Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 10, 2025
7:00
- 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
- CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
- LIAISON REPORTS
- SEWER REPORTS Director of Public Work’s Report; Pennoni Engineer’s Report; Big Fish Environmental Report
- APPROVAL OF MINUTES January 13, 2025
- APPROVAL OF INVOICES
| Company | Invoice # | Amount | Paid? |
|---|---|---|---|
| Pennoni | 1258959 | $970.00 | |
| Pennoni | 1258961 | $343.75 | |
| Gawthrop Greenwood | 222070486 | $594.50 | |
| Lenni Electric | 250122 | $6,522.50 | paid |
| Alfa Laval | 285760303 | $7,875.00 | paid |
- FINANCIAL REPORTS January 2025
- OLD BUSINESS
1
- 2025 Goals:
| Goal | Status |
|---|---|
| Ridley Creek Plant compliance | January was in compliance with PADEP permit requirements. |
| Continue to implement infiltration and inflow for the sewer system | Ongoing. |
| Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. | Attend meetings on quarterly basis. |
| Long-term sustainability | (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates. |
- NEW BUSINESS
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
2
1
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171
Date: February 10, 2025 To: Municipal Authority From: Mark Miller Re: Monthly Report Monthly Flows: The average daily flow to West Goshen was 626,723 per day. Meters:
• Were read on a daily basis • Two of three replacement meters for Ellis Lane, Paoli Pike, and Westtown Way have arrived. We also be replacing the mounting brackets as soon as the third meter arrives. C.C. Collection:
• Pump stations were visited on a daily basis • We had a problem with the fog rod at the Barkway station and operated off the backup floats until John Laidley replaced it. • We have continued with the televising and cleaning of the collection lines in Sectors 3 and 4 and have started with the repairs. Pipe Data View will be taking care of the pressure grouting of the larger ones. • Goshen Valley: We will be meeting with the two property management companies that oversee the facilities to go over the list of problems our guys have compiled.
Ridley Creek Collection:
• The pump stations were visited daily. • The wet well at the Hunt Country pump station was washed down and vacuumed out. • The pump that was pulled at the Hershey Mill station was not worth getting repaired, so we ordered a new one at a cost of $9,400.00 with a 6-week delivery time. • We received a sewer odor complaint at the bottom of Cornwallis Drive and had to replace the charcoal filter that was in the manhole.
2
Ridley Creek Plant:
• The new generator has been installed and is in operation. Alarms: 16 PA One Calls: 77 Monthly Rainfall: 1.68” Lateral Repairs or Caps:
Pennoni
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
February 7, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- UV Disinfection System – The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. The system is still being run in Hand mode with one module On and the other Off in the meantime. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
- Generator #2 Replacement – The new generator was installed on January 16.
- Electrical Supply Evaluation – The power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest provided the testing report on January 10. A summary of the report is as follows: 12 voltage events were recorded during the 25-day monitoring period. All of the events were either dips or interruptions. 10 of the events occurred on 12/5/24. 2 of the events occurred on 12/17/24.; 10 of the events occurred on 12/5/24.; 2 of the events occurred on 12/17/24.; The power quality at the RCSTP appeared to be adequate during that period as the only events recorded were dips and interruptions which are believed to have originated externally to the plant.; No swells or surges were recorded during the monitoring period.; While onsite, it was noted that the A phase surge protection module in the outdoor MDP switchboard was not indicating an active status. It is recommended that this is replaced.; Additionally, it is recommended to have surge protection installed at multiple locations and voltage levels within the facility.
The plant operator stated that the generators briefly turned on 12/5 and 12/17, but no equipment issues were reported. We are discussing the results further with our electrical engineers and will provide a recommendation regarding next steps.
- Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes, most notably the replacement of both generators. We contacted the company who performed the last arc flash study, Clinger Electric, in November to obtain a quote. They have not been responsive so we will reach out to other firms for a quote.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – A pre-construction meeting with the contractor, Vortex Services, is scheduled for February 12.
- DCED Small Water & Sewer Grant – Applications are now being accepted until April 30 for construction, improvement, and repair of water, sanitary sewer, or storm sewer projects for up to $500,000. This is a potential source of funding for 2026 pipe lining work, Hershey’s Mill Pump Station upgrades, or other sewer system improvements.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are performing regular inspections.
