Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
December 8, 2025
7:00

  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE — Ask if anyone will be taping the meeting.
  • CHAIRMAN'S REPORT/OTHER MEMBERS' REPORTS
  • LIAISON REPORTS
  • SEWER REPORTS — Director of Public Works' Report; West Goshen Report; Pennoni Engineer's Report (Updated Charter Chase/Goshen Downs Interest Exhibits; 2025 Water and Sewer Rates Comparisons); Big Fish Environmental Report
  • APPROVAL OF MINUTES — November 10, 2025
  • APPROVAL OF INVOICES
Company Invoice # Amount Paid?
Pennoni 1302600 $2,721.00
Pennoni 1302601 $2,110.75
Gawthrop Greenwood 222082911 $431.00
Gawthrop Greenwood 222083557 $615.50
  • FINANCIAL REPORTS — November 2025
  • OLD BUSINESS

Page 1 of 2

  • 2025 Goals:
Goal Status
Ridley Creek Plant compliance January through November were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on quarterly basis.
Long-term sustainability Ongoing:
(1) Sewer rate increase implemented July 2024.
(2) Development of 20-year+ Capital Improvement Plan underway.
(3) Continue to study sewer rates.
  • NEW BUSINESS — Memo from Mark Miller: Request for Approval of Camera System Upgrade for RCSTP; Pennoni Fee Schedule for 2026
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

Page 2 of 2

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: December 8, 2025
To: Municipal Authority
From: Mark Miller
Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 535,207 per day.

Monthly Rainfall: 3.44"

Meters: Read on a daily basis.

C.C. Collection:

  • Pump stations were visited on a daily basis and wet wells were washed down with no problems to report.
  • John Laidley and his team are onsite installing the new alarm system.

Morstein Rd Sewer Extension Project

  • East Goshen PW crew spent two days in November using the vac truck to locate and mark all underground utilities in the area of the proposed sewer extension

Ridley Creek Collection:

  • Pump stations were visited on a daily basis and wet wells were washed down with no problems to report.

Ridley Creek Plant:

  • Minor maintenance was performed by PWD.
  • Pumps were pulled from SBR 1. — Matthew will be transferring effluent from SBR 1 to SBR 2.; In the spring, he will do the same with SBR 3 and SBR 4.

Alarms: 5 (all caused by power outages)

PA One Calls: 75

Lateral Repairs/Caps: 0

Page 1 of 1

West Goshen November 2025 Sewer Report

From: Mike Moffa <MMoffa@westgoshen.org>
Sent: Thursday, December 4, 2025 1:15 PM
To: Lynn Werkheiser <lwerkheiser@eastgoshen.org>; Mark Miller <mmiller@eastgoshen.org>
Subject: RE: Monthly Update

Good morning Mark,

General Notes:

  • For the month of November the plant operated in compliance with its NPDES permit.
  • WWTP monthly average daily flow - 3.09 mgd.
  • WWPS monthly average daily flow - 1.065 mgd.
  • Monthly estimated average total phosphorus discharge concentration was <0.04 mg/L.
  • Sludge to landfill – 192 wet tons.
  • The WG Sewer Authority has completed its annual 10-year CIP review. Compared to the September version of the CIP that was provided to EG, the final version reduces EG's expected 2025 contribution (payable in 2026) by $37,000 and increases its 2026 contribution (payable in 2027) by $58,00. There were no other updates affecting EG.

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements. Results of the grant applications are anticipated by December, 2025.

Ongoing Projects:

  • WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 4 th qtr, 2026.
  • Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. Anticipated equipment delivery is 4 th qtr, 2025 with installation during 1 st qtr, 2026.
  • Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 1 st qtr, 2026.

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

[Seal: WEST GOSHEN TOWNSHIP 1817]

Pennoni

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT

December 4, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – Our Electrical Engineer met on-site with Lenni Electric and the RCSTP operator to walkthrough the current electrical systems on September 18. A surge suppression inventory report identifying the protected downstream equipment is being finalized.
  • SBR Tank Inspections – We previously performed a visual structural and condition inspection of SBR Tank #1 on June 26 and submitted a draft inspection report. A visual structural and condition assessment of SBR Tank #2 was conducted on October 24. It is recommended that three spalls and general repairs to areas of coating bubbles or delaminated coating be repaired at the earliest opportunity. A full inspection report for SBR Tank #2 is currently being prepared. J.P. Smith (contractor) performed a site visit on September 10 to assess the proposed repairs of SBR #1. They provided a cost quote for all the repair work. The cost was higher than expected and above the public bid threshold. As such, we reached out to another contractor, Pullman, that can perform the repair work to obtain another opinion on the cost of the repair work to SBR #1 and #2. Pullman performed a site visit on October 24 to assess the proposed repairs of SBR #2 and to estimate potential repairs of the other three SBR tanks. They provided a quote for the initial SBR #2 spall and coating repairs for $11,325. They also provided a separate quote for the estimated full repair scope for all four tanks for a TOTAL of approx $245,000 based on the assumption that all tanks' conditions are similar to SBR #2. J.P. Smith's quote for a comparable scope of work was approx $156,000 PER TANK. Pullman's quotes are attached. Based on the projected costs for the repairs, the work will need to be publicly bid. We expect the most cost-effective approach will be to inspect the other two tanks over the next couple months and then conduct one public bid solicitation for repairs to all four tanks in 2026. That approach will be determined with more certainty after we obtain budgetary pricing from another contractor(s) and inspection of the other tanks.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small "bubbles" throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. In follow-up to the August MA meeting, we notified the contractor to proceed with the evaluation. They responded that they were meeting internally the week of August 26 to review the next steps. We have followed up with them several times since then, most recently on November 3, but have not received a response. Final payment will not be processed until this matter is resolved.
  • Waterview – Waterview is planned for pipe lining in 2026. Pipe Data View finished televising the pipes on November 3. We are currently reviewing the videos, developing a rehabilitation scope of work and cost estimate, prioritizing the pipes for re-lining, and preparing a recommended list of improvements withing the available 2026 budget. We will then prepare a bid package with the intent to bid and award the construction contract in the winter so that construction can occur in spring 2026.

Pump Stations

  • Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. We expect that DCED will make awards in early 2026.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 2

EGMAU25001
East Goshen Municipal Authority

December 4, 2025

Engineer's Report
Page 2 of 2

Sewer Extensions

  • Morstein Road and Great Oak Circle – We performed a site visit with Public Works on October 29 to discuss the proposed sanitary sewer layout, evaluate existing utilities based on PA One Call responses, and determine soft dig test pit locations for potential utility conflicts. Public Works performed the soft dig test pit and provided us the results. Pennoni's survey crew began survey work on November 24 and will continue the week of December 1, including representative data in roads, soft dig test pit locations, and sewer cleanouts/septic tanks on residential properties. Once that initial survey has been completed, we will then analyze the test pit results, prepare a concept design and plan for the sewer extensions, and develop an updated construction cost opinion.
  • Charter Chase and Goshen Downs – One revised response from a property owner about interest in public sewer was received since the last MA meeting. The response was originally a "No", but the property was sold and the new property owner is a "Yes". An updated exhibit depicting the properties definitely interested, interested depending on costs, not interested, and not yet responded is attached. As of the date of this report, there are 58 properties that are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties have not yet responded.

New Connections

  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland.
  • 1344 Morstein Road – We are reviewing a revised plan submission that is under review. One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We previously spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.

END OF REPORT

PULLMAN

National Structural Repair and Building Envelope Preservation
Pullman SST Inc.
2227 High Hill Road
Swedesboro, NJ 08085
Tel: 856.218.7900
Fax: 856.218.8410
www.pullman-services.com

W.I.# Work Items QTY UOM Total Cost
1 General Conditions / Mob / Demob / Equipment / Temporary Protections 1 LS $ 8,200.00
2 CIM localize repair at bubbles unit price (assumed 1 SF EA) 1 EA $ 275.00
3 Spall repair at 3 location assumed 1 SF EA at 3" depth and 5 LF of sealant per loacation 3 EA $ 2,850.00
Total Cost 1 LS $ 11,325.00

Pullman SST Inc. Qualifications Statement

SUPPORT BY OTHERS (at no cost to Pullman SST) SHALL INCLUDE THE FOLLOWING:

  1. All repair layout & verification by others
  2. Excludes all Bonds & Permits
  3. Potable water
  4. Construction permits paid as a pass through.
  5. Unobstructed access to work area
  6. Location for dumpster
  7. Pullman SST not responsible for damage to unknown embedded utilities
  8. Removal of mechanical and electrical appurtenances to provide unobstructed access to work area.
  9. Lead paint abatement and/or asbestos removal, if necessary, Abatement of hazardous material
  10. Signage –removal or placement
  11. Railings –Removal and setting
  12. Premium Time
  13. Pullman SST assumed no Temporary enclosures, Heating, or weather-Related protections.
  14. Pullman has excluded cleaning/replacing rusted fittings/pipes and epoxy coating on decanter

Confidential: Any unauthorized use or distribution is prohibited.

