Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
September 9, 2024
7:00
- PRE-MEETING TOUR OF WEST GOSHEN SEWER PLANT (for Municipal Authority members only): Meet at East Goshen Township Building for van departure at 5pm
- 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
- APPOINTMENT OF OFFICERS
- SEWER REPORTS Director of Public Work’s Report; Pennoni Engineer’s Report; Big Fish Environmental Report
- APPROVAL OF MINUTES August 12, 2024
- APPROVAL OF INVOICES No invoices to approve
- LIAISON REPORTS
- FINANCIAL REPORTS August 2024
- OLD BUSINESS Award Recommendation for Supplee Valley Pipe Lining Contract (Mike Ellis) See Mark Miller for full copy of Vortex bid package; See Mark Miller for full copy of Vortex bid package; Recommendation to Approve EnerG Test Study for RCSTP (Mike Ellis)
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\09-09-24\Meeting Materials\09-09-2024 Agenda.doc
- 2024 Goals:
| Goal | Status |
|---|---|
| Ridley Creek plant compliance | January through August were in compliance with PADEP permit requirements. |
| Continue to implement infiltration and inflow for the sewer system | Ongoing. |
| RCSTP UV Disinfection System Construction Completion | The UV replacement is 99% complete. |
| Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. | Attend meetings on quarterly basis. |
| Long-term sustainability | (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates. |
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2024 MA Agendas\09-09-24\Meeting Materials\09-09-2024 Agenda.doc
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
Date: September 9, 2024
To: Municipal Authority
From: Mark Miller
Re: Monthly Report
Monthly Flows: The average daily flow to West Goshen was 768,659 per day.
Meters:
- Were read on a daily basis with no problems to report
C.C. Collection:
- All pump stations were visited on a daily basis with no problems to report.
- Wet wells were washed down & generator fluids checked.
- The muffin monster was serviced at the pump station.
C.C. Interceptor:
- Nothing to report
R.C. Collection:
- Pump stations were visited on a daily basis.
- Wet wells were washed down & generator fluids checked.
- Service was performed on the muffin monster.
- On 9/1/2024, we were notified by county radio of a resident on Burning Bush Lane reporting a backed lateral. Public Works cleared the lateral line.
Ridley Creek Plant:
- The plant operator reported that the utility water pump had quit. We pulled the pump and installed a rebuilt one that we had in stock.
Alarms: 17
PA One Calls: 97
Monthly Rainfall: 6.55”
Lateral Repairs or Caps: 0
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
September 6, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
- UV Disinfection System – The new UV module cords were delivered and installed, and the temporary UV channel was picked up by Glasco on August 13. The two-week trial of the second UV module has been successfully completed, and both modules are operational. Glasco is providing on-site training to Matthew Mullin (RCSTOP operator) and post-startup inspection of the permanent UV installation on September 6. Pending that inspection, the only outstanding punchlist items are connection of the permanent alarm and flow metering cables to the two UV modules. John Laidley has been contacted to complete those connections. The cables are run but just need to be connected on both ends. The system is being run in Hand mode with one module On and the other Off in the meantime. After the flow metering cables are connected, the UV modules will automatically control which ones are On or Off based on flow pacing. The project will be complete at that time, and we notify PADEP accordingly. We are awaiting final payment applications and closeout documents from the contractors.
- Generator #2 Replacement – No activity by Pennoni since the last report.
- Electrical Supply Evaluation – We evaluated costs and feasibility for installing a line conditioner on the main PECO electric supply line. We provided an email on September 5 with our follow-up recommendation to install a power meter on the incoming electric supply and to provide an analysis report. If the Energ Test quote is awarded, arc flash labeling will need to be installed in advance. Their proposal requires that arc flash labeling be on any electric equipment that they will be in contact with. Labeling is not on the Main Distribution Panel (MDP), so it will need to be installed before they install the power meter. A short circuit and arc flash analysis was performed as part of the RCSTP expansion in 2011. Labels were provided at that time, but there is not a label currently on the MDP. The Township will need to have the labels printed and attached to the MDP, and they should be attached to other applicable equipment while at it if other equipment is not currently labeled either. We can forward an electronic copy of the report that includes the labels from 2011. Separate of the power monitoring – An updated arc flash study should be considered in the near future since it has been over five years since the last study and there have been electrical equipment changes, most notably the replacement of both generators. We could obtain a quote, and this be considered in 2025 budgeting. We anticipate it can occur separate of and after the power monitoring.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – We conducted the bid solicitation, and bids were opened on September 4. We provided a bid tabulation and award recommendation letter. The low bidder’s total bid is $331,241. Bids were consistent with our anticipated cost of approximately $360,000. We confirmed with Dave Ware that there is adequate budget to award the total bid while also allowing for contingencies should additional repair work be identified to be necessary after the contractor performs their pre-lining TV inspection.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU24001
East Goshen Municipal Authority
September 6, 2024
Engineer’s Report
Page 2 of 2
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – We reviewed a revised Land Development Plan submission and issued a comment letter on July 25. In addition to other Land Development comments, a few minor sanitary sewer design comments remain. The BOS granted conditional Land Development approval on September 3. A meeting is scheduled with the Applicant’s team, East Goshen, and Pennoni on September 12 to discuss approach to satisfaction of conditions, plan updates, and legal agreements.
- 301 Reservoir Road (5-Lot Residential Subdivision) – We reviewed a revised Land Development Plan submission and issued a comment letter on August 21. In addition to other Land Development comments, four sanitary sewer design comments remain outstanding. The BOS granted conditional Land Development approval on September 3. A meeting is scheduled with the Applicant’s team, East Goshen, and Pennoni on September 12 to discuss approach to satisfaction of conditions, plan updates, and legal agreements.
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware if the grinder pump has been installed.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, two of which are related to sanitary sewer.
- 1338 Morstein Road – The MA previously approved sewer capacity for the three proposed residential lots in East Goshen which are part of a 16-lot development that is primarily in West Whiteland. There has not been any recent activity related to Land Development Plan updates or sewage planning that East Goshen has been privy to. A meeting is scheduled with the Applicant, East Goshen, and Pennoni on September 12 to obtain updates.
