Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

East Goshen Township Pipeline Task Force Meeting Agenda

Thursday, June 25, 2020

5:00PM

During this tele-conference Pipeline Task Force Meeting, public comment will be handled as follows:

• Participants are asked to call in by 4:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting. • The public will be muted during the meeting when the Task Force is talking. • The public will be unmuted and given an opportunity to comment and ask questions during the Public Comment period. • Participants wishing to comment must state their name and must speak one at a time.

I. Call to Order

2. Pledge of Allegiance / Moment of Silence

3. Ask if anyone is recording the meeting

4. Approval of Minutes May 28, 2020

5. Public Comment

6. Chairperson's Report

7. Reports

a.

Legislative Update if applicable

b.

Current Pipeline Events Impacting East Goshen

8. Old Business a. PennEast -Adelphia Project

9. New Business a. Pipeline Noise as Public Nuisance

10. Any Other Matter

11. Correspondence

12. Adjournment

F:\Data\Shared Data\Agendas\Pipeline\2020\2020-06-ZS_Pipeline Task Force Agenda.docx

1 PIPELINE TASK FORCE MEETING 2 THURSDAY, MAY 28, 2020 3 DRAFT MINUTES 4 5 Members Present: 6 Caroline Hughes, Chair; Bill Wegemann, Vice Chair; Members: Judi Difonzo; Christina 7 Morley, Gerry Sexton 8 9 Others Present 10 · David Shuey, Liaison, Township Supervisor; Rick Smith, Township Manager, Josh Maxwell, 11 Chester County Commissioner; Eve Miari, Clean Air Council; Melissa DiBernardino, Russ 12 Frank, Dianna Masha 13 14 COMMON ACRONYMS:

15

BOS

CCATO DEP

EGT EGSEA HDD JR MEI ME2 PHMSA PUC

TF

Board of Supervisors

Chester County Association of Township Officials Deportment of Environmental Protection

East Goshen Township East Goshen Safety and Environmental Advocates Horizontal Directional Drilling Inadvertent Return Mariner East I Mariner East 2 Pipeline Hazard Materials and Safety Administration Public Utility Commission

Task Force

16 Call to Order & Pledge of Allegiance 17 Caroline called the meeting to order at 5:01 p.m. and Christina led the Pledge of Allegiance. 18 19 Moment of Silence 20 Caroline called for a moment of silence to honor our first responders, those that have 21 fallen in service and those fighting this pandemic. 22 23 Recording 24 Susan reported that she was recording to the cloud. 25 26 Chairperson Report 27 Caroline outlined the topics for discussion: 28 2 recent announcements: 29 o Sunoco's announcement that the 16-inch line is now active. 30 o PennEast has teamed up with Adelphia. 31 A Rolling Stone Article regarding how a local municipality in Pennsylvania was able

32 to get the DEP to revoke a permit for an injection well. She stated that an 33 opportunity for a joint effort could now exist for the Township's Pipeline TF and 34 Sustainability Advisory Committee. 35

May 28, 2020 1

1 State Impact Article regarding how the Revolution pipeline explosion in Beaver 2 County resulted in a huge fine for Energy Transfer. DEP has also uncovered 3 hundreds of new violations. 4 PUC Press Release regarding a new settlement in Morgantown and an open 5 comment period. 6 7 Adelphia/PennEast 8 Caroline introduced Eve Miari from the Clean Air Council to discuss the 9 Adelphia/PennEast Topic. She stated that there are residents in East Goshen with 10 easement agreements with Adelphia that could be impacted. 11 12 Eve provided background on the PennEast project explaining that it was to start in the 13 Poconos and head east into New Jersey (NJ). However, the NJ DEP rejected the application 14 and PennEast cannot move forward with their original plan. PennEast has proposed a 15 modification that would interconnect with Adelphia. 16 17 David asked if methane gas will still be transferred and if there are any new pipes being 18 introduced. 19 20 Eve confirmed that it is methane and that she is not aware of any changes to Adelphia. She 21 added that PennEast is a new 36-inch pipeline - compared to Adelphia which is 18 inches. 22 She continued that the pipelines are to interconnect east of Bethlehem. 23 24 David stated that EGT's easement only permits the exiting 20-inch pipe; no new pipes can 25 be added, and the contents are restricted to methane. 26 27 Eve stated that there is a possibility that if the New Jersey pipeline is null/void, Penn East 28 may look to expand the Adelphia pipeline. The group discussed the pressure of the 2 29 pipelines and their different sizes and valve stations. 30 31 Eve stated that the communities in North Eastern PA have been actively against the 32 PennEast pipeline for the last 5 years. They have signed municipal and county resolutions 33 of concern. She continued that these communities could use support from those that live 34 along Adelphia. She stated that the council is trying to educate the surrounding 35 community. 36 37 Eve explained the permits were denied to PennEast in NJ. There is a lot of conservation 38 and preserved land in this area. These townships banded together and would not sign the 39 easement agreements. They also signed resolutions of concern. These actions caused the 40 permit to be blocked. 41 42 Christina raised the question if townships and counties should issue resolutions opposing 43 PennEast connecting to Adelphia. Eve stated that there is no formal DEP public comment 44 period. However, the council has sent comments to DEP anyway. She encouraged the 45 Township to send comments if they have concerns. 46

