Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

September 9, 2024

7:00

  • PRE-MEETING TOUR OF WEST GOSHEN SEWER PLANT (for Municipal Authority members only): Meet at East Goshen Township Building for van departure at 5pm
  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  • CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
  • APPOINTMENT OF OFFICERS
  • SEWER REPORTS Director of Public Work’s Report; Pennoni Engineer’s Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES August 12, 2024
  • APPROVAL OF INVOICES No invoices to approve
  • LIAISON REPORTS
  • FINANCIAL REPORTS August 2024
  • OLD BUSINESS Award Recommendation for Supplee Valley Pipe Lining Contract (Mike Ellis) See Mark Miller for full copy of Vortex bid package; See Mark Miller for full copy of Vortex bid package; Recommendation to Approve EnerG Test Study for RCSTP (Mike Ellis)

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\09-09-24\Meeting Materials\09-09-2024 Agenda.doc

  • 2024 Goals:
Goal Status
Ridley Creek plant compliance January through August were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
RCSTP UV Disinfection System Construction Completion The UV replacement is 99% complete.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis.
Long-term sustainability (1) Sewer rate increase implemented July 2024.
(2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.
  • NEW BUSINESS
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\09-09-24\Meeting Materials\09-09-2024 Agenda.doc

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: September 9, 2024

To: Municipal Authority

From: Mark Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 768,659 per day.

Meters:

  • Were read on a daily basis with no problems to report

C.C. Collection:

  • All pump stations were visited on a daily basis with no problems to report.
  • Wet wells were washed down & generator fluids checked.
  • The muffin monster was serviced at the pump station.

C.C. Interceptor:

  • Nothing to report

R.C. Collection:

  • Pump stations were visited on a daily basis.
  • Wet wells were washed down & generator fluids checked.
  • Service was performed on the muffin monster.
  • On 9/1/2024, we were notified by county radio of a resident on Burning Bush Lane reporting a backed lateral. Public Works cleared the lateral line.

Ridley Creek Plant:

  • The plant operator reported that the utility water pump had quit. We pulled the pump and installed a rebuilt one that we had in stock.

Alarms: 17

PA One Calls: 97

Monthly Rainfall: 6.55”

Lateral Repairs or Caps: 0

EAST GOSHEN MUNICIPAL AUTHORITY

ENGINEER’S REPORT

September 6, 2024

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
  • UV Disinfection System – The new UV module cords were delivered and installed, and the temporary UV channel was picked up by Glasco on August 13. The two-week trial of the second UV module has been successfully completed, and both modules are operational. Glasco is providing on-site training to Matthew Mullin (RCSTOP operator) and post-startup inspection of the permanent UV installation on September 6. Pending that inspection, the only outstanding punchlist items are connection of the permanent alarm and flow metering cables to the two UV modules. John Laidley has been contacted to complete those connections. The cables are run but just need to be connected on both ends. The system is being run in Hand mode with one module On and the other Off in the meantime. After the flow metering cables are connected, the UV modules will automatically control which ones are On or Off based on flow pacing. The project will be complete at that time, and we notify PADEP accordingly. We are awaiting final payment applications and closeout documents from the contractors.
  • Generator #2 Replacement – No activity by Pennoni since the last report.
  • Electrical Supply Evaluation – We evaluated costs and feasibility for installing a line conditioner on the main PECO electric supply line. We provided an email on September 5 with our follow-up recommendation to install a power meter on the incoming electric supply and to provide an analysis report. If the Energ Test quote is awarded, arc flash labeling will need to be installed in advance. Their proposal requires that arc flash labeling be on any electric equipment that they will be in contact with. Labeling is not on the Main Distribution Panel (MDP), so it will need to be installed before they install the power meter. A short circuit and arc flash analysis was performed as part of the RCSTP expansion in 2011. Labels were provided at that time, but there is not a label currently on the MDP. The Township will need to have the labels printed and attached to the MDP, and they should be attached to other applicable equipment while at it if other equipment is not currently labeled either. We can forward an electronic copy of the report that includes the labels from 2011. Separate of the power monitoring – An updated arc flash study should be considered in the near future since it has been over five years since the last study and there have been electrical equipment changes, most notably the replacement of both generators. We could obtain a quote, and this be considered in 2025 budgeting. We anticipate it can occur separate of and after the power monitoring.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – We conducted the bid solicitation, and bids were opened on September 4. We provided a bid tabulation and award recommendation letter. The low bidder’s total bid is $331,241. Bids were consistent with our anticipated cost of approximately $360,000. We confirmed with Dave Ware that there is adequate budget to award the total bid while also allowing for contingencies should additional repair work be identified to be necessary after the contractor performs their pre-lining TV inspection.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2

EGMAU24001
East Goshen Municipal Authority
September 6, 2024
Engineer’s Report
Page 2 of 2

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – We reviewed a revised Land Development Plan submission and issued a comment letter on July 25. In addition to other Land Development comments, a few minor sanitary sewer design comments remain. The BOS granted conditional Land Development approval on September 3. A meeting is scheduled with the Applicant’s team, East Goshen, and Pennoni on September 12 to discuss approach to satisfaction of conditions, plan updates, and legal agreements.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – We reviewed a revised Land Development Plan submission and issued a comment letter on August 21. In addition to other Land Development comments, four sanitary sewer design comments remain outstanding. The BOS granted conditional Land Development approval on September 3. A meeting is scheduled with the Applicant’s team, East Goshen, and Pennoni on September 12 to discuss approach to satisfaction of conditions, plan updates, and legal agreements.
  • 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware if the grinder pump has been installed.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, two of which are related to sanitary sewer.
  • 1338 Morstein Road – The MA previously approved sewer capacity for the three proposed residential lots in East Goshen which are part of a 16-lot development that is primarily in West Whiteland. There has not been any recent activity related to Land Development Plan updates or sewage planning that East Goshen has been privy to. A meeting is scheduled with the Applicant, East Goshen, and Pennoni on September 12 to obtain updates.

Capital Improvement Plan

  • We provided a 1 st draft of a 20+ year capital improvement plan that includes pipe lining, manhole lining, pump station upgrades, metering, wastewater treatment plant upgrades and equipment replacement, and other improvements in August. The plan is under review with Finance and Public Works. The plan is updated over the next several weeks, and an updated draft will be presented to the MA in the fall.

END OF REPORT

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report
September 2024

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for August 2024. All supplemental reports were submitted for August 2024. Caustic usage decreased slightly to 53 gallons per day from 54 gallons last month. Aluminium sulfate solution volumes increased to an average of 70.3 gallons per day from the previous standard of 68.8 gallons per day last month. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.

