Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
1
EAST GOSHEN MUNICIPAL AUTHORITY
August 11, 2025
7:00 • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE o Ask if anyone will be taping the meeting
• CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS • LIAISON REPORTS • SEWER REPORTS o Director of Public Work’s Report
West Goshen Report o Pennoni Engineer’s Report o Big Fish Environmental Report • APPROVAL OF MINUTES o July 14, 2025
• APPROVAL OF INVOICES Company Invoice # Amount Paid? Pennoni 1284514 $2,584.75 Gawthrop Greenwood 222078999 $184.50
• FINANCIAL REPORTS o July 2025
• OLD BUSINESS
2
• 2025 Goals: Goal Status
Ridley Creek Plant compliance January through July were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building.
Attend meetings on quarterly basis.
Long-term sustainability
Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.
• NEW BUSINESS
• CAPACITY REQUESTS o Mortein Tie-in Survey Results & Sewer Connection Exhibits o Charter Chase Tie-in Discussion (email from Mark Johnsen, 1213 Waterford Rd)
• ANY OTHER MATTER • CORRESPONDENCE AND REPORTS OF INTEREST o SBR Tank #1 Structural Assessment Draft o RCSTP Protective Device Coordination & Arc Flash Study
• PUBLIC COMMENT • ADJOURNMENT
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
| Date: | August 11, 2025 |
|---|---|
| To: | Municipal Authority |
| From: | Mark Miller |
| Re: | Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 579,445 per day.
Meters: Read on a daily basis with no problems to report.
C.C. Collection:
- Pump stations were visited on a daily basis with no problems to report.
- We inspected the lines in the Waterview development because we will be milling and paving the roads there in the next two weeks.
Ridley Creek Collection:
- The pump stations were visited on a daily basis with no problems to report.
- The upgrades to Hershey Mill Station are just about completed.
Ridley Creek Plant:
- We didn't have any problems to report.
- We cleared the brush from both retention basins and rom around the fence.
- I ordered two new dialers for the plant which will be installed and in operation by the end of September.
Alarms: 22, all weather-related
PA One Calls: 118
Lateral Caps: 2
Monthly Rainfall: 5.00”
1
Mark Miller
| From: | Mike Moffa <MMoffa@westgoshen.org> |
|---|---|
| Sent: | Thursday, August 7, 2025 7:13 AM |
| To: | Mark Miller |
| Subject: | Monthly Update |
Good morning Mark,
Please let me know if you need anything else or would like different info...
General Notes:
- For the month of July the plant operated in compliance with its NPDES permit.
- WWTP monthly average daily flow - 3.732 mgd
- WWPS monthly average daily flow - 1.213 mgd
- Monthly average total phosphorus discharge concentration was <0.04 mg/L.
- Sludge to landfill – 327 wet tons
- The WG Sewer Authority is working on updating its 10-year CIP. A meeting to discuss with EG will be scheduled soon for a potential late Aug or early Sep meeting.
Grant Projects:
- 2024 LSA-Statewide Grant: WWTP Pump Replacements . Results of the grant applications are anticipated for September, 2025.
Ongoing Projects:
- WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and are being reviewed. Anticipated equipment delivery - 3 rd qtr, 2026.
- Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. Anticipated equipment delivery and installation - 4 th qtr, 2025.
- Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 4 th qtr, 2025.
Thanks and please let me know if you have any question,
Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900
[Logo: WEST GOSHEN TOWNSHIP]
1
[Logo: Pennoni]
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
August 8, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- Arc Flash Study – The final Arc Flash Study report was submitted to the operator and Public Works. It is our understanding that Lenni has already implemented the recommendations and installed the new arc flash labels so this project is now complete. The actual effort to complete the study was more than we had initially scoped due to additional effort to research breakers that were not clearly visible on-site, and we respectfully request supplemental funding for a portion of that additional effort to be covered with available budget from our 2025 General Services task order. We will submit a separate request to document the additional effort and cost for discussion with the Township and MA.
- SBR Tank Inspections – We performed a visual structural and condition inspection of SBR #1 on June 26. For reference, the last inspection of SBR #1 occurred in 2021, and subsequent coating repairs were made in that SBR by Dutchland in June 2021. The draft 2025 inspection report was submitted to the operator and Public Works for review, and a review meeting to discuss observations and recommended repairs is being scheduled.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment need to be repaired/relined and will not be accepted as-is. They responded with the attached letter proposing to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. We will follow-up with them on the next steps after review and discussion with the Municipal Authority. Final payment will not be processed until this matter is resolved.
Pump Stations
- Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. DCED contacted the Township to question the funding request matching amount, and Mark Miller submitted a response to DCED regarding the matching funds commitment on July 16. We expect that DCED will make awards in late 2025 or early 2026.
- Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
Sewer Extension
- Morstein Road and Great Oak Circle – The inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses were requested by August 31. Several responses have already been received. Exhibits depicting the three sanitary sewer connection alternatives, approximate septic system ages, available sanitary sewer connection option for the surveyed properties, the properties that are definitely interested, interested depending on costs, not interested, and not yet responded, and the cost estimates for the three alternatives were submitted to the Township.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we performed regular inspections.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
| EGMAU25001 East Goshen Municipal Authority |
August 8, 2025 | Engineer’s Report Page 2 of 2 |
|---|
- Timbermill (301 Reservoir Road) – Site construction is ongoing, and we performed regular inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
- 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.
- 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.
END OF REPORT
[Logo: UNITED FELTS A VORTEX COMPANY]
05 June 2025
Dave Alpaugh
Director of Operations
Vortex Services- Mid-America
210 Bennett Road
Freehold, NJ 07728
Re: East Goshen, PA Baldwin Dr and Reservoir Rd Easement Installation
Dave,
After reviewing the post video, random bubbles of separated polyurethane (PU) coating exist throughout the length of the installation. The inspection clearly shows bubbles or blisters of the PU film detaching from the underlying needled felt material. Upon close inspection of the bubbles, it is only the film coating and not the felt/resin matrix within the structural CIPP pipe wall. The picture to the right shows random white areas in the pipe cross-section, indicating PU separation from the composite, in the surrounding dark areas of intact PU film on the CIPP inner surface.
