Pipeline Task Force
The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.
| Board Members | Term Expiration Date |
| Gerald Sexton, Chair | 2027 |
| Mary McCloskey, Vice Chair | 2028 |
| Judi DiFonzo | 2026 |
| David Shuey | 2028 |
| Vacant | 2027 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Documents
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
1. Call to Order
East Goshen Township Pipeline Task Force Meeting Agenda
Thursday, February 27, 2020
5:00 PM
2. Pledge of Allegiance / Moment of Silence
3. Ask if anyone is recording the meeting
4. Approval of Minutes
January 23, 2020
5. Public Comment
6. Chairperson's Report
7. Reports a. Legislative Update b. Current Pipeline Events Impacting East Goshen
8. Old Business a. Boot Road Geophysical Survey Report Revised 01/03/2020 b. Right To Know Request for info related to Boot Road Geophysical Studies c. Hiring of consultant geologist d. HDD S3-0500 Re-Evaluation Report Approved by PA DEP e. Follow up PL TF Accomplishments & Objectives from O l /28/2020 ABC Planning Session f. Follow up on Energy Transfer Permit Compliance in EGT and Cease & Desist - Request any/all amendments since 2017 permit approval g. Ongoing contact with Planning Commission and other EGT Committees h. Consider Task Force Recommendation to Board of Supervisors for Planning Commission to review Township Ordinance setback requirements i. Emergency Action Plan
9. New Business a. Consider BOS Recommendation for comments to PHMSA regarding their proposal to its regulations concerning natural gas and hazardous liquid pipelines. (Comments due by 4/6/20)
10. Any Other Matter
11. Correspondence
12. Adjournment
F:\Data\Shared Data\Agendas\Pipeline\2020\2020-02-27 _Pipeline Task Force Agenda.docx
1 2 PIPELINE TASK FORCE MEETING 3 1580 PAOLI PIKE 4 THURSDAY, January 23, 2020 5 DRAFT MINUTES 6 7 Members Present: 8 Caroline Hughes, Chair; Bill Wegemann, Vice Chair; Members: Judi DiFonzo; Christina 9 Morley; Gerry Sexton 10 11 Others Present: 12 Mark Gordon, Zoning Officer; Michele Truitt, Township Supervisor 13 14 Call to Order & Pledge of Allegiance 15 Caroline called the meeting to order at 5:00 p.m. and Christina led the pledge of allegiance. 16 17 Moment of Silence 18 Caroline called for a moment of silence to honor those injured or deceased in the line of 19 duty. 20 21 Recording 22 Caroline asked if anyone was recording the meeting. No one was recording. 23 24 Approval of Minutes 25 The minutes from December 5, 2019 and January 9, 2020 were approved unanimously. 26 27 Public Comment 28 None. 29 30 Chairperson's Report 31 1. Caroline reported that Sunoco was fined $2 million for Mariner East spills in Raystown 32 Lake, Huntingdon County. 33 2. Caroline explained that the FBI is investigating the Wolf administration's issuing of 34 Mariner East pipeline permits. She explained that the former secretary of DEP, John 35 Quigley, would not grant these permits unless the deficiencies were remedied. Pat 36 McDonald has been assigned as the new secretary of DEP. 37 3. Caroline reported that Chester County's request to stop Sunoco's construction by the 38 Chester County library was denied. The judge sited that he did not have jurisdiction to 39 rule on the matter. 40 4. Caroline explained that there is another DEP public comment period opportunity. 41 Since the deadline is January 28, 2020, there is not enough time make a 42 recommendation to the Board of Supervisors. Michele stated that she will submit 43 comments as a concerned citizen and resident. Michele also stated that she met with 44 Sunoco earlier in the month. She will be meeting again with representatives from 45 Sunoco's Operations and Engineering departments. 46 47
January 23, 2020 1
1 Reports 2 1. Legislative Update - Bill provided information about his background and his 3 involvement with East Goshen Safety Environment Advocates (EGSEA). He expressed 4 his concerns that during the 5 years of Governor Wolfs Administration, not one single 5 pipeline bill has been signed. Bill explained how Pennsylvania is the only major gas- 6 producing state in the U.S. that does not have a severance tax. This has been a major 7 sticking point in Harrisburg for nearly a decade. Instead, Pennsylvania has a unique 8 "impact fee." Gas companies pay the fee for each well they drill. He continued that he 9 hopes that PUC rulemaking will provide guidelines and laws moving forward. 10 11 2.
Current Pipeline Events Impacting East Goshen - Mark reported that two noise 12 violations were filed against Sunoco regarding properties around the New Kent area. 13 He will be siting Sunoco with an additional violation on 1/24/20. Mark provided a 14 completion status of the Sunoco installation of the 16-inch and 20-inch pipes to date.
15 16 Old Business 17 1. Boot Road Geophysical Survey Reports - The TF discussed the latest Boot Road 18 report that was provided. The TF also discussed their concerns about Larry 19 Greminger's qualifications. Christina made a motion requesting Township Staff to file a 20 Right to Know Request to PennDOT to obtain all information, correspondence, reports, 21 data, etc. associated with the Boot Road Geophysical Survey. Bill seconded the motion. 22 The motion passed unanimously. 23 Christina requested from the Township staff that all correspondence be forwarded to 24 the TF as soon as it is received. 25 Christina explained that she held an informational session/workshop for a few 2 6 residents to assist in improving their skills in submitting public comment to 27 organizations such as DEP. She is willing to do this again if there is interest. 28 29 2. Accomplishments and Objectives - Gerry presented for review a list of the TF 30 accomplishments and objectives in preparation for the ABC Annual Planning session to 31 be held January 28 at 6:00 pm. The TF discussed and revised. Gerry will make 32 modifications for distribution at the meeting. 33 34 3. Professional Geologist - The TF discussed hiring a professional geologist. Mark 35 suggested that the TF recommend to the Board of Supervisors that a professional 36 geologist from Pennoni begin this process with a review of the Boot Road Geophysical
37 Survey Reports. Judi made a motion for this recommendation and Gerry seconded it. 38 The motion passed unanimously.
39
40 Adjournment 41 The meeting was adjourned at 7:15 pm. The next meeting is Thursday, February 27, 2020, 42 at 5:00 pm. 43 44 Respectfully submitted, 45 Susan D'Amore 46 4 7 F:\Data\Shared Data\Minutes\Pipeline Task Force\2020\Pipeline TF Mins01·23-20 DRAFT.docx
January 23, 2020 2
,.
j:ast Whl\eland To'."nshlp
\.
16" Completed
Q.1
East Goshen Twp. - Transmission Pipelines
t,1a1ch 201S• lCUoo1Appro:>.lmitf, buedllponChUl'lt Coonlyf'lal'lnlng Commlilon PipclirlD W«rNllM Cenlot
HDD
460 Fire House (WGT) Wellington Entrance 461 Giant Entrance 471 Quaker Village 490 Goshen Exe Ctr 500 New Kent 501 Bow Tree 521 Bow Tree Drive Total
Percentage
ESTIMATED SUNOCO PIPE INSTALLATION
Segment Length Method
to Wellington Entrance 3391 HDD to Giant Entrance 1125 Open Cut to Quaker Village 882 HDD to Goshen Exe Ctr 3730 HDD to New Kent 2970 HDD to Bow Tree 2140 HDD to Bow Tree Drive 975 HDD to St Simon & Jude (WT) 6943 HDD 22156
Note: HDD 461 scheduled for pull back in March
F:\Data\Shared Data\Admin Dept\Sunoco\HDD Plans\Sunoco Pipe Installation 020420.xlsx
Revised 2/ 4/20
20 inch pipe 16 inch pipe
Status Installed Status Installed completed 3391 completed 3391 completed 1125 completed 1125 reaming completed 882 completed 3730 completed 2970 completed 2970 completed 2140 completed 975 completed 975 completed 6943 8461 22156 38.19% 100.00%
Sheet 1
Rick,
As a follow-up to the January 13, 2020 email, attached is the updated geophysical survey report from RETTEW Associates, Inc. as it pertains to the survey conducted on Boot Road between Carriage Drive and Wilson Drive on October 8-9, 2019. As noted in the previous email, the department requested additional information to address comments in the initial report. The revised report by RETTEW has addressed the main comment of Schnabel's memo dated November 20, 2019 regarding anomalies seen in plan-view results versus how those anomalies compare in the profile-view results. To address this RETTEW has included approximately½ of the GPR profiles collected parallel to the road and additional text discussion of how it interpreted the profiles to consider if the anomalies were likely caused by voids or other features (such as utilities, etc.). Based on the review of the profiles, Penn DOT and Schnabel concur with the results summary, which is there are several anomalies but they do not appear to be caused by open voids.
Thank you,
Gene
RETTEW
···:: ... .... ·::::= ENYI ROS CAN 3020 Columbia Avenue, Lancaster, PA 17603 • Phone: (800) 738-8395 E-mail: rettew@rettew.com • Website: rettew.com
October 22, 2019 Revised January 3, 2020
Mr. Larry J. Gremminger Sunoco Pipeline, LP 535 Fritztown Road Sinking Spring, PA 19608
Dear Mr. Gremminger:
RE: Geophysical Survey Sunoco Pipeline, LP Pipeline Project S3-0460 Greenhill Road GPR Survey at Wilson Drive East Goshen Township, Chester County, PA RETTEW Project No. 096303003
Engineers
Environmental
Consultants
Surveyors
Landscape
Architects
Safety Consultants
Geophysicists
RETTEW Associates, Inc. completed a Ground Penetrating Radar (GPR) geophysical survey along a 980-foot section of the S3-0460, Greenhill Road horizontal directional drill (HDD) site. The purpose of the survey was to detect and delineate subsurface voids or low-density zones adjacent to an HDD path where inadvertent returns (I Rs) emerged near the intersection of Wilson Drive with East Boot Road and through a saw-cut in the roadway near the intersection of Greenhill Road with Carriage Drive on May 29, 2019. A multi-technique geophysical survey along a 250-foot section of the Greenhill Road HDD was completed on June 22, 2019. A copy of the report of the June 22nd survey is included as Attachment 1. The work reported here is an expansion of the previous survey to cover an earlier IR location, and to repeat the GPR survey with integrated Global Positioning System (GPS) location control. The following report, figures, and attachments describe the method and results of the investigation.
EXECUTIVE SUMMARY
The expanded survey was completed on October 8 and 9, 2019. GPR scanning detected several underground utilities (previously marked by others on the road surface) as well as four anomalous areas of high-amplitude GPR reflectors characteristic of disturbed or settled soils, possibly from movement or compaction of backfill material in the shallow utility trenches. Three anomalous areas encompass multiple water lines and valves, while the other (larger) area is devoid of any known utilities. The four areas displayed anomalous GPR reflection patterns but did not display the very high-amplitude "ringing" typically associated with open voids.
SITE DESCRIPTION
The S3-0460, Greenhill Road HDD is located at the intersection of East Boot Road and both Wilson Drive and Carriage Drive in Chester County, Pennsylvania (see Figure 1). A geophysical survey was conducted along a 980-foot section of the east- and west-bound lanes of Boot Road, which parallels the HDD alignment (see Figure 2). Portions of all lanes of Boot Road were sequentially closed (for approximately 4 to 6 hours each) to complete the survey.
0
Page 2 of 3 Sunoco Logistics, L.P. October 22, 2019 Revised January 3, 2020 RETTEW Project No. 096303003
GPRSURVEV
The GPR survey was completed using a GSSI GPR digital controller and dual-frequency 300/800 Mega Hertz
(MHz) scanning antenna. GPR systems produce cross-sectional images of subsurface features and layers by continuously emitting pulses of radar-frequency energy from a scanning antenna as it is towed along a survey profile. The radar pulses are reflected by interfaces between materials with differing dielectric properties. The reflections return to the antenna are displayed on a video monitor as a continuous cross section in real time. Since the electrical properties of air and clay mud are distinctly different from undisturbed soils, such features produce characteristic reflections. In particular, air and mud typically produce very high-amplitude reflections, with air-filled voids also often displaying reverberating or
"ringing" reflections.
GPR scanning was performed along survey profiles spaced approximately 2 feet apart, as well as several additional diagonal transects (see Figure 2, red lines). The GPR data were integrated in real time with a Topcon Hiper Lite Plus DGPS GNSS system. The profiles were recorded for post-processing with both Radan by GSSI and GPR-Slice by Geophysical Archaeometry Laboratory, Inc. GPR-Slice was used to filter the individual profiles before combining them into a three-dimensional model of the subsurface. Seven horizontal slices were then extracted between O and 6 feet below grade. Figure 3 shows three of the seven horizontal slices and a composite of the seven slices combined. The shades of red represent the relative amplitude of the GPR signal increasing from white (minimum) to red (maximum).
Figure 4 summarizes the results of the GPR survey with an annotated slice and two vertical GPR cross-sectional profiles showing samples of the anomalous features identified in the 3D model. The
vertical profile colors represent relative amplitude of the GPR signal. Shades of light blue to white indicate the highest amplitude signal, while black and red represent the lowest amplitudes. Appendices I through V include every other GPR profile performed in a southwest direction across the survey area. The profiles are a fusion of the data from both antenna frequencies (300 and 800 MHz) into a single cross section.
RESULTS
The GPR results show multiple high-amplitude reflectors across the survey area. Most of the reflections are associated with the numerous underground utility lines beneath the survey area, as well as related metallic surface features such as valve and utility hole covers and storm drains. Utility lines appear as hyperbolas or "chevrons" where the GPR profile crosses them at a high angle, and as continuous reflections when the profile runs parallel and close to the trace. On Figure 2, water lines (blue) are shown only where they were clearly visible on the GPR records. Metallic surface features produce reflections that "ring" all the way down through the record. These are actually multiple returns of the transmitted pulse as it bounces back and forth in the air between the antenna and the metal target (see Figure 4 and Appendices). The labels on the GPR features in Figure 4 and the Appendices are interpretive, not definitive. None of the identified anomalies resemble the expected reflection pattern for voids beneath the roadway.
Three adjacent anomalous areas are located beneath the west-bound lane (near 15318+00), between several suspected water lines and multiple water valves (hatched in Figure 4). These areas show high-amplitude GPR reflectors, including downward-dipping reflectors possibly consistent with settlement of utility trench backfill materials. The two westernmost areas were identified in the June 2019
RETTEW.
Page 3 of 3 Sunoco Logistics, LP.
October 22, 2019 Revised January 3, 2020 RETTEW Project No. 096303003
GPR survey by RETTEW. The third is coincident with a known backfilled excavation area. This GPR
reflection pattern is characteristic of settlement or subsidence, as opposed to most of the GPR reflectors across the site that are associated directly with utility lines or disturbed soils around and above the buried utilities. The three anomalous areas (near 15318+00) are located between water lines and water valves and therefore may be related to settlement of the water line trench materials or associated with other past events not related to the recent IR. A larger area of high-amplitude reflectors (near 15320+00) was observed in the eastbound lane, southeast of the Carriage Drive intersection (Figure 4). These GPR reflectors also show characteristics of settlement or subsidence, but do not appear to be associated with observed underground utility lines. These reflectors may be related to pre-road construction or pre-road land use and do not appear to have had an impact the current roadway condition. None of the anomalies display reverberation of the type commonly associated with air-filled voids. No subsurface voids were identified by GPR in the survey area.
LIMITATIONS
The survey described above was completed using standard and/or routinely accepted practices of the geophysical industry, and the equipment employed represents, in RETTEW's professional opinion, the best available technology. RETTEW does not accept responsibility for survey limitations due to inherent technological limitations or unforeseen site-specific conditions. We will notify you of such limitations or conditions, when they are identifiable.
Please also note that the survey is based on observation of current subsurface conditions. Therefore, while the results of this survey can be used to guide further investigations, RETTEW cannot make any warranties concerning future subsidence occurrence - particularly under the influence of altered surface and subsurface drainage patterns due to grading and construction activities.
We have enjoyed and appreciated the opportunity to have worked with you. If you have any questions, please do nstesitate to contact the undersigned.
/. ,., ---i 7 _/-bf{,_ ✓ :;,/IL Charles H. R ine, MSc, PG Senior Project Manager
/2LkvL£>JL Felicia ue1v1 Bechtel, MSc, PG Director of Geophysics
Enclosures
Figure 1: Topographic Basemap Figure 2: Data Coverage Map Figure 3: GPR Horizontal Slice Maps Figure 4: Data Summary Map Appendices 1-V: GPR Profiles Attachment 1-June 2019 S3-0460 Boot Road GPR Survey at Wilson Drive Report
Z:\Shared\Projects\09630\096303003 - SL - Greenhill Road Geophysics\GP - Boot Road GPR\REPORT PIECES\S3-0460 Greenhill Rd Revised Final Report 20202 -01-03.docx
llETTEW.
RETTEW. I ... ;Mli l ;;OC;H
ENCLOSURES
RETTEW I '"'!MIi i • ;il:;OSUH
ti' JO 1 'ON 311091:1 ------;,o;;:o;;;o·z::=-.. 't ____ ,,w,.
-----:6-=-to:-:z'"'/ £-:-:t'"/c-:ot=---- •n•o ------;c \l';-:H::J-- :1,9 NMYHO
-----::8:,-A:l-,----- •A90lM31/\3H
E00€0E960 :'ON MlillH -----,,6t"O"Z"/S""Z"/"60;.---- ,,i.a u••ns
y'' " ...
. '1
••
·._;. I•
., ,,,, ...
;1
S4iit-ttl'OOl·l•UOIU {07!1 'U'1Jllr1',Jtl'M><JU.YflCI.W11,80lot
'?lll'rll,Y.,llSPttltlAJWil
•.,'_, "'•'il.t, ':
'J • I. . I • .,
I'
09t>O·ES peo\j m4uaa,9/peo\l 1000 1se3
0 0 0 ...
0 8 "' g 0 ., 0 0 ] "'
0 0
0
.., ., C E "' .. C .. - .. .. < <( _,
0 > ·a ., 0
0.. i': :r I C; :!l
V> ::, °B .,, .., '" ., - ·l lS .<! Q. Q. 0 0 e ., 0 ..c 0.. "' :r CL 0 .. t!J •
., 0 z
Notes:
g
le' £ 0
250800
250750
250700
250650
250600
250550
2577600 2577700
Basemap image from Nearmap, extracted 8/2019.
Coordinates in PA South State Plane, NAD83.
2577800 2577900 2578000 2578100
Easting (ft)
2578200 2578300 2578400 2578500
Legend
• • • •
!II!
GPR Profile
Gas Line (extent observed with GPR)
Water Line (extent observed with GPR}
Manhole - Water
Manhole - Storm
Manhole - Unknown
Water Valve
Stormwater Inlet
16" Pipeline
[ 20' Pipeline
0 50 100 150 200
ml"' o"" m §
·:
,1- 00 0: N O ti ';;'1-s
:: N ,
s .. s i: :l a: a: 0 111 1tl ...... > ..... ·=
F----7 E,-! { c:::::........ ' ii --d 2d § 1
n,
"O
(II 0 0: n,
(II
g <.:> "' --o -g N'I .... 0 Vl n, 0: 0 0 a,
(II
Notes:
Basemap image from Nearmap, extracted 8/2019.
Vertical GPR slices from GPR-Slice v7, by Geophysical Archaeometry laboratory, Inc.
Horizontal Composite 0.0' - 6.0'
Legend
Gas Line (observed with GPR)
16 .. Pipeline --J- 20" Pipeline
i
i
"' a:: 1, :c 0) C: - ul - O:.: "' «> ....
I I ! w 6 : :c is CZ: 0 0 Ill 1!{i •..... > ······== ····••""-'== F--7 E-i L l i; ,...... __ ____,,, n an
Ill
CII ,!::! iii
"iij
0 N ·;;: 0 :I: a: c.. I!)
rt)
CII
u::
"O "' 0 a:
QJ QJ 0 «> \!) "" ----0 "O ' "'"' 0 <I> a: 0 0 "' "' LU
i
Plan View Scale (ft) -=- 0 25
Notes:
so 75 100
Basemap image from Nearmap' extracted 8/2019.
g g:
GPR data from GSSI System, 300/800 MHz antenna with RTK-GPS.
Vertical profiles from Radan by GSSI. Hoizontal slice from GPR-Slice by Geophysical Archaeometry Laboratory, Inc.
g g:
Along-Profile Distance (ft)
Legend
' GPR Anomalous Features W' (Possible Subsidence)
- High-Amplitude GPR Signal
• • • •
!II!
Gas Line (observed with GPR)
Water Line (observed with GPR)
Manhole - Water
Manhole -Storm
Manhole - Unknown
Water Valve
Stormwater Inlet
16" Pipeline
-:-- 20" Pipeline
Along-Profile Distance (ft)
°'IM en
., c< 13::' 0:::W:: :I: II 0 * u_ u
l
o
..
ci ! ► 0 z_ IU d) ili <I) 0::: 0::: 0 0 Ill
1{{1 •••••• > · · · · · · = ······ .......
F-----7
; ,..... _____ ......., =
Q. Ill
> 0 a: E E ., 0 :s \0 (!) ..,. VI ---0 .,, . Ill ,. m ... 0 Vl a: C 0 <:t
CII t; ...
RETTEW I ... MIii " i1 T;OC;H
APPENDICES I-IV GPR Profiles Sections 1-4
RETTEW I .. ·;..iWII j • lii:;OSCAH
Notes:
I
--· .
.. .· :: ..... ,_ .: _-:_-_I .• - ', f· 'l
utll[ty Line and Trench Jilt001P_lill Storm Drain UtJlity Hole or VatveCover?
,,
---- - -- -- -
I - - I
r.1eoosr _,u
·,,:r - --------- ---- - ----
I
. .
- -
1 • I • -• •
r1lt06lPe6lt Utility Hole or
VatveCover?
- -
Utility Hole or Valve Cover?
------ ... <--·- -==-::::
mec.si>_611 UtilityUne and Trench
-
·__ - - . .-.: .. - --
'1\e0Ui>_6u - _::.. ,_ ... -: . : -:--- --U'" , V-·- _:--:.-.::.;_:: : --··
Utility line and Trench
Southwest
Vertical GPR slices from merged 300/800 MHz data processed ln Radan by GSSI.
Appendix I: GPR Profiles Section 1
East Boot Road/Greenhill Road
S3-0460
CIUSTUtCOUNTV. l>A RETTEW.
L'tnc·"" rd ntc:u, 111<- l020Coltlmbb.h,....,.,unu1tu.l>A 17601 Phonf(717J39-4..J7ll fH(71?J)94-106) I
--- ..... .. ,.........,_.._ ..................
ENVIROSCAII
SURVEY DATE: 09/25/2019
RmEW No,: 096303003
REVIEWED BY: FKB
DRAWN BY: CHR
DATE: 12/27/2019
SCAlf: NA
APPENDIX N 1 of 5
' ...
Notes:
- -
. -.•...... 1\ ,.. ,1'
' ' . • ,• ..
1ileOllP_6H Utility Utility Utility
--
, • - . • .,, ',r ·' . . • . ,· .. - .. ... ., . -. .. ' ', ..... fllt01SP_6ll
filt019P_6ll
filt071P_'1t Utility Hole or
Valve Cover?
utility ,.
Utility&
Trench
' . ·..... . , ,ij N-·'
Utility Hole or Valve Covers?
Utility
utility Utility Utlllty
,. 1'
Utility
i
--- - . -·
-· • , • ' -. #
Utility Utility Utility Utility
,, ,, 'I'
,-- -. . ' ... ,. ' -! - . '•' -- ,· ....... ·:·. ---..... ;,: -.... : ' ;., · ... flit 100,_,11 Utility Utllitie, Utility T,ench Utility Utility
Southwest
Vertical GPR slices from merged 300/800 MHz data
processed in Radan by GSSI, Inc.
Appendix II: GPR Profiles Section 2
East Boot Road/Greenhill Road
S3-0460
(ll[SIOCOIJIOY, PA TTvw 1 ···M11 RE D ." l/iboscA11
fl:C11tlffltld^tl.lnc. )OlO(olvmbl1Annu1,Unu1tu,l'A 17601 Phoni!(117J.J<H•l1ll fu(7l7)39-t-10U
SURVEY DATE: 09/25/2019 RETTEW No.: 096303003
REVIEWED BY: ---'-F"KB ::;_ ___ _
DRAWN BY: ---C"'H"-R'-,-----
OATE: ___ __;1`2:!_/2:::7,_,__/,:,20:.:1:::9 __ _ SCALE: ____ _!N,.cA,_ ___ _
APPENDIX NO 2 Of 5
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
g "
'•
·.
Notes:
- - - . - -- .... . . ·_ ... - . . - . ,ö,. _.,- -- .. - :_ - .-_ ,_ - . ,, . ... ,:·" -·_,--·,, :;, F ...,".G' -H ,' .. ,. '., .\· ', \ -- :' I ... •.,: ., ' . . ,., ,: -·.
Utility Hole or Utility Hole or file OJO, _611 Valve Cover? Valve Cover? Possible Subsidence Feature
Water Line
'I'
-- - - -
. . . . .. -:-:· : . . - .f ·1 . ' ' • file0)S,_6U
- - --- -
rneon,_,11
Utilities
file1l1,_61l
Utility Utilities
Top of Rock?
Utility Waterline
IR
i
Waterline
IR
IR
,,;,. .... • .p--- - . -- - _ ... _ . -_ - ,---· .; p ___ - ---
.:h--.-·-/:'"°:e0-:: ... ·12_; ....... - :·· : .. ::\-:-_3 . .-·.4
0
. -•-·· __ • •• 1/. :-- :.;
filtlHP_6U Utility lfne and Trench Waterline
- -- -- - - - - -
IR
. .
• • • ''
• •.,p O • • llY , (&- • • ":.,• --;::- ... ' > • • • • T • •-• • •• .' .-.·.: ... F-·- ·,>· .-·:-. _____ .--_. _ ._ . · ... --· --- . _...,.._·:·-,.'.·: . ·:-. -- -_-
fileUSP_611 Utility Line and Trench Waterline
IR
Southwest
Vertical GPR slices from merged 300/800 MHz data
processed in Radan by GSSI, Inc.
Appendix IV: GPR Profiles Section 4
(A.ST G÷H(N TOWNSHIP
East Boot Road/Greenhill Road
S3-0460
CIUSTUICOUNTY, PA TTvw1•" RE D .. lLf ;S;A
llrtlt'#fitldSc-f'i1<tIIK. lOJO Co!.imbb Avtnu,, UIKU!tl, PA 11601 Ptiontjl17}3'-l•llll tul7ll}»M06l
SURVEY DAT£: 09/25/2019
RETTEW No.: 096303003
REVIEWED BY: __ _:F.:_:K::_B ___ _
DRAWN BY: --C::,H_:;R
'""'--:---- DATE: ____ l :::2:c/=.27:.cf.:;20 :..:1:.:9 __ _
SCALE: _____ !.!NA c,_ ___ _
APPENDIX N 4 Of 5
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
RETTEW. I ... L7Ro c H
ATTACHMENT 1 June 2019 S3-0460 Boot Road GPR Survey at Wilson Drive Report
RVTTEW , ..MIi j • lil:;OICAH
RETTEW
···:: •... . . - ···--- ENVI ROS CAN 3020 Columbia Avenue, Lancaster, PA 17603 • Phone: {800) 738-8395 E-mail: rettew@rettew.com • Website: rettew.com
July 29, 2019
Mr. Larry J. Gremminger Sunoco Pipeline, LP 535 Fritztown Road Sinking Spring, PA 19608
RE: Geophysical Survey Sunoco Pipeline, LP Pipeline Project
Engineers
Environmental
Consultants
Surveyors
Landscape
Architects
Safety Consultants
Geophysicists
250-Foot Section of Boot Road Centered on 460 HDD Saw-cut Location East Goshen Township, Chester County, PA RETTEW Project No. 096303003
Dear Mr. Gremminger:
RETTEW Field Services, Inc. completed a multi-technique geophysical survey along a 250-foot section of the S3-0460, Greenhill Road horizontal directional drill (HDD) site. The purpose of the survey was to detect and delineate subsurface voids or low-density zones adjacent to an HDD path where a recent inadvertent return (IR) occurred through a saw-cut in the asphalt. The following report, figures, and attachments describe the methods and results of the investigation.
EXECUTIVE SUMMARY
The multi-technique geophysical survey was completed on June 22, 2019. Three different geophysical techniques were utilized to detect and delineate subsurface voids or low-density zones beneath the roadway. The survey identified features characteristic of low-density soils and possible bedrock fractures which are described below:
• Microgravity delineated subsurface low-density zones in several areas. These zones could represent air-, water-, or mud-filled voids, or locally deeper rock/thicker soils. • Seismic Refraction and Multi-spectral Analysis of Surface Waves (MASW) techniques confirmed the presence of bedrock low-velocity zones that are characteristic of fracture zones. • Ground Penetrating Radar (GPR) scanning detected several underground utilities (previously marked by others on the surface) as well as an anomalous area of high-amplitude GPR reflectors characteristic of disturbed soils between two water lines, and another adjacent to the water line in the saw-cut area.
Results from the survey techniques are consistent with each other, suggesting that the local bedrock may be fractured. In addition, there is evidence of movement of material in the shallow utility trenches.
SITE DESCRIPTION
The S3-0460, Greenhill Road HDD is located at the intersection of East Boot Road and Carriage Drive in Chester County, Pennsylvania (see Figure 1). A geophysical survey was conducted within the 250-foot accessible portions of the east- and west-bound lanes of Boot Road, which parallels the HDD alignment (see Figure 2). The west-bound lane portion of the geophysical survey could not be centered on the
0
Page 2 of 5 Sunoco Logistics, L. P. July 29, 2019
RETTEW Project No. 096303003
saw-cut location due to its proximity to the Carriage Drive intersection, which could not be shut down for the geophysical survey. Portions of each lane of Boot Road were closed for approximately four hours.
The site bedrock geology consists of the Glenarm Wissahickon Formation, with the contact between ultramafic rocks (serpentinite) a few hundred yards to the southeast (see Figure 2, inset). This unit, formerly mapped as part of the Wissahickon Formation, is a metamorphic mica-schist that is probably lower Paleozoic in age (Berg, T. M., Edmunds, W. E., Geyer, A. R., and others, compilers, 1980).
MICROGRAVITY SURVEY
Microgravity meters are capable of detecting and measuring very small local variations in gravity. Several factors can locally affect the force of gravity. One factor is the local density or mass distribution of the bedrock or soils beneath the meter. Gravity highs (mass excesses) commonly represent locally shallow bedrock pinnacles or float blocks in the soil profile or zones of particularly massive bedrock. Gravity lows
(mass deficiencies) may represent locally deep bedrock cutters or clay seams where soil displaces bedrock; air-, water- or mud-filled voids within bedrock; stoping voids in the soil above bedrock; or zones where soils have been made less dense by removal of fines. Specific microgravity survey parameters are listed in Appendix A.