- 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction is ongoing, and we are performing regular inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU25001 Engineer’s Report
East Goshen Municipal Authority February 7, 2025 Page 2 of 2
- 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. We are coordinating with Howell Environmental and Township staff to have the required Sewage Facilities Planning Module (SFPM) Components completed and signed and submitted to PADEP. It was the previous understanding that PADEP was not requiring any forms or SFPM resolution by East Goshen since the bulk of the project is in West Whiteland and the entire public sewer system is proposed to be owned by West Whiteland, but PADEP subsequently provided comments that the forms and resolution are required.
- 1344 Morstein Road – One new home is proposed with a grinder pump. Pennoni met virtually with the design engineer to discuss design and plan requirement. We subsequently reviewed an updated sewer plan submission and provided sanitary sewer comments to the design engineer on February 6.
- 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.
Chapter 94 Reports
- We continued preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31.
END OF REPORT
RCSTP Monthly Operations Report
February 2025
Big Fish Environmental Services Inc.
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for January 2025. All supplemental reports were submitted for January 2025. Caustic usage increased to 64.67 gallons per day from 54.34 gallons per day last month. Aluminum sulfate solution volumes remained at a daily average of 74 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Table 1
| January 2025 - Final Effluent - Outfall 001 | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 | Total Nitrogen | TSS | NH4-N | Total Phosphorus | Fecal Coliform | Ultraviolet light Intesity | Copper, Total | Zinc, Total | ||||||
| mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | mg/L | lbs/month | Geo Mean | Geo Mean | |||||
| 0.75 | 10 | 62 | Report | Report | 10 | 62 | 25 | 44 | 0.5 | 3 | 200 | 1,000 | ||||
| Inst. Max | 20 | 94 | 15 | 94 | 5 | 1 | Report | Report | Report | |||||||
| Sample Date | ||||||||||||||||
| January 7, 2025 | 0.375 | 2.2 | 6.9 | 6.18 | 19.3 | 6.8 | 21.3 | 0.10 | 0.31 | 0.11 | 0.34 | 1 | 0.0000 | NS | 0.003 | 0.039 |
| January 14, 2025 | 0.221 | 2.2 | 4.1 | 6.00 | 11.1 | 6.2 | 11.4 | 0.10 | 0.18 | 0.11 | 0.20 | 1 | 0.0000 | NS | NS | NS |
| January 21, 2025 | 0.310 | 3.1 | 8.0 | 7.37 | 19.1 | 4.2 | 10.9 | 0.10 | 0.26 | 0.13 | 0.34 | 1 | 0.0000 | NS | NS | NS |
| January 28, 2025 | 0.277 | 2.1 | 4.9 | 6.91 | 16.0 | 4.0 | 9.2 | 0.10 | 0.23 | 0.10 | 0.23 | 1 | 0.0000 | |||
| NS | NS | NS | ||||||||||||||
| Average | 0.296 | 2.4 | 6.0 | 6.62 | 16.4 | 5.3 | 13.2 | 0.10 | 0.25 | 0.11 | 0.28 | 1 | 0.0000 | NA | NA | NA |
| Minimum | 0.221 | 2.1 | 4.1 | 6.00 | 11.1 | 4.0 | 9.2 | 0.10 | 0.18 | 0.10 | 0.20 | 1 | 0.0000 | NA | NA | NA |
| Maximum | 0.375 | 3.1 | 8.0 | 7.37 | 19.3 | 6.8 | 21.3 | 0.10 | 0.31 | 0.13 | 0.34 | 1 | 0.0000 | NA | NA | NA |
Treatment Process Operation
Table 1 illustrates the final effluent composite sample data reported for outfall 001 for January 2025. The monthly average total phosphorus was reported as 0.11 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 5.3 mg/L compared to the discharge limitation of 10 mg/L.
