Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

March 9, 2026
7:00

  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
  • CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
  • LIAISON REPORTS
  • SEWER REPORTS Director of Public Works’ Report; West Goshen Report; Pennoni Engineer’s Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES February 9, 2026
  • APPROVAL OF INVOICES
Company Invoice # Amount Paid?
Pennoni 1314790 78.00
Pennoni 1314791 ,546.75
Pennoni 1314792 ,390.75
Pennoni 1314793 ,635.00
Gawthrop Greenwood 222068274 05.00
  • FINANCIAL REPORTS February 2026
  • OLD BUSINESS

Page 1 of 2

  • 2026 Goals:
Goal Status
Ridley Creek Plant compliance January & February 2026 were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. Attend meetings on an as-needed basis.
Long-term sustainability Ongoing:
(1) Sewer rate increase implemented July 2024.
(2) Development of 20-year+ Capital Improvement Plan underway.
(3) Continue to study sewer rates.
  • NEW BUSINESS Consideration to Advertise Waterview Sewer Pipe Lining Project
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

Page 2 of 2

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: March 9, 2026

To: Municipal Authority

From: Mark Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 567,129 gallons per day.

Monthly Rainfall: 2.57

Meters:

  • Read on a daily basis. No problems to report.
  • I reached out to Paul Mamzic from Allied Control to discuss the calibration of the meters going forward.

C.C. Collection:

  • Pump stations were visited daily, wet wells were washed down, pumps were checked for proper operation, and generator was checked for fuel along with oil levels.
  • We investigated a lateral blockage on Grand Oak Ln and advised the resident to contact a plumber.
  • We utilized Pipe Data View to clean and televise the Waterview Development.
  • John Laidley has been installing the new Data and Dialer devices in the pump stations – see attached screenshots of the Mission 123SCADA website interface.

Ridley Creek Collection:

  • We found the pump station operation to be normal.
  • We checked oil levels on the muffin monster and the generator.
  • During the snowstorm we experienced loss of power for approximately twenty hours.
  • We were notified of a missing manhole cover in the Hunt Country Development.

Page 1 of 2

Ridley Creek Plant:

  • Plant operator said the plant was normal for the month.
  • The plant was on emergency power during the snowstorm. A limb had struck the main line causing a fuse to trip out. PECO emergency operations center was notified.
  • Lenni conducted their annual electrical equipment detailed inspection.
  • Mike Ellis and his electrical engineer met with Joe from Lenni Electric to go over the motor control center and we decided to do the engineering work this year.

Alarms: 18

PA One Calls: 127

Lateral Repairs/Caps: 0

  • We inspected a new lateral in the Millstone Meadows Development on Hershey Mill Road.

Page 2 of 2

Mission 123SCADA Website

A web browser screenshot of the Mission 123SCADA website interface displaying a SCADA dashboard, station telemetry details for Hershey Mill Pump Station, an alarm log, and a geographic map of pump station locations in East Goshen Township.

URL: https://123scada.com/#!/

Dashboard Status: 0 Alarms | 0 Service | 100% OK | 2 Disabled | 0 Offline

Time Ack Type Event
March 05 at 12:41:56 PM [icon] Vince acknowledged the Generator Not Running at Barkway Pump Station.
March 05 at 12:41:05 PM [icon] Generator Not Running at Barkway Pump Station. Vince Damico is being notified.
March 05 at 12:38:02 PM [icon] Generator Not Running at Barkway Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 12:34:30 PM [icon] Vince acknowledged the Generator Not Running at Hershey Mill Pump Station.
March 05 at 12:34:18 PM [icon] Generator Not Running at Hershey Mill Pump Station. Vince Damico is being notified.
March 05 at 12:31:16 PM [icon] Generator Not Running at Hershey Mill Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 12:23:13 PM [icon] Vince acknowledged the Generator Running at Barkway Pump Station.
March 05 at 12:21:01 PM [icon] Generator Running at Barkway Pump Station. Vince Damico is being notified.

Station: Hershey Mill

RTU Status: All Normal
Last Heard Time: Mar 05 03:32:53 PM

Analog Input:
Wet Well Level: 3.38 Feet
Station Flow: -1.3 GPM

Digital Input:
Pump 1 | Pump 2 | Generator | High Level Float | Backup System | Pump 1 Fail | Pump 2 Fail | Seal Fail

Digital Output / Relays:
Relay 1 | Relay 2 | Relay 3

RTU Data:
A.C.: 13.9 VAC | VAUX: 11.8 V
Batt: 12.5 VDC | Temp: 118.0 °F
RSRQ: -14.0 dB | RSRP: -118.0 dBm

Devices:

  • Ashbridge Pump Station
  • Barkway Pump Station
  • East Goshen Municipal Building
  • Hershey Mill Pump Station
  • Hunt Country Pump Station

A web browser screenshot of the Mission 123SCADA website interface showing a regional map of East Goshen, West Goshen, and surrounding areas with pump station device markers.

URL: https://123scada.com/#!/

Devices:

  • Ashbridge Pump Station
  • Barkway Pump Station
  • East Goshen Municipal Building
  • Hershey Mill Pump Station
  • Hunt Country Pump Station

Map Features and Locations: US 202, Exton, Exton Bypass, West King Road, Sproul Road, Malvern, Paoli Pike, Darby Paoli Road, Newtown Road, PA 100, East Boot Road, North Chester Road, Clocktower Woods, Bow Tree, PA 352, Brandywine Regional Airport, Greystone, West Chester Bypass, West Chester, West Goshen, PA 3, Willistown, PA 926, Okehocking Preserve, Castle Rock, Runnymead Farms, Upper Providence.

A web browser screenshot of the Mission 123SCADA website interface displaying an event log table of generator alarms and acknowledgments for various pump stations.