The resulting residual microgravity data are shown on Figure 3. The values depict the general plan-view shallow mass distribution beneath the survey area. Lower values (red) represent local mass deficiencies (air- or clay-filled voids or deeper soils), and higher values (blue) represent local mass excesses (bedrock highs or float blocks).
SEISMIC MASW AND REFRACTION SURVEY
Seismic MASW and refraction methods utilize the speed of seismic waves through various geologic layers and features to characterize subsurface conditions. The methods enable determination of the approximate depth to bedrock or rock profile, and variations in soils and rock stiffness. MASW can detect low velocities below the top of rock that might be associated with fracture zones. The principles of seismic refraction are summarized in Appendix B.
The seismic survey consisted of two profiles along the microgravity profiles (see blue triangles representing each geophone, Figure 2). Color-contour velocity models of the seismic velocity for refraction and MASW are presented on Figure 4; refraction on the upper profiles and MASW on the lower profiles. On each, the vertical scale represents relative elevation in feet, and the horizontal axis represents an along-profile distance in feet. The color contours represent variations for compressional or primary (P) wave velocities for refraction, and shear or secondary (S) wave velocities for MASW. Increasing velocities grade from blue to yellow to orange to brown (refraction), and purple to grey to tan to brown (MASW). Please note that high- and low-velocity data along the first and last fifteen feet of any profile have higher uncertainty. Specific seismic refraction and MASW survey parameters are listed in Appendix A.
GPR SURVEY
A GPR survey was completed using a GSSI GPR digital controller and dual frequency 300/800 MegaHertz
(MHz) scanning antenna. GPR systems produce cross-sectional images of subsurface features and layers by continuously emitting pulses of radar-frequency energy from a scanning antenna as it is towed along a survey profile. The radar pulses are reflected by interfaces between materials with differing dielectric properties. The reflections return to the antenna are displayed on a video monitor as a continuous cross
RETTEW
Page 3 of 5 Sunoco Logistics, LP. July 29, 2019
RETTEW Project No. 096303003
section in real time. Since the electrical properties of air and clay mud are distinctly different from undisturbed soils, such features produce characteristic reflections. In particular, air and mud typically produce very high-amplitude, characteristically reverberating reflections.
GPR scanning was performed along the microgravity/seismic survey profiles, as well as several additional parallel transects (see Figure 2, red lines). The long parallel profiles were recorded for post-processing and are presented on Figure 5. The vertical scale represents approximate depth in feet below grade while the horizontal scale is along-profile distance in feet as measured by a high-precision (sub-millimeter) survey wheel that also triggered the GPR pulses. The colors represent relative amplitude of the GPR signal. Shades of white indicate the highest amplitude. During set-up and calibration, and following scanning of the profiles in Figures 5 and 6, additional variously-oriented radar profiles were examined in real time (but not recorded) to identify and delineate high-amplitude reverberating anomalies of the type commonly associated with suspected air- or mud-filled voids. Specific GPR survey parameters are listed in Appendix A.
RESULTS
The microgravity data are depicted on Figure 3 as colored dots representing the relative density of the subsurface, with blue for high-density, green for "site normal," and red for locally low-density areas. The microgravity results delineated several low-density areas beneath the survey grid. Low density (red) represents low-density soils or possible "missing" rock and soils, while blue represents intact bedrock or float material, or compacted soils. A minor low-density reading was detected around the location of the
IR; however, it is very laterally restricted, indicating that it is not extensive.
The seismic refraction data are presented as cross-sectional profiles on Figure 4 and indicate a general two-layer stratigraphy consisting of residual soil mantle over bedrock. The uppermost layer has average P-wave velocities generally less than 5,000 feet per second (fps) with a thickness of approximately 25-35 feet. This is consistent with the residual clay soil mantle or deeply weathered bedrock (shaded blue to yellow). The deepest layers have velocities over 10,000 fps (shaded orange to brown) consistent with competent crystalline bedrock (Carmichael, R. S., 1989). The area between roughly the 5,000 and
10,000 fps contours represents a suspected weathered bedrock zone or saprolite transitioning from soil to bedrock.
The seismic refraction results show several locations where the competent bedrock surface is depressed, possibly indicative of deeper weathering along fractures. The suspected fracture zones are highlighted in
magenta on the seismic profiles.
The MASW seismic cross sections are presented on Figure 4, lower profiles. The MASW velocity models show velocity changes within the bedrock layer across the profiles that are relatively consistent with the seismic refraction. Velocity lows below the bedrock surface could indicate fractures; these zones are highlighted on the cross sections.
The GPR results show multiple high-amplitude reflectors across the survey area. Most of the reflections are associated with the numerous underground utility lines beneath the survey area. An area beneath the west-bound lane, between two suspected water lines, shows high-amplitude reflectors, including downward-dipping reflectors. This reflection pattern (circled on Profiles 7, 8 and 9, in Figure 5) is characteristic of settlement or subsidence. These anomalies are between two water lines. A smaller area of high-amplitude reflectors observed in the eastbound lane along Profile 12 is also adjacent to a water
Page 4 of 5 Sunoco Logistics, L.P. July 29, 2019
RETTEW Project No. 096303003
line in the saw-cut area (Figure 5). These results suggest that there has been some settlement of the water line trench materials, and possibly infiltration of the trench materials by outside material; i.e. water from precipitation or the lines themselves, or possibly drilling fluids.
CONCLUSIONS
The geophysical techniques display anomalies indicative of potential fracture zones within the underlying bedrock. Figure 7 summarizes the geophysical survey results in plan view. The GPR survey indicated two significant anomalous zones, both above seismic anomalous zones and underground utilities, that may be associated with saturated soils (possibly from the nearby utilities). These two areas do not show significant microgravity lows, and neither the microgravity nor GPR data show open voids along the asphalt cut.
Although RETTEW sees no evidence the IR caused any subsurface impacts or subsidence, there are identified anomalies beneath the roadway which may be related to leaks in existing water lines. For safety considerations these anomalies warrant further investigation. RETTEW recommends Sunoco investigate the two GPR anomalous areas identified on Figures 5, 6, and 7 by drilling or test pitting to further characterize these anomalous conditions to ensure the anomalies are not resulting from drilling activities.
LIMITATIONS
The survey described above was completed using standard and/or routinely accepted practices of the geophysical industry, and the equipment employed represents, in RETTEW's professional opinion, the best available technology. RETTEW does not accept responsibility for survey limitations due to inherent technological limitations or unforeseen site-specific conditions. We will notify you of such limitations or conditions, when they are identifiable.
Please also note that the survey is based on observation of current subsurface conditions. Therefore, while the results of this survey can be used to guide further investigations, RETTEW cannot make any warranties concerning future subsidence occurrence - particularly under the influence of altered surface and subsurface drainage patterns due to grading and construction activities.
We have enjoyed and appreciated the opportunity to have worked with you. If you have any questions, please do not hesitate to contact the undersigned.
{; ,;;;·tj2;· Charles H. Rhine, MSc, PG Senior Project Manager
cyt43u 1W51
---
Timothy D. Bechtel, PhD, PG Senior Project Manager 7.LJ;;- Felicia Kegel Bechtel, MSc, PG Director of Geophysics
RETTEW.
Page 5 of 5 Sunoco Logistics, L.P. July 29, 2019
RETTEW Project No. 096303003
Enclosures Figure 1: Topographic Basemap Figure 2: Data Coverage Map and Geologic Setting Figure 3: Residual Microgravity Results Figure 4: Seismic Survey Results Figure 5: GPR Profiles Figure 6: GPR Profiles with Anomalies Figure 7: Geophysical Survey Summary Appendix A: Geophysical Survey Parameters Appendix B: Introduction to Seismic Refraction
References
Berg, T.M., Edmunds, W.E., Geyer, A.R., and others, 1980, Geologic Map of Pennsylvania, PA Geological Survey, 4th series.
Carmichael, R. S. (1989), Physical Properties of Rocks and Minerals, CRC Press.
Wood, C. R. (1980). Groundwater resources of the Gettysburg and Hammer Creek formations, southeastern Pennsylvania: Pennsylvania Geological Survey, 4th ser. Water Resource Report, 49, 87.
Z\Shared\Projects\09630\096303003 - SL - Greenhill Road Geophysics\GP\Greenhill Report Pieces\S3-0460 Greenhill Rd
HDD_Boot Rd Geophysics Survey_7-29-19.docx
RETTEW
RETTEWI .. w l ;;O CAN
ENCLOSURES
RVTTVW I '''Alli
D • lt:;OSCAN
L JO t 'ON lHn!:11:1 ------,,o"o"'o•i-==-.. ·1---- :n<.>s ----6::l:::O::;Z/-;;8:;l-,/ L;;O:----- :uva ------;; ij;;H:;:) ___ :A9 NMVSO
g)I :Ae O:IM311\3ll
EOOEOE960 :'ON M3illS ----6""t"o"'Z7:JZ,.,Z7-/9oio1-:uva """"'
Y''
i6tl·lfl-(10t·11UO.U (09H y4'<1\ln .. f1•'"'1 .. MVr?(liun;O)0t0f
.,._,.Ul',A/)$Pl9tli\lUU
'J ..: !1 ..
V<ll'.WIOO)l!JU)H)
' ' '
\ ',
,. ,,'
091'0·£S peolJ m4uaa19/peoll 1009 1se3
r; .. ... . I
-0
C ., .. _,
> ., ::, "' ] - .s::.
Q. 0 ., t!I
I '
41HSPIMOJ.HIHS09JM
0 0 0
0 8"' g 0 ., 0 0 7i N .x
8
0
C ., .. .!!!' <( <( 1: 0 > ·a ., 0
0.. :r i
V> °G 'C - ..c C. C. 0 £ ii: 0 "' :r •
:ti 0 s 0 'C ., t; .,
., V> V> :;; :s:
u :g_
to 0 C. 0 I- VO :::, V> ii: :::,
E ,g 'O
C. 1l., 0 XI z "'
' •
.....
Geologic Setting
Notes:
Basemap from Nearmap on June 9, 2019.
Survey profiles/stations from DGPS survey by RITTEW.
Geologic information from DCNR WMS Server, extracted 11/2018, and Wood (1980).
Data Coverage Map
GPR Profile Line • Microgravity Survey Station • Seismic Geophone location
Proposed 16" Alignment
Proposed 20" Alignment
Gas Lines (marked by others)
&x:x:j Excavation Pits (Metal Covers}
• Water Valves 1:.2 Saw•cutArea
Water Lines
0
Scale (ft)
20 40 60 80
8 "'I"' NO "' "' a-, 0
8101.,_
0::::: N o:t _ :Ca>° 11 0 U ..-t = N
ci ;.: z w .. :s :s L," 6 :c il CC a: 0 0 Ill
1{{i :::::: ...... !
" # $ $ n·•-::::, =
tl0 C .:;
% Ill
t ' cu > 0 u
l'O ... l'O 0
N
cu :, tl0 u:::
iJ
0 c,::
:E <= l::o ( "' )g "C ' "'"' 0 V) 0 0 a, *
Notes;
0.1
a E
-0.1
0 20
Basemap from Nearmap on June 9, 2019.
40 60 80 100 120 140 160
Alon_!•Profile Distance (ft)
Classed Post-Microgravity
Q
-0.12 mgals to -0.04 mgals -0.04 mgals to -0.02 mgals -0.02 mgals to 0.02 mgals 0.02 mgals to 0.04 mgals 0.04 mgals to 0.12 mgals
Microgravity data from Scintrex CG-5 gravimeter, with Bouguer correction.
Residual Gravity Results
Microgravity West-Bound Profile , t , I ': : ·: ' - ---: -ic? Q
-O.lt1--t -j --1--t -j--t -! --1--t j
0 20 40 60 80 100 120 140 160 180 200
Geophysical Survey Legend
0 Microgravity Survey Station (color-coded)
Proposed 16" Alignment
Proposed 20" Alignment
Gas Lines (marked by others)
0
Scale _(ft)
20 40 60 80
"' ... I
a::,... o ;'\! ....
> ! i--w :s ..., a::: a:: C C v. ,i • • • • • • ::> :::::: ---
r.......-:::, =
"' .... :i "' cu a:: > ... ·s
tllJ 0 ... u io
:::J "'C 'iii cu a::
('t'l
cu :::J tllJ
"O "'
0 "'
:i::
C: " g g "O ' "'"' O Vl "' 'a
0 co t;;
Seismic Refraction West-Bound Profile
460
440 ..,,- ·- --- ---- ------- ---
420
J a
-
- : - • ',, b 400-tr tl - ',, - ---⇒ ,,, - ·
0 20 40 60 80 100 120 140 160 180 200
Seismic MASW West-Bound Profile
460
]
440 ,
Water Line Crossing ,o,
[ J
360-j
340 I I 0 20
Notes:
' - -
I I I I 40 60 80 100
Weighted Average Velocity
(Trg)
':_1 '.'._1,c9 _:P:..,
v, = 9,429 fps
-
I I 120 140
Seismic data from Geometrics 24•channel Geode with 4.0 Hz geophones.
Relative seismic velocity models from Seislmager (by Oya Corporation) tomographic and ReMi inversions.
1 f
I
-;. I I I =
160 180 200
460
440
420
400 0 20 40
460
440
420
400
380
360
340 0 20 40
Seismic Refraction East-Bound Profile
60 80 100 120 140 160 180 200
Seismic MASW East-Bound Profile
60 80 100 120 140 160 180 200
Geophysical Survey Legend
,,' Possible Fracture Zone ,,'
Proposed 16" HOD
s:, {:.,P Station Number -,,<o .,,
220
Relative P-Wave Velocity (fps)
Open Field Ripping (09}
0
Rippable
Marginally
Rippable
Non-Rippable 15000
Unconsolidated
Sediments or
Residuum
Transition Zone
Competent
Bedrock
Relative S-Wave Velocity (fps)
Iii - "' lo
O O ,-. a::"' 0 - al :I
::; ...
6 ► " "' iz i!; .. .; Ed :l ! ii cc cc 0 C v, J{i
::::::
F ........ 7 " " F-.-:::, ==
"' "' a:
Qj C: ::I Ill
u ·e ·a; Ill '¢
Qj ::I
;;l 0 a: :c
C
., 0 # "' <.!) "' '-o -0 ' "'"' 0 <I)
0 a,
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Westbound lane- Profile 7
Westbound lane- Profile 8
Westbound Lane - Profile9
Eastbound Lane- Profile 12
North
East Profile Distance (ft)
Figure 6: GPR Profiles with Anomalies
EAST GOSU(N TOWllSfn,
East Boot Road/Greenhill Road
S3-0460
CHISTU;(OOIITY,,A
1'ffiEWfi11dSrM<rs,ln(. lO?OColumHA,-Inur,UnOllrr,,A 11J1 Pt>oneHOO·?l-Hl9K
Relallve GPR Signal Amplitude
f ? j 1
-LO r +LO } ,-,.
SURVEY DATE, 06/22/20 19
RmEW No., 096303003
REVIEWED BY: ___ F_KB ____ _
DRAWN BY: --=7.C
,::H
:;:
R=-;;---- DATE, -----'0-'7 /
'-'1'-B+/2-;:
0;- 1_9 __ _
SCALE: ---t• u•
'-:pvr
-;- o
:::- fllw ex s ---
FIGURE NO, 6 of 7
Notes:
•
A
A
-:-:3
Ill F'0
GPR Anomaly Area
(Unknown Source)
Microgravity Low
Seismic MASW Feature
seismic Refraction Feature
Proposed 16" Alignment
Proposed 20" Alignment
Gas Lines (marked by others)
Excavation Pits (Metal Covers)
Water Valves
Saw-cut Area
- Waterlines
Basemap from Nearmap on June 9, 2019.
Anomalous features based on geophysical survey; see RITTEW report for details.
' '· •
0 10 20
1!1 ······> ······= ..........
----- !j i::::::.,____. =t• c::::---' l ., r------i i • ::is .... Hi
>... 111 E E ::I <II >
... ::I <II iii u - .s::.
Q. 0 CII C, r:.
::I tlO u:
"O :c
C g 9 ., m 0 V) a:
0 0 a,
.;;
0
i 5 § 3
APPENDIX A Geophysical Survey Parameters
RETTEWI .. l . IE:;OSCAN
Spacing1 Shot lnterval2
(feet) (feet)
Seismic Refraction I
5/10 I
20/40 I Seismic MASW 5/10 5
GPR I continuous -
MicroGravity I 5 I
1 geophone, electrode, or station
Offset3
(feet)
20 20
3
Geophysical Survey Parameters -- Greenhill Road
Spread Length4 Array Type Effective Depth5
(feet) (feet)
200 40 200 60
300/800 depends on soil
Lateral Resolution5
(feet)
5{10 5{10
depends on depth
,□ __ size-depth trade-off depends on depth
2 Seis {lNb slidehammer source) 3 distance between parallel profiles
Vertical Resolutions
(percent)
15 25
5
depends on depth
4Seis
5 rule-of-thumb only (most depend on site-specific soil properties, sampling interval, depth, and target dimensions)
System
Geometrics Geode Geometrics Geode
GSSI SIR-4000
Scintrex CG-5
RETTEW I '"All w ;0 (
APPENDIX B Introduction to Seismic Refraction
RETTEWI .. • it:IOICIH
RETTEW
3020 Columbia Avenue, Lancaster, PA 17603 • Phone: (800) 738-8395 E-mail: rettew@rettew.com • Website: rettew.com
ENERGY
INTRODUCTION TO SEISMIC REFRACTION
BY TIMOTHY D. BECHTEL, PHO, PG
Mechanical elastic (seismic) waves generated by a hammer blow, weight drop, or explosion.
SENSITIVITY
Sensitive to elastic properties or moduli - generally strongly correlated with density.
BASIC EQUIPMENT
Recording Seismograph (generally 24 or more channels); Geophones (one for each channel); Geophone cable; Hammer or weight plus strike plate or explosives; Trigger switch.
COMMON APPLICATIONS
Determination of the depth and dip of soil horizons and bedrock surfaces. Recent processing advances allow some detection and delineation of discrete targets.
PRINCIPLES
In a uniform isotropic earth, the shock wave from a blow or explosion at the surface travels outward and downward in a hemispherical wave front like a three-dimensional ripple from a pebble in a still pond. At any point on the wave front, a straight line from the shock source to the wave front depicts the path of the seismic wave and is called a ray path (see Figure SR-1). In reality, there are several independent shock waves; the fast-moving primary, compressional or P wave front; the slower moving secondary, shear or S wave (both of which form hemispherical wavefronts); and several disk-like wave fronts that travel only along the surface of the earth (called surface waves or ground roll). For the purposes of most seismic refraction surveys, only the fastest moving wave front - the P wave - is considered. S-wave refraction is used in selected circumstances where complete determination of elastic moduli is desired - particularly when it may be desirable to eliminate the effects of water saturation.
In a layered earth, the hemispherical P shock wave defined by the radially distributed P ray paths are deflected according to the laws of optics (Snell's Law) at interfaces between materials with differing seismic velocities (i.e. densities or elastic properties). Figure SR-2 depicts the deflection of ray paths due to an increase in P velocity at a bedding plane. The type of deflection that a ray path will undergo is dependent upon the angle at which it strikes the interface, and falls into one of four categories:
Some direct rays (green in Figures SR-2 and SR-3) travel parallel to the ground surface at the seismic velocity of the upper layer, do not strike the underlying interface, and consequently are not deflected.
Reflected rays (purple in Figures SR-2 and SR-3) arise where direct rays strike the interface, and a portion of the energy is reflected symmetrically back towards the surface.
0
Page 2 of 3 Introduction to Seismic Refraction
The portion of the energy of the incident direct wave that is not reflected upward is refracted or bent as it crosses the interface - making refracted waves in the lower layer (red in Figures SR-2 and SR-3).
At a precise angle called the critical angle, the incident ray is refracted directly along the interface, and travels at the higher seismic velocity of the lower layer (see Critically Refracted Wave in Figure SR-3). As this critically refracted or head wave races along beneath the interface, it generates a secondary elastic disturbance that travels back to the surface along ray paths that define a wave front analogous to the bow wake of a ship. These returning rays again travel at the slower velocity of the upper layer.
To perform a refraction survey, a linear array of ground motion sensors or geophones is spaced out from the seismic source or shot point, forming a geophone spread. Each geophone is connected to a separate channel in a seismograph which records a wiggle trace representing the ground motion resulting from the passage of the various seismic rays.
As depicted in the time-distance (T-X) curve in Figure SR-4, the layered earth structure can be determined by analyzing the seismographic wiggle traces. At distances close to the seismic source, the first wiggle or ground motion (the first arrival after the shot) is due to passage of the direct wave travelling at the velocity of the upper layer. Reflected waves arrive later since they have by definition traveled a greater distance at the same velocity (additional later wiggles are caused by passage of the more slowly travelling S and surface waves). Beyond a distance dictated by the critical angle, the first arrival of seismic energy represents the head wave of the critically refracted ray. These refracted rays also by definition travel a greater distance than the direct wave. However, along part of their path, they have traveled at the higher velocity of the underlying more consolidated layer. At greater distances from the shot point, where the path length in the higher velocity layer becomes significant, the head wave arrivals actually race past the direct wave and become the first arrival (see labeled crossover in Figure SR-4). By extension, it can be shown that if a third layer with even greater velocity lies at greater depth, the head wave from this layer will become the first arrival at a sufficient distance from the shot point.
In conventional seismic refraction, only the first P wave arrivals can be reliably selected on a wiggle trace record. The later reflected P wave arrivals are generally obscured by the slower-travelling Sand surface waves, and the very slow air blast or sound wave from the shot. To interpret a seismic refraction record, the first arrival travel times are measured for each wiggle trace and plotted at the appropriate point on a time-distance (T-X) curve (see Figure SR-4). In a plane-layered earth, these first arrivals define a series of line segments, each representing a discrete layer. The seismic velocity of each layer is simply the reciprocal of the slope of the associated line segment. The thickness of each layer can be calculated from the distances where the line segments intersect. The mathematics for these calculations are easily derived, and can be found in any introductory geophysics text.
True geologic strata are rarely perfectly horizontal. The effect of a dipping interface on a travel time curve cannot be recognized using a single shot point. Calculations based on a T-X curve from a single shot point should always be considered as producing apparent depths to interfaces and apparent seismic velocities for all but the uppermost layer. To determine the true depths and dips of interfaces and the true seismic velocities, it is necessary to reverse the seismic line; that is, move the shot point to a location at or beyond the farthest geophone in the spread, and repeat the shot. The calculation of true depths, dips and velocities from reversed seismic lines is also readily performed.
RETTEW
Page 3 of 3 Introduction to Seismic Refraction
CAPABILITIES
Conventional seismic refraction can yield accurate measurements of depths and attitudes of soil horizons, groundwater tables, and other relatively distinct and planar strata. Modern computer analysis of multi fold seismic refraction data (i.e. with many and overlapping shot points) can provide delineation of undulating or even irregular (as opposed to simply planar) interfaces. The latest generation of computer processing techniques require very high-fold data, but in favorable conditions, are capable of resolving even discrete targets such as foundation elements, tunnels or cavities, and can resolve gradational boundaries as well as distinct interfaces. The seismic P-wave velocities of materials are generally an indication of relative density or compaction. S-wave refraction data (collected using specialized geophones, shock sources and field procedures) can provide S-wave velocities that bear a well constrained empirical relationship to standard penetration test (SPT) N values and therefore bearing capacity. For surveys where matching P- and S-wave velocities are determined, the dynamic elastic moduli of subsurface materials can be calculated (including Poisson's Ration, Young's or Bulk Modulus, and Shear Modulus or Rigidity).
LIMITATIONS
Seismic data is collected at spaced geophones, and therefore does not provide continuous profile data. If geophones are spaced too widely, thin layers can be missed entirely.
Conventional refraction interpretations are only accurate where the velocity of strata increase with depth. Velocity inversions not only alter the data, but are particularly insidious since the presence of a low velocity zone at depth is not apparent in first arrival data. The latest generation of computer processing techniques do allow detection and delineation of laterally restricted low velocity zones (e.g. tunnels, cavities, gravel lenses, etc.).
Sharp or dramatic interface relief such as limestone pinnacles cannot always be resolved even with very tight geophone spacing. Therefore, refraction profiles of expectedly irregular interfaces should be assumed to represent somewhat smoothed versions of actual relief (see e.g. Figure SR-5).
Seismic records can contain noise due to heavy machinery vibrations, vehicular traffic, and sometimes even wind or distant earthquakes. Care must be taken to identify potential sources of seismic noise prior to beginning a survey.
The effective survey depth is limited to approximately 1/5 of the greatest shotpoint to geophone distance. Therefore, very deep surveys may require impractically long lines (requiring consideration of other geophysical techniques such as seismic reflection).
RETTEW.
Figure SR-1
Figure SR-3
S • Wave Raypath P -Wave Raypath
Seismic Wave Types
Body Waves consist of P and S waves. Surface Waves consist of Rayleigh and Love waves.
Rev. 04/2018 RETIEW
i. • • • • • • • • • • • • .. • • .. • r. • • • • • • .. • • • • • • qire: :171 Ol'ft
•.. •· • • • • •. • .. ., • • • ll. •· • • • • a-.. P. • • . • • • I • ,, a 0 • - • 0 • g.. • 0 t · lO!• it a "O a••#$ .. • ;s:,.O • • '$:--,£ • • .tf • • • -(/, ((,'t • (j>o • ((, -&o'\ ((,o • • <P • "Yo .. _., . . - ·- . ., . .. .. .. .. . . . ..
.. . 4 . . . . • •c • •• ·"E ... . :::, . • .0 . .__ . .. II, • Q) • •L· • •• CJ.• • • . .
Seismic Ray Path Geometry Rev. 04/2018 UE'rf E\f.
Direct Wave Wavefront Direct Wave Raypath >
Reflected Wave Wavefront
Reflected Wave Raypath
Refracted wave wavefront
Refracted Wave Raypath
Layer 2, V2(>V1)
----------------------
Figure SR-2
'· "",. I
:8:c...,,""
"",. a ""'"""'·'----;,
/ ,,
Figure SR-4
Effect of Layering on Body Wave Raypath
Rev. 04/2018 RfflEW
Refracted Wave Arrivals OirectWaveArrivals Reflected Wave Arrivals
/
/
Time (T)----;7
Idealized Seismic Record and T- X Graph
/
/ /
/
Surface Wave
Arrivals !
g
E ,; l1 '6 .,. -;;g .... ·E·5 " C
ui .2 i !i
Rev. 04/2018 Rln'fE\[
E
::I ·s 'iii Ill
Cl) g .:.
Ill Ill .e-
0 0 ..... <D u, 0) ..... II II c>a ..... N <'od > > 0
a <'a <='o
-'a <'od % od o
q,
)Q cod 0
"a COd %0.1 o
q,
cl> i: C: o ·- 0 0 .c ;.(Q a. a. 0 0 co _,::, cl> "0 (/) (.!) *I> g> -.I * I>
*I> -'o <'a <='o
#
0 0 $
Ill .... 0 00 M <D
II
(") > //1/7, ;:;1/,/1/ ,Ú Û '»',7,½',?!'/ ;fdf$19f ///,0 // / 1/, / ///, / /, //;,::_, /1/,/ / //
'////·'/,. // ·''///, /:-;////. /{;·/.• / / // 1,;/,;//a// / // /. ,z, //// 1/,/ /
• ✓
////,, • ✓-(;-!:!'.//'// %1/,2%'' ,,,//,>-✓ ,1/,>/:, ;/,//:1/,1/,1/0·-> · ,/. / ///1 /✓;:, ' / 0:1 /;i1i91i}f% U/1/.' . 0."%. 1/, / ,;: ✓;✓1/, 1/_/.,/ 'j'/ ;,,F/ ✓ ,// , ., 1' ✓0////."/ ,• //, /, _ ... 1/,'///// ;;.;(/0: // '@' // / , / '//. / 1/, , '/. ,, "/,
// // ,;: ✓/ /// 1/, /,;;(/ :✓ // 0'/.,1/,Ü/ -1///Ý 1/ 0/ - ,:1/ /// .Z.,/ / "// 1/ //, ½
%/1/,/' //0;'/ / i@ / <>&:
1/
✓2. , 1/.;--;;1, // /, j,1//>-✓ /
@w/ «(✓-Þ ß-à
/;; ; %*;:✓:Ji?/ / / / / .:,:?'// /./ , /, '1/,'/u-/.
-:, '//.' / / /, /// /':✓1/, // 0//. //¾ /2/ /%1/ ,0-
/%½ , 0.-✓ /,1/,, 1/,/ // / /;;;::-1
/ /á:✓, ½ -:$,/,1;; ,,.ffi):> ::8 // ✓,:1//;/0· 0¾ ,, . 1/,/// 1/, . / / -â✓ // ã / /, 1// /.' /// /////_,/,.,., ,· / . //, / 1/,.r:,;/äå // <J/,;:/,: ///1/ '0_//// -,,, 1//, _, / /, // ///, 1// /, /// '//4< 0/.%,,✓;0(;,1/i&./?,:/1//,½ æç 1/ //,0, , // / / / /. -✓;,;:/ ✓½'J' %$"-, /0:/l ✓'2 //,è//é0 / /. , // // ,/;,; '% /, ½ .iP<✓:✓
:34 %:1{ %0,, /'0 /// /////1/' , ;,,;=:: //,'/ / /,/,/,-///// / ,,// -'/,//.' ., ·Q)/_,,.. . / ,,*/-, //,'. / // ///.<J:;;,;.// / I '/ ///// , //,;;;,,:.,-i '/_//'/2- W(/,;,:(/ '/// ///"-/ 0 /// /. '// h)/:W w,10@
/,/ ✓j//,13 -✓:(/,1/: :z::J,.✓
:,5 / /,'/. / / / ê1/, , /,%/ / / ,// /, ,-/,: ,, /, / . ///////1/ ✓'ii ,i}; /, ///_ //////,;,: ,' , /j1/. //,
-
fl, 1 1 I 1 1 1 1 I', 1 1 I' t 1 1 11 1 1 1 [ '1 1 1 I' t 1 1 11 1 1 1 I' 1 1 1 11 rrr
0 0 0 0 0 0 0 0 0 0 0 C') N ..... 0 CJ) CX) I'-- co l!) '<I" C') ..... ..... ..... .....
(lSV\1\:7' iaa1) UO!Je/\a13
- %
0 co C')
0 0 '<I" N C')
0 "C 0 Ql N "' C') ·s: & 0 0 C')
0 CX) N
0 co N
0 QJ '<I" ' N
I., 0 0. N N,,__ - Q) E g N ......... - Q) QJ 0 () V') co C ..... Jg QJ Cl) C oi5 C'O
Q)
I., ...
t;:::: QJ oO '<I" ,_ .... ..... a.. Ill I., 0 C'O N ( .....
QJ 0 C. 0 E .....
C'O )( 0 CX) w
0 co
0 '<I"
0 Ln N I a::
0 V) cu "- :::J b.0 ·- u..
Memo
Date:
To: From: Re:
February 6, 2020 Board of Supervisors Rick Smith, Township Manager Boot Road Geophysical Survey
The Board agreed to send a Right to Know Request to PennDOT for the additional information regarding the Boot Road Geophysical Survey and once it is received to have Pennoni review all
of the information.