Table 2
January 2025 - Influent Wastewater
| Design Basis | Flow MGD Average | BOD5 | CBOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total , mg/L | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| 335 | 2,098 | NA | NA | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample Date | |||||||||||||
| January 7, 2025 | 0.355 | 699 | 2,070 | 512 | 1,516 | 668 | 1,978 | 39.9 | 118 | 70.0 | 207 | 13.9 | 41.2 |
| January 14, 2025 | 0.246 | 258 | 529 | 314 | 644 | 264 | 542 | 33.1 | 68 | 54.1 | 111 | 6.86 | 14.1 |
| January 21, 2025 | 0.316 | 354 | 933 | 266 | 701 | 242 | 638 | 36.1 | 95 | 44.0 | 116 | 7.84 | 20.7 |
| January 28, 2025 | 0.311 | 336 | 871 | 319 | 827 | 240 | 622 | 24.9 | 65 | 94.5 | 245 | 8.16 | 21.2 |
| Average | 0.307 | 412 | 1,101 | 353 | 922 | 354 | 945 | 34 | 86 | 65.7 | 170 | 9.19 | 24.3 |
| Minimum | 0.246 | 258 | 529 | 266.0 | 644 | 240 | 542 | 25 | 65 | 44.0 | 111 | 6.86 | 14.1 |
| Maximum | 0.355 | 699 | 2,070 | 512 | 1,516 | 668 | 1,978 | 40 | 118 | 94.5 | 245 | 13.90 | 41.2 |
Table 2 represents the water quality data of the flow entering the plant at the doghouse manhole where the composite samples were collected in January, 2025
There was no discharge to the Applebrook Golf course for the month of January 2025.
PA DEP
Annual Inspection 1/24/25
Working with Inspector to privide the requested information in the desired format. All reports , SOP, and staffing plan were were provided, however, the information is requested to be placed in PA DEP's stand form. The updated reports are planned to be submitted on or before February 28th.
Pennoni Associates
Preparing Chapter 94 report
Analyzing data from the power study conducted from 12/5/24-12/30/24
Significant Rainfall
During January, there were 7 (7) days where precipitation occured. There were 0 days where rain accumulation was greater than 0.50".
Total rainfall for January was 0.44"
Total snowfall for January was roughly 4"
Page 2 of 4
Chemical Data
| January 2025 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Caustic Soda, gal | 64.67 | 2069.58 |
| Aluminum Sulfate solution, gal | 73.73 | 2,283 |
| Sludge Dewatering, gal* | 30,334 | 485,341 |
*16 days of sludge dewatering
There was a Decrease of 72,993 gallons of sludge dewatering during the month of January compared to December.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Major Repairs or Upgrades
-UPS and 24v power supply replaced in influent grinder control panel
-Generator 2 replaced
-torn filter media section replaced in disk filter #2
-began process to install prebuilt alum lines, discovered that the piping in the tanks may be cracked. This means we will have to lower tank levels below the alum lines, and install new shutoff valves above the sections being replaced inside. This will allow us to close the chemical lines and prevent siphoning from the SBRs while we cut out and replace all of the plumbing from the alum pumps, to the actuated valves, as well as install new pumps. Once the weather warms up we will then be able to drain the tanks completely one by one to make repairs to the alum lines and inspect everything else in each SBR.
Upcoming Repairs or Upgrades
-New Alum pump to be installed
-install new alum valve actuators
-install alum line shutoff valves
-rebuild disk filter suction pumps
Page 3 of 4
Flow Data
| January 2025 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building | 9.906 | 319,555 | 451,910 |
| Influent Wastewater to SBRs | 11.875 | 383,074 | 475,680 |
| Internal Recycle | 1.969 | 63,518 | 169,578 |
| Treated Effluent to Disc Filters | 11.196 | 361,161 | 434,272 |
| Final Effluent Discharge | 9.661 | 312,000 | 434,272 |
| Applebrook Golf Course | 0 | 0 | 0 |
The plant hydraulic design loading is 745,000 gpd.
There were no high flow events during the month of January 2025
Page 4 of 4
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 13, 2025
The East Goshen Township Municipal Authority held their regular meeting on Monday, January 13, 2025 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Kevin Cummings
Sean Ellsworth
John Stipe
Also in attendance were:
Mark Miller (Director of Public Works),
Cody Bright (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Robert Jefferson (Attorney)
Stacey Fuller (Attorney)
Mike Ellis (Pennoni).
COMMON ACRONYMS:
| Acronym | Acronym |
|---|---|
| ATS – Automatic Transfer Switch | MA- Municipal Authority |
| BFES – Big Fish Environmental Services | NPDES – National Pollutant Discharge Elimination System |
| BOS – Board of Supervisors | PC – Planning Commission |
| CB – Conservancy Board | PM – Prevention Maintenance |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
| PWD – Public Works Department |
Call to Order & Pledge of Allegiance
Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Dana asked for a moment of silence for our police, fire fighters, EMT and military.
Dana asked if anyone would be recording the meeting. There was no response.
