Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

1

EAST GOSHEN MUNICIPAL AUTHORITY

August 11, 2025

7:00 • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE o Ask if anyone will be taping the meeting

• CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS • LIAISON REPORTS • SEWER REPORTS o Director of Public Work’s Report

West Goshen Report o Pennoni Engineer’s Report o Big Fish Environmental Report • APPROVAL OF MINUTES o July 14, 2025

• APPROVAL OF INVOICES Company Invoice # Amount Paid? Pennoni 1284514 $2,584.75 Gawthrop Greenwood 222078999 $184.50

• FINANCIAL REPORTS o July 2025

• OLD BUSINESS

2

• 2025 Goals: Goal Status

Ridley Creek Plant compliance January through July were in compliance with PADEP permit requirements.

Continue to implement infiltration and inflow for the sewer system Ongoing.

Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building.

Attend meetings on quarterly basis.

Long-term sustainability

Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.

• NEW BUSINESS

• CAPACITY REQUESTS o Mortein Tie-in Survey Results & Sewer Connection Exhibits o Charter Chase Tie-in Discussion (email from Mark Johnsen, 1213 Waterford Rd)

• ANY OTHER MATTER • CORRESPONDENCE AND REPORTS OF INTEREST o SBR Tank #1 Structural Assessment Draft o RCSTP Protective Device Coordination & Arc Flash Study

• PUBLIC COMMENT • ADJOURNMENT

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: August 11, 2025
To: Municipal Authority
From: Mark Miller
Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 579,445 per day.

Meters: Read on a daily basis with no problems to report.

C.C. Collection:

  • Pump stations were visited on a daily basis with no problems to report.
  • We inspected the lines in the Waterview development because we will be milling and paving the roads there in the next two weeks.

Ridley Creek Collection:

  • The pump stations were visited on a daily basis with no problems to report.
  • The upgrades to Hershey Mill Station are just about completed.

Ridley Creek Plant:

  • We didn't have any problems to report.
  • We cleared the brush from both retention basins and rom around the fence.
  • I ordered two new dialers for the plant which will be installed and in operation by the end of September.

Alarms: 22, all weather-related

PA One Calls: 118

Lateral Caps: 2

Monthly Rainfall: 5.00”

1

Mark Miller

From: Mike Moffa <MMoffa@westgoshen.org>
Sent: Thursday, August 7, 2025 7:13 AM
To: Mark Miller
Subject: Monthly Update

Good morning Mark,

Please let me know if you need anything else or would like different info...

General Notes:

  • For the month of July the plant operated in compliance with its NPDES permit.
  • WWTP monthly average daily flow - 3.732 mgd
  • WWPS monthly average daily flow - 1.213 mgd
  • Monthly average total phosphorus discharge concentration was <0.04 mg/L.
  • Sludge to landfill – 327 wet tons
  • The WG Sewer Authority is working on updating its 10-year CIP. A meeting to discuss with EG will be scheduled soon for a potential late Aug or early Sep meeting.

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements . Results of the grant applications are anticipated for September, 2025.

Ongoing Projects:

  • WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and are being reviewed. Anticipated equipment delivery - 3 rd qtr, 2026.
  • Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. Anticipated equipment delivery and installation - 4 th qtr, 2025.
  • Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 4 th qtr, 2025.

Thanks and please let me know if you have any question,

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

[Logo: WEST GOSHEN TOWNSHIP]

1

[Logo: Pennoni]

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
August 8, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Arc Flash Study – The final Arc Flash Study report was submitted to the operator and Public Works. It is our understanding that Lenni has already implemented the recommendations and installed the new arc flash labels so this project is now complete. The actual effort to complete the study was more than we had initially scoped due to additional effort to research breakers that were not clearly visible on-site, and we respectfully request supplemental funding for a portion of that additional effort to be covered with available budget from our 2025 General Services task order. We will submit a separate request to document the additional effort and cost for discussion with the Township and MA.
  • SBR Tank Inspections – We performed a visual structural and condition inspection of SBR #1 on June 26. For reference, the last inspection of SBR #1 occurred in 2021, and subsequent coating repairs were made in that SBR by Dutchland in June 2021. The draft 2025 inspection report was submitted to the operator and Public Works for review, and a review meeting to discuss observations and recommended repairs is being scheduled.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment need to be repaired/relined and will not be accepted as-is. They responded with the attached letter proposing to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. We will follow-up with them on the next steps after review and discussion with the Municipal Authority. Final payment will not be processed until this matter is resolved.

Pump Stations

  • Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. DCED contacted the Township to question the funding request matching amount, and Mark Miller submitted a response to DCED regarding the matching funds commitment on July 16. We expect that DCED will make awards in late 2025 or early 2026.
  • Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.

Sewer Extension

  • Morstein Road and Great Oak Circle – The inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses were requested by August 31. Several responses have already been received. Exhibits depicting the three sanitary sewer connection alternatives, approximate septic system ages, available sanitary sewer connection option for the surveyed properties, the properties that are definitely interested, interested depending on costs, not interested, and not yet responded, and the cost estimates for the three alternatives were submitted to the Township.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we performed regular inspections.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 2

EGMAU25001
East Goshen Municipal Authority
August 8, 2025 Engineer’s Report
Page 2 of 2
  • Timbermill (301 Reservoir Road) – Site construction is ongoing, and we performed regular inspections.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.
  • 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.

END OF REPORT

[Logo: UNITED FELTS A VORTEX COMPANY]

05 June 2025

Dave Alpaugh
Director of Operations
Vortex Services- Mid-America
210 Bennett Road
Freehold, NJ 07728

Re: East Goshen, PA Baldwin Dr and Reservoir Rd Easement Installation

Dave,

After reviewing the post video, random bubbles of separated polyurethane (PU) coating exist throughout the length of the installation. The inspection clearly shows bubbles or blisters of the PU film detaching from the underlying needled felt material. Upon close inspection of the bubbles, it is only the film coating and not the felt/resin matrix within the structural CIPP pipe wall. The picture to the right shows random white areas in the pipe cross-section, indicating PU separation from the composite, in the surrounding dark areas of intact PU film on the CIPP inner surface.

[Photograph: CIPP pipe interior inspection showing PU film detachment and blistering at distance 335.5 ft, timestamp 3/31/2025 3:45:53 PM]

The PU coating delamination, not layer separation, is seen throughout the pipe length and arbitrarily changes in surface area and protrusion from the CIPP pipe wall.