Table 1

August 2024- Final Effluent - Outfall 001

NPDES Permit Discharge Limitations Flow CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform
MGD mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
Average 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000
Inst. Max 0.75 20 94 15 94 5 1
Sample Date
August 6, 2024 0.316 2.0 5.3 8.23 21.7 4.5 11.9 0.10 0.26 0.10 0.26 1 0.0000
August 13, 2024 0.238 2.0 4.0 6.53 13.0 6.8 13.5 0.10 0.20 0.10 0.20 1 0.0000
August 20, 2024 0.224 2.0 3.7 6.82 12.7 4.0 7.5 0.10 0.19 0.10 0.19 1 0.0000
August 27, 2024
Average 0.259 2.0 4.3 7.19 15.8 5.1 10.9 0.10 0.22 0.10 0.22 1 0.0000
Minimum 0.224 2.0 3.7 6.53 12.7 4.0 7.5 0.10 0.19 0.10 0.19 1 0.0000
Maximum 0.316 2.0 5.3 8.23 21.7 6.8 13.5 0.10 0.26 0.10 0.26 1 0.0000

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for August 2024. The monthly average total phosphorus was reported as 0.1 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples consistently showed single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 5.1 mg/L compared to the 10 mg/L discharge limitation.

The final effluent test results demonstrate that the biological treatment performed well during August. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.

Table 2

August 2024 - Influent Wastewater

Design Basis Flow BOD5 CBOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
Average 335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
Sample Date
August 6, 2024 0.432 452 1,627 374 1,346 455 1,638 29.5 106 49.3 177 7.2 25.7
August 13, 2024 0.303 255 645 479 1,212 833 2,107 26.8 68 115.0 291 17.80 45.0
August 20, 2024 0.244 444 904 322 656 362 737 34.0 69 66.4 135 6.69 13.6
August 27, 2024
Average 0.326 384 1,059 392 1,071 550 1,494 30 81 76.9 201 10.55 28.1
Minimum 0.244 255 645 322.0 656 362 737 27 68 49.3 135 6.69 13.6
Maximum 0.432 452 1,627 479 1,346 833 2,107 34 106 115.0 291 17.80 45.0

Table 2 represents the water quality data of the flow entering the plant at the doghouse manhole where the composite samples were collected in August 2024.

Table 3

August 2024 - Applebrook - Out Fall 002

NPDES Permit Discharge Limitations Flow CBOD5 Total Nitrogen TSS NH4-N Phosphorus, Total Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000
August 6, 2024 0.036 2.0 0.61 8.23 2.50 4.5 1.37 0.10 0.03 0.10 0.03 1 0.0000
August 13, 2024 0.033 2.0 0.56 6.53 1.81 6.8 1.89 0.10 0.03 0.10 0.03 1 0.0000
August 20, 2024 0.031 2.0 0.51 6.82 1.74 4.0 1.02 0.10 0.03 0.10 0.03 1 0.0000
August 27, 2024
Average 0.033 2.0 0.56 7.19 2.02 5.1 1.4 0.10 0.03 0.10 0.03 1 0.0000
Minimum 0.031 2.0 0.51 6.53 1.74 4.0 1.0 0.10 0.03 0.10 0.03 1 0.0000
Maximum 0.036 2.0 0.61 8.23 2.50 6.8 1.9 0.10 0.03 0.10 0.03 1 0.0000

Table 3 represents the water quality data of the flow pumped to Applebrook Golf Course in August 2024.

PA DEP

No activity

Page 2 of 4

Pennoni Associates

No activity

Significant Rainfall

During August, there were nine (9) days when rainfall occurred.

Five (5) events exceeded 0.50 inches of rain in 24 hours:

  • 8/4: 0.55”
  • 8/7: 1.70”
  • 8/9: 0.66”
  • 8/10: 0.87”
  • 8/19” 0.88”

Total Rainfall for August was 5.48 inches

Chemical Data

Chemical August 2024 Daily Average Total Monthly
Caustic Soda, gal 53.1 1,645
Aluminum Sulfate solution, gal 70.3 2,179
Sludge Dewatering, gal* 22,347 402,248

*18 days of sludge dewatering

There was a decrease of 137,009 gallons of sludge dewatering during August compared to July.

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily.
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly.
  • Cleaned buildings and laboratory.

Major Repairs or Upgrades

  • Remaining UV cables were installed
  • Utility water pump replaced
  • New Muffin Monster installed

Page 3 of 4

Caustic line for SBR 3 was replaced, and the tubing conduit design was improved to prevent another premature failure

Upcoming Repairs or Upgrades

The remaining caustic tubing conduits will be updated with the improved design to prevent premature failure of the caustic tubing

Flow Data

Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 9.768 315,105 467,180
Influent Wastewater to SBRs 11.340 365,796 485,968
Internal Recycle 1.575 50,794 96,740
Treated Effluent to Disc Filters 11.101 358,110 465,920
Final Effluent Discharge 7.703 248,000 351,000
Applebrook Golf Course 0.993 32,034 37,168

The plant hydraulic design loading is 745,000 gpd.

There were no high-flow events during August.

Page 4 of 4

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 12, 2024

The East Goshen Township Municipal Authority held their regular meeting on Monday, August 12, 2024 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Jack Yahraes
Carmen Battavio
Kevin Cummings

Also in attendance were:
Mark Miller (Director of Public Works),
Michele Truitt (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Mike Ellis (Pennoni).

COMMON ACRONYMS:
ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services
BOS – Board of Supervisors
CB – Conservancy Board
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
HC – Historical Commission
I&I – Inflow & Infiltration
LCSTP – Lockwood Chase Sewer Treatment Plant
PWD – Public Works Department
MA- Municipal Authority
NPDES – National Pollutant Discharge Elimination System
PC – Planning Commission
PM – Prevention Maintenance
PR – Park & Recreation Board
RCSTP – Ridley Creek Sewer Treatment Plant
SBR – Sequencing Batch Reactor
SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Dana asked for a moment of silence for our troops, police, EMTs and first responders.
Dana asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report

Mark reminded everyone that they will take a tour of the West Goshen plant before the September meeting. Meet at the Township Building at 5:00 p.m. He will provide a van.

MA 8-12-24 draft 1

SEWER REPORTS

1. Director of Public Works, Mark Miller’s report for August 12, 2024.

Monthly Flows – The average daily flow to West Goshen was 795,367 gallons per day.

Meters:

  • The meters were read on a daily basis.
  • No issues found with operating meters

C.C. Collection:

  • All pump stations were visited on a daily basis.