URL: https://123scada.com/#!/

Dashboard: 0 Alarms | 0 Service | 100% OK | 2 Disabled | 0 Offline

Time Ack Type Event
March 05 at 12:41:56 PM [icon] Vince acknowledged the Generator Not Running at Barkway Pump Station.
March 05 at 12:41:05 PM [icon] Generator Not Running at Barkway Pump Station. Vince Damico is being notified.
March 05 at 12:38:02 PM [icon] Generator Not Running at Barkway Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 12:34:30 PM [icon] Vince acknowledged the Generator Not Running at Hershey Mill Pump Station.
March 05 at 12:34:18 PM [icon] Generator Not Running at Hershey Mill Pump Station. Vince Damico is being notified.
March 05 at 12:31:16 PM [icon] Generator Not Running at Hershey Mill Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 12:23:13 PM [icon] Vince acknowledged the Generator Running at Barkway Pump Station.
March 05 at 12:21:01 PM [icon] Generator Running at Barkway Pump Station. Vince Damico is being notified.
March 05 at 12:18:01 PM [icon] Generator Running at Barkway Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 12:16:45 PM [icon] Vince acknowledged the Generator Running at Hershey Mill Pump Station.
March 05 at 12:16:33 PM [icon] Generator Running at Hershey Mill Pump Station. Vince Damico is being notified.
March 05 at 12:13:31 PM [icon] Generator Running at Hershey Mill Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 9:51:14 AM [icon] Vince acknowledged the Generator Not Running at Hunt Country Pump Station.
March 05 at 9:50:57 AM [icon] Generator Not Running at Hunt Country Pump Station. Vince Damico is being notified.
March 05 at 9:47:53 AM [icon] Generator Not Running at Hunt Country Pump Station. John Laidley, Joe Alessi are being notified.
March 05 at 9:31:09 AM [icon] Vince acknowledged the Generator Running at Hunt Country Pump Station.
March 05 at 9:30:56 AM [icon] Generator Running at Hunt Country Pump Station. Vince Damico is being notified.
March 05 at 9:27:54 AM [icon] Generator Running at Hunt Country Pump Station. John Laidley, Joe Alessi are being notified.
March 04 at 12:22:06 PM [icon] Vince acknowledged the Generator Not Running at Ashbridge Pump Station.
March 04 at 12:21:49 PM [icon] Generator Not Running at Ashbridge Pump Station. Vince Damico is being notified.
March 04 at 12:18:45 PM [icon] Generator Not Running at Ashbridge Pump Station. John Laidley, Joe Alessi are being notified.

[Screenshot of a browser window at https://123scada.com/#!/ showing a line graph titled Supergraph, Hershey Mill Pump Station, with a legend on the left and repeated rising and falling blue sawtooth lines.]

Browser tabs: KYW Newsradio - All News; East Goshen Township (PA), Po... Bookmarks include Google, Weather.com, Yahoo - login, KYW Newsradio - Al..., EGT Website Login, East Goshen Towns..., Constant Contact, WB Mason - Save o..., Amazon Business, PennDOT Customer..., All Bookmarks.

Supergraph, Hershey Mill Pump Station

12 hours | 1 day | Mar 05 09:35:32 AM - Mar 05 03:35:32 PM (6 Hours)

  • Analog Inputs: Wet Well Level, Station Flow
  • Device Performance: Signal Quality, Signal Power, Battery, AC Power, Aux Power Supply, Temperature, Online, Dallas Keys
  • Weather Station: West Chester, PA (KOQN): Temperature, Rainfall
  • Pumps: Pump 1, Pump 2, Generator
  • Alarms: Alarms

Value labels at right edge of graph: 118 °F, -14.00 dB, 13.92 VAC, 12.49 VDC, 11.81 VDC, 45 °F, 3.52 Feet, -118.00 dBm, 0.00 in, -1.6 GPM.

Time axis: 10:00 AM, 11:00 AM, 12:00 PM, 1:00 PM, 2:00 PM, 3:00 PM; Mar 4, 6:00 AM, 12:00 PM, 6:00 PM; Mar 5, 6:00 AM, 12:00 PM. Start Menu and 45°F shown in the taskbar.

West Goshen February 2026 Sewer Report

General Notes:

  • For the month of February, the plant operated in compliance with its NPDES permit.
  • WWTP monthly average daily flow - 3.45 mgd.
  • WWPS monthly average daily flow – 1.158 mgd.
  • Monthly estimated average total phosphorus discharge concentration was <0.01 mg/L.
  • Sludge to landfill – 272 wet tons.

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements. The WGSA has been awarded a grant of 50,000 for this project.

Ongoing Projects:

  • WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 4 th qtr, 2026.
  • Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. 95% of order has been delivered. Installation expected during 2 nd qtr, 2026.
  • Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 2 nd qtr, 2026.

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

[West Goshen Township Seal]

[Pennoni Logo]

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

March 5, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
  • Motor Control Center (MCC) #1 – Pennoni recommended in our arc flash and short circuit study in 2025 that several breakers in the MCC be replaced with larger capacity breakers. Lenni Electric was unable to do so because the replacement breakers for the four blower starters do not align with the on-off switches that extend outside of the MCC cabinets, and compatible parts are not available given the age of the MCC. We met on-site with Lenni Electric and the RCSTP operator to evaluate potential replacement of the MCC accordingly. We documented existing conditions including tracing wiring throughout the MCC and marking up single line diagrams and building plans. It was determined that the replacement does not need to be with a new MCC but can instead be simplified with just four blower starters, two replacement electrical panels, and a transformer. We prepared a proposed written scope for the work and are coordinating with Lenni for budgetary pricing. We propose that the project be budgeted for construction in 2027. Design can potentially occur in 2026. We can provide a design proposal after the proposed scope is confirmed with Lenni, the operator, and Public Works.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. We have not heard from the contractor in several months and are contacting them for resolution. Final payment is still being held.
  • Waterview – We performed visual interior condition assessments of additional manholes in the neighborhood, and we completed analysis of the pipe inspection videos. We met with Mark Miller to review pipe lining recommendations and to resolve discrepancies on sewer system pipe routing and manhole locations, confirm several pipes have previously been pipe lined, revisit that one pipe did not have a video, and request additional videos to confirm. Public Works subsequently televised several of the pipes and confirmed the pipe routing and pipes that were already lined. We prepared a pipe lining recommendation letter and submitted to the Township for consideration by the Municipal Authority of direction to advertise.

Pump Stations

  • Hunt Country Pump Station – Pennoni conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, on February 18 and a topographic survey of the site on February 25. Blood Hound performed utility locating of the existing force main on March 4. Our survey crew will go back out to the site to survey the force main afterwards. Existing conditions plans are currently being prepared.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2

EGMAU26001
East Goshen Municipal Authority
March 5, 2026
Engineer’s Report
Page 2 of 2

Sewer Extensions

  • Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. We will provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.

Chapter 94 Reports

  • We are continuing preparation of the 2025 Chapter 94 Annual Reports. We are on track to submit before the March 31 submission due date.

New Connections

  • 1344 Morstein Road – One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously reviewed a revised plan submission, issued a comment letter, and discussed the approach to resolve outstanding comments with the design engineer. We are awaiting a plan resubmission to address minor sewer comments. We also provided the design engineer with the Township’s Grinder Pump O&M agreement template.
  • 1354 Paoli Pike – The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump. We provided information to Mark Miller on grinder pump vendor alternatives and low pressure sewer lateral requirements.

