Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

November 9, 2026
7:00

  • 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
  • CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
  • LIAISON REPORTS
  • SEWER REPORTS Director of Public Works’ Report; West Goshen Report; Pennoni Engineer’s Report; Big Fish Environmental Report
  • APPROVAL OF MINUTES October 19, 2026
  • APPROVAL OF INVOICES Company Invoice # Amount Paid? Xylem 3556E44123 $4,388.96 yes
  • FINANCIAL REPORTS October 2026
  • OLD BUSINESS

Page 1 of 2

  • 2026 Goals: Goal Status Ridley Creek Plant compliance January through October 2026 were in compliance with PADEP permit requirements. Continue to implement infiltration and inflow for the sewer system Ongoing. Attend West Goshen meetings on an as-needed basis. Mike Moffa will continue to send monthly reports for West Goshen. Long-term sustainability Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates.
  • NEW BUSINESS
  • CAPACITY REQUESTS
  • ANY OTHER MATTER
  • CORRESPONDENCE AND REPORTS OF INTEREST
  • PUBLIC COMMENT
  • ADJOURNMENT

Page 2 of 2

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171

Date: November 9, 2026

To: Municipal Authority

From: Kevin Miller

Re: Monthly Report

Monthly Flows: The average daily flow to West Goshen was 552,632 gallons per day.

Monthly Rainfall: 3.77”

Meters:

  • Were read on a daily basis
  • Ellis Ln meter needed calibration

C.C. Collection:

  • Stations checked daily with no issues
  • EGPW located two leaks in manhole at Greenhill Rd & Hershey Mill Gate. Estimated 2000 to 3000 gallons a day, repairs have been made (pics attached)

C.C. Interceptor:

  • Mowed and maintained

R.C. Collection:

  • Stations checked daily with no issues
  • 1622 Eldridge manhole repair (broken ring)

Ridley Creek Plant:

  • Meter calibration
  • 2 nd Ridley utility pump failure sent out for repairs
  • Power failure 10/12 & 10/13 - EGPW fueled generators

Alarms: 17

PA One Calls: 227

Lateral Repairs or Caps: 2 caps

Page 1 of 1

[[Photograph attached to Public Works Monthly Report: Close-up interior view inside a sewer manhole showing water infiltration and a leak area circled in red adjacent to a green sewer pipe.]] [[Photograph attached to Public Works Monthly Report: Close-up interior view of the manhole wall and pipe joint showing mineral deposits, gravel, and water infiltration at the leak site.]]

[Photograph: close-up view looking into a circular opening, with water flowing over a curved pipe end and a green pipe visible inside.]

[[Photograph attached to Public Works Monthly Report: Public Works crew excavating around a concrete sewer manhole in the roadway using a red extension ladder and a GapVax MC150 vacuum truck.]] [[Photograph attached to Public Works Monthly Report: View looking down into the excavated pit around the manhole showing a vertical metal vacuum pipe, a high-pressure water jetting wand spraying the exposed green sewer pipe, and gravel bedding.]]

West Goshen September 2026 Sewer Report

General Notes:

  • For the month of October, the wastewater treatment plant operated in compliance with the requirements of its NPDES permit.
  • WWTP monthly average daily flow – 3.392 mgd.
  • WWPS monthly average daily flow – 1.097 mgd.
  • Monthly estimated average total phosphorus discharge concentration was <0.012 mg/L.
  • Sludge to landfill – 247 wet tons (estimate).

Grant Projects:

  • 2024 LSA-Statewide Grant: WWTP Pump Replacements . The WGSA has been awarded a grant of $250,000 for this project. To date, 2 pumps totaling $165,120 have been ordered with an estimated delivery of Nov, 2026. We do not anticipate the total project cost to exceed the grant amount by any significant amount.

Ongoing Projects:

  • WWTP Transformer Replacement – The switchgear delivery is expected Monday, 11/9/26. The transformer is estimated to ship late November.
  • Primary Clarifier No. 2 Rehab – Finalization and successful startup of the clarifier mechanism occurred on 10/20/2026.

Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900

Pennoni

EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER’S REPORT

November 4, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
  • SBR Tank Inspections – Inspections of SBRs #1 and #2 were performed in 2025. Inspection of SBR #4 occurred on August 31, 2026. A summary of our findings was provided to the Township in October. Inspection of SBR #3 will tentatively occur in November, after the pump repairs are completed and the tank has been drained. A full report of all SBRs’ conditions and the rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect SBR #3.
  • Motor Control Center (MCC) #1 – No updates since our last report. Design for replacement of the MCC is complete, and construction is planned for 2027. Finalized plans and scope of work were submitted thereafter to Lenni on August 24. Lenni will provide a quote for the work for the Township to include in their 2027 budget.
  • RCSTP NPDES Permit Renewal – The application was submitted to PADEP on October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining – We provided Change Order #2 to document final as-built quantities and markups to Pay Application #3 (Final) to the contractor, Vortex Services, on October 29. We will provide recommendation letters after the signed change order, revised Pay Application #3, and closeout documents have been submitted and processed.
  • Waterview and Meadows Pipe Lining – No updates since our last report. All work was completed in August. We are awaiting closeout documents and are coordinating a final pay application with the contractor.
  • Ridley Creek Permanent Sewer Meter – No updates since our last report. The new gravity flow meter and manhole for the proposed location in the Ridley Creek Collection System near the Blacksmith Shop have been delivered. The Township PW Department can install the permanent metering manhole.

Pump Stations

  • Hunt Country Pump Station – We are continuing to prepare the WQM permit application and are continuing with design and plan preparation for the pump station upgrades and force main replacement.

