Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

January 21, 2025 1

PIPELINE TASK FORCE Tuesday January 21, 2025 East Goshen Township Building

FINAL MINUTES

Members Present are highlighted Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo Others Present are highlighted Township Supervisor: Barbara Emery; Township Supervisor: Michele Truitt; Township Manager: Derek Davis; Office Administrator: Ashley Nowak COMMON ACRONYMS:

Call to Order Gerry called the meeting to order at 10:02am. Recording The meeting was not being recorded.

ACOE Army Core of Engineers BI&E BOS

Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission

January 21, 2025 2

Approval of Minutes The minutes from the October 10, 2024 meeting were approved. The minutes from the November 14, 2024 meeting were approved with the correction of the date. Public Comment None. Chairperson’s Report Gerry noted that there was a special section on Carbon Footprint Reduction in the December 2024 edition of Chemical Engineering Progress Magazine. He shared an article from this section on Carbon Storage In Saline Formations. The deadline for the next township newsletter is 03/21/2025. Judi proposed a PTF article that consists of a matching game for residents using pictures and names of pipeline-related items. Everyone agreed this is a good idea. Judi will compile the necessary photos. We will finalize the article at our next meeting on 03/18/2025. Old Business Hydrogen Pipelines The group continues to work on a draft hydrogen pipeline ordinance. Judi shared an article on the Assessment of the Damage from Hydrogen Pipeline Explosions on People and Buildings. The article proposed a safe distance of 1000 meters to design a new pipeline network. The group agreed to continue researching specific setback values. La Porte Texas Pipeline Fire Mary reached out to PHMSA about regulations regarding the requirements for protective/safety equipment around above-ground infrastructures on pipelines. PHMSA referred her to Title 49 CFR Parts 190 - 199. The group is currently reviewing these documents. They are extensive and complicated, so this will take some time to complete. It was suggested to reach out to local legislators for their help in identifying applicable regulations. New Business Protection of Williams Natural Gas Valve Station on Paoli Pike from Vehicle Strike Gerry attended the BOS meeting on November 19, 2024 to present this topic. The board agreed that the addition of a guard rail along the south edge of the east-bound lane of Paoli Pike would be appropriate. Derek will work with PennDOT on this request. Ashley will follow up with Derek for an update. Spotlight PA Article on ME2 Project Permitting The group agreed that the PTF will not pursue further investigation of this matter. However, we will keep this issue in mind going forward. It serves as a good lesson learned regarding the need for transparency during the pipeline permitting process.

January 21, 2025 3

Watersheds Judi recently attended a presentation at West Chester University on local watersheds. Here are links to the watershed webpages that Judi shared. Map of Chester County Watersheds: https://www.chesco.org/DocumentCenter/View/7267/watersheds_of_chescoletteraug06?bidId= Chester, Ridley, and Crum Creek Watersheds Association: https://www.crcwatershedsorg/ East Goshen Township lies in the Chester Creek Watershed. The PTF has a common interest with the Conservancy Board and ESAC regarding waterways. This includes gaining a better understanding regarding the effects of flooding on buried pipelines. There is potential to work with these groups. Therefore, Gerry will add this to the list of things to do for the PTF. Reports / Legislative Update Resolution on Carbon Tax – H.Con.Res, 86 of the 118th Congress Mary shared this resolution. It was received in the Senate on 03/22/2024 and referred to the Committee on Finance. Liaison Reports CCEA Meeting Judi shared a summary of the CCEA Meeting on 01/11/2025. She advised the group that their next meeting will be Saturday 05/03/2025 in case Barbara would like to attend. Correspondence / Any Other Matter None. Next meeting The next meeting is scheduled for Tuesday, March 18, 2025 at 10:00am. Adjournment The meeting was adjourned at 12:04 pm. Respectfully submitted, Ashley Nowak, Office Administrator F:\Data\Shared Data\Minutes\Pipeline Task Force\2025\Pipeline TF Mins 1-21-2025 FINAL.docx