Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

Page 1 of 2

EAST GOSHEN MUNICIPAL AUTHORITY

July 13, 2026

7:00 • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE o Ask if anyone will be taping the meeting.

• CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS • LIAISON REPORTS • SEWER REPORTS o Director of Public Works’ Report o West Goshen Report o Pennoni Engineer’s Report o Big Fish Environmental Report

• APPROVAL OF MINUTES o June 8, 2026 • APPROVAL OF INVOICES

Company Invoice # Amount Notes Paid? Pennoni 1331573 $1,569.25 Pennoni 1331574 $1,389.50 Pennoni 1331575 $3,621.75 Pennoni 1331576 $1,330.00 Pennoni 1331577 $14,440.94

TRACOM, Inc

Order Acknowledgement

2026110 $19,790.00

For Blacksmith Shop metering manhole - the order acknowledgement does not include freight yet, which should be $1500. Gawthrop Greenwood 222093788 $307.50 Gawthrop Greenwood 222095276 $328.00 West Goshen Sewer Authority EG25-T $115,707.56 Teledyne Instruments S020778336 $102,922.00

Page 2 of 2

• FINANCIAL REPORTS o June 2026

• OLD BUSINESS o N Chester Rd Sewer Tie-in Survey Results (Pennoni)

• 2026 Goals: Goal Status

Ridley Creek Plant compliance January through June 2026 were in compliance with PADEP permit requirements.

Continue to implement infiltration and inflow for the sewer system Ongoing.

Attend West Goshen meetings on an as- needed basis.

Mike Moffa will continue to send monthly reports for West Goshen.

Long-term sustainability

Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.

• NEW BUSINESS o Sanitary Sewer Rates Comparison (Pennoni)

• CAPACITY REQUESTS

• ANY OTHER MATTER • CORRESPONDENCE AND REPORTS OF INTEREST o West Goshen Sewer Authority Summary Financial Statement – December 31, 2025

• PUBLIC COMMENT • ADJOURNMENT

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: July13, 2026
To: Municipal Authority
From: Mark Miller
Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 523,260 gallons per day.

Monthly Rainfall: 3.95”

Meters:

  • Read on a daily basis. No problems to report.
  • Replaced electrical pane and cabinet at Hicks meter

C.C. Collection:

  • The pumping stations were checked on a daily basis.

Ridley Creek Collection:

  • Stations were visited daily.

Ridley Creek Plant:

  • No problems to report.

Alarms: 30

PA One Calls: 206

Lateral Repairs/Caps – 4 sewer cap replacements

Page 1 of 1

West Goshen June 2026 Sewer Report

General Notes:

  • For the month of June, the wastewater treatment plant operated in compliance with the requirements of its NPDES permit, with the exception of the monthly average ammonia discharge concentration limit of 2.0 mg/L. The estimated monthly average ammonia concentration in the effluent was 2.5 mg/L. On Monday, June 15, plant staff observed elevated effluent ammonia concentrations of approximately 8.0 mg/L, compared to the expected operating level of approximately 0.1 mg/L. An investigation concluded that a discharge to the wastewater treatment plant containing inhibitory compounds likely disrupted the nitrifying bacteria within the activated sludge process, resulting in reduced ammonia removal efficiency. In response, plant staff increased aeration, added alkalinity to support nitrification, and re-seeded the biological process by importing healthy activated sludge from a nearby wastewater treatment facility. These corrective actions successfully restored nitrification, and by Friday of that week, effluent ammonia concentrations had returned to acceptable levels. DEP was notified accordingly.
  • WWTP monthly average daily flow – 3.348 mgd.
  • WWPS monthly average daily flow – 1.066 mgd.
  • Monthly estimated average total phosphorus discharge concentration was <0.02 mg/L.
  • Sludge to landfill – 240 wet tons (estimate).

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements . The WGSA has been awarded a grant of $250,000 for this project. To date, 2 pumps totaling $165,120 have been ordered with an estimated delivery of Nov, 2026. We do not anticipate the total project cost to exceed the grant amount by any significant amount.

Ongoing Projects:

  • WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 3 rd , 2026.
  • Primary Clarifier No. 2 Rehab – 100% of the clarifier mechanism has been delivered. Installation expected end of July into early August, 2026.
  • Return Activated Sludge (RAS) Force Main Line Stop and Gate Valve Installation – project was awarded June 3, 2026. Anticipated installation 3 rd quarter, 2026.

[West Goshen Township Seal]

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

[Pennoni Logo]

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

July 8, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 were planned to occur in spring 2026, but there have been long lead times for parts for rehab of the currently drained tank that will push the inspection of SBR #3 and #4 to later in 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
  • Motor Control Center (MCC) #1 – Design for replacement of the MCC is continuing, and construction is planned for 2027. Approx 90% complete plans are anticipated to be submitted by July 17 for Township, RCSTP operator, and electrician review.
  • RCSTP NPDES Permit Renewal –The draft application is being finalized for submission to the Township for review before submission to PADEP. The application is due to PADEP by October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining –The contractor, Vortex Services, performed corrective action punchlist work on the one pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site. They submitted their post-rehab video, which we reviewed. The liner condition was very similar to that immediately after the original installation approximately one year prior, indicating that the blisters do not visually appear to be getting worse.. Vortex submitted Pay Application #3 for this pipe run, which we processed for payment. Once they provide contract closeout documents, a final Pay Application (#4) can be made, which we expect will be presented at the August MA meeting.
  • Waterview Pipe Lining – Construction is ongoing, and we are performing part-time inspections during the work. Cleaning and televising of the added sewers in the Meadows neighborhood (Meadow Drive and Hollyberry Lane) has been completed. The pipes were found to be in fair-to-good condition with no repair required prior to pipe lining. Pipe lining began on July 6 in the Meadows and is expected to take two weeks. They are concurrently performing root removal and preparatory work on the pipes in Waterview. They will perform pipe lining in Waterview after completing lining in the Meadows.
  • Ridley Creek Permanent Sewer Meter – The Authority approved the quotes for the manhole and metering materials for a new permanent gravity collection system flow meter near the Blacksmith Shop at the June MA meeting. The meter has been delivered. The estimated ship date of the manhole is August 5.

Pump Stations

  • Hunt Country Pump Station –Field survey work and underground utility locating has been completed. Existing conditions plans have been updated to reflect this additional survey. We are continuing preparation of design and proposed conditions plans.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 3

EGMAU26001
East Goshen Municipal Authority
July 8, 2026
Engineer’s Report
Page 2 of 3

Sewer Extensions

  • Morstein Road and Great Oak Circle – An approx. 75% complete progress plan set and budgetary cost opinion was provided to the Township on May 6. This is the level of completeness that was scoped for our initial efforts on this project. A list of locations for Public Works to perform soft dig test pits for rock depths based upon the currently designed sewer depths was also provided. It is our understanding that Public Works is scheduling completion of the test pits. If additional engineering effort and budget is authorized, we can update the design and cost opinion after the results of the test pits are provided, and we can progress the design towards 100%. If authorized, we can also initiate Sewage Facilities Planning with PADEP.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
  • N. Chester Road – A sewer extension interest survey for the 39 properties along N. Chester Road, Forest Lane, Ivy Lane, Old Orchard Lane, and Raewyck Drive was sent to the property owners on May 28. Survey responses were due June 30. The results are that 13 properties are definitely interested, 3 properties are interested depending on costs, 12 properties are not interested, and 11 properties did not respond. An exhibit depicting the results of the survey is attached. A developer is continuing with considerations to develop 1152 N. Chester Road into a residential development and to potentially extend sewer to it. We provided information to their design consultant for their use in sewer extension planning.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) – No activity by Pennoni since our last report. The Westtown Township Sewer Engineer contacted East Goshen to confirm sewer system capacity for redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 5,992 gpd, which is an increase over the existing use’s flow. The property’s wastewater already flows through East Goshen. We previously reviewed the capacity of the Ashbridge Pump Station as noted above and determined there is adequate capacity for the increased flows at both the pump station and in East Goshen’s gravity conveyance system.
  • 1570 Colonial Lane – No activity by Pennoni since our last report. One single family dwelling is proposed on the vacant property. There was formerly a house there with a public sewer connection. The proposed dwelling will re-use the sewer lateral subject to inspection for adequacy of re-use.
  • 971 Cornwallis Drive – Pennoni reviewed a new land development submission and provided a review letter on June 22. The applicant is proposing to subdivide the existing approximately 7.5-acre parcel into three new lots, demolish the existing residential structure, and construct three new single-family homes. The Township sewer system in this area includes the tie-in of the Hershey's Mill Pump Station (HMPS) force main into the Township's gravity sewer system. The applicant proposes to re-use the existing gravity sewer connection, and to construct one new gravity sewer connection and one new grinder pump and low-pressure sewer connection, to converge within a new sanitary manhole, and then connect to the existing Township manhole with the HMPS force main tie-in. Our review letter advised that additional discussion with the Township Public Works is needed due to the

EGMAU26001
East Goshen Municipal Authority
July 8, 2026
Engineer’s Report
Page 3 of 3

complication of the proposed sewer connection and offered a possible alternate approach for consideration. Additionally, we noted concerns regarding proposed construction within the emergency access road easement and advised that the Township Solicitor review the land development submission for conformance with the easement restrictions.

Other

  • GIS Mapping – No activity by Pennoni since our last report. We have updated the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We will present it to Public Works, tentatively in August, to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
  • Rate Comparison – Attached is a comparison summary of local private sanitary sewer usage rates. All costs are quarterly and based on an average usage of 12,000 gallons/quarter. East Goshen’s sanitary sewer rate is a $60.61 fixed rate plus $12.00/1,000 gallons.