The attached Right to Know Request was sent to PennDOT on February 6th•
F:\Data\Shared Data\Admin Dept\Sunoco\Penn DOT\Boot Road Study\Memo to PTF 022620.doc
OS-100 (11-18)
pennsylvania OEPARTMENTOF TRANSPORTATION
www.penndot.gov
REQUESTOR INFORMATION
FIRST NAME Louis
MAILING ADDRESS 1580 Paoli Pike
CITY
West Chester
COMPANY (Optional)
East Goshen Township
E-MAIL f ptional)
rsmith eastgoshen.org
RECORDS REQUESTED
RIGHT-TO-KNOW REQUEST
I
LAST NAME Smith
I
STATE PA (Pennsylvania) I ZIP CODE
19380
I TELEPHONE (Optional)
610-692-7171
Please provide as much specific detail as possible so we can identify the information. If the records you request are location-specific, please also provide the county.
Please see the attached Dated February 6, 2020
The records requested relate to the Sunoco Pipeline Project in East Goshen Township, Chester County.
Electronic copies (PDFs) are preferred.
I recognize that I will be charged for copies of redaction is required.
Thanks
Iii Request continued on attached page/file.
Please choose ONE method below to access or receive the record(s) you requested: Iii I would like copies. (If the records are available on the Internet, you will be directed to their online location.) □I would like certified copies. □I would like to inspect the records. (You will be provided a Penn DOT contact with whom to schedule an appointment.)
Requests received by the PennDOT Open Records Officer after 4:30 p.m., or received on a weekend, on a Commonwealth holiday, or during any closure of Commonwealth Offices, will be dated the following business day. See page two for instructions on submitting a request and PennDOT's Fee Schedule.
East Goshen Township, Chester County Right to Know Request Dated February 6, 2020
The Sunoco Mariner Pipeline Project runs thru the middle of East Goshen Township, Chester
County. It generally follows Boot Road (SR 2020) and North Chester Road (SR 0352). Sunoco is installing the new pipelines in East Goshen under both Boot Road and North Chester Road, pursuant to an HOP issued by the Department. Sunoco is utilizing the horizontal directional drilling (HDD) to install the pipelines. During the pipeline installation on Boot Road Sunoco experienced several inadvertent returns of drilling fluid in the spring of 2019.
As a result in the late spring/early summer of 2019 the Department required Sunoco to have their engineer prepare and submit a Geophysical Survey for the section of Boot Road (SR 2020) near the intersection of Wilson Drive (T552) in East Goshen Township. Sunoco refers to this section of the project as HDD 460.
Sunoco submitted a Geophysical Survey prepared by Rettew dated July 29, 2019 for a section of Boot Road (SR 2020) in East Goshen Township. The Department reviewed this survey and requested that Sunoco have Rettew provide the Department with additional information.
Sunoco subsequently submitted a second Geophysical Survey prepared by Rettew dated October 22, 2019.
The Department engaged Schnabel to review the Survey's prepared by Rettew, who then issued a memorandum dated November 20, 2019 that summarized their findings. Their memorandum notes that Schnabel would like to see "additional example profile slices from anomalies throughout the area survey and, in particular, in the area where inadvertent returns of the drilling fluid had been previously noted and where the pipelines cross the roadway."
It is our understanding that Rettew submitted this additional information to the Department on January 3, 2020.
Accordingly, East Goshen Township is requesting the following.
• A copy of the additional information that has been submitted by Rettew to the Department.
• A copy of Schnabel's review of the additional information submitted by Rettew
• A copy of any reviews conducted by the Department's Geotechnical Unit on the July 29, 2019 Survey, the October 22, 2019 Survey, and the additional information that has been submitted by Rettew.
F:\Data\Shared Data\Admin Dept\Sunoco\Penn DOT\Boot Road Study\RTK 020620.docx
Rick Smith
From: Sent: To: Cc: Subject:
Bill
Rick Smith Tuesday, February 18, 2020 4:17 PM 'Bill Wegemann'; David Shuey; Mike Lynch - BOS -- East Goshen Twp Caroline Hughes
RE: Expert advice of geological survey
The August 10, 2017 Stipulated Order required Sunoco to submit re-evaluation reports to the Appellants (Clean Air Council, Delaware River Keepers and Mountain Watershed Association) and to landowners with private wells within 450 feet of the HOD . Since there is no centralized list of private wells, I suspect that Sunoco sent the list to everyone with 450 feet, which is why your neighbors (who are on public water) would have received them. Sunoco has had to submit several re-evaluation reports. I believe that one referred to in the September 20, letter was the report for HOD 500 (New
Kent to Bow Tree).
This issue was discussed at the October 24th meeting in conjunction with the Boot Road geophysical survey, and Jon Altshul was asked to see if Pennoni had a geologist (they do). I would add that the public comment period for this report closed on October 4th. PA DEP approved the re-evaluation report on January 23rd•
That being said the on February 4th the Board did authorized me to submit a righto know request to Penn DOT for the Boot Road info (sent 2/6/20), and once I receive the info have Pennoni's geologist review it.
Rick Smith East Goshen Township Manager 610-692-7171
From: Bill Wegemann <wrwjmd@gmail.com> Sent: Friday, February 14, 2020 8:08 AM To: Rick Smith <rsmith@eastgoshen.org>; David Shuey <dshuey@eastgoshen.org>; Mike Lynch - BOS -- East Goshen Twp <m lynch@eastgoshen.org> Cc: Caroline Hughes <carolinechughes2@gmail.com> Subject: Expert advice of geological survey
Rick, David, and Mike, I wanted to circle back on an item we reviewed at two Task Force meetings last year. A packet from Energy Transfer dated September 20, 2019 was sent to East Goshen residents whose homes are located within 450 of an HDD site. This HDD Reevaluation Repo1t was required to be performed by SPLP as te1ms of a Stipulated Order entered by the Pennsylvania Environmental Hearing Board. As per discussions at our Task Force Meetings, it was determined that the information was too technical for the average citizen to understand, and the Task Force recommended that the township hire an expert geologist (or firm) to review the findings of this report. As part of this discussion, I did contact Paul Rubin, an independent Geologic & Hydrologic Consultant, who was willing to review the report and make recommendations to the township. His fee for these services was quoted at $2,000.
After discussions among the Task Force Members and advisers, it was determined that the township would seek advice from their current consultant, Pennoni. As I do not have any further notes concerning this subject, I would like to get an update to determine if the township did present this analysis to Pennoni, and if so, what were the findings.
1
Thank you for your assistance and we can discuss this further at the next Task Force Meeting. - Bill Wegemann
2
,--pennsylvania ----- - - - -. ------. ---- ------------- 1. ◄ DEPARTMENT OF ENVIRONMENTAL · PROTECTION
Janumy 23, 2020
Mr. Matthew Gordon Sunoco Pipeline, L.P. 535 Fritzto_wn Road Sinking Spring, PA 19608
Re: Hydrogeological HDD Reevaluation Report
Village Square Ddve Crossing Horizontal Directipnal Drill (S3-0471) PerrnitNo. E15-862 East Goshen Township Chester County
Dear Mr. Gordon:
The Department of Environmental Protection (DEP) has reviewed the supplemental Horizontal Directional Drill (HDD) analysis that Sunoco Pipeline, L.P. (SPLP), submitted for the Village Square Drive Crossing, 20-inch HDD Location (S3-0471) and permitted under
Permit El5-8"62. The SPLP HDD reevaluation was posted on DEP's Pipeline Portal on September 26, 2019. The information is adequate Džth the undetstanding that you will be proceeding as set forth in your reevaluation.
DEP'.s review of the geologic aspects of this HDD reevaluation were completed by a Licensed Professional Geologist.
. . You may proceed with the permitted HDD activity in the manner proposed in your reevaluation:and in accordance with all applicable·pennit terms and conditions, including the HDD IR and Water Supply PPC Plans.
Southeast Regional Office 2 East Main Street I Norristown, PA 19401-4915 I 484,250.5160 I Fax484.250,5971 I www.dep.pa.gov
},i[r. Matthew Gordon - 2 -
. - . . . _, . .
January 23, 2020
If you have addition'al qiiestiÌns, please contact me at the telephone number located in the first page footer.
Sincerely, ,;-/ C7
John Hohenstein, P.E. Environmental Program Manager Waterways and Wetlands
cc: Mr. Gremminger - Energy Transfer Partners Ms. Styles - Energy Transfer Partners Mr. Stmcik- TetraTech Mr. Prosceno - TetraTech Mr. Staron, P.G. - DEP Mr. Sofranko - CCCD East Goshen Township Re 30 (GJS20WAW)23-3
l!!-pennsylvani a--
t'..af
DEPARTMENT OF ENVIRONMENTAL PROTECTION
January 23, 2020
Mr. Matthew Gordon·
Sunoco Pipeline, L.P. 535 FritztownRoad Sinking Spring, PA 19608
------------.-----/------------------------------- . ... .
Re: Hydrogeological HDD Reevaluation Report Eldriqge Drive / Nt>rth Chester Road Crossing Horizontal
Dir:ectional Drilų (S3-0500) PennitNo. El5-8q2 East Goshen Township · Chester County
Dear Mr. Gordon:
The Department of Environmental Protection (DEP) has reviewed the supplemental Horizontal Directional Drill (HDD) analysis that Sunoco Pipeline, L.P. (SPLP), submitted for the Eldridge Drive /North Chester Road Crossing, 20-inch HDD Location (S3-0500) and pennitted under Pennit El5-862. The SPLP HDD reevaluation was posted on DEP' s Pipeline Portal on September 19, 2019. The information is adequate with the understanding that you will be proceediog as set forth in your reevaluation.
DEP' s review of the geologic aspects of this HDD reevaluation were completed by a Licensed
Professional Geologist.
You may proceed with the permitted HDD activity in the manner proposed in your reevaluation and in accordance with all applicable permit terms and conditions, including the HDD IR and Water Supply PPC Plans. -
Southeast Regional Office 2 East Main Street I Norristown, PA 19401-4915 I 484.250.5160 [ Fax 484.250.5971 I www.dep.pa.gov
Mr. Matthew Gordon - 2 - January 23, 2020
If you have additional questions, please contact me at the telephone number located in the first page footer.
Sincerely, \ (_
.)' ,;,
John Hohenstein, P.E. Environmental Program Manager Waterways and Wetlands
cc: Mr. Gremminger _ Energy Transfer Partners Ms. Styles - Energy Transfer Partners Mr. Simcilc - TetraTech Mr. Prosceno -TefraTech Mr. Staron, P.G. - DEP Mr. Sofranko - CCCD East Goshen Township Re 30 (GJS20WA W)23-4
COMMONWEALTH OF PENNSYLVANIA BEFORE THE ENVIRONMENTAL HEARING BOARD
CLEAN AIR COUNCIL; THE DELA WARE RIVERKEEPER NETWORK; and MOUNTAIN WATERSHED ASSOCIATION, INC.,
Appellants, EHB DOCK.ET NO. 2017-009-L
v.
COMMONWEALTH OF PENNSYLVANIA, DEPARTMENT OF ENVIRONMENTAL PROTECTION,
Appellee,
and
SUNOCO PIPELINE L.P.,
Pennittee.
CORRECTED §TIPULATED ORDER
AND NOW this 10th day of August, 2017, the Clean Air Council, the Delaware
Riverkeeper Network, the Mountain Watershed Association, Inc. (collectively "Appellants"),
Sunoco Pipeline L.P. ("Sunoco"), and the Commonwealth of Pennsylvania, Department of
Environmental Protection ("Department''), by and through their respective counsel, hereby agree
to resolve the Appellants' Application for Temporary Partial Supersedeas and Petition for Partial
Supersedeas, both of which were filed on July 19, 2017, through a negotiated agreement with
regard to the following terms and conditions, which shall be entered by the Environmental
Heariog Board ("Board") as a Stipulated Order, and which supersedes and replaces the
Stipulated Order approved by the Board on August 9, 2017, as follows:
1754957_1.docx
l. Appellants' Petition for Temporary Partial Supersedeas and Petition for Partial
Supersedeas are hereby withdrawn without prejudice. The Board's Orders dated July 25, 2017,
July 28, 2017, August 1, 2017, August 3, 2017, and August 4, 2017 (attached as Exhibit "1 ") are
hereby vacated. Appellants reserve the right to seek a temporary or permanent supersedeas for
conduct after the Board's entry of this Stipulated Order, including any activities related to
horizontal directional drilling ("HDD").
2. Sunoco will perform a re-evaluation of the 41 HDDs listed on Exhibit "2"
attached hereto. Exhibit "2" provides the rationale for selecting these HDDs for re-evaluation as
well as the nature of the re-evaluation.
3. Sunoco will also perform a re-evaluation of the HDDs listed on Exhibit "3."
These HDDs constitute drills for which an inadvertent return ("IR") occurred during the
installation of one pipe (20" or 16" diameter) and where a second pipe will hereafter be installed
in the same right-of-way ("ROW"). In addition, Sunoco will perform a re-evaluation ofHDDs
for which an IR occurs in the future during the installation of one pipe where a second pipe will
thereafter be installed in the same ROW.
4. In re-evaluating the design of the HOD techniques for the sites referenced in
Paragraphs 2 and 3 herein, Sunoco shall:
i. Re-examine the geology at each site using information and data gathered
during HDD operations at that and other sites during construction of the
pipelines subject to the permits in the above-captioned Appeal;
ii. Consider data that is specific to the needs of each HDD heing reevaluated,
including at a specific HDD: geologic strength at profile depth, overburden
strength, HOD depth, entry nngle, pipe stress radius, open cut alternatives, a
l 754957 _J.docx
re-route analysis for all HDDs (including those on Exhibit "2") and analysis of
well production zones;
iii. Conduct, as appropriate, additional geotechnical evaluation at each sit.e using
techniques generally recognized within the scientific community which may
include:
• Additional field drilling and sampling;
• Seismic surveys;
• Ground penetrating radar; and
• Electromagnetic surveys/electrical resistivity tomography.
iv. In karst areas, Sunoco shall consider the use of seismic surveys and
electromagnetic surveys/electrical resistivity tomography for the re-evaluation
undertaken pursuant to this Order, and if it does not use these evaluation
methodologies, it will provide the Department with an explanation for why
they were not used at that site.
5. Upon completion of Sunoco's re-evaluation of each HOD site referenced in
Paragraphs 2 and 3 herein, Sunoco shall provide for each such site a report signed and sealed by
a Professional Geologist, describing and presenting the results of its study for that location
("Report"). The Professional Geologist shall be a person trained and experienced in geotechnical
and hydro geologic investigation. The Report shall specify all actions to be taken by Sunoco to
eliminate, reduce, or control the release or JR ofHDD drilling fluids to the surface of the ground
or impact to water supplies at that location during HOD operations.
i. The Report shall document in detail the infonnation considered for the re
evaluation of the design of the HOD at that site.
1754957_1.doc:x.
:,, 08/10/2017
@ J. IOHl
ii. The Report shall contain an evaluation of the feasibility of constructing the
proposed HDD crossing at that location and, as appropriate, propose
modification of the design cifthe HDD or relocation of the pipeline based
upon the results of its study for that location.
6. Sunoco will submit the Reports to the Department for review and approval.
1. For any recommendation that requires a major permit modification, the
Department's procedures for major permit modifications shall apply.
ii. For all recommendations for which a minor permit modification is required,
including, but not limited to, certain changes from HDD to an open cut or
certain changes to the Limit of Disturbance (''LOD"), the Department will
have 21 days to review the submission and render a determination with
respect to such minor permit modification, unless Sunoco agrees to extend
the 21-day time period. Appellants end private water supply landowners,
who have received notice pursuant to Paragraph 7 below, shall submit
comments, if any, within 14 days of the Department's posting ofSunoco's
Reports on the Department's Pennsylvania Pipeline Portal website.
Comments on the Reports shall be submitted to the Department at: Karyn
Yordy, Executive Assistant, Office of Programs, Department of
Environmental Protection, Rachel Carson State Office Building, 400 Market
Street, Harrisburg, PA 17101; Email-kyordy@pa.gov; Phone-(717) 772-
5906; Fax -(717) 705-4980. Appellants will provide copies of their
comments by email to Sunoco to the email address provided to Appellants'
1754957_1.docx
counsel. The Department shall consider comments received and document
such consideration.
iii. For all other recommendations, including, but not limited to,
recommendations of no change or of changes that do not require a minor
permit modification, the Department will have 21 days to review the
submission and render a determination with respect thereto, unless Sunoco
agrees to extend the 21-day time period. Appellants and private water
supply landowners who have received notice pursuant to Paragraph 7 below,
shall submit comments, if any, within 14 days oftheDepartment'sposting
of Sunoco' s Reports on the Department's Pennsylvania Pipeline Portal
website. Comments on the Reports shall be submitted to the Department at:
Karyn Yordy, Executive Assistant, Office of Programs, Department of
Environmental Protection, Rachel Carson State Office Building, 400 Market
Street, Harrisburg, PA 17101; Email -kyordy@pa.gov; Phone - (717) 772-
5906; Fax- (717) 705-4980. Appellants will provide copies of their
comments by email to Sunoco to the email address provided to Appellants'
counsel. The Department shall consider comments received and document
such consideration.
7. At the same time that Sunoco provides the Report to the Department, Sonoco will
also provide a copy of the Report to Appellants by email to the address provided to Sunoco's
counsel. The Department shall post Snnoco's Report to the Pennsylvania Pipeline Portal website
within on.e business day of receipt. Sunoco shall send a copy of the Report (by U.S. Postal
1754957 _1.docx
Service Certified Mail and First Class Mail) to all landowners who have a private water supply
that is located within 450 feet of the HOD addressed by the Report.
8. Ten days before HOD operations start at an HOD location, or re-start at an HDD
location at which there was an IR (as listed on Exhibit "4"), Swioco will identify all landowners
within 450 feet ofHDD alignments, and notify all such landowners (by U.S. Postal Service
Certified Mail and First Class Mail) and offer such landowners the opportunity to have their
water supplies within 450 feet of the HOD alignment sampled befure, during, and after start or
re-start of such HDD in accordance with the parameters in the water supply testing plan
(Appendix B of the Water Supply Assessment, Preparedness, Prevention and Contingency Plan).
For any such water supplies, the drill path will be compared to the well depth and geology of the
area. Those water supplies in geologies with potentially signifiqant interconnected secondary
porosity (solution openings and structural features) will be considered for monitoring during
HOD mstalls depending on speGific individual water supplier requirements.
9. At the 22 HDDs identified on Exhibit "5," water supplies within 150 feet shall
re<1eive 72 hours' notice (by U.S. Postal Service Certified Mail and First Class Mail) in advance
of restarting these HDDs, and Sunoco will provide notice to landowners (by U.S. Postal Service
Certified Mail and First Class Mail) between 150 feet and 450 feet of the HDD within 30 days of
the HOD restarting. Such notice shall offer the landowner with the opportunity to have a water
supply located within 450 feet of the HOD alignment sampled in accordance with the parameters
in the water supply testing plan (Appendix B of the Water Supply Assessment, Preparedness,
Prevention and Contingency Plan) within 10 days of the landowner's request.
10. Sunoco shall provide copies of the Certified Mail receipts and landowner
responses to the Department, and copies of the Certified Mail receipts to Appellants.
1754957_1.docx
\\l
08/10/2017
\.%, ... ,,,.
,,
11. Sunoco wlll immediately notify a landowner with a water supply within 450 feet
of an HDD when Sunoco or the Department has determined that there is a substantial possibility
that the operation of the HDD will impact his or her water supply.
12. Within 14 days of the Board's entry of this Stipulated Order, Sunoco will provide
the Department with a complete list of drilling instructions and specifications provided to all
drillers performing HDD operations associated with the permits that are subject to the above
captioned Appeal, which provide the general operational parameters and best management
practices to be utilized by the drillers during the performance ofHDD operations under said
permits.
13. The Department may review the drilling instructions and specifications, and
suggest modifications to be incorporated into the instructions and specifications. If appropriate,
the Department and Sunoco will discuss the fea.qibility of incorporating the Department's
suggested modifications into the drilling instructions and specifications.
14. Within 14 days of the Board's entry of this Stipulated Order, Sunoco will provide
the Department with as-builts for six HDDs that have been completed and at which an IR
occurred to assure that the HDDs are being built in accordance with approved plans. To the
extent possible, the as-bµilts shall represent the work of at least three different drilling
contractors for HDD wol"k performed in at least three different spreads of the pipelines subject to
the permits in the above-captioned Appeal.
15. The parties have agreed to revisions to: the HDD Inadvertent Return Assessment,
Preparedness, Prevention and Contingency Plan; the Water Supply Assessment, Preparedness,
Prevention and Contingency Plan; and, the Void Mitigation Plan for Karst Terrain and
1754957 _I.doc,
Underground Mining (collectively, the "Plans"), as revised, such revisions dated August 8, 2017.
Sunoco agrees to abide by these Plans, as revised.
16. Sunoco shall inform, as appropriate, its officers, agents, employees, and
contractors of the August 8, 2017 revisions to the Plans and ensure that the Plans as revised are
present onsite during drilling operations and are made available to the Department.
SUNOCO PIPELINE L.P.:
Isl Robert D. Fox
Robert D. Fox, Esq.
CLEAN AIR COUNCIL:
Isl Joseph 0. Minott Joseph 0. Minott, Esquire
MOUNTAIN WATERSHED ASSOCIATION:
Isl Melissa Marshall Melissa Marshall, Esquire
DATED: August 10, 2017
THE COMMONWEALTH OF PENNSYLVANIA, DEPARTMENT OF ENVIRONMENTAL PROTECTION:
Isl Nels J. Taber Nels J, Taber, Esq., Regional Counsel
DELAWARE RIVERKEEPER NETWORK:
Isl Aaron J. Stemplewicz Aaron J, Stemplewicz, Esquire
sl Maya K. van Rossum Maya K. van Rossum
APPROVED AND SO ORDERED
ENVIRONMENTAL HEARING BOARD
sl Bernard A. Labuskes, Jr. BERNARD A. LABUSKES, JR. Judge
1754957 _l.doox
Pipeline Task Force 2019 Accomplishments & 2020 Objectives
2019 Accomplishments
1. Established routine operation of task force. Elected Chairperson and Vice Chairperson. Held 13 meetings in 2019. Issued agendas and meetings.
2. Reviewed and provided comments on relevant pipeline legislation.
3. Provided recommendations to BOS on environmental assessment for Adelphia Gateway Project. BOS subsequently filed comments to FERG.
4. Provided detailed comments for ANPRO on safety regulations regarding hazardous liquids public utility standards (Docket No. L-2019-3010267). BOS included these comments in their letter to PUC.
5. Provided detailed comments on several HOD Re-Evaluation Reports to PADEP.
6. Investigated UV resistance of pipeline coating systems.
7. Provided a representative to the Chester County Environment Alliance.
8. Connected with Planning Commission to incorporate pipeline safety into future planning projects.
9. Recommended that East Goshen Township request a cease and desist order for Bow Tree/ Strasburg HOD site based on Notice of Violation issued for noncompliance.
Page 1 of 2 EGT PL TF 2019 Accomplishments 2020 Objectives v2.docx
Pipeline Task Force 2019 Accomplishments & 2020 Objectives
2020 Objectives
Note: Many of these objectives are ongoJng or continuation of efforts already under way.
1. Review and assess regulatory and technical aspects of pipeline infrastructure projects. Provide comments to BOS on relevant pipeline legislation (state and federal) and regulatory documentation (PUC, FERG, PHMSA, DEP).
2. Advise BOS regarding pipeline incidents such as inadvertent returns during drilling, sinkhole formations, ground water issues, noise ordinance violations, spills, leaks, and any other environmental violations.
3. Secure services of a licensed professional geologist for consultation on relevant documentation, legislation, and issues.
4. Address questions and concerns from residents regarding pipeline activities.
5. Provide input to BOS on communications (i.e. Newsletters, Constant Contact Notifications) to residents regarding pipeline issues and activities.
6. Continue investigation of Boot Road Geophysical Survey Reports.
7. Provide recommendations to BOS and Planning Commission regarding pipeline setbacks and consultation zones for zoning ordinances.
8. Fill vacancy on task force. Currently there are only six members. Full staff is seven members.
9. Meet with state representatives, state senators, and county commissioners on pipeline issues.
10. Provide input to Chester County Pipeline Safety Advisory Board. Contribute to development of an emergency response plan.
11. Continue investigation of air quality monitoring and leak detection systems for areas surrounding pipelines.
12. Continue investigation of dust monitoring and dust control measures at pipeline construction areas.
13. Interact with the Sustainability Advisory Committee.
Page 2 of 2 EGT PL TF 2019 Accomplishments 2020 Objectives v2.docx
7162 Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 192 and 195
[Docket No. PHMSA-2013-0255]
RIN 2137-AF06
Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards
AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of proposed rulemaking.
SUMMARY: PHMSA is proposing to revise the Pipeline Safety Regulations applicable to newly constructed and entirely replaced onshore natural gas
transmission and hazardous liquid pipelines to mitigate ruptures. Additionally, PHMSA is revising the regulations regarding ruptnre detection to shorten pipeline segment isolation times. These proposals address congressional mandates, incorporate recommendations from the National Transportation Safety Board, and are
necessary to reduce the consequences of large-volume, uncontrolled releases of natural gas and hazardous liquid pipeline ruptures.
DATES: Persons interested in submitting written comments on this NPRM must do so by April 6, 2020.
ADDRESSES: You may submit comments identified by the docket number PHMSA-2013-0255 by any of tbe following methods:
Comments should reference Docket No. PHMSA-2013-0255 and may be submitted in the following ways:
• Federal eRulemaking Portal: http:// www.regulations.gov, This site allows the public to enter comments on any Federal Register notice issued by any agency. Follow tbe online instructions for submitting comments.
• Fax: 1-202-493-2251. • Mail: U.S. DOT Docket Operations Facility (M-30), West Building, 1200 New Jersey Avenue SE, Washington, DC 20590. • Hand Delive1y: DOT Docket Operations Facility, West Building, Room W12-140, 1200 New Jersey
Avenue SE, Washington, DC 20590 between 9:00 a,m, and 5:00 p.m., Monday through Friday, except Federal holidays,
Instructions: Identify the docket number, PHMSA-2 013-0255, at the beginning of your comments. If yon mail your comments, submit two copies. To confirm receipt of your comments,
include a self-addressed, stamped postcard.
Note: All comments are posted electronically in their original form, without changes or edits, including any personal information.
Privacy Act Statement
In accordance with 5 U.S.C. 553(c), DOT solicits comments from the public to better inform its rulemaking process, DOT posts these comments, without edit, including any personal information the commenter provides, to
www.regulations.gov, as described in the system of records notice (DOT/ ALL- 14 FDMS), which can bo reviewed at www.dot.gov/privacy.
Confidential Business Information
Confidential Business Information (CBI) is commercial or financial information that is both customarily and actually treated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure, If your comments responsive to this notice contain commercial or financial information that is customarily treated ns private, that you actually treat as private, and that is relevant or responsive to this notice, it is important that you clearly designate the submitted comments as CBI. Pursuant to 49 CFR
190.343, you may ask PHMSA to give confidential treatment to information you give to the agency by taking the following steps: (1) Mark each page of the original document submission containing CBI as "Confidential"; (2) send PHMSA, along with the original document, a second copy of the original document with tbe CBI deleted; and (3) explain why the information yon are submitting is CBI. Unless you are notified otherwise, PHMSA will treat such marked submissions as confidential under the Freedom of Information Act, and they will not be placed in the public docket of this notice. Submissions containing CBI should be sent to Robert Jagger at U.S. DOT, PHMSA, PHP-30, 1200 New Jersey Avenue SE, PHP-30, Washington, DC 20590-0001. Any commentary PHMSA receives that is not specifically design_ated as CBI will be placed in the public docket for this matter.
FOR FURTHER INFORMATION CONTACT: Technical questions: Steve Nauney, Project Manager, by telephone at 713- 272-2855. General information: Robert Jagger, Senior Transportation Specialist, by telephone at 202-366-4361.
SUPPLEMENTARY INFORMATION: L Executive Summary
A. Purpose of Regulatory Action B. Summary of the Major Provisions of the
Regulatory Action C. Costs and Benefits
II. Background
A. General Authority B. Major Pipeline Accidents C, National Transportation Safety Board
Recommendations D. Advance Notices of Proposed
Rulemaking (ANPRM) E. Pipeline Safety, Regulatory Certainty,
and Job Creation Act of 2011 and Related Studies i. Section 4-Automatic and Remote-
Controlled Shut-Off Valves a. GAO Report GA0-13-168 b. ORNL Report ORNL/TM-2012/411 ii. Section 8-Leak Detection F. PHMSA 2012 R&D Forum, "Leak
Detection and Mitigation" III. Proposed Rupture Detection and
Mitigation Actions and Analysis of ANPRM Comments A. Definition of Rupture B. Accident Response and Mitigation
Measures i. Installing Remote Control Valves (RCVs)
and Automatic Shutoff Valves (ASVs) ii. Standai·ds for Rupture Identification and
Response Times iii. Using RCVs and ASVs in All Cases C, Drills to Validate Valve Closure
Capability D. Maximum Valve Spacing Distance
i. Gas Transmission Pipelines ii. Valve Spacing in Response to Class
Location Changes iii. Hazardous Liquid Pipelines E. Protection of High Consequence Arnas
(HCAs) i. Gas Transmission Pipelines ii. Hazardous Liquid Pipelines F, Failure Investigations IV. Section-byӊSection Analysis of Changes to
49 CFR Part 192 for Gas Transmission Pipelines V. Section-by-Section Analysis of Changes to
49 CFR Part 195 for Hazardous Liquid Pipelines VI, Regulatory Analyses and Notices
I. Executive Summary
A. Purpose of the Regulatory Action
PHMSA seeks notice and comment on proposed revisions to the Pipeline Safety Regulations for both gas transmission and hazardous liquid pipelines, PHMSA is prnposing regulations to meet a congressional mandate calling for the installation of remote-control valves (RCV), automatic shntoff valves (ASV), or eqnivalent technology, on all newly constructed and fully replaced gas transmission and hazardous liquid lines, However, consistent with the mandate, PHMSA recognizes that there may be locatious
where it is not economically, technically, or operationally feasible to install RCVs, ASVs, or equivalent technology, Therefore, PHMSA is proposing to allow operators to install manual valves at these locations,
provided operators have a snfficient justification for using a manual valve instead of an RCV, an ASV, or
Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7163
equivalent technology, and provided that operators appropriately station personnel to ensure that 11 manual valve can be closed within the same 40- minute timeframe PJ-IM:SA is proposing in this rnlemaking for RCVs, ASVs, and equivalent technology. This will help to ensure that a consistent level of safety is provided whether operators use manual valves, RCVs, ASVs, or equivalent technology.