Other

  • GIS Mapping – We are updating the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We intend to present it to Public Works in March and to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.

END OF REPORT

[Big Fish Environmental Services Inc. Logo]

RCSTP Monthly Operations Report
March 2026

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for February 2026. All supplemental reports were submitted for January 2026. Caustic usage increased to 51.85 gallons per day from 47.99 gallons per day last month. Aluminum sulfate solution volumes daily average increased slightly to 68.90 gallons per day from 68.61 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

TABLES

CERTIFIED LAB RESULTS- FINAL EFFLUENT February 2026

DATE FLOW Gallons Final EFF/Applebrook Ammonia as N 7mg/L monthly CBOD 15mg/L Total Phosphorus 0.5mg/L Total Suspended Solids 15mg/L Fecal Coliform 200 coliforms/100mL
2/3/26 Meter Error/37,156 6.63 3.3 0.12 5.5 <1
2/10/2026 280,000/37,888 0.49 2.1 <0.10 5.8 1
2/17/2026 315,000/0 0.14 2.3 0.11 8 <1
2/24/2026 355,000/0 1.06 2.9 0.17 5 <1

CERTIFIED LAB RESULTS- FINAL EFFLUENT February 2026 Non-Report tests

DATE FLOW Final EFF/Applebrook NO2-NO3 (mg/L) TKN (mg/L) TN (mg/L)
2/3/2026 Meter Error/37,156 4.55 8.07 12.6
2/10/2026 280,000/37,888 4.26 1.64 5.91
2/17/26 315,000/0 3.46 1.86 5.32
2/24/26 355,000/0 6.48 2.39 8.87

CERTIFIED LAB RESULTS- INFLUENT February 2026

DATE FLOW Ammonia as N BOD CBOD TKN Total Phosphorus Total Suspended Solids
2/3/2026 298,630 41.9 152 180 56.5 5.04 100
2/10/2026 301,250 37 209 210 51.3 5.53 152
2/17/2026 310,666 37.5 274 221 58.2 5.3 230
2/24/2026 328,250 31.7 209 230 49.7 4.72 205

TKN = Total Kleidahl Nitrogen
TN= Total Nitrogen
NO2-NO3= Nitrogen, Nitrate-Nitrite

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained well below all of the weekly average discharge limits for the month of January.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During February, there were two (2) days where precipitation occured. There were 2 days where precipitation accumulation was greater than 0.50”.

2/16 1” snow
2/23 7” snow

Total precipitation for the month was 8” snow

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Chemical Data

Chemical February 2026
Daily Average Total Monthly
Caustic Soda, gal 51.85 1399.86
Aluminum Sulfate solution, gal 68.90 1860.42
Sludge Dewatering, gal* 17,911 429,853

*24 days of sludge dewatering

There was a decrease of 10,057 gallons of sludge dewatering during the month of February compared to January.

Page 2 of 3

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily.
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly.
  • Cleaned buildings and laboratory.

Major Repairs or Upgrades

Nothing to report

Upcoming Repairs or Upgrades

Nothing to report

Flow Data

Flow Meter Location February 2026
Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 8.173 291,904 378,700
Influent Wastewater to SBRs 11.049 394,607 475,424
Internal Recycle 2.876 102,703 153,210
Treated Effluent to Disc Filters 10.336 369,127 474,496
Final Effluent Discharge 8.543 305,000 389,000
Applebrook Golf Course .405 31,175 37,888

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of February 2026

Page 3 of 3

Draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

February 9, 2026

The East Goshen Township Municipal Authority held their regular meeting on Monday, February 9, 2026 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings – Chairman
John Stipe – Vice Chairman
Sean Ellsworth
Dana Pizarro
Walter Wujcik

Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Peter Hicks (Supervisor
Kelly Brophy, Finance Director
Patrick McKenna (Attorney)
Theodore Speedy (Attorney)
Stacey Fuller (Attorney)

COMMON ACRONYMS:

Acronym Acronym
ATS – Automatic Transfer Switch MA- Municipal Authority
BFES – Big Fish Environmental Services NPDES – National Pollutant Discharge Elimination System
BOS – Board of Supervisors PC – Planning Commission
CB – Conservancy Board PM – Prevention Maintenance
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge
PWD – Public Works Department

Call to Order & Pledge of Allegiance

John called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
John asked for a moment of silence for our First Responders and Military.
John asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report

None

Liaison Reports

1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful day is in April.
2. Planning Commission – John reported that they are considering the AI Data Centers to be covered in our Ordinance.

MA 2--9-26 draft

1

3. BOS – Peter had nothing to report.

SEWER REPORTS

1. Director of Public Works, Mark Miller’s report for February 9, 2026.

Monthly Flows – The average daily flow to West Goshen was 558,781 gallons per day.

Monthly Rainfall - 2.55”. Mark mentioned that they were busy most of the month clearing snow.

Meters: Read on a daily basis. No problems to report.

C.C.Collection
• All Pump stations were visited daily and regular maintenance was performed.

Ridley Creek Collection:
• Pump stations were visited daily and regular maintenance was performed.

Ridley Creek Plant:
• Lenni started their annual inspection of breakers and fuses.

Alarms: 6

PA One Calls: 73

Lateral Repairs/Caps: 0

2. West Goshen Report

• Kelly provided a copy of the West Goshen invoice for East Goshen’s share of the operation and maintenance costs of the Sewage Treatment System. The WGSA has been awarded a grant of $250,000 for the WWTP Pump Replacements project.

3. Pennoni Engineer’s Report dated February 9, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. Based on the projected costs for the repairs identified in the first two tanks, the repair work will need to be publicly bid. We expect the most cost-effective approach will be to inspect the other two tanks and then conduct one public bid solicitation in late 2026 for repairs to all four tanks. That approach will be determined with more certainty after we

MA 2--9-26 draft

2

inspect the remaining two tanks.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. In follow-up to the August MA meeting, we notified the contractor to proceed with the evaluation. They responded that they were meeting internally the week of August 26 to review the next steps. We have followed up with them several times since then, most recently on November 3, but have not received a response. Final payment will not be processed until this matter is resolved.
  • Waterview – We performed visual interior condition assessments of a portion of manholes in the neighborhood. Most of the manholes are brick and did not have any observed deficiencies; a few manholes have already been interior lined. Several manhole lids were unable to be opened, and one manhole appears to be buried in a residential yard. We will perform another site visit with Public Works after the snow melts to open and assess the remainder of the manholes. We had intended to request authority to advertise the project at the February MA meeting, but we recommend the remaining manholes be inspected and any needed repairs identified before doing so. Weather permitting, we expect to request authority to advertise at the March MA meeting.