[Photograph: CIPP pipe interior inspection showing PU film detachment and blistering at distance 335.5 ft, timestamp 3/31/2025 3:45:53 PM]
The PU coating delamination, not layer separation, is seen throughout the pipe length and arbitrarily changes in surface area and protrusion from the CIPP pipe wall.
[Photograph: CIPP pipe interior inspection showing PU coating delamination at distance 83.2 ft, timestamp 3/31/2025]
A few of the PU blisters or bubbles contain water, as seen in the picture to the right.
[Photograph: CIPP pipe interior inspection showing water-filled PU blisters at distance 204.0 ft, timestamp 3/31/2025 3:41:51 PM]
This tube’s materials and processing have been reviewed.
- The tube had no pinholes or irregularities passing the 33 quality assurance manufacturing tests, including a dye water bath that specifically highlights porosity or breaches in the coating.
450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com
[Logo: United Felts graphic symbol]
- The tube’s wet out report indicates the coating was continuous during the application of a vacuum preparation step for the resin distribution throughout the tube length.
- The installation process curing boiler log indicated the recommended heating schedule was followed and interface temperatures indicated a sufficient cure process.
After cooling down and the removal of the internal air pressure completeing the installation process, the PU coating anomalies were observed. The PU film coating applied to the felt layer has randomly detached throughout the pipe installation. The PU coating was pushed off the felt as seen in the blister/bubbles. The source of the blister creating pressure is a high resin exotherm temperature during the curing phase that was retained by the thermal “insulating” PVC host pipe. The exotherm is typically dissipated by the heat conductance through the host pipe and surrounding soil envelope. The PVC pipe material limits temperature control during the curing resin exotherm. Elevated resin exotherm temperature spikes conduct heat toward the lower temperature curing steam and can generate PU coating blistering. This exotherm created the blistering of the inner film coating.
[Photograph: CIPP pipe interior inspection showing detached PU coating blister, timestamp 3/31/2025 3:39:03 PM, distance 28.0 ft]
[Photograph: CIPP pipe interior inspection showing internal steam/film effect during inspection, timestamp 3/31/2025 3:41:20 PM]
The coating of the tube is a non-structural component of the CIPP pipe. The function of the coating is to provide ease of tube handling, allow for vacuum impregnation of the resin system and create an impermeable fluid barrier (air or water) for the inversion installation process. During physical testing of CIPP pipe samples, the ASTM process standards mathematically subtract the coating thickness or remove the specimen’s coating for physical test results since the film coating is considered a non-structural portion of the installed pipe.
We propose a robotic cutter to remove the blistered PU coating on a section of this installed pipe to allow for inspection of the underlying resin/felt cured wall. It is expected a well cured resin/felt matrix laminate will be observed. The PU blisters containing water may have a small solution channel through the CIPP wall that allow elevated groundwater to seep through the small pathway and fill the PU blisters. These small channels typically seep for a short duration due to the transport of the surrounding soil clay and silt particles that block of blind off the micro pathways meandering in the CIPP wall.
450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com
[Logo: United Felts graphic symbol]
We propose to video these areas of the removed PU blister/bubbles and prepare a qualitative review for the customer.
Please tell me if you would like to discuss this option further before sending this proposal to your customers for consideration and approval.
Respectfully,
[Signature: Rick Baxter]
Rick Baxter, P.E.
United Felts Technical Services Engineer
CC: Mark Chandler United Felts Technical Director
Justin Hancock, VP United Felts Operations
450 College Drive | Martinsville, VA 24112 | 276-656-1904
unitedfelts.com
[Logo: Big Fish Environmental Services Inc.]
| RCSTP Monthly Operations Report August 2025 |
|---|
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for July 2025. All supplemental reports were submitted for June 2025. Caustic usage decreased to 62.07 gallons per day from 64.24 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 71.25 gallons per day from 72.52 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Tables
| CERTIFIED LAB RESULTS- INFLUENT JULY 2025 | ||||
|---|---|---|---|---|
| Ammonia as N | CBOD | Total Phosphorus | Total Suspended Solids | |
| DATE | ||||
| 7/1/2025 | 36.0 mg/L | 200 mg/L | 4.76 mg/L | 176 mg/L |
| 7/8/2025 | 33.4 mg/L | 230 mg/L | 4.91 mg/L | 172 mg/L |
| 7/15/2025 | 26.7 mg/L | 249 mg/L | 3.96 mg/L | 177 mg/L |
| 7/22/2025 | 35.7 mg/L | 210 mg/L | 2.22 mg/L | 114 mg/L |
| CERTIFIED LAB RESULTS- FINAL EFFLUENT JULY 2025 | ||||||
|---|---|---|---|---|---|---|
| FLOW | Ammonia as | CBOD | Total Phosphor | Total Suspended Solids | Fecal Coliform | |
| Permit Limit (Weekly Average) | Gallons | 2.5mg/L | 15mg/L | 0.5mg/L | 15mg/L | 200 coliforms/100mL |
| DATE | ||||||
| 7/1/2025 | 321,000 | <0.10 | <2.0 | 0.19 | 4 | <1 |
| 7/8/2025 | 324,000 | <0.10 | <2.0 | 0.16 | 5.5 | 7 |
| 7/15/25 | 257,000 | <0.10 | <2.0 | 0.11 | <4.0 | 3 |
| 7/22/2025 | 249,000 | <0.10 | <2.0 | 0.14 | <4.0 | <1 |
The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. For simplicity, only the parameters that have discharge limits are shown above. We remained well below all of the weekly average discharge limits for the month of July.
PA DEP
Nothing to report
Pennoni Associates
Nothing to report
Significant Rainfall
During July, there were eight (8) days where precipitation occured. There were 5 days where rain accumulation was greater than 0.50”.