Chairman’s Report/Other Members Report
1. Reorganization - Dana made a motion to nominate Walter for Chairman. Kevin seconded the motion. The motion passed unanimously. Walter made a motion to nominate Kevin for Vice Chairman. Dana seconded the motion. The motion passed unanimously. Walter made a motion to
MA 1-13-25 draft 1
nominate the following: John, Secretary; Sean, Treasurer; and Dana, Secretary/Treasurer. Kevin seconded the motion. The motion passed unanimously.
2. Reappointment of Gawthrop Greenwood Legal Services – Kevin made a motion to reappoint Gawthrop Greenwood as solicitor and their fees for 2025. Dana seconded the motion. The motion passed unanimously.
Liaison Reports
1. Board of Supervisors - Cody acknowledged that he will be the liaison for the Municipal Authority for 2025.
2. Conservancy Board - Walter reported that the Board has a new member which brings the number to a full 7. Michele Truitt is their liaison for 2025. The Board is still trying to get stream data from the Willistown Conservancy.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for January 13, 2025.
Monthly Flows – The average daily flow to West Goshen was 744,216 gallons per day.
Meters:
- Were read on a daily basis
- Westtown Way Meter – On November 30, Lynn advised me that the Westtown Way meter was reading high. The flows stayed high for several days, so I contacted Allied Control. A technician came out a couple days before Christmas and verified that the meter was correct.
C.C. Collection:
- The pumping stations were visited on a daily basis.
- Wet wells were cleaned, oil levels on equipment were checked.
- Racquet Club Apartments Contractor A contractor working at Racquet Club Apartments reported a blocked sewer main. When the guys arrived, they noticed the contractor using a pressure washer to clean the manholes in the complex, pushing grease into our line. Kevin explained that they must capture the grease that they washed down. We went into the manhole, removed the grease, jetted our lines, and captured all grease.
Ridley Creek Collection
- The pumping station was visited on a daily basis.
MA 1-13-25 draft 2
- Seal Failure at Hershey Mill Station We received an alarm for a seal failure at the Hershey Mill station. The crew pulled the pump and steam cleaned it prior to sending the unit out. A spare pump was pulled off the shelf and installed.
CC Interceptor:
- As I stated in the meter report above, we were showing high flows at Westtown Way. We were able to isolate the problem to quadrant 3. We began plugging the interceptor line at each manhole. We did locate some small leaks at the manholes which we can repair with pressure grout.
- On January 3, 2025, Allied Control came out to repair the meter. The technician downloaded several weeks of data which they will analyze to figure out the problem. I called Mike Moffa at West Goshen to let him know we were working with I&I.
- We have been televising through the nighttime hours while the flows are down and using the Jetter to pull the camera when needed. We have logged over 260 man-hours looking for I&I.
- Goshen Valley We definitely think we have I&I from the condominium’s developments. Once we get into normal weather, we will start the process of pulling manholes and plugging lines in the condominium’s complexes at night. I spoke to the manager at Goshen Valley and told her the game plan and that it will be up to them to make the repairs to the issues we find.
Note: After discussion, Mark asked Stacey to write a letter to Goshen Valley outlining what has to be done. He will sign it.
Alarms: 17
PA 1 Calls: 150
Monthly Rainfall: 4.52”
Lateral Repairs or Caps:
2. Pennoni Engineer’s Report dated January 9, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- Caustic Soda Conversion – We submitted the O&M Manual information for the system to the Township and operator on January 7.
- UV Disinfection System –The Mechanical Contractor, Zimmerman, has submitted their final payment application and closeout documents and we provided a payment recommendation letter.
- The only outstanding punchlist item remains the connection of the permanent alarm to the two
MA 1-13-25 draft 3
UV modules. Jon Laidley had begun to complete the alarm connections a couple months ago. The system is still being run in Hand mode with one module On and the other Off in the meantime. After the alarms are connected, the UV modules will be complete, and we will notify PADEPA accordingly.
- Generator #2 Replacement – No activity by Pennoni since the last report.
Electrical Supply Evaluation – The power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest will analyze the data and provide a report indicating if there were any notable electrical events or supply anomalies. If there are no notable events or anomalies, we will notify EnerG Test to continue monitoring the power supply for an additional 25 days.
Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes most notable the replacement of both generators. We contacted the company who performed the last arc flash study, Clinger Electric, in November to obtain a quote. We provided additional information to them thereafter per their request and are awaiting the quote.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – The awarded contractor, Vortex Services, updated their insurance certificate to address the prior non-compliant certificate. The contract can now be executed and the Notice to Proceed can be issued.
