDIT EGT MUA500.00
07-424-3110MUNIC.AUTH.-AUDITING03/21/24Pay Check: 350124-00676 PROGRESS BILLING AUDIT EGT MUA7,000.00
07-424-3110MUNIC.AUTH.-AUDITING05/21/24Pay Check: 350924-01183 FINAL BILLING AUDIT EGT MUA3,750.00
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00380 SERV THRU 011424 23 CHAPTER 94744.50
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00381 SERV THRU 011424 2024 GEN SERV799.75
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00384 SERV THRU 011424 2023 GEN SERV521.50
07-424-3130ENGINEERING SERVICES03/15/24Pay Check: 349724-00647 SERV THRU 021124 23 CHAPTER 94649.75
07-424-3130ENGINEERING SERVICES03/15/24Pay Check: 349724-00648 SERV THRU 021124 2024 GEN SERV725.00

Page 2 of 4

Municipal Authority

YTD Revenues and Expenses thru 7/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3130ENGINEERING SERVICES04/03/24Pay Check: 350324-00780 SERV THRU 031724 2024 GEN SERV1,609.50
07-424-3130ENGINEERING SERVICES04/03/24Pay Check: 350324-00779 SERV THRU 031724 23 CHAPTER 941,101.75
07-424-3130ENGINEERING SERVICES05/14/24Pay Check: 350824-01143 SERV THRU 041424 2024 GEN SERV4,015.50
07-424-3130ENGINEERING SERVICES05/14/24Pay Check: 350824-01142 SERV THRU 041424 23 CHAPTER 941,509.50
07-424-3130ENGINEERING SERVICES07/16/24Pay Check: 351424-01661 SERV THRU 061624 2024 GEN SERV5,109.75
07-424-3140LEGAL SERVICES01/11/24Pay Check: 347424-00076 LEGAL SERV DEC 2023 GEN AUTH533.00
07-424-3140LEGAL SERVICES02/14/24Pay Check: 348124-00378 LEGAL SERV JAN 2024 GEN AUTH528.50
07-424-3140LEGAL SERVICES03/15/24Pay Check: 349624-00635 LEGAL SERVICES 2/5-2/12/24 GEN430.50
07-424-3140LEGAL SERVICES04/09/24Pay Check: 350524-00826 LEGAL SERV MARCH 2024 GEN AUTH431.00
07-424-3140LEGAL SERVICES05/14/24Pay Check: 350724-01141 LEGAL SERV APRIL 2024 GEN AUTH471.50
07-424-3140LEGAL SERVICES06/27/24Pay Check: 351124-01450 LEGAL SERV MAY 2024 GEN AUTH492.00
07-424-3140LEGAL SERVICES07/16/24Pay Check: 351224-01657 LEGAL SERV JUNE 2024 GEN AUTH1,048.00
07-424-3700CHESTER CREEK ENGINEERING02/14/24Pay Check: 348324-00383 SERV THRU 011424 CHESTER CREEK1,755.50
07-424-3700CHESTER CREEK ENGINEERING03/15/24Pay Check: 349724-00645 SERV THRU 021124 CHESTER CREEK4,235.75
07-424-3700CHESTER CREEK ENGINEERING04/03/24Pay Check: 350324-00782 SERV THRU 031724 CHESTER CREEK3,163.50
07-424-3700CHESTER CREEK ENGINEERING07/16/24Pay Check: 351424-01660 SERV THRU 061624 CHESTER CREEK1,412.50
07-424-7490CAP.REPLACEMENT R.C.07/29/24Pay Check: 351624-01742 CMD3210-XDS2.0 MUFFIN MONSTER27,691.19
07-429-1505RCSTP CAPITAL01/05/24Pay Check: 347224-00033 TYPE B C&G 3" COUOLER X M NPT94.02
07-429-1505RCSTP CAPITAL01/10/24Pay Check: 70324-00056 VARIOUS PURCHASES- SEE NOTES97.00
07-429-1505RCSTP CAPITAL01/17/24Pay Check: 347524-00098 RC ST-RAN CONDUIT FOR TEMP PUM9,530.65
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 ADAPTER 4" FNPT X 6" MCAM429.92
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 ADAPTER 6" FRMALE CAM X MNPT1,337.24
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 HOSE 6" X 50' CAMLOCK LAYFLAT12,392.88
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 DELIVERY645.12
07-429-1505RCSTP CAPITAL01/31/24Pay Check: 347724-00210 SAND BAR (YELLOW) & BAGS67.00
07-429-1505RCSTP CAPITAL01/31/24Pay Check: 347824-00237 HOSE 6"X10' HD TANK TRUCK CAML4,069.12
07-429-1505RCSTP CAPITAL02/06/24Pay Check: 347924-00271 TROUGH AND CMU WALL ABLATION6,860.00
07-429-1505RCSTP CAPITAL02/08/24Pay Check: 70424-00317 VARIOUS PURCHASES- SEE NOTES91.92
07-429-1505RCSTP CAPITAL02/14/24Pay Check: 348224-00379 RCSTP- UV REPLACEMENT PYMT 14,296.24
07-429-1505RCSTP CAPITAL02/14/24Pay Check: 348324-00382 SERV THRU 011424 RCSTP GENERAT302.75
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348424-00426 UV SYSTEM INSTALLATION-FILTER1,427.00
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348424-00425 DISK FILTER#1 FAILURE, ALARM T300.00
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348524-00436 PIPING FOR NEW MUFFIN MONSTER3,980.40
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348724-00437 ELECTICAL PARTS-INSTL MUFFIN M141.57
07-429-1505RCSTP CAPITAL02/27/24Pay Check: 348924-00513 FLYGT NP-3171.095 6" SUBMERSIB33,647.00
07-429-1505RCSTP CAPITAL02/29/24Pay Check: 70524-00520 VARIOUS PURCHASES- SEE NOTES794.81
07-429-1505RCSTP CAPITAL02/29/24Pay Check: 70524-00520 VARIOUS PURCHASES- SEE NOTES129.10
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349024-00539 PURCHASE TENT HEATERS &DELIVER2,149.78
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349124-00530 (20) ROD 5/8 X 20' (#5)356.00