END OF REPORT

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report

July 2026

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for June 2026. All supplemental reports were submitted for May 2026. Caustic usage increased to 61.21 gallons per day from 60.40 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 50.90 gallons per day from 68.22 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

TABLES

CERTIFIED LAB RESULTS- FINAL EFFLUENT June 2026
FLOW Ammonia as N CBOD Total Phosphorus Total Suspended Solids Fecal Coliform
Permit Limit (Weekly Average) Gallons 7mg/L monthly 15mg/L 0.5mg/L 15mg/L 200 coliforms/100mL
DATE Final EFF/Applebrook
6/2/2026 260,000/33,608 <0.10 <2.0 <0.10 4.8 1
6/9/2026 251,000/33,311 <0.10 3.4 0.18 7 <1
6/16/2026 239,000/32,347 <0.10 <2.0 0.19 5.5 <1

CERTIFIED LAB RESULTS- FINAL EFFLUENT June 2026 Non-Report tests

DATE FLOW
Final EFF/Applebrook
NO2-NO3 (mg/L) TKN (mg/L) TN (mg/L)
6/2/2026 260,000/33,608 3.84 0.93 4.77
6/9/2026 251,000/33,311 5.42 1.03 6.45
6/16/2026 239,000/32,347 4.94 0.97 5.91

CERTIFIED LAB RESULTS- INFLUENT June 2026

DATE FLOW Ammonia as N BOD CBOD TKN Total Phosphorus Total Suspended Solids
6/2/2026 311,320 39.9 207 266 52.9 5.58 178
6/9/2026 306,900 42.3 267 252 58 5.9 252
6/16/2026 284,920 37.4 296 218 55.1 5.22 164

TKN = Total Kleidahl Nitrogen
TN= Total Nitrogen
NO2-NO3= Nitrogen, Nitrate-Nitrite

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained below all of the weekly average discharge limits for the month of June.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During June, there were seven (7) days where precipitation occured. There were 2 days where precipitation accumulation was equal to or greater than 0.50".

6/15 1.60"
6/23 1.60"

Total precipitation for the month was 3.97" of rain

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Chemical Data

June 2026
Chemical Daily Average Total Monthly
Caustic Soda, gal 61.21 1836.18
Aluminum Sulfate solution, gal 50.90 1527.12
Sludge Dewatering, gal* 16,762 385,521

*23 days of sludge dewatering

There was an increase of 78,993 gallons of sludge dewatering during the month of June compared to May.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.

Major Repairs or Upgrades

New Alum pumps were installed and put into service

Upcoming Repairs or Upgrades

Nothing to report

Page 2 of 3

Flow Data

June 2026
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 9.017 300,574 381,020
Influent Wastewater to SBRs 11.082 369,388 423,360
Internal Recycle 2.073 69,110 97,570
Treated Effluent to Disc Filters 10.747 358,221 408,896
Final Effluent Discharge 7.464 249,000 299,000
Applebrook Golf Course 1.002 33,387 37,139

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of June 2026

Page 3 of 3

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 8 , 2026

The East Goshen Township Municipal Authority held their regular meeting on Monday, June 8, 2026 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings – Chairman
John Stipe – Vice Chairman
Sean Ellsworth
Dana Pizarro
Walter Wujcik

Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Peter Hicks (Supervisor
Kelly Brophy, Finance Director
Patrick McKenna (Attorney)
Theodore Speedy (Attorney)
Stacey Fuller (Attorney)

COMMON ACRONYMS:

ATS – Automatic Transfer Switch MA- Municipal Authority
BFES – Big Fish Environmental Services NPDES – National Pollutant Discharge Elimination System
BOS – Board of Supervisors PC – Planning Commission
CB – Conservancy Board PM – Prevention Maintenance
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge
PWD – Public Works Department

Call to Order & Pledge of Allegiance
John called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
John asked for a moment of silence for our First Responders and Military.
John asked if anyone would be recording the meeting. There was no response.

Chairman’s Report/Other Members Report
None

Liaison Reports
1. Board of Supervisors – Peter mentioned that the Comprehensive Plan should be reviewed this year. He asked the MA members to come up with items that they feel are important.

MA 6-8-26 draft 1

SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for June 8, 2026.

Monthly Flows – The average daily flow to West Goshen was 564,839 gallons per day.

Monthly Rainfall - 5.54” (East Goshen rain gauge)

Meters:

  • Read on a daily basis. No problems to report.
  • Attached are charts from our new Mission Communications program. They show the daily flow and rainfall for the month of May. Note: Mark reviewed the data from the new system and Mike also made some comments.
  • Hershey Mill Pump Station Two pumps replaced by Kappe. Replacement was cheaper than repairs.

Barkway Pump Station
Two pumps were rebuilt.

C.C.Collection

  • Pump stations were checked on a daily basis.
  • Pulled Ashbridge & Barkway pumps for maintenance.

Ridley Creek Collection:

  • Stations were visited daily.
  • Purchased two new pumps for Hershey Mill pump station.

Ridley Creek Plant:

  • Switched from well water to city water because Matthew was having problems with well water reacting with the polymer.
  • New fan was installed in the sludge control panel.

Alarms: 14

PA One Calls: 221
Billy responds to every PA One Call and marks them out.

Lateral Repairs/Caps: photo attached. In the small storm we had, the tree in the attached picture went down and broke the cleanout at the home in Waterview.

Morstein/Charter Chase Test Pits – photo attached
We started doing the test pits for Mike Ellis and have hit shale several times. We should finish up on Monday, June 8, 2026.

2. West Goshen Report
The report was reviewed and numbers discussed.

MA 6-8-26 draft 2

3. Pennoni Engineer’s Report dated June 4, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant in being finalized.
  • SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 were planned to occur in spring 2026, but there have been long lead times for parts for rehab of the currently drained tank that will push the inspection of SBR #3 and #4 to later in 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
  • Motor Control Center (MCC) #1 – Design for replacement of the MCC is underway, and construction is planned for 2027. Draft existing conditions, plans and single line diagrams have been prepared. We are confirming additional existing conditions information with the operator. Demolition and new work plans and diagrams are currently being prepared.
  • RCSTP NPDES Permit Renewal - We are continuing to compile information, review available sampling data, and prepare the NPDES permit renewal application package. Additional sampling is required for the application, and the sampling is underway. The application is due to PADEP by October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – No updates since our last report. The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are still awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
  • Waterview Pipe Lining – The contract with SWERP has been executed, and a pre-construction meeting was held on May 21. Notice to Proceed was issued on May 22. A change order is being prepared to add the Meadows neighborhood (Meadow Drive and Hollyberry Lane) sanitary sewer pipes to the contract within the remaining budget. The change order will also add 30 days to the contract duration for the additional scope. Televising work is scheduled for the week of June 8. Pipe lining work is scheduled to start the week of July 6.
  • Ridley Creek Permanent Sewer Meter – We obtained quotes for manhole and metering materials for a new permanent gravity collection system flow meter near the Blacksmith Shop.

MA 6-8-26 draft 3

Pump Stations

  • Hunt Country Pump Station – Pennoni previously conducted an existing conditions survey of the interior of the Hunt Country Pup Station building, including electrical components, and a topographic survey of the site. Blood Hound also previously performed utility locating of the existing force main, and our survey crew surveyed the force main mark outs. Additional survey of the existing wet well and valve vault we performed on May 22. Field survey work is now complete. Existing conditions plans are being updated to reflect this additional survey. We area also continuing preparation of design and proposed conditions plans.

Sewer Extensions

  • Morstein Road and Great Oak Circle – An approx. 75% complete progress plan set and budgetary cost opinion was provided to the Township on May 6. This is the level of completeness that was scoped for our initial efforts on the project.

A list of locations for Public Works to perform soft dig test pits for rock depths based upon the currently designed sewer depths was also provided. It is our understanding that Public Works began performing the test pits on June 3. If additional engineering effort and budget is authorized, we can update the design and cost opinion after the results of the test pits are provided, and we can progress the design towards 100%. If authorized, we can also initiate Sewage Facilities Planning with PADEP.

  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
  • N. Chester Road – A sewer extension interest survey for the 39 properties along N. Chester Road, Forest Lane, Ivy Lane, Old Orchard Lane, and Raewyck Drive was sent to the property owners on May 28. Survey responses are due June 30. An exhibit depicting the results of the sewer extension interest survey will be prepared after responses are received. It is our understanding that a developer is continuing with considerations to develop 1152 N. Chester Road into a residential development and to potentially extend sewer to it.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.

MA 6-8-26 draft 4

  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) - No activity by Pennoni since our last report. The Westtown Township Sewer Engineer contacted East Goshen to confirm sewer system capacity for redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 5,992 gpd, which is an increase over the existing use’s flow. The property’s wastewater already flows through East Goshen. We reviewed the capacity of the Ashbridge Pump Station as noted above and determined there is adequate capacity for the increased flows at both the pump station and in East Goshen’s gravity conveyance system.
  • 1570 Colonial Lane – We reviewed a plan to construct one single family dwelling on the property. There was formerly a house there with a public sewer connection. The proposed dwelling will re-use the sewer lateral subject to inspection for adequacy of re-use. We provided comments on the plan and sewer to the Applicant’s design consultant.

Other

  • GIS Mapping – No activity by Pennoni since our last report. We have updated the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We will present it to Public Works to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.

New Business
Blacksmith Shop Metering Manhole - Mike reviewed the information for the proposed manhole location at the Blacksmith Shop. He explained the quotes for the metering manhole and flowmeter. The manhole quote has not changed. The flowmeter quote from Hartco has been revised and the new total is $10,292.00.
Motion: Dana moved to approve the quotes from TRACOM for the manhole for $19,790.00 and from Hartco for the flowmeter for $10,292.00. Sean seconded the motion. The motion passed unanimously.