Capital Improvement Plan
- We provided a 1 st draft of a 20+ year capital improvement plan that includes pipe lining, manhole lining, pump station upgrades, metering, wastewater treatment plant upgrades and equipment replacement, and other improvements in August. The plan is under review with Finance and Public Works. The plan is updated over the next several weeks, and an updated draft will be presented to the MA in the fall.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
September 2024
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for August 2024. All supplemental reports were submitted for August 2024. Caustic usage decreased slightly to 53 gallons per day from 54 gallons last month. Aluminium sulfate solution volumes increased to an average of 70.3 gallons per day from the previous standard of 68.8 gallons per day last month. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Table 1
August 2024- Final Effluent - Outfall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| Average | 10 | 62 | Report | Report | 10 | 62 | 2.5 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Inst. Max | 0.75 | 20 | 94 | 15 | 94 | 5 | 1 | ||||||
| Sample Date | |||||||||||||
| August 6, 2024 | 0.316 | 2.0 | 5.3 | 8.23 | 21.7 | 4.5 | 11.9 | 0.10 | 0.26 | 0.10 | 0.26 | 1 | 0.0000 |
| August 13, 2024 | 0.238 | 2.0 | 4.0 | 6.53 | 13.0 | 6.8 | 13.5 | 0.10 | 0.20 | 0.10 | 0.20 | 1 | 0.0000 |
| August 20, 2024 | 0.224 | 2.0 | 3.7 | 6.82 | 12.7 | 4.0 | 7.5 | 0.10 | 0.19 | 0.10 | 0.19 | 1 | 0.0000 |
| August 27, 2024 | |||||||||||||
| Average | 0.259 | 2.0 | 4.3 | 7.19 | 15.8 | 5.1 | 10.9 | 0.10 | 0.22 | 0.10 | 0.22 | 1 | 0.0000 |
| Minimum | 0.224 | 2.0 | 3.7 | 6.53 | 12.7 | 4.0 | 7.5 | 0.10 | 0.19 | 0.10 | 0.19 | 1 | 0.0000 |
| Maximum | 0.316 | 2.0 | 5.3 | 8.23 | 21.7 | 6.8 | 13.5 | 0.10 | 0.26 | 0.10 | 0.26 | 1 | 0.0000 |
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for August 2024. The monthly average total phosphorus was reported as 0.1 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples consistently showed single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 5.1 mg/L compared to the 10 mg/L discharge limitation.
The final effluent test results demonstrate that the biological treatment performed well during August. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service.
Table 2
August 2024 - Influent Wastewater
| Design Basis | Flow | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | |
| Average | 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||||
| August 6, 2024 | 0.432 | 452 | 1,627 | 374 | 1,346 | 455 | 1,638 | 29.5 | 106 | 49.3 | 177 | 7.2 | 25.7 |
| August 13, 2024 | 0.303 | 255 | 645 | 479 | 1,212 | 833 | 2,107 | 26.8 | 68 | 115.0 | 291 | 17.80 | 45.0 |
| August 20, 2024 | 0.244 | 444 | 904 | 322 | 656 | 362 | 737 | 34.0 | 69 | 66.4 | 135 | 6.69 | 13.6 |
| August 27, 2024 | |||||||||||||
| Average | 0.326 | 384 | 1,059 | 392 | 1,071 | 550 | 1,494 | 30 | 81 | 76.9 | 201 | 10.55 | 28.1 |
| Minimum | 0.244 | 255 | 645 | 322.0 | 656 | 362 | 737 | 27 | 68 | 49.3 | 135 | 6.69 | 13.6 |
| Maximum | 0.432 | 452 | 1,627 | 479 | 1,346 | 833 | 2,107 | 34 | 106 | 115.0 | 291 | 17.80 | 45.0 |
Table 2 represents the water quality data of the flow entering the plant at the doghouse manhole where the composite samples were collected in August 2024.
Table 3
August 2024 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations | Flow | CBOD5 | Total Nitrogen | TSS | NH4-N | Phosphorus, Total | Fecal Coliform | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |
| 0.135 | 25 | Report | Report | 30 | 7.0 | 44 | 0.5 | 3 | 200 | 1,000 | |||
| August 6, 2024 | 0.036 | 2.0 | 0.61 | 8.23 | 2.50 | 4.5 | 1.37 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| August 13, 2024 | 0.033 | 2.0 | 0.56 | 6.53 | 1.81 | 6.8 | 1.89 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| August 20, 2024 | 0.031 | 2.0 | 0.51 | 6.82 | 1.74 | 4.0 | 1.02 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| August 27, 2024 | |||||||||||||
| Average | 0.033 | 2.0 | 0.56 | 7.19 | 2.02 | 5.1 | 1.4 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| Minimum | 0.031 | 2.0 | 0.51 | 6.53 | 1.74 | 4.0 | 1.0 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
| Maximum | 0.036 | 2.0 | 0.61 | 8.23 | 2.50 | 6.8 | 1.9 | 0.10 | 0.03 | 0.10 | 0.03 | 1 | 0.0000 |
Table 3 represents the water quality data of the flow pumped to Applebrook Golf Course in August 2024.
PA DEP
No activity
Page 2 of 4
Pennoni Associates
No activity
Significant Rainfall
During August, there were nine (9) days when rainfall occurred.
Five (5) events exceeded 0.50 inches of rain in 24 hours:
- 8/4: 0.55”
- 8/7: 1.70”
- 8/9: 0.66”
- 8/10: 0.87”
- 8/19” 0.88”
Total Rainfall for August was 5.48 inches
Chemical Data
| Chemical | August 2024 Daily Average | Total Monthly |
|---|---|---|
| Caustic Soda, gal | 53.1 | 1,645 |
| Aluminum Sulfate solution, gal | 70.3 | 2,179 |
| Sludge Dewatering, gal* | 22,347 | 402,248 |
*18 days of sludge dewatering
There was a decrease of 137,009 gallons of sludge dewatering during August compared to July.
Minor Preventative Maintenance
- Flushed chemical feed lines to the SBRs.
- Cleaned final effluent weir trough daily.
- Skimmed surface of disc filters daily
- Drained and cleaned disc filters bi-weekly.
- Cleaned buildings and laboratory.
Major Repairs or Upgrades
- Remaining UV cables were installed
- Utility water pump replaced
- New Muffin Monster installed
Page 3 of 4
Caustic line for SBR 3 was replaced, and the tubing conduit design was improved to prevent another premature failure
Upcoming Repairs or Upgrades
The remaining caustic tubing conduits will be updated with the improved design to prevent premature failure of the caustic tubing
Flow Data
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
|---|---|---|---|
| Influent Wastewater to Screening Building | 9.768 | 315,105 | 467,180 |
| Influent Wastewater to SBRs | 11.340 | 365,796 | 485,968 |
| Internal Recycle | 1.575 | 50,794 | 96,740 |
| Treated Effluent to Disc Filters | 11.101 | 358,110 | 465,920 |
| Final Effluent Discharge | 7.703 | 248,000 | 351,000 |
| Applebrook Golf Course | 0.993 | 32,034 | 37,168 |
The plant hydraulic design loading is 745,000 gpd.
There were no high-flow events during August.
Page 4 of 4
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 12, 2024
The East Goshen Township Municipal Authority held their regular meeting on Monday, August 12, 2024 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Jack Yahraes
Carmen Battavio
Kevin Cummings
Also in attendance were:
Mark Miller (Director of Public Works),
Michele Truitt (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Mike Ellis (Pennoni).