We also field measured distances between manholes to resolve discrepancies between sewer system mapping and the pipe lengths from the sewer videos.

Pump Stations

  • Hunt Country Pump Station – The PA Department of Community and Economic Development (DCED) Small Water and Sewer Grant application for the pump station upgrade was awarded in the amount of $205,000 on January 20, 2026. The budgetary project cost is approximately $630,000, including engineering and construction administration. The application had been for $479,952 with the remainder as a match.

We submitted a proposal for survey, engineering, permitting, and bid assistance services for the project.

Sewer Extensions

  • Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. We will provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.

MA 2--9-26 draft

3

Chapter 94 Reports

  • We are continuing preparation of the 2025 Chapter 94 Annual Reports. We are on track to submit before the March 31 submission due date.

New Connections

  • 1344 Morstein Road – One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We reviewed a revised plan submission, issued a comment letter, and discussed the approach to resolve outstanding comments with the design engineer.

Other

  • GIS Mapping – We are initiating a limited update of the sewer system mapping in GIS to correct the Waterview manhole and pipe discrepancies noted above and to make it a functional asset management tool for the Public Works Department. Once updated, we will present it to Public Works to discuss additional features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
  • Sewer Specifications – We updated the Township sewer lateral standard detail regarding cleanout fittings as requested by Mark Miller.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for January 2026. All supplemental reports were submitted for December 2025. Caustic usage decreased to 47.99 gallons per day from 62.46 gallons per day last month. This was due to less being required to maintain alkalinity in the sludge holding tanks. Aluminum sulfate solution volumes daily average decreased to 68.61 gallons per day from 71.25 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Approval of Minutes

The minutes of the January 12, 2025 meeting were approved as amended.

Approval of Invoices

1. Walter approved payment of Pennoni Invoices:
#1311436 in the amount of $4,835.25.
#1311437 in the amount of $14,225.50
Dana seconded the motion. The motion passed unanimously.
2. Sean moved to approved payment of the Kappe Associates invoice #25-640-M in the amount of $4,251.50 (paid). John seconded the motion. The motion passed unanimously.
3. Dana moved to approve payment of the Gawthrop Greenwood invoice #222087284 in the amount of $273.00. John seconded the motion. The motion passed unanimously.

MA 2--9-26 draft

4

Financial Reports

Kelly reviewed the following report: YTD January 2026, the Municipal Authority recorded $4,876.81 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers) and $4,864.00 in expenses (Hershey Mill pump station mission alarm panel installation and engineering expenses). The net result of operations is $512.81. As of January 31, 2026, the fund balance was $28,380.03.

Old Business -

None

Goals

1. It was noted that the change to add “Municipal Authority representative to attend on as needed basis was not done.

New Business –

1. Motor Control Center – Mike mentioned that there is going to be a meeting on Wednesday to discuss removal of the Motor Control Center to consolidate everything.
2. Hunt Country Pump Station Engineering Proposal- Mike reviewed the design proposal and what changes will be made. The pump station is 45 years old and has only had minimum maintenance done. The estimated cost is $80,600.00. Bidding will be done in the fall. Dana made a motion authorizing Pennoni to do the Hunt Country Pump Station project. Walter seconded the motion. The motion passed unanimously.
3. Capacity Requests – 1354 Paoli Pk, Homeowner: Joe Francis. Proposal is for a grinder pump system and will require an easement from 642 Meadow Dr. Mark explained where this is and who is working with them. He will give the easement to Patrick for review. Walter moved to approve this Capacity Request. John seconded the motion. The motion passed unanimously.

Any Other Matter -

Code of Ethics – John reminded everyone to read the Code of Ethics, sign it and turn it in to the Township.

Correspondence- None

Public Comment - None

Adjournment

There being no further business Sean moved to adjourn the meeting. John seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:50 pm.
The next regular meeting will be held on Monday, March 9, 2026 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 2--9-26 draft

5

[Pennoni logo]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1314790
Invoice Date : 02/27/2026
Project : EGMAU25004
Project Name : Hunt Country Pump Station Upgrade

For Services Rendered Through 02/15/2026

Kickoff design. Set up field visit for electrical and building interior survey. Coordinated with subcontractor in preparation for force main utility locating. PA One Call request ticket.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Survey NTE $11,400.00 $0.00 0.00% $0.00 $0.00
02 -- Design NTE $50,100.00 $0.00 0.95% $478.00 $478.00
03 -- Permitting NTE $12,800.00 $0.00 0.00% $0.00 $0.00
04 -- Bid Services NTE $6,300.00 $0.00 0.00% $0.00 $0.00
Total : $80,600.00 $0.00 $478.00 $478.00

Phase: 02 -- Design

Labor

Class Hours Rate Amount
Authority Engineer 0.25 166.00 41.50
Senior Professional 1.50 158.00 237.00
Staff Professional 1.50 133.00 199.50
Labor 478.00

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 478.00 0.00 478.00
Limit 50,100.00
Remaining 49,622.00

Phase Subtotal: $478.00

Amount Due This Invoice: $478.00

APPROVED BY: KLB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3705

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Field Value Field Value
Project: EGMAU25004
Pennoni Job No.: Hunt Country Pump Station Upgrade
Invoice No: 1314790
Invoice Period: 1/19/2026 to 2/15/2026
Initial Authorization: $ 80,600.00 Date: 2/27/2026
Contract Amount: $ 80,600.00
Previously Invoiced: $ -
Current Invoice: $ 478.00
Invoiced to Date ($): $ 478.00
Invoiced to Date (%): 1%
Remaining Budget ($): $ 80,122.00
Remaining Budget (%): 99%

Budget by Phase:

Phase Metric Value
Phase Name: Hunt Country Pump Station Upgrade
Phase Budget: $ 80,600.00
Previously Invoiced: $ -
Current Invoice: $ 478.00
Invoiced to Date ($): $ 478.00
Invoiced to Date (%): 1%
Remaining Budget ($): $ 80,122.00
Remaining Budget (%): 99%

Comments: Kickoff design. Set up field visit for electrical and building interior survey. Coordinated with subcontractor in preparation for force main utility locating. PA One Call request ticket.

[Pennoni logo]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1314791
Invoice Date : 02/27/2026
Project : EGMAU25006
Project Name : Morstein Rd Sewer Design and Permitting

For Services Rendered Through 02/15/2026

Continued concept design and preparation of plans including site plans, sewer main profiles, and construction details.

