Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

June 8, 2026
7:00

  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
  • CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
  • LIAISON REPORTS
  • SEWER REPORTS Director of Public Works’ Report; West Goshen Report; Pennoni Engineer’s Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES May 11, 2026
  • APPROVAL OF INVOICES
Company Invoice # Amount Paid?
Pennoni 1326599 $1,338.25
Pennoni 1326600 $2,941.75
Pennoni 1326601 $174.50
Pennoni 1326602 $2,442.00
Pennoni 1326603 $681.50
Gawthrop Greenwood 222092608 $701.10

Page 1 of 2

  • FINANCIAL REPORTS May 2026
  • OLD BUSINESS
  • 2026 Goals:
Goal Status
Ridley Creek Plant compliance January through May 2026 were in compliance with PADEP permit requirements.
Continue to implement infiltration and inflow for the sewer system Ongoing.
Attend West Goshen meetings on an as-needed basis. Mike Moffa will continue to send monthly reports for West Goshen.
Long-term sustainability Ongoing:
(1) Sewer rate increase implemented July 2024.
(2) Development of 20-year+ Capital Improvement Plan underway.
(3) Continue to study sewer rates.
  • NEW BUSINESS Blacksmith Shop Metering Manhole (Mike Ellis)
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

Page 2 of 2

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: June 8, 2026

To: Municipal Authority

From: Mark Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 564,839 gallons per day.

Monthly Rainfall: 5.54 (East Goshen rain gauge)

Meters – charts attached:

  • Read on a daily basis. No problems to report.
  • Attached are charts from our new Mission Communications program. They show the daily flow and rainfall for the month of May. Hunt Country pump station’s flow meter will be installed soon.

Hershey Mill Pump Station:

  • Two pumps replaced by Kappe - replacement was cheaper than repairs

Barkway Pump Station:

  • Two pumps were rebuilt.

C.C. Collection:

  • The pumping stations were checked on a daily basis.
  • Pulled Ashbridge & Barkway pumps for maintenance

Ridley Creek Collection:

  • Stations were visited daily.
  • Purchased two new pumps for Hershey Mill pump station

Ridley Creek Plant:

  • Switched from well water to city water because Matthew was having problems with well water reacting with the polymer.
  • New fan was installed in the sludge control panel

Page 1 of 2

Alarms: 14

  • Billy responds to every PA One Call and marks them out.

PA One Calls: 221

Lateral Repairs/Caps – photo attached: In the small storm we had, the tree in the attached picture went down and broke the cleanout at a home in Waterview.

Mostein/Charter Chase Test Pits – photo attached

  • We started doing the test pits for Mike Ellis and have hit shale several times. We should finish up on Monday, June 8, 2026.

Page 2 of 2

Integrated Flow vs. Rainfall (Daily)

East Goshen Township (PA) - Ashbridge Pump Station
1 May 2026 - 31 May 2026

Rainfall (Inches) - KOQN:West Chester

From Date/Time Station Flow (Gallons) Rainfall (Inches) - KOQN:West Chester Peak GPM Peak Time
1 May 2026 38,047 0.00 308.19 1 May 2026 08:53:44 PM
2 May 2026 40,562 0.00 316.13 2 May 2026 09:37:54 PM
3 May 2026 44,320 0.00 310.63 3 May 2026 12:52:45 PM
4 May 2026 49,192 0.00 310.02 4 May 2026 06:50:44 PM
5 May 2026 37,174 308.8 5 May 2026 01:08:23 AM
6 May 2026 38,410 312.46 6 May 2026 06:53:48 PM
7 May 2026 40,305 0.00 348.5 7 May 2026 10:56:09 AM
8 May 2026 36,819 0.00 314.91 8 May 2026 12:37:45 PM
9 May 2026 43,018 0.03 313.07 9 May 2026 10:53:26 AM
10 May 2026 43,095 0.09 315.52 10 May 2026 06:10:43 PM
11 May 2026 41,571 0.00 308.8 11 May 2026 11:04:44 PM
12 May 2026 39,693 0.00 313.68 12 May 2026 09:04:53 PM
13 May 2026 39,867 0.35 317.35 13 May 2026 06:43:37 PM
14 May 2026 40,132 0.03 322.85 14 May 2026 09:54:44 PM
15 May 2026 37,674 0.00 312.46 15 May 2026 06:24:50 AM
16 May 2026 37,653 0.00 306.35 16 May 2026 12:04:09 AM
17 May 2026 43,217 0.00 303.91 17 May 2026 06:11:54 PM
18 May 2026 39,116 0.00 306.35 18 May 2026 03:17:53 AM
19 May 2026 41,055 0.62 313.68 19 May 2026 08:28:45 PM
20 May 2026 45,676 0.88 321.01 20 May 2026 05:44:46 PM
21 May 2026 46,012 0.29 311.24 21 May 2026 09:40:14 PM
22 May 2026 39,854 0.04 310.63 22 May 2026 05:25:24 PM
23 May 2026 42,661 0.62 311.24 23 May 2026 06:18:45 PM
24 May 2026 76,437 1.54 317.96 24 May 2026 07:01:26 AM
25 May 2026 51,903 0.04 310.02 25 May 2026 02:44:58 PM
26 May 2026 43,066 0.00 308.19 26 May 2026 03:33:30 AM
27 May 2026 42,134 0.11 306.35 27 May 2026 01:56:05 AM
28 May 2026 39,657 0.00 305.74 28 May 2026 09:55:19 PM
29 May 2026 37,324 0.00 308.19 29 May 2026 07:04:07 PM
30 May 2026 36,459 0.00 310.02 30 May 2026 05:12:45 PM
31 May 2026 43,084 0.00 310.02 31 May 2026 11:21:25 PM
Total 1,315,187 4.64

Integrated Flow Report, Ashbridge Pump Station

[Bar and line graph showing Integrated Flow vs. Rainfall for Ashbridge Pump Station from May 1 to May 31, 2026. X-axis represents Time (May 4, May 11, May 18, May 25, Jun 1). Left Y-axis represents Flow Measurement (Gallons) from 0 to 60k. Right Y-axis represents Rainfall for West Chester, PA (KOQN) from 0 to 1.2.]

  • Station Flow (Gallons): Blue bars
  • West Chester, PA (KOQN): Line graph with circular data points

Station Flow

Gallons
Last Hour (04 Jun 10:00): 2,208
Since Midnight: 14,262
Yesterday Total: 39,158
vs. 24Hrs ago: -5%

Download Data

Integrated Flow vs. Rainfall (Daily)

East Goshen Township (PA) - Barkway Pump Station
1 May 2026 - 31 May 2026

Rainfall (Inches) - KOQN:West Chester

From Date/Time Station Flow (Gallons) Rainfall (Inches) - KOQN:West Chester
1 May 2026 8,196 0.00
2 May 2026 9,947 0.00
3 May 2026 8,782 0.00
4 May 2026 8,315 0.00
5 May 2026 8,578
6 May 2026 9,023
7 May 2026 8,994 0.00
8 May 2026 8,377 0.00
9 May 2026 8,507 0.03
10 May 2026 9,434 0.09
11 May 2026 9,044 0.00
12 May 2026 8,757 0.00
13 May 2026 7,558 0.35
14 May 2026 8,254 0.03
15 May 2026 7,458 0.00
16 May 2026 8,394 0.00
17 May 2026 8,605 0.00
18 May 2026 8,357 0.00
19 May 2026 8,321 0.62
20 May 2026 8,583 0.88
21 May 2026 8,125 0.29
22 May 2026 6,918 0.04
23 May 2026 7,614 0.62
24 May 2026 9,629 1.54
25 May 2026 9,661 0.04
26 May 2026 8,046 0.00
27 May 2026 8,801 0.11
28 May 2026 8,272 0.00
29 May 2026 7,944 0.00
30 May 2026 8,669 0.00
31 May 2026 10,407 0.00
Total 265,570 4.64

Integrated Flow Report, Barkway Pump Station

[Bar and line graph showing Integrated Flow vs. Rainfall for Barkway Pump Station from May 1 to May 31, 2026. X-axis represents Time (May 4, May 11, May 18, May 25, Jun 1). Left Y-axis represents Flow Measurement (Gallons) from 0 to 8k. Right Y-axis represents Rainfall for West Chester, PA (KOQN) from 0 to 1.2.]