PULLMAN

National Structural Repair and Building Envelope Preservation
Pullman SST Inc.
2227 High Hill Road
Swedesboro, NJ 08085
Tel: 856.218.7900
Fax: 856.218.8410
www.pullman-services.com

East Goshen TWP WWTP Budget Estimate

W.I.# Work Items QTY UOM Total Cost
1 General Conditions / Mob / Demob / Equipment / Temporary Protections/ Access 1 LS $ 32,100.00
2 Tank coating w/ CIM 1000 260' x 10' area 2,600 SF (assumed no removal of existing coating) 4 EA $ 185,000.00
3 Lug lifing patches assume 3" depth 110 EA $ 11,000.00
4 Sealants 1400 LF $ 16,800.00
Total Cost 1 LS $ 244,900.00

**The budget pricing provided herein is based on preliminary and assumed quantities. This figure should be considered a conceptual estimate only and is intended to reflect a ±10% range of potential cost variation. The pricing is subject to change pending additional project information, refined scope definition, and confirmation of actual quantities and site conditions. Pullman shall not be held to this budget number in any contractual capacity and reserves the right to revise pricing upon receipt of further details or design documents.**

Confidential: Any unauthorized use or distribution is prohibited.

Map of East Goshen Wastewater Facilities (Figure 1) showing pump stations, sewage treatment plants, sanitary manholes, meters, sanitary sewers, forcemains, service areas, and an highlighted Area of Interest.

CHARTER CHASE/GOSHEN DOWNS - SURVEY RESPONSE EXHIBIT

NOVEMBER 26, 2025

[Parcel map of Charter Chase/Goshen Downs color-coded by survey response and public sewer connection status]

Map Callouts

  • PROPERTIES CONNECTED TO PUBLIC SEWER (YELLOW)
  • PROPERTIES CONNECTED TO PUBLIC SEWER (ORANGE)
  • PROPERTIES CONNECTED TO PUBLIC SEWER (LIGHT BLUE)

Legend

  • Definitely Interested (58)
  • Interested Depending on Cost (23)
  • Not Interested (42)
  • Not Yet Responded (31)

TOTAL PROPERTIES = 154

Lynn Werkheiser

From: Michael Ellis <MEllis@Pennoni.com>
Sent: Tuesday, November 11, 2025 9:06 AM
To: Mark Miller; Lynn Werkheiser; David Ware; Derek Davis; 'Patrick M. McKenna' (PMcKenna@gawthrop.com)
Cc: Nathan M. Cline; Erika Addison
Subject: 2025 Water and Sewer Rates Comparisons
Attachments: 2025 Water Rate Comparison (KAC).pdf; 2025 Sewer Rate Comparison (KAC).pdf

Hi All,

For your reference, attached are lists of 2025 rates for various Pennsylvania municipalities and private utilities. I mentioned this at recent MA meetings, but I don't think I had forwarded it yet. Please feel free to share with the MA or others.

This was compiled by another consultant and was made available to share. Our understanding is it was compiled from online resources in March 2025. It is not an all-inclusive list of every provider in the state.

East Goshen is not on the Sewer list, but following is a summary as it relates to East Goshen's sewer:

  • The average and median quarterly bills (rounded to the whole dollar) on the list are $162 and $144.
  • The average is pulled UP by the private utilities (PAWC and AQUA). Excluding those systems ranked #2 thru #7 in the list, the average is $151.
  • I believe EGMA's consumption-based rate for 12,000 gallons = $144 (at $12/thousand gallons). This is below the average on this list.

Mike

Michael Ellis, PE
Municipal Division Manager

Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com

What's Possible Podcast Episode 2

1

Page 1 of 4

Comparison of Quarterly Water Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Water System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Water Bill
1Pennsylvania-American Water Company (Rate Zone 1)MF/USC1M$281.66
2Pennsylvania-American Water Company (Rate Zone 3)MF/USC1M$281.66
3AQUA Pennsylvania Water - Rate Zone 1 & 2MF/USCMM$280.07
4AQUA Pennsylvania Water - Rate Zone 3MF/USCMM$278.46
5Pennsylvania-American Water Company (Rate Zone 2)MF/USC1M$251.71
6Pittsburgh Water & Sewer AuthorityMF/UMin1M$242.04
7Schuylkill County Municipal Authority (West Brunswick/Orwigsburg)MF/USC1Q$216.23
8Buckingham Township - District #2MF/UMinMQ$212.46
9Downingtown Municipal Water AuthorityMF/USC1Q$189.00
10Schuylkill County Municipal Authority (Pine Grove Twp)MF/USC1Q$184.36
11York Water Company - RepumpedMF/USC1M$174.27
12Ashland Area Municipal AuthorityMF/USC1Q$171.00
13Quarryville Borough AuthorityMF/UMin1Q$159.00
14Milford Water AuthorityMF/UMinMQ$154.54
15Lehigh County Authority (Allentown Division)MF/USC1Q$151.88
16Manheim Area Water & Sewer AuthorityMF/USC1M$147.04
17Mahanoy Township AuthorityMF/UMinMM$147.00
18Plum Creek Municipal AuthorityMF/UMin1Q$146.00
19Blythe Township Water AuthorityMF/UMin1Q$144.00
20Reading Area Water AuthorityMF/USC1M$138.36
21Municipal Authority of the Borough of MinersvilleMF/UMinMQ$134.85
22Borough of OrwigsburgMF/UMin1Q$132.00
23Morrisville Municipal AuthorityMF/UMin1Q$131.76
24Bucks County Water & Sewer AuthorityMF/USC1M$131.40
25York Water Company - GravityMF/USC1M$131.32

Page 2 of 4

Comparison of Quarterly Water Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Water System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Water Bill
26Gettsburg Municipal Authority (High Pressure Zone)MF/USC1Q$129.76
27East Petersburg BoroughMF/UMin1Q$129.15
28Chester Water Authority - Village Green WestMF/USCMQ$129.04
29Schuylkill County Municipal Authority (Pottsville, Tremont, and PinebMF/UMinMQ$127.86
30Upper Southampton Municipal AuthorityMF/UMin1Q$124.68
31Borough of Kennett SquareMF/UMin1Q$123.77
32Philadelphia Water DepartmentMF/USCMM$123.64
33Schwenksville Borough AuthorityMF/USC1M$122.88
34Perkasie Regional AuthorityMF/USCMQ$122.85
35Strasburg BoroughMF/UMinMQ$122.06
36Borough of SlatingtonMF/UMin1Q$120.52
37Mifflin County Municipal AuthorityMF/USCMQ$120.49
38Erie Water WorksMF/USC1Q$118.85
39Schuylkill Haven BoroughMF/USC1M$118.53
40Mount Joy Borough AuthorityMF/UMinMQ$114.96
41Chester Water Authority - Village Green EastMF/USCMQ$110.06
42City of Lancaster (Inside City)MF/USCMQ$109.38
43Warminster Municipal AuthorityMF/USC1Q$108.32
44Telford Borough AuthorityMF/USC1M$108.24
45Gettsburg Municipal AuthorityMF/USC1Q$108.13
46Northampton Bucks County Municipal AuthorityMF/USC1M$107.70
47Buckingham Township - District #1MF/UMinMQ$107.31
48Weverland Valley AuthorityMF/USC1Q$105.60
49Township of Falls AuthorityMF/USCMQ$105.34
50Newtown Artesian Water CompanyMF/USC1Q$105.30

Page 3 of 4

Comparison of Quarterly Water Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Water System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Water Bill
51Pottstown Borough Authority (Outside Borough)MF/USC1Q$105.14
52Northampton Borough Municipal Authority (High Pump District)MF/USC1Q$104.66
53Easton Suburban Water AuthorityMF/USC1Q$104.40
54Pottstown Borough Authority (Inside Borough)MF/USC1Q$103.14
55Mt. Penn Borough Municipal AuthorityMF/USC1Q$102.12
56Northampton Borough Municipal AuthorityMF/USC1Q$100.65
57Denver BoroughMF/UMin1Q$99.00
58East Cocalico Township AuthorityMUO01Q$96.00
59Hulmeville Municipal AuthorityMF/USC1Q$93.84
60Borough of Oxford (In Town Rates)MF/USCMQ$93.00
61Doylestown Township Municipal AuthorityMF/USC1Q$90.20
62Upper Leacock TownshipMF/UMin1Q$89.51
63Bedminster Municipal AuthorityMF/USC1Q$88.16
64Ephrata BoroughMF/UMin1M$85.19
65North Penn Water Authority (Main and East Rockhill Area)MF/USC1Q$83.99
66Upper Saucon TownshipMF/USC1Q$83.20
67Lehigh County Authority (Suburban Division Common Rates)MF/USCMQ$82.74
68City of BethlehemMF/USC1Q$82.13
69Lehigh County Authority (Welshtown Road)MF/UMin1Q$82.00
70Warwick Township Water & Sewer Authority (Bucks County)MF/USCMQ$81.66
71City of Lancaster (Outside City)MF/USCMQ$81.40
72Upper Hanover AuthorityMF/UMin1Q$77.22
73Horsham Water & Sewer AuthorityMF/USCMQ$73.75
74Adamstown BoroughMF/UMinMQ$73.20
75Wernersville Municipal Authority - District #3MF/UMin1Q$73.13