3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for May 2026. All supplemental reports were submitted for April 2026. Caustic usage increased to 60.40 gallons per day from 58.48 gallons per day last month. Aluminum sulfate solution volumes daily average increased to 68.22 gallons per day from 60.60 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
Comments: Check the dates contained in the April dates.

MA 6-8-26 draft 5

Approval of Minutes
The minutes of the May 11, 2026 meeting were approved as amended.

Approval of Invoices
1. Dana approved payment of Pennoni Invoices:
#1326599 in the amount of $1,338.25
#1326600 in the amount of $2,941.75
#1326601 in the amount of $ 174.50
#1326602 in the amount of $2,442.00
#1326603 in the amount of $ 681.50
Sean seconded the motion. The motion passed unanimously.
2. Dana moved to approve payment of Gawthrop Greenwood invoice #222092608 in the amount of $701.10. Sean seconded the motion. The motion passed unanimously.

Financial Reports
Kelly reviewed the following report: YTD May 2026, the Municipal Authority recorded $144,262.19 in revenues (primarily from Sewer Capital Reserve, Sewer Operating transfers and collecting inspection and tapping fees) and $127,684.86 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA quarterly recharges, audit expenses, Flygt sludge pump repair, and legal and engineering expenses). The net result of operations is $16,577.33. As of May 31, 2026, the fund balance was $44,944.55.
The MA discussed possible sewer rate increases.

Old Business –
None

Goals - None

Capacity Requests – Mark spoke about Supplee Valley residents who want to tie into the sewer.

Any Other Matter - None

Correspondence- None

Public Comment - None

Adjournment
There being no further business Sean moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, July 6, 2026 at 7:00 p.m.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 6-8-26 draft 6

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1331573
Invoice Date : 07/02/2026
Project : EGMAU25004
Project Name : Hunt Country Pump Station Upgrade

For Services Rendered Through 06/21/2026

Completed field survey of existing wet well and manholes, and updated existing conditions plans.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Survey NTE $11,400.00 $11,375.25 99.78% $11,375.25 $0.00
02 -- Design NTE $50,100.00 $9,453.75 22.00% $11,023.00 $1,569.25
03 -- Permitting NTE $12,800.00 $0.00 0.00% $0.00 $0.00
04 -- Bid Services NTE $6,300.00 $0.00 0.00% $0.00 $0.00
Total : $80,600.00 $20,829.00 $22,398.25 $1,569.25

Phase: 02 -- Design

Labor

Class Hours Rate Amount
Senior Professional 2.50 158.00 395.00
Staff Professional 1.00 133.00 133.00
Senior Engineering Tech 4.00 118.00 472.00
Engineering Tech 5.75 99.00 569.25
Labor 1,569.25

Billing Limits

Current Prior To-Date
Total Billings 1,569.25 9,453.75 11,023.00
Limit 50,100.00
Remaining 39,077.00

Phase Subtotal: $1,569.25

Amount Due This Invoice: $1,569.25

APPROVED BY: MM KCR
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3705

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25004
Pennoni Job No.: Hunt Country Pump Station Upgrade
Invoice No: 1331573
Invoice Period: 5/18/2026 to 6/21/2026
Initial Authorization: $ 80,600.00 Date: 7/2/2026
Contract Amount: $ 80,600.00
Previously Invoiced: $ 20,829.00
Current Invoice: $ 1,569.25
Invoiced to Date ($): $ 22,398.25
Invoiced to Date (%): 28%
Remaining Budget ($): $ 58,201.75
Remaining Budget (%): 72%

Budget by Phase:

Phase Name: Hunt Country Pump Station Upgrade
Phase Budget: $ 80,600.00
Previously Invoiced: $ 20,829.00
Current Invoice: $ 1,569.25
Invoiced to Date ($): $ 22,398.25
Invoiced to Date (%): 28%
Remaining Budget ($): $ 58,201.75
Remaining Budget (%): 72%

Comments: Completed field survey of existing wet well and manholes, and updated existing conditions plans.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1331574
Invoice Date : 07/02/2026
Project : EGMAU25007
Project Name : Waterview Pipe Lining

For Services Rendered Through 06/21/2026

Reviewed contractor’s pre-construction videos of pipes in Meadows neighborhood, field measurements of pipe lengths in Meadows for scope addition via change order, conducted pre-construction meeting and prepared meeting summary, issued Notice to Proceed, and prepared residents notification letter and construction contact list.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
.. Waterview Pipe Lining est. $30,000.00 $10,446.50 $11,836.00 $1,389.50
Total : $30,000.00 $10,446.50 $11,836.00 $1,389.50

Labor

Class Hours Rate Amount
Authority Engineer 3.75 166.00 622.50
Senior Engineering Tech 6.50 118.00 767.00
Labor 1,389.50

Amount Due This Invoice: $1,389.50

APPROVED BY: MAM KCR
DATE PAID:
CHECK #:
CHARGED TO: 07-429-3700

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU25007
Pennoni Job No.: Waterview Pipe Lining
Invoice No: 1331574
Invoice Period: 5/18/2026 to 6/21/2026
Initial Authorization: $ 30,000.00 Date: 7/2/2026
Contract Amount: $ 30,000.00
Previously Invoiced: $ 10,446.50
Current Invoice: $ 1,389.50
Invoiced to Date ($): $ 11,836.00
Invoiced to Date (%): 39%
Remaining Budget ($): $ 18,164.00
Remaining Budget (%): 61%

Budget by Phase:

Phase Name: Waterview Pipe Lining
Phase Budget: $ 30,000.00
Previously Invoiced: $ 10,446.50
Current Invoice: $ 1,389.50
Invoiced to Date ($): $ 11,836.00
Invoiced to Date (%): 39%
Remaining Budget ($): $ 18,164.00
Remaining Budget (%): 61%

Comments: Reviewed contractor's pre-construction videos of pipes in Meadows neighborhood, field measurements of pipe lengths in Meadows for scope addition via change order, conducted pre-construction meeting and prepared meeting summary, issued Notice to Proceed, and prepared residents notification letter and construction contact list.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1331575
Invoice Date : 07/02/2026
Project : EGMAU26001
Project Name : 2026 General Services

For Services Rendered Through 06/21/2026

Prepared June Engineer's Report. Reviewed June RCSTP Operator's Report. Attended June MA meeting.

Updated sewer extension interest survey letter to N. Chester Rd and surrounding residents. Updated concept exhibits of sewer extension alternatives and cost estimates. Reviewed initial survey responses and prepared exhibit summarizing responses. Attended pre-application meeting at Twp building with potential 1152 N. Chester Rd developer and Township staff.

Gravity flow meter near Blacksmith Shop: Reviewed shop drawings of metering manhole from vendor.

Compiled private utility sewer rates for rate comparison.

Supplee Valley Cured-In-Place Pipe Lining: Coordinate with contractor for submission of recent rehab pipe videos for review and payment.

Assisted Public Works with response to Charter Chase resident inquiry on potential sewer extension connection feasibilty and timeframe for extensions.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- General Engineering Services NTE $45,925.25 $16,040.75 42.81% $19,662.50 $3,621.75
02 -- Grants NTE $74.75 $74.75 100.00% $74.75 $0.00
Total : $46,000.00 $16,115.50 $19,737.25 $3,621.75

Phase: 01 -- General Engineering Services

Labor

Class Hours Rate Amount
Authority Engineer 10.00 166.00 1,660.00
Staff Professional 14.75 133.00 1,961.75
Labor 3,621.75

Phase Subtotal: $3,621.75

Amount Due This Invoice: $3,621.75

APPROVED BY: KCR
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMAU26001
Pennoni Job No.: 2026 General Services
Invoice No: 1331575
Invoice Period: 5/18/2026 to 6/21/2026
Initial Authorization: $ 46,000.00 Date: 7/2/2026
Contract Amount: $ 46,000.00
Previously Invoiced: $ 16,115.50
Current Invoice: $ 3,621.75
Invoiced to Date ($): $ 19,737.25
Invoiced to Date (%): 43%
Remaining Budget ($): $ 26,262.75
Remaining Budget (%): 57%

Budget by Phase:

Phase Name: 2026 General Services
Phase Budget: $ 46,000.00
Previously Invoiced: $ 16,115.50
Current Invoice: $ 3,621.75
Invoiced to Date ($): $ 19,737.25
Invoiced to Date (%): 43%
Remaining Budget ($): $ 26,262.75
Remaining Budget (%): 57%

Comments: Prepared June Engineer's Report. Reviewed June RCSTP Operator's Report. Attended June MA meeting.
Updated sewer extension interest survey letter to N. Chester Rd and surrounding residents. Updated concept exhibits of sewer extension alternatives and cost estimates. Reviewed initial survey responses and prepared exhibit summarizing responses. Attended pre-application meeting at Twp building with potential 1152 N. Chester Rd developer and Township staff.
Gravity flow meter near Blacksmith Shop: Reviewed shop drawings of metering manhole from vendor.
Compiled private utility sewer rates for rate comparison.
Supplee Valley Cured-In-Place Pipe Lining: Coordinate with contractor for submission of recent rehab pipe videos for review and payment.
Assisted Public Works with response to Charter Chase resident inquiry on potential sewer extension connection feasibilty and timeframe for extensions.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1331576
Invoice Date : 07/02/2026
Project : EGMAU26003
Project Name : RCSTP NPDES
Permit Renewal

For Services Rendered Through 06/21/2026

Continued preparation of permit application documents, reviewed additional lab sampling results, and coordinated with Township and Operator for additional information required for application.