  • Station Flow (Gallons): Blue bars
  • West Chester, PA (KOQN): Line graph with circular data points

Station Flow

Gallons
Last Hour (04 Jun 10:00): 369
Since Midnight: 2,851
Yesterday Total: 8,010
vs. 24Hrs ago: -4%

Download Data

Integrated Flow vs. Rainfall (Daily)

East Goshen Township (PA) - Hershey Mill Pump Station
1 May 2026 - 31 May 2026

Rainfall (Inches) - KOQN:West Chester

From Date/Time Station Flow (Gallons) Rainfall (Inches) - KOQN:West Chester Peak GPM Peak Time
1 May 2026 39,029 0.00 300 1 May 2026 12:00:13 AM
2 May 2026 40,597 0.00 300 2 May 2026 12:15:27 AM
3 May 2026 43,363 0.00 300 3 May 2026 12:27:36 AM
4 May 2026 40,105 0.00 300 4 May 2026 12:24:15 AM
5 May 2026 39,277 300 5 May 2026 12:48:18 AM
6 May 2026 37,201 300 6 May 2026 01:03:38 AM
7 May 2026 40,755 0.00 300 7 May 2026 12:38:24 AM
8 May 2026 39,572 0.00 300 8 May 2026 12:40:12 AM
9 May 2026 41,069 0.03 300 9 May 2026 12:34:32 AM
10 May 2026 44,655 0.09 300 10 May 2026 12:02:31 AM
11 May 2026 41,411 0.00 300 11 May 2026 12:58:07 AM
12 May 2026 39,733 0.00 300 12 May 2026 12:13:51 AM
13 May 2026 39,334 0.35 300 13 May 2026 12:22:41 AM
14 May 2026 40,060 0.03 300 14 May 2026 12:25:47 AM
15 May 2026 38,918 0.00 300 15 May 2026 12:51:54 AM
16 May 2026 41,730 0.00 300 16 May 2026 12:09:13 AM
17 May 2026 42,856 0.00 300 17 May 2026 12:53:15 AM
18 May 2026 39,641 0.00 300 18 May 2026 12:24:08 AM
19 May 2026 40,013 0.62 300 19 May 2026 12:05:29 AM
20 May 2026 40,884 0.88 300 20 May 2026 12:07:19 AM
21 May 2026 40,944 0.29 300 21 May 2026 12:20:36 AM
22 May 2026 36,421 0.04 300 22 May 2026 12:36:41 AM
23 May 2026 39,125 0.62 300 23 May 2026 12:30:43 AM
24 May 2026 52,090 1.54 300 24 May 2026 12:18:36 AM
25 May 2026 52,394 0.04 300 25 May 2026 12:09:29 AM
26 May 2026 45,758 0.00 300 26 May 2026 12:28:55 AM
27 May 2026 48,406 0.11 300 27 May 2026 12:09:19 AM
28 May 2026 45,713 0.00 300 28 May 2026 12:47:42 AM
29 May 2026 41,980 0.00 300 29 May 2026 12:27:38 AM
30 May 2026 43,092 0.00 300 30 May 2026 12:05:13 AM
31 May 2026 47,006 0.00 300 31 May 2026 12:40:22 AM
Total 1,303,132 4.64

Integrated Flow Report, Hershey Mill Pump Station

[Bar and line graph showing Integrated Flow vs. Rainfall for Hershey Mill Pump Station from May 1 to May 31, 2026. X-axis represents Time (May 1, May 3, May 5, May 7, May 9, May 11, May 13, May 15, May 17, May 19, May 21, May 23, May 25, May 27, May 29, May 31). Left Y-axis represents Flow Measurement (Gallons) from 0 to 40k. Right Y-axis represents Rainfall for West Chester, PA (KOQN) from 0 to 1.2.]

  • Station Flow (Gallons): Blue bars
  • West Chester, PA (KOQN): Line graph with circular data points

Station Flow

Gallons
Last Hour (04 Jun 11:00): 2,378
Since Midnight: 16,941
Yesterday Total: 43,872
vs. 24Hrs ago: -1%

Download Data

Color photograph showing two workers in a residential yard digging soil around the base and exposed roots of a large uprooted, fallen tree, with a green plastic sewer pipe riser and cap lying on the grass in the foreground.

Rock depth test pit #7- 11 ft

9 ft to rock

No utilities

Tablet notes app screenshot (1:36 PM Thu Jun 4, 100%, Back) displaying a top-down photograph of a rectangular test pit excavated through asphalt pavement into brown soil and rock below, with a worker's boot visible at the edge of the pit.

West Goshen May 2026 Sewer Report

General Notes:

  • For the month of May, the plant operated in compliance with its NPDES permit.
  • WWTP monthly average daily flow – 3.526 mgd.
  • WWPS monthly average daily flow – 1.138 mgd.
  • Monthly estimated average total phosphorus discharge concentration was <0.01 mg/L.
  • Sludge to landfill – 268 wet tons.

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements. The WGSA has been awarded a grant of 50,000 for this project. To date, 2 pumps totaling 65,120 have been ordered with an estimated delivery of Nov, 2026. We do not anticipate the total project cost to exceed the grant amount by any significant amount.

Ongoing Projects:

  • WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 3 rd , 2026.
  • Primary Clarifier No. 2 Rehab – 100% of the clarifier mechanism has been delivered. Installation expected during 2 nd qtr, 2026.
  • Return Activated Sludge (RAS) Force Main Line Stop and Gate Valve Installation – Award of this project, in the amount of 1,597.09, is scheduled for consideration at the June 3, 2026, WG Sewer Authority meeting.

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

[Seal: West Goshen Township]

[Logo: Pennoni]

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

June 4, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 were planned to occur in spring 2026, but there have been long lead times for parts for rehab of the currently drained tank that will push the inspection of SBR #3 and #4 to later in 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
  • Motor Control Center (MCC) #1 – Design for replacement of the MCC is underway, and construction is planned for 2027. Draft existing conditions plans and single line diagrams have been prepared. We are confirming additional existing conditions information with the operator. Demolition and new work plans and diagrams are currently being prepared.
  • RCSTP NPDES Permit Renewal – We are continuing to compile information, review available sampling data, and prepare the NPDES permit renewal application package. Additional sampling is required for the application, and the sampling is underway. The application is due to PADEP by October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are still awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
  • Waterview Pipe Lining – The contract with SWERP has been executed, and a pre-construction meeting was held on May 21. Notice to Proceed was issued on May 22. A change order is being prepared to add the Meadows neighborhood (Meadow Drive and Hollyberry Lane) sanitary sewer pipes to the contract within the remaining budget. The change order will also add 30 days to the contract duration for the additional scope. Televising work is scheduled for the week of June 8. Pipe lining work is scheduled to start the week of July 6.
  • Ridley Creek Permanent Sewer Meter – We obtained quotes for manhole and metering materials for a new permanent gravity collection system flow meter near the Blacksmith Shop.

Pump Stations

  • Hunt Country Pump Station – Pennoni previously conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, and a topographic survey of the site. Blood Hound also previously performed utility locating of the existing force main, and our survey crew surveyed the force main mark outs. Additional survey of the existing wet well and valve vault was performed on May 22. Field survey work is now complete. Existing conditions plans are being updated to reflect this additional survey. We are also continuing preparation of design and proposed conditions plans.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2

EGMAU26001
East Goshen Municipal Authority
June 4, 2026
Engineer’s Report
Page 2 of 2

Sewer Extensions

  • Morstein Road and Great Oak Circle – An approx 75% complete progress plan set and budgetary cost opinion was provided to the Township on May 6. This is the level of completeness that was scoped for our initial efforts on this project. A list of locations for Public Works to perform soft dig test pits for rock depths based upon the currently designed sewer depths was also provided. It is our understanding that Public Works began performing the test pits on June 3. If additional engineering effort and budget is authorized, we can update the design and cost opinion after the results of the test pits are provided, and we can progress the design towards 100%. If authorized, we can also initiate Sewage Facilities Planning with PADEP.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
  • N. Chester Road – A sewer extension interest survey for the 39 properties along N. Chester Road, Forest Lane, Ivy Lane, Old Orchard Lane, and Raewyck Drive was sent to the property owners on May 28. Survey responses are due June 30. An exhibit depicting the results of the sewer extension interest survey will be prepared after responses are received. It is our understanding that a developer is continuing with considerations to develop 1152 N. Chester Road into a residential development and to potentially extend sewer to it.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) – No activity by Pennoni since our last report. The Westtown Township Sewer Engineer contacted East Goshen to confirm sewer system capacity for redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 5,992 gpd, which is an increase over the existing use’s flow. The property’s wastewater already flows through East Goshen. We reviewed the capacity of the Ashbridge Pump Station as noted above and determined there is adequate capacity for the increased flows at both the pump station and in East Goshen’s gravity conveyance system.
  • 1570 Colonial Lane – We reviewed a plan to construct one single family dwelling on the property. There was formerly a house there with a public sewer connection. The proposed dwelling will re-use the sewer lateral subject to inspection for adequacy of re-use. We provided comments on the plan and sewer to the Applicant’s design consultant.