- New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction has begun and we are performing regular inspections.
- 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction has begun and we are performing regular inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, two of which are related to sanitary sewer.
- 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. No activity by Pennoni since our last report.
- 1344 Morstein Road – One new home is proposed. No activity by Pennoni since our last report. We previously provided a comment letter on the plans on November 22.
- 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.
MA 1-13-25 draft 4
Chapter 94 Reports
- We initiated preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for December 2024. All supplemental reports were submitted for December 2024. Caustic usage decreased to 54.34 gallons per day from 63.53 gallons per day last month. Aluminum sulfate solution volumes increased to an average of 74 gallons per day from the previous standard of 69.4 gallons per day last month. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational problems. There were no odor complaints during the month.
Approval of Minutes
The minutes of the December 9, 2024 meeting were approved as amended.
Approval of Invoices
1. Kevin moved to approve payment of Pennoni Invoice #1256809 for $2,459.75. Sean seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of the following Gawthrop Greenwood Invoices:
Invoice # 22066269 $ 538.50
Invoice #22067461 $ 123.00
Invoice #222069250 $ 266.50
Kevin seconded the motion. The motion passed unanimously.
3. Dana moved to approve payment of the Pennoni for Zimmerman Environmental RCSTP UV Disinfection System Replacement Payment Application #3 (final) in the amount of $7,043.52. John seconded the motion. The motion passed unanimously.
4. Kevin moved to approve payment of Integrated Controls Invoice #02315-04-00 in the amount of $1,365.00. Dana seconded the motion. The motion passed unanimously.
Financial Reports
Dave Ware provided the following report: Year to date December 2024, the Municipal Authority recorded $738,251.29 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $730,087.89 in expenses (RCSTP UV replacement capital costs, Flygt pump, Chester Creek Interceptor work by Insituform Technologies, West Goshen capital sewer tapping and bond, RCSTP Caustic Soda, quarterly recharges, engineering, and audit expenses). The net result of operations is $8,163.40. As of December 31, 2024, the fund balance was $15,725.56.
Old Business - None
MA 1-13-25 draft 5
Goals – The goals were reviewed with the following changes:
Goal – Continue to implement infiltration and inflow for the sewer system.
Status – Ongoing. Apartments and condominiums are going to be scrutinized. Check for I&I in multifamily housing.
Goal – West Goshen MA Meetings.
Status – Attend meetings on a quarterly basis. Kevin will attend the first quarter. John will attend the second quarter. Kevin will send out an email.
Goal – Long-term Sustainability
Status – Remove sewer rate increase.
Review 20-year + Capital improvement Plan. Continue to study sewer rates.
New Business –
1. Sewer Camera Purchase - Kevin moved to approve payment of H.A. DeHart & Son quote #J0373 in the amount of $16,865.02 providing the following:
Subsite Protrack Tractor
Camera connection -4 Pin
18” – 30” Crawler Kit
6” Crawler Kit
Accessory Kit
Sonde 512HZ
6Pin to 4 Pin Adaptors (2)
½ day of training 2 $142.00/hr
John seconded the motion. The motion passed unanimously.
Any Other Matter - None
Correspondence- None
Public Comment - None
Adjournment
There being no further business Sean moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:15 pm.
The next regular meeting will be held on Monday, February 10, 2025 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 1-13-25 draft 6
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1258959
Invoice Date : 01/22/2025
Project : EGMAU25001
Project Name : 2025 General Services
For Services Rendered Through 01/12/2025
January Engineer's Report. Reviewed January RCSTP Operator's Report.
Supplee Valley Cured-in-Place Pipe Lining: Reviewed revised Certificate of Insurance and sent contract documents to Twp to sign.
