Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

March 10, 2025
7:00

  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting
  • CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
  • LIAISON REPORTS
  • SEWER REPORTS Director of Public Work’s Report; Pennoni Engineer’s Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES February 10, 2025
  • APPROVAL OF INVOICES
Company Invoice # Amount Paid?
Gawthrop Greenwood 222071832 $164.00
HA DeHart & Son M101003320 $16,865.02
Kappe Associates 25-059-M $8,346.00 paid
  • FINANCIAL REPORTS February 2025
  • OLD BUSINESS

1

  • 2025 Goals:
Goal Status
Ridley Creek Plant compliance January & February were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis.
Long-term sustainability Ongoing:
(1) Sewer rate increase implemented July 2024.
(2) Development of 20-year+ Capital Improvement Plan underway.
(3) Continue to study sewer rates.
  • NEW BUSINESS Supplee Valley CIPPL Change Order for $9,729 (email from Vortex); Pennoni Proposal for Supplee Valley CIPPL Construction Phase Services; Pennoni Proposal for RCSTP Arc Flash Study
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

2

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: March 10, 2025

To: Municipal Authority

From: Mark Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 630,885 per day.

Meters:

  • Were read on a daily basis
  • We will be installing the new meters for Ellis Lane, Paoli Pike, and Westtown Way on March 11th.

C.C. Collection:

  • Pump stations were visited on a daily basis.
  • The contractor doing the slip liner in Supplee Valley found inflow from a lateral on Katherine Lane. Public Works televised the lateral and found that it was broken 6’ from the main. We excavated the main, cut a section, and installed a new wye and 10’ of lateral pipe.
  • With the windstorms, we have been busy with alarm callouts from the stations due to power outages. We have also been busy clearing downed trees on sanitary sewer rights-of-way.
  • We had an electrical problem with the generator at Ashbridge Station and had to pump haul for several hours until the problem was located. It turned out to be a bad solenoid.
  • We utilized Pipe Data View to grout ten leaks at various locations on the Chester Creek Collection.

Ridley Creek Collection:

  • The pump stations were visited daily.
  • Alarms were constant due to the weather.
  • Purchased new pump for the Hershey Mill Pump Station

1

Ridley Creek Plant:

  • Lenni has been working at the plant performing inspections of electrical equipment and wires. They ordered two new surge processors (TVSS) for the main distribution box.
  • We had a bad drive on Blower #2 in the SBR building. I asked Lenni to order a spare drive unit for the blowers and the centrifuge.

Alarms: 60: All storm-related with the exception of Ashbridge Pump Station

PA One Calls: 46

  • On February 28th, Billy, Lynn, and Louis attended a PA One Call seminar on mark outs and general information.

Monthly Rainfall: 3.22”

2

[Photograph showing an excavation pit in a paved roadway with two workers wearing red hard hats standing on a dirt shelf inside the trench, a ladder, drainage hoses, an exposed sewer pipe along the wall, and standing muddy groundwater being pumped from the bottom.]

Handwritten note (top right): Pumping ground water out.

Page label (bottom right): ①

[Photograph of utility vehicles including a red truck, excavator, and crane boom lowering a trench box into a road excavation on a residential street with workers in safety gear and hard hats.]

Handwritten note (top left): Putting trench box to locate the pipe

Page label (bottom right): ②

[Photograph looking down into a trench box inside an excavation pit, showing two workers wearing red hard hats and gray long-sleeve shirts locating the underground pipe.]

Handwritten note (top right): Locating the Pipe

Page label (bottom right): 3

[Photograph taken from above looking down into a trench box where two workers wearing red hard hats, full-face respirators, and blue gloves give thumbs-up signs standing next to an exposed AC (asbestos cement) pipe with a cut section.]

Handwritten note (top left): Breathing Resperators Due A/c pipe

Page label (bottom right): 4

[Pennoni logo]

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

March 6, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • UV Disinfection System –The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. We understand the system is still being run in Hand mode with one module On and the other Off in the meantime. We spoke with John on February 12, and he indicated he was awaiting parts and should be able to complete the work soon. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
  • Electrical Supply Evaluation – As previously reported, the power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest provided the testing report on January 10. A summary of the report is as follows: 12 voltage events were recorded during the 25-day monitoring period. All of the events were either dips or interruptions. 10 of the events occurred on 12/5/24. 2 of the events occurred on 12/17/24.; 10 of the events occurred on 12/5/24.; 2 of the events occurred on 12/17/24.; The power quality at the RCSTP appeared to be adequate during that period as the only events recorded were dips and interruptions which are believed to have originated externally to the plant.; No swells or surges were recorded during the monitoring period.; While onsite, it was noted that the A phase surge protection module in the outdoor MDP switchboard was not indicating an active status. It is recommended that this is replaced.; Additionally, it is recommended to have surge protection installed at multiple locations and voltage levels within the facility.