7/1: 3.20”
7/9: 0.83”
7/10: 0.89”
7/15: 0.87”
7/27: 0.70”
Total rainfall for July was 6.68 inches
*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred
Chemical Data
| July 2025 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Caustic Soda, gal | 62.07 | 1924.05 |
| Aluminum Sulfate solution, gal | 71.25 | 2208.87 |
| Sludge Dewatering, gal* | 18,914 | 416,101 |
*22 days of sludge dewatering
There was an increase of 9,075 gallons of sludge dewatering during the month of July compared to June.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Page 2 of 3
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Major Repairs or Upgrades
Nothing to report
Upcoming Repairs or Upgrades
SBR 1 pump rails will be repaired and reinforced to prevent separation problems in the future
Flow Data
| July 2025 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building | 10.825 | 349,206 | 493,140 |
| Influent Wastewater to SBRs | 11.632 | 375,217 | 454,432 |
| Internal Recycle | 1.073 | 34,621 | 74,778 |
| Treated Effluent to Disc Filters | 11.387 | 367,335 | 432,960 |
| Final Effluent Discharge | 8.063 | 260,000 | 324,000 |
| Applebrook Golf Course | 1.036 | 33,412 | 42,582 |
The plant hydraulic design loading is 745,000 gpd.
There were no high flow events during the month of July 2025
Page 3 of 3
DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 14, 2025
The East Goshen Township Municipal Authority held their regular meeting on Monday, July 14, 2025 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings – Vice Chairman
Sean Ellsworth
John Stipe
Dana Pizarro
Also in attendance were:
Mark Miller (Director of Public Works),
Cody Bright (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Robert Jefferson (Attorney)
Stacey Fuller (Attorney)
Mike Ellis (Pennoni).
COMMON ACRONYMS:
| ATS – Automatic Transfer Switch | MA- Municipal Authority |
|---|---|
| BFES – Big Fish Environmental Services | NPDES – National Pollutant Discharge Elimination System |
| BOS – Board of Supervisors | PC – Planning Commission |
| CB – Conservancy Board | PM – Prevention Maintenance |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
| PWD – Public Works Department |
Call to Order & Pledge of Allegiance
Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Walter asked for a moment of silence for our troops and EMT.
Walter asked if anyone would be recording the meeting. There was no response.
Chairman’s Report/Other Members Report
1. Sean will attend the West Goshen meeting in August.
MA 6-9-25 draft 1
Liaison Reports
1. Conservancy Board – Walter mentioned that spraying of invasives will begin. The discussion on street trees has been postponed. The Willistown report on water quality is due in August.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for July 9, 2025.
Monthly Flows – The average daily flow to West Goshen was 569,063 gallons per day.
Meters:
- Read on a daily basis with no problems to report.
C.C. Collection:
- Routine maintenance was performed at the pump stations and there were no problems to report.
- We were notified of two lateral blockages: 1425 Grand Oak Ln, which we cleared for the resident; 511 Gateswood Dr. We were able to clear the pipe; however, a portion was collapsed so we told her she would need to call a plumber.
Ridley Creek Collection
- The stations were visited daily with no problems to report.
Ridley Creek Plant
- Routine maintenance was performed by the Public works employees
- The on-site stormwater basins were cleaned out.
- Number one SBR was drained, cleaned, and inspected.
- Lenni has ordered the breakers that were needed as part of the Arc Flash report.
Alarms: 23 (all weather related)
PA One Calls: 205
Lateral Caps: none
Monthly Rainfall: 6.62” for June. As of July 10th, we have received 3.90” of rainfall.
2. Pennoni Engineer’s Report dated July 10, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- Arc Flash Study – A full draft of the Arc Flash Study report was submitted to the operator and Public Works on May 29 for review. A review meeting with Lenni Electric occurred on July 2. Lenni is replacing circuit breakers as recommended in the report. The report is being
MA 6-9-25 draft 2
updated accordingly and the final version will be submitted.
- SBR Tank Inspections – Visual inspection of the coating and concrete walls and floor within SBR #1 occurred on June 26. The last inspection of SBR #1 occurred in 2021, and subsequent coating repairs were made in that SBR by Dutchland in June 2021. The structural and coatings assessment report for SBR #1 is currently being prepared.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – The contractor, Vortex Services, previously completed all pipe lining work. One 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment need to be repaired/relined and will not be accepted as-is. They acknowledged the notification and responded that they would discuss internally and get back to us. We followed-up on June 5 but have not yet received a response. We will follow-up with them again. Final payment will not be processed until this matter is resolved.
Pump Stations
- Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. DCED contacted us to question the funding request breakdown, and we are coordinating with DCED to address. We expect that DCED will make awards in late 2025 or early 2026.
- Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
Sewer Extension
- Morstein Road – The inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses are required by August 31. Several responses have already been received.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we are continuing to perform regular inspections.
- Timbermill (301 Reservoir Road) – Site construction is ongoing, and we are performing continuing to perform regular inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
- 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County
MA 6-9-25 draft 3
Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.
- 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. The Design Engineer provided a revised submission package on May 28. Pennoni provided a comment letter on June 17.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2025. All supplemental reports were submitted for June 2025. Caustic usage increased slightly to 64.24 gallons per day from 62.82 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 72.52 gallons per day from 73.21 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Approval of Minutes
The minutes of the June 9, 2025 meeting were approved as amended.
Approval of Invoices
1. Kevin moved to approve payment of the following Pennoni invoices:
| * | Invoice #1280947 | $8,652.25 |
|---|---|---|
| * | Invoice #1280948 | $ 352.00 |
| • | Invoice #1280949 | $3,268.50 |
| • | Invoice #1280950 | $6,075.00 |
Sean seconded the motion. The motion passed unanimously.
2. John moved to approve payment of Gawthrop Greenwood Invoice #222077798 in the amount of $759.50. Kevin seconded the motion. The motion passed unanimously.
3. Kevin moved to approve payment of the Colonial Electric paid Invoice #16339274 in the amount of $10,800.00. Dana seconded the motion. The motion passed unanimously.
Financial Reports
The following report was provided: YTD June 2025, the Municipal Authority recorded $458,317.38 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $448,541.27 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, and
MA 6-9-25 draft 4
engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,776.11. As of June 30, 2025, the fund balance was $25,501.67.