Sewer Extensions

  • Morstein Road and Great Oak Circle – No activity since our last report. An approx. 75% complete progress plan set and budgetary cost opinion was provided to the Township on May 6. This is the level of completeness that was scoped for our initial efforts on this project. A list of locations for Public Works to perform soft dig test pits for rock depths based upon the currently designed sewer depths was also provided. Public Works is scheduling completion of the test pits. If additional engineering effort and budget is authorized, we can update the design and cost opinion after the results of the test pits are provided, and we can progress the design towards 100%. If authorized, we can also initiate Sewage Facilities Planning with PADEP.
  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.

Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2

EGMAU26001 | East Goshen Municipal Authority | November 4, 2026 | Engineer's Report | Page 2 of 2

  • N. Chester Road – No updates since our last report. The results of the sewer extension interest survey for the 39 properties along N. Chester Road, Forest Lane, Ivy Lane, Old Orchard Lane, and Raewyck Drive from June 30 were that 13 properties are definitely interested, 3 properties are interested depending on costs, 12 properties are not interested, and 11 properties did not respond.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) – DEP issued a Sewage Facilities Planning exemption on October 15. The proposed project is located in Westtown Township and is redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 8,243 gpd, which is an increase over the existing use’s flow.
  • 1570 Colonial Lane – No activity by Pennoni since our last report. One single family dwelling is proposed on the vacant property. There was formerly a house there with a public sewer connection. The proposed dwelling will re-use the sewer lateral subject to inspection for adequacy of re-use.
  • 971 Cornwallis Drive – No activity by Pennoni since our last report. Pennoni previously reviewed a new land development submission and provided a review letter on June 22. The applicant is proposing to subdivide the existing approximately 7.5-acre parcel into three new lots, demolish the existing residential structure, and construct three new single-family homes.
  • 1409 Manley Road – Pennoni reviewed the second land development submission and provided a review letter on October 23. The applicant is proposing to subdivide the existing 1.2-acre lot into three lots, construct two new single-family homes, and keep the existing single-family home. The MA approved capacity for 2 new EDU’s at the October MA meeting. We are coordinating for signatures for on the Sewage Facilities Planning Mailer for submission to DEP.
  • 1352 Morstein Road – A Land Development Plan is proposed to subdivide the parcel into two lots, demolish the existing home, and construct two new homes. We provided a review letter on October 23. The Applicant’s Engineer is updating the plans regarding sanitary sewer in follow-up to their attendance at the October MA meeting to propose two low pressure sewer laterals across Morstein Road, through a residential property, and to connect to the existing gravity sewer main in that property’s rear yard.

Other

  • GIS Mapping – Licensing for the sewer system GIS system was set up in September with Esri (ArcGIS). We are continuing to prepare updates to the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department including addition of attribute information to pipes and manholes about their materials, if they have been pipe lined, sizes, and to correct pipe routing discrepancies.

END OF REPORT

Big Fish Environmental Services Inc.

RCSTP Monthly Operations Report

November 2026

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for October 2026. All supplemental reports were submitted for September 2026. Caustic usage increased to 50.34 gallons per day from 47.67 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 53.27 gallons per day from 53.33 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

TABLES

CERTIFIED LAB RESULTS- FINAL EFFLUENT October 2026

Permit Limit (Weekly Average) / DATE FLOW
Gallons
Final EFF/Applebrook
Ammonia as N
7mg/L monthly
CBOD
15mg/L
Total Phosphorus
0.5mg/L
Total Suspended Solids
15mg/L
Fecal Coliform
200 coliforms/100mL
10/6/26 270,000/35,268 <0.10 <2.0 <.10 <4.0 <1
10/13/2026 292,000/38,392 <0.10 <2.0 0.11 <4.0 <1
10/20/2026 286,000/37,738 <0.10 <2.0 <0.10 <4.0 <1

CERTIFIED LAB RESULTS- FINAL EFFLUENT October 2026 Non-Report tests

DATE FLOW
Final EFF/Applebrook
NO2-NO3 (mg/L) TKN (mg/L) TN (mg/L)
10/6/2026 270,000/35,268 5.51 1.18 6.69
10/13/2026 292,000/38,392 3.58 0.85 4.43
10/20/26 286,000/37,738 5.25 0.96 6.21

CERTIFIED LAB RESULTS- INFLUENT October 2026

DATE FLOW Ammonia as N BOD CBOD TKN Total Phosphorus Total Suspended Solids
10/6/2026 365,685 37.8 194 189 45.7 5.53 188
10/13/2026 407,223 33.1 227 192 46.3 4.51 188
10/20/2026 387,381 37.4 251 211 58 5.4 210

TKN = Total Kleidahl Nitrogen

TN= Total Nitrogen

NO2-NO3= Nitrogen, Nitrate-Nitrite

The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained below all of the weekly average discharge limits for the month of October.

PA DEP

Nothing to report

Pennoni Associates

Nothing to report

Significant Rainfall

During October, there were four (4) days where precipitation occurred. There were 2 days where precipitation accumulation was equal to or greater than 0.50”.

10/11 0.50

10/12 1.90

Total precipitation for the month was 3.03” of rain

*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred

Chemical Data

October 2026
Chemical Daily Average Total Monthly
Caustic Soda, gal 50.34 1560.45
Aluminum Sulfate solution, gal 53.27 1651.35
Sludge Dewatering, gal* 13,220 317,284

*24 days of sludge dewatering

There was a decrease of 30,780 gallons of sludge dewatering during the month of October compared to September. With the colder weather, the sludge tends to thicken, forcing us to run at a lower feed rate, hence the decrease in gallons dewatered.

