Pipeline Task Force
The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.
| Board Members | Term Expiration Date |
| Gerald Sexton, Chair | 2027 |
| Mary McCloskey, Vice Chair | 2028 |
| Judi DiFonzo | 2026 |
| David Shuey | 2028 |
| Vacant | 2027 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Documents
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
I . Call to Order
2. Pledge of Allegiance
3. Moment of Silence
East Goshen Township
Pipeline Task Force
Meeting Agenda Thursday, May 23, 2019
5:00PM
4. Ask if anyone is recording the meeting
5. Approval of Minutes
a. April 25, 2019
6. Chairman's Report
7. Reports a. Legislative Update b. Current Pipeline Events Impacting East Goshen
8. Old Business a. Pipeline Coating Degradation b. Review Pipeline legislation - Bills: 40,257,259,261,262
(Bills distributed last month)
9. New Business
I 0. Correspondence
a. Pipeline Safety Bulletin - 2019
11. Public Comment
12. Adjournment
F:\Data\Shared Data\Agendas\Pipeline\2019\2019-0S-23_Pipeline Task Force Agenda.docx
1 EAST GOSHEN TOWNSHIP 2 PIPELINE TASK FORCE WORKSHOP MEETING 3 1580 PAOLI PIKE 4 THURSDAY, April 25, 2019 5 DRAFT MINUTES 6 7 Present: Chair Caroline Hughes; Vice Chair Bill Wegemann; Members: Judi DiFonzo, 8 Russ Frank, Karen Miller, Christina Morley, Gerald Sexton; David Shuey (Liaison, 9 Township Supervisor, Jon Altshul, Assistant Township Manager and Finance 10 Director 11 12 Call to Order & Pledge of Allegiance 13 Caroline called the meeting to order at 5:02 p.m. and led the pledge of allegiance. 14 15 Moment of Silence 16 Caroline called for a moment of silence to honor our first responders and troops. 17 18 Recording 19 Caroline asked if anyone was recording the meeting. No one was recording. 20 21 Approval of Minutes 2 2 The minutes were approved as amended with the clarification that the pipeline coating is 2 3 a fusion bonded epoxy from Dura-bond Industries. 24 25 Chairman's Report 26 • Caroline stated that there is no current movement on Adelphia. 27 • Bill acknowledged David for raising community awareness to the pipeline. 28 • Caroline reported that Mariner 1 is operational. 29 • Caroline reported there was a 12x12x12 sinkhole in Delaware County, along 30 Route 1. 31 • Caroline reported that the PUC refused Sunoco's request to restart drilling of 32 ME2 near Shoen Rd. This was based on Senator Dinniman's case. Caroline 33 referred the group to the PUC website and video. 34 • Caroline reported that in Chester County Government news that a formal 35 petition was filed to the Court of Common Pleas and a request to the issuance 36 of a permanent injunction prohibiting Sunoco from construction on ME2. 37 Caroline will send a link to the group. 38 • Christina explained that she contacted an author who wrote an article 39 published in Bloomburg regarding expanding the pipeline in its current
40
environment. She continued that the author responded that what is 41 happening here locally was not the intention of his article. Bill asked 42 Christina if she could contact him to write an update to his article. 43 • Caroline updated the group that in Upper Uwchlan Sunoco modified the 44 installation method from HOD to Open Cut for both the 16 inch and 20 inch 45 pipes.
