Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
September 8, 2025
7:00
- 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
- CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
- LIAISON REPORTS
- SEWER REPORTS Director of Public Work’s Report – verbal report from Mark Miller Average daily flow to West Goshen: 514,329 gallons/day Monthly rainfall: 1.10″; Average daily flow to West Goshen: 514,329 gallons/day; Monthly rainfall: 1.10″; West Goshen Report; Pennoni Engineer’s Report; Big Fish Environmental Report
- APPROVAL OF MINUTES August 11, 2025
- APPROVAL OF INVOICES Company Invoice # Amount Paid? Pennoni 1289164 $5,224.00 Pennoni 1289165 $675.00 West Goshen Sewer Authority EG24-T $44,172.77 paid
- FINANCIAL REPORTS August 2025
- OLD BUSINESS
1
- 2025 Goals: Goal Status Ridley Creek Plant compliance January through August were in compliance with PADEP permit requirements. Continue to implement infiltration and inflow for the sewer system Ongoing. Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1 st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis. Long-term sustainability Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.
- NEW BUSINESS Morstein Rd Sewer Extension Morstein Rd Tie-in Survey Response Exhibit Proposal for Morstein Rd Sewer Extension Design & Permitting Phase Services; Morstein Rd Tie-in Survey Response Exhibit; Proposal for Morstein Rd Sewer Extension Design & Permitting Phase Services
- CAPACITY REQUESTS Charter Chase & Goshen Downs Tie-in Survey Response Exhibit
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
2
WEST GOSHEN SEWER REPORT
From: Mike Moffa <MMoffa@westgoshen.org>
Sent: Thursday, September 4, 2025 8:46 AM
To: Mark Miller <mmiller@eastgoshen.org>
Subject: RE: Monthly Update
Good morning Mark,
Nothing new this month…
General Notes:
- For the month of August the plant operated in compliance with its NPDES permit.
- WWTP monthly average daily flow - 3.211 mgd.
- WWPS monthly average daily flow - 1.063 mgd.
- Monthly average total phosphorus discharge concentration was <0.04 mg/L.
- Sludge to landfill – 225 wet tons.
- The WG Sewer Authority is working on updating its 10-year CIP. WG and EG are coordinating a meeting date.
Grant Projects:
- 2024 LSA-Statewide Grant: WWTP Pump Replacements. Results of the grant applications are anticipated by November, 2025.
Ongoing Projects:
- WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and are being reviewed. Anticipated equipment delivery - 3 rd qtr, 2026.
- Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. Anticipated equipment delivery and installation - 4 th qtr, 2025.
- Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 4 th qtr, 2025.
[Pennoni Logo]
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT
September 3, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- Arc Flash Study – The final Arc Flash Study report was previously submitted to the operator and Public Works. Pennoni mailed the updated arc flash labels on August 26. The Township received the labels on August 27 and will coordinate with Lenni for their installation. After the new arc flash labels are installed, the project will be complete.
- Surge Suppression Inventory – We revisited our files, and we have a brief list of surge suppression/TVSS devices in the plant. However, that list may be outdated. It does not include the status of the device (such as age or if the counter works) nor a reference to the equipment that it protects. If the MA would like an updated and comprehensive surge suppression inventory, we suggest our Electrical Engineer meet on-site with Lenni Electric and the operator to walkthrough the current electrical systems. We could then prepare an updated surge suppression inventory that identifies the protected downstream equipment. We anticipate this would be a limited effort, about two total days for the field walkthrough and preparation of an updated inventory.
- SBR Tank Inspections – We performed a visual structural and condition inspection of SBR #1 on June 26, and we submitted a draft inspection report. Pennoni contacted Dutchland to schedule them to come out to the RCSTP to examine the tank and to provide a cost estimate for the repair work outlined in the inspection report. However, Dutchland is no longer in the service or repair business. We are currently reaching out to potential other vendors that can perform the repair work.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. In follow-up to the August MA meeting, we notified the contractor to proceed with the evaluation. They responded that they were meeting internally the week of August 26 to review the next steps. We are awaiting their response. Final payment will not be processed until this matter is resolved.
- Waterview – Waterview is planned for pipe lining in 2026. The Township is having the pipes in the neighborhood televised in September. We can then review the videos and prepare a bid package with the intent to bid and award the construction contract in the winter so that construction can occur in spring 2026.
Pump Stations
- Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. We expect that DCED will make awards in late 2025 or early 2026.
- Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
Sewer Extension
- Morstein Road and Great Oak Circle – The initial inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses were requested by August 31. A few more responses were received since the last meeting. An updated exhibit depicting the properties definitely interested, interested depending on costs, not interested, and not yet responded was submitted to the Township. Six properties are definitely interested, seven properties are interested depending on costs, three properties are not interested, and three properties did not respond.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU25001
East Goshen Municipal Authority
September 3, 2025
Engineer’s Report
Page 2 of 2
Our proposal for design and permitting services for the proposed sewer extension was submitted.
- Charter Chase and Goshen Downs – We prepared inquiry letters to the property owners in the two neighborhoods to gauge their interest in public sewer in follow-up to the August MA meeting. An exhibit depicting the properties definitely interested, interested depending on costs, not interested, and not yet responded was submitted to the Township. 34 properties are definitely interested, 11 properties are interested depending on costs, 21 properties are not interested, and 88 properties have not yet responded.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we performed periodic inspections.
- Timbermill (301 Reservoir Road) – Site construction is ongoing, and we performed periodic inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
- 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.
- 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We previously spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.
END OF REPORT
[Big Fish Environmental Services Inc. Logo]
RCSTP Monthly Operations Report
September 2025
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for August 2025. All supplemental reports were submitted for July 2025. Caustic usage decreased to 56.59 gallons per day from 62.07 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 71.06 gallons per day from 71.25 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Tables
| CERTIFIED LAB RESULTS- FINAL EFFLUENT August 2025 | ||||||
|---|---|---|---|---|---|---|
| FLOW | Ammonia as | CBOD | Total Phosphor | Total Suspended Solids | Fecal Coliform | |
| Permit Limit (Weekly Average) | Gallons | 2.5mg/L | 15mg/L | 0.5mg/L | 15mg/L | 200 coliforms/100mL |
| DATE | Final EFF/Applebrook | |||||
| 8/5/2025 | 243,000/36,036 | <0.10 | <2.0 | 0.14 | <4.0 | 1 |
| 8/12/2025 | 236,000/36,403 | 0.15 | <2.0 | 0.14 | <4.0 | 6 |
| 8/19/25 | 283,000/32,985 | <0.10 | <2.0 | 0.14 | <4.0 | <1 |
| CERTIFIED LAB RESULTS- INFLUENT September 2025 | ||||
|---|---|---|---|---|
| Ammonia as N | CBOD | Total Phosphorus | Total Suspended Solids | |
| DATE | ||||
| 8/5/2025 | 38.7 mg/L | 142 mg/L | 5.54 mg/L | 44.0 mg/L |
| 8/12/2025 | 37.6 mg/L | 209 mg/L | 5.37 mg/L | 220 mg/L |
| 8/19/2025 | 39.9 mg/L | 265 mg/L | 5.86 mg/L | 158 mg/L |
The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. For simplicity, only the parameters that have discharge limits are shown above. We remained well below all of the weekly average discharge limits for the month of August.