Page 2 of 3

Minor Preventative Maintenance

  • Flushed chemical feed lines to the SBRs.
  • Cleaned final effluent weir trough daily.
  • Skimmed surface of disc filters daily
  • Drained and cleaned disc filters bi-weekly.
  • Cleaned buildings and laboratory.

Major Repairs or Upgrades

All 40 bulbs in UV bank 2 replaced along with 2 quartz sleeves and 1 ballast

Field Influent Meter B was calibrated at zero flow, Field Influent Meter is permanently offline.

Upcoming Repairs or Upgrades

Flow Data

October 2026
Flow Meter Location Total Volume for Month, MG Average Daily Flow, gpd Daily Maximum Flow, gpd
Influent Wastewater to Screening Building 11.246 362,759 539,620
Influent Wastewater to SBRs 11.547 372,479 514,080
Internal Recycle 0.390 12,601 89,103
Treated Effluent to Disc Filters 11.251 362,924 505,536
Final Effluent Discharge 8.269 267,000 399,000
Applebrook Golf Course 1.109 35,763 43,502

The plant hydraulic design loading is 745,000 gpd.

There were no high flow events during the month of October 2026.

Page 3 of 3

DRAFT
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
October 19, 2026

The East Goshen Township Municipal Authority held their regular meeting on Monday, October 19, 2026 at 7:00 pm. at the Township Building.

Members in attendance are indicated in BOLD:

  • Kevin Cummings – Chairman
  • John Stipe – Vice Chairman
  • Sean Ellsworth
  • Dana Pizarro
  • Walter Wujcik

Also in attendance were:

  • Kevin Miller (Director of Public Works),
  • Mike Ellis (Pennoni).
  • Peter Hicks (Supervisor)
  • Kelly Brophy, Finance Director
  • Patrick McKenna (Attorney)
  • Derek Davis (Township Manager)
  • Theodore Speedy (Attorney)
  • Stacey Fuller (Attorney)

COMMON ACRONYMS:

Acronym & Definition (Column 1) Acronym & Definition (Column 2)
ATS – Automatic Transfer Switch
BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PM – Prevention Maintenance
EPA – Environmental protection Agency PR – Park & Recreation Board
HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant
I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor
LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow
PWD – Public Works Department WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

John called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.

John asked for a moment of silence to remember our first responders and military.

John asked if anyone would be recording the meeting. There was no response.

Chairman's Report/Other Members Report.

None

MA 10-19-26 draft — Page 1

Liaison Reports

1. Conservancy Board – Walter mentioned that East Goshen won the Bioblitz competition with West Goshen. East Goshen won a cypress tree which will be planted near the playground. Also, CRC did some plantings in Applebrook Park and Clocktower.

SEWER REPORTS

1. Director of Public Works, Kevin Miller's report for October 19, 2026.

Monthly Flows – The average daily flow to West Goshen was 544,6700 gallons per day.

Monthly Rainfall – 6.20”

Meters:

  • Read on a daily basis. No problems to report.

C.C.Collection

  • The pumping stations were checked on a daily basis with no issues.

Ridley Creek Collection:

  • Stations were visited daily with no issues.

Ridley Creek Plant:

  • Ridley Utility water pumps went down. They are in for repair.
  • SBR Tank #4 pumps out for repairs to get the tank back up.
  • Cleaned grit chamber
  • Cleaned meter pit

Alarms: 30

PA One Calls: 226

Lateral Repairs/Caps:

  • 812 Trout Run: sewer repair
  • 221 Edith Lane Sewer clog (resident issue)

2. West Goshen Sewer Authority Report

The report was reviewed and numbers discussed.

3. Pennoni Engineer's Report dated September 10, 2026

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.

MA 10-19-26 draft — Page 2

  • SBR Tank Inspections – Inspections of SBRs #1 and #2 were performed in 2025. Inspection of SBR #4 occurred on August 31, 2026. The SBR #4 conditions were similar to SBRs #1 and #2 but with more extensive bubbling of the CIM coating and loss of coating adherence to the floor slab at various locations along floor joints. A summary of our findings is attached. Inspection of SBR #3 will tentatively occur in November, after the tank has been drained. A full report of all SBRs' conditions and the rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect SBR #3.
  • Motor Control Center (MCC) #1 – Design for replacement of the MCC is complete, and construction is planned for 2027. Approx 90% complete plans were submitted on July 23 for Township, RCSTP operator, and electrician (Lenni) review. Pennoni conducted a site meeting with the Township, RCSTP operator, and Lenni on July 28 to review the plans and scope of work. Finalized plans and scope of work were submitted thereafter to Lenni on August 24. Lenni will provide a quote for the work for the Township to include in their 2027 budget.
  • RCSTP NPDES Permit Renewal –The application was submitted to PADEP on October 2, 2026.

Sanitary Sewer Pipe Rehab

  • Supplee Valley Pipe Lining –The contractor, Vortex Services, submitted a revised Pay Application #3 (Final) for the pipe run that had blisters that they grinded out. They also provided Change Order #2 to document final as-built quantities along with closeout documents. We are processing the documents and will provide recommendation letters.
  • Waterview and Meadows Pipe Lining – No updates since our last report. All work was completed in August. We are awaiting closeout documents and are coordinating a final pay application with the contractor.
  • Ridley Creek Permanent Sewer Meter – The new gravity flow meter and manhole for the proposed location in the Ridley Creek Collection System near the Blacksmith Shop have been delivered. The Township PW Department can install the permanent metering manhole.

Pump Stations

  • Hunt Country Pump Station – A pre-application with PADEP occurred on August 20 to discuss permitting for the pump station since no existing permits have been found. PADEP determined that a new WQG-02 permit is required. We are currently preparing the permit application and are continuing with design and plan preparation for the pump station upgrades and force main replacement.

