Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
MA 4-14-25 final 1
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES April 14, 2025 The East Goshen Township Municipal Authority held their regular meeting on Monday, April 14 10, 2025 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman Kevin Cummings – Vice Chairman Sean Ellsworth (via phone) John Stipe Dana Pizarro Also in attendance were: Mark Miller (Director of Public Works), Cody Bright (Supervisor) Dave Ware (Finance Director), Patrick McKenna (Attorney) Robert Jefferson (Attorney) Stacey Fuller (Attorney) Mike Ellis (Pennoni). COMMON ACRONYMS: ATS – Automatic Transfer Switch BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow PWD – Public Works Department WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. Walter asked for a moment of silence for our troops and EMT. Walter asked if anyone would be recording the meeting. There was no response. Chairman’s Report/Other Members Report Attendance to the West Goshen meeting was discussed.
MA 4-14-25 final 2
Liaison Reports 1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful Day was this Sunday April 13 ,2025. They had 10-12 groups and 3 hunting clubs, who did their usual areas. They also planted a tree in Clymer’s Woods. 2. Board of Supervisors – Cody mentioned that their next meeting is May 13. They will have land development plans to review. SEWER REPORTS 1. Director of Public Works, Mark Miller’s report for April 14, 2025. Monthly Flows – The average daily flow to West Goshen was 609,755 gallons per day. Meters:
• The new meters were installed, and we have been reading them on a daily basis. • The Ellis Lane meter was pulled for the pipe lining project and is now reinstalled and back in operation. C.C. Collection:
• The pump stations were visited on a daily basis and the wet wells were cleaned. • The muffin monsters were pulled and inspected for broken teeth and general wear and tear. • Lenni was called out to look at the VFDs at the Ashbridge Station. • The current VFDs have been in service for 16 years. • The current model is no longer available, and we are in the process of tracking down a new set. • We should consider upgrading the Ashbridge Station in 2026/2027. • PECO is scheduled to install new underground lines in the Pin Oak Farms development over the next three months.
• Since we don’t have any lateral locations on file in that neighborhood, the Public Works Department cleaned and televised 6500 linear feet of sewer main. • All laterals were marked at the main. A pre-construction meeting was held, and the contractor was advised that the main was marked and the depth of each manhole was painted on the street. Ridley Creek Collection
• The Hershey Mill Station was visited on a daily basis, and the wet well was washed down. There were no problems to report. • PECO will also be installing new electric lines in the Lochwood Chase development. • Public Works will be cleaning and televising the sewer lines next week and will be marking the laterals and mains. • We were notified of lateral blockage on Jamestown Way in the Clocktower development. We were able to utilize the new vac truck to locate the buried cleanout, which was a huge help as the main was 15 feet in depth. Using the vac truck to locate the cleanout saved us from digging the lateral.
MA 4-14-25 final 3
Ridley Creek Plant
• The Public Works Department assisted the plat operator with removing old and outdated parts from the SBR building. • Lenni received the new VFDs for te SBR blowers. • One was installed and two were placed on the shelf. • Lenni also installed the new surge protector on the TVSS. • The fittings that the operator requested for the caustic soda system were dropped off. • The Public Works employees assisted the operator with maintenance. • We had to replace the pressure washer at the plant. The original unit was purchased in 2010. Alarms: 23, mostly weather related PA 1 Calls: 72 Monthly Rainfall: 4.80” 2. Pennoni Engineer’s Report dated April 11, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
• UV Disinfection System –The only outstanding item remains the connection of the permanent alarm to the two UV modules. John Laidley had begun to complete the alarm connections a couple months ago. We understand the system is still being run in Hand mode with one module On and the other Off in the meantime. We spoke with John on February 12, and he indicated he was awaiting parts and should be able to complete the work soon. After the alarms are connected, the UV modules will be complete, and we will notify PADEP accordingly.
