Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
April 13, 2026
7:00
- 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
- CHAIRMAN'S REPORT/OTHER MEMBERS' REPORTS
- LIAISON REPORTS
- SEWER REPORTS Director of Public Works' Report; West Goshen Report; Pennoni Engineer's Report; Big Fish Environmental Report
- APPROVAL OF MINUTES March 9, 2026
- APPROVAL OF INVOICES
| Company | Invoice # | Amount | Notes | Paid? |
|---|---|---|---|---|
| Pennoni | 1319278 - Hunt Country Pump Station Upgrade | $15,658.75 | ||
| Pennoni | 1319279 - Waterview Pipe Lining | $7,608.50 | Pennoni's Waterview Pipe Lining Proposal (under New Business) should be considered and approved by MA before approving this invoice. | |
| Pennoni | 1319280 - 2026 General Services | $9,700.25 | ||
| Gawthrop Greenwood | 222091490 | $338.10 | ||
| Maillie | 126946 | $7,500.00 | paid | |
| Xylem Water Solutions | 3556E12877 | $15,524.69 | paid |
Page 1 of 2
- FINANCIAL REPORTS March 2026
- OLD BUSINESS
- 2026 Goals:
| Goal | Status |
|---|---|
| Ridley Creek Plant compliance | January through March 2026 were in compliance with PADEP permit requirements. |
| Continue to implement infiltration and inflow for the sewer system | Ongoing. |
| Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. | Attend meetings on an as-needed basis. |
| Long-term sustainability | Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates. |
- NEW BUSINESS 1152 N Chester Rd - Possible Low Pressure Pump Station (TR Moser, no handouts); Consider Waterview CIPPL Engineering Proposal; Waterview Pipe Lining Bid Award Recommendation (Mike Ellis)
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Page 2 of 2
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
| Date: | April 13, 2026 |
|---|---|
| To: | Municipal Authority |
| From: | Mark Miller |
| Re: | Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 586,452 gallons per day.
Monthly Rainfall: 4.96
Meters:
- Read on a daily basis. No problems to report.
C.C. Collection:
- The pumping stations were checked on a daily basis.
- Gallagher Septic System Pumping was utilized to clean the grease at all pump stations. Wet wells were pumped all the way down so grease could be removed.; At that time, the floats were checked out to make sure they were operational.; We utilized our confined space entry gear. Happy to report that all members participated in the operation.; We saw cut and jackhammered out the large piece of concrete that supported the generator, which is now located outside the control building.
Ridley Creek Collection:
- The station wet was pumped down so the grit could be removed. Floats were cleaned and pumps were checked for wear. We found no problems with the equipment.
Page 1 of 2
Ridley Creek Plant:
- On March 26 th , we plugged the influent line to the plant. The guys went in and pulled the grit from the line, then vacuumed all the grit and other debris that had collected since the last cleaning.
- Muffin monster was pulled and cleaned thoroughly; we also flushed and cleaned the Roto-Mat.
- Lenni completed the electrical inspection at the plant.
Alarms: 27 alarms. The new alarm system is working very well.
PA One Calls: 166
Lateral Repairs/Caps:
- Public Works was contacted to check a lateral blockage in Millcreek Development. The guys plunged the trap and were able to clear the line.
- I stopped by a home in Clocktower Development when I saw a contractor working around a lateral. I introduced myself to the worker who said that the lateral cleanout had pulled out from the tee. They installed a new cleanout and all joints were glued. He said he had done a few in East Goshen so I gave him my card and asked that he contact me when working in the township.
Page 2 of 2
West Goshen March 2026 Sewer Report
General Notes:
- For the month of March, the plant operated in compliance with its NPDES permit.
- WWTP monthly average daily flow - 3.74 mgd.
- WWPS monthly average daily flow – 1.224 mgd.
- Monthly estimated average total phosphorus discharge concentration was <0.02 mg/L.
- Sludge to landfill – 320 wet tons.
Grant Projects:
- 2024 LSA-Statewide Grant: WWTP Pump Replacements. The WGSA has been awarded a grant of $250,000 for this project.
Ongoing Projects:
- WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 4 th qtr, 2026.
- Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. 95% of order has been delivered. Installation expected during 2 nd qtr, 2026.
- Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 2 nd qtr, 2026.
Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900
[Logo: West Goshen Township seal]
[Logo: Pennoni]
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
April 9, 2026
Ridley Creek Sewage Treatment Plant (RCSTP)
- Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
- SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
- Motor Control Center (MCC) #1 – Replacement of the MCC is proposed for design in 2026 and construction in 2027. We are preparing a proposal for engineering and design services for consideration at the May MA meeting.
- RCSTP NPDES Permit Renewal – We have begun to compile information for and to prepare the NPDES permit renewal application package. After we compile available information, we will determine if additional sampling is required for the application. The application is due to PADEP by October 2, 2026.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
- Waterview Pipe Lining – We finalized the bid document and administered the construction solicitation. The project was advertised for bid on March 13 and 17, and bids were due on April 3. Six bids were received. We conducted the bid opening, reviewed bids, prepared a bid tabulation, and submitted an award recommendation letter.
Pump Stations
- Hunt Country Pump Station – Pennoni conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, on February 18 and a topographic survey of the site on February 25. Blood Hound performed utility locating of the existing force main on March 4. Our survey crew surveyed the force main mark outs on March 5. Existing and proposed conditions design and plans are currently being prepared.
Sewer Extensions
- Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. We will provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
- Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
| Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713 |
T: 302-655-4451 | www.pennoni.com Page 1 of 3 |
|---|
| EGMAU26001 East Goshen Municipal Authority |
April 9, 2026 | Engineer's Report Page 2 of 3 |
|---|
Chapter 94 Reports
We completed the 2025 reports for the Ridley Creek STP (RCSTP), West Goshen (Chester Creek), and Westtown systems. We submitted the RCSTP report to PADEP on March 31. The West Goshen and Westtown Tributary reports were submitted to West Goshen Township and Westtown Township respectively on March 30.
East Goshen’s existing and projected treatment and conveyance needs for all three systems are all well within available and permitted capacities. A summary of the RCSTP and West Goshen reports follows:
- RCSTP Service Area: The RCSTP's average influent flow was 381,000 gpd in 2025. For reference, the average influent flow was 418,000 gpd in 2024. Flows remain well within the 750,000 gpd permitted average capacity of the plant. The 2025 flows are equivalent to 189 gpd/EDU, which is less than the Township's planning flow rate of 225 gpd/EDU. See Table 1 in the RCSTP Chapter 94 Report for a tabulation of 5-year flow history.; The projected future 5-year average and maximum monthly flows to the RCSTP are 424,000 gpd and 473,000 gpd, which is below the permitted capacity of the plant. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.; The RCSTP's average organic loading was 922 lbs BOD 5 /day in 2025. For reference, the average organic loading was 1,342 lbs BOD 5 /day in 2024. Organic loadings remain well within the 2,098 lbs/day permitted capacity. See Table 3 in the RCSTP Chapter 94 Report for a tabulation of 5-year organic loading history.; The 5-year projected average and maximum monthly organic loading to the plant is 932 lbs BOD 5 /day and 1,341 lbs BOD 5 /day, which is within the permitted capacity. Refer to the attached Chart 2 excerpt for a graph of the 5-year historical and 5-year projected organic loadings.; The Hershey's Mill and Hunt Country Pump Stations operated within their permitted hydraulic capacities in 2025, and they are projected to continue to do so in the future due to little to no projected upstream connections in the next couple years. See Table 8 in the RCSTP Chapter 94 Report for a summary of 2025 pump station flows versus capacities.