Old Business – None
Goals –None
New Business – None
Capacity Requests – None
Any Other Matter – None
Correspondence- None
Public Comment – None
Adjournment
There being no further business Kevin moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:25 pm.
The next regular meeting will be held on Monday, August 11, 2025 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 6-9-25 draft 5
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
| Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 |
Invoice No : 1284514 Invoice Date : 07/23/2025 Project : EGMAU25001 Project Name : 2025 General Services |
|---|
For Professional Services Rendered Through 07/13/2025
Phase 01, General Engineering - July Engineer's Report. Performed RCSTP SBR Tank #1 inspection and prepared inspection report. Updated Morstein Rd resident inquiry letter for Township to issue to residents.
Phase 02, Grants - Reviewed DCED comments and grant guidelines on Hunt Country PS Small Water & Sewer Grant application matching funds amount.
| Phase Code | Phase Name | Fee Type | Contract Amount | Previously Billed | Current Billing | Total Billing | Remaining | % Cmpl |
|---|---|---|---|---|---|---|---|---|
| 01 | General Engineering Services | NTE | $ 39,357.50 | $ 13,478.25 | $ 2,514.00 | $ 15,992.25 | $ 23,365.25 | 40.63% |
| 02 | Grants | NTE | $ 4,642.50 | $ 4,571.75 | $ 70.75 | $ 4,642.50 | $ 0.00 | 100.00% |
| Subtotal: | $ 44,000.00 | $ 18,050.00 | $ 2,584.75 | $ 20,634.75 | $ 23,365.25 | 46.90% | ||
| Total: | $ 44,000.00 | $ 18,050.00 | $ 2,584.75 | $ 20,634.75 | ||||
| Total Amount Due | $ 2,584.75 | |||||||
Phase 01 General Engineering Services
Rate Schedule Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.75 | 158.00 | 276.50 |
| Senior Professional | 1.00 | 150.00 | 150.00 |
| Project Professional | 10.00 | 135.00 | 1,350.00 |
| Staff Professional | 14.00 | 125.00 | 1,750.00 |
| Rate Schedule Labor | 3,526.50 | ||
| Total this Phase | $2,514.00 | ||
Phase 02 Grants
Rate Schedule Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 158.00 | 39.50 |
| Staff Professional | 0.25 | 125.00 | 31.25 |
| Rate Schedule Labor | 70.75 | ||
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
| Project EGMAU25001 | 2025 General Services | Invoice 1284514 |
|---|
Total this Phase $70.75
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 2,584.75 | 18,050.00 | 20,634.75 |
| Limit | 44,000.00 | ||
| Remaining | 23,365.25 |
Total this Project $2,584.75
Outstanding Invoices
| Number | Date | Balance |
|---|---|---|
| 1280947 | 6/27/2025 | 8,652.25 |
| Total | 8,652.25 |
APPROVED BY: [Signature] 7/24/25
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
| Project: | EGMAU25001 | ||
|---|---|---|---|
| Pennoni Job No.: | 2025 General Services | ||
| Invoice No: | 1284514 | ||
| Invoice Period: | 6/16/2025 | to | 7/13/2025 |
| Initial Authorization: | $ 44,000.00 | Date: | 7/23/2025 |
| Contract Amount: | $ 44,000.00 | ||
| Previously Invoiced: | $ 18,050.00 | ||
| Current Invoice: | $ 2,584.75 | ||
| Invoiced to Date ($): | $ 20,634.75 | ||
| Invoiced to Date (%): | 46.90% | ||
| Remaining Budget ($): | $ 23,365.25 | ||
| Remaining Budget (%): | 53.10% |
Budget by Phase:
| Phase Name: | 2025 General Services |
|---|---|
| Phase Budget: | $ 44,000.00 |
| Previously Invoiced: | $ 18,050.00 |
| Current Invoice: | $ 2,584.75 |
| Invoiced to Date ($): | $ 20,634.75 |
| Invoiced to Date (%): | 46.90% |
| Remaining Budget ($): | $ 23,365.25 |
| Remaining Budget (%): | 53.10% |
Comments: Phase 01, General Engineering - July Engineer's Report. Performed RCSTP SBR Tank #1 inspection and prepared inspection report. Updated Morstein Rd resident inquiry letter for Township to issue to residents.
Phase 02, Grants - Reviewed DCED comments and grant guidelines on Hunt Country PS Small Water & Sewer Grant application matching funds amount.
[Logo: Gawthrop Greenwood, PC Attorneys at Law]
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
| East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380 |
Page: 1 08/07/2025 Client No: 6604-001M Invoice No. 222078999 |
|---|
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 07/11/2025 PMM |
Email from L. Werkheiser regarding Board meeting agenda and meeting materials; Review and analyze same. | 0.40 | 82.00 |
| 07/14/2025 PMM |
Attend Authority Board meeting. | 0.50 | 102.50 |
| For Current Services Rendered | 0.90 | 184.50 | |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Patrick M. McKenna, Esquire | 0.90 | $205.00 | $184.50 |
| Previous Balance | $759.50 |
|---|---|
| Total Current Charges | 184.50 |
| 07/29/2025 Payment | -759.50 |
| Balance Due | $184.50 |
APPROVED BY: [Signature] 8/8/25
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3140
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
Page: 1
.08/07/2025
Client No: 6604M
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
| Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|
| 6604-001 General Authority Services | ||||
| 759.50 | 184.50 | 0.00 | -759.50 | $184.50 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
To: Municipal Authority
From: Dana Gieder
Re: MA July 2025 YTD Financial Report
Date: August 5, 2025
YTD July 2025, the Municipal Authority recorded $477,444.45 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $467,648.52 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, Hershey Mill pump station replacement Hydromatic pump, Sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,795.93. As of July 31, 2025, the fund balance was $25,521.49.