04/25/19 April 25, 2019 1
1 • There was discussion that it is being proposed that ME2 and 2X be pulled at 2 the same time. There was discussion that Sunoco may request 24 x 7 drilling. 3 David reported that the BOS will not allow Sunoco to drill 24 hours without a 4 public meeting. If Sunoco violates the local new ordinances, under state law, 5 they can be fine $1,000 per day for violating local noise ordinance. 6 • Jon reported that the lubrication station was set up at the Goshen Executive 7 Center. He also stated that some residents in Marydell have been 8 complaining of noise. The township has not received a response from Sunoco 9 regarding an additional sound barrier. Caroline stated that there is an APP 10 available that will measure decibels and time stamp when the noise level was 11 recorded. 12 • Bill stated that he and several others requested a home inspection from 13 Sunoco. Christina stated she was informed by a home inspector that she 14 needs to contact a structural engineer to determine if any activity is causing 15 damage. 16 17 Old Business 18 1. Review Pipeline Legislation - Bills 40, 257, 259, 261, 262 19 a. For the next meeting, the group will need to review their respective bills, 20 provide a summary and list the pros/cons of the bill. There was 21 discussion that the group may need to email the author of a particular 22 bill. It was agreed that a generic email account should be used. Jon will 23 have a pipelinetf@eastgoshen.org email account set up. This will be used 24 for political contacts as well as for the general public to contact the TF. 25 The chairperson will be the monitor of this account. 26 b. David stated that the BOS could support the bills reviewed as one entire 27 package. 28 29 2. Newsletter Article 30 The TF worked on the article for the newsletter. There was general discussion 31 that residents need to be informed of what is being transported in the pipeline. 32 Jon stated that the article should be general education to the community. It was 33 agreed that it would be comprised of 2 separate parts: 34 • The first section will explain who the TF members are, how to contact the 35 TF with questions/concerns and their mission statement. 36 • The second will include education points such as: 37 o The product in the pipeline is not natural gas. It contains a product 38 that is odorless, colorless and heavier than air. 39 o The product is not for domestic use and is exported overseas 40 o HDD vs open cut and how HDD can create noise, vibration and 41 dust. 42 It was agreed to address pipeline safety in next newsletter article. 43 44 3. Fugitive Dust Concerns at HDD sites 45 Bill asked the status on when the engineer will start to monitor one HDD pipeline 46 drilling site. David stated that it was passed by the BOS and will be set up when 47 needed. Jon will verify if the drilling at Bow Tree staited. There was also discussion
04/25/19 April 25, 2019 2
1 that an additional barrier is needed at New Kent to block the dust going into Rt 352 & 2 the Bow Tree development. Bill stressed that the fugitive dust issue is not getting the 3 attention it should. 4 5 Christina also stated that it is difficult to exit at the intersection of Bancroft Drive and 6 North Chester Road. Sunoco' s work sign in addition to overgrown shrubs cause 7 visual obstruction. 8 9 4. Pipeline Coating Degradation 10 a. Due to time constraint at the meeting, Gerry was unable to present his 11 research regarding pipeline coating degradation. Gerry will address this first 12 at the next meeting. 13 14 Action Items for TF 15 • Bill Review and summary 16 17 Public Comment 18 None 19 20 The next regular meeting is Thursday, May 23, 2019, at 5:00 pm. 21 22 Adjournment 23 The meeting was adjourned at 7:05 pm. 24 25 Respectfully submitted, 26 Susan D'Amore 27 28 F:\Data\Shared Data\Minutes\Pipeline Task Force\2019\Pipeline TF Mins 04-25-19 DRAFT.docx
04/25/19 April 25, 2019 3
.Sponsors & bmergency Numbers
Bluestone Pipeline Company of PA, LLC
Buckeye Partners LP.
Chambersburg Gas Department
Chartiers Natural Gas Company, Inc.
Chesapeake Energy
CNX Midstream Partners
CNX Resources Corporation
Columbia Gas of Pennsylvania, Inc.
Delaware Pipeline Company
Dominion Energy Transmission, Inc.
Eastern Shore Natural Gas
Energy Transfer
Enterprise Products
Interstate Energy Company
Keystone Cooperative Association
Knox Energy Cooperative Association
National Fuel Gas
Paulsboro Natural Gas Pipeline Company
PECO, An Exelon Company
Peoples Gas Company LLC
Philadelphia Gas Works
Stagecoach Gas Services
Sunoco Pipeline
Texas Eastern Transmission, LP
Transcontinental Gas Pipe Line Co. LLC
UGI Utilities, Inc.
United States Gypsum Company
United States Steel Corporation
800-363-9541
800-331-4115
717-263-4111
724-745-6342
888-460-0003
844-700-2663
800-583-3755
888-460-4332
855-887-9768
888-264-8240
877-650-1257
800-375-5702
888-883-6308
800-747-3375
888-784-6160
888-784-6160
800-444-3130
877-662-4575
800-841-4141
800-400-4271
215-235-1212
866-234-7473
800-786-7440
800-231-7794
800-440-8475
800-276-2722
877-258-2901
800-992-2262 l!l:J.00 w-xy'fL -r(z Color Code for Temporary Markings
J.: Jg,,.· "i:!::.; IL. . r.i ·: . =: 1:.1 .... • .•
Call Before You Di
• Statistics indicate that damage from excavation related activities is a leading cause of pipeline accidents. If you are a homeowner, farmer, excavator, or developer, we need your help in preventing pipeline emergencies. • Call Pennsylvania One Call System, Inc. (POCS) at least three business days before you dig at 8-1-1 or 800-242-1776. • It is your responsibility under the law to provide exact and specific work site information. • Pennsylvania One Call System, Inc. does not
locate underground facility lines. • POCS automated response system will notify you of the member facility owner's status on your dig notification at the end of the second business day for routine notifications and 2 hours for emergency notifications. • Maintain a safe clearance between any subsurface facility and the cutting edge or point of powered equipment. The law requires use of prudent techniques inside 18" of the outside edge of an underground facility. • Marking indicates only the approximate location of buried lines. After obtaining facility owner's permission, hand dig test holes in a careful and prudent manner to determine the precise location of underground facility lines. Upon hand digging, if you are still unable to determine the exact location of the lines, call POCS or the facility owner for assistance prior to any excavation. • If you must expose a line, the state law requires you to protect and support the underground facility line while working on the site. Ask the facility owner's locator for help and advice when you are near underground lines. • The excavator must renotify POCS for new markings if the facility owner markings are destroyed or removed before excavation commences. • The excavator must also renotify POCS if the job is delayed more than 10 business days from the original start date.