Billing Limits

Current Prior To-Date
Total Billings 1,330.00 2,344.00 3,674.00
Limit 7,500.00
Remaining 3,826.00

Labor

Class Hours Rate Amount
Staff Professional 10.00 133.00 1,330.00
Totals 10.00 1,330.00

Total Labor: 1,330.00

Total this Invoice: $1,330.00

APPROVED BY: MAM KCR
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Field Value
Project: EGMAU26003
Pennoni Job No.: RCSTP NPDES Permit Renewal
Invoice No: 1331576
Invoice Period: 5/18/2026 to 6/21/2026
Date: 7/2/2026
Initial Authorization: $ 7,500.00
Contract Amount: $ 7,500.00
Previously Invoiced: $ 2,344.00
Current Invoice: $ 1,330.00
Invoiced to Date ($): $ 3,674.00
Invoiced to Date (%): 49%
Remaining Budget ($): $ 3,826.00
Remaining Budget (%): 51%

Budget by Phase:

Field Value
Phase Name: RCSTP NPDES Permit Renewal
Phase Budget: $ 7,500.00
Previously Invoiced: $ 2,344.00
Current Invoice: $ 1,330.00
Invoiced to Date ($): $ 3,674.00
Invoiced to Date (%): 49%
Remaining Budget ($): $ 3,826.00
Remaining Budget (%): 51%

Comments: Continued preparation of permit application documents, reviewed additional lab sampling results, and coordinated with Township and Operator for additional information required for application.

Pennoni

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199

Invoice No : 1331577
Invoice Date : 07/02/2026
Project : EGMAU26004
Project Name : RCSTP MCC-1
Replacement

For Services Rendered Through 06/21/2026

Prepared electrical design including updates to existing single line diagrams to reflect existing conditions, single line diagram demolition plan, new temporary single line diagram to maintain power during construction, new proposed conditions single line diagram, new panel schedules, and specifications. Coordinated with RCSTP Operator to confirm existing electrical conditions.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Design $26,700.00 $0.00 54.09% $14,440.94 $14,440.94
02 -- Arc Flash Study $8,000.00 $0.00 0.00% $0.00 $0.00
Total : $34,700.00 $0.00 $14,440.94 $14,440.94

Amount Due This Invoice: $14,440.94

APPROVED BY: MAM KCR
DATE PAID:
CHECK #:
CHARGED TO: 7-424-7431

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Field Value
Project: EGMAU26004
Pennoni Job No.: RCSTP MCC-1 Replacement
Invoice No: 1331577
Invoice Period: 5/6/2026 to 6/21/2026
Date: 7/2/2026
Initial Authorization: $ 34,700.00
Contract Amount: $ 34,700.00
Previously Invoiced: $ -
Current Invoice: $ 14,440.94
Invoiced to Date ($): $ 14,440.94
Invoiced to Date (%): 42%
Remaining Budget ($): $ 20,259.06
Remaining Budget (%): 58%

Budget by Phase:

Field Value
Phase Name: RCSTP MCC-1 Replacement
Phase Budget: $ 34,700.00
Previously Invoiced: $ -
Current Invoice: $ 14,440.94
Invoiced to Date ($): $ 14,440.94
Invoiced to Date (%): 42%
Remaining Budget ($): $ 20,259.06
Remaining Budget (%): 58%

Comments: Prepared electrical design including updates to existing single line diagrams to reflect existing conditions, single line diagram demolition plan, new temporary single line diagram to maintain power during construction, new proposed conditions single line diagram, new panel schedules, and specifications. Coordinated with RCSTP Operator to confirm existing electrical conditions.

TRACOM, Inc.
162 Don Westbrook Ave S
Jasper, GA 30143
+18774358637
maryann@tracomfrp.com

TRACOM

Order Acknowledgement

ADDRESS SHIP TO
East Goshen Township PW
1580 Paoli Pike
West Chester, PA 19380
East Goshen Township PW
1580 Paoli Pike
West Chester, PA 19380
ORDER ACKNOWLEDGEMENT # DATE
2026110 06/10/2026
SHIP DATE P.O. NUMBER PROJECT NAME
08/05/2026 Approved Quote Blacksmith
ACTIVITY DESCRIPTION QTY AMOUNT
MH-4H20 Packaged H-20 Fiberglass Manhole, 4’-0” Ø, with:
-11’-0” deep (inlet invert to grade ring bench)
-Fiberglass tube, 1/2” nominal thickness, Polyester Resin and Gel Coat (white)
-Integral base with 4” external mounting flange
-Polystyrene pad for placement between slab and manhole
-H-20 Highway Loading Cone (grade rings, cover, and frame by others)
-31” I.D. / 32” O.D. opening
1 18,290.00
FAB-LADDER Ladder, FRP, 1.5” Ø reinforced rungs, non-slip top surface, S.S. hardware 1 0.00
FAB-2”NPT 2” Ø NPT fitting / coupling / tap 1 0.00
MH-I-PB-10 Palmer-Bowlus flume, 4D+1” style, 10” throat
-Inlet and Outlet Bulkheads
-Resin, Isophthalic polyester, 1/4” thick
-Gel coat with U.V. inhibitors, grey cloud, textured finish, 15mil
1 0.00
P-10 Pipe Stub, 10” Ø x 6” L, Sch 40 PVC 2 0.00
C-CON-10 Coupling, concentric, 10” Ø for C.I./PVC, flexible PVC with S.S. clamps 2 0.00
FLOW-STAFF-MOLD Staff gauge, molded into flume/weir sidewall (clear gel coat) 1 0.00
FLOW-ULT-OVER Ultrasonic mounting bracket, 304SS, over channel (VA) 1 0.00

Your order is in production. Please contact Tracom if you cannot accept the shipment by the ship date. We cannot HOLD shipments. Freight to be added.

SUBTOTAL 18,290.00
TAX 0.00
TOTAL $18,290.00

7/8/2026
Approved
Mark Miller
Freight 1,500.00
$19,790.00

Lynn Werkheiser

From: Erika Addison <eaddison@Pennoni.com>
Sent: Tuesday, July 7, 2026 7:26 AM
To: Lynn Werkheiser
Cc: Michael Ellis; Mark Miller
Subject: FW: Blacksmith Shop Metering Manhole - East Goshen Township
Attachments: 2026110.pdf

Lynn,

Just wanted to make sure that the attached invoice for the Blacksmith Shop metering manhole is included in this month's MA packet. The invoice amount appears to be correct. However, it does not include freight yet. Freight should be $1,500.

Erika

Erika Addison, PE

Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5263
www.pennoni.com | eaddison@Pennoni.com

From: Mary Ann Cronley <maryann@tracomfrp.com>
Sent: Wednesday, June 24, 2026 2:39 PM
To: Andrew Helbling <andrew@tracomfrp.com>
Cc: Lynn Werkheiser <lwerkheiser@eastgoshen.org>; Erika Addison <eaddison@Pennoni.com>; Matt Tracom <gm@tracomfrp.com>; Matt Gurkin <mhartco@comcast.net>; Michael Ellis <MEllis@Pennoni.com>; Jake Gurkin <jhartco@comcast.net>; Mark Miller <mmiller@eastgoshen.org>
Subject: Re: Blacksmith Shop Metering Manhole - East Goshen Township

You don't often get email from maryann@tracomfrp.com. Learn why this is important

The order acknowledgment is attached.

Thank you for your order. Our payment terms are Net 30.

On Wed, Jun 24, 2026 at 11:59 AM Andrew Helbling <andrew@tracomfrp.com> wrote:

Looping in Mary Ann,

Andrew Helbling
*********************************
Sales and Engineering Manager
TRACOM, Inc.
162 Don Westbrook AVE S

1

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
06/05/2026
Client No: 6604-001M
Invoice No. 222093788

General Authority Services

Fees

Date Staff Description Hours Amount
05/08/2026 PMM Email from L. Werkheiser in preparation for Board meeting. 0.20 41.00
05/11/2026 PMM Preparation for & Attend Authority Board meeting. 1.30 266.50
For Current Services Rendered 1.50 307.50

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 1.50 $205.00 $307.50

Previous Balance: $701.10
Total Current Charges: 307.50
Balance Due: $1,008.60

APPROVED BY: KCS
DATE PAID: _________
CHECK #: _________
CHARGED TO: 07-424-3140

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
06/05/2026
Client No: 6604M

Account Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services 701.10 307.50 0.00 0.00 $1,008.60

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
07/06/2026
Client No: 6604-001M
Invoice No. 222095276

General Authority Services

Fees

Date Staff Description Hours Amount
06/05/2026 PMM Email from L. Werkheiser re meeting agenda and materials for Authority Board meeting. 0.20 41.00
06/08/2026 PMM Attend authority Board meeting. 0.80 164.00
06/26/2026 PMM Messages (2) from/to M. Miller re easement and legal description for Connie Bane/Hankin sewer connection; Review & Analyze legal description and plan for same. 0.60 123.00
For Current Services Rendered 1.60 328.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Patrick M. McKenna, Esquire 1.60 $205.00 $328.00

Previous Balance: $1,008.60
Total Current Charges: 328.00
06/16/2026 Payment: -701.10
Balance Due: $635.50

APPROVED BY: MAM
DATE PAID: _________
CHECK #: _________
CHARGED TO: 07-424-3140

East Goshen Municipal Authority
General Authority Services

Page: 2
07/06/2026
Client No: 6604-001M
Invoice No. 222095276

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law

(p) 610-696-8225
(f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com

GAWTHROP GREENWOOD CLIENT INVOICE

Please Mail checks to: P.O. Box 562
West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit:
https://secure.lawpay.com/pages/gawthrop/operating
Effective February 1, 2025 there will be
a 3% convenience fee on all credit card payments.