The plant operator stated that the generators briefly turned on 12/5 and 12/17, but no equipment issues were reported.

A virtual meeting was held on February 13 between Pennoni, Mark Miller, and Matt Mullin to further discuss the electrical supply evaluation report and the potential electrical issues at the RCSTP. It was concluded that the following improvements should be installed at the plant: replacement of the surge counters throughout the plant, or replacement of the surge protectors/TVSS if a similar price to replacing the counters, and installation of surge protection for the two water supply pumps. Mark is requesting Lenni confirm feasibility and provide cost quotes for these improvements. Feasibility and cost for installation of a line conditioner on the customer side of the electric service will also be requested.

Once the surge counters, which track the number of surges experienced by each protector/TVSS, are all replaced and functional, the next step is to monitor and log the quantity of surges at each unit and other electric events. Pennoni provided a list of equipment, items, and parameters to keep track of on a weekly basis to the plant operator. The recommended information to keep track of can be used to develop a baseline of information for further evaluation of spurious electrical events at the RCSTP after a couple of months of monitoring.

A second round of power supply metering is not recommended.

  • Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes, most notably the replacement of both generators. We provided a proposal to perform an updated arc flash study.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – A pre-construction meeting with the contractor, Vortex Services, occurred on February 12. The contractor subsequently cleaned and televised all the pipes. We performed part-time on-site observation of the cleaning and televising, and we reviewed the videos. The only notable deficiency that was identified that would impact pipe lining was a leak in a lateral. Public Works televised the lateral, identified the leak location, and performed an excavated repair.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 2

EGMAU25001
East Goshen Municipal Authority

March 6, 2025

Engineer’s Report
Page 2 of 2

The contractor also provided construction submittals, which we reviewed. They are scheduled to start pipe lining on March 10, and they anticipate approximately two weeks to complete the work.

A number of the pipes, totaling approximately 2,162 LF, were identified to be 10” diameter during the televising. The pipes were previously believed to be 8” diameter and were bid accordingly. The contractor submitted a change order proposal for $9,729 ($4.50/LF extra) for the additional cost of the larger diameter.

Pump Stations

  • Hunt Country Pump Station – We performed a site visit with Public Works to discuss the desired improvements to the Hunt Country Pump Station that are to be incorporated as part of the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application. The scope includes addition of a Muffin Monster, effluent flow meter, and bypass connection, replacement of the force main, and replacement of the SCADA system and controls. We are also evaluating replacement of the pumps within the scope. We have begun preparation of the grant application, which is due by April 30.
  • Ashbridge Pump Station – We understand the station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – Site and sanitary sewer construction is ongoing, and we are continuing to perform regular inspections.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction is ongoing, and we are performing continuing to perform regular inspections. We also reviewed construction submittals including shop drawings for sanitary sewer components.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. We coordinated with Howell Environmental and Township staff to have the required Sewage Facilities Planning Module (SFPM) Components completed and signed and submitted to PADEP. It was the previous understanding that PADEP was not requiring any forms or SFPM resolution by East Goshen since the bulk of the project is in West Whiteland and the entire public sewer system is proposed to be owned by West Whiteland, but PADEP subsequently provided comments that the forms and resolution are required.

The East Goshen Township required SFPM Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC) on February 13. The CCHD returned the completed Component on February 21. We are still waiting for CCPC to complete their respective Component. After the Components have been completed by the CCHD and CCPC, we will coordinate with the Township staff to sign the remaining outstanding items needed for the SFPM resubmission to PADEP.

  • 1344 Morstein Road – One new home is proposed with a grinder pump. No activity by Pennoni since our last report.
  • 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.

Chapter 94 Reports

  • We continued preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31.

END OF REPORT

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report
March 2025

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for February 2025. All supplemental reports were submitted for February 2025. Caustic usage decreased to 53.35 gallons per day from 64.67 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 71 gallons per day from 74 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Table 1

January 2025 - Final Effluent - Outfall 001

NPDES Permit
Discharge Limitations
Flow CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform Ultraviolet light Intesity Copper, Total Zinc, Total
MGD mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
mg/L lbs/
month
Geo
Mean
Geo
Mean
Average 0.75 10 62 Report Report 10 62 25 44 0.5 3 200 1,000
Inst. Max 20 94 15 94 5 1 Report Report Report
Sample Date
January 7, 2025 0.375 2.2 6.9 6.18 19.3 6.8 21.3 0.10 0.31 0.11 0.34 1 0.0000 NS 0.003 0.039
January 14, 2025 0.221 2.2 4.1 6.00 11.1 6.2 11.4 0.10 0.18 0.11 0.20 1 0.0000 NS NS NS
January 21, 2025 0.310 3.1 8.0 7.37 19.1 4.2 10.9 0.10 0.26 0.13 0.34 1 0.0000 NS NS NS
January 28, 2025 0.277 2.1 4.9 6.91 16.0 4.0 9.2 0.10 0.23 0.10 0.23 1 0.0000
NS NS NS
Average 0.296 2.4 6.0 6.62 16.4 5.3 13.2 0.10 0.25 0.11 0.28 1 0.0000 NA NA NA
Minimum 0.221 2.1 4.1 6.00 11.1 4.0 9.2 0.10 0.18 0.10 0.20 1 0.0000 NA NA NA
Maximum 0.375 3.1 8.0 7.37 19.3 6.8 21.3 0.10 0.31 0.13 0.34 1 0.0000 NA NA NA