Other

  • GIS Mapping – No activity by Pennoni since our last report. We have updated the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We will present it to Public Works to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.

END OF REPORT

[Logo: Big Fish Environmental Services Inc.]

RCSTP Monthly Operations Report
June 2026

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for May 2026. All supplemental reports were submitted for April 2026. Caustic usage increased to 60.40 gallons per day from 58.48 gallons per day last month. Aluminum sulfate solution volumes daily average increased to 68.22 gallons per day from 60.60 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

TABLES

CERTIFIED LAB RESULTS- FINAL EFFLUENT May 2026

FLOW Ammonia as N CBOD Total Phosphorus Total Suspended Solids Fecal Coliform
Permit Limit (Weekly Average) Gallons 7mg/L monthly 15mg/L 0.5mg/L 15mg/L 200 coliforms/100mL
DATE Final EFF/Applebrook
5/5/26 248,000/33,885 0.15 <2.0 0.18 5 1
5/12/2026 265,000/34,846 <0.10 <2.0 <0.10 <4.0 <1
5/19/2026 257,000/35,967 <0.10 <2.0 0.15 5.8 1

CERTIFIED LAB RESULTS- FINAL EFFLUENT April 2026 Non-Report tests

FLOW NO2-NO3 (mg/L) TKN (mg/L) TN (mg/L)
DATE Final EFF/Applebrook
5/5/2026 248,000/33,885 4.19 1.29 5.48
5/12/2026 265,000/34,846 4.67 1.47 6.14
5/19/26 257,000/35,967 4.71 1.47 6.18

CERTIFIED LAB RESULTS- INFLUENT May 2026

FLOW Ammonia as N BOD CBOD TKN Total Phosphorus Total Suspended Solids
DATE
5/5/2026 299,520 45.6 269 255 60.7 6.58 196
5/12/2026 296,150 40.6 206 289 54.2 5.75 260
5/19/2026 370,520 43.5 321 270 54.5 6.03 117

*Effluent was partially cloudy on 4/7, signifying higher TSS levels than normal. To ensure we remained below the weekly average limit I took an additional composite sample on 4/10 out of precaution. That is why 4/10 is only showing a result for TSS

TKN = Total Kleidahl Nitrogen

TN= Total Nitrogen

NO2-NO3= Nitrogen, Nitrate-Nitrite

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the

end of the UV channel weirs. We remained below all of the weekly average discharge limits for the month of May.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During May, there were twelve (12) days where precipitation occured. There were 4 days where precipitation accumulation was equal to or greater than 0.50”.

5/7 0.53”

5/20 0.50”

5/21 0.70”

5/24 2.53”

Total precipitation for the month was 5.68 ” of rain

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Chemical Data

Chemical May 2026
Daily Average
Total Monthly
Caustic Soda, gal 60.40 1872.54
Aluminum Sulfate solution, gal 68.22 2114.94
Sludge Dewatering, gal* 12,261 306,528

*25 days of sludge dewatering

There was a decrease of 25,990 gallons of sludge dewatering during the month of May compared to April.

Page 2 of 3

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.

Major Repairs or Upgrades

Nothing to report

Upcoming Repairs or Upgrades

Nothing to report

Flow Data

May 2026
Flow Meter Location Total Volume for
Month, MG
Average Daily
Flow, gpd
Daily Maximum
Flow, gpd
Influent Wastewater to Screening Building 9.584 309,176 446,610
Influent Wastewater to SBRs 11.861 382,604 527,456
Internal Recycle 2.276 73,428 124,516
Treated Effluent to Disc Filters 11.519 371,588 452,032
Final Effluent Discharge 8.006 258,000 339,000
Applebrook Golf Course 1.040 33,555 38,892

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of May 2026

Page 3 of 3

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
May 11, 2026

The East Goshen Township Municipal Authority held their regular meeting on Monday, May 11, 2026 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings – Chairman
John Stipe – Vice Chairman
Sean Ellsworth
Dana Pizarro
Walter Wujcik

Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Peter Hicks (Supervisor
Kelly Brophy, Finance Director
Patrick McKenna (Attorney)
Theodore Speedy (Attorney)
Stacey Fuller (Attorney)

COMMON ACRONYMS:

ATS – Automatic Transfer Switch MA- Municipal Authority
BFES – Big Fish Environmental Services NPDES – National Pollutant Discharge Elimination System
BOS – Board of Supervisors PC – Planning Commission
CB – Conservancy Board PM – Prevention Maintenance
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge
PWD – Public Works Department

Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Kevin asked for a moment of silence for our First Responders and Military.
Kevin asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report
Kevin got an email for a submission to the East Goshen newsletter. Topic was discussed and will be sewers in all neighborhoods. He will put something together and get it out to the members.

Liaison Reports
1. Conservancy Board - Walter mentioned that Keep East Goshen Beautiful day was cancelled due to the weather. At the PECO Arbor Day event, the Township got 6 trees.

MA 5-11-26 draft
1

SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for May 11, 2026.

Monthly Flows – The average daily flow to West Goshen was 526,491 gallons per day.

Monthly Rainfall - 2.87”.

Meters: Read on a daily basis. No problems to report. Meter calibrations were done on 5/7/26 with minor adjustments.

C.C.Collection
• Pump stations were checked on a daily basis.
• As part of our preventive maintenance program, pumps were pulled and sent to the motor shop to be checked over.
• Wet wells were cleaned at all stations.
• Replaced half dozen manhole castings and lids that were damaged over the winter by the plows.
• We began cleaning and televising Mill Valley.

Ridley Creek Collection:
• Stations were visited daily.
• We’ve been having seal failure alarms at Hershey Mill Pump Station.
• We pulled both pumps and sent them to be repaired.

Ridley Creek Plant:
• Matthew, the Plant Operator, along with his grandfather tore down the centrifuge and rebuilt the unit. It was back in service on Sunday night, 5/3/26.
• Lenni rebuilt the motors that operate louvers.
• Replaced control switch for the a/c unit in the lab.
• All surge protectors are up to date.
• There was a terminal block in the Number 2 blower.

Alarms: 15

PA One Calls: 182

Lateral Repairs/Caps: 3 caps

2. West Goshen Report
The report was reviewed and numbers discussed are good. A plan for a car wash at the Rite Aid in Westtown capacity possibility was discussed.

MA 5-11-26 draft
2

3. Pennoni Engineer’s Report dated May 7, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
  • Motor Control Center (MCC) #1 – Replacement of the MCC is proposed for design in 2026 and construction in 2027. We submitted a proposal for engineering and design services for consideration at the May MA meeting.
  • RCSTP NPDES Permit Renewal – We are compiling information for and preparing the NPDES permit renewal application package. Additional sampling is required for the application, and the sampling is underway. The application is due to PADEP by October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are still awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
  • Waterview Pipe Lining – The project was awarded to SWERP at the April MA meeting. We sent an award letter to the contractor. They provided bonds and insurance documents, which were found acceptable. We are coordinating with the Township to sign the agreement. A pre-construction meeting will be scheduled thereafter.

We also evaluated other asbestos cement pipes to line with the remaining ±0,000 of budget. It was determined that the Meadows neighborhood (Meadow Drive and Hollyberry Lane) should be able to be added within the budget. That is the next priority neighborhood on the pipe lining Capital Improvement Plan. A change order to add these pipe quantities will be pursued with SWERP.

Pump Stations

  • Hunt Country Pump Station – Pennoni previously conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, and a topographic survey of the site. Blood Hound also previously performed utility locating of the existing force main, and our survey crew surveyed the force main mark outs. Existing

MA 5-11-26 draft
3

conditions plans have been prepared, and we are continuing preparation of design and proposed conditions plans.

  • Barkway Pump Station – We analyzed pump run times, cycling frequency, and flow rates from the recently installed SCADA system. This allows for live observation of instantaneous flow and other data, as well as all historical data since the system was installed. One of the pumps was identified to be pumping at a very low rate. We notified Mark Miller for the pump to be inspected.
  • Ashbridge Pump Station – We also analyzed SCADA data for this pump station. Both pumps are operating as designed.