- West Goshen Service Area: East Goshen's average daily flow was 529,000 gpd in 2025. For reference, the average daily flow was 706,000 gpd in 2024. The actual flow rate in 2025 was 149 gpd/EDU, which is well under the planning flow rate of 225 gpd/EDU. See Table 1 in the West Goshen Chapter 94 Report for a tabulation of 5-year flow history.; The projected future 5-year average and maximum monthly flows to West Goshen are 650,000 gpd and 774,000 gpd, which is well within the intermunicipal capacity of 1 MGD. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.; The Barkway and Ashbridge Pump Stations operated within their permitted hydraulic capacities in 2025 and are projected to continue to do so due to no projected upstream connections in the next couple years. See Table 8 in the West Goshen Chapter 94 Report for a summary of 2025 pump station flows versus capacities.
New Connections
- 1344 Morstein Road – One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
- 1354 Paoli Pike – The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump. No activity since our last report.
| EGMAU26001 East Goshen Municipal Authority |
April 9, 2026 | Engineer's Report Page 3 of 3 |
|---|
- 1152 N. Chester Road – We performed a cursory evaluation of a possible sewer extension to service potential new residential development at the property. The extension would run approximately 1,950 LF to an existing sanitary sewer manhole in Tanglewood Lane. It could be constructed entirely as a low pressure system with grinder pumps or as a combination of gravity and low pressure sewers. This would potentially enable connections from other properties along that stretch of N. Chester Road and also from Ivy Lane, Old Orchard Lane, and Raewyck Drive. Sewer from the manhole on Tanglewood Drive to Greenhill Road could be gravity sewer instead of low pressure, but all sewers to the east of Greenhill Road would need to be low pressure due to topography.
Other
- GIS Mapping – We are updating the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We intend to present it to Public Works in April and to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
END OF REPORT
Chart 1 - Ridley Creek STP Hydraulic Loading
[Line chart plotting Flow (MGD) on the vertical axis from 0.000 to 0.800 against Year on the horizontal axis from 2021 to 2030. A horizontal red line marks the Permit Limit at 0.750 MGD across 2021–2030. Historical Monthly Average (blue line) and Annual Average (pink dashed line) are plotted from 2021 through early 2026, with Projected 3-Month Maximum (green line, approximately 0.47 MGD) and Projected Annual Average (pink solid line, approximately 0.42 MGD) extending from 2026 to 2030.]
Legend
- Permit Limit (0.750 MGD)
- Monthly Average
- Annual Average
- Projected 3-Month Maximum
- Projected Annual Average
Axes
- Flow (MGD): 0.000, 0.100, 0.200, 0.300, 0.400, 0.500, 0.600, 0.700, 0.800
- Year: 2021, 2022, 2023, 2024, 2025, 2026, 2027, 2028, 2029, 2030
RCSTP 2025 Ch 94 Rpt
Chart 2 - Ridley Creek STP Organic Loading
[Line chart plotting Organic Load (Lbs/Day) on the vertical axis from 0 to 2,400 against Year on the horizontal axis from 2021 to 2030. A horizontal red line marks the Permit Limit at 2,098 Lbs/Day across 2021–2030. Historical Monthly Average (blue line) and Annual Average (pink dashed line) are plotted from 2021 through early 2026, with Projected Monthly Average (pink solid line, approximately 930 Lbs/Day) and Projected Monthly Maximum (green solid line, approximately 1,340 Lbs/Day) extending from 2026 to 2030.]
Legend
- Permit Limit (2,098 Lbs/Day)
- Monthly Average
- Annual Average
- Projected Monthly Average
- Projected Monthly Maximum
Axes
- Organic Load (Lbs/Day): 0, 200, 400, 600, 800, 1,000, 1,200, 1,400, 1,600, 1,800, 2,000, 2,200, 2,400
- Year: 2021, 2022, 2023, 2024, 2025, 2026, 2027, 2028, 2029, 2030
RCSTP 2025 Ch 94 Rpt
Chart 1 - West Goshen Service Area Hydraulic Loading
[Line chart plotting Flow (MGD) on the vertical axis from 0.000 to 1.200 against Year on the horizontal axis from 2021 to 2030. A horizontal red dotted line marks the Intermunicipal Agreement Capacity Limit at 1.000 MGD across 2021–2030. Historical Monthly Average (green solid line) and Annual Average (grey solid line) are plotted from 2021 through early 2026, with Projected Monthly Average (green dashed line, approximately 0.64–0.65 MGD) and Projected 3-Month Maximum (purple dashed line, approximately 0.76–0.77 MGD) extending from 2026 to 2030.]
Legend
- Intermunicipal Agreement Capacity Limit (1.000 MGD)
- Monthly Average
- Annual Average
- Projected Monthly Average
- Projected 3-Month Maximum
Axes
- Flow (MGD): 0.000, 0.200, 0.400, 0.600, 0.800, 1.000, 1.200
- Year: 2021, 2022, 2023, 2024, 2025, 2026, 2027, 2028, 2029, 2030
2025 WG Chapter 94 Report
Chart1
[Logo: Big Fish Environmental Services Inc.]
RCSTP Monthly Operations Report
April 2026
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for March 2026. All supplemental reports were submitted for February 2026. Caustic usage increased to 62.26 gallons per day from 51.85 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 63.34 gallons per day from 68.90 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
TABLES
CERTIFIED LAB RESULTS- FINAL EFFLUENT March 2026
| FLOW | Ammonia as N | CBOD | Total Phosphorus | Total Suspended Solids | Fecal Coliform | |
|---|---|---|---|---|---|---|
| Permit Limit (Weekly Average) | Gallons | 7mg/L monthly | 15mg/L | 0.5mg/L | 15mg/L | 200 coliforms/100mL |
| DATE | Final EFF/Applebrook | |||||
| 3/3/26 | 373,000/0 | <0.10 | 2.5 | <0.10 | 4.2 | 4 |
| 3/10/2026 | 302,000/0 | <0.10 | 2.4 | 0.21 | 6.2 | <1 |
| 3/17/2026 | 361,000/0 | <0.10 | 3.2 | 0.21 | 7.2 | 1 |
| 3/24/2026 | 299,000/0 | <0.10 | 2.3 | 0.15 | 6.8 | 1 |
CERTIFIED LAB RESULTS- FINAL EFFLUENT March 2026 Non-Report tests
| FLOW | NO2-NO3 (mg/L) | TKN (mg/L) | TN (mg/L) | |
|---|---|---|---|---|
| DATE | Final EFF/Applebrook | |||
| 3/3/2026 | 373,000/0 | 5.49 | 1.38 | 6.87 |
| 3/10/2026 | 302,000/0 | 2.91 | 1.34 | 4.25 |
| 3/17/26 | 361,000/0 | 6.14 | 1.69 | 7.83 |
| 3/24/26 | 299,000/0 | 5.17 | 1.37 | 6.55 |
CERTIFIED LAB RESULTS- INFLUENT March 2026
| FLOW | Ammonia as N | BOD | CBOD | TKN | Total Phosphorus | Total Suspended Solids | |
|---|---|---|---|---|---|---|---|
| DATE | |||||||
| 3/3/2026 | 340,600 | 36.6 | 202 | 213 | 47 | 4.98 | 200 |
| 3/10/2026 | 338,120 | 36 | 234 | 218 | 52.4 | 4.63 | 118 |
| 3/17/2026 | 345,900 | 32.5 | 349 | 320 | 50.4 | 4.81 | 202 |
| 3/24/2026 | 284,410 | 37 | 222 | 190 | 48.8 | 4.84 | 132 |
TKN = Total Kleidahl Nitrogen
TN= Total Nitrogen
NO2-NO3= Nitrogen, Nitrate-Nitrite
The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained well below all of the weekly average discharge limits for the month of March.