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
07/06/2026
Client No: 6604M

Account Previous Balance Fees Expenses Payments Balance
6604-001 General Authority Services 1,008.60 328.00 0.00 -701.10 $635.50

To ensure proper credit, please write your client number on your check when returning payment.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

West Goshen Sewer Authority

INVOICE

WEST GOSHEN TOWNSHIP 1817
848 S. Concord Road
West Chester, PA 19382
P: 610-696-0900
F: 610-429-9360

Date: June 30, 2026
Invoice #: EG25-T
For: 2025 WG Sewer Authority Tapping Fee Fund Expenses
Bill To:
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

DESCRIPTION AMOUNT
Costs (Non-Bond funded) for projects of the West Goshen Sewer Authority as per Memorandum Agreement No. VIII of June 20, 2017 for the period of January 01, 2025 through December 31, 2025 (details attached). 694,106.56
SUBTOTAL $694,106.56
Capacity % 16.67%
OTHER $0.00
TOTAL $115,707.56

APPROVED BY: KCS
DATE PAID: _________
CHECK #: _________
CHARGED TO: 07-429-6100

Please make check payable to:
WEST GOSHEN SEWER AUTHORITY

THANK YOU!

West Goshen Sewer Authority
TAPPING FEE FUND
Expense Detail - 2025
East Goshen Township

Date Paid Project Vendor Amount
1 2024 INTERCEPTOR REHAB 46,942.77
2 SCREW PUMP REPLACEMENTS 181,239.84
03/04/2026 CLARIFIER NO. 2 REHAB G.M.H. ASSOCIATES OF AMERICA, INC. 176,269.50
04/01/2026 CLARIFIER NO. 2 REHAB G.M.H. ASSOCIATES OF AMERICA, INC. 17,179.70
12/03/2025 COMAG PUMP REPAIR XYLEM WATER SOLUTIONS USA INC. 10,197.85
05/07/2025 EQ BLOWER REPLACEMENT KAPPE ASSOCIATES INC 7,660.00
06/04/2025 EQ BLOWER REPLACEMENT KAPPE ASSOCIATES INC 30,640.00
06/04/2025 GRIT CONVEYOR LINER KAPPE ASSOCIATES INC 5,895.00
03/05/2025 LUNCH/LOCKER ROOM HEAT PUMP PRECISION AIR HEATING & COOLING 11,485.00
07/02/2025 POLYMER UPGRADE - DEWATERING BRENDAN STANTON, INC. 6,020.00
12/03/2025 POLYMER UPGRADE - DEWATERING BRENDAN STANTON, INC. 4,650.00
12/03/2025 RAS LINE PROJECT UNDERGROUND SERVICES INC 1,500.00
07/02/2025 RAS VALVE REPLACEMENTS L-B WATER SERVICE, INC. 32,590.50
08/06/2025 RAS WELL CONCRETE REPAIR MITCHELL MECHANICAL 9,897.50
10/01/2025 RAS WELL PLATFORM MITCHELL MECHANICAL 12,441.00
11/05/2025 REPLACEMENT RAS PUMP KAPPE ASSOCIATES INC 72,070.00
04/02/2025 SCADA - PROFESSIONAL SERVICES OPTIMUM CONTROLS CORPORATION 5,605.00
06/04/2025 SCADA - PROFESSIONAL SERVICES OPTIMUM CONTROLS CORPORATION 2,660.40
07/02/2025 SCADA - PROFESSIONAL SERVICES OPTIMUM CONTROLS CORPORATION 760.00
03/04/2026 SCREW PUMP UPPER BEARING PYRZ WATER SUPPLY CO. INC. 27,580.00
03/05/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 9,439.50
04/02/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 1,044.00
05/07/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 1,392.00
07/02/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 304.50
10/01/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 2,871.00
11/05/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 2,566.50
12/03/2025 TMDL HANGLEY, ARONCHICK, SEGAL, PUDLIN & SCHILLER 391.50
12/03/2025 TREE PLANTINGS - WESTTOWN WAY BELL LANDSCAPE INC 6,751.00
04/02/2025 WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 527.50
05/07/2025 WWTP TRANSFORMER BRENDAN STANTON, INC. 3,150.00
06/04/2025 WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 345.00
11/05/2025 WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 315.00
12/03/2025 WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 1,610.00
01/07/2026 WWTP TRANSFORMER HERBERT, ROWLAND & GRUBIC, INC. 115.00
Total Allocated 694,106.56

Comments:
1 See 2024 Interceptor Rehabilitation Project Detail Sheet.
2 See Screw Pump Replacement Detail Sheet.

Page 1 of 1

2024 Interceptor Rehabilitation Project - Detail Sheet

35.57% Allocation after Grant

No. Description Cost Allocation Allocation after Grant
GENERAL
1 MOBILIZATION & PROJECT MANAGEMENT $ 20,000.00 * $ 1,358.00 $ 483.04
2 TRAFFIC MAINTENANCE & PROTECTION $ 10,000.00 * $ 679.00 $ 241.52
3 EROSION & SEDIMENTATION CONTROL $ 140,000.00 * $ 9,506.00 $ 3,381.28
4 BY-PASS PUMPING $ 300,000.00 * $ 20,370.00 $ 7,245.61
4A HOT TAP OF 18" FARCEMAIN W/REQ> SUPPORT AND APP. $
5 MANHOLE TOP REMOVAL/EASEMENT ACCESS & RESTORATION $ 140,000.00 * $ 9,506.00 $ 3,381.28
SANITARY SEWER PIPE, APPURTENANCES, AND RELATED WORK
6 14-18 INCH CIPP LINING $ 121,170.00 $
7 30 INCH CIPP LINING $ 441,780.00 $ 74,925.00 $ 26,650.82
8 SANITARY SEWER LATERAL REINSTATEMENT $ 10,000.00 $
SANITARY SEWER MH, APPURTENANCES, AND RELATED WORK
9 MANHOLE 1300-1 REHABILITATION $ 5,600.00 $ 5,600.00 $ 1,991.92
10 MANHOLE 1300-2 REHABILITATION $ 5,600.00 $ 5,600.00 $ 1,991.92
11 MANHOLE 801-9 REHABILITATION $ 5,600.00 $
12 MANHOLE 801-10 REHABILITATION $ 9,500.00 $
13 MANHOLE 801-13 REHABILITATION $ 9,500.00 $
14 MANHOLE 801-14A REHABILITATION $ 5,600.00 $
15 MANHOLE 801-16A REHABILITATION $ 5,600.00 $
16 MANHOLE 801-17 REHABILITATION $ 5,600.00 $
17 MANHOLE 803-A REHABILITATION $ 5,600.00 $
18 MANHOLE 839-A REHABILITATION $ 5,600.00 $
19 MANHOLE 801-21 REHABILITATION $ 5,600.00 $
CONTINGENT ITEMS
20 SANITARY SEWER LATERAL REINSTATEMENT $ $
21 CHEMICAL GROUT $ $
CHANGE ORDER NO. 1
GENERAL
MOBILIZATION & PROJECT MANAGEMENT $ 10,000.00 $
TRAFFIC MAINTENANCE & PROTECTION $ 15,000.00 $
EROSION & SEDIMENTATION CONTROL $ 75,000.00 $
BY-PASS PUMPING $ 95,000.00 $
EASEMENT ACCESS AND RESTORATION $ 95,000.00 $
SANITARY SEWER PIPE, APPURTENANCES, AND RELATED WORK
20-21 INCH CIPP LINING $ 280,370.00 $
SANITARY SEWER MH, APPURTENANCES, AND RELATED WORK
MANHOLE 925 REHABILITATION $ 6,200.00 $
MANHOLE 926 REHABILITATION $ 6,200.00 $
MANHOLE 927 REHABILITATION $ 6,200.00 $
MANHOLE 928 REHABILITATION $ 6,200.00 $
MANHOLE 929 REHABILITATION $ 6,200.00 $
MANHOLE 931 REHABILITATION $ 9,500.00 $
MANHOLE 932 REHABILITATION $ 6,200.00 $
BY-PASS PUMPING (SINGLE WALL HDPE PIPE @ CULVERTS) $ (15,000.00) $
CHEMICAL GROUT - CREW AND EQUIPMENT $ $
CHEMICAL GROUT MATERIAL $ $
CHANGE ORDER NO. 2
ROAD PLATES TO WIDEN ROAD NEAR MH 801-17 $ 6,750.00 $
ROAD PLATES TO WIDEN ROAD NEAR MH 801-21 $ 4,355.00 $
WRAPID SEAL, FURNISH AND INSTALL $ 4,000.00 $
DOCUMENTATION $ 9,113.94 $
MISC.
...ENGINEERING, PERMITTING & INSPECTION $ 63,342.11 * $ 4,300.93 $ 1,529.84
...LEGAL $ 1,885.75 * $ 128.04 $ 45.54
Total Project Cost (TPC) $ 1,943,866.80 $ 46,942.77
Total Allocated
Grant Amount Received $ 1,252,487.00
% of TPC Remaining after Grant 35.57%

* Allocations for Items 1-5, Engineering, and Legal were calculated by applying the percentage of project expenses associated with E. Goshen to the TPC (excluding Items 1-5, Engineering, and Legal).
$ 86,125.00 / $ 1,268,638.94 = 6.79%