C.C. Interceptor:

  • Mowed and maintained.

R.C. Collection:

  • Routine maintenance was performed on a daily basis.
  • Public Works crew pulled all manholes and inspected and marked out sewer lines in the Clocktower development in preparation for upcoming Riggs/Distler utility work.

Ridley Creek Plant

  • Cleaned grit chamber
  • Jetted and flushed inflow pipe to the plant

Applebrook Golf Course

  • PW crew replaced the Applebrook pump, and it is now pumping 36,500 gallons per day.

Alarms: 6

PA 1 Calls: 73

Monthly Rainfall: 2.80”

Lateral Repairs or Caps: 4: 1 Wentworth, 1 Reservoir Rd, 1 Baldwin Dr and 1 Katherine Ln

MA 8-12-24 draft 2

2. Pennoni Engineer’s Report dated July 15, 2024

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Caustic Soda Conversion – Matt Mullin provided as-built photos of the caustic soda plumbing. We updated the as-built plans accordingly with the provided plumbing information and submitted the revised as-built plans to PADEP on July 23. We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
  • UV Disinfection System – On June 20, Lenni installed power to the jib crane and relocated the control panel to its permanent location, but it was discovered that the cords to connect the second UV module to the control panel are too short. Pennoni has since been coordinating with Glasco to obtain a new, longer cord for the module. Glasco picked up the temporary UV module cords to modify them to the correct length on July 25. Glasco will modify the temporary cords and return them in early August. After the new cords are installed, the two-week trial of the second UV module will begin. Glasco will also be scheduled to perform a post-startup inspection of the permanent UV installation. The temporary system has been fully disassembled. Pennoni informed Glasco on June 25 that the temporary channel is ready for pickup and for them to coordinate with Mark Miller on the specific day and time of the pickup. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024; Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024; Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing); 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024; Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024; Install Second UV Module into Permanent Channel – June 11, 2024; Two Week Trial of Second New UV System in Permanent Channel – August 13 – 27, 2024; Construction Completed –Late August 2024
  • Generator #2 Replacement – No activity by Pennoni since the last report.
  • Electrical Supply Evaluation – We received a quote from EnerG Test for the installation of a power meter on the incoming electric supply line for $9,144.00. The testing would be performed for 25 days and will monitor and log power usage, voltage, phase, and other components of the electric supply. EnerG Test’s engineers will analyze the results and provide a report within 30 days of completion of the monitoring. The report will address if there are unusual power/voltage spikes or drops and other anomalies. We recommend that

MA 8-12-24 draft 3

their scope also include recommendations in their report to address any observed deficient conditions. For example, if the voltage is extremely inconsistent, a line conditioner (which acts as an electric filter) may be recommended on the main supply line. If problems are identified on the main feed, their report and recommendations can be provided to PECO to substantiate the problem with a request for PECO to implement the recommendations.

Their proposal requires that arc flash labeling be on any electric equipment that they will be in contact with. Labeling is not on the Main Distribution Panel (MDP), so it will need to be installed before they install the power meter. A short circuit and arc flash analysis was performed as part of the RCSTP expansion in 2011. Labels were provided at that time, but there is not a label currently on the MDP. The Township will need to have the labels printed and attached to the MDP, and they should be attached to other applicable equipment while at it if other equipment is not currently labeled either. We can forward an electronic copy of the report that includes the labels from 2011.

Separate of the power monitoring – An updated arc flash study should be performed in the near future since it has been over five years since the last study and there have been electrical equipment changes, most notably the replacement of both generators. We could obtain a quote, and this be considered in 2025 budgeting. We anticipate it can occur separate of and after the power monitoring.

Sanitary Sewer Pipe Rehab

  • Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. We processed the fifth and final payment application and provided a payment recommendation letter. We also reviewed the Contractor’s Maintenance Bond, Statement of Surety, and Contractor’s Release and found all documents satisfactory. After approval of the final payment application, this project will be fully complete.
  • Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley as well as some manhole lining. We are finalizing the bid document and have updated the construction cost estimate. We anticipate the cost will be approximately $400,000, and we are coordinating with Dave Ware and Mark Miller on the available budget to establish Base Bid vs. Add Items. Funding from the planned 2025 Pipe Lining budget item is expected to be needed in conjunction with 2024 budget to cover the full cost of this work in one construction contract. The project is therefore proposed to be advertised in late August, bids due in late September, award consideration by the MA In October, and construction to occur in late 2024-early 2025 with all invoicing and payments to occur in 2025.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – We reviewed a revised Land Development Plan submission and issued a comment letter on July 25. In addition to other Land Development comments, a few minor sanitary sewer design comments remain outstanding.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – We assisted the Design Engineer with response to PADEP’s comments on the Sewage Facilities Planning mailer. Responses were provided to PADEP, and PADEP issued a Planning exemption letter on August 6.

MA 8-12-24 draft 4

  • 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware if the grinder pump has been installed.
  • 14 Reservoir Road – PADEP approved the Sewage Facilities Planning Mailer exemption on June 5. We received a new plan submission and provided a comment letter on July 12. Amongst other things, two sanitary sewer design comments remain outstanding.

Capital Improvement Plan

  • We prepared a 1 st draft of a 20+ year capital improvement plan that includes pipe lining, manhole lining, pump station upgrades, metering, wastewater treatment plant upgrades and equipment replacement, and other improvements. The plan is currently under review with Finance and Public Works. We anticipate the plan will be iteratively edited over the next few weeks, and an updated draft will be presented to the MA at the September meeting.

Note: Michele Truitt’s memo commented that the warranty on pumps for the pump station start when they are put into service not when they are received.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2024. All supplemental reports were submitted for July 2024. Caustic usage increased to 54 gallons per day from 51 gallons per day last month. Aluminum sulfate solution volumes decreased to a daily average of 68.8 gpd from the previous standard of 70.5 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.

Note: There was discussion about the effluent numbers.

Approval of Minutes

The minutes of the July 15, 2024 meeting were approved as amended.

Approval of Invoices

  1. Walter moved to approve payment of the following Pennoni invoices: Invoice # 1233192 $ 113.00; Invoice # 1233193 $ 339.00; Invoice # 1233194 $ 5,142.50 Jack seconded the motion. The motion passed unanimously.
  2. Carmen moved to approve Payment Application #5 for Insituform Technologies Chester Creek Interceptor Inspection & Repair in the amount of $11,348.00. Walter seconded the motion. The motion passed unanimously.

