Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Pipeline\2025\2025-01-21 Pipeline Task Force Agenda v1.docx

East Goshen Township Pipeline Task Force Meeting Agenda

Tuesday, January 21, 2025 East Goshen Township Building

10:00 AM Join Zoom Meeting

Link: https://us02web.zoom.us/j/81293249195 Dial In Number: 1 929 205 6099 Meeting ID: 812 9324 9195

1. Call to Order (10:00 AM)

2. Ask if anyone is recording the meeting

3. Approval of Minutes (10:05 AM to 10:10 AM) a. October 10, 2024 and November 14, 2024

4. Public Comment (10:10 AM to 10:15 AM)

5. Chairperson’s Report (10:15 AM to 10:30 AM)

6. Old Business (10:30 AM to 11:15 AM) a. Hydrogen pipelines.

- Research regarding proposed setback distances. - Path forward. b. La Porte pipeline fire.

- Regulations regarding requirements for protective/safety equipment around above-

ground infrastructure on pipelines. - Response from PHMSA to info request by Mary.

7. New Business (11:15 AM to 11:45 AM) a. Protection of Williams natural gas valve station on Paoli Pike from vehicle strike.

- Follow up from discussion at 11/19/2024 BOS meeting. b. Spotlight PA article on ME2 project permitting. c. Watersheds (Info from Judi).

8. Reports / Legislative Update (11:45 PM to 11:50 AM) a. Resolution on carbon tax - H.Con.Res.86 of the 118th Congress (Info from Mary).

9. Liaison Reports (11:50 AM to 11:55 AM) a. CCEA Meeting 01/11/2025 (Judi).

10. Correspondence / Any Other Matter (11:55 AM to 12:00 PM)

11. Next Meeting Meeting scheduled for Tuesday March 18, 2025 at 10:00 AM.

12. Adjournment (12:00 PM)

October 10, 2024 1

PIPELINE TASK FORCE 1 Thursday October 10, 2024 2 East Goshen Township Building 3 DRAFT MINUTES 4 5 6 Members Present are highlighted 7 Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo, John 8 McDonough 9 10 Others Present are highlighted 11 Township Supervisor: Barbara Emery; Township Manager: Derek Davis; 12 Office Administrator: Ashley Nowak; Nathaniel Smith (West Chester Resident-via 13 Zoom) 14 15 COMMON ACRONYMS: 16

17 Call to Order 18 Gerry called the meeting to order at 7:01pm. 19 20 Recording 21 The meeting was not being recorded. 22 23 24

ACOE Army Core of Engineers BI&E BOS

Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission

October 10, 2024 2

1 Approval of Minutes 2 The minutes from the September 12, 2024 meeting were unanimously approved. 3 4 Public Comment 5 None. 6 7 Chairperson’s Report 8 Gerry noted that West Whiteland Township recently adopted a carbon dioxide pipeline 9 ordinance that is very similar to the one in EGT. 10 11 Old Business 12 Hydrogen Pipelines 13 Continued discussion of this topic including our latest findings. So far, few existing 14 regulations and guidelines specific to hydrogen pipelines have been identified. The group 15 reviewed a first draft of a proposed ordinance and an appendix. Barbara suggested that 16 wording be added to the subsection on material of construction for hydrogen pipelines in 17 the draft ordinance to better explain why hydrogen embrittlement is a critical issue. This 18 comment will be addressed in the next draft. The use of permits to regulate hydrogen 19 pipelines in the township was discussed. It is felt that an ordinance could serve as the 20 basis for any future permitting requirements. The group agreed that we need to do some 21 more research on proposed setback distances. We are looking for justifications or 22 examples already in practice. 23 24 PTF Article for Spring 2025 EGT Newsletter 25 The revised deadline is 10/29/2024. The topic will be a recap of our accomplishments for 26 this year and our goals for next year. Gerry will email a draft to the PTF by 10/16/2024. 27 Comments are due to Gerry by 10/21/2024. [PMN: All of these tasks were completed and 28 the article was emailed to Jessica Wilhelmy and Ashley Nowak on 10/24/2024.] 29 30 New Business 31 Pipeline fire in La Porte Texas 32 The group discussed a summary of this incident that Gerry prepared and emailed on 33 09/22/2024. There are many features of this La Porte pipeline that are similar to those 34 for pipelines in EGT. Mary will research regulations regarding the requirement for 35 protective/safety equipment around above-ground infrastructure (like valve stations) on 36 pipelines. These regulations could be at the federal, state, or local level. 37 38 Reports / Legislative Update 39 Mary reported that she emailed Chester County Commissioner Josh Maxwell in October to 40 express concern regarding potential damage to pipelines as a result of extreme flooding. 41 In his response, Commissioner Maxwell cited the Pipeline Incident Annex being 42 developed by the Chester County Department of Emergency Services. He also mentioned 43 current work on a flood mitigation plan for the entire Brandywine watershed. The intent 44 of this plan is to expand the capacity of retention basins and dams. 45 46