Page 4 of 4

Comparison of Quarterly Water Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Water System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Water Bill
76Hilltown Township Water & Sewer AuthorityMF/USCMQ$69.64
77Whitehall Township AuthorityMF/UMin1Q$66.00
78Warwick Township Municipal Authority (Lancaster County)MF/USC1Q$63.65
79Wernersville Municipal Authority - District #2MF/UMin1Q$61.99
80Borough of LititzMF/USC1Q$42.39
Average$135.64

Rate Structures

  1. Charging Method - M = Metered, FR = Flat Rate
  2. Metered Billing Type - F/U = Fixed Charge / Usage Charge, UO = Usage Charge Only
  3. Fixed Charge Type - Min = Minimum Charge, SC = Service Charge
  4. Usage Charge Type - M = Multiple Rate Blocks, 1 = Single Rate Block
  5. Billing Frequency - M = Monthly, Q = Quarterly, SA = Annually, A = Annually

Compiled by Keystone Alliance Consulting based on published rates as of March 2025.

6/17/2025

Figure No. 1
Comparison of Quarterly Water Bills of Residential Customers

(Using 12,000 Gallons Per Quarter)

[Bar chart comparing quarterly residential water bills across water systems from $0.00 to $300.00, with callout arrows for YARDLEY, LMT, MEAN AVERAGE, MMA, and TOFA]

Chart Labels

  • Y-Axis Title: Quarterly Water Bill
  • Y-Axis Scale: $300.00, $250.00, $200.00, $150.00, $100.00, $50.00, $0.00
  • X-Axis Title: Water System
  • Highlighted Systems / Callouts: YARDLEY, LMT, MEAN AVERAGE, MMA, TOFA

Page 1 of 6

Comparison of Quarterly Sewer Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill
1Buckingham Township - District #2FRQ$499.15
2Aqua Pennsylvania Wastewater - Zone 5MF/USC1M$455.20
3Aqua Pennsylvania Wastewater - Zone 4MF/USC1M$416.32
4Pennsylvania-American Water Company (Rate Zone 1)MF/USC1M$373.93
5Aqua Pennsylvania Wastewater - Zone 3MF/USC1M$353.93
6Aqua Pennsylvania Wastewater - Zone 2MF/USC1M$325.30
7Aqua Pennsylvania Wastewater - Zones 1 & 1AMF/USC1M$309.26
8Weverland Valley AuthorityMF/USC1Q$278.80
9Manheim Area Water & Sewer AuthorityMF/UMin1M$247.23
10Schuylkill County Municipal Authority (Deer Lake)FRM$246.00
11Schuylkill County Municipal Authority (Orwigsburg Tributary)FRM$246.00
12Schuylkill County Municipal Authority (Branch/Cass)FRM$240.00
13Hilltown Township Water & Sewer Authority (District 5)FRQ$239.56
14Buckingham Township - District #1FRQ$231.55
15Oxford Area Sewer Authority (Zone 2)MF/UMin1Q$226.58
16Aqua Pennsylvania Wastewater - Zone 6MF/USC1M$220.72
17Oxford Area Sewer Authority (Zone 1)MF/UMin1Q$219.14
18Schuylkill County Municipal Authority (Butler Twp)FRM$216.00
19Schuylkill County Municipal Authority (Seiders Hill)FRM$216.00
20Schuylkill County Municipal Authority (Tremont)FRM$216.00
21Upper Montgomery Joint Authority - East GreenvilleMF/USC1Q$211.11
22Upper Montgomery Joint Authority - PennsburgMF/USC1Q$211.11
23Upper Montgomery Joint Authority - Red HillMF/USC1Q$211.11

Page 2 of 6

Comparison of Quarterly Sewer Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill
24Schuylkill County Municipal Authority (Gordon Borough)FRM$210.00
25Schuylkill County Municipal Authority (Highridge Pumped)FRM$210.00
26Reading Area Water AuthorityMF/USC1M$208.47
27Yardley Borough Sewer AuthorityMF/USC1M$195.00
28City of Lancaster (Inside City)MF/USCMQ$188.91
29Antietam Valley Municipal AuthorityMF/USC1Q$188.87
30Bedminster Municipal AuthorityMF/USC1Q$186.04
31Lehigh County Authority (Washington Township)MF/USC1Q$184.00
32Upper Hanover AuthorityFRQ$182.25
33Schuylkill County Municipal Authority (Highridge Gravity)FRM$180.00
34Lancaster Area Sewer Authority (West Earl Twp Sewer District)FRQ$175.50
35Northampton Bucks County Municipal AuthorityMF/UMin1M$171.90
36Schwenksville Borough AuthorityFRM$171.84
37Oxford Area Sewer Authority (Lincoln Village)FRQ$167.40
38East Cocalico Township AuthorityMUO1Q$166.20
39Horsham Water & Sewer AuthorityMF/USC1Q$166.20
40Borough of KenhorstMF/UMin1Q$166.00
41Schuylkill Haven BoroughMUO1M$164.44
42Perkasie Regional AuthorityMF/USCMQ$162.30
43Upper Southampton Municipal AuthorityMF/UMin1Q$160.68
44Lehigh County Authority (Lynn Township)FRQ$158.98
45Gettsburg Municipal Authority (Cumberland & Straban Townships)MF/UMinMQ$157.77
46Township of Falls AuthorityMF/USCMQ$157.04

Page 3 of 6

Comparison of Quarterly Sewer Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill
47Lower Pottsgrove Township AuthorityFRQ$156.00
48Newtown Bucks County Joint Municipal AuthorityMF/UMin1Q$155.82
49Bucks County Water & Sewer AuthorityMF/USC1M$155.79
50Borough of West ChesterMF/UMin1M$155.37
51Municipal Authority of the Borough of MinersvilleMF/UMinMQ$151.82
52Telford Borough AuthorityMF/USC1M$151.68
53Denver BoroughMF/UMin1Q$150.00
54New Hanover Township AuthorityFRQ$150.00
55Adamstown BoroughMF/UMin1Q$145.23
56Lower Salford Township AuthorityFRQ$145.00
57Gettsburg Municipal AuthorityMF/UMinMQ$143.50
58Morrisville Municipal Authority (Falls Sewer District)MF/UMin1Q$140.76
59Hilltown Township Water & Sewer Authority (District 4)FRQ$140.33
60Berks-Montgomery Municipal AuthorityFRQ$140.00
61Borough of OrwigsburgMF/UMin1Q$138.00
62Malvern BoroughMF/UMin1Q$137.60
63Suburban Lancaster Sewer AuthorityFRA$137.50
64Borough of Slatington Sewer AuthorityMF/UMin1Q$137.16
65Strasburg BoroughMF/UMinMQ$136.36
66Lansdale BoroughMF/USC1Q$135.66
67Lehigh County Authority (Heidelberg Heights/Sand Springs/Wynnewood TeMF/USC1Q$135.36
68Wernersville Municipal AuthorityMF/UMinMQ$134.51
69Mount Joy BoroughMF/UMinMQ$132.84

Page 4 of 6

Comparison of Quarterly Sewer Bills
For Residential Customers
12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill
70Borough Of Sinking SpringMF/USC1M$131.64
71Township of AbingtonMF/USC1Q$128.12
72Chalfont-New Britain Township Joint Sewage AuthorityMF/USCMQ$127.59
73St. Lawrence SewerMF/USC1Q$127.50
74Greater Pottsville Area Sewer AuthorityFRQ$127.50
75Ephrata BoroughMF/USCMM$123.87
76Borough of LititzMF/USC1Q$121.72
77Montgomery Township Municipal Sewer AuthorityMF/USC1Q$121.67
78Warminster Municipal AuthorityMF/USC1Q$120.92
79Quarryville Borough AuthorityMF/UMin1Q$120.00
80Upper Leacock TownshipFRQ$120.00
81Whitemarsh Township AuthorityFRSA$119.94
82Pottstown Borough AuthorityMF/USC1Q$118.44
83Borough of Kennett SquareMF/UMin1Q$117.90
84Gettsburg Municipal Authority (Hunterstown)FRQ$117.15
85Warwick Township Municipal Authority (Lancaster County)MF/UMin1Q$116.07
86Lancaster Area Sewer Authority (LASA Sewer District)FRQ$114.00
87Warwick Township Water & Sewer Authority (Bucks County)MF/USCMQ$113.24
88Morrisville Municipal AuthorityMF/UMin1Q$112.56
89Bristol TownshipFR$111.03
90City of EastonMF/UMin1M$110.68
91Upper Saucon TownshipFRQ$110.00
92Whitpain TownshipFRQ$110.00