This rulemaking (NPRM) is proposing to apply this installation requirement to those newly constructed or fully replaced pipelines that are greater-than or-equal-to 6 inches in nominal diameter. PHMSA is also proposing regulations to improve pipeline
operators' responses to large-volume, uncontrolled release events that may occur dnring the operation of certain onshore gas transmission, hazardous liquid, and carbon dioxide pipelines of particular diameters and in specific
locations, 1 This NPRM would define a "rupture" event through certain metrics or observations, reqnire operators of applicable lines to meet new regulatory standards to identify ruptures more quickly, respond to them more effectively, and mitigate their impacts, PHMSA's existing regulations require that operators take several steps to reduce the risk of potential leaks and failures, including testing and assessments, continuous monitoring of operations, and physical surveys and patrols of their pipelines' right-of-ways. Based on congressional direction, National Transportation Safety Board (NTSB) safety recommendations from accident investigations, recommendations from the Government Accountability Office (GAO), and PHMSA's analysis of incidents and
evolving technology, this rule proposes to define large-volume, uncontrolled releases of both natural gas and hazardous liquids as pipeline "ruptures>/ and proposes standards to mitigate those ruptures.
One snch rupture occurred on July 25, 2010, in Marshall, Michigan, resulting in the spill of approximately 800,000 gallons of crude oil into tho Kalamazoo River and approximately $1 billion in damages. The operator took 18 hours to confirm the pipeline rupture, Following confirmation of the rupture, the failed segment of the pipeline was immediately isolated using remote controlled valves,
Another incident occurred on September 9, 2010, in San Bruno,
1 For brevity, reference to "hazardous liquid pipelines" through the remainder of this NPMf will include carbon dioxide pipslinss as wsll, unless otherwiso stipulated,
California, when a gas pipeline ruptured, causing a fire. This incideut involved the uncontrolled release of natural gas for 95 miuutes, severely hampering firefighting efforts, before the operator closed the mainline valves. The incident resulted in 8 deaths, 51 injuries requiring hospitalization, the destruction of 38 homes, damage to 70 other homes, and the evacuation of approximately 300 houses,
These two incidents are examples of release events where consequeuces can be significantly aggravated by some combination of missed opportunities by operators, including: (1) Identifying that a rupture has occurred; (2) failing to
take appropriate and prompt action(s) once a rupture has been identified, including calling 911 following the rupture, activating emergency response protocols, and notifying first respouders and public officials; and (3) failing to promptly access and close available segment isolation valves that would be most beneficial for mitigating the impact of the rupture.
Following those incidents, Cougross issued the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 (2011 Pipeline Safety Act), which contained several mandates to improve pipeline safety. Section 4 of the 2011 Pipeline Safety Act requires PHMSA to issue regulations, if appropriate, requiring the use of automatic or remote-controlled shut-off valves, or equivalent technology, on newly constructed or replaced natural gas or hazardous liquid pipeline facilities.
PHMSA is proposing these regulations to improve operational practices related to rupture mitigation and to shorten rupture-segment isolation times by requiring operators of applicable lines to identify a rupture quickly, implement response procedures, and fully close pipeliue mainline valves to terminate the uncontrolled release of commodity as soon as practicable. PHMSA is also requiring operators to install automatic shutoff, rernote-coutrolled, or equivalent valves on newly constructed and entirely replaced pipelines to meet the section 4 mandate. PHMSA seeks comment from the public on these proposals.
Enbridge, the pipeline operator responsible for the incident near Marshall, MI, had remote-control
technology installed on the ruptured pipeline. However, a failure to identify the rupture within a short amount of time rendered the technology esseutially useless. Therefore, PHMSA believes a regulation requiring the installatiou of rupture-mitigating valves should be paired with a standard delineating when
an operator must identify a rupture aud actuate those valves. PHMSA also believes that this standard will be most cost-effective when applied to onshore hazardous liquid and natural gas transmission pipelines of certain diameters in high-consequence areas (HCA), areas that could affect HCAs (for hazardous liquid pipelines), and Class 3 aud 4 locations (for natural gas transmission pipelines),2 where a release could have the most significant adverse consequences on public safety or the environment.
In developing these proposed regulations, PHMSA considered other mandates in the 2011 Pipeline Safety Act, as well as NTSB safety recommendations that followed the San Bruno incident; 3 GAO recommendatious on the ability of operators to respond to commodity releases in HCAs; 4 technical reports commissioned hy PHMSA on valves and leak detection from Oak Ridge Natioual Laboratory (ORNL) and Kiefner and Associates, respectively; 5 6 comments received on related topics through advance notices of proposed rulemaking (ANPRM); and information gathered at public meetings and workshops.
PHMSA believes this approach, as detailed in this NPRM, will help reduce the consequences of ruptures through
2 A gas pipeline's class location broadly judicates the level of potential consequences for a pipeline relsass based upon population density along tho pipeline, Class locations ars determined as spocifisd at§ 192,S(a) by using a "sliding mile" that extends 220 yards on both sidss of the centerline of a pipeline, Ths number of buildings within this
sliding mils at any point during the mile's movement determines ths class location for ths entire mile ofpipelins contained within ths sliding mile, Class 1 locations contain 10 or fswer buildings intsndsd for human occupancy, Class 2 locations contain 11 to 45 buildings, Class 3 locations contain 46 or more buildings, and Class 4 locations have a prevalence of 4-or-mom-story buildings.
3 "Pacific Gas and Electl'ic Company; Natural Gas Transmission Pipeline Rupture and Firo; San Bruno, CA; September 9, 2010; NTSE Accident Report PAR-11/01; Adopted August 30, 2011. https:l/www.ntsb.gov/investigations/ AccidentRe parts/Re ports IP AR1101. pdf
4 "Pipelino Safety: Eettsr Data and Guidance Nsoded to hnprovs Pipeline Operator Incident Response," Government Accountability Office Report to Congressional Committsss, January 2013. https:l/www.gao.gov/assets/BB0/651408.pdf.
5 "Studies for ths Requirements of Automatic and Remotely Controlled Shutoff Valves and Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety;" Oak Ridge National Laboratory; ORNL/TM-2012/411; October 31, 2012. https:l/www.pbmsa.dat.gov/sites/ phmsa.dot.gov/filesldocs/technical-resourcesl pipeline/16701/finalvalvestudy.pdf.
6"Leak Detection Study-DTPH56-11-D- 000001;" Kiefner ond Associates, Inc.; Final Report No. 12-173; December 10, 2012. https:/1 www.phmsa.dot.gov/sites/phmsa.dot.gov/filcsl docs/teclrnical-resources/pipeline/166 91 /leak detec/fon-study. pdf
7164 Federal Register/Vol. 85, No. 25/Thursday, FebruaTy 6, 2020/Proposed Rules
improving both rupture identification and rupture mitigation, including more rapid and effective isolation of failed pipeline segments.
B. Summary of the Major Provisions of the Proposed Regulato1y Action
This NPRM will require the installation of automatic shntoffvalves, remote-control valves, or equivalent technology, on all newly constructed or entirely replaced natural gas transmission and hazardous liquid
pipelines that have nominal diameters of 6 inches or greater,7 For the pUip□ses of this NPRM, PHMSA considers pipelines to be "entirely replaced" when 2 or more contiguous miles are being replaced with new pipe. PHMSA requests comments on this definition of "entirely replaced" in the context of the Section 4 valve installation mandate and whether it is reasonable or should be modified in the future. Additionally, for gas transmission pipelines, when a pipeline's class location changes and results in pipe replacement to meet the maximum allowable operating pressure {MAOP) requirements of the new class location, an operator would be required to install or otherwise modify valves as necessary to comply with valve spacing
reqnirements and the proposed rupture identification and mitigation requirement<;.
The NPRM also would establish Federal minimnm standards for the
identification of ruptures and the initiation of pipeline shutdowns, segment isolation, and other mitigative actions, which are designed to reduce the volume of commodity released dne to a pipeline rupture and thereby minimize potential adverse safety and enviromnental consequences, This NPRM also would establish standards for improving the effectiveness of emergency response. Specifically, the proposed rupture identification and mitigation regulations include: (1) Defining the term "rupture" as an event that results in an uncontrolled release of a large volume of commodity that can be determined according to specific criteria or that has been observed and reported to the operator; (2) a requirement to establish procedures for responding to a rupture; (3) a requirement to declare a rupture as soon as practicable but no
longer than 10 minutes after iuitial notification or indication; (4) a requirement to immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call
7 "Nominal" pipe size is the standard sizu used to rofor to pipe in non-specific terms and identifies the approximate inner diameter of the pipe with a non-dimensional nnmber.
centers) for the jurisdiction in which the rupture is located; and (5) a reqnirement to respond to a rupture as soon as practicable by closing rupture mitigation valves, with complete valve shut-off and segment isolation within 40 minutes after rupturn identification.
The term "rupture-mitigation valve," as it pertains to this proposal, means the specific valve(s) that the operator would use to isolate a pipeline segment that experiences a rupture-the applicable "shut-off segment" as those are specified in this rulemaking. These valves can be any combination of automatic shutoff valves (ASVs), remote-control valves (RCVs), or equivalent technology. A "shut-off segment," for the purposes of this NPRM, is the segment of applicable pipe between the rupturn-mitigation valves closest to the upstream and downstream endpoints of a high-consequence area, a Class 3 location, or a Class 4 location so that the entirety of these areas is between rupture-mitigation valves, Multiple high-consequence areas, Class 3 locations, or Class 4 locations can be contained in a single shut-off segment, and all valves installed on a shut-off segment are rupture-mitigation valves. Additionally, operators would be required to perform post-accident reviews of any ruptures or other release events involving the closure of rupture mitigation valves to ensure these proposed performance objectives are met and to apply any lessons learned system-wide. The new rupture mitigation reqnirements in this NPRM wonld take effect 12 months after the final rule is published.
In this NPRM, PHMSA is only allowing operators to install or use manual valves if they can demonstrate to PHMSA that it would be economically, technically, or operationally infeasible to install or use an ASV, RCV, or equivalent technology. Examples of where an ASV, RCV, or equivalent techuology might be infeasible include locations that may have issues with communication signals, power sources, space for actuators, or physical security.
PHMSA is not proposing additional valve requirements for smaller diameter pipelines or leaks that don't meet the proposed definition of rupture in this rulemaking. PHMSA is also not requiring leak detection equipment on gas transmission and distribution pipelines as specifically recommended by NTSB Recommendation P-11-10. Pursuant to the findings in the Kiefner Leak Detection study that is referenced later in this rulemaking, it is typically more challenging to detect smaller leaks in an operationally, technically, and
economically feasible manner. However, this proposed rule, for both hazardous liquid and gas transmission pipelines, requires the installation of pressure monitoring equipment at all rupture mitigation valves on both the upstream
and downstream locations of the valve, which will help operators better detect ruptures and which can be used for leak detection.
PHMSA continues to address the effectiveness of leak detection systems for other non-rupture type leaks through its rulemaking on the safety of hazardous liquid pipelines; 0 research and development projects, including work on externol-based leak detection sensors and acoustic pipeline leak detection systems; 9 and engagement in new or updated standards being developed by standard developing organizations, including API recommended practices 1130 and 1175.10 The requirements in this NPRM of adding pressure detection and communication equipment at rupture mitigation valves are expected to drive fmther development and installation of leak detection technology and may help drive operators to make decisions to improve the capabilities of their leak detection systems to detect non-rupture type events.
C, Costs and Benefits
Consistent with Executive Order 12866, PHMSA has prepared an assessment of the benefits and costs of the NPRM, as well as reasonable alternatives. Per the Preliminary Regulatory Impact Analysis (PRIA), PHMSA estimates the annual costs of the rule to be approximately $3, 1 million, calculated using a 7 percent discount rate. The costs reflect the installation of valves on newly constructed and entirely replaced gas transmission and hazardous liquid pipelines, as well as incremental programmatic changes that operators will need to make to incorporate the proposed rupture detection and response procedures. PHMSA elected not to quantify the benefits of this rulemaking and instead discusses them qualitatively in the PRIA.
PHMSA is posting the PRIA for this proposed rule in the public docket. In the PRIA, costs are aggregated by compliance method to estimate total
8 https:llwww.regulotions.gov/docket?D=PHMSA- 2010-0229.
9 Details on all of PHMSA's leak detection research and development projects can be found at: l1ttps:l/primis.pl1msa.dot.gov/malrix/ PrjQumy.rdm?text1=leak&bin=Modern+Seorcli.
Jo Computational Pipeline Monitoring for Liquids and Pipeline Leak Detection Program Management, rospectively.
Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules 7165
costs, hy year, for the baseline and NPRM. The incremental effect of this rulemaking is estimated by taking the difference in total costs relative to the baseline. Costs are then aggregated across all years in the analysis period and annualized.
II. Backgrouud
A. General Authority
Congress has authorized Federal regulation of the transportation of gas and hazardous liquids by pipeline in the Pipeline Safety Laws (49 U.S.C. 60101 et seq,), a series of statutes that are administered by PHMSA. Congress established the current framework for regulating pipelines transporting gas in the Natnral Gas Pipeline Safety Act of 1968 (Pub. L. 90-481) and the safety of hazardous liquid pipelines in the Hazardous Liquid Pipeline Safety Act of 1979 (Pub. L. 96-129). These laws give PHMSA the authority and responsibility to develop, prescribe, and enforce minimum Federal safety standards for the transportation of gas and hazardous liquids by pipeline. PHMSA prescribes and enforces comprehensive minimum safety standards for the transportation of gas and hazardous liquids by pipeline in 49 Code of Federal Regulations (CFR) parts 190-199. Among those standards, PHMSA has codified safety standards for the design, construction, testing, operation, and maintenance of gas and hazardous liquid pipelines in 49 CFR part 192, Transportation of Natural and Other Gas by Pipeline, and 49 CFR part 195, Transportation ofHazardons Liquids by Pipeline.
Part 192 prescribes minimum safety requirements for the transportation of gas by pipeline, including ancillary facilities and within the limits of the outer continental shelf as defined in the Outer Continental Shelf Lands Act ( 43 U.S.C. 1331). Part 195 prescribes minimum safety requirements for pipeline facilities used in the transportation of hazardous liquids or carbon dioxide, including pipelines on the Outer Continental Shelf,
B. Major Pipeline Accidents
Although transmission pipelines are generally considered to be a very safe means of transporting natural gas and hazardous liquids,11 they can experience large-volume, uncontrolled releases that can have severe consequences. For exaIIlple, and
11 Energy products being shipped through the nation's 2,7 million miles of pipelines reach their destinations without incident 99.997 percent of the time. https:llwww.phmsa.dot.gov/sites/ plimsa. dot.gov/files/ docs/news/69671 I ao pl-api speech .pdf.
according to PHMSA hazardous liquid pipeline accident reports from 2006 to 2016, there were 91 reported incidents on pipelines within HCAs that would have been reported as "ruptures" per this proposed rulemaking and would have triggered this NPRM's rupture mitigation response provisions. Snch accidents can be aggravated by some combination of: Missed opportunities by the operator to identify that a rupture has occurred; failure of operating personnel to take appropriate action(s) once a rupture is identified; delays in
accessing and closing available segment isolation valves; and an inability to quickly close isolation valves that would have the most significant impact in mitigating the conseqnences of a rupture. Typically, these types of incidents (i.e., failure events that result in rapidly occurring, large-volume releases) have been the most serious in terms of monetary and environmental damages and safety consequences-the aforementioned 91 hazardous liquid "ruptures" resulted in $1.21 billion dollars in damage and 88,506 bbls spilled. Tbe Marshall, MI, and San Bruno, CA, accidents are examples of failure events that resulted in rapidly occurring, large-volume releases on high-pressure, large-diameter pipelines.
The intent of this NPRM is to improve operational practices that in turn will improve rupture mitigation and shorten rupture isolation times for certain onshore gas transmission and hazardous liqnid pipelines, "Rupture isolation time," as it is discussed in this NPRM, is the time it takes an operator to identify a rupture, implement response procedures, and fully close the appropriate mainline valves to terminate the uncontrolled flow of commodity from the ruptured pipeline segment.
In accident investigations, PHMSA and the NTSB have identified issues relating to the timeliness of rupture identification and the appropriateness
and timeliness of operators' responses to ruptures. Typically, no single aspect contributes to the deficiencies in ruptnre identification and response. Instead, there were multiple contributing factors associated with the technology, equipment, procedures, and human elements that resulted in inadequate rupture identification and response efforts. In some incidents, certain aspects of an operator's rupture identification or response efforts appeared adequate, but other issues, snch as delayed access to isolation valves, resulted in an inadequate response overall. For instance, in the incident near Marshall, MI, the pipeline operator had in place leak detection
systems (LDS) and supervisory control and data acquisition (SCADA) systems that notified the controller of a potential rupture within minutes of the actual event, but issues related to the operator's procednres, training, and personnel response resulted in an excessive amount oftime-18 hours before the operator confirmed the rnplure and initiated mitigative actions. In the incident in San Bruno, CA, the
operator effectively identified there was a leak through LDS or SCADA systems bnt took 95 minutes to isolate the gas pipeline ruptnre, which caused the fire to continue to burn unabated. The NTSB noted that the operator, Pacific Gas & Electric (PG&E), lacked a detailed and
comprehensive procedure for responding to large-scale emergencies such as a transmission pipeline break, and that the use of ASVs or RCVs would have reduced the amonnt of time taken to stop the flow of gas.
Prior to these incidents, the NTSB noted similar issues related to rupture response in its report on an incident occurring on March 23, 1994, in Edison Township, New Jersey.12 In the Edison incident, the operator took nearly 2½ hours to stop the flow of gas. The fire that followed the rupture desb·oyed 8 buildings, caused the evacuation of approximately 1,500 apartment residents, and caused more than $25
million worth of property damage. The director of the operator's Gas Conb·ol division stated in the NTSB accident report that the operator could typically notify employees to close valves within 5 to 10 minutes after identifying a rupture and that the time it took to close a valve depended on the employee's travel time to the valve site. In his experience, he found that employees conld usually aTrive at a valve site within 15 to 20 minutes, bnt in some instances it took more than 1 hour for employees to arrive at certain valves after being dispatched. In its accident report, the NTSB concluded that the lack of automatic- or remote-operated valves on the ruptured line prevented the company from promptly stopping the flow of gas to the failed pipeline segment, which exacerbated damage to nearby property. Snbseqnently, the NTSB recommended to PHMSA's predecessor, the Research and Special Programs Administration (RSPA), that it expedite establishing requirements for
installing automatic- or remote-operated mainline valves on high-pressure
12 National Transportnlion Safety Board Pipeline Accident Report; Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire; Edison, New Jersey; March 23, 1994, littps:/1
www.ntsb.gov/investigations/Accide11tReporls/ Reports/PAR9501.pdf.
7166 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules
pipelines in urban and environmentally sensitive areas to provide for rapid shutdown of failed pipeline systems (P- 95-1). As recognized by Congress and several other stakeholders, these high̵ consequence rupture events deserve special consideration and regulatory treatment. Accordingly, PHMSA is proposing a combination of standards that focus on achieving the congressional objective of more timely rupture detection and mitigation in important areas while also requiring a broader installation of rupture̶ mitigating valves on newly constructed and entirely replaced pipeline infrastructure.
C. National Transportation Safety Board Recommendations
On August 30, 2011, the NTSB issued its report on the gas transmission pipeline accident that occurred in San
Bruno, CA, on September 9, 2010.13 In its report, the NTSB issued safety recommendations P-11-8 through P-
11-20 to PHMSA; safety recommendations P-11-24 through P- 11-31 to PG&E, the operator of the failod line; and several recommendations to other entities, including the Governor of the State of California, the California Public Utilities
Commission (CPUC), the American Gas Association (AGA), and the Interstate Natural Gas Association of America (INGAA). NTSB safety recommendations P-11-9, P-11-10, and P-11-11 recommended that PHMSA require operators to immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call centers) in the communities and jurisdictions where a pipeline rupture is indicated; equip their SCADA systems with tools, including leak detection systems and appropriately spaced flow and pressure transmitters along covered transmission lines, to identify leaks (and ruptures); and require automatic shut-off valves (ASV) or remote-control valves (RCV) be installed in HCAs and Class 3 and 4 locations with the valves spaced considering risk analysis factors, respectively.14
PHMSA determined that, although the NTSB directed these recommendations to onshore gas transmission pipelines in response to a natural gas transmission accident, certain aspects of these recommendations are also applicable to
ts NTSBIPAR-11101, PB2011-916501, Pacific Gas and Electl'ic Company Natural Gas Tra11smissio11 Pipeline Ruptme and Fire,
14 NTSB Safety Recommendation addrossed to PHMSA; September 26, 2011; https:/lwww.ntsb.gov/ ,m fety I saf ety-recslrecletters/P-11-000-020. pdf.
hazardous liquid pipelines, particularly as they relate to ruptures.
D. Advance Notices of Proposed Rulemaking
PHMSA published two ANPRMs seeking comments regarding the revision of several topic areas in the Pipeline Safety Regulations that are applicable to the safety of hazardous liquid pipelines (Octoher 18, 2010; 75 FR 63774) and gas transmission pipelines (Augnst 25, 2011; 76 FR 53086}.15 This NPRM addresses issnes that were raised in the ANPRMs related to rupture detection and mitigation, including leak detection, valve spacing, valve installation, and method of valve actuation,
In response to the questions in the ANPRMs, a variety of parties representing interests from the natural gas and hazardons liquid industries, citizen gronps, regulators, and local governments, provided comments. PHMSA considered these comments as discussed in Section III of this NPRM. Separately, PHMSA is addressing several other topics considered in the hazardous liquid and gas transmission ANPRMs, specifically in NPRMs titled ''Safety of Hazardous Liquid Pipelines'' (October 13, 2015; 80 FR 61610) and "Safety of Gas Transmission and Gathering Pipelines" (April 8, 2016; 81 FR 20722).
E. Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 and Related Studies
Public Law 112-9, known as the "Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011" (2011 Pipeline Safety Act), was enacted on Jannary 3, 2012. Several of the 2011 Pipeline Safety Act's statutory requirements relate directly to the topics addressed in the ANPRMs, which have an impact on this proposed rulemaking. This NPRM is, in part, a response to the mandates of section 4 and section 8 of
the 2011 Pipeline Safety Act.
i. Section 4-Antomatic and Remote Controlled Shut-Off Valves
Section 4 of the 2011 Pipeline Safety Act directs the Secretary of Transportation (Secretary), if appropriate, to require by regulation the nse of ASVs or RCVs, or eqnivalent technology, where it is economically, technically, and operationally feasible, on hazardons liquid and natnral gas transmission pipeline facilities that are
constructed or entirely replaced after
1ssee www.1·egulations.gov, dockets PHMSA- 2010-0229 and PHMSA-2011-0023, respectively, for both the ANPRlvis and NPRMs.
the date on which the Secretary issues the final rule containing such requirements. PHlvfSA is proposing to address this mandate by sstablishing the minimum standards described in this NPRM. These standards were also developed in consideration ofNTSB Recommendations P-11-10 and P-11- 11, the GAO Report GAO-13-168, "Better Data and Guidance Needed to Improve Pipeline Operator Incident Response," 16 and ORNL Report/TM- 2012/411, "Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines With Respect to Public and Environmental Safety," which was performed in response to the 2011 Pipeline Safety Act,17
a. GAO Report GAO-13-168
Section 4 of the 2011 Pipeline Safety Act also required the development of a study by the Comptroller General on the ability of pipeline operators to respond to a hazardous liquid or gas release from a pipeline segment located in an HCA. This study was published by the GAO in January 2013 and recommended PHMSA take the following two actions:
1. Improve the reliability of incident response data to improve operators' incident response times, and use this data to evaluate whether to implement a performance-based framework for incident response times, and
2. Assist operators in determining whether to install antomated valves by using PHMSA's existing information sharing mechanisms to alert all pipeline operators of inspection and enforcement guidance that provides additional information on how to interpret regulations on automated valves, and share approaches used by operators for making decisions on whether to install automated valves.
The GAO report noted that defined performance-based goals, ostablished with reliable data and sound agency assessments, could result in improved operator response to incidents, with ASV and RCV installation and use being one of the determining factors. The GAO fnrther noted that, although the cnrrent
PHMSA regnlations for incident response and the installation and use of ASVs and RCVs arn performance-based, they are very general, currently requiring operators to respond to incidents in a "prompt and effective
16Publisbed January 2013; www.regulalio11s.gov (Docket ID PHMSA-2013-0255-0002).
17Published October 31, 2012; www.regulations.gov(Docket ID PHMSA-2013- 0255-0004).
Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules 7167
mauuer," 10 and requiring operators to iustall ASVs, RCVs, or emergency flow restricting devices (EFRD) if an opera.tor determines, through risk analysis, such valves are necessary to protect HCAs,1 9
More clearly defined goals can help operators identify actions that could improve their ability to respond to certain types of incidents consistently and promptly, though identical incident response actions are not appropriate for all circumstances due to pipelines having variable locations, equipment needs, configUiations, and operating conditions. PHMSA agrees with the GAO's conclusions that a more specific standard, in conjunction with carefully selected requirements, could be more effective in improving incident response times, particularly when ruptures are involved,
The GAO report also concluded that the primary advantage of installing and using automated valves is that operators can respond more quickly to isolate the affected pipeline segment and reduce the amouut of commodity released. Although the report suggested that using automated valves can have certain disadvantages, including the potential for accidental closures, which makes it appropriate for operators to decide whether to install automated valves on a case-by-case basis, the report recognized that a faster incident respouse time could reduce the amount of property damage from secondary fires (after au initial pipeline rupture) by allowiug fire departments to extinguish the fires sooner. Iu addition, for hazardous liquid pipelines, a faster incideut response time could result in lower costs for environmental remediation efforts and less commodity loss.
PHMSA applied these principles and the GAO's findings and recommendations in developing the staudards proposed in this NPRM. The proposed amendments in this NPRM would also include new, specific, post accideut review requirements in §§ 192.617(a) and 195.402(c)(5)(i) and (ii), Operators would make those post accideut reviews available for PHMSA to iuspect, aud PHMSA could use those reviews iu disseminating lessons learned to other operators and to better iuform future rulemakings, The GAO report may be reviewed at http://
WWvV.regulations.gov by searching for Docket No. PHMSA-2013-0023.
111 For natural gas and hazardous liquid pipelines, §§ 192,615(a)(3) and 195.402(0){2), respeclively.
19 Requirements for ASV and RCV installation aro at§ 192.935(c), and requirements for EPRD installation are at§ Hl5.452(i)(4).
b. ORNL Report ORNL/TM-2012/411
In March 2012, PlllvfSA requested assistance from ORNL to perform a
study to address the issues outlined in Section 4 of the 2011 Pipeline Safety Act and those raised by the NTSB in its accident report for the September 9, 2010, San Bruno nahual gas pipeline incident. The ORNL study assessed the effectiveuess of valve-closme swiftness iu mitigating the consequences of natural gas and hazardous liquid pipeline releases on public and environmental safety. It also evaluated the tecbnical, operational, and economic feasibility and potential
benefits of installing ASVs and RCVs in newly constructed and fully replaced pipelines. The study concluded that:
1. In general, installing ASVs and RCVs on newly constructed and fully replaced natural gas transmission and hazardous liquid pipelines is
technically feasible, provided sufficient space is available for the valve body, actuators, power source, sensors and related electronic equipment, and personnel required to install and maintaiu the valve; and is operationally feasible, provided the communication links between the RCV site and the control room are continuous and reliable.
2, There is evidence that it is economically feasible to install ASVs and RCVs on uewly constructed and fully replaced natural gas transmission and hazardous liquid pipelines and the benefits would exceed the costs for the release scenarios considered in the study. However, it is necessary to consider site-specific variables in determining whether installing ASV s or RCVs on newly constructed or fully replaced pipelines is economically feasible in a particular situation.
3. Installing ASVs and RCVs on newly constructed and fully replaced natural gas and hazardous liquid pipelines can be an effective strategy for mitigating potential fire consequences resulting from a release and subsequent ignition. Adding automatic closure capability to valves on newly constructed or fully replaced hazardous liquid pipelines can also be an effective strategy for mitigating potential socioeconomic and environmental damage resulting from a release that does not ignite.
4. For hazardous liquid pipelines, installing ASV s and RCV s can be an effective strategy for mitigating potential fire damage resulting from a pipe opening-type breaks 20 and subsequent ignition, provided the leak is detected
20 A break in tho pipeline that involves the opening of the pipe in either the circumforontinl or longitudinal direction.
and the appropriate ASVs and RCVs close completely so that the damaged pipeline segment is isolated within 15 minutes after the break
PHMSA used the conclusions of the ORNL Report in developing this NPRM and as a basis for proposing to implement standaxds for valve installation per Section 4 of the 2011 Pipeline Safety Act. The report may be reviewed at http://www.regulations.gov by searching for Docket No. PHMSA- 2013-0255-0004.
ii. Section 8-Leak Detection
Section 8 of the 2011 Pipeline Safety Act required the Secretary to submit to
Congress a report on leak detection systems (LDS) utilized by operators of hazardous liquid pipeline facilities, including transportation̥ related flow lines, and to establish technically, operationally, and economically feasible standards for the capability of leak detection systems to detect leaks.
PHMSA responded to the 2011 Pipeline Safety Act's Section 8 mandate by contracting with Kiefner and Associates, Inc. to prepare a leak detection study. The Kiefner study examined LDS used by operators of hazardous liquid and natural gas transmission pipelines and included an analysis of the technical limitations of current LDS, the ability of the systems to detect ruptures and small leaks that are ongoing or intermittent, and what can be done to foster development of better technologies. It also reviewed the practicality of establishing technically, operationally, and economically feasible standards for LDS capabilities. The study addressed five tasks defined by PHMSA:
• Assess past incidents to determine if additional LDS may have helped to reduce the consequences of the incident;
• Review installed and currently available LDS technologies, along with their benefits, drawbacks, and their retrofit applicability to existing pipelines;
• Study current LDS operational practices used by the pipeline industry;
• Perform a cost-benefit analysis of deploying LDS on existing and new pipelines; and
• Study existing LDS standards to determine what gaps exist and if additional standards are needed to cover LDS over a larger range of pipeline categories.
The authors of the Kiefner study were tasked only to report data and technical and cost aspects of LDS. Although the Kiefner study did not provide any specific conclusions or recommendations related to leak
7168 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules
detection system standards, its content did inform this NRPM, acknowledging that pressure/flow monitoring (leak detection techniques) will consistently and reliably catch large volume, uncontrolled release events such as ruptures. Therefore, PHMSA has proposed that valves designated as rupture-mitigation valves for this rulemaking he outfitted with eqnipment or other means to monitor valve statns, commodity pressures, and flow rates. Also, the report noted that operator procedures may have allowed ignoring alarms, restarting pumps, or opening valves during large releases.
