Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
MA 3-10-25 final 1
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES March 10, 2025 The East Goshen Township Municipal Authority held their regular meeting on Monday, March 10, 2025 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman Kevin Cummings – Vice Chairman Sean Ellsworth John Stipe Dana Pizarro Also in attendance were: Mark Miller (Director of Public Works), Cody Bright (Supervisor) Dave Ware (Finance Director), Patrick McKenna (Attorney) Robert Jefferson (Attorney) Stacey Fuller (Attorney) Mike Ellis (Pennoni). COMMON ACRONYMS: ATS – Automatic Transfer Switch BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow PWD – Public Works Department WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. Walter asked for a moment of silence for our police, fire fighters, EMT and military. Walter asked if anyone would be recording the meeting. There was no response. Chairman’s Report/Other Members Report None Liaison Reports 1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful Day is Saturday April 12,2025.
MA 3-10-25 final 2
SEWER REPORTS 1. Director of Public Works, Mark Miller’s report for March 10, 2025. Monthly Flows – The average daily flow to West Goshen was 630,885 gallons per day. Meters:
• Were read on a daily basis • We will be installing the new meters for Ellis Lane, Paoli Pike and Westtown Way on March 11th. C.C. Collection:
• The pump stations were visited on a daily basis. • The contractor doing the slip liner in Supplee Valley found inflow from a lateral on Katherine Lane. Public Works televised the lateral and found that it was broken 6’ from the main. We excavated the main, cut a section, and installed a new wye and 10’ of lateral pipe. • With the windstorms, we have been busy with alarm callouts from the stations due to power outages. We have also been busy clearing downed trees on sanitary sewer rights-of-way. • We had an electrical problem with the generator at Ashbridge Station and had to pump and haul for several hours until the problem was located. It turned out to be a bad solenoid. • We utilized Pipe Data View to grout ten leaks at various locations on the Chester Creek Collection.. Ridley Creek Collection
• The pump stations were visited daily. • Alarms were constant due to the weather. • Purchased new pump for the Hershey Mill Pump Station. . Ridley Creek Plant
• Lenni has been working at the plant performing inspections of electrical equipment and wires. They ordered two new surge processors (TVSS) for the main distribution box. • We had a bad drive on Blower #2 in the SBR building. I asked Lenni to order a spare drive unit for the blowers and the centrifuge.. Alarms: 60: all storm-related with the exception of Ashbridge Pump Station PA 1 Calls: 46
• On February 28th, Billy, Lynn, and Louis attended a PA One Call seminar on mark outs and general information. Monthly Rainfall: 3.22”
MA 3-10-25 final 3
2. Pennoni Engineer’s Report dated March 6, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
• UV Disinfection System –The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. We understand the system is still being run in Hand mode with one module On and the other Off in the meantime. We spoke with John on February 12, and he indicated he was awaiting parts and should be able to complete the work soon. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
• Electrical Supply Evaluation – As previously reported, the power supply meter was installed on December 5. The 25 days of power supply monitoring was completed, and the power supply meter was removed on December 30. EnerGTest provided the testing report on January 10. A summary of the report is as follows:
o 12 voltage events were recorded during the 25-day monitoring period. All of the
events were either dips or interruptions.
10 of the events occurred on 12/5/24. 2 of the events occurred on 12/17/24. o The power quality at the RCSTP appeared to be adequate during that period as the
only events recorded were dips and interruptions which are believed to have originated externally to the plant. o No swells or surges were recorded during the monitoring period. o While onsite, it was noted that the A phase surge protection module in the outdoor
MDP switchboard was not indicating an active status. It is recommended that this is replaced. o Additionally, it is recommended to have surge protection installed at multiple
locations and voltage levels within the facility.
The plant operator stated that the generators briefly turned on 12/5 and 12/17, but no equipment issues were reported. A virtual meeting was held on February 13 between Pennoni, Mark Miller, and Matt Mullin to further discuss the electrical supply evaluation report and the potential electrical issues at the RCSTP. It was concluded that the following improvements should be installed at the plant: replacement of the surge counters throughout the plant, or replacement of the surge protectors/TVSS if a similar price to replacing the counters, and installation of surge protection for the two water supply pumps. Mark is requesting Lenni confirm feasibility and provide cost quotes for these improvements. Feasibility and cost for installation of a line conditioner on the customer side of the electric service will also be requested. Once the surge counters, which track the number of surges experienced by each protector/TVSS, are all replaced and functional, the next step is to monitor and log the quantity of surges at each unit and other electric events. Pennoni provided a list of equipment, items, and parameters to keep track of on a weekly basis to the plant operator. The recommended information to keep track of can be used to develop a baseline of information for further evaluation of spurious electrical events at the RCSTP after a couple of months of monitoring.
MA 3-10-25 final 4
A second round of power supply metering is not recommended.
• Arc Flash Study – It has been over five years since the last study, and there have been electrical equipment changes, most notably the replacement of both generators. We provided a proposal to perform an updated arc flash study.