Page 5 of 6

Comparison of Quarterly Sewer Bills For Residential Customers 12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill
93 West Norriton Township M F/U Min 1 Q $109.59
94 Borough of Conshohocken Authority M F/U SC 1 Q $108.50
95 Hilltown Township Water & Sewer Authority (District 1) FR Q $106.52
96 Hilltown Township Water & Sewer Authority (District 3) FR Q $106.52
97 Hatfield Township Municipal Authority FR Q $106.47
98 Hulmeville Municipal Authority FR Q $104.30
99 Lower Providence Township Sewer Authority FR Q $96.00
100 Philadelphia Water Department M F/U SC 1 M $95.92
101 Upper Moreland-Hatboro Joint Authority M F/U Min 1 Q $91.33
102 West Conshohocken Borough M F/U Min 1 Q $89.07
103 City of Lancaster (Outside City) M F/U SC M Q $88.07
104 Valley Forge Sewer Authority FR Q $85.00
105 Pittsburgh Water & Sewer Authority M F/U Min 1 M $84.87
106 Norristown Municipal Waste Authority M F/U SC M M $84.25
107 Lehigh County Authority (Allentown Division) M F/U SC 1 Q $79.62
108 City of Bethlehem (Outside City) M F/U SC 1 Q $76.84
109 Lehigh County Authority (Upper Milford Twp, Weisenberg Twp, Lowhill T M F/U SC 1 Q $75.36
110 City of Bethlehem (Inside City) M F/U SC 1 Q $73.20
111 Lawrence Park Township M F/U SC M Q $58.34
112 Borough of Jenkintown M F/U Min 1 A $53.02
113 Hilltown Township Water & Sewer Authority (District 2) FR Q $46.35
Average $162.45

Page 6 of 6

Comparison of Quarterly Sewer Bills For Residential Customers 12,000 Gallons Per Quarter

Rank & Color Sewer System Rate Structure 1 Rate Structure 2 Rate Structure 3 Rate Structure 4 Rate Structure 5 Quarterly Sewer Bill

Rate Structures

  1. Charging Method - M = Metered, FR = Flat Rate
  2. Metered Billing Type - F/U = Fixed Charge / Usage Charge, UO = Usage Charge Only
  3. Fixed Charge Type - Min = Minimum Charge, SC = Service Charge
  4. Usage Charge Type - M = Multiple Rate Blocks, 1 = Single Rate Block
  5. Billing Frequency - M = Monthly, Q = Quarterly, SA = Annually, A = Annually

Compiled by Keystone Alliance Consulting based on published rates as of March 2025.

6/12/2025

Comparison of Quarterly Sewer Bills of Residential Customers

(Using 12,000 Gallons Per Quarter)

[Bar chart comparing quarterly residential sewer bills across sewer systems from $0.00 to $600.00, with callout arrows for LMT, MEAN AVERAGE, YARDLEY, TOFA, and MMA]

Chart Labels

  • Y-Axis Title: Quarterly Sewer Bill
  • Y-Axis Scale: $600.00, $500.00, $400.00, $300.00, $200.00, $100.00, $0.00
  • X-Axis Title: Sewer System
  • Highlighted Systems / Callouts: LMT, MEAN AVERAGE, YARDLEY, TOFA, MMA

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report
December 2025

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for November 2025. All supplemental reports were submitted for October 2025. Caustic usage increased to 59.09 gallons per day from 55.52 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 70.40 gallons per day from 69.10 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Tables

CERTIFIED LAB RESULTS- FINAL EFFLUENT November 2025

FLOW Ammonia as N CBOD Total Phosphorus Total Suspended Solids Fecal Coliform
Permit Limit (Weekly Average) Gallons 2.5mg/L 15mg/L 0.5mg/L 15mg/L 200 coliforms/100mL
DATE Final EFF/Applebrook
11/4/2025 247,000/33,789 <0.10 <2.0 0.14 5.2 2
11/11/2025 265,000/38,946 0.34 <2.0 0.17 6.2 <1

CERTIFIED LAB RESULTS- FINAL EFFLUENT November 2025 Non-Report tests

DATE FLOW Final EFF/Applebrook NO2-NO3 (mg/L) TKN (mg/L) TN (mg/L)
11/4/2025 247,000/33,789 4.34 0.96 5.3
11/11/2025 265,000/38,946 3.8 1.41 5.22

CERTIFIED LAB RESULTS- INFLUENT November 2025

DATE FLOW Ammonia as N BOD CBOD TKN Total Phosphorus Total Suspended Solids
11/4/2025 266,100 38.2 234 168 47.6 5.3 110
11/11/0254 313,340 37.9 204 199 49.6 2.26 188

TKN = Total Kleidahl Nitrogen

TN= Total Nitrogen

NO2-NO3= Nitrogen, Nitrate-Nitrite

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained well below all of the weekly average discharge limits for the month of November.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During November, there were nine (8) days where precipitation occured. There was 1 day where rain accumulation was greater than 0.50".

11/26 0.62"

Total rainfall for November was 2.26 inches

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Page 2 of 4

Chemical Data

November 2025
Chemical Daily Average Total Monthly
Caustic Soda, gal 59.09 1772.55
Aluminum Sulfate solution, gal 70.40 2111.91
Sludge Dewatering, gal* 14,499 347,987

*24 days of sludge dewatering

There was a decrease of 119,344 gallons of sludge dewatering during the month of November compared to October.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily.

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly.

Cleaned buildings and laboratory.

Major Repairs or Upgrades

Nothing to report

Upcoming Repairs or Upgrades

Nothing to report

Page 3 of 4

Flow Data

November 2025
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 9.279 309,290 437,400
Influent Wastewater to SBRs 11.432 381,078 530,336
Internal Recycle 2.154 71,788 166,352
Treated Effluent to Disc Filters 11.031 367,693 488,704
Final Effluent Discharge 7.921 264,000 360,000
Applebrook Golf Course 1.099 36,644 50,500

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of November 2025

Page 4 of 4

Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
November 10, 2025

The East Goshen Township Municipal Authority held their regular meeting on Monday, November 10, 2025 at 7:00 pm. at the Township Building.

Members in attendance are indicated in BOLD:

  • Walter Wujcik, Chairman
  • Kevin Cummings – Vice Chairman
  • Sean Ellsworth
  • John Stipe
  • Dana Pizarro

Also in attendance were:

  • Mark Miller (Director of Public Works),
  • Mike Ellis (Pennoni).
  • Cody Bright (Supervisor)
  • Dave Ware (Finance Director),
  • Patrick McKenna (Attorney)
  • Theodore Speedy (Attorney)
  • Stacey Fuller (Attorney)

COMMON ACRONYMS:

ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
PWD – Public Works Department WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Walter called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.

Walter asked for a moment of silence for our troops and for Veterans Day.

Walter asked if anyone would be recording the meeting. There was no response.

Chairman's Report/Other Members Report

  1. A monthly update was received from Mike Moffa, Director of Wastewater for West Goshen Township.
  2. The Meeting Schedule for 2026 was provided by Mark and discussed.

MA 11-10-25 draft | 1

Liaison Reports

  1. Board of Supervisors – Cody reported that their next meeting is Nov. 18th and they are going to interview for the Police Chief..
  2. Conservancy Board – Walter mentioned that their meeting is this week and they will be discussing possible tree plantings..

SEWER REPORTS

1. Director of Public Works, Mark Miller's report for November 10, 2025.

Monthly Flows – The average daily flow to West Goshen was 521,055 gallons per day.

Monthly Rainfall - 3.85"

Meters: Read on a daily basis.

C.C.Collection

  • Pump stations were visited on a daily basis with no problems to report.

Ridley Creek Collection:

  • Pump stations were visited on a daily basis with no problems to report.
  • 540 Beaumont Circle: On Wednesday night, 11/5/25, we were notified of a sewer problem at 540 Beaumont Cir. I stopped out Thursday morning, 11/6/25, to meet the property owner and explained that he was responsible if the problem was outside of the township right-of-way. The plumber was onsite and televised the lateral to locate the problem, which ended up being in the middle of the yard.