[Photograph: CIPP pipe interior inspection showing PU coating delamination at distance 83.2 ft, timestamp 3/31/2025]

A few of the PU blisters or bubbles contain water, as seen in the picture to the right.

[Photograph: CIPP pipe interior inspection showing water-filled PU blisters at distance 204.0 ft, timestamp 3/31/2025 3:41:51 PM]

This tube’s materials and processing have been reviewed.

  • The tube had no pinholes or irregularities passing the 33 quality assurance manufacturing tests, including a dye water bath that specifically highlights porosity or breaches in the coating.

450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com

[Logo: United Felts graphic symbol]

  • The tube’s wet out report indicates the coating was continuous during the application of a vacuum preparation step for the resin distribution throughout the tube length.
  • The installation process curing boiler log indicated the recommended heating schedule was followed and interface temperatures indicated a sufficient cure process.

After cooling down and the removal of the internal air pressure completeing the installation process, the PU coating anomalies were observed. The PU film coating applied to the felt layer has randomly detached throughout the pipe installation. The PU coating was pushed off the felt as seen in the blister/bubbles. The source of the blister creating pressure is a high resin exotherm temperature during the curing phase that was retained by the thermal “insulating” PVC host pipe. The exotherm is typically dissipated by the heat conductance through the host pipe and surrounding soil envelope. The PVC pipe material limits temperature control during the curing resin exotherm. Elevated resin exotherm temperature spikes conduct heat toward the lower temperature curing steam and can generate PU coating blistering. This exotherm created the blistering of the inner film coating.

[Photograph: CIPP pipe interior inspection showing detached PU coating blister, timestamp 3/31/2025 3:39:03 PM, distance 28.0 ft]

[Photograph: CIPP pipe interior inspection showing internal steam/film effect during inspection, timestamp 3/31/2025 3:41:20 PM]

The coating of the tube is a non-structural component of the CIPP pipe. The function of the coating is to provide ease of tube handling, allow for vacuum impregnation of the resin system and create an impermeable fluid barrier (air or water) for the inversion installation process. During physical testing of CIPP pipe samples, the ASTM process standards mathematically subtract the coating thickness or remove the specimen’s coating for physical test results since the film coating is considered a non-structural portion of the installed pipe.

We propose a robotic cutter to remove the blistered PU coating on a section of this installed pipe to allow for inspection of the underlying resin/felt cured wall. It is expected a well cured resin/felt matrix laminate will be observed. The PU blisters containing water may have a small solution channel through the CIPP wall that allow elevated groundwater to seep through the small pathway and fill the PU blisters. These small channels typically seep for a short duration due to the transport of the surrounding soil clay and silt particles that block of blind off the micro pathways meandering in the CIPP wall.

450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com

[Logo: United Felts graphic symbol]

We propose to video these areas of the removed PU blister/bubbles and prepare a qualitative review for the customer.

Please tell me if you would like to discuss this option further before sending this proposal to your customers for consideration and approval.

Respectfully,
[Signature: Rick Baxter]
Rick Baxter, P.E.
United Felts Technical Services Engineer

CC: Mark Chandler United Felts Technical Director
Justin Hancock, VP United Felts Operations

450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report

August 2025

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for July 2025. All supplemental reports were submitted for June 2025. Caustic usage decreased to 62.07 gallons per day from 64.24 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 71.25 gallons per day from 72.52 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Tables

CERTIFIED LAB RESULTS- INFLUENT JULY 2025
Ammonia as N CBOD Total Phosphorus Total Suspended Solids
DATE
7/1/2025 36.0 mg/L 200 mg/L 4.76 mg/L 176 mg/L
7/8/2025 33.4 mg/L 230 mg/L 4.91 mg/L 172 mg/L
7/15/2025 26.7 mg/L 249 mg/L 3.96 mg/L 177 mg/L
7/22/2025 35.7 mg/L 210 mg/L 2.22 mg/L 114 mg/L
CERTIFIED LAB RESULTS- FINAL EFFLUENT JULY 2025
FLOW Ammonia as CBOD Total Phosphor Total Suspended Solids Fecal Coliform
Permit Limit (Weekly Average) Gallons 2.5mg/L 15mg/L 0.5mg/L 15mg/L 200 coliforms/100mL
DATE
7/1/2025 321,000 <0.10 <2.0 0.19 4 <1
7/8/2025 324,000 <0.10 <2.0 0.16 5.5 7
7/15/25 257,000 <0.10 <2.0 0.11 <4.0 3
7/22/2025 249,000 <0.10 <2.0 0.14 <4.0 <1

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. For simplicity, only the parameters that have discharge limits are shown above. We remained well below all of the weekly average discharge limits for the month of July.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During July, there were eight (8) days where precipitation occured. There were 5 days where rain accumulation was greater than 0.50”.
7/1: 3.20”
7/9: 0.83”
7/10: 0.89”
7/15: 0.87”
7/27: 0.70”
Total rainfall for July was 6.68 inches

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Chemical Data

July 2025
Chemical Daily Average Total Monthly
Caustic Soda, gal 62.07 1924.05
Aluminum Sulfate solution, gal 71.25 2208.87
Sludge Dewatering, gal* 18,914 416,101

*22 days of sludge dewatering

There was an increase of 9,075 gallons of sludge dewatering during the month of July compared to June.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily

Page 2 of 3

Drained and cleaned disc filters bi-weekly.

Cleaned buildings and laboratory.

Major Repairs or Upgrades

Nothing to report

Upcoming Repairs or Upgrades

SBR 1 pump rails will be repaired and reinforced to prevent separation problems in the future

Flow Data

July 2025
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 10.825 349,206 493,140
Influent Wastewater to SBRs 11.632 375,217 454,432
Internal Recycle 1.073 34,621 74,778
Treated Effluent to Disc Filters 11.387 367,335 432,960
Final Effluent Discharge 8.063 260,000 324,000
Applebrook Golf Course 1.036 33,412 42,582

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of July 2025

Page 3 of 3

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 14, 2025

The East Goshen Township Municipal Authority held their regular meeting on Monday, July 14, 2025 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings – Vice Chairman
Sean Ellsworth
John Stipe
Dana Pizarro

Also in attendance were:
Mark Miller (Director of Public Works),
Cody Bright (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Robert Jefferson (Attorney)
Stacey Fuller (Attorney)
Mike Ellis (Pennoni).