RCSTP UV Replacement: Finalized and submitted final payment recommendation letter and supporting documents for Zimmerman.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 970.00 | 0.00 | 970.00 |
| Limit | 44,000.00 | ||
| Remaining | 43,030.00 |
Labor
| Labor Category | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.75 | 158.00 | 434.50 |
| Staff Professional | 1.50 | 125.00 | 187.50 |
| Associate Professional | 3.00 | 116.00 | 348.00 |
| Totals | 7.25 | 970.00 | |
| Total Labor | 970.00 | ||
| Total this Invoice | $970.00 |
APPROVED BY: [signature] 1/24/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25001
Pennoni Job No.: 2025 General Services
Invoice No:
Invoice Period: 1/1/2025 to 1/12/2025
Initial Authorization: $ 44,000.00 Date: 1/22/2025
Contract Amount: $ 44,000.00
Previously Invoiced: $ -
Current Invoice: $ 970.00
Invoiced to Date ($): $ 970.00
Invoiced to Date (%): 2%
Remaining Budget ($): $ 43,030.00
Remaining Budget (%): 98%
Budget by Phase:
| Phase Name | 2025 General Services |
|---|---|
| Phase Budget: | $ 44,000.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 970.00 |
| Invoiced to Date ($): | $ 970.00 |
| Invoiced to Date (%): | 2% |
| Remaining Budget ($): | $ 43,030.00 |
| Remaining Budget (%): | 98% |
Comments: January Engineer's Report. Reviewed January RCSTP Operator's Report.
Supplee Valley Cured-in-Place Pipe Lining: Reviewed revised Certificate of Insurance and sent contract documents to Twp to sign.
RCSTP UV Replacement: Finalized and submitted final payment recommendation letter and supporting documents for Zimmerman.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1258961
Invoice Date : 01/22/2025
Project : EGMAU25002
Project Name : 2024 Chapter 94 Reports
For Services Rendered Through 01/12/2025
Initiated preparation of Chapter 94 Reports.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 343.75 | 0.00 | 343.75 |
| Limit | 8,000.00 | ||
| Remaining | 7,656.25 |
Labor
| Labor Category | Hours | Rate | Amount |
|---|---|---|---|
| Staff Professional | 2.75 | 125.00 | 343.75 |
| Totals | 2.75 | 343.75 | |
| Total Labor | 343.75 | ||
| Total this Invoice | $343.75 |
APPROVED BY: [signature] 1/24/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25002
Pennoni Job No.: 2025 Chapter 94 Reports
Invoice No:
Invoice Period: 1/1/2025 to 1/12/2025
Initial Authorization: $ 8,000.00 Date: 1/22/2025
Contract Amount: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 343.75
Invoiced to Date ($): $ 343.75
Invoiced to Date (%): 4%
Remaining Budget ($): $ 7,656.25
Remaining Budget (%): 96%
Budget by Phase:
Phase Name: 2025 Chapter 94 Reports
Phase Budget: $ 8,000.00
Previously Invoiced: $ -
Current Invoice: $ 343.75
Invoiced to Date ($): $ 343.75
Invoiced to Date (%): 4%
Remaining Budget ($): $ 7,656.25
Remaining Budget (%): 96%
Comments: Initiated preparation of Chapter 94 Reports.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
02/05/2025
Client No: 6604-001M
Invoice No. 222070486
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 01/10/2025 PMM | Email from L. Werkheiser with Board agenda and meeting materials. | 0.20 | 41.00 |
| 01/13/2025 PMM | Receipt and review memo from M. Miller regarding Goshen Valley Condominiums. | 0.20 | 41.00 |
| SLF | Preparation for and attendance at meeting. | 1.50 | 307.50 |
| 01/15/2025 PMM | Message from and Telephone conference with M. Miller regarding Goshen Valley Condos; Review & Analyze Township sewer ordinances for enforcement; Emails (2) to/from D. Davis, M. Thompson and M. Miller regarding same. | 1.00 | 205.00 |
| For Current Services Rendered | 2.90 | 594.50 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Stacey L. Fuller, Esquire | 1.50 | $205.00 | $307.50 |
| Patrick M. McKenna, Esquire | 1.40 | 205.00 | 287.00 |
Previous Balance: $928.00
Total Current Charges: 594.50
APPROVED BY: KLB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140
01/27/2025 Payment: -928.00
Balance Due: $594.50
East Goshen Municipal Authority
General Authority Services
Page: 2
02/05/2025
Client No: 6604-001M
Invoice No. 222070486
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
02/05/2025
Client No: 6604M
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 928.00 | 594.50 | 0.00 | -928.00 | $594.50 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
LEC LENNI ELECTRIC CORPORATION