COMMON ACRONYMS:
ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services
BOS – Board of Supervisors
CB – Conservancy Board
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
HC – Historical Commission
I&I – Inflow & Infiltration
LCSTP – Lockwood Chase Sewer Treatment Plant
PWD – Public Works Department
MA- Municipal Authority
NPDES – National Pollutant Discharge Elimination System
PC – Planning Commission
PM – Prevention Maintenance
PR – Park & Recreation Board
RCSTP – Ridley Creek Sewer Treatment Plant
SBR – Sequencing Batch Reactor
SSO – Sanitary System Overflow
WAS – Waste Activated Sludge
Call to Order & Pledge of Allegiance
Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Dana asked for a moment of silence for our troops, police, EMTs and first responders.
Dana asked if anyone would be recording the meeting. There was no response.
Chairman’s Report/Other Members Report
Mark reminded everyone that they will take a tour of the West Goshen plant before the September meeting. Meet at the Township Building at 5:00 p.m. He will provide a van.
MA 8-12-24 draft 1
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for August 12, 2024.
Monthly Flows – The average daily flow to West Goshen was 795,367 gallons per day.
Meters:
- The meters were read on a daily basis.
- No issues found with operating meters
C.C. Collection:
- All pump stations were visited on a daily basis.
C.C. Interceptor:
- Mowed and maintained.
R.C. Collection:
- Routine maintenance was performed on a daily basis.
- Public Works crew pulled all manholes and inspected and marked out sewer lines in the Clocktower development in preparation for upcoming Riggs/Distler utility work.
Ridley Creek Plant
- Cleaned grit chamber
- Jetted and flushed inflow pipe to the plant
Applebrook Golf Course
- PW crew replaced the Applebrook pump, and it is now pumping 36,500 gallons per day.
Alarms: 6
PA 1 Calls: 73
Monthly Rainfall: 2.80”
Lateral Repairs or Caps: 4: 1 Wentworth, 1 Reservoir Rd, 1 Baldwin Dr and 1 Katherine Ln
MA 8-12-24 draft 2
2. Pennoni Engineer’s Report dated July 15, 2024
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – Matt Mullin provided as-built photos of the caustic soda plumbing. We updated the as-built plans accordingly with the provided plumbing information and submitted the revised as-built plans to PADEP on July 23. We previously prepared a draft O&M Manual for the system that was submitted to the Township and operator for review. We will set up a meeting to review now that the system is up and running so that the Manual can be finalized.
- UV Disinfection System – On June 20, Lenni installed power to the jib crane and relocated the control panel to its permanent location, but it was discovered that the cords to connect the second UV module to the control panel are too short. Pennoni has since been coordinating with Glasco to obtain a new, longer cord for the module. Glasco picked up the temporary UV module cords to modify them to the correct length on July 25. Glasco will modify the temporary cords and return them in early August. After the new cords are installed, the two-week trial of the second UV module will begin. Glasco will also be scheduled to perform a post-startup inspection of the permanent UV installation. The temporary system has been fully disassembled. Pennoni informed Glasco on June 25 that the temporary channel is ready for pickup and for them to coordinate with Mark Miller on the specific day and time of the pickup. An updated tentative construction schedule follows with completed work in italics: Delivery of Permanent UV Equipment – October 30, 2023; Delivery of Bypass Pumps and Hoses – Week of November 13, 2023; Initiate Temporary Bypass Work – Mid-November 2023; Complete Temporary Bypass Work and Initiate Use of Bypass System – January 23, 2024; Two Week Trial and Sampling of Temporary Bypass System – completed February 9, 2024; Township to Perform Concrete Channel Work – completed late-March 2024 (end of initial curing); 2nd Notice to Proceed to Contractors: Permanent Work – Mid-March 2024; Redirect Flow back to Permanent Channel (±30 days of 2nd NTP) – April 24, 2024; Two Week Trial of New UV System in Permanent Channel – April 24 – May 8, 2024; Install Second UV Module into Permanent Channel – June 11, 2024; Two Week Trial of Second New UV System in Permanent Channel – August 13 – 27, 2024; Construction Completed –Late August 2024
- Generator #2 Replacement – No activity by Pennoni since the last report.
- Electrical Supply Evaluation – We received a quote from EnerG Test for the installation of a power meter on the incoming electric supply line for $9,144.00. The testing would be performed for 25 days and will monitor and log power usage, voltage, phase, and other components of the electric supply. EnerG Test’s engineers will analyze the results and provide a report within 30 days of completion of the monitoring. The report will address if there are unusual power/voltage spikes or drops and other anomalies. We recommend that
MA 8-12-24 draft 3
their scope also include recommendations in their report to address any observed deficient conditions. For example, if the voltage is extremely inconsistent, a line conditioner (which acts as an electric filter) may be recommended on the main supply line. If problems are identified on the main feed, their report and recommendations can be provided to PECO to substantiate the problem with a request for PECO to implement the recommendations.
Their proposal requires that arc flash labeling be on any electric equipment that they will be in contact with. Labeling is not on the Main Distribution Panel (MDP), so it will need to be installed before they install the power meter. A short circuit and arc flash analysis was performed as part of the RCSTP expansion in 2011. Labels were provided at that time, but there is not a label currently on the MDP. The Township will need to have the labels printed and attached to the MDP, and they should be attached to other applicable equipment while at it if other equipment is not currently labeled either. We can forward an electronic copy of the report that includes the labels from 2011.
Separate of the power monitoring – An updated arc flash study should be performed in the near future since it has been over five years since the last study and there have been electrical equipment changes, most notably the replacement of both generators. We could obtain a quote, and this be considered in 2025 budgeting. We anticipate it can occur separate of and after the power monitoring.
Sanitary Sewer Pipe Rehab
- Chester Creek Sewer Rehab – The Contractor, Insituform, has completed all work. We processed the fifth and final payment application and provided a payment recommendation letter. We also reviewed the Contractor’s Maintenance Bond, Statement of Surety, and Contractor’s Release and found all documents satisfactory. After approval of the final payment application, this project will be fully complete.
- Supplee Valley Pipe Lining – The next sewer rehabilitation project is planned to be installation of cured-in-place pipe liners in the remaining un-lined sewers in Supplee Valley as well as some manhole lining. We are finalizing the bid document and have updated the construction cost estimate. We anticipate the cost will be approximately $400,000, and we are coordinating with Dave Ware and Mark Miller on the available budget to establish Base Bid vs. Add Items. Funding from the planned 2025 Pipe Lining budget item is expected to be needed in conjunction with 2024 budget to cover the full cost of this work in one construction contract. The project is therefore proposed to be advertised in late August, bids due in late September, award consideration by the MA In October, and construction to occur in late 2024-early 2025 with all invoicing and payments to occur in 2025.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – We reviewed a revised Land Development Plan submission and issued a comment letter on July 25. In addition to other Land Development comments, a few minor sanitary sewer design comments remain outstanding.