PA DEP
Nothing to report
Pennoni Associates
Nothing to report
Significant Rainfall
During March, there were fourteen (14) days where precipitation occured. There were 2 days where precipitation accumulation was greater than 0.50”.
3/6 0.70”
3/17 0.69”
Total precipitation for the month was 3.61” rain
*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred
Chemical Data
| March 2026 | ||
|---|---|---|
| Chemical | Daily Average | Total Monthly |
| Caustic Soda, gal | 62.26 | 1930.11 |
| Aluminum Sulfate solution, gal | 63.34 | 1963.44 |
| Sludge Dewatering, gal* | 16,378 | 393,078 |
*24 days of sludge dewatering
There was a decrease of 36,775 gallons of sludge dewatering during the month of March compared to February.
Page 2 of 3
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Major Repairs or Upgrades
Nothing to report
Upcoming Repairs or Upgrades
Centrifuge major overhaul
Flow Data
| March 2026 | |||
|---|---|---|---|
| Flow Meter Location | Total Volume for Month, MG |
Average Daily Flow, gpd |
Daily Maximum Flow, gpd |
| Influent Wastewater to Screening Building | 9.743 | 314,288 | 389,550 |
| Influent Wastewater to SBRs | 12.475 | 402,413 | 512,640 |
| Internal Recycle | 2.732 | 88,126 | 143,194 |
| Treated Effluent to Disc Filters | 11.841 | 381,955 | 489,664 |
| Final Effluent Discharge | 9.397 | 303,000 | 415,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
The plant hydraulic design loading is 745,000 gpd.
There were no high flow events during the month of March 2026
Page 3 of 3
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
March 9, 2026
The East Goshen Township Municipal Authority held their regular meeting on Monday, March 9, 2026 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings – Chairman
John Stipe – Vice Chairman
Sean Ellsworth
Dana Pizarro
Walter Wujcik
Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Peter Hicks (Supervisor)
Kelly Brophy, Finance Director
Patrick McKenna (Attorney)
Theodore Speedy (Attorney)
Stacey Fuller (Attorney)
COMMON ACRONYMS:
| ATS – Automatic Transfer Switch | MA- Municipal Authority |
|---|---|
| BFES – Big Fish Environmental Services | NPDES – National Pollutant Discharge Elimination System |
| BOS – Board of Supervisors | PC – Planning Commission |
| CB – Conservancy Board | PM – Prevention Maintenance |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
| PWD – Public Works Department |
Call to Order & Pledge of Allegiance
John called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
John asked for a moment of silence for our First Responders and Military.
John asked if anyone would be recording the meeting. There was no response.
Chairman’s Report/Other Members Report
None
Liaison Reports
1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful day is April 25.
PECO Arbor Day will be Friday, April 24, 2026. Chester County and East Goshen has been asked to host this event. PECO will donate 100 trees. Some will be given away for free.
MA 3--9-26 draft 1
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for March 9, 2026.
Monthly Flows – The average daily flow to West Goshen was 567,129 gallons per day.
Monthly Rainfall - 2.57”.
Meters: Read on a daily basis. No problems to report.
I reached out to Paul Mamzic from Allied Control to discuss the calibration of the meters going forward.
C.C.Collection
- Pump stations were visited daily, wet wells were washed down, pumps were checked for proper operation, and generator was checked for fuel along with oil levels..
- We investigated a lateral blockage on Grand Oak Ln and advised the resident to contact a plumber.
- We utilized Pipe Data View to clean and televise the Waterview Development.
- John Laidley has been installing the new data and dialer devices in the pump stations – see attached screenshots of the mission 1235CADA website interface. We will take courses to learn how to use this.
Ridley Creek Collection:
- We found the pump station operation to be normal.
- We checked oil levels on the muffin monster and the generator.
- During the snowstorm we experienced loss of power for approximately twenty hours.
- We were notified of a missing manhole cover in the Hunt Country Development.
Ridley Creek Plant:
- Plant Operator said the plant was normal for the month.
- The plant was on emergency power during the snowstorm. A limb had struck the main line causing a fuse to trip out. PECO emergency operations center was notified.
- Lenni conducted their annual electrical equipment detailed inspection.
- Mike Ellis and his electrical engineer met with Joe from Lenni Electric to go over the motor control center and we decided to do the engineering work this year.
Alarms: 18
PA One Calls: 127
Lateral Repairs/Caps: 0
- We inspected a new lateral in the Millstone Meadows Development on Hershey Mill Rd.
2. West Goshen Report
The phosphorus number was discussed.
MA 3--9-26 draft 2
3. Pennoni Engineer’s Report dated March 5, 2026
Ridley Creek Sewage Treatment Plant (RCSTP)
- Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
- SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
- Motor Control Center (MCC) #1 – Pennoni recommended in our arc flash and short circuit study in 2025 that several breakers in the MCC be replaced with larger capacity breakers. Lenni Electric was unable to do so because the replacement breakers for the four blower starters do not align with the on-off switches that extend outside of the MCC cabinets, and compatible parts are not available given the age of the MCC. We met on-site with Lenni Electric and the RCSTP operator to evaluate potential replacement of the MCC accordingly. We documented existing conditions including tracing wiring throughout the MCC and marking up single line diagrams and building plans. It was determined that the replacement does not need to be with a new MCC but can instead be simplified with just four blower starters, two replacement electrical panels, and a transformer. We prepared a proposed written scope for the work and are coordinating with Lenni for budgetary pricing. We propose that the project be budgeted for construction in 2027. Design can potentially occur in 2026. We can provide a design proposal after the proposed scope is confirmed with Lenni, the operator, and Public Works.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – No updates since our last report. As previously reported, the contractor, Vortex Services, completed all pipe lining work, but one 370 LF pipe run has small “bubbles” throughout the liner. The contractor proposed to remove a sample of the blistered liner with a robotic cutter to evaluate the condition of the underlying resin/felt cured wall. We have not heard from the contractor in several months and are contacting them for resolution. Final payment is still being held.
- Waterview – We performed visual interior condition assessments of additional manholes in the neighborhood, and we completed analysis of the pipe inspection videos. We met with Mark Miller to review pipe lining recommendations and to resolve discrepancies on sewer system pipe routing and manhole locations, confirm several pipes have previously been pipe lined, revisit that one pipe did not have a video, and request additional videos to confirm. Public Works subsequently televised several of the pipes and confirmed the pipe routing and pipes that were already lined. We prepared a pipe lining recommendation letter and submitted to the Township for consideration by the Municipal Authority of direction to advertise.
Pump Stations
- Hunt Country Pump Station – Pennoni conducted an existing conditions survey of the
MA 3--9-26 draft 3
interior of the Hunt Country Pump Station building, including electrical components, on February 18 and a topographic survey of the site on February 25. Blood Hound performed utility locating of the existing force main on March 4. Our survey crew will go back out to the site to survey the force main afterwards. Existing conditions plans are currently being prepared.
Sewer Extensions
- Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. We will provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
- Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
Chapter 94 Reports
- We are continuing preparation of the 2025 Chapter 94 Annual Reports. We are on track to submit before the March 31 submission due date.
New Connections
- 1344 Morstein Road – One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously reviewed a revised plan submission, issued a comment letter, and discussed the approach to resolve outstanding comments with the design engineer. We are awaiting a plan resubmission to address minor sewer comments. We also provided the design engineer with the Township’s Grinder Pump O&M agreement template.
- 1354 Paoli Pike – The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump. We provided information to Mark Miller on grinder pump vendor alternatives and low pressure sewer lateral requirements.