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 4,546.75 16,336.25 20,883.00
Limit 25,000.00
Remaining 4,117.00

Labor

Class Hours Rate Amount
Authority Engineer .75 166.00 124.50
Staff Professional 33.25 133.00 4,422.25
Totals 34.00 4,546.75
Total Labor 4,546.75

Total this Invoice: $4,546.75

Outstanding Invoices

Number Date Balance
1311437 2/4/2026 14,225.50
Total 14,225.50

APPROVED BY: KLB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Field Value Field Value
Project: EGMAU25006
Pennoni Job No.: Morstein Rd Sewer Design and Permitting
Invoice No: 1314791
Invoice Period: 1/1/2026 to 2/15/2026
Initial Authorization: $ 25,000.00 Date: 2/27/2026
Contract Amount: $ 25,000.00
Previously Invoiced: $ 16,336.25
Current Invoice: $ 4,546.75
Invoiced to Date ($): $ 20,883.00
Invoiced to Date (%): 84%
Remaining Budget ($): $ 4,117.00
Remaining Budget (%): 16%

Budget by Phase:

Phase Metric Value
Phase Name: Morstein Rd Sewer Design and Permitting
Phase Budget: $ 25,000.00
Previously Invoiced: $ 16,336.25
Current Invoice: $ 4,546.75
Invoiced to Date ($): $ 20,883.00
Invoiced to Date (%): 84%
Remaining Budget ($): $ 4,117.00
Remaining Budget (%): 16%

Comments: Continued concept design and preparation of plans including site plans, sewer main profiles, and construction details.

[Pennoni logo]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1314792
Invoice Date : 02/27/2026
Project : EGMAU26001
Project Name : 2026 General Services

For Services Rendered Through 02/15/2026

January and February Engineer's Reports. Reviewed January and February RCSTP Operator's Reports. Attended January and February MA meetings. Meeting with PW Director and Finance Director regarding 2026 project budgets.

Waterview Pipe Lining: Field inspection of interior manhole conditions and sewer main routing. Continued review of CCTV pipe videos and updating of condition assessment mapping, pipe priorities, cost estimates, and recommendation letter. Initiated bid document preparation.

RCSTP MCC: Field meeting at RCSTP with Lenni Electric and plant operator to evaluate conditions and document wiring for Motor Control Center (MCC) #1. Prepared markups of MCC conditions and circuits. Initiated evaluation and scoping alternatives for potential MCC replacement.

Evaluated 1354 Paoli Pike sewer connection request and feasibility of gravity lateral vs. grinder pump.

Initiated updates to GIS mapping of Township-wide sanitary sewer system including field identified deficiencies with Waterview manholes and pipe routing. Update Township's typical sanitary sewer lateral detail per PW Director comments.

Researched conflicting info from PA DCED on grant award amount for Hershey's Mill Pump Station Upgrade.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- General Engineering Services NTE $46,000.00 $0.00 20.41% $9,390.75 $9,390.75
02 -- Grants NTE $0.00 $0.00 0.00% $33.25 $33.25
Total : $46,000.00 $0.00 $9,424.00 $9,424.00

Phase: 01 -- General Engineering Services

Labor

Class Hours Rate Amount
Authority Engineer 18.75 166.00 3,112.50
Senior Professional 15.50 158.00 2,449.00
Project Professional 1.00 142.00 142.00
Staff Professional 3.25 133.00 432.25
Associate Professional 5.00 120.00 600.00
Engineering Tech III 22.50 118.00 2,655.00
Labor 9,390.75

Phase Subtotal: $9,390.75

Phase: 02 -- Grants

APPROVED BY: KLB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project Description Document Invoice Number
Project EGMAU26001 2026 General Services Invoice 1314792

Labor

Class Hours Rate Amount
Staff Professional 0.25 133.00 33.25
Labor 33.25

Phase Subtotal: $33.25

Amount Due This Invoice: $9,424.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Page 2

Field Value Field Value
Project: EGMAU26001
Pennoni Job No.: 2026 General Services
Invoice No: 1314792
Invoice Period: 1/1/2026 to 2/15/2026
Initial Authorization: $ 46,000.00 Date: 2/27/2026
Contract Amount: $ 46,000.00
Previously Invoiced: $ -
Current Invoice: $ 9,424.00
Invoiced to Date ($): $ 9,424.00
Invoiced to Date (%): 20%
Remaining Budget ($): $ 36,576.00
Remaining Budget (%): 80%

Budget by Phase:

Phase Metric Value
Phase Name: 2026 General Services
Phase Budget: $ 46,000.00
Previously Invoiced: $ -
Current Invoice: $ 9,424.00
Invoiced to Date ($): $ 9,424.00
Invoiced to Date (%): 20%
Remaining Budget ($): $ 36,576.00
Remaining Budget (%): 80%

Comments: January and February Engineer's Reports. Reviewed January and February RCSTP Operator's Reports. Attended January and February MA meetings. Meeting with PW Director and Finance Director regarding 2026 project budgets.
Waterview Pipe Lining: Field inspection of interior manhole conditions and sewer main routing. Continued review of CCTV pipe videos and updating of condition assessment mapping, pipe priorities, cost estimates, and recommendation letter. Initiated bid document preparation.
RCSTP MCC: Field meeting at RCSTP with Lenni Electric and plant operator to evaluate conditions and document wiring for Motor Control Center (MCC) #1. Prepared markups of MCC conditions and circuits. Initiated evaluation and scoping alternatives for potential MCC replacement.
Evaluated 1354 Paoli Pike sewer connection request and feasibility of gravity lateral vs. grinder pump.
Initiated updates to GIS mapping of Township-wide sanitary sewer system including field identified deficiencies with Waterview manholes and pipe routing. Update Township's typical sanitary sewer lateral detail per PW Director comments.
Researched conflicting info from PA DCED on grant award amount for Hershey's Mill Pump Station Upgrade.

[Pennoni logo]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1314793
Invoice Date : 02/27/2026
Project : EGMAU26002
Project Name : 2025 Chapter 94 Reports

For Services Rendered Through 02/15/2026

Initiated preparation of RCSTP, West Goshen (Chester Creek), and Westtown Chapter 94 Reports.