Page 3 of 4

Municipal Authority

YTD Revenues and Expenses thru 7/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349124-00550 5.5 YD CONCRETE 4000 PSI1,198.00
07-429-1505RCSTP CAPITAL03/06/24Pay Check: 349224-00567 20X20 TENT RENTAL UV CONCRETE800.00
07-429-1505RCSTP CAPITAL03/11/24Pay Check: 349424-00606 DUMPSTER RENTAL- CONSTRUCTION450.00
07-429-1505RCSTP CAPITAL03/11/24Pay Check: 349524-00607 RCSTP-UV DISINFEC RPLCMT PYMT23,541.86
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349724-00646 SERV THRU 021124 RCSTP GENERAT3,658.25
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349724-00644 SERV THRU 031124 RCSTP UV REPL2,698.50
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349824-00659 (5) 5 GALLONS WHITE PAINT118.95
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349924-00625 RCSTP- UV DISINFECTION SYS REP31,183.78
07-429-1505RCSTP CAPITAL03/21/24Pay Check: 350024-00698 INSTALL EMER. SHOWER & EYEWASH3,101.53
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES18.49
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES313.32
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES226.26
07-429-1505RCSTP CAPITAL04/03/24Pay Check: 350324-00783 SERV THRU 031724 RCSTP UV REPL661.50
07-429-1505RCSTP CAPITAL04/03/24Pay Check: 350324-00781 SERV THRU 031724 RCSTP GENERAT1,028.50
07-429-1505RCSTP CAPITAL04/09/24Pay Check: 350424-00872 20X20 FRAME TENT RENTAL4/3-5/1800.00
07-429-1505RCSTP CAPITAL04/09/24Pay Check: 350624-00869 CONCRETE PUMPING- 1751 TOWNE575.00
07-429-1505RCSTP CAPITAL05/14/24Pay Check: 350824-01144 SERV THRU 041424 RCSTP UV REPL1,571.25
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351324-01664 RCSTP-UV DISINFEC RPLCMT PYMT310,110.42
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351324-01662 RCSTP-UNWIRE & REMOVE CABLES267.50
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351424-01658 SERV THRU 061624 RCSTP UV REPL-226.00
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351424-01658 SERV THRU 061624 RCSTP UV REPL689.75
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351524-01663 RCSTP-UV DISINFECTION SYS REP52,769.70
07-429-1520RCSTP - CAUSTIC SODA05/14/24Pay Check: 350824-01145 SERV THRU 041424 RCSTP CAU SOD123.00
07-429-1520RCSTP - CAUSTIC SODA07/16/24Pay Check: 351424-01659 SERV THRU 061624 RCSTP CAU SOD595.00
07-429-3700CHESTER CREEK CAPITAL02/14/24Pay Check: 348024-00376 CHESTERCREEK INTERCEPTOR PYMT120,340.00
07-429-3700CHESTER CREEK CAPITAL02/14/24Pay Check: 348024-00377 CHESTERCREEK INTERCEPTOR PYMT253,325.00
07-429-3700CHESTER CREEK CAPITAL02/27/24Pay Check: 348824-00516 CHESTERCREEK INTERCEPTOR PYMT312,870.00
07-429-3700CHESTER CREEK CAPITAL06/06/24Pay Check: 351024-01292 CHESTERCREEK INTERCEPTOR PYMT4117,677.00
07-429-6100WEST GOSHEN CAPITAL07/29/24Pay Check: 351724-01750 2023 WG SEWER AUTH TAPPING FEE31,392.87
07-429-6100WEST GOSHEN CAPITAL07/29/24Pay Check: 351824-01751 2023 WG SEWER AUTH BOND FUND E95.64
Total Expense528,781.16
Net Operating5,306.68