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 for January 2025. The monthly average total phosphorus was reported as 0.11 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The monthly average TSS is reported as 5.3 mg/L compared to the discharge limitation of 10 mg/L.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Table 2

January 2025 - Influent Wastewater

Design Basis Flow BOD5 CBOD5 TSS NH4-N TKN, mg/L Phosphorus,Total
, mg/L
MGD
Average
mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57
Sample Date
January 7, 2025 0.355 699 2,070 512 1,516 668 1,978 39.9 118 70.0 207 13.9 41.2
January 14, 2025 0.246 258 529 314 644 264 542 33.1 68 54.1 111 6.86 14.1
January 21, 2025 0.316 354 933 266 701 242 638 36.1 95 44.0 116 7.84 20.7
January 28, 2025 0.311 336 871 319 827 240 622 24.9 65 94.5 245 8.16 21.2
Average 0.307 412 1,101 353 922 354 945 34 86 65.7 170 9.19 24.3
Minimum 0.246 258 529 266.0 644 240 542 25 65 44.0 111 6.86 14.1
Maximum 0.355 699 2,070 512 1,516 668 1,978 40 118 94.5 245 13.90 41.2

Table 2 represents the water quality data of the flow entering the plant at the doghouse manhole where the composite samples were collected in January, 2025

There was no discharge to the Applebrook Golf course for the month of January 2025.

Chemical Data

January 2025
Chemical Daily Average Total Monthly
Caustic Soda, gal 53.35 1493.79
Aluminum Sulfate solution, gal 73.88 1985
Sludge Dewatering, gal* 22,511 405,189

*18 days of sludge dewatering

There was a Decrease of 80,152 gallons of sludge dewatering during the month of February compared to January.

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily.
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly.
  • Cleaned buildings and laboratory.

Page 2 of 3

Major Repairs or Upgrades

-Disk filter #1 backwash pump was rebuilt and installed

Upcoming Repairs or Upgrades

-New Alum pump to be installed

-install new alum valve actuators

-install alum line shutoff valves

Significant Rainfall

During February, there were nine (9) days where precipitation occured. There were 2 days where rain accumulation was greater than 0.50”.

2/1/25: 0.58”

2/16/25: 1.17”

Total rainfall for February was 2.77”

Total snowfall for February was roughly 2”

Flow Data

Flow Meter Location February 2025
Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 8.945 319,471 454,784
Influent Wastewater to SBRs 10.532 376,150 454,784
Internal Recycle 1.587 56,678 144,804
Treated Effluent to Disc Filters 10.204 364,427 439,200
Final Effluent Discharge 8.547 305,000 385,000
Applebrook Golf Course 0 0 0

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of February 2025

Page 3 of 3

DRAFT

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
February 10, 2025

The East Goshen Township Municipal Authority held their regular meeting on Monday, February 10, 2025 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Dana Pizarro, Chairman
Walter Wujcik, Vice Chairman
Kevin Cummings
Sean Ellsworth
John Stipe

Also in attendance were:
Mark Miller (Director of Public Works),
Cody Bright (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Robert Jefferson (Attorney)
Stacey Fuller (Attorney)
Mike Ellis (Pennoni).

COMMON ACRONYMS:
ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services
BOS – Board of Supervisors
CB – Conservancy Board
DEP – Department of Environmental Protection
EPA – Environmental protection Agency
HC – Historical Commission
I&I – Inflow & Infiltration
LCSTP – Lockwood Chase Sewer Treatment Plant
PWD – Public Works Department
MA- Municipal Authority
NPDES – National Pollutant Discharge Elimination System
PC – Planning Commission
PM – Prevention Maintenance
PR – Park & Recreation Board
RCSTP – Ridley Creek Sewer Treatment Plant
SBR – Sequencing Batch Reactor
SSO – Sanitary System Overflow
WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Dana called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Dana asked for a moment of silence for our police, fire fighters, EMT and military.
Dana asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report

None

MA 2-10-25 draft 1

Liaison Reports

1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful Day is Saturday April 12,2025. The Board is looking at the street tree issue.