Ridley Creek Plant:

  • No problems to report.

Alarms: 4

PA One Calls: 160

Lateral Repairs/Caps: 0

2. Pennoni Engineer's Report dated October 16, 2025

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – Our Electrical Engineer met on-site with Lenni Electric and the RCSTP operator to walkthrough the current electrical systems on September 18. A surge suppression inventory report identifying the protected downstream equipment is currently being prepared.
  • SBR Tank Inspections – We previously performed a visual structural and condition inspection of SBR Tank #1 on June 26 and submitted a draft inspection report. A visual structural and condition assessment of SBR Tank #2 was conducted on October 24. An inspection report for SBR Tank #2 is currently being prepared.

MA 11-10-25 draft | 2

J.P. Smith (contractor) performed a site visit on September 10 to assess the proposed repairs of SBR #1. They provided a cost quote for all the repair work. The cost was higher than expected and above the public bid threshold. As such, we are currently reaching out to potential other contractors that can perform the repair work to obtain other opinions on the cost of the repair work to SBR #1. Pullman (contractor) performed a site visit on October 24 to assess the proposed repairs of SBR #1 and to estimate potential repairs of the other three SBR tanks. They are currently preparing a cost quote. We will also follow-up with J.P. Smith to discuss the basis for their costs.

Based on the anticipated costs for the repairs, the work will need to be publicly bid. We expect the most cost-effective approach will be to inspect the other two tanks over the next couple months and then conduct one public bid solicitation for repairs to all four tanks in 2026. That approach will be determined with more certainty after we obtain budgetary pricing from another contractor(s) and inspection of the other tanks.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small "bubbles" throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. In follow-up to the August MA meeting, we notified the contractor to proceed with the evaluation. They responded that they were meeting internally the week of August 26 to review the next steps. We have followed up with them several times since then, most recently on November 3, but have not received a response. Final payment will not be processed until this matter is resolved.
  • Waterview – Waterview is planned for pipe lining in 2026. Pipe Data View finished televising the pipes on November 3. Upon receipt of the videos, we will review them and prepare a bid package with the intent to bid and award the construction contract in the winter so that construction can occur in spring 2026.

Pump Stations

  • Hunt Country Pump Station – We submitted the PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application on April 30 for the pump station upgrade. We expect that DCED will make awards in early 2026.

Sewer Extensions

  • Morstein Road and Great Oak Circle – We performed a site visit with Public Works on October 29 to discuss the proposed sanitary sewer layout, evaluate existing utilities based on PA One Call responses, and determine soft dig test pit locations for potential utility conflicts. We provided Public Works with an exhibit for the proposed soft dig test pit locations thereafter for their use in performing the test pits.

We prepared a letter to notify 30 residents that our survey crew will need to perform survey on their property of topography and their existing septic system cleanout(s). Public Works

MA 11-10-25 draft | 3

expects to send the letters by November 7, and we will conduct the surveys the week of November 17.
Once that initial survey and the test pits are completed, we will then prepare a concept design and plan for the sewer extensions and develop an updated construction cost opinion.

  • Charter Chase and Goshen Downs – Additional responses from property owners in the two neighborhoods about their interest in public sewer have been received. An updated exhibit depicting the properties definitely interested, interested depending on costs, not interested, and not yet responded is attached. As of the date of this report, there are 57 properties that are definitely interested, 23 properties are interested depending on costs, 43 properties are not interested, and 31 properties have not yet responded.

New Connections

  • Millstone Meadows (1010 Hershey Mill Road) – Site construction is ongoing, and we performed periodic inspections.
  • Timbermill (301 Reservoir Road) – Site construction is ongoing, and we performed periodic inspections.
  • 14 Reservoir Road – No activity by Pennoni since our last report. We are awaiting a plan resubmission to address comments from our last review letter dated July 12, 2024, two of which are related to sanitary sewer.
  • 1338 Morstein Road (WCU Foundation) – No activity by Pennoni since our last report. Three new homes are proposed in East Goshen with additional homes in West Whiteland.
  • 1344 Morstein Road – We received a revised plan submission that is under review. One new home is proposed with a grinder pump. As previously reported, after exploring various alternatives, we notified the Design Engineer that the only viable option to connect to public sewer is through an easement across an existing residential property to the existing sewer in Eastwick Circle. The Design Engineer provided the existing easement for review by the Township to evaluate if it can be used to install the new pipe. However, the easement is a private property matter, so we deferred to the property owners to confirm the easement can be used in writing. We previously spoke with the property owner/applicant and advised her of the need to have the adjacent property owners confirm the use of the existing easement for new piping in writing.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for October 2025. All supplemental reports were submitted for September 2025. Caustic usage increased to 55.52 gallons per day from 53.23 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 69.10 gallons per day from 70.09 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Comment: Walter mentioned that the month for rainfall should be September.

MA 11-10-25 draft | 4

Approval of Minutes

The minutes of the October 20, 2025 meeting were approved.

Approval of Invoices

1. Dana moved to approve payment of the following Pennoni invoices:

  • Invoice #1298459 in the amount of $4,862.00
  • Invoice #1298460 in the amount of $68.50

John seconded the motion. The motion passed unanimously.

Financial Reports

Dave provided the following report: YTD October 2025, the Municipal Authority recorded $621,862.44 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $609,250.50 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, installation of new generator, Hershey Mill pump station replacement Hydromatic pump, sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD's for RCSTP, West Goshen capital sewer tapping fees, RCSTP arc flash study, Ridley Creek submersible grinder pump replacement, (2) Replacement Flygt Submersible sludge pumps, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 engineering expenses in 2025. The net result of operations is $12,611.94. As of October 31, 2025, the fund balance was $28,337.50.

Old Business -

1. Morestein Rd - Mike reported that he walked the area. They sent out 40 letters to the home owners about the possible sewer extension. About 2/3 responded yes. Mark reported that a man who is moving here in December asked him about public sewer.

Goals

1. Walter mentioned that instead of someone attending the West Goshen meetings, we are receiving and reviewing a written monthly report from Mike Moffa.

New Business – None

Any Other Matter - None

Correspondence- None

Public Comment - None

Adjournment

There being no further business Dana moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:19 pm.

The next regular meeting will be held on Monday, December 8, 2025 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 11-10-25 draft | 5

Pennoni - INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1302600
Invoice Date : 11/21/2025
Project : EGMAU25001
Project Name : 2025 General Services

APPROVED BY: [Signature] 11/24/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

For Professional Services Rendered Through 11/09/2025

Attended October MA meeting. Reviewed October and November RCSTP Operator's reports. Finalized and issued October Engineer's Report. Prepared and submitted November Engineer's Report.

RCSTP SBR Tanks - Performed inspection of Tank #2 including meeting with a construction contractor on-site for rehab pricing.

Sewer Extensions - Reviewed new property owner survey responses from Charter Chase and Goshen Downs regarding in public sewer in preparation for October and November MA meetings. Updated and submitted exhibits summarizing responses for October and November MA meetings.

Phase Code Phase Name Fee Type Contract Amount Previously Billed Current Billing Total Billing Remaining % Cmpl
01 General Engineering Services NTE $ 39,357.50 $ 31,795.00 $ 2,721.00 $ 34,516.00 $ 4,841.50 87.70%
02 Grants NTE $ 4,642.50 $ 4,642.50 $ 0.00 $ 4,642.50 $ 0.00 100.00%
Subtotal: 44,000.00 $ 36,437.50 $ 2,721.00 $ 39,158.50 4,841.50 89.00%
Total: 44,000.00 $ 36,437.50 $ 2,721.00 $ 39,158.50
Total Amount Due $ 2,721.00

Phase 01 General Engineering Services

Rate Schedule Labor

Class Hours Rate Amount
Authority Engineer 5.75 158.00 908.50
Staff Professional 14.50 125.00 1,812.50
Rate Schedule Labor 2,721.00
Total this Phase $2,721.00

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 2,721.00 36,437.50 39,158.50
Limit 44,000.00
Remaining 4,841.50

Total this Project: $2,721.00

Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25001 | 2025 General Services | Invoice: 1302600

Outstanding Invoices

Number Date Balance
1298459 10/24/2025 4,862.00
Total 4,862.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Page 2

Project: EGMAU25001
Pennoni Job No.: 2025 General Services
Invoice No: 1302600
Invoice Period: 10/13/2025 to 11/9/2025
Initial Authorization: $ 44,000.00 Date: 11/21/2025
Contract Amount: $ 44,000.00
Previously Invoiced: $ 36,437.50
Current Invoice: $ 2,721.00
Invoiced to Date ($): $ 39,158.50
Invoiced to Date (%): 89.00%
Remaining Budget ($): $ 4,841.50
Remaining Budget (%): 11.00%

Budget by Phase:

Phase Name: 2025 General Services
Phase Budget: $ 44,000.00
Previously Invoiced: $ 36,437.50
Current Invoice: $ 2,721.00
Invoiced to Date ($): $ 39,158.50
Invoiced to Date (%): 89.00%
Remaining Budget ($): $ 4,841.50
Remaining Budget (%): 11.00%

Comments:

Attended October MA meeting. Reviewed October and November RCSTP Operator's reports. Finalized and issued October Engineer's Report. Prepared and submitted November Engineer's Report.