1020 Andrew Drive
West Chester PA 19380
610-436-9922
Service Invoice
Invoice#: 250122
Date: 01/16/2025
APPROVED BY: MM 1/23/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-1500 Capital Reserv
Billed To:
East Goshen Township
1580 Paoli Pike
West Chester PA 19380
Project:
32453
MUNICIPAL BUILDING
1580 PAOLI PK
WEST CHESTER PA 19380
Scheduled: 01/14/2025
Time:
Employee:
Order#:
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| INSTALL & WIRE NEW GEN SET UPON ARRIVAL 1-14-25 INTO 1-15-25 DAY INTO OVERNIGHT - UNWIRED EXISTING GENERATOR FOR REMOVAL; RELOCATED GENERATOR; PUMPED OUT FUEL TANK; MOVED TANK; PUMPED FUEL INTO ORIGINAL TANK; MOVED NEW GENERATOR AND TANK INTO PLACE; PUMPED FUEL INTO NEW TANK; CONNECTED FLEX AND WIRED NEW GENERATOR; RAN CARFLEX AND WIRE TO CONTROL UNIT; RAN CARFLEX AND WIRE TO COOLANT HEATER AND BATTERY CHARGER; ENERGIZED; TESTED FOR PROPER ROTATION - GOOD. ** GENERATOR TECH TO RESOLVE ISSUE WITH GEN CONTROL NOT OPERATIONAL IN AUTO** HE RETURNED AND COMPLETED 1-16-25. |
||||
| ELECTRICIANS - 3 MEN 8 HRS EACH | HRS | 24.00 | 95.00 | 2,280.00 |
| ELECTRICIAN | HRS | 3.00 | 95.00 | 285.00 |
| LABORER | HRS | 8.00 | 75.00 | 600.00 |
| ELECTRICIANS - OT - 2 MEN 11.5 HRS EACH | HRS | 23.00 | 142.50 | 3,277.50 |
PAID
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
| Description | Amount |
|---|---|
| Non-Taxable Amount: | 6,522.50 |
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due | 6,522.50 |
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
Service Invoice
Continued...
Invoice#: 250122
Date: 01/16/2025
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
| SERVICE TRUCK | DY | 2.00 | 40.00 | 80.00 |
Notes:
Page 2 of 2
Invoice
ALFA LAVAL
Recipient
East Goshen Township
Attn: Accounts Payable
1580 Paoli Pike
West Chester, PA 19380
UNITED STATES
PAID
Delivery address
East Goshen Township
PO 24-02413
1580 Paoli Pike
West Chester, PA 19380
UNITED STATES
Delivery contact
Mark Miller
Page: 1(2)
Your reference
Customer
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6107
UNITED STATES
Your reference
Your order date
10/30/2024
Your order no
24-02413
Please state at payment
Invoice no: 285760303
Your VAT reg no:
Goodsmark: 24-02413
Our reference
Contact person: Herbert Huong
Our reference: Breann Getridge
Date: 01/21/2025
Due date: 02/20/2025
Payment terms: Net 30 Days
Delivery method: Road Express
Delivery date: 01/21/2025
Delivery terms (Incoterms 2020*): DAP - Delivered At Place, West Chester
Order no: 0006091576
Cust no: E1753881
Description: Decanter Control Repair
Assignm. No 1
| Ln | Description | Cust Pos/Item | VAT | Inv qty | Net price | Amount |
|---|---|---|---|---|---|---|
| 1 | L Decanter Controls Repair | 00 | 1.00 AMT | 7,875.00 | 7,875.00 |
Please contact Breann Getridge with any questions regarding this invoice. 804 236 1341 or email breann.getridge@alfalaval.com
APPROVED BY: MM 1/23/25
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1500
Item value: 7,875.00
Alfa Laval Inc. (AL) will process personal data supplied by you for the purpose of enabling AL to perform any contractual obligations towards you and to fulfil AL's statutory obligations. An application by you for information of your personal data registered by us must be made in writing to AL.
The general conditions of sale are according to AL's General Conditions Of Sale if nothing else is stated. An extra copy of these conditions will be sent to you upon request. The goods to be delivered may be subject to export license requirement. AL reserves the right to cancel the order without any liability for damage or loss arising out of or relating to the cancellation in the event such an export license is not granted by competent export control authority.
Attention of the buyer is drawn to the following: Indirect, special and/or consequential damages are excluded from Supplier's liability and Supplier's total liability shall never exceed a maximum cumulative amount equal to 15 % of the contract price. Should parts of the contract be held to be invalid or otherwise unenforceable in any jurisdiction, any other contract provisions shall not be affected.
Alfa Laval Inc.
5400 Int. Trade Drive
Richmond, VA 23231
United States
Fed. I.D. No.: 13-1681631
Please send remittance to:
P.O. BOX 200081
Pittsburgh, PA 15251-0081
Local sales office
Alfa Laval Inc.