West Goshen Sewer Authority /
Final Project Billing

WWTP Screw Pump Replacements Project
Detail Sheet

Date Paid PAYEE AMOUNT
09/06/2023 21ST CENTURY MEDIA-PHILLY CLUSTER 472.53
09/06/2023 HERBERT, ROWLAND & GRUBIC, INC. 12,615.00
10/04/2023 HERBERT, ROWLAND & GRUBIC, INC. 9,861.50
11/01/2023 HERBERT, ROWLAND & GRUBIC, INC. 4,239.85
12/06/2023 HERBERT, ROWLAND & GRUBIC, INC. 3,737.78
12/06/2023 BOB'S CRANE 3,002.50
12/06/2023 UNRUH TURNER BURKE & FREES 147.00
12/06/2023 EASTERN ENVIRONMENTAL CONTRACTOR 6,120.00
01/03/2024 HERBERT, ROWLAND & GRUBIC, INC. 3,868.82
01/03/2024 PYRZ WATER SUPPLY CO. INC. 429,450.00
02/07/2024 HERBERT, ROWLAND & GRUBIC, INC. 2,163.50
03/06/2024 HERBERT, ROWLAND & GRUBIC, INC. 384.50
05/01/2024 HERBERT, ROWLAND & GRUBIC, INC. 2,382.50
06/05/2024 HERBERT, ROWLAND & GRUBIC, INC. 333.00
06/05/2024 EASTERN ENVIRONMENTAL CONTRACTOR 29,357.91
07/03/2024 HERBERT, ROWLAND & GRUBIC, INC. 8,077.80
07/03/2024 EASTERN ENVIRONMENTAL CONTRACTOR 20,549.77
08/07/2024 HERBERT, ROWLAND & GRUBIC, INC. 3,846.15
09/04/2024 EASTERN ENVIRONMENTAL CONTRACTOR 13,212.00
09/04/2024 HERBERT, ROWLAND & GRUBIC, INC. 1,235.50
10/02/2024 HERBERT, ROWLAND & GRUBIC, INC. 1,414.50
10/02/2024 EASTERN ENVIRONMENTAL CONTRACTOR 33,731.99
11/06/2024 HERBERT, ROWLAND & GRUBIC, INC. 3,853.63
11/06/2024 UNRUH TURNER BURKE & FREES 42.00
11/06/2024 EASTERN ENVIRONMENTAL CONTRACTOR 24,120.00
12/04/2024 HERBERT, ROWLAND & GRUBIC, INC. 4,984.61
12/04/2024 EASTERN ENVIRONMENTAL CONTRACTOR 44,393.84
01/08/2025 HERBERT, ROWLAND & GRUBIC, INC. 8,914.92
01/08/2025 UNRUH TURNER BURKE & FREES 84.00
01/08/2025 EASTERN ENVIRONMENTAL CONTRACTOR 34,986.98
02/05/2025 HERBERT, ROWLAND & GRUBIC, INC. 1,959.98
02/05/2025 EASTERN ENVIRONMENTAL CONTRACTOR 25,178.03
03/05/2025 EASTERN ENVIRONMENTAL CONTRACTOR 26,600.00
03/05/2025 HERBERT, ROWLAND & GRUBIC, INC. 6,707.20
04/02/2025 HERBERT, ROWLAND & GRUBIC, INC. 2,673.60
05/07/2025 EASTERN ENVIRONMENTAL CONTRACTOR 15,092.13
05/07/2025 HERBERT, ROWLAND & GRUBIC, INC. 808.50
06/04/2025 HERBERT, ROWLAND & GRUBIC, INC. 483.00
07/02/2025 HERBERT, ROWLAND & GRUBIC, INC. 693.00
08/06/2025 HERBERT, ROWLAND & GRUBIC, INC. 260.32
Sub Total $ 792,039.84
Grant Total $ (610,800.00)
Total Allocation $ 181,239.84

1 of 1

TELEDYNE INSTRUMENTS, INC.
Everywhereyoulook
Federal ID: 95-4888283

Page 2 of 2

Remit to:
12497 Collections Center Drive
Chicago, IL 60693
ABA# 121-000-358
Acct# 12331-07806

Sold To:
East Goshen Township
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Invoice

Bill To:
East Goshen Township
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Ship To:
East Goshen Township
PO#2601258
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Sales Order Customer PO Customer Reference Payment Terms Discount Customer No Invoice No
00856216 2601258 QMGBOQ3612 Net 30 0054768 S020778336
Carrier Tracking Number Teledyne Contact Information Invoice Date
UPS Ground 1Z6343870394163436 Frink, Elizabeth Ann 800/228-4373 6/17/2026
Delivery Terms Named Destination Packing List
ORIG-S&HAd 00882442
Line Item Number Description Tax U/M Quantity Unit Price Amount
682541001 FLOWLINK CIPHER 1-9 ACTIVE SITES
Flowlink Cipher for up to 9 active sites. Price is per site. Please multiply with number of sites.
ea 1 360.00 360.00

APPROVED BY: MAM / KCS
DATE PAID: _________
CHECK #: _________
CHARGED TO: 07-429-2100

Shipping & Handling: 295.00
Invoice Amount: 10,292.00 USD

These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations.

Seller's Offer, and any order issued by Buyer to Seller for the goods and/or services specified herein, is expressly limited to Seller's General Terms and Conditions of Sale, which can be found at www.teledyne.com/what-we-do/terms-and-conditions. Seller objects to any different or additional terms except, in connection with an order in furtherance of a government prime contract, those government contract clauses that are required by law to be incorporated herein.

TELEDYNE ISCO Everywhereyoulook
www.teledyneisco.com
+1-800-228-4373

ATTENTION: REGARDING SALES TAX
If you should not be charged sales tax, it is imperative to provide a tax exemption certificate or direct payment permit for the state to which order is being delivered. Send exemption certificate to LIN_CFS@teledyne.com
Thank you for your order

TELEDYNE INSTRUMENTS, INC.
Everywhereyoulook
Federal ID: 95-4888283

Page 1 of 2

Remit to:
12497 Collections Center Drive
Chicago, IL 60693
ABA# 121-000-358
Acct# 12331-07806

Sold To:
East Goshen Township
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Invoice

Bill To:
East Goshen Township
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Ship To:
East Goshen Township
PO#2601258
1580 Paoli Pike
WEST CHESTER, PA 19380
United States

Sales Order Customer PO Customer Reference Payment Terms Discount Customer No Invoice No
00856216 2601258 QMGBOQ3612 Net 30 0054768 S020778336
Carrier Tracking Number Teledyne Contact Information Invoice Date
UPS Ground 1Z6343870394163436 Frink, Elizabeth Ann 800/228-4373 6/17/2026
Delivery Terms Named Destination Packing List RMA Number
ORIG-S&HAd 00882442
Line Item Number Description Tax U/M Quantity Unit Price Amount
IMEI 357273224384992 S/N 226C02495
684310000 MODEL 310 USNC 10M BM 4300
624300005 - Signature Ultrasonic Flow Meter 684310000 - Signature Ultrasonic Flow Meter
684310000 - Signature Ultrasonic Flow Meter
604314005 - TIENET 310 ULTRASONIC Sensor 10m (32.8 ft) cable
604307015 - Battery Backup
604307108 - TC4 EU Modem
604357018 - Expansion Box
604304050 - TIENet Cable (160 Feet)
***For replacement parts refer to the replacement parts list that is included in the instruction manual***

Serial Number(s):
604307015:
226D02533

604307108:
226C02495

604314005:
226F01037

604357018:
226F01242

624300005:
226E01039
ea 1 9,637.00 9,637.00
Continued Next Page

These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations.

Seller's Offer, and any order issued by Buyer to Seller for the goods and/or services specified herein, is expressly limited to Seller's General Terms and Conditions of Sale, which can be found at www.teledyne.com/what-we-do/terms-and-conditions. Seller objects to any different or additional terms except, in connection with an order in furtherance of a government prime contract, those government contract clauses that are required by law to be incorporated herein.

TELEDYNE ISCO Everywhereyoulook
www.teledyneisco.com
+1-800-228-4373

ATTENTION: REGARDING SALES TAX
If you should not be charged sales tax, it is imperative to provide a tax exemption certificate or direct payment permit for the state to which order is being delivered. Send exemption certificate to LIN_CFS@teledyne.com
Thank you for your order

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA June 2026 YTD Financial Report
Date: July 7, 2026

YTD June 2026, the Municipal Authority recorded $170,625.39 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers, collecting inspection and tapping fees) and $148,533.58 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, Flygt sludge pump repair, legal and engineering expenses). The net result of operations is $22,091.81. As of June 30, 2026, the fund balance was $50,459.03.

Attached is a complete list of 2026 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD JUNE 2026

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 91.81 161.11
07-364-1100 C.C. TAPPING FEES 2,300.00 5,500.00 0
07-364-1110 R.C.TAPPING FEES 4,332.72 16,500.00 0
07-364-1130 CONNECTION FEES - SEWER 563.76 0 0
07-380-1000 MISCELLANEOUS REVENUE 282.24 0 0
07-392-0500 TRANSFER FROM SEWER OPERATING 319,438.19 110,026.19 73,456.70
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,033,650.00 38,507.39 384,699.57
Total Revenue 1,360,566.91 170,625.39 458,317.38
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 47,871.20 25,139.24 23,935.60
07-424-3000 MISCELLANEOUS EXPENSE 1,645.71 0 960.00
07-424-3110 MUNIC.AUTH.-AUDITING 12,000.00 12,000.00 12,000.00
07-424-3130 ENGINEERING SERVICES 61,000.00 49,928.25 11,879.25
07-424-3140 LEGAL SERVICES 6,500.00 2,129.70 2,875.50
07-424-3700 CHESTER CREEK ENGINEERING 42,000.00 0 5,777.50
07-424-3705 HUNT COUNTY ENGINEERING 95,000.00 20,829.00 0
07-424-7431 CAPITAL PROJ.-ENGINEERING 60,000.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 126,000.00 0 6,413.85
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 4,251.50 20,850.00
07-429-1504 HUNT CO PUMP STATION CAPITAL 515,550.00 0 0
07-429-1505 RCSTP CAPITAL 50,000.00 23,809.39 86,523.04
07-429-3700 CHESTER CREEK CAPITAL 343,000.00 10,446.50 277,326.53
Total Expenses 1,360,566.91 148,533.58 448,541.27
Net Result From Operations 0.00 22,091.81 9,776.11