Sewer Extensions

  • Morstein Road and Great Oak Circle – No activity since our last report. An approx. 75% complete progress plan set and budgetary cost opinion was provided to the Township on May 6. This is the level of completeness that was scoped for our initial efforts on this project.

MA 10-19-26 draft — Page 3

A list of locations for Public Works to perform soft dig test pits for rock depths based upon the currently designed sewer depths was also provided. Public Works is scheduling completion of the test pits. If additional engineering effort and budget is authorized, we can update the design and cost opinion after the results of the test pits are provided, and we can progress the design towards 100%. If authorized, we can also initiate Sewage Facilities Planning with PADEP.

  • Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
  • N. Chester Road – No updates since our last report. The results of the sewer extension interest survey for the 39 properties along N. Chester Road, Forest Lane, Ivy Lane, Old Orchard Lane, and Raewyck Drive from June 30 were that 13 properties are definitely interested, 3 properties are interested depending on costs, 12 properties are not interested, and 11 properties did not respond.

New Connections

  • 1344 Morstein Road – No activity by Pennoni since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
  • 1354 Paoli Pike – No activity by Pennoni since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
  • 1535 West Chester Pike (Westtown Triangle) – No activity by Pennoni since our last report. The proposed project is located in Westtown Township and is redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 8,243 gpd, which is an increase over the existing use's flow. The property's wastewater already flows through East Goshen. It is our understanding that the applicant is working on Sewage Facilities Planning with PADEP.
  • 1570 Colonial Lane – No activity by Pennoni since our last report. One single family dwelling is proposed on the vacant property. There was formerly a house there with a public sewer connection. The proposed dwelling will re-use the sewer lateral subject to inspection for adequacy of re-use.
  • 971 Cornwallis Drive – No activity by Pennoni since our last report. Pennoni previously reviewed a new land development submission and provided a review letter on June 22. The applicant is proposing to subdivide the existing approximately 7.5-acre parcel into three new lots, demolish the existing residential structure, and construct three new single-family homes.
  • 1352 Morstein Road – A Land Development Plan was submitted to subdivide the parcel into two lots, demolish the existing home, and construct two new homes. Frontage is along Morstein Road where the Morstein Road sewer extension is proposed. The plans show

MA 10-19-26 draft — Page 4

proposed sewer lateral connections to that sewer extension. However, it is expected to be at least three years until the extension is constructed (if the extension project moves forward), but the Applicant would like to construct the houses prior to that.

In follow-up to the September MA meeting, we communicated with the Design Engineer about the concept to run two sewer laterals across Morstein Road to tie into the existing sewer main behind houses on the opposite side of the road. We also provided them a historical plan of the original sewer design. There are no as-built plans on file, so they will need to survey the existing sewer manholes to prepare a plan for their sewer lateral connections.

Other

  • GIS Mapping – We have set up licensing for the sewer system GIS system with Esri (ArcGIS). We are continuing to prepare updates to the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department including addition of attribute information to pipes and manholes about their materials, if they have been pipe lined, sizes, and to correct pipe routing discrepancies.

3. Big Fish Environmental Services –

The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for September 2026. All supplemental reports were submitted for August 2026. Caustic usage increased to 47.67 gallons per day from 42.25 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 53.33 gallons per day from 56.01 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.

Note: Dana and Walter commented that some numbers don't seem right (1st page ok, 2nd not sure). Kevin will contact Matt and Scott.

Approval of Minutes

The minutes of the September 14, 2026 meeting were approved.

Approval of Invoices

  1. Walter moved to approve payment of the following Gawthrop Greenwood Invoice #222098541 in the amount of $437.00. Dana seconded the motion. The motion was approved unanimously.
  2. TRACOM invoice #2026110 in the amount of $1,285.00. Note: additional freight charges for Blacksmith Shop metering manhole – a check for $19,790 was already mailed out after September MA meeting. After discussion, John moved to approve payment of this invoice. Walter seconded the motion. The motion passed unanimously.

MA 10-19-26 draft — Page 5

Financial Reports

Kelly reviewed the following report: YTD September 2026, the Municipal Authority recorded $396,888.16 in revenues (primarily from Sewer Capital Reserve, Sewer Operating transfers and collecting inspection and tapping fees) and $360,966.26 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA quarterly recharges, audit expenses, Flygt sludge pump repair, Wesst Goshen capital sewer tapping fees, Ultrasonic flowmeter system, Packaged H—20 Fiberglass Manhole and legal and engineering expenses). The net result of operations is $35,921.90. As of September 30, 2026, the fund balance was $64,289.12.

Old Business -

None

Goals –

Discussed sewer rate increase. Dana moved to approve a 10% increase in sewer rates to go into effect January 1, 2027. Walter seconded the motion. The motion passed unanimously.

New Business

  1. Dana moved to approve the Resolution establishing a minimum fund balance in the Sewer Reserve Capital Fund. Walter seconded the motion. The motion passed unanimously.

Capacity Requests –

  1. 1352 Morstein Road – Dan Popplewell, Engineer, reviewed the plans for the subdivision on the south side of Morstein Rd. They spoke with neighbors who are okay with a temporary easement. They don't know how long the easement will be in effect. Mike recommended that they read the Township Sewer Ordinance.
  2. 1409 Manley Rd. – Mike Ellis and Mr. Campbell spoke about this project. The home is on 1.5 acres. Old trees were taken down. The home has been restored. They need a variance to allow them to keep the home and build 2 new homes, one on each side of the existing home. Mike explained the existing sewer and capacity is okay. Walter moved to allow 3 EDUs on the subdivision. Dana seconded the motion. The motion passed unanimously.