• Arc Flash Study – A site visit with Pennoni and the operator occurred on March 18 to compile a full list of electrical equipment and corresponding power requirements for the arc flash study. Pennoni is currently preparing the arc flash study.
Sanitary Sewer Pipe Rehab
• Supplee Valley Pipe Lining – The contractor, Vortex Services, completed all pipe lining work, and we performed part-time inspections. There was approximately 450 LF of contracted pipe that was identified to be PVC in good condition so we directed the contractor not to install liners in that piping. The contractor installed approximately 150 LF of pipe liner in a sewer along Strasburg Road instead. No manholes in Supplee Valley were identified to have any infiltration so no manhole grouting needed to be performed.
We processed the 1st pay application. We expect the 2nd (final) pay application and contract closeout documents to be provided for consideration at the May MA meeting.
MA 4-14-25 final 4
Pump Stations
• Hunt Country Pump Station – We continued preparation of the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application, which is due by April 30. The scope includes addition of a Muffin Monster, effluent flow meter, bypass connection, replacement of the force main, and replacement of the SCADA system and controls. We are also evaluating replacement of the pumps within the scope. The cost estimate and grant application resolution were provided for MA consideration.
• Ashbridge Pump Station – The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
New Connections
• Millstone Meadows (1010 Hershey Mill Road) – Site and sanitary sewer construction is ongoing, and we are continuing to perform regular inspections.
• Timbermill (301 Reservoir Road) – Site and sanitary sewer construction is ongoing, and we are performing continuing to perform regular inspections.
• 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
• 1338 Morstein Road (WCU Foundation) – Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. The only outstanding item is a cover letter to PADEP provided by East Goshen Township for inclusion with the SFPM. After the cover letter is provided, the SFPM will be resubmitted to PADEP.
• 1344 Morstein Road – One new home is proposed with a grinder pump. After exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle.
• 20 Ellis Lane, West Goshen Township – Two existing single family homes and 14 new townhouses are proposed to connect to West Goshen’s public sewer. The flows are then “wheeled” through East Goshen’s Chester Creek conveyance system. We reviewed a SFPM Mailer, determined there is adequate capacity in the Chester Creek system, and recommended East Goshen sign the Capacity Determination form.
Chapter 94 Reports
• We completed the 2024 reports for the Ridley Creek, West Goshen (Chester Creek), and Westtown systems. We submitted the Ridley Creek report directly to PADEP via their OnBase system on March 31. The Chester Creek and Westtown Tributary reports were submitted by the Township to West Goshen Township and Westtown Township respectively
MA 4-14-25 final 5
on March 28. East Goshen’s existing and projected treatment and conveyance needs for all three systems are all well within available and permitted capacities.
A summary of the RCSTP and West Goshen reports follows: o RCSTP:
The RCSTP’s average influent flow was 418,000 gpd in 2024, which is slightly
greater than the flow from 2023. Flows remain well within the 750,000 gpd permitted average capacity of the plant. The 2024 flows are equivalent to 207 gpd/EDU, which is less than the Township’s planning flow rate of 225 gpd/EDU. See Table 1 in the RCSTP Chapter 94 Report for a tabulation of 5-year flow history.
The projected future 5-year average and maximum monthly flows to the RCSTP
are 440,000 gpd and 493,000 gpd, which is below the permitted capacity of the plant. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.
The RCSTP’s average organic loading was 1,342 lbs BOD5/day in 2024, which is
greater than the loading in 2023. Organic loadings remain well within the 2,098 lbs/day permitted capacity. See Table 3 in the RCSTP Chapter 94 Report for a tabulation of 5-year organic loading history.
The 5-year projected average and maximum monthly organic loading to the plant
is 1,357 lbs BOD5/day and 1,917 lbs BOD5/day, which is within the permitted capacity. Refer to the attached Chart 2 excerpt for a graph of the 5-year historical and 5-year projected organic loadings.