SEWER REPORTS

1. Director of Public Works, Mark Miller’s report for February 10, 2025.

Monthly Flows – The average daily flow to West Goshen was 626,723 gallons per day.

Meters:

  • Were read on a daily basis
  • Two of the three replacement meters for Ellis Lane, Paoli Pike and Westtown Way have arrived. Also, we will be replacing the mounting brackets as soon as the third meter arrives.

C.C. Collection:

  • The pumping stations were visited on a daily basis.
  • We had a problem with the fog rod at the Barkway station and operated off the backup floats until John Laidley replaced it.
  • We have continued with the televising and cleaning of the collection lines in Sectors 3 and 4 and have started with the repairs. Pipe Data View will be taking care of the pressure grouting of the larger ones.
  • Goshen Valley: We will be meeting with the two property management companies that oversee the facilities to go over the list of problems our guys have compiled.

Ridley Creek Collection

  • The pump stations were visited on a daily basis.
  • The wet well at the Hunt Country pump station was washed down and vacuumed out.
  • The pump that was pulled at the Hershey Mill station was not worth getting repaired so we ordered a new one at the cost of $9,400.00 with a 6-week delivery time.
  • We received a sewer odor complaint at the bottom of Cornwallis Drive and had to replace the charcoal filter that was in the manhole.

Ridley Creek Plant

  • The new generator has been installed and is in operation.

Alarms: 16

PA 1 Calls: 77

Monthly Rainfall: 4.52”

Lateral Repairs or Caps:

MA 2-10-25 draft 2

2. Pennoni Engineer’s Report dated February 7, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • UV Disinfection System –The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. The system is still being run in Hand mode with one module On and the other Off in the meantime. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
  • Generator #2 Replacement – The new generator was installed on January 16.
  • Electrical Supply Evaluation – The power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest provided the testing report on January 10. A summary of the report is as follows: 12 voltage events were recorded during the 25-day monitoring period. All of the events were either dips or interruptions. 10 of the events occurred on 12/5/24. 2 of the events occurred on 12/17/24.; 10 of the events occurred on 12/5/24.; 2 of the events occurred on 12/17/24.; The power quality at the RCSTP appeared to be adequate during that period as the only events recorded were dips and interruptions which are believed to have originated externally to the plant.; No swells or surges were recorded during the monitoring period.; While onsite, it was noted that the A phase surge protection module in the outdoor MDP switchboard was not indicating an active status. It is recommended that this is replaced.; Additionally, it is recommended to have surge protection installed at multiple locations and voltage levels within the facility.

The plant operator stated that the generators briefly turned on 12/5 and 12/17, but no equipment issues were reported. We are discussing the results further with our electrical engineers and will provide a recommendation regarding next steps.

  • Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes, most notably the replacement of both generators. We contacted the company who performed the last arc flash study, Clinger Electric, in November to obtain a quote. They have not been responsive so we will reach out to other firms for a quote.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – A pre-construction meeting with the contractor, Vortex Services, is scheduled for February 12.
  • DCED Small Water & Sewer Grant – Applications are now being accepted until April 30 for construction, improvement, and repair of water, sanitary sewer, or storm sewer projects for up to $500,000. This is a potential source of funding for 2026 pipe lining work, Hershey’s Mill Pump Station upgrades, or other sewer system improvements.

MA 2-10-25 draft 3

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are performing regular inspections.
  • 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction is ongoing, and we are performing regular inspections.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. We are coordinating with Howell Environmental and Township staff to have the required Sewage Facilities Planning Module (SFPM) Components completed and signed and submitted to PADEP. It was the previous understanding that PADEP was not requiring any forms or SFPM resolution by East Goshen since the bulk of the project is in West Whiteland and the entire public sewer system is proposed to be owned by West Whiteland, but PADEP subsequently provided comments that the forms and resolution are required.
  • 1344 Morstein Road – One new home is proposed with a grinder pump. Pennoni met virtually with the design engineer to discuss design and plan requirement. We subsequently reviewed an updated sewer plan submission and provided sanitary sewer comments to the design engineer on February 6.
  • 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.

Chapter 94 Reports

  • We continued preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for January 2025. All supplemental reports were submitted for January 2025. Caustic usage increased to 64.67 gallons per day from 54.34 gallons per day last month. Aluminum sulfate solution volumes remained at a daily average of 74 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational problems. There were no odor complaints during the month.

Approval of Minutes

The minutes of the January 13, 2025 meeting were approved as amended.
Patrick commented that he doesn’t have the authority to write the letter so Township Staff and the Township Attorney are working on it.