Any Other Matter - None

Correspondence- None

Public Comment - None

Adjournment

There being no further business Walter moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

MA 10-19-26 draft — Page 6

Xylem Water Solutions U.S.A., Inc. — INVOICE

2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563

REMIT TO: 26717 Network Place, Chicago, IL 60673-1267

YOUR PURCHASE ORDER INVOICE NO. FUS NO. DATE SHIPPED DELIVERY NOTE INVOICE DATE TRN WHS PAYMENT TERMS
26-02152 3556E44123 F74904 10/19/26 K92924 10/19/26 C1 130 100% N30 FROM INVOICE

Customer No.: 213828 | Global No.: 5230853

Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

FREIGHT TERMS DELIVERY TERMS ORDER PROCESSED BY SHIP VIA ORDER TEXT CUSTOMER TEXT
Jobsite Prepaid FLYGT-PHILADELPHIA,PA BRA Shipper choice-Ground East Goshen T#4797 DELVONNE MCCULLUM
LINE ITEM/DESCRIPTION QUANTITY SHIPPED UM UNIT PRICE DISCOUNT/CHARGE NET PRICE EXTENDED AMOUNT
Quote# R2026-MAL-0288
001 0000005047807
CABLE UNIT
1 EA 160.720 160.72
002 0000005188902
DETECTOR,LEAKAGE UNIT FLS
1 EA 346.041 346.04
003 0000005950101
HOUSING,OIL BOTTOM CI
1 EA 768.341 768.34
004 0000005959105
ROTOR UNIT
1 EA 957.760 957.76
005 0000005960700
WASHER,SQUARE ALUM
3 EA 13.120 39.36

Stamp: PAID

APPROVED BY: Kmm Kws
CHARGED TO: 07-429-1505
Cont on 2

IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.

Xylem Water Solutions U.S.A., Inc. — INVOICE (Page 2)

2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563

REMIT TO: 26717 Network Place, Chicago, IL 60673-1267

YOUR PURCHASE ORDER INVOICE NO. FUS NO. DATE SHIPPED DELIVERY NOTE INVOICE DATE TRN WHS PAYMENT TERMS
26-02152 3556E44123 F74904 10/19/26 K92924 10/19/26 C1 130 100% N30 FROM INVOICE

Customer No.: 213828 | Global No.: 5230853 | Page: 2

Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

FREIGHT TERMS DELIVERY TERMS ORDER PROCESSED BY SHIP VIA ORDER TEXT CUSTOMER TEXT
Jobsite Prepaid FLYGT-PHILADELPHIA,PA BRA Shipper choice-Ground East Goshen T#4797 DELVONNE MCCULLUM
LINE ITEM/DESCRIPTION QUANTITY SHIPPED UM UNIT PRICE DISCOUNT/CHARGE NET PRICE EXTENDED AMOUNT
005 0000005960700
006 0000006018948
KIT,REPAIR BASIC 3085.092,182
1 EA 1,276.741 1,276.74
007 1400000690002A
LABOR,SVC FLYGT,NO TAX Z3-TP
MODELS: 3000,6000,7000,8000
5 EA 145.000 725.00
008 1400000690021A
ENV FEE 0-10HP NO TAX TP
ENVIRONMENTAL FEE
1 EA 60.000 60.00
009 1400000690024
SHOP SUPPLIES-SMALL PUMPS TP
MISC SHOP SUPPLIES FOR REPAIR
1 EA 55.000 55.00
SUB-TOTAL OF POSITIONS
** ADD NO S & H CHARGES **
4,388.96

Cont on 3

IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.

Xylem Water Solutions U.S.A., Inc. — INVOICE (Page 3)

2330 YELLOW SPRINGS RD.
MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563

REMIT TO: 26717 Network Place, Chicago, IL 60673-1267

YOUR PURCHASE ORDER INVOICE NO. FUS NO. DATE SHIPPED DELIVERY NOTE INVOICE DATE TRN WHS PAYMENT TERMS
26-02152 3556E44123 F74904 10/19/26 K92924 10/19/26 C1 130 100% N30 FROM INVOICE

Customer No.: 213828 | Global No.: 5230853 | Page: 3

Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6107

FREIGHT TERMS DELIVERY TERMS ORDER PROCESSED BY SHIP VIA ORDER TEXT CUSTOMER TEXT
Jobsite Prepaid FLYGT-PHILADELPHIA,PA BRA Shipper choice-Ground East Goshen T#4797 DELVONNE MCCULLUM
LINE ITEM/DESCRIPTION QUANTITY SHIPPED UM UNIT PRICE DISCOUNT/CHARGE NET PRICE EXTENDED AMOUNT
NET AMOUNT BEFORE TAXES USD 4,388.96
ORDER TOTAL USD 4,388.96

IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.

Memo

To: Municipal Authority
From: Dana Gieder
Re: MA October 2026 YTD Financial Report
Date: November 2, 2026

YTD October 2026, the Municipal Authority recorded $401,736.00 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers, collecting inspection and tapping fees) and $365,792.22 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, Flygt sludge pump repair, West Goshen capital sewer tapping fees, Ultrasonic flowmeter system, Packaged H-20 Fiberglass Manhole, legal and engineering expenses). The net result of operations is $35,943.78. As of October 31, 2026, the fund balance was $64,311.00.