- 301 Reservoir Road (5-Lot Residential Subdivision) – We assisted the Design Engineer with response to PADEP’s comments on the Sewage Facilities Planning mailer. Responses were provided to PADEP, and PADEP issued a Planning exemption letter on August 6.
MA 8-12-24 draft 4
- 1712 E. Boot Road – No activity by Pennoni since our last report. The service piping was previously installed, but we are not aware if the grinder pump has been installed.
- 14 Reservoir Road – PADEP approved the Sewage Facilities Planning Mailer exemption on June 5. We received a new plan submission and provided a comment letter on July 12. Amongst other things, two sanitary sewer design comments remain outstanding.
Capital Improvement Plan
- We prepared a 1 st draft of a 20+ year capital improvement plan that includes pipe lining, manhole lining, pump station upgrades, metering, wastewater treatment plant upgrades and equipment replacement, and other improvements. The plan is currently under review with Finance and Public Works. We anticipate the plan will be iteratively edited over the next few weeks, and an updated draft will be presented to the MA at the September meeting.
Note: Michele Truitt’s memo commented that the warranty on pumps for the pump station start when they are put into service not when they are received.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2024. All supplemental reports were submitted for July 2024. Caustic usage increased to 54 gallons per day from 51 gallons per day last month. Aluminum sulfate solution volumes decreased to a daily average of 68.8 gpd from the previous standard of 70.5 gallons per day. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering experienced no mechanical issues impacting production. There were no odor complaints during the month.
Note: There was discussion about the effluent numbers.
Approval of Minutes
The minutes of the July 15, 2024 meeting were approved as amended.
Approval of Invoices
- Walter moved to approve payment of the following Pennoni invoices: Invoice # 1233192 $ 113.00; Invoice # 1233193 $ 339.00; Invoice # 1233194 $ 5,142.50 Jack seconded the motion. The motion passed unanimously.
- Carmen moved to approve Payment Application #5 for Insituform Technologies Chester Creek Interceptor Inspection & Repair in the amount of $11,348.00. Walter seconded the motion. The motion passed unanimously.
MA 8-12-24 draft 5
- Carmen moved to approve JWC Environmental paid Invoice #119462 in the amount of $27,691.19. This was for the muffin monster. Jack seconded the motion. The motion passed unanimously.
- Carmen moved to approve payment of the following West Goshen Sewer Authority invoices: EG23-B $ 95.64; EG23-T $31,392.87 Walter seconded the motion. The motion passed unanimously.
- Jack moved to approve payment of the Gawthrop Greenwood invoice #293953 in the amount of $315.00. Walter seconded the motion. The motion passed unanimously.
Liaison Reports
1. Conservancy Board - Walter mentioned that the meeting is this Wednesday and they will review landscape plans for a developer.
Financial Reports
Dave Ware provided the following report:
Year to date July 2024, the Municipal Authority recorded $534,087.84 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $528,781.16 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, engineering, and audit expenses). The net result of operations is $5,306.68. As of July 31, 2024, the fund balance was $6,688.76.
Old Business
None
Goals – The goals were reviewed.
New Business
1. EnerG Test Quote - Mike explained that this quote of $9,144.00 would be for an electric meter to be installed and monitor the power supply coming into the plant. After discussion, Kevin and Carmen want the cost of a filter instead.
2. Supplee Valley Pipe Relining – Mike mentioned that in 2016 1/3 of the neighborhood was done. The cost to complete this is $380,000.00 which includes manhole grouting. $425,000.00 is available for this year. He can put it out for bid this week and have bids available for the September meeting. Kevin made a motion to approve advertising for bids for the sanitary sewer lining. Carmen seconded the motion. The motion passed unanimously.
MA 8-12-24 draft 6
Any Other Matter - None
Correspondence- None
Public Comment - None
Adjournment
There being no further business Jack moved to adjourn the meeting. Walter seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:45 pm. The next regular meeting will be held on Monday, September 9, 2024 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 8-12-24 draft 7
Memo
To: Municipal Authority
From: Dave Ware
Re: MA August 2024 YTD Financial Report
Date: September 4, 2024
YTD August 2024, the Municipal Authority recorded $551,815.68 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $546,471.54 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, RCSTP Caustic Soda, engineering and audit expenses). The net result of operations is $5,344.14. As of August 31, 2024, the fund balance was $12,906.30.
Attached is a complete list of 2024 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD August 2024
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 262.26 | 164.53 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 8,574.08 | 2,084.88 | 4,882.72 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,127.52 | 563.76 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 564.06 | 282.24 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 109,517.00 | 99,555.07 | 65,023.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 837,464.00 | 449,067.47 | 443,241.34 |
| Total Revenue | 959,546.66 | 551,815.68 | 514,157.59 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 39,847.10 | 22,380.52 | 19,343.25 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 3,286.22 | 1,056.61 | 1,655.25 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 21,630.00 | 11,250.00 | 10,500.00 |
| 07-424-3130 | ENGINEERING SERVICES | 48,667.50 | 21,929.00 | 25,522.00 |
| 07-424-3140 | LEGAL SERVICES | 8,652.00 | 4,249.50 | 5,432.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 0.00 | 10,567.25 | |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 310,500.00 | 27,691.19 | 0.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 85,000.00 | 0 | 10,240.62 |
| 07-429-1505 | RCSTP CAPITAL | 366,963.84 | 199,467.96 | 115,446.16 |
| 07-429-1510 | HERSHEY'S MILL ESTATES PROJECT | 0.00 | 0 | 90,113.64 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 831.00 | 50,412.49 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 0.00 | 215,560.00 | 0 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 75,000.00 | 31,488.51 | 182,262.24 |
| Total Expenses | 959,546.66 | 546,471.54 | 510,928.15 | |
| Net Result From Operations | 0.00 | 5,344.14 | 3,229.44 | |
Municipal Authority
YTD Revenues and Expenses thru 8/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/24 | Revenue Journal | INTEREST EARNED JANUARY 2024 | 35.21 |
| 07-341-1000 | INTEREST EARNINGS | 02/29/24 | Revenue Journal | INTEREST EARNED FEBRUARY 2024 | 41.23 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/24 | Revenue Journal | INTEREST EARNED MARCH 2024 | 50.34 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/24 | Revenue Journal | INTEREST EARNED APRIL 2024 | 16.09 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/24 | Revenue Journal | INTEREST EARNED MAY 2024 | 13.17 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/24 | Revenue Journal | INTEREST EARNED JUNE 2024 | 38.57 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/24 | Revenue Journal | INTEREST EARNED JULY 2024 | 30.19 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/24 | Revenue Journal | INTEREST EARNED AUGUST 2024 | 37.46 |