Sanitary Sewer Pipe Rehab
• Supplee Valley Pipe Lining – A pre-construction meeting with the contractor, Vortex Services, occurred on February 12. The contractor subsequently cleaned and televised all the pipes. We performed part-time on-site observation of the cleaning and televising, and we reviewed the videos. The only notable deficiency that was identified that would impact pipe lining was a leak in a lateral. Public Works televised the lateral, identified the leak location, and performed an excavated repair.
The contractor also provided construction submittals, which we reviewed. They are scheduled to start pipe lining on March 10, and they anticipate approximately two weeks to complete the work. A number of the pipes, totaling approximately 2,162 LF, were identified to be 10” diameter during the televising. The pipes were previously believed to be 8” diameter and were bid accordingly. The contractor submitted a change order proposal for $9,729 ($4.50/LF extra) for the additional cost of the larger diameter.
Pump Stations
• Hunt Country Pump Station – We performed a site visit with Public Works to discuss the desired improvements to the Hunt Country Pump Station that are to be incorporated as part of the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application. The scope includes addition of a Muffin Monster, effluent flow meter, and bypass connection, replacement of the force main, and replacement of the SCADA system and controls. We are also evaluating replacement of the pumps within the scope. We have begun preparation of the grant application, which is due by April 30.
• Ashbridge Pump Station – We understand the station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
New Connections
• Millstone Meadows (1010 Hershey Mill Road) – Site and sanitary sewer construction is ongoing, and we are continuing to perform regular inspections.
• 301 Reservoir Road (5-Lot Residential Subdivision) – Site construction is ongoing, and we are performing continuing to perform regular inspections. We also reviewed construction submittals including shop drawings for sanitary sewer components.
• 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
•
MA 3-10-25 final 5
•1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. We coordinated with Howell Environmental and Township staff to have the required Sewage Facilities Planning Module (SFPM) Components completed and signed and submitted to PADEP. It was the previous understanding that PADEP was not requiring any forms or SFPM resolution by East Goshen since the bulk of the project is in West Whiteland and the entire public sewer system is proposed to be owned by West Whiteland, but PADEP subsequently provided comments that the forms and resolution are required
The East Goshen Township required SFPM Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC) on February 13. The CCHD returned the completed Component on February 21. We are still waiting for CCPC to complete their respective Component. After the Components have been completed by the CCHD and CCPC, we will coordinate with the Township staff to sign the remaining outstanding items needed for the SFPM resubmission to PADEP. • 1344 Morstein Road – One new home is proposed with a grinder pump. No activity by Pennoni since our last report.
• 107 N. Chester Road – One new house is proposed. No activity by Pennoni since our last report.
Chapter 94 Reports
• We continued preparation of the 2024 Chapter 94 Reports, which are due for submission to PADEP by March 31st.
3. Big Fish Environmental Services – The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for February 2025. All supplemental reports were submitted for February 2025. Caustic usage decreased to 53.35 gallons per day from 64.67 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 71 gallons per day from 74 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month. Approval of Minutes The minutes of the February 10, 2025 meeting were approved as amended. Approval of Invoices 1. Kevin moved to approve payment of the Gawthrop Greenwood invoice 3222071832 in the amount of $164.00. Sean seconded the motion. The motion passed unanimously. 2. Kevin moved to approve payment of the HA DeHart & Son invoice #M101003320 in the amount of $16,865.02. Sean seconded the motion. The motion passed unanimously. 3. Sean moved to approve payment of the Kappe Associates invoice #25-059-M in the amount of $8,346.00 (paid). Kevin seconded the motion. The motion passed unanimously. .
MA 3-10-25 final 6
Financial Reports The following report was provided: YTD February 2025, the Municipal Authority recorded $39,229.79 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $29,582.02 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,647.77. As of February 28, 2025, the fund balance was $25,373.33. Old Business - None Goals –None New Business – • Supplee Valley CIPPL Change Order for $9,729.00. Mike reviewed the Vortex email and recommended approval. Sean moved to approve the Change Order in the amount of $9,729.00. Kevin seconded the motion. The motion passed unanimously. • Pennoni Proposal for Supplee Valley CIPPL Construction Phase Services. Mike explained the proposal for Supplee Valley not to exceed $22,000.00. Kevin moved to approve the proposal for Supplee Valley not to exceed $22,000.00. Sean seconded the motion. The motion passed unanimously. • Pennoni Proposal for RCSTP Arc Flash Study – After discussion, Kevin moved to approve the proposal for RCSTP Arc Flask Study not to exceed $13,500.00. Sean seconded the motion. The motion passed unanimously. Any Other Matter - • Grants – Mike mentioned grants that are available. He gave an update on the Hunt Country Pump Station grant application. Correspondence- None Public Comment - None Adjournment There being no further business Sean moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:25 pm. The next regular meeting will be held on Monday, April 14, 2025 at 7:00 p.m. Respectfully submitted, Ruth Kiefer, Recording Secretary