MA 8-12-24 draft 5

  1. Carmen moved to approve JWC Environmental paid Invoice #119462 in the amount of $27,691.19. This was for the muffin monster. Jack seconded the motion. The motion passed unanimously.
  2. Carmen moved to approve payment of the following West Goshen Sewer Authority invoices: EG23-B $ 95.64; EG23-T $31,392.87 Walter seconded the motion. The motion passed unanimously.
  3. Jack moved to approve payment of the Gawthrop Greenwood invoice #293953 in the amount of $315.00. Walter seconded the motion. The motion passed unanimously.

Liaison Reports

1. Conservancy Board - Walter mentioned that the meeting is this Wednesday and they will review landscape plans for a developer.

Financial Reports

Dave Ware provided the following report:
Year to date July 2024, the Municipal Authority recorded $534,087.84 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $528,781.16 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, engineering, and audit expenses). The net result of operations is $5,306.68. As of July 31, 2024, the fund balance was $6,688.76.

Old Business

None

Goals – The goals were reviewed.

New Business

1. EnerG Test Quote - Mike explained that this quote of $9,144.00 would be for an electric meter to be installed and monitor the power supply coming into the plant. After discussion, Kevin and Carmen want the cost of a filter instead.

2. Supplee Valley Pipe Relining – Mike mentioned that in 2016 1/3 of the neighborhood was done. The cost to complete this is $380,000.00 which includes manhole grouting. $425,000.00 is available for this year. He can put it out for bid this week and have bids available for the September meeting. Kevin made a motion to approve advertising for bids for the sanitary sewer lining. Carmen seconded the motion. The motion passed unanimously.

MA 8-12-24 draft 6

Any Other Matter - None

Correspondence- None

Public Comment - None

Adjournment

There being no further business Jack moved to adjourn the meeting. Walter seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:45 pm. The next regular meeting will be held on Monday, September 9, 2024 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 8-12-24 draft 7

Memo

To: Municipal Authority

From: Dave Ware

Re: MA August 2024 YTD Financial Report

Date: September 4, 2024

YTD August 2024, the Municipal Authority recorded $551,815.68 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $546,471.54 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, RCSTP Caustic Soda, engineering and audit expenses). The net result of operations is $5,344.14. As of August 31, 2024, the fund balance was $12,906.30.

Attached is a complete list of 2024 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

YTD August 2024

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 262.26 164.53
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 8,574.08 2,084.88 4,882.72
07-364-1130 CONNECTION FEES - SEWER 1,127.52 563.76 563.76
07-380-1000 MISCELLANEOUS REVENUE 564.06 282.24 282.24
07-392-0500 TRANSFER FROM SEWER OPERATING 109,517.00 99,555.07 65,023.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 837,464.00 449,067.47 443,241.34
Total Revenue 959,546.66 551,815.68 514,157.59
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 39,847.10 22,380.52 19,343.25
07-424-3000 MISCELLANEOUS EXPENSE 3,286.22 1,056.61 1,655.25
07-424-3110 MUNIC.AUTH.-AUDITING 21,630.00 11,250.00 10,500.00
07-424-3130 ENGINEERING SERVICES 48,667.50 21,929.00 25,522.00
07-424-3140 LEGAL SERVICES 8,652.00 4,249.50 5,432.50
07-424-3700 CHESTER CREEK ENGINEERING 0.00 10,567.25
07-424-7490 CAP.REPLACEMENT R.C. 310,500.00 27,691.19 0.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 85,000.00 0 10,240.62
07-429-1505 RCSTP CAPITAL 366,963.84 199,467.96 115,446.16
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 0.00 0 90,113.64
07-429-1520 RCSTP - CAUSTIC SODA 0.00 831.00 50,412.49
07-429-3700 CHESTER CREEK CAPITAL 0.00 215,560.00 0
07-429-6100 WEST GOSHEN CAPITAL 75,000.00 31,488.51 182,262.24
Total Expenses 959,546.66 546,471.54 510,928.15
Net Result From Operations 0.00 5,344.14 3,229.44

Municipal Authority

YTD Revenues and Expenses thru 8/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000INTEREST EARNINGS01/31/24Revenue JournalINTEREST EARNED JANUARY 202435.21
07-341-1000INTEREST EARNINGS02/29/24Revenue JournalINTEREST EARNED FEBRUARY 202441.23
07-341-1000INTEREST EARNINGS03/31/24Revenue JournalINTEREST EARNED MARCH 202450.34
07-341-1000INTEREST EARNINGS04/30/24Revenue JournalINTEREST EARNED APRIL 202416.09
07-341-1000INTEREST EARNINGS05/31/24Revenue JournalINTEREST EARNED MAY 202413.17
07-341-1000INTEREST EARNINGS06/30/24Revenue JournalINTEREST EARNED JUNE 202438.57
07-341-1000INTEREST EARNINGS07/31/24Revenue JournalINTEREST EARNED JULY 202430.19
07-341-1000INTEREST EARNINGS08/31/24Revenue JournalINTEREST EARNED AUGUST 202437.46
07-364-1110R.C.TAPPING FEES01/02/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES02/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES03/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES04/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES05/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES06/04/24Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES07/01/24Revenue Journal1577 COLONIAL LN297.84
07-364-1130CONNECTION FEES - SEWER01/25/24Revenue JournalCONNECTION FEE INSTALLMENT INV# 13262281.88
07-364-1130CONNECTION FEES - SEWER04/24/24Revenue JournalCONNECTION FEE INSTALLMENT INV# 13263281.88
07-380-1000MISCELLANEOUS REVENUE01/25/24Revenue JournalPINE ROCK INTEREST PORTION - STOFFLET141.12
07-380-1000MISCELLANEOUS REVENUE04/24/24Revenue JournalPINE ROCK INTEREST PORTION - PAPPANO141.12
07-392-0500TRANSFER FROM SEWER OPERATING01/09/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA431.00
07-392-0500TRANSFER FROM SEWER OPERATING01/11/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA533.00
07-392-0500TRANSFER FROM SEWER OPERATING02/14/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA4,349.75
07-392-0500TRANSFER FROM SEWER OPERATING02/22/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA500.00
07-392-0500TRANSFER FROM SEWER OPERATING03/11/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA749.00
07-392-0500TRANSFER FROM SEWER OPERATING03/15/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA6,041.00
07-392-0500TRANSFER FROM SEWER OPERATING03/21/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,000.00
07-392-0500TRANSFER FROM SEWER OPERATING03/26/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA245.00
07-392-0500TRANSFER FROM SEWER OPERATING03/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,190.26
07-392-0500TRANSFER FROM SEWER OPERATING04/01/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA62.61
07-392-0500TRANSFER FROM SEWER OPERATING04/03/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,874.75
07-392-0500TRANSFER FROM SEWER OPERATING04/09/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA431.00
07-392-0500TRANSFER FROM SEWER OPERATING05/14/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,996.50
07-392-0500TRANSFER FROM SEWER OPERATING05/21/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA3,750.00
07-392-0500TRANSFER FROM SEWER OPERATING06/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA492.00
07-392-0500TRANSFER FROM SEWER OPERATING06/27/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,190.26
07-392-0500TRANSFER FROM SEWER OPERATING07/16/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,570.25
07-392-0500TRANSFER FROM SEWER OPERATING07/29/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA27,691.19
07-392-0500TRANSFER FROM SEWER OPERATING08/15/24Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA5,457.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/02/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,720.00