MA 2-10-25 draft 4

Approval of Invoices

1. John moved to approve payment of the following Pennoni Invoices:
#1258959 $970.0
#1258961 $343.75
Dana seconded the motion. The motion passed unanimously.
2. Sean moved to approve payment of the Gawthrop Greenwood Invoice #222070486 in the amount of $594.50. Dana seconded the motion. The motion passed unanimously.
3. Dana moved to approve payment of the Lenni Electric invoice #250122 in the amount of $6,522.50 (paid). Sean seconded the motion. The motion passed unanimously.
4. John moved to approve payment of the Alfa Laval invoice #285760303 in the amount of $7,875.00 (paid) . Sean seconded the motion. The motion passed unanimously.

Financial Reports

The following report was provided: Year to date January 2025, the Municipal Authority recorded $28,957.00 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $19,327.77 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,629.23. As of January 31, 2025, the fund balance was $25,354.79.

Old Business - None

Goals –None

New Business – None

Any Other Matter - None

Correspondence- None

Public Comment - None

Adjournment

There being no further business John moved to adjourn the meeting. Sean seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:45 pm.
The next regular meeting will be held on Monday, March 10, 2025 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 2-10-25 draft 5

[Gawthrop Greenwood, PC logo]

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
03/05/2025
Client No: 6604-001M
Invoice No. 222071832

General Authority Services

Fees

Date Timekeeper Description Hours Amount
02/10/2025 PMM Attend Authority Board meeting. 0.80 164.00
For Current Services Rendered 0.80 164.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 0.80 $205.00 $164.00
Description Amount
Previous Balance $594.50
Total Current Charges 164.00
03/04/2025 Payment -594.50
Balance Due $164.00

APPROVED BY: [signature] 3/7/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

[Logo: H.A. DeHart & Son Transportation Equipment Specialists, Since 1884]

H.A. DeHart & Son
311 Crown Point Road
Thorofare, NJ 08086
P: (856) 845-2800
F: (856) 845-2461

BILL TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
P: (610) 692-7171
Contact:

DELIVER TO
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
P: (610) 692-7171
Contact:

SALES INVOICE: M101003320

BILL TO CUSTO TERMS DELIVERY DATE INVOICE DATE SALESPERSON CUSTOMER REFERENCE
12049 NET10 2/19/2025 2/20/2025 Koering, J 25-00040
YR - MAKE - MODEL SERIAL NUMBER / ITEM DESCRIPTION PRICE
2024 - SUBSITE - PROTRAK PRTK0142
Vehicle - Price 16,865.02
Furnish Only
Ref: State of PA DGS # 4400028109
Delivery: Jeremy to deliver
Total Price: $16,865.02

APPROVED BY: MM [signature] 2/27/25
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505
Sewer Pipe . Camera

All company deliveries must have a signature. No returns after 30 days. All damaged

SALES PRICE $16,865.02
TAX + $0.00
TOTAL PRICE = $16,865.02
LESS DOWNPAYMENT - $0.00
UNPAID BALANCE = $16,865.02

Please Remit Payment To:
H.A. DeHart & Son
311 Crown Point Road
THOROFARE, NJ, 08086

X Buyer Signature  X Seller Signature

Page 1 of 1

[Logo: kai Kappe Associates Inc. since 1946]

Kappe Associates Inc
100 Wormans Mill Court
Frederick, MD 21701
Phone# 301-846-0200
Fax# 301-846-0808
www.kappe-inc.com

Invoice

Date Invoice #
2/19/25 25-059-M

Bill To
East Goshen Township
1580 Paoli Pike
West Chester, PA. 19380

P.O. No.: 25-00157
Job Name/No.: 25-059-M
Job Location: West Chester PA

Date Description Billed
02/19/25 Eng# 516230997 - Hydromatic Pump Model S4NX750EC
Serial #10855039
8,195.00
Freight
Shipped on 02/18/25
151.00
Thank you for your order!

[Stamp: PAID]

APPROVED BY: MM [signature] 2/24/25
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1503
Hershey mill P/S

Subtotal $8,346.00
Sales Tax (6.0%) $0.00
Total $8,346.00
Payments/Credits $0.00
Balance Due $8,346.00

Please inspect entire shipment for damage immediately upon receipt. Kappe will not accept responsibility for damaged or short shipments unless notified with 5 days of receiving shipment.

Terms: Net 30 Days - 1.5% per month interest on unpaid balance over 30 days.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA February 2025 YTD Financial Report
Date: March 4, 2025

YTD February 2025, the Municipal Authority recorded $39,229.79 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $29,582.02 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, Hershey Mill pump station replacement Hydromatic pump, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,647.77. As of February 28, 2025, the fund balance was $25,373.33.