PIPELINE
SAFETY BULLETIN
2019
Important Safety Guidelines
Pennsylvania One Call: The Keystone of
Damage Prevention
Sponsored by Pennsylvania One Call System, Inc.,
Your Local Gas Distribution
and Pipeline Companies www.paonecall.org (for additional Pipeline Safety Bulletins)
www.puc.pa.gov
www .osha.gov http://phmsa.dot.gov www .commongroundalliance.com
www.pipelineawareness.org www.pennsylvaniapipeline.com/Pipeline-Safety .html
Printed March 2019
Safety & Education
•
•
•
•
•
•
•
•
•
•
PA Act 287 as amended requires excavators as well as private land owners to call POCS three business days before any kind of digging occurs with powered equipment. Mark your proposed excavation area with white paint or flags before calling with a dig notification. By calling you allow the facility owners an opportunity to locate and mark their underground facilities in advance of the planned excavation
(gas and liquid pipelines will mark underground facility lines using yellow stakes, flags or paint).
Protect and preserve markings until they are no longer required for a safe and proper excavation. Pipeline operators may monitor the excavation to prevent accidents and detect potentially hazardous situations. No construction or excavation activities of any kind, including blasting, drilling, boring vibration or operating vibrating equipment are to be done on any pipeline easement area before the pipeline operator has established the location of all affected facilities and the limits of the easements. Because of the critical nature of liquid pipelines and high pressure natural gas, facility owners may want to be on site when construction or excavation activities are near the lines. When crossing a pipeline with heavy equipment during construction, you may be required to use protective materials that are approved by individual pipeline companies. When construction is completed, the additional protection must be removed. Please consult with the facility owner or line operator when backfilling, which also includes areas of washout and erosion. Contact your local pipeline operator for information on high-consequence areas and integrity management programs. For more information, see the individual pipeline company websites.
Prevent Damage
•
•
•
•
•
Pipeline markers display the material transported, the name of the pipeline operator and the operator's emergency number. Pipeline markers show approximate location of pipelines and do not reveal the exact location, depth or pressure of the pipeline. Easements are written agreements between
pipeline companies and landowners, which permit pipeline companies to operate and maintain the pipeline through the landowner's property. When purchasing property or beginning construction, it is essential to research existing easements. Easements must be kept clear and nothing can be built over the pipeline. Many pipelines were built in unpopulated areas that are now developed. Accidents occur when excavators encroach on the rights of way through construction.
Excavation and design projects
should always begin with notification to the state's one call system as required by the
PA UULPLaw.
[!]·[!] ';11&.,,'J,_i;t,i/_t•f :·
r--.. m-,-: -- l!Jtr .. -
www .paonecall.org/pipelinesafety 3 Business Days Notice Required
Emergency Actions
If a gas or petroleum line is hit or damaged and is leaking:
• Stop all digging and leave the equipment in place. • Evacuate the work area and adjacent structures. • Remain upwind at a safe distance, 500 feet or more. • Under PA law, you must dial 9-1-1 or the local fire
department. • Call the appropriate gas or petroleum company
immediately from a safe distance (refer to the emergency numbers). • Eliminate potential ignition sources, i.e., open
flames, smoking materials, the starting or operating of motor vehicles, the use of phones, radios, doorbells, electric switches, flashlights, etc. • Do not try to extinguish a fire unless there is a direct threat to life. • Do not operate any pipeline valves. • Cordon off the excavation area. Keeping a minimum safe distance of 500 feet. Do not
attempt to stop the escape of gas by covering the leak with dirt. • Any damage to a line must be reported to the facility owner by law, and it is unlawful to cover up a line that may be damaged.
If a gas or petroleum line is hit or exposed without apparent damage or leakage:
• Call the appropriate gas or petroleum company immediately from a safe distance (refer to the emergency numbers). • Stop excavation activity until the facility owner
clears you to proceed. • Special Note: If you hit a line and there is no
apparent leak at that location, it is still possible that there could be secondary damage away from the site, resulting in a leak. In addition some pipelines have sensitive coatings that even when scraped or nicked may create holes. Damage to a line may not be readily apparent when a line is exposed or hit. • Reporting all damages, even minor nicks and gouges is required by PA law. Minor nicks, gouges, or scrapes can and have been the cause of future failures. Some companies have policies in place to repair minor nicks, gouges and scrapes free of charge.