PA DEP
Nothing to report
Pennoni Associates
Nothing to report
Significant Rainfall
During August, there were four (4) days where precipitation occured. There were 0 days where rain accumulation was greater than 0.50″.
Total rainfall for August was 0.79 inches
*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred
Chemical Data
| August 2025 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Caustic Soda, gal | 56.59 | 1754.37 |
| Aluminum Sulfate solution, gal | 71.06 | 2202.81 |
| Sludge Dewatering, gal* | 19,478 | 370,076 |
*22 days of sludge dewatering
There was a decrease of 46,025 gallons of sludge dewatering during the month of August compared to July.
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Page 2 of 3
Major Repairs or Upgrades
Nothing to report
Upcoming Repairs or Upgrades
Nothing to report
Flow Data
| August 2025 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building | 8.977 | 289,566 | 357,250 |
| Influent Wastewater to SBRs | 10.707 | 345,376 | 419,328 |
| Internal Recycle | 1.730 | 55,810 | 88,508 |
| Treated Effluent to Disc Filters | 10.417 | 336,018 | 411,392 |
| Final Effluent Discharge | 7.144 | 230,000 | 285,000 |
| Applebrook Golf Course | 1.057 | 34,089 | 42,163 |
The plant hydraulic design loading is 745,000 gpd.
There were no high flow events during the month of August 2025
Page 3 of 3
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
August 11, 2025
The East Goshen Township Municipal Authority held their regular meeting on Monday, August 11, 2025 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Walter Wujcik, Chairman
Kevin Cummings – Vice Chairman
Sean Ellsworth
John Stipe
Dana Pizarro
Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Cody Bright (Supervisor)
Dave Ware (Finance Director),
Patrick McKenna (Attorney)
Robert Jefferson (Attorney)
Stacey Fuller (Attorney)
Mark Johnsen, Resident
COMMON ACRONYMS:
| ATS – Automatic Transfer Switch | MA- Municipal Authority |
|---|---|
| BFES – Big Fish Environmental Services | NPDES – National Pollutant Discharge Elimination System |
| BOS – Board of Supervisors | PC – Planning Commission |
| CB – Conservancy Board | PM – Prevention Maintenance |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
| PWD – Public Works Department |
Call to Order & Pledge of Allegiance
Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Walter asked for a moment of silence for our troops and EMT.
Walter asked if anyone would be recording the meeting. There was no response.
Chairman’s Report/Other Members Report
1. Mark Miller asked Mike Moffa, Director of Wastewater for West Goshen Township to send a monthly report. The report dated August 7, 2025 included General Notes (daily flows etc.), Grant Projects, and Ongoing Projects. The report was discussed.
MA 8-11-25 draft 1
Capacity Requests
1. Charter Chase tie-in - Mark Johnsen (1213 Waterford Rd.) mentioned that he moved here from Virginia and is concerned about the septic system. He is curious about the possible expansion of the East Goshen sewer system. Also, there is a community pond which has had a lot of algae this year. He understands this may be due to fertilizer runoff.
Kevin commented that the MA has surveyed residents in the past, but they said no to the public sewer.
Mark bought his home from the original owners and there have been several other houses sold, so, he thinks there may be a change in accepting public sewer.
Kevin mentioned that property owners won’t have enough land in the future to install sand lot systems.
Dave mentioned that in the past the MA has subsidized sewer installation and offered 20-year payment programs.
Mike explained the process for installing sewer which could take 3 years.
Mark also mentioned that the walking trail is overgrown and he would like to have it cleared so it can be used.
The MA thanked Mark Johnsen for coming to the meeting.
Mark Miller mentioned that he has received calls from residents about hooking into the sewer system.
After discussion, Kevin moved to send a letter to Charter Chase residents about the sewer installation and include financing options. John seconded the motion. The motion passed unanimously.
Liaison Reports
1. Conservancy Board – Walter commented that there will be no meeting in August.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for August 11, 2025.
Monthly Flows – The average daily flow to West Goshen was 579,445 gallons per day.
Meters:
- Read on a daily basis with no problems to report.
C.C. Collection:
- Pump stations were visited on a daily basis with no problems to report.
- We inspected the lines in the Waterview development because we will be milling and paving the roads there in the next two weeks.
Ridley Creek Collection
- The pump stations were visited on a daily basis with no problems to report.
- The upgrades to the Hershey Mill Station are just about completed.
Ridley Creek Plant
- We didn’t have any problems to report.
MA 8-11-25 draft 2
- We cleared the brush from both retention basins and from around the fence.
- I ordered 4 new dialers for the plant which will be installed and in operation by the end of September.
Alarms: 22 (all weather related)
PA One Calls: 118
Lateral Caps: 2
Monthly Rainfall: 5.00”
2. Pennoni Engineer’s Report dated August 8, 2025
Ridley Creek Sewage Treatment Plant (RCSTP)
- Arc Flash Study – The final Arc Flash Study report was submitted to the operator and Public Works. It is our understanding that Lenni has already implemented the recommendations and installed the new arc flash labels so this project is now complete. The actual effort to complete the study was more than we had initially scoped due to additional effort to research breakers that were not clearly visible on-site, and we respectfully request supplemental funding for a portion of that additional effort to be covered with available budget from our 2025 General Services task order. We will submit a separate request to document the additional effort and cost for discussion with the Township and MA.
- SBR Tank Inspections – We performed a visual structural and condition inspection of SBR #1 on June 26. For reference, the last inspection of SBR #1 occurred in 2021, and subsequent coating repairs were made in that SBR by Dutchland in June 2021. The draft 2025 inspection report was submitted to the operator and Public Works for review, and a review meeting to discuss observations and recommended repairs is being scheduled.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. We notified the contractor on May 22 that this liner segment need to be repaired/relined and will not be accepted as-is. They responded with the attached letter proposing to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. We will follow-up with them on the next steps after review and discussion with the Municipal Authority. Final payment will not be processed until this matter is resolved.