Attached is a complete list of 2025 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

YTD FEBRUARY 2025

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 32.77 76.44
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 6,557.09 0 595.68
07-364-1130 CONNECTION FEES - SEWER 1,498.43 0 281.88
07-380-1000 MISCELLANEOUS REVENUE 1,076.32 0 141.12
07-392-0500 TRANSFER FROM SEWER OPERATING 238,506.00 5,296.00 5,813.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 698,000.00 33,901.02 168,888.74
Total Revenue 947,937.84 39,229.79 175,797.61
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 45,000.00 0 0
07-424-3000 MISCELLANEOUS EXPENSE 2,500.00 0 0
07-424-3110 MUNIC.AUTH.-AUDITING 15,000.00 0 500.00
07-424-3130 ENGINEERING SERVICES 52,000.00 -5,841.50 2,065.75
07-424-3140 LEGAL SERVICES 8,000.00 1,522.50 1,061.50
07-424-3700 CHESTER CREEK ENGINEERING 43,000.00 0 1,755.50
07-424-3705 HUNT COUNTY ENGINEERING 22,500.00 0 0
07-424-7440 R.C. CAPITAL-STP 30,500.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 49,500.00 0 0
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 8,346.00 0
07-429-1504 HUNT CO PUMP STATION CAPITAL 150,000.00 0 0
07-429-1505 RCSTP CAPITAL 87,500.00 25,555.02 80,633.74
07-429-3700 CHESTER CREEK CAPITAL 430,000.00 0 86,535.00
07-429-6100 WEST GOSHEN CAPITAL 20,000.00 0 0
Total Expenses 955,500.00 29,582.02 172,551.49
Net Result From Operations -7,562.16 9,647.77 3,246.12

PER DAVE CARRY OVER FROM LAST YEAR

Municipal Authority
YTD Revenues and Expenses thru 2/28/2025

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/25 Revenue Journal INTEREST EARNED JANUARY 2025 14.23
07-341-1000 INTEREST EARNINGS 02/28/25 Revenue Journal INTEREST EARNED FEBRUARY 2025 18.54
07-392-0500 TRANSFER FROM SEWER OPERATING 01/21/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 3,387.75
07-392-0500 TRANSFER FROM SEWER OPERATING 02/25/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 1,908.25
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/10/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 4,114.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/21/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 7,043.52
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/28/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 14,397.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/25/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 8,346.00
Total Revenue 39,229.79
07-424-3130 ENGINEERING SERVICES 01/21/25 Pay Check: 3537 25-00117 SERV THRU 123124 2024 GEN SERV 2,459.75
07-424-3130 ENGINEERING SERVICES 01/22/25 Invoice Pay Ck:9190016715 AR000101 MISC. RECHARGE 07 acct -3,695.00
07-424-3130 ENGINEERING SERVICES 01/22/25 Invoice Pay Ck:9190016715 AR000101 MISC. RECHARGE 07 acct -5,920.00
07-424-3130 ENGINEERING SERVICES 02/25/25 Pay Check: 3543 25-00415 SERV THRU 011225 2025 GEN SERV 970.00
07-424-3130 ENGINEERING SERVICES 02/25/25 Pay Check: 3543 25-00416 SERV THRU 011225 24 CHAPTER 94 343.75
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00116 LEGAL SERV DEC 2024 GEN AUTH 266.50
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00115 LEGAL SERV OCT 2024 GEN AUTH 538.50
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00114 LEGAL SERV NOV 2024 GEN AUTH 123.00
07-424-3140 LEGAL SERVICES 02/25/25 Pay Check: 3541 25-00414 LEGAL SERV DEC 2024 GEN AUTH 594.50
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 02/25/25 Pay Check: 3542 25-00471 ENG # 516230997-S4NX750EC 7HP 8,346.00
07-429-1505 RCSTP CAPITAL 01/10/25 Pay Check: 3535 25-00016 UV SYS REMOTE ACCESS UPGRADE 4,114.00
07-429-1505 RCSTP CAPITAL 01/21/25 Pay Check: 3538 25-00118 RCSTP- UV DISINFECTION SYS REP 7,043.52
07-429-1505 RCSTP CAPITAL 01/28/25 Pay Check: 3539 25-00178 DECANTER CONTROLS REPAIR 7,875.00
07-429-1505 RCSTP CAPITAL 01/28/25 Pay Check: 3540 25-00175 INSTALL & WIRE NEW GENERATOR 6,522.50
Total Expense 29,582.02
Net Operating 9,647.77

THIS IS 2024 REVENUE RECEIVED IN 2025 TO OFFSET 07-424-3130 EXPENSE ACCT FOR RECHARGES TO AQUA

Page 1 of 1

Lynn Werkheiser

From: Cory Twibell <coryt@vortexcompanies.com>
Sent: Friday, February 28, 2025 2:30 PM
To: Matthew McAloon; Michael Ellis; Zaid Al-Majali
Cc: Mark Miller
Subject: RE: SSPL-2024 Notice of Proceed

Gents, for the 10” segments, there’s approximately 2,162 LF of 10” pipe to be lined that had been called out at 8” on the plans.