Page 1 of 5

Municipal Authority

YTD Revenues and Expenses thru 8/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/05/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA94.02
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/10/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA97.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/26/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA14,805.16
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/26/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA9,530.65
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/31/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,136.12
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA6,860.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/08/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA91.92
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/14/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,598.99
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/15/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA73,665.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/22/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA5,848.97
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/27/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA46,517.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/29/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA923.91
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/05/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,703.78
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA800.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/11/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,991.86
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/15/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA37,659.48
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/21/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,101.53
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/01/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA558.07
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/03/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,690.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/09/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,375.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/14/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,694.25
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/06/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA117,677.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/16/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA64,206.37
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/29/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA31,488.51
07-392-0900TRANSFER FROM SEWER CAP RESERVE08/14/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA11,348.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE08/15/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA452.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE08/27/24Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA432.88
Total Revenue551,815.68
07-424-1400ADMINISTRATIVE WAGES03/26/24Pay Check: 70624-00730 QTR 1 2024 MA CHARGE BACK11,190.26
07-424-1400ADMINISTRATIVE WAGES06/27/24Pay Check: 70824-01495 QTR 2 2024 MA CHARGE BACK11,190.26
07-424-3000MISCELLANEOUS EXPENSE03/11/24Pay Check: 349324-00582 2024 ANNUAL DAILY DISCHARGE CA749.00
07-424-3000MISCELLANEOUS EXPENSE03/26/24Pay Check: 350224-00722 PREP SEAL &PAINT BLOCK CHAMBER245.00
07-424-3000MISCELLANEOUS EXPENSE04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES27.02
07-424-3000MISCELLANEOUS EXPENSE04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES35.59
07-424-3110MUNIC.AUTH.-AUDITING02/22/24Pay Check: 348624-00447 PROGRESS BILLING AUDIT EGT MUA500.00
07-424-3110MUNIC.AUTH.-AUDITING03/21/24Pay Check: 350124-00676 PROGRESS BILLING AUDIT EGT MUA7,000.00

Page 2 of 5

Municipal Authority

YTD Revenues and Expenses thru 8/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3110MUNIC.AUTH.-AUDITING05/21/24Pay Check: 350924-01183 FINAL BILLING AUDIT EGT MUA3,750.00
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00380 SERV THRU 011424 23 CHAPTER 94744.50
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00381 SERV THRU 011424 2024 GEN SERV799.75
07-424-3130ENGINEERING SERVICES02/14/24Pay Check: 348324-00384 SERV THRU 011424 2023 GEN SERV521.50
07-424-3130ENGINEERING SERVICES03/15/24Pay Check: 349724-00647 SERV THRU 021124 23 CHAPTER 94649.75
07-424-3130ENGINEERING SERVICES03/15/24Pay Check: 349724-00648 SERV THRU 021124 2024 GEN SERV725.00
07-424-3130ENGINEERING SERVICES04/03/24Pay Check: 350324-00780 SERV THRU 031724 2024 GEN SERV1,609.50
07-424-3130ENGINEERING SERVICES04/03/24Pay Check: 350324-00779 SERV THRU 031724 23 CHAPTER 941,101.75
07-424-3130ENGINEERING SERVICES05/14/24Pay Check: 350824-01143 SERV THRU 041424 2024 GEN SERV4,015.50
07-424-3130ENGINEERING SERVICES05/14/24Pay Check: 350824-01142 SERV THRU 041424 23 CHAPTER 941,509.50
07-424-3130ENGINEERING SERVICES07/16/24Pay Check: 351424-01661 SERV THRU 061624 2024 GEN SERV5,109.75
07-424-3130ENGINEERING SERVICES08/15/24Pay Check: 352124-01872 SERV THRU 071424 2024 GRN SERV5,142.50
07-424-3140LEGAL SERVICES01/11/24Pay Check: 347424-00076 LEGAL SERV DEC 2023 GEN AUTH533.00
07-424-3140LEGAL SERVICES02/14/24Pay Check: 348124-00378 LEGAL SERV JAN 2024 GEN AUTH528.50
07-424-3140LEGAL SERVICES03/15/24Pay Check: 349624-00635 LEGAL SERVICES 2/5-2/12/24 GEN430.50
07-424-3140LEGAL SERVICES04/09/24Pay Check: 350524-00826 LEGAL SERV MARCH 2024 GEN AUTH431.00
07-424-3140LEGAL SERVICES05/14/24Pay Check: 350724-01141 LEGAL SERV APRIL 2024 GEN AUTH471.50
07-424-3140LEGAL SERVICES06/27/24Pay Check: 351124-01450 LEGAL SERV MAY 2024 GEN AUTH492.00
07-424-3140LEGAL SERVICES07/16/24Pay Check: 351224-01657 LEGAL SERV JUNE 2024 GEN AUTH1,048.00
07-424-3140LEGAL SERVICES08/15/24Pay Check: 352024-01873 LEGAL SERV JULY 2024 GEN AUTH315.00
07-424-3700CHESTER CREEK ENGINEERING02/14/24Pay Check: 348324-00383 SERV THRU 011424 CHESTER CREEK1,755.50
07-424-3700CHESTER CREEK ENGINEERING03/15/24Pay Check: 349724-00645 SERV THRU 021124 CHESTER CREEK4,235.75
07-424-3700CHESTER CREEK ENGINEERING04/03/24Pay Check: 350324-00782 SERV THRU 031724 CHESTER CREEK3,163.50
07-424-3700CHESTER CREEK ENGINEERING07/16/24Pay Check: 351424-01660 SERV THRU 061624 CHESTER CREEK1,412.50
07-424-7490CAP.REPLACEMENT R.C.07/29/24Pay Check: 351624-01742 CMD3210-XDS2.0 MUFFIN MONSTER27,691.19
07-429-1505RCSTP CAPITAL01/05/24Pay Check: 347224-00033 TYPE B C&G 3" COULOER X M NPT94.02
07-429-1505RCSTP CAPITAL01/10/24Pay Check: 70324-00056 VARIOUS PURCHASES- SEE NOTES97.00
07-429-1505RCSTP CAPITAL01/17/24Pay Check: 347524-00098 RC ST-RAN CONDUIT FOR TEMP PUM9,530.65
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 ADAPTER 4" FNPT X 6" MCAM429.92
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 ADAPTER 6" FRMALE CAM X MNPT1,337.24
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 HOSE 6" X 50' CAMLOCK LAYFLAT12,392.88
07-429-1505RCSTP CAPITAL01/26/24Pay Check: 347624-00041 DELIVERY645.12
07-429-1505RCSTP CAPITAL01/31/24Pay Check: 347724-00210 SAND BAR (YELLOW) & BAGS67.00
07-429-1505RCSTP CAPITAL01/31/24Pay Check: 347824-00237 HOSE 6"X10' HD TANK TRUCK CAML4,069.12
07-429-1505RCSTP CAPITAL02/06/24Pay Check: 347924-00271 TROUGH AND CMU WALL ABLATION6,860.00
07-429-1505RCSTP CAPITAL02/08/24Pay Check: 70424-00317 VARIOUS PURCHASES- SEE NOTES91.92
07-429-1505RCSTP CAPITAL02/14/24Pay Check: 348224-00379 RCSTP- UV REPLACEMENT PYMT 14,296.24
07-429-1505RCSTP CAPITAL02/14/24Pay Check: 348324-00382 SERV THRU 011424 RCSTP GENERAT302.75
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348424-00426 UV SYSTEM INSTALLATION-FILTER1,427.00