Sewer Extensions

  • Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. An approx 75% complete progress plan set was provided to the Township and MA. We are making some updates to the progress plan to propose a few sewer runs at shallower depths. The initially authorized effort for the plan preparation will then be complete. We will then provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
  • 1152 N. Chester Road – No activity since our last report. We previously performed a cursory evaluation of possible sewer extension alternatives to service potential new residential development at the property. Depending upon the route of the selected alternative, this would potentially enable connections from other properties along a portion of N. Chester Road and also from Ivy Lane, Old Orchard Lane, and/or Raewyck Drive. It is our understanding that the potential applicant is still in the early stages of site planning and has not initiated the formal Land Development process yet.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) – The Westtown Township Sewer Engineer contacted East Goshen to confirm sewer system capacity for redevelopment of the Rite Aid

MA 5-11-26 draft
4

site with a proposed car wash with an estimated sewer flow of 5,992 gpd, which is an increase over the existing use’s flow. The property’s wastewater already flows through East Goshen. We reviewed the capacity of the Ashbridge Pump Station as noted above and determined there is adequate capacity for the increased flows at both the pump station and in East Goshen’s gravity conveyance system.

Other

  • GIS Mapping – We have updated the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We will present it to Public Works to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.

3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for April 2026. All supplemental reports were submitted for March 2026. Caustic usage decreased to 58.48 gallons per day from 62.26 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 60.60 gallons per day from 63.34 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Approval of Minutes
The minutes of the April 13, 2026 meeting were approved.

Approval of Invoices
1. John approved payment of Pennoni Invoices:
#1323177 in the amount of ,354.00
#1323178 in the amount of ,064.00
#1323179 in the amount of ,663.50
#1323180 in the amount of ,973.25
#1323181 in the amount of ,220.50
#1323182 in the amount of ,662.50
Walter seconded the motion. The motion passed unanimously.
2. Sean moved to approve payment of Maillie invoice #127792 in the amount of ,500.00. John seconded the motion. The motion passed unanimously.
3. Walter moved to approve payment of the Xylem Water Solutions invoice #3556E14139 in the amount of ,284.70 (paid). John seconded the motion. The motion passed unanimously.

Financial Reports
Kelly reviewed the following report: YTD April 2026, the Municipal Authority recorded 25,808.47 in revenues (primarily from Sewer Capital Reserve, Sewer Operating transfers and collecting inspection and tapping fees) and 09,247.11 in expenses (Hershey Mill pump station

MA 5-11-26 draft
5

mission alarm panel installation, Aeration pump repair, MA quarterly recharges, audit expenses, Flygt sludge pump repair, and legal and engineering expenses). The net result of operations is 6,561.36. As of April 30, 2026, the fund balance was 4,928.58.

Old Business -
Morestein Rd Sewer Extension Progress Plans – Mike Ellis reviewed his report. The updated cost is ,097,000.00. There are 29 houses at 00,000.00 per house. The project will start in 2 years. Almost 00,000.00 for lateral was not included initially. They need to see if there is any need for rock removal on Waterford. IF so, it will be an additional cost. Mike applied for a grant.

Goals
For #2 change to “Continue to implement reduction of infiltration….”

New Business –
1. RCSTP MCC-1 Replacement Design Proposal – The MCC1 proposal was reviewed. They have to redo the Arc study. Construction for next year. Walter moved to approve engineering costs for the RCSTP MCC1 project not to exceed 5,000.00. John seconded the motion. The motion passed unanimously.

Capacity Requests – Mark received a call from a resident on Old Orchard who is having problems and she feels other neighbors would want sewer. TR Moser submitted a plan for a property on Rte. 352 for 12 carriage home units.

Any Other Matter -

Correspondence- None

Public Comment - None

Adjournment
There being no further business Walter moved to adjourn the meeting. Sean seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, June 8, 2026 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 5-11-26 draft
6

[Logo: Pennoni]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1326599
Invoice Date : 05/26/2026
Project : EGMAU25004
Project Name : Hunt Country Pump Station Upgrade

For Services Rendered Through 05/17/2026

Continued preparation of design and plans.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Survey NTE 1,400.00 1,375.25 99.78% 1,375.25 bash.00
02 -- Design NTE 0,100.00 ,115.50 18.87% ,453.75 ,338.25
03 -- Permitting NTE 2,800.00 bash.00 0.00% bash.00 bash.00
04 -- Bid Services NTE ,300.00 bash.00 0.00% bash.00 bash.00
Total : 0,600.00 9,490.75 0,829.00 ,338.25

Phase: 02 -- Design

Labor

Class Hours Rate Amount
Authority Engineer 0.25 166.00 41.50
Staff Professional 9.75 133.00 1,296.75
Labor 1,338.25
Billing Limits Current Prior To-Date
Total Billings 1,338.25 8,115.50 9,453.75
Limit 50,100.00
Remaining 40,646.25

Phase Subtotal ,338.25

Amount Due This Invoice ,338.25

Outstanding Invoices

Number Date Balance
1323177 5/1/2026 3,354.00
Total 3,354.00

APPROVED BY: [Signatures: MM, KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3700

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25004
Pennoni Job No.: Hunt Country Pump Station Upgrade
Invoice No: 1326599
Invoice Period: 4/20/2026 to 5/17/2026
Initial Authorization: $ 80,600.00 Date: 5/26/2026
Contract Amount: $ 80,600.00
Previously Invoiced: $ 19,490.75
Current Invoice: $ 1,338.25
Invoiced to Date ($): $ 20,829.00
Invoiced to Date (%): 26%
Remaining Budget ($): $ 59,771.00
Remaining Budget (%): 74%

Budget by Phase:

Phase Name: Hunt Country Pump Station Upgrade
Phase Budget: $ 80,600.00
Previously Invoiced: $ 19,490.75
Current Invoice: $ 1,338.25
Invoiced to Date ($): $ 20,829.00
Invoiced to Date (%): 26%
Remaining Budget ($): $ 59,771.00
Remaining Budget (%): 74%

Comments: Continued preparation of design and plans.

[Logo: Pennoni]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1326600
Invoice Date : 05/26/2026
Project : EGMAU25006
Project Name : Morstein Rd Sewer Design and Permitting

For Services Rendered Through 05/17/2026

Continued concept design, preparation of plans, and cost estimate and made progress plan & cost estimate submission deliverable to Township. Prepared exhibit for Township Public Works for proposed boring locations to determine rock presence/absence and depths.

Billing Limits Current Prior To-Date
Total Billings 2,941.75 21,947.00 24,888.75
Limit 25,000.00
Remaining 111.25

Labor

Class Hours Rate Amount
Authority Engineer 3.50 166.00 581.00
Staff Professional 17.75 133.00 2,360.75
Totals 21.25 2,941.75
Total Labor 2,941.75

Total this Invoice ,941.75

Outstanding Invoices

Number Date Balance
1323178 5/1/2026 1,064.00
Total 1,064.00

APPROVED BY: [Signatures: MM, KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25006
Pennoni Job No.: Morstein Rd Sewer Design and Permitting
Invoice No: 1326600
Invoice Period: 4/20/2026 to 5/17/2026
Initial Authorization: $ 25,000.00 Date: 5/26/2026
Contract Amount: $ 25,000.00
Previously Invoiced: $ 21,947.00
Current Invoice: $ 2,941.75
Invoiced to Date ($): $ 24,888.75
Invoiced to Date (%): 100%
Remaining Budget ($): $ 111.25
Remaining Budget (%): 0%

Budget by Phase:

Phase Name: Morstein Rd Sewer Design and Permitting
Phase Budget: $ 25,000.00
Previously Invoiced: $ 21,947.00
Current Invoice: $ 2,941.75
Invoiced to Date ($): $ 24,888.75
Invoiced to Date (%): 100%
Remaining Budget ($): $ 111.25
Remaining Budget (%): 0%

Comments: Continued concept design, preparation of plans, and cost estimate and made progress plan & cost estimate submission deliverable to Township. Prepared exhibit for Township Public Works for proposed boring locations to determine rock presence/absence and depths.

[Logo: Pennoni]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1326601
Invoice Date : 05/26/2026
Project : EGMAU25007
Project Name : Waterview Pipe Lining

For Services Rendered Through 05/17/2026

Reviewed contractor’s bonds and insurance documents. Coordination for pre-construction meeting.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
-- Waterview Pipe Lining est. 0,000.00 0,272.00 0,446.50 74.50
Total : 0,000.00 0,272.00 0,446.50 74.50

Labor

Class Hours Rate Amount
Authority Engineer 0.25 166.00 41.50
Staff Professional 1.00 133.00 133.00
Labor 174.50

Amount Due This Invoice 74.50

Outstanding Invoices

Number Date Balance
1323179 5/1/2026 2,663.50
Total 2,663.50

APPROVED BY: [Signatures: MM, KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-429-3700

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25007
Pennoni Job No.: Waterview Pipe Lining
Invoice No: 1326601
Invoice Period: 4/20/2026 to 5/17/2026
Initial Authorization: $ 30,000.00 Date: 5/26/2026
Contract Amount: $ 30,000.00
Previously Invoiced: $ 10,272.00
Current Invoice: $ 174.50
Invoiced to Date ($): $ 10,446.50
Invoiced to Date (%): 35%
Remaining Budget ($): $ 19,553.50
Remaining Budget (%): 65%

Budget by Phase:

Phase Name: Waterview Pipe Lining
Phase Budget: $ 30,000.00
Previously Invoiced: $ 10,272.00
Current Invoice: $ 174.50
Invoiced to Date ($): $ 10,446.50
Invoiced to Date (%): 35%
Remaining Budget ($): $ 19,553.50
Remaining Budget (%): 65%

Comments: Reviewed contractor’s bonds and insurance documents. Coordination for pre-construction meeting.