Page 4 of 4

enerGtest
employee owned
206 Gale Lane
Kennett Square, PA 19348
enerGtest.com
Office: 484-731-0200
24hr Service: 800-456-7782

empowering peace of mind

Erika Addison
Pennoni Associates
121 Continental Drive, Suite 207
Newark, DE 19713
Phone: 302-351-5263
Email: eaddison@Pennoni.com

July 24, 2024

Re: Ridley Creek STP Utility Power Monitoring
Site Adress: 1751 Towne Drive, West Chester, PA 19380
EnerG Test Proposal #SF-10794

EnerG Test, LLC is a NETA accredited, highly trained, qualified, and experienced engineering service, electrical testing, and equipment servicing organization, a fully owned subsidiary of the Tri-M Group. Safety, quality, and professionalism are the fundamental characteristics of our company, and our accomplishments are identified by reliability, efficiency, and thoroughness. We specialize in offering engineering, testing, and equipment solutions to meet our customer’s needs.

Based on your request, EnerG Test will provide labor material, and equipment to provide the following scope of work:

Detailed Scope of Work:

  1. Install Power Quality Meter Average current usage, peak current usage; RMS voltage, Transient voltage, voltage swells, voltage dips and dropouts; Power factor, Displacement power factor, voltage unbalances and phase sequence; Harmonic voltage and currents; All data will be analyzed by a professional engineer and a full report will be provided.

General Clarifications:

  • Power meter will be left on for a period of 25 days.
  • EnerG Test to provide protective grounds, as necessary, for safe access to the equipment
  • No repair, replacement parts, or associated labor outside of the scope of work is included.
  • This proposal assumes that any equipment requiring energized electrical work, including but not limited to commissioning, metering, and testing, will be labeled by the owner with an NFPA 70E compliant arc flash label. If a label or owner provided analysis is not available, an incident energy analysis can be provided at an additional fee.
  • This proposal excludes providing an Arc Flash Hazard Analysis and associated equipment labeling.
  • Final report will be issued within 30 calendar days after completion of scope of work.

Schedule/ Timeline

  • Our proposal is based on completing the scope of work during normal business hours (Mon-Fri 7am – 3:30pm)
  • No electrical outage will be required to install the power meter.
  • Power meter will be left on for a period of 25 days.