Attached is a complete list of 2026 YTD detailed MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD OCTOBER 2026

REVENUE

Account Id Account Description Annual Budget Current YTD Prior YTD
07-341-1000 INTEREST EARNINGS 0.00 193.78 246.94
07-364-1100 C.C. TAPPING FEES 2,300.00 19,250.00 0
07-364-1110 R.C.TAPPING FEES 4,332.72 16,500.00 2,750.00
07-364-1130 CONNECTION FEES - SEWER 563.76 0 0
07-380-1000 MISCELLANEOUS REVENUE 282.24 0 0
07-392-0500 TRANSFER FROM SEWER OPERATING 319,438.19 184,269.81 119,440.75
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,033,650.00 181,522.41 499,424.75
Total Revenue 1,360,566.91 401,736.00 621,862.44

EXPENSES

Account Id Account Description Annual Budget Current YTD Prior YTD
07-424-1400 ADMINISTRATIVE WAGES 47,871.20 37,708.86 35,903.40
07-424-3000 MISCELLANEOUS EXPENSE 1,645.71 802.00 960.00
07-424-3110 MUNIC.AUTH.-AUDITING 12,000.00 12,000.00 12,000.00
07-424-3130 ENGINEERING SERVICES 61,000.00 59,712.75 41,159.00
07-424-3140 LEGAL SERVICES 6,500.00 4,185.70 4,537.00
07-424-3700 CHESTER CREEK ENGINEERING 42,000.00 0 5,777.50
07-424-3705 HUNT COUNTY ENGINEERING 95,000.00 23,370.50 0
07-424-7431 CAPITAL PROJ.-ENGINEERING 60,000.00 26,700.00 0
07-424-7490 CAP.REPLACEMENT R.C. 126,000.00 19,790.00 9,488.85
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 0.00 4,251.50 20,850.00
07-429-1504 HUNT CO PUMP STATION CAPITAL 515,550.00 0 0
07-429-1505 RCSTP CAPITAL 50,000.00 38,490.35 153,806.95
07-429-3700 CHESTER CREEK CAPITAL 343,000.00 23,073.00 280,595.03
07-429-6100 WEST GOSHEN CAPITAL 0.00 115,707.56 44,172.77
Total Expenses 1,360,566.91 365,792.22 609,250.50
Net Result From Operations 0.00 35,943.78 12,611.94

Municipal Authority
YTD Revenues and Expenses thru 10/31/2026

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000INTEREST EARNINGS01/31/26Revenue JournalINTEREST EARNED JANUARY 202612.81
07-341-1000INTEREST EARNINGS02/28/26Revenue JournalINTEREST EARNED FEBRUARY 202612.04
07-341-1000INTEREST EARNINGS03/31/26Revenue JournalINTEREST EARNED MARCH 202613.53
07-341-1000INTEREST EARNINGS04/30/26Revenue JournalINTEREST EARNED APRIL 202622.98
07-341-1000INTEREST EARNINGS05/31/26Revenue JournalINTEREST EARNED MAY 202615.97
07-341-1000INTEREST EARNINGS06/30/26Revenue JournalINTEREST EARNED JUNE 202614.48
07-341-1000INTEREST EARNINGS07/31/26Revenue JournalINTEREST EARNED JULY 202628.90
07-341-1000INTEREST EARNINGS08/31/26Revenue JournalINTEREST EARNED AUGUST 202630.78
07-341-1000INTEREST EARNINGS09/30/26Revenue JournalINTEREST EARNED SEPTEMBER 202620.41
07-341-1000INTEREST EARNINGS10/31/26Revenue JournalINTEREST EARNED OCTOBER 202621.88
07-364-1100C.C. TAPPING FEES06/16/26Revenue JournalINSPECTION FEE C.C. 401 ELLIS2,000.00
07-364-1100C.C. TAPPING FEES06/16/26Revenue JournalSEWER INSPECTION FEE C.C. 401 ELLIS750.00
07-364-1100C.C. TAPPING FEES06/26/26Revenue JournalINSPECTION FEE C.C. 1413 Milstone2,000.00
07-364-1100C.C. TAPPING FEES06/26/26Revenue JournalSEWER INSPECTION FEE C.C. 1413 Milstone750.00
07-364-1100C.C. TAPPING FEES07/30/26Revenue JournalINSPECTION FEE 1419 Milstone2,000.00
07-364-1100C.C. TAPPING FEES07/30/26Revenue JournalSEWER INSPECTION FEE 1419 Milstone750.00
07-364-1100C.C. TAPPING FEES08/18/26Revenue JournalSEWER TAP INN FEE 1425 Millstone2,000.00
07-364-1100C.C. TAPPING FEES08/18/26Revenue JournalSEWER INSPECTION FEE C.C. 1425 Milstone750.00
07-364-1100C.C. TAPPING FEES08/26/26Revenue JournalSEWER TAP INN FEE 1570 Colonial2,000.00
07-364-1100C.C. TAPPING FEES08/26/26Revenue JournalSEWER INSPECTION FEE 1570 Colonial750.00
07-364-1100C.C. TAPPING FEES09/25/26Revenue JournalINSPECTION FEE 1409 MILLSTONE CR2,000.00
07-364-1100C.C. TAPPING FEES09/25/26Revenue JournalSEWER INSPECT FEE 1409 MILLSTONE CR750.00
07-364-1100C.C. TAPPING FEES09/25/26Revenue JournalINSPECTION FEE 1423 MILLSTONE CR2,000.00
07-364-1100C.C. TAPPING FEES09/25/26Revenue JournalSEWER INSPECT FEE 1423 MILLSTONE CR750.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1427 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1427 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1411 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1411 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalINSPECTION FEE R.C. 1417 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES02/20/26Revenue JournalSEWER INSPECTION FEE R.C. 1417 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES03/11/26Revenue JournalINSPECTION FEE 301 RESERVOIR RD LOT 52,000.00
07-364-1110R.C.TAPPING FEES03/11/26Revenue JournalSEWER INSPECTION FEE 301 RESERVOIR LOT5750.00
07-364-1110R.C.TAPPING FEES03/31/26Revenue JournalINSPECTION FEE R.C. 1415 MILLSTONE2,000.00
07-364-1110R.C.TAPPING FEES03/31/26Revenue JournalSEWER INSPECTION FEE R.C. 1415 MILLSTONE750.00
07-364-1110R.C.TAPPING FEES04/06/26Revenue JournalINSPECTION FEE R.C. 1406 TIMBERMILL LN2,000.00
07-364-1110R.C.TAPPING FEES04/06/26Revenue JournalSEWER INSPECT FEE R.C.1406 TIMBERMILL LN750.00
07-392-0500TRANSFER FROM SEWER OPERATING01/21/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA612.50
07-392-0500TRANSFER FROM SEWER OPERATING02/10/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA19,333.75
07-392-0500TRANSFER FROM SEWER OPERATING03/10/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,864.75