May 28, 2020 2

1 David explained that the Township's current perspective with Adelphia is that there are 2 no new excavation plans. The Township has the valve station on Paoli Pike that will be 3 converted to blowdown. Before the BOS can sign a resolution, they will need to know what 4 will change to the existing pipeline. 5 6 The group discussed the environmental concerns that pipelines have on the environment 7 and the number of blowdowns in Chester County. 8 9 Commissioner Maxwell explained that an energy committee for the county held their first 10 meeting today (5/28/20). They will be the conduit for environmental policy for county 11 discussion including how environmental ordinances could help in making things more 12 difficult for the pipeline industry. Caroline asked Commissioner Maxwell if the EGT Pipeline 13 TF could help the County task force. He stated that he would check with them. 14 15 Eve concluded by telling the group to let her know if the Council can help in any way e.g. 16 DEP comments/ township ordinances. 17 18 Rick stated that if PennEast and Adelphia proposed any changes to the DEP, the Township 19 would have been notified. 20 21 David stated he has the following questions: 22 1. Any new construction or integrity issues 23 2. What is the impact on EGT's valve station 24 3. What capacity changes are being proposed and what is the volume and the pressure 25 of existing proposals 26 27 Caroline made a motion recommending that the BOS send a letter to DEP for clarification 28 regarding the proposal between PennEast and Adelphia. Bill seconded the motion. The 29 motion passed unanimously. Rick asked that additional questions be forwarded to him, 30 and he will draft the letter for the June 9th agenda. 31 32 Public Comment 33 Russ Frank asked if the pipeline easement was written for only natural gas. Eve answered 34 that they include liquid petroleum and oil. Russ said he believes that hydrocarbon and 35 gasses are also included. He added that he believes Adelphia will be supplying power to 36 Liberty Power Company in Essington. 37 38 Diana Masha explained that Adelphia dissects her back yard. She asked what changes will 39 come of the PennEast /Adelphia project. 40 41 Melissa DiBernardino asked if there was an update on Boot Road by Paoli Pike. She 42 reported that there are divots and it seems to be deteriorating. 43 44 45 46

May 28, 2020 3

1 Reports 2 Current Pipeline Events Impacting East Goshen 3 Rick reported that the 16-inch line is now operational between West Whiteland Township 4 and Middletown Township. 5 Bill asked if there was product running presently? Rick answered yes and stated that the 6 new pipeline is connected to the existing pipeline. 7 8 Melissa Bernardino asked if the 12-inch line is no longer needed. Rick clarified that the 12- 9 inch line is still in operation in Uwchlan and Upper Uwchlan but not in East Goshen. Rick 10 will get further clarity on what is happening with the 12-inch pipeline in East Goshen. 11 12 Bill expressed concerned that they are actively drilling next to a line that is running product. 13 14 Caroline commented that the information sent out by the township needs to be directed to 15 the average resident. She asked how the Pipeline TF can help. Rick stated that the website 16 will be updated, a map will be added along with a link for safety information. 17 18 Bill asked when will Sunoco be finished. Rick stated that the longest part that is left is from 19 Bow Tree to Saints Simon and Jude Church; and that will be complete by January 2021. 20 21 Christina stated that she hopes her Right-To-Know request is rescheduled so she can 22 review the Bow Tree documents. 23 24 Easement Renewals 25 Caroline indicated that residents in EGT are currently undergoing easement renewals at 26 this time. These agreements are not on the same timeline. There was discussion what, if 27 anything, the Township can do for owners who have issues. Rick stated that they need to 28 seek legal advice. 29 30 PUC Press Release 31 Caroline explained that there is another comment period with the PUC and Sunoco on the

32

Morgantown leak and the life study of MEL Since this period is a 10-day window, a 33 recommendation to the BOS could not be made. It was suggested that members submit 34 their own comments. Caroline will send a link to the press release to the group. 35 36 Legislative Update 37 Bill stated that he has emailed the offices of Representative Carolyn Committa, Senators 38 Andy Dinniman and Tom Killion asking for any updates to share for this meeting. Bill 39 reported that Rep. Committa informed him that she was in contact with Joe McGinn and 40 that Joe would contact Bill directly. Shannon Royer from Rep. Killian's office informed Bill 41 that Rep Killion provided testimony to PUC in reference to the Flynn vs. PUC Sunoco 42 complaint back in January. Killian's Pipeline Safety Bill remains to be approved by the 43 senate. This bill would have passed earlier if not for the pandemic. That would have been 44 the first one to have passed. Their office is closely monitoring the progress by the PUC and 45 safety rulemaking process. 46