COMMON ACRONYMS:

ATS – Automatic Transfer Switch MA- Municipal Authority
BFES – Big Fish Environmental Services NPDES – National Pollutant Discharge Elimination System
BOS – Board of Supervisors PC – Planning Commission
CB – Conservancy Board PM – Prevention Maintenance
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge
PWD – Public Works Department

Call to Order & Pledge of Allegiance

Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Walter asked for a moment of silence for our troops and EMT.
Walter asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report

1. Sean will attend the West Goshen meeting in August.

MA 6-9-25 draft 1

Liaison Reports

1. Conservancy Board – Walter mentioned that spraying of invasives will begin. The discussion on street trees has been postponed. The Willistown report on water quality is due in August.

SEWER REPORTS

1. Director of Public Works, Mark Miller’s report for July 9, 2025.

Monthly Flows – The average daily flow to West Goshen was 569,063 gallons per day.

Meters:

  • Read on a daily basis with no problems to report.

C.C. Collection:

  • Routine maintenance was performed at the pump stations and there were no problems to report.
  • We were notified of two lateral blockages: 1425 Grand Oak Ln, which we cleared for the resident; 511 Gateswood Dr. We were able to clear the pipe; however, a portion was collapsed so we told her she would need to call a plumber.

Ridley Creek Collection

  • The stations were visited daily with no problems to report.

Ridley Creek Plant

  • Routine maintenance was performed by the Public works employees
  • The on-site stormwater basins were cleaned out.
  • Number one SBR was drained, cleaned, and inspected.
  • Lenni has ordered the breakers that were needed as part of the Arc Flash report.

Alarms: 23 (all weather related)

PA One Calls: 205

Lateral Caps: none

Monthly Rainfall: 6.62” for June. As of July 10th, we have received 3.90” of rainfall.

2. Pennoni Engineer’s Report dated July 10, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Arc Flash Study – A full draft of the Arc Flash Study report was submitted to the operator and Public Works on May 29 for review. A review meeting with Lenni Electric occurred on July 2. Lenni is replacing circuit breakers as recommended in the report. The report is being

MA 6-9-25 draft 2

updated accordingly and the final version will be submitted.

  • SBR Tank Inspections – Visual inspection of the coating and concrete walls and floor within SBR #1 occurred on June 26. The last inspection of SBR #1 occurred in 2021, and subsequent coating repairs were made in that SBR by Dutchland in June 2021. The structural and coatings assessment report for SBR #1 is currently being prepared.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – The contractor, Vortex Services, previously completed all pipe lining work. One 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment need to be repaired/relined and will not be accepted as-is. They acknowledged the notification and responded that they would discuss internally and get back to us. We followed-up on June 5 but have not yet received a response. We will follow-up with them again. Final payment will not be processed until this matter is resolved.

Pump Stations

  • Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. DCED contacted us to question the funding request breakdown, and we are coordinating with DCED to address. We expect that DCED will make awards in late 2025 or early 2026.
  • Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.

Sewer Extension

  • Morstein Road – The inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses are required by August 31. Several responses have already been received.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are continuing to perform regular inspections.
  • Timbermill (301 Reservoir Road) – Site construction is ongoing, and we are performing continuing to perform regular inspections.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County

MA 6-9-25 draft 3

Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.

  • 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. The Design Engineer provided a revised submission package on May 28. Pennoni provided a comment letter on June 17.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2025. All supplemental reports were submitted for June 2025. Caustic usage increased slightly to 64.24 gallons per day from 62.82 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 72.52 gallons per day from 73.21 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Approval of Minutes

The minutes of the June 9, 2025 meeting were approved as amended.

Approval of Invoices

1. Kevin moved to approve payment of the following Pennoni invoices:

* Invoice #1280947 $8,652.25
* Invoice #1280948 $ 352.00
• Invoice #1280949 $3,268.50
• Invoice #1280950 $6,075.00

Sean seconded the motion. The motion passed unanimously.
2. John moved to approve payment of Gawthrop Greenwood Invoice #222077798 in the amount of $759.50. Kevin seconded the motion. The motion passed unanimously.
3. Kevin moved to approve payment of the Colonial Electric paid Invoice #16339274 in the amount of $10,800.00. Dana seconded the motion. The motion passed unanimously.

Financial Reports

The following report was provided: YTD June 2025, the Municipal Authority recorded $458,317.38 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $448,541.27 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, and

MA 6-9-25 draft 4

engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,776.11. As of June 30, 2025, the fund balance was $25,501.67.

Old Business – None

Goals –None

New Business – None

Capacity Requests – None

Any Other Matter – None

Correspondence- None

Public Comment – None

Adjournment

There being no further business Kevin moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:25 pm.
The next regular meeting will be held on Monday, August 11, 2025 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 6-9-25 draft 5

[Logo: Pennoni]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1284514
Invoice Date : 07/23/2025
Project : EGMAU25001
Project Name : 2025 General Services

For Professional Services Rendered Through 07/13/2025

Phase 01, General Engineering - July Engineer's Report. Performed RCSTP SBR Tank #1 inspection and prepared inspection report. Updated Morstein Rd resident inquiry letter for Township to issue to residents.

Phase 02, Grants - Reviewed DCED comments and grant guidelines on Hunt Country PS Small Water & Sewer Grant application matching funds amount.

Phase Code Phase Name Fee Type Contract Amount Previously Billed Current Billing Total Billing Remaining % Cmpl
01 General Engineering Services NTE $ 39,357.50 $ 13,478.25 $ 2,514.00 $ 15,992.25 $ 23,365.25 40.63%
02 Grants NTE $ 4,642.50 $ 4,571.75 $ 70.75 $ 4,642.50 $ 0.00 100.00%
Subtotal: $ 44,000.00 $ 18,050.00 $ 2,584.75 $ 20,634.75 $ 23,365.25 46.90%
Total: $ 44,000.00 $ 18,050.00 $ 2,584.75 $ 20,634.75
Total Amount Due $ 2,584.75

Phase 01 General Engineering Services
Rate Schedule Labor

Class Hours Rate Amount
Authority Engineer 1.75 158.00 276.50
Senior Professional 1.00 150.00 150.00
Project Professional 10.00 135.00 1,350.00
Staff Professional 14.00 125.00 1,750.00
Rate Schedule Labor 3,526.50
Total this Phase $2,514.00

Phase 02 Grants
Rate Schedule Labor

Class Hours Rate Amount
Authority Engineer 0.25 158.00 39.50
Staff Professional 0.25 125.00 31.25
Rate Schedule Labor 70.75

Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project EGMAU25001 2025 General Services Invoice 1284514

Total this Phase $70.75

Billing Limits Current Prior To-Date
Total Billings 2,584.75 18,050.00 20,634.75
Limit 44,000.00
Remaining 23,365.25

Total this Project $2,584.75

Outstanding Invoices

Number Date Balance
1280947 6/27/2025 8,652.25
Total 8,652.25

APPROVED BY: [Signature] 7/24/25
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Page 2

Project: EGMAU25001
Pennoni Job No.: 2025 General Services
Invoice No: 1284514
Invoice Period: 6/16/2025 to 7/13/2025
Initial Authorization: $ 44,000.00 Date: 7/23/2025
Contract Amount: $ 44,000.00
Previously Invoiced: $ 18,050.00
Current Invoice: $ 2,584.75
Invoiced to Date ($): $ 20,634.75
Invoiced to Date (%): 46.90%
Remaining Budget ($): $ 23,365.25
Remaining Budget (%): 53.10%

Budget by Phase:

Phase Name: 2025 General Services
Phase Budget: $ 44,000.00
Previously Invoiced: $ 18,050.00
Current Invoice: $ 2,584.75
Invoiced to Date ($): $ 20,634.75
Invoiced to Date (%): 46.90%
Remaining Budget ($): $ 23,365.25
Remaining Budget (%): 53.10%

Comments: Phase 01, General Engineering - July Engineer's Report. Performed RCSTP SBR Tank #1 inspection and prepared inspection report. Updated Morstein Rd resident inquiry letter for Township to issue to residents.

Phase 02, Grants - Reviewed DCED comments and grant guidelines on Hunt Country PS Small Water & Sewer Grant application matching funds amount.

[Logo: Gawthrop Greenwood, PC Attorneys at Law]

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
08/07/2025
Client No: 6604-001M
Invoice No. 222078999

General Authority Services

Fees

Date Description Hours Amount
07/11/2025
PMM
Email from L. Werkheiser regarding Board meeting agenda and meeting materials; Review and analyze same. 0.40 82.00
07/14/2025
PMM
Attend Authority Board meeting. 0.50 102.50
For Current Services Rendered 0.90 184.50

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 0.90 $205.00 $184.50
Previous Balance $759.50
Total Current Charges 184.50
07/29/2025 Payment -759.50
Balance Due $184.50

APPROVED BY: [Signature] 8/8/25
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

Page: 1
.08/07/2025
Client No: 6604M

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
759.50 184.50 0.00 -759.50 $184.50

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA July 2025 YTD Financial Report
Date: August 5, 2025

YTD July 2025, the Municipal Authority recorded $477,444.45 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $467,648.52 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, Hershey Mill pump station replacement Hydromatic pump, Sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,795.93. As of July 31, 2025, the fund balance was $25,521.49.

Attached is a complete list of 2025 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

YTD JULY 2025

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 180.93 224.80
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 6,557.09 0 2,084.88
07-364-1130 CONNECTION FEES - SEWER 1,498.43 0 563.76
07-380-1000 MISCELLANEOUS REVENUE 1,076.32 0 282.24
07-392-0500 TRANSFER FROM SEWER OPERATING 238,506.00 89,295.45 94,097.57
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 698,000.00 387,968.07 436,834.59
Total Revenue 947,937.84 477,444.45 534,087.84
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 45,000.00 23,935.60 22,380.52
07-424-3000 MISCELLANEOUS EXPENSE 2,500.00 960.00 1,056.61
07-424-3110 MUNIC.AUTH.-AUDITING 15,000.00 12,000.00 11,250.00
07-424-3130 ENGINEERING SERVICES 52,000.00 26,958.50 16,786.50
07-424-3140 LEGAL SERVICES 8,000.00 3,635.00 3,934.50
07-424-3700 CHESTER CREEK ENGINEERING 43,000.00 5,777.50 10,567.25
07-424-3705 HUNT COUNTY ENGINEERING 22,500.00 0 0
07-424-7440 R.C. CAPITAL-STP 30,500.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 49,500.00 6,413.85 27,691.19
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 20,850.00 0
07-429-1504 HUNT CO PUMP STATION CAPITAL 150,000.00 0 0
07-429-1505 RCSTP CAPITAL 87,500.00 86,523.04 198,696.08
07-429-1520 RCSTP - CAUSTIC SODA 0.00 0 718.00
07-429-3700 CHESTER CREEK CAPITAL 430,000.00 280,595.03 204,212.00
07-429-6100 WEST GOSHEN CAPITAL 20,000.00 0 31,488.51
Total Expenses 955,500.00 467,648.52 528,781.16
Net Result From Operations -7,562.16 PER DAVE CARRY OVER FROM LAST YEAR 9,795.93 5,306.68

Municipal Authority

YTD Revenues and Expenses thru 7/31/2025

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-341-1000INTEREST EARNINGS01/31/25Revenue JournalINTEREST EARNED JANUARY 202514.23
07-341-1000INTEREST EARNINGS02/28/25Revenue JournalINTEREST EARNED FEBRUARY 202518.54
07-341-1000INTEREST EARNINGS03/31/25Revenue JournalINTEREST EARNED MARCH 202519.48
07-341-1000INTEREST EARNINGS04/30/25Revenue JournalINTEREST EARNED APRIL 202563.08
07-341-1000INTEREST EARNINGS05/31/25Revenue JournalINTEREST EARNED MAY 202529.32
07-341-1000INTEREST EARNINGS06/30/25Revenue JournalINTEREST EARNED JUNE 202516.46
07-341-1000INTEREST EARNINGS07/31/25Revenue JournalINTEREST EARNED JULY 202519.82
07-392-0500TRANSFER FROM SEWER OPERATING01/21/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA3,387.75
07-392-0500TRANSFER FROM SEWER OPERATING02/25/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA1,908.25
07-392-0500TRANSFER FROM SEWER OPERATING03/21/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA12,944.00
07-392-0500TRANSFER FROM SEWER OPERATING03/27/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,967.80
07-392-0500TRANSFER FROM SEWER OPERATING04/21/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA21,807.10
07-392-0500TRANSFER FROM SEWER OPERATING05/15/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,392.00
07-392-0500TRANSFER FROM SEWER OPERATING05/21/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA328.00
07-392-0500TRANSFER FROM SEWER OPERATING06/10/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA574.00
07-392-0500TRANSFER FROM SEWER OPERATING06/24/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA180.00
07-392-0500TRANSFER FROM SEWER OPERATING06/27/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA11,967.80
07-392-0500TRANSFER FROM SEWER OPERATING07/22/25Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA15,838.75
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/10/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,114.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/21/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA7,043.52
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/28/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA14,397.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/25/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA8,346.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/10/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA16,865.02
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/25/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA6,170.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/31/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,294.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/08/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA25,872.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/21/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,971.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/23/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA244,537.03
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/06/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA6,500.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/15/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA32,789.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/17/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA10,800.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/22/25Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA3,268.50
Total Revenue477,444.45
07-424-1400ADMINISTRATIVE WAGES03/27/25Pay Check: 71125-00691 QTR 1 2025 MA CHARGE BACK11,967.80
07-424-1400ADMINISTRATIVE WAGES06/27/25Pay Check: 71225-01401 QTR 2 2025 MA CHARGE BACK11,967.80
07-424-3000MISCELLANEOUS EXPENSE03/21/25Pay Check: 354525-00599 2025 ANNUAL DAILY DISCHARGE CA780.00
07-424-3000MISCELLANEOUS EXPENSE06/24/25ExpdREIMBURSE 01 FOR 07 CC EXPENSE180.00