Attached is a complete list of 2025 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD JULY 2025
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 180.93 | 224.80 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 6,557.09 | 0 | 2,084.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,498.43 | 0 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 1,076.32 | 0 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 238,506.00 | 89,295.45 | 94,097.57 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 698,000.00 | 387,968.07 | 436,834.59 |
| Total Revenue | 947,937.84 | 477,444.45 | 534,087.84 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 45,000.00 | 23,935.60 | 22,380.52 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 2,500.00 | 960.00 | 1,056.61 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 15,000.00 | 12,000.00 | 11,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 52,000.00 | 26,958.50 | 16,786.50 |
| 07-424-3140 | LEGAL SERVICES | 8,000.00 | 3,635.00 | 3,934.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 43,000.00 | 5,777.50 | 10,567.25 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 22,500.00 | 0 | 0 |
| 07-424-7440 | R.C. CAPITAL-STP | 30,500.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 49,500.00 | 6,413.85 | 27,691.19 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 20,850.00 | 0 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 150,000.00 | 0 | 0 |
| 07-429-1505 | RCSTP CAPITAL | 87,500.00 | 86,523.04 | 198,696.08 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 0 | 718.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 430,000.00 | 280,595.03 | 204,212.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 20,000.00 | 0 | 31,488.51 |
| Total Expenses | 955,500.00 | 467,648.52 | 528,781.16 | |
| Net Result From Operations | -7,562.16 PER DAVE CARRY OVER FROM LAST YEAR | 9,795.93 | 5,306.68 | |
Municipal Authority
YTD Revenues and Expenses thru 7/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/25 | Revenue Journal | INTEREST EARNED JANUARY 2025 | 14.23 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/25 | Revenue Journal | INTEREST EARNED FEBRUARY 2025 | 18.54 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/25 | Revenue Journal | INTEREST EARNED MARCH 2025 | 19.48 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/25 | Revenue Journal | INTEREST EARNED APRIL 2025 | 63.08 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/25 | Revenue Journal | INTEREST EARNED MAY 2025 | 29.32 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/25 | Revenue Journal | INTEREST EARNED JUNE 2025 | 16.46 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/25 | Revenue Journal | INTEREST EARNED JULY 2025 | 19.82 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 3,387.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/25/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,908.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 12,944.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,967.80 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 21,807.10 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/15/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,392.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 328.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/10/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 574.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/24/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 180.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,967.80 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/22/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 15,838.75 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,114.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/21/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 7,043.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/28/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,397.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/25/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,346.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/10/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 16,865.02 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/25/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,170.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/31/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,294.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/08/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 25,872.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/21/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,971.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/23/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 244,537.03 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/06/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,500.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/15/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 32,789.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/17/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 10,800.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/22/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,268.50 |
| Total Revenue | 477,444.45 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/27/25 | Pay Check: 711 | 25-00691 QTR 1 2025 MA CHARGE BACK | 11,967.80 |
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/27/25 | Pay Check: 712 | 25-01401 QTR 2 2025 MA CHARGE BACK | 11,967.80 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/21/25 | Pay Check: 3545 | 25-00599 2025 ANNUAL DAILY DISCHARGE CA | 780.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 06/24/25 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 180.00 |
Page 1 of 3
Municipal Authority
YTD Revenues and Expenses thru 7/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/21/25 | Pay Check: 3547 | 25-00624 FINAL BILLING AUDIT EGT MUA | 12,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/21/25 | Pay Check: 3537 | 25-00117 SERV THRU 123124 2024 GEN SERV | 2,459.75 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR000101 MISC. RECHARGE 07 acct | -3,695.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR000101 MISC. RECHARGE 07 acct | -5,920.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/25/25 | Pay Check: 3543 | 25-00415 SERV THRU 011225 2025 GEN SERV | 970.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/25/25 | Pay Check: 3543 | 25-00416 SERV THRU 011225 24 CHAPTER 94 | 343.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00840 SERV THRU 031625 2025 SUPPLEE | 5,777.50 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00841 SERV THRU 031625 2025 GEN SERV | 7,235.00 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00842 SERV THRU 031625 24 CHAPTER 94 | 2,093.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/28/25 | Expd | RECLASS PENNONI 1267313 PO# 25-00840 | -5,777.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01077 SERV THRU 041325 RCSTP ARC FLA | 6,750.00 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01076 SERV THRU 041325 24 CHAPTER 94 | 449.25 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01075 SERV THRU 041325 2025 GEN SERV | 1,192.75 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01548 SERV THRU 061525 24 CHAPTER 94 | 352.00 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01547 SERV THRU 061525 GEN SERV | 8,652.25 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01546 SERV THRU 061525 RCSTP ARC FLA | 6,075.00 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00116 LEGAL SERV DEC 2024 GEN AUTH | 266.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00115 LEGAL SERV OCT 2024 GEN AUTH | 538.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00114 LEGAL SERV NOV 2024 GEN AUTH | 123.00 |
