Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Pipeline\2024\2024-11-14 Pipeline Task Force Agenda v1.docx

East Goshen Township Pipeline Task Force Meeting Agenda

Thursday, November 14, 2024 East Goshen Township Building

7:00 PM Join Zoom Meeting

Link: https://us02web.zoom.us/j/81668580718 Dial In Number: 1 929 205 6099 Meeting ID: 816 6858 0718

1. Call to Order (7:00 PM)

2. Ask if anyone is recording the meeting

3. Approval of Minutes (7:05 PM to 7:10 PM) October 10, 2024

4. Public Comment (7:10 PM to 7:15 PM)

5. Chairperson’s Report (7:15 PM to 7:25 PM)

6. Old Business (7:25 PM to 8:30 PM) a. Hydrogen pipelines.

- Research regarding proposed setback distances. - Draft ordinance revisions. - Path forward. b. La Porte pipeline fire.

- Regulations regarding requirements for protective/safety equipment around above-

ground infrastructure on pipelines.

7. New Business (8:30 PM to 9:05 PM) a. Zoom meeting precautions. b. PTF in 2025.

8. Reports / Legislative Update (9:05 PM to 9:15 PM)

9. Liaison Reports (9:15 PM to 9:25 PM) a. CC-PSAB Meeting 10/24/2024 (Judi).

10. Correspondence / Any Other Matter (9:25 PM to 9:30 PM)

11. Next Meeting Meeting schedule for 2025 to be determined.

12. Adjournment (9:30 PM)

October 10, 2024 1

PIPELINE TASK FORCE 1 Thursday October 10, 2024 2 East Goshen Township Building 3 DRAFT MINUTES 4 5 6 Members Present are highlighted 7 Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo, John 8 McDonough 9 10 Others Present are highlighted 11 Township Supervisor: Barbara Emery; Township Manager: Derek Davis; 12 Office Administrator: Ashley Nowak; Nathaniel Smith (West Chester Resident-via 13 Zoom) 14 15 COMMON ACRONYMS: 16

17 Call to Order 18 Gerry called the meeting to order at 7:01pm. 19 20 Recording 21 The meeting was not being recorded. 22 23 24

ACOE Army Core of Engineers BI&E BOS

Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission

October 10, 2024 2

1 Approval of Minutes 2 The minutes from the September 12, 2024 meeting were unanimously approved. 3 4 Public Comment 5 None. 6 7 Chairperson’s Report 8 Gerry noted that West Whiteland Township recently adopted a carbon dioxide pipeline 9 ordinance that is very similar to the one in EGT. 10 11 Old Business 12 Hydrogen Pipelines 13 Continued discussion of this topic including our latest findings. So far, few existing 14 regulations and guidelines specific to hydrogen pipelines have been identified. The group 15 reviewed a first draft of a proposed ordinance and an appendix. Barbara suggested that 16 wording be added to the subsection on material of construction for hydrogen pipelines in 17 the draft ordinance to better explain why hydrogen embrittlement is a critical issue. This 18 comment will be addressed in the next draft. The use of permits to regulate hydrogen 19 pipelines in the township was discussed. It is felt that an ordinance could serve as the 20 basis for any future permitting requirements. The group agreed that we need to do some 21 more research on proposed setback distances. We are looking for justifications or 22 examples already in practice. 23 24 PTF Article for Spring 2025 EGT Newsletter 25 The revised deadline is 10/29/2024. The topic will be a recap of our accomplishments for 26 this year and our goals for next year. Gerry will email a draft to the PTF by 10/16/2024. 27 Comments are due to Gerry by 10/21/2024. [PMN: All of these tasks were completed and 28 the article was emailed to Jessica Wilhelmy and Ashley Nowak on 10/24/2024.] 29 30 New Business 31 Pipeline fire in La Porte Texas 32 The group discussed a summary of this incident that Gerry prepared and emailed on 33 09/22/2024. There are many features of this La Porte pipeline that are similar to those 34 for pipelines in EGT. Mary will research regulations regarding the requirement for 35 protective/safety equipment around above-ground infrastructure (like valve stations) on 36 pipelines. These regulations could be at the federal, state, or local level. 37 38 Reports / Legislative Update 39 40 Insert summary of Mary’s email interactions with Chester County Commissioner Josh 41 Maxwell. 42 43 Liaison Reports 44 None. 45 46

October 10, 2024 3

Correspondence / Any Other Matter 1 None. 2 3 Next meeting 4 The next meeting is scheduled for Thursday November 14, 2024 at 7:00pm. 5 6 Adjournment 7 The meeting was adjourned at 8:52 pm. 8 9 Respectfully submitted, 10 Gerald Sexton, Chair East Goshen Pipeline Task Force 11 12 F:\Data\Shared Data\Minutes\Pipeline Task Force\2024\Pipeline TF Mins 10-10-2024 DRAFT v1.docx 13