| 07-364-1110 | R.C.TAPPING FEES | 01/02/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 02/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 03/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 04/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 05/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 06/04/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1110 | R.C.TAPPING FEES | 07/01/24 | Revenue Journal | 1577 COLONIAL LN | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 01/25/24 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 13262 | 281.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 04/24/24 | Revenue Journal | CONNECTION FEE INSTALLMENT INV# 13263 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 01/25/24 | Revenue Journal | PINE ROCK INTEREST PORTION - STOFFLET | 141.12 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 04/24/24 | Revenue Journal | PINE ROCK INTEREST PORTION - PAPPANO | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/09/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 431.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/11/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 533.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/14/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 4,349.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/22/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 500.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/11/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 749.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/15/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 6,041.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/21/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,000.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/26/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 245.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,190.26 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/01/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 62.61 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/03/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,874.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/09/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 431.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/14/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,996.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/21/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 3,750.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 492.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,190.26 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/16/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,570.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/29/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 27,691.19 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/15/24 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 5,457.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/02/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,720.00 |
Page 1 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/05/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 94.02 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 97.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,805.16 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/26/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 9,530.65 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/31/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,136.12 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/06/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,860.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/08/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 91.92 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/14/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,598.99 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/15/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 73,665.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/22/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 5,848.97 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/27/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 46,517.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/29/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 923.91 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/05/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,703.78 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/06/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 800.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/11/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,991.86 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/15/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 37,659.48 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/21/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,101.53 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/01/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 558.07 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/03/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,690.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/09/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,375.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/14/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 1,694.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/06/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 117,677.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/16/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 64,206.37 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/29/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 31,488.51 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/14/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 11,348.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/15/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 452.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/27/24 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 432.88 |
| Total Revenue | 551,815.68 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/26/24 | Pay Check: 706 | 24-00730 QTR 1 2024 MA CHARGE BACK | 11,190.26 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/27/24 | Pay Check: 708 | 24-01495 QTR 2 2024 MA CHARGE BACK | 11,190.26 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/11/24 | Pay Check: 3493 | 24-00582 2024 ANNUAL DAILY DISCHARGE CA | 749.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/26/24 | Pay Check: 3502 | 24-00722 PREP SEAL &PAINT BLOCK CHAMBER | 245.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 27.02 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 35.59 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 02/22/24 | Pay Check: 3486 | 24-00447 PROGRESS BILLING AUDIT EGT MUA | 500.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/21/24 | Pay Check: 3501 | 24-00676 PROGRESS BILLING AUDIT EGT MUA | 7,000.00 |
Page 2 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 05/21/24 | Pay Check: 3509 | 24-01183 FINAL BILLING AUDIT EGT MUA | 3,750.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00380 SERV THRU 011424 23 CHAPTER 94 | 744.50 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00381 SERV THRU 011424 2024 GEN SERV | 799.75 |
| 07-424-3130 | ENGINEERING SERVICES | 02/14/24 | Pay Check: 3483 | 24-00384 SERV THRU 011424 2023 GEN SERV | 521.50 |
| 07-424-3130 | ENGINEERING SERVICES | 03/15/24 | Pay Check: 3497 | 24-00647 SERV THRU 021124 23 CHAPTER 94 | 649.75 |
| 07-424-3130 | ENGINEERING SERVICES | 03/15/24 | Pay Check: 3497 | 24-00648 SERV THRU 021124 2024 GEN SERV | 725.00 |
| 07-424-3130 | ENGINEERING SERVICES | 04/03/24 | Pay Check: 3503 | 24-00780 SERV THRU 031724 2024 GEN SERV | 1,609.50 |
| 07-424-3130 | ENGINEERING SERVICES | 04/03/24 | Pay Check: 3503 | 24-00779 SERV THRU 031724 23 CHAPTER 94 | 1,101.75 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/24 | Pay Check: 3508 | 24-01143 SERV THRU 041424 2024 GEN SERV | 4,015.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/24 | Pay Check: 3508 | 24-01142 SERV THRU 041424 23 CHAPTER 94 | 1,509.50 |
| 07-424-3130 | ENGINEERING SERVICES | 07/16/24 | Pay Check: 3514 | 24-01661 SERV THRU 061624 2024 GEN SERV | 5,109.75 |
| 07-424-3130 | ENGINEERING SERVICES | 08/15/24 | Pay Check: 3521 | 24-01872 SERV THRU 071424 2024 GRN SERV | 5,142.50 |
| 07-424-3140 | LEGAL SERVICES | 01/11/24 | Pay Check: 3474 | 24-00076 LEGAL SERV DEC 2023 GEN AUTH | 533.00 |
| 07-424-3140 | LEGAL SERVICES | 02/14/24 | Pay Check: 3481 | 24-00378 LEGAL SERV JAN 2024 GEN AUTH | 528.50 |
| 07-424-3140 | LEGAL SERVICES | 03/15/24 | Pay Check: 3496 | 24-00635 LEGAL SERVICES 2/5-2/12/24 GEN | 430.50 |