Page 1 of 4

Municipal Authority
YTD Revenues and Expenses thru 10/31/2026 (Page 2 of 4)

Account Number Account Description Date Type Transaction Data/Comment Amount
07-392-0500TRANSFER FROM SEWER OPERATING03/17/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA7,500.00
07-392-0500TRANSFER FROM SEWER OPERATING03/27/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA12,569.62
07-392-0500TRANSFER FROM SEWER OPERATING04/15/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA25,697.10
07-392-0500TRANSFER FROM SEWER OPERATING05/13/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA15,774.25
07-392-0500TRANSFER FROM SEWER OPERATING06/11/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,104.60
07-392-0500TRANSFER FROM SEWER OPERATING06/29/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA12,569.62
07-392-0500TRANSFER FROM SEWER OPERATING07/22/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA21,597.44
07-392-0500TRANSFER FROM SEWER OPERATING08/19/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA802.00
07-392-0500TRANSFER FROM SEWER OPERATING09/24/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA38,837.56
07-392-0500TRANSFER FROM SEWER OPERATING09/25/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA12,569.62
07-392-0500TRANSFER FROM SEWER OPERATING10/22/26Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA437.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/21/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,251.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/31/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA15,524.69
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/15/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA7,608.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE04/15/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA8,284.70
07-392-0900TRANSFER FROM SEWER CAP RESERVE05/13/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA2,663.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE06/11/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA174.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE07/22/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA127,389.06
07-392-0900TRANSFER FROM SEWER CAP RESERVE09/24/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA11,237.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE10/28/26Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA4,388.96
Total Revenue401,736.00
07-424-1400ADMINISTRATIVE WAGES03/27/26Pay Check: 71526-00698 QTR 1 2026 MA CHARGE BACK12,569.62
07-424-1400ADMINISTRATIVE WAGES06/29/26Pay Check: 71626-01466 QTR 2 2026 MA CHARGE BACK12,569.62
07-424-1400ADMINISTRATIVE WAGES09/25/26Pay Check: 71726-02155 QTR 3 2026 MA CHARGE BACK12,569.62
07-424-1400ADMINISTRATIVE WAGES09/25/26Pay Check: 360426-02155 QTR 3 2026 MA CHARGE BACK12,569.62
07-424-1400ADMINISTRATIVE WAGES09/25/26Void Check: 360426-02155 QTR 3 2026 MA CHARGE BACK-12,569.62
07-424-3000MISCELLANEOUS EXPENSE08/19/26Pay Check: 360026-01839 2026 ANNUAL DAILY DISCHARGE CA802.00
07-424-3110MUNIC.AUTH.-AUDITING03/17/26Pay Check: 358726-00635 PROGRESS BILLING AUDIT EGT MUA7,500.00
07-424-3110MUNIC.AUTH.-AUDITING05/13/26Pay Check: 359226-01071 FINAL BILLING AUDIT EGT MUA4,500.00
07-424-3130ENGINEERING SERVICES02/10/26Pay Check: 358426-00338 SERV THRU 123125 2025 GEN SERV4,835.25
07-424-3130ENGINEERING SERVICES02/10/26Pay Check: 358426-00339 SERV THRU 123125 MORSTEIN RD14,225.50
07-424-3130ENGINEERING SERVICES03/10/26Pay Check: 358626-00549 SERV THRU 021526 25 CHAPTER 942,635.00
07-424-3130ENGINEERING SERVICES03/10/26Pay Check: 358626-00550 SERV THRU 021526 MORSTEIN RD4,546.75
07-424-3130ENGINEERING SERVICES04/14/26Pay Check: 359126-00867 SERV THRU 032226 2026 GEN SERV9,700.25
07-424-3130ENGINEERING SERVICES05/13/26Pay Check: 359326-01075 SERV THRU 041926 2026 GEN SERV3,973.25
07-424-3130ENGINEERING SERVICES05/13/26Pay Check: 359326-01073 SERV THRU 041926 MORSTEIN RD1,064.00
07-424-3130ENGINEERING SERVICES05/13/26Pay Check: 359326-01076 SERV THRU 041926 25 CHAPTER 941,220.50

Page 2 of 4

Municipal Authority
YTD Revenues and Expenses thru 10/31/2026 (Page 3 of 4)