The Hershey’s Mill and Hunt Country Pump Stations operated within their
permitted hydraulic capacities in 2024, and they are projected to continue to do so in the future due to little to no projected upstream connections. See Table 8 in the RCSTP Chapter 94 Report for a summary of 2024 pump station flows versus capacities.
o West Goshen Service Area:
East Goshen’s average daily flow was 706,000 gpd in 2024, which is an increase
of 2.6% from 2023 and 12.4% from 2022. The actual flow rate in 2024 was 199 gpd/EDU, which is well under the planning flow rate of 225 gpd/EDU. See Table 1 in the West Goshen Chapter 94 Report for a tabulation of 5-year flow history.
The projected future 5-year average and maximum monthly flows to West Goshen
are 673,000 gpd and 768,000 gpd, which is well within the intermunicipal capacity of 1 MGD. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.
The Barkway and Ashbridge Pump Stations operated within their permitted hydraulic capacities in 2024 and are projected to continue to do so. See Table 8 in the West Goshen Chapter 94 Report for a summary of 2024 pump station flows versus capacities.
MA 4-14-25 final 6
3. Big Fish Environmental Services – The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for March 2025. All supplemental reports were submitted for March 2025. Caustic usage increased to 62.85 gallons per day from 53.35 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 65.58 gallons per day from 71 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month. Approval of Minutes The minutes of the March 10, 2025 meeting were approved as amended. Approval of Invoices 1. Kevin moved to approve payment of the following Pennoni invoices: * Invoice #1267311 $7,235.00 * Invoice #1267312 $2,093.75 * Invoice #1267313 $5,777.50 John seconded the motion. The motion passed unanimously. 2. Kevin moved to approve payment of the Vortex Services – Supplee Valley Sanitary Sewer Lining Change Order #1 (which is part of the Payment Application #1) in the amount of $9,729.00. John seconded the motion. The motion passed unanimously. 3. Kevin moved to approve payment of the Vortex Services – Supplee Valley Sanitary Sewer Lining Payment Application #1 in the amount of $244,537.03. John seconded the motion. The motion passed unanimously. 4. Dana moved to approve payment of the Gawthrop Greenwood Invoice # 222073391 in the amount of $287.00. Kevin seconded the motion. The motion passed unanimously. 5. Kevin moved to approve payment of the following paid invoices: 1. Maillie – audit #116087 $12,000.00 2. Delaware River Basis Com. annual fee #252178 $ 780.00 3. Lenni Electric – generator #250337 $ 3,294.00 4. Kappe Assocs. Inc. – new pump #25-102-M $12,504.00 5. Colonial Electric- Ridley cap replacement #16238560 $13,368.00 Dana seconded the motion. The motion passed unanimously. Financial Reports The following report was provided: YTD March 2025, the Municipal Authority recorded $90,490.09 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $80,822.84 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,667.25. As of March 31, 2025, the fund balance was $25,392.81. Old Business - None
MA 4-14-25 final 7
Goals –None New Business – !. Grant - Mike explained that an Authorized Official Resolution was prepared for the MA to request a PA Small Water and Sewer Program grant in the amount of $491,000.00 for Hunt Country upgrades. The applicant is responsible for 15% of the cost. The application has to be submitted by the end of the month. He expects to have a response by the end of the year. Dana made a motion to authorized John Stipe to sign the Resolution to apply for a grant in the amount of $491,000.00. Kevin seconded the motion. The motion passed unanimously. John signed the Resolution. Capacity Requests 1. 1404 Morstein Rd – Mark explained that this property is in Charter Chase which does not have public sewer. Mike provided a map of the area. There is a pump station across the street, but it would be difficult to get to just for him. Other options were discussed. Dana suggested getting data from Chester County about the on-site systems in Charter Chase that have failed and been replaced. Mike will get that information. Any Other Matter - None Correspondence- None Public Comment - None Adjournment There being no further business Dana moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm. The next regular meeting will be held on Monday, May 12, 2025 at 7:00 p.m. Respectfully submitted, Ruth Kiefer, Recording Secretary