Page 1 of 3

Municipal Authority

YTD Revenues and Expenses thru 7/31/2025

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-424-3110MUNIC.AUTH.-AUDITING03/21/25Pay Check: 354725-00624 FINAL BILLING AUDIT EGT MUA12,000.00
07-424-3130ENGINEERING SERVICES01/21/25Pay Check: 353725-00117 SERV THRU 123124 2024 GEN SERV2,459.75
07-424-3130ENGINEERING SERVICES01/22/25Invoice Pay Ck:9190016715AR000101 MISC. RECHARGE 07 acct-3,695.00
07-424-3130ENGINEERING SERVICES01/22/25Invoice Pay Ck:9190016715AR000101 MISC. RECHARGE 07 acct-5,920.00
07-424-3130ENGINEERING SERVICES02/25/25Pay Check: 354325-00415 SERV THRU 011225 2025 GEN SERV970.00
07-424-3130ENGINEERING SERVICES02/25/25Pay Check: 354325-00416 SERV THRU 011225 24 CHAPTER 94343.75
07-424-3130ENGINEERING SERVICES04/21/25Pay Check: 355525-00840 SERV THRU 031625 2025 SUPPLEE5,777.50
07-424-3130ENGINEERING SERVICES04/21/25Pay Check: 355525-00841 SERV THRU 031625 2025 GEN SERV7,235.00
07-424-3130ENGINEERING SERVICES04/21/25Pay Check: 355525-00842 SERV THRU 031625 24 CHAPTER 942,093.75
07-424-3130ENGINEERING SERVICES04/28/25ExpdRECLASS PENNONI 1267313 PO# 25-00840-5,777.50
07-424-3130ENGINEERING SERVICES05/14/25Pay Check: 355825-01077 SERV THRU 041325 RCSTP ARC FLA6,750.00
07-424-3130ENGINEERING SERVICES05/14/25Pay Check: 355825-01076 SERV THRU 041325 24 CHAPTER 94449.25
07-424-3130ENGINEERING SERVICES05/14/25Pay Check: 355825-01075 SERV THRU 041325 2025 GEN SERV1,192.75
07-424-3130ENGINEERING SERVICES07/22/25Pay Check: 356425-01548 SERV THRU 061525 24 CHAPTER 94352.00
07-424-3130ENGINEERING SERVICES07/22/25Pay Check: 356425-01547 SERV THRU 061525 GEN SERV8,652.25
07-424-3130ENGINEERING SERVICES07/22/25Pay Check: 356425-01546 SERV THRU 061525 RCSTP ARC FLA6,075.00
07-424-3140LEGAL SERVICES01/21/25Pay Check: 353625-00116 LEGAL SERV DEC 2024 GEN AUTH266.50
07-424-3140LEGAL SERVICES01/21/25Pay Check: 353625-00115 LEGAL SERV OCT 2024 GEN AUTH538.50
07-424-3140LEGAL SERVICES01/21/25Pay Check: 353625-00114 LEGAL SERV NOV 2024 GEN AUTH123.00
07-424-3140LEGAL SERVICES02/25/25Pay Check: 354125-00414 LEGAL SERV DEC 2024 GEN AUTH594.50
07-424-3140LEGAL SERVICES03/21/25Pay Check: 354625-00589 LEGAL SERV FEB 2025 GEN AUTH164.00
07-424-3140LEGAL SERVICES04/21/25Pay Check: 355425-00843 LEGAL SERV MARCH 2025 GEN AUTH287.00
07-424-3140LEGAL SERVICES05/21/25Pay Check: 356025-01097 LEGAL SERV APRIL 2025 GEN AUTH328.00
07-424-3140LEGAL SERVICES06/10/25Pay Check: 356125-01289 LEGAL SERV MAY 2025 GEN AUTH574.00
07-424-3140LEGAL SERVICES07/22/25Pay Check: 356325-01545 LEGAL SERV JUNE 2025 GEN AUTH759.50
07-424-3700CHESTER CREEK ENGINEERING04/28/25ExpdRECLASS PENNONI 1267313 PO# 25-008405,777.50
07-424-7490CAP.REPLACEMENT R.C.04/21/25Pay Check: 355325-00894 PORTABLE HOT HIGH PRESS WASHER6,413.85
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL02/25/25Pay Check: 354225-00471 ENG # 516230997-S4NX750EC 7HP8,346.00
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL04/08/25Pay Check: 355125-00772 HYDROMATIC PUMP W/2 CONNECTING12,504.00
07-429-1505RCSTP CAPITAL01/10/25Pay Check: 353525-00016 UV SYS REMOTE ACCESS UPGRADE4,114.00
07-429-1505RCSTP CAPITAL01/21/25Pay Check: 353825-00118 RCSTP- UV DISINFECTION SYS REP7,043.52
07-429-1505RCSTP CAPITAL01/28/25Pay Check: 353925-00178 DECANTER CONTROLS REPAIR7,875.00
07-429-1505RCSTP CAPITAL01/28/25Pay Check: 354025-00175 INSTALL & WIRE NEW GENERATOR6,522.50
07-429-1505RCSTP CAPITAL03/10/25Pay Check: 354425-00562 SUBSITE PROTRAK TRACTOR CAMERA16,865.02
07-429-1505RCSTP CAPITAL03/25/25Pay Check: 354825-00657 RENTL 600KW PORTABLE GENERATOR6,170.00
07-429-1505RCSTP CAPITAL03/31/25Pay Check: 354925-00731 RIDLEY PLANT GENERATOR ATS TRA3,294.00
07-429-1505RCSTP CAPITAL04/08/25Pay Check: 355025-00776 EXPLOSION PROOF HEATERS- RCSTP13,368.00
07-429-1505RCSTP CAPITAL04/21/25Pay Check: 355225-00853 (8) PARATECH LOCKSTROKE STRUTS3,971.00
07-429-1505RCSTP CAPITAL05/06/25Pay Check: 355725-01006 TRANSPORT NEW GENERATOR-RCSTP6,500.00