[Logo: Pennoni]

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1326602
Invoice Date : 05/26/2026
Project : EGMAU26001
Project Name : 2026 General Services

For Services Rendered Through 05/17/2026

Prepared May Engineer’s Report. Reviewed May RCSTP Operator’s Report. Attended May MA meeting.

Gravity flow meter near Blacksmith Shop: Prepared exhibit of proposed location of metering manhole. Submitted exhibit with supplier’s material quotes to Township.

Training on new SCADA system with controls contractor. Evaluated SCADA data to confirm Barkway Pump Station pump flow rate issues.

New connections: Reviewed Ashbridge Pump Station current flows and pumping operation in SCADA to confirm capacity for proposed car wash in Westtown Triangle. Notified Westtown Township Engineer that capacity is available in sewer system for project. Reviewed concept sketch for potential development at 1152 N. Chester Rd. Drafted sewer extension interest letter to N. Chester Rd and surrounding roads’ residents.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- General Engineering Services NTE 5,925.25 3,598.75 34.93% 6,040.75 ,442.00
02 -- Grants NTE 4.75 4.75 100.00% 4.75 bash.00
Total : 6,000.00 3,673.50 6,115.50 ,442.00

Phase: 01 -- General Engineering Services

Labor

Class Hours Rate Amount
Authority Engineer 7.50 166.00 1,245.00
Staff Professional 9.00 133.00 1,197.00
Labor 2,442.00

Phase Subtotal ,442.00

Amount Due This Invoice ,442.00

Outstanding Invoices

Number Date Balance
1323180 5/1/2026 3,973.25
Total 3,973.25

APPROVED BY: [Signatures: MM, KLB]
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU26001
Pennoni Job No.: 2026 General Services
Invoice No: 1326602
Invoice Period: 4/20/2026 to 5/17/2026
Initial Authorization: $ 46,000.00 Date: 5/26/2026
Contract Amount: $ 46,000.00
Previously Invoiced: $ 13,673.50
Current Invoice: $ 2,442.00
Invoiced to Date ($): $ 16,115.50
Invoiced to Date (%): 35%
Remaining Budget ($): $ 29,884.50
Remaining Budget (%): 65%

Budget by Phase:

Phase Name: 2026 General Services
Phase Budget: $ 46,000.00
Previously Invoiced: $ 13,673.50
Current Invoice: $ 2,442.00
Invoiced to Date ($): $ 16,115.50
Invoiced to Date (%): 35%
Remaining Budget ($): $ 29,884.50
Remaining Budget (%): 65%

Comments: Prepared May Engineer's Report. Reviewed May RCSTP Operator's Report. Attended May MA meeting.

Gravity flow meter near Blacksmith Shop: Prepared exhibit of proposed location of metering manhole. Submitted exhibit with supplier's material quotes to Township.

Training on new SCADA system with controls contractor. Evaluated SCADA data to confirm Barkway Pump Station pump flow rate issues.

New connections: Reviewed Ashbridge Pump Station current flows and pumping operation in SCADA to confirm capacity for proposed car wash in Westtown Triangle. Notified Westtown Township Engineer that capacity is available in sewer system for project. Reviewed concept sketch for potential development at 1152 N. Chester Rd. Drafted sewer extension interest letter to N. Chester Rd and surrounding roads' residents.

Project: EGMAU26003
Pennoni Job No.: RCSTP NPDES Permit Renewal
Invoice No: 1326603
Invoice Period: 4/20/2026 to 5/17/2026
Initial Authorization: $ 7,500.00 Date: 5/26/2026
Contract Amount: $ 7,500.00
Previously Invoiced: $ 1,662.50
Current Invoice: $ 681.50
Invoiced to Date ($): $ 2,344.00
Invoiced to Date (%): 31%
Remaining Budget ($): $ 5,156.00
Remaining Budget (%): 69%

Budget by Phase:

Phase Name: RCSTP NPDES Permit Renewal
Phase Budget: $ 7,500.00
Previously Invoiced: $ 1,662.50
Current Invoice: $ 681.50
Invoiced to Date ($): $ 2,344.00
Invoiced to Date (%): 31%
Remaining Budget ($): $ 5,156.00
Remaining Budget (%): 69%

Comments: Continued preparation of permit application documents, coordinated with MA operator for additional sampling needs, and submitted Act 14 notifications to County and Township.

Pennoni

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

INVOICE

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1326603
Invoice Date : 05/26/2026
Project : EGMAU26003
Project Name : RCSTP NPDES Permit Renewal

For Services Rendered Through 05/17/2026

Continued preparation of permit application documents, coordinated with MA operator for additional sampling needs, and submitted Act 14 notifications to County and Township.

Billing Limits Current Prior To-Date
Total Billings 681.50 1,662.50 2,344.00
Limit 7,500.00
Remaining 5,156.00

Labor

Hours Rate Amount
Authority Engineer .50 166.00 83.00
Staff Professional 4.50 133.00 598.50
Totals 5.00 681.50
Total Labor 681.50

Total this Invoice: $681.50

Outstanding Invoices

Number Date Balance
1323182 5/1/2026 1,662.50
Total 1,662.50

APPROVED BY: MM KCB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
APPROVED BY: KCB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3140
Page: 1
05/07/2026
Client No: 6604-001M
Invoice No. 222092608

General Authority Services

Fees

Date / Timekeeper Description Hours Amount
04/06/2026
PMM
Message from and telephone conference with M. Miller regarding easement versus right of way. 0.40 82.00
04/10/2026
PMM
Email from L. Werkheiser regarding Board agenda and meeting materials; Review & Analyze same. 0.30 61.50
04/13/2026
TTS
Attend meeting. 1.50 292.50
04/14/2026
PMM
Emails (2) from L. Werkheiser regarding sewer easement for 1354 Paoli Pike. 0.40 82.00
04/14/2026
TTS
Legal research and evaluation of pending lawsuit re municipal authority control by PUC; Email to Board regarding case law updated; Email from D. Pizarro regarding caselaw update. 0.50 97.50
04/15/2026
PMM
Review & Analyze draft easement agreement for Joe Francis; Telephone conference with M. Miler regarding same. 0.40 82.00
For Current Services Rendered 3.50 697.50

Recapitulation

Timekeeper Hours Hourly Rate Total
Theodore T. Speedy Jr., Esquire 2.00 $195.00 $390.00
Patrick M. McKenna, Esquire 1.50 205.00 307.50

Expenses

Travel to/from EGMA Meeting 3.60
East Goshen Municipal Authority
General Authority Services
Page: 2
05/07/2026
Client No: 6604-001M
Invoice No. 222092608
Total Expenses Thru 04/30/2026 3.60
Previous Balance $338.10
Total Current Charges 701.10
04/21/2026 Payment -338.10
Balance Due $701.10

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
05/07/2026
Client No: 6604M
Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services
338.10 697.50 3.60 -338.10 $701.10

To ensure proper credit, please write your client number on your check when returning payment..
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA May 2026 YTD Financial Report
Date: June 2, 2026

YTD May 2026, the Municipal Authority recorded $144,262.19 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers, collecting inspection and tapping fees) and $127,684.86 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, Flygt sludge pump repair, legal and engineering expenses). The net result of operations is $16,577.33. As of May 31, 2026, the fund balance was $44,944.55.