Other
- GIS Mapping – We are updating the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We intend to present it to Public Works in March and to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
MA 3--9-26 draft 4
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for February 2026. All supplemental reports were submitted for January 2026. Caustic usage increased to 51.85 gallons per day from 47.99 gallons per day last month. Aluminum sulfate solution volumes daily average increased slightly to 68.90 gallons per day from 68.61 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Approval of Minutes
The minutes of the February 9, 2026 meeting were approved by Sean and John.
Approval of Invoices
1. Walter approved payment of Pennoni Invoices:
#1314790 in the amount of $478.00.
#1314791 in the amount of $4,546.75
#1314793 in the amount of $2,636.00
John seconded the motion. The motion passed unanimously. (it was decided to hold payment of Invoice #1314792 in the amount of $9,390.75)
2. Walter moved to approve payment of Gawthrop Greenwood invoice #222.68274 in the amount of $205.00. Sean seconded the motion. The motion passed unanimously.
Financial Reports
Kelly reviewed the following report: YTD February 2026, the Municipal Authority recorded $32,472.60 in revenues (primarily from Sewer Capital Reserve, Sewer Operating transfers and collecting tapping fees) and $24,197.75 in expenses (Hershey Mill pump station mission alarm panel installation and legal and engineering expenses). The net result of operations is $8,274.85. As of February 28, 2026, the fund balance was $36,642.07.
Old Business –
Tapping Fees were discussed. They cover cost by municipality for installing piping. John asked about inspection fees. Mark explained.
Goals
All okay
New Business –
1. Biennial Meeting – This planning meeting of the ABCs is tomorrow. Kevin put together the report for this meeting.
2. Waterview – Mike mentioned that some of the piping is already lined so this will be less than a 3 year project. His proposal was reviewed. Bid will go out at $300,000. Walter moved to authorize that the bid package be sent out. Sean seconded the motion. The motion passed unanimously.
3. The letter from Aqua is just an FYI.
MA 3--9-26 draft 5
Any Other Matter –
Correspondence- None
Public Comment - None
Adjournment
There being no further business Walter moved to adjourn the meeting. Sean seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:45 pm.
The next regular meeting will be held on Monday, April 13, 2026 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 3--9-26 draft 6
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1319278
Invoice Date : 04/03/2026
Project : EGMAU25004
Project Name : Hunt Country Pump Station Upgrade
For Services Rendered Through 03/22/2026
Pennoni performed survey of existing site conditions, topography, and utility markouts; obtained and reviewed PA One Call plans from utilities; assisted with subcontractor utility locating on-site; interior survey of existing pump station building; engineering field visits for electrical and piping design; prepared existing site and building plans; and initiated design and plan preparation.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- Survey | NTE | $11,400.00 | $0.00 | 87.42% | $9,966.25 | $9,966.25 |
| 02 -- Design | NTE | $50,100.00 | $478.00 | 12.32% | $6,170.50 | $5,692.50 |
| 03 -- Permitting | NTE | $12,800.00 | $0.00 | 0.00% | $0.00 | $0.00 |
| 04 -- Bid Services | NTE | $6,300.00 | $0.00 | 0.00% | $0.00 | $0.00 |
| Total : | $80,600.00 | $478.00 | $16,136.75 | $15,658.75 |
Phase: 01 -- Survey
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Senior Professional | 5.50 | 158.00 | 869.00 |
| Engineering Tech III | 32.00 | 118.00 | 3,776.00 |
| Engineering Tech | 53.75 | 99.00 | 5,321.25 |
| Labor | 9,966.25 | ||
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 9,966.25 | 0.00 | 9,966.25 |
| Limit | 11,400.00 | ||
| Remaining | 1,433.75 |
Phase Subtotal $9,966.25
Phase: 02 -- Design
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.75 | 166.00 | 456.50 |
| Senior Professional | 2.00 | 158.00 | 316.00 |
| Staff Professional | 33.00 | 133.00 | 4,389.00 |
| Engineering Tech III | 4.50 | 118.00 | 531.00 |
| Labor | 5,692.50 | ||
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25004
Pennoni Job No.: Hunt Country Pump Station Upgrade
Invoice No: 1319278
Invoice Period: 2/16/2026 to 3/22/2026
Initial Authorization: $ 80,600.00 Date: 4/2/2026
Contract Amount: $ 80,600.00
Previously Invoiced: $ 478.00
Current Invoice: $ 15,658.75
Invoiced to Date ($): $ 16,136.75
Invoiced to Date (%): 20%
Remaining Budget ($): $ 64,463.25
Remaining Budget (%): 80%
Budget by Phase:
Phase Name: Hunt Country Pump Station Upgrade
Phase Budget: $ 80,600.00
Previously Invoiced: $ 478.00
Current Invoice: $ 15,658.75
Invoiced to Date ($): $ 16,136.75
Invoiced to Date (%): 20%
Remaining Budget ($): $ 64,463.25
Remaining Budget (%): 80%
Comments: Pennoni performed survey of existing site conditions, topography, and utility markouts; obtained and reviewed PA One Call plans from utilities; assisted with subcontractor utility locating on-site; interior survey of existing pump station building; engineering field visits for electrical and piping design; prepared existing site and building plans; and initiated design and plan preparation.
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1319279
Invoice Date : 04/03/2026
Project : EGMAU25007
Project Name : Waterview Pipe Lining
For Services Rendered Through 03/22/2026
Field inspection of interior manhole conditions and sewer main routing. Multiple field visits to resolve sewer connectivity/routing discrepancies from CCTV video documentation. Reviewed CCTV pipe videos. Confirmed pipes that were previously lined with PW Dept. Prepared condition assessment mapping, pipe priorities, cost estimates, and programming recommendation letter to Authority for pipes to line. Prepared bid document and attended meeting with PW Director to review bid document. Prepared construction solicitation on PennBID. Provided bid assistance including response to bidders' questions.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| .. Waterview Pipe Lining | est. | $30,000.00 | $0.00 | $7,608.50 | $7,608.50 | |
| Total : | $30,000.00 | $0.00 | $7,608.50 | $7,608.50 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 8.25 | 166.00 | 1,369.50 |
| Senior Professional | 2.50 | 158.00 | 395.00 |
| Staff Professional | 1.50 | 133.00 | 199.50 |
| Associate Professional | 5.00 | 120.00 | 600.00 |
| Engineering Tech III | 42.75 | 118.00 | 5,044.50 |
| Labor | 7,608.50 | ||
Amount Due This Invoice $7,608.50
APPROVED BY: [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-429-3700
[Handwritten: OK MAM 4/9/2026]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25007
Pennoni Job No.: Waterview Pipe Lining
Invoice No:
Invoice Period: 2/16/2026 to 3/22/2026
Initial Authorization: $ 30,000.00 Date: 4/2/2026
Contract Amount: $ 30,000.00
Previously Invoiced: $ -
Current Invoice: $ 7,608.50
Invoiced to Date ($): $ 7,608.50
Invoiced to Date (%): 25%
Remaining Budget ($): $ 22,391.50
Remaining Budget (%): 75%
Budget by Phase:
Phase Name: Waterview Pipe Lining
Phase Budget: $ 30,000.00
Previously Invoiced: $ -
Current Invoice: $ 7,608.50
Invoiced to Date ($): $ 7,608.50
Invoiced to Date (%): 25%
Remaining Budget ($): $ 22,391.50
Remaining Budget (%): 75%
Comments: Field inspection of interior manhole conditions and sewer main routing. Multiple field visits to resolve sewer connectivity/routing discrepancies from CCTV video documentation. Reviewed CCTV pipe videos. Confirmed pipes that were previously lined with PW Dept. Prepared condition assessment mapping, pipe priorities, cost estimates, and programming recommendation letter to Authority for pipes to line. Prepared bid document and attended meeting with PW Director to review bid document. Prepared construction solicitation on PennBID. Provided bid assistance including response to bidders' questions.
| Project | EGMAU25004 | Hunt Country Pump Station Upgrade | Invoice | 1319278 |
|---|
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 5,692.50 | 478.00 | 6,170.50 |
| Limit | 50,100.00 | ||
| Remaining | 43,929.50 |
Phase Subtotal $5,692.50
Amount Due This Invoice $15,658.75
APPROVED BY: [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3705
[Handwritten: OK MAM 4/9/2026]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
[Logo: Pennoni]
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1319280
Invoice Date : 04/03/2026
Project : EGMAU26001
Project Name : 2026 General Services
For Services Rendered Through 03/22/2026
January, February, and March Engineer's Reports. Reviewed January, February, and March RCSTP Operator's Reports. Attended January, February, and March MA meetings. Meeting with PW Director and Finance Director regarding 2026 project budgets.