MA 8-11-25 draft 3
- Note: At the MA meeting Mike spoke about the Supplee Valley pipe lining and said the contractor is offering to come out and inspect and video the pipe. Warranty on labor and materials was discussed by the MA members.
Pump Stations
- Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. DCED contacted the Township to question the funding request matching amount, and Mark Miller submitted a response to DCED regarding the matching funds commitment on July 16. We expect that DCED will make awards in late 2025 or early 2026.
- Ashbridge Pump Station – No activity by Pennoni. The station is in need of upgrades. We will coordinate with Public Works to develop the scope of improvements.
Sewer Extension
- Morstein Road and Great Oak Circle – The inquiry letter to Morstein Road property owners to gauge interest in connecting to public sewer was issued on June 11. Responses were requested by August 31. Several responses have already been received. Exhibits depicting the three sanitary sewer connection alternatives, approximate septic system ages, available sanitary sewer connection option for the surveyed properties, the properties that are definitely interested, interested depending on costs, not interested, and not yet responded, and the cost estimates for the three alternatives were submitted to the Township.
New Connections
- Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we performed regular inspections.
- Timbermill (301 Reservoir Road) – Site construction is ongoing, and we performed regular inspections.
- 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
- 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland. The East Goshen Township-required Sewage Facilities Planning Module (SFPM) Components were submitted to the Chester County Health Department (CCHD) and Chester County Planning Commission (CCPC), and both agencies returned the completed components. It is our understanding that the developer’s Design Engineer previously resubmitted to PADEP.
- 1344 Morstein Road – One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing
MA 8-11-25 draft 4
easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.
NOTE: Mike mentioned that the NPDS permit expires Mach 31, 2027. He will start to work on the application next year.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for July 2025. All supplemental reports were submitted for June 2025. Caustic usage decreased to 62.07 gallons per day from 64.24 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 71.25 gallons per day from 72.52 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Approval of Minutes
The minutes of the July 14, 2025 meeting were approved.
Approval of Invoices
1. John moved to approve payment of Pennoni invoice #1284514 in the amount of $2,584.75.
Dana seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of Gawthrop Greenwood Invoice #222078999 in the amount of $184.50. John seconded the motion. The motion passed unanimously.
Financial Reports
Dave provided the following report: YTD July 2025, the Municipal Authority recorded $477,444.45 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $467,648.52 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $9,795.93. As of July 31, 2025, the fund balance was $25,521.49.
Dave mentioned that he has finished the 2026 budget and will present it to the BOS at their September meeting.
Old Business - None
Goals –None
New Business – None
MA 8-11-25 draft 5
Capacity Requests -
1. Morestein Tie—In – Mike reviewed the survey results. Five have not responded yet. Gravity and grinder pumps were discussed. The total cost would be about $1.2 million. Kevin suggested a letter be sent to the residents with financing options.
Any Other Matter
1. Waterview – Mike will get a bid ready for the Waterview pipe lining.
Correspondence-
1. SBR Tank #1 – Mike reported on past work that was done. This time the hairline cracks are the same and there is some minor blistering. Dutchland came out several times to make repairs. The recommendation is to have Dutchland come out again. The MA agreed.
2. Arc Flash Study – Mike reviewed the final report. Recommendations have been implemented. Mike requested an additional $4,000. He will submit an invoice for the next meeting.
Public Comment - None
Adjournment
There being no further business Sean moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:35 pm.
The next regular meeting will be held on Monday, September 8, 2025 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 8-11-25 draft 6
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1289164
Invoice Date : 08/20/2025
Project : EGMAU25001
Project Name : 2025 General Services
For Professional Services Rendered Through 08/10/2025
Prepared August Engineer's Report. Discussed RCSTP SBR Tank #1 inspection report and repair recommendations with PW Director. Reviewed Morstein Rd property owners' survey responses and created map of responses. Researched RCSTP NPDES Permit renewal timeframe and application deadline. 2026 capital budgeting with Finance Director.
Invoice also includes $3,944 of effort from the RCSTP Arc Flash Study for additional services for investigation and research of circuits and related information that was beyond the original scope of the study.
| Phase Code | Phase Name | Fee Type | Contract Amount | Previously Billed | Current Billing | Total Billing | Remaining | % Cmpl |
|---|---|---|---|---|---|---|---|---|
| 01 | General Engineering Services | NTE | $ 39,357.50 | $ 15,992.25 | $ 5,224.00 | $ 21,216.25 | $ 18,141.25 | 53.91% |
| 02 | Grants | NTE | $ 4,642.50 | $ 4,642.50 | $ 0.00 | $ 4,642.50 | $ 0.00 | 100.00% |
| Subtotal: | 44,000.00 $ | 20,634.75 $ | 5,224.00 $ | 25,858.75 | 18,141.25 | 58.77% | ||
| Total: | 44,000.00 $ | 20,634.75 $ | 5,224.00 $ | 25,858.75 | ||||
Total Amount Due $ 5,224.00
Phase 01 General Engineering Services
Rate Schedule Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 3.75 | 158.00 | 592.50 |
| Staff Professional | 5.50 | 125.00 | 687.50 |
| Associate Professional | 34.00 | 116.00 | 3,944.00 |
| Rate Schedule Labor | 5,224.00 | ||
Total this Phase $5,224.00
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 5,224.00 | 20,634.75 | 25,858.75 |
| Limit | 44,000.00 | ||
| Remaining | 18,141.25 |
Total this Project $5,224.00
APPROVED BY: [Signature: D W 8/22/25]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3180
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
| Project | EGMAU25001 | 2025 General Services | Invoice | 1289164 |
|---|
Outstanding Invoices
| Number | Date | Balance |
|---|---|---|
| 1284514 | 7/23/2025 | 2,584.75 |
| Total | 2,584.75 | |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
Project: EGMAU25001
Pennoni Job No.: 2025 General Services
Invoice No: 1289164
Invoice Period: 7/14/2025 to 8/10/2025
Initial Authorization: $ 44,000.00 Date: 8/20/2025
Contract Amount: $ 44,000.00
Previously Invoiced: $ 20,634.75
Current Invoice: $ 5,224.00
Invoiced to Date ($): $ 25,858.75
Invoiced to Date (%): 58.77%
Remaining Budget ($): $ 18,141.25
Remaining Budget (%): 41.23%
Budget by Phase:
Phase Name: 2025 General Services
Phase Budget: $ 44,000.00
Previously Invoiced: $ 20,634.75
Current Invoice: $ 5,224.00
Invoiced to Date ($): $ 25,858.75
Invoiced to Date (%): 58.77%
Remaining Budget ($): $ 18,141.25
Remaining Budget (%): 41.23%
Comments: Prepared August Engineer's Report. Discussed RCSTP SBR Tank #1 inspection report and repair recommendations with PW Director. Reviewed Morstein Rd property owners' survey responses and created map of responses. Researched RCSTP NPDES Permit renewal timeframe and application deadline. 2026 capital budgeting with Finance Director.