Page 2 of 3

Municipal Authority

YTD Revenues and Expenses thru 7/31/2025

Account Number Account Description Date Type Transaction Data/Comment Amount
07-429-1505 RCSTP CAPITAL 06/17/25 Pay Check: 3562 25-01336 RIDLEY C-EXPLOSION PROOF VFD'S 10,800.00
07-429-3700 CHESTER CREEK CAPITAL 04/23/25 Pay Check: 3556 25-00921 SUPPLEE VALLEY SANITARY SEWER 244,537.03
07-429-3700 CHESTER CREEK CAPITAL 05/14/25 Pay Check: 3558 25-01074 SERV THRU 041325 2025 SUPPLEE 6,217.50
07-429-3700 CHESTER CREEK CAPITAL 05/14/25 Pay Check: 3559 25-01078 SUPPLEE VALLEY SANITARY SEWER 26,572.00
07-429-3700 CHESTER CREEK CAPITAL 07/22/25 Pay Check: 3564 25-01549 SERV THRU 061525 2025 SUPPLEE 3,268.50
Total Expense 467,648.52
Net Operating 9,795.93

Page 3 of 3

Morstein Rd Sewer Tie-in Survey

Number Street Interest? Comments
1235 Great Oak Cir YES Probably seems too expensive, but open to exploring options.
1237 Great Oak Cir YES Depends on cost, but $60 - $100K is not an option.
1239 Great Oak Cir NO
1241 Great Oak Cir YES
1344A Morstein Rd
1346 Morstein Rd YES I am interested in connecting but it will depend on cost. Unfortunately, due to the economy and unexpected life events, the money set aside for this a few years ago is no longer available.
1350 Morstein Rd YES We would not be interested if the cost of the sewer system extension is to be divided equally among all property owners. Our property is much closer to the connection on Barkway Ln. A price per foot from each house to the connection point would be more equitable.
1352 Morstein Rd YES After we subdivide, we will have two lots to connect. Let's do it.
1398 Morstein Rd YES Great idea - lets' make this happen - with grants!
1402 Morstein Rd YES
1404 Morstein Rd YES
1406 Morstein Rd
1408 Morstein Rd
1410 Morstein Rd YES We are possibly interested if grants are obtained and cost is dramatically reduced.
1412 Morstein Rd NO Not interested due to cost.
1414 Morstein Rd NO Our septic system is in excellent condition.
1416 Morstein Rd
1240 Waterford Rd
1243 Waterford Rd YES Our house's back corner to middle of Morstein is @ 60 yds, all downhill. Big issue is the large trees in path. Will there be an annual fee to access the pipeline? There is nothing wrong with the existing method. What are the estimated fees? The fees become an annuity for each home. - Mike Montgomery
19 Total properties
3 Not interested
11 Interested
5 Not yet responded
16% NOT INTERESTED
58% INTERESTED
26% NOT YET RESPONDED

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 11, 2025

Dear Property Owner:

Multiple property owners along Morstein Road have recently been in contact with the East Goshen Municipal Authority to inquire about the feasibility of connecting their home to the public sanitary sewer system. The Authority would like to gauge the interest of other property owners to connect as well. This letter provides some very general information for your consideration. We respectfully request your response as described hereafter.

It is the Authority’s understanding that many properties along Morstein Road still utilize their originally constructed septic systems. Original systems would be 40 to 50+ years old, which is typically at or near the end of their useful lives. Due to poor infiltration rates in the area, some property owners may not have the ability to install new septic systems or will have to replace them with options such as sand mounds or drip irrigation, which are more costly than their existing system. New septic systems can cost over $40,000 to construct depending upon the extent and type of the new/replacement system.

To provide public sanitary sewer service along Morstein Road, the existing sanitary sewer system along Barkway Lane could be extended. The extension could utilize a combination of gravity sewers and low-pressure force mains along Morstein Road and Great Oak Circle. In order to connect to the extended gravity system, each applicable property owner desiring a connection would need to install a private lateral pipe on their property from their house to the new sewer main. To connect to the low-pressure force main system, each applicable property owner desiring a connection would need to install a private grinder pump and private force main pipe on their property.

There are certain properties that are only expected to be able to connect via low-pressure due to topography, whereas others could connect via gravity if the surrounding properties also connect via gravity.

The following eight properties could be connected by either a gravity or low-pressure force main system:

  • 1240 Waterford Road
  • 1243 Waterford Road
  • 1346 Morstein Road
  • 1350 Morstein Road
  • 1352 Morstein Road
  • 1398 Morstein Road
  • 1402 Morstein Road
  • 1404 Morstein Road

The following 11 properties could be connected only by a low-pressure force main system:

  • 1235 Great Oak Circle
  • 1237 Great Oak Circle
  • 1239 Great Oak Circle
  • 1241 Great Oak Circle
  • 1344 A Morstein Road
  • 1406 Morstein Road
  • 1408 Morstein Road
  • 1410 Morstein Road
  • 1412 Morstein Road
  • 1414 Morstein Road
  • 1416 Morstein Road

The cost of the public sanitary sewer system extension is expected to be divided equally among the properties that are connecting. However, grants can be sought to reduce the costs. The cost range is very conceptual at this time until the level of interest is known and engineering design occurs. The cost per property could be in the range of $60,000 to $100,000, but that could be reduced dramatically depending on the total number of properties that decide to connect, and if grants are obtained.

Any responses or requests for additional information should be submitted in writing to Mark Miller and Lynn Werkheiser in the East Goshen Township Public Works Department at mmiller@eastgoshen.org and lwerkheiser@eastgoshen.org.

Please note again that the Authority is just seeking an expression of initial interest at this time to evaluate if further consideration should be given to public sewer extensions.