Municipal Authority
YTD Revenues and Expenses thru 6/30/2026

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000 INTEREST EARNINGS 01/31/26 Revenue Journal INTEREST EARNED JANUARY 2026 12.81
07-341-1000 INTEREST EARNINGS 02/28/26 Revenue Journal INTEREST EARNED FEBRUARY 2026 12.04
07-341-1000 INTEREST EARNINGS 03/31/26 Revenue Journal INTEREST EARNED MARCH 2026 13.53
07-341-1000 INTEREST EARNINGS 04/30/26 Revenue Journal INTEREST EARNED APRIL 2026 22.98
07-341-1000 INTEREST EARNINGS 05/31/26 Revenue Journal INTEREST EARNED MAY 2026 15.97
07-341-1000 INTEREST EARNINGS 06/30/26 Revenue Journal INTEREST EARNED JUNE 2026 14.48
07-364-1100 C.C. TAPPING FEES 06/16/26 Revenue Journal INSPECTION FEE C.C. 401 ELLIS 2,000.00
07-364-1100 C.C. TAPPING FEES 06/16/26 Revenue Journal SEWER INSPECTION FEE C.C. 401 ELLIS 750.00
07-364-1100 C.C. TAPPING FEES 06/26/26 Revenue Journal INSPECTION FEE C.C. 1413 Millstone 2,000.00
07-364-1100 C.C. TAPPING FEES 06/26/26 Revenue Journal SEWER INSPECTION FEE C.C. 1413 Millstone 750.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1427 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1427 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1411 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1411 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal INSPECTION FEE R.C. 1417 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 02/20/26 Revenue Journal SEWER INSPECTION FEE R.C. 1417 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 03/11/26 Revenue Journal INSPECTION FEE 301 RESERVOIR RD LOT 5 2,000.00
07-364-1110 R.C.TAPPING FEES 03/11/26 Revenue Journal SEWER INSPECTION FEE 301 RESERVOIR LOT 5 750.00
07-364-1110 R.C.TAPPING FEES 03/31/26 Revenue Journal INSPECTION FEE R.C. 1415 MILLSTONE 2,000.00
07-364-1110 R.C.TAPPING FEES 03/31/26 Revenue Journal SEWER INSPECTION FEE R.C. 1415 MILLSTONE 750.00
07-364-1110 R.C.TAPPING FEES 04/06/26 Revenue Journal INSPECTION FEE R.C. 1406 TIMBERMILL LN 2,000.00
07-364-1110 R.C.TAPPING FEES 04/06/26 Revenue Journal SEWER INSPECT FEE R.C.1406 TIMBERMILL LN 750.00
07-364-1110 R.C.TAPPING FEES 04/06/26 Revenue Journal INSPECTION FEE R.C. 1406 TIMBERMILL LN 612.50
07-392-0500 TRANSFER FROM SEWER OPERATING 01/21/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 19,333.75
07-392-0500 TRANSFER FROM SEWER OPERATING 02/10/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 7,864.75
07-392-0500 TRANSFER FROM SEWER OPERATING 03/10/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 7,500.00
07-392-0500 TRANSFER FROM SEWER OPERATING 03/17/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 12,569.62
07-392-0500 TRANSFER FROM SEWER OPERATING 03/27/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 25,697.10
07-392-0500 TRANSFER FROM SEWER OPERATING 04/15/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 15,774.25
07-392-0500 TRANSFER FROM SEWER OPERATING 05/13/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 8,104.60
07-392-0500 TRANSFER FROM SEWER OPERATING 06/11/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 12,569.62
07-392-0500 TRANSFER FROM SEWER OPERATING 06/29/26 Revenue Journal XFER FROM 05 SEWER OPERATING TO 07 MA 612.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 01/21/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 4,251.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 03/31/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 15,524.69
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/15/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 7,608.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 04/15/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 8,284.70
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 05/13/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 2,663.50
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 06/11/26 Revenue Journal XFER FROM 09 SEWER CAP TO 07 MA 174.50
Total Revenue 170,625.39

Page 1 of 2

Municipal Authority

YTD Revenues and Expenses thru 6/30/2026

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-1400 ADMINISTRATIVE WAGES 03/27/26 Pay Check: 715 26-00698 QTR 1 2026 MA CHARGE BACK 12,569.62
07-424-1400 ADMINISTRATIVE WAGES 06/29/26 Pay Check: 716 26-01466 QTR 2 2026 MA CHARGE BACK 12,569.62
07-424-3110 MUNIC.AUTH.-AUDITING 03/17/26 Pay Check: 3587 26-00635 PROGRESS BILLING AUDIT EGT MUA 7,500.00
07-424-3110 MUNIC.AUTH.-AUDITING 05/13/26 Pay Check: 3592 26-01071 FINAL BILLING AUDIT EGT MUA 4,500.00
07-424-3130 ENGINEERING SERVICES 02/10/26 Pay Check: 3584 26-00338 SERV THRU 123125 2025 GEN SERV 4,835.25
07-424-3130 ENGINEERING SERVICES 02/10/26 Pay Check: 3584 26-00339 SERV THRU 123125 MORSTEIN RD 14,225.50
07-424-3130 ENGINEERING SERVICES 03/10/26 Pay Check: 3586 26-00549 SERV THRU 021526 25 CHAPTER 94 2,635.00
07-424-3130 ENGINEERING SERVICES 03/10/26 Pay Check: 3586 26-00550 SERV THRU 021526 MORSTEIN RD 4,546.75
07-424-3130 ENGINEERING SERVICES 04/14/26 Pay Check: 3591 26-00867 SERV THRU 032226 2026 GEN SERV 9,700.25
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01075 SERV THRU 041926 2026 GEN SERV 3,973.25
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01073 SERV THRU 041926 MORSTEIN RD 1,064.00
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01076 SERV THRU 041926 25 CHAPTER 94 1,220.50
07-424-3130 ENGINEERING SERVICES 05/13/26 Pay Check: 3593 26-01077 SERV THRU 041926 RCSTP NPDES 1,662.50
07-424-3130 ENGINEERING SERVICES 06/11/26 Pay Check: 3595 26-01263 SERV THRU 051726 RCSTP NPDES 681.50
07-424-3130 ENGINEERING SERVICES 06/11/26 Pay Check: 3595 26-01260 SERV THRU 051726 MORSTEIN RD 2,941.75
07-424-3130 ENGINEERING SERVICES 06/11/26 Pay Check: 3595 26-01262 SERV THRU 051726 2026 GEN SERV 2,442.00
07-424-3140 LEGAL SERVICES 01/21/26 Pay Check: 3581 26-00116 LEGAL SERV DEC 2025 GEN AUTH 612.50
07-424-3140 LEGAL SERVICES 02/10/26 Pay Check: 3583 26-00337 LEGAL SERV JAN 2026 GEN AUTH 273.00
07-424-3140 LEGAL SERVICES 03/10/26 Pay Check: 3585 26-00548 LEGAL SERV FEB 2026 GEN AUTH 205.00
07-424-3140 LEGAL SERVICES 04/14/26 Pay Check: 3590 26-00868 LEGAL SERV MARCH 2026 GEN AUTH 338.10
07-424-3140 LEGAL SERVICES 06/11/26 Pay Check: 3594 26-01259 LEGAL SERV APRIL 2026 GEN AUTH 701.10
07-424-3705 HUNT COUNTY ENGINEERING 03/10/26 Pay Check: 3586 26-00551 SERV THRU 021526 HUNT CTRY PUM 478.00
07-424-3705 HUNT COUNTY ENGINEERING 04/14/26 Pay Check: 3591 26-00865 SERV THRU 032226 HUNT CTRY PUM 15,658.75
07-424-3705 HUNT COUNTY ENGINEERING 05/13/26 Pay Check: 3593 26-01072 SERV THRU 041926 HUNT CTRY PUM 3,354.00
07-424-3705 HUNT COUNTY ENGINEERING 06/11/26 Pay Check: 3595 26-01264 SERV THRU 051726 HUNT CTRY PUM 1,338.25
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 01/21/26 Pay Check: 3582 26-00147 HERSHEY MILLS PUMP ST- MISSION 4,251.50
07-429-1505 RCSTP CAPITAL 03/31/26 Pay Check: 3588 26-00757 AERATION PUMP REPAIR- FLYGT Z3 15,524.69
07-429-1505 RCSTP CAPITAL 04/14/26 Pay Check: 3589 26-00819 SLUDGE PUMP REPAIR-FLYGT Z3-TP 8,284.70
07-429-3700 CHESTER CREEK CAPITAL 04/14/26 Pay Check: 3591 26-00866 SERV THRU 032226 WATERVIEW PIP 7,608.50
07-429-3700 CHESTER CREEK CAPITAL 05/13/26 Pay Check: 3593 26-01074 SERV THRU 041926 WATERVIEW PIP 2,663.50
07-429-3700 CHESTER CREEK CAPITAL 06/11/26 Pay Check: 3595 26-01261 SERV THRU 051726 WATERVIEW PIP 174.50
Total Expense 148,533.58
Net Operating 22,091.81