Invoice also includes $3,944 of effort from the RCSTP Arc Flash Study for additional services for investigation and research of circuits and related information that was beyond the original scope of the study.
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1289165
Invoice Date : 08/20/2025
Project : EGMAU25005
Project Name : RCSTP Arc Flash Study
For Services Rendered Through 08/10/2025
Coordinated with Lenni Electric to address comments on draft report. Finalized and submitted report to Township.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| -- RCSTP Arc Flash Study | $13,500.00 | $12,825.00 | 100.00% | $13,500.00 | $675.00 |
| Total : | $13,500.00 | $12,825.00 | $13,500.00 | $675.00 |
Amount Due This Invoice $675.00
APPROVED BY: [Signature: D W 8/22/25]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3180
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25005
Pennoni Job No.: RCSTP Arc Flash Study
Invoice No: 1289165
Invoice Period: 6/16/2025 to 8/10/2025
Initial Authorization: $ 13,500.00 Date: 8/20/2025
Contract Amount: $ 13,500.00
Previously Invoiced: $ 12,825.00
Current Invoice: $ 675.00
Invoiced to Date ($): $ 13,500.00
Invoiced to Date (%): 100%
Remaining Budget ($): $ -
Remaining Budget (%): 0%
Budget by Phase:
Phase Name: RCSTP Arc Flash Study
Phase Budget: $ 13,500.00
Previously Invoiced: $ 12,825.00
Current Invoice: $ 675.00
Invoiced to Date ($): $ 13,500.00
Invoiced to Date (%): 100%
Remaining Budget ($): $ -
Remaining Budget (%): 0%
Comments: Coordinated with Lenni Electric to address comments on draft report. Finalized and submitted report to Township.
[Seal: West Goshen Township 1788]
West Goshen Sewer Authority
INVOICE
Date: August 5, 2025
Invoice #: EG24-T
For: 2024 WG Sewer Authority Tapping Fee Fund Expenses
Bill To: East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360
| DESCRIPTION | AMOUNT |
|---|---|
| Costs (Non-Bond funded) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2024 through December 31, 2024 (details attached). | 264,983.62 |
[Stamp: PAID]
| SUBTOTAL | $264,983.62 |
|---|---|
| Capacity % | 16.67% |
| OTHER | $0.00 |
| TOTAL | $44,172.77 |
APPROVED BY: [Signature: D W 8/5/25]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-6100
Please make check payable to:
WEST GOSHEN SEWER AUTHORITY
THANK YOU!
West Goshen Sewer Authority
TAPPING FEE FUND
Expense Detail - 2024
East Goshen Township
| Project | Vendor | Amount |
|---|---|---|
| LIFT STATION - PUMP IMPELLER | KAPPE ASSOCIATES INC | 22,100.00 |
| LIFT STATION - PUMP SHAFT | KAPPE ASSOCIATES INC | 4,932.00 |
| POLYMER BLENDING SYSTEM | SHERWOOD-LOGAN & ASSOCIATES, INC. | 60,404.00 |
| REPLACEMENT DRIVE FOR CLARIFIE | G.M.H. ASSOCIATES OF AMERICA, INC. | 67,920.00 |
| ROOF REPLACEMENT - HEADWORKS B | WEAVER COMPANIES, INC. | 29,900.00 |
| ROOF REPLACEMENT - SMALL GARAG | WEAVER COMPANIES, INC. | 7,100.00 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 3,610.00 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 12,480.00 |
| SCADA - PROFESSIONAL SERVICES | OPTIMUM CONTROLS CORPORATION | 2,850.00 |
| UV REHAB PARTS | XYLEM WATER SOLUTIONS USA INC. | 32,835.60 |
| UV REHAB PARTS | XYLEM WATER SOLUTIONS USA INC. | 5,472.60 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 1,587.50 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 370.00 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 201.50 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 1,897.42 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 68.00 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 421.00 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 523.00 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 512.00 |
| WWTP TRANSFORMER | HERBERT, ROWLAND & GRUBIC, INC. | 389.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 126.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 42.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 2,031.50 |
| TMDL | UNRUH TURNER BURKE & FREES | 84.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 1,783.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 739.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 1,566.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 84.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 84.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 1,696.50 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 957.00 |
| TMDL | UNRUH TURNER BURKE & FREES | 42.00 |
| TMDL | HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLI | 174.00 |
| Total Allocated | 264,983.62 | |
Page 2 of 2
Dana Gieder
From: David Ware
Sent: Tuesday, August 5, 2025 2:07 PM
To: Dana Gieder
Subject: FW: 2024 Year-End Invoicing (West Goshen Wastewater)
Attachments: O&M, 2024 True-Up, EG.pdf; WGSA, 2024 Capital - EG.pdf
FYI, got the True-ups and we owe another $44K on top of the $236K that was Bond-related to be paid out of Either M/A or Sewer Capital Reserve, whatever we did in the past.
Dave Ware
Director of Finance/Treasurer
East Goshen Township
dware@eastgoshen.org
610-692-7171
610-314-3100 (cell)
From: Mike Moffa <MMoffa@westgoshen.org>
Sent: Tuesday, August 5, 2025 2:04 PM
To: Derek Davis <ddavis@eastgoshen.org>; David Ware <dware@eastgoshen.org>; Mark Miller <mmiller@eastgoshen.org>
Cc: Walt Wills <wwills@wgtsa.org>; Chris Bashore <cbashore@westgoshen.org>; Christine Riffey <criffey@westgoshen.org>; Matthew Froncillo <MFroncillo@westgoshen.org>; Gianna Marino <gmarino@westgoshen.org>
Subject: 2024 Year-End Invoicing (West Goshen Wastewater)
Good afternoon Derek,
Please find attached the 2024 Operation & Maintenance true-up invoice and the 2024 Capital Projects year-end invoice for your township’s share of the 2024 West Goshen Wastewater Treatment System expenses. Please note that the invoices are payable to two different entities. My apologies for sending these so late as we were once again waiting for completion of our annual audit. Details of the attached invoices are as follows:
- 2024 Operation & Maintenance true-up - $626.85 - payable to West Goshen Township
- 2024 Capital Projects - $44,172.77 - payable to West Goshen Sewer Authority
Thank you for your continued support and please let me know if you have any questions.