Page 3 of 5

Municipal Authority

YTD Revenues and Expenses thru 8/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348424-00425 DISK FILTER#1 FAILURE, ALARM T300.00
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348524-00436 PIPING FOR NEW MUFFIN MONSTER3,980.40
07-429-1505RCSTP CAPITAL02/22/24Pay Check: 348724-00437 ELECTICAL PARTS-INSTL MUFFIN M141.57
07-429-1505RCSTP CAPITAL02/27/24Pay Check: 348924-00513 FLYGT NP-3171.095 6" SUBMERSIB33,647.00
07-429-1505RCSTP CAPITAL02/29/24Pay Check: 70524-00520 VARIOUS PURCHASES- SEE NOTES794.81
07-429-1505RCSTP CAPITAL02/29/24Pay Check: 70524-00520 VARIOUS PURCHASES- SEE NOTES129.10
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349024-00539 PURCHASE TENT HEATERS &DELIVER2,149.78
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349124-00530 (20) ROD 5/8 X 20' (#5)356.00
07-429-1505RCSTP CAPITAL03/05/24Pay Check: 349124-00550 5.5 YD CONCRETE 4000 PSI1,198.00
07-429-1505RCSTP CAPITAL03/06/24Pay Check: 349224-00567 20X20 TENT RENTAL UV CONCRETE800.00
07-429-1505RCSTP CAPITAL03/11/24Pay Check: 349424-00606 DUMPSTER RENTAL- CONSTRUCTION450.00
07-429-1505RCSTP CAPITAL03/11/24Pay Check: 349524-00607 RCSTP-UV DISINFEC RPLCMT PYMT23,541.86
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349724-00646 SERV THRU 021124 RCSTP GENERAT3,658.25
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349724-00644 SERV THRU 031124 RCSTP UV REPL2,698.50
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349824-00659 (5) 5 GALLONS WHITE PAINT118.95
07-429-1505RCSTP CAPITAL03/15/24Pay Check: 349924-00625 RCSTP- UV DISINFECTION SYS REP31,183.78
07-429-1505RCSTP CAPITAL03/21/24Pay Check: 350024-00698 INSTALL EMER. SHOWER & EYEWASH3,101.53
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES18.49
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES313.32
07-429-1505RCSTP CAPITAL04/01/24Pay Check: 70724-00765 VARIOUS PURCHASES- SEE NOTES226.26
07-429-1505RCSTP CAPITAL04/03/24Pay Check: 350324-00783 SERV THRU 031724 RCSTP UV REPL661.50
07-429-1505RCSTP CAPITAL04/03/24Pay Check: 350324-00781 SERV THRU 031724 RCSTP GENERAT1,028.50
07-429-1505RCSTP CAPITAL04/09/24Pay Check: 350424-00872 20X20 FRAME TENT RENTAL4/3-5/1800.00
07-429-1505RCSTP CAPITAL04/09/24Pay Check: 350624-00869 CONCRETE PUMPING- 1751 TOWNE575.00
07-429-1505RCSTP CAPITAL05/14/24Pay Check: 350824-01144 SERV THRU 041424 RCSTP UV REPL1,571.25
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351324-01664 RCSTP-UV DISINFEC RPLCMT PYMT310,110.42
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351324-01662 RCSTP-UNWIRE & REMOVE CABLES267.50
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351424-01658 SERV THRU 061624 RCSTP UV REPL-226.00
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351424-01658 SERV THRU 061624 RCSTP UV REPL689.75
07-429-1505RCSTP CAPITAL07/16/24Pay Check: 351524-01663 RCSTP-UV DISINFECTION SYS REP52,769.70
07-429-1505RCSTP CAPITAL08/15/24Pay Check: 352124-01871 SERV THRU 070124 RCSTP UV REPL339.00
07-429-1505RCSTP CAPITAL08/27/24Pay Check: 352224-01972 INJECTABLE MORTAR HY 200-A V3432.88
07-429-1520RCSTP - CAUSTIC SODA05/14/24Pay Check: 350824-01145 SERV THRU 041424 RCSTP CAU SOD123.00
07-429-1520RCSTP - CAUSTIC SODA07/16/24Pay Check: 351424-01659 SERV THRU 061624 RCSTP CAU SOD595.00
07-429-1520RCSTP - CAUSTIC SODA08/15/24Pay Check: 352124-01870 SERV THRU 071424 RCSTP CAU SOD113.00
07-429-3700CHESTER CREEK CAPITAL02/14/24Pay Check: 348024-00376 CHESTERCREEK INTERCEPTOR PYMT120,340.00
07-429-3700CHESTER CREEK CAPITAL02/14/24Pay Check: 348024-00377 CHESTERCREEK INTERCEPTOR PYMT253,325.00
07-429-3700CHESTER CREEK CAPITAL02/27/24Pay Check: 348824-00516 CHESTERCREEK INTERCEPTOR PYMT312,870.00
07-429-3700CHESTER CREEK CAPITAL06/09/24Pay Check: 351024-01292 CHESTERCREEK INTERCEPTOR PYMT4117,677.00