RCSTP SBR Tanks - Performed inspection of Tank #2 including meeting with a construction contractor on-site for rehab pricing.

Sewer Extensions - Reviewed new property owner survey responses from Charter Chase and Goshen Downs regarding in public sewer in preparation for October and November MA meetings. Updated and submitted exhibits summarizing responses for October and November MA meetings.

Pennoni - INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1302601
Invoice Date : 11/21/2025
Project : EGMAU25006
Project Name : Morstein Rd Sewer Design and Permitting

For Services Rendered Through 11/09/2025

Submitted PA One Call design ticket. Performed site visit with PW Department to evaluate site constraints and potential pipe alignment and to determine locations of needed test pits for existing utility identification. Prepared follow-up exhibit of recommended test pit locations for use by PW Department. Prepared notices to property owners about upcoming field survey work.

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 2,110.75 0.00 2,110.75
Limit 25,000.00
Remaining 22,889.25

Labor

Labor Hours Rate Amount
Authority Engineer 5.25 158.00 829.50
Staff Professional 10.25 125.00 1,281.25
Totals 15.50 2,110.75
Total Labor 2,110.75
Total this Invoice $2,110.75

APPROVED BY: [Signature] 11/24/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25006
Pennoni Job No.: Morstein Rd Sewer Design and Permitting
Invoice No: 1302601
Invoice Period: 10/13/2025 to 11/9/2025
Date: 11/21/2025

ItemAmount / Percentage
Initial Authorization:$ 25,000.00
Contract Amount:$ 25,000.00
Previously Invoiced:$ -
Current Invoice:$ 2,110.75
Invoiced to Date ($):$ 2,110.75
Invoiced to Date (%):8%
Remaining Budget ($):$ 22,889.25
Remaining Budget (%):92%

Budget by Phase:

ItemValue
Phase Name:Morstein Rd Sewer Design and Permitting
Phase Budget:$ 25,000.00
Previously Invoiced:$ -
Current Invoice:$ 2,110.75
Invoiced to Date ($):$ 2,110.75
Invoiced to Date (%):8%
Remaining Budget ($):$ 22,889.25
Remaining Budget (%):92%

Comments: Submitted PA One Call design ticket. Performed site visit with PW Department to evaluate site constraints and potential pipe alignment and to determine locations of needed test pits for existing utility identification. Prepared follow-up exhibit of recommended test pit locations for use by PW Department. Prepared notices to property owners about upcoming field survey work.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/06/2025
Client No: 6604-001M
Invoice No. 222082911

General Authority Services

Fees

DateTimekeeperDescriptionHoursAmount
10/17/2025PMMReceipt and review Board meeting agenda and materials.0.2041.00
10/20/2025TTSReceipt and Review Board meeting agenda and materials in preparation of meeting; Travel to and Attend Meeting.1.80351.00
10/21/2025TTSDraft summary of meeting.0.2039.00
For Current Services Rendered2.20431.00

Recapitulation

TimekeeperHoursHourly RateTotal
Theodore Speedy2.00$195.00$390.00
Patrick M. McKenna, Esquire0.20205.0041.00
DateDescriptionAmount
Previous Balance$717.50
Total Current Charges431.00
11/04/2025Payment-717.50
Balance Due$431.00

APPROVED BY: [Signature] 11/7/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
11/06/2025
Client No: 6604M

AccountPrevious BalanceFeesExpensesPaymentsBalance
6604-001 General Authority Services717.50431.000.00-717.50$431.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
12/03/2025
Client No: 6604-001M
Invoice No. 222083557

General Authority Services

Fees

DateTimekeeperDescriptionHoursAmount
11/07/2025PMMEmail from L. Werkheiser regarding Board meeting packet and agenda.0.2041.00
11/10/2025PMMAttend Authority Board meeting.0.50102.50
11/11/2025PMMEmail from M. Ellis regarding water and sewer rate comparisons.0.2041.00
For Current Services Rendered0.90184.50

Recapitulation

TimekeeperHoursHourly RateTotal
Patrick M. McKenna, Esquire0.90$205.00$184.50
DescriptionAmount
Previous Balance$431.00
Total Current Charges184.50
Balance Due$615.50

APPROVED BY: [Signature] 12/4/25
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA November 2025 YTD Financial Report
Date: December 2, 2025

YTD November 2025, the Municipal Authority recorded $626,995.94 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $614,365.00 in expenses (RCSTP UV replacement capital costs, Decanter controls repair, Installation of new generator, Hershey Mill pump station replacement Hydromatic pump, Sewer pipe camera, explosion proof heaters for RCSTP, Supplee Valley sanitary sewer pipe lining work, VFD's for RCSTP, West Goshen capital sewer tapping fees, RCSTP arc flash study, Ridley Creek submersible grinder pump replacement, (2) Replacement Flygt Submersible sludge pumps, and engineering expenses). We also received 2024 revenue for recharges to Aqua to offset 07-424-3130 Engineering expenses in 2025. The net result of operations is $12,630.94. As of November 30, 2025, the fund balance was $28,356.50.

Attached is a complete list of 2025 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD NOVEMBER 2025

Account IdAccount DescriptionAnnual BudgetCurrent YTDPrior YTD
REVENUE
07-341-1000INTEREST EARNINGS0.00265.94317.95
07-364-1100C.C. TAPPING FEES2,300.0000
07-364-1110R.C.TAPPING FEES6,557.092,750.004,834.88
07-364-1130CONNECTION FEES - SEWER1,498.430563.76
07-380-1000MISCELLANEOUS REVENUE1,076.320282.24
07-392-0500TRANSFER FROM SEWER OPERATING238,506.00124,486.75160,813.74
07-392-0900TRANSFER FROM SEWER CAP RESERVE698,000.00499,493.25558,134.09
Total Revenue947,937.84626,995.94724,946.66
EXPENSES
07-424-1400ADMINISTRATIVE WAGES45,000.0035,903.4033,570.78
07-424-3000MISCELLANEOUS EXPENSE2,500.001,144.001,604.74
07-424-3110MUNIC.AUTH.-AUDITING15,000.0012,000.0011,250.00
07-424-3130ENGINEERING SERVICES52,000.0046,021.0052,588.50
07-424-3140LEGAL SERVICES8,000.004,537.005,338.00
07-424-3700CHESTER CREEK ENGINEERING43,000.005,777.5010,567.25
07-424-3705HUNT COUNTY ENGINEERING22,500.0000
07-424-7440R.C. CAPITAL-STP30,500.0000
07-424-7490CAP.REPLACEMENT R.C.49,500.009,488.8545,463.47
07-429-1501BARKWAY PUMP STATION CAPITAL0.00065,891.85
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL0.0020,850.000
07-429-1504HUNT CO PUMP STATION CAPITAL150,000.00011,331.86
07-429-1505RCSTP CAPITAL87,500.00153,806.95216,849.89
07-429-1520RCSTP - CAUSTIC SODA0.0001,109.25
07-429-3000MISC. CAPITAL0.00014,182.73
07-429-3700CHESTER CREEK CAPITAL430,000.00280,663.53215,560.00
07-429-6100WEST GOSHEN CAPITAL20,000.0044,172.7731,488.51
Total Expenses955,500.00614,365.00716,796.83
Net Result From Operations-7,562.1612,630.948,149.83