| 07-424-3140 | LEGAL SERVICES | 02/25/25 | Pay Check: 3541 | 25-00414 LEGAL SERV DEC 2024 GEN AUTH | 594.50 |
| 07-424-3140 | LEGAL SERVICES | 03/21/25 | Pay Check: 3546 | 25-00589 LEGAL SERV FEB 2025 GEN AUTH | 164.00 |
| 07-424-3140 | LEGAL SERVICES | 04/21/25 | Pay Check: 3554 | 25-00843 LEGAL SERV MARCH 2025 GEN AUTH | 287.00 |
| 07-424-3140 | LEGAL SERVICES | 05/21/25 | Pay Check: 3560 | 25-01097 LEGAL SERV APRIL 2025 GEN AUTH | 328.00 |
| 07-424-3140 | LEGAL SERVICES | 06/10/25 | Pay Check: 3561 | 25-01289 LEGAL SERV MAY 2025 GEN AUTH | 574.00 |
| 07-424-3140 | LEGAL SERVICES | 07/22/25 | Pay Check: 3563 | 25-01545 LEGAL SERV JUNE 2025 GEN AUTH | 759.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 04/28/25 | Expd | RECLASS PENNONI 1267313 PO# 25-00840 | 5,777.50 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 04/21/25 | Pay Check: 3553 | 25-00894 PORTABLE HOT HIGH PRESS WASHER | 6,413.85 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/25/25 | Pay Check: 3542 | 25-00471 ENG # 516230997-S4NX750EC 7HP | 8,346.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 04/08/25 | Pay Check: 3551 | 25-00772 HYDROMATIC PUMP W/2 CONNECTING | 12,504.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/25 | Pay Check: 3535 | 25-00016 UV SYS REMOTE ACCESS UPGRADE | 4,114.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/21/25 | Pay Check: 3538 | 25-00118 RCSTP- UV DISINFECTION SYS REP | 7,043.52 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3539 | 25-00178 DECANTER CONTROLS REPAIR | 7,875.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3540 | 25-00175 INSTALL & WIRE NEW GENERATOR | 6,522.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/10/25 | Pay Check: 3544 | 25-00562 SUBSITE PROTRAK TRACTOR CAMERA | 16,865.02 |
| 07-429-1505 | RCSTP CAPITAL | 03/25/25 | Pay Check: 3548 | 25-00657 RENTL 600KW PORTABLE GENERATOR | 6,170.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/31/25 | Pay Check: 3549 | 25-00731 RIDLEY PLANT GENERATOR ATS TRA | 3,294.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/08/25 | Pay Check: 3550 | 25-00776 EXPLOSION PROOF HEATERS- RCSTP | 13,368.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/21/25 | Pay Check: 3552 | 25-00853 (8) PARATECH LOCKSTROKE STRUTS | 3,971.00 |
| 07-429-1505 | RCSTP CAPITAL | 05/06/25 | Pay Check: 3557 | 25-01006 TRANSPORT NEW GENERATOR-RCSTP | 6,500.00 |
Page 2 of 3
Municipal Authority
YTD Revenues and Expenses thru 7/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 06/17/25 | Pay Check: 3562 | 25-01336 RIDLEY C-EXPLOSION PROOF VFD'S | 10,800.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 04/23/25 | Pay Check: 3556 | 25-00921 SUPPLEE VALLEY SANITARY SEWER | 244,537.03 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 05/14/25 | Pay Check: 3558 | 25-01074 SERV THRU 041325 2025 SUPPLEE | 6,217.50 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 05/14/25 | Pay Check: 3559 | 25-01078 SUPPLEE VALLEY SANITARY SEWER | 26,572.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 07/22/25 | Pay Check: 3564 | 25-01549 SERV THRU 061525 2025 SUPPLEE | 3,268.50 |
| Total Expense | 467,648.52 | ||||
| Net Operating | 9,795.93 |
Page 3 of 3
Morstein Rd Sewer Tie-in Survey
| Number | Street | Interest? | Comments |
|---|---|---|---|
| 1235 | Great Oak Cir | YES | Probably seems too expensive, but open to exploring options. |
| 1237 | Great Oak Cir | YES | Depends on cost, but $60 - $100K is not an option. |
| 1239 | Great Oak Cir | NO | |
| 1241 | Great Oak Cir | YES | |
| 1344A | Morstein Rd | ||
| 1346 | Morstein Rd | YES | I am interested in connecting but it will depend on cost. Unfortunately, due to the economy and unexpected life events, the money set aside for this a few years ago is no longer available. |
| 1350 | Morstein Rd | YES | We would not be interested if the cost of the sewer system extension is to be divided equally among all property owners. Our property is much closer to the connection on Barkway Ln. A price per foot from each house to the connection point would be more equitable. |
| 1352 | Morstein Rd | YES | After we subdivide, we will have two lots to connect. Let's do it. |
| 1398 | Morstein Rd | YES | Great idea - lets' make this happen - with grants! |
| 1402 | Morstein Rd | YES | |
| 1404 | Morstein Rd | YES | |
| 1406 | Morstein Rd | ||
| 1408 | Morstein Rd | ||
| 1410 | Morstein Rd | YES | We are possibly interested if grants are obtained and cost is dramatically reduced. |
| 1412 | Morstein Rd | NO | Not interested due to cost. |
| 1414 | Morstein Rd | NO | Our septic system is in excellent condition. |
| 1416 | Morstein Rd | ||
| 1240 | Waterford Rd | ||
| 1243 | Waterford Rd | YES | Our house's back corner to middle of Morstein is @ 60 yds, all downhill. Big issue is the large trees in path. Will there be an annual fee to access the pipeline? There is nothing wrong with the existing method. What are the estimated fees? The fees become an annuity for each home. - Mike Montgomery |
| 19 | Total properties |
|---|---|
| 3 | Not interested |
| 11 | Interested |
| 5 | Not yet responded |
| 16% | NOT INTERESTED |
|---|---|
| 58% | INTERESTED |
| 26% | NOT YET RESPONDED |
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 11, 2025
Dear Property Owner:
Multiple property owners along Morstein Road have recently been in contact with the East Goshen Municipal Authority to inquire about the feasibility of connecting their home to the public sanitary sewer system. The Authority would like to gauge the interest of other property owners to connect as well. This letter provides some very general information for your consideration. We respectfully request your response as described hereafter.
It is the Authority’s understanding that many properties along Morstein Road still utilize their originally constructed septic systems. Original systems would be 40 to 50+ years old, which is typically at or near the end of their useful lives. Due to poor infiltration rates in the area, some property owners may not have the ability to install new septic systems or will have to replace them with options such as sand mounds or drip irrigation, which are more costly than their existing system. New septic systems can cost over $40,000 to construct depending upon the extent and type of the new/replacement system.
To provide public sanitary sewer service along Morstein Road, the existing sanitary sewer system along Barkway Lane could be extended. The extension could utilize a combination of gravity sewers and low-pressure force mains along Morstein Road and Great Oak Circle. In order to connect to the extended gravity system, each applicable property owner desiring a connection would need to install a private lateral pipe on their property from their house to the new sewer main. To connect to the low-pressure force main system, each applicable property owner desiring a connection would need to install a private grinder pump and private force main pipe on their property.
There are certain properties that are only expected to be able to connect via low-pressure due to topography, whereas others could connect via gravity if the surrounding properties also connect via gravity.