| 07-424-3140 | LEGAL SERVICES | 04/09/24 | Pay Check: 3505 | 24-00826 LEGAL SERV MARCH 2024 GEN AUTH | 431.00 |
| 07-424-3140 | LEGAL SERVICES | 05/14/24 | Pay Check: 3507 | 24-01141 LEGAL SERV APRIL 2024 GEN AUTH | 471.50 |
| 07-424-3140 | LEGAL SERVICES | 06/27/24 | Pay Check: 3511 | 24-01450 LEGAL SERV MAY 2024 GEN AUTH | 492.00 |
| 07-424-3140 | LEGAL SERVICES | 07/16/24 | Pay Check: 3512 | 24-01657 LEGAL SERV JUNE 2024 GEN AUTH | 1,048.00 |
| 07-424-3140 | LEGAL SERVICES | 08/15/24 | Pay Check: 3520 | 24-01873 LEGAL SERV JULY 2024 GEN AUTH | 315.00 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 02/14/24 | Pay Check: 3483 | 24-00383 SERV THRU 011424 CHESTER CREEK | 1,755.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 03/15/24 | Pay Check: 3497 | 24-00645 SERV THRU 021124 CHESTER CREEK | 4,235.75 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 04/03/24 | Pay Check: 3503 | 24-00782 SERV THRU 031724 CHESTER CREEK | 3,163.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 07/16/24 | Pay Check: 3514 | 24-01660 SERV THRU 061624 CHESTER CREEK | 1,412.50 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 07/29/24 | Pay Check: 3516 | 24-01742 CMD3210-XDS2.0 MUFFIN MONSTER | 27,691.19 |
| 07-429-1505 | RCSTP CAPITAL | 01/05/24 | Pay Check: 3472 | 24-00033 TYPE B C&G 3" COULOER X M NPT | 94.02 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/24 | Pay Check: 703 | 24-00056 VARIOUS PURCHASES- SEE NOTES | 97.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/17/24 | Pay Check: 3475 | 24-00098 RC ST-RAN CONDUIT FOR TEMP PUM | 9,530.65 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 4" FNPT X 6" MCAM | 429.92 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 ADAPTER 6" FRMALE CAM X MNPT | 1,337.24 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 HOSE 6" X 50' CAMLOCK LAYFLAT | 12,392.88 |
| 07-429-1505 | RCSTP CAPITAL | 01/26/24 | Pay Check: 3476 | 24-00041 DELIVERY | 645.12 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3477 | 24-00210 SAND BAR (YELLOW) & BAGS | 67.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/31/24 | Pay Check: 3478 | 24-00237 HOSE 6"X10' HD TANK TRUCK CAML | 4,069.12 |
| 07-429-1505 | RCSTP CAPITAL | 02/06/24 | Pay Check: 3479 | 24-00271 TROUGH AND CMU WALL ABLATION | 6,860.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/08/24 | Pay Check: 704 | 24-00317 VARIOUS PURCHASES- SEE NOTES | 91.92 |
| 07-429-1505 | RCSTP CAPITAL | 02/14/24 | Pay Check: 3482 | 24-00379 RCSTP- UV REPLACEMENT PYMT 1 | 4,296.24 |
| 07-429-1505 | RCSTP CAPITAL | 02/14/24 | Pay Check: 3483 | 24-00382 SERV THRU 011424 RCSTP GENERAT | 302.75 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3484 | 24-00426 UV SYSTEM INSTALLATION-FILTER | 1,427.00 |
Page 3 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3484 | 24-00425 DISK FILTER#1 FAILURE, ALARM T | 300.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3485 | 24-00436 PIPING FOR NEW MUFFIN MONSTER | 3,980.40 |
| 07-429-1505 | RCSTP CAPITAL | 02/22/24 | Pay Check: 3487 | 24-00437 ELECTICAL PARTS-INSTL MUFFIN M | 141.57 |
| 07-429-1505 | RCSTP CAPITAL | 02/27/24 | Pay Check: 3489 | 24-00513 FLYGT NP-3171.095 6" SUBMERSIB | 33,647.00 |
| 07-429-1505 | RCSTP CAPITAL | 02/29/24 | Pay Check: 705 | 24-00520 VARIOUS PURCHASES- SEE NOTES | 794.81 |
| 07-429-1505 | RCSTP CAPITAL | 02/29/24 | Pay Check: 705 | 24-00520 VARIOUS PURCHASES- SEE NOTES | 129.10 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3490 | 24-00539 PURCHASE TENT HEATERS &DELIVER | 2,149.78 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3491 | 24-00530 (20) ROD 5/8 X 20' (#5) | 356.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/05/24 | Pay Check: 3491 | 24-00550 5.5 YD CONCRETE 4000 PSI | 1,198.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/06/24 | Pay Check: 3492 | 24-00567 20X20 TENT RENTAL UV CONCRETE | 800.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/11/24 | Pay Check: 3494 | 24-00606 DUMPSTER RENTAL- CONSTRUCTION | 450.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/11/24 | Pay Check: 3495 | 24-00607 RCSTP-UV DISINFEC RPLCMT PYMT2 | 3,541.86 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3497 | 24-00646 SERV THRU 021124 RCSTP GENERAT | 3,658.25 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3497 | 24-00644 SERV THRU 031124 RCSTP UV REPL | 2,698.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3498 | 24-00659 (5) 5 GALLONS WHITE PAINT | 118.95 |
| 07-429-1505 | RCSTP CAPITAL | 03/15/24 | Pay Check: 3499 | 24-00625 RCSTP- UV DISINFECTION SYS REP | 31,183.78 |
| 07-429-1505 | RCSTP CAPITAL | 03/21/24 | Pay Check: 3500 | 24-00698 INSTALL EMER. SHOWER & EYEWASH | 3,101.53 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 18.49 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 313.32 |
| 07-429-1505 | RCSTP CAPITAL | 04/01/24 | Pay Check: 707 | 24-00765 VARIOUS PURCHASES- SEE NOTES | 226.26 |
| 07-429-1505 | RCSTP CAPITAL | 04/03/24 | Pay Check: 3503 | 24-00783 SERV THRU 031724 RCSTP UV REPL | 661.50 |
| 07-429-1505 | RCSTP CAPITAL | 04/03/24 | Pay Check: 3503 | 24-00781 SERV THRU 031724 RCSTP GENERAT | 1,028.50 |
| 07-429-1505 | RCSTP CAPITAL | 04/09/24 | Pay Check: 3504 | 24-00872 20X20 FRAME TENT RENTAL4/3-5/1 | 800.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/09/24 | Pay Check: 3506 | 24-00869 CONCRETE PUMPING- 1751 TOWNE | 575.00 |
| 07-429-1505 | RCSTP CAPITAL | 05/14/24 | Pay Check: 3508 | 24-01144 SERV THRU 041424 RCSTP UV REPL | 1,571.25 |
| 07-429-1505 | RCSTP CAPITAL | 07/16/24 | Pay Check: 3513 | 24-01664 RCSTP-UV DISINFEC RPLCMT PYMT3 | 10,110.42 |
| 07-429-1505 | RCSTP CAPITAL | 07/16/24 | Pay Check: 3513 | 24-01662 RCSTP-UNWIRE & REMOVE CABLES | 267.50 |
| 07-429-1505 | RCSTP CAPITAL | 07/16/24 | Pay Check: 3514 | 24-01658 SERV THRU 061624 RCSTP UV REPL | -226.00 |
| 07-429-1505 | RCSTP CAPITAL | 07/16/24 | Pay Check: 3514 | 24-01658 SERV THRU 061624 RCSTP UV REPL | 689.75 |
| 07-429-1505 | RCSTP CAPITAL | 07/16/24 | Pay Check: 3515 | 24-01663 RCSTP-UV DISINFECTION SYS REP | 52,769.70 |
| 07-429-1505 | RCSTP CAPITAL | 08/15/24 | Pay Check: 3521 | 24-01871 SERV THRU 070124 RCSTP UV REPL | 339.00 |
| 07-429-1505 | RCSTP CAPITAL | 08/27/24 | Pay Check: 3522 | 24-01972 INJECTABLE MORTAR HY 200-A V3 | 432.88 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 05/14/24 | Pay Check: 3508 | 24-01145 SERV THRU 041424 RCSTP CAU SOD | 123.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 07/16/24 | Pay Check: 3514 | 24-01659 SERV THRU 061624 RCSTP CAU SOD | 595.00 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 08/15/24 | Pay Check: 3521 | 24-01870 SERV THRU 071424 RCSTP CAU SOD | 113.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/14/24 | Pay Check: 3480 | 24-00376 CHESTERCREEK INTERCEPTOR PYMT1 | 20,340.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/14/24 | Pay Check: 3480 | 24-00377 CHESTERCREEK INTERCEPTOR PYMT2 | 53,325.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 02/27/24 | Pay Check: 3488 | 24-00516 CHESTERCREEK INTERCEPTOR PYMT3 | 12,870.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 06/09/24 | Pay Check: 3510 | 24-01292 CHESTERCREEK INTERCEPTOR PYMT4 | 117,677.00 |
Page 4 of 5
Municipal Authority
YTD Revenues and Expenses thru 8/31/2024
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-3700 | CHESTER CREEK CAPITAL | 08/05/24 | Pay Check: 3519 | 24-01787 CHESTERCREEK INTERCEPTOR PYMTS | 11,348.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 07/29/24 | Pay Check: 3517 | 24-01750 2023 WG SEWER AUTH TAPPING FEE | 31,392.87 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 07/29/24 | Pay Check: 3518 | 24-01751 2023 WG SEWER AUTH BOND FUND E | 95.64 |
| Total Expense | 546,471.54 | ||||
| Net Operating | 5,344.14 | ||||
Page 5 of 5
Pennoni
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713 T: 302-655-4451 F: 302-654-2895
www.pennoni.com
September 5, 2024
EGMAU24001
Mark Miller Director of Public Works East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Re: Award Recommendation Supplee Valley Sanitary Sewer Pipe Lining, Contract No. SSPL-2024
Dear Mr. Miller:
We have tabulated the bids received through PennBid on September 4, 2024 for the referenced contract. The bid tabulation is attached.