Michael Moffa
Director of Wastewater Operations
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900
1
Memo
To: Municipal Authority
From: Dana Gieder
Re: MA August 2025 YTD Financial Report
Date: September 2, 2025
YTD August 2025, the Municipal Authority recorded $524,406.63 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $514,590.54 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, Hershey Mill pump station replacement Hydromatic pump, Sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD’s for RCSTP, West Goshen capital sewer tapping fees, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $9,816.09. As of August 31, 2025, the fund balance was $25,541.65.
Attached is a complete list of 2025 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD AUGUST 2025
REVENUE
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 201.09 | 262.26 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 6,557.09 | 0 | 2,084.88 |
| 07-364-1130 | CONNECTION FEES - SEWER | 1,498.43 | 0 | 563.76 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 1,076.32 | 0 | 282.24 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 238,506.00 | 92,064.70 | 99,555.07 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 698,000.00 | 432,140.84 | 449,067.47 |
| Total Revenue | 947,937.84 | 524,406.63 | 551,815.68 | |
EXPENSES
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| 07-424-1400 | ADMINISTRATIVE WAGES | 45,000.00 | 23,935.60 | 22,380.52 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 2,500.00 | 960.00 | 1,056.61 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 15,000.00 | 12,000.00 | 11,250.00 |
| 07-424-3130 | ENGINEERING SERVICES | 52,000.00 | 29,543.25 | 21,929.00 |
| 07-424-3140 | LEGAL SERVICES | 8,000.00 | 3,819.50 | 4,249.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 43,000.00 | 5,777.50 | 10,567.25 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 22,500.00 | 0 | 0 |
| 07-424-7440 | R.C. CAPITAL-STP | 30,500.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 49,500.00 | 6,413.85 | 27,691.19 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 20,850.00 | 0 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 150,000.00 | 0 | 0.00 |
| 07-429-1505 | RCSTP CAPITAL | 87,500.00 | 86,523.04 | 199,467.96 |
| 07-429-1520 | RCSTP - CAUSTIC SODA | 0.00 | 0 | 831.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 430,000.00 | 280,595.03 | 215,560.00 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 20,000.00 | 44,172.77 | 31,488.51 |
| Total Expenses | 955,500.00 | 514,590.54 | 546,471.54 | |
| Net Result From Operations | -7,562.16 | 9,816.09 | 5,344.14 | |
PER DAVE CARRY OVER FROM LAST YEAR
Municipal Authority
YTD Revenues and Expenses thru 8/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/25 | Revenue Journal | INTEREST EARNED JANUARY 2025 | 14.23 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/25 | Revenue Journal | INTEREST EARNED FEBRUARY 2025 | 18.54 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/25 | Revenue Journal | INTEREST EARNED MARCH 2025 | 19.48 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/25 | Revenue Journal | INTEREST EARNED APRIL 2025 | 63.08 |
| 07-341-1000 | INTEREST EARNINGS | 05/31/25 | Revenue Journal | INTEREST EARNED MAY 2025 | 29.32 |
| 07-341-1000 | INTEREST EARNINGS | 06/30/25 | Revenue Journal | INTEREST EARNED JUNE 2025 | 16.46 |
| 07-341-1000 | INTEREST EARNINGS | 07/31/25 | Revenue Journal | INTEREST EARNED JULY 2025 | 19.82 |
| 07-341-1000 | INTEREST EARNINGS | 08/31/25 | Revenue Journal | INTEREST EARNED AUGUST 2025 | 20.16 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 3,387.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/25/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 1,908.25 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 12,944.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,967.80 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 21,807.10 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/15/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 8,392.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 05/21/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 328.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/10/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 574.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/24/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 180.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 06/27/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 11,967.80 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 07/22/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 15,838.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 08/14/25 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 2,769.25 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/10/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,114.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/21/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 7,043.52 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/28/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 14,397.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 02/25/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,346.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/10/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 16,865.02 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/25/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,170.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/31/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,294.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/08/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 25,872.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/21/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,971.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/23/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 244,537.03 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/06/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 6,500.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 05/15/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 32,789.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 06/17/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 10,800.00 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 07/22/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 3,268.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 08/25/25 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 44,172.77 |