The standard PHMSA is proposing in this rulemaking intends to reduce the frequency of these errors by requiring an operator to determine a rupture is occurring within 10 minutes following the first notification to the operator or following specific criteria involving throughput. PHMSA is considering alternate timeframes for rupture confirmation for this rulemaking. PHMSA notes that a 10-minute confirmation standard would be consistent with certain industry practices. For example, in its report following the incident near Marshall, MI, the NTSB noted that the operator had procedures in its operations manual that restricted the operation of a pipeline for longer than 10 minutes when the pipeline was operating under unknown circumstances. This procedure was adopted following a 1991 rupture and release by the same operator, PHMSA welcomes comments from stakeholders on the feasibility, reasonableness, and adequacy of the proposed 10-minute rupture confll'mation standard.
The proposed accident review following these ruptures can also help drive operators to implement lessons leai·ned system-wide and assist PHMSA in providing industry-wide guidance regarding overarching performance issues. The report may be reviewed at http:/ !MTWW,regulations.gov by searching for Docket No. PHMSA-2013-0018.
PHMSA is not proposing specific metrics to address smaller, non-ruptnrn type leaks in this rulemaking. PHMSA is also not proposing to require leak detection equipment on gas b·ansmission and distrihution pipelines as expansively as recommended by NTSB recommendation P-11-10, which recommended that all operators of natural gas b'ansmission and distribution pipelines equip their supervisory control and data acqnisition systems with tools to assist in recognizing and pinpointing the location of leaks, including line breaks. Pursuant to the findings in the Kiefner
Leak Detection stndy, it is typically more challenging to detect smaller leaks in an operationally, technically, and economically feasible manner. Further, the report notes that LDS with the same technology, when applied to two different operating pipeline systems, can have very different resnlts. In short, one size does not fit all, and determining a reasonable, minimum Federal standard for safety comes with several challenges. However, this NPRM, for both onshore hazardous liquid and gas transmission pipelines, would require the installation of pressure monitoring equipment at all rupture mitigation valves on both the upsb'eam and downstream locations of the valve. This requirement incorporates an aspect of NTSB Recommendation P- 11-10 that will help operators to hetter detect ruptures, which should drive further development and installation of
leak detection technology, and may help drive operators to make decisions to improve the capabilities of their current
leak detection systems to detect non rupture type events. PHMSA continnes to address the effectiveness of LDS for other non-rupture type leaks throngh a rnlemaking,21 engagement in new or updated standards being developed by standard developing organizations, and
through the development of research and development projects,22
F. PHMSA 2012 Rli'D Forum, "Leak Detection and Mitigation"
PHMSA sponsored a workshop on leak detection and expanded EFRD use, in Rockville, MD, on March 27-28,
2012. Additionally, a Government and Industry Pipeline Research and Development (R&D) Forum was held in Arlington, VA, on July 18-19, 2012.23 PHMSA periodically holds 2-day R&D forums to generate a national research agenda that fosters solutions for the many challenges facing pipeline safety and environmental protection, The R&D forum allowed public, government, and industry pipelino stakeholders to develop a consensus on the technical gaps and challenges for futnre research, It also enabled stakeholders to discuss
21 Pipeline Safety: Safety of Hazardous Liquid Pipelines; 80 FR 61609; October 13, 2015.
22 Improving Leak Detection System Design Redundancy and Accuracy, DTPH56-14-H-00007 (End: April 2017); Emissions Quantification Verification Process, DTPH5615T00012L (End: December 2017); Framework for Verifying and Validating the Performance and Viubility of External Leak Detection Systems for Liquid and Natural Gas Pipelines, DTPH5615T00004L (End: Mai-ch 2010)
23 httptd!primis.pl1msa.dol.gov/meetingsl Mtgllome.mtg?mtg=77. For details on the moeting, please see the summary report at littps:/1 pn"mis. plimsa. dot.gov/rd/mtgs/0 71 812/2012 _JW _ FommSllmmaiyReport.pdf.
ways to reduce duplication of programs, consider ongoing research efforts, and leverage resources to achieve common
ohjectives. Participants discussed the development of leak detection technology for all pipeline types (from any deployment platform) and the capabilities and limitations of current leak͓ detection technologies. A working gronp convened for the meeting for the topic of leak detection identified four gaps for future research, which were: (1) To reduce false alaTms of leak detection systems; (2) leak detection technology, standards, and knowledge for new and existing systems; (3) smart system development; and ( 4) mobile-based leak detection system testing.
III. Proposed Rupture Identification and Mitigation Actions and Analysis of ANPRM Comments
In response to the congressional mandates contained in the 2011 Pipeline Safety Act, rncommendations from the NTSB and GAO, comments received to both .ANPRMs, discussions at PHMSA's public workshops, and the results of the studies and analyses
described above, PHtvfSA is proposing standards for valve installation, rupture recognition and timely mitigation, and valve shut-off and location requirements for segment isolation. These actions are intended to minimize consequences from ruptured pipeline segments and improve the effectiveness of emergency response.
The proposed valve installation requirement applies to all newly constructed and entirely replaced gas transmission and hazardons liquid pipelines with nominal diameters of 6 inches or greater. For the purposes of this rulemaking, PHMSA proposes to define "entirely replaced" pipelines as those pipelines where 2 or more contiguous miles are being replaced with new pipe. Operators of these lines would be requll'ed to install automatic shutoff valves, remote-control valves, or equivalent technology at the valve spacing intervals or locations already specified in the cnrrent regulations. In the case of "entirely replaced" pipelines, valves that are directly associated with or are otherwise impacted by the replacement project wonld need to be upgraded to antomatic shutoff, remote control, or eqnivalent valve technology. In the May 1, 1998, final order to Viking Gas Transmission,24 PHMSA notes that § 192,13(b) states "no person may operate a segment of pipeline [. , .] that is replaced, relocated, or otherwise
24 In the Matter of Viking Gas Transmission, Final Order, C.P.F. No. 32102 (May 1, 1998).
Federal Register/Vol. 85, No, 25/Thursday, February 6, 2020/Proposed Rules 7169
changed [. . .], unless the replacement, relocation, or change has been made according to the requirements in [part 192]," In tbat final order, PHMSA stated it expected the operator to ensure that any future pipeline replacements comply with the valve spacing requirements at§ 192.179. Therefore, even if a replaced segment does not have a valve, operators would need to ensure that the replaced segment meets the spacing requirements at§ 192.179 and would need to ensure, per this rulemaking, that any valves installed for compliance also meet the standard of being automatic shut-off, remote control, or equivalent technology. In the case of hazardous liquid pipelines, maximum valve spacing mileages are not specified under the cur.rent regulations, and PHMSA has proposed valve spacing for those pipelines constructed following the issuance of the final rule. The valves installed per the NPRM's provisions for bath gas transmission and hazardous liquid pipelines would also be subject to the 40-minute rupture-mitigation closm·e requirement and the monitoring requirements of the rulemaking,
These proposed rupture identification and mitigation regulations include: (1) Defining the term "rupture" as a significant breach of a pipeline that results in a large-volume, uncontrolled release of commodity that can be
determined according to specific criteria or that has been observed and reported to the operator; (2) a requirement to establish procedures specifically for responding to a rupture based on the definition; (3) a requirement to declare a rupture as soon as practicable but no longer than 10 minutes after initial notification or iudication; (4) a requirement to immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call centers) for the jurisdiction in which the rupture is located; and 5) a requirement to respond to a ruptu.re as soon as practicable by closing rupture mitigation valves, with complete valve shut-off and segment isolation within 40 minutes after rupture identification. Rupture identification occurs when a rupture is reported to, or observed by, pipeline operating personnel or a controllor.
The term "rupture-mitigation valve," as it pertains to this proposal, means the specific valve(s) that the operator would use to isolate a pipeline segment that experiences a rupture-the applicable "shut-off segment" as specified in this NPRM. These valves can be any combination of ASVs, RCVs, or equivalent technology upon review by PHMSA, and they would be required to
comply with the proposed new rupture mitigation timing, testing, communication1 maintenance, and inspection requirements of this NPRM. PHMSA is also proposing operators periodically verify, tluough drills, that their rupture-mitigation valves can reliably meet the standard outlined above and that any communications equipment necessary for valve actuation
functions as needed. Additionally, operators wonld be required to perform post-accident reviews of any ruptures or
other release events involving the closure of rnpture-mitigation valves to ensure these proposed performance
objectives are met and that any lessons learned can be applied system-wide.
Regarding the proposal for immediately and directly notifying the appropriate public safety answering point (PSAP) for the jurisdiction in which the mpture is located 1 per PHMSA's Advisory Bulletin published on October 11, 2012 (77 FR 61826), PHMSA believes that immediate communication should be established between pipeline facility operators and PSAP staff when there is any indication of a pipeline rupture or other emergency condition tlrnt may have a potential adverse impact an public safety or the environment. PHMSA .recommends that pipeline facility operators ask their applicable PSAP(s) if tbere are any other reported indicators of possible pipeline emergencies such as odors, unexplained noises1 product releases1 explosions, fires, etc., as these reports may not have been linked to a possible pipeline incident by the callers contacting the 9-1-1 emergency call center, This early coordination will facilitate the timely and effective implementation of the pipeline facility operator's emergency T8Sponse plan and coordinated response with local public safety officials.
PHMSA is not proposing specific metrics to address smaller, non-rupture type leaks in this NPRM. PHMSA is also not proposing to require loak detection equipment on gas transmission and distribution pipelines as specifically recommended by NTSB recommendation P-11-10. Pursuant to the findings in the Kiefuer Leak Detection study, it is typically more challenging to detect smaller leaks on
pipelines in an operationally, technically, and economically feasible manner. However, this NPRM, for both hazardous liquid and gas transmission pipelines1 requires the installation of pressure monitoring eqnipment at all rupture mitigation valves on both the upstream and downstream locations of the valve, which will help operators to
better detect ruptures and which can be used for leak detection when leak
detection technology becomes further developed. PHMSA continues to address the effectiveness of leak detection systems for other non-rupture type leaks through other rulemakings, R&D projects, and engagement in new or up dated standards being developed by standard developing organizations.
The rupture-mitigation provisions of this NPRM1 and the related comments to the major topic areas of this NPRM, are
discussed below:
A. Definition of Rupture
Section 4 of the 2011 Pipeline Safety Act requires PHMSA to, if appropriate, issue regulations requiring the use of ASVs or RCVs, or equivalent technology, where economically, technically1 and operationally feasible, on newly constructed or entirely replaced transmission pipeline facilities, PHl'vfSA notes, though, that there may be little benefit to the installation of these valves if there is not a threshold requiring their use to mitigate the consequence of large releases.
While some individual operators have installed ASVs and RCVs in response to recent high-profile incidents, and existing regulations require operators to consider these types of valves as additional mitigative measures in HCAs, the continned occurrence of incidents with unnecessarily slow response times suggests that operators may not be fully accounting for the social costs of unmitigated large-scale release events in their risk analysis1 emergency planning, and valve automation decisions. PHMSA is proposing a new definition for the term "rupturnu for both natural gas and hazardous liquid pipelines in parts 192 and 195, respectively, that operators must properly identify and suhseqnently take mitigative action against as proposed in this NPRM.
The term "rupture,'
1 as defined and applied in these proposed regulations, is meant to encompass any type of large volume, rapidly occurring, and uncontrolled release or failure event. Ruptures would include events that have rupture-like characteristics in terms of pressure and flow profiles1 including bnt not limited to failures due to mechanical punctures1 line breaks and other large-scale failures, seam splits, large through-wall cracks, sheared lines due to natural or other outside force damage1 and valves inadvertently left open.
A rupture, as defined in this NPRM, would include any of tho following events that involve an uncontrolled release of a large volume of product over a short period of time: An unanticipated or unplanned pressure loss of 10
7170 Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules
percent or more, occurring within a time interval of 15 minutes or less (with certain specific exceptions relevant to gas and liquid pipelines); an unexplained flow-rate change, pressure change, instrumentation indication, or equipment function; and an apparent large-volume, uncontrolled release of gas or a failure observed by operator personnel, the public, or public authorities. The term "rupture" as defined in this NPRM is only applicable as it would pertain to the proposed regulations in parts 192 and 195 and should not be confused with the term "rupture" as it is utilized in other PHMSA applications, such as in incident and accident reporting forms and other general PHMSA documents and records, For the purposes of those other applications, operators should consult the instructions for those forms to find the definition of "rupture," as it will be distinct from the term's proposed use in pru:ts 192 or 195 per this rulemaking. PHMSA welcomes comment on this proposed definition of rupture and the usages of the term as they are proposed.
Although there are key differences in the behavior of gas pipeline ruptures and hazardous liquid pipeline ruptures, prompt identification, rapid system shutdown, and segment isolation are objectives common to both. Both types of ruptures have increased risks of adverse conseqnences as the time lengthens for both system shutdown and segment isolation, In the case of hazardous liquid pipelines, the volnme of product released increases and spreads further over the surrounding terrain or in water as response and isolation times are prolonged, which significantly increases the potential for adverse consequences. As it can take an area affected by a hazardous liquid spill months or even years to be restored to a pre-accident state, limiting the amount of product released and the size of the affected area are of great importance.
For gas pipelines, a rupturn results in a sudden release of energy that is sustained for longex periods of time even after the system is shut down, as the pressurized gas expands into the atmosphere and remains in relative proximity to the failnre site in most cases. When gas ruptures ignite, the length of time that the gas pipeline is not shut down and isolated leads to conseqnences, such as fires, that may otherwise be containable but spread outward and cause significant additional damage beyond the immediate impact zone.
In both cases, the qnick isolation of a ruptured segment does not significantly alter the immediate impact of the
rupture even though the extended consequences can he significantly reduced.25 Therefore, this rulemaking is expected to drive improvement in rupture response and isolation times to reduce a rupture's extended consequences.
The rupture-mitigation requirements of any final rule that are based on the uew rupture definition would take effect 12 months after the rulemaking becomes effective, and the definition itself would
be incorporated with the other definitions for parts 192 and 195 in § 192,3 for onshore gas transmission pipelines and in§ 195.2 for onshore hazardous liquid pipelines, respectively.
B. Accident Response and Mitigation Measures
i. Installing RCVs and ASVs
Severn.I operators aud industry trade groups, including INGAA, AGA, American Public Gas Association (APGA), Atmos, MidAmerican, Dominion East Ohio, and TransCanada, noted in the ANPRM that installing RCVs and ASVs will not prevent incidents and that existing requirements allow for safe aud reliable service.
Chevron commented that operators should have the flexibility to select the most effective measures based on specific locations, risks, and conditions of the pipeline segment. PHMSA notes that, following the San Brnno incidont, PG&E rapidly installed ASVs where
possible and stated there was sufficient basis to deploy such valves; according to a CPUC press release, the workplan it approved for PG&E would install 228 automated shut-off valves from 2012- 2014.2627 In comparison, in 2006, PG&E conclnded that most of the damage from a rupture would take place in the first
30 seconds before shut-off valves could stop the flow of gas.20 Gas transmission operators have previously cited a Gas
Research Institute study from 1998 as
250ak Ridgo National Laboratory; "Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids
and Natural Gas Pipelines with Respect to Public and Environmental Safety;" ORNL/TM-2012/411; October 31, 2012; Section 5, pgs. 175-185.
26 Carey and Rogers. 2011. PG&E officials grilled about automatic shut off valves. Silicon Valley MercuryNews.com, http://www.mercurynews.caml san-bmno-fire/ci_ 175102097nclick_ check=1, posted 3/1/11,
21 California Public Utilities Commission. 2012. "CPUC Approves Pipelino Safely Plan for PG&E; Incrcasos Whistleblower Protections," http:// docs.cp11c.ca.gov/PublishedDocs/P11bHshed/G000! MD40/K531/4053158D.PDF
2acarey and Rogers. 2011. PG&E officials grilled about automatic shut offvalves. Silicon Valley MercuryNews.com, l1ttp:/lwww.mercu1ynews.com/ san-brnno-fire/ci _175102097nclick _ c}1eck=1, posted 3/1/11.
the basis for concluding that the installation of RCV s is not cost֤ effective since, in most cases, injury or death occurs so near to the time of pipeline rupture that RCVs may not respond quickly enough. A PG&E internal memorandum from 2006 {subsequently released to the public) documenting its consideration of installing ASV s and RCVs on lines pointed to this study when concluding that the use of an ASV or RCV as a prevention and mitigation measure iu au HCA would have "little or no effect on increasing human safety or protecting properties," and did not recommend using either as a general mitigation measure.29
However, the NTSB investigation of the San Bruno incident and research by ORNL suggests there are real benefits to more rapid valve closure due to faster emergency response. As the NTSB stated, the total heat and radiant energy released by the burning gas was directly proportional to the time gas flowed freely from the ruptlll'ed pipeline. Because the operator took 95 minutes to
stop the flow of gas and isolate the rupture, the natul'Bl gas-fed fire continued to ignite homes and vegetation, contributing to the extent and severity of property damage and increasing the life-threatening risks to residents and emergency responders. It wasn't until 95 minutes after the rupture that firefighters could safely approach the rupture site and begin containment efforts due to the intensity of the fire. Firefighting continued for 2 days after the flow of gas stopped, and over 900 emergency responders were deployed, The use of ASVs or RCVs would have reducod the amount of time taken to stop the flow of gas and would have shortened the time the site was inaccessible to emergency responders,
Additionally, studies have indicated that a prolonged gas-fed fire leads to increased property damage, includiug two separate studies from the Gas Research Institute,30 as well as a 1999 study from RSPA stating that RCV use could reduce property damage, reduce public disruption of product supply, reduce damage to other utilities, and allow emergency responders faster access to the accident site,31
29NTSB Accident Report; NTSB/PAR-11/01; PG&E Natural Gas Transmission Rupture and Fire; San Bruno, California; September 9, 2010; Pgs. 56- 57.
30M. Stephens, "A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines," GRI-00/0189, Gas Research Institute, October 2000; and C.R. Spnl'ks, "Remote and Automatic Main Line Valve Technology Assessment," Gas Research Institute, July 1995.
a1 Remotely Controlled Valves on Interstate Natural Gas Pipelines {Feasibility Detormination Mandated by the Accountable Pipeline Safety and
Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules 7171
PHMSA is proposing to implement the section 4 mandate from the 2011 Pipeline Safety Act by requiring newly constructed and entirely replaced natural gas transmission and hazardous liquid pipelines with nominal diameters of 6 inches and greater be equipped with remote-control valves, automatic shutoff valves, or equivalent technology, at distances specified nuder the valve spacing requirements per the current regulations.
For newly constructed pipelines of certain diameters and replaced pipelines of certain diameters and specific lengths, this NPRM would require rupture-mitigation valves located on both sides of a "shut-off segment," which is defined in this NPRM as the applicable segment of pipe between the valves closest to the endpoints of a high consequence area or Class 3 or 4 location. For hazardous liquid pipelines, any mainline valve located within a shut-off segment would be a rupture-mitigation valve, For gas transmission pipelines, maximum valve spacing for shnt-off segments would apply based on class location factors.
Comments from pipeline operators and industry organizations point to a wide dispal'ity in the percentage of sectionalizing valves that are RCVs or ASV s. This may reflect the use of very different decision criteria by different operators for determining when RCVs or ASVs should be installed. PHMSA determined a need for clarity in the criteria for rnptnre mitigation and segment isolation to ensure that valve configurations are capable of adequately mitigating the potential consequences of rupture releases, as discussed below.
ii. Standards for Rupture Identification and Response Times
In this NPRM, PHMSA proposes requirements for rupture response and mitigation that would require operators of certain pipeline segments to: (1) Determine the existence of a rupture within 10 minutes of initial identification; (2) make immediate and direct notification to the appropriate public safety answering point (9-1-1 emergency call centers); (3) initiate rupture-mitigation valve closure as soon as practicable after identifying a rupture; and 4) complete rupture mitigation valve shut-off (closure and rupture segment isolation) as soon as practicable but within a maximum time interval of 40 minutes after rupture
Partnership Act of 1996); September 1999; https:II rosap.ntl.bts.govlviewldot/16918/dot_ 16918 _ DS1.pdp.
identification. 32 Operators may meet this standard using ASVs, RCVs, or equivalent technologies upon review by PHMSA. This NPRM also proposes that operators conduct regular emergency drills and inspections to confirm the performance of operator systems, processes, procedures, and personnel to achieve this standard.
In the hazardous liquid ANPRM, the American Petroleum Institute (API), Association of Oil Pipelines (AOPL), the Texas Oil and Gas Association (TxOGA), Louisiana Midcontinent Oil & Gas Association (LMOGA), and TransCanada Keystone Pipeline commented that there is no current industry standard setting a maximum spill volume or valve activation timing due to the widespread variation in pipeline dynamics, and it therefore would be difficult to establish a one size-fits-all requirement for these items. AP! and AOPL suggested PHMSA should focus on prevention and response rather than reducing spill size,
PHMSA agrees with the commenters that spill prevention and response arn important to ensuring the safety of hazardous liquid pipelines and that establishing a one-size-fits-all maximum spill volume would be extremely challenging dne to a variety of factors, including different pipeline diameters, terrain surrounding pipelines, commodity type, operating conditions, sensitivity of the surrounding areas, and types and nature of flow paths. However, based on previous incident history, PHMSA has determined that it is necessar·y to define standards to ensure operators identify ruptures when they occur and promptly shut off mainline valves and isolate the ruptured pipeline segment. As a result, PHMSA is proposing to require operators to base their decisions upon documented procedures that take into account unexplained flow rate changes, pressure changes, instrumentation indications, and equipment functions. Factoring this information into the decision-making processes, when paired with additional pressure sensors located along the pipeline and valves that can be closed quickly after rupture detection, should help mitigate the effects of pipeline ruptures. For instance, such requirements would have helped mitigate the PG&E incident at San Bruno, CA, and the Enbridge incident near Marshall, MI, because the operators would have been in a better position to identify the ruptures if they were monitoring for the required information.
32 As defined in this NPRM, rupture identification occurs when a rupture is observed by or reported to pipeline operating personnel or a controller.
The GAO report referenced in Section II of this NPRM noted that performance based goals established with reliable data and sound agency assessments could result in improved operator response with ASV and RCV use. The report also states that although existing PHMSA regulations for operator response and ASV and RCV use are performance-based, they are "not well defined." Specifically, parts 192 and 195 currently require operators to respond to incidents and accidents in a
"prompt aud effective manner" (§§ 192.615(a)(3) and 195.402(e)(2)). As mentioned earlier, however, identical response actions are not appropriate for all circumstances due to the specific and highly variable location, equipment, and operating conditions involved on individual pipeliue systems. The GAO noted some organizations in the pipeline industry believe that some form of performance-based goals can allow operators to identify actions that could improve their ability to respond to accidents, including ruptures, more consistently aud in a timelier manner, and those organizations are laking steps to implement this approach. PHMSA agrees that a more precise regulation specific to ruptures would be effective in improving operator response times and mitigative actions because ruptures have recognizable operational signatures and, hence, more clearly defined triggers and actions that operators can take iu response.
iii. Using RCVs or ASVs in All Cases
In the hazardous liquid and gas transmission ANPRMs, PHMSA asked stakeholders to comment on whether the Pipeline Safety Regulations should include a requirement mandating the use of RCVs in all cases, The NTSB reinforced, via a submitted comment, that PHMSA should adopt requirements consistent with its recommendations P-11-10 and P-11-11. The NTSB noted in its analysis of the San Bruno incideut that if PG&E could have shut off the gas flow of its ruptured segment sooner than 95 minutes, it would have likely resulted iu a smaller fire of shorter duration as well as less risk to residents, their property, and first responders. The ORNL report and the GAO report referenced in this rulemaking reached conclusions similar to the NTSB's for both gas transmission and hazardous liquid pipelines. In other comments, Metro Area Water Utility Commission
(MAWUC) indicated that PHMSA should consider requiring all valves to be remotely controlled but that its decision should be based on an analysis of benefits and risks, North Slope Borough (NSB) supported the use of
7172 Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules
RCVs in all instances. A private citizen commented tbat PHMSA should issue regulatory language requiring RCVs for poison inhalation hazard pipelines. Conversely, comments from industry groups and pipeline operators stated that the benefits of requiring all valves to be remotely controlled would be dependent on local factors, and such additional requirements would add to pipeline system complexity and increase the probability of failure.
In consideration of the comments received, PHMSA has determined that a requirement for all valves to be automatically or remotely controlled wonld not be feasible due to several technical concerns, including a lack of space for actuator and communication equipment in urban areas, no cormnnnications signal in certain areas, and the potential for vandalism, The ORNL report came to a similar conclusion in that it was technically feasible to install ASVs and RCVs provided there was sufficient space for the valve body, actuators, power source, sensors, related electronic equipment, and the appropriate personnel required to install and maintain the valves,
Further, PHMSA determined that it would be most reasonable for newly constructed or entirely replaced natural gas transmission and hazardous liquid pipelines with diameters of 6 inches or greater to be subject to the valve installation requirement per the Section 4 mandate in the 2011 Pipeline Safety Act. While it is technically possible for lines as small as 2 or 4 inches to have automatic shutoff or remote-control valves, the potential impact radii and release volumes would be smaller under those scenarios, and PHMSA wonld not expect there to be benefits commensurate with the costs of installing the valves. However, PHMSA would like comment on whether these assumptions are reasonable.
Tberefore, PHMSA is addressing the mandate in the 2011 Pipeline Safety Act by proposing a valve installation requirement on newly constructed and entirely replaced gas transmission and hazardous liquid pipelines, as well as proposing a standard for rupturn identification and mitigation in areas of higher consequence, Alternatives
considered by PHMSA are documented in the PRIA filed under Docket No. PHMSA-2013-0255 at http:!/
www.regulations.gov.
Several commenters on the gas transmission and hazardous liquid ANPRMs, including industry trade groups and pipeline operators, opposed a requirement that all sectionalizing valves be capable of being controlled remotely. As some commenters pointed
out, RCVs or ASVs may not be warranted in many situations because of specific local conditions that conld limit the safety benefits of such a requirement. The ORNL report also concluded that site-specific parameters can influence risk analyses and feasibility evaluations, and they can often vary significantly from one pipeline segment to another.
Recent high-profile pipeline construction projects show a wide use of ASVs and RCVs, which demonstrates the feasibility and prevalence of these technologies. The interstate transportation of energy products, including natural gas, is subject to economic regulation by the Federal Energy Regulatory Commission (FERC). New gas transmission pipeline
construction projects and significant changes to existing pipelines are therefore subject to FERC review and environmental analysis requirements under the National Environmental Policy Act. Final Environmental Impact Statements (EIS) published or approved after the 2011 Pipeline Safety Act have included some commitment to use ASVs or RCVs on new or upgraded gas transmission pipelines subject to FERC approval. The wide use of this technology demonstrates the feasibility and prevalence of the nse of powered actuators or otherwise remote-controlled valves.
For instance, the Southeast Market Pipelines Project 33 intended to equip all 63 mainline block valves with ASVs or RCVs within three connected natural
gas transmission pipeline projects in Florida, Alabama, and Georgia. Similarly, per the Rover Pipeline final EIS,34 all 78 mainline block valves for the Rover Pipeline and related projects would be equipped for remote operation from the conh'ol center, The PRIA for this NPRM contains further information on this topic under Section 4.4-Valve Automation.
Further, recent high-profile hazardous liquid pipeline consh'uction projects also show use of RCVs. The final EIS for TransCanada's proposed Keystone XL Pipeline project indicated that 71 out of 112 intermediate mainline valves along the ronte would be remotely operated block valves, while an additional 24 valves wonld be designated as cbeck valves (U.S. Depaitment of State, 2011).
aa FERC, 2015, Southeast Market Pipelines Project, Final EIS, Office of Euergy Projects, Volume 1, Section 2,6.1. https:llwww.fe1'c.gov/industries/ gas/en viral eis/2015/12-1 B-15-eis. asp
34 FERC, 2016. Rover Pipeline, Panlrnndle Backhaul, and Tnmkline Beckhaul Projects, Final EIS. Volume 1, Section 2.2.2. liitps:/lwww.ferc.gov/ industries/gas/en v froleis/2016/07-29-16-rover pipeline.asp.
The North Dakota Public Service Commission reported that the Dakota
Access Pipeline design includes remote actuators on all mainline valves in the State of North Dakota (North Dakota Public Service Cormnission, 2016).
However, as stated before, PHMSA understands there may be technical challenges to requiriug the nse of automation in certain cases. Specifically, PHMSA is aware that there migbt not be the space necessary for operators to install equipment needed for an ASV or an RCV, and PHMSA also realizes that in certain areas, operators migbt not be able to get the necessary communications signal to ASVs or RCVs so they work as intended. Therefore, a one-size-fits-all valve-type installation requirement may not be feasible. As
snch, PHMSA is proposing a rupture mitigation valve standard that provides operators flexibility to install RCVs, AS Vs, or an equivalent technology. Alternatively, operators may use manual valves where it is not economically, tecbnically, and operationally feasible to use RCVs, ASVs, or an equivalent
technology. This flexibility will allow operators to choose the most appropriate valve based on the unique circumstances at each location, wbile still ensuring that such valves will close as soon as practicable but no later than 40 miuutes after a ruptnre is identified. PHMSA welcomes any cormnents that stakeholders might have regarding the reasonability of the proposed 40-minute valve closure time based on current technologies and capabilities. When considering an appropriate valve closure time for this rulemaking, PHMSA noted that many natural gas transmission and hazardous liquid systems can have several junctions where product arrives and departs or where multiple pipelines are connected with each other in a series of looped lines. On these more complicated pipeline systems, operators implementing shutoff procedurns may need to consider factors including the potential effects on pipeline systems flowing into a pipeline needing to be
isolated, the restriction of downstream deliveries to vital customers, and the impacts of the complete isolation of looped common-use systems. Therefore, establishing a one-size-fits-all requirement for valve closure times on all natural gas transmission and hazardous liqnid pipeline systems can be challenging.
When developing the proposed valve closure time in this NPRM, PHMSA considered its work on the "Alternative MAOP" rulemaking and the requiremeuts in that rule for operators to install RCVs and close valves within
Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules 7173
60 minutes on applicable pipeline segments. 35 PHMSA also considered its work on recent special permits and conditions in those permits for single, non-looped pipelines to have valves that can close within 30 minutes. Further, PHMSA notes that in the ANPRM stages of the Safety of Hazardous Liquid Pipelines and the Safety of Gas
Transmission Pipelines rulemakings, PHMSA considered valve closure times of 30 minutes for both natural gas transmission and hazardous liquid pipelines, and certain industry commenters representing gas pipeline operators proposed times of 60 minutes.
In this NPRM1 PHMSA is proposing to require operators to close the necessru·y valves "as soon as practicable" following rupture identification with a 40-minute-maximum closure time becanse 40 minutes represents a reasonable outer limit to provide time, if needed, for operators to get personnel on-site to close any necessary valves. However, PHMSA expects RCVs or ASVs in most instances to be shut off in a much shorter timeframe.