Page 4 of 5

Municipal Authority

YTD Revenues and Expenses thru 8/31/2024

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-3700 CHESTER CREEK CAPITAL 08/05/24 Pay Check: 3519 24-01787 CHESTERCREEK INTERCEPTOR PYMTS 11,348.00
07-429-6100 WEST GOSHEN CAPITAL 07/29/24 Pay Check: 3517 24-01750 2023 WG SEWER AUTH TAPPING FEE 31,392.87
07-429-6100 WEST GOSHEN CAPITAL 07/29/24 Pay Check: 3518 24-01751 2023 WG SEWER AUTH BOND FUND E 95.64
Total Expense 546,471.54
Net Operating 5,344.14

Page 5 of 5

Pennoni

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713 T: 302-655-4451 F: 302-654-2895

www.pennoni.com

September 5, 2024

EGMAU24001

Mark Miller Director of Public Works East Goshen Township 1580 Paoli Pike West Chester, PA 19380

Re: Award Recommendation Supplee Valley Sanitary Sewer Pipe Lining, Contract No. SSPL-2024

Dear Mr. Miller:

We have tabulated the bids received through PennBid on September 4, 2024 for the referenced contract. The bid tabulation is attached.

As reflected in the bid tabulation, the low bidder for the project is Vortex Services, LLC, who submitted a Total Bid of $331,241.00.

We found Vortex Services submitted proposal to be complete and accurate. We have confirmed their experience on similar projects. Therefore, as the responsive low bidder, we recommend Vortex Services be awarded the contract for the Base Bid and all Add Items in the amount of $331,241.00.

Vortex Services’ bid package documents are also attached.

Sincerely,

PENNONI ASSOCIATES INC.

Michael J. Ellis, PE Associate Vice President

Enclosures: As noted

/za

cc: East Goshen Municipal Authority Derek Davis, Township Manager Dave Ware, Finance Director Patrick McKenna, Esq.

East Goshen Municipal Authority

Tabulation of Bids Received by 11:00 AM Eastern on September 4, 2024

Contract No. SSPL-2024: Supplee Valley Sanitary Sewer Pipe Lining

ITEM NUMBER DESCRIPTION ESTIMATED QUANTITY/UNIT Vortex Services LLC 210 Bennett Road Freehold, NJ 07728 (814) 270-7602 Insituform Technologies, LLC 580 Goddard Avenue Chesterfield, MO 63005 (636) 530-8679 AM-Liner East, Inc. 601 Jack Enders Blvd Berryville, VA 22611 (540) 955-9671 Mobile Dredging & Video Pipe, Inc. 1566 Harding Highway Newfield, NJ 08344 (856) 697-1900
UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT
BASE BID
1-1 Cured-In-Place Pipe Lining of 8" Pipe within Township Roads 2,418 L.F. $54.00 $130,572.00 $51.00 $123,318.00 $60.00 $145,080.00 $62.00 $149,916.00
1-2 Cured-In-Place Pipe Lining of 8" Pipe within Easements 2,556 L.F. $54.00 $138,024.00 $62.00 $158,472.00 $65.00 $166,140.00 $65.00 $166,140.00
1-3 Lateral Reinstatements 35 EA. $55.00 $1,925.00 $99.00 $3,465.00 $150.00 $5,250.00 $200.00 $7,000.00
TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES) $270,521.00 $285,255.00 $316,470.00 $323,056.00
ADD ITEMS
2-1 Cured-In-Place Pipe Lining of 8" Pipe from C414 to C413 370 L.F. $45.00 $16,650.00 $45.00 $16,650.00 $60.00 $22,200.00 $66.00 $24,420.00
2-2 Cured-In-Place Pipe Lining of 8" Pipe from C413 to C412 139 L.F. $72.00 $10,008.00 $89.00 $12,371.00 $60.00 $8,340.00 $66.00 $9,174.00
2-3 Cured-In-Place Pipe Lining of 8" Pipe from C412 to C411 232 L.F. $63.00 $14,616.00 $63.00 $14,616.00 $60.00 $13,920.00 $66.00 $15,312.00
2-4 Lateral Reinstatements between C414 to C413 6 EA. $55.00 $330.00 $128.00 $768.00 $150.00 $900.00 $200.00 $1,200.00
2-5 Lateral Reinstatements between C413 to C412 3 EA. $55.00 $165.00 $136.00 $408.00 $150.00 $450.00 $200.00 $600.00
2-6 Lateral Reinstatements between C412 to C411 1 EA. $55.00 $55.00 $141.00 $141.00 $150.00 $150.00 $200.00 $200.00
2-7 Manhole Pressure Grouting 4 EA. $3,124.00 $12,496.00 $4,850.00 $19,400.00 $2,000.00 $8,000.00 $2,400.00 $9,600.00
2-8 Grout 160 GAL. $40.00 $6,400.00 $58.00 $9,280.00 $15.00 $2,400.00 $20.00 $3,200.00
TOTAL ADD ITEMS (BASED ON ESTIMATED QUANTITIES) $60,720.00 $73,634.00 $56,360.00 $63,706.00
TOTAL BASE BID AND ADD ITEMS (BASED ON ESTIMATED QUANTITIES) $331,241.00 $358,889.00 $372,830.00 $386,762.00
BID SECURITY REVIEW 10% of Bid 10% of Bid 10% of Bid 10% of Bid

We Declare this to be a true Tabulation of Bids Received on September 4, 2024 by East Goshen Municipal Authority for Contract No. SSPL-2024.

PENNONI ASSOCIATES INC.

Michael J. Ellis, PE, PA Reg. No. PE075139 FOR: PENNONI ASSOCIATES INC.

Lynn Werkheiser

From: Michael Ellis <MEllis@Pennoni.com>

Sent: Thursday, September 5, 2024 6:49 PM

To: Mark Miller; Lynn Werkheiser; David Ware

Cc: Derek Davis; Erika Addison

Subject: RCSTP Electrical Supply Evaluation

Attachments: 2024-07-24_EnerG Test Proposal Sf-10794 Ridley Creek STP Utility Power Monitoring.pdf

Hi All,

This email is in follow up to the Authority’s direction at the August meeting to install a line conditioner on the PECO main electric supply line at the RCSTP instead of performing a study of the incoming electrical supply, if the cost to install a line conditioner was similar to the cost of the study.

Exec Summary – We recommend the study be performed per the attached quote before performing any corrective actions.