October 10, 2024 3

Liaison Reports 1 None. 2 3 Correspondence / Any Other Matter 4 None. 5 6 Next meeting 7 The next meeting is scheduled for Thursday November 14, 2024 at 7:00pm. 8 9 Adjournment 10 The meeting was adjourned at 8:52 pm. 11 12 Respectfully submitted, 13 Gerald Sexton, Chair East Goshen Pipeline Task Force 14 15 F:\Data\Shared Data\Minutes\Pipeline Task Force\2024\Pipeline TF Mins 10-10-2024 DRAFT v2.docx 16

November 14, 2024 1

PIPELINE TASK FORCE 1 Thursday November 11, 2024 2 East Goshen Township Building 3 DRAFT MINUTES 4 5 6 Members Present are highlighted 7 Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo, John 8 McDonough 9 10 Others Present are highlighted 11 Township Supervisor: Barbara Emery; Township Supervisor: Michele Truitt; 12 Township Manager: Derek Davis; Office Administrator: Ashley Nowak 13 14 COMMON ACRONYMS: 15

16 Call to Order 17 Gerry called the meeting to order at 7:00pm. 18 19 Recording 20 The meeting was not being recorded. 21 22 23 24

ACOE Army Core of Engineers BI&E BOS

Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission

November 14, 2024 2

Approval of Minutes 1 The draft minutes for the meeting on 10/10/2024 need some additional editing. They 2 will be reviewed and approved at the next meeting. 3 4 Public Comment 5 None. 6 7 Chairperson’s Report 8 Gerry noted that October 8th was National Hydrogen and Fuel Cell Day. That date was 9 chosen because 10/08 is the same sequence of numbers as the atomic weight of 10 hydrogen, which is 1.008. 11 12 Gerry shared that the Center for Hydrogen Safety (CHS) announced that PHMSA joined as 13 a strategic partner. CHS is a global non-profit dedicated to promoting hydrogen safety 14 and best practices worldwide. Gerry intends to do more investigation of CHS to 15 determine if they have any information that could be useful to the PTF. 16 17 Gerry also shared an article on sequestering carbon in wood vaults. As is the case with 18 most new technologies, barriers to scaling up include permitting and funding. But the 19 simplicity of this methodology means implementation could be rapid. 20 21 Old Business 22 Hydrogen Pipelines 23 The group continues to work on a draft hydrogen pipeline ordinance. Proposed setback 24 distances from the pipelines were discussed. So far, it has been difficult to find 25 information that strongly supports a rationale for a specific setback value. More research 26 is needed. 27 28 La Porte Texas Pipeline Fire 29 Many features of the La Porte Texas pipeline are similar to those for pipelines in EGT. The 30 group discussed the four above-ground valve/meter stations in our township and 31 preventing an accident like the one in La Porte. The valve station on the Williams natural 32 gas pipeline south of Paoli Pike is the most vulnerable to a vehicle strike. Several means 33 of reducing this risk were discussed. Paoli Pike is a state road which is managed by 34 PennDOT. Michele will ask Derek to place this topic on the agenda for the next BOS 35 meeting on 11/19/2025 and Gerry will attend. 36 37 New Business 38 The group discussed what to do in the future if there is another Zoom-bombing issue like 39 the one that occurred at the October meeting. 40 41 John will not be continuing with the PTF in 2025 and will resign effective 11/30/2025. 42 The PTF thanked him for his service during the past two years. 43 44 Gerry proposed some changes regarding the PTF meeting schedule in 2025. He would 45 like to reduce the frequency of meetings and change the meeting time. He recommended 46

November 14, 2024 3

that the PTF meet every other month and during the day. The group agreed with this 1 proposal and gave suggestions for possible dates and times. [PMN: The group agreed to 2 meet at 10:00 am in the small conference room on the third Tuesday of odd numbered 3 months with the exception of May. Since 05/20/2025 is Primary Election Day, the PTF 4 will meet at 10:00 am on Monday 05/19/2025 (3rd Monday). This 2025 PTF meeting 5 schedule was approved by the BOS at their re-organization meeting on 01/06/2025.] 6 7 Reports / Legislative Update 8 Judy summarized the 10/24/2024 CC-PSAC meeting. She reported that there are two 9 table-top functional exercises planned for December. 10 11 Liaison Reports 12 None. 13 14 Correspondence / Any Other Matter 15 None. 16 17 Next meeting 18 The next meeting is scheduled for Tuesday, January 21, 2025 at 10:00am. 19 20 Adjournment 21 The meeting was adjourned at 8:44 pm. 22 23 Respectfully submitted, 24 Ashley Nowak, Office Administrator 25 26 F:\Data\Shared Data\Minutes\Pipeline Task Force\2024\Pipeline TF Mins 11-14-2024 DRAFT v2.docx 27