PHMSA determined the 40-minute closme time as follows:
Locating the rupture: Once an operator confirms a rupture is occurring, an operator needs to determine the location of the rupture. As a part of this process, control personnel would identify the location of the mainline valves needing to be shut as well as any crossover valves and other pipeline systems that flow into or out of the impacted pipeline system, Control personnel would then identify the systems needing to be isolated, if any, and the locations of the valves necessary to do so. If any of these systems ru·e operated by a different operator, those operators must be notified so that
deliveries can be re-routed and so that deliveries are not restricted to critical
customers such as hospitals or power plants, Following the rupture being located, control personnel would dispatch operating personnel to the rupture site, mainline valve locations, and any other critical pipeline locations, Those operating personnel would communicate and collaborate with local emergency responders to minimize the impact to the public and environment and identify safety needs, Further, operators must notify other parties, including local distribution companies, operators of directly connected pipelines, power plants, and direct-feed manufacturing facilities to ensure that
35 "Pipeline Safety: Standards for Increasing the Maximum Allowablo Operating Pressure for Gas Transmission Pipelines; Final Rule;'' October 17,
2008; 73 FR 62148.
rapid valve closures do not cause emergency cascading events dne to increased pressures, surges, or the lack of energy product. PHMSA has estimated these actions will be completed anywhere between 5 and 15 minntes of rupture identification.
Isolating the ruptured segment: An operator will begin closing the appropriate valves once a rupture is identified and located. This might include mainline valves, any crossover valves, and valves to other pipeline systems that flow into OT out of the ruptured pipeline system. Operating personnel would continue to work with emergency responders to minimize the impact to the public and identify safety needs. If a valve fails to close, the local pipeline operating personnel would close it. PHMSA notes that RCV shutdown times will vary based on size, whether it is a ball or gate valve, the actuator type, and the operating pressure at the time of closure, which will depend on how close it is located to the rupture site. ASV shutdown times will vary based on the preceding factors as well as the minimum pressure or the rate of pressure change at the mainline valve, All pipeline system valve shutdown times require the consideration of the valve closure timing and its impact on maximum operating pressures and surge pressures from the speed of valve closure on the pipeline system and any laterals or other pipeline systems connected to the
ruptured pipeline. Under emergency conditions and given operating pressures, PHMSA estimates an RCV can be closed within 5 to 15 minutes after rupture identification and location,
an ASV can be closed within 10 to 25 minutes after rupture identification, and
a valve needing some type of manual actuation could be closed within 15 to
25 minutes after rupture identification. Based on this analysis, PHMSA is proposing a maximum 40-minute valve closure period; however, PHMSA welcomes comments regarding whether this timeframe could be reasonably lowered so that segments are isolated more quickly and ruptures are mitigated faster, or whether there are other reasons that would preclude an operator from confirming a rupture and closing an ASV, RCV, or equivalent valve within 40 minutes after the identification of a rupture. Similarly, PHMSA welcomes comment on the 40- minute closure limit as it applies to any manual valves that operators might need to install because installing ASVs, RCVs, or equivalent technology is not feasihle.
PHMSA also notes that the "Alternative MAOP" final rule
published on October 17, 2008, which affects gas transmission pipelines, finalized a requirement to provide remote valve control through a SCADA system, other leak detection system, or an alternative method of control. This requirement applies if personnel response time to mainline valves on either side of an HCA exceeds 1 hour
(under normal driving conditions and posted speed limits) from the time an emergency event is identified in the operator's control room. PHMSA welcomes comment on whether it should revise the Alternative MAOP rule's requirements to match this rulemaking's proposed 40-minute response time, or whether this
rulemaking should be made consistent with the Alternative MAOP rule and establish a BO-minute response time following rupture identification.
C. Drills To Validate Valve Closure Capability
In response to the hazardous liquid ANPRM, Texas Pipeline Association (TPA) and others commented that requiring additional valve automation could result in an increased probability of valve or system failure. PHMSA agrees that the addition of any type of engineered equipment is accompanied by a potential for mechanical or operational failure, This rule proposes inspection and maintenance provisions to minimize this possibility. These inspection and mainteuance provisions would apply to procedures and equipment that should be in use to isolate pipeline segments in the event of potential incidents. More specifically, PHMSA proposes to require that operators conduct initial and periodic validation drills to ensure that valves designated for rupture mitigation will close to ensure that the response and shut-off times of this proposal can be reliably and consistently achieved. PHMSA is also proposing demonstration and verification requirements, including point-to-point verification tests for RCVs, to ensure tliat communications equipment works. New provisions proposed in this NPRM wonld also require that any deficiencies be identified and corrected within a fixed period, and that any lessons learned during these drills be applied system-wide to ensure adequate
performance in future emergencies. PHMSA has proposed these requirements because any newly installed valve systems will require regular maintenance activities and emergency drills to ensure they operate as intended per the proposals in this rulemaking.
7174 Federal Register/ Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules
The ORNL report discussed in Section II of this NPRM documented the reliable operation of ASVs and the importance of operating procedures in enslll'ing the
reliability of RCVs. The report noted that, in areas that are susceptible to electrical power outages, reliability is a potential concern, and redundant, alternative, or backup power sources may be required to ensure continuous availability of electricity for motors, solenoids, and electronic components, Proper valve maintenance involving seat and valve-body cleaning, packing and gasket replacement, and valve closure testing to ensure that ASVs actuate on command and close completely, are issues that inflnence operational feasibility. As PHMSA notes throughout this NPRM, ruptme-mitigation valves must function properly when needed following an identified rupture to quickly mitigate the consequences of pipeline rnptmes, including property and environmental damage. The drill requirements are proposed in§ 192.745
for onshore gas transmission pipelines and§ 195.420 for onshore hazardous liquid pipelines.
D. Maximum Valve Spacing Distance
i. Gas Transmission Pipelines
Existing regulations for gas transmission pipelines at§ 192.179 already contain provisions for maximum valve spacing based on class location, This NPRM proposes supplementary requirements for rupture-mitigation valve spacing in newly defined "shut-off segments" on newly constructed or replaced onshore gas transmission pipelines.
These "shut-off segments" are segments of pipe between the upstream mainline valves closest to the upstream endpoints of the HCAs or Class 3 or 4 locations and the downstream mainline valves closest to the downstream endpoints of the HCAs or Class 3 or 4 locations so that the entirety of the applicable HCA or Class 3 or 4 location is contained between a set of rupture mitigation valves. A shut-off segment can contain multiple HCAs or Class 3 or 4 locations-an operator of snch a segment would need to ensure that the entirety of the contiguous class locations and HCAs are within a set of rupture-mitigation valves. Shut-off segments also extend to the nearest mainline valves of any crossover and lateral pipe that connects to the shut-off segment between the furthest upstream and downstream mainline valves. All valves on shut-off segments would be identified as ''rnptnre-mitigation valves" for the purposes of this rulemaking and its proposed provisions
so that, when closed, there is no flow path for gas to be transported to the rupture site (except for any residual gas already in the ruptured shut-off segment).
In this NPRM, PHMSA proposes that the distance between rupture-mitigation valves for each shut-off segment must not exceed 8 miles for shut-off segments containing a Class 4 location (with or
without an HCA), 15 miles for a shut off segment containing a Class 3 location (with or without an HCA), aud 20 miles for a shut-off segment containing HCAs in Class 1 or 2 locations, These proposed ruptme mitigation valve spacing requirements for shut-off segments are in accordance
with§§ 192.179 and 192.611 for pipeline class location segments that have had a one-class class location change (a Class 1 to a Class 2, a Class 2 to a Class 3, or a Class 3 to a Class 4 change) and meet the criteria under § 192.611(a) for a "one class change
bump." This allows operators to use the valve spacing required in§ 192.179 for the previous class location when creating shut-off segments where the class location has recently changed.
Shut-off segments containing different class locations or HCAs must have valve spacing equivalent to the spacing, as provided above, for the most stringent class location in the shut-off segment.
In response to questions in the gas transmission ANPRM related to valve
spacing, INGAA contended that while valve spacing and selection are important factors in incident response,
public safety requires integrated planning and implementation for detecting ruptmes and closing valves, which INGAA called an "Incident Mitigation Management" (IM:tvf) plan in its comments. ING AA described IMM as a holistic performance-based means of detecting and responding to pipeline failures with some similarities to the proposals in this NPRM. INGAA contends that IlvfM plans should cover various aspects of response, including how operators detect failures, how they place and operate valves, how they evacuate gas from pipeline segments, and how they prioritize coordination efforts with emergency responders.
Conversely, Accufacts contended that existing spacing requirements are inadequate and suggested that further regulation is required concerning the placement, selection, and choice of RCVs, ASVs, or equivalent techuology.
They stated that valve spacing and closure play a significant role in depressurizing a gas pipeline segment after a ruptme, thereby limiting the total volume of gas released in an incident. The Pipeline Safety Trust also
supported the iustallation of additional valves on gas transmission pipelines to reduce consequences following large scale iucidents. A private citizen suggested that valves be required at 1- mile intervals in densely populated urban areas and that they close automatically in the event of an incident.
PHMSA agrees with certain cornmenters that the mere installation of additional valves, including RCVs or ASVs, will not reduce the frequency of gas transmission pipeline releases. The mere presence of a valve will not prevent an incident from occurriug. However, PHlvfSA disagrees with the same commenters who assert that additional valves do not reduce the consequences after such releases, as prompt rupture identification, response, and segment isolation through valve shut-off are key factors iu limiting and reducing incident consequences. As discussed tlrroughout this NPRM, PHMSA has determined that prompt operator rupture identification and mitigation, which includes the isolation of the rupture or failed segment as soon as practicable, are important factors that can contribute to reduced cousequences.
ii. Valve Spacing iu Response to Class Location Changes
In addition to the valve spacing requirements listed above related to
shut-off segments, PHMSA is also proposing that operators be required to add valves if necessary to meet the applicable valve spaciug requirements when changes to class location occur that require pipe replacement. PHtvfSA notes that a gas pipeline's class location broadly indicates the level of potential consequences for a pipeline release. Section 192.179 currently requires closer valve spacing for higher class locations. Areas of potentially higher consequences (i.e., HCAs) can be in lower class locatious as well. HCAs in Class 1 or Class 2 locations include pipeline segments where a release could have severe consequences similar to a release in Class 3 and Class 4 areas. In HCAs, operators are required to provide additional protection in accordance with the integrity managemeut requirements of part 192, subpart 0,
There were several comments related to new valve installations in the event of a class location change so that those valves meet the spacing reqnirements of § 192.179. The Gas Pipiug Technology
Committee (GPTC), AGA, INGAA, and several of INGAA's members (MidAmerican, Paiute, and Southwest Gas) opposed applying§ 192.179 requirements retroactively to class location changes. Commenters also
Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules 7175
expressed opinions that the existing regulations are adequate, However, the Commissioners of Wyoming County, Pennsylvania and CPUC commented that regulations should require additional valves when population increases and class locations change. Additionally, Accufacts suggested that new mainline valves should be installed when a site becomes an HCA regardless of class location, but a reasonable time should be allowed for such valves to be installed and become operational.
Valve spacing requirements in § 192,179 are based upon the class
location. When a pipeline class location changes because of additional development near a pipeline, this increases both the potential consequences of a release and the potential benefits of closer valve spacing for consequence mitigation. PHMSA proposes to only require that valve
spacing be made to match the requirements in§ 192.179 for a new class location when pipe replacement is necessai·y in response to a class location change, such as a Class 1 to Class 3, or a Class 2 to Class 4. Note that this requirement would be consistent with the 1998 Final Order for Viking Pipeline,36 which required class location changes to meet the mainline valve spacing as defined in §192.179 and the installation of a sectionalizing valve based upon the class location in a "replaced pipeline segment." Under this approach, when a class location change is implemented using only a pressure test in accordance with § 192.611 but without pipe replacement, then additional valve installation would not be required. 37 This approach will better balance the potential benefits from mitigating consequences of releases because of closer valve spacing with the costs of installing new valves, costs that will be lower if operators install additional valves in the context of installing new pipe for a class location change.
iii. Hazardous Liquid Pipelines
For onshore hazardous liquid pipelines, existing regulations establish valve location requirements for certain pipeline facilities and locations, such as at pump stations, breakout storage
36 Jn tlie Matter of Viking Gas Transmission, Final Order, C.P.F. No, 32102 (May 1, 1998).
37Valve spacing requirements are in the design and constmction sections of the rogulations. If a pipeline segmont changes class location but can be successfully pressure tested to the MAOP standards of the next highest class location per§ 192.611, PHlviSA cannot retroactively impose new valve spacing on an existing segment. However, if the segment is replaced by virtue of a highor class location, the more stringent valve spacing roquiraments wonld apply.
tanks, lateral takeoffs, certain water crossings, public water reservoirs, and for other locations as appropriate, based on terrain, location of popnlated areas, and other factors. However, a maximum distance for valve spacing for new pipelines is not currently specified. Iu response to the hazardous liquid ANPRM, several industry groups and individnal operators noted that ASlvIB B31.4, a consensus industry standard published by the American Society of Mechanical Engineers (ASME), includes a maximum valve spacing requirement of 7½ miles for liqnefied petroleum gas
and anhydrous ammonia pipelines in populated areas. Specifically, these commenters stated that valve spacing varies, that most mainline valves are mannally operated, that check valves are nsed in certain cases, and that some remotely controlled valves had been added because of the integrity management requirements.
PHMSA also asked for public comment on how the agency should apply any new valve location
requirements developed for hazardous liquid pipelines. AP! and AOPL, supported by TransCanada Keystone Pipeline, LMOGA, and TxOGA, indicated that valve spacing reqnirements should not be changed, and that specifying valve location reqnirements retroactively would be difficult and confusing. Further, these commenters indicated that requiring the retrofitting of existing lines to meet any type of new requirement would be expensive for industry, create environmental impacts, lead to potential construction accidents, and may cause possible interruptions of service. MAWUC and NSB commented that any new valve locations or remote actuation regulations should be applied to new pipelines or existing pipelines that are
repaired.
In this NPRM, PHMSA is proposing that newly constructed and entirely replaced hazardous liquid pipelines with nominal diameters of 6 inches or greater have antomatic shutoff valves,
remote-control valves, or equivalent technology spaced in accordance with the existing hazardons liqnid valve location provisions and the valve spacing requirements proposed in this rulemaking, as there me no current valve spacing requirements in the regulations for hazardous liquid pipelines.
For newly constructed onshore hazardons liquid pipelines that could affect HCAs or for hazardons liquid pipelines in areas that could affect HCAs and where 2 or more contiguous
miles have been replaced, PHMSA is proposing a maximum valve spacing of
every 15 miles. PHMSA based this spacing mileage, in part, off of Class 2 requirements for natural gas pipelines. Additionally, PHMSA believes that, given the current guidelines operators must consider regarding local terrain and drain-down volumes, a maximwn spacing of 15 miles for valves in HCAs would be reasonable.
For newly constructed onshore highly volatile liquid (HVL) pipelines in high population areas or other populated areas, as those terms are defined in § 195.450, or for HVL pipelines in those
areas where 2 or more contiguous miles have been replaced, PHMSA is proposing a maximum valve spacing of every 7½ miles. PHMSA notes that the current ASME B31.4 code provides for a 7½ mile maximnm valve spacing requirement on piping systems transporting liquefied petroleum gas or liquid anhydrous ammonia in industrial, commercial, and residential areas.
In an attempt to be more consistent with similar aspects of the natural gas pipeline regulations and taking into account the valve spacing requirements for Class 1 locations, PHMSA is proposing a 20-mile maximum valve spacing requirement for newly constructed and replaced hazardous liquid pipeliues that could not affect HCAs.
Part 195 currently does not prescribe whether manual or remote control valves must be installed at particular locations, but it does require tho consideration of check valves and remote control valves under the EFRD requirements for pipelines that could affect an HCA. Section 4 of the Act includes a new mandate for PHMSA to evaluate and issue additional regulations for the use of valves (such as remote control, automatic shut-off, or equivalent technology) for rupture mitigation. The current proposal seeks to establish a reasonable maximum distance that wonld apply to any lype of terrain and in any area, regardless of population or environmental sensitivity.
PHMSA expects that operators, in their pursuit of compliance with other valve location requirements, will locate, install, and equip valves for remote or antomatic operation as needed and in accordance with the requirements of the integrity management regulations (§ 195.452(i)(4), including Appendix C). This will result in valve location profiles that meet their operational needs and are reflective of the risks and potential consequences unique to their individual pipelines, including the consideration of factors such as maximum spill volumes, terrain, and population and environmental
7176 Federal Register /Vol. 85, No. 25 / Thursday, February 6, 2020 / Proposed Rules
receptors. The maximum spacing requirements would not supplant or supersede any other valve location
requirement and would only apply to newly constructed and replaced pipelines of certain diameters, These proposed requirements address Section 4 of the 2011 Act and are consistent with PHMSA's efforts to address NTSB Recommendation P-11-11 for gas transmission pipelines as well.
For newly constructed and replaced segments that could affect an HCA or that are within an HCA, valves would be required at a minimum of every 15 miles. For new and replaced segments transportiug highly volatile liquids
(HVL) in HCAs established due to populated areas, the maximum distance between valves would be 7½ miles. This requirement mirrors the requirements that currently exist nnder
ASME B31.4 for HVL mainline valve spacing and is necessary due to the unique safety risks these pipelines pose to populated areas. In addition, valves located on each side of a water crossing greater than or equal to 100 feet (30 meters) wide would be required to be installed outside the flood plain. The requirements of this proposed rule, specifically applying to segments of new or replaced pipelines that could potentially impact HCAs, would result in the placement of valves on each side of these HCA segments, This requirement acknowledges the sensitive nature of these specifically defined
areas and requires their protection with mainline valves comparable to other sensitive locations.
The new requirements for valve spacing are proposed in§§ 192.179, 192.610 and 192.634 for gas transmission pipelines and §§ 195.260 and 195.418 for hazardous liquid pipelines,
E. Integrity Management and the Protection of HCAs
This NPRM would also strengthen integrity management requirements for both onshore gas transmission and hazardous liquid pipelines by addressing the use of ASVs or RCVs (including EFRDs) in HCAs as they apply to rupture mitigation. These existing requirements are at§ 192.935(c) for gas transmission pipelines and
§ 195.452(i)(4) for hazardous liquid pipelines, and they specify that operators must conduct a risk analysis and add additional ASVs, RCVs, and EFRDs, as needed, to provide additional protections for HCAs. As gas transmission pipeline segments in HCAs are, by definition, near higher population areas and developments and include areas where people assemble or
have difficult-to-evacuate facilities such as schools or hospitals, releases from these segments have a higher poteutial for adverse consequences than releases from other segments.
i. Gas Transmission Pipelines
In the gas transmission ANPRM, commenters addressed PHMSA's consideration of additional decision criteria for operator evaluation of additional valves, remote closure, and valve automation. INGAA, AGA, GPTC, Ameren, and Mid.American were not in support of additional decision criteria, whereas Accufacts, CPUC, and an anonymous commenter were in support of additional decision criteria. Accufacts argued that valve regulations should be required for larger-diameter gas transmission pipelines in HCAs, especially in areas where manual closure times could be long. CPUC expressed its conclusion that decision criteria may need to be added for all Method 1 HCA locations,38
PHMSA notes that although§ 192.935 currently requires operators to consider installing additional RCVs and ASVs to mitigate potential consequences to
HCAs, the regulation does not establish criteria based on consequence reduction to gnide operator decisions. In developing this rulemaking, PHMSA has noted the challenges of requiring certain types of valves at specific locations, Therefore, PHMSA has determined that the most beneficial criteria for rupture mitigation are standards for rupture identification and
response times paired with maximum valve spacing requirements, because limiting the consequences of a release is primarily dependent upon how quickly an operator identifies, acknowledges, and isolates a rupture. In this NPRM, the required time thresholds for operator response following rupture identification serve as the decision criteria. Because the rupture response and mitigation requirements of this rulemaking will apply to newly constructed systems and entirely replaced pipeline systems of 2 contiguous miles or greater, operators can design their valve configurations as needed to address site-specific issues while meeting the proposed rupture-
38Method 1 is defined in§ 192.903 HCA definition, pn:ragroph (1) as a Closs 3 or Class 4 location as those torms are defined under§ 192.5; or any area within a Class 1 or Class 2 location where the potential impact mdius is greater than 660 feet, and the area within a potential impact circle contains 20 or more buildings intended for human occupancy; or any area in a Class 1 or Class 2 location where the potential impact circle contains an identified site. Definitions for "potential impact radius," "potential impact circle," and "identified site" are at§ 192.903.
mitigation requirements. Operators can determine what kinds of response and communication procedures need to be established, if arrangements need to be made for valve access by local operating
personnel, if valves need to he equipped for remote or automatic operation and whether some other alternative equivalent technology can be employed to meet the standard.
ii. Hazardous Liquid Pipelines
The hazardous liquid integrity management regulations issued in 2002 require operators to assess and adjust their existing EFRD configurations to better protect HCAs. GAO's findings in GA0---13-168 support PHMSA's experience that large discrepancies still exist in how individual operators use existing valves as EFRDs, due largely to the lack of prescription in both the regulations and iudnstry standards relating to EFRD installation. The lack of rapid closure capability has heen found to have significantly exacerbated
both the volume released and the adverse consequences in past accidents, even when emergency situations were quickly recognized by the operator. The ORNL report (ORNL/TM-2012/411) confirmed that "swiftness of valve closure has a significant effect on mitigating potential socioeconomic and environmental damage to the human and natural enviTonments," Similarly, the GAO study also found that "quickly isolating the pipeline segment through automated valves can significantly reduce subsequent damage by reducing the amount of hazardons liquid released."
PHMSA determined that there is a need to establish additional requirements related to EFRD actuation for newly constructed and replaced pipelines of 2 contiguous miles or greater in HCAs, as pairing standards for valve actuation with considerations for valve placement will help to achieve fuller safety benefits when considering rupture mitigation. This NPRM would also include annual inspection and maintenance requirements to assure that any valves installed under this rulemaking would reliably operate on demand dnring emergency situations.
In response to the hazai·dons liquid ANPRM of October 18, 2010, PHMSA received comments on location and performance standards for EFRDs from industry and trade associations. AP!, AOPL, TxOGA, LMOGA, and TransCanada Keystone Pipeline reported that no industry standa:rds currently address EFRD use, PHMSA also received several comments regarding location requirements for EFRDs, indicating that PHMSA should
Federal Register/Vol. 85, No, 25/Thursday, February 6, 2020/Proposed Rules 7177
not specify the location of EFRDs. More
specifically, AP!, AOPL, TransCanada Keystone Pipeline, LMOGA, and TxOGA indicated that a reqnirement to
place EFRDs at predetermined locations or fixed intervals in lien of a comprehensive engineering risk analysis would be arbitrary, costly, and potentially counter-productive to pipeline safety. They noted that § 195.452 already requires EFRDs to be
installed to protect an HCA if the operator determines, through a risk assessment, that an EFRD is needed, and TPA suggested that no general criteria beyond those in the existing regulations are appropriate becanse decisions on EFRD placement are driven by local factors. Conversely, NSB and MAWUC stated EFRDs should be required on all pipelines PHMSA regulates, with specific instruction or criteria on when and where EFRDs need to be used, especially if they can limit a spill.
As discussed above, PHMSA determined that the lack of more comprehensive and specific gnidance
regarding the location and performance requirements for EFRDs perpetnates the inconsistencies and large variances in operators' response times in isolating pipeline segments when failures occnr, particularly when a rupture or other fast-acting, large-volmne release occurs, Valves, even when located properly, are more effective in failure scenarios when they can be closed quickly to isolate the failed segment. PHMSA also notes that ASME B31.4, "Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids" (2009), addresses mainline valves and specifies operators install RCVs and/or check valves in certain instances.
Furthermore, PHMSA determined that, although the EFRD evalnation requirement already exists for HCA segments, additional measures are needed to specifically address rupture mitigation for new and replaced pipelines. In accident reports submitted to PHMSA by operators from 2010 to 2017, jnst over one-half of all HCA incidents where valve type was recorded occurred at a location where either the upstream or downstream valve was an antomatic, remotely controlled, or check valve. In approximately one-third of incidents occurring in an HCA, both the upstream and down valves were actnated by some manner of automation. It is difficult to envision a case where some type of rnpture-mitigation valve (which in some cases can be an EFRD} on either side of {or within) an HCA segment wonld not provide additional protection. In all cases where a valve cannot be quickly accessed and manually closed, remote
or automatic actuation is the only way to ensure prompt and effective closure.
In the hazardons liquid pipeline regnlations, EFRDs are defined as check valves or remote-control valves. Although check valves can be considered as either an ASV or an EFRD in some applications, this NPRM only considers them to be a rnpture mitigation valve if an operator can demonstrate the valve's operational and protective equivalence when the valve is nsed for segment shnt-off and isolation in response to a rupture. The NPRM proposes that operators must annually verify check valves or EFRDs are operational if they serve as rnpture mitigation valves. Considerations for the nse of check valves as alternative eqnivalent technology for rnpture mitigation should include all of the factors identified in this proposal and all existing regnlalions, inclnding those contained in part 195, appendix C, such as the nature and characteristics of the transported commodity, the physical and operating characteristics of the pipeline, the hydraulic gradient of the pipeline, the terrain surrounding the pipeline, and all other factors pertinent to rupture mitigation inclnding valve closure sealing performance and closure times.
F. Failure Investigations
Current pipeline safety regulations (§ 192.617 for gns transmission pipelines and§ 195.402(c)(5) for hazardous liqnid pipelines) reqnire operators to report all incidents (gas) and accidents (hazardous liquid) over certain reporting thresholds, and to investigate incidents and accidents involving failed pipe, failed components or other pipeline system eqnipment1 and incorrect operations. The terms incident and accident are nsed interchangeably in this NPRM.
In addition to the proposed rupture response and mitigation requirements, PHMSA is proposing new specific
requirements for post-accident analysis (i.e., an accident investigation) of any rupture or other event involving the activation of rupture-mitigation valves. These post-accident reviews would focus on ways to ensnre that the proposed performance objectives in this NPRM are met in the future and that lessons leained can be applied by the operator system-wide. PHMSA has determined this will improve the safety performance of individual operators, while also improving the industry's overall safety performance through information sharing forums.
The NTSB noted in its accident report of the PG&E incident at San Bruno, CA, that many of the organizational
deficiencies causing the incident were previously known to the operator as a result of previous accidents. The NTSB
further noted that, as a lesson from those accidents, PG&E should have critically examined all components of its pipeline system to identify and analyze risks as well as update emergency response procedures. Had this recommended approach been taken by PG&E following eaTlier incidents, the NTSB argued, the San Bruno accident may have been prevented. Similar organizational failures were found
following the Enbridge incident nefil' Marshall, Ml, and the NTSB noted that Enbridge failed to adapt lessons learned into its IM program.
Consistent with the findings in the GAO Report (GAO-13-168) and recommendations as described in this section, the proposed amendments in this NPRM would include new post accident review and implementation requirements in§§ 192.617 and 195,402(c)(5). As provided in the regulatory text, PHMSA would expect operators would analyze data points including, but not limited to, the time taken to detect a rnpture, the time taken to initiate mitigative actions, emergency response communications, personnel response time, valve closure time, SCADA performance, and valve location. Operators would then use these data points to enact improvements to the operator's suite of procedures, including its training and qualification
programs, pipeline system design, risk management, operations and maintenance activities, and emergency response procedures.
IV. SectionMbyMSection Analysis of
Changes to 49 CFR Part 192 for Gas Transmission Pipelines
Sec. 192.3 Definitions
Most of the requirements of this NPRM would be triggered by the identification of a "rupture." Section 192.3 would be amended to define "ruptnre" as any of the following events that involve an uncontrolled release of a large volume of gas over a short period of time: (1) An nnanticipated or nnp]anned pressure loss of 10 percent or more, occurring within a time interval of 15 minutes or Jess, unless the operator has documented in advance of the pressure loss a need for a higher pressure change; (2) an unexplained flow-rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event described above; or (3) an apparnnt large-volume, uncontrolled release of gas or a failure observed by operator personnel, the
7178 Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules
public, or public authorities, that is
reported to the operator and that may be :representative of an unintentional and uncontrolled release event that is defined in the items above,
Sec. 192.179 Transmission Line Valves PHMSA proposes adding paragraph (e) to require that all valves on newly constructed or entirely replaced onshore gas transmission pipelines that have nominal diameters greater than or equal to 6 inches be automatic shut-off valves, remote-control valves, or an equivalent technology, unless such valves are not economically, technologically, or operationally feasible. PHMSA proposes to permit the installation of maunal valves as rupture-mitigation valves only when there are feasibility issues precluding the installation of automatic or remote-control valves. All valves installed per this requirement would have to meet the new rnpture-mitigation standards proposed in§ 192.634 and isolate a ruptured pipeline segment within 40 minutes of rupture identification. Rupture identification would be defined in§ 192.3 to occur when a rupture is reported to or observed by pipeline operating personnel or a controller.
Sec. 192.610 Change in Class Location: Change in Valve Spacing
A new§ 192.610 is proposed to specify rnpture-mitigation valve requirements when a class location changes. In cases where pipe is replaced to meet the maximum allowable operating pressure in accordance with requirements for class location changes under§§ 192.611, 192.619(a), and 192.620, then the rupture-mitigation valve installation requirement in § 192.179 applies for the new class
location, which may require the operator to install new valves, and the rupture-mitigation requirements of § 192.634 wonld apply as well. Such
additional valves must be installed within 24 months of the class location change,
Sec. 192.615 Emergency Plans
PHMSA proposes to revise parngraphs (a)(2), (a)(6), (a)(8), (a)(l 1), and (c) of § 192.615 to require that emergency
procedures provide for rupture mitigation in response to a ruptnre event, including specific timing provisions relating to the identification of ruptures. Specifically, operators must have procednres in place allowing them to identify a rupture event within 10 minutes of the initial notification to the operator, PHJ'vfSA also proposes to require that operators maintain liaison with and contact the appropriate public
safety answering point {9-1-1
emergency call center) in the event an operator's pipeline ruptures.
Sec. 192.617 Investigation of Failures and Incidents
PHMSA proposes to revise§ 192.617 to define the elements that an operator must incorporate when conducting a post-incident analysis of certain specifically defined incidents, namely ruptures, and other release and failure events involving the activation of rupture-mitigation valves.
The proposed revision would require the operator to identify potential preventive and mitigative measures that conld be taken to reduce or limit the release volume and damage from similai· events in the future. The post-incident review would address factors associated with this rulemaking, including bnt not limited to detection and mitigation actions, response time, valve location, valve actuation, and SCADA performance. Upon completing the post accident analysis, the operator must develop and implement the lessons
learned throughout its snite of procedures, inclnding in pertinent operator personnel training and qnalification programs, and in design, constrnction, testing, maintenance, operations, and emergency procedure manuals and specifications.