RCSTP MCC: Field meeting at RCSTP with Lenni Electric and plant operator to evaluate conditions and document wiring for Motor Control Center (MCC) #1. Prepared markups of MCC conditions and circuits. Initiated evaluation, scoping alternatives, and budgetary cost estimating for potential MCC replacement.
Evaluated 1354 Paoli Pike sewer connection request and feasibility of gravity lateral vs. grinder pump. Cursory evaluation of potential low pressure sewer extension along N. Chester Rd for possible development at 1152 N. Chester Rd. Responded to questions from 1352 Morstein Rd developer about potential Morstein Rd sewer extension for future connection.
Gravity flow meter near Blacksmith Shop: performed field visit to measure existing manhole depths and evaluate sie conditions, and coordinated with suppliers for meter and manhole quotes.
Initiated updates to GIS mapping of Township-wide sanitary sewer system including field identified deficiencies with Waterview manholes and pipe routing. Update Township's typical sanitary sewer lateral detail per PW Director comments.
Researched conflicting info from PA DCED on grant award amount for Hershey's Mill Pump Station Upgrade.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- General Engineering Services | NTE | $45,925.25 | $0.00 | 20.96% | $9,625.50 | $9,625.50 |
| 02 -- Grants | NTE | $74.75 | $0.00 | 100.00% | $74.75 | $74.75 |
| Total : | $46,000.00 | $0.00 | $9,700.25 | $9,700.25 |
Phase: 01 -- General Engineering Services
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 28.50 | 166.00 | 4,731.00 |
| Senior Professional | 19.25 | 158.00 | 3,041.50 |
| Project Professional | 4.00 | 142.00 | 568.00 |
| Staff Professional | 7.00 | 133.00 | 931.00 |
| Engineering Tech III | 3.00 | 118.00 | 354.00 |
| Labor | 9,625.50 | ||
Phase Subtotal $9,625.50
Phase: 02 -- Grants
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU26001
Pennoni Job No.: 2026 General Services
Invoice No: 1319280
Invoice Period: 1/1/2026 to 3/22/2026
Initial Authorization: $ 46,000.00 Date: 4/2/2026
Contract Amount: $ 46,000.00
Previously Invoiced: $ -
Current Invoice: $ 9,700.25
Invoiced to Date ($): $ 9,700.25
Invoiced to Date (%): 21%
Remaining Budget ($): $ 36,299.75
Remaining Budget (%): 79%
Budget by Phase:
Phase Name: 2026 General Services
Phase Budget: $ 46,000.00
Previously Invoiced: $ -
Current Invoice: $ 9,700.25
Invoiced to Date ($): $ 9,700.25
Invoiced to Date (%): 21%
Remaining Budget ($): $ 36,299.75
Remaining Budget (%): 79%
Comments: January, February, and March Engineer's Reports. Reviewed January, February, and March RCSTP Operator's Reports. Attended January, February, and March MA meetings. Meeting with PW Director and Finance Director regarding 2026 project budgets.
RCSTP MCC: Field meeting at RCSTP with Lenni Electric and plant operator to evaluate conditions and document wiring for Motor Control Center (MCC) #1. Prepared markups of MCC conditions and circuits. Initiated evaluation, scoping alternatives, and budgetary cost estimating for potential MCC replacement.
Evaluated 1354 Paoli Pike sewer connection request and feasibility of gravity lateral vs. grinder pump. Cursory evaluation of potential low pressure sewer extension along N. Chester Rd for possible development at 1152 N. Chester Rd. Responded to questions from 1352 Morstein Rd developer about potential Morstein Rd sewer extension for future connection.
Gravity flow meter near Blacksmith Shop: performed field visit to measure existing manhole depths and evaluate sie conditions, and coordinated with suppliers for meter and manhole quotes.
Initiated updates to GIS mapping of Township-wide sanitary sewer system including field identified deficiencies with Waterview manholes and pipe routing. Update Township's typical sanitary sewer lateral detail per PW Director comments.
Researched conflicting info from PA DCED on grant award amount for Hershey's Mill Pump Station Upgrade.
| Project | EGMAU26001 | 2026 General Services | Invoice | 1319280 |
|---|
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 166.00 | 41.50 |
| Staff Professional | 0.25 | 133.00 | 33.25 |
| Labor | 74.75 | ||
Phase Subtotal 4.75
Amount Due This Invoice ,700.25
APPROVED BY: [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130
[Handwritten: OK MAM 4/9/2026]
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/08/2026
Client No: 6604-001M
Invoice No. 222091490
APPROVED BY: [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140
[Handwritten: OK MAM]
General Authority Services
Fees
| Date | Staff | Description | Hours | Amount |
|---|---|---|---|---|
| 03/06/2026 | PMM | Email from L. Werkheiser with Board meeting agenda and materials; Review & Analyze same. | 0.30 | 61.50 |
| 03/09/2026 | TTS | Receipt and Review meeting materials; Preparation for and Attend Authority Board Meeting. | 1.40 | 273.00 |
| For Current Services Rendered | 1.70 | 334.50 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Theodore Speedy | 1.40 | 95.00 | 73.00 |
| Patrick M. McKenna, Esquire | 0.30 | 205.00 | 61.50 |
Expenses
| Travel to/from East Goshen MA (T Speedy) | 3.60 |
|---|---|
| Total Expenses Thru 03/31/2026 | 3.60 |
Previous Balance: 05.00
Total Current Charges: 338.10
03/17/2026 Payment: -205.00
Balance Due: 38.10
East Goshen Municipal Authority
General Authority Services
Page: 2
04/08/2026
Client No: 6604-001M
Invoice No. 222091490
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Gawthrop Greenwood, PC
Attorneys at Law
(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
GAWTHROP GREENWOOD CLIENT INVOICE
Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562
To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
04/08/2026
Client No: 6604M
| Account | Previous Balance | Fees | Expenses | Payments | Balance |
|---|---|---|---|---|---|
| 6604-001 General Authority Services | 205.00 | 334.50 | 3.60 | -205.00 | 38.10 |
To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Maillie
ACCOUNTANTS • ADVISORS
500 N Lewis Rd
Limerick, PA 19468
(610) 935-1420
EIN: 23-1518888
Web: www.maillie.com
Email: firm@maillie.com
Kelly Brophy
East Goshen Municipal Authority
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
Date: 2/28/2026
Invoice Number: 126946
Client: 2500.000
Due Date: Upon Receipt
Billing for time incurred from January 1, 2026 to February 28, 2026 for the following services:
Progress billing on December 31, 2025 financial statement audit
Invoice Total: ,500.00
APPROVED BY: [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3110
[Stamp: PAID]
Please return this portion with payment.