As reflected in the bid tabulation, the low bidder for the project is Vortex Services, LLC, who submitted a Total Bid of $331,241.00.
We found Vortex Services submitted proposal to be complete and accurate. We have confirmed their experience on similar projects. Therefore, as the responsive low bidder, we recommend Vortex Services be awarded the contract for the Base Bid and all Add Items in the amount of $331,241.00.
Vortex Services’ bid package documents are also attached.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE Associate Vice President
Enclosures: As noted
/za
cc: East Goshen Municipal Authority Derek Davis, Township Manager Dave Ware, Finance Director Patrick McKenna, Esq.
East Goshen Municipal Authority
Tabulation of Bids Received by 11:00 AM Eastern on September 4, 2024
Contract No. SSPL-2024: Supplee Valley Sanitary Sewer Pipe Lining
| ITEM NUMBER | DESCRIPTION | ESTIMATED QUANTITY/UNIT | Vortex Services LLC 210 Bennett Road Freehold, NJ 07728 (814) 270-7602 | Insituform Technologies, LLC 580 Goddard Avenue Chesterfield, MO 63005 (636) 530-8679 | AM-Liner East, Inc. 601 Jack Enders Blvd Berryville, VA 22611 (540) 955-9671 | Mobile Dredging & Video Pipe, Inc. 1566 Harding Highway Newfield, NJ 08344 (856) 697-1900 | ||||
|---|---|---|---|---|---|---|---|---|---|---|
| UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | |||
| BASE BID | ||||||||||
| 1-1 | Cured-In-Place Pipe Lining of 8" Pipe within Township Roads | 2,418 L.F. | $54.00 | $130,572.00 | $51.00 | $123,318.00 | $60.00 | $145,080.00 | $62.00 | $149,916.00 |
| 1-2 | Cured-In-Place Pipe Lining of 8" Pipe within Easements | 2,556 L.F. | $54.00 | $138,024.00 | $62.00 | $158,472.00 | $65.00 | $166,140.00 | $65.00 | $166,140.00 |
| 1-3 | Lateral Reinstatements | 35 EA. | $55.00 | $1,925.00 | $99.00 | $3,465.00 | $150.00 | $5,250.00 | $200.00 | $7,000.00 |
| TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES) | $270,521.00 | $285,255.00 | $316,470.00 | $323,056.00 | ||||||
| ADD ITEMS | ||||||||||
| 2-1 | Cured-In-Place Pipe Lining of 8" Pipe from C414 to C413 | 370 L.F. | $45.00 | $16,650.00 | $45.00 | $16,650.00 | $60.00 | $22,200.00 | $66.00 | $24,420.00 |
| 2-2 | Cured-In-Place Pipe Lining of 8" Pipe from C413 to C412 | 139 L.F. | $72.00 | $10,008.00 | $89.00 | $12,371.00 | $60.00 | $8,340.00 | $66.00 | $9,174.00 |
| 2-3 | Cured-In-Place Pipe Lining of 8" Pipe from C412 to C411 | 232 L.F. | $63.00 | $14,616.00 | $63.00 | $14,616.00 | $60.00 | $13,920.00 | $66.00 | $15,312.00 |
| 2-4 | Lateral Reinstatements between C414 to C413 | 6 EA. | $55.00 | $330.00 | $128.00 | $768.00 | $150.00 | $900.00 | $200.00 | $1,200.00 |
| 2-5 | Lateral Reinstatements between C413 to C412 | 3 EA. | $55.00 | $165.00 | $136.00 | $408.00 | $150.00 | $450.00 | $200.00 | $600.00 |
| 2-6 | Lateral Reinstatements between C412 to C411 | 1 EA. | $55.00 | $55.00 | $141.00 | $141.00 | $150.00 | $150.00 | $200.00 | $200.00 |
| 2-7 | Manhole Pressure Grouting | 4 EA. | $3,124.00 | $12,496.00 | $4,850.00 | $19,400.00 | $2,000.00 | $8,000.00 | $2,400.00 | $9,600.00 |
| 2-8 | Grout | 160 GAL. | $40.00 | $6,400.00 | $58.00 | $9,280.00 | $15.00 | $2,400.00 | $20.00 | $3,200.00 |
| TOTAL ADD ITEMS (BASED ON ESTIMATED QUANTITIES) | $60,720.00 | $73,634.00 | $56,360.00 | $63,706.00 | ||||||
| TOTAL BASE BID AND ADD ITEMS (BASED ON ESTIMATED QUANTITIES) | $331,241.00 | $358,889.00 | $372,830.00 | $386,762.00 | ||||||
| BID SECURITY REVIEW | 10% of Bid | 10% of Bid | 10% of Bid | 10% of Bid | ||||||
We Declare this to be a true Tabulation of Bids Received on September 4, 2024 by East Goshen Municipal Authority for Contract No. SSPL-2024.
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE, PA Reg. No. PE075139 FOR: PENNONI ASSOCIATES INC.
Lynn Werkheiser
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Thursday, September 5, 2024 6:49 PM
To: Mark Miller; Lynn Werkheiser; David Ware
Cc: Derek Davis; Erika Addison
Subject: RCSTP Electrical Supply Evaluation
Attachments: 2024-07-24_EnerG Test Proposal Sf-10794 Ridley Creek STP Utility Power Monitoring.pdf
Hi All,
This email is in follow up to the Authority’s direction at the August meeting to install a line conditioner on the PECO main electric supply line at the RCSTP instead of performing a study of the incoming electrical supply, if the cost to install a line conditioner was similar to the cost of the study.