PER DAVE CARRY OVER FROM LAST YEAR

Municipal Authority

YTD Revenues and Expenses thru 11/30/2025

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/25 Revenue Journal INTEREST EARNED JANUARY 2025 14.23
07-341-1000 INTEREST EARNINGS 02/28/25 Revenue Journal INTEREST EARNED FEBRUARY 2025 18.54
07-341-1000 INTEREST EARNINGS 03/31/25 Revenue Journal INTEREST EARNED MARCH 2025 19.48
07-341-1000 INTEREST EARNINGS 04/30/25 Revenue Journal INTEREST EARNED APRIL 2025 63.08
07-341-1000 INTEREST EARNINGS 05/31/25 Revenue Journal INTEREST EARNED MAY 2025 29.32
07-341-1000 INTEREST EARNINGS 06/30/25 Revenue Journal INTEREST EARNED JUNE 2025 16.46
07-341-1000 INTEREST EARNINGS 07/31/25 Revenue Journal INTEREST EARNED JULY 2025 19.82
07-341-1000 INTEREST EARNINGS 08/31/25 Revenue Journal INTEREST EARNED AUGUST 2025 20.16
07-341-1000 INTEREST EARNINGS 09/30/25 Revenue Journal INTEREST EARNED SEPTEMBER 2025 28.67
07-341-1000 INTEREST EARNINGS 10/31/25 Revenue Journal INTEREST EARNED OCTOBER 2025 17.18
07-341-1000 INTEREST EARNINGS 11/30/25 Revenue Journal INTEREST EARNED NOVEMBER 2025 19.00
07-364-1110 R.C.TAPPING FEES 09/12/25 Revenue Journal INSPECTION FEE C.C 724 N CHESTER RD 2,000.00
07-364-1110 R.C.TAPPING FEES 09/12/25 Revenue Journal SEWER INSPECTION FEE C.C 724 N CHESTER R 750.00
07-392-0500 TRANSFER FROM SEWER OPERATING 01/21/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 3,387.75
07-392-0500 TRANSFER FROM SEWER OPERATING 02/25/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 1,908.25
07-392-0500 TRANSFER FROM SEWER OPERATING 03/21/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 12,944.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/27/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 11,967.80
07-392-0500 TRANSFER FROM SEWER OPERATING 04/21/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 21,807.10
07-392-0500 TRANSFER FROM SEWER OPERATING 05/15/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 8,392.00
07-392-0500 TRANSFER FROM SEWER OPERATING 05/21/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 328.00
07-392-0500 TRANSFER FROM SEWER OPERATING 06/10/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 574.00
07-392-0500 TRANSFER FROM SEWER OPERATING 06/24/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 180.00
07-392-0500 TRANSFER FROM SEWER OPERATING 06/27/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 11,967.80
07-392-0500 TRANSFER FROM SEWER OPERATING 07/22/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 15,838.75
07-392-0500 TRANSFER FROM SEWER OPERATING 08/14/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 2,769.25
07-392-0500 TRANSFER FROM SEWER OPERATING 09/12/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 5,899.00
07-392-0500 TRANSFER FROM SEWER OPERATING 09/30/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 11,967.80
07-392-0500 TRANSFER FROM SEWER OPERATING 10/07/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 3,075.00
07-392-0500 TRANSFER FROM SEWER OPERATING 10/31/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 6,434.25
07-392-0500 TRANSFER FROM SEWER OPERATING 11/18/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 4,862.00
07-392-0500 TRANSFER FROM SEWER OPERATING 11/25/25 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 184.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/10/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 4,114.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/21/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 7,043.52
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/28/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 14,397.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 02/25/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 8,346.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/10/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 16,865.02
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/25/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 6,170.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/31/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 3,294.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/08/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 25,872.00

Page 1 of 4

Municipal Authority

YTD Revenues and Expenses thru 11/30/2025

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/21/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 3,971.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/23/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 244,537.03
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/06/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 6,500.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/15/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 32,789.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/17/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 10,800.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 07/22/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 3,268.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 08/25/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 44,172.77
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/07/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 18,999.60
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 10/31/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 48,284.31
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 11/18/25 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 68.50
Total Revenue 626,995.94
07-424-1400 ADMINISTRATIVE WAGES 03/27/25 Pay Check: 711 25-00691 QTR 1 2025 MA CHARGE BACK 11,967.80
07-424-1400 ADMINISTRATIVE WAGES 06/27/25 Pay Check: 712 25-01401 QTR 2 2025 MA CHARGE BACK 11,967.80
07-424-1400 ADMINISTRATIVE WAGES 09/30/25 Pay Check: 713 25-02017 QTR 3 2025 MA CHARGE BACK 11,967.80
07-424-3000 MISCELLANEOUS EXPENSE 03/21/25 Pay Check: 3545 25-00599 2025 ANNUAL DAILY DISCHARGE CA 780.00
07-424-3000 MISCELLANEOUS EXPENSE 06/24/25 Expd REIMBURSE 01 FOR 07 CC EXPENSE 180.00
07-424-3000 MISCELLANEOUS EXPENSE 11/25/25 Pay Check: 3576 25-02475 GEN, SEWER, CAP RESERVE CHECKS 184.00
07-424-3110 MUNIC.AUTH.-AUDITING 03/21/25 Pay Check: 3547 25-00624 FINAL BILLING AUDIT EGT MUA 12,000.00
07-424-3130 ENGINEERING SERVICES 01/21/25 Pay Check: 3537 25-00117 SERV THRU 123124 2024 GEN SERV 2,459.75
07-424-3130 ENGINEERING SERVICES 01/22/25 Invoice Pay Ck:9190016715 AR000101 MISC. RECHARGE 07 acct -3,695.00
07-424-3130 ENGINEERING SERVICES 01/22/25 Invoice Pay Ck:9190016715 AR000101 MISC. RECHARGE 07 acct -5,920.00
07-424-3130 ENGINEERING SERVICES 02/25/25 Pay Check: 3543 25-00415 SERV THRU 011225 2025 GEN SERV 970.00
07-424-3130 ENGINEERING SERVICES 02/25/25 Pay Check: 3543 25-00416 SERV THRU 011225 24 CHAPTER 94 343.75
07-424-3130 ENGINEERING SERVICES 04/21/25 Pay Check: 3555 25-00840 SERV THRU 031625 SUPPLEE 5,777.50
07-424-3130 ENGINEERING SERVICES 04/21/25 Pay Check: 3555 25-00841 SERV THRU 031625 2025 GEN SERV 7,235.00
07-424-3130 ENGINEERING SERVICES 04/21/25 Pay Check: 3555 25-00842 SERV THRU 031625 24 CHAPTER 94 2,093.75
07-424-3130 ENGINEERING SERVICES 04/28/25 Expd RECLASS PENNONI 1267313 PO# 25-00840 -5,777.50
07-424-3130 ENGINEERING SERVICES 05/14/25 Pay Check: 3558 25-01077 SERV THRU 041325 RCSTP ARC FLA 6,750.00
07-424-3130 ENGINEERING SERVICES 05/14/25 Pay Check: 3558 25-01076 SERV THRU 041325 24 CHAPTER 94 449.25
07-424-3130 ENGINEERING SERVICES 05/14/25 Pay Check: 3558 25-01075 SERV THRU 041325 2025 GEN SERV 1,192.75
07-424-3130 ENGINEERING SERVICES 07/22/25 Pay Check: 3564 25-01548 SERV THRU 061525 24 CHAPTER 94 352.00
07-424-3130 ENGINEERING SERVICES 07/22/25 Pay Check: 3564 25-01547 SERV THRU 061525 GEN SERV 8,652.25
07-424-3130 ENGINEERING SERVICES 07/22/25 Pay Check: 3564 25-01546 SERV THRU 061525 RCSTP ARC FLA 6,075.00
07-424-3130 ENGINEERING SERVICES 08/14/25 Pay Check: 3566 25-01713 SERV THRU 071325 2025 GEN SERV 2,584.75
07-424-3130 ENGINEERING SERVICES 09/12/25 Pay Check: 3568 25-01930 SERV THRU 081025 2025 GEN SERV 5,224.00
07-424-3130 ENGINEERING SERVICES 09/12/25 Pay Check: 3568 25-01931 SERV THRU 081025 RCSTP ARC FLA 675.00
07-424-3130 ENGINEERING SERVICES 10/29/25 Pay Check: 3574 25-02205 SERV THRU 091425 2025 GEN SERV 5,716.75