The following eight properties could be connected by either a gravity or low-pressure force main system:
- 1240 Waterford Road
- 1243 Waterford Road
- 1346 Morstein Road
- 1350 Morstein Road
- 1352 Morstein Road
- 1398 Morstein Road
- 1402 Morstein Road
- 1404 Morstein Road
The following 11 properties could be connected only by a low-pressure force main system:
- 1235 Great Oak Circle
- 1237 Great Oak Circle
- 1239 Great Oak Circle
- 1241 Great Oak Circle
- 1344 A Morstein Road
- 1406 Morstein Road
- 1408 Morstein Road
- 1410 Morstein Road
- 1412 Morstein Road
- 1414 Morstein Road
- 1416 Morstein Road
The cost of the public sanitary sewer system extension is expected to be divided equally among the properties that are connecting. However, grants can be sought to reduce the costs. The cost range is very conceptual at this time until the level of interest is known and engineering design occurs. The cost per property could be in the range of $60,000 to $100,000, but that could be reduced dramatically depending on the total number of properties that decide to connect, and if grants are obtained.
Any responses or requests for additional information should be submitted in writing to Mark Miller and Lynn Werkheiser in the East Goshen Township Public Works Department at mmiller@eastgoshen.org and lwerkheiser@eastgoshen.org.
Please note again that the Authority is just seeking an expression of initial interest at this time to evaluate if further consideration should be given to public sewer extensions.
Please complete and return the form on the next page to help us gauge interest in this project.
Best regards,
Mark Miller
Director of Public Works
East Goshen Township
Please return this form to East Goshen Township in the enclosed stamped, self-addressed envelope by August 12, 2025. This is NOT a commitment form. It is only being used to gauge initial interest for evaluation purposes. You may also scan and email this form to lwerkheiser@eastgoshen.org.
- □ 1235 Great Oak Circle
- □ 1237 Great Oak Circle
- □ 1239 Great Oak Circle
- □ 1241 Great Oak Circle
- □ 1344A Morstein Road
- □ 1346 Morstein Road
- □ 1350 Morstein Road
- □ 1352 Morstein Road
- □ 1398 Morstein Road
- □ 1402 Morstein Road
- □ 1404 Morstein Road
- □ 1406 Morstein Road
- □ 1408 Morstein Road
- □ 1410 Morstein Road
- □ 1412 Morstein Road
- □ 1414 Morstein Road
- □ 1416 Morstein Road
- □ 1240 Waterford Road
- □ 1243 Waterford Road
□ I / We may be interested in connecting to the public sanitary sewer system.
□ I am NOT / We are NOT interested in connecting to the public sanitary sewer system.
Optional Information:
Name(s) __________________________________________________
Email(s): __________________________________________________
Phone #(s): __________________________________________________
Comments: __________________________________________________
__________________________________________________
Lynn Werkheiser
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Thursday, August 7, 2025 11:13 PM
To: Lynn Werkheiser; Mark Miller
Cc: Erika Addison
Subject: Morstein Rd Sewer Extension Exhibits for MA
Attachments: Morstein Road Sewer Connection Exhibits_Combined.pdf
Hi Mark and Lynn,
We added two exhibits to the package that was prepared for the June MA meeting to show the survey interest results for each parcel on a map and to summarize which properties can connect only by low pressure (grinder pump) vs. an option of low pressure or gravity. Those are the 6th and 7th pages of the attached package. The other pages are from the June MA meeting package. This can be included in the MA packet for discussion on Monday along with this summary email.
The exhibits in the package follow:
1st page: Overview map of Township showing area of interest
2nd-4th pages: Sewer extension alternatives #1 thru #3
5th page: Age of onlot systems based on available info from the County Health Dept
6th page: Which properties can connect via only low pressure vs. an option of low pressure or gravity
7th page: Survey responses. Note that most of the properties uphill (west) of Barkway Ln are interested. This is the area that could be gravity or low pressure.
8th-10th pages: Budgetary cost opinions
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com
What's Possible Podcast Episode 2
1
EAST GOSHEN
WASTEWATER FACILITIES
FIGURE 1
Map of East Goshen Wastewater Facilities.
- MH R-265 PORTABLE METER
- LINE ROAD MH R-238 PORTABLE METER
- MH R-022 PORTABLE METER
- E. BOOT RD MH R-214 PORTABLE METER
- ELDRIDGE DRIVE MH R-568 PORTABLE METER
- ACHCOM MH R-636 PORTABLE METER
- HUNT COUNTRY PUMP STATION
- RIDLEY CREEK SEWAGE TREATMENT PLANT
- RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
- ASHBRIDGE PUMP STATION
- RESERVOIR ROAD METER
- WESTTOWN WAY METER
- PROPOSED RESERVOIR ROAD PUMP STATION
- ELLIS LANE METER
- HICKS METER
- PAOLI PIKE WEST METER
- WILSON DRIVE METER
- AREA OF INTEREST
- BARKWAY PUMP STATION
- HERSHEY'S MILL SEWAGE TREATMENT PLANT
- HERSHEY'S MILL PUMP STATION
- DECOMMISIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT
Legend
- PUMP STATION
- SEWAGE TREATMENT PLANT
- SANITARY MANHOLES
- PERMANENT METERS
- PORTABLE METERS (2020)
- SANITARY SEWER
- FORCEMAIN
- TOWNSHIP BOUNDARY
- SubAreas
- Parcels
- PONDS & LAKES
- RIVERS
- EAST WHITELAND SERVICE AREA
- HERSHEY'S MILL SERVICE AREA
- RIDLEY CREEK SERVICE AREA
- WEST GOSHEN SERVICE AREA
- WESTTOWN SERVICE AREA
N
TOWNSHIP OF EAST GOSHEN CHESTER COUNTY PENNSYLVANIA INCORPORATED 1817
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
0 1,000 2,000 4,000 Feet
1 inch = 1,000 feet
ALTERNATIVE 1
Map of Barkway Pump Station sewer alternative.
BARKWAY PUMP STATION
New Low Pressure System
New MHs & Gravity Pipe to Barkway PS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
ALTERNATIVE 2
Parcel map illustrating the proposed sewer extension layout for Alternative 2, showing existing gravity sewer parcels shaded light blue, Barkway Pump Station in red, manholes and gravity pipes in green, and numbered parcels 1 through 19 served by a proposed New Low Pressure System in blue.