May 28, 2020 4

1 David asked ifthere is an update on PUC rulemaking. Rick explained that this process 2 takes a while. 3 4 Old Business 5 PHMSA comment update 6 Due to COVID-19, the BOS did not meet to submit public comment to PHMSA regarding 7 their proposal to its regulations concerning natural gas and hazardous liquid pipelines. 8 Caroline reported that, at Gerry's suggestion, she submitted the comments on behalf of the 9 EGT Pipeline TF. 10 11 Gerry reported that he could not find Caroline's comments online. 12 13 Approval of Minutes 14 The minutes from February 27, 2020, were unanimously approved. 15 16 Adjournment 17 The meeting was adjourned at 7:00 p.m. 18 19 The next meeting is Thursday, June 25, 2020, at 5:00 pm via Zoom 20 21 Respectfully submitted, 22 Susan D'Amore 23 24 F:\Data\Shared Data\Minutes\Pipeline Task Force\2020\Pipeline TF Mins 05-28-20 DRAFT.docx

May 28, 2020 5

HDD

460

461 471 490 500 501 520/530

ESTIMATED SUNOCO PIPE INSTALLATION

Segment Length Method

Fire House (WGT) to Wellington Entrance 3391 HDD Wellington Entrance to Giant Entrance 1125 Open Cut Giant Entrance to Quaker Village 882 HDD Quaker Village to Goshen Exe Ctr 3730 HDD Goshen Exe Ctr to New Kent 2970 HDD New Kent to Bow Tree 2140 HDD Bow Tree to Bow Tree Drive 975 HDD Bow Tree Drive to St Simon & Jude (WT) 6943 HDD

Total 22156 Percentage

HDD 461- Pull back expected to occur in mid-July.

HDD 471 - Mobilize equipment in mid-July with pull back in December.

HDD 500 - Pull back expected to occur at the end of July

HDD520/530 - Pull back expected to occur at the end of January 2021.

F:\Data\Shared Data\Admin Dept\Sunoco\HDD Plans\Sunoco Pipe Installation 061920.xlsx

6/19/20

20 inch pipe 16 inch pipe

Status Installed Status Installed completed 3391 completed 3391 completed 1125 completed 1125 completed 882 completed 3730 completed 2970 completed 2970 completed 2140 completed 975 completed 975 completed 6943 5/29/20 in 8461 service 22156 38.19% 100.00%

Sheet 1

610-69,'2-71?1""

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY June 10, 2020 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Kevin White, P.E. Environmental Group Manager Pennsylvania Department of Environmental Protection Regional Permit Coordination Office 2 Public Square Wilke-Barre, PA 18701-1915

Re: PennEast Pipeline Company, LLC Project Phasing request dated January 30, 2020

Dear Mr. White:

PennEast Pipeline has a certificate from FERC to install a natural gas pipeline in the northeastern part of Pennsylvania. In January they submitted an application to FERC (Docket CP20-47) to amend this certificate to allow for interconnections with the Columbia Gas Pipeline and the Adelphia Pipeline. The Adelphia Pipeline bisects East Goshen Township and it also recently received a certificate from FERG.

On January 30, 2020 PennEast submitted a request to amend the existing joint permit application they have pending with PA DEP.

Concerns have been expressed about how these interconnections would impact the Adelphia Pipeline. The Board of Supervisors discussed this matter at their meeting on June 9, 2020 and directed me to submit the followings questions to PA DEP for a response.

1) It is important for us, as a Township to understand the impact the connection of PennEast to Adelphia will have. So that we may convey this information to our residents from a trusted, reliable source, please explain in detail what effects PA DEP expects to see from this newly proposed modification.

2) The Environmental Assessment conducted for the Adelphia Gateway project in January 2019 did not reflect the now-proposed addition of the PennEast Pipeline. Will the PA DEP now require a revised Environmental Assessment that includes the newly proposed route and will that assessment be made available to the public (for comments)?

3) In Pennsylvania the number of drilled wells exceeds the capacity to transport. Connecting PennEast and Adelphia would increase transport capacity and could potentially bring more wells online to fill the expanded infrastructure. If PA DEP approves this revised project, please explain how this action aligns with the Commonwealth's, the Governor's, and the PA DEP's Climate Action Plan and stated goals of reducing Greenhouse Gas Emissions by 26% by 2025 and 80% by 2050 - the two appear incompatible.

4) Our small township (East Goshen) will soon have 11 pipelines running through it. Will the PA DEP begin considering the very real issue of pipeline saturation as a factor when evaluating permits and routes? While the environmental effects of one pipeline in a specific area is evaluated during a permitting process, what is lost is the degradation over time of a geographic area that repeatedly suffers from the loss of mature trees, cleared vegetation, repeated runoff and flooding due to years of ongoing construction. This inability to recover between projects results in a much higher level of environmental deterioration than that which is captured in a single environmental assessment that narrowly focuses on the effects of just one project. How does the PA DEP evaluate the comprehensive environmental impact of its permitted projects?

5) As a result of this request will PA DEP require PennEast to submit a complete new application and essentially restart the approval process?

Sincerely,

L1:t5:

1 Township Manager

F:\Data\Shared Data\Admin Dept\Penn East\Comments 061020.docx