Attached is a complete list of 2026 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD MAY 2026

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 77.33 144.65
07-364-1100 C.C. TAPPING FEES 2,300.00 0 0
07-364-1110 R.C.TAPPING FEES 4,332.72 16,500.00 0
07-364-1130 CONNECTION FEES - SEWER 563.76 0 0
07-380-1000 MISCELLANEOUS REVENUE 282.24 0 0
07-392-0500 TRANSFER FROM SEWER OPERATING 319,438.19 89,351.97 60,734.90
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,033,650.00 38,332.89 373,899.57
Total Revenue 1,360,566.91 144,262.19 434,779.12
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 47,871.20 12,569.62 11,967.80
07-424-3000 MISCELLANEOUS EXPENSE 1,645.71 0 780.00
07-424-3110 MUNIC.AUTH.-AUDITING 12,000.00 12,000.00 12,000.00
07-424-3130 ENGINEERING SERVICES 61,000.00 43,863.00 11,879.25
07-424-3140 LEGAL SERVICES 6,500.00 1,428.60 2,301.50
07-424-3700 CHESTER CREEK ENGINEERING 42,000.00 0 5,777.50
07-424-3705 HUNT COUNTY ENGINEERING 95,000.00 19,490.75 0
07-424-7431 CAPITAL PROJ.-ENGINEERING 60,000.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 126,000.00 0 6,413.85
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 4,251.50 20,850.00
07-429-1504 HUNT CO PUMP STATION CAPITAL 515,550.00 0 0
07-429-1505 RCSTP CAPITAL 50,000.00 23,809.39 75,723.04
07-429-3700 CHESTER CREEK CAPITAL 343,000.00 10,272.00 277,326.53
Total Expenses 1,360,566.91 127,684.86 425,019.47
Net Result From Operations 0.00 16,577.33 9,759.65

Municipal Authority - YTD Revenues and Expenses thru 5/31/2026

Account NumberAccount DescriptionDateTypeTransaction Data/CommentAmount
07-341-1000INTEREST EARNINGS01/31/26Revenue JournalINTEREST EARNED JANUARY 202612.81
07-341-1000INTEREST EARNINGS02/28/26Revenue JournalINTEREST EARNED FEBRUARY 202612.04
07-341-1000INTEREST EARNINGS03/31/26Revenue JournalINTEREST EARNED MARCH 202613.53
07-341-1000INTEREST EARNINGS04/30/26Revenue JournalINTEREST EARNED APRIL 202622.98
07-341-1000INTEREST EARNINGS05/31/26Revenue JournalINTEREST EARNED MAY 202615.97
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1427 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1427 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1411 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1411 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1417 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1417 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES03/11/26Revenue JournalINSPECTION FEE 301 RESERVOIR RD LOT 52,000.00
07-364-1110R.C.TAPPING FEES03/11/26Revenue JournalSEWER INSPECTION FEE 301 RESERVOIR LOTS750.00
07-364-1110R.C.TAPPING FEES03/31/26Revenue JournalINSPECTION FEE R.C. 1415 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES03/31/26Revenue JournalSEWER INSPECTION FEE R.C. 1415 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES04/06/26Revenue JournalINSPECTION FEE R.C. 1406 TIMBERMILL LN2,000.00
07-364-1110R.C.TAPPING FEES04/06/26Revenue JournalSEWER INSPECT FEE R.C.1406 TIMBERMILL LN750.00
07-392-0500TRANSFER FROM SEWER OPERATING01/21/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA612.50
07-392-0500TRANSFER FROM SEWER OPERATING02/10/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA19,333.75
07-392-0500TRANSFER FROM SEWER OPERATING03/10/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,864.75
07-392-0500TRANSFER FROM SEWER OPERATING03/17/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,500.00
07-392-0500TRANSFER FROM SEWER OPERATING03/27/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA12,569.62
07-392-0500TRANSFER FROM SEWER OPERATING04/15/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA25,697.10
07-392-0500TRANSFER FROM SEWER OPERATING05/13/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA15,774.25
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/21/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,251.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/31/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA15,524.69
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/15/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA7,608.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/15/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA8,284.70
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/13/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA2,663.50
Total Revenue144,262.19
07-424-1400ADMINISTRATIVE WAGES03/27/26Pay Check: 71526-00698 QTR 1 2026 MA CHARGE BACK12,569.62
07-424-3110MUNIC.AUTH.-AUDITING03/17/26Pay Check: 358726-00635 PROGRESS BILLING AUDIT EGT MUA7,500.00
07-424-3110MUNIC.AUTH.-AUDITING05/13/26Pay Check: 359226-01071 FINAL BILLING AUDIT EGT MUA4,500.00
07-424-3130ENGINEERING SERVICES02/10/26Pay Check: 358426-00338 SERV THRU 123125 2025 GEN SERV4,835.25
07-424-3130ENGINEERING SERVICES02/10/26Pay Check: 358426-00339 SERV THRU 123125 MORSTEIN RD14,225.50
07-424-3130ENGINEERING SERVICES03/10/26Pay Check: 358626-00549 SERV THRU 021526 25 CHAPTER 942,635.00

Page 1 of 2

Municipal Authority

YTD Revenues and Expenses thru 5/31/2026

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3130 ENGINEERING SERVICES 03/10/26 Pay Check: 3586 26-00550 SERV THRU 021526 MORSTEIN RD 4,546.75
07-424-3130 ENGINEERING SERVICES 04/14/26 Pay Check: 3591 26-00867 SERV THRU 032226 2026 GEN SERV 9,700.25
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01075 SERV THRU 041926 2026 GEN SERV 3,973.25
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01073 SERV THRU 041926 MORSTEIN RD 1,064.00
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01076 SERV THRU 041926 25 CHAPTER 94 1,220.50
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01077 SERV THRU 041926 RCSTP NPDES 1,662.50
07-424-3140 LEGAL SERVICES 01/21/26 Pay Check: 3581 26-00116 LEGAL SERV DEC 2025 GEN AUTH 612.50
07-424-3140 LEGAL SERVICES 02/10/26 Pay Check: 3583 26-00337 LEGAL SERV JAN 2026 GEN AUTH 273.00
07-424-3140 LEGAL SERVICES 03/10/26 Pay Check: 3585 26-00548 LEGAL SERV FEB 2026 GEN AUTH 205.00
07-424-3140 LEGAL SERVICES 04/14/26 Pay Check: 3590 26-00868 LEGAL SERV MARCH 2026 GEN AUTH 338.10
07-424-3705 HUNT COUNTY ENGINEERING 03/10/26 Pay Check: 3586 26-00551 SERV THRU 021526 HUNT CTRY PUM 478.00
07-424-3705 HUNT COUNTY ENGINEERING 04/14/26 Pay Check: 3591 26-00865 SERV THRU 032226 HUNT CTRY PUM 15,658.75
07-424-3705 HUNT COUNTY ENGINEERING 05/13/26 Pay Check: 3593 26-01072 SERV THRU 041926 HUNT CTRY PUM 3,354.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/21/26 Pay Check: 3582 26-00147 HERSHEY MILLS PUMP ST- MISSION 4,251.50
07-429-1505 RCSTP CAPITAL 03/31/26 Pay Check: 3588 26-00757 AERATION PUMP REPAIR- FLYGT Z3 15,524.69
07-429-1505 RCSTP CAPITAL 04/14/26 Pay Check: 3589 26-00819 SLUDGE PUMP REPAIR-FLYGT Z3-TP 8,284.70
07-429-3700 CHESTER CREEK CAPITAL 04/14/26 Pay Check: 3591 26-00866 SERV THRU 032226 WATERVIEW PIP 7,608.50
07-429-3700 CHESTER CREEK CAPITAL 05/13/26 Pay Check: 3593 26-01074 SERV THRU 041926 WATERVIEW PIP 2,663.50
Total Expense 127,684.86
Net Operating 16,577.33

Page 2 of 2

Lynn Werkheiser

From: Erika Addison <eaddison@Pennoni.com>
Sent: Monday, April 27, 2026 1:20 PM
To: Mark Miller; Lynn Werkheiser
Cc: Michael Ellis
Subject: Blacksmith Shop Metering Manhole
Attachments: Aerial Exhibit.pdf; 2026-03-30_20260141-tracom_blacksmith.pdf; 2026-04-24 _MGBOQ3612_Flowmeter Quote_R1.pdf

Good afternoon,

Please see the attached aerial exhibit of the proposed location for the Blacksmith Shop Metering Manhole location. Additionally, I have attached the quotes for the metering manhole and flowmeter. The manhole quote has not changed since last time. The flowmeter quote has been revised and includes the Flowlink Cipher Cloud-based software, a 160 ft cable, and the iCell Service has been removed.

Please let us know if you have any questions or comments.
Erika

Erika Addison, PE

Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5263
www.pennoni.com | eaddison@Pennoni.com

[Photo of a man sitting at a desk with computer monitors displaying engineering software, with an inset video play icon.]

Celebrating 60 Years!

1

COUNTY OF CHESTER PENNSYLVANIA - GIS Map

Aerial GIS map of East Goshen Township near the intersection of E Boot Rd and Route 352 (N Chester Rd), showing sewer lines in green, manhole locations, boardwalk trails, stream, and parcel boundaries.