Page 2 of 4

Municipal Authority

YTD Revenues and Expenses thru 11/30/2025

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3130 ENGINEERING SERVICES 11/18/25 Pay Check: 3575 25-02407 SERV THRU 101225 2025 GEN SERV 4,862.00
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00116 LEGAL SERV DEC 2024 GEN AUTH 266.50
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00115 LEGAL SERV OCT 2024 GEN AUTH 538.50
07-424-3140 LEGAL SERVICES 01/21/25 Pay Check: 3536 25-00114 LEGAL SERV NOV 2024 GEN AUTH 123.00
07-424-3140 LEGAL SERVICES 02/25/25 Pay Check: 3541 25-00414 LEGAL SERV DEC 2024 GEN AUTH 594.50
07-424-3140 LEGAL SERVICES 03/21/25 Pay Check: 3546 25-00589 LEGAL SERV FEB 2025 GEN AUTH 164.00
07-424-3140 LEGAL SERVICES 04/21/25 Pay Check: 3554 25-00843 LEGAL SERV MARCH 2025 GEN AUTH 287.00
07-424-3140 LEGAL SERVICES 05/21/25 Pay Check: 3560 25-01097 LEGAL SERV APRIL 2025 GEN AUTH 328.00
07-424-3140 LEGAL SERVICES 06/10/25 Pay Check: 3561 25-01289 LEGAL SERV MAY 2025 GEN AUTH 574.00
07-424-3140 LEGAL SERVICES 07/22/25 Pay Check: 3563 25-01545 LEGAL SERV JUNE 2025 GEN AUTH 759.50
07-424-3140 LEGAL SERVICES 08/14/25 Pay Check: 3565 25-01714 LEGAL SERV JULY 2025 GEN AUTH 184.50
07-424-3140 LEGAL SERVICES 10/29/25 Pay Check: 3571 25-02202 LEGAL SERV SEPT 2025 GEN AUTH 164.00
07-424-3140 LEGAL SERVICES 10/29/25 Pay Check: 3571 25-02204 LEGAL SERV AUG 2025 GEN AUTH 553.50
07-424-3700 CHESTER CREEK ENGINEERING 04/28/25 Expd RECLASS PENNONI 1267313 PO# 25-00840 5,777.50
07-424-7490 CAP.REPLACEMENT R.C. 04/21/25 Pay Check: 3553 25-00894 PORTABLE HOT HIGH PRESS WASHER 6,413.85
07-424-7490 CAP.REPLACEMENT R.C. 10/07/25 Pay Check: 3569 25-02095 2.5" DISCHARGE FLANGE ADAPTER 3,075.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 02/25/25 Pay Check: 3542 25-00471 ENG # 516230997-S4NX750EC 7HP 8,346.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 04/08/25 Pay Check: 3551 25-00772 HYDROMATIC PUMP W/2 CONNECTING 12,504.00
07-429-1505 RCSTP CAPITAL 01/10/25 Pay Check: 3535 25-00016 UV SYS REMOTE ACCESS UPGRADE 4,114.00
07-429-1505 RCSTP CAPITAL 01/21/25 Pay Check: 3538 25-00118 RCSTP- UV DISINFECTION SYS REP 7,043.52
07-429-1505 RCSTP CAPITAL 01/28/25 Pay Check: 3539 25-00178 DECANTER CONTROLS REPAIR 7,875.00
07-429-1505 RCSTP CAPITAL 01/28/25 Pay Check: 3540 25-00175 INSTALL & WIRE NEW GENERATOR 6,522.50
07-429-1505 RCSTP CAPITAL 03/10/25 Pay Check: 3544 25-00562 SUBSITE PROTRAK TRACTOR CAMERA 16,865.02
07-429-1505 RCSTP CAPITAL 03/25/25 Pay Check: 3548 25-00657 RENTL 600KW PORTABLE GENERATOR 6,170.00
07-429-1505 RCSTP CAPITAL 03/31/25 Pay Check: 3549 25-00731 RIDLEY PLANT GENERATOR ATS TRA 3,294.00
07-429-1505 RCSTP CAPITAL 04/08/25 Pay Check: 3550 25-00776 EXPLOSION PROOF HEATERS- RCSTP 13,368.00
07-429-1505 RCSTP CAPITAL 04/21/25 Pay Check: 3552 25-00853 (8) PARATECH LOCKSTROKE STRUTS 3,971.00
07-429-1505 RCSTP CAPITAL 05/06/25 Pay Check: 3557 25-01006 TRANSPORT NEW GENERATOR-RCSTP 6,500.00
07-429-1505 RCSTP CAPITAL 06/17/25 Pay Check: 3562 25-01336 RIDLEY C-EXPLOSION PROOF VFD'S 10,800.00
07-429-1505 RCSTP CAPITAL 10/07/25 Pay Check: 3570 25-02094 FLGYT NP452-3-3/460/3 50' FM 18,999.60
07-429-1505 RCSTP CAPITAL 10/29/25 Pay Check: 3572 25-02201 HPGB1000M4-2-10 HP, 460V, 3PH, 29,076.00
07-429-1505 RCSTP CAPITAL 10/29/25 Pay Check: 3573 25-02203 RCSTP- ARC FLASH STUDY 19,208.31
07-429-3700 CHESTER CREEK CAPITAL 04/23/25 Pay Check: 3556 25-00921 SUPPLEE VALLEY SANITARY SEWER 244,537.03
07-429-3700 CHESTER CREEK CAPITAL 05/14/25 Pay Check: 3558 25-01074 SERV THRU 041325 2025 SUPPLEE 6,217.50
07-429-3700 CHESTER CREEK CAPITAL 05/14/25 Pay Check: 3559 25-01078 SUPPLEE VALLEY SANITARY SEWER 26,572.00
07-429-3700 CHESTER CREEK CAPITAL 07/22/25 Pay Check: 3564 25-01549 SERV THRU 061525 2025 SUPPLEE 3,268.50
07-429-3700 CHESTER CREEK CAPITAL 11/18/25 Pay Check: 3575 25-02406 SERV THRU 101225 2025 SUPPLEE 68.50
07-429-6100 WEST GOSHEN CAPITAL 08/21/25 Pay Check: 3567 25-01781 2024 WG SEWER AUTH TAPPING FEE 44,172.77

Page 3 of 4

Municipal Authority
YTD Revenues and Expenses thru 11/30/2025

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
Total Expense614,365.00
Net Operating12,630.94

Page 4 of 4

AREA COD 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Date: December 8, 2025
To: Municipal Authority
From: Mark Miller
Re: Camera Upgrades for Ridley Creek Sewer Plant

I would like to upgrade the four existing cameras at the plant. I would also like to install three new cameras: one in the screen room and two on the SBR. If the operator can watch the screen room during rain events, he will be able to see if there is a problem and fix it before the room floods out, which has happened in the past. Cameras on the SBR will give us a better view of the tanks and any safety issues that may occur on top.

The total cost for the seven new cameras (four upgrades and three new cameras) is $3,685 – see attached quote from Alan Pearson.

Alan Pearson

QUOTE

820 Mt Laurel Road
Hainesport NJ 08036
Cell 609-471-1535

DATE: November 24, 2025
QUOTE: 1222

Bill To:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
610-692-7171
Mark Miller

For:
Quote for Camera systems
Water Treatment Plant

DESCRIPTIONAMOUNT
8 port NVR with 8 TB hard drive$ 850.00
7 new cameras 8MP with 2.8mm lens true night color 350 each2,450.00
180 camera 8MP true color350.00
wall mount for camera in screen room35.00
3 year warranty cameras and NVR
SUBTOTAL$ 3,685.00
Tax-
OTHER-
TOTAL$ 3,685.00

THANK YOU FOR YOUR BUSINESS!

Pennoni

December 4, 2025

East Goshen Township
Attn: Derek Davis, Township Manager
1580 Paoli Pike
West Chester, PA 19380

RE: Fee Schedule for Year 2026
East Goshen Township and East Goshen Municipal Authority

Dear Derek:

Pennoni is proud to serve East Goshen Township and East Goshen Municipal Authority, and we look forward to working with you again in 2026.

Our rates for 2026 for Township and Authority Engineering services are listed below for the categories of staff that most frequently provide services to the Township and Authority.

CategoryRate
Township/Authority Engineer$166/hr
Senior Professional$158/hr
Project Professional$142/hr
Staff Professional$133/hr
Associate Professional$120/hr
Senior Engineering Technician$118/hr
Graduate Professional$113/hr
Engineering Technician$99/hr

We will continue to provide services to the Township and Authority as requested.

For typical general engineering services to the Authority, we recommend budgeting the following under the expectation of similar level of effort in 2026 as in 2025. Similar to previous years, we will establish separate accounts for each activity listed below, and each activity will be invoiced separately.

  • General Consultation and monthly meetings: $46,000
  • Chapter 94 reports: $7,500
  • RCSTP NPDES Permit Renewal: $7,500

TOTAL: $61,000

Other Authority capital projects outside of general services, as requested, will be proposed separately, such as the following projects that are planned for engineering in 2026:

  • Hunt Country Pump Station Upgrade and Force Main Replacement
  • Waterview Sanitary Sewer Pipe Lining
  • Morstein Road Sewer Extension

We thank you again for the confidence you have placed in Pennoni over the years and look forward to continuing to serve you in the future!

Sincerely,

PENNONI ASSOCIATES INC.

[Signature]
Michael J. Ellis, PE
Associate Vice President

[Signature]
Nathan M. Cline, PE
Vice President

158 West Gay Street, Suite 300
West Chester, PA 19380
T: 610-429-8907
www.pennoni.com
Page 1 of 1