Pipeline Task Force
The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.
| Board Members | Term Expiration Date |
| Gerald Sexton, Chair | 2027 |
| Mary McCloskey, Vice Chair | 2028 |
| Judi DiFonzo | 2026 |
| David Shuey | 2028 |
| Vacant | 2027 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Documents
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
October 10, 2024 1
PIPELINE TASK FORCE Thursday October 10, 2024 East Goshen Township Building
FINAL MINUTES
Members Present are highlighted Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo, John McDonough Others Present are highlighted Township Supervisor: Barbara Emery; Township Manager: Derek Davis; Office Administrator: Ashley Nowak; Nathaniel Smith (West Chester Resident-via Zoom) COMMON ACRONYMS:
Call to Order Gerry called the meeting to order at 7:01pm. Recording The meeting was not being recorded.
ACOE Army Core of Engineers BI&E BOS
Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission
October 10, 2024 2
Approval of Minutes The minutes from the September 12, 2024 meeting were unanimously approved. Public Comment None. Chairperson’s Report Gerry noted that West Whiteland Township recently adopted a carbon dioxide pipeline ordinance that is very similar to the one in EGT. Old Business Hydrogen Pipelines Continued discussion of this topic including our latest findings. So far, few existing regulations and guidelines specific to hydrogen pipelines have been identified. The group reviewed a first draft of a proposed ordinance and an appendix. Barbara suggested that wording be added to the subsection on material of construction for hydrogen pipelines in the draft ordinance to better explain why hydrogen embrittlement is a critical issue. This comment will be addressed in the next draft. The use of permits to regulate hydrogen pipelines in the township was discussed. It is felt that an ordinance could serve as the basis for any future permitting requirements. The group agreed that we need to do some more research on proposed setback distances. We are looking for justifications or examples already in practice. PTF Article for Spring 2025 EGT Newsletter The revised deadline is 10/29/2024. The topic will be a recap of our accomplishments for this year and our goals for next year. Gerry will email a draft to the PTF by 10/16/2024. Comments are due to Gerry by 10/21/2024. [PMN: All of these tasks were completed and the article was emailed to Jessica Wilhelmy and Ashley Nowak on 10/24/2024.] New Business Pipeline fire in La Porte Texas The group discussed a summary of this incident that Gerry prepared and emailed on 09/22/2024. There are many features of this La Porte pipeline that are similar to those for pipelines in EGT. Mary will research regulations regarding the requirement for protective/safety equipment around above-ground infrastructure (like valve stations) on pipelines. These regulations could be at the federal, state, or local level. Reports / Legislative Update Mary reported that she emailed Chester County Commissioner Josh Maxwell in October to express concern regarding potential damage to pipelines as a result of extreme flooding. In his response, Commissioner Maxwell cited the Pipeline Incident Annex being developed by the Chester County Department of Emergency Services. He also mentioned current work on a flood mitigation plan for the entire Brandywine watershed. The intent of this plan is to expand the capacity of retention basins and dams.
October 10, 2024 3
Liaison Reports None. Correspondence / Any Other Matter None. Next meeting The next meeting is scheduled for Thursday November 14, 2024 at 7:00pm. Adjournment The meeting was adjourned at 8:52 pm. Respectfully submitted, Gerald Sexton, Chair East Goshen Pipeline Task Force C:\Users\Gerald\Documents\East Goshen Twp\Pipeline Projects\Pipeline Task Force\Meetings\Minutes\Pipeline TF Mins 10-10-2024 FINAL.docx