Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

MA 6-9-25 final 1

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES June 9, 2025 The East Goshen Township Municipal Authority held their regular meeting on Monday, June 9, 2025 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman Kevin Cummings – Vice Chairman Sean Ellsworth John Stipe Dana Pizarro Also in attendance were: Mark Miller (Director of Public Works), Cody Bright (Supervisor) Dave Ware (Finance Director), Patrick McKenna (Attorney) Robert Jefferson (Attorney) Stacey Fuller (Attorney) Mike Ellis (Pennoni). COMMON ACRONYMS: ATS – Automatic Transfer Switch BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow PWD – Public Works Department WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. Walter asked for a moment of silence for our troops and EMT. Walter asked if anyone would be recording the meeting. There was no response. Chairman’s Report/Other Members Report 1. John read the MA Handbook which mentioned that the MA has been authorized in service for 50 years. Patrick and Derek will work on getting this in front of the BOS.

MA 6-9-25 final 2

Liaison Reports None SEWER REPORTS 1. Director of Public Works, Mark Miller’s report for June 9, 2025. Monthly Flows – The average daily flow to West Goshen was 609,471 gallons per day. Meters:

• Read Daily. Calibrated on 6/4/25 and no adjustments were required. C.C. Collection:

• The pump stations were visited on a daily basis with no problems to report. • PECO is installing new underground conduit. We inspected our pipe prior to the start of the work and cleaned and televised the lines. We will need to go back and televise the lines wherever they crossed our pipe. Ridley Creek Collection

• The stations were checked daily. • We had a problem with the check valves at the Hunt Country Pump Station. MGK checked and replaced both valves. Ridley Creek Plant

• We addressed some maintenance repairs. • I ordered rebuild kits for the filter pumps. • I talked to Matthew Mullin, the plant operator, about draining tanks so we can inspect the tank walls. The plan is to get all three done by the end of the year.

• I talked with Mike Ellis to make sure his structural engineer is available to inspect the tanks. Alarms: 15 (all weather related) PA One Calls: 211 Lateral Caps: 3 in Bow Tree, 1 on Cooper Cir, 2 in Waterview Monthly Rainfall: 8.82”

MA 6-9-25 final 3

2. Pennoni Engineer’s Report dated June 5, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

• Arc Flash Study – A full draft of the Arc Flash Study report was submitted to the operator and Public Works on May 29 for review. A review meeting is being scheduled. The report will be updated thereafter, if applicable, and the final version will be submitted.

• SBR Tank Inspections – Visual inspection of the coating and concrete walls and floor within the SBR tank that is currently not in use is being scheduled for a Pennoni structural engineer and Matt McAloon in mid-June. The last inspection occurred in 2021, which was in SBR #1, and subsequent coating repairs were made in that SBR by Dutchland in June 2021.

Sanitary Sewer Pipe Rehab

• Supplee Valley Pipe Lining – The contractor, Vortex Services, previously completed all pipe lining work. One 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment needs to be repaired/relined and will not be accepted as-is. They acknowledged the notification and responded that they would discuss internally and get back to us. We followed-up on June 5 but have not yet received a response. Final payment will not be processed until this matter is resolved.

Pump Stations

• Hunt Country Pump Station – No activity by Pennoni since our last report. We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. We expect that DCED will make awards in late 2025 or early 2026.

• Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.

Sewer Extension

• Morstein Road – We obtained onlot/septic system replacement permit history from the Chester County Health Department for Charter Chase and the subject portion of Morstein Road. The status of the onlot systems is tabulated in the attached spreadsheet and summarized by color-coding based on system age in the attached exhibit.

The available permits date back to 1999. It is not known if there were any repairs or replacements prior to 1999 (there may not have been since the systems were generally ≤30 years old) or if permit records were not retained prior to that. Therefore, for properties for which CCHD did not have any permit records, we assumed the original onlot system is still in use in the tabulation and exhibit. We also drafted an inquiry letter to the Morstein Road property owners to gauge interest in connecting to public sewer for review by the Township and Municipal Authority.

MA 6-9-25 final 4

New Connections

• Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are continuing to perform regular inspections.

• Timbermill (301 Reservoir Road) – Site construction is ongoing, and we are continuing to perform regular inspections.

• 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.

• 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.

• 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we are deferring to the property owners to confirm the easement can be used in writing.

The Design Engineer provided a revised submission package on May 28. We are currently reviewing the submission. 3. Big Fish Environmental Services – The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for May 2025. All supplemental reports were submitted for May 2025. Caustic usage decreased slightly to 62.82 gallons per day from 63.33 gallons per day last month. Aluminum sulfate solution volumes daily average increased to 73.21 gallons per day from 69.59 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month. Approval of Minutes The minutes of the May 12, 2025 meeting were approved as amended. Approval of Invoices 1. John moved to approve payment of the following Gawthrop Greenwood invoices: * Invoice #222074961 $328.00 (paid) * Invoice #222075796 $574.00 Sean seconded the motion. The motion passed unanimously.

MA 6-9-25 final 5

Financial Reports The following report was provided: YTD May 2025, the Municipal Authority recorded $434,779.12 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $425,019.47 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,759.65. As of May 31, 2025, the fund balance was $25,485.21. Old Business - 1404 Morestein Rd – There was discussion about sewering Morstein Road. They reviewed the letter to go to the residents. John made a motion to send the letter. Sean seconded the motion. The motion passed unanimously. Goals –None New Business – 1. Sewer Fund Balance Projection & Analysis – Dave reviewed his future plan with rates to possibly increase in 2028 – 2029, although he will check every year. Costs are rising for supplies and electric and water. This is an old system which will need upgrades. Capacity Requests 1. 724 N. Chester Road - The property Owner Connie Bain will have to get an easement from Hankin for the New Kent apartments property. John made a motion to approve the capacity request and require an easement. Sean seconded the motion. The motion passed unanimously. Any Other Matter - None Correspondence- None Public Comment - None Adjournment There being no further business John moved to adjourn the meeting. Sean seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm. The next regular meeting will be held on Monday, July 14, 2025 at 7:00 p.m. Respectfully submitted, Ruth Kiefer, Recording Secretary