Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
MA 2-10-25 final 1
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES February 10, 2025 The East Goshen Township Municipal Authority held their regular meeting on Monday, February 10, 2025 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman Kevin Cummings – Vice Chairman Sean Ellsworth John Stipe Dana Pizarro Also in attendance were: Mark Miller (Director of Public Works), Cody Bright (Supervisor) Dave Ware (Finance Director), Patrick McKenna (Attorney) Robert Jefferson (Attorney) Stacey Fuller (Attorney) Mike Ellis (Pennoni). COMMON ACRONYMS: ATS – Automatic Transfer Switch BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow PWD – Public Works Department WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. Walter asked for a moment of silence for our police, fire fighters, EMT and military. Walter asked if anyone would be recording the meeting. There was no response. Chairman’s Report/Other Members Report None
MA 2-10-25 final 2
Liaison Reports 1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful Day is Saturday April 12,2025. The Board is looking at the street tree issue. SEWER REPORTS 1. Director of Public Works, Mark Miller’s report for February 10, 2025. Monthly Flows – The average daily flow to West Goshen was 626,723 gallons per day. Meters:
• Were read on a daily basis • Two of the three replacement meters for Ellis Lane, Paoli Pike and Westtown Way have arrived. Also, we will be replacing the mounting brackets as soon as the third meter arrives. C.C. Collection:
• The pumping stations were visited on a daily basis. • We had a problem with the fog rod at the Barkway station and operated off the backup floats until John Laidley replaced it. • We have continued with the televising and cleaning of the collection lines in Sectors 3 and 4 and have started with the repairs. Pipe Data View will be taking care of the pressure grouting of the larger ones. • Goshen Valley: We will be meeting with the two property management companies that oversee the facilities to go over the list of problems our guys have compiled. Ridley Creek Collection
• The pump stations were visited on a daily basis. • The wet well at the Hunt Country pump station was washed down and vacuumed out. • The pump that was pulled at the Hershey Mill station was not worth getting repaired so we ordered a new one at the cost of $9,400.00 with a 6-week delivery time. • We received a sewer odor complaint at the bottom of Cornwallis Drive and had to replace the charcoal filter that was in the manhole. . Ridley Creek Plant • The new generator has been installed and is in operation. Alarms: 16 PA 1 Calls: 77 Monthly Rainfall: 1.68” Lateral Repairs or Caps:
MA 2-10-25 final 3
2. Pennoni Engineer’s Report dated February 7, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
• UV Disinfection System –The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. The system is still being run in Hand mode with one module On and the other Off in the meantime. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
• Generator #2 Replacement – The new generator was installed on January 16.
• Electrical Supply Evaluation – The power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest provided the testing report on January 10. A summary of the report is as follows:
o 12 voltage events were recorded during the 25-day monitoring period. All of the
events were either dips or interruptions.
10 of the events occurred on 12/5/24. 2 of the events occurred on 12/17/24. o The power quality at the RCSTP appeared to be adequate during that period as the
only events recorded were dips and interruptions which are believed to have originated externally to the plant. o No swells or surges were recorded during the monitoring period. o While onsite, it was noted that the A phase surge protection module in the outdoor
MDP switchboard was not indicating an active status. It is recommended that this is replaced. o Additionally, it is recommended to have surge protection installed at multiple
locations and voltage levels within the facility.
The plant operator stated that the generators briefly turned on 12/5 and 12/17, but no equipment issues were reported. We are discussing the results further with our electrical engineers and will provide a recommendation regarding next steps. • Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes, most notably the replacement of both generators. We contacted the company who performed the last arc flash study, Clinger Electric, in November to obtain a quote. They have not been responsive so we will reach out to other firms for a quote.
Sanitary Sewer Pipe Rehab
• Supplee Valley Pipe Lining – A pre-construction meeting with the contractor, Vortex Services, is scheduled for February 12.
• DCED Small Water & Sewer Grant – Applications are now being accepted until April 30 for construction, improvement, and repair of water, sanitary sewer, or storm sewer projects for up to $500,000. This is a potential source of funding for 2026 pipe lining work, Hershey’s Mill Pump Station upgrades, or other sewer system improvements.
MA 2-10-25 final 4
New Connections
• Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are performing regular inspections.
• 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction is ongoing, and we are performing regular inspections.
• 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
• 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. We are coordinating with Howell Environmental and Township staff to have the required Sewage Facilities Planning Module (SFPM) Components completed and signed and submitted to PADEP. It was the previous understanding that PADEP was not requiring any forms or SFPM resolution by East Goshen since the bulk of the project is in West Whiteland and the entire public sewer system is proposed to be owned by West Whiteland, but PADEP subsequently provided comments that the forms and resolution are required.
• 1344 Morstein Road – One new home is proposed with a grinder pump. Pennoni met virtually with the design engineer to discuss design and plan requirement. We subsequently reviewed an updated sewer plan submission and provided sanitary sewer comments to the design engineer on February 6.
• 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.
Chapter 94 Reports
• We continued preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31.
3. Big Fish Environmental Services – The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for January 2025. All supplemental reports were submitted for January 2025. Caustic usage increased to 64.67 gallons per day from 54.34 gallons per day last month. Aluminum sulfate solution volumes remained at a daily average of 74 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational problems. There were no odor complaints during the month. Approval of Minutes The minutes of the January 13, 2025 meeting were approved as amended. Patrick commented that because it’s a Township ordinance, he doesn’t have the authority to write the letter, so Township Staff and the Township Attorney are working on it.
MA 2-10-25 final 5
Approval of Invoices 1. John moved to approve payment of the following Pennoni Invoices: #1258959 $970.0 #1258961 $343.75 Dana seconded the motion. The motion passed unanimously. 2. Sean moved to approve payment of the Gawthrop Greenwood Invoice #222070486 in the amount of $594.50. Dana seconded the motion. The motion passed unanimously. 3. Dana moved to approve payment of the Lenni Electric invoice #250122 in the amount of $6,522.50 (paid). Sean seconded the motion. The motion passed unanimously. 4. John moved to approve payment of the Alfa Laval invoice #285760303 in the amount of $7,875.00 (paid) . Sean seconded the motion. The motion passed unanimously. Financial Reports The following report was provided: Year to date January 2025, the Municipal Authority recorded $28,957.00 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $19,327.77 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,629.23. As of January 31, 2025, the fund balance was $25,354.79. Old Business - None Goals –None New Business – None Any Other Matter - None Correspondence- None Public Comment - None Adjournment There being no further business John moved to adjourn the meeting. Sean seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:45 pm. The next regular meeting will be held on Monday, March 10, 2025 at 7:00 p.m. Respectfully submitted, Ruth Kiefer, Recording Secretary