Exec Summary – We recommend the study be performed per the attached quote before performing any corrective actions.
Explanation follows:
EnerG Test provided the attached quote to install a power meter on the incoming electric supply line. EnerG Test’s quote proposed $9,144.00 for the installation of the power meter, including testing for 25 days. The testing will monitor and log power usage, voltage, phase, and other components of the electric supply. As part of the quote, EnerG Test’s engineers will analyze the results and provide a report within 30 days of completion of the monitoring. The report will address if there are any unusual power/voltage spikes or drops and other anomalies.
The MA requested at the August meeting that we obtain a cost to install a line conditioner on the main electric supply line. We consulted with our electrical engineers and Lenni Electric, who both advised that the cost for a line conditioner would be significantly more than $9,144. Lenni expects the labor alone would be at least that much. That would potentially require this work be publicly bid. Additionally, Lenni is not certified to work on that size line, nor would any Township contractor be allowed to without PECO approval since PECO owns that part of the line. PECO would likely only allow a line conditioner if installed by their own crew. Further, PECO is highly unlikely to approve or install such equipment without a study that identifies/proves the exact issues and corrective actions. If the study identifies the problem to be on the PECO side of the Main Distribution Panel (MDP), then PECO will be obligated to address it at their own cost. We recognize that could be very slow to occur, but there is not an option if the solution needs to be implemented on that line.
Pennoni and Lenni further recommend the study in order to determine the exact problem. While a line conditioner might be a solution based on what we’ve heard, we do not know if it will address the electrical spiking issues without a study. For example, the study may identify that the spikes occur due to an issue on the RCSTP side of the MDP. For example, there could be a very high instantaneous electric demand within the plant, such as certain pieces of equipment (i.e. blowers and pumps) turning on at exactly the same time, which may only happen infrequently. There could be a variety of other causes as well, each of which may have a different solution. It would thereby be a guess to implement a “corrective action” without the study.
As a result, we strongly recommend that the study be performed as the 1st step. We also recommend EnerG Test’s quote include recommendations to address any observed deficient conditions. If the study identifies that there are problems and that they are on the PECO line, the report and recommendations can be provided to PECO to substantiate the problem with a request for PECO to implement the recommendations. This process is expected
1
to be more effective for the Authority/Township by first identifying if there is a problem, and if so, what the cause(s) is and how to address it.
Mike
Michael Ellis, PE Municipal Division Manager
Pennoni Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713 Direct: +1 302-351-5236 | Mobile: +1 302-561-4235 www.pennoni.com | MEllis@Pennoni.com
Engineering the Future
Our Services and Expertise
Our Services and Expertise
2
enerGtest
employee owned
206 Gale Lane, Kennett Square, PA 19348 | enerGtest.com | Office: 484-731-0200 | 24hr Service: 800-456-7782
empowering peace of mind
Erika Addison Pennoni Associates 121 Continental Drive, Suite 207 Newark, DE 19713 Phone: 302-351-5263 Email: eaddison@Pennoni.com
July 24, 2024
Re: Ridley Creek STP Utility Power Monitoring Site Adress: 1751 Towne Drive, West Chester, PA 19380 EnerG Test Proposal #SF-10794
EnerG Test, LLC is a NETA accredited, highly trained, qualified, and experienced engineering service, electrical testing, and equipment servicing organization, a fully owned subsidiary of the Tri-M Group. Safety, quality, and professionalism are the fundamental characteristics of our company, and our accomplishments are identified by reliability, efficiency, and thoroughness. We specialize in offering engineering, testing, and equipment solutions to meet our customer’s needs.
Based on your request, EnerG Test will provide labor material, and equipment to provide the following scope of work:
Detailed Scope of Work:
- Install Power Quality Meter Average current usage, peak current usage; RMS voltage, Transient voltage, voltage swells, voltage dips and dropouts; Power factor, Displacement power factor, voltage unbalances and phase sequence; Harmonic voltage and currents; All data will be analyzed by a professional engineer and a full report will be provided.
General Clarifications:
- Power meter will be left on for a period of 25 days.
- EnerG Test to provide protective grounds, as necessary, for safe access to the equipment
- No repair, replacement parts, or associated labor outside of the scope of work is included.
- This proposal assumes that any equipment requiring energized electrical work, including but not limited to commissioning, metering, and testing, will be labeled by the owner with an NFPA 70E compliant arc flash label. If a label or owner provided analysis is not available, an incident energy analysis can be provided at an additional fee.
- This proposal excludes providing an Arc Flash Hazard Analysis and associated equipment labeling.
- Final report will be issued within 30 calendar days after completion of scope of work.
Schedule/ Timeline
- Our proposal is based on completing the scope of work during normal business hours (Mon-Fri 7am – 3:30pm)
- No electrical outage will be required to install the power meter.
- Power meter will be left on for a period of 25 days.
Owner Responsibilities
The facility owner representatives are to provide:
- Provide all equipment manufacturer manuals and single line drawings
- All switching to remove electrical load and restore electrical load if applicable.
- Coordination of switching by the local utility to isolate the equipment for inspection and testing and payment for services provided by the utility if applicable.
enerGtest.com
enerGtest
employee owned
206 Gale Lane, Kennett Square, PA 19348 | enerGtest.com | Office: 484-731-0200 | 24hr Service: 800-456-7782
empowering peace of mind
Pricing
Total Project Pricing: $9,144.00
- No federal, state, or local taxes on labor are included in the above pricing.
- If this project is tax exempt, a copy of their tax-exempt form with be submitted with their purchase order
- The volatility of copper and other metals as well as the unpredictability of the impacts related to new government tariffs have made the projection of certain building materials difficult to forecast. EnerG Test reserves the right to recover increases greater than 5% of any materials containing copper or other metals. The increase will be based on Producer Price Index as of the day the proposal is submitted.
- Cancellation or postponement of schedule work (non-weather related) could result in additional charges.
- Cancellation/postponement within 48 hours of scheduled work will result in a fee of 10% of the project value.
- Cancellation/postponement within 1 week of scheduled work will result in a fee of 5% of the project value.
Terms & Conditions
- This proposal is valid for thirty (30) days, from the date of issue.
- EnerG Test’s Customer Terms and Conditions (05.25.21 Version) are the basis for all pricing and should this proposal be accepted shall become part of the contract documentation and supersede all subsequent terms to the contrary.
EnerG Test appreciates the opportunity to support your electrical needs. If you have any questions, please contact me.
Respectfully,
Jason Smith
Jason Smith Account Executive Cell: 610-721-3548 Email: mjsmith@energtest.com