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3130ENGINEERING SERVICES05/13/26Pay Check: 359326-01077 SERV THRU 041926 RCSTP NPDES1,662.50
07-424-3130ENGINEERING SERVICES06/11/26Pay Check: 359526-01263 SERV THRU 051726 RCSTP NPDES681.50
07-424-3130ENGINEERING SERVICES06/11/26Pay Check: 359526-01260 SERV THRU 051726 MORSTEIN RD2,941.75
07-424-3130ENGINEERING SERVICES06/11/26Pay Check: 359526-01262 SERV THRU 051726 2026 GEN SERV2,442.00
07-424-3130ENGINEERING SERVICES07/21/26Pay Check: 359726-01630 SERV THRU 062126 RCSTP NPDES1,330.00
07-424-3130ENGINEERING SERVICES07/21/26Pay Check: 359726-01629 SERV THRU 062126 2026 GEN SERV3,621.75
07-424-3130ENGINEERING SERVICES09/24/26Pay Check: 360226-02101 SERV THRU 081626 2026 GEN SERV4,533.50
07-424-3130ENGINEERING SERVICES09/24/26Pay Check: 360226-02100 SERV THRU 081626 RCSTP NPDES299.25
07-424-3140LEGAL SERVICES01/21/26Pay Check: 358126-00116 LEGAL SERV DEC 2025 GEN AUTH612.50
07-424-3140LEGAL SERVICES02/10/26Pay Check: 358326-00337 LEGAL SERV JAN 2026 GEN AUTH273.00
07-424-3140LEGAL SERVICES03/10/26Pay Check: 358526-00548 LEGAL SERV FEB 2026 GEN AUTH205.00
07-424-3140LEGAL SERVICES04/14/26Pay Check: 359026-00868 LEGAL SERV MARCH 2026 GEN AUTH338.10
07-424-3140LEGAL SERVICES06/11/26Pay Check: 359426-01259 LEGAL SERV APRIL 2026 GEN AUTH701.10
07-424-3140LEGAL SERVICES07/21/26Pay Check: 359626-01625 LEGAL SERV MAY 2026 GEN AUTH307.50
07-424-3140LEGAL SERVICES07/21/26Pay Check: 359626-01624 LEGAL SERV JUNE 2026 GEN AUTH328.00
07-424-3140LEGAL SERVICES09/24/26Pay Check: 360126-02089 LEGAL SER JULY 2026 GEN AUTH491.50
07-424-3140LEGAL SERVICES09/24/26Pay Check: 360126-02088 LEGAL SERV AUG 2026 GEN AUTH492.00
07-424-3140LEGAL SERVICES10/22/26Pay Check: 360526-02394 LEGAL SERV SEPT 2026 GEN AUTH437.00
07-424-3705HUNT COUNTY ENGINEERING03/10/26Pay Check: 358626-00551 SERV THRU 021526 HUNT CTRY PUM478.00
07-424-3705HUNT COUNTY ENGINEERING04/14/26Pay Check: 359126-00865 SERV THRU 032226 HUNT CTRY PUM15,658.75
07-424-3705HUNT COUNTY ENGINEERING05/13/26Pay Check: 359326-01072 SERV THRU 041926 HUNT CTRY PUM3,354.00
07-424-3705HUNT COUNTY ENGINEERING06/11/26Pay Check: 359526-01264 SERV THRU 051726 HUNT CTRY PUM1,338.25
07-424-3705HUNT COUNTY ENGINEERING07/21/26Pay Check: 359726-01627 SERV THRU 062126 HUNT CTRY PUM1,569.25
07-424-3705HUNT COUNTY ENGINEERING09/24/26Pay Check: 360226-02103 SERV THRU 081626 HUNT CTRY PUM972.25
07-424-7431CAPITAL PROJ.-ENGINEERING07/21/26Pay Check: 359726-01626 SERV THRU 062126 RCSTP MCC-1 R14,440.94
07-424-7431CAPITAL PROJ.-ENGINEERING09/24/26Pay Check: 360226-02099 SERV THRU 081626 RCSTP MCC-1 R12,259.06
07-424-7490CAP.REPLACEMENT R.C.09/24/26Pay Check: 360326-02097 H-20 FIBERGLASS MANHOLE, TUBE,19,790.00
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL01/21/26Pay Check: 358226-00147 HERSHEY MILLS PUMP ST- MISSION4,251.50
07-429-1505RCSTP CAPITAL03/31/26Pay Check: 358826-00757 AERATION PUMP REPAIR- FLYGT Z315,524.69
07-429-1505RCSTP CAPITAL04/14/26Pay Check: 358926-00819 SLUDGE PUMP REPAIR-FLYGT Z3-TP8,284.70
07-429-1505RCSTP CAPITAL07/21/26Pay Check: 359826-01622 ULTRASONIC FLOWMETER SYSTEM10,292.00
07-429-1505RCSTP CAPITAL10/28/26Pay Check: 360626-02449 SLUDGE PUMP REPAIR-FLYGT Z3-TP4,388.96
07-429-3700CHESTER CREEK CAPITAL04/14/26Pay Check: 359126-00866 SERV THRU 032226 WATERVIEW PIP7,608.50
07-429-3700CHESTER CREEK CAPITAL05/13/26Pay Check: 359326-01074 SERV THRU 041926 WATERVIEW PIP2,663.50
07-429-3700CHESTER CREEK CAPITAL06/11/26Pay Check: 359526-01261 SERV THRU 051726 WATERVIEW PIP174.50
07-429-3700CHESTER CREEK CAPITAL07/21/26Pay Check: 359726-01628 SERV THRU 062126 WATERVIEW PIP1,389.50
07-429-3700CHESTER CREEK CAPITAL09/24/26Pay Check: 360226-02102 SERV THRU 081626 WATERVIEW PIP11,237.00
07-429-6100WEST GOSHEN CAPITAL07/21/26Pay Check: 359926-01623 2025 WG SEWER AUTH TAPPING FEE115,707.56

Page 3 of 4

Municipal Authority
YTD Revenues and Expenses thru 10/31/2026 (Page 4 of 4)

Account Number Account Description Date Type Transaction Data/Comment Amount
Total Expense 365,792.22
Net Operating 35,943.78

Page 4 of 4