US MH DS MH TV
C426 C425 186.2
C425 C424 200.6
C424 C423 50.2
C423 C422 205.9
C422 C421 402.1
C421 C420 145.5
C420 C419 367.7
C419 C418 398
C418 C039 206.1

A $4.50 per LF increase to Bid Item 1-2 (CIPP Lining of 8” Pipe within Easements) from $54 to $58.50 will cover our material cost for the larger tube and additional resin required. Please let us know if agreeable and we’ll send over a formal change order proposal.

Thanks,

Cory

Cory Twibell | Project Manager
Vortex Services Mid-Atlantic | C: 516-698-2194
Celebrating 10 Years! | Vortex10.com

From: Cory Twibell
Sent: Monday, February 24, 2025 1:38 PM
To: Matthew McAloon <MMcAloon@Pennoni.com>; Michael Ellis <MEllis@Pennoni.com>; Zaid Al-Majali <ZAlMajali@Pennoni.com>
Cc: Mark Miller (mmiller@eastgoshen.org) <mmiller@eastgoshen.org>
Subject: RE: SSPL-2024 Notice of Proceed

Excellent, thanks for the update Matt, was just about to send an email for that question.

We’ll provide pricing for the liner upsize to 10” only.

Thanks,

1

[Pennoni logo]

March 6, 2025

EGMAU25003P

East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380

RE: Proposal for Supplee Valley CIPPL Construction Phase Services

Dear Mr. Miller:

Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for construction phase services for the Supplee Valley Cured-in-Place Pipe Lining (CIPPL) project.

Background

The construction contract has been awarded to Vortex Services, and pipe lining construction is planned to start on March 10.

All design and bid assistance work to-date by Pennoni was performed under our General Engineering task. However, General Engineering budget is not set up to cover the cost of construction phase services for capital projects. Therefore, the purpose of this proposal is to create a separate task order to fund construction phase engineering and inspection for the project through a separate task order.

Scope of Services

Pennoni will provide construction engineering support as requested, which is expected to include: pre-construction meeting, part-time on-site observation of pipe cleaning and televising, review of inspection videos, observation of manhole conditions, recommendations for any additional pipe or manhole repairs, construction submittal reviews, near full-time inspection of pipe lining and manhole grouting, review of post-construction videos, processing of pay applications, review of any change order proposals, review of prevailing wage certifications, and processing of project closeout.

The contractor already completed the cleaning and televising, which took three days. They are estimating approximately two to three weeks for pipe lining and manhole grouting. We recommend budgeting for 120 hours of on-site construction inspection and 50 hours of engineering office support.

Schedule

Performance of services will be conducted based on the contractor’s construction schedule.

Fee

We will perform the Scope of Services on a Time and Materials basis at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee of Twenty-Two Thousand Dollars ($22,000.00).

Billing and Payment

Invoices will be submitted monthly. Payment is due within 30 days of invoicing.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 2

EGMAU25003P
East Goshen Municipal Authority

March 6, 2025

Supplee Valley CIPPL
Page 2 of 2

Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.

If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.

Sincerely,
PENNONI ASSOCIATES INC.

[signature]
Michael J. Ellis, PE
Associate Vice President

ACCEPTED BY:

____________________________________________________
Written Name:

East Goshen Municipal Authority

DATE:

__________________________

[Pennoni logo]

March 6, 2025

EGMAU25005P

East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380

RE: Proposal for RCSTP Arc Flash Study

Dear Mr. Miller:

Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority to perform an electrical arc flash study at the Ridley Creek Sewage Treatment Plant (RCSTP).

Background

The last arc flash study at the RCSTP was conducted circa 2011. There have been electrical equipment changes since then, most notably the replacement of both generators. Industry guidelines recommend arc flash studies be reviewed, and updated if applicable, every five years or when major electrical changes occur.

Scope of Services

Pennoni will provide the following scope of services:

  1. Perform an arc flash study for the RCSTP facility based on a red-lines single line drawing E-06 dated 2008.
  2. Conduct an initial one day site visit to survey the electrical equipment, feeder information, feeder lengths, and utility transformer data. This proposal is based on two personnel conducting site visits. We will confirm relay settings, fuse ratings, circuit breaker settings (down to feeder level), and other pertinent data as accessible for performing the study. A short circuit and protective device coordination study are required to be done prior to the arc flash hazard study and are included in our scope of services.
  3. Collect any remaining follow up data on-site.
  4. The study will include contributions of large mechanical motor loads (> 5hp) that are not fed through variable frequency drives. These include air compressors, roof top units, etc.
  5. Perform the study in accordance with IEEE 1584-2018. IEEE 1584-2018 includes the requirements of NFPA 70E. Equipment to be evaluated for arc flash include Switchboards, Panelboards, Industrial Control Panels, MCCs, Transformers, and Disconnect Switches.
  6. Coordinate with the local utility to obtain utility fault contributions and upstream overcurrent settings.
  7. Prepare the arc flash study with associated one-line drawings as modeled in our electrical study software, EasyPower 10.4, listing pertinent electrical system information, and select time-current characteristic curve sets illustrating the coordination between protective devices.
  8. Provide a report presenting the worst case of two scenarios: system fed from utility source(s), at 100% and 50% fault and one generator backup source.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 4