| Total Revenue | 524,406.63 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/27/25 | Pay Check: 711 | 25-00691 QTR 1 2025 MA CHARGE BACK | 11,967.80 |
Page 1 of 3
Municipal Authority
YTD Revenues and Expenses thru 8/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-1400 | ADMINISTRATIVE WAGES | 06/27/25 | Pay Check: 712 | 25-01401 QTR 2 2025 MA CHARGE BACK | 11,967.80 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 03/21/25 | Pay Check: 3545 | 25-00599 2025 ANNUAL DAILY DISCHARGE CA | 780.00 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 06/24/25 | Expd | REIMBURSE 01 FOR 07 CC EXPENSE | 180.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/21/25 | Pay Check: 3547 | 25-00624 FINAL BILLING AUDIT EGT MUA | 12,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/21/25 | Pay Check: 3537 | 25-00117 SERV THRU 123124 2024 GEN SERV | 2,459.75 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR0000101 MISC. RECHARGE 07 acct | -3,695.00 |
| 07-424-3130 | ENGINEERING SERVICES | 01/22/25 | Invoice Pay Ck:9190016715 | AR0000101 MISC. RECHARGE 07 acct | -5,920.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/25/25 | Pay Check: 3543 | 25-00415 SERV THRU 011225 2025 GEN SERV | 970.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/25/25 | Pay Check: 3543 | 25-00416 SERV THRU 011225 24 CHAPTER 94 | 343.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00840 SERV THRU 031625 2025 SUPPLEE | 5,777.50 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00841 SERV THRU 031625 2025 GEN SERV | 7,235.00 |
| 07-424-3130 | ENGINEERING SERVICES | 04/21/25 | Pay Check: 3555 | 25-00842 SERV THRU 031625 24 CHAPTER 94 | 2,093.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/28/25 | Expd | RECLASS PENNONI 1267313 PO# 25-00840 | -5,777.50 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01077 SERV THRU 041325 RCSTP ARC FLA | 6,750.00 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01076 SERV THRU 041325 24 CHAPTER 94 | 449.25 |
| 07-424-3130 | ENGINEERING SERVICES | 05/14/25 | Pay Check: 3558 | 25-01075 SERV THRU 041325 2025 GEN SERV | 1,192.75 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01548 SERV THRU 061525 24 CHAPTER 94 | 352.00 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01547 SERV THRU 061525 GEN SERV | 8,652.25 |
| 07-424-3130 | ENGINEERING SERVICES | 07/22/25 | Pay Check: 3564 | 25-01546 SERV THRU 061525 RCSTP ARC FLA | 6,075.00 |
| 07-424-3130 | ENGINEERING SERVICES | 08/14/25 | Pay Check: 3566 | 25-01713 SERV THRU 071325 2025 GEN SERV | 2,584.75 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00116 LEGAL SERV DEC 2024 GEN AUTH | 266.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00115 LEGAL SERV OCT 2024 GEN AUTH | 538.50 |
| 07-424-3140 | LEGAL SERVICES | 01/21/25 | Pay Check: 3536 | 25-00114 LEGAL SERV NOV 2024 GEN AUTH | 123.00 |
| 07-424-3140 | LEGAL SERVICES | 02/25/25 | Pay Check: 3541 | 25-00414 LEGAL SERV DEC 2024 GEN AUTH | 594.50 |
| 07-424-3140 | LEGAL SERVICES | 03/21/25 | Pay Check: 3546 | 25-00589 LEGAL SERV FEB 2025 GEN AUTH | 164.00 |
| 07-424-3140 | LEGAL SERVICES | 04/21/25 | Pay Check: 3554 | 25-00843 LEGAL SERV MARCH 2025 GEN AUTH | 287.00 |
| 07-424-3140 | LEGAL SERVICES | 05/21/25 | Pay Check: 3560 | 25-01097 LEGAL SERV APRIL 2025 GEN AUTH | 328.00 |
| 07-424-3140 | LEGAL SERVICES | 06/10/25 | Pay Check: 3561 | 25-01289 LEGAL SERV MAY 2025 GEN AUTH | 574.00 |
| 07-424-3140 | LEGAL SERVICES | 07/22/25 | Pay Check: 3563 | 25-01545 LEGAL SERV JUNE 2025 GEN AUTH | 759.50 |
| 07-424-3140 | LEGAL SERVICES | 08/14/25 | Pay Check: 3565 | 25-01714 LEGAL SERV JULY 2025 GEN AUTH | 184.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 04/28/25 | Expd | RECLASS PENNONI 1267313 PO# 25-00840 | 5,777.50 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 04/21/25 | Pay Check: 3553 | 25-00894 PORTABLE HOT HIGH PRESS WASHER | 6,413.85 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 02/25/25 | Pay Check: 3542 | 25-00471 ENG # 516230997-S4NX750EC 7HP | 8,346.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 04/08/25 | Pay Check: 3551 | 25-00772 HYDROMATIC PUMP W/2 CONNECTING | 12,504.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/10/25 | Pay Check: 3535 | 25-00016 UV SYS REMOTE ACCESS UPGRADE | 4,114.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/21/25 | Pay Check: 3538 | 25-00118 RCSTP- UV DISINFECTION SYS REP | 7,043.52 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3539 | 25-00178 DECANTER CONTROLS REPAIR | 7,875.00 |
| 07-429-1505 | RCSTP CAPITAL | 01/28/25 | Pay Check: 3540 | 25-00175 INSTALL & WIRE NEW GENERATOR | 6,522.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/10/25 | Pay Check: 3544 | 25-00562 SUBSITE PROTRAK TRACTOR CAMERA | 16,865.02 |
Page 2 of 3
Municipal Authority
YTD Revenues and Expenses thru 8/31/2025
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-429-1505 | RCSTP CAPITAL | 03/25/25 | Pay Check: 3548 | 25-00657 RENTL 600KW PORTABLE GENERATOR | 6,170.00 |
| 07-429-1505 | RCSTP CAPITAL | 03/31/25 | Pay Check: 3549 | 25-00731 RIDLEY PLANT GENERATOR ATS TRA | 3,294.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/08/25 | Pay Check: 3550 | 25-00776 EXPLOSION PROOF HEATERS- RCSTP | 13,368.00 |
| 07-429-1505 | RCSTP CAPITAL | 04/21/25 | Pay Check: 3552 | 25-00853 (8) PARATECH LOCKSTROKE STRUTS | 3,971.00 |
| 07-429-1505 | RCSTP CAPITAL | 05/06/25 | Pay Check: 3557 | 25-01006 TRANSPORT NEW GENERATOR-RCSTP | 6,500.00 |
| 07-429-1505 | RCSTP CAPITAL | 06/17/25 | Pay Check: 3562 | 25-01336 RIDLEY C-EXPLOSION PROOF VFD'S | 10,800.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 04/23/25 | Pay Check: 3556 | 25-00921 SUPPLEE VALLEY SANITARY SEWER | 244,537.03 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 05/14/25 | Pay Check: 3558 | 25-01074 SERV THRU 041325 2025 SUPPLEE | 6,217.50 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 05/14/25 | Pay Check: 3559 | 25-01078 SUPPLEE VALLEY SANITARY SEWER | 26,572.00 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 07/22/25 | Pay Check: 3564 | 25-01549 SERV THRU 061525 2025 SUPPLEE | 3,268.50 |
| 07-429-6100 | WEST GOSHEN CAPITAL | 08/21/25 | Pay Check: 3567 | 25-01781 2024 WG SEWER AUTH TAPPING FEE | 44,172.77 |
| Total Expense | 514,590.54 | ||||
| Net Operating | 9,816.09 | ||||
Page 3 of 3
EAST GOSHEN
WASTEWATER FACILITIES
FIGURE 1
Map of East Goshen wastewater facilities showing sanitary sewer lines, forcemains, pump stations, sewage treatment plants, meters, and service areas across East Goshen Township, highlighting an Area of Interest in the southwest.