  • Roads: E Boot RD, 352 / N Chester RD
  • Manholes & Callouts: MH R561, MH R021, Proposed Metering Manhole Location (40.00 ft from MH R021), MH R020
  • Municipality: East Goshen Township
  • Parcels: 53-4-177.1 (1 AC.), 53-4-177.2 (9.1 AC.), 53-4L-132 (47.4 AC.), 53-4F-10 (1 AC.), 53-4F-11 (0.57 AC.), 271, 272
  • Scale: 0, 20, 40, 80 Feet (1 inch = 50 feet)

Map Created: Friday, April 24, 2026 | County of Chester

Chester County is committed to providing meaningful access to its programs, services, and activities, including information made available through ChescoViews and other County digital resources. We are working to improve the accessibility and usability of our maps, applications, and documents in accordance with applicable accessibility standards. If you experience difficulty accessing any content, feature, or functionality, or if you need information in an alternative format, please contact DCIS-GIS at gis@chesco.org or (610) 344-6696. Please identify the application, page, map, or document involved and describe the assistance you need. Chester County will make reasonable efforts to provide the requested information in an accessible format or through an alternative method in a timely manner.

Limitations of Liability and Use: County of Chester, Pennsylvania makes no claims to the completeness, accuracy, or content of any data contained herein, and makes no representation of any kind, including, but not limited to, the warranties of merchantability or fitness for a particular use, nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. For information on data sources visit the GIS Services page listed at www.chesco.org/gis.

TRACOM INC. FIBERGLASS PRODUCTS

Estimate

Tracom
162 Don Westbrooke Ave S
Jasper, GA 30314
US

Client
Mark Miller
Public Works Director of East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Tel: 610-692-8950
Terms
Due on Shipment
Date
3/30/2026
Estimate #
20260141

Manholes - Tracom_Blacksmith

Manhole Body

QTY ITEM DESCRIPTION
1 MH-4H20 Packaged H-20 Fiberglass Manhole, 4'-0" , with: 11'-0" deep (inlet invert to grade ring bench) -H-20 Highway Loading Cone (grade rings, cover, and frame by others) -31" I.D. / 32" O.D. c oncentric opening
1 FAB-LADDER Ladder, FRP, 1.5" reinforced rungs, non-slip top surface, S.S. hardware
1 FAB-2"NPT 2" NPT fitting / coupling / tap
1 MH-I-PB-10 Palmer-Bowlus flume, 4D+1" style, 10" throat
2 P-10 Pipe Stub, 10" x 6" L, Sch 40 PVC
2 C-CON-10 Coupling, concentric, 10" for C.I./PVC, flexible PVC with S.S. clamps
1 FLOW-STAFF-MOLD Staff gauge, molded into flume/weir sidewall (clear gel coat)
1 FLOW-ULT-OVER Ultrasonic mounting bracket, 304SS, over channel (VA)

Total: $18,290.00

Manhole Body

  • Fiberglass tube, 1/2" nominal thickness, Polyester Resin and Gel Coat (white)
  • Integral base with 4" external mounting flange
  • Polystyrene pad for placement between slab and manhole

Flume Assembly

  • Inlet and Outlet Adapters
  • Resin, Isophthalic polyester, 1/4" thick
  • Gel coat with U.V. inhibitors, grey cloud, textured finish, 15mil

Freight

QTY ITEM DESCRIPTION TOTAL
1 Freight Estimated Freight (valid for 30 days), PP&A, to: West Chester, PA $1,500.00

Total: $1,500.00

Grand Total: $19,790.00

Terms and Conditions of Sale

Price Terms: 100% payment required before shipment, less freight. Freight billed PP&A after shipment. F.O.B. Factory, Freight Prepaid and Add, and Valid Only in the Quantities Shown. Prices in US dollars. Retainage is not allowed. Failure to pay within the terms will suspend the warranty and require a warranty reactivation fee. Prices quoted are net to you, and do not include freight, installation, start-up assistance, taxes, or any items, goods or services not specifically listed, regardless of specification. Freight, if quoted, is an estimate only, actual freight charges will apply. Orders canceled after release to production shall incur a minimum, non-refundable cancellation fee of 10% (00 minimum).

Lead-time Terms: Average lead time is 6-8 weeks for small flumes and 8-12 for large flumes and shelters. Actual lead-times may be longer or shorter without notice. This document is not a guarantee of lead time. All lead times are ARO of approved submittals.

Proposal Terms: Valid for thirty (30) days from the date of quotation and only with the FULL, UNALTERED ACCEPTANCE of Tracom terms and conditions.

General Terms:

-This quote was assembled per the documents listed above and NOTHING ELSE.

-If a product or sub-product is not listed in this quote's description then it is not included in Tracom's quoted scope-of-supply.

-If a service is not listed in this quote's description, then it is not included in Tracom's quoted scope-of-supply.

-If a certification or report not listed in this quote's description, then it is not included in Tracom's quoted scope-of-supply.

-If an engineering stamp/calculation/report is not listed in this quote's description, then it is not included in Tracom's quoted scope-of-supply.

-It is the responsibility of the Buyer to obtain local / state / federal permits and approvals to place this product into service.

-Tracom does not provide hard copies of any document.

-Tracom does not provide / assemble Operation and Maintenance manuals. Tracom's O&M is a (1-2 page) document referring only to the fiberglass products manufactured in-house. Operations and Maintenance information for components is included in the Tracom Product Submittal and will not be reassembled into a new document.

  1. BUYER'S TERMS AND CONDITIONS: The Seller's (Tracom) terms and conditions are the core of any agreement reached with the Buyer. Any additional terms and conditions provided by the Buyer are secondary to this document. Buyer's terms and conditions in direct conflict with this document must be resolved by editing this document and signed execution by both Buyer and Seller.
  2. GOVERNING LAW, VENUE, AND JURISDICTION: All purchase agreements shall be governed by and construed under the Uniform Commercial Code as adopted by the State of Georgia as effective and in force on the date of order acceptance. Both the Seller and the Buyer shall agree to the sole jurisdiction of the courts of the State of Georgia for any suit brought by either party.
  3. ACCEPTANCE OF PURCHASE ORDER: No purchase order is considered to be valid unless accepted by the Seller's business owner (Matthew Kazmier). The Seller may accept or decline purchase orders at its convenience, without recourse by the Buyer.
  4. FREIGHT: All prices are in U.S. dollars, F.O.B. FACTORY with transportation charges prepaid and added, and valid only in the quantities quoted, unless expressly agreed to in writing at the time of quotation by an authorized employee of the Seller. The Buyer agrees that freight estimates given by the Seller's employees are estimates only and that the Buyer is solely responsible for the payment of said freight charges. The Buyer shall reimburse the Seller for all freight cost forthwith upon demand.
  5. TIME OF SHIPMENT: The Seller provides estimated delivery dates only for the convenience of the Buyer. The Seller shall not be liable for any delay or failure to produce, process, ship, or deliver occasioned by Force Majeure to include all circumstances or actions beyond the Seller's direct and immediate control. The Seller is not relieved from making shipment or the Buyer from accepting delivery at the agreed upon price when the cause interfering with delivery is removed. If shipment of completed equipment or any completed part is delayed due to the Buyer's request, the Buyer is expected to make payment of all periodic or partial invoices. Risk of loss shall pass to the Buyer upon delivery to the carrier on shipments made F.O.B. Factory.
  6. BANKRUPTCY: In the event that (a) the Buyer files a voluntary petition initiating any proceedings under the United States Bankruptcy Court with respect to itself; (b) Any involuntary petition initiating a proceeding under the United States Bankruptcy Court is filed against the Buyer and such petition is not dismissed within thirty (30) days; (c) The Buyer is adjudicated as bankrupt; (d) The Buyer makes and assignment for the benefit of its creditors or takes the benefits of any insolvency laws; (e) A receiver is appointed for the Buyer or for a substantial part of its property and such appointment is not discharged within sixty (60) days; (f)

The Buyer shall admit in writing its inability to pay its debts generally as they come due; (g) Any governmental body or agency condemns or requisitions any significant asset of the Buyer; (h) The Buyer fails to post security requested by the Seller within fifteen (15) days after the request; or (i) the Buyer commits any breach of contract and fails to remedy such breach within seven (7) days after giving notice to thereof to the Seller, then in any and all such cases the Seller may by notice to the Buyer in writing, fax, or electronic mail cancel any existing or resulting contract so far as any future performance by the Seller is concerned but without prejudice to the rights and remedies provided by the State of Georgia to either party arising of any antecedent performance or breach.