Please complete and return the form on the next page to help us gauge interest in this project.

Best regards,

Mark Miller
Director of Public Works
East Goshen Township

Please return this form to East Goshen Township in the enclosed stamped, self-addressed envelope by August 12, 2025. This is NOT a commitment form. It is only being used to gauge initial interest for evaluation purposes. You may also scan and email this form to lwerkheiser@eastgoshen.org.

  • □ 1235 Great Oak Circle
  • □ 1237 Great Oak Circle
  • □ 1239 Great Oak Circle
  • □ 1241 Great Oak Circle
  • □ 1344A Morstein Road
  • □ 1346 Morstein Road
  • □ 1350 Morstein Road
  • □ 1352 Morstein Road
  • □ 1398 Morstein Road
  • □ 1402 Morstein Road
  • □ 1404 Morstein Road
  • □ 1406 Morstein Road
  • □ 1408 Morstein Road
  • □ 1410 Morstein Road
  • □ 1412 Morstein Road
  • □ 1414 Morstein Road
  • □ 1416 Morstein Road
  • □ 1240 Waterford Road
  • □ 1243 Waterford Road

□ I / We may be interested in connecting to the public sanitary sewer system.

□ I am NOT / We are NOT interested in connecting to the public sanitary sewer system.

Optional Information:

Name(s) __________________________________________________

Email(s): __________________________________________________

Phone #(s): __________________________________________________

Comments: __________________________________________________
__________________________________________________

Lynn Werkheiser

From: Michael Ellis <MEllis@Pennoni.com>
Sent: Thursday, August 7, 2025 11:13 PM
To: Lynn Werkheiser; Mark Miller
Cc: Erika Addison
Subject: Morstein Rd Sewer Extension Exhibits for MA
Attachments: Morstein Road Sewer Connection Exhibits_Combined.pdf

Hi Mark and Lynn,

We added two exhibits to the package that was prepared for the June MA meeting to show the survey interest results for each parcel on a map and to summarize which properties can connect only by low pressure (grinder pump) vs. an option of low pressure or gravity. Those are the 6th and 7th pages of the attached package. The other pages are from the June MA meeting package. This can be included in the MA packet for discussion on Monday along with this summary email.

The exhibits in the package follow:

1st page: Overview map of Township showing area of interest
2nd-4th pages: Sewer extension alternatives #1 thru #3
5th page: Age of onlot systems based on available info from the County Health Dept
6th page: Which properties can connect via only low pressure vs. an option of low pressure or gravity
7th page: Survey responses. Note that most of the properties uphill (west) of Barkway Ln are interested. This is the area that could be gravity or low pressure.
8th-10th pages: Budgetary cost opinions

Mike

Michael Ellis, PE
Municipal Division Manager

Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com

What's Possible Podcast Episode 2

1

EAST GOSHEN
WASTEWATER FACILITIES
FIGURE 1

Map of East Goshen Wastewater Facilities.

  • MH R-265 PORTABLE METER
  • LINE ROAD MH R-238 PORTABLE METER
  • MH R-022 PORTABLE METER
  • E. BOOT RD MH R-214 PORTABLE METER
  • ELDRIDGE DRIVE MH R-568 PORTABLE METER
  • ACHCOM MH R-636 PORTABLE METER
  • HUNT COUNTRY PUMP STATION
  • RIDLEY CREEK SEWAGE TREATMENT PLANT
  • RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
  • ASHBRIDGE PUMP STATION
  • RESERVOIR ROAD METER
  • WESTTOWN WAY METER
  • PROPOSED RESERVOIR ROAD PUMP STATION
  • ELLIS LANE METER
  • HICKS METER
  • PAOLI PIKE WEST METER
  • WILSON DRIVE METER
  • AREA OF INTEREST
  • BARKWAY PUMP STATION
  • HERSHEY'S MILL SEWAGE TREATMENT PLANT
  • HERSHEY'S MILL PUMP STATION
  • DECOMMISIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT

Legend

  • PUMP STATION
  • SEWAGE TREATMENT PLANT
  • SANITARY MANHOLES
  • PERMANENT METERS
  • PORTABLE METERS (2020)
  • SANITARY SEWER
  • FORCEMAIN
  • TOWNSHIP BOUNDARY
  • SubAreas
  • Parcels
  • PONDS & LAKES
  • RIVERS
  • EAST WHITELAND SERVICE AREA
  • HERSHEY'S MILL SERVICE AREA
  • RIDLEY CREEK SERVICE AREA
  • WEST GOSHEN SERVICE AREA
  • WESTTOWN SERVICE AREA

N

TOWNSHIP OF EAST GOSHEN CHESTER COUNTY PENNSYLVANIA INCORPORATED 1817

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

0 1,000 2,000 4,000 Feet
1 inch = 1,000 feet

ALTERNATIVE 1

Map of Barkway Pump Station sewer alternative.

BARKWAY PUMP STATION

New Low Pressure System

New MHs & Gravity Pipe to Barkway PS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

ALTERNATIVE 2

Parcel map illustrating the proposed sewer extension layout for Alternative 2, showing existing gravity sewer parcels shaded light blue, Barkway Pump Station in red, manholes and gravity pipes in green, and numbered parcels 1 through 19 served by a proposed New Low Pressure System in blue.

  • BARKWAY PUMP STATION
  • New Low Pressure System
  • New MHs & Gravity Pipes to Barkway PS
  • Numbered parcels: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19

ALTERNATIVE 3

Parcel map illustrating the proposed sewer extension layout for Alternative 3, showing existing gravity sewer parcels shaded light blue, Barkway Pump Station in red, manholes and gravity pipes in green, and numbered parcels 1 through 19 served by a proposed New Low Pressure System in blue.

  • BARKWAY PUMP STATION
  • New Low Pressure System
  • New MHs & Gravity Pipes to Barkway PS
  • Numbered parcels: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19

APPROXIMATE SEPTIC SYSTEM AGE EXHIBIT

JUNE 3, 2025

Color-coded parcel map showing the approximate septic system age across 106 properties in the neighborhood, adjacent to properties connected to the public sewer shaded in light blue.

Legend

  • ≤5 Years (5)
  • 6 - 10 Years (5)
  • 11 - 20 Years (12)
  • 21 - 30 Years (12)
  • 31 - 40 Years (6)
  • 41 - 50 Years (2)
  • > 50 Years (64)

TOTAL = 106 PROPERTIES

PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)

AVAILABLE CONNECTION TYPE EXHIBIT

AUGUST 7, 2025

Color-coded parcel map showing the available sewer connection type for 19 properties adjacent to existing public sewer connections.