Billing Limits

Billing Limits Current Prior To-Date
Total Billings 2,635.00 0.00 2,635.00
Limit 7,500.00
Remaining 4,865.00

Labor

Class Hours Rate Amount
Authority Engineer .25 166.00 41.50
Staff Professional 19.50 133.00 2,593.50
Totals 19.75 2,635.00
Total Labor 2,635.00

Total this Invoice: $2,635.00

APPROVED BY: KLB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Field Value Field Value
Project: EGMAU26002
Pennoni Job No.: 2025 Chapter 94 Reports
Invoice No: 1314793
Invoice Period: 1/1/2026 to 2/15/2026
Initial Authorization: $ 7,500.00 Date: 2/27/2026
Contract Amount: $ 7,500.00
Previously Invoiced: $ -
Current Invoice: $ 2,635.00
Invoiced to Date ($): $ 2,635.00
Invoiced to Date (%): 35%
Remaining Budget ($): $ 4,865.00
Remaining Budget (%): 65%

Budget by Phase:

Phase Metric Value
Phase Name: 2025 Chapter 94 Reports
Phase Budget: $ 7,500.00
Previously Invoiced: $ -
Current Invoice: $ 2,635.00
Invoiced to Date ($): $ 2,635.00
Invoiced to Date (%): 35%
Remaining Budget ($): $ 4,865.00
Remaining Budget (%): 65%

Comments: Initiated preparation of RCSTP, West Goshen (Chester Creek), and Westtown Chapter 94 Reports.

[Gawthrop Greenwood, PC logo]

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
03/04/2026
Client No: 6604-001M
Invoice No. 222088274

APPROVED BY: [signature]
DATE PAID:
CHECK #:
CHARGED TO:

General Authority Services

Fees

Date Timekeeper Description Hours Amount
02/06/2026 PMM Email from L. Werkheiser regarding Board meeting materials. 0.20 41.00
02/09/2026 PMM Attend Authority Board meeting. 0.80 164.00
For Current Services Rendered 1.00 205.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 1.00 $205.00 $205.00
Description Amount
Previous Balance $273.00
Total Current Charges 205.00
02/25/2026 Payment -273.00
Balance Due $205.00

ok Approved 3/5/2026

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

[Gawthrop Greenwood, PC logo]

Gawthrop Greenwood, PC

Attorneys at Law

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com
www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
03/04/2026
Client No: 6604M

Account Description Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services 273.00 205.00 0.00 -273.00 $205.00

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA February 2026 YTD Financial Report
Date: March 3, 2026

YTD February 2026, the Municipal Authority recorded $32,472.60 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers and collecting tapping fees) and $24,197.75 in expenses (Hershey Mill pump station mission alarm panel installation, legal and engineering expenses). The net result of operations is $8,274.85. As of February 28, 2026, the fund balance was $36,642.07.

Attached is a complete list of 2026 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

YTD FEBRUARY 2026

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 24.85 32.77
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 4,332.72 8,250.00 0
07-364-1130 CONNECTION FEES - SEWER 563.76 0 0
07-380-1000 MISCELLANEOUS REVENUE 282.24 0 0
07-392-0500 TRANSFER FROM SEWER OPERATING 319,438.19 19,946.25 5,296.00
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,033,650.00 4,251.50 33,901.02
Total Revenue 1,360,566.91 32,472.60 39,229.79
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 47,871.20 0 0
07-424-3000 MISCELLANEOUS EXPENSE 1,645.71 0 0
07-424-3110 MUNIC.AUTH.-AUDITING 12,000.00 0 0
07-424-3130 ENGINEERING SERVICES 61,000.00 19,060.75 -5,841.50
07-424-3140 LEGAL SERVICES 6,500.00 885.50 1,522.50
07-424-3700 CHESTER CREEK ENGINEERING 42,000.00 0 0
07-424-3705 HUNT COUNTY ENGINEERING 95,000.00 0 0
07-424-7431 CAPITAL PROJ.-ENGINEERING 60,000.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 126,000.00 0 0
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 4,251.50 8,346.00
07-429-1504 HUNT CO PUMP STATION CAPITAL 515,550.00 0 0
07-429-1505 RCSTP CAPITAL 50,000.00 0.00 25,555.02
07-429-3700 CHESTER CREEK CAPITAL 343,000.00 0 0
Total Expenses 1,360,566.91 24,197.75 29,582.02
Net Result From Operations 0.00 8,274.85 9,647.77

Municipal Authority
YTD Revenues and Expenses thru 2/28/2026

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/26 Revenue Journal INTEREST EARNED JANUARY 2026 12.81
07-341-1000 INTEREST EARNINGS 02/28/26 Revenue Journal INTEREST EARNED FEBRUARY 2026 12.04
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1427 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1427 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1411 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1411 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1417 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1417 MILLSTONE 750.00
07-392-0500 TRANSFER FROM SEWER OPERATING 01/21/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 612.50
07-392-0500 TRANSFER FROM SEWER OPERATING 02/10/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 19,333.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/21/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 4,251.50
Total Revenue 32,472.60
07-424-3130 ENGINEERING SERVICES 02/10/26 Pay Check: 3584 26-00338 SERV THRU 123125 2025 GEN SERV 4,835.25
07-424-3130 ENGINEERING SERVICES 02/10/26 Pay Check: 3584 26-00339 SERV THRU 123125 MORSTEIN RD 14,225.50
07-424-3140 LEGAL SERVICES 01/21/26 Pay Check: 3581 26-00116 LEGAL SERV DEC 2025 GEN AUTH 612.50
07-424-3140 LEGAL SERVICES 02/10/26 Pay Check: 3583 26-00337 LEGAL SERV JAN 2026 GEN AUTH 273.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/21/26 Pay Check: 3582 26-00147 HERSHEY MILLS PUMP ST- MISSION 4,251.50
Total Expense 24,197.75
Net Operating 8,274.85

Page 1 of 1

Pennoni

March 5, 2026

EGMAU25007

East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380

RE: Waterview Sanitary Sewer Pipe Lining Project

Dear Mr. Miller:

We have analyzed sanitary sewer televised videos for the Waterview neighborhood conducted by Pipe Data View in November 2025, and we have prepared the following condition assessment, sewer pipe lining cost opinion, prioritization, and rehabilitation recommendations.

A total of 6,038 linear feet (LF) of sanitary sewers were televised. In general, the asbestos cement pipes are in fair-to-good condition. Very limited infiltration was observed, estimated at only 7,000–10,000 GPD total across all televised pipes. A limited number of pipes had isolated deficiencies including but not limited to cracks, small holes, joint offsets, root intrusion, and sags of less than 50%.

Pennoni also performed investigations of the interior conditions of several accessible sanitary sewer manholes in the neighborhood. All observed manholes were found to be in good structural condition and do not require lining or rehabilitation.

The pipe videos and field verification identified that a number of the sanitary sewer mains have already been rehabilitated with cured-in-place pipe (CIPP) lining. This substantially reduces the amount of sewers for pipe lining and is expected enable the Authority to pipe line nearly all remaining sewer mains in the neighborhood within the 2026 budget framework.