  1. EXCLUSION OF CONSEQUENTIAL DAMAGES: The Buyer specifically understands and agrees that under no circumstances shall the Seller be held liable for economic, special, incidental, or consequential damages or losses of any kind whatsoever, including but not limited to, loss of anticipated profits and any other loss caused by reason of the non-operation or late arrival of the goods or services. This exclusion is applicable to claims for breach of warranty, tortious conduct, or any other cause of action against the Seller.
  2. TORT LIABILITY: The Buyer specifically understands and agrees that the Seller and its officers, agents, and employees shall not be liable in tort (whether based on negligence, strict liability, or any other theory of tort liability) for any action or failure to act in respect to the manufacturer, preparation for sale, sale, delivery, or servicing of the product(s). It is the Buyer's intent to absolve and protect the Seller and Seller's officers, agents, and employees from any and all tort liability.
  3. PRICES: The price of goods and services shall be valid only as long as the term expressly stated on the quotation. In the event that the period of validity is not expressly stated in the quotation, the quotation shall be assumed to be in effect for thirty (30) days from the date of the offering.
  4. CANCELATION: The Buyer may cancel their order by written notice at any time, provided that the Buyer pays cancellation charges based on the percentage of work completed. Orders canceled after release to production shall incur a minimum non-refundable cancellation fee of 10% (00 minimum).
  5. RETURNS: The products provided by the Seller are of a custom nature and are not returnable. Those items deemed by the Seller to be have sufficient potential for resale may be considered for a buy-back by the Seller. As such, price paid by the Seller to buy-back a product shall be determined solely by the Seller. No items shall be returned by the Buyer without the express written consent of the Seller.
  6. THE EXTENSION OF CREDIT: Credit shall be provided to the Buyer solely at the discretion of the Seller.
  7. CREDIT, NON WAIVER: If the Buyer fails to fulfill the terms of payment in every respect, the Seller is not obligated to make delivery and may resort to the remedies provided under the law or herein. The Seller reserves the right, prior to making delivery, to require from the Buyer satisfactory security performance of the Buyer's obligations.
  8. ORDER DISCREPANCY: In the event that the Buyer discovers any discrepancies with the order, receives any incorrect merchandise, or finds that goods are damaged; the Buyer agrees to notify the Seller in writing within twenty-four (24) hours of receipt. The Buyer shall be solely responsible for contacting and making arrangements with the freight company for inspection of the goods, and if necessary, filing a claim for damage. The Buyer further agrees to notify the Seller within ten (10) days of receipt of any shortage or inaccuracy in the order. In the event that the Buyer does not notify the Seller within the ten (10) day period, any repair, replacement, or correction of the delivered goods shall be at the discretion of the Seller. The Buyer understands and agrees that the Seller is not responsible for the correction of order discrepancies brought to the Seller's attention after the ten (10) day notification period has passed. The Buyer shall be liable, after the notification period, for any and all freight charges to the Seller's facility in the event that the Seller allows repair, replacement, or correction. The Seller's warranty document provided in the executed Product Submittal shall govern warranty repair or replacement of merchandise.
  9. INVOICING AND BILLING: For purposes of invoicing and billing, each shipment hereunder shall be treated as a separate and independent contract. The invoice due date shall be calculated from the date the product is transferred to the freight carrier (or the date of completion if the Buyer is to arrange pick-up). No other time frame shall apply. Postdated, unsigned, or incorrect payments shall not be acceptable. Payment must be received at Seller's office by the due date of the invoice. Payment must be correct, complete, and unencumbered. Interest penalties shall accrue until the payment is correct, complete, and unencumbered.
  10. RETAINAGE: The Seller does not accept retainage on any order issued by the Buyer. In the event that the Seller accepts retainage, acceptance must be in writing and accompanied by a definite and mutually agreed upon method of execution to be considered to be in effect.
  11. LATE PAYMENT AND COLLECTION: The Buyer agrees to pay in full any and all late charges as outlined below. Should the Buyer not remit payment to Seller for the complete sale price (including freight) within the payment terms, the Buyer's outstanding debt will accrue late charges of 2% per month (or portion thereof). All delinquent accounts shall be forwarded to Dun and Bradstreet Receivables Management Service for collection. The Buyer shall be solely responsible for any and all outstanding invoice amount plus any and all reasonable collection charges. Minimum late charge is 00. In the event that attorney intervention is required in the collection of the account, expenses incurred will qualify as collection charges.
  12. WARRANTY: Seller warrants equipment per the Seller's Statement of Warranty Form in effect at the time of order. Damage during transit to the point of delivery must be claimed within the time frame and in the manner expressed in the Order Discrepancy Form provided with the packing list. Failure to file claims within the time frame and in the manner expressed in the Order Discrepancy Form may result in claims being waived. Damage due to improper storage, subsequent reshipment, transportation, or movement of the unit shall not be warranted. Failure to pay within the payment terms extended by seller will suspend the terms of the warranty and shall result in the notification of all affected parties. Should payment become greater than 28 days past due, reestablishment of the warranty shall require a warranty fee of 00.

QUOTATION

HARTCO ENVIRONMENTAL, LLC

Sales Rep Matt Gurkin

Quotation Number
(Please refer to this number when ordering)
Number: MGBOQ3612
Date: Jun 4, 2026

Reference: East Goshen Township Rev.2

East Goshen Township
Mark Miller
1580 Paoli Pike
West Chester, PA 19380

Phone: (610) 692-7171
Fax:

Please Address Purchase Order To:

Teledyne Isco
C/O Hartco Environmental LLC
4700 Superior Street
Lincoln, NE 68504

Phone: 856-324-0165
Fax: 856-324-0176

Line Qty Catalog Number Description Unit Price Ext. Price
1 1 684310000 Signature® Ultrasonic flowmeter system. Starting price includes base station 624300005, TIENet 310 ultrasonic level sensor with 32.8 ft (10 m) cable, and coupon for ISCO Open Channel flowmeter Handbook. The price will change as configured options are added to meet customer specifications. Configured options may include mounting hardware, cable lengths, power, I/O, interfaces, communication, totalizer, and rain gauge connector. $5,861.00 $5,861.00
2 1 604307015 Battery backup kit for Signature® meter. Includes model 946 lead-acid battery, adapter cable, and mounting hardware. $734.00 $734.00
3 1 682541001 Flowlink Cipher Cloud-based Water Data Management and Analysis Software for a single active site $360.00 $360.00
4 1 604307108 LTE Global cellular modem with magnetic mount antenna for Signature® meter. Requires customer provided cell phone service SIM card (Verizon, AT&T, Bell, Telus, Rogers, Orange, Telstra, Vodafone and others using frequency bands B1, B2, B3, B4, B5, B7, B8, B9, B12, B13, B14, B18, B19, B20, B25, B26, B28) with static IP address $1,689.00 $1,689.00
5 1 604357018 TIENet® Network Expansion Box with Desiccator, with 10 ft (3.05 m) TIENet® cable which connects to a Signature® meter or another TIENet Network Expansion Box in a daisy-chain configuration. Rated IP 67 (NEMA 4X, 6). The expansion box supports multiple connections at its internal terminal connections. Connections may be routed through three available ports. A TIENet® Option Card may also be mounted in the expansion box. $969.00 $969.00

Teledyne Isco
4700 Superior Street
Lincoln, NE 68504-1398
Phone: (800) 228-4373
Phone: (402) 464-0231
Fax: (402) 465-3022
Federal I.D. No.: 95-4888283
Duns No.: 07-832-7063

Created on 06/04/26 15:07:03

Page 1 of 2

Line Qty Catalog Number Description Unit Price Ext. Price
An option card limits the available ports to one. May be used with conduit or cable connections. If installed with cable connections, order cord grip fittings as needed. The desiccator supports TIENet devices which require reference air. The expansion box includes two plugs for unused ports.
6 1 604304050 TIENet® bulk cable, cut to length, 999 ft (304 m) maximum. Specify total length in feet. Price = per foot price x cable length. $384.00 $384.00
7 1 FC5 Freight Charge 5 ($5,000.00 - $12,499.99) $295.00 $295.00
Total $10,292.00

Terms & Conditions

Payment Net 30 days.
Prices are F.O.B - prepaid and added.
Estimated shipment 2-8 weeks after receipt of order.
Charges for expedited transportation shall be for the account of the purchaser.
Prices include packing for domestic shipment.
Any applicable sales tax is not included unless noted.
**Seller's Offer, and any order issued by Buyer to Seller for the goods and/or services specified herein, is strictly limited to Seller's General Terms and Conditions of Sale, which can be found at teledyneisco.com.
Please contact me if I can be of further assistance.

These prices are valid for 30 days.

By: __________________________________
Matt Gurkin
Manager

Teledyne Isco
4700 Superior Street
Lincoln, NE 68504-1398
Phone: (800) 228-4373
Phone: (402) 464-0231
Fax: (402) 465-3022
Federal I.D. No.: 95-4888283
Duns No.: 07-832-7063

Created on 06/04/26 15:07:03

Page 2 of 2