Legend
- PUMP STATION
- SEWAGE TREATMENT PLANT
- SANITARY MANHOLES
- PERMANENT METERS
- PORTABLE METERS (2020)
- SANITARY SEWER
- FORCEMAIN
- TOWNSHIP BOUNDARY
- SubAreas
- Parcels
- PONDS & LAKES
- RIVERS
- EAST WHITELAND SERVICE AREA
- HERSHEY'S MILL SERVICE AREA
- RIDLEY CREEK SERVICE AREA
- WEST GOSHEN SERVICE AREA
- WESTTOWN SERVICE AREA
Labels
- MH R-265 PORTABLE METER
- LINE ROAD MH R-23B PORTABLE METER
- MH R-022 PORTABLE METER
- E. BOOT RD MH R-214 PORTABLE METER
- ELDRIDGE DRIVE MH R-56B PORTABLE METER
- ACHCOM MH R-636 PORTABLE METER
- HUNT COUNTRY PUMP STATION
- RIDLEY CREEK SEWAGE TREATMENT PLANT
- RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
- ASHBRIDGE PUMP STATION
- DECOMMISIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT
- HERSHEY'S MILL PUMP STATION
- HERSHEY'S MILL SEWAGE TREATMENT PLANT
- BARKWAY PUMP STATION
- AREA OF INTEREST
- WILSON DRIVE METER
- HICKS METER
- PAOLI PIKE WEST METER
- ELLIS LANE METER
- PROPOSED RESERVOIR ROAD PUMP STATION
- RESERVOIR ROAD METER
- WESTTOWN WAY METER
- Pennoni
Scale: 1 inch = 1,000 feet
MORSTEIN RD - AVAILABLE CONNECTION TYPE EXHIBIT
SEPTEMBER 3, 2025
Legend
- Pressure Only (11)
- Gravity or Pressure (8)
TOTAL PROPERTIES = 19
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
PROPERTIES CONNECTED TO PUBLIC SEWER (ORANGE)
[Map exhibit showing parcel boundaries along Morstein Rd color-coded by available sewer connection type: green for Pressure Only (11), blue for Gravity or Pressure (8), light blue for properties connected to public sewer along the red sewer line, and orange for properties connected to public sewer.]
MORSTEIN RD - SURVEY RESPONSE EXHIBIT
SEPTEMBER 3, 2025
Legend
- Definitely Interested (6)
- Interested Depending on Cost (7)
- Not Interested (3)
- Not Yet Responded (3)
TOTAL PROPERTIES = 19
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
PROPERTIES CONNECTED TO PUBLIC SEWER (ORANGE)
[Map exhibit showing parcel boundaries along Morstein Rd color-coded by survey response: green for Definitely Interested (6), green with red crosshatch for Interested Depending on Cost (7), red for Not Interested (3), gray for Not Yet Responded (3), light blue for properties connected to public sewer, and orange for properties connected to public sewer.]
Pennoni
September 3, 2025
EGMAU25006P
East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380
RE: Proposal for Morstein Road Sewer Extension Design & Permitting Phase Services
Dear Mr. Miller:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for the design and permitting phase services for the Morstein Road Sewer Extension project. A separate proposal will be provided for bid assistance and construction phase services.
Background
Multiple property owners along Morstein Road and Great Oak Circle in East Goshen Township have expressed interest in connecting to the Township's public sanitary sewer system. To provide public sanitary sewer service to these areas, the existing sanitary sewer system along Barkway Lane, in the West Goshen Service Area, could be extended using a combination of gravity sewers and low-pressure force mains along Morstein Road and Great Oak Circle. The flows from the newly connected homes would be conveyed to the Barkway Pump Station and eventually treated at the West Goshen Sewage Treatment Plant. It is assumed that no upgrades to the Barkway Pump Station would be necessary for this sewer extension.
Based on preliminary research and discussions with the Authority, it was determined that a new gravity sewer extension could be constructed beginning at the intersection of Morstein Road and Great Oak Circle, extending east down Morstein Road to the intersection of Barkway Lane, then connecting to the existing gravity sewer within Barkway Lane that flows to the Barkway Pump Station. Due to the topography in the area, a low-pressure force main would need to be constructed along the eastern side of Morstein Road between 1416 Morstein Road and 1406 Morstein Road and then connect to the new gravity sewer extension at the intersection of Barkway Lane and Morstein Road. A low-pressure force main would also need to be constructed along Great Oak Circle and connect to the new gravity sewer extension at the intersection of Great Oak Circle and Morstein Road.
Scope of Services
Our scope of services consists of the following:
- Survey Services Pennoni will perform an existing conditions and topographic survey for the locations of the proposed gravity sewer and low-pressure force main route along Barkway Lane, Morstein Road, and Great Oak Circle. The survey will also include the immediate area around the Barkway Pump Station, the elevations and locations of existing manholes and inlets, and the existing conditions 15 feet on either side of the edge of the roadways. The locations of other existing utilities will also be surveyed.; The Township should budget approximately $10,000 as an allowance for a subcontractor to perform existing utility locating and mark outs along Barkway Lane, Morstein Road, Great Oak Circle, and other site locations as needed, including traffic control during the locating work.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 4
EGMAU25006P
East Goshen Municipal Authority
September 3, 2025
Morstein Road Sewer Extension
Page 2 of 4
- The Township should also budget approximately $10,000 as an allowance for a subcontractor to perform soft dig test pits to determine presence of bedrock, existing road pavement thickness, and if the utility locating in Task 1.B identifies that there will be utility crossings and possible conflicts with proposed sewers. This allowance is expected to provide for approximately 5 test pits with associated traffic control.
- Design Services Design a gravity sewer and low-pressure force main extension to service the aforementioned portions of Morstein Road and Great Oak Circle to connect to the existing gravity sewer along Barkway Lane.; Prepare a plan set consisting of a cover sheet, existing conditions plans, proposed conditions plans and profiles, erosion and sediment (E&S) control plans, E&S notes and details, traffic control plan and details, and construction notes and details.; Prepare a bid document with construction specifications.; Develop an Engineer's Opinion of Probable Construction Costs.; Facilitate four meetings with the Township during the design process to review the deliverables. One meeting is expected to occur after survey services are performed. The remaining three meetings are expected to occur after the 30%, 60%, and 90% submissions.
- PADEP Planning and Permitting Prepare and submit a Sewage Facilities Planning Mailer and subsequent Sewage Facilities Planning Module (SFPM) to PADEP including conducting a Pennsylvania Natural Diversity Inventory (PNDI) search for the project.; Prepare and submit a Water Quality Management (WQM) WQG-02 Permit application for the Barkway Pump Station to PADEP.
Assumptions
- Bid assistance and construction services will be provided under a separate proposal.
- East Goshen Township will pay all permit application fees.
- East Goshen Township does not have an existing WQM permit for the Barkway Pump Station so a full permit application will be required. If the Township does have the WQM permit, only an amendment application to the existing WQM permit will be required.
- No other permitting is required. Should additional permitting become necessary during the course of the project, we will submit a separate proposal for such supplemental work.
- The PNDI search review will not require any wetland delineations, bog turtle habitat or other species investigations, or other follow-ups or submissions to regulatory agencies.
- There are no downstream capacity limitations in the existing sanitary sewer system or at the wastewater treatment plant, so no upgrade or rehabilitation planning or design for the existing sanitary sewer system, including the Barkway Pump Station, is required.