EGMAU25005P
East Goshen Municipal Authority

March 6, 2025

RCSTP Arc Flash Study
Page 2 of 4

  1. Analyze short circuit and arc flash calculations, and identify any equipment that is determined to be underrated or causes an abnormally high incident energy calculation.
  2. Prepare summary of the results of the power system studies in a final written report. The report will include the following sections: General Summary – A synopsis of our overall findings, methods, procedures, and assumptions used in preparing the studies.; Discussion – A discussion of each of the following power system analyses performed for this study: Short Circuit Analysis Reports Protective Device Coordination Arc Flash Hazard Analysis Results; Short Circuit Analysis Reports; Protective Device Coordination; Arc Flash Hazard Analysis Results; Recommendations – Recommendations to reduce the existing incident energy levels and to improve overall future maintenance and operation of the electrical distribution system.
  3. Deliver report in electronic PDF format.
  4. Printing of labels on 4”x6” durable, weather resistant, labels for client installation.

Deliverables

We will provide the following project submissions:

  • Draft Arc Flash Study
  • Final Arc Flash Study
  • Arc Flash Labels (Approximately 30 Labels)

Information Required

The following information will be required to be provided by the Client if Pennoni does not already have the information on file:

  • Cable feeder lengths or scaled plans showing locations of all equipment shown on the single lines
  • Equipment submittals where available for all loads indicating equipment SCCR and/or kAIC ratings
  • Transformer impedances
  • Relay and breaker settings
  • Circuit breaker cut sheets indicating model numbers
  • Fuse ratings

Assumptions

  1. It is assumed all equipment are clearly labeled and that all equipment ratings are readily visible without opening panels. Effort is not included to research equipment ratings via internet searches or other means. Should research be required, additional effort will be billed in accordance with Pennoni’s rate schedule.
  2. An RCSTP representative will be available to escort Pennoni employees to electrical equipment in the building during the entire time Pennoni personnel are scheduled to be on-site.
  3. An RCSTP representative key contact will be available to support requests for additional information.
  4. Pennoni will not remove electrical equipment panel covers.

EGMAU25005P
East Goshen Municipal Authority

March 6, 2025

RCSTP Arc Flash Study
Page 3 of 4

  1. Pennoni personnel will not enter confined spaces or other locations deemed hazardous.
  2. 208V panels fed from associated 125kVA or smaller transformers will not be included in the calculation, but generic labels will be provided.
  3. Proposal includes time for two additional follow up site visits.
  4. Owner will install arc flash labels. If owner requests assistance in applying labels, additional time will be billed in accordance with Pennoni’s rate schedule.
  5. Where equipment labels or documentation is not available, equipment SCCR will be assumed to be 5 kAIC.

Additional Services

In the event that additional services become necessary during the term of the project, Pennoni will provide a separate scope of services and fee proposal to address the required services. Additional services can include, but are not necessarily limited to, the following items:

  • Studies or evaluation of systems beyond those stated herein
  • Electrical engineering design not specifically mentioned herein
  • Additional requested meetings or site visits exceeding those specified herein
  • Installation of arc flash labels
  • Electrical single line drawings in AutoCAD format
  • Services resulting from revisions due to the enactment or revision of codes, laws, or regulations subsequent to commencing the preparation of report
  • Meetings with government agencies, permit filing or application fees
  • Preparation of as-built drawings
  • Testing, disassembly of building systems and components, or removal of finishes to gain access to building systems and components
  • Design of remedies to conditions noted in the report
  • Materials/equipment testing
  • Design, engineering and preparation of plans and specifications

Schedule

Performance of services will commence upon receipt of Notice to Proceed (NTP). Schedule will depend on accessibility to visually identify equipment and availability of needed information.

Fee

We will perform the Scope of Services for a Lump Sum of Thirteen Thousand Five Hundred Dollars ($13,500.00).

Billing and Payment

Invoices will be submitted monthly. Payment is due within 30 days of invoicing.

Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.

If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.

EGMAU25005P      RCSTP Arc Flash Study
East Goshen Municipal Authority      March 6, 2025      Page 4 of 4

Sincerely,
PENNONI ASSOCIATES INC.

[Signature: Michael J. Ellis]

Michael J. Ellis, PE
Associate Vice President

ACCEPTED BY:

________________________________________
Written Name:
East Goshen Municipal Authority

DATE:

___________