Owner Responsibilities

The facility owner representatives are to provide:

  • Provide all equipment manufacturer manuals and single line drawings
  • All switching to remove electrical load and restore electrical load if applicable.
  • Coordination of switching by the local utility to isolate the equipment for inspection and testing and payment for services provided by the utility if applicable.

enerGtest.com

enerGtest
employee owned
206 Gale Lane
Kennett Square, PA 19348
enerGtest.com
Office: 484-731-0200
24hr Service: 800-456-7782

empowering peace of mind

Pricing

Total Project Pricing: $9,144.00

  • No federal, state, or local taxes on labor are included in the above pricing.
  • If this project is tax exempt, a copy of their tax-exempt form with be submitted with their purchase order
  • The volatility of copper and other metals as well as the unpredictability of the impacts related to new government tariffs have made the projection of certain building materials difficult to forecast. EnerG Test reserves the right to recover increases greater than 5% of any materials containing copper or other metals. The increase will be based on Producer Price Index as of the day the proposal is submitted.
  • Cancellation or postponement of schedule work (non-weather related) could result in additional charges.
  • Cancellation/postponement within 48 hours of scheduled work will result in a fee of 10% of the project value.
  • Cancellation/postponement within 1 week of scheduled work will result in a fee of 5% of the project value.

Terms & Conditions

  • This proposal is valid for thirty (30) days, from the date of issue.
  • EnerG Test’s Customer Terms and Conditions (05.25.21 Version) are the basis for all pricing and should this proposal be accepted shall become part of the contract documentation and supersede all subsequent terms to the contrary.

EnerG Test appreciates the opportunity to support your electrical needs. If you have any questions, please contact me.

Respectfully,

Jason Smith

Jason Smith
Account Executive
Cell: 610-721-3548
Email: mjsmith@energtest.com

enerGtest.com

From: Michael Ellis
To: Lynn Werkheiser; David Ware
Cc: Mark Miller; Derek Davis
Subject: Supplee Valley Pipe Lining for MA meeting
Date: Thursday, August 8, 2024 11:35:35 AM
Attachments: ATT00001.png
000000 Advertisement.docx

Hi Lynn,

Please include another MA New Business agenda item for: Approval to Advertise for Supplee Valley Pipe Lining. Mark and I discussed this today also.

The proposed draft advertisement is attached for reference, and the proposed bid schedule follows:

Pennoni to provide final ad to EGT to send to DLN = 8/13
Advertise in DLN = 8/14 and 8/19
Bids due = 9/4
Pennoni award recommendation = 9/5
MA Award consideration = 9/9
NTP with construction = early October with goal to complete work by end of 2024

Dave,
I'll call you to revisit budget so that we can establish Base Bid vs. Add Items if needed.

Mike

Michael Ellis, PE
Municipal Division Manager

Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com

[Image: Engineering the Future: Our Services and Expertise]

Our Services and Expertise

Supplee Valley Sanitary Sewer Pipe Lining
Contract No. SSPL-2024

A. ADVERTISEMENT

EAST GOSHEN MUNICIPAL AUTHORITY
WEST CHESTER, PENNSYLVANIA

Sealed bids will be received electronically through PennBid™ by the East Goshen Municipal Authority for Supplee Valley Sanitary Sewer Pipe Lining, Contract No. SSPL-2024 until 11:00 AM, prevailing time, on the 4th day of September 2024, at which time they will be publicly read at the East Goshen Township office, 1580 Paoli Pike, West Chester, PA 19380. All documents and solicitation details are available online anytime at no cost at PennBid™ (www.PennBid.net).

Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.

This project involves cured-in-place pipe lining of ±5,710 L.F. of 8-inch diameter asbestos cement gravity sewer pipe and 44 lateral reinstatements.

Bids must be submitted unconditionally. No bidder may withdraw bid within sixty (60) days after the scheduled closing time for receipt of bids.

The Owner reserves the right to waive any informality, or to reject any or all bids.

Pennsylvania Department of Labor and Industry Prevailing Wage Rates apply to this project.

A-1