The Authority’s 2026 allocated budget for Waterview sewer rehabilitation consists of $250,000 for pipe lining and $50,000 for manhole lining. Since manhole lining is not necessary, we propose that all $300,000 be applied towards pipe lining. This may allow for all Waterview pipe lining to be completed in a single year, rather than over multiple years as had previously been anticipated.

The budget is intended to be used for both engineering and construction. The engineering, scoping, and bid document preparation has been performed under our separate annual General Services task. We recommend budgeting $25,000 for bid assistance, construction administration, and construction inspections. The construction budget would then be $275,000.

We have prioritized the pipes based on condition and proximity to each other and propose the scope be bid with Base Bid and Add Items to allow flexibility to award as much scope as possible within budget. The breakdown of proposed Base Bid and Add Items pipes are in the table below. The Base Bid is estimated at $269,350, and Add Items are estimated at $33,740.

If authorized to proceed by the Municipal Authority, we anticipate advertising the project on March 13 and March 17 with bids due on April 3. The project award would then be presented for consideration at the April 13 Municipal Authority meeting, with construction tentatively in June-July.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713

T: 302-655-4451

www.pennoni.com
Page 1 of 3

EGMAU25007
East Goshen Municipal Authority

March 5, 2026

Waterview Sanitary Sewers
Page 2 of 3

Street Name Upstream Manhole Downstream Manhole Pipe Length (feet) Pipe Dia. (inches) No. Laterals Estimated Cost
Base Bid Items
Glenbrook Lane C243 C242 387 8 6 $25,494
Glenbrook Lane C244 C243A 100 8 0 $6,200
Glenbrook Lane C243A C243 172 8 3 $11,414
Glenbrook Lane C254 C253 25 8 ? $1550
Lochwood Lane C204 C203 288 8 2 $18,606
Lochwood Lane C274 C273 400 8 5 $26,050
Lochwood Lane C380 C368 281 8 1 $17,672
Lochwood Lane C381 C380 161 8 2 $10,482
Lochwood Lane C382 C381 304 8 4 $20,848
Waterview Rd C272 C271 270 8 2 $17,240
Glenbrook Lane C253 C209 202 8 2 $13,024
Lochwood Lane C276 C275 258 8 1 $16,246
Waterview Rd C278 C275 192 8 3 $12,654
Lochwood Lane C275 C274 310 8 3 $19,970
Waterview Rd C271 C270 413 8 4 $26,606
Waterview Rd C268 C267 212 8 1 $13,394
Waterview Rd C267 C207 200 8 2 $12,900
Total Base Bid Items 4,175 8 42 $269,350
Add Items
Waterview Rd C270 C269 281 8 3 $18,172
Waterview Rd C269 C207 239 8 3 $15,568
Total Add Items 520 - 6 $33,740
Total (Base & Add Items) 4695 48 $303,090

Based on our evaluation and field findings, we recommend proceeding with the rehabilitation project as outlined above, which will proactively address sanitary sewer deficiencies and extend the useful life of the Waterview sanitary sewer system in a cost-effective manner.

Please call me with any questions or if you require additional information.

Sincerely,
PENNONI ASSOCIATES INC.

[Signature]
Michael J. Ellis, PE
Associate Vice President

EGMAU25007
East Goshen Municipal Authority

March 5, 2026

Waterview Sanitary Sewers
Page 3 of 3

/jdb

Enclosures: Waterview Sewer Lining Exhibit
Waterview Sanitary Sewer Condition Assessment

cc: Derek Davis, Township Manager
Lynn Werkheiser, Public Works

[Map of parcels and streets (Lochwood La, Sturbridge La, Glenbrook La) with numbered nodes C023 through C382 joined by lines. Green and blue line segments show pipe runs; a red cloud outlines an area near C208, C209 and C210. Three blue callout boxes and two green lists are printed on the page. The entries C204 > C203 and C254 > C253 are highlighted in pink.]

Callouts:

  • Pipe video labels do not correspond to field investigation.
  • No pipe video on file for review
  • Additional Manhole not shown on Map

Proposed Year #1 Pipe Lining

  • C244 > C243A = 387'
  • C243A > C243 = 99'
  • C243 > C242 = 172'
  • C272 > C271 = 269'
  • C382 > C381 = 303'
  • C381 > C380 = 160'
  • C380 > C368 = 281'
  • C274 > C273 = 400'
  • C204 > C203 = 288'
  • C254 > C253 = 25'
  • C253 > C209 = 201'

Proposed Year #1 Pipe Lining

  • C276 > C275 = 258'
  • C278 > C275 = 191'
  • C275 > C274 = 314'
  • C271 > C270 = 413'
  • C270 > C269 = 281'
  • C269 > C207 = 238'
  • C268 > C267 = 212'*
  • C267 > C207 = 200'
Disc Date Road Upstream MH Downstream MH Upstream MH material/condition Upstream MH depth to bench Direction of Survey Length Surveyed (ft) Pipe Size (in) Pipe Material Comments
1 1/22/2026 Lochwood Lane C382 C381 Brick/ Good Condition, minor mortar deterioration 76" Downstream 303.5 8 Asbestos Cement (108.2) Tap - Position: 3
(111.4) Tap - Position: 9
(273.3) Tap - Position: 9
(276.8) Tap - Position: 3
1 1/22/2026 Lochwood Lane C381 C380 Brick/ OK condition, minor I&I through mortar 68" Downstream 160.5 8 Asbestos Cement (49.1) Tap - Position: 9
(79.6) Fracture - Position: 1 to 2
(118.2) Tap - Position: 3
1 1/22/2026 Lochwood Lane C380 C368
(Video says C379)
Brick/ Good Condition 56" Downstream 280.6 8 Asbestos Cement (169.5) Fracture - Dripper Infiltration - Position: 11 _black discoloration (position 11-5)
(171.8) Tap - Position: 9
1 1/22/2026 Lochwood Lane C276 C275 Could not open Upstream 257.8 8 Asbestos Cement (91.6) Tap - Position: 9
1 1/22/2026 Waterview Rd C278 C275 Could Not Open Upstream 192 8 Asbestos Cement (31.4) Tap - Position: 9
(172.8) Tap - Position: 3
(176.1) Tap - Position: 9
1 1/22/2026 Lochwood Lane C275 C274 Could Not Open Downstream 313.5 (Field Surveyed @ 306.5') 8 Asbestos Cement (22.3) Tap - Position 3
(198.2) Tap - Position 9
(201.6) Tap - Position 3
1 1/22/2026 Lochwood Lane C274 C273 Brick/ Good Condition 203" Downstream 400.2 8 Asbestos Cement (43.7) Tap - Position: 9
(111.6) Fracture at pipe joint, gasket intruding into pipe. Possible infiltration weeper. Position: 10 to 3
(124.7) Tap - Position: 3 (camera passed without stopping)
(208.9) Tap - Position: 9
(224.7) Tap - Position: 3
(305.7) Tap - Position: 9
1 1/22/2026 Glenbrook Lane C244 C243A Brick/ Good Condition 96" Upstream 99.1 8 Asbestos Cement No Taps, no deficiencies
1 1/22/2026 Glenbrook Lane C243A C243 Concrete/ Good condition 52" Downstream 171.8 8 Asbestos Cement (47.6) Fracture, possible infiltration weeper -Position 1
(56.3) Tap - Position: 3
(165.6) Tap - Position: 3
(169.5) Tap - Position: 3
1 1/22/2026 Glenbrook Lane C243 C242 Brick/ Good Condition 70" Upstream 387.1 8 Asbestos Cement (53.4) Tap - Position: 9
(77.4) Tap - Position: 3
(161.3) Tap - Position: 9
(311.8) Tap - Position: 3
(315.1) Tap - Position: 9
(362.0) Tap - Position: 9
1 1/22/2026 Glenbrook Lane C242 C210 (C242) Brick, Spray lined/ Great condition
(C210 - 99" depth, Lined & slightly peeling)
83" Downstream 207.7 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (45.6) Tap - Position: 9
(171.0) Tap - Position: 9
(195.3 - 207.7) Camera under water, pipe appears to have been completely full based on staining all arund pipe, because of below issue?
(207.7) Is this the manhole or a capped lateral ?
(207.7) Pressure pipe discharge into sewer with significant flowrate (in manhole?) that is backing up upstream flow?
(207.7) Video ends, cannot get past the connecting pipe (manhole)?
1 1/22/2026 Glenbrook Lane C253 C209 Concrete/ Good condition 103" Upstream 239.7 8 Video noted as Asbestos Cement but appears to have been fully CIPPL No Taps, no deficiencies