ID: 2500
East Goshen Municipal Authority
Date: 2/28/2026
Due Date: Upon Receipt
Invoice: 126946
Amount Due: ,500.00
Amount Enclosed:
Please make checks payable to Maillie LLP.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO:
26717 Network Place
Chicago, IL 60673-1267
INVOICE
| YOUR PURCHASE ORDER | INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 26-00105 | 3556E12877 | F49602 | 3/06/26 | K49821 | 3/06/26 | C1 | 130 | 100% N30 FROM INVOICE |
Customer No. 213828 | Global No. 5230853
Sold To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
Ship To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| FREIGHT TERMS: Jobsite | DELIVERY TERMS: No S & H Charge | ORDER PROCESSED BY: FLYGT-PHILADELPHIA, PA BRA |
|---|---|---|
| SHIP VIA: Customer Pick Up | ORDER TEXT: East Goshen T#4533 | CUSTOMER TEXT: Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED / UM | UNIT PRICE / DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| Quote# R2026-MAL-0012 | |||||
| 001 | 0000000830453 SCREW, ALLEN M12 X 45 SS |
4 EA |
7.626 | 30.50 | |
| 002 | 0000000830455 SCREW, ALLEN M12 X 110 SS |
1 EA |
31.161 | 31.16 | |
| 003 | 0000000835350 PARTITION |
1 EA |
6.641 | 6.64 | |
| 004 | 0000000835354 SUPPORT, END |
2 EA |
10.661 | 21.32 | |
| 005 | 0000000835358 CLAMP, TERMINAL |
3 EA |
12.301 | 36.90 | |
[Stamp: PAID]
APPROVED BY: [Signature: MAM] [Initials: KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-429-1505
Cont on 2
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO:
26717 Network Place
Chicago, IL 60673-1267
INVOICE
| YOUR PURCHASE ORDER | INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 26-00105 | 3556E12877 | F49602 | 3/06/26 | K49821 | 3/06/26 | C1 | 130 | 100% N30 FROM INVOICE |
Page 2
Customer No. 213828 | Global No. 5230853
Sold To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
Ship To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| FREIGHT TERMS: Jobsite | DELIVERY TERMS: No S & H Charge | ORDER PROCESSED BY: FLYGT-PHILADELPHIA, PA BRA |
|---|---|---|
| SHIP VIA: Customer Pick Up | ORDER TEXT: East Goshen T#4533 | CUSTOMER TEXT: Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED / UM | UNIT PRICE / DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 005 | 0000000835358 | ||||
| 006 | 0000000835361 CLAMP, TERMINAL |
8 EA |
31.161 | 249.29 | |
| 007 | 0000000841804 GROMMET, NBR 29ID 52OD 26L |
2 EA |
45.921 | 91.84 | |
| 008 | 0000000942108 CABLE, SUBCAB AWG 8/3-2-1-GC+ 28.2MM |
40 FT |
45.921 | 1,836.84 | |
| 009 | 0000006081302 JACKET, COOLING STEEL |
1 EA |
634.680 | 634.68 | |
| 010 | 0000006081402 DIFFUSER, FLOW STEEL COATED |
1 EA |
386.221 | 386.22 |
Cont on 3
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO:
26717 Network Place
Chicago, IL 60673-1267
INVOICE
| YOUR PURCHASE ORDER | INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 26-00105 | 3556E12877 | F49602 | 3/06/26 | K49821 | 3/06/26 | C1 | 130 | 100% N30 FROM INVOICE |
Page 3
Customer No. 213828 | Global No. 5230853
Sold To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
Ship To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| FREIGHT TERMS: Jobsite | DELIVERY TERMS: No S & H Charge | ORDER PROCESSED BY: FLYGT-PHILADELPHIA, PA BRA |
|---|---|---|
| SHIP VIA: Customer Pick Up | ORDER TEXT: East Goshen T#4533 | CUSTOMER TEXT: Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED / UM | UNIT PRICE / DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 010 | 0000006081402 | ||||
| 011 | 0000006082210 ADAPTOR, CI |
1 EA |
2,170.540 | 2,170.54 | |
| 012 | 0000006419405 STATOR, 21-15-4A 230/460V |
1 EA |
2,045.080 | 2,045.08 | |
| 013 | 0000006421000 HOLDER, BEARING ALUM |
1 EA |
646.981 | 646.98 | |
| 014 | 0000006421200 COVER, HOUSING SEAL CI |
1 EA |
1,367.760 | 1,367.76 | |
| 015 | 0000006421701 FLANGE, ENTRANCE CI |
1 EA |
273.061 | 273.06 |
Cont on 4
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO:
26717 Network Place
Chicago, IL 60673-1267
INVOICE
| YOUR PURCHASE ORDER | INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 26-00105 | 3556E12877 | F49602 | 3/06/26 | K49821 | 3/06/26 | C1 | 130 | 100% N30 FROM INVOICE |
Page 4
Customer No. 213828 | Global No. 5230853
Sold To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
Ship To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| FREIGHT TERMS: Jobsite | DELIVERY TERMS: No S & H Charge | ORDER PROCESSED BY: FLYGT-PHILADELPHIA, PA BRA |
|---|---|---|
| SHIP VIA: Customer Pick Up | ORDER TEXT: East Goshen T#4533 | CUSTOMER TEXT: Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED / UM | UNIT PRICE / DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 015 | 0000006421701 | ||||
| 016 | 0000006505100 CABLE UNIT |
1 EA |
127.100 | 127.10 | |
| 017 | 0000006571708 KIT, REPAIR BASIC 3153 |
1 EA |
2,925.761 | 2,925.76 | |
| 018 | 0000006630400 SENSOR, LEVEL FLS-10 |
1 EA |
464.940 | 464.94 | |
| 019 | 0000007201400 SLEEVE UNIT |
1 EA |
250.920 | 250.92 | |
| 020 | 0000007345900 LEAD-THROUGH UNIT |
1 EA |
72.160 | 72.16 |
Cont on 5
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO:
26717 Network Place
Chicago, IL 60673-1267
INVOICE
| YOUR PURCHASE ORDER | INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 26-00105 | 3556E12877 | F49602 | 3/06/26 | K49821 | 3/06/26 | C1 | 130 | 100% N30 FROM INVOICE |
Page 5
Customer No. 213828 | Global No. 5230853
Sold To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
Ship To:
East Goshen TWP
1580 PAOLI PIKE
WEST CHESTER PA 19380-6107
| FREIGHT TERMS: Jobsite | DELIVERY TERMS: No S & H Charge | ORDER PROCESSED BY: FLYGT-PHILADELPHIA, PA BRA |
|---|---|---|
| SHIP VIA: Customer Pick Up | ORDER TEXT: East Goshen T#4533 | CUSTOMER TEXT: Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED / UM | UNIT PRICE / DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 020 | 0000007345900 | ||||
| 021 | 1400000690002A LABOR, SVC FLYGT, NO TAX Z3-TP MODELS: 3000,6000,7000,8000 |
12 EA |
145.000 | 1,740.00 | |
| 022 | 1400000690021A ENV FEE 0-10HP NO TAX TP ENVIRONMENTAL FEE |
1 EA |
60.000 | 60.00 | |
| 023 | 1400000690024 SHOP SUPPLIES-SMALL PUMPS TP MISC SHOP SUPPLIES FOR REPAIR |
1 EA |
55.000 | 55.00 | |
| SUB-TOTAL OF POSITIONS | 15,524.69 | ||||
| ** ADD NO S & H CHARGES ** | |||||
| NET AMOUNT BEFORE TAXES USD | 15,524.69 | ||||
| ORDER TOTAL USD | 15,524.69 | ||||
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Dana Gieder |
| Re: | MA March 2026 YTD Financial Report |
| Date: | April 9, 2026 |
YTD March 2026, the Municipal Authority recorded 1,445.19 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers and collecting tapping fees) and 7,656.81 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, legal and engineering expenses). The net result of operations is 3,788.38. As of March 31, 2026, the fund balance was 2,155.60.