Page 2 of 2

N Chester Rd Sewer Tie-in Survey Tracking as of 7/8/26

Number Street Interest Comments
942 Forest Lane
944 Forest Lane
946 Forest Lane YES
1600 Ivy Lane NO A new septic system was put in when we purchased the home in 2009. We are absolutely NOT interested
1601 Ivy Lane YES Definitely interested!
1602 Ivy Lane YES Will provide necessary R-O-Ws that may involve our property
1603 Ivy Lane YES I appreciate that East Goshen Municipal Authority is seeking interest in connecting my home to a public sewer system.
1137 N Chester Rd YES
1143 N Chester Rd YES We have 2 on-lot septic fields with an expected life of 80+ years. We are retured and on a fixed income without room for another house payment size bill. Only if the additoinal bottom-line cost to join a public sewer is less than
1145 N Chester Rd YES
1149 N Chester Rd NO In a word - "No" - We are over 85 years old - our septic system is good - just two people here - not interested at all.
1151 N Chester Rd NO If this passes and we start the project will there be hearings? Also if the work is being done can we propose water and natural gas to the project?
1152 N Chester Rd YES Thank you!
1157 N Chester Rd YES
1163 N Chester Rd
1167 N Chester Rd NO It's not in the budget.
1201 N Chester Rd
1221 N Chester Rd YES I am extremely interested! I am in favor of connecting to the public sewer system. It has been a long time in being offered to this area of East Goshen Twp. It would be beneficial not only to the homeowners but also to the twp.
1225 N Chester Rd YES
1601 Old Orchard Lane NO
1602 Old Orchard Lane
1603 Old Orchard Lane NO
1604 Old Orchard Lane
1605 Old Orchard Lane
1606 Old Orchard Lane YES
1600 Raewyck Dr
1603 Raewyck Dr YES
1604 Raewyck Dr NO
1607 Raewyck Dr NO Installed complete new system in 2020. Would love to hook up but it's another expense. Possible interest at later date to tie-in.
1608 Raewyck Dr NO I have lived in this house for 61 years and have never had a problem with my
1609 Raewyck Dr
1611 Raewyck Dr
1612 Raewyck Dr
1614 Raewyck Dr NO We had a new septidc system installed 15 years ago.
1617 Raewyck Dr NO We currently have no issues with our septic system. Several homes on Raewyck Drive have had to pay for a replacement system as a condition of
1618 Raewyck Dr NO No difficulties with OUR system.
1621 Raewyck Dr NO No difficulties with OUR system.
Number Street Interest Comments
1622 Raewyck Dr YES
1625 Raewyck Dr NO My initial treatment system was installed in 1961 and replaced in 2019 giving it a life span of about 58 years. I would expect the new system would have a similar life span affording future owners of the property with adequate treatment capabilites for a good number of years. I am 96 years old. I would never realize any benefits of investing in connecting to a public sewer system.
39 total properties
14 not interested
14 interested
11 not yet responded
36% NO
36% YES
28% NOT YET RESPONDED

Map of East Goshen Wastewater Facilities (Figure 1) showing sewer service areas, pump stations, sewage treatment plants, meters, sanitary sewers, forcemains, and an outlined Area of Interest.

EAST GOSHEN WASTEWATER FACILITIES
FIGURE 1

Map Callouts and Labels

  • AREA OF INTEREST
  • MH R-265 PORTABLE METER
  • LINE ROAD MH R-238 PORTABLE METER
  • MH R-022 PORTABLE METER
  • ELDRIDGE DRIVE MH R-568 PORTABLE METER
  • E. BOOT RD MH R-214 PORTABLE METER
  • ACHCOM MH R-636 PORTABLE METER
  • HUNT COUNTRY PUMP STATION
  • RIDLEY CREEK SEWAGE TREATMENT PLANT
  • RIDLEY CREEK SEWAGE TREATMENT PLANT INFLUENT METER
  • ASHBRIDGE PUMP STATION
  • RESERVOIR ROAD METER
  • WESTTOWN WAY METER
  • PROPOSED RESERVOIR ROAD PUMP STATION
  • ELLIS LANE METER
  • HICKS METER
  • PAOLI PIKE WEST METER
  • WILSON DRIVE METER
  • BARKWAY PUMP STATION
  • HERSHEY'S MILL SEWAGE TREATMENT PLANT
  • HERSHEY'S MILL PUMP STATION
  • DECOMMISIONED LOCKWOOD CHASE SEWAGE TREATMENT PLANT

Legend

  • PUMP STATION
  • SEWAGE TREATMENT PLANT
  • SANITARY MANHOLES
  • PERMANENT METERS
  • PORTABLE METERS (2020)
  • SANITARY SEWER
  • FORCEMAIN
  • TOWNSHIP BOUNDARY
  • SubAreas
  • Parcels
  • PONDS & LAKES
  • RIVERS
  • EAST WHITELAND SERVICE AREA
  • HERSHEY'S MILL SERVICE AREA
  • RIDLEY CREEK SERVICE AREA
  • WEST GOSHEN SERVICE AREA
  • WESTTOWN SERVICE AREA

Attribution and Scale

TOWNSHIP OF EAST GOSHEN CHESTER COUNTY PENNSYLVANIA - 13 AUGUST 1917

Pennoni - PENNONI ASSOCIATES INC. CONSULTING ENGINEERS

Scale: 0 1,000 2,000 4,000 Feet (1 inch = 1,000 feet)

Color-coded parcel map showing survey responses and public sewer connections along N. Chester Road.

N. CHESTER ROAD - SURVEY RESPONSE EXHIBIT

Legend

  • Definitely Interested (13)
  • Interested Depending on Cost (3)
  • Not Interested (12)
  • Not Yet Responded (11)

TOTAL PROPERTIES = 39

Map Callouts

  • PROPERTIES NOT INCLUDED IN SURVEY (WHITE)
  • PROPERTIES CONNECTED TO PUBLIC SEWER (YELLOW)
  • PROPERTIES CONNECTED TO PUBLIC SEWER (ORANGE)

JULY 6, 2026

SANITARY SEWER RATES COMPARISON¹

Customer Type AQUA PA PAWC EGMA
East Bradford Township New Garden Township Deerfield Knoll & Willistown Woods Divisions Avon Grove, East Bradford (Brandywine), Little Washington, Plumsock, The Greens at Penn Oaks, Newlin Green, & Sage Hill Divisions Coatesville & Exeter Districts Royersford District East Goshen Township
Residential $325.30 $325.30 $353.93 $455.20 $399.47 $214.80 $325.83
Non-Residential $314.47 $369.42 $345.22 $442.92 $373.93 $200.10 -
Unmetered (Residential) $487.98 N/A $548.01 $746.91 $375.00 $270.00 N/A
Unmetered (Non-Residential) $506.94 N/A $569.01 $764.73 $560.10 $449.10 N/A

¹Quarterly costs based on an average usage of 12,000 gallons/quarter.

[Seal: WEST GOSHEN TOWNSHIP 1817]

WEST GOSHEN SEWER AUTHORITY

(A Component Unit of West Goshen Township)

WEST CHESTER, PENNSYLVANIA

SUMMARY FINANCIAL STATEMENT

DECEMBER 31, 2025

[Logo: BTCPA BARBACANE THORNTON & COMPANY]

INDEPENDENT AUDITOR'S REPORT ON SUMMARY FINANCIAL STATEMENT

June 3, 2026

To the Officers
West Goshen Sewer Authority
West Chester, Pennsylvania

Opinion

The summary financial statement of the West Goshen Sewer Authority ("the Authority"), as of and for the year ended December 31, 2025, is derived from the audited financial statements of the Authority, as of and for the year ended December 31, 2025. We expressed an unmodified audit opinion on those audited financial statements in our report dated June 3, 2026. The audited financial statements, and the summary financial statement derived therefrom, do not reflect the effects, if any, which occurred subsequent to the date of our report on the audited financial statements.

In our opinion, the summary financial statement of the Authority as of and for the year ended December 31, 2025 referred to above is consistent, in all material respects, with the audited financial statements from which it has been derived, in accordance with accounting principles generally accepted in the United States of America.

Summary Financial Statements

The summary financial statement does not contain all the disclosures required by accounting principles generally accepted in the United States of America. Reading the summary financial statement and the auditor's report thereon, therefore, is not a substitute for reading the audited financial statements and the auditor's report thereon. The summary financial statement and the audited financial statements do not reflect the effects of events that occurred subsequent to the date of our report on the audited financial statements.

Responsibilities of Management for the Summary Financial Statement

Management is responsible for the preparation of the summary financial statement.

- 1 -

503 Carr Road □ Suite 100 □ Wilmington, DE 19809
302.478.8940 □ www.btcpa.com

To the Officers
West Goshen Sewer Authority

Auditor's Responsibility

Our responsibility is to express an opinion on whether the summary financial statement is consistent, in all material respects, with the audited financial statements based on our procedures, which were conducted in accordance with auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards, issued by the Comptroller General of the United States. The procedures consisted principally of comparing the summary financial statement with the related information in the audited financial statements from which the summary financial statement has been derived. We did not perform any audit procedures regarding the audited financial statements after the date of our report on those financial statements.

Barbacane, Thornton & Company LLP
BARBACANE, THORNTON & COMPANY LLP

- 2 -

WEST GOSHEN SEWER AUTHORITY

FINANCIAL STATEMENT

ANNUAL AUDIT AND FINANCIAL REPORT FOR THE WEST GOSHEN SEWER AUTHORITY OF CHESTER COUNTY, PENNSYLVANIA FOR THE YEAR ENDED DECEMBER 31, 2025

This condensed presentation is published in accordance with Section 8 of the Pennsylvania Municipal Authorities Act. A complete copy of the Audit Report is on file and available for inspection at the West Goshen Sewer Authority's office.

REVENUES $ 4,879,093
EXPENSES 2,198,524
EXCESS OF REVENUE OVER EXPENSES 2,680,569
NET POSITION, JANUARY 1, 2025 40,829,775
NET POSITION, DECEMBER 31, 2025 $ 43,510,344
TOTAL DEBT OUTSTANDING (AT FACE), DECEMBER 31, 2025 $ 12,225,000

- 3 -