1

Disc Date Road Upstream MH Downstream MH Upstream MH material/condition Upstream MH depth to bench Direction of Survey Length Surveyed (ft) Pipe Size (in) Pipe Material Comments
1 1/22/2026 Glenbrook Lane C254 C253 Could not Open Upstream 201.3 ??? GIS between C253 & C254 shows 25' (verified 25' in field) 8 Asbestos Cement (14.9) Possible Infiltration stain/surface wearing at joint - Position: 12 to 12 (camera passed without stopping)
(24.4) Possible Infiltration stain/surface wearing at joint - Position: 12 to 12 (camera passed without stopping)
(62.6) Tap - Position: 3
(80.6) Infiltration weeper at joint - Position: 12 to 12
(148.9) Tap - Position: 3
1 1/22/2026 Glenbrook Lane C209 C208 Could Not Open 96" Downstream 257 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (210.0) Tap - Position: 3 (camera passed without stopping)
1 1/22/2026 Waterview Rd C208 C207 Lined/ Good Condition (Appears to connect with C210) 106" Upstream 151.9 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (50.4) Tap - Position: 9 (Capped)
(51.3 - 71.8) Camera under water, paned left side wall
(71.8 - 100) Camera completely under water
1 11/3/2025 Waterview Rd C207 C206 Downstream 276.8 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (208.7) Tap - Position: 3
(211.9) Tap - Position: 9
1 11/3/2025 Waterview Rd C206 C205 Downstream 354.7 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (0 - 14) Camera completely under water
(92.4) Tap - Position: 3
(156.3) Tap - Position: 9
(281.3) Tap - Position: 3
(311 - 323.6) Camera completely under water
(345.6) Tap - Position: 9
(348.9 - 354.7) Camera completely under water
1 11/3/2025 Waterview Rd C206 C205 Downstream 371.4 8 Video noted as Asbestos Cement but appears to have been fully CIPPL (94) Tap - Position: 3 . Infiltration runner approx 2 feet up lateral (2-3 gpm)
(158.2) Tap - Position: 9
(282.9) Tap - Position: 3
(347.1) Tap - Position: 9
(353.2 - 362.7) Pipe sag, approx 50-60% full of water. Creating possible upstream blockages based on first video?
1 11/3/2025 Waterview Rd C272 C271 Upstream 269 8 Asbestos Cement / PVC (13.2) Tap - Position: 3
(118.3) Tap - Position: 3
(149.8) Root ball creating partial blockage (about 25%) of flow area
(149.8 - 192.7) Material changed - PVC
1 11/3/2025 Waterview Rd C271 C270 Downstream 412.9 8 Asbestos Cement / PVC (65.0) Tap - Position: 3
(78.7) Tap - Position: 9
(224.2) Tap - Position: 9
(278.1) Tap - Position: 3
(403.1 - 406.0) Material changed - PVC
(412.9) - Offset joint, possible pipe settlement, causing approx 1" of standing water in pipe before manhole discharge - CONSIDER EXCAVATED REPAIR BEFORE PIPE LINING
1 11/3/2025 Waterview Rd C270 C269 Downstream 280.9 8 Asbestos Cement (101.7) Tap - Position: 3
(176.3) Tap - Position: 9
(250.3) Tap - Position: 3
1 11/3/2025 Waterview Rd C269 C207 Downstream 238.4 8 Asbestos Cement (148.9) Tap - Position: 3
(152.2) Tap - Position: 9
(198.5) Tap - Position: 3
1 11/3/2025 Waterview Rd C268 C267 Downstream 211.9 8 PVC/ Asbestos Cement

2

Disc Date Road Upstream MH Downstream MH Upstream MH material/condition Upstream MH depth to bench Direction of Survey Length Surveyed (ft) Pipe Size (in) Pipe Material Comments
1 11/3/2025 Waterview Rd C267 C207 Downstream 200 8 Asbestos Cement (6.2) Tap - Position: 9
(148.8) Tap -Position: 3
1 11/3/2025 Lochwood Lane C205 C204 Downstream 171.9 8 Video noted as Asbestos Cement but appears to have been fully CIPPL
1 11/3/2025 Lochwood Lane C204 C203 Downstream 287.6 8 Asbestos Cement (98.4) Tap - Position: 3
(103.5) Tap - Position: 3 (Capped)
(106.6) Tap -Position: 9
(190.3) Tap? - Position: 3 (camera passed without stopping) - Is it active?
(203.5) Patched hole/tap - Position: 12-2
(272.7) Possible hole or tap (camera passed without stopping) - Position 10 to 2
2 11/4/2025 Lochwood Lane C273 C204 Downstream 8 Asbestos Cement

3