Attached is a complete list of 2026 YTD detailed MA revenues and expenses.
****Per Pennoni’s instructions we are still holding invoice # 1314792 for ,390.75, dated 2/27/2026, Project Name: 2026 General Services.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD MARCH 2026
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 38.38 | 52.25 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 4,332.72 | 13,750.00 | 0 |
| 07-364-1130 | CONNECTION FEES - SEWER | 563.76 | 0 | 0 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 282.24 | 0 | 0 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 319,438.19 | 47,880.62 | 30,207.80 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1,033,650.00 | 19,776.19 | 60,230.04 |
| Total Revenue | 1,360,566.91 | 81,445.19 | 90,490.09 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 47,871.20 | 12,569.62 | 11,967.80 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,645.71 | 0 | 780.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 12,000.00 | 7,500.00 | 12,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 61,000.00 | 26,242.50 | -5,841.50 |
| 07-424-3140 | LEGAL SERVICES | 6,500.00 | 1,090.50 | 1,686.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 42,000.00 | 0 | 0 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 95,000.00 | 478.00 | 0 |
| 07-424-7431 | CAPITAL PROJ.-ENGINEERING | 60,000.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 126,000.00 | 0 | 0 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 4,251.50 | 8,346.00 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 515,550.00 | 0 | 0 |
| 07-429-1505 | RCSTP CAPITAL | 50,000.00 | 15,524.69 | 51,884.04 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 343,000.00 | 0 | 0 |
| Total Expenses | 1,360,566.91 | 67,656.81 | 80,822.84 | |
| Net Result From Operations | 0.00 | 13,788.38 | 9,667.25 | |
Municipal Authority
YTD Revenues and Expenses thru 3/31/2026
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/26 | Revenue Journal | INTEREST EARNED JANUARY 2026 | 12.81 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/26 | Revenue Journal | INTEREST EARNED FEBRUARY 2026 | 12.04 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/26 | Revenue Journal | INTEREST EARNED MARCH 2026 | 13.53 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1427 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1427 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1411 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1411 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1417 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1417 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/11/26 | Revenue Journal | INSPECTION FEE 301 RESERVOIR RD LOT 5 | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/11/26 | Revenue Journal | SEWER INSPECTION FEE 301 RESERVOIR LOT5 | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/31/26 | Revenue Journal | INSPECTION FEE R.C. 1415 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/31/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1415 MILLSTONE | 750.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/21/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 612.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/10/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 19,333.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/10/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,864.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/17/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,500.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 12,569.62 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/21/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,251.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/31/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 15,524.69 |
| Total Revenue | 81,445.19 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/27/26 | Pay Check: 715 | 26-00698 QTR 1 2026 MA CHARGE BACK | 12,569.62 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/17/26 | Pay Check: 3587 | 26-00635 PROGRESS BILLING AUDIT EGT MUA | 7,500.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/10/26 | Pay Check: 3584 | 26-00338 SERV THRU 123125 2025 GEN SERV | 4,835.25 |
| 07-424-3130 | ENGINEERING SERVICES | 02/10/26 | Pay Check: 3584 | 26-00339 SERV THRU 123125 MORSTEIN RD | 14,225.50 |
| 07-424-3130 | ENGINEERING SERVICES | 03/10/26 | Pay Check: 3586 | 26-00549 SERV THRU 021526 25 CHAPTER 94 | 2,635.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/10/26 | Pay Check: 3586 | 26-00550 SERV THRU 021526 MORSTEIN RD | 4,546.75 |
| 07-424-3140 | LEGAL SERVICES | 01/21/26 | Pay Check: 3581 | 26-00116 LEGAL SERV DEC 2025 GEN AUTH | 612.50 |
| 07-424-3140 | LEGAL SERVICES | 02/10/26 | Pay Check: 3583 | 26-00337 LEGAL SERV JAN 2026 GEN AUTH | 273.00 |
| 07-424-3140 | LEGAL SERVICES | 03/10/26 | Pay Check: 3585 | 26-00548 LEGAL SERV FEB 2026 GEN AUTH | 205.00 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 03/10/26 | Pay Check: 3586 | 26-00551 SERV THRU 021526 HUNT CTRY PUM | 478.00 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/21/26 | Pay Check: 3582 | 26-00147 HERSHEY MILLS PUMP ST- MISSION | 4,251.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/31/26 | Pay Check: 3588 | 26-00757 AERATION PUMP REPAIR- FLYGT Z3 | 15,524.69 |
| Total Expense | 67,656.81 | ||||
| Net Operating | 13,788.38 |
Page 1 of 1
Lynn Werkheiser
From: Michael Ellis <MEllis@Pennoni.com>
Sent: Tuesday, April 7, 2026 10:38 AM
To: Mark Miller; Lynn Werkheiser
Cc: Derek Davis; Kelly Brophy; Nathan M. Cline
Subject: Waterview CIPPL Engineering Proposal
Attachments: Waterview CIPPL Proposal.pdf
Hi Mark and Lynn,
As requested at the March MA meeting, attached is our proposal for engineering, bid assistance, and construction phase services for the subject project.
As requested by the MA, the proposed budget includes Pennoni’s engineering and bid assistance effort on the project for the year-to-date, which is approximately ,000. It also includes proposed construction phase services.
We had invoiced in March for the Waterview engineering efforts under our General Engineering task (Pennoni project #EGMAU26001). That invoice was not approved by the MA in March since they asked that we instead invoice for the Waterview effort under a separate Waterview project to account against that project’s 2026 budget line item. The invoice package that was submitted today thereby includes an invoice for the Waterview project for effort-to-date and a revised General Engineering invoice that no longer includes Waterview efforts. As a result, the Waterview proposal should be considered and approved by the MA on Monday as an agenda item before they approve the Waterview invoice.
For reference, the Waterview project is tracking well under the 2026 budgeted amount of 00,000. The lowest contractor bid is 87,781.81. With the proposed 0,000 engineering, the current estimated overall project cost is approx 18,000. We can discuss the potential for additional pipes to line with the remaining budget.
Please call me if you would like to discuss.
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com
[Image: Video thumbnail with play button featuring an engineer in an office, captioned "Celebrating 60 Years!"]
Celebrating 60 Years!
1
[Logo: Pennoni]
April 7, 2026
EGMAU25007
East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380
RE: Proposal for Engineering and Construction Phase Services
Waterview Cured-In-Place Pipe Lining
Dear Mr. Miller:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for engineering and construction phase services for the Waterview Cured-In-Place Pipe Lining (CIPPL) project.
Background
East Goshen Township commissioned a TV inspection of the sanitary sewer mains in the Waterview neighborhood in 2025. Pennoni analyzed the videos, performed field visits to evaluate manhole conditions and resolve discrepancies in sewer pipe routing and lengths, prepared rehabilitation programming and pipe prioritization recommendations, provided a construction cost opinion, developed a construction bid document, administered the bid solicitation on PennBid including responding to bidders’ questions and issuing addenda, and conducted the bid opening including review of bids, preparation of a bid tabulation, and recommendation for construction contract award.
Contract award is scheduled for consideration at the Municipal Authority (MA) meeting on April 13, 2026. If awarded, construction is expected to occur in late spring-summer 2026 with an estimated construction duration of approximately 3-4 weeks.