- BARKWAY PUMP STATION
- New Low Pressure System
- New MHs & Gravity Pipes to Barkway PS
- Numbered parcels: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19
ALTERNATIVE 3
Parcel map illustrating the proposed sewer extension layout for Alternative 3, showing existing gravity sewer parcels shaded light blue, Barkway Pump Station in red, manholes and gravity pipes in green, and numbered parcels 1 through 19 served by a proposed New Low Pressure System in blue.
- BARKWAY PUMP STATION
- New Low Pressure System
- New MHs & Gravity Pipes to Barkway PS
- Numbered parcels: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19
APPROXIMATE SEPTIC SYSTEM AGE EXHIBIT
JUNE 3, 2025
Color-coded parcel map showing the approximate septic system age across 106 properties in the neighborhood, adjacent to properties connected to the public sewer shaded in light blue.
Legend
- ≤5 Years (5)
- 6 - 10 Years (5)
- 11 - 20 Years (12)
- 21 - 30 Years (12)
- 31 - 40 Years (6)
- 41 - 50 Years (2)
- > 50 Years (64)
TOTAL = 106 PROPERTIES
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
AVAILABLE CONNECTION TYPE EXHIBIT
AUGUST 7, 2025
Color-coded parcel map showing the available sewer connection type for 19 properties adjacent to existing public sewer connections.
Legend
- Pressure Only (11)
- Gravity or Pressure (8)
TOTAL PROPERTIES = 19
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
SURVEY RESPONSE EXHIBIT
AUGUST 7, 2025
Color-coded parcel map showing property owner survey responses for 19 properties adjacent to existing public sewer connections.
Legend
- Definitely Interested (4)
- Interested Depending on Cost (7)
- Not Interested (3)
- Not Yet Responded (5)
TOTAL PROPERTIES = 19
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
Pennoni
5/9/2025
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 1
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $60,500.00 | $60,500 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $10,000.00 | $10,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $83,000 | |||
| SANITARY SEWER | ||||
| Low Pressure Sewer | 2,850 | LF | $150.00 | $427,500 |
| 8" Gravity Sewer | 200 | LF | $225.00 | $45,000 |
| Manhole | 2 | EA | $9,000.00 | $18,000 |
| Grinder Pump | 19 | EA | $15,000.00 | $285,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| SUBTOTAL | $784,500 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $5,000.00 | $5,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base & 2.5" Binder) | 311 | SY | $100.00 | $31,111 |
| 1.5" Mill & Wearing Course Overlay | 467 | SY | $25.00 | $11,667 |
| SUBTOTAL | $56,278 | |||
| CONSTRUCTION SUBTOTAL | $923,778 | |||
| 20% CONTINGENCY | $184,756 | |||
| 15% ENGINEERING & INSPECTIONS | $138,567 | |||
| TOTAL | $1,247,100 | |||
| TOTAL (rounded) | $1,248,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\LEGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 3 of 5
Pennoni
5/9/2025
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 2
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $71,300.00 | $71,300 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $15,000.00 | $15,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $98,800 | |||
| EAST MORSTEIN LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 880 | LF | $150.00 | $132,000 |
| Grinder Pump | 6 | EA | $15,000.00 | $90,000 |
| SUBTOTAL | $222,000 | |||
| GREAT OAK CIRCLE LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 780 | LF | $150.00 | $117,000 |
| Grinder Pump | 5 | EA | $15,000.00 | $75,000 |
| SUBTOTAL | $192,000 | |||
| GRAVITY SANITARY SEWER | ||||
| 8" Gravity Sewer | 1,390 | LF | $225.00 | $312,750 |
| Sewer Lateral | 400 | LF | $150.00 | $60,000 |
| Manhole | 5 | EA | $9,000.00 | $45,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| SUBTOTAL | $426,750 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $5,000.00 | $5,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base & 2.5" Binder) | 872 | SY | $100.00 | $87,222 |
| 1.5" Mill & Wearing Course Overlay | 1,953 | SY | $25.00 | $48,833 |
| SUBTOTAL | $149,556 | |||
| CONSTRUCTION SUBTOTAL | $1,089,106 | |||
| 20% CONTINGENCY | $217,821 | |||
| 15% ENGINEERING & INSPECTIONS | $163,366 | |||
| TOTAL | $1,470,293 | |||
| TOTAL (rounded) | $1,471,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\LEGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 4 of 5
[Logo: Pennoni]
5/9/2025
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 3
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $69,800.00 | $69,800 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $15,000.00 | $15,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $97,300 | |||
| EAST MORSTEIN LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 880 | LF | $150.00 | $132,000 |
| Grinder Pump | 6 | EA | $15,000.00 | $90,000 |
| SUBTOTAL | $222,000 | |||
| GREAT OAK CIRCLE LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 780 | LF | $150.00 | $117,000 |
| Grinder Pump | 5 | EA | $15,000.00 | $75,000 |
| SUBTOTAL | $192,000 | |||
| GRAVITY SANITARY SEWER | ||||
| 8" Gravity Sewer | 1,375 | LF | $225.00 | $309,375 |
| Sewer Lateral | 400 | LF | $150.00 | $60,000 |
| Manhole | 7 | EA | $9,000.00 | $63,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| Connection to Existing Manhole | 2 | EA | $3,500.00 | $7,000 |
| Easements | TBD | TBD | ||
| SUBTOTAL | $448,375 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $10,000.00 | $10,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base and 2.5" Binder) | 572 | SY | $100.00 | $57,222 |
| 1.5" Mill & Wearing Course Overlay | 1,233 | SY | $25.00 | $30,833 |
| SUBTOTAL | $106,556 | |||
| CONSTRUCTION SUBTOTAL | $1,066,231 | |||
| 20% CONTINGENCY | $213,246 | |||
| 15% ENGINEERING & INSPECTIONS | $159,935 | |||
| TOTAL | $1,439,411 | |||
| TOTAL (rounded) | $1,440,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\EGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 5 of 5