Sec. 192.634 Transmission Lines: Onshore Valve Shut-Off for Rupture Mitigation
Proposed new § 192.634 would establish an emergency operations standard requiring operators to isolate certain ruptured pipeline segments as soon as practicable via rupturn mitigation valves with complete segment isolation as soon as practicable but within 40 minutes of identifying a rupture. This would apply to newly constrncted and entirely replaced onshore gas transmission pipeline segments in HCAs and Class 3 and Class 4 locations with nominal diameters greater than or equal to 6 inches, and it would also apply to any gas transmission pipelines where 2 or more contiguous miles of pipeline with nominal diameters greater than or equal to 6 inches are replaced in HCAs and Class 3 and Class 4 locations. This NPRM would require that operators designate shut-off segments in these areas and designate mainline valves used to isolate ruptnres on those shutoff segments as rupture-mitigation valves. This rulemaking would establish maximum distances between rupture mitigation valves .from 8 to 20 miles depending on the pipeline's class location. Compliance with the standard
could be achieved using ASVs, RCVs, or an equivalent technology. Operators may install manually or locally operated valves to act as rupture-mitigation valves only if the installation of ASVs, RCVs, or equivalent technology is not feasible at the location, provided the operator demonstrates that the 40- minute closure standard can be achieved under emergency conditions. Operators using manual valves or other equivalent technology must notify PHMSA in accordance with the procedure ontlined in§ 192.634(h). The NPRM would also require that operators monitor the position and operational status of all rupture-mitigation valves. Operators will be required to meet these provisions within 12 mouths after the
effective date of the final rule.
Sec. 192.745 Valve Maintenance: Transmission Lines
PHMSA proposes to revise§ 192.745 by adding paragraphs (c), (d), and (e) to incorporate the maintenance, inspection, and operator drills required to ensure operators can close a rupture mitigation valve as soon as practicable,
but within 40 minutes of rnpture identification. Demonstration and verification requirements are proposed, including pointͭ to-point verification tests for rupture-mitigation valves that
are ASVs or RCVs and initial validation drills and periodic confirmation drills for any manually or locally operated valve identified as a rnpture-mitigation valve. The operator would be required to identify corrective actions and lessons learned resulting from its validation and confirmation drills and share and implement them across its entire network of pipeline systems.
Sec. 192.935 What additional preventive and mitigative measure must
an operator take?
PHIVfSA proposes to revise § 192.935(c) to clarify the requirements
for conducting ASV and RCV evalnations for HCAs, particnlarly when RCV s and ASV s are installed as preventive and mitigative measures associated with improved response times for pipeline ruptures. The amendments would require that operators he able to evaluate and demonstrate that they could identify a rupture within 10 minutes in accordance with the proposed § 192.615(a)(6) and meet the standard
specified in the proposed§ 192.634 to isolate shut-off segments in HCAs dnring rupture events as soon as practicable but within 40 minutes. Operators would also be required to demonstrate, through the risk analysis required by this section, that any ASVs
Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules 7179
or RCVs installed under this section can comply with the proposed valve maintenance requirements at§ 192. 745.
V. Section-by-Section Analysis for Changes to 49 CFR Part 195 for Hazardous Liquid Pipelines
Sec. 195 .2 Definitions
Most of the requirements of the NPRM would be triggered by the identification of a "rupture." Section 195.2 would be amended to define "rupture" for hazardous liquid pipelines as any of the following events that involve an uncontrolled release of a large volume of hazardous liquid over a short period of time: (1) An unanticipated or unplanned flow rate change of 10 percent or greater or a pressure loss of 10 percent or greater, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the flow rate change or pressure loss the need for a higher flow rate change or higher pressure-change
threshold due to pipeline flow dynamics and terrain elevation changes that canse fluctuations in hazardous liquid flow that are typically higher than a flow rate change or pressure loss of 10 percent or greater in a time interval of 15 minutes or less; (2) Au unexpected flow rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event defined above; or (3) An apparent large-volume, uncontrolled release of hazardous liquid or a failure observed by operator personnel, the public, or public authorities, that is reported to the operator and that may be representative of an nnintentional and uncontrolled release event that is defined above,
Sec. 195.258 Valves: General PI-™SA proposes to require that all valves on newly constructed and entirely replaced hazardous liquid lines that have nominal diameters greater than or equal to 6 inches be RCVs, ASVs, or an equivalent technology, unless such valves are not economically, technologically, or operationally feasible. PHMSA proposes
to permit operators install manually or locally operated valves only when there are feasibility issues precluding the installation of ASVs, RCVs, or equivalent technology. All valves installed under this requirement would have to meet the new rupture-mitigation standards proposed in§ 195.418 and isolate a ruptured pipeline segment as soon as practicable, but within 40 minutes of rnpture identification. Rupture identification would be defined in§ 195.2 to occur when a rupture is
reported to or observed by pipeline operating personnel or a controller.
Sec, 195.260 Valves: Location Section 195.260 proposes the requirements for the location of valves on newly constructed hazardous liquid pipelines, entirely replaced hazardous liquid pipelines, and hazardous liquid pipelines where 2 or more contiguous miles have been replaced. PHMSA proposes to revise§ 195.260 to incorporate uew maximum valve spacing requirements for the general placement of valves, including a 20-mile maximum spacing requirement for valves on pipelines that conld not affect high consequence areas, with more stringent maximum spacing requiremeuts of 15 miles and 7.5 miles for pipelines that could affect HCAs and HVL pipeliues iu populated areas, respectively. These valve spacing requiremeuts carry over to the rupture mitigation valve spacing requirements at § 195.418 as well, where operators
would be required to install ruptme mitigatiou valves at a maximum of every
15 miles but no further than 7½ miles from the HCA segment endpoints and at a maximum of every 7½ miles for HVL lines in highly populated areas. Revisions to§ 195.260 would also include two miscellaneous clarifications: (1) To explicitly include carbou dioxide as a transported commodity whose consequences are to be considered, and (2) to include new requirements pertaining to valves at water crossings to ensure these valves will not be impacted by flood conditions and to allow multiple water crossings to be protected by a single pair of valves.
Sec. 195.402 Procedural Manual for Operations, Maintenance, and Emergencies
PHMSA proposes to revise§ 195.402 to identify the areas requil'ing an immediate respouse by the operator to prevent hazards to the public, property,
or the environment if the facilities failed or malfunctioned, including segments that could affect HCAs and segments with valves that are specified in §§ 195.418 and 195.452(i)(4).
PHMSA is also revising§ 195.402 to define the elements that an operator must incorporate when conducting a post-accident analysis of ruptures and other release and failure events involving the activation of rupture mitigation valves. The proposed revision would require the operator to identify potential preventative and mitigative measures that conld be taken to reduce or limit the release volume and damage from similar events in the
future. The post-accident review would address factors associated with this rulemaking, including but not limited to detection and mitigation actions, response time, valve location, valve actuation, and SCADA performance. Upon completion of this post-accident analysis, the operator would be required to develop and implement the lessons learned throughout its suite of procedures, including in pertinent operator personnel training and
qualification programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications.
Further, PHMSA is revising§ 195.402 to clarify that requirements to establish liaison with emergency officials must include public safety auswering points (9-1-1 emergency call centers) and that requirements for notifying emergency officials when eveuts occur must include notifications to those local public safety answering points.
Section 195.402 also require that emergency procedures provide for rupture detection and valve closure in respouse to a leakage or failure event, including specific timing provisions relating to ruptures. Specifically, operators must have procedures in place so that they cau identify a rupture event within 10 minutes of the initial uotification to the operator. This section would also be revised as a matter of minor clarification to incorporate valve shut-off as an example of an emergency action to minimize the hazards of released hazardous liquid or carbon dioxide to life, property, or the environment.
Sec. 195.418 Valves: Onshore Valve Shut-Off for Rupture Mitigation
Proposed new§ 195.418 would establish an emergency operations standard requiring operators to isolate certain ruptmed pipeline segments as soon as practicable via rupture
mitigation valves with complete segment isolation within 40 minutes of identifying a rupture. This standard would apply to newly constructed and entirely replaced onshore hazardous liquid pipelines in HCAs and that could affect HCAs with nominal diameters greater than or equal to 6 iuches, and it would also apply to any hazardous liquid pipelines where 2 or more contiguous miles of pipeliue with nominal diameters greater than or equal to 6 inches are replaced in HCAs or where they could affect HCAs. This NPRM would require that operators
designate shut-off segments in these areas and designate maiuliue valves used to isolate ruptures on those shut off segments as rupture-mitigation
7180 l'ederal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules
valves. This NPRM would establish maximum distances of 15 miles between rupture-mitigation valves and 7½ miles between rupture-mitigation valves an HVL lines1 which are consistent with the proposed spacing requirements of § 195.260. Operators could use ASVs,
RCVs, an equivalent technology, or manually operated valves (if the operator demonstrates infeasibility of ASVs, RCVs and equivalent technology, that the standard can be achieved under emergency conditions, and provides notification to PHMSA). Operators would also be required to monitor the position and operational status of all rupture-mitigation valves. Operators will be required to meet these provisions within 12 months after the effective date of the final rule.
Sec. 195.420 Valve Maintenance
PHMSA proposes to revise§ 195.420 to incorporate the maintenance, inspection, and operator drills required to ensure operators can close a rupture mitigation valve as soon as practicable but within 40 minutes. Demonstration and verification requirements are proposed, including point-to-point verification tests for rupture-mitigation valves that are ASVs or RCVs and initial validation drills and periodic confirmation drills for any manually or locally operated valves identified as rupture-mitigation valves. This section would also require an operator to identify corrective actions and lessons learned resulting from its validation or confirmation drills and sha:re and implement those lessons learned across its entire network of pipeline systems.
Sec. 195.452 Pipeline Integrity Management in High Consequence Areas
PHMSA proposes to revise § 195.452(i)(4) to clarify the existing
requirements for the condnct of EFRD evaluations for HCAs, particula:rly when operators use EFRDs as rupture mitigation valves on applicable lines. Further, the amendments would also
require that operators be able to evaluate and demonstrate that they could identify a rupture within 10 minutes in accordance with the proposed§ 195.402 and meet the standard specified in the proposed§ 195.418 to isolate shut-off segments that could affect HCAs during rupture events, and the amendments would require that any EPRDs installed on shut-off segments also comply with the design, operatiou, testing, and maintenance requirements of §§ 195.258, 195.260, 195.402, and
195.420.
VI. Regulatory Analyses and Notices
A. Statuto1y/Legal Authority for This Rulemaking
This NPRM is published under the authority of the Federal Pipeline Safety Law (49 U.S.C. 60101 et seq.). Section 60102 authorizes the Secretary of Transportation to issue regulations governing the design, installation, inspection, emergency procedures, testing, construction, extension, operation, replacement, and maintenance of pipeline facilities. The Secretary delegated this authority to PHMSA at 49 CFR 1.97(a).
B. Executive Ordern 12866 and 13771, and DOT Regulatory Policies and Procedures
Executive Order 12866 requires agencies to regulate in the "most cost effective manner," to make a "reasoned determination that the benefits of the intended regulation justify its costs," and to develop regulations that "impose the least burden on society.'' This NPRM has been determined to be significant under Executive Order 12866 and the Department of Transportation's Regulatory Policies and Procedures. This NPRM has been reviewed by the Office of Management and Budget in
accordance with Executive Order 12866 (Regulatory Planning and Review) and is consistent with the Executive Order 12866 requirements and 49 U.S.C. 60102(b)(5)-(6). Consistent with Executive Order 12866, PHMSA has prepared a preliminary assessment of the benefits and costs of the proposed rule as well as reasonable alternatives. PHMSA anticipates that, if promulgated, this NPRM will provide benefits to the public through more rapid valve closure resulting in better consequence mitigation.
For hazardous liquid pipelines, most damages are calculated by the cost of cleanup and long-term environmental remediation.39 Therefore, a reduction in the amount of product released from a hazardous liquid pipeline can directly correlate to a reduction in damages. As discussed earlier in this NPRM, in tlie Enbridge incident near Marshall, MI, the pipeline continued to pump oil for 18 hours before valves were closed, resulting in approximately 20,000 barrels of oil being released. With faster rupture detection, pump shutdowns, and valve closures in line with this NPRM, the pipeline would have been isolated 17 hours and 20 minutes
39PHMSA notes that HVL releases may have similar incident profiles to natural gas transmission pipelines, as escaping product can be ignited and cause similar damage via a rupture.
ea:rlier, which would have resulted in a substantially lower spill size, environmental impact, and remedial costs.
Natural gas transmission pipeline incidents result predominately in fatalities, injuries, or property damages that are not linearly related to the quantity of natural gas released, For small incidents and for those incidents in remote locations, damages may be limited to pipeline repair and gas loss costs, La:rger incidents, on the other hand, likely involve the ignition of gas and extensive property damage and personal injury, depending on the location of the release and its proximity to buildings, homes, or other a:reas. A reduction in the cumulative product release over these types of incidents would not necessarily imply avoided damages in the way that it would apply to hazardous liquid pipelines as discussed above. For example, in the PG&E incident, the homes destroyed by the initial rupture would not have been saved through a more prompt valve closure. However, as discussed earlier in this document, during the 95 minutes it took PG&E to isolate the ruptured segment, the fue resulting from the rupture was being fed by the transmission line, and firefighters could not start firefighting and containment activities until the line was isolated. Earlier valve closme, in that
circumstance, could have limited the spread of fire and additional damage beyond the immediate rupture area.
PHMSA estimates that the NPRM will result in annualized costs of approximately $3.1 million per year, calculated at a 7 percent discount rate. The table below presents the annualized costs for the baseline and this NPRM, at a 3 percent and a 7 percent discount rate:
TABLE 1-ANNUALIZED COSTS OF THE
PROPOSED RULE
[Millions 2015$]
7% 3% System type Discount Discount rale rate
Gas transmission $1.2 $1.0 Hazardous liquid ..... 1.9 1.5
Total ....... , .... ............. 3.1 2.5
The NPRM is expected to be an E.O. 13771 regulatory action. Details on the estimated costs of this NPRM can be found in the rule's economic analysis.
For more information, please see the PRIA in the docket for this rulemaking.
Federal Register/Vol. 85, No. 25/Thursday, February 6, 2020/Proposed Rules 7181
C. Executive Order 13132: Federalism
PHMSA has analyzed this rulemaking action according to Executive Order 13132 ("Federalism"). While this NPRM may preempt some State requirements, it does not impose any regulation that has substantial direct effects on the States, the relationship between the national government and the States, or the distribution of power and responsibilities among the various levels of government. Therefore, the consultation and funding requirements of Executive Order 13132 do not apply, The pipeline safety laws, specifically 49 U.S.C. 60104(c), prohibit State safety regulation of interstate pipelines. Under the pipeline safety laws, States have the ability to augment pipeline safety requirements for intrastate pipelines, but may not approve safety requirements less stringent than those required by Federal law, A State may also regulate an intrastate pipeline facility PHMSA does not regulate.
D. Regulatory Flexibility Act
The Regulatory Flexibility Act, as amended by the Small Business Regulatory Flexibility Fairness Act of 1996, requires Federal regulatory agencies to prepare an Initial Regulatory Flexibility Analysis (!RF A) for any proposed rule subject to notice-and comment rulemaking under the Administrative Procedure Act unless the agency head certifies that the rulemaking will not have a significant economic impact on a substantial number of small entities.
PHMSA prepared an !RF A of the potential economic impact on small
entities, which is available in the docket for this NPRM. For a worst-case scenario, PHMSA compared compliance costs to estimated sales for businesses. Average annualized costs could exceed
1 percent of sales for 34 (8 percent) of the estimated small gas transmission entities and 12 (19 percent) of the estimated small hazardous liquid operators for a total of 46 (10 percent) entities combined across both sectors. Average annualized costs conld exceed
3% of sales for 3 (1 percent) gas transmission operators and 4 (6 percent) hazardous liquid operators, which
represent 7 (1 percent) of the total estimated small business entities.
Due to various uncertainties in the screening analysis (see Table 7 in the IRFA), PHMSA seeks comments regarding the impacts of the NPRM on small entities. PHMSA will subsequently modify the IRF A and make a determination as to whether this
NPRM will have a significant economic
impact on a number of small entities at the final rule stage.
E. National Environmental Policy Act
PHMSA analyzed this NPRM in accordance with section 102(2)(c) of the National Environmental Policy Act (42 U.S,C. 4332), the Council on Environmental Quality regulations (40 CFR parts 1500-1508), and DOT Order 5610.lC, and has preliminarily determined this action will not
significantly affect the quality of the human environment. The Environmental Assessment for this NPRM is in the docket.
F. Executive Order 13175: Consultation and Coordination With Indian Tribal
Governments
PHMSA has analyzed this NPRlvf in accordance with the principles and criteria contained in Executive Order 13175 ("Consultation and Coordination with Indian Tribal Governments"). Because this NPRM is not expected to have Tribal implications and is not expected to impose substantial direct compliance costs on Indian Tribal governments, PHMSA does not anticipate that the funding and consultation requirements of Executive Order 13175 will apply. PHMSA seeks
comment on the applicability of the executive order to this NPRM.
G. E'xecutive Order 13211
This NPRM is not anticipated to be a "significant energy action" under Executive Order 13211 (Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use). It is not likely to have a significant adverse effect on supply, distribution, or energy use. Further, the Office of Information and Regulatory Affairs has not designated this proposed rule as a significant energy action.
H. Paperwork Reduction Act
Pursuant to 5 CFR 1320.B(d), PHMSA is required to provide interested members of the public and affected agencies with an opportunity to
comment on information collection and recordkeeping reqnests, PHMSA estimates that the proposals in this NPRM will create the following Paperwork Reduction Act impacts:
PHMSA proposes to create a new information collection to cover the recordkeeping requirement for postΞ incident recordkeeping called:
''Rupture/Shut-off Valve: Post-Incident Records for Pipeline Operators.'' PHMSA also proposes to create a new information collection called "Alternative Technology for Onshore
Rnpture Mitigation Notifications" to cover this specific notification requirement.
PHMSA will submit information collection requests to the Office of Management and Bndget (0MB) for approval based on the reqnirements that trigger components of the Paperwork Rednction Act in this NPRM. PHMSA
will also request two new 0MB Control Numbers for these collections. These information collections are contained in the pipeline safety regulations, 49 CFR parts 190-199. The following information is provided for each of these information collections: (1) Title of the information collection; (2) 0MB control number; (3) Current expiration date; (4) Type of reqnest; (5) Abstract of the information collection activity; (6) Description of affected public; (7) Estimate of total annual reporting and recordkeeping bnrden; and (8) Frequency of collection. The information collection burdens are estimated as follows:
1. Title: "Ruptme/Valve Shut-off: Post-Incident Records for Pipeline Operators."
0MB Control Number: Will request one from 0MB.
Current Expiration Date: New Collection-To be determined,
Abstract: This NPRM proposes to amend 49 CFR 192.617 and 195.402 to reqnire operators who have experienced a rupture or rupture-mitigation valve shnt-offto complete a post-incident summary. The post-incident summary, all investigation and analysis documents used to prepare it, and
records of lessons learned must be kept for the life of the pipeline. PHMSA estimates this recordkeeping requirement will result in 50 responses
annually and has allotted each respondent 8 honrs per response to make and maintain the required records.
PHMSA does not currently have an information collection that covers this requirement and will request the approval of this new collection, along with a new 0MB Control Number, from the Office of Management and Bndget.
Affected Public: Operators of PHMSA regulated pipelines.
Annual Reporting and Recordkeeping Burden:
Total Annual Responses: 50. Total Annual Burden Hours: 400. I<i·equency of Collection: On occasion.
2. Title: "Alternative Equivalent Technology for Onshore Rupture
Mitigation Notifications."
0MB Control Number: Will request one from 0MB.
Current Expiration Date: New Collection-To be determined.
7182 Federal Register/Vol. 85, No, 25 /Thursday, February 6, 2020/Proposed Rules
Abstract: This NPRM proposes a new paragraph (d) in both 49 CFR 192.634 and 195.418 requiring operators who elect to use alternative equivalent technology to notify, in accordance with 192.949, the Office of Pipeline Safety at least 90 days in advance of use, An operator choosing this option must include a technical and safety evaluation, including design, construction, and operating procedures for the alternative equivalent technology to the Associate Administrator of Pipeline Safety with the notification. PHMSA would then have 90 days to
object to the alternative equivalent technology via letter from the Associate Administrator of Pipeline Safety; otherwise, the alternative equivalent technology would be acceptable for use, PHMSA estimates this notification requirement will result in 2 responses annually and has allotted each respondent 40 hours per response to conduct this task. PHMSA does not currently have an information collection that covers this requirement and will request the approval of this new collection, along with a new 0MB Control Number, from the Office of Management and Budget.
Affected Public: Operators of PHMSA regulated pipelines.
Annual Reporting and Recordkeeping Burden:
Total Annual Responses: 2, Total Annual Burden Hours: BO. Frequency of Collection: On occasion. Requests for copies of these information collections shonld be directed to Angela Hill, Office of Pipeline Safety (PHP-30), Pipeline and Hazardous Materials Safety Administration, 2nd Floor, 1200 New Jersey Avenue SE, Washington, DC
20590-0001, Telephone: 202-366-1246. Comments arn invited on: (a) The need for the proposed collection of information for the proper performance of the functions of the agency, including whether the information will have practical utility;
(b) The accuracy of the agency's estimate of the burden of the revised collection of information, including the validity of the methodology and assumptions used;
(c) Ways to enhance the quality, utility, and clarity of the information to be collected; and
(d) Ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques.
(e) Ways the collection of this information is beneficial or not beneficial to public safety,
Send comments directly to the Office of Management and Budget, Office of Information and Regulatory Affairs, Attn: Desk Officer for the Department of Transportation, 725 17th Street NW, Washington, DC 20503. Comments should be submitted on or prior to April 6, 2020.
I. Unfunded Mandates Reform Act of
1995
The analysis PHMSA performed in accordance with preparing the Preliminary Regulatory Impact Assessment does not expect this NPRM to impose unfunded mandates per the Unfunded Mandates Reform Act of 1995. It is not expected to result in costs of $100 million, adjusted for inflation, or more in any one (1) year to either State, local, or tribal governments, in the aggregate, or to the private sector, and is the least burdensome alternative that achieves the objective of the proposed rulemaking. A copy of the Preliminary Regulatory Impact Assessment is available for review in the docket.
J. Privacy Act Statement
Anyone may search the electronic form of all comments received for any of our dockets. You may reviewDOT's complete Privacy Act Statement,
published on April 11, 2000 (65 FR
19476), in the Federal Register at: https :I lwww.govinfo.gov/ content/FR-
2000-04-11 /pdf/00-8505.pdf.
K. Regulation Identifier Nwnbe1·
A regulation identifier number (RIN) is assigned to each regulatory action listed in the Unified Agenda of Federal Regulations. The Regulatory Information Service Center publishes the Unified Agenda in April and October of each year. The RIN contained in the heading of this document may be used to cross reference this action with the Unified Agenda.
List of Subjects
49 CFR Port 192
Gas, Incorporation by reference, Natural gas, Pipeline safety, Reporting and record.keeping requirements.
49 CFR Part 195
Anhydrous ammonia, Carbon dioxide, Incorporation by reference, Petroleum, Pipeline safety, Reporting and recordkeeping requirements.
In consideration of the foregoing, PHMSA proposes to amend 49 CFR parts 192 and 195 as follows:
PART 192-TRANSPORTATION OF NATURAL GAS AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS
■1. The authority citation for part 192 continues to read as follows:
Authority: 30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101 et. seq., and 49 CFR 1.97. ■2. In§ 192,3, the definition of
"rupture" is added in alphabetical order to read as follows:
§ 192.3 Definitions. * * ' • • Rupture means any of the following events that involve an uncontrolled release of a large volume of gas:
(1) A release of gas observed or reported to the operator by its field
personnel, nearby pipeline or utility personnel, the public, local responders, or public authorities, and that may be representative of an unintentional and uncontrolled release event defined in paragraphs (2) or (3) of this definition;
(2) An unanticipated or unplanned pressure loss of 10 percent or greater, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the pressure loss the need for a higher pressille change threshold due to pipeline flow dynamics that cause fluctuations in gas demand that are typically higher than a pressure loss of 10 percent in a time interval of 15 minutes or less; or
(3) An unexplained flow rate change, pressure change, instrumentation indication, or equipment function that may be representative of an event defined in paragraph (2) of this definition.
Note: Rupture identification occurs when a rupture, as defined in this section, is first observed by or reported to pipeline operating personnel or a controller.
* * * • * ■3. In§ 192.179, paragraph (e) is added to read as follows:
§ 192.179 Transmission line valves. • • * • • {e) All onshore transmission line segments with diameters greater thau or equal to 6 inches that are constructed or entirely replaced after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF
FINAL RULE] must have automatic shutoff valves, remote-control valves, or equivalent technology installed at intervals meeting the appropriate valve
spacing requirements of this section, An operator may only install a manual valve under this pm:agraph if it can demonstrate to PHMSA that installing an automatic shutoff valve, remote-
Federal Register/Vol. 85, No. ZS /Thursday, February 6, 2020 /Proposed Rules 7183
control valve, or equivalent technology would be economically, technically, or operationally infeasible. An operator using alternative equivalent technology or manual valve mnst notify PHMSA in accordance with the procedure in § 192.634(h), All valves and technology
installed under this paragraph must meet the requirements of§ 192.634(c),
(d), (f), and (g). ■4. Section 192.610 is added to read as follows:
§ 192.610 Change in class location: Change in valve spacing.
If a class location change on a transmission line occurs after
[EFFECTIVE DATE OF F1NAL RULE] and results in pipe replacement to meet the maximum allowable operating pressure requirements in§§ 192.611, 192.619, or 192.620, then the requirements in§§ 192.179 and 192.634 apply to the new class location, and the operator must install valves as necessary to comply with those sections. Such valves must be installed within 24 months of the class location change in accordance with§ 192.611(d). ■5. In§ 192.615, paragraphs (a)(2), (6),
(8), and (11), and paragraph (c) introductory text are revised to read as follows:
§ 192.615 Emergency plans. (a)* * * (2) Establishing and maintaining adequate means of communication with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, to learn the responsibility, resources, jurisdictional area, and emergency contact telephone numbers for both local and out-of-area calls of each government organization that may respond to a pipeline emergency, and to inform the officials about the operator's
ability to respond to the pipeline emergency and means of conununication. • • * * * (6) Taking necessary actions, including but not limited to, emergency shutdown, valve shut-off, and pressure reduction, in any section of the operator's pipeline system to minimize hazards of released gas to life, property, or the environment. Each operator installing valves in accordance with
§ 192.179(e) or subject to the requirements in§ 192.634 must also evaluate and identify a rupture as defined in§ 192.3 as being an actual rupture event or non-rupture event in accordance with operating procedures as soon as practicable but within 10 minutes of the initial notification to or
by the operator, regardless of how the rupture is initially detected or observed. • • • • • (8) Notifying the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, of gas pipeline emergencies to coordinate and share information to determine the location of the release, including both planned responses and actual responses during an emergency. The operator
(pipeline controller or the appropriate operator emergency response coordinator) must immediately and directly notify the appropriate public safety answering point (9-1-1 emergency call center) or other coordinating agency for the communities and jurisdictions in which the pipeline is located after the operator determines a rupture has occurred when a release is indicated and rupture mitigation valve closure is implemented, • * • • • (11) Actions required to be taken by a controller during an emergency in accordance with the operator's emergency plans and§§ 192.631 and 192,634. • • • • • (c) Each operator must establish and maintain liaison with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials to: • • • • • ■6. Section 192.617 is revised to read as follows:
§ 192.617 Investigation of failures and incidents.
(a) Post-incident procedures. Each operator must establish and follow post incident procedures for investigating and analyzing failures and incidents as defined in§ 191.3, including sending the failed pipe, component, or equipment for laboratory testing or examination, where appropriate, to determine the causes and contributing factors of the failure or incident and minimize the possibility of a recurrence.
(b) Post-incident lessons learned. Each operator must develop, implement, and incorporate lessons learned from a post-incident review into its procedures, including in pertinent operator
personnel training and qualification programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications.
(c) Analysis of rupture and valve shut offs; prnventive and mitigative measures. If a failure or incident involves a rupture as defined in § 192.3
or the closure of a rupture-mitigation valve as defined in§ 192.634, the operator must also conduct a post incident analysis of all factors impacting the release volume and the consequences of the release, and identify and implement preventive and mitigative measures to reduce or limit the release volume and damage in a future failure or incident. The analysis must include all relevant factors impacting the release volume and consequences, including, bnt not limited to, the following:
(1) Detection, identification, operational response, system shut-off, and emergency response communications, based on the type and volume of the release or failnre event;
(2) Appropriateness and effectiveness of procedures and pipeline systems, including SCADA, communications, valve shut-off, and operator personnel;
(3) Actual response time from rupture detection to initiation of mitigative actions, and the appropriateness and effectiveness of the mitigative actions taken;
(4) Location and the timeliness of actuation of rupture-mitigation valves identified under§ 192.634; and
(5) All other factors the operator deems appropriate.
(d) Rupture post-incident summary. If a failure or incident involves a rupture as defined in§ 192.3 or the closure of a rupture-mitigation valve as defined in
§ 192.634, the operator must complete a summary of the post-incident review required by paragraph (c) of this section within 90 days of the failure or incident, and while the investigation is pending, conduct quarterly status reviews until completed. The post-incident summary and all other reviews and analyses produced under the requirements of this section must be reviewed, dated, and signed by the appropriate senior executive officer, The post-incident summaxy, all investigation and analysis documents used to prepare it, and records of lessons learned must be kept for the useful life of the pipeline. ■7. Section 192.634 is added to read as follows:
§ 192.634 Transmission lines: Onshore valve shut-off for rupture mitigation.
(a) Applicability. For onshore transmission pipeline segments with nominal diameters of 6 inches or greater in high consequence fil'eas or Class 3 or Class 4 locations that are constructed or where 2 or more contiguous miles have been replaced after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE], an operator must install rupture mitigation valves according to the requirements of this section. Rupture-
7184 Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules
mitigation valves mnst be operational within 7 days of placing the new or replaced pipeline segment in service.
(b) Maximum spacing between valves. Rupture-mitigation valves mnst be installed in accordance with the following requirements:
(1) High Consequence Areas. For purposes of this paragraph (b)(l), "shnt off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream high consequence area segment endpoint and the downstream mainline valve closest to the downstream high consequence area segment endpoint so that the entirety of the high consequence area segment is between at least two rnptnre mitigation valves. If any crossover or lateral pipe for gas receipts or deliveries connects to the shnt-off segment between the upstream and downstream mainline valves, then the segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to be transported to the rupture site (except for residual gas already in the shut-off segment), All such valves on a shut-off segment are "rnpture-mitigation valves.'' Multiple high consequence areas may be contained within a single shut-off segment. The distance between rupture-mitigation valves for each shut off segment must not exceed:
(i) 8 miles if one or more high conseqnence areas in the shutoff segment is in a Class 4 location;
(ii) 15 miles if one or more high consequence areas in the shutoff segment is in a Class 3 location, and
(iii) 20 miles if all high consequence areas in the shutoff segment are located in Class 1 or 2 locations, or
(iv) The mainline valve spacing requirements of§ 192.179 wheu mainline valve spacing does not meet § 192.634(b)(1)(i), (ii), or (iii).