Explanation follows:

EnerG Test provided the attached quote to install a power meter on the incoming electric supply line. EnerG Test’s quote proposed $9,144.00 for the installation of the power meter, including testing for 25 days. The testing will monitor and log power usage, voltage, phase, and other components of the electric supply. As part of the quote, EnerG Test’s engineers will analyze the results and provide a report within 30 days of completion of the monitoring. The report will address if there are any unusual power/voltage spikes or drops and other anomalies.

The MA requested at the August meeting that we obtain a cost to install a line conditioner on the main electric supply line. We consulted with our electrical engineers and Lenni Electric, who both advised that the cost for a line conditioner would be significantly more than $9,144. Lenni expects the labor alone would be at least that much. That would potentially require this work be publicly bid. Additionally, Lenni is not certified to work on that size line, nor would any Township contractor be allowed to without PECO approval since PECO owns that part of the line. PECO would likely only allow a line conditioner if installed by their own crew. Further, PECO is highly unlikely to approve or install such equipment without a study that identifies/proves the exact issues and corrective actions. If the study identifies the problem to be on the PECO side of the Main Distribution Panel (MDP), then PECO will be obligated to address it at their own cost. We recognize that could be very slow to occur, but there is not an option if the solution needs to be implemented on that line.

Pennoni and Lenni further recommend the study in order to determine the exact problem. While a line conditioner might be a solution based on what we’ve heard, we do not know if it will address the electrical spiking issues without a study. For example, the study may identify that the spikes occur due to an issue on the RCSTP side of the MDP. For example, there could be a very high instantaneous electric demand within the plant, such as certain pieces of equipment (i.e. blowers and pumps) turning on at exactly the same time, which may only happen infrequently. There could be a variety of other causes as well, each of which may have a different solution. It would thereby be a guess to implement a “corrective action” without the study.

As a result, we strongly recommend that the study be performed as the 1st step. We also recommend EnerG Test’s quote include recommendations to address any observed deficient conditions. If the study identifies that there are problems and that they are on the PECO line, the report and recommendations can be provided to PECO to substantiate the problem with a request for PECO to implement the recommendations. This process is expected

1

to be more effective for the Authority/Township by first identifying if there is a problem, and if so, what the cause(s) is and how to address it.

Mike

Michael Ellis, PE Municipal Division Manager

Pennoni Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713 Direct: +1 302-351-5236 | Mobile: +1 302-561-4235 www.pennoni.com | MEllis@Pennoni.com

Engineering the Future

Our Services and Expertise

Our Services and Expertise

2

enerGtest

employee owned

206 Gale Lane, Kennett Square, PA 19348 | enerGtest.com | Office: 484-731-0200 | 24hr Service: 800-456-7782

empowering peace of mind

Erika Addison Pennoni Associates 121 Continental Drive, Suite 207 Newark, DE 19713 Phone: 302-351-5263 Email: eaddison@Pennoni.com

July 24, 2024

Re: Ridley Creek STP Utility Power Monitoring Site Adress: 1751 Towne Drive, West Chester, PA 19380 EnerG Test Proposal #SF-10794

EnerG Test, LLC is a NETA accredited, highly trained, qualified, and experienced engineering service, electrical testing, and equipment servicing organization, a fully owned subsidiary of the Tri-M Group. Safety, quality, and professionalism are the fundamental characteristics of our company, and our accomplishments are identified by reliability, efficiency, and thoroughness. We specialize in offering engineering, testing, and equipment solutions to meet our customer’s needs.

Based on your request, EnerG Test will provide labor material, and equipment to provide the following scope of work:

Detailed Scope of Work:

  1. Install Power Quality Meter Average current usage, peak current usage; RMS voltage, Transient voltage, voltage swells, voltage dips and dropouts; Power factor, Displacement power factor, voltage unbalances and phase sequence; Harmonic voltage and currents; All data will be analyzed by a professional engineer and a full report will be provided.

General Clarifications:

  • Power meter will be left on for a period of 25 days.
  • EnerG Test to provide protective grounds, as necessary, for safe access to the equipment
  • No repair, replacement parts, or associated labor outside of the scope of work is included.
  • This proposal assumes that any equipment requiring energized electrical work, including but not limited to commissioning, metering, and testing, will be labeled by the owner with an NFPA 70E compliant arc flash label. If a label or owner provided analysis is not available, an incident energy analysis can be provided at an additional fee.
  • This proposal excludes providing an Arc Flash Hazard Analysis and associated equipment labeling.
  • Final report will be issued within 30 calendar days after completion of scope of work.

Schedule/ Timeline

  • Our proposal is based on completing the scope of work during normal business hours (Mon-Fri 7am – 3:30pm)
  • No electrical outage will be required to install the power meter.
  • Power meter will be left on for a period of 25 days.

Owner Responsibilities

The facility owner representatives are to provide:

  • Provide all equipment manufacturer manuals and single line drawings
  • All switching to remove electrical load and restore electrical load if applicable.
  • Coordination of switching by the local utility to isolate the equipment for inspection and testing and payment for services provided by the utility if applicable.

enerGtest.com

enerGtest

employee owned

206 Gale Lane, Kennett Square, PA 19348 | enerGtest.com | Office: 484-731-0200 | 24hr Service: 800-456-7782

empowering peace of mind

Pricing

Total Project Pricing: $9,144.00

  • No federal, state, or local taxes on labor are included in the above pricing.
  • If this project is tax exempt, a copy of their tax-exempt form with be submitted with their purchase order
  • The volatility of copper and other metals as well as the unpredictability of the impacts related to new government tariffs have made the projection of certain building materials difficult to forecast. EnerG Test reserves the right to recover increases greater than 5% of any materials containing copper or other metals. The increase will be based on Producer Price Index as of the day the proposal is submitted.
  • Cancellation or postponement of schedule work (non-weather related) could result in additional charges.
  • Cancellation/postponement within 48 hours of scheduled work will result in a fee of 10% of the project value.
  • Cancellation/postponement within 1 week of scheduled work will result in a fee of 5% of the project value.

Terms & Conditions

  • This proposal is valid for thirty (30) days, from the date of issue.
  • EnerG Test’s Customer Terms and Conditions (05.25.21 Version) are the basis for all pricing and should this proposal be accepted shall become part of the contract documentation and supersede all subsequent terms to the contrary.

EnerG Test appreciates the opportunity to support your electrical needs. If you have any questions, please contact me.

Respectfully,

Jason Smith

Jason Smith Account Executive Cell: 610-721-3548 Email: mjsmith@energtest.com

enerGtest.com