- East Goshen Township and West Goshen Township will provide required sewer system maps, any easement documentation, conveyance system, pump station, and sewer flow info, and sign the applicable Section J capacity confirmation of the SFPM for their respective parts of the downstream sewer system and treatment plant.
EGMAU25006P
East Goshen Municipal Authority
September 3, 2025
Morstein Road Sewer Extension
Page 3 of 4
- East Goshen Township will provide any required plans, specifications, and design information for the Barkway Pump Station WQM Permit application submission.
- No comments will be made on the public notice or SFPM Components 4A, 4B, or 4C that will require SFPM or design revisions or responses.
- No new easements or property boundary research will be required.
- No existing utility relocations will be required.
- Any detour routes that may be needed will not require any PennDOT permitting or approvals.
Deliverables
Pennoni will provide four submissions – a 30% plan submission, 60% plan submission, 90% plan submission, and Final plan submission. The 30% through Final submissions will include the Engineer’s Opinion of Probable Construction Cost and all plan sheets. The 90% and Final submissions will also include bid documents and specifications.
Schedule
Performance of services will commence upon receipt of Notice to Proceed. We anticipate the following tentative schedule with estimated milestone durations and dates.
| MILESTONE | ESTIMATED DATE |
|---|---|
| Notice to Proceed | Day 0 |
| Utility Locating | Day 21 |
| Field Survey | Day 42 |
| 30% Submission | Day 70 |
| 30% Review Meeting | Day 77 |
| Sewage Facilities Planning Mailer Submission to PADEP | Day 84 |
| Soft Dig Test Pits (±4 weeks after 30% meeting, if necessary) | Day 105 |
| PADEP Sewage Facilities Planning Mailer Response (±1 month after submission) | Day 112 |
| 60% Submission (±3 weeks after soft dig test pits) | Day 126 |
| 60% Review Meeting | Day 133 |
| SFPM Components 4A, 4B, and 4C Submissions to Agencies | Day 140 |
| 90% Submission (±3 weeks after 60% meeting) | Day 154 |
| 90% Review Meeting | Day 161 |
| SFPM Components 4A, 4B, and 4C Agency Responses (±45 days after submissions) | Day 185 |
| SFPM Public Notice and BOS Adoption (±45 days after Agency responses) | Day 230 |
| Final Submission and SFPM Submission to PADEP | Day 237 |
| PADEP SFPM Response (±3 months after submission) | Day 327 |
| WQM Permit Application Submission to PADEP | Day 340 |
| PADEP WQM Permit Application Response (±3 months after submission) | Day 430 |
EGMAU25006P
East Goshen Municipal Authority
September 3, 2025
Morstein Road Sewer Extension
Page 4 of 4
Fee
We will perform tasks on a Time and Materials (T&M) basis at our hourly rates approved by the Authority for an estimated fee of One Hundred Seventeen Thousand Nine Hundred Dollars ($117,900.00) as shown below.
| Task | Description | Fee |
|---|---|---|
| 1A | Existing Conditions Survey | $27,100.00 |
| 1B | ALLOWANCE – Utility Locating | $10,000.00 |
| 1C | ALLOWANCE – Soft Dig Test Pits | $10,000.00 |
| 2 | Design Services | $46,500.00 |
| 3A | PADEP SFPM | $12,000.00 |
| 3B | PADEP WQM Permit Application | $12,300.00 |
| TOTAL FEE | $117,900.00 | |
We have proposed a Scope of Services that satisfies our current understanding of the project. Should additional services be requested that are not included or listed in the above Scope of Services, we will provide a supplemental proposal.
Billing and Payment
Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Associate Vice President
ACCEPTED BY:
____________________________________________________
Written Name:
East Goshen Municipal Authority
DATE: ________________________
EAST GOSHEN WASTEWATER FACILITIES
FIGURE 1
Legend
- PUMP STATION
- SEWAGE TREATMENT PLANT
- SANITARY MANHOLES
- PERMANENT METERS
- PORTABLE METERS (2020)
- SANITARY SEWER
- FORCEMAIN
- TOWNSHIP BOUNDARY
- SubAreas
- Parcels
- PONDS & LAKES
- RIVERS
- EAST WHITELAND SERVICE AREA
- HERSHEY'S MILL SERVICE AREA
- RIDLEY CREEK SERVICE AREA
- WEST GOSHEN SERVICE AREA
- WESTTOWN SERVICE AREA
Map Labels
- MH R-265 PORTABLE METER
- LINE ROAD MH R-238 PORTABLE METER
- MH R-022 PORTABLE METER
- E. BOOT RD MH R-214 PORTABLE METER
- ELDRIDGE DRIVE MH R-568 PORTABLE METER
- ACHCOM MH R-636 PORTABLE METER
- HUNT COUNTRY PUMP STATION
- RIDLEY CREEK SEWAGE TREATMENT PLANT
- RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
- ASHBRIDGE PUMP STATION
- RESERVOIR ROAD METER
- WESTTOWN WAY METER
- PROPOSED RESERVOIR ROAD PUMP STATION
- ELLIS LANE METER
- HICKS METER
- PAOLI PIKE WEST METER
- WILSON DRIVE METER
- AREA OF INTEREST
- BARKWAY PUMP STATION
- HERSHEY'S MILL SEWAGE TREATMENT PLANT
- HERSHEY'S MILL PUMP STATION
- DECOMMISIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT
TOWNSHIP OF EAST GOSHEN CHESTER COUNTY PENNSYLVANIA INCORPORATED 1817
Pennoni PENNONI ASSOCIATES INC. CONSULTING ENGINEERS
0 1,000 2,000 4,000 Feet | 1 inch = 1,000 feet
[Color map of East Goshen Township wastewater facilities, service areas, sewer lines, pump stations, treatment plants, and meters.]
CHARTER CHASE/GOSHEN DOWNS - SURVEY RESPONSE EXHIBIT
SEPTEMBER 3, 2025
Legend
- Definitely Interested (34)
- Interested Depending on Cost (11)
- Not Interested (21)
- Not Yet Responded (88)
TOTAL PROPERTIES = 154
PROPERTIES CONNECTED TO PUBLIC SEWER (YELLOW)
PROPERTIES CONNECTED TO PUBLIC SEWER (ORANGE)
PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)
[Map exhibit showing parcels in the Charter Chase/Goshen Downs area color-coded by survey response: green for Definitely Interested (34), green with red crosshatch for Interested Depending on Cost (11), red for Not Interested (21), gray for Not Yet Responded (88), and properties connected to public sewer in yellow, orange, and light blue.]