(2) Class 3 locations, For pnrposes of this paragraph, "shut-off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream endpoiut of the Class 3 location and the downstream mainline valve closest to the downstream endpoint of the Class 3 location so that the entirety of the Class 3 location is between at least two rupture-mitigation valves. If any crossover or lateral pipe for gas receipts or deliveries connects to the shut-off segment between the upstream and downstream mainline valves, the shut off segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to be transported to the rnpture site
(except for residual gas already in the shut-off segment), All such valves on a shnt-off segment are ''rupture-mitigation valves." Multiple Class 3 locations may be contained within a single shut-off segment. The distance between mainliue valves serving as rupture mitigation valves for each shut-off segment must not exceed 15 miles.
(3) Class 4 locations, For purposes of this paragraph, "shut-off segment" means the segment of pipe between the upstream mainline valve closest to the upstream endpoint of the Class 4 location and the dowustream mainline valve closest to the downstream endpoiut of the Class 4 location so that the entirety of the Class 4 location is between at least two rupture-mitigation valves. If any crossover or lateral pipe for gas receipts or deliveries connects to the shut-off segment between the upstream and downstream mainline
valves, the shut-off segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed, there is no flow path for gas to be transported to the rupture site (except for residual gas already in the shut-off segment). All such valves on a shut-off segment are "rupture-mitigation valves." Multiple Class 4 locations may be contained within a single shut-off segment, The distance between mainline valves serving as rnptnre mitigation valves for each shut-off segment mnst not exceed 8 miles,
(4) Laterals. Laterals extending from shut-off segments that contribute less than 5 percent of the total shnt-off segment volnme may have rupture mitigation valves that meet the
actuation requirements of this section at locations other than mainline receipt/ delivery points, as long as all of these laterals contributing gas volumes to the shut-off segment do not coutribute more than 5 percent of the total shut-off segment gas volume, based upon maximum flow volume at the operating pressure,
(c) Valve sl1ut-offtime for rupture mitigation. Upon identifying a rupture, the operator must, as soon as practicable:
(1) Commence shut-off of the rupture mitigation valve or valves which would have the greatest effect on minimizing the release volnme and other potential safety and environmental consequeuces of the discharge to achieve full rnptnre mitigation valve shut-off within 40 minntes of rnptnre identification; and
(2) Initiate other mitigative actions appropriate for the situation to miuimize the release volume and potential adverse consequences.
(d) Valve shut-off capability. Onshore transmission line rupture-mitigation valves must have actuation capability (i.e., remote-control shut-off, automatic shut-off, equivalent technology, or manual shut-off where personnel are in proximity) to ensure pipeline ruptures are promptly mitigated based upon maximum valve shut-off times, location, and spacing specified in paragraphs (b) and (c) of this section to mitigate the volmne and consequence of gas released.
(e) Valve shut-off methods. All onshore transmission line rupture mitigation valves must be actuated by oue of the following methods to mitigate a rupture as soon as practicable but within 40 minntes of rupture identification:
(1) Remote control from a location that is continuously staffed with personnel trained in rupture response to provide immediate shut-off following identification of a rupture or other decision to close the valve;
{2) Automatic shut-off following identification of a rupture; or
(3) Alternative equivalent technology that is capable of mitigating a rupture in accordance with this section.
(4) Manual operation upon identificatiou of a rnptnre. Operators using a manual valve in accordance with§ 192.179(e), must apprapriately station personnel to ensure valve shut off in accordance with paragraph (c) of this section. Manual operation of valves must include time for the assembly of necessary operating personnel, the acquisition of necessary tools and equipment, driving time under heavy traffic conditions and at the posted speed limit, walking time to access the
valve, and time to manually shut off all valves, not to exceed the 40-minute total response time in paragraph (c)(1) of this section.
(f) Valve monitoring and operation capabilities. Onshore transmission line rupture-mitigation valves actuated by methods in paragraph (e) of this section
must be capable of being:
(1) Monitored or controlled by either remote or onsite personnel;
(2) Operated during normal, abnormal, and emergency operating conditions;
(3) Monitored for valve status (i.e., open, closed, or partial closed/open), upstrefilll pressm·e, and downstrefilll pressure, Pipeline segments that use manual valve operation must have the capability to monitor pressures and gas flow rates on the pipeline to be able to identify and locate a rupture;
( 4) Initiated to close as soon as practicable after identifying a rupture and with complete valve shnt-offwithiu
Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules 7185
40 minutes of rupture identification as specified in paragraph (c) of this section; and
(5) Monitored and controlled by remote personnel or must have a back up power source to maintain SCADA or
other remote communications for remote control shut-off valve or automatic shut-off valve operational status,
(g) Monitol'ing ofvolve shut-off response status. Operating control personnel must continually monitor rupture-mitigation valve position and operational status of all rupture mitigation valves for the affected shut off segment during and after a rupture event until the pipeline segment is isolated. Such monitoring must be maintained through continual electronic communications with remote instrumentation or through continual verbal communication with onsite personnel stationed at each rupture mitigation valve, via telephone, radio, or equivalent means.
(h) Alternative equivalent technology or manual valves for onshore transmission rupture mitigation. If an operator elects to use alternative equivalent technology or manual valves in accordance with§ 192.179(e), tbe operator must notify PHMSA at least 90 days in advance of installation or use in accordance with§ 192.949. The operator must include a technical and safety evaluation in its notice to PHMSA, including design, construction, and operating procedures for the alternative equivalent technology or manual valve. Operators installing manual valves must also demonstrate that installing an automatic shutoff valve, a remote control valve, OT equivalent technology would be economically, technically, or operationally infeasible. An operator may proceed to use the alternative equivalent technology or manual valves 91 days after submitting the notification unless it receives a letter from the Associate Administrator of Pipeline Safety informing the operator that PHMSA objects to the proposed use of the alternative equivalent technology or manual valves or that PHMSA requires additional time to conduct its review. ■8. In§ 192.745 paragraphs (c), (d), and (e) are added to read as follows:
§192.745 Valve maintenance: Transmission lines.
* * * * * (c) For each valve installed under § 192.179(e) and each rupture-mitigation
valve under§ 192.634 that is a remote control shut-off or automatic shut-off valve, or that is based on alternative equivalent technology, the operator must conduct a point-to-point
verification between SCADA displays and the mainline valve, sensors, and communications equipment in accordance with§ 192.631(c) and (e).
(d) For each rupture-mitigation valve under§ 192.634 that is manually or locally operated:
(1) Operators must establish the 40- minute total response time as required by§ 192.634 through an initial drill and through periodic validation as required in paragraph (d)(2) of this section. Each phase of the drill response must be reviewed and the results documented to validate the total response time, including valve shut-off, as being less than or eqnal to 40 minutes following rupture identification.
(2) A mainline valve serving as a rupture-mitigation valve within each pipeline system and within each operating or maintenance field work unit must be randomly selected for an annual 40-minute total response time validation drill that simulates worst case conditions for that location to ensure compliance. The response drill must occur at least once each calendar year, with intervals not to exceed 15 months.
(3) If the 40-minute maximum response time cannot be validated or achieved in the drill, the operator must revise response efforts to achieve compliance with§ 192.634 no later than 6 months after the drill. Alternative valve shut-off measures must be in place in accordance with paragraph (e) of this section within 7 days of a failed drill.
(4) Based on the results of response̽ time dxills, the operator must inclnde lessons learned in:
(i) Training and qualifications programs; and
(ii) Design, construction, testing, maintenance, operating, and emergency procedures manuals; and
(iii) Any other areas identified by the operator as needing improvement.
(e) Each operator must take remedial measures to correct any valve installed under§ 192.179(e) or any rupture mitigation valve identified in§ 192.634 that is found to be inoperable or unable to maintain shut-off, as follows:
(1) Repair or replace the valve as soon as practicable but no later than 6 months after finding that the valve is inoperable or unable to maintain shut̾ off; and
(2) Designate an alternative compliant valve within 7 calendar days of the finding while repairs are being made. ■9. In§ 192.935, paragraph (c) is revised to read as follows:
§ 192.935 What additional preventive and mitigative measures must an operator take? • * • • *
(c) Risk analysis for gas releases and protection against ruptures. If an operator determines, based on a risk analysis, that an automatic shut-off valve (ASV) or remote-conb·ol valve (RCV) would be an efficient means of adding protection to a high consequence area in the event of a gas release, an operator must install the ASV or RCV. In making that determination, an operator must, at least, consider the
following factors-swiftness of leak detection and pipe shutdown capabilities, the type of gas being transported, operating pressure, the rate of potential release, pipeline profile, the potential for ignition, and location of nearest response personnel.
(1) Pl'otection of onshore transmission high consequence areas from ruptures. An operator of an onshore transmission pipeline segment that is constructed, or that has 2 or more contiguous miles replaced, after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE] and is greater than OT equal to 6 inc bes in nominal diameter and is located in a high consequence area mnst provide for the additional protection of those pipeline segments to assure the timely termination and mitigation of rupture events by complying with §§ 192.615(a)(6), 192,634, and 192.745.
At a minimum, the analysis specified in paragraph (c) of this section must demonstrate that the operator can achieve tbe following standards for termination of rupture eveuts:
(i) Operators must identify a rupture event as soon as practicable but within 10 minutes of the initial notification to or by the operator, in accordance with § 192.615(a)(6), regardless of how tbe
rupture is initially detected or observed;
(ii) Operators must begin closing shut off segment rupture-mitigation valves as soon as practicnble after identifying a rupture in accordance with § 192.634; and
(iii) Operators must achieve complete segment shut-off and isolation as soon as practicable after rupture detection but within 40 minutes of rupture identification in accordance with § 192,634.
(2) Compliance deadlines. The risk analysis and assessments specified in paragraph (c) of this section must be completed prior to placing into service onshore transmission pipelines constructed or where 2 or more contiguous miles have been replaced after [DA TE 12 MONTHS AFTER
EFFECTIVE DATE OF FINAL RULE]. Implementation of risk analysis and assessment findings for rupture
mitigation valves must meet § 192,634.
(3J Periodic evaluations. Risk analyses and assessments conducted under
7186 Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules
paiagraph (c) of this section must be reviewed by the operator for new or existing operational and integrity matters that would affect rupture mitigation on an annual basis, not to exceed a period of 15 months, or within 3 months of an incident or safetyƌrelated condition, as those terms are defined at §§ 191.3 and 191.23, respectively, and
certified by the signature of a senior executive of the company. * * * • •
PART 195-TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE
■10. The authority citation for part 195 continues to read as follows:
Authority: 30 U.S.C. 185(w)(3), 49 U,S.C. 5103, 60101 et seq., and 49 CFR 1.97. 11 11. In§ 195.2, the definition for "rupture" is added in alphabetical order to read as follows;
§ 195.2 Definitions. • • • * * Rupture means any of the following events that involve an uncontrolled release of a laige volume of hazardons liquid or caibon dioxide:
(1) A release of hazardous liquid or carbon dioxide observed and reported to the operator by its field personnel, nearby pipeline or utility personnel, the public, local responders, or pnblic
authorities, and that may be representative of an unintentional and uncontrolled release event defined in paragraphs (2) or (3) of this definition;
(2) An unanticipated or unplanned flow rate change of 10 percent or greater or a pressure loss of 10 percent or
greater, occurring within a time interval of 15 minutes or less, unless the operator has documented in advance of the flow rate change or pressure loss the need for a higher flow rate change or higher pressure-change threshold due to
pipeline flow dynamics and terrain elevation changes that cause fluctuations in hazardous liqnid or carbon dioxide flow that are typically higher than a flow rate change or pressure loss of 10 percent in a time interval of 15 minutes or less; or
(3) An unexplained flow rate change, pressure change, instrumentation indication or equipment function that may be representative of an event defined in paragraph (2) of this definition.
Note: Rupture identification occurs when a rupture, as defined in this section, is first observed by or reported to pipeline operating personnel or a controller.
• * * • • ■12. In§ 195.258, paragraph (c) is added to read as follows:
§195.258 Valves: General. • • , , ' (c) All onshore hazardous liquid or carbon dioxide pipeline segments with diameters greater than or equal to 6 inches that are constructed or entirely replaced after [DATE 12 MONTHS AFTER EFFECTIVE DATE OF F1NAL RULE] must have automatic shutoff
valves, remote-control valves, or equivalent technology installed at intervals meeting the appropriate valve location and spacing requirements of
this section and§ 195.260. An operator may only install a manual valve under this paragraph ifit can demonstrate to PHMSA that installing an automatic shutoff valve, remote-control valve, or eqnivalent technology would be economically, technically, or operationally infeasible. An operator installing alternative equivalent technology or mannal valves must notify PHMSA in accordance with the procedure at§ 195.418(h). Valves and technology installed under this section mnst meet the requirements of § 195.418(c), (d), (f), and (g).
■13. In§ 195.260, parngraphs (c) and (e) are revised and paragraphs (g) and (h) are added to read as follows:
§ 195.260 Valves: Location. • * ' * , (c) On each mainline at locations along the pipeline system that will minimize or prevent safety risks, property damage, or environmental hann from accidental hazardous liquid or carbon dioxide discharges, as appropriate for onshore areas, offshore areas, or high consequence areas. For
onshore pipelines constructed or that have had 2 or more contiguons miles replaced after [DATE 12 MONTHS AFTER EFFECTIVE DA TE OF FINAL RULE], mainline valve spacing must not exceed 15 miles for pipeline segments that could affect high consequence areas (as defined in§ 195.450) and 20 miles for pipeline segments that could not affect high consequence areas, Valves protecting high consequence areas must be located as determined by the operator's process for identifying preventive and mitigative measures established in§ 195.452(i) and by nsing a process, snch as is set forth in Section l.B of Appendix C of pai·t 195, hut with a maximum distance from the high consequence area segment endpoints that does not exceed 7½ miles. • • * * * (e) On oach side of a water crossing that is more than 100 feet (30 meters) wide from high-water mark to highƌ water mark as follows, unless the Associate Administrator finds under pai-agraph (e)(3) of this section that
valves or valve spacing is not necessaiy in a particnlar case to achieve an equivalent level of safety:
(1) Valves must either be located outside of the flood plain or have valve actuators and other control equipment installed to not be impacted by flood conditions; and
(2) For multiple water crossings, valves must be located on the pipeline upstream and downstream of the first and last water crossings so that the total distance between the first upstream valve and last downstream valve does not exceed 1 mile.
(3) An operator may notify PHMSA in accordance with paragraph (h) of this section if in a particular case the valves or valve spacing required by this paragraph is not necessary to achieve an equivalent level of safety. Unless the Associate Administrator finds in that particular case the valves or valve spacing required by this parngraph are not necessary to achieve an equivalent levol of safety, the operator must comply with the valve and valve spacing reqnirements of this paragraph. • ' • • *
(g) On each mainline highly volatile liquid (HVL) pipeline that is located in a high population area or other populated area as defined in§ 195.450
and that is constructed or that has 2 or more contiguous miles replaced after
[DATE 12 MONTHS AFTER EFFECTIVE DATE OF FINAL RULE], with a ma.J<imum valve spacing of 7½ miles, nuless the Associate Administrator finds in a particular case that this valve spacing is not necessary to achieve an equivalent level of safety. An operator may notify PHMSA in accordance with paragraph (h) of this section if in a particular case the valve spacing required by this paragraph is not necessary to achieve an equivalent level of safety. Jf the Associate Administrator informs an operator that PHMSA objects, the operator must comply with the valve spacing requirements of this paragraph.
(h) An operator must provide any notification required by this section by:
(1) Sending the notification by electronic mail to InformationResourcesManager@dot.gov; or
(2) Sending the notification by mail to ATTN: Information Resources Manager, DOT/PHMSA/OPS, East Building, 2nd Floor, E22-321, 1200 New Jersey Ave. SE, Washington, DC 20590. 11 14. In§ 195.402, paragraphs (c)(4), (5), and (12), and (e)(l), (4), (7), and (10) are revised to read as follows:
Federal Register /Vol. 85, No. 25 /Thursday, February 6, 2020 /Proposed Rules 7187
§ 195.40 2 Procedural manual for operations, maintenance, and emergencies. • • • • • (c) * * * (4) Determining which pipeline facilities are in areas that would require an immediate response by the operator to prevent hazards to the public, property, or the environment if the facilities failed or malfunctioned, including segments that could affect high consequence areas and valves specified in either§§ 195.418 or 195.452(i)(4), (5) Investigating and analyzing pipeline accidents and failures, including sending the failed pipe, component, or equipment for laboratory testing or examination where appropriate, to determine the causes and contributing factors of the failure and minimize the possibility of a recurrence.
(i) Postlincident lessons learned. Each operator must develop, implement, and incorporate lessons learned from a post accident review into its procedures, including in pertinent operator personnel training and qualifications programs and in design, construction, testing, maintenance, operations, and emergency procedure mannals and specifications.
(ii) Analysis of rupture and valve shut-offs; preventive and mitigative measures. If a failure or accident involves a rupture as defined in§ 195.2 or a rupture-mitigation valve closure as defined in§ 195.418, the operator must also conduct a post-accident analysis of all factors impacting the release volume and the conseqnences of the release, and identify and implement preventive and mitigative measures to reduce or limit the release volume and damage in a future failure or incident. The analysis must inclnde all relevant factors impacting the release volume and
consequences, including, but not limited to, the following:
(A) Detection, identification, operational response, system shut-off, and emergency-response communications, based on the type and volume of the release or failure event;
(B) Appropriateness and effectiveness of procedmes and pipeline systems, including SCADA, communicatious, valve shut-off, and operator personnel;
(C) Actnal response time from rupture identification to initiation of mitigative actions, and the appropriateness and effectiveness of the mitigative actions taken;
(D) Location and the timeliness of actuation of all ruptme-mitigation valves identified under§ 195.418; and
(E) All other factors the operator deems appropriate.
(iii) Rupture post-incident summary. If a failure or incident involves a rupture as defined in§ 195,2 or the closure of a rupture-mitigation valve as defined in§ 195,418, the operator must complete a snmmary of the post accident review required by paragraph (c)(5)(ii) of this section within 90 days of the failure or incident, and while the investigation is pending, conduct quarterly status reviews until completed. The post-incident summary and all other reviews and analyses produced under the requirements of this section must be reviewed, dated, and signed by the appropriate senior executive officer. The post-incident summai-y, all investigation and analysis documents used to prepare it, and records of lessons learned must be kept for the useful life of the pipeline. • • • • •
(12) Establishing and maintaining adequate means of communication with the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other pnblic officials, to learn the responsibility, resources, jurisdictional area, and emergency contact telephone nnmbers for both local and out-of-area calls of each government organization that may respond to a pipeline emergency, and to inform the officials about the operator's
ability to respond to the pipeline emergency and means of communication. • • • • •
(e) * * *
(1) Receiving, identifying, and classifying notices of events that need
immediate response by the operator or notice to the appropriate public safety answering point (9-1-1 emergency call center), as well as fire, police, and other appropriate public officials, and communicating this information to appropriate operator personnel for conective action. • • • • •
(4) Taking necessary actions, including but not limited to, emergency shutdown, valve shut-off, and pressure reduction, in any section of the operator's pipeline system to minimize hazai·ds of released hazardous liquid or carbon dioxide to life, property, or the environment. Each operator installing valves in accordance with§ 195.258(c) or subject to the requirements in § 195.418 must also evaluate and identify a ruptnre as defined in§ 195.2 as being an actual rupture event or non rupture event in accordance with operating procedures as soon as
practicable but within 10 minutes of the initial notification to or by the operator,
regardless of how the rupture is initially detected or observed, • • • • • (7) Notifying the appropriate pnblic safety answering point (9-1-1 emergency call center), as well as fire, police, and other public officials, of hazardous liquid or carbon dioxide pipeline emergencies to coordinate and share information to determine the location of the release, including both planned responses and actual responses dnring an emergency, and any additional precautions necessary for an emergency involving a pipeline transporting a highly volatile liquid. The operator (pipeline controller or the appropriate operator emergency response coordinator) must immediately
and directly notify the appropriate public safety answering point (9-1-1 emergency call center) or other coordinating agency for the communities and jurisdictions in which the pipeline is located after the operator determines a rupture has occurred when a release is indicated and valve closure is implemented. • • • • • (10) Actions required to be taken by a controller during an emergency, in accordance with the operator's emergency plans and §§ 195.418 and 195,446, • • • • • ■15. Section 195.418 is added to read as follows:
§ 195.418 Valves: Onshore valve shut-off for rupture mitigation.
(a) Applicability. For onshore pipeline segments that could affect high consequence areas with nominal diameters of 6 inches or greater, that are constructed or where 2 or more contiguous miles are replaced after
[DATE 12 MONTHS AFTER THE EFFECTIVE DATE OF THE RULE], an operator must install rupture-mitigation valves according to the requirements of this section and § 195,260, Rupture mitigation valves mnst be operational within 7 days of placing the new or replaced pipeline segment in service.
(b) Maximum spacing between valves. Rupture-mitigation valves must be installed in accordance with the following requirements:
(1) For purposes of this section, a "shut-off segment" means the segment of pipe located between the upstream mainline valve closest to the upstream high consequence area segment endpoint and the downstream mainline valve closest to the downstream high conseqnence area segment endpoint so that the entirety of the segment that could affect the high consequence area
7188 Federal Register /Vol. 85, No. 25 / Thursday, Febmary 6, 2020 / Proposed Rules
is between at least two rupture mitigation valves. If any crossover or
lateral pipe for commodity receipts or deliveries connects to the shut-off segment between the upstream and
downstream mainline valves, the segment also extends to the nearest valve on the crossover connection(s) or lateral(s), such that, when all valves are closed1 there is no flow path for commodity to be transported to the
rupture site (except for residual liquids already in the shut-off segment). All such valves on a shut-off segment are
"rupture-mitigation valves." Multiple high consequence areas may be contained within a single shnt-off segment. All replacement pipeline segments that al'e over 2 continuous miles in length and could affect a high consequence area must include a minimum of one mainline valve that meets the requirements of this section. The distance between rupture
mitigation valves in high consequence areas for each shut-off segment must not exceed 15 miles, with a maximum distance not to exceed 7½ miles from the endpoints of a shnt-off segment. Valves on lines carrying highly volatile liquids in high popnlation areas and other popnlated areas, as those terms are defined in§ 195.450, must have rupture mitigation valves spaced at a maximum distance not exceeding 7½ miles.
(2) Lateral lines to shut-off segments that contribute less than 5 percent of the total shut-off segment commodity volume may have lateral rupture mitigation valves that meet the actuation requirements of this section at locations other than mainline receipt/ delivery points, as long as all of these laterals contributing hazardous liquid or carbon dioxide volumes to the shut-off segment do not contribute more than 5 percent of the total shnt-off segment commodity volume based upon maximum flow gradients and terrain.
(c) Valve shut-off time for rupture mitigation. Upon identifying a rupture, the operator must, as soon as practicable:
(1) Commence shut-off of the rupture mitigation valve or valves that would have the greatest effect on minimizing the release volume and other potential safety and environmental consequences of the discharge to achieve full rupture mitigation valve shnt-off within 40 minutes of rupture identification; and
(2) Initiate other mitigative actions appropriate for the situation to minimize the release volume and potential adverse consequences.
(d) Valve slmt-off capability. Onshore rupture-mitigation valves must have actuation capability (i.e., remote control shut-off, automatic shut-off, equivalent
technology, or manual shut-off where personnel are in proximity) to ensure pipeline ruptures are promptly mitigated based upon maximum valve shut-off times, location, and spacing specified in paragraphs (b) and (c) of this section to mitigate the volume and consequence of hazardous liquid or carhon dioxide released.
(e) Valve shut-off methods. All onshore rupture-mitigation valves must be actuated by one of the following methods to mitigate a rupture as soon as practicable but within 40 minutes of rupture identification:
(1) Remote control from a location that is continuously staffed with personnel trained in rupture response to provide immediate shut-off following identification of a rupture or other decision to close the valve;
(2) Automatic shut-off followiug an identification of a rupture; or
(3) Alternative equivalent technology tliat is capable of mitigating a rupture in accordance with this section.
(4) Manual operation upon identification of a rupture. Operators using a manual valve in accordance with§ 195.258 must appropriately station personnel to ensure valve shut off in accordance with paragraph (c) of this section. Manual operation of valves must include time for the assembly of necessary operating personnel, acquisition of necessary tools and equipment, driving time under heavy traffic conditions and at the posted speed limit, walking time to access the valve, and time to manually shut off all valves, not to exceed a 40-minnte total response time in paragraph (c){l) of this section.
(f) Valve monitoring and operation capabilitJ.'es. Onshore rupture-mitigation valves actuated by methods in paragraph (e) of this section must be capable of being:
(1) Monitored or controlled by either remote or onsite personnel;
(2) Operated during normal, abnormal, and emergency operating conditions;
(3) Monitored for valve status (i.e., open, closed, or partial closed/open), upstream pressure, and downstream pressure. Pipeline segments that nse manual valve operation must have the capability to monitor pressures and gas flow rates on the pipeline to be able to identify and locate a rupture;
(4) Initiated to close as soon as practicable after identifying a ruptnre and with complete valve shut-off within 40 minutes of rupture identification as specified in paragraph (c)(1) of this section; and
(5) Monitored and controlled by remote personnel or must have a back-
up power source to maintain SCADA or other remote communications for remote control shut-off valve or
automatic shut-off valve operational status.
(g) Monitoring of valve shut-off response status, Operating control personnel must continually monitor mptnre-mitigation valve position and operational status of all rupture mitigation valves for the affected shut off segment during and after a rupture event until the pipeline segment is isolated. Such monitoring must he maintained through continual electronic communications with remote iustrnmentation or through continual verbal communication with onsite personnel stationed at each mplureͰ
mitigation valve, via telephone, radio, or equivalent means,
(h) Alternative equivalent technology or manual valves fol' onshore rupture mitigation. If an operator elects to nse alternative equivalent technology or manual valves in accordance with § 195.258(c), the operator must notify
PHMSA at least 90 days iu advance of installation or use in accordance with § 195.452(m). The operator must include
a technical and safety evaluation in its notice to PHMSA, including design, construction, and operating procedures for the alternative equivalent technology or manual valve. Operators installing manual valves must also demonstrate that installing an automatic shutoff valve, a remote-control valve, or eqnivalent technology in lieu of a manual valve would be economically, technically, or operationally infeasible. An operator may proceed to use the alternative equivalent technology or manual valves 91 days after submitting the notification nnless it receives a letter from the Associate Administrator of Pipeline Safety informing the operator that PHMSA objects to the proposed use of the alternative equivalent technology or manual valves or that PHMSA requires additional time to conduct its review.
16. In§ 195.420, paragraph (b) is revised and paragraphs (d), (e), and(!] are added to read as follows:
§ 195.420 Valve maintenance. • • • • • (b) Each operator must, at intervals uot exceeding 7½ months but at least twice each calendar yeB.l·, inspect each mainline valve to determine that it is functioning properly. Each valve installed under§ 195.258(c) or rnpture mitigation valve, as defined under § 195.418, must also be partially
operated as part of the inspection, • • • • •
Federal Register/Vol. 85, No. ZS/Thursday, February 6, 2020/Proposed Rules 7189
(d) For each valve installed nnder § 195.258(c) or onshore rupture mitigation valve identified under § 195.418 that is remote-control shut-off,
automatic shut-off, or that is based on alternative equivalent technology, the operator must conduct a point-to-point verification between SCADA displays and the mainline valve, sensors, and commnnications equipment in accordance with§ 195.446(c) and (e), or perform an equivalent verification.
(e) For each onshore rupture mitigation valve identified under § 195.418 that is to be manually or
locally operated:
(1) Operators must establish the 40- minute total response time as required by§ 195.418 through an initial drill and through periodic validation as required by paragraph (e)(2) of this section. Each phase of the drill response must be reviewed and the results documented to validate the total response time, including valve shut-off, as being less than or equal to 40 minutes.
(2) A rupture-mitigation valve within each pipeline system and within each operating or maintenance field work unit must be randomly selected for an annnal 40-minute total rosponse time validation drill simulating worst-case
conditions for that location to ensure compliance. The response drill must occur at least once each calendar year, with intervals not to exceed 15 months.
(3) If the 40-minnte maximum response time cannot he validated or achieved in the d.Till, the operator mnst revise response efforts to achieve
compliance with§ 195.418 no later than 6 months after the drill. Alternative valve shut-off measures must be in accordance with parngraph (f] of this section within 7 days of the drill.
(4) Based on the results of response time drills, the operator must include lessons learned in:
(i} Training and qualifications programs; and
(ii) Design, construction, testing, maintenance, operating, and emergency procedures manuals.
(iii) Any other areas identified hy the operator as needing improvement,
(f] Each operator must take remedial measures to correct any onshore valve installed under§ 195.258(c) or rupture mitigation valve identified under § 195,418 that is found inoperable or unable to maintain shut-off as follows:
(1) Repair or replace the valve as soon as practicable but no later than 6 months after the finding; and
(2) Designate an alternative compliant valve within 7 calendar days of the finding while repairs are being made. Repairs must be completed within 6 months. ■17. In§ 195.452, paragraph (i)(4) is revised to read as follows:
§ 195.452 Pipeline integrity management in high consequence areas. • • • • • (i)* * * (4) Emergency Flow Restricting Devices (EFRD). If an operator determines that an EFRD is needed on a pipeline segment to protect a high consequence area in the event of a hazardous liquid pipeline release, an operator must install the EFRD. In making this determination, an operator mnst, at least, consider the following factors-the swiftness of leak detection and pipeline shntdown capabilities, the type of commodity carried, the rate of potential leakage, the volume that can be released, topography or pipeline profile, the potential for ignition,
proximity to power sources, location of nearest response personnel, specific terrain between the pipeline segment and the high consequence area, and benefits expected by reducing the spill size.
(i) Where EFRDs are installed to protect HCAs on all onshore pipelines
with diameters of 6 inches or greater and that are placed into service or that have had 2 or more contignous miles of pipe replaced after [insert date 12 months after effective date of this rule], the location, installation, actuation, operation, and maintenance of snch EFRDs (including valve actuators, personnel response, operational control centers, SCADA, communications, and procedmes) must meet the design, operation, testing, maintenance, and rupture mitigation requirements of §§ 195.258, 195.260, 195.402, 195.418,
and 195.420.
(ii) The EFRD analysis and assessments specified in paragraph (i)(4)
of this section must be completed prior to placing into service all onshore pipelines with diameters of 6 inches or greater and that are constrncted or that have had 2 01' more contiguous miles of pipe replaced after [insert date 12 months after effective date of this rule].
Implementation of EFRD findings for rupture-mitigation valves must meet § 195.418. • • • • •
Issued in Washington, DC on January 23, 2020, undor authority delegated in 49 CFR part 1.97. Alan I<. Mayberry,
Associate Administratorfor Pipeline Safety.