5400 Int. Trade Drive
Richmond, VA 23231
United States
Contact
Tel.: (804) 222-5300
customerservice.richmond@alfalaval.com
www.alfalaval.com
Invoice
ALFA LAVAL
Recipient
East Goshen Township
Cust no: E1753881
Order no: 0006091576
Your reference:
Your order no: 24-02413
Please state at payment
Invoice no: 285760303
Date: 01/21/2025
Page: 2(2)
| Ln | Description | Cust Pos/Item | VAT | Inv qty | Net price | Amount |
|---|---|---|---|---|---|---|
| TO PAY USD: 7,875.00 | ||||||
These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations.
Alfa Laval Inc.
5400 Int. Trade Drive
Richmond, VA 23231
United States
Fed. I.D. No.: 13-1681631
Please send remittance to:
P.O. BOX 200081
Pittsburgh, PA 15251-0081
Local sales office
Alfa Laval Inc.
5400 Int. Trade Drive
Richmond, VA 23231
United States
Contact
Tel.: (804) 222-5300
customerservice.richmond@alfalaval.com
www.alfalaval.com
Memo
To: Municipal Authority
From: Dana Gieder
Re: MA January 2025 YTD Financial Report
Date: February 5, 2025
YTD January 2025, the Municipal Authority recorded $28,957.00 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $19,327.77 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,629.23. As of January 31, 2025, the fund balance was $25,354.79.
Attached is a complete list of 2025 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD JANUARY 2025
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 14.23 | 35.21 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 6,557.09 | 0.00 | 297.84 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,498.43 | 0.00 | 281.88 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 1,076.32 | 0.00 | 141.12 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 238,506.00 | 3,387.75 | 964.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 698,000.00 | 25,555.02 | 30,382.95 |
| Total Revenue | 947,937.84 | 28,957.00 | 32,103.00 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 45,000.00 | 0 | 0 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 2,500.00 | 0 | 0 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 15,000.00 | 0 | 0 |
| 07-424-3130 | ENGINEERING SERVICES | 52,000.00 | -7,155.25 | 0 |
| 07-424-3140 | LEGAL SERVICES | 8,000.00 | 928.00 | 533.00 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 43,000.00 | 0 | 0 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 22,500.00 | 0 | 0 |
| 07-424-7440 | R.C. CAPITAL-STP | 30,500.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 49,500.00 | 0 | 0 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 150,000.00 | 0 | 0 |
| 07-429-1505 | RCSTP CAPITAL | 87,500.00 | 25,555.02 | 28,662.95 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 430,000.00 | 0 | 0 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 20,000.00 | 0 | 0 |
| Total Expenses | 955,500.00 | 19,327.77 | 29,195.95 | |
| Net Result From Operations | -7,562.16 | 9,629.23 | 2,907.05 | |
PER DAVE CARRY OVER FROM LAST YEAR
Municipal Authority
YTD Revenues and Expenses thru 1/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/25 | Revenue Journal | INTEREST EARNED JANUARY 2025 | 14.23 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 3,387.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,114.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/21/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 7,043.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/28/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,397.50 |
| Total Revenue | 28,957.00 | ||||
| 07-424-3130 | ENGINEERING SERVICES | 01/21/25 | Pay Check: 3537 | 25-00117 SERV THRU 123124 2024 GEN SERV | 2,459.75 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR000101 MISC. RECHARGE 07 acct | -3,695.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR000101 MISC. RECHARGE 07 acct | -5,920.00 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00116 LEGAL SERV DEC 2024 GEN AUTH | 266.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00115 LEGAL SERV OCT 2024 GEN AUTH | 538.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00114 LEGAL SERV NOV 2024 GEN AUTH | 123.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/25 | Pay Check: 3535 | 25-00016 UV SYS REMOTE ACCESS UPGRADE | 4,114.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/21/25 | Pay Check: 3538 | 25-00118 RCSTP- UV DISINFECTION SYS REP | 7,043.52 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3539 | 25-00178 DECANTER CONTROLS REPAIR | 7,875.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3540 | 25-00175 INSTALL & WIRE NEW GENERATOR | 6,522.50 |
| Total Expense | 19,327.77 | ||||
| Net Operating | 9,629.23 |
THIS IS 2024 REVENUE RECEIVED IN 2025 TO OFFSET 07-424-3130 EXPENSE ACCT FOR RECHARGES TO AQUA