Legend

  • Pressure Only (11)
  • Gravity or Pressure (8)

TOTAL PROPERTIES = 19

PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)

SURVEY RESPONSE EXHIBIT

AUGUST 7, 2025

Color-coded parcel map showing property owner survey responses for 19 properties adjacent to existing public sewer connections.

Legend

  • Definitely Interested (4)
  • Interested Depending on Cost (7)
  • Not Interested (3)
  • Not Yet Responded (5)

TOTAL PROPERTIES = 19

PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)

Pennoni

5/9/2025

EAST GOSHEN MUNICIPAL AUTHORITY

MORSTEIN ROAD SANITARY SEWER EXTENSION

ALTERNATIVE 1

BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS

Description Quantity Units Unit Price Total
GENERAL
Mobilization & Demobilization 1 LS $60,500.00 $60,500
Survey & Layout 1 LS $5,000.00 $5,000
Site Preparation and Erosion & Sediment Controls 1 LS $5,000.00 $5,000
Traffic Control 1 LS $10,000.00 $10,000
Miscellaneous Excavation & Backfill 25 CY $100.00 $2,500
SUBTOTAL $83,000
SANITARY SEWER
Low Pressure Sewer 2,850 LF $150.00 $427,500
8" Gravity Sewer 200 LF $225.00 $45,000
Manhole 2 EA $9,000.00 $18,000
Grinder Pump 19 EA $15,000.00 $285,000
Doghouse Manhole 1 EA $9,000.00 $9,000
SUBTOTAL $784,500
RESTORATION
Grading/Lawn/Site Restoration 1 LS $5,000.00 $5,000
Driveway Restoration 100 SY $85.00 $8,500
Roadway Restoration (5" Base & 2.5" Binder) 311 SY $100.00 $31,111
1.5" Mill & Wearing Course Overlay 467 SY $25.00 $11,667
SUBTOTAL $56,278
CONSTRUCTION SUBTOTAL $923,778
20% CONTINGENCY $184,756
15% ENGINEERING & INSPECTIONS $138,567
TOTAL $1,247,100
TOTAL (rounded) $1,248,000

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

U:\Accounts\EGMA\LEGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02

Page 3 of 5

Pennoni

5/9/2025

EAST GOSHEN MUNICIPAL AUTHORITY

MORSTEIN ROAD SANITARY SEWER EXTENSION

ALTERNATIVE 2

BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS

Description Quantity Units Unit Price Total
GENERAL
Mobilization & Demobilization 1 LS $71,300.00 $71,300
Survey & Layout 1 LS $5,000.00 $5,000
Site Preparation and Erosion & Sediment Controls 1 LS $5,000.00 $5,000
Traffic Control 1 LS $15,000.00 $15,000
Miscellaneous Excavation & Backfill 25 CY $100.00 $2,500
SUBTOTAL $98,800
EAST MORSTEIN LOW PRESSURE SEWER
Low Pressure Sewer 880 LF $150.00 $132,000
Grinder Pump 6 EA $15,000.00 $90,000
SUBTOTAL $222,000
GREAT OAK CIRCLE LOW PRESSURE SEWER
Low Pressure Sewer 780 LF $150.00 $117,000
Grinder Pump 5 EA $15,000.00 $75,000
SUBTOTAL $192,000
GRAVITY SANITARY SEWER
8" Gravity Sewer 1,390 LF $225.00 $312,750
Sewer Lateral 400 LF $150.00 $60,000
Manhole 5 EA $9,000.00 $45,000
Doghouse Manhole 1 EA $9,000.00 $9,000
SUBTOTAL $426,750
RESTORATION
Grading/Lawn/Site Restoration 1 LS $5,000.00 $5,000
Driveway Restoration 100 SY $85.00 $8,500
Roadway Restoration (5" Base & 2.5" Binder) 872 SY $100.00 $87,222
1.5" Mill & Wearing Course Overlay 1,953 SY $25.00 $48,833
SUBTOTAL $149,556
CONSTRUCTION SUBTOTAL $1,089,106
20% CONTINGENCY $217,821
15% ENGINEERING & INSPECTIONS $163,366
TOTAL $1,470,293
TOTAL (rounded) $1,471,000

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

U:\Accounts\EGMA\LEGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02

Page 4 of 5

[Logo: Pennoni]

5/9/2025

EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 3
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS

Description Quantity Units Unit Price Total
GENERAL
Mobilization & Demobilization 1 LS $69,800.00 $69,800
Survey & Layout 1 LS $5,000.00 $5,000
Site Preparation and Erosion & Sediment Controls 1 LS $5,000.00 $5,000
Traffic Control 1 LS $15,000.00 $15,000
Miscellaneous Excavation & Backfill 25 CY $100.00 $2,500
SUBTOTAL $97,300
EAST MORSTEIN LOW PRESSURE SEWER
Low Pressure Sewer 880 LF $150.00 $132,000
Grinder Pump 6 EA $15,000.00 $90,000
SUBTOTAL $222,000
GREAT OAK CIRCLE LOW PRESSURE SEWER
Low Pressure Sewer 780 LF $150.00 $117,000
Grinder Pump 5 EA $15,000.00 $75,000
SUBTOTAL $192,000
GRAVITY SANITARY SEWER
8" Gravity Sewer 1,375 LF $225.00 $309,375
Sewer Lateral 400 LF $150.00 $60,000
Manhole 7 EA $9,000.00 $63,000
Doghouse Manhole 1 EA $9,000.00 $9,000
Connection to Existing Manhole 2 EA $3,500.00 $7,000
Easements TBD TBD
SUBTOTAL $448,375
RESTORATION
Grading/Lawn/Site Restoration 1 LS $10,000.00 $10,000
Driveway Restoration 100 SY $85.00 $8,500
Roadway Restoration (5" Base and 2.5" Binder) 572 SY $100.00 $57,222
1.5" Mill & Wearing Course Overlay 1,233 SY $25.00 $30,833
SUBTOTAL $106,556
CONSTRUCTION SUBTOTAL $1,066,231
20% CONTINGENCY $213,246
15% ENGINEERING & INSPECTIONS $159,935
TOTAL $1,439,411
TOTAL (rounded) $1,440,000

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

U:\Accounts\EGMA\EGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 5 of 5