The MA has requested that Pennoni’s aforementioned engineering and bid assistance efforts to-date be accounted against the MA’s budgeted 2026 Waterview project instead of our 2026 General Engineering task since the General Engineering budget is not intended to cover the cost of services for larger capital projects. Therefore, the purpose of this proposal is to create a separate task order for effort to-date and for upcoming construction phase engineering and inspection services.
Scope of Services
Pennoni has completed engineering and bid assistance services as described above.
Pennoni will provide construction engineering support, which is expected to include: pre-construction meeting, part-time on-site observation of pipe cleaning and televising, review of pre-construction inspection videos and submittals, response to contractor RFIs and questions, near full-time inspection of pipe lining, review of post-construction videos, processing of pay applications, review of any change order proposals, review of prevailing wage certifications, punchlist administration if applicable, and processing of project closeout.
The proposed fee includes effort-to-date plus approximately 120 hours of on-site construction inspection and 50 hours of engineering office support.
Schedule
Performance of services will be conducted based on the contractor’s construction schedule.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU25007
East Goshen Municipal Authority
April 7, 2026
Waterview CIPPL
Page 2 of 2
Fee
We will perform the Scope of Services on a Time and Materials basis at the Authority’s approved rates for Pennoni for the calendar year in which work is performed for an estimated fee of Thirty Thousand Dollars (0,000.00).
Billing and Payment
Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
cc: Derek Davis, Township Manager
Lynn Werkheiser, Public Works
Kelly Brophy, Director of Finance/Treasurer
ACCEPTED BY:
_________________________________
Written Name:
East Goshen Municipal Authority
DATE:
_________________________________
[Logo: Pennoni]
April 8, 2026
EGMAU25007
East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380
RE: Award Recommendation
Waterview Sanitary Sewer Pipe Lining, Contract No. WVPL-2026
Dear Mr. Miller:
We have tabulated the bids received through PennBid on April 3, 2026, for the referenced contract. The bid tabulation is attached, and the bid results are as follows:
| Contractor | Total Bid including Add Items |
|---|---|
| SWERP Incorporated | 87,781.81 |
| Vortex Services LLC | 98,684.50 |
| Insight Pipe Contracting, LLC | 17,337.40 |
| Mr. Rehab LLC | 29,487.00 |
| Victory Trenchless LLC | 64,862.00 |
| Mobile Dredging & Video Pipe, Inc. | 87,980.00 |
The low bidder is SWERP Incorporated located in Bristol, PA. We found the low bidder’s submitted proposal to be complete and accurate, and we have experience with them on similar projects. Therefore, we recommend SWERP Incorporated be awarded the contract for the Total Bid including All Add Items in the amount of 87,781.81 contingent upon provision of the required bonds and insurance and their execution of the contract.
All six bidders’ bid documents will be provided separately.
Sincerely,
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE
Associate Vice President
Enclosures: As Noted
cc: East Goshen Municipal Authority
Derek Davis, Township Manager
Lynn Werkheiser, Public Works
Kelly Brophy, Director of Finance/Treasurer
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 1
1 of 1
East Goshen Municipal Authority
Tabulation of Bids Received by 11:00 AM Eastern on April 3, 2026
Contract No. WVPL-2026: Waterview Sanitary Sewer Pipe Lining
| ITEM NUMBER | DESCRIPTION | ESTIMATED QUANTITY/UNIT | SWERP Incorporated 1237 Hayes Boulevard Bristol, PA 19007 (215) 785-2242 |
Vortex Services LLC 210 Bennett Road Freehold, NJ 07728 (814) 270-7602 |
Insight Pipe Contracting, LLC 232 E. Lancaster Road Harmony, PA 16037 (724) 452-6060 |
Mr. Rehab LLC 3 Long Lane Mechanicsburg, PA 17050 (717) 697-1242 |
Victory Trenchless LLC 1455 Skinners Turn Road Owings, MD 20736-3055 (301) 752-9794 |
Mobile Dredging & Video Pipe, Inc. 1566 Harding Highway Newfield, NJ 08344 (856) 697-1900 |
||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | UNIT COST | AMOUNT | |||
| BASE BID | ||||||||||||||
| 1 | Cured-In-Place Pipe Lining of 8" Pipe | 3,963 L.F. | 8.87 | 54,041.81 | 0.50 | 60,501.50 | 4.80 | 77,542.40 | 8.00 | 90,224.00 | 5.50 | 19,946.50 | 2.50 | 08,057.50 |
| 2 | Lateral Reinstatements | 41 EA. | 00.00 | ,100.00 | 0.00 | ,050.00 | 50.00 | ,150.00 | 5.00 | ,895.00 | 00.00 | ,100.00 | 0.00 | ,050.00 |
| TOTAL BASE BID (BASED ON ESTIMATED QUANTITIES) |
58,141.81 | 62,551.50 | 83,692.40 | 94,119.00 | 24,046.50 | 10,107.50 | ||||||||
| ADD ITEMS | ||||||||||||||
| 3 | Cured-In-Place Pipe Lining of 8" Pipe from MH 270 to MH 269 | 281 L.F. | 0.00 | 1,240.00 | 4.00 | 2,364.00 | 5.00 | 2,645.00 | 8.00 | 3,488.00 | 5.50 | 5,595.50 | 4.50 | 6,554.50 |
| 4 | Lateral Reinstatements from MH 270 to MH 269 | 3 EA. | 00.00 | 00.00 | 0.00 | 50.00 | 50.00 | 50.00 | 5.00 | 85.00 | 00.00 | 00.00 | 0.00 | 50.00 |
| 5 | Cured-In-Place Pipe Lining of 8" Pipe from MH 269 to MH 207 | 239 L.F. | 0.00 | ,560.00 | 9.00 | 1,711.00 | 5.00 | 0,755.00 | 8.00 | 1,472.00 | 5.50 | 3,264.50 | 07.50 | 5,692.50 |
| 6 | Lateral Reinstatements from MH 269 to MH 207 | 3 EA. | 00.00 | 00.00 | 0.00 | 50.00 | 50.00 | 50.00 | 5.00 | 85.00 | 00.00 | 00.00 | 0.00 | 50.00 |
| 7 | Cured-In-Place Pipe Lining of 8" Pipe from MH 273 to MH 204 | 201 L.F. | 0.00 | ,040.00 | 8.00 | 1,658.00 | 5.00 | ,045.00 | 8.00 | ,648.00 | 5.50 | 1,155.50 | 25.50 | 5,225.50 |
| 8 | Lateral Reinstatements from MH 273 to MH 204 | 2 EA. | 00.00 | 00.00 | 0.00 | 00.00 | 50.00 | 00.00 | 5.00 | 90.00 | 00.00 | 00.00 | 0.00 | 00.00 |
| TOTAL ADD ITEMS (BASED ON ESTIMATED QUANTITIES) |
9,640.00 | 6,133.00 | 3,645.00 | 5,368.00 | 0,815.50 | 7,872.50 | ||||||||
| TOTAL BASE BID AND ADD ITEMS (BASED ON ESTIMATED QUANTITIES) |
87,781.81 | 98,684.50 | 17,337.40 | 29,487.00 | 64,862.00 | 87,980.00 | ||||||||
| BID SECURITY REVIEW | 10% of Bid | 10% of Bid | 10% of Bid | 10% of Bid | 10% of Bid | 10% of Bid | ||||||||
We Declare this to be a true Tabulation of Bids Received on April 3, 2026, by East Goshen Municipal Authority for Contract No. WVPL-2026.
PENNONI ASSOCIATES INC.
[Signature: Michael J. Ellis]
Michael J. Ellis, PE, PA Reg. No. PE075139
